<?xml version="1.0" encoding="UTF-8"?>
<feed xmlns:georss="http://www.georss.org/georss" xmlns="http://www.w3.org/2005/Atom">
<author>
<name>Bernie Burnett</name>
<email>bernie.burnett@vancouver.ca</email>
</author>
<contributor>
<name>Engineering Webmaster</name>
<email>engineering.webmaster@vancouver.ca</email>
</contributor>
<generator uri="http://www.safe.com/products/fme/index.php" version="2021.7.41.21607">FME(R) 2021.1.0.0</generator>
<id>urn:uuid:c3d84ad9-0af0-46d9-80e2-9e272e76092f</id>
<link href="http://vancouver.ca/streets-transportation/roadwork.aspx"/>
<logo>http://vancouver.ca/engsvcs/streets/roadwork/images/roadahead.gif</logo>
<rights>Copyright 2016, City of Vancouver</rights>
<subtitle>Media releases about roadwork affecting major routes in Vancouver.</subtitle>
<title>City of Vancouver Road Ahead Information</title>
<updated>2026-06-10T05:00:01-07:00</updated>
<entry>
<category term="Upcoming Project"/>
<content>Balaclava St - W King Edward Av to W 27th Av               Jul 2026 - Sept 2026 
Carvarnon St - W King Edward Av to W 27th Av              Aug 2026 - Sept 2026
W 27th Av - Carnarvon St to Quesnel Dr                         Sept 2026 - Oct 2026 
Location: 
Schedule: Jul 31, 2026 - Oct 6, 2026; All days; 7:00 AM - 3:00 PM</content>
<id>urn:uuid:c9f4b3e5-52a1-417c-ae58-5777682efa7c</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/4190b8ca-bcb0-40dd-a42d-c1589556110f"/>
<published>2026-04-02T07:00:00Z</published>
<title> Dunbar Southland East</title>
<updated>2026-05-28T19:09:32.0903191Z</updated>
<georss:line>49.25002238427962 -123.1729698140242 49.24798049164119 -123.1729698140242</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Balaclava St - W King Edward Av to W 27th Av               Jul 2026 - Sept 2026 
Carvarnon St - W King Edward Av to W 27th Av              Aug 2026 - Sept 2026
W 27th Av - Carnarvon St to Quesnel Dr                         Sept 2026 - Oct 2026 
Location: 
Schedule: Jul 31, 2026 - Oct 6, 2026; All days; 7:00 AM - 3:00 PM</content>
<id>urn:uuid:57d7c769-3e1d-49ee-95da-75a2025f409e</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/4190b8ca-bcb0-40dd-a42d-c1589556110f"/>
<published>2026-04-02T07:00:00Z</published>
<title> Dunbar Southland East</title>
<updated>2026-05-28T19:09:32.0903191Z</updated>
<georss:line>49.24798049164119 -123.17295417387994 49.24803153998636 -123.17032662964334</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Balaclava St - W King Edward Av to W 27th Av               Jul 2026 - Sept 2026 
Carvarnon St - W King Edward Av to W 27th Av              Aug 2026 - Sept 2026
W 27th Av - Carnarvon St to Quesnel Dr                         Sept 2026 - Oct 2026 
Location: 
Schedule: Jul 31, 2026 - Oct 6, 2026; All days; 7:00 AM - 3:00 PM</content>
<id>urn:uuid:56aa48ee-ab0d-477a-9f8a-5bfe472f367f</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/4190b8ca-bcb0-40dd-a42d-c1589556110f"/>
<published>2026-04-02T07:00:00Z</published>
<title> Dunbar Southland East</title>
<updated>2026-05-28T19:09:32.0903191Z</updated>
<georss:line>49.25002527414483 -123.1756791703777 49.24800566958365 -123.17572494932455</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Fir St - W 3rd Av to W 6th Av
Location: Fir St - W 3rd Av to W 6th Av
Schedule: Jan 1, 2027 - Dec 31, 2027</content>
<id>urn:uuid:2d84dab4-b021-4f4f-bef0-e18df7652cc5</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a0aca0a0-6aac-49b3-8180-cf3db9151e3d"/>
<published>2025-11-27T08:00:00Z</published>
<title> Fir St - W 3rd Av to W 6th Av</title>
<updated>2026-05-27T01:01:03.7204173Z</updated>
<georss:line>49.26881927499167 -123.14084641026062 49.266221953474 -123.14092687653103</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Granville Bridge South Approach &amp; Ramps Rehabilitation Project


Location: Fir St  Off-Ramp
Schedule: Aug 26, 2025 - Dec 15, 2025</content>
<id>urn:uuid:aa6226a6-c5dc-42f3-8fce-2ea93870bc08</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca55b5ab-70e3-4c32-b39c-47b09e49c257"/>
<published>2025-03-07T08:00:00Z</published>
<title> GBSAR Ph 1 Fir St Off-Ramp</title>
<updated>2025-11-06T15:46:51.5852301Z</updated>
<georss:line>49.26853242075305 -123.13947926712845 49.2684474601983 -123.13961406802444 49.26840019555567 -123.13968424522147 49.26836625485896 -123.13973781357743 49.268332672516976 -123.13977769191911 49.268298406977294 -123.13981719713613 49.26827230956508 -123.13984142617718 49.26824346402839 -123.13986944129614 49.26822256701956 -123.13988525874544 49.268195173881566 -123.1399023911659 49.268170760139554 -123.13991788248563 49.268146167274466 -123.1399327272269 49.268121413276816 -123.13994692544148 49.26809650717527 -123.13996044966386 49.26807143997502 -123.13997329986958 49.26804623864504 -123.13998548988164 49.26802089420701 -123.13999700592976 49.26799542465156 -123.14000784806575 49.26796983899061 -123.14001800257022 49.26593344494037 -123.14057127415737 49.26586212409319 -123.14059909811574 49.265775380537235 -123.14063835542842 49.26566093426598 -123.14069769804809 49.26555599460468 -123.14075809832302 49.265485813165355 -123.14079571158697 49.26542848764359 -123.14082448197873 49.26534440681124 -123.14086355370237 49.265245073948506 -123.1409068428391 49.2651867761046 -123.1409289026027 49.26515273425042 -123.1409395542852 49.265097423728974 -123.14095348541629 49.265057691817304 -123.1409609320074 49.26496770160216 -123.14097009098958 49.26454852612369 -123.14098392003156</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Concrete renewal and repaving works on Nanaimo St, Broadway to West 12th (South Grandview Highway)
Location: 
Schedule: Mar 17, 2025 - Apr 30, 2025</content>
<id>urn:uuid:aecb84c9-7606-4d2d-ab3e-de34852d1a28</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/216ca79a-8d80-4f9b-ac3a-ae2aaefddfc8"/>
<published>2025-03-14T07:00:00Z</published>
<title> Nanaimo St, Broadway to W 12th - Street Renewal</title>
<updated>2025-03-18T19:09:51.3078939Z</updated>
<georss:line>49.26008834129976 -123.05660498788315 49.25962023911683 -123.05660588185137</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Concrete renewal and repaving works on Nanaimo St, Broadway to West 12th (South Grandview Highway)
Location: 
Schedule: Mar 17, 2025 - Apr 30, 2025</content>
<id>urn:uuid:fce5206b-e36f-4abd-b268-7ff3195b5062</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/216ca79a-8d80-4f9b-ac3a-ae2aaefddfc8"/>
<published>2025-03-14T07:00:00Z</published>
<title> Nanaimo St, Broadway to W 12th - Street Renewal</title>
<updated>2025-03-18T19:09:51.3078939Z</updated>
<georss:line>49.26008834129976 -123.05660498788315 49.25962023911683 -123.05660588185137</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Concrete renewal and repaving works on Nanaimo St, Broadway to West 12th (South Grandview Highway)
Location: 
Schedule: Mar 17, 2025 - Apr 30, 2025</content>
<id>urn:uuid:6658fc33-a49a-4ea0-8981-694bfcf278b4</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/216ca79a-8d80-4f9b-ac3a-ae2aaefddfc8"/>
<published>2025-03-14T07:00:00Z</published>
<title> Nanaimo St, Broadway to W 12th - Street Renewal</title>
<updated>2025-03-18T19:09:51.3078939Z</updated>
<georss:line>49.2603662125758 -123.05660446731747 49.26008834129976 -123.05660498788315</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Concrete renewal and repaving works on Nanaimo St, Broadway to West 12th (South Grandview Highway)
Location: 
Schedule: Mar 17, 2025 - Apr 30, 2025</content>
<id>urn:uuid:a76dbc2b-5fb3-449a-aba4-11e3f8f15022</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/216ca79a-8d80-4f9b-ac3a-ae2aaefddfc8"/>
<published>2025-03-14T07:00:00Z</published>
<title> Nanaimo St, Broadway to W 12th - Street Renewal</title>
<updated>2025-03-18T19:09:51.3078939Z</updated>
<georss:line>49.26055632650687 -123.05660409376804 49.2603662125758 -123.05660446731747</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Concrete renewal and repaving works on Nanaimo St, Broadway to West 12th (South Grandview Highway)
Location: 
Schedule: Mar 17, 2025 - Apr 30, 2025</content>
<id>urn:uuid:99843572-784f-4e17-9f20-aab796b0a04d</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/216ca79a-8d80-4f9b-ac3a-ae2aaefddfc8"/>
<published>2025-03-14T07:00:00Z</published>
<title> Nanaimo St, Broadway to W 12th - Street Renewal</title>
<updated>2025-03-18T19:09:51.3078939Z</updated>
<georss:line>49.26102500430656 -123.05660320043201 49.26055632650687 -123.05660409376804</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Concrete renewal and repaving works on Nanaimo St, Broadway to West 12th (South Grandview Highway)
Location: 
Schedule: Mar 17, 2025 - Apr 30, 2025</content>
<id>urn:uuid:ca962113-46b1-4faa-b922-0513fbc17ce5</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/216ca79a-8d80-4f9b-ac3a-ae2aaefddfc8"/>
<published>2025-03-14T07:00:00Z</published>
<title> Nanaimo St, Broadway to W 12th - Street Renewal</title>
<updated>2025-03-18T19:09:51.3078939Z</updated>
<georss:line>49.261269908071455 -123.05660273835406 49.26102500430656 -123.05660320043201</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Concrete renewal and repaving works on Nanaimo St, Broadway to West 12th (South Grandview Highway)
Location: 
Schedule: Mar 17, 2025 - Apr 30, 2025</content>
<id>urn:uuid:5264f6d4-1ac7-49c7-a3fb-3c2cb60a4fd9</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/216ca79a-8d80-4f9b-ac3a-ae2aaefddfc8"/>
<published>2025-03-14T07:00:00Z</published>
<title> Nanaimo St, Broadway to W 12th - Street Renewal</title>
<updated>2025-03-18T19:09:51.3078939Z</updated>
<georss:line>49.26214932532875 -123.05660107778434 49.261269908071455 -123.05660273835406</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Concrete renewal and repaving works on Nanaimo St, Broadway to West 12th (South Grandview Highway)
Location: 
Schedule: Mar 17, 2025 - Apr 30, 2025</content>
<id>urn:uuid:8dd64eb9-fdd7-42dc-9fd3-ff67c5aa49e1</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/216ca79a-8d80-4f9b-ac3a-ae2aaefddfc8"/>
<published>2025-03-14T07:00:00Z</published>
<title> Nanaimo St, Broadway to W 12th - Street Renewal</title>
<updated>2025-03-18T19:09:51.3078939Z</updated>
<georss:line>49.258468761021845 -123.05660806947404 49.257769777915314 -123.05661029353121</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Concrete renewal and repaving works on Nanaimo St, Broadway to West 12th (South Grandview Highway)
Location: 
Schedule: Mar 17, 2025 - Apr 30, 2025</content>
<id>urn:uuid:7d92c915-a017-4dbf-96d5-5a4cd2d8b5e0</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/216ca79a-8d80-4f9b-ac3a-ae2aaefddfc8"/>
<published>2025-03-14T07:00:00Z</published>
<title> Nanaimo St, Broadway to W 12th - Street Renewal</title>
<updated>2025-03-18T19:09:51.3078939Z</updated>
<georss:line>49.259152550682046 -123.0566067625363 49.258468761021845 -123.05660806947404</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Concrete renewal and repaving works on Nanaimo St, Broadway to West 12th (South Grandview Highway)
Location: 
Schedule: Mar 17, 2025 - Apr 30, 2025</content>
<id>urn:uuid:c31406c0-de84-43a8-84d1-d633666d6a0c</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/216ca79a-8d80-4f9b-ac3a-ae2aaefddfc8"/>
<published>2025-03-14T07:00:00Z</published>
<title> Nanaimo St, Broadway to W 12th - Street Renewal</title>
<updated>2025-03-18T19:09:51.3078939Z</updated>
<georss:line>49.25946193225647 -123.05660618181965 49.259152550682046 -123.0566067625363</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Concrete renewal and repaving works on Nanaimo St, Broadway to West 12th (South Grandview Highway)
Location: 
Schedule: Mar 17, 2025 - Apr 30, 2025</content>
<id>urn:uuid:32397c4e-9f94-4d08-95e8-ff8e5af8acc3</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/216ca79a-8d80-4f9b-ac3a-ae2aaefddfc8"/>
<published>2025-03-14T07:00:00Z</published>
<title> Nanaimo St, Broadway to W 12th - Street Renewal</title>
<updated>2025-03-18T19:09:51.3078939Z</updated>
<georss:line>49.25962023911683 -123.05660588185137 49.25946193225647 -123.05660618181965</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Block party to celebrate National Indigenous Peoples day 200 Princess between Powell st and the alley north of E Cordova
Location: 200 princess between Powell st and the laneway south 
Schedule: Jun 19, 2026</content>
<id>urn:uuid:1085203b-aba7-4ce1-8307-91b671123805</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/036620e5-2b1c-4d77-8cb7-091ecf19ba8d"/>
<published>2026-05-19T07:00:00Z</published>
<title> National Indigenous Peoples Day Celebration</title>
<updated>2026-05-19T17:32:41.6427926Z</updated>
<georss:line>49.2829441775294 -123.09142657236355 49.28259996495558 -123.09142657236355</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Intermittent closure of Water St to install concrete barriers at 0 Water St
Location: 
Schedule: Nov 27, 2025</content>
<id>urn:uuid:634e312d-e23e-4d4b-a62f-57a9701f107d</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e0463c83-e8d2-4c1c-b61e-5d15d7e276b9"/>
<published>2025-11-10T08:00:00Z</published>
<title>0 Water - Loading Zone Installation </title>
<updated>2025-11-10T23:32:57.1216284Z</updated>
<georss:line>49.283496673786686 -123.10426176613505 49.283884968733105 -123.10638331443363</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Sewer Abandonment for Henry Hudson Elementary School
Location: 
Schedule: Jul 13, 2026 - Jul 31, 2026</content>
<id>urn:uuid:b07bec5c-08f1-4813-8950-71fa135b1b13</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/600bb76d-8b7e-43d5-90c3-a31fad3def38"/>
<published>2026-05-04T07:00:00Z</published>
<title>1530 Maple - Sewer Abandonment</title>
<updated>2026-05-04T17:05:19.103004Z</updated>
<georss:line>49.27247103472837 -123.1479266885716 49.27250592482582 -123.1502439168405 49.27161621963185 -123.15027065408977 49.27158714402796 -123.14784647682384 49.27247684974631 -123.14781082715815</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Concrete barrier delivery and installation, sign plan implementation as per Transportation Project 2023-72-D-GP.
Location: 1600 block W 5th Ave between Fir St and Pine St.
Schedule: Nov 5, 2025</content>
<id>urn:uuid:6942dd24-8dd4-4b81-ac42-1303c54918e5</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d173eac6-86f7-4eb2-8112-a866fb721257"/>
<published>2025-11-03T08:00:00Z</published>
<title>1600 W 5th Ave (Burrard Slopes) barrier install and traffic changes</title>
<updated>2025-11-03T18:44:59.2365554Z</updated>
<georss:line>49.26708351664658 -123.14088965904156 49.26712036023639 -123.14326045391425</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Median Construction - WB Closed, EB 1 Lane
Location: 200 E Cordova
Schedule: Sep 27, 2025 - Sep 28, 2025</content>
<id>urn:uuid:c1cea64f-39e5-4e12-bf19-cfed6ab17a1c</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e9a7b613-8450-4bbd-b87e-5d3c6a5b4903"/>
<published>2025-09-23T07:00:00Z</published>
<title>200 E Cordova - Streets Construction</title>
<updated>2025-09-23T22:49:00.1615484Z</updated>
<georss:line>49.282279707386664 -123.09886155020045 49.28225579855777 -123.09765205850192</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Shallow mill &amp; overlay of asphalt road surface in areas targeted due to poor condition.  Individual street segments to be closed  2-3 days at most.  Crews to alert residents of hard closure dates.
Location: General area is bound by Kingsway to north, Fraser to west, Victoria to east and 43rd Ave to south.
Schedule: Jun 25, 2025 - Jul 25, 2025</content>
<id>urn:uuid:02dfb3b7-aadd-4f59-b2fd-062b1b20a64d</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d1ef364f-8f52-4f5f-97f4-ba632df94862"/>
<published>2025-06-17T07:00:00Z</published>
<title>2025 Thin Lift Overlay</title>
<updated>2025-07-21T16:25:52.6974647Z</updated>
<georss:line>49.234515247871 -123.0686759135325 49.23450419647324 -123.06801576115248</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Shallow mill &amp; overlay of asphalt road surface in areas targeted due to poor condition.  Individual street segments to be closed  2-3 days at most.  Crews to alert residents of hard closure dates.
Location: General area is bound by Kingsway to north, Fraser to west, Victoria to east and 43rd Ave to south.
Schedule: Jun 25, 2025 - Jul 25, 2025</content>
<id>urn:uuid:01d4aa0f-4714-4df9-b5b8-259e01942184</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d1ef364f-8f52-4f5f-97f4-ba632df94862"/>
<published>2025-06-17T07:00:00Z</published>
<title>2025 Thin Lift Overlay</title>
<updated>2025-07-21T16:25:52.6974647Z</updated>
<georss:line>49.234699850355184 -123.0686726116741 49.234515247871 -123.0686759135325</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Shallow mill &amp; overlay of asphalt road surface in areas targeted due to poor condition.  Individual street segments to be closed  2-3 days at most.  Crews to alert residents of hard closure dates.
Location: General area is bound by Kingsway to north, Fraser to west, Victoria to east and 43rd Ave to south.
Schedule: Jun 25, 2025 - Jul 25, 2025</content>
<id>urn:uuid:b348d1e2-8345-4c29-ac20-23520659c53f</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d1ef364f-8f52-4f5f-97f4-ba632df94862"/>
<published>2025-06-17T07:00:00Z</published>
<title>2025 Thin Lift Overlay</title>
<updated>2025-07-21T16:25:52.6974647Z</updated>
<georss:line>49.23527028461936 -123.06865660240885 49.234699850355184 -123.0686726116741</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Shallow mill &amp; overlay of asphalt road surface in areas targeted due to poor condition.  Individual street segments to be closed  2-3 days at most.  Crews to alert residents of hard closure dates.
Location: General area is bound by Kingsway to north, Fraser to west, Victoria to east and 43rd Ave to south.
Schedule: Jun 25, 2025 - Jul 25, 2025</content>
<id>urn:uuid:b1b5350a-a95c-417c-abe1-d881e44b4f00</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d1ef364f-8f52-4f5f-97f4-ba632df94862"/>
<published>2025-06-17T07:00:00Z</published>
<title>2025 Thin Lift Overlay</title>
<updated>2025-07-21T16:25:52.6974647Z</updated>
<georss:line>49.23527028461936 -123.06865660240885 49.23526315582677 -123.0679951128903</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Shallow mill &amp; overlay of asphalt road surface in areas targeted due to poor condition.  Individual street segments to be closed  2-3 days at most.  Crews to alert residents of hard closure dates.
Location: General area is bound by Kingsway to north, Fraser to west, Victoria to east and 43rd Ave to south.
Schedule: Jun 25, 2025 - Jul 25, 2025</content>
<id>urn:uuid:8de561dd-2682-4f7c-bd28-88cbc60c9b0a</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d1ef364f-8f52-4f5f-97f4-ba632df94862"/>
<published>2025-06-17T07:00:00Z</published>
<title>2025 Thin Lift Overlay</title>
<updated>2025-07-21T16:25:52.6974647Z</updated>
<georss:line>49.23450419647324 -123.06801576115248 49.23449169408815 -123.06615521209882</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Shallow mill &amp; overlay of asphalt road surface in areas targeted due to poor condition.  Individual street segments to be closed  2-3 days at most.  Crews to alert residents of hard closure dates.
Location: General area is bound by Kingsway to north, Fraser to west, Victoria to east and 43rd Ave to south.
Schedule: Jun 25, 2025 - Jul 25, 2025</content>
<id>urn:uuid:f76608f8-c5c9-4360-a9ed-d4b30645dc15</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d1ef364f-8f52-4f5f-97f4-ba632df94862"/>
<published>2025-06-17T07:00:00Z</published>
<title>2025 Thin Lift Overlay</title>
<updated>2025-07-21T16:25:52.6974647Z</updated>
<georss:line>49.23449169408815 -123.06615521209882 49.23448530872457 -123.0654899293039</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Shallow mill &amp; overlay of asphalt road surface in areas targeted due to poor condition.  Individual street segments to be closed  2-3 days at most.  Crews to alert residents of hard closure dates.
Location: General area is bound by Kingsway to north, Fraser to west, Victoria to east and 43rd Ave to south.
Schedule: Jun 25, 2025 - Jul 25, 2025</content>
<id>urn:uuid:2f67d417-829b-4e78-844c-6afae24e0011</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d1ef364f-8f52-4f5f-97f4-ba632df94862"/>
<published>2025-06-17T07:00:00Z</published>
<title>2025 Thin Lift Overlay</title>
<updated>2025-07-21T16:25:52.6974647Z</updated>
<georss:line>49.23526315582677 -123.0679951128903 49.23524275583506 -123.0661335906936</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Shallow mill &amp; overlay of asphalt road surface in areas targeted due to poor condition.  Individual street segments to be closed  2-3 days at most.  Crews to alert residents of hard closure dates.
Location: General area is bound by Kingsway to north, Fraser to west, Victoria to east and 43rd Ave to south.
Schedule: Jun 25, 2025 - Jul 25, 2025</content>
<id>urn:uuid:65e54dc8-ba8c-4320-b093-613c240031ef</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d1ef364f-8f52-4f5f-97f4-ba632df94862"/>
<published>2025-06-17T07:00:00Z</published>
<title>2025 Thin Lift Overlay</title>
<updated>2025-07-21T16:25:52.6974647Z</updated>
<georss:line>49.23524275583506 -123.0661335906936 49.23523537188797 -123.06546828275816</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Shallow mill &amp; overlay of asphalt road surface in areas targeted due to poor condition.  Individual street segments to be closed  2-3 days at most.  Crews to alert residents of hard closure dates.
Location: General area is bound by Kingsway to north, Fraser to west, Victoria to east and 43rd Ave to south.
Schedule: Jun 25, 2025 - Jul 25, 2025</content>
<id>urn:uuid:26d9858b-c61c-4296-b1bf-bae5d529283a</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d1ef364f-8f52-4f5f-97f4-ba632df94862"/>
<published>2025-06-17T07:00:00Z</published>
<title>2025 Thin Lift Overlay</title>
<updated>2025-07-21T16:25:52.6974647Z</updated>
<georss:line>49.23306022348922 -123.07010935088393 49.232635316154415 -123.07012182626308</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Shallow mill &amp; overlay of asphalt road surface in areas targeted due to poor condition.  Individual street segments to be closed  2-3 days at most.  Crews to alert residents of hard closure dates.
Location: General area is bound by Kingsway to north, Fraser to west, Victoria to east and 43rd Ave to south.
Schedule: Jun 25, 2025 - Jul 25, 2025</content>
<id>urn:uuid:c47f653e-51ed-4294-9a38-b86b8cf49092</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d1ef364f-8f52-4f5f-97f4-ba632df94862"/>
<published>2025-06-17T07:00:00Z</published>
<title>2025 Thin Lift Overlay</title>
<updated>2025-07-21T16:25:52.6974647Z</updated>
<georss:line>49.23471581018828 -123.07006203614223 49.23306022348922 -123.07010935088393</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Shallow mill &amp; overlay of asphalt road surface in areas targeted due to poor condition.  Individual street segments to be closed  2-3 days at most.  Crews to alert residents of hard closure dates.
Location: General area is bound by Kingsway to north, Fraser to west, Victoria to east and 43rd Ave to south.
Schedule: Jun 25, 2025 - Jul 25, 2025</content>
<id>urn:uuid:b245cd87-7831-4c5d-b845-16d77c7c2ab7</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d1ef364f-8f52-4f5f-97f4-ba632df94862"/>
<published>2025-06-17T07:00:00Z</published>
<title>2025 Thin Lift Overlay</title>
<updated>2025-07-21T16:25:52.6974647Z</updated>
<georss:line>49.23057929128288 -123.07226336422818 49.23057062715495 -123.07157254072922</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Shallow mill &amp; overlay of asphalt road surface in areas targeted due to poor condition.  Individual street segments to be closed  2-3 days at most.  Crews to alert residents of hard closure dates.
Location: General area is bound by Kingsway to north, Fraser to west, Victoria to east and 43rd Ave to south.
Schedule: Jun 25, 2025 - Jul 25, 2025</content>
<id>urn:uuid:60838be4-e0cd-4e75-b616-e081b72a2de5</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d1ef364f-8f52-4f5f-97f4-ba632df94862"/>
<published>2025-06-17T07:00:00Z</published>
<title>2025 Thin Lift Overlay</title>
<updated>2025-07-21T16:25:52.6974647Z</updated>
<georss:line>49.230587843917675 -123.07295326753045 49.23057929128288 -123.07226336422818</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Shallow mill &amp; overlay of asphalt road surface in areas targeted due to poor condition.  Individual street segments to be closed  2-3 days at most.  Crews to alert residents of hard closure dates.
Location: General area is bound by Kingsway to north, Fraser to west, Victoria to east and 43rd Ave to south.
Schedule: Jun 25, 2025 - Jul 25, 2025</content>
<id>urn:uuid:861dda1b-37e4-4ee4-91ce-c8ce4d12fef7</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d1ef364f-8f52-4f5f-97f4-ba632df94862"/>
<published>2025-06-17T07:00:00Z</published>
<title>2025 Thin Lift Overlay</title>
<updated>2025-07-21T16:25:52.6974647Z</updated>
<georss:line>49.23223889150441 -123.0729034198581 49.230587843917675 -123.07295326753045</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Shallow mill &amp; overlay of asphalt road surface in areas targeted due to poor condition.  Individual street segments to be closed  2-3 days at most.  Crews to alert residents of hard closure dates.
Location: General area is bound by Kingsway to north, Fraser to west, Victoria to east and 43rd Ave to south.
Schedule: Jun 25, 2025 - Jul 25, 2025</content>
<id>urn:uuid:f90ae4cd-79b5-4c75-8bf9-07386009bc42</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d1ef364f-8f52-4f5f-97f4-ba632df94862"/>
<published>2025-06-17T07:00:00Z</published>
<title>2025 Thin Lift Overlay</title>
<updated>2025-07-21T16:25:52.6974647Z</updated>
<georss:line>49.23266828703069 -123.07289217007077 49.23223889150441 -123.0729034198581</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Shallow mill &amp; overlay of asphalt road surface in areas targeted due to poor condition.  Individual street segments to be closed  2-3 days at most.  Crews to alert residents of hard closure dates.
Location: General area is bound by Kingsway to north, Fraser to west, Victoria to east and 43rd Ave to south.
Schedule: Jun 25, 2025 - Jul 25, 2025</content>
<id>urn:uuid:2e507a22-aaa7-41e1-b220-69ccad6484ce</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d1ef364f-8f52-4f5f-97f4-ba632df94862"/>
<published>2025-06-17T07:00:00Z</published>
<title>2025 Thin Lift Overlay</title>
<updated>2025-07-21T16:25:52.6974647Z</updated>
<georss:line>49.242967515280725 -123.07221036788765 49.24295485343703 -123.07140887769822</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Shallow mill &amp; overlay of asphalt road surface in areas targeted due to poor condition.  Individual street segments to be closed  2-3 days at most.  Crews to alert residents of hard closure dates.
Location: General area is bound by Kingsway to north, Fraser to west, Victoria to east and 43rd Ave to south.
Schedule: Jun 25, 2025 - Jul 25, 2025</content>
<id>urn:uuid:d6feb195-a09b-4ee1-9416-7701b14994ad</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d1ef364f-8f52-4f5f-97f4-ba632df94862"/>
<published>2025-06-17T07:00:00Z</published>
<title>2025 Thin Lift Overlay</title>
<updated>2025-07-21T16:25:52.6974647Z</updated>
<georss:line>49.242980616842715 -123.0728479678653 49.242967515280725 -123.07221036788765</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Shallow mill &amp; overlay of asphalt road surface in areas targeted due to poor condition.  Individual street segments to be closed  2-3 days at most.  Crews to alert residents of hard closure dates.
Location: General area is bound by Kingsway to north, Fraser to west, Victoria to east and 43rd Ave to south.
Schedule: Jun 25, 2025 - Jul 25, 2025</content>
<id>urn:uuid:d6480da3-31c8-4045-9e5c-c1843eb30aab</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d1ef364f-8f52-4f5f-97f4-ba632df94862"/>
<published>2025-06-17T07:00:00Z</published>
<title>2025 Thin Lift Overlay</title>
<updated>2025-07-21T16:25:52.6974647Z</updated>
<georss:line>49.24299250958691 -123.07355614310582 49.24298996180582 -123.07341807714496 49.242980616842715 -123.0728479678653</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Shallow mill &amp; overlay of asphalt road surface in areas targeted due to poor condition.  Individual street segments to be closed  2-3 days at most.  Crews to alert residents of hard closure dates.
Location: General area is bound by Kingsway to north, Fraser to west, Victoria to east and 43rd Ave to south.
Schedule: Jun 25, 2025 - Jul 25, 2025</content>
<id>urn:uuid:5e17ac82-c2a3-4523-8d4d-2d138f2fc45e</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d1ef364f-8f52-4f5f-97f4-ba632df94862"/>
<published>2025-06-17T07:00:00Z</published>
<title>2025 Thin Lift Overlay</title>
<updated>2025-07-21T16:25:52.6974647Z</updated>
<georss:line>49.24537733651468 -123.07346947154241 49.24363254571918 -123.0735309208206</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Shallow mill &amp; overlay of asphalt road surface in areas targeted due to poor condition.  Individual street segments to be closed  2-3 days at most.  Crews to alert residents of hard closure dates.
Location: General area is bound by Kingsway to north, Fraser to west, Victoria to east and 43rd Ave to south.
Schedule: Jun 25, 2025 - Jul 25, 2025</content>
<id>urn:uuid:053bf8f5-db4b-49e2-a200-6d40ed2fab79</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d1ef364f-8f52-4f5f-97f4-ba632df94862"/>
<published>2025-06-17T07:00:00Z</published>
<title>2025 Thin Lift Overlay</title>
<updated>2025-07-21T16:25:52.6974647Z</updated>
<georss:line>49.24596872324051 -123.07344881882734 49.24537733651468 -123.07346947154241</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Shallow mill &amp; overlay of asphalt road surface in areas targeted due to poor condition.  Individual street segments to be closed  2-3 days at most.  Crews to alert residents of hard closure dates.
Location: General area is bound by Kingsway to north, Fraser to west, Victoria to east and 43rd Ave to south.
Schedule: Jun 25, 2025 - Jul 25, 2025</content>
<id>urn:uuid:49f17b79-d1ed-4175-911b-1d0d122990fe</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d1ef364f-8f52-4f5f-97f4-ba632df94862"/>
<published>2025-06-17T07:00:00Z</published>
<title>2025 Thin Lift Overlay</title>
<updated>2025-07-21T16:25:52.6974647Z</updated>
<georss:line>49.24156306263609 -123.06804489484476 49.241472262887214 -123.06797155775502 49.2408274261594 -123.06799358824752</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Shallow mill &amp; overlay of asphalt road surface in areas targeted due to poor condition.  Individual street segments to be closed  2-3 days at most.  Crews to alert residents of hard closure dates.
Location: General area is bound by Kingsway to north, Fraser to west, Victoria to east and 43rd Ave to south.
Schedule: Jun 25, 2025 - Jul 25, 2025</content>
<id>urn:uuid:eeeb0218-99a9-46c5-b01e-2975303107cf</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d1ef364f-8f52-4f5f-97f4-ba632df94862"/>
<published>2025-06-17T07:00:00Z</published>
<title>2025 Thin Lift Overlay</title>
<updated>2025-07-21T16:25:52.6974647Z</updated>
<georss:line>49.2416360727492 -123.07359836652495 49.24162630405391 -123.07288874377531</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Shallow mill &amp; overlay of asphalt road surface in areas targeted due to poor condition.  Individual street segments to be closed  2-3 days at most.  Crews to alert residents of hard closure dates.
Location: General area is bound by Kingsway to north, Fraser to west, Victoria to east and 43rd Ave to south.
Schedule: Jun 25, 2025 - Jul 25, 2025</content>
<id>urn:uuid:2c59cc22-f705-4965-b848-84cfeb61bd9d</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d1ef364f-8f52-4f5f-97f4-ba632df94862"/>
<published>2025-06-17T07:00:00Z</published>
<title>2025 Thin Lift Overlay</title>
<updated>2025-07-21T16:25:52.6974647Z</updated>
<georss:line>49.2408274261594 -123.06799358824752 49.24009358000947 -123.06801805122657</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Shallow mill &amp; overlay of asphalt road surface in areas targeted due to poor condition.  Individual street segments to be closed  2-3 days at most.  Crews to alert residents of hard closure dates.
Location: General area is bound by Kingsway to north, Fraser to west, Victoria to east and 43rd Ave to south.
Schedule: Jun 25, 2025 - Jul 25, 2025</content>
<id>urn:uuid:ba6bfe95-5e44-4d9f-8f52-8ec1ddb08ec5</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d1ef364f-8f52-4f5f-97f4-ba632df94862"/>
<published>2025-06-17T07:00:00Z</published>
<title>2025 Thin Lift Overlay</title>
<updated>2025-07-21T16:25:52.6974647Z</updated>
<georss:line>49.24162630405391 -123.07288874377531 49.24161632277887 -123.07218125046737</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Shallow mill &amp; overlay of asphalt road surface in areas targeted due to poor condition.  Individual street segments to be closed  2-3 days at most.  Crews to alert residents of hard closure dates.
Location: General area is bound by Kingsway to north, Fraser to west, Victoria to east and 43rd Ave to south.
Schedule: Jun 25, 2025 - Jul 25, 2025</content>
<id>urn:uuid:dba2c8e5-d282-448a-ad81-ebbd0edb43d7</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d1ef364f-8f52-4f5f-97f4-ba632df94862"/>
<published>2025-06-17T07:00:00Z</published>
<title>2025 Thin Lift Overlay</title>
<updated>2025-07-21T16:25:52.6974647Z</updated>
<georss:line>49.24299250958691 -123.07355614310582 49.2416360727492 -123.07359836652495</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Shallow mill &amp; overlay of asphalt road surface in areas targeted due to poor condition.  Individual street segments to be closed  2-3 days at most.  Crews to alert residents of hard closure dates.
Location: General area is bound by Kingsway to north, Fraser to west, Victoria to east and 43rd Ave to south.
Schedule: Jun 25, 2025 - Jul 25, 2025</content>
<id>urn:uuid:7afd2525-c9e0-4ecb-be43-5d0e27d33cba</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d1ef364f-8f52-4f5f-97f4-ba632df94862"/>
<published>2025-06-17T07:00:00Z</published>
<title>2025 Thin Lift Overlay</title>
<updated>2025-07-21T16:25:52.6974647Z</updated>
<georss:line>49.24295485343703 -123.07140887769822 49.24294432796202 -123.07075267966793</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Shallow mill &amp; overlay of asphalt road surface in areas targeted due to poor condition.  Individual street segments to be closed  2-3 days at most.  Crews to alert residents of hard closure dates.
Location: General area is bound by Kingsway to north, Fraser to west, Victoria to east and 43rd Ave to south.
Schedule: Jun 25, 2025 - Jul 25, 2025</content>
<id>urn:uuid:42032014-c92a-4e04-afee-bbe3289b1ddc</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d1ef364f-8f52-4f5f-97f4-ba632df94862"/>
<published>2025-06-17T07:00:00Z</published>
<title>2025 Thin Lift Overlay</title>
<updated>2025-07-21T16:25:52.6974647Z</updated>
<georss:line>49.23310904801599 -123.07425809640417 49.232684067338255 -123.07427201959436</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Shallow mill &amp; overlay of asphalt road surface in areas targeted due to poor condition.  Individual street segments to be closed  2-3 days at most.  Crews to alert residents of hard closure dates.
Location: General area is bound by Kingsway to north, Fraser to west, Victoria to east and 43rd Ave to south.
Schedule: Jun 25, 2025 - Jul 25, 2025</content>
<id>urn:uuid:dd99ae05-928a-4785-ab1e-73b57161bcf9</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d1ef364f-8f52-4f5f-97f4-ba632df94862"/>
<published>2025-06-17T07:00:00Z</published>
<title>2025 Thin Lift Overlay</title>
<updated>2025-07-21T16:25:52.6974647Z</updated>
<georss:line>49.23476416524147 -123.07420211439567 49.23310904801599 -123.07425809640417</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Shallow mill &amp; overlay of asphalt road surface in areas targeted due to poor condition.  Individual street segments to be closed  2-3 days at most.  Crews to alert residents of hard closure dates.
Location: General area is bound by Kingsway to north, Fraser to west, Victoria to east and 43rd Ave to south.
Schedule: Jun 25, 2025 - Jul 25, 2025</content>
<id>urn:uuid:0181d7bb-5f9c-474c-b7a8-7282e6c132e3</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d1ef364f-8f52-4f5f-97f4-ba632df94862"/>
<published>2025-06-17T07:00:00Z</published>
<title>2025 Thin Lift Overlay</title>
<updated>2025-07-21T16:25:52.6974647Z</updated>
<georss:line>49.233093159735915 -123.07287802884684 49.23266828703069 -123.07289217007077</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Shallow mill &amp; overlay of asphalt road surface in areas targeted due to poor condition.  Individual street segments to be closed  2-3 days at most.  Crews to alert residents of hard closure dates.
Location: General area is bound by Kingsway to north, Fraser to west, Victoria to east and 43rd Ave to south.
Schedule: Jun 25, 2025 - Jul 25, 2025</content>
<id>urn:uuid:8dd61a1c-260b-4853-bda9-f75170bc0a47</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d1ef364f-8f52-4f5f-97f4-ba632df94862"/>
<published>2025-06-17T07:00:00Z</published>
<title>2025 Thin Lift Overlay</title>
<updated>2025-07-21T16:25:52.6974647Z</updated>
<georss:line>49.234748814604444 -123.0728242680779 49.233093159735915 -123.07287802884684</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Shallow mill &amp; overlay of asphalt road surface in areas targeted due to poor condition.  Individual street segments to be closed  2-3 days at most.  Crews to alert residents of hard closure dates.
Location: General area is bound by Kingsway to north, Fraser to west, Victoria to east and 43rd Ave to south.
Schedule: Jun 25, 2025 - Jul 25, 2025</content>
<id>urn:uuid:cf2137d9-9777-42aa-ba44-bc72cd02218e</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d1ef364f-8f52-4f5f-97f4-ba632df94862"/>
<published>2025-06-17T07:00:00Z</published>
<title>2025 Thin Lift Overlay</title>
<updated>2025-07-21T16:25:52.6974647Z</updated>
<georss:line>49.23307886077288 -123.07150498364632 49.2326514729196 -123.07151370727902</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Shallow mill &amp; overlay of asphalt road surface in areas targeted due to poor condition.  Individual street segments to be closed  2-3 days at most.  Crews to alert residents of hard closure dates.
Location: General area is bound by Kingsway to north, Fraser to west, Victoria to east and 43rd Ave to south.
Schedule: Jun 25, 2025 - Jul 25, 2025</content>
<id>urn:uuid:98b34cc2-c197-4fb9-ace9-213951fc3d52</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d1ef364f-8f52-4f5f-97f4-ba632df94862"/>
<published>2025-06-17T07:00:00Z</published>
<title>2025 Thin Lift Overlay</title>
<updated>2025-07-21T16:25:52.6974647Z</updated>
<georss:line>49.234731198867365 -123.07144618583102 49.23307886077288 -123.07150498364632</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Shallow mill &amp; overlay of asphalt road surface in areas targeted due to poor condition.  Individual street segments to be closed  2-3 days at most.  Crews to alert residents of hard closure dates.
Location: General area is bound by Kingsway to north, Fraser to west, Victoria to east and 43rd Ave to south.
Schedule: Jun 25, 2025 - Jul 25, 2025</content>
<id>urn:uuid:58ff9d1a-5b16-4b2c-a03c-0355d5c475a3</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d1ef364f-8f52-4f5f-97f4-ba632df94862"/>
<published>2025-06-17T07:00:00Z</published>
<title>2025 Thin Lift Overlay</title>
<updated>2025-07-21T16:25:52.6974647Z</updated>
<georss:line>49.2416360727492 -123.07359836652495 49.24017119882424 -123.07363920375167</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Shallow mill &amp; overlay of asphalt road surface in areas targeted due to poor condition.  Individual street segments to be closed  2-3 days at most.  Crews to alert residents of hard closure dates.
Location: General area is bound by Kingsway to north, Fraser to west, Victoria to east and 43rd Ave to south.
Schedule: Jun 25, 2025 - Jul 25, 2025</content>
<id>urn:uuid:17d4e21c-2ed1-4ed7-ba5b-34e5570a725c</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d1ef364f-8f52-4f5f-97f4-ba632df94862"/>
<published>2025-06-17T07:00:00Z</published>
<title>2025 Thin Lift Overlay</title>
<updated>2025-07-21T16:25:52.6974647Z</updated>
<georss:line>49.240631913051175 -123.0749047275727 49.24019088552768 -123.07491836195867</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Shallow mill &amp; overlay of asphalt road surface in areas targeted due to poor condition.  Individual street segments to be closed  2-3 days at most.  Crews to alert residents of hard closure dates.
Location: General area is bound by Kingsway to north, Fraser to west, Victoria to east and 43rd Ave to south.
Schedule: Jun 25, 2025 - Jul 25, 2025</content>
<id>urn:uuid:5539c3d9-08d8-4b25-80f2-26e3f8d99a61</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d1ef364f-8f52-4f5f-97f4-ba632df94862"/>
<published>2025-06-17T07:00:00Z</published>
<title>2025 Thin Lift Overlay</title>
<updated>2025-07-21T16:25:52.6974647Z</updated>
<georss:line>49.24165414260992 -123.0748746750158 49.240631913051175 -123.0749047275727</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Shallow mill &amp; overlay of asphalt road surface in areas targeted due to poor condition.  Individual street segments to be closed  2-3 days at most.  Crews to alert residents of hard closure dates.
Location: General area is bound by Kingsway to north, Fraser to west, Victoria to east and 43rd Ave to south.
Schedule: Jun 25, 2025 - Jul 25, 2025</content>
<id>urn:uuid:a48e0309-673b-43ca-9fa3-2bbd2f46839d</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d1ef364f-8f52-4f5f-97f4-ba632df94862"/>
<published>2025-06-17T07:00:00Z</published>
<title>2025 Thin Lift Overlay</title>
<updated>2025-07-21T16:25:52.6974647Z</updated>
<georss:line>49.244577209848416 -123.07757108420601 49.2425164091803 -123.0776261773204</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Shallow mill &amp; overlay of asphalt road surface in areas targeted due to poor condition.  Individual street segments to be closed  2-3 days at most.  Crews to alert residents of hard closure dates.
Location: General area is bound by Kingsway to north, Fraser to west, Victoria to east and 43rd Ave to south.
Schedule: Jun 25, 2025 - Jul 25, 2025</content>
<id>urn:uuid:d3a64548-5064-4a0c-b8ba-4acb5475b28f</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d1ef364f-8f52-4f5f-97f4-ba632df94862"/>
<published>2025-06-17T07:00:00Z</published>
<title>2025 Thin Lift Overlay</title>
<updated>2025-07-21T16:25:52.6974647Z</updated>
<georss:line>49.24300386744423 -123.07423605696674 49.24299250958691 -123.07355614310582</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Shallow mill &amp; overlay of asphalt road surface in areas targeted due to poor condition.  Individual street segments to be closed  2-3 days at most.  Crews to alert residents of hard closure dates.
Location: General area is bound by Kingsway to north, Fraser to west, Victoria to east and 43rd Ave to south.
Schedule: Jun 25, 2025 - Jul 25, 2025</content>
<id>urn:uuid:e78a78c4-b950-4e54-bb4d-5f31fc397cde</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d1ef364f-8f52-4f5f-97f4-ba632df94862"/>
<published>2025-06-17T07:00:00Z</published>
<title>2025 Thin Lift Overlay</title>
<updated>2025-07-21T16:25:52.6974647Z</updated>
<georss:line>49.24301588714877 -123.07483238464829 49.24300386744423 -123.07423605696674</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Shallow mill &amp; overlay of asphalt road surface in areas targeted due to poor condition.  Individual street segments to be closed  2-3 days at most.  Crews to alert residents of hard closure dates.
Location: General area is bound by Kingsway to north, Fraser to west, Victoria to east and 43rd Ave to south.
Schedule: Jun 25, 2025 - Jul 25, 2025</content>
<id>urn:uuid:6a83385b-4a5e-4584-9c36-20cd591afb08</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d1ef364f-8f52-4f5f-97f4-ba632df94862"/>
<published>2025-06-17T07:00:00Z</published>
<title>2025 Thin Lift Overlay</title>
<updated>2025-07-21T16:25:52.6974647Z</updated>
<georss:line>49.24846602064031 -123.07335514493096 49.248076344815814 -123.0733732681867</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Shallow mill &amp; overlay of asphalt road surface in areas targeted due to poor condition.  Individual street segments to be closed  2-3 days at most.  Crews to alert residents of hard closure dates.
Location: General area is bound by Kingsway to north, Fraser to west, Victoria to east and 43rd Ave to south.
Schedule: Jun 25, 2025 - Jul 25, 2025</content>
<id>urn:uuid:458fcb85-e9ad-498a-9ce8-9db785e628e2</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d1ef364f-8f52-4f5f-97f4-ba632df94862"/>
<published>2025-06-17T07:00:00Z</published>
<title>2025 Thin Lift Overlay</title>
<updated>2025-07-21T16:25:52.6974647Z</updated>
<georss:line>49.250856597600176 -123.08036438415145 49.250849712761806 -123.07994154625422</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Shallow mill &amp; overlay of asphalt road surface in areas targeted due to poor condition.  Individual street segments to be closed  2-3 days at most.  Crews to alert residents of hard closure dates.
Location: General area is bound by Kingsway to north, Fraser to west, Victoria to east and 43rd Ave to south.
Schedule: Jun 25, 2025 - Jul 25, 2025</content>
<id>urn:uuid:fd670475-cc74-4b3f-920b-4dee7776162f</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d1ef364f-8f52-4f5f-97f4-ba632df94862"/>
<published>2025-06-17T07:00:00Z</published>
<title>2025 Thin Lift Overlay</title>
<updated>2025-07-21T16:25:52.6974647Z</updated>
<georss:line>49.25176027099738 -123.08041009812912 49.25175235299497 -123.07990764731994</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Shallow mill &amp; overlay of asphalt road surface in areas targeted due to poor condition.  Individual street segments to be closed  2-3 days at most.  Crews to alert residents of hard closure dates.
Location: General area is bound by Kingsway to north, Fraser to west, Victoria to east and 43rd Ave to south.
Schedule: Jun 25, 2025 - Jul 25, 2025</content>
<id>urn:uuid:3a63dadb-d7ef-49e4-9408-b0be6465065a</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d1ef364f-8f52-4f5f-97f4-ba632df94862"/>
<published>2025-06-17T07:00:00Z</published>
<title>2025 Thin Lift Overlay</title>
<updated>2025-07-21T16:25:52.6974647Z</updated>
<georss:line>49.25085902991498 -123.08054005407841 49.250856597600176 -123.08036438415145</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Shallow mill &amp; overlay of asphalt road surface in areas targeted due to poor condition.  Individual street segments to be closed  2-3 days at most.  Crews to alert residents of hard closure dates.
Location: General area is bound by Kingsway to north, Fraser to west, Victoria to east and 43rd Ave to south.
Schedule: Jun 25, 2025 - Jul 25, 2025</content>
<id>urn:uuid:d11be470-e876-4c8a-bef0-f58160d80a9b</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d1ef364f-8f52-4f5f-97f4-ba632df94862"/>
<published>2025-06-17T07:00:00Z</published>
<title>2025 Thin Lift Overlay</title>
<updated>2025-07-21T16:25:52.6974647Z</updated>
<georss:line>49.247491720762156 -123.07685529534842 49.24748348311306 -123.07618683829803</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Shallow mill &amp; overlay of asphalt road surface in areas targeted due to poor condition.  Individual street segments to be closed  2-3 days at most.  Crews to alert residents of hard closure dates.
Location: General area is bound by Kingsway to north, Fraser to west, Victoria to east and 43rd Ave to south.
Schedule: Jun 25, 2025 - Jul 25, 2025</content>
<id>urn:uuid:28af752e-1e33-491a-a7ee-7c8ed04fdc10</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d1ef364f-8f52-4f5f-97f4-ba632df94862"/>
<published>2025-06-17T07:00:00Z</published>
<title>2025 Thin Lift Overlay</title>
<updated>2025-07-21T16:25:52.6974647Z</updated>
<georss:line>49.246401781608995 -123.07343323442421 49.24596872324051 -123.07344881882734</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Shallow mill &amp; overlay of asphalt road surface in areas targeted due to poor condition.  Individual street segments to be closed  2-3 days at most.  Crews to alert residents of hard closure dates.
Location: General area is bound by Kingsway to north, Fraser to west, Victoria to east and 43rd Ave to south.
Schedule: Jun 25, 2025 - Jul 25, 2025</content>
<id>urn:uuid:cb5ba526-ac00-4973-85bb-3fffd40e9612</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d1ef364f-8f52-4f5f-97f4-ba632df94862"/>
<published>2025-06-17T07:00:00Z</published>
<title>2025 Thin Lift Overlay</title>
<updated>2025-07-21T16:25:52.6974647Z</updated>
<georss:line>49.248076344815814 -123.0733732681867 49.247832658366946 -123.07338222296325</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Shallow mill &amp; overlay of asphalt road surface in areas targeted due to poor condition.  Individual street segments to be closed  2-3 days at most.  Crews to alert residents of hard closure dates.
Location: General area is bound by Kingsway to north, Fraser to west, Victoria to east and 43rd Ave to south.
Schedule: Jun 25, 2025 - Jul 25, 2025</content>
<id>urn:uuid:96714f2c-4514-41e7-8b5e-811e8b50372a</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d1ef364f-8f52-4f5f-97f4-ba632df94862"/>
<published>2025-06-17T07:00:00Z</published>
<title>2025 Thin Lift Overlay</title>
<updated>2025-07-21T16:25:52.6974647Z</updated>
<georss:line>49.24752211135862 -123.07938912324013 49.247491720762156 -123.07685529534842</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Shallow mill &amp; overlay of asphalt road surface in areas targeted due to poor condition.  Individual street segments to be closed  2-3 days at most.  Crews to alert residents of hard closure dates.
Location: General area is bound by Kingsway to north, Fraser to west, Victoria to east and 43rd Ave to south.
Schedule: Jun 25, 2025 - Jul 25, 2025</content>
<id>urn:uuid:4a23dd0e-76c9-48f7-83ec-7211e43bfbc6</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d1ef364f-8f52-4f5f-97f4-ba632df94862"/>
<published>2025-06-17T07:00:00Z</published>
<title>2025 Thin Lift Overlay</title>
<updated>2025-07-21T16:25:52.6974647Z</updated>
<georss:line>49.246460249962155 -123.08009484496293 49.24594751831995 -123.08011272911826</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Shallow mill &amp; overlay of asphalt road surface in areas targeted due to poor condition.  Individual street segments to be closed  2-3 days at most.  Crews to alert residents of hard closure dates.
Location: General area is bound by Kingsway to north, Fraser to west, Victoria to east and 43rd Ave to south.
Schedule: Jun 25, 2025 - Jul 25, 2025</content>
<id>urn:uuid:8aaaa18d-cba4-4bce-99b5-4949981b5b60</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d1ef364f-8f52-4f5f-97f4-ba632df94862"/>
<published>2025-06-17T07:00:00Z</published>
<title>2025 Thin Lift Overlay</title>
<updated>2025-07-21T16:25:52.6974647Z</updated>
<georss:line>49.24753030225534 -123.080059367497 49.24752211135862 -123.07938912324013</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Shallow mill &amp; overlay of asphalt road surface in areas targeted due to poor condition.  Individual street segments to be closed  2-3 days at most.  Crews to alert residents of hard closure dates.
Location: General area is bound by Kingsway to north, Fraser to west, Victoria to east and 43rd Ave to south.
Schedule: Jun 25, 2025 - Jul 25, 2025</content>
<id>urn:uuid:27806c4a-5ac0-4729-a48b-a653f33562f4</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d1ef364f-8f52-4f5f-97f4-ba632df94862"/>
<published>2025-06-17T07:00:00Z</published>
<title>2025 Thin Lift Overlay</title>
<updated>2025-07-21T16:25:52.6974647Z</updated>
<georss:line>49.250870741415554 -123.0812726240709 49.25085902991498 -123.08054005407841</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Shallow mill &amp; overlay of asphalt road surface in areas targeted due to poor condition.  Individual street segments to be closed  2-3 days at most.  Crews to alert residents of hard closure dates.
Location: General area is bound by Kingsway to north, Fraser to west, Victoria to east and 43rd Ave to south.
Schedule: Jun 25, 2025 - Jul 25, 2025</content>
<id>urn:uuid:7424e6dd-03f6-4f65-ad38-24c53966d08e</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d1ef364f-8f52-4f5f-97f4-ba632df94862"/>
<published>2025-06-17T07:00:00Z</published>
<title>2025 Thin Lift Overlay</title>
<updated>2025-07-21T16:25:52.6974647Z</updated>
<georss:line>49.25088035629301 -123.08187285053087 49.250870741415554 -123.0812726240709</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Shallow mill &amp; overlay of asphalt road surface in areas targeted due to poor condition.  Individual street segments to be closed  2-3 days at most.  Crews to alert residents of hard closure dates.
Location: General area is bound by Kingsway to north, Fraser to west, Victoria to east and 43rd Ave to south.
Schedule: Jun 25, 2025 - Jul 25, 2025</content>
<id>urn:uuid:c8a12d3f-3609-46b9-8544-57631e2bd20a</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d1ef364f-8f52-4f5f-97f4-ba632df94862"/>
<published>2025-06-17T07:00:00Z</published>
<title>2025 Thin Lift Overlay</title>
<updated>2025-07-21T16:25:52.6974647Z</updated>
<georss:line>49.25091003625647 -123.0838107375655 49.25088035629301 -123.08187285053087</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Shallow mill &amp; overlay of asphalt road surface in areas targeted due to poor condition.  Individual street segments to be closed  2-3 days at most.  Crews to alert residents of hard closure dates.
Location: General area is bound by Kingsway to north, Fraser to west, Victoria to east and 43rd Ave to south.
Schedule: Jun 25, 2025 - Jul 25, 2025</content>
<id>urn:uuid:dbf6db2e-0731-41c8-92c8-7ad42e317685</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d1ef364f-8f52-4f5f-97f4-ba632df94862"/>
<published>2025-06-17T07:00:00Z</published>
<title>2025 Thin Lift Overlay</title>
<updated>2025-07-21T16:25:52.6974647Z</updated>
<georss:line>49.25269757710478 -123.08254740735859 49.252686706247005 -123.08180777572434</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Shallow mill &amp; overlay of asphalt road surface in areas targeted due to poor condition.  Individual street segments to be closed  2-3 days at most.  Crews to alert residents of hard closure dates.
Location: General area is bound by Kingsway to north, Fraser to west, Victoria to east and 43rd Ave to south.
Schedule: Jun 25, 2025 - Jul 25, 2025</content>
<id>urn:uuid:963abb01-4950-4a7c-8d35-7b915ae3d631</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d1ef364f-8f52-4f5f-97f4-ba632df94862"/>
<published>2025-06-17T07:00:00Z</published>
<title>2025 Thin Lift Overlay</title>
<updated>2025-07-21T16:25:52.6974647Z</updated>
<georss:line>49.251782607510705 -123.08184288868463 49.25176027099738 -123.08041009812912</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Shallow mill &amp; overlay of asphalt road surface in areas targeted due to poor condition.  Individual street segments to be closed  2-3 days at most.  Crews to alert residents of hard closure dates.
Location: General area is bound by Kingsway to north, Fraser to west, Victoria to east and 43rd Ave to south.
Schedule: Jun 25, 2025 - Jul 25, 2025</content>
<id>urn:uuid:df43e23f-2166-4540-b745-5e39ce4a0442</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d1ef364f-8f52-4f5f-97f4-ba632df94862"/>
<published>2025-06-17T07:00:00Z</published>
<title>2025 Thin Lift Overlay</title>
<updated>2025-07-21T16:25:52.6974647Z</updated>
<georss:line>49.252715328847444 -123.08374155419442 49.25269757710478 -123.08254740735859</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Shallow mill &amp; overlay of asphalt road surface in areas targeted due to poor condition.  Individual street segments to be closed  2-3 days at most.  Crews to alert residents of hard closure dates.
Location: General area is bound by Kingsway to north, Fraser to west, Victoria to east and 43rd Ave to south.
Schedule: Jun 25, 2025 - Jul 25, 2025</content>
<id>urn:uuid:1cdbd933-bac0-41ef-a9d8-cfedcd89abbd</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d1ef364f-8f52-4f5f-97f4-ba632df94862"/>
<published>2025-06-17T07:00:00Z</published>
<title>2025 Thin Lift Overlay</title>
<updated>2025-07-21T16:25:52.6974647Z</updated>
<georss:line>49.24855546540971 -123.08264708614064 49.24772465523856 -123.08266217391102</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Shallow mill &amp; overlay of asphalt road surface in areas targeted due to poor condition.  Individual street segments to be closed  2-3 days at most.  Crews to alert residents of hard closure dates.
Location: General area is bound by Kingsway to north, Fraser to west, Victoria to east and 43rd Ave to south.
Schedule: Jun 25, 2025 - Jul 25, 2025</content>
<id>urn:uuid:0a62a9ba-c8ac-4292-94a4-e00e264c502a</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d1ef364f-8f52-4f5f-97f4-ba632df94862"/>
<published>2025-06-17T07:00:00Z</published>
<title>2025 Thin Lift Overlay</title>
<updated>2025-07-21T16:25:52.6974647Z</updated>
<georss:line>49.24772938512004 -123.0832781555349 49.24772465523856 -123.08266217391102</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Shallow mill &amp; overlay of asphalt road surface in areas targeted due to poor condition.  Individual street segments to be closed  2-3 days at most.  Crews to alert residents of hard closure dates.
Location: General area is bound by Kingsway to north, Fraser to west, Victoria to east and 43rd Ave to south.
Schedule: Jun 25, 2025 - Jul 25, 2025</content>
<id>urn:uuid:f942664d-c87f-43f8-a538-0faa2c017a32</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d1ef364f-8f52-4f5f-97f4-ba632df94862"/>
<published>2025-06-17T07:00:00Z</published>
<title>2025 Thin Lift Overlay</title>
<updated>2025-07-21T16:25:52.6974647Z</updated>
<georss:line>49.24773642819318 -123.08390004948942 49.24772938512004 -123.0832781555349</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Shallow mill &amp; overlay of asphalt road surface in areas targeted due to poor condition.  Individual street segments to be closed  2-3 days at most.  Crews to alert residents of hard closure dates.
Location: General area is bound by Kingsway to north, Fraser to west, Victoria to east and 43rd Ave to south.
Schedule: Jun 25, 2025 - Jul 25, 2025</content>
<id>urn:uuid:6967e160-0053-4e00-94a5-2a1673c7260e</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d1ef364f-8f52-4f5f-97f4-ba632df94862"/>
<published>2025-06-17T07:00:00Z</published>
<title>2025 Thin Lift Overlay</title>
<updated>2025-07-21T16:25:52.6974647Z</updated>
<georss:line>49.24598809837457 -123.08393536607919 49.24545477004338 -123.0839490672502</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Shallow mill &amp; overlay of asphalt road surface in areas targeted due to poor condition.  Individual street segments to be closed  2-3 days at most.  Crews to alert residents of hard closure dates.
Location: General area is bound by Kingsway to north, Fraser to west, Victoria to east and 43rd Ave to south.
Schedule: Jun 25, 2025 - Jul 25, 2025</content>
<id>urn:uuid:e50d4fd6-6a13-406a-9149-8679a1e4bf6f</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d1ef364f-8f52-4f5f-97f4-ba632df94862"/>
<published>2025-06-17T07:00:00Z</published>
<title>2025 Thin Lift Overlay</title>
<updated>2025-07-21T16:25:52.6974647Z</updated>
<georss:line>49.24653330212314 -123.08268417491662 49.24579638456257 -123.08269833286437</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Shallow mill &amp; overlay of asphalt road surface in areas targeted due to poor condition.  Individual street segments to be closed  2-3 days at most.  Crews to alert residents of hard closure dates.
Location: General area is bound by Kingsway to north, Fraser to west, Victoria to east and 43rd Ave to south.
Schedule: Jun 25, 2025 - Jul 25, 2025</content>
<id>urn:uuid:a336465a-75f9-4c5e-aa21-09e083c20486</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d1ef364f-8f52-4f5f-97f4-ba632df94862"/>
<published>2025-06-17T07:00:00Z</published>
<title>2025 Thin Lift Overlay</title>
<updated>2025-07-21T16:25:52.6974647Z</updated>
<georss:line>49.246532608303085 -123.08392087291799 49.24598809837457 -123.08393536607919</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Shallow mill &amp; overlay of asphalt road surface in areas targeted due to poor condition.  Individual street segments to be closed  2-3 days at most.  Crews to alert residents of hard closure dates.
Location: General area is bound by Kingsway to north, Fraser to west, Victoria to east and 43rd Ave to south.
Schedule: Jun 25, 2025 - Jul 25, 2025</content>
<id>urn:uuid:ffc320e1-2203-4608-b032-70bb5c8bf2f0</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d1ef364f-8f52-4f5f-97f4-ba632df94862"/>
<published>2025-06-17T07:00:00Z</published>
<title>2025 Thin Lift Overlay</title>
<updated>2025-07-21T16:25:52.6974647Z</updated>
<georss:line>49.24698634491867 -123.08390966062971 49.246532608303085 -123.08392087291799</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Shallow mill &amp; overlay of asphalt road surface in areas targeted due to poor condition.  Individual street segments to be closed  2-3 days at most.  Crews to alert residents of hard closure dates.
Location: General area is bound by Kingsway to north, Fraser to west, Victoria to east and 43rd Ave to south.
Schedule: Jun 25, 2025 - Jul 25, 2025</content>
<id>urn:uuid:e97e9d32-a788-454d-8d48-da16ba91e231</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d1ef364f-8f52-4f5f-97f4-ba632df94862"/>
<published>2025-06-17T07:00:00Z</published>
<title>2025 Thin Lift Overlay</title>
<updated>2025-07-21T16:25:52.6974647Z</updated>
<georss:line>49.247502990239525 -123.0839038172107 49.24698634491867 -123.08390966062971</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Shallow mill &amp; overlay of asphalt road surface in areas targeted due to poor condition.  Individual street segments to be closed  2-3 days at most.  Crews to alert residents of hard closure dates.
Location: General area is bound by Kingsway to north, Fraser to west, Victoria to east and 43rd Ave to south.
Schedule: Jun 25, 2025 - Jul 25, 2025</content>
<id>urn:uuid:e12aa0f7-d46f-4f76-af3b-3519654ff03f</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d1ef364f-8f52-4f5f-97f4-ba632df94862"/>
<published>2025-06-17T07:00:00Z</published>
<title>2025 Thin Lift Overlay</title>
<updated>2025-07-21T16:25:52.6974647Z</updated>
<georss:line>49.24772465523856 -123.08266217391102 49.247716105343386 -123.08191062517653</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Shallow mill &amp; overlay of asphalt road surface in areas targeted due to poor condition.  Individual street segments to be closed  2-3 days at most.  Crews to alert residents of hard closure dates.
Location: General area is bound by Kingsway to north, Fraser to west, Victoria to east and 43rd Ave to south.
Schedule: Jun 25, 2025 - Jul 25, 2025</content>
<id>urn:uuid:ea63e4c8-4f65-4aa9-9aac-e430d60b4dd7</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d1ef364f-8f52-4f5f-97f4-ba632df94862"/>
<published>2025-06-17T07:00:00Z</published>
<title>2025 Thin Lift Overlay</title>
<updated>2025-07-21T16:25:52.6974647Z</updated>
<georss:line>49.25094154911872 -123.08574405432454 49.25048949910553 -123.08576150571751</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Shallow mill &amp; overlay of asphalt road surface in areas targeted due to poor condition.  Individual street segments to be closed  2-3 days at most.  Crews to alert residents of hard closure dates.
Location: General area is bound by Kingsway to north, Fraser to west, Victoria to east and 43rd Ave to south.
Schedule: Jun 25, 2025 - Jul 25, 2025</content>
<id>urn:uuid:55b93afe-29f6-4962-8dbd-24e8990e70fc</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d1ef364f-8f52-4f5f-97f4-ba632df94862"/>
<published>2025-06-17T07:00:00Z</published>
<title>2025 Thin Lift Overlay</title>
<updated>2025-07-21T16:25:52.6974647Z</updated>
<georss:line>49.25094154911872 -123.08574405432454 49.25091003625647 -123.0838107375655</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Shallow mill &amp; overlay of asphalt road surface in areas targeted due to poor condition.  Individual street segments to be closed  2-3 days at most.  Crews to alert residents of hard closure dates.
Location: General area is bound by Kingsway to north, Fraser to west, Victoria to east and 43rd Ave to south.
Schedule: Jun 25, 2025 - Jul 25, 2025</content>
<id>urn:uuid:ee091c13-d8e5-422d-a128-8496a0d0b59f</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d1ef364f-8f52-4f5f-97f4-ba632df94862"/>
<published>2025-06-17T07:00:00Z</published>
<title>2025 Thin Lift Overlay</title>
<updated>2025-07-21T16:25:52.6974647Z</updated>
<georss:line>49.252746203516494 -123.08567580602657 49.252715328847444 -123.08374155419442</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Shallow mill &amp; overlay of asphalt road surface in areas targeted due to poor condition.  Individual street segments to be closed  2-3 days at most.  Crews to alert residents of hard closure dates.
Location: General area is bound by Kingsway to north, Fraser to west, Victoria to east and 43rd Ave to south.
Schedule: Jun 25, 2025 - Jul 25, 2025</content>
<id>urn:uuid:9436b4d1-9692-4ce1-951b-32a8d00b7da4</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d1ef364f-8f52-4f5f-97f4-ba632df94862"/>
<published>2025-06-17T07:00:00Z</published>
<title>2025 Thin Lift Overlay</title>
<updated>2025-07-21T16:25:52.6974647Z</updated>
<georss:line>49.252777333845785 -123.08760979964748 49.252746203516494 -123.08567580602657</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Shallow mill &amp; overlay of asphalt road surface in areas targeted due to poor condition.  Individual street segments to be closed  2-3 days at most.  Crews to alert residents of hard closure dates.
Location: General area is bound by Kingsway to north, Fraser to west, Victoria to east and 43rd Ave to south.
Schedule: Jun 25, 2025 - Jul 25, 2025</content>
<id>urn:uuid:063ff503-ca39-41d8-96c7-ae56f3fce7ac</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d1ef364f-8f52-4f5f-97f4-ba632df94862"/>
<published>2025-06-17T07:00:00Z</published>
<title>2025 Thin Lift Overlay</title>
<updated>2025-07-21T16:25:52.6974647Z</updated>
<georss:line>49.25319859496449 -123.08565861476613 49.252746203516494 -123.08567580602657</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Shallow mill &amp; overlay of asphalt road surface in areas targeted due to poor condition.  Individual street segments to be closed  2-3 days at most.  Crews to alert residents of hard closure dates.
Location: General area is bound by Kingsway to north, Fraser to west, Victoria to east and 43rd Ave to south.
Schedule: Jun 25, 2025 - Jul 25, 2025</content>
<id>urn:uuid:675cd0bf-ccc0-4f80-9803-ffb83209d169</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d1ef364f-8f52-4f5f-97f4-ba632df94862"/>
<published>2025-06-17T07:00:00Z</published>
<title>2025 Thin Lift Overlay</title>
<updated>2025-07-21T16:25:52.6974647Z</updated>
<georss:line>49.253650641918256 -123.08564498174161 49.25319859496449 -123.08565861476613</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Shallow mill &amp; overlay of asphalt road surface in areas targeted due to poor condition.  Individual street segments to be closed  2-3 days at most.  Crews to alert residents of hard closure dates.
Location: General area is bound by Kingsway to north, Fraser to west, Victoria to east and 43rd Ave to south.
Schedule: Jun 25, 2025 - Jul 25, 2025</content>
<id>urn:uuid:13627b83-12a7-4c45-9d90-5d6b619b6ee2</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d1ef364f-8f52-4f5f-97f4-ba632df94862"/>
<published>2025-06-17T07:00:00Z</published>
<title>2025 Thin Lift Overlay</title>
<updated>2025-07-21T16:25:52.6974647Z</updated>
<georss:line>49.24658161766391 -123.08848543127269 49.24658004265052 -123.08780272061155</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Shallow mill &amp; overlay of asphalt road surface in areas targeted due to poor condition.  Individual street segments to be closed  2-3 days at most.  Crews to alert residents of hard closure dates.
Location: General area is bound by Kingsway to north, Fraser to west, Victoria to east and 43rd Ave to south.
Schedule: Jun 25, 2025 - Jul 25, 2025</content>
<id>urn:uuid:a9b9dcaa-cbe4-45b6-bd53-9b949032e7fc</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d1ef364f-8f52-4f5f-97f4-ba632df94862"/>
<published>2025-06-17T07:00:00Z</published>
<title>2025 Thin Lift Overlay</title>
<updated>2025-07-21T16:25:52.6974647Z</updated>
<georss:line>49.24659157781426 -123.08959108485259 49.24658161766391 -123.08848543127269</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Shallow mill &amp; overlay of asphalt road surface in areas targeted due to poor condition.  Individual street segments to be closed  2-3 days at most.  Crews to alert residents of hard closure dates.
Location: General area is bound by Kingsway to north, Fraser to west, Victoria to east and 43rd Ave to south.
Schedule: Jun 25, 2025 - Jul 25, 2025</content>
<id>urn:uuid:e6b7775d-3621-422f-940c-8fd2b1665bb6</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d1ef364f-8f52-4f5f-97f4-ba632df94862"/>
<published>2025-06-17T07:00:00Z</published>
<title>2025 Thin Lift Overlay</title>
<updated>2025-07-21T16:25:52.6974647Z</updated>
<georss:line>49.25003745876373 -123.08577799495417 49.2500073866772 -123.08384334183293</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Shallow mill &amp; overlay of asphalt road surface in areas targeted due to poor condition.  Individual street segments to be closed  2-3 days at most.  Crews to alert residents of hard closure dates.
Location: General area is bound by Kingsway to north, Fraser to west, Victoria to east and 43rd Ave to south.
Schedule: Jun 25, 2025 - Jul 25, 2025</content>
<id>urn:uuid:c95b856d-1497-4b14-a3b9-0d6c62efe48f</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d1ef364f-8f52-4f5f-97f4-ba632df94862"/>
<published>2025-06-17T07:00:00Z</published>
<title>2025 Thin Lift Overlay</title>
<updated>2025-07-21T16:25:52.6974647Z</updated>
<georss:line>49.24659789560167 -123.09018823229042 49.24659157781426 -123.08959108485259</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Shallow mill &amp; overlay of asphalt road surface in areas targeted due to poor condition.  Individual street segments to be closed  2-3 days at most.  Crews to alert residents of hard closure dates.
Location: General area is bound by Kingsway to north, Fraser to west, Victoria to east and 43rd Ave to south.
Schedule: Jun 25, 2025 - Jul 25, 2025</content>
<id>urn:uuid:db0cb9fe-46f6-46e9-a6ac-ecf7a6fd6a15</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d1ef364f-8f52-4f5f-97f4-ba632df94862"/>
<published>2025-06-17T07:00:00Z</published>
<title>2025 Thin Lift Overlay</title>
<updated>2025-07-21T16:25:52.6974647Z</updated>
<georss:line>49.250066114033956 -123.0877115349202 49.25003745876373 -123.08577799495417</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Shallow mill &amp; overlay of asphalt road surface in areas targeted due to poor condition.  Individual street segments to be closed  2-3 days at most.  Crews to alert residents of hard closure dates.
Location: General area is bound by Kingsway to north, Fraser to west, Victoria to east and 43rd Ave to south.
Schedule: Jun 25, 2025 - Jul 25, 2025</content>
<id>urn:uuid:e2475c0f-7b7d-476e-963f-b08fa8ee8f7f</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d1ef364f-8f52-4f5f-97f4-ba632df94862"/>
<published>2025-06-17T07:00:00Z</published>
<title>2025 Thin Lift Overlay</title>
<updated>2025-07-21T16:25:52.6974647Z</updated>
<georss:line>49.25048949910553 -123.08576150571751 49.25003745876373 -123.08577799495417</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Shallow mill &amp; overlay of asphalt road surface in areas targeted due to poor condition.  Individual street segments to be closed  2-3 days at most.  Crews to alert residents of hard closure dates.
Location: General area is bound by Kingsway to north, Fraser to west, Victoria to east and 43rd Ave to south.
Schedule: Jun 25, 2025 - Jul 25, 2025</content>
<id>urn:uuid:9d520871-033d-4dd4-9370-e40bb28e8a84</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d1ef364f-8f52-4f5f-97f4-ba632df94862"/>
<published>2025-06-17T07:00:00Z</published>
<title>2025 Thin Lift Overlay</title>
<updated>2025-07-21T16:25:52.6974647Z</updated>
<georss:line>49.24549316496376 -123.0878286298476 49.24548619968789 -123.08717935315283</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Shallow mill &amp; overlay of asphalt road surface in areas targeted due to poor condition.  Individual street segments to be closed  2-3 days at most.  Crews to alert residents of hard closure dates.
Location: General area is bound by Kingsway to north, Fraser to west, Victoria to east and 43rd Ave to south.
Schedule: Jun 25, 2025 - Jul 25, 2025</content>
<id>urn:uuid:4fcbd4ce-9aee-47a2-871f-a82aa9e9558b</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d1ef364f-8f52-4f5f-97f4-ba632df94862"/>
<published>2025-06-17T07:00:00Z</published>
<title>2025 Thin Lift Overlay</title>
<updated>2025-07-21T16:25:52.6974647Z</updated>
<georss:line>49.245479104531796 -123.08654248326361 49.24547234883221 -123.08589197073806</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Shallow mill &amp; overlay of asphalt road surface in areas targeted due to poor condition.  Individual street segments to be closed  2-3 days at most.  Crews to alert residents of hard closure dates.
Location: General area is bound by Kingsway to north, Fraser to west, Victoria to east and 43rd Ave to south.
Schedule: Jun 25, 2025 - Jul 25, 2025</content>
<id>urn:uuid:5c619f22-c91c-4be2-aa55-3886ae74ba84</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d1ef364f-8f52-4f5f-97f4-ba632df94862"/>
<published>2025-06-17T07:00:00Z</published>
<title>2025 Thin Lift Overlay</title>
<updated>2025-07-21T16:25:52.6974647Z</updated>
<georss:line>49.24548619968789 -123.08717935315283 49.245479410589695 -123.0865782067283</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Shallow mill &amp; overlay of asphalt road surface in areas targeted due to poor condition.  Individual street segments to be closed  2-3 days at most.  Crews to alert residents of hard closure dates.
Location: General area is bound by Kingsway to north, Fraser to west, Victoria to east and 43rd Ave to south.
Schedule: Jun 25, 2025 - Jul 25, 2025</content>
<id>urn:uuid:80d0afc6-44ee-49af-8c1c-474996b8b571</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d1ef364f-8f52-4f5f-97f4-ba632df94862"/>
<published>2025-06-17T07:00:00Z</published>
<title>2025 Thin Lift Overlay</title>
<updated>2025-07-21T16:25:52.6974647Z</updated>
<georss:line>49.246564442654545 -123.08651802702254 49.24655577339561 -123.08582774743057</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Shallow mill &amp; overlay of asphalt road surface in areas targeted due to poor condition.  Individual street segments to be closed  2-3 days at most.  Crews to alert residents of hard closure dates.
Location: General area is bound by Kingsway to north, Fraser to west, Victoria to east and 43rd Ave to south.
Schedule: Jun 25, 2025 - Jul 25, 2025</content>
<id>urn:uuid:46de7e01-7078-46f0-afda-94516935531d</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d1ef364f-8f52-4f5f-97f4-ba632df94862"/>
<published>2025-06-17T07:00:00Z</published>
<title>2025 Thin Lift Overlay</title>
<updated>2025-07-21T16:25:52.6974647Z</updated>
<georss:line>49.24657204230084 -123.0871540736221 49.246564442654545 -123.08651802702254</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Shallow mill &amp; overlay of asphalt road surface in areas targeted due to poor condition.  Individual street segments to be closed  2-3 days at most.  Crews to alert residents of hard closure dates.
Location: General area is bound by Kingsway to north, Fraser to west, Victoria to east and 43rd Ave to south.
Schedule: Jun 25, 2025 - Jul 25, 2025</content>
<id>urn:uuid:8f13e3ad-c70a-40ea-bd6c-06a246201b99</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d1ef364f-8f52-4f5f-97f4-ba632df94862"/>
<published>2025-06-17T07:00:00Z</published>
<title>2025 Thin Lift Overlay</title>
<updated>2025-07-21T16:25:52.6974647Z</updated>
<georss:line>49.24658004265052 -123.08780272061155 49.24657204230084 -123.0871540736221</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Shallow mill &amp; overlay of asphalt road surface in areas targeted due to poor condition.  Individual street segments to be closed  2-3 days at most.  Crews to alert residents of hard closure dates.
Location: General area is bound by Kingsway to north, Fraser to west, Victoria to east and 43rd Ave to south.
Schedule: Jun 25, 2025 - Jul 25, 2025</content>
<id>urn:uuid:11c94dcc-e056-4024-a2f0-5340156e3bee</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d1ef364f-8f52-4f5f-97f4-ba632df94862"/>
<published>2025-06-17T07:00:00Z</published>
<title>2025 Thin Lift Overlay</title>
<updated>2025-07-21T16:25:52.6974647Z</updated>
<georss:line>49.2445819190973 -123.07821777478813 49.244577209848416 -123.07757108420601</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Shallow mill &amp; overlay of asphalt road surface in areas targeted due to poor condition.  Individual street segments to be closed  2-3 days at most.  Crews to alert residents of hard closure dates.
Location: General area is bound by Kingsway to north, Fraser to west, Victoria to east and 43rd Ave to south.
Schedule: Jun 25, 2025 - Jul 25, 2025</content>
<id>urn:uuid:e7f9fa95-144c-42bc-8e2d-f854713f39a7</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d1ef364f-8f52-4f5f-97f4-ba632df94862"/>
<published>2025-06-17T07:00:00Z</published>
<title>2025 Thin Lift Overlay</title>
<updated>2025-07-21T16:25:52.6974647Z</updated>
<georss:line>49.24458703251247 -123.07886006954946 49.2445819190973 -123.07821777478813</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Shallow mill &amp; overlay of asphalt road surface in areas targeted due to poor condition.  Individual street segments to be closed  2-3 days at most.  Crews to alert residents of hard closure dates.
Location: General area is bound by Kingsway to north, Fraser to west, Victoria to east and 43rd Ave to south.
Schedule: Jun 25, 2025 - Jul 25, 2025</content>
<id>urn:uuid:20b9433e-e029-4c4a-bc1e-3942f89a9333</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d1ef364f-8f52-4f5f-97f4-ba632df94862"/>
<published>2025-06-17T07:00:00Z</published>
<title>2025 Thin Lift Overlay</title>
<updated>2025-07-21T16:25:52.6974647Z</updated>
<georss:line>49.24459173679634 -123.07950349041406 49.24458703251247 -123.07886006954946</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Shallow mill &amp; overlay of asphalt road surface in areas targeted due to poor condition.  Individual street segments to be closed  2-3 days at most.  Crews to alert residents of hard closure dates.
Location: General area is bound by Kingsway to north, Fraser to west, Victoria to east and 43rd Ave to south.
Schedule: Jun 25, 2025 - Jul 25, 2025</content>
<id>urn:uuid:54c81bad-3f02-429e-abb4-215dd7c61306</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d1ef364f-8f52-4f5f-97f4-ba632df94862"/>
<published>2025-06-17T07:00:00Z</published>
<title>2025 Thin Lift Overlay</title>
<updated>2025-07-21T16:25:52.6974647Z</updated>
<georss:line>49.24459643499932 -123.08015051110044 49.24459173679634 -123.07950349041406</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Shallow mill &amp; overlay of asphalt road surface in areas targeted due to poor condition.  Individual street segments to be closed  2-3 days at most.  Crews to alert residents of hard closure dates.
Location: General area is bound by Kingsway to north, Fraser to west, Victoria to east and 43rd Ave to south.
Schedule: Jun 25, 2025 - Jul 25, 2025</content>
<id>urn:uuid:3121db53-b531-476f-b9ec-bf678d776f36</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d1ef364f-8f52-4f5f-97f4-ba632df94862"/>
<published>2025-06-17T07:00:00Z</published>
<title>2025 Thin Lift Overlay</title>
<updated>2025-07-21T16:25:52.6974647Z</updated>
<georss:line>49.24459966347473 -123.08074589705829 49.24459643499932 -123.08015051110044</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Shallow mill &amp; overlay of asphalt road surface in areas targeted due to poor condition.  Individual street segments to be closed  2-3 days at most.  Crews to alert residents of hard closure dates.
Location: General area is bound by Kingsway to north, Fraser to west, Victoria to east and 43rd Ave to south.
Schedule: Jun 25, 2025 - Jul 25, 2025</content>
<id>urn:uuid:cdefa114-7fee-45c5-9e6c-d709f1b56561</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d1ef364f-8f52-4f5f-97f4-ba632df94862"/>
<published>2025-06-17T07:00:00Z</published>
<title>2025 Thin Lift Overlay</title>
<updated>2025-07-21T16:25:52.6974647Z</updated>
<georss:line>49.244602475449625 -123.08134078779446 49.24459966347473 -123.08074589705829</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Shallow mill &amp; overlay of asphalt road surface in areas targeted due to poor condition.  Individual street segments to be closed  2-3 days at most.  Crews to alert residents of hard closure dates.
Location: General area is bound by Kingsway to north, Fraser to west, Victoria to east and 43rd Ave to south.
Schedule: Jun 25, 2025 - Jul 25, 2025</content>
<id>urn:uuid:a9a721e3-412e-4b22-bd58-b226d8df80d1</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d1ef364f-8f52-4f5f-97f4-ba632df94862"/>
<published>2025-06-17T07:00:00Z</published>
<title>2025 Thin Lift Overlay</title>
<updated>2025-07-21T16:25:52.6974647Z</updated>
<georss:line>49.24460595992511 -123.08203578458584 49.244602475449625 -123.08134078779446</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Shallow mill &amp; overlay of asphalt road surface in areas targeted due to poor condition.  Individual street segments to be closed  2-3 days at most.  Crews to alert residents of hard closure dates.
Location: General area is bound by Kingsway to north, Fraser to west, Victoria to east and 43rd Ave to south.
Schedule: Jun 25, 2025 - Jul 25, 2025</content>
<id>urn:uuid:50254f90-ef30-4ea1-beec-3eaa65c13259</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d1ef364f-8f52-4f5f-97f4-ba632df94862"/>
<published>2025-06-17T07:00:00Z</published>
<title>2025 Thin Lift Overlay</title>
<updated>2025-07-21T16:25:52.6974647Z</updated>
<georss:line>49.24460943510064 -123.08272536815859 49.24460595992511 -123.08203578458584</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Shallow mill &amp; overlay of asphalt road surface in areas targeted due to poor condition.  Individual street segments to be closed  2-3 days at most.  Crews to alert residents of hard closure dates.
Location: General area is bound by Kingsway to north, Fraser to west, Victoria to east and 43rd Ave to south.
Schedule: Jun 25, 2025 - Jul 25, 2025</content>
<id>urn:uuid:a5182387-4abc-4f68-b2fe-b947dc42253b</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d1ef364f-8f52-4f5f-97f4-ba632df94862"/>
<published>2025-06-17T07:00:00Z</published>
<title>2025 Thin Lift Overlay</title>
<updated>2025-07-21T16:25:52.6974647Z</updated>
<georss:line>49.24579638456257 -123.08269833286437 49.245448498410894 -123.08270462167054</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Shallow mill &amp; overlay of asphalt road surface in areas targeted due to poor condition.  Individual street segments to be closed  2-3 days at most.  Crews to alert residents of hard closure dates.
Location: General area is bound by Kingsway to north, Fraser to west, Victoria to east and 43rd Ave to south.
Schedule: Jun 25, 2025 - Jul 25, 2025</content>
<id>urn:uuid:3c3b70b5-0636-418b-8907-23686526fd0f</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d1ef364f-8f52-4f5f-97f4-ba632df94862"/>
<published>2025-06-17T07:00:00Z</published>
<title>2025 Thin Lift Overlay</title>
<updated>2025-07-21T16:25:52.6974647Z</updated>
<georss:line>49.24594751831995 -123.08011272911826 49.24543529094322 -123.08012977561161</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Shallow mill &amp; overlay of asphalt road surface in areas targeted due to poor condition.  Individual street segments to be closed  2-3 days at most.  Crews to alert residents of hard closure dates.
Location: General area is bound by Kingsway to north, Fraser to west, Victoria to east and 43rd Ave to south.
Schedule: Jun 25, 2025 - Jul 25, 2025</content>
<id>urn:uuid:564c67d0-2ae2-4824-91cd-4825f3ffdbf0</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d1ef364f-8f52-4f5f-97f4-ba632df94862"/>
<published>2025-06-17T07:00:00Z</published>
<title>2025 Thin Lift Overlay</title>
<updated>2025-07-21T16:25:52.6974647Z</updated>
<georss:line>49.24543886103697 -123.08075134610478 49.24543529094322 -123.08012977561161</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Shallow mill &amp; overlay of asphalt road surface in areas targeted due to poor condition.  Individual street segments to be closed  2-3 days at most.  Crews to alert residents of hard closure dates.
Location: General area is bound by Kingsway to north, Fraser to west, Victoria to east and 43rd Ave to south.
Schedule: Jun 25, 2025 - Jul 25, 2025</content>
<id>urn:uuid:9e9528de-79f2-44dc-b0ae-e242c8ecf741</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d1ef364f-8f52-4f5f-97f4-ba632df94862"/>
<published>2025-06-17T07:00:00Z</published>
<title>2025 Thin Lift Overlay</title>
<updated>2025-07-21T16:25:52.6974647Z</updated>
<georss:line>49.245441573095206 -123.08137312137262 49.24543886103697 -123.08075134610478</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Shallow mill &amp; overlay of asphalt road surface in areas targeted due to poor condition.  Individual street segments to be closed  2-3 days at most.  Crews to alert residents of hard closure dates.
Location: General area is bound by Kingsway to north, Fraser to west, Victoria to east and 43rd Ave to south.
Schedule: Jun 25, 2025 - Jul 25, 2025</content>
<id>urn:uuid:8437fd6e-5576-4afb-b91a-8ce67f91691a</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d1ef364f-8f52-4f5f-97f4-ba632df94862"/>
<published>2025-06-17T07:00:00Z</published>
<title>2025 Thin Lift Overlay</title>
<updated>2025-07-21T16:25:52.6974647Z</updated>
<georss:line>49.24254393586702 -123.08790757687201 49.24253067524694 -123.08597336803209</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Shallow mill &amp; overlay of asphalt road surface in areas targeted due to poor condition.  Individual street segments to be closed  2-3 days at most.  Crews to alert residents of hard closure dates.
Location: General area is bound by Kingsway to north, Fraser to west, Victoria to east and 43rd Ave to south.
Schedule: Jun 25, 2025 - Jul 25, 2025</content>
<id>urn:uuid:a6a65a3d-c30f-4283-ba50-f46419ace184</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d1ef364f-8f52-4f5f-97f4-ba632df94862"/>
<published>2025-06-17T07:00:00Z</published>
<title>2025 Thin Lift Overlay</title>
<updated>2025-07-21T16:25:52.6974647Z</updated>
<georss:line>49.24326521481265 -123.0859526058992 49.242884411049744 -123.08596387031378</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Shallow mill &amp; overlay of asphalt road surface in areas targeted due to poor condition.  Individual street segments to be closed  2-3 days at most.  Crews to alert residents of hard closure dates.
Location: General area is bound by Kingsway to north, Fraser to west, Victoria to east and 43rd Ave to south.
Schedule: Jun 25, 2025 - Jul 25, 2025</content>
<id>urn:uuid:2ecd6f31-dafa-467b-803f-5f8374ec71ed</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d1ef364f-8f52-4f5f-97f4-ba632df94862"/>
<published>2025-06-17T07:00:00Z</published>
<title>2025 Thin Lift Overlay</title>
<updated>2025-07-21T16:25:52.6974647Z</updated>
<georss:line>49.245479410589695 -123.0865782067283 49.24326396369378 -123.08664006075546</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Shallow mill &amp; overlay of asphalt road surface in areas targeted due to poor condition.  Individual street segments to be closed  2-3 days at most.  Crews to alert residents of hard closure dates.
Location: General area is bound by Kingsway to north, Fraser to west, Victoria to east and 43rd Ave to south.
Schedule: Jun 25, 2025 - Jul 25, 2025</content>
<id>urn:uuid:5977c8a4-41f9-43e3-b1de-d70fc3ec573c</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d1ef364f-8f52-4f5f-97f4-ba632df94862"/>
<published>2025-06-17T07:00:00Z</published>
<title>2025 Thin Lift Overlay</title>
<updated>2025-07-21T16:25:52.6974647Z</updated>
<georss:line>49.24547234883221 -123.08589197073806 49.24545477004338 -123.0839490672502</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Shallow mill &amp; overlay of asphalt road surface in areas targeted due to poor condition.  Individual street segments to be closed  2-3 days at most.  Crews to alert residents of hard closure dates.
Location: General area is bound by Kingsway to north, Fraser to west, Victoria to east and 43rd Ave to south.
Schedule: Jun 25, 2025 - Jul 25, 2025</content>
<id>urn:uuid:858e24d2-766a-47a9-90a7-3d9f669d1b23</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d1ef364f-8f52-4f5f-97f4-ba632df94862"/>
<published>2025-06-17T07:00:00Z</published>
<title>2025 Thin Lift Overlay</title>
<updated>2025-07-21T16:25:52.6974647Z</updated>
<georss:line>49.24392699890373 -123.08593440979122 49.24391222871975 -123.08398962072269</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Shallow mill &amp; overlay of asphalt road surface in areas targeted due to poor condition.  Individual street segments to be closed  2-3 days at most.  Crews to alert residents of hard closure dates.
Location: General area is bound by Kingsway to north, Fraser to west, Victoria to east and 43rd Ave to south.
Schedule: Jun 25, 2025 - Jul 25, 2025</content>
<id>urn:uuid:b0fc4d07-ffd8-43a3-870b-f8e0319b37f7</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d1ef364f-8f52-4f5f-97f4-ba632df94862"/>
<published>2025-06-17T07:00:00Z</published>
<title>2025 Thin Lift Overlay</title>
<updated>2025-07-21T16:25:52.6974647Z</updated>
<georss:line>49.24461549966179 -123.08396975108589 49.24460943510064 -123.08272536815859</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Shallow mill &amp; overlay of asphalt road surface in areas targeted due to poor condition.  Individual street segments to be closed  2-3 days at most.  Crews to alert residents of hard closure dates.
Location: General area is bound by Kingsway to north, Fraser to west, Victoria to east and 43rd Ave to south.
Schedule: Jun 25, 2025 - Jul 25, 2025</content>
<id>urn:uuid:6dc9c975-e9ba-42af-9d54-67c51fad67cc</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d1ef364f-8f52-4f5f-97f4-ba632df94862"/>
<published>2025-06-17T07:00:00Z</published>
<title>2025 Thin Lift Overlay</title>
<updated>2025-07-21T16:25:52.6974647Z</updated>
<georss:line>49.24065829093527 -123.08410119359122 49.24026179685001 -123.08411607189656</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Shallow mill &amp; overlay of asphalt road surface in areas targeted due to poor condition.  Individual street segments to be closed  2-3 days at most.  Crews to alert residents of hard closure dates.
Location: General area is bound by Kingsway to north, Fraser to west, Victoria to east and 43rd Ave to south.
Schedule: Jun 25, 2025 - Jul 25, 2025</content>
<id>urn:uuid:bb4a6742-74a0-44ec-803a-fd2dbe328e61</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d1ef364f-8f52-4f5f-97f4-ba632df94862"/>
<published>2025-06-17T07:00:00Z</published>
<title>2025 Thin Lift Overlay</title>
<updated>2025-07-21T16:25:52.6974647Z</updated>
<georss:line>49.23984318754202 -123.08460569853533 49.238237825545355 -123.08465326337178</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Shallow mill &amp; overlay of asphalt road surface in areas targeted due to poor condition.  Individual street segments to be closed  2-3 days at most.  Crews to alert residents of hard closure dates.
Location: General area is bound by Kingsway to north, Fraser to west, Victoria to east and 43rd Ave to south.
Schedule: Jun 25, 2025 - Jul 25, 2025</content>
<id>urn:uuid:771cf477-3784-4cf5-94c8-44930052b7c6</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d1ef364f-8f52-4f5f-97f4-ba632df94862"/>
<published>2025-06-17T07:00:00Z</published>
<title>2025 Thin Lift Overlay</title>
<updated>2025-07-21T16:25:52.6974647Z</updated>
<georss:line>49.24026478541339 -123.08459358729883 49.23984318754202 -123.08460569853533</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Shallow mill &amp; overlay of asphalt road surface in areas targeted due to poor condition.  Individual street segments to be closed  2-3 days at most.  Crews to alert residents of hard closure dates.
Location: General area is bound by Kingsway to north, Fraser to west, Victoria to east and 43rd Ave to south.
Schedule: Jun 25, 2025 - Jul 25, 2025</content>
<id>urn:uuid:ff3235a3-0a30-4156-b7ef-7605b9502646</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d1ef364f-8f52-4f5f-97f4-ba632df94862"/>
<published>2025-06-17T07:00:00Z</published>
<title>2025 Thin Lift Overlay</title>
<updated>2025-07-21T16:25:52.6974647Z</updated>
<georss:line>49.24211886173899 -123.08404528456572 49.24065829093527 -123.08410119359122</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Shallow mill &amp; overlay of asphalt road surface in areas targeted due to poor condition.  Individual street segments to be closed  2-3 days at most.  Crews to alert residents of hard closure dates.
Location: General area is bound by Kingsway to north, Fraser to west, Victoria to east and 43rd Ave to south.
Schedule: Jun 25, 2025 - Jul 25, 2025</content>
<id>urn:uuid:430e978c-e379-4bc7-8575-da5249a5c83d</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d1ef364f-8f52-4f5f-97f4-ba632df94862"/>
<published>2025-06-17T07:00:00Z</published>
<title>2025 Thin Lift Overlay</title>
<updated>2025-07-21T16:25:52.6974647Z</updated>
<georss:line>49.24084380849695 -123.08795499251227 49.240830491661455 -123.0860248752808</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Shallow mill &amp; overlay of asphalt road surface in areas targeted due to poor condition.  Individual street segments to be closed  2-3 days at most.  Crews to alert residents of hard closure dates.
Location: General area is bound by Kingsway to north, Fraser to west, Victoria to east and 43rd Ave to south.
Schedule: Jun 25, 2025 - Jul 25, 2025</content>
<id>urn:uuid:a9b59083-71fa-4094-bbfa-3fddb16c7e93</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d1ef364f-8f52-4f5f-97f4-ba632df94862"/>
<published>2025-06-17T07:00:00Z</published>
<title>2025 Thin Lift Overlay</title>
<updated>2025-07-21T16:25:52.6974647Z</updated>
<georss:line>49.241707744881495 -123.08963180464109 49.24169431604159 -123.087933216142</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Shallow mill &amp; overlay of asphalt road surface in areas targeted due to poor condition.  Individual street segments to be closed  2-3 days at most.  Crews to alert residents of hard closure dates.
Location: General area is bound by Kingsway to north, Fraser to west, Victoria to east and 43rd Ave to south.
Schedule: Jun 25, 2025 - Jul 25, 2025</content>
<id>urn:uuid:6039c9a2-f784-40c7-ace2-c17328b452a7</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d1ef364f-8f52-4f5f-97f4-ba632df94862"/>
<published>2025-06-17T07:00:00Z</published>
<title>2025 Thin Lift Overlay</title>
<updated>2025-07-21T16:25:52.6974647Z</updated>
<georss:line>49.2417133357817 -123.09030705044604 49.241707744881495 -123.08963180464109</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Shallow mill &amp; overlay of asphalt road surface in areas targeted due to poor condition.  Individual street segments to be closed  2-3 days at most.  Crews to alert residents of hard closure dates.
Location: General area is bound by Kingsway to north, Fraser to west, Victoria to east and 43rd Ave to south.
Schedule: Jun 25, 2025 - Jul 25, 2025</content>
<id>urn:uuid:8dab13a7-eaae-4b50-b746-e3b63bbe0a27</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d1ef364f-8f52-4f5f-97f4-ba632df94862"/>
<published>2025-06-17T07:00:00Z</published>
<title>2025 Thin Lift Overlay</title>
<updated>2025-07-21T16:25:52.6974647Z</updated>
<georss:line>49.24251594227604 -123.08402779578428 49.24211886173899 -123.08404528456572</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Shallow mill &amp; overlay of asphalt road surface in areas targeted due to poor condition.  Individual street segments to be closed  2-3 days at most.  Crews to alert residents of hard closure dates.
Location: General area is bound by Kingsway to north, Fraser to west, Victoria to east and 43rd Ave to south.
Schedule: Jun 25, 2025 - Jul 25, 2025</content>
<id>urn:uuid:a8b7892f-c8ec-4cd4-b9e5-65558343a0e9</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d1ef364f-8f52-4f5f-97f4-ba632df94862"/>
<published>2025-06-17T07:00:00Z</published>
<title>2025 Thin Lift Overlay</title>
<updated>2025-07-21T16:25:52.6974647Z</updated>
<georss:line>49.242520425500004 -123.0846267174755 49.24251594227604 -123.08402779578428</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Shallow mill &amp; overlay of asphalt road surface in areas targeted due to poor condition.  Individual street segments to be closed  2-3 days at most.  Crews to alert residents of hard closure dates.
Location: General area is bound by Kingsway to north, Fraser to west, Victoria to east and 43rd Ave to south.
Schedule: Jun 25, 2025 - Jul 25, 2025</content>
<id>urn:uuid:d5f0bace-0180-4ed9-a762-867ada1df418</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d1ef364f-8f52-4f5f-97f4-ba632df94862"/>
<published>2025-06-17T07:00:00Z</published>
<title>2025 Thin Lift Overlay</title>
<updated>2025-07-21T16:25:52.6974647Z</updated>
<georss:line>49.242526243970445 -123.08537445992023 49.242520425500004 -123.0846267174755</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Shallow mill &amp; overlay of asphalt road surface in areas targeted due to poor condition.  Individual street segments to be closed  2-3 days at most.  Crews to alert residents of hard closure dates.
Location: General area is bound by Kingsway to north, Fraser to west, Victoria to east and 43rd Ave to south.
Schedule: Jun 25, 2025 - Jul 25, 2025</content>
<id>urn:uuid:bd027814-cead-4fbf-bc9b-e9cff8454dbd</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d1ef364f-8f52-4f5f-97f4-ba632df94862"/>
<published>2025-06-17T07:00:00Z</published>
<title>2025 Thin Lift Overlay</title>
<updated>2025-07-21T16:25:52.6974647Z</updated>
<georss:line>49.24253067524694 -123.08597336803209 49.242526243970445 -123.08537445992023</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Shallow mill &amp; overlay of asphalt road surface in areas targeted due to poor condition.  Individual street segments to be closed  2-3 days at most.  Crews to alert residents of hard closure dates.
Location: General area is bound by Kingsway to north, Fraser to west, Victoria to east and 43rd Ave to south.
Schedule: Jun 25, 2025 - Jul 25, 2025</content>
<id>urn:uuid:a768b92c-7cd3-4f51-a52f-6d042218ee9f</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d1ef364f-8f52-4f5f-97f4-ba632df94862"/>
<published>2025-06-17T07:00:00Z</published>
<title>2025 Thin Lift Overlay</title>
<updated>2025-07-21T16:25:52.6974647Z</updated>
<georss:line>49.242884411049744 -123.08596387031378 49.24253067524694 -123.08597336803209</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>On Sunday, October 4, 2026, the following locations will be closed for the CIBC Run for the Cure event: 

Event will cause various road closures and traffic delays on the following locations:

Sunday, October 4, 2026 from 05:00 am to 2:00 pm 

•	Pacific Blvd from Nelson to Quebec
•	Pat Quinn Way, from Pacific to Expo 
•	Cambie Bridge Off-Ramp to Pacific Blvd

Sunday, October 4, 2026 from 09:00 am to 11:00 am 

•	Expo Blvd, from Abbott to Quebec
•	Keefer, from Carrall to Columbia/Quebec
•	W 6th Ave, from Quebec to Cambie
•	Abbott St., from Pender to Pacific Blvd 
•	Carrall St., from Keefer to Pacific Blvd
•	Quebec, from Keefer to E 7th Ave
•	2nd Ave, from Main to Cambie
•	Westbound Terminal Ave, from Main to Quebec
•	Cambie Bridge on-ramp, from W 2nd
•	Cambie St &amp; Cambie Bridge (northbound), from W Broadway to Expo Blvd 

Location: Various locations
Schedule: Oct 4, 2026 5:00 AM - 2:00 PM</content>
<id>urn:uuid:272c4bb7-defe-4fd3-9291-8d46d8b61965</id>
<link href="https://support.cancer.ca/site/TR/RunfortheCure/RFTC_NW_odd_?fr_id=28558&amp;pg=entry"/>
<published>2026-03-20T07:00:00Z</published>
<title>2026 CIBC Run For Cure</title>
<updated>2026-03-11T20:38:51.8982211Z</updated>
<georss:line>49.27805537518 -123.10614747012 49.27787309031996 -123.10505215532 49.277783110558005 -123.10446781537001 49.277732919206045 -123.10420684444001 49.27770902946202 -123.10409544467998</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>On Sunday, October 4, 2026, the following locations will be closed for the CIBC Run for the Cure event: 

Event will cause various road closures and traffic delays on the following locations:

Sunday, October 4, 2026 from 05:00 am to 2:00 pm 

•	Pacific Blvd from Nelson to Quebec
•	Pat Quinn Way, from Pacific to Expo 
•	Cambie Bridge Off-Ramp to Pacific Blvd

Sunday, October 4, 2026 from 09:00 am to 11:00 am 

•	Expo Blvd, from Abbott to Quebec
•	Keefer, from Carrall to Columbia/Quebec
•	W 6th Ave, from Quebec to Cambie
•	Abbott St., from Pender to Pacific Blvd 
•	Carrall St., from Keefer to Pacific Blvd
•	Quebec, from Keefer to E 7th Ave
•	2nd Ave, from Main to Cambie
•	Westbound Terminal Ave, from Main to Quebec
•	Cambie Bridge on-ramp, from W 2nd
•	Cambie St &amp; Cambie Bridge (northbound), from W Broadway to Expo Blvd 

Location: Various locations
Schedule: Oct 4, 2026 5:00 AM - 2:00 PM</content>
<id>urn:uuid:24f41d9a-b8ea-481e-9df3-1b431fc69418</id>
<link href="https://support.cancer.ca/site/TR/RunfortheCure/RFTC_NW_odd_?fr_id=28558&amp;pg=entry"/>
<published>2026-03-20T07:00:00Z</published>
<title>2026 CIBC Run For Cure</title>
<updated>2026-03-11T20:38:51.8982211Z</updated>
<georss:line>49.279245716933985 -123.10443941948999 49.27922683875397 -123.10444637785 49.279208041082995 -123.10445383132999 49.27918932392001 -123.10446177995 49.27917070524299 -123.10447023747001 49.27915219406 -123.10447919018 49.27913378138797 -123.1044886243 49.27911547620897 -123.10449855359998 49.279097287531016 -123.10450896436 49.27907922435 -123.10451985658 49.279061286651995 -123.10453124403001 49.279043483457 -123.10454309920999 49.279025814753 -123.10455543588002 49.27900829854201 -123.10456824032 49.27899091684699 -123.10458149876 49.27897369663998 -123.10459522499 49.27895663792103 -123.10460941901 49.278939740715 -123.10462405333 49.27892301400399 -123.10463914171 49.278906466797 -123.10465467043 49.27889009009601 -123.10467063945998 49.278873910900955 -123.10468703511002 49.27885791120801 -123.1047038711 49.27884210901999 -123.10472113369998 49.27882650434904 -123.10473880918 49.278811106190005 -123.10475689756 49.278795914543025 -123.10477539881998 49.27878093841599 -123.10479429924 49.27876617781996 -123.10481358508 49.27875165072098 -123.10483328387 49.278737339166014 -123.10485335432 49.278723261143995 -123.10487379647 49.278709416644006 -123.10489462406998 49.278695814684994 -123.10491580964 49.27868245526702 -123.10493735319 49.27866934738398 -123.10495925473 49.278656491037 -123.10498151426 49.278643886264035 -123.10500409053 49.27863155102801 -123.10502701108001 49.278619467352 -123.10505026213 49.278607662247 -123.10507381623 49.278596117709014 -123.10509768709998 49.27858485172899 -123.10512187477 49.27857386433101 -123.10514635174 49.278563155515 -123.10517111801998 49.27855273428901 -123.10519615988 49.278544286640965 -123.10521720503 49.278388647696005 -123.10562614611 49.278387574343014 -123.10562934727 49.278332351344005 -123.1057589072 49.27826856451199 -123.10587894816 49.27819692571799 -123.10598813802 49.27811820966201 -123.10608529607 49.27805537518 -123.10614747012</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>On Sunday, October 4, 2026, the following locations will be closed for the CIBC Run for the Cure event: 

Event will cause various road closures and traffic delays on the following locations:

Sunday, October 4, 2026 from 05:00 am to 2:00 pm 

•	Pacific Blvd from Nelson to Quebec
•	Pat Quinn Way, from Pacific to Expo 
•	Cambie Bridge Off-Ramp to Pacific Blvd

Sunday, October 4, 2026 from 09:00 am to 11:00 am 

•	Expo Blvd, from Abbott to Quebec
•	Keefer, from Carrall to Columbia/Quebec
•	W 6th Ave, from Quebec to Cambie
•	Abbott St., from Pender to Pacific Blvd 
•	Carrall St., from Keefer to Pacific Blvd
•	Quebec, from Keefer to E 7th Ave
•	2nd Ave, from Main to Cambie
•	Westbound Terminal Ave, from Main to Quebec
•	Cambie Bridge on-ramp, from W 2nd
•	Cambie St &amp; Cambie Bridge (northbound), from W Broadway to Expo Blvd 

Location: Various locations
Schedule: Oct 4, 2026 5:00 AM - 2:00 PM</content>
<id>urn:uuid:34275064-c241-459f-ad98-391e096187d9</id>
<link href="https://support.cancer.ca/site/TR/RunfortheCure/RFTC_NW_odd_?fr_id=28558&amp;pg=entry"/>
<published>2026-03-20T07:00:00Z</published>
<title>2026 CIBC Run For Cure</title>
<updated>2026-03-11T20:38:51.8982211Z</updated>
<georss:line>49.279712697719276 -123.1076326076154 49.278653179756986 -123.10763523781915</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>On Sunday, October 4, 2026, the following locations will be closed for the CIBC Run for the Cure event: 

Event will cause various road closures and traffic delays on the following locations:

Sunday, October 4, 2026 from 05:00 am to 2:00 pm 

•	Pacific Blvd from Nelson to Quebec
•	Pat Quinn Way, from Pacific to Expo 
•	Cambie Bridge Off-Ramp to Pacific Blvd

Sunday, October 4, 2026 from 09:00 am to 11:00 am 

•	Expo Blvd, from Abbott to Quebec
•	Keefer, from Carrall to Columbia/Quebec
•	W 6th Ave, from Quebec to Cambie
•	Abbott St., from Pender to Pacific Blvd 
•	Carrall St., from Keefer to Pacific Blvd
•	Quebec, from Keefer to E 7th Ave
•	2nd Ave, from Main to Cambie
•	Westbound Terminal Ave, from Main to Quebec
•	Cambie Bridge on-ramp, from W 2nd
•	Cambie St &amp; Cambie Bridge (northbound), from W Broadway to Expo Blvd 

Location: Various locations
Schedule: Oct 4, 2026 5:00 AM - 2:00 PM</content>
<id>urn:uuid:e3c2b1aa-7287-4b78-b54e-a2e4eb245696</id>
<link href="https://support.cancer.ca/site/TR/RunfortheCure/RFTC_NW_odd_?fr_id=28558&amp;pg=entry"/>
<published>2026-03-20T07:00:00Z</published>
<title>2026 CIBC Run For Cure</title>
<updated>2026-03-11T20:38:51.8982211Z</updated>
<georss:line>49.279245716933985 -123.10443941948999 49.27921129506504 -123.10247734306999 49.279273503301965 -123.10221604896</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>On Sunday, October 4, 2026, the following locations will be closed for the CIBC Run for the Cure event: 

Event will cause various road closures and traffic delays on the following locations:

Sunday, October 4, 2026 from 05:00 am to 2:00 pm 

•	Pacific Blvd from Nelson to Quebec
•	Pat Quinn Way, from Pacific to Expo 
•	Cambie Bridge Off-Ramp to Pacific Blvd

Sunday, October 4, 2026 from 09:00 am to 11:00 am 

•	Expo Blvd, from Abbott to Quebec
•	Keefer, from Carrall to Columbia/Quebec
•	W 6th Ave, from Quebec to Cambie
•	Abbott St., from Pender to Pacific Blvd 
•	Carrall St., from Keefer to Pacific Blvd
•	Quebec, from Keefer to E 7th Ave
•	2nd Ave, from Main to Cambie
•	Westbound Terminal Ave, from Main to Quebec
•	Cambie Bridge on-ramp, from W 2nd
•	Cambie St &amp; Cambie Bridge (northbound), from W Broadway to Expo Blvd 

Location: Various locations
Schedule: Oct 4, 2026 5:00 AM - 2:00 PM</content>
<id>urn:uuid:c22e6f71-b2ae-4b1a-9540-c1e3f8131bec</id>
<link href="https://support.cancer.ca/site/TR/RunfortheCure/RFTC_NW_odd_?fr_id=28558&amp;pg=entry"/>
<published>2026-03-20T07:00:00Z</published>
<title>2026 CIBC Run For Cure</title>
<updated>2026-03-11T20:38:51.8982211Z</updated>
<georss:line>49.280598194938136 -123.10762976362741 49.279712697719276 -123.1076326076154</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>On Sunday, October 4, 2026, the following locations will be closed for the CIBC Run for the Cure event: 

Event will cause various road closures and traffic delays on the following locations:

Sunday, October 4, 2026 from 05:00 am to 2:00 pm 

•	Pacific Blvd from Nelson to Quebec
•	Pat Quinn Way, from Pacific to Expo 
•	Cambie Bridge Off-Ramp to Pacific Blvd

Sunday, October 4, 2026 from 09:00 am to 11:00 am 

•	Expo Blvd, from Abbott to Quebec
•	Keefer, from Carrall to Columbia/Quebec
•	W 6th Ave, from Quebec to Cambie
•	Abbott St., from Pender to Pacific Blvd 
•	Carrall St., from Keefer to Pacific Blvd
•	Quebec, from Keefer to E 7th Ave
•	2nd Ave, from Main to Cambie
•	Westbound Terminal Ave, from Main to Quebec
•	Cambie Bridge on-ramp, from W 2nd
•	Cambie St &amp; Cambie Bridge (northbound), from W Broadway to Expo Blvd 

Location: Various locations
Schedule: Oct 4, 2026 5:00 AM - 2:00 PM</content>
<id>urn:uuid:c40da350-9fbd-449f-a059-750af41ed824</id>
<link href="https://support.cancer.ca/site/TR/RunfortheCure/RFTC_NW_odd_?fr_id=28558&amp;pg=entry"/>
<published>2026-03-20T07:00:00Z</published>
<title>2026 CIBC Run For Cure</title>
<updated>2026-03-11T20:38:51.8982211Z</updated>
<georss:line>49.28108380246945 -123.10758815577525 49.280903620900006 -123.10762586348287 49.280598194938136 -123.10762976362741</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>On Sunday, October 4, 2026, the following locations will be closed for the CIBC Run for the Cure event: 

Event will cause various road closures and traffic delays on the following locations:

Sunday, October 4, 2026 from 05:00 am to 2:00 pm 

•	Pacific Blvd from Nelson to Quebec
•	Pat Quinn Way, from Pacific to Expo 
•	Cambie Bridge Off-Ramp to Pacific Blvd

Sunday, October 4, 2026 from 09:00 am to 11:00 am 

•	Expo Blvd, from Abbott to Quebec
•	Keefer, from Carrall to Columbia/Quebec
•	W 6th Ave, from Quebec to Cambie
•	Abbott St., from Pender to Pacific Blvd 
•	Carrall St., from Keefer to Pacific Blvd
•	Quebec, from Keefer to E 7th Ave
•	2nd Ave, from Main to Cambie
•	Westbound Terminal Ave, from Main to Quebec
•	Cambie Bridge on-ramp, from W 2nd
•	Cambie St &amp; Cambie Bridge (northbound), from W Broadway to Expo Blvd 

Location: Various locations
Schedule: Oct 4, 2026 5:00 AM - 2:00 PM</content>
<id>urn:uuid:7acff191-0495-4778-a7b5-400153c20e54</id>
<link href="https://support.cancer.ca/site/TR/RunfortheCure/RFTC_NW_odd_?fr_id=28558&amp;pg=entry"/>
<published>2026-03-20T07:00:00Z</published>
<title>2026 CIBC Run For Cure</title>
<updated>2026-03-11T20:38:51.8982211Z</updated>
<georss:line>49.28108380246945 -123.10758815577525 49.280903620900006 -123.10762586348287 49.280598194938136 -123.10762976362741</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>On Sunday, October 4, 2026, the following locations will be closed for the CIBC Run for the Cure event: 

Event will cause various road closures and traffic delays on the following locations:

Sunday, October 4, 2026 from 05:00 am to 2:00 pm 

•	Pacific Blvd from Nelson to Quebec
•	Pat Quinn Way, from Pacific to Expo 
•	Cambie Bridge Off-Ramp to Pacific Blvd

Sunday, October 4, 2026 from 09:00 am to 11:00 am 

•	Expo Blvd, from Abbott to Quebec
•	Keefer, from Carrall to Columbia/Quebec
•	W 6th Ave, from Quebec to Cambie
•	Abbott St., from Pender to Pacific Blvd 
•	Carrall St., from Keefer to Pacific Blvd
•	Quebec, from Keefer to E 7th Ave
•	2nd Ave, from Main to Cambie
•	Westbound Terminal Ave, from Main to Quebec
•	Cambie Bridge on-ramp, from W 2nd
•	Cambie St &amp; Cambie Bridge (northbound), from W Broadway to Expo Blvd 

Location: Various locations
Schedule: Oct 4, 2026 5:00 AM - 2:00 PM</content>
<id>urn:uuid:ceeaade9-36c6-4bfc-b890-97f35e2f0b9b</id>
<link href="https://support.cancer.ca/site/TR/RunfortheCure/RFTC_NW_odd_?fr_id=28558&amp;pg=entry"/>
<published>2026-03-20T07:00:00Z</published>
<title>2026 CIBC Run For Cure</title>
<updated>2026-03-11T20:38:51.8982211Z</updated>
<georss:line>49.28108380246945 -123.10758815577525 49.280903620900006 -123.10762586348287 49.280598194938136 -123.10762976362741</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>On Sunday, October 4, 2026, the following locations will be closed for the CIBC Run for the Cure event: 

Event will cause various road closures and traffic delays on the following locations:

Sunday, October 4, 2026 from 05:00 am to 2:00 pm 

•	Pacific Blvd from Nelson to Quebec
•	Pat Quinn Way, from Pacific to Expo 
•	Cambie Bridge Off-Ramp to Pacific Blvd

Sunday, October 4, 2026 from 09:00 am to 11:00 am 

•	Expo Blvd, from Abbott to Quebec
•	Keefer, from Carrall to Columbia/Quebec
•	W 6th Ave, from Quebec to Cambie
•	Abbott St., from Pender to Pacific Blvd 
•	Carrall St., from Keefer to Pacific Blvd
•	Quebec, from Keefer to E 7th Ave
•	2nd Ave, from Main to Cambie
•	Westbound Terminal Ave, from Main to Quebec
•	Cambie Bridge on-ramp, from W 2nd
•	Cambie St &amp; Cambie Bridge (northbound), from W Broadway to Expo Blvd 

Location: Various locations
Schedule: Oct 4, 2026 5:00 AM - 2:00 PM</content>
<id>urn:uuid:b67f5204-9146-4ba4-9ef8-1017e2788270</id>
<link href="https://support.cancer.ca/site/TR/RunfortheCure/RFTC_NW_odd_?fr_id=28558&amp;pg=entry"/>
<published>2026-03-20T07:00:00Z</published>
<title>2026 CIBC Run For Cure</title>
<updated>2026-03-11T20:38:51.8982211Z</updated>
<georss:line>49.271903157769 -123.10191517272999 49.27187118612002 -123.10192846887 49.27182360986001 -123.10194963731 49.27177628433196 -123.10197208469002 49.27172922756196 -123.10199576978998 49.27168243952599 -123.10202072012 49.271664953314996 -123.10203040309 49.27121705258401 -123.10227804784999</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>On Sunday, October 4, 2026, the following locations will be closed for the CIBC Run for the Cure event: 

Event will cause various road closures and traffic delays on the following locations:

Sunday, October 4, 2026 from 05:00 am to 2:00 pm 

•	Pacific Blvd from Nelson to Quebec
•	Pat Quinn Way, from Pacific to Expo 
•	Cambie Bridge Off-Ramp to Pacific Blvd

Sunday, October 4, 2026 from 09:00 am to 11:00 am 

•	Expo Blvd, from Abbott to Quebec
•	Keefer, from Carrall to Columbia/Quebec
•	W 6th Ave, from Quebec to Cambie
•	Abbott St., from Pender to Pacific Blvd 
•	Carrall St., from Keefer to Pacific Blvd
•	Quebec, from Keefer to E 7th Ave
•	2nd Ave, from Main to Cambie
•	Westbound Terminal Ave, from Main to Quebec
•	Cambie Bridge on-ramp, from W 2nd
•	Cambie St &amp; Cambie Bridge (northbound), from W Broadway to Expo Blvd 

Location: Various locations
Schedule: Oct 4, 2026 5:00 AM - 2:00 PM</content>
<id>urn:uuid:aa2c049c-dfd2-4d48-9ffb-06adaa1235cd</id>
<link href="https://support.cancer.ca/site/TR/RunfortheCure/RFTC_NW_odd_?fr_id=28558&amp;pg=entry"/>
<published>2026-03-20T07:00:00Z</published>
<title>2026 CIBC Run For Cure</title>
<updated>2026-03-11T20:38:51.8982211Z</updated>
<georss:line>49.276814923929436 -123.10224706283506 49.27752343656769 -123.10223927467038 49.27761174011107 -123.1021400279415</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>On Sunday, October 4, 2026, the following locations will be closed for the CIBC Run for the Cure event: 

Event will cause various road closures and traffic delays on the following locations:

Sunday, October 4, 2026 from 05:00 am to 2:00 pm 

•	Pacific Blvd from Nelson to Quebec
•	Pat Quinn Way, from Pacific to Expo 
•	Cambie Bridge Off-Ramp to Pacific Blvd

Sunday, October 4, 2026 from 09:00 am to 11:00 am 

•	Expo Blvd, from Abbott to Quebec
•	Keefer, from Carrall to Columbia/Quebec
•	W 6th Ave, from Quebec to Cambie
•	Abbott St., from Pender to Pacific Blvd 
•	Carrall St., from Keefer to Pacific Blvd
•	Quebec, from Keefer to E 7th Ave
•	2nd Ave, from Main to Cambie
•	Westbound Terminal Ave, from Main to Quebec
•	Cambie Bridge on-ramp, from W 2nd
•	Cambie St &amp; Cambie Bridge (northbound), from W Broadway to Expo Blvd 

Location: Various locations
Schedule: Oct 4, 2026 5:00 AM - 2:00 PM</content>
<id>urn:uuid:9d937dcc-a963-4760-a8c3-b3ae32d3acc5</id>
<link href="https://support.cancer.ca/site/TR/RunfortheCure/RFTC_NW_odd_?fr_id=28558&amp;pg=entry"/>
<published>2026-03-20T07:00:00Z</published>
<title>2026 CIBC Run For Cure</title>
<updated>2026-03-11T20:38:51.8982211Z</updated>
<georss:line>49.276070502321005 -123.10207916694999 49.27534324903499 -123.1019992895</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>On Sunday, October 4, 2026, the following locations will be closed for the CIBC Run for the Cure event: 

Event will cause various road closures and traffic delays on the following locations:

Sunday, October 4, 2026 from 05:00 am to 2:00 pm 

•	Pacific Blvd from Nelson to Quebec
•	Pat Quinn Way, from Pacific to Expo 
•	Cambie Bridge Off-Ramp to Pacific Blvd

Sunday, October 4, 2026 from 09:00 am to 11:00 am 

•	Expo Blvd, from Abbott to Quebec
•	Keefer, from Carrall to Columbia/Quebec
•	W 6th Ave, from Quebec to Cambie
•	Abbott St., from Pender to Pacific Blvd 
•	Carrall St., from Keefer to Pacific Blvd
•	Quebec, from Keefer to E 7th Ave
•	2nd Ave, from Main to Cambie
•	Westbound Terminal Ave, from Main to Quebec
•	Cambie Bridge on-ramp, from W 2nd
•	Cambie St &amp; Cambie Bridge (northbound), from W Broadway to Expo Blvd 

Location: Various locations
Schedule: Oct 4, 2026 5:00 AM - 2:00 PM</content>
<id>urn:uuid:4eef74be-9867-45b3-b7c0-d49eeb6b360f</id>
<link href="https://support.cancer.ca/site/TR/RunfortheCure/RFTC_NW_odd_?fr_id=28558&amp;pg=entry"/>
<published>2026-03-20T07:00:00Z</published>
<title>2026 CIBC Run For Cure</title>
<updated>2026-03-11T20:38:51.8982211Z</updated>
<georss:line>49.27534324903499 -123.1019992895 49.27495451878599 -123.10192137669002</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>On Sunday, October 4, 2026, the following locations will be closed for the CIBC Run for the Cure event: 

Event will cause various road closures and traffic delays on the following locations:

Sunday, October 4, 2026 from 05:00 am to 2:00 pm 

•	Pacific Blvd from Nelson to Quebec
•	Pat Quinn Way, from Pacific to Expo 
•	Cambie Bridge Off-Ramp to Pacific Blvd

Sunday, October 4, 2026 from 09:00 am to 11:00 am 

•	Expo Blvd, from Abbott to Quebec
•	Keefer, from Carrall to Columbia/Quebec
•	W 6th Ave, from Quebec to Cambie
•	Abbott St., from Pender to Pacific Blvd 
•	Carrall St., from Keefer to Pacific Blvd
•	Quebec, from Keefer to E 7th Ave
•	2nd Ave, from Main to Cambie
•	Westbound Terminal Ave, from Main to Quebec
•	Cambie Bridge on-ramp, from W 2nd
•	Cambie St &amp; Cambie Bridge (northbound), from W Broadway to Expo Blvd 

Location: Various locations
Schedule: Oct 4, 2026 5:00 AM - 2:00 PM</content>
<id>urn:uuid:da2d62ea-d639-45e1-bf64-dfd9a198699f</id>
<link href="https://support.cancer.ca/site/TR/RunfortheCure/RFTC_NW_odd_?fr_id=28558&amp;pg=entry"/>
<published>2026-03-20T07:00:00Z</published>
<title>2026 CIBC Run For Cure</title>
<updated>2026-03-11T20:38:51.8982211Z</updated>
<georss:line>49.279273503301965 -123.10221604896 49.27906675449901 -123.10212850854 49.277642397627005 -123.10212474263999</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>On Sunday, October 4, 2026, the following locations will be closed for the CIBC Run for the Cure event: 

Event will cause various road closures and traffic delays on the following locations:

Sunday, October 4, 2026 from 05:00 am to 2:00 pm 

•	Pacific Blvd from Nelson to Quebec
•	Pat Quinn Way, from Pacific to Expo 
•	Cambie Bridge Off-Ramp to Pacific Blvd

Sunday, October 4, 2026 from 09:00 am to 11:00 am 

•	Expo Blvd, from Abbott to Quebec
•	Keefer, from Carrall to Columbia/Quebec
•	W 6th Ave, from Quebec to Cambie
•	Abbott St., from Pender to Pacific Blvd 
•	Carrall St., from Keefer to Pacific Blvd
•	Quebec, from Keefer to E 7th Ave
•	2nd Ave, from Main to Cambie
•	Westbound Terminal Ave, from Main to Quebec
•	Cambie Bridge on-ramp, from W 2nd
•	Cambie St &amp; Cambie Bridge (northbound), from W Broadway to Expo Blvd 

Location: Various locations
Schedule: Oct 4, 2026 5:00 AM - 2:00 PM</content>
<id>urn:uuid:f07b155c-158f-498f-8b93-f09692a79e5a</id>
<link href="https://support.cancer.ca/site/TR/RunfortheCure/RFTC_NW_odd_?fr_id=28558&amp;pg=entry"/>
<published>2026-03-20T07:00:00Z</published>
<title>2026 CIBC Run For Cure</title>
<updated>2026-03-11T20:38:51.8982211Z</updated>
<georss:line>49.27495451878599 -123.10192137669002 49.27445189025099 -123.10180391238002 49.27402874225996 -123.10170778502001 49.27373035436696 -123.10170717154 49.27301600088197 -123.10172809713</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>On Sunday, October 4, 2026, the following locations will be closed for the CIBC Run for the Cure event: 

Event will cause various road closures and traffic delays on the following locations:

Sunday, October 4, 2026 from 05:00 am to 2:00 pm 

•	Pacific Blvd from Nelson to Quebec
•	Pat Quinn Way, from Pacific to Expo 
•	Cambie Bridge Off-Ramp to Pacific Blvd

Sunday, October 4, 2026 from 09:00 am to 11:00 am 

•	Expo Blvd, from Abbott to Quebec
•	Keefer, from Carrall to Columbia/Quebec
•	W 6th Ave, from Quebec to Cambie
•	Abbott St., from Pender to Pacific Blvd 
•	Carrall St., from Keefer to Pacific Blvd
•	Quebec, from Keefer to E 7th Ave
•	2nd Ave, from Main to Cambie
•	Westbound Terminal Ave, from Main to Quebec
•	Cambie Bridge on-ramp, from W 2nd
•	Cambie St &amp; Cambie Bridge (northbound), from W Broadway to Expo Blvd 

Location: Various locations
Schedule: Oct 4, 2026 5:00 AM - 2:00 PM</content>
<id>urn:uuid:52f79b47-8167-4510-9339-e4fb3389fe66</id>
<link href="https://support.cancer.ca/site/TR/RunfortheCure/RFTC_NW_odd_?fr_id=28558&amp;pg=entry"/>
<published>2026-03-20T07:00:00Z</published>
<title>2026 CIBC Run For Cure</title>
<updated>2026-03-11T20:38:51.8982211Z</updated>
<georss:line>49.27301600088197 -123.10172809713 49.27292589888799 -123.10099683519998 49.272776297056 -123.10002804173999</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>On Sunday, October 4, 2026, the following locations will be closed for the CIBC Run for the Cure event: 

Event will cause various road closures and traffic delays on the following locations:

Sunday, October 4, 2026 from 05:00 am to 2:00 pm 

•	Pacific Blvd from Nelson to Quebec
•	Pat Quinn Way, from Pacific to Expo 
•	Cambie Bridge Off-Ramp to Pacific Blvd

Sunday, October 4, 2026 from 09:00 am to 11:00 am 

•	Expo Blvd, from Abbott to Quebec
•	Keefer, from Carrall to Columbia/Quebec
•	W 6th Ave, from Quebec to Cambie
•	Abbott St., from Pender to Pacific Blvd 
•	Carrall St., from Keefer to Pacific Blvd
•	Quebec, from Keefer to E 7th Ave
•	2nd Ave, from Main to Cambie
•	Westbound Terminal Ave, from Main to Quebec
•	Cambie Bridge on-ramp, from W 2nd
•	Cambie St &amp; Cambie Bridge (northbound), from W Broadway to Expo Blvd 

Location: Various locations
Schedule: Oct 4, 2026 5:00 AM - 2:00 PM</content>
<id>urn:uuid:ef6bb818-6161-4e75-92ee-3c00467a2c81</id>
<link href="https://support.cancer.ca/site/TR/RunfortheCure/RFTC_NW_odd_?fr_id=28558&amp;pg=entry"/>
<published>2026-03-20T07:00:00Z</published>
<title>2026 CIBC Run For Cure</title>
<updated>2026-03-11T20:38:51.8982211Z</updated>
<georss:line>49.27301600088197 -123.10172809713 49.272555151173975 -123.10176789589998 49.27250563903999 -123.10177084591 49.272456161723 -123.1017751157 49.27240674621001 -123.10178070532 49.272357401495015 -123.10178761480002 49.27230814556799 -123.10179584416 49.272258987437 -123.10180537968 49.27220995408601 -123.10181622139 49.27216104551499 -123.10182836931001 49.27211227971404 -123.10184182345999 49.27206368368098 -123.10185657015 49.27201525740202 -123.10187262313002 49.27196702788697 -123.10188995494 49.271903157769 -123.10191517272999</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>On Sunday, October 4, 2026, the following locations will be closed for the CIBC Run for the Cure event: 

Event will cause various road closures and traffic delays on the following locations:

Sunday, October 4, 2026 from 05:00 am to 2:00 pm 

•	Pacific Blvd from Nelson to Quebec
•	Pat Quinn Way, from Pacific to Expo 
•	Cambie Bridge Off-Ramp to Pacific Blvd

Sunday, October 4, 2026 from 09:00 am to 11:00 am 

•	Expo Blvd, from Abbott to Quebec
•	Keefer, from Carrall to Columbia/Quebec
•	W 6th Ave, from Quebec to Cambie
•	Abbott St., from Pender to Pacific Blvd 
•	Carrall St., from Keefer to Pacific Blvd
•	Quebec, from Keefer to E 7th Ave
•	2nd Ave, from Main to Cambie
•	Westbound Terminal Ave, from Main to Quebec
•	Cambie Bridge on-ramp, from W 2nd
•	Cambie St &amp; Cambie Bridge (northbound), from W Broadway to Expo Blvd 

Location: Various locations
Schedule: Oct 4, 2026 5:00 AM - 2:00 PM</content>
<id>urn:uuid:60bb9a59-6ed6-45ed-b5b7-c4f8be559e5a</id>
<link href="https://support.cancer.ca/site/TR/RunfortheCure/RFTC_NW_odd_?fr_id=28558&amp;pg=entry"/>
<published>2026-03-20T07:00:00Z</published>
<title>2026 CIBC Run For Cure</title>
<updated>2026-03-11T20:38:51.8982211Z</updated>
<georss:line>49.26918772809711 -123.10151483604125 49.26917359726647 -123.10071234697428</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>On Sunday, October 4, 2026, the following locations will be closed for the CIBC Run for the Cure event: 

Event will cause various road closures and traffic delays on the following locations:

Sunday, October 4, 2026 from 05:00 am to 2:00 pm 

•	Pacific Blvd from Nelson to Quebec
•	Pat Quinn Way, from Pacific to Expo 
•	Cambie Bridge Off-Ramp to Pacific Blvd

Sunday, October 4, 2026 from 09:00 am to 11:00 am 

•	Expo Blvd, from Abbott to Quebec
•	Keefer, from Carrall to Columbia/Quebec
•	W 6th Ave, from Quebec to Cambie
•	Abbott St., from Pender to Pacific Blvd 
•	Carrall St., from Keefer to Pacific Blvd
•	Quebec, from Keefer to E 7th Ave
•	2nd Ave, from Main to Cambie
•	Westbound Terminal Ave, from Main to Quebec
•	Cambie Bridge on-ramp, from W 2nd
•	Cambie St &amp; Cambie Bridge (northbound), from W Broadway to Expo Blvd 

Location: Various locations
Schedule: Oct 4, 2026 5:00 AM - 2:00 PM</content>
<id>urn:uuid:bed980ab-8b38-4c2d-ab5d-04332e5465b6</id>
<link href="https://support.cancer.ca/site/TR/RunfortheCure/RFTC_NW_odd_?fr_id=28558&amp;pg=entry"/>
<published>2026-03-20T07:00:00Z</published>
<title>2026 CIBC Run For Cure</title>
<updated>2026-03-11T20:38:51.8982211Z</updated>
<georss:line>49.277095779239005 -123.10638079667 49.277055926608995 -123.10424344614 49.277055598282004 -123.10421851968002 49.277054982078994 -123.10419362010002 49.27705409600401 -123.10416873371 49.277052940043006 -123.10414387424 49.27705149620701 -123.10411904167002 49.27704978245998 -123.10409426352 49.27704778982098 -123.10406952604 49.277045527273 -123.10404484297999 49.27704298581901 -123.10402021433002 49.277040174430994 -123.10399566759999 49.277037084113005 -123.10397120279 49.277033732868006 -123.10394680616 49.27703010268101 -123.10392250519999 49.277026202548 -123.10389829991001 49.277022041451005 -123.10387420406 49.277017610395006 -123.10385021764 49.27701290936699 -123.10382635439001 49.277007947363984 -123.10380261433001 49.277002715376995 -123.10377901118999 49.276997231397985 -123.10375554501 49.27699147743502 -123.10373221576 49.276985471467015 -123.10370903721 49.27697921346899 -123.10368603687 49.276972694471 -123.10366318721998 49.276965923443015 -123.10364051578001 49.27695890038606 -123.10361802254 49.2769516253 -123.10359570751 49.27694410715503 -123.10357359820001 49.276936345964 -123.10355168087 49.276928332718995 -123.10352996924001 49.27692008541101 -123.10350846335 49.27691160402699 -123.10348717695999 49.27690288855601 -123.10346612379999 49.27689393001501 -123.10344529011 49.276884746381 -123.10342468969 49.27687533764299 -123.10340433626001 49.27686570380101 -123.10338422985 49.27685584485499 -123.10336437044002 49.276845769787 -123.10334477181001 49.27683547858601 -123.1033254477 49.276824971265 -123.10330638436 49.276814247809995 -123.10328759555 49.27680332620099 -123.10326909505 49.276792197442006 -123.10325088283 49.276780870528 -123.10323295892 49.276769345459996 -123.10321532333002 49.27675762221301 -123.10319800353001 49.27674570980702 -123.10318097206999 49.27673360820603 -123.10316427017 49.27672132641601 -123.10314788412 49.27670885544299 -123.10313181389002 49.27669622227302 -123.10311605954999 49.276683399895006 -123.10310064852 49.27667041530799 -123.10308556712002 49.27665726849898 -123.1030708291 49.276643959468004 -123.10305643445 49.276630488216995 -123.10304238318001 49.276616863726986 -123.10302868905 49.276603085998005 -123.10301535206001 49.27658917302199 -123.10300237225 49.276574459573 -123.1029892808 49.27655974613401 -123.10297617561 49.27654504168896 -123.10296307044 49.27653034623799 -123.10294996531 49.27651564180201 -123.10293684641002 49.27650094635899 -123.10292372754 49.276486250927974 -123.10291059492 49.27647155549397 -123.10289746232 49.276456869067005 -123.10288431599001 49.276442173643005 -123.10287116965999 49.27642749622004 -123.10285800962 49.276412809801 -123.10284484956 49.276398132387015 -123.10283167579 49.276383454972006 -123.10281850203 49.276368777567 -123.10280531452 49.27633943175999 -123.10277892580999</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>On Sunday, October 4, 2026, the following locations will be closed for the CIBC Run for the Cure event: 

Event will cause various road closures and traffic delays on the following locations:

Sunday, October 4, 2026 from 05:00 am to 2:00 pm 

•	Pacific Blvd from Nelson to Quebec
•	Pat Quinn Way, from Pacific to Expo 
•	Cambie Bridge Off-Ramp to Pacific Blvd

Sunday, October 4, 2026 from 09:00 am to 11:00 am 

•	Expo Blvd, from Abbott to Quebec
•	Keefer, from Carrall to Columbia/Quebec
•	W 6th Ave, from Quebec to Cambie
•	Abbott St., from Pender to Pacific Blvd 
•	Carrall St., from Keefer to Pacific Blvd
•	Quebec, from Keefer to E 7th Ave
•	2nd Ave, from Main to Cambie
•	Westbound Terminal Ave, from Main to Quebec
•	Cambie Bridge on-ramp, from W 2nd
•	Cambie St &amp; Cambie Bridge (northbound), from W Broadway to Expo Blvd 

Location: Various locations
Schedule: Oct 4, 2026 5:00 AM - 2:00 PM</content>
<id>urn:uuid:2d810219-9326-4c14-99d5-526116d21828</id>
<link href="https://support.cancer.ca/site/TR/RunfortheCure/RFTC_NW_odd_?fr_id=28558&amp;pg=entry"/>
<published>2026-03-20T07:00:00Z</published>
<title>2026 CIBC Run For Cure</title>
<updated>2026-03-11T20:38:51.8982211Z</updated>
<georss:line>49.27770902946202 -123.10409544467998 49.27769792779 -123.10404730144 49.27768630411799 -123.10399944584 49.27767414942801 -123.10395190535999 49.27766147271299 -123.10390468003001 49.27764827396399 -123.10385778358999 49.27763456214899 -123.10381124355999 49.277620346264996 -123.10376505995 49.27760560831001 -123.10371924649 49.277590375257006 -123.10367381698 49.27757464709401 -123.10362878517 49.277558423797956 -123.10358417855 49.27754170538003 -123.10353998337 49.277524500813 -123.10349622717 49.277506819077985 -123.10345292369001 49.277488660165005 -123.1034100867 49.27747003306999 -123.10336771620001 49.277450946762 -123.10332583972999 49.27743139226101 -123.1032844435 49.27741138751901 -123.10324356881 49.277390932538 -123.10320321566002 49.277370036300994 -123.10316339781 49.27734870779099 -123.10312412902002 49.27732694700899 -123.10308540931001 49.277304762938 -123.10304725243999 49.27728215556698 -123.10300967214998 49.277259142874016 -123.10297268223 49.277235724848 -123.10293629644 49.27721190148901 -123.10290051476 49.27718769077501 -123.10286535099999 49.277163101692 -123.1028308189 49.27713812524203 -123.10279691846002 49.27711278838899 -123.10276367723 49.27708708214999 -123.10273108144 49.27706102449201 -123.10269915862 49.27703461541401 -123.10266790878 49.277007863889 -123.10263735942 49.27698077893501 -123.10260748308 49.27695336951396 -123.10257832101001 49.276925644618984 -123.10254987323 49.27689760426401 -123.10252212599 49.276869266403 -123.10249512057 49.276840640043986 -123.10246884325 49.27681171618096 -123.10244330775001 49.276782521786004 -123.10241852787 49.276753056861 -123.10239450362002 49.27672333039996 -123.10237123501 49.27669335138799 -123.10234873581 49.276663128807996 -123.10232701978 49.276632671667954 -123.10230607320001 49.27660198893801 -123.10228592356998</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>On Sunday, October 4, 2026, the following locations will be closed for the CIBC Run for the Cure event: 

Event will cause various road closures and traffic delays on the following locations:

Sunday, October 4, 2026 from 05:00 am to 2:00 pm 

•	Pacific Blvd from Nelson to Quebec
•	Pat Quinn Way, from Pacific to Expo 
•	Cambie Bridge Off-Ramp to Pacific Blvd

Sunday, October 4, 2026 from 09:00 am to 11:00 am 

•	Expo Blvd, from Abbott to Quebec
•	Keefer, from Carrall to Columbia/Quebec
•	W 6th Ave, from Quebec to Cambie
•	Abbott St., from Pender to Pacific Blvd 
•	Carrall St., from Keefer to Pacific Blvd
•	Quebec, from Keefer to E 7th Ave
•	2nd Ave, from Main to Cambie
•	Westbound Terminal Ave, from Main to Quebec
•	Cambie Bridge on-ramp, from W 2nd
•	Cambie St &amp; Cambie Bridge (northbound), from W Broadway to Expo Blvd 

Location: Various locations
Schedule: Oct 4, 2026 5:00 AM - 2:00 PM</content>
<id>urn:uuid:10ac2d88-d256-4186-85ce-6b04da0b866d</id>
<link href="https://support.cancer.ca/site/TR/RunfortheCure/RFTC_NW_odd_?fr_id=28558&amp;pg=entry"/>
<published>2026-03-20T07:00:00Z</published>
<title>2026 CIBC Run For Cure</title>
<updated>2026-03-11T20:38:51.8982211Z</updated>
<georss:line>49.27680761910699 -123.10213312411 49.27675899419398 -123.10215001658 49.27671256447499 -123.10217666106 49.276671509300996 -123.1022084722 49.276637171695995 -123.10224234566 49.27660198893801 -123.10228592356998</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>On Sunday, October 4, 2026, the following locations will be closed for the CIBC Run for the Cure event: 

Event will cause various road closures and traffic delays on the following locations:

Sunday, October 4, 2026 from 05:00 am to 2:00 pm 

•	Pacific Blvd from Nelson to Quebec
•	Pat Quinn Way, from Pacific to Expo 
•	Cambie Bridge Off-Ramp to Pacific Blvd

Sunday, October 4, 2026 from 09:00 am to 11:00 am 

•	Expo Blvd, from Abbott to Quebec
•	Keefer, from Carrall to Columbia/Quebec
•	W 6th Ave, from Quebec to Cambie
•	Abbott St., from Pender to Pacific Blvd 
•	Carrall St., from Keefer to Pacific Blvd
•	Quebec, from Keefer to E 7th Ave
•	2nd Ave, from Main to Cambie
•	Westbound Terminal Ave, from Main to Quebec
•	Cambie Bridge on-ramp, from W 2nd
•	Cambie St &amp; Cambie Bridge (northbound), from W Broadway to Expo Blvd 

Location: Various locations
Schedule: Oct 4, 2026 5:00 AM - 2:00 PM</content>
<id>urn:uuid:ed3a4573-6590-4bbb-82f6-bf2f2deda6cf</id>
<link href="https://support.cancer.ca/site/TR/RunfortheCure/RFTC_NW_odd_?fr_id=28558&amp;pg=entry"/>
<published>2026-03-20T07:00:00Z</published>
<title>2026 CIBC Run For Cure</title>
<updated>2026-03-11T20:38:51.8982211Z</updated>
<georss:line>49.27716573021331 -123.1033960397209 49.27710715300108 -123.09965994811535 49.27710480978672 -123.09955034137 49.27710228003079 -123.09943787459875 49.277099641076916 -123.0993267412118 49.277096884937436 -123.09921577258214 49.27709401161255 -123.09910496871055 49.27709005980938 -123.09899293908873 49.277083936779206 -123.09888474093876 49.27707527057669 -123.09877354059383 49.27706399695916 -123.09866082276739 49.27705043677008 -123.09855008020028 49.27703383015739 -123.09843575705962 49.27701632385464 -123.0983320734286 49.276995081288135 -123.0982215357772 49.27697421904588 -123.09811849181824 49.27695103194202 -123.09800957280282 49.27692779556611 -123.09790560318842 49.276903147983404 -123.09780029729484 49.2768762108833 -123.09768984511689 49.276852187656715 -123.09759058992537 49.27682674971925 -123.09748349551396 49.276814793262474 -123.09743236955082 49.276809612820045 -123.09741010086495 49.276804434563246 -123.09738523376159 49.276800152783125 -123.09736397047922 49.27679590700291 -123.0973426797748 49.276792557076675 -123.09732573529483 49.276788544492405 -123.09730524245623 49.27678458578282 -123.09728485971316 49.276780636180604 -123.0972643395084 49.27677718827948 -123.09724622624243 49.276772540528896 -123.09722156643944 49.27676780348057 -123.09719612281366 49.27676443665243 -123.09717785848541 49.276760693920096 -123.09715733870392 49.27675642309248 -123.09713369702995 49.276752761297246 -123.09711319116234 49.27674842823376 -123.09708866948442 49.27674473105043 -123.0970674486438 49.27674149055002 -123.09704868964293 49.27673887674149 -123.09703346517935 49.27673612881145 -123.09701727807536 49.276732289053996 -123.09699443467017 49.27672904201572 -123.09697273353667 49.27672620857811 -123.0969512394407 49.27672361881346 -123.09692878344603 49.276721567359544 -123.09690799204843 49.276719750617815 -123.09688619748896 49.27671831132341 -123.09686481611821 49.27671768785473 -123.09684669468456</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>On Sunday, October 4, 2026, the following locations will be closed for the CIBC Run for the Cure event: 

Event will cause various road closures and traffic delays on the following locations:

Sunday, October 4, 2026 from 05:00 am to 2:00 pm 

•	Pacific Blvd from Nelson to Quebec
•	Pat Quinn Way, from Pacific to Expo 
•	Cambie Bridge Off-Ramp to Pacific Blvd

Sunday, October 4, 2026 from 09:00 am to 11:00 am 

•	Expo Blvd, from Abbott to Quebec
•	Keefer, from Carrall to Columbia/Quebec
•	W 6th Ave, from Quebec to Cambie
•	Abbott St., from Pender to Pacific Blvd 
•	Carrall St., from Keefer to Pacific Blvd
•	Quebec, from Keefer to E 7th Ave
•	2nd Ave, from Main to Cambie
•	Westbound Terminal Ave, from Main to Quebec
•	Cambie Bridge on-ramp, from W 2nd
•	Cambie St &amp; Cambie Bridge (northbound), from W Broadway to Expo Blvd 

Location: Various locations
Schedule: Oct 4, 2026 5:00 AM - 2:00 PM</content>
<id>urn:uuid:f05b8bae-1e34-48ab-bc42-6e849486ce14</id>
<link href="https://support.cancer.ca/site/TR/RunfortheCure/RFTC_NW_odd_?fr_id=28558&amp;pg=entry"/>
<published>2026-03-20T07:00:00Z</published>
<title>2026 CIBC Run For Cure</title>
<updated>2026-03-11T20:38:51.8982211Z</updated>
<georss:line>49.27805537518 -123.10614747012 49.278037704685005 -123.10616156579 49.27801987270499 -123.10617519365 49.27800187925297 -123.10618833996 49.277983751314 -123.10620100476001 49.277965479893 -123.10621318803999 49.277947064991 -123.10622488981 49.27792852462298 -123.10623608260002 49.27790985877601 -123.10624678016 49.27789106745101 -123.10625698250001 49.27787216863899 -123.10626668964 49.277853162350965 -123.10627588786 49.277834057597005 -123.1062845634 49.27781484535501 -123.10629274376001 49.27779555263601 -123.1063004015 49.277776170433015 -123.10630755034 49.27775670775401 -123.10631417656 49.277737173594005 -123.10632028017 49.277717576936 -123.10632587495 49.277697917804005 -123.1063309334 49.27767820518201 -123.10633546927998 49.277658439069 -123.10633948260998 49.27763863746901 -123.10634295966 49.27761879137404 -123.10634591416 49.27759891878699 -123.10634833241998 49.27758347265603 -123.10634985279 49.277095779239005 -123.10638079667</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>On Sunday, October 4, 2026, the following locations will be closed for the CIBC Run for the Cure event: 

Event will cause various road closures and traffic delays on the following locations:

Sunday, October 4, 2026 from 05:00 am to 2:00 pm 

•	Pacific Blvd from Nelson to Quebec
•	Pat Quinn Way, from Pacific to Expo 
•	Cambie Bridge Off-Ramp to Pacific Blvd

Sunday, October 4, 2026 from 09:00 am to 11:00 am 

•	Expo Blvd, from Abbott to Quebec
•	Keefer, from Carrall to Columbia/Quebec
•	W 6th Ave, from Quebec to Cambie
•	Abbott St., from Pender to Pacific Blvd 
•	Carrall St., from Keefer to Pacific Blvd
•	Quebec, from Keefer to E 7th Ave
•	2nd Ave, from Main to Cambie
•	Westbound Terminal Ave, from Main to Quebec
•	Cambie Bridge on-ramp, from W 2nd
•	Cambie St &amp; Cambie Bridge (northbound), from W Broadway to Expo Blvd 

Location: Various locations
Schedule: Oct 4, 2026 5:00 AM - 2:00 PM</content>
<id>urn:uuid:bbb7f3ee-0c9b-485c-808b-1038bfc16d49</id>
<link href="https://support.cancer.ca/site/TR/RunfortheCure/RFTC_NW_odd_?fr_id=28558&amp;pg=entry"/>
<published>2026-03-20T07:00:00Z</published>
<title>2026 CIBC Run For Cure</title>
<updated>2026-03-11T20:38:51.8982211Z</updated>
<georss:line>49.27770882491399 -123.10409284578002 49.27770902946202 -123.10409544467998 49.27769692326899 -123.10403404573998 49.277686400812996 -123.10397196272001 49.27767747098599 -123.10390930564002 49.27767014271001 -123.10384615699999 49.27766444286999 -123.10378262684002 49.27765771392001 -123.10371311391998 49.27764916747202 -123.10364407841999 49.27763880344202 -123.10357561656998 49.27762663970901 -123.10350785215002 49.277622285994 -123.10347777503999 49.277618283180004 -123.10344758867 49.277614622273006 -123.10341729304001 49.27761130326098 -123.10338690189 49.277608335114024 -123.10335644273 49.27760571784401 -123.10332590182001 49.277603451439006 -123.1032952929 49.277601526891004 -123.1032646297 49.277599962191005 -123.10323391226999 49.27759873932399 -123.10320316804999 49.27759787628 -123.10317239708 49.277597355067996 -123.10314159934 49.277597193655 -123.10311080234 49.27759738305798 -123.10307999232998 49.277597923252046 -123.10304919679001 49.27759881422401 -123.10301842948 49.27760005598796 -123.10298767665 49.27760014771596 -123.10298568331 49.277642397627005 -123.10212474263999</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>On Sunday, October 4, 2026, the following locations will be closed for the CIBC Run for the Cure event: 

Event will cause various road closures and traffic delays on the following locations:

Sunday, October 4, 2026 from 05:00 am to 2:00 pm 

•	Pacific Blvd from Nelson to Quebec
•	Pat Quinn Way, from Pacific to Expo 
•	Cambie Bridge Off-Ramp to Pacific Blvd

Sunday, October 4, 2026 from 09:00 am to 11:00 am 

•	Expo Blvd, from Abbott to Quebec
•	Keefer, from Carrall to Columbia/Quebec
•	W 6th Ave, from Quebec to Cambie
•	Abbott St., from Pender to Pacific Blvd 
•	Carrall St., from Keefer to Pacific Blvd
•	Quebec, from Keefer to E 7th Ave
•	2nd Ave, from Main to Cambie
•	Westbound Terminal Ave, from Main to Quebec
•	Cambie Bridge on-ramp, from W 2nd
•	Cambie St &amp; Cambie Bridge (northbound), from W Broadway to Expo Blvd 

Location: Various locations
Schedule: Oct 4, 2026 5:00 AM - 2:00 PM</content>
<id>urn:uuid:ddef2f3a-c9b4-4729-8c9f-18e7b1d50098</id>
<link href="https://support.cancer.ca/site/TR/RunfortheCure/RFTC_NW_odd_?fr_id=28558&amp;pg=entry"/>
<published>2026-03-20T07:00:00Z</published>
<title>2026 CIBC Run For Cure</title>
<updated>2026-03-11T20:38:51.8982211Z</updated>
<georss:line>49.268707160454994 -123.10272262982998 49.268255072589 -123.10274083931</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>On Sunday, October 4, 2026, the following locations will be closed for the CIBC Run for the Cure event: 

Event will cause various road closures and traffic delays on the following locations:

Sunday, October 4, 2026 from 05:00 am to 2:00 pm 

•	Pacific Blvd from Nelson to Quebec
•	Pat Quinn Way, from Pacific to Expo 
•	Cambie Bridge Off-Ramp to Pacific Blvd

Sunday, October 4, 2026 from 09:00 am to 11:00 am 

•	Expo Blvd, from Abbott to Quebec
•	Keefer, from Carrall to Columbia/Quebec
•	W 6th Ave, from Quebec to Cambie
•	Abbott St., from Pender to Pacific Blvd 
•	Carrall St., from Keefer to Pacific Blvd
•	Quebec, from Keefer to E 7th Ave
•	2nd Ave, from Main to Cambie
•	Westbound Terminal Ave, from Main to Quebec
•	Cambie Bridge on-ramp, from W 2nd
•	Cambie St &amp; Cambie Bridge (northbound), from W Broadway to Expo Blvd 

Location: Various locations
Schedule: Oct 4, 2026 5:00 AM - 2:00 PM</content>
<id>urn:uuid:787790e4-d9fb-433c-b575-856807ae68ba</id>
<link href="https://support.cancer.ca/site/TR/RunfortheCure/RFTC_NW_odd_?fr_id=28558&amp;pg=entry"/>
<published>2026-03-20T07:00:00Z</published>
<title>2026 CIBC Run For Cure</title>
<updated>2026-03-11T20:38:51.8982211Z</updated>
<georss:line>49.269209999540465 -123.10271662765447 49.26918772809711 -123.10151483604125</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>On Sunday, October 4, 2026, the following locations will be closed for the CIBC Run for the Cure event: 

Event will cause various road closures and traffic delays on the following locations:

Sunday, October 4, 2026 from 05:00 am to 2:00 pm 

•	Pacific Blvd from Nelson to Quebec
•	Pat Quinn Way, from Pacific to Expo 
•	Cambie Bridge Off-Ramp to Pacific Blvd

Sunday, October 4, 2026 from 09:00 am to 11:00 am 

•	Expo Blvd, from Abbott to Quebec
•	Keefer, from Carrall to Columbia/Quebec
•	W 6th Ave, from Quebec to Cambie
•	Abbott St., from Pender to Pacific Blvd 
•	Carrall St., from Keefer to Pacific Blvd
•	Quebec, from Keefer to E 7th Ave
•	2nd Ave, from Main to Cambie
•	Westbound Terminal Ave, from Main to Quebec
•	Cambie Bridge on-ramp, from W 2nd
•	Cambie St &amp; Cambie Bridge (northbound), from W Broadway to Expo Blvd 

Location: Various locations
Schedule: Oct 4, 2026 5:00 AM - 2:00 PM</content>
<id>urn:uuid:82f45d88-67fc-4072-81e1-63c96a5ded1d</id>
<link href="https://support.cancer.ca/site/TR/RunfortheCure/RFTC_NW_odd_?fr_id=28558&amp;pg=entry"/>
<published>2026-03-20T07:00:00Z</published>
<title>2026 CIBC Run For Cure</title>
<updated>2026-03-11T20:38:51.8982211Z</updated>
<georss:line>49.26970163475801 -123.10268069259 49.269204389056 -123.10270118715998</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>On Sunday, October 4, 2026, the following locations will be closed for the CIBC Run for the Cure event: 

Event will cause various road closures and traffic delays on the following locations:

Sunday, October 4, 2026 from 05:00 am to 2:00 pm 

•	Pacific Blvd from Nelson to Quebec
•	Pat Quinn Way, from Pacific to Expo 
•	Cambie Bridge Off-Ramp to Pacific Blvd

Sunday, October 4, 2026 from 09:00 am to 11:00 am 

•	Expo Blvd, from Abbott to Quebec
•	Keefer, from Carrall to Columbia/Quebec
•	W 6th Ave, from Quebec to Cambie
•	Abbott St., from Pender to Pacific Blvd 
•	Carrall St., from Keefer to Pacific Blvd
•	Quebec, from Keefer to E 7th Ave
•	2nd Ave, from Main to Cambie
•	Westbound Terminal Ave, from Main to Quebec
•	Cambie Bridge on-ramp, from W 2nd
•	Cambie St &amp; Cambie Bridge (northbound), from W Broadway to Expo Blvd 

Location: Various locations
Schedule: Oct 4, 2026 5:00 AM - 2:00 PM</content>
<id>urn:uuid:09531752-43a7-473e-acba-62bca51b22f5</id>
<link href="https://support.cancer.ca/site/TR/RunfortheCure/RFTC_NW_odd_?fr_id=28558&amp;pg=entry"/>
<published>2026-03-20T07:00:00Z</published>
<title>2026 CIBC Run For Cure</title>
<updated>2026-03-11T20:38:51.8982211Z</updated>
<georss:line>49.27121705258401 -123.10227804784999 49.271135687203014 -123.10232303759001 49.27109164378899 -123.10234667331 49.271047340558 -123.10236912622999 49.271002786504994 -123.10239039637 49.27095799065003 -123.10241045627001 49.270912979943006 -123.10242934723 49.270867754433 -123.10244701425 49.270822332086 -123.10246348488 49.270776739902004 -123.10247874542 49.270730968895975 -123.10249278212 49.27069491623001 -123.10250283867002</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>On Sunday, October 4, 2026, the following locations will be closed for the CIBC Run for the Cure event: 

Event will cause various road closures and traffic delays on the following locations:

Sunday, October 4, 2026 from 05:00 am to 2:00 pm 

•	Pacific Blvd from Nelson to Quebec
•	Pat Quinn Way, from Pacific to Expo 
•	Cambie Bridge Off-Ramp to Pacific Blvd

Sunday, October 4, 2026 from 09:00 am to 11:00 am 

•	Expo Blvd, from Abbott to Quebec
•	Keefer, from Carrall to Columbia/Quebec
•	W 6th Ave, from Quebec to Cambie
•	Abbott St., from Pender to Pacific Blvd 
•	Carrall St., from Keefer to Pacific Blvd
•	Quebec, from Keefer to E 7th Ave
•	2nd Ave, from Main to Cambie
•	Westbound Terminal Ave, from Main to Quebec
•	Cambie Bridge on-ramp, from W 2nd
•	Cambie St &amp; Cambie Bridge (northbound), from W Broadway to Expo Blvd 

Location: Various locations
Schedule: Oct 4, 2026 5:00 AM - 2:00 PM</content>
<id>urn:uuid:8d211f5a-9f35-46c3-ba9b-17bceba3f2f2</id>
<link href="https://support.cancer.ca/site/TR/RunfortheCure/RFTC_NW_odd_?fr_id=28558&amp;pg=entry"/>
<published>2026-03-20T07:00:00Z</published>
<title>2026 CIBC Run For Cure</title>
<updated>2026-03-11T20:38:51.8982211Z</updated>
<georss:line>49.27068880677885 -123.10249596834183 49.27014627147287 -123.10257643461227</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>On Sunday, October 4, 2026, the following locations will be closed for the CIBC Run for the Cure event: 

Event will cause various road closures and traffic delays on the following locations:

Sunday, October 4, 2026 from 05:00 am to 2:00 pm 

•	Pacific Blvd from Nelson to Quebec
•	Pat Quinn Way, from Pacific to Expo 
•	Cambie Bridge Off-Ramp to Pacific Blvd

Sunday, October 4, 2026 from 09:00 am to 11:00 am 

•	Expo Blvd, from Abbott to Quebec
•	Keefer, from Carrall to Columbia/Quebec
•	W 6th Ave, from Quebec to Cambie
•	Abbott St., from Pender to Pacific Blvd 
•	Carrall St., from Keefer to Pacific Blvd
•	Quebec, from Keefer to E 7th Ave
•	2nd Ave, from Main to Cambie
•	Westbound Terminal Ave, from Main to Quebec
•	Cambie Bridge on-ramp, from W 2nd
•	Cambie St &amp; Cambie Bridge (northbound), from W Broadway to Expo Blvd 

Location: Various locations
Schedule: Oct 4, 2026 5:00 AM - 2:00 PM</content>
<id>urn:uuid:e3dca538-2d76-4b96-838a-32c4ea4a9115</id>
<link href="https://support.cancer.ca/site/TR/RunfortheCure/RFTC_NW_odd_?fr_id=28558&amp;pg=entry"/>
<published>2026-03-20T07:00:00Z</published>
<title>2026 CIBC Run For Cure</title>
<updated>2026-03-11T20:38:51.8982211Z</updated>
<georss:line>49.27015364185101 -123.10266213821998 49.26970163475801 -123.10268069259</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>On Sunday, October 4, 2026, the following locations will be closed for the CIBC Run for the Cure event: 

Event will cause various road closures and traffic delays on the following locations:

Sunday, October 4, 2026 from 05:00 am to 2:00 pm 

•	Pacific Blvd from Nelson to Quebec
•	Pat Quinn Way, from Pacific to Expo 
•	Cambie Bridge Off-Ramp to Pacific Blvd

Sunday, October 4, 2026 from 09:00 am to 11:00 am 

•	Expo Blvd, from Abbott to Quebec
•	Keefer, from Carrall to Columbia/Quebec
•	W 6th Ave, from Quebec to Cambie
•	Abbott St., from Pender to Pacific Blvd 
•	Carrall St., from Keefer to Pacific Blvd
•	Quebec, from Keefer to E 7th Ave
•	2nd Ave, from Main to Cambie
•	Westbound Terminal Ave, from Main to Quebec
•	Cambie Bridge on-ramp, from W 2nd
•	Cambie St &amp; Cambie Bridge (northbound), from W Broadway to Expo Blvd 

Location: Various locations
Schedule: Oct 4, 2026 5:00 AM - 2:00 PM</content>
<id>urn:uuid:47dc365c-8984-4c1e-b189-941a412dcc9b</id>
<link href="https://support.cancer.ca/site/TR/RunfortheCure/RFTC_NW_odd_?fr_id=28558&amp;pg=entry"/>
<published>2026-03-20T07:00:00Z</published>
<title>2026 CIBC Run For Cure</title>
<updated>2026-03-11T20:38:51.8982211Z</updated>
<georss:line>49.269204389056 -123.10270118715998 49.268707160454994 -123.10272262982998</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>On Sunday, October 4, 2026, the following locations will be closed for the CIBC Run for the Cure event: 

Event will cause various road closures and traffic delays on the following locations:

Sunday, October 4, 2026 from 05:00 am to 2:00 pm 

•	Pacific Blvd from Nelson to Quebec
•	Pat Quinn Way, from Pacific to Expo 
•	Cambie Bridge Off-Ramp to Pacific Blvd

Sunday, October 4, 2026 from 09:00 am to 11:00 am 

•	Expo Blvd, from Abbott to Quebec
•	Keefer, from Carrall to Columbia/Quebec
•	W 6th Ave, from Quebec to Cambie
•	Abbott St., from Pender to Pacific Blvd 
•	Carrall St., from Keefer to Pacific Blvd
•	Quebec, from Keefer to E 7th Ave
•	2nd Ave, from Main to Cambie
•	Westbound Terminal Ave, from Main to Quebec
•	Cambie Bridge on-ramp, from W 2nd
•	Cambie St &amp; Cambie Bridge (northbound), from W Broadway to Expo Blvd 

Location: Various locations
Schedule: Oct 4, 2026 5:00 AM - 2:00 PM</content>
<id>urn:uuid:a4e820e6-3b7a-45f7-a3f8-202db6068e6e</id>
<link href="https://support.cancer.ca/site/TR/RunfortheCure/RFTC_NW_odd_?fr_id=28558&amp;pg=entry"/>
<published>2026-03-20T07:00:00Z</published>
<title>2026 CIBC Run For Cure</title>
<updated>2026-03-11T20:38:51.8982211Z</updated>
<georss:line>49.27660198893801 -123.10228592356998 49.276452914375994 -123.10221177377 49.276272829438994 -123.10214205603 49.276070502321005 -123.10207916694999</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>On Sunday, October 4, 2026, the following locations will be closed for the CIBC Run for the Cure event: 

Event will cause various road closures and traffic delays on the following locations:

Sunday, October 4, 2026 from 05:00 am to 2:00 pm 

•	Pacific Blvd from Nelson to Quebec
•	Pat Quinn Way, from Pacific to Expo 
•	Cambie Bridge Off-Ramp to Pacific Blvd

Sunday, October 4, 2026 from 09:00 am to 11:00 am 

•	Expo Blvd, from Abbott to Quebec
•	Keefer, from Carrall to Columbia/Quebec
•	W 6th Ave, from Quebec to Cambie
•	Abbott St., from Pender to Pacific Blvd 
•	Carrall St., from Keefer to Pacific Blvd
•	Quebec, from Keefer to E 7th Ave
•	2nd Ave, from Main to Cambie
•	Westbound Terminal Ave, from Main to Quebec
•	Cambie Bridge on-ramp, from W 2nd
•	Cambie St &amp; Cambie Bridge (northbound), from W Broadway to Expo Blvd 

Location: Various locations
Schedule: Oct 4, 2026 5:00 AM - 2:00 PM</content>
<id>urn:uuid:a37e41cc-2034-4957-ae6f-6bb6ba801cf3</id>
<link href="https://support.cancer.ca/site/TR/RunfortheCure/RFTC_NW_odd_?fr_id=28558&amp;pg=entry"/>
<published>2026-03-20T07:00:00Z</published>
<title>2026 CIBC Run For Cure</title>
<updated>2026-03-11T20:38:51.8982211Z</updated>
<georss:line>49.27633557782755 -123.10275077819824 49.27661206187483 -123.10231626033784</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>On Sunday, October 4, 2026, the following locations will be closed for the CIBC Run for the Cure event: 

Event will cause various road closures and traffic delays on the following locations:

Sunday, October 4, 2026 from 05:00 am to 2:00 pm 

•	Pacific Blvd from Nelson to Quebec
•	Pat Quinn Way, from Pacific to Expo 
•	Cambie Bridge Off-Ramp to Pacific Blvd

Sunday, October 4, 2026 from 09:00 am to 11:00 am 

•	Expo Blvd, from Abbott to Quebec
•	Keefer, from Carrall to Columbia/Quebec
•	W 6th Ave, from Quebec to Cambie
•	Abbott St., from Pender to Pacific Blvd 
•	Carrall St., from Keefer to Pacific Blvd
•	Quebec, from Keefer to E 7th Ave
•	2nd Ave, from Main to Cambie
•	Westbound Terminal Ave, from Main to Quebec
•	Cambie Bridge on-ramp, from W 2nd
•	Cambie St &amp; Cambie Bridge (northbound), from W Broadway to Expo Blvd 

Location: Various locations
Schedule: Oct 4, 2026 5:00 AM - 2:00 PM</content>
<id>urn:uuid:6f113956-7b64-41d1-8d62-7c9c61396c9a</id>
<link href="https://support.cancer.ca/site/TR/RunfortheCure/RFTC_NW_odd_?fr_id=28558&amp;pg=entry"/>
<published>2026-03-20T07:00:00Z</published>
<title>2026 CIBC Run For Cure</title>
<updated>2026-03-11T20:38:51.8982211Z</updated>
<georss:line>49.26599462918401 -123.10283581295 49.26554253212899 -123.10285397919</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>On Sunday, October 4, 2026, the following locations will be closed for the CIBC Run for the Cure event: 

Event will cause various road closures and traffic delays on the following locations:

Sunday, October 4, 2026 from 05:00 am to 2:00 pm 

•	Pacific Blvd from Nelson to Quebec
•	Pat Quinn Way, from Pacific to Expo 
•	Cambie Bridge Off-Ramp to Pacific Blvd

Sunday, October 4, 2026 from 09:00 am to 11:00 am 

•	Expo Blvd, from Abbott to Quebec
•	Keefer, from Carrall to Columbia/Quebec
•	W 6th Ave, from Quebec to Cambie
•	Abbott St., from Pender to Pacific Blvd 
•	Carrall St., from Keefer to Pacific Blvd
•	Quebec, from Keefer to E 7th Ave
•	2nd Ave, from Main to Cambie
•	Westbound Terminal Ave, from Main to Quebec
•	Cambie Bridge on-ramp, from W 2nd
•	Cambie St &amp; Cambie Bridge (northbound), from W Broadway to Expo Blvd 

Location: Various locations
Schedule: Oct 4, 2026 5:00 AM - 2:00 PM</content>
<id>urn:uuid:54db52fd-6665-458d-b458-ba1fb9b7646b</id>
<link href="https://support.cancer.ca/site/TR/RunfortheCure/RFTC_NW_odd_?fr_id=28558&amp;pg=entry"/>
<published>2026-03-20T07:00:00Z</published>
<title>2026 CIBC Run For Cure</title>
<updated>2026-03-11T20:38:51.8982211Z</updated>
<georss:line>49.267802705123984 -123.10275984514001 49.26735062551603 -123.10277879624</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>On Sunday, October 4, 2026, the following locations will be closed for the CIBC Run for the Cure event: 

Event will cause various road closures and traffic delays on the following locations:

Sunday, October 4, 2026 from 05:00 am to 2:00 pm 

•	Pacific Blvd from Nelson to Quebec
•	Pat Quinn Way, from Pacific to Expo 
•	Cambie Bridge Off-Ramp to Pacific Blvd

Sunday, October 4, 2026 from 09:00 am to 11:00 am 

•	Expo Blvd, from Abbott to Quebec
•	Keefer, from Carrall to Columbia/Quebec
•	W 6th Ave, from Quebec to Cambie
•	Abbott St., from Pender to Pacific Blvd 
•	Carrall St., from Keefer to Pacific Blvd
•	Quebec, from Keefer to E 7th Ave
•	2nd Ave, from Main to Cambie
•	Westbound Terminal Ave, from Main to Quebec
•	Cambie Bridge on-ramp, from W 2nd
•	Cambie St &amp; Cambie Bridge (northbound), from W Broadway to Expo Blvd 

Location: Various locations
Schedule: Oct 4, 2026 5:00 AM - 2:00 PM</content>
<id>urn:uuid:4cbdb48a-9793-44b8-878b-3c9c1686f25b</id>
<link href="https://support.cancer.ca/site/TR/RunfortheCure/RFTC_NW_odd_?fr_id=28558&amp;pg=entry"/>
<published>2026-03-20T07:00:00Z</published>
<title>2026 CIBC Run For Cure</title>
<updated>2026-03-11T20:38:51.8982211Z</updated>
<georss:line>49.268255072589 -123.10274083931 49.267802705123984 -123.10275984514001</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>On Sunday, October 4, 2026, the following locations will be closed for the CIBC Run for the Cure event: 

Event will cause various road closures and traffic delays on the following locations:

Sunday, October 4, 2026 from 05:00 am to 2:00 pm 

•	Pacific Blvd from Nelson to Quebec
•	Pat Quinn Way, from Pacific to Expo 
•	Cambie Bridge Off-Ramp to Pacific Blvd

Sunday, October 4, 2026 from 09:00 am to 11:00 am 

•	Expo Blvd, from Abbott to Quebec
•	Keefer, from Carrall to Columbia/Quebec
•	W 6th Ave, from Quebec to Cambie
•	Abbott St., from Pender to Pacific Blvd 
•	Carrall St., from Keefer to Pacific Blvd
•	Quebec, from Keefer to E 7th Ave
•	2nd Ave, from Main to Cambie
•	Westbound Terminal Ave, from Main to Quebec
•	Cambie Bridge on-ramp, from W 2nd
•	Cambie St &amp; Cambie Bridge (northbound), from W Broadway to Expo Blvd 

Location: Various locations
Schedule: Oct 4, 2026 5:00 AM - 2:00 PM</content>
<id>urn:uuid:a754b65c-43d3-4c35-86db-382669a9fc06</id>
<link href="https://support.cancer.ca/site/TR/RunfortheCure/RFTC_NW_odd_?fr_id=28558&amp;pg=entry"/>
<published>2026-03-20T07:00:00Z</published>
<title>2026 CIBC Run For Cure</title>
<updated>2026-03-11T20:38:51.8982211Z</updated>
<georss:line>49.26557763798101 -123.10478873967 49.26554253212899 -123.10285397919</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>On Sunday, October 4, 2026, the following locations will be closed for the CIBC Run for the Cure event: 

Event will cause various road closures and traffic delays on the following locations:

Sunday, October 4, 2026 from 05:00 am to 2:00 pm 

•	Pacific Blvd from Nelson to Quebec
•	Pat Quinn Way, from Pacific to Expo 
•	Cambie Bridge Off-Ramp to Pacific Blvd

Sunday, October 4, 2026 from 09:00 am to 11:00 am 

•	Expo Blvd, from Abbott to Quebec
•	Keefer, from Carrall to Columbia/Quebec
•	W 6th Ave, from Quebec to Cambie
•	Abbott St., from Pender to Pacific Blvd 
•	Carrall St., from Keefer to Pacific Blvd
•	Quebec, from Keefer to E 7th Ave
•	2nd Ave, from Main to Cambie
•	Westbound Terminal Ave, from Main to Quebec
•	Cambie Bridge on-ramp, from W 2nd
•	Cambie St &amp; Cambie Bridge (northbound), from W Broadway to Expo Blvd 

Location: Various locations
Schedule: Oct 4, 2026 5:00 AM - 2:00 PM</content>
<id>urn:uuid:333a6ed0-7303-400f-bec3-98b05bdb67da</id>
<link href="https://support.cancer.ca/site/TR/RunfortheCure/RFTC_NW_odd_?fr_id=28558&amp;pg=entry"/>
<published>2026-03-20T07:00:00Z</published>
<title>2026 CIBC Run For Cure</title>
<updated>2026-03-11T20:38:51.8982211Z</updated>
<georss:line>49.26735062551603 -123.10277879624 49.26689865374996 -123.10279781595001</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>On Sunday, October 4, 2026, the following locations will be closed for the CIBC Run for the Cure event: 

Event will cause various road closures and traffic delays on the following locations:

Sunday, October 4, 2026 from 05:00 am to 2:00 pm 

•	Pacific Blvd from Nelson to Quebec
•	Pat Quinn Way, from Pacific to Expo 
•	Cambie Bridge Off-Ramp to Pacific Blvd

Sunday, October 4, 2026 from 09:00 am to 11:00 am 

•	Expo Blvd, from Abbott to Quebec
•	Keefer, from Carrall to Columbia/Quebec
•	W 6th Ave, from Quebec to Cambie
•	Abbott St., from Pender to Pacific Blvd 
•	Carrall St., from Keefer to Pacific Blvd
•	Quebec, from Keefer to E 7th Ave
•	2nd Ave, from Main to Cambie
•	Westbound Terminal Ave, from Main to Quebec
•	Cambie Bridge on-ramp, from W 2nd
•	Cambie St &amp; Cambie Bridge (northbound), from W Broadway to Expo Blvd 

Location: Various locations
Schedule: Oct 4, 2026 5:00 AM - 2:00 PM</content>
<id>urn:uuid:b7e3a324-e287-49f1-adc8-4d78d8a9f7ed</id>
<link href="https://support.cancer.ca/site/TR/RunfortheCure/RFTC_NW_odd_?fr_id=28558&amp;pg=entry"/>
<published>2026-03-20T07:00:00Z</published>
<title>2026 CIBC Run For Cure</title>
<updated>2026-03-11T20:38:51.8982211Z</updated>
<georss:line>49.26689865374996 -123.10279781595001 49.26644655646601 -123.10281632649</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>On Sunday, October 4, 2026, the following locations will be closed for the CIBC Run for the Cure event: 

Event will cause various road closures and traffic delays on the following locations:

Sunday, October 4, 2026 from 05:00 am to 2:00 pm 

•	Pacific Blvd from Nelson to Quebec
•	Pat Quinn Way, from Pacific to Expo 
•	Cambie Bridge Off-Ramp to Pacific Blvd

Sunday, October 4, 2026 from 09:00 am to 11:00 am 

•	Expo Blvd, from Abbott to Quebec
•	Keefer, from Carrall to Columbia/Quebec
•	W 6th Ave, from Quebec to Cambie
•	Abbott St., from Pender to Pacific Blvd 
•	Carrall St., from Keefer to Pacific Blvd
•	Quebec, from Keefer to E 7th Ave
•	2nd Ave, from Main to Cambie
•	Westbound Terminal Ave, from Main to Quebec
•	Cambie Bridge on-ramp, from W 2nd
•	Cambie St &amp; Cambie Bridge (northbound), from W Broadway to Expo Blvd 

Location: Various locations
Schedule: Oct 4, 2026 5:00 AM - 2:00 PM</content>
<id>urn:uuid:2f7d7630-5335-4cd1-9b28-8e533a14caad</id>
<link href="https://support.cancer.ca/site/TR/RunfortheCure/RFTC_NW_odd_?fr_id=28558&amp;pg=entry"/>
<published>2026-03-20T07:00:00Z</published>
<title>2026 CIBC Run For Cure</title>
<updated>2026-03-11T20:38:51.8982211Z</updated>
<georss:line>49.26644655646601 -123.10281632649 49.26599462918401 -123.10283581295</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>On Sunday, October 4, 2026, the following locations will be closed for the CIBC Run for the Cure event: 

Event will cause various road closures and traffic delays on the following locations:

Sunday, October 4, 2026 from 05:00 am to 2:00 pm 

•	Pacific Blvd from Nelson to Quebec
•	Pat Quinn Way, from Pacific to Expo 
•	Cambie Bridge Off-Ramp to Pacific Blvd

Sunday, October 4, 2026 from 09:00 am to 11:00 am 

•	Expo Blvd, from Abbott to Quebec
•	Keefer, from Carrall to Columbia/Quebec
•	W 6th Ave, from Quebec to Cambie
•	Abbott St., from Pender to Pacific Blvd 
•	Carrall St., from Keefer to Pacific Blvd
•	Quebec, from Keefer to E 7th Ave
•	2nd Ave, from Main to Cambie
•	Westbound Terminal Ave, from Main to Quebec
•	Cambie Bridge on-ramp, from W 2nd
•	Cambie St &amp; Cambie Bridge (northbound), from W Broadway to Expo Blvd 

Location: Various locations
Schedule: Oct 4, 2026 5:00 AM - 2:00 PM</content>
<id>urn:uuid:0e169538-a1f4-448e-a4d9-9f8f82696a7a</id>
<link href="https://support.cancer.ca/site/TR/RunfortheCure/RFTC_NW_odd_?fr_id=28558&amp;pg=entry"/>
<published>2026-03-20T07:00:00Z</published>
<title>2026 CIBC Run For Cure</title>
<updated>2026-03-11T20:38:51.8982211Z</updated>
<georss:line>49.265090551214 -123.10287299752 49.264638498349 -123.10289196038998</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>On Sunday, October 4, 2026, the following locations will be closed for the CIBC Run for the Cure event: 

Event will cause various road closures and traffic delays on the following locations:

Sunday, October 4, 2026 from 05:00 am to 2:00 pm 

•	Pacific Blvd from Nelson to Quebec
•	Pat Quinn Way, from Pacific to Expo 
•	Cambie Bridge Off-Ramp to Pacific Blvd

Sunday, October 4, 2026 from 09:00 am to 11:00 am 

•	Expo Blvd, from Abbott to Quebec
•	Keefer, from Carrall to Columbia/Quebec
•	W 6th Ave, from Quebec to Cambie
•	Abbott St., from Pender to Pacific Blvd 
•	Carrall St., from Keefer to Pacific Blvd
•	Quebec, from Keefer to E 7th Ave
•	2nd Ave, from Main to Cambie
•	Westbound Terminal Ave, from Main to Quebec
•	Cambie Bridge on-ramp, from W 2nd
•	Cambie St &amp; Cambie Bridge (northbound), from W Broadway to Expo Blvd 

Location: Various locations
Schedule: Oct 4, 2026 5:00 AM - 2:00 PM</content>
<id>urn:uuid:2f01eb92-dc21-4d5c-943b-824d1f393a22</id>
<link href="https://support.cancer.ca/site/TR/RunfortheCure/RFTC_NW_odd_?fr_id=28558&amp;pg=entry"/>
<published>2026-03-20T07:00:00Z</published>
<title>2026 CIBC Run For Cure</title>
<updated>2026-03-11T20:38:51.8982211Z</updated>
<georss:line>49.26554253212899 -123.10285397919 49.265090551214 -123.10287299752</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>On Sunday, October 4, 2026, the following locations will be closed for the CIBC Run for the Cure event: 

Event will cause various road closures and traffic delays on the following locations:

Sunday, October 4, 2026 from 05:00 am to 2:00 pm 

•	Pacific Blvd from Nelson to Quebec
•	Pat Quinn Way, from Pacific to Expo 
•	Cambie Bridge Off-Ramp to Pacific Blvd

Sunday, October 4, 2026 from 09:00 am to 11:00 am 

•	Expo Blvd, from Abbott to Quebec
•	Keefer, from Carrall to Columbia/Quebec
•	W 6th Ave, from Quebec to Cambie
•	Abbott St., from Pender to Pacific Blvd 
•	Carrall St., from Keefer to Pacific Blvd
•	Quebec, from Keefer to E 7th Ave
•	2nd Ave, from Main to Cambie
•	Westbound Terminal Ave, from Main to Quebec
•	Cambie Bridge on-ramp, from W 2nd
•	Cambie St &amp; Cambie Bridge (northbound), from W Broadway to Expo Blvd 

Location: Various locations
Schedule: Oct 4, 2026 5:00 AM - 2:00 PM</content>
<id>urn:uuid:f21634d9-9d45-4966-b6b4-a879cff78cd2</id>
<link href="https://support.cancer.ca/site/TR/RunfortheCure/RFTC_NW_odd_?fr_id=28558&amp;pg=entry"/>
<published>2026-03-20T07:00:00Z</published>
<title>2026 CIBC Run For Cure</title>
<updated>2026-03-11T20:38:51.8982211Z</updated>
<georss:line>49.273158123391994 -123.11476875239002 49.269552585992955 -123.11488912241</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>On Sunday, October 4, 2026, the following locations will be closed for the CIBC Run for the Cure event: 

Event will cause various road closures and traffic delays on the following locations:

Sunday, October 4, 2026 from 05:00 am to 2:00 pm 

•	Pacific Blvd from Nelson to Quebec
•	Pat Quinn Way, from Pacific to Expo 
•	Cambie Bridge Off-Ramp to Pacific Blvd

Sunday, October 4, 2026 from 09:00 am to 11:00 am 

•	Expo Blvd, from Abbott to Quebec
•	Keefer, from Carrall to Columbia/Quebec
•	W 6th Ave, from Quebec to Cambie
•	Abbott St., from Pender to Pacific Blvd 
•	Carrall St., from Keefer to Pacific Blvd
•	Quebec, from Keefer to E 7th Ave
•	2nd Ave, from Main to Cambie
•	Westbound Terminal Ave, from Main to Quebec
•	Cambie Bridge on-ramp, from W 2nd
•	Cambie St &amp; Cambie Bridge (northbound), from W Broadway to Expo Blvd 

Location: Various locations
Schedule: Oct 4, 2026 5:00 AM - 2:00 PM</content>
<id>urn:uuid:80c3cf88-b526-42f3-a5d1-389c7067bb9a</id>
<link href="https://support.cancer.ca/site/TR/RunfortheCure/RFTC_NW_odd_?fr_id=28558&amp;pg=entry"/>
<published>2026-03-20T07:00:00Z</published>
<title>2026 CIBC Run For Cure</title>
<updated>2026-03-11T20:38:51.8982211Z</updated>
<georss:line>49.27499892773844 -123.11270445447094 49.27496866027636 -123.11272151524494 49.27491903968371 -123.11276160064287 49.27487559735147 -123.11281235455782 49.27485234614565 -123.11284781196439 49.274831259044305 -123.11288708240033 49.274513461405604 -123.11366457058439 49.27443009930431 -123.11386930121489 49.2743891190955 -123.1139495204728 49.27429576236898 -123.11410007527856 49.27424752055555 -123.11416444015599 49.274183698431216 -123.11423851595285 49.2741104065212 -123.11431037006967 49.274034984152564 -123.11437167469992 49.273949078446975 -123.1144278408249 49.27389875984642 -123.11445458701431 49.273837916917614 -123.1144812812995 49.273779563201686 -123.11450136875791 49.27370655859738 -123.11451915392712 49.27363690827346 -123.11452879459618 49.273562612310656 -123.1145425899412 49.27349372463692 -123.11456325770612 49.27341968141434 -123.11459430646825 49.27335368408731 -123.11463018534604 49.273296752734694 -123.11466723991629 49.27324759236498 -123.11470515100464 49.27319634607076 -123.11475114058443 49.27316373265421 -123.11478419587588</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>On Sunday, October 4, 2026, the following locations will be closed for the CIBC Run for the Cure event: 

Event will cause various road closures and traffic delays on the following locations:

Sunday, October 4, 2026 from 05:00 am to 2:00 pm 

•	Pacific Blvd from Nelson to Quebec
•	Pat Quinn Way, from Pacific to Expo 
•	Cambie Bridge Off-Ramp to Pacific Blvd

Sunday, October 4, 2026 from 09:00 am to 11:00 am 

•	Expo Blvd, from Abbott to Quebec
•	Keefer, from Carrall to Columbia/Quebec
•	W 6th Ave, from Quebec to Cambie
•	Abbott St., from Pender to Pacific Blvd 
•	Carrall St., from Keefer to Pacific Blvd
•	Quebec, from Keefer to E 7th Ave
•	2nd Ave, from Main to Cambie
•	Westbound Terminal Ave, from Main to Quebec
•	Cambie Bridge on-ramp, from W 2nd
•	Cambie St &amp; Cambie Bridge (northbound), from W Broadway to Expo Blvd 

Location: Various locations
Schedule: Oct 4, 2026 5:00 AM - 2:00 PM</content>
<id>urn:uuid:8586dc4d-8dd9-46ab-a21d-5c40d2ca8785</id>
<link href="https://support.cancer.ca/site/TR/RunfortheCure/RFTC_NW_odd_?fr_id=28558&amp;pg=entry"/>
<published>2026-03-20T07:00:00Z</published>
<title>2026 CIBC Run For Cure</title>
<updated>2026-03-11T20:38:51.8982211Z</updated>
<georss:line>49.276680561394016 -123.10898698514002 49.27665977513601 -123.10905200980001 49.276631350496984 -123.10913759867 49.27660195504501 -123.1092224154 49.27657158879401 -123.10930644623998 49.27654026977501 -123.10938964996998 49.276508007009994 -123.10947199911999 49.276474800529 -123.10955346617999 49.27644067733101 -123.10963403748 49.276405637431 -123.10971369925 49.27636968986599 -123.10979241026999 49.276332852639996 -123.10987015681998 49.27629513478999 -123.10994689769001 49.27551831915599 -123.11153338712 49.27499331815301 -123.11268901082 49.274853702125995 -123.11300391486002</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>On Sunday, October 4, 2026, the following locations will be closed for the CIBC Run for the Cure event: 

Event will cause various road closures and traffic delays on the following locations:

Sunday, October 4, 2026 from 05:00 am to 2:00 pm 

•	Pacific Blvd from Nelson to Quebec
•	Pat Quinn Way, from Pacific to Expo 
•	Cambie Bridge Off-Ramp to Pacific Blvd

Sunday, October 4, 2026 from 09:00 am to 11:00 am 

•	Expo Blvd, from Abbott to Quebec
•	Keefer, from Carrall to Columbia/Quebec
•	W 6th Ave, from Quebec to Cambie
•	Abbott St., from Pender to Pacific Blvd 
•	Carrall St., from Keefer to Pacific Blvd
•	Quebec, from Keefer to E 7th Ave
•	2nd Ave, from Main to Cambie
•	Westbound Terminal Ave, from Main to Quebec
•	Cambie Bridge on-ramp, from W 2nd
•	Cambie St &amp; Cambie Bridge (northbound), from W Broadway to Expo Blvd 

Location: Various locations
Schedule: Oct 4, 2026 5:00 AM - 2:00 PM</content>
<id>urn:uuid:9e905365-1a09-4c2c-a6c6-18aa06aa8586</id>
<link href="https://support.cancer.ca/site/TR/RunfortheCure/RFTC_NW_odd_?fr_id=28558&amp;pg=entry"/>
<published>2026-03-20T07:00:00Z</published>
<title>2026 CIBC Run For Cure</title>
<updated>2026-03-11T20:38:51.8982211Z</updated>
<georss:line>49.27805537518 -123.10614747012 49.27805595678399 -123.10615082603002 49.278122832891995 -123.10641821592 49.27820762900001 -123.10667346385 49.278309412298995 -123.10691374954001 49.27836872154302 -123.10702602607002 49.278537975522 -123.10734536378999 49.278557595490014 -123.10738250057 49.27860925835 -123.10750446826 49.278647569421 -123.10761979398</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>On Sunday, October 4, 2026, the following locations will be closed for the CIBC Run for the Cure event: 

Event will cause various road closures and traffic delays on the following locations:

Sunday, October 4, 2026 from 05:00 am to 2:00 pm 

•	Pacific Blvd from Nelson to Quebec
•	Pat Quinn Way, from Pacific to Expo 
•	Cambie Bridge Off-Ramp to Pacific Blvd

Sunday, October 4, 2026 from 09:00 am to 11:00 am 

•	Expo Blvd, from Abbott to Quebec
•	Keefer, from Carrall to Columbia/Quebec
•	W 6th Ave, from Quebec to Cambie
•	Abbott St., from Pender to Pacific Blvd 
•	Carrall St., from Keefer to Pacific Blvd
•	Quebec, from Keefer to E 7th Ave
•	2nd Ave, from Main to Cambie
•	Westbound Terminal Ave, from Main to Quebec
•	Cambie Bridge on-ramp, from W 2nd
•	Cambie St &amp; Cambie Bridge (northbound), from W Broadway to Expo Blvd 

Location: Various locations
Schedule: Oct 4, 2026 5:00 AM - 2:00 PM</content>
<id>urn:uuid:2512f763-f946-4360-ad32-adc20824e576</id>
<link href="https://support.cancer.ca/site/TR/RunfortheCure/RFTC_NW_odd_?fr_id=28558&amp;pg=entry"/>
<published>2026-03-20T07:00:00Z</published>
<title>2026 CIBC Run For Cure</title>
<updated>2026-03-11T20:38:51.8982211Z</updated>
<georss:line>49.27711991857001 -123.10767644058 49.276680561394016 -123.10898698514002</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>On Sunday, October 4, 2026, the following locations will be closed for the CIBC Run for the Cure event: 

Event will cause various road closures and traffic delays on the following locations:

Sunday, October 4, 2026 from 05:00 am to 2:00 pm 

•	Pacific Blvd from Nelson to Quebec
•	Pat Quinn Way, from Pacific to Expo 
•	Cambie Bridge Off-Ramp to Pacific Blvd

Sunday, October 4, 2026 from 09:00 am to 11:00 am 

•	Expo Blvd, from Abbott to Quebec
•	Keefer, from Carrall to Columbia/Quebec
•	W 6th Ave, from Quebec to Cambie
•	Abbott St., from Pender to Pacific Blvd 
•	Carrall St., from Keefer to Pacific Blvd
•	Quebec, from Keefer to E 7th Ave
•	2nd Ave, from Main to Cambie
•	Westbound Terminal Ave, from Main to Quebec
•	Cambie Bridge on-ramp, from W 2nd
•	Cambie St &amp; Cambie Bridge (northbound), from W Broadway to Expo Blvd 

Location: Various locations
Schedule: Oct 4, 2026 5:00 AM - 2:00 PM</content>
<id>urn:uuid:07c5db3f-0846-4251-973f-ae4879f2a830</id>
<link href="https://support.cancer.ca/site/TR/RunfortheCure/RFTC_NW_odd_?fr_id=28558&amp;pg=entry"/>
<published>2026-03-20T07:00:00Z</published>
<title>2026 CIBC Run For Cure</title>
<updated>2026-03-11T20:38:51.8982211Z</updated>
<georss:line>49.277095779239005 -123.10638079667 49.27711991857001 -123.10767644058</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>On Sunday, October 4, 2026, the following locations will be closed for the CIBC Run for the Cure event: 

Event will cause various road closures and traffic delays on the following locations:

Sunday, October 4, 2026 from 05:00 am to 2:00 pm 

•	Pacific Blvd from Nelson to Quebec
•	Pat Quinn Way, from Pacific to Expo 
•	Cambie Bridge Off-Ramp to Pacific Blvd

Sunday, October 4, 2026 from 09:00 am to 11:00 am 

•	Expo Blvd, from Abbott to Quebec
•	Keefer, from Carrall to Columbia/Quebec
•	W 6th Ave, from Quebec to Cambie
•	Abbott St., from Pender to Pacific Blvd 
•	Carrall St., from Keefer to Pacific Blvd
•	Quebec, from Keefer to E 7th Ave
•	2nd Ave, from Main to Cambie
•	Westbound Terminal Ave, from Main to Quebec
•	Cambie Bridge on-ramp, from W 2nd
•	Cambie St &amp; Cambie Bridge (northbound), from W Broadway to Expo Blvd 

Location: Various locations
Schedule: Oct 4, 2026 5:00 AM - 2:00 PM</content>
<id>urn:uuid:7db364b3-9d91-4247-9d19-4df856237c68</id>
<link href="https://support.cancer.ca/site/TR/RunfortheCure/RFTC_NW_odd_?fr_id=28558&amp;pg=entry"/>
<published>2026-03-20T07:00:00Z</published>
<title>2026 CIBC Run For Cure</title>
<updated>2026-03-11T20:38:51.8982211Z</updated>
<georss:line>49.27427289011612 -123.1144881248474 49.274916877491506 -123.1129002571106</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>On Sunday, October 4, 2026, the following locations will be closed for the CIBC Run for the Cure event: 

Event will cause various road closures and traffic delays on the following locations:

Sunday, October 4, 2026 from 05:00 am to 2:00 pm 

•	Pacific Blvd from Nelson to Quebec
•	Pat Quinn Way, from Pacific to Expo 
•	Cambie Bridge Off-Ramp to Pacific Blvd

Sunday, October 4, 2026 from 09:00 am to 11:00 am 

•	Expo Blvd, from Abbott to Quebec
•	Keefer, from Carrall to Columbia/Quebec
•	W 6th Ave, from Quebec to Cambie
•	Abbott St., from Pender to Pacific Blvd 
•	Carrall St., from Keefer to Pacific Blvd
•	Quebec, from Keefer to E 7th Ave
•	2nd Ave, from Main to Cambie
•	Westbound Terminal Ave, from Main to Quebec
•	Cambie Bridge on-ramp, from W 2nd
•	Cambie St &amp; Cambie Bridge (northbound), from W Broadway to Expo Blvd 

Location: Various locations
Schedule: Oct 4, 2026 5:00 AM - 2:00 PM</content>
<id>urn:uuid:6ae981d9-0da3-4d09-9ee4-e53848e7560e</id>
<link href="https://support.cancer.ca/site/TR/RunfortheCure/RFTC_NW_odd_?fr_id=28558&amp;pg=entry"/>
<published>2026-03-20T07:00:00Z</published>
<title>2026 CIBC Run For Cure</title>
<updated>2026-03-11T20:38:51.8982211Z</updated>
<georss:line>49.278647569421 -123.10761979398 49.27711991857001 -123.10767644058</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>On Sunday, October 4, 2026, the following locations will be closed for the CIBC Run for the Cure event: 

Event will cause various road closures and traffic delays on the following locations:

Sunday, October 4, 2026 from 05:00 am to 2:00 pm 

•	Pacific Blvd from Nelson to Quebec
•	Pat Quinn Way, from Pacific to Expo 
•	Cambie Bridge Off-Ramp to Pacific Blvd

Sunday, October 4, 2026 from 09:00 am to 11:00 am 

•	Expo Blvd, from Abbott to Quebec
•	Keefer, from Carrall to Columbia/Quebec
•	W 6th Ave, from Quebec to Cambie
•	Abbott St., from Pender to Pacific Blvd 
•	Carrall St., from Keefer to Pacific Blvd
•	Quebec, from Keefer to E 7th Ave
•	2nd Ave, from Main to Cambie
•	Westbound Terminal Ave, from Main to Quebec
•	Cambie Bridge on-ramp, from W 2nd
•	Cambie St &amp; Cambie Bridge (northbound), from W Broadway to Expo Blvd 

Location: Various locations
Schedule: Oct 4, 2026 5:00 AM - 2:00 PM</content>
<id>urn:uuid:06682c8a-232c-4de6-aaa2-5b29655b2651</id>
<link href="https://support.cancer.ca/site/TR/RunfortheCure/RFTC_NW_odd_?fr_id=28558&amp;pg=entry"/>
<published>2026-03-20T07:00:00Z</published>
<title>2026 CIBC Run For Cure</title>
<updated>2026-03-11T20:38:51.8982211Z</updated>
<georss:line>49.273040890840434 -123.11474293470383 49.273033890756636 -123.11472684144972</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>On Sunday, October 4, 2026, the following locations will be closed for the CIBC Run for the Cure event: 

Event will cause various road closures and traffic delays on the following locations:

Sunday, October 4, 2026 from 05:00 am to 2:00 pm 

•	Pacific Blvd from Nelson to Quebec
•	Pat Quinn Way, from Pacific to Expo 
•	Cambie Bridge Off-Ramp to Pacific Blvd

Sunday, October 4, 2026 from 09:00 am to 11:00 am 

•	Expo Blvd, from Abbott to Quebec
•	Keefer, from Carrall to Columbia/Quebec
•	W 6th Ave, from Quebec to Cambie
•	Abbott St., from Pender to Pacific Blvd 
•	Carrall St., from Keefer to Pacific Blvd
•	Quebec, from Keefer to E 7th Ave
•	2nd Ave, from Main to Cambie
•	Westbound Terminal Ave, from Main to Quebec
•	Cambie Bridge on-ramp, from W 2nd
•	Cambie St &amp; Cambie Bridge (northbound), from W Broadway to Expo Blvd 

Location: Various locations
Schedule: Oct 4, 2026 5:00 AM - 2:00 PM</content>
<id>urn:uuid:d92210b2-a45f-4ca5-add3-250c280f68e5</id>
<link href="https://support.cancer.ca/site/TR/RunfortheCure/RFTC_NW_odd_?fr_id=28558&amp;pg=entry"/>
<published>2026-03-20T07:00:00Z</published>
<title>2026 CIBC Run For Cure</title>
<updated>2026-03-11T20:38:51.8982211Z</updated>
<georss:line>49.26557763798101 -123.10478873967 49.26561278344599 -123.10672344803</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>On Sunday, October 4, 2026, the following locations will be closed for the CIBC Run for the Cure event: 

Event will cause various road closures and traffic delays on the following locations:

Sunday, October 4, 2026 from 05:00 am to 2:00 pm 

•	Pacific Blvd from Nelson to Quebec
•	Pat Quinn Way, from Pacific to Expo 
•	Cambie Bridge Off-Ramp to Pacific Blvd

Sunday, October 4, 2026 from 09:00 am to 11:00 am 

•	Expo Blvd, from Abbott to Quebec
•	Keefer, from Carrall to Columbia/Quebec
•	W 6th Ave, from Quebec to Cambie
•	Abbott St., from Pender to Pacific Blvd 
•	Carrall St., from Keefer to Pacific Blvd
•	Quebec, from Keefer to E 7th Ave
•	2nd Ave, from Main to Cambie
•	Westbound Terminal Ave, from Main to Quebec
•	Cambie Bridge on-ramp, from W 2nd
•	Cambie St &amp; Cambie Bridge (northbound), from W Broadway to Expo Blvd 

Location: Various locations
Schedule: Oct 4, 2026 5:00 AM - 2:00 PM</content>
<id>urn:uuid:b5b0a478-7fb3-4989-9a88-b49d876c2a1b</id>
<link href="https://support.cancer.ca/site/TR/RunfortheCure/RFTC_NW_odd_?fr_id=28558&amp;pg=entry"/>
<published>2026-03-20T07:00:00Z</published>
<title>2026 CIBC Run For Cure</title>
<updated>2026-03-11T20:38:51.8982211Z</updated>
<georss:line>49.26569015047198 -123.11085140859 49.265725535478026 -123.11278689599</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>On Sunday, October 4, 2026, the following locations will be closed for the CIBC Run for the Cure event: 

Event will cause various road closures and traffic delays on the following locations:

Sunday, October 4, 2026 from 05:00 am to 2:00 pm 

•	Pacific Blvd from Nelson to Quebec
•	Pat Quinn Way, from Pacific to Expo 
•	Cambie Bridge Off-Ramp to Pacific Blvd

Sunday, October 4, 2026 from 09:00 am to 11:00 am 

•	Expo Blvd, from Abbott to Quebec
•	Keefer, from Carrall to Columbia/Quebec
•	W 6th Ave, from Quebec to Cambie
•	Abbott St., from Pender to Pacific Blvd 
•	Carrall St., from Keefer to Pacific Blvd
•	Quebec, from Keefer to E 7th Ave
•	2nd Ave, from Main to Cambie
•	Westbound Terminal Ave, from Main to Quebec
•	Cambie Bridge on-ramp, from W 2nd
•	Cambie St &amp; Cambie Bridge (northbound), from W Broadway to Expo Blvd 

Location: Various locations
Schedule: Oct 4, 2026 5:00 AM - 2:00 PM</content>
<id>urn:uuid:00e34a6a-dc63-4e33-bcb0-4866fcdd0323</id>
<link href="https://support.cancer.ca/site/TR/RunfortheCure/RFTC_NW_odd_?fr_id=28558&amp;pg=entry"/>
<published>2026-03-20T07:00:00Z</published>
<title>2026 CIBC Run For Cure</title>
<updated>2026-03-11T20:38:51.8982211Z</updated>
<georss:line>49.26561278344599 -123.10672344803 49.26566397273098 -123.10943779426</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>On Sunday, October 4, 2026, the following locations will be closed for the CIBC Run for the Cure event: 

Event will cause various road closures and traffic delays on the following locations:

Sunday, October 4, 2026 from 05:00 am to 2:00 pm 

•	Pacific Blvd from Nelson to Quebec
•	Pat Quinn Way, from Pacific to Expo 
•	Cambie Bridge Off-Ramp to Pacific Blvd

Sunday, October 4, 2026 from 09:00 am to 11:00 am 

•	Expo Blvd, from Abbott to Quebec
•	Keefer, from Carrall to Columbia/Quebec
•	W 6th Ave, from Quebec to Cambie
•	Abbott St., from Pender to Pacific Blvd 
•	Carrall St., from Keefer to Pacific Blvd
•	Quebec, from Keefer to E 7th Ave
•	2nd Ave, from Main to Cambie
•	Westbound Terminal Ave, from Main to Quebec
•	Cambie Bridge on-ramp, from W 2nd
•	Cambie St &amp; Cambie Bridge (northbound), from W Broadway to Expo Blvd 

Location: Various locations
Schedule: Oct 4, 2026 5:00 AM - 2:00 PM</content>
<id>urn:uuid:27fdd1d2-54a7-4cf6-8fe7-04b85ab442e6</id>
<link href="https://support.cancer.ca/site/TR/RunfortheCure/RFTC_NW_odd_?fr_id=28558&amp;pg=entry"/>
<published>2026-03-20T07:00:00Z</published>
<title>2026 CIBC Run For Cure</title>
<updated>2026-03-11T20:38:51.8982211Z</updated>
<georss:line>49.26566397273098 -123.10943779426 49.26569015047198 -123.11085140859</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>On Sunday, October 4, 2026, the following locations will be closed for the CIBC Run for the Cure event: 

Event will cause various road closures and traffic delays on the following locations:

Sunday, October 4, 2026 from 05:00 am to 2:00 pm 

•	Pacific Blvd from Nelson to Quebec
•	Pat Quinn Way, from Pacific to Expo 
•	Cambie Bridge Off-Ramp to Pacific Blvd

Sunday, October 4, 2026 from 09:00 am to 11:00 am 

•	Expo Blvd, from Abbott to Quebec
•	Keefer, from Carrall to Columbia/Quebec
•	W 6th Ave, from Quebec to Cambie
•	Abbott St., from Pender to Pacific Blvd 
•	Carrall St., from Keefer to Pacific Blvd
•	Quebec, from Keefer to E 7th Ave
•	2nd Ave, from Main to Cambie
•	Westbound Terminal Ave, from Main to Quebec
•	Cambie Bridge on-ramp, from W 2nd
•	Cambie St &amp; Cambie Bridge (northbound), from W Broadway to Expo Blvd 

Location: Various locations
Schedule: Oct 4, 2026 5:00 AM - 2:00 PM</content>
<id>urn:uuid:621776f5-dba9-4262-ba6f-5ddca266404a</id>
<link href="https://support.cancer.ca/site/TR/RunfortheCure/RFTC_NW_odd_?fr_id=28558&amp;pg=entry"/>
<published>2026-03-20T07:00:00Z</published>
<title>2026 CIBC Run For Cure</title>
<updated>2026-03-11T20:38:51.8982211Z</updated>
<georss:line>49.265725535478026 -123.11278689599 49.26573638970402 -123.11338732540999</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>On Sunday, October 4, 2026, the following locations will be closed for the CIBC Run for the Cure event: 

Event will cause various road closures and traffic delays on the following locations:

Sunday, October 4, 2026 from 05:00 am to 2:00 pm 

•	Pacific Blvd from Nelson to Quebec
•	Pat Quinn Way, from Pacific to Expo 
•	Cambie Bridge Off-Ramp to Pacific Blvd

Sunday, October 4, 2026 from 09:00 am to 11:00 am 

•	Expo Blvd, from Abbott to Quebec
•	Keefer, from Carrall to Columbia/Quebec
•	W 6th Ave, from Quebec to Cambie
•	Abbott St., from Pender to Pacific Blvd 
•	Carrall St., from Keefer to Pacific Blvd
•	Quebec, from Keefer to E 7th Ave
•	2nd Ave, from Main to Cambie
•	Westbound Terminal Ave, from Main to Quebec
•	Cambie Bridge on-ramp, from W 2nd
•	Cambie St &amp; Cambie Bridge (northbound), from W Broadway to Expo Blvd 

Location: Various locations
Schedule: Oct 4, 2026 5:00 AM - 2:00 PM</content>
<id>urn:uuid:b2eee1af-7990-40c6-8375-2af23cae0f85</id>
<link href="https://support.cancer.ca/site/TR/RunfortheCure/RFTC_NW_odd_?fr_id=28558&amp;pg=entry"/>
<published>2026-03-20T07:00:00Z</published>
<title>2026 CIBC Run For Cure</title>
<updated>2026-03-11T20:38:51.8982211Z</updated>
<georss:line>49.26573638970402 -123.11338732540999 49.26575912059903 -123.11464525757</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>On Sunday, October 4, 2026, the following locations will be closed for the CIBC Run for the Cure event: 

Event will cause various road closures and traffic delays on the following locations:

Sunday, October 4, 2026 from 05:00 am to 2:00 pm 

•	Pacific Blvd from Nelson to Quebec
•	Pat Quinn Way, from Pacific to Expo 
•	Cambie Bridge Off-Ramp to Pacific Blvd

Sunday, October 4, 2026 from 09:00 am to 11:00 am 

•	Expo Blvd, from Abbott to Quebec
•	Keefer, from Carrall to Columbia/Quebec
•	W 6th Ave, from Quebec to Cambie
•	Abbott St., from Pender to Pacific Blvd 
•	Carrall St., from Keefer to Pacific Blvd
•	Quebec, from Keefer to E 7th Ave
•	2nd Ave, from Main to Cambie
•	Westbound Terminal Ave, from Main to Quebec
•	Cambie Bridge on-ramp, from W 2nd
•	Cambie St &amp; Cambie Bridge (northbound), from W Broadway to Expo Blvd 

Location: Various locations
Schedule: Oct 4, 2026 5:00 AM - 2:00 PM</content>
<id>urn:uuid:e54bd691-05e3-43a6-9921-ecd31b788a4d</id>
<link href="https://support.cancer.ca/site/TR/RunfortheCure/RFTC_NW_odd_?fr_id=28558&amp;pg=entry"/>
<published>2026-03-20T07:00:00Z</published>
<title>2026 CIBC Run For Cure</title>
<updated>2026-03-11T20:38:51.8982211Z</updated>
<georss:line>49.26621149597 -123.11462950886 49.26575912059903 -123.11464525757</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>On Sunday, October 4, 2026, the following locations will be closed for the CIBC Run for the Cure event: 

Event will cause various road closures and traffic delays on the following locations:

Sunday, October 4, 2026 from 05:00 am to 2:00 pm 

•	Pacific Blvd from Nelson to Quebec
•	Pat Quinn Way, from Pacific to Expo 
•	Cambie Bridge Off-Ramp to Pacific Blvd

Sunday, October 4, 2026 from 09:00 am to 11:00 am 

•	Expo Blvd, from Abbott to Quebec
•	Keefer, from Carrall to Columbia/Quebec
•	W 6th Ave, from Quebec to Cambie
•	Abbott St., from Pender to Pacific Blvd 
•	Carrall St., from Keefer to Pacific Blvd
•	Quebec, from Keefer to E 7th Ave
•	2nd Ave, from Main to Cambie
•	Westbound Terminal Ave, from Main to Quebec
•	Cambie Bridge on-ramp, from W 2nd
•	Cambie St &amp; Cambie Bridge (northbound), from W Broadway to Expo Blvd 

Location: Various locations
Schedule: Oct 4, 2026 5:00 AM - 2:00 PM</content>
<id>urn:uuid:c6015529-a139-4830-81c7-ae64478310a9</id>
<link href="https://support.cancer.ca/site/TR/RunfortheCure/RFTC_NW_odd_?fr_id=28558&amp;pg=entry"/>
<published>2026-03-20T07:00:00Z</published>
<title>2026 CIBC Run For Cure</title>
<updated>2026-03-11T20:38:51.8982211Z</updated>
<georss:line>49.26675091502355 -123.11462491750716 49.26616633007774 -123.11463564634323</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>On Sunday, October 4, 2026, the following locations will be closed for the CIBC Run for the Cure event: 

Event will cause various road closures and traffic delays on the following locations:

Sunday, October 4, 2026 from 05:00 am to 2:00 pm 

•	Pacific Blvd from Nelson to Quebec
•	Pat Quinn Way, from Pacific to Expo 
•	Cambie Bridge Off-Ramp to Pacific Blvd

Sunday, October 4, 2026 from 09:00 am to 11:00 am 

•	Expo Blvd, from Abbott to Quebec
•	Keefer, from Carrall to Columbia/Quebec
•	W 6th Ave, from Quebec to Cambie
•	Abbott St., from Pender to Pacific Blvd 
•	Carrall St., from Keefer to Pacific Blvd
•	Quebec, from Keefer to E 7th Ave
•	2nd Ave, from Main to Cambie
•	Westbound Terminal Ave, from Main to Quebec
•	Cambie Bridge on-ramp, from W 2nd
•	Cambie St &amp; Cambie Bridge (northbound), from W Broadway to Expo Blvd 

Location: Various locations
Schedule: Oct 4, 2026 5:00 AM - 2:00 PM</content>
<id>urn:uuid:569a8bf8-c4ca-4bd8-a32f-ecfefde4ee55</id>
<link href="https://support.cancer.ca/site/TR/RunfortheCure/RFTC_NW_odd_?fr_id=28558&amp;pg=entry"/>
<published>2026-03-20T07:00:00Z</published>
<title>2026 CIBC Run For Cure</title>
<updated>2026-03-11T20:38:51.8982211Z</updated>
<georss:line>49.269552585992955 -123.11488912241 49.269193208557 -123.11477277881 49.26899372978204 -123.11474688576 49.26673690432199 -123.11461277441</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>On Sunday, October 4, 2026, the following locations will be closed for the CIBC Run for the Cure event: 

Event will cause various road closures and traffic delays on the following locations:

Sunday, October 4, 2026 from 05:00 am to 2:00 pm 

•	Pacific Blvd from Nelson to Quebec
•	Pat Quinn Way, from Pacific to Expo 
•	Cambie Bridge Off-Ramp to Pacific Blvd

Sunday, October 4, 2026 from 09:00 am to 11:00 am 

•	Expo Blvd, from Abbott to Quebec
•	Keefer, from Carrall to Columbia/Quebec
•	W 6th Ave, from Quebec to Cambie
•	Abbott St., from Pender to Pacific Blvd 
•	Carrall St., from Keefer to Pacific Blvd
•	Quebec, from Keefer to E 7th Ave
•	2nd Ave, from Main to Cambie
•	Westbound Terminal Ave, from Main to Quebec
•	Cambie Bridge on-ramp, from W 2nd
•	Cambie St &amp; Cambie Bridge (northbound), from W Broadway to Expo Blvd 

Location: Various locations
Schedule: Oct 4, 2026 5:00 AM - 2:00 PM</content>
<id>urn:uuid:481440e5-4b5d-403c-96c3-9d0fc8ef581f</id>
<link href="https://support.cancer.ca/site/TR/RunfortheCure/RFTC_NW_odd_?fr_id=28558&amp;pg=entry"/>
<published>2026-03-20T07:00:00Z</published>
<title>2026 CIBC Run For Cure</title>
<updated>2026-03-11T20:38:51.8982211Z</updated>
<georss:line>49.26531506242034 -123.11475723356162 49.26497108000177 -123.11477213265495</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>On Sunday, October 4, 2026, the following locations will be closed for the CIBC Run for the Cure event: 

Event will cause various road closures and traffic delays on the following locations:

Sunday, October 4, 2026 from 05:00 am to 2:00 pm 

•	Pacific Blvd from Nelson to Quebec
•	Pat Quinn Way, from Pacific to Expo 
•	Cambie Bridge Off-Ramp to Pacific Blvd

Sunday, October 4, 2026 from 09:00 am to 11:00 am 

•	Expo Blvd, from Abbott to Quebec
•	Keefer, from Carrall to Columbia/Quebec
•	W 6th Ave, from Quebec to Cambie
•	Abbott St., from Pender to Pacific Blvd 
•	Carrall St., from Keefer to Pacific Blvd
•	Quebec, from Keefer to E 7th Ave
•	2nd Ave, from Main to Cambie
•	Westbound Terminal Ave, from Main to Quebec
•	Cambie Bridge on-ramp, from W 2nd
•	Cambie St &amp; Cambie Bridge (northbound), from W Broadway to Expo Blvd 

Location: Various locations
Schedule: Oct 4, 2026 5:00 AM - 2:00 PM</content>
<id>urn:uuid:6bb24352-e634-46fe-86ea-e97b3829cfcd</id>
<link href="https://support.cancer.ca/site/TR/RunfortheCure/RFTC_NW_odd_?fr_id=28558&amp;pg=entry"/>
<published>2026-03-20T07:00:00Z</published>
<title>2026 CIBC Run For Cure</title>
<updated>2026-03-11T20:38:51.8982211Z</updated>
<georss:line>49.26497108000177 -123.11477213265495 49.26486307892105 -123.11477681661303</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>On Sunday, October 4, 2026, the following locations will be closed for the CIBC Run for the Cure event: 

Event will cause various road closures and traffic delays on the following locations:

Sunday, October 4, 2026 from 05:00 am to 2:00 pm 

•	Pacific Blvd from Nelson to Quebec
•	Pat Quinn Way, from Pacific to Expo 
•	Cambie Bridge Off-Ramp to Pacific Blvd

Sunday, October 4, 2026 from 09:00 am to 11:00 am 

•	Expo Blvd, from Abbott to Quebec
•	Keefer, from Carrall to Columbia/Quebec
•	W 6th Ave, from Quebec to Cambie
•	Abbott St., from Pender to Pacific Blvd 
•	Carrall St., from Keefer to Pacific Blvd
•	Quebec, from Keefer to E 7th Ave
•	2nd Ave, from Main to Cambie
•	Westbound Terminal Ave, from Main to Quebec
•	Cambie Bridge on-ramp, from W 2nd
•	Cambie St &amp; Cambie Bridge (northbound), from W Broadway to Expo Blvd 

Location: Various locations
Schedule: Oct 4, 2026 5:00 AM - 2:00 PM</content>
<id>urn:uuid:471cf7f8-5129-4b99-a185-67f9f728bfba</id>
<link href="https://support.cancer.ca/site/TR/RunfortheCure/RFTC_NW_odd_?fr_id=28558&amp;pg=entry"/>
<published>2026-03-20T07:00:00Z</published>
<title>2026 CIBC Run For Cure</title>
<updated>2026-03-11T20:38:51.8982211Z</updated>
<georss:line>49.26486307892105 -123.11477681661303 49.264133896179715 -123.11480841521852</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>On Sunday, October 4, 2026, the following locations will be closed for the CIBC Run for the Cure event: 

Event will cause various road closures and traffic delays on the following locations:

Sunday, October 4, 2026 from 05:00 am to 2:00 pm 

•	Pacific Blvd from Nelson to Quebec
•	Pat Quinn Way, from Pacific to Expo 
•	Cambie Bridge Off-Ramp to Pacific Blvd

Sunday, October 4, 2026 from 09:00 am to 11:00 am 

•	Expo Blvd, from Abbott to Quebec
•	Keefer, from Carrall to Columbia/Quebec
•	W 6th Ave, from Quebec to Cambie
•	Abbott St., from Pender to Pacific Blvd 
•	Carrall St., from Keefer to Pacific Blvd
•	Quebec, from Keefer to E 7th Ave
•	2nd Ave, from Main to Cambie
•	Westbound Terminal Ave, from Main to Quebec
•	Cambie Bridge on-ramp, from W 2nd
•	Cambie St &amp; Cambie Bridge (northbound), from W Broadway to Expo Blvd 

Location: Various locations
Schedule: Oct 4, 2026 5:00 AM - 2:00 PM</content>
<id>urn:uuid:4fae1f86-9cbf-4224-9bf7-db4af29ba6e6</id>
<link href="https://support.cancer.ca/site/TR/RunfortheCure/RFTC_NW_odd_?fr_id=28558&amp;pg=entry"/>
<published>2026-03-20T07:00:00Z</published>
<title>2026 CIBC Run For Cure</title>
<updated>2026-03-11T20:38:51.8982211Z</updated>
<georss:line>49.264133896179715 -123.11480841521852 49.26395948062307 -123.11481596877503</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>On Sunday, October 4, 2026, the following locations will be closed for the CIBC Run for the Cure event: 

Event will cause various road closures and traffic delays on the following locations:

Sunday, October 4, 2026 from 05:00 am to 2:00 pm 

•	Pacific Blvd from Nelson to Quebec
•	Pat Quinn Way, from Pacific to Expo 
•	Cambie Bridge Off-Ramp to Pacific Blvd

Sunday, October 4, 2026 from 09:00 am to 11:00 am 

•	Expo Blvd, from Abbott to Quebec
•	Keefer, from Carrall to Columbia/Quebec
•	W 6th Ave, from Quebec to Cambie
•	Abbott St., from Pender to Pacific Blvd 
•	Carrall St., from Keefer to Pacific Blvd
•	Quebec, from Keefer to E 7th Ave
•	2nd Ave, from Main to Cambie
•	Westbound Terminal Ave, from Main to Quebec
•	Cambie Bridge on-ramp, from W 2nd
•	Cambie St &amp; Cambie Bridge (northbound), from W Broadway to Expo Blvd 

Location: Various locations
Schedule: Oct 4, 2026 5:00 AM - 2:00 PM</content>
<id>urn:uuid:3e8ff190-e1fc-4669-a167-a0a195aa1945</id>
<link href="https://support.cancer.ca/site/TR/RunfortheCure/RFTC_NW_odd_?fr_id=28558&amp;pg=entry"/>
<published>2026-03-20T07:00:00Z</published>
<title>2026 CIBC Run For Cure</title>
<updated>2026-03-11T20:38:51.8982211Z</updated>
<georss:line>49.26395948062307 -123.11481596877503 49.263506858322586 -123.11483557678204</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>On Sunday, October 4, 2026, the following locations will be closed for the CIBC Run for the Cure event: 

Event will cause various road closures and traffic delays on the following locations:

Sunday, October 4, 2026 from 05:00 am to 2:00 pm 

•	Pacific Blvd from Nelson to Quebec
•	Pat Quinn Way, from Pacific to Expo 
•	Cambie Bridge Off-Ramp to Pacific Blvd

Sunday, October 4, 2026 from 09:00 am to 11:00 am 

•	Expo Blvd, from Abbott to Quebec
•	Keefer, from Carrall to Columbia/Quebec
•	W 6th Ave, from Quebec to Cambie
•	Abbott St., from Pender to Pacific Blvd 
•	Carrall St., from Keefer to Pacific Blvd
•	Quebec, from Keefer to E 7th Ave
•	2nd Ave, from Main to Cambie
•	Westbound Terminal Ave, from Main to Quebec
•	Cambie Bridge on-ramp, from W 2nd
•	Cambie St &amp; Cambie Bridge (northbound), from W Broadway to Expo Blvd 

Location: Various locations
Schedule: Oct 4, 2026 5:00 AM - 2:00 PM</content>
<id>urn:uuid:17dd90b6-ec92-4ff8-b835-f2a3b7349ece</id>
<link href="https://support.cancer.ca/site/TR/RunfortheCure/RFTC_NW_odd_?fr_id=28558&amp;pg=entry"/>
<published>2026-03-20T07:00:00Z</published>
<title>2026 CIBC Run For Cure</title>
<updated>2026-03-11T20:38:51.8982211Z</updated>
<georss:line>49.26621620764101 -123.1147944227 49.26577687765601 -123.11477157609 49.265309453506035 -123.1147417922</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>On Sunday, October 4, 2026, the following locations will be closed for the CIBC Run for the Cure event: 

Event will cause various road closures and traffic delays on the following locations:

Sunday, October 4, 2026 from 05:00 am to 2:00 pm 

•	Pacific Blvd from Nelson to Quebec
•	Pat Quinn Way, from Pacific to Expo 
•	Cambie Bridge Off-Ramp to Pacific Blvd

Sunday, October 4, 2026 from 09:00 am to 11:00 am 

•	Expo Blvd, from Abbott to Quebec
•	Keefer, from Carrall to Columbia/Quebec
•	W 6th Ave, from Quebec to Cambie
•	Abbott St., from Pender to Pacific Blvd 
•	Carrall St., from Keefer to Pacific Blvd
•	Quebec, from Keefer to E 7th Ave
•	2nd Ave, from Main to Cambie
•	Westbound Terminal Ave, from Main to Quebec
•	Cambie Bridge on-ramp, from W 2nd
•	Cambie St &amp; Cambie Bridge (northbound), from W Broadway to Expo Blvd 

Location: Various locations
Schedule: Oct 4, 2026 5:00 AM - 2:00 PM</content>
<id>urn:uuid:91f4afc1-cb8d-4100-ab6a-6520a1466b2d</id>
<link href="https://support.cancer.ca/site/TR/RunfortheCure/RFTC_NW_odd_?fr_id=28558&amp;pg=entry"/>
<published>2026-03-20T07:00:00Z</published>
<title>2026 CIBC Run For Cure</title>
<updated>2026-03-11T20:38:51.8982211Z</updated>
<georss:line>49.265309453506035 -123.1147417922 49.264965471104006 -123.11475669139</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>On Sunday, October 4, 2026, the following locations will be closed for the CIBC Run for the Cure event: 

Event will cause various road closures and traffic delays on the following locations:

Sunday, October 4, 2026 from 05:00 am to 2:00 pm 

•	Pacific Blvd from Nelson to Quebec
•	Pat Quinn Way, from Pacific to Expo 
•	Cambie Bridge Off-Ramp to Pacific Blvd

Sunday, October 4, 2026 from 09:00 am to 11:00 am 

•	Expo Blvd, from Abbott to Quebec
•	Keefer, from Carrall to Columbia/Quebec
•	W 6th Ave, from Quebec to Cambie
•	Abbott St., from Pender to Pacific Blvd 
•	Carrall St., from Keefer to Pacific Blvd
•	Quebec, from Keefer to E 7th Ave
•	2nd Ave, from Main to Cambie
•	Westbound Terminal Ave, from Main to Quebec
•	Cambie Bridge on-ramp, from W 2nd
•	Cambie St &amp; Cambie Bridge (northbound), from W Broadway to Expo Blvd 

Location: Various locations
Schedule: Oct 4, 2026 5:00 AM - 2:00 PM</content>
<id>urn:uuid:4b254ca1-90fe-4075-a786-d411b8fc0063</id>
<link href="https://support.cancer.ca/site/TR/RunfortheCure/RFTC_NW_odd_?fr_id=28558&amp;pg=entry"/>
<published>2026-03-20T07:00:00Z</published>
<title>2026 CIBC Run For Cure</title>
<updated>2026-03-11T20:38:51.8982211Z</updated>
<georss:line>49.26575912059903 -123.11464525757 49.265309453506035 -123.1147417922</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>On Sunday, October 4, 2026, the following locations will be closed for the CIBC Run for the Cure event: 

Event will cause various road closures and traffic delays on the following locations:

Sunday, October 4, 2026 from 05:00 am to 2:00 pm 

•	Pacific Blvd from Nelson to Quebec
•	Pat Quinn Way, from Pacific to Expo 
•	Cambie Bridge Off-Ramp to Pacific Blvd

Sunday, October 4, 2026 from 09:00 am to 11:00 am 

•	Expo Blvd, from Abbott to Quebec
•	Keefer, from Carrall to Columbia/Quebec
•	W 6th Ave, from Quebec to Cambie
•	Abbott St., from Pender to Pacific Blvd 
•	Carrall St., from Keefer to Pacific Blvd
•	Quebec, from Keefer to E 7th Ave
•	2nd Ave, from Main to Cambie
•	Westbound Terminal Ave, from Main to Quebec
•	Cambie Bridge on-ramp, from W 2nd
•	Cambie St &amp; Cambie Bridge (northbound), from W Broadway to Expo Blvd 

Location: Various locations
Schedule: Oct 4, 2026 5:00 AM - 2:00 PM</content>
<id>urn:uuid:38470c6b-5f4d-4178-8ebe-6a1fd2964567</id>
<link href="https://support.cancer.ca/site/TR/RunfortheCure/RFTC_NW_odd_?fr_id=28558&amp;pg=entry"/>
<published>2026-03-20T07:00:00Z</published>
<title>2026 CIBC Run For Cure</title>
<updated>2026-03-11T20:38:51.8982211Z</updated>
<georss:line>49.263506858322586 -123.11483557678204 49.263340294026676 -123.11484467401556 49.26322406705316 -123.11489886007084</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Curb lanes only – Fraser St to Cambie St. 

Location: 41st Av - Fraser ST to Cambie St
Schedule: Jun 16, 2025 - Aug 5, 2025</content>
<id>urn:uuid:ad4ecab9-f40b-4515-90ca-6c484ef4b1e5</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ea38cd74-b088-4cd8-8598-6b58c815e507"/>
<published>2025-07-10T07:00:00Z</published>
<title>41st Av - Fraser ST to Cambie St</title>
<updated>2025-07-29T21:58:23.1763401Z</updated>
<georss:line>49.233148395351776 -123.10499214529324 49.23312218707443 -123.10372322552577</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Curb lanes only – Fraser St to Cambie St. 

Location: 41st Av - Fraser ST to Cambie St
Schedule: Jun 16, 2025 - Aug 5, 2025</content>
<id>urn:uuid:5f6f4af1-fdd9-469f-81a1-c96f28b53b1f</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ea38cd74-b088-4cd8-8598-6b58c815e507"/>
<published>2025-07-10T07:00:00Z</published>
<title>41st Av - Fraser ST to Cambie St</title>
<updated>2025-07-29T21:58:23.1763401Z</updated>
<georss:line>49.23315953921053 -123.10565456835069 49.233148395351776 -123.10499214529324</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Curb lanes only – Fraser St to Cambie St. 

Location: 41st Av - Fraser ST to Cambie St
Schedule: Jun 16, 2025 - Aug 5, 2025</content>
<id>urn:uuid:67a28023-0e92-458a-9c23-65f51b59acb8</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ea38cd74-b088-4cd8-8598-6b58c815e507"/>
<published>2025-07-10T07:00:00Z</published>
<title>41st Av - Fraser ST to Cambie St</title>
<updated>2025-07-29T21:58:23.1763401Z</updated>
<georss:line>49.23350973812711 -123.1153272425789 49.233436374827164 -123.1134355627308</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Curb lanes only – Fraser St to Cambie St. 

Location: 41st Av - Fraser ST to Cambie St
Schedule: Jun 16, 2025 - Aug 5, 2025</content>
<id>urn:uuid:7e7ebe28-46c3-45f0-821d-89eaa3208742</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ea38cd74-b088-4cd8-8598-6b58c815e507"/>
<published>2025-07-10T07:00:00Z</published>
<title>41st Av - Fraser ST to Cambie St</title>
<updated>2025-07-29T21:58:23.1763401Z</updated>
<georss:line>49.23350973812711 -123.1153272425789 49.233543467151264 -123.11619218473058</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Curb lanes only – Fraser St to Cambie St. 

Location: 41st Av - Fraser ST to Cambie St
Schedule: Jun 16, 2025 - Aug 5, 2025</content>
<id>urn:uuid:ddd3f758-33d5-4da5-9076-9ca35fe8f98e</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ea38cd74-b088-4cd8-8598-6b58c815e507"/>
<published>2025-07-10T07:00:00Z</published>
<title>41st Av - Fraser ST to Cambie St</title>
<updated>2025-07-29T21:58:23.1763401Z</updated>
<georss:line>49.23338291181679 -123.11205738002903 49.233436374827164 -123.1134355627308</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Curb lanes only – Fraser St to Cambie St. 

Location: 41st Av - Fraser ST to Cambie St
Schedule: Jun 16, 2025 - Aug 5, 2025</content>
<id>urn:uuid:aa321ffc-8b43-410a-8af9-995bbcd24f44</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ea38cd74-b088-4cd8-8598-6b58c815e507"/>
<published>2025-07-10T07:00:00Z</published>
<title>41st Av - Fraser ST to Cambie St</title>
<updated>2025-07-29T21:58:23.1763401Z</updated>
<georss:line>49.233331184734396 -123.11073729466544 49.23338291181679 -123.11205738002903</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Curb lanes only – Fraser St to Cambie St. 

Location: 41st Av - Fraser ST to Cambie St
Schedule: Jun 16, 2025 - Aug 5, 2025</content>
<id>urn:uuid:a65394f0-9a86-4c81-bba5-2f2aae5d86b7</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ea38cd74-b088-4cd8-8598-6b58c815e507"/>
<published>2025-07-10T07:00:00Z</published>
<title>41st Av - Fraser ST to Cambie St</title>
<updated>2025-07-29T21:58:23.1763401Z</updated>
<georss:line>49.23324323032861 -123.10811505058174 49.233331184734396 -123.11073729466544</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Curb lanes only – Fraser St to Cambie St. 

Location: 41st Av - Fraser ST to Cambie St
Schedule: Jun 16, 2025 - Aug 5, 2025</content>
<id>urn:uuid:4fec84f4-9570-4eff-a4f8-de1f5cbdd585</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ea38cd74-b088-4cd8-8598-6b58c815e507"/>
<published>2025-07-10T07:00:00Z</published>
<title>41st Av - Fraser ST to Cambie St</title>
<updated>2025-07-29T21:58:23.1763401Z</updated>
<georss:line>49.233181579616655 -123.10627995488323 49.23324323032861 -123.10811505058174</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Curb lanes only – Fraser St to Cambie St. 

Location: 41st Av - Fraser ST to Cambie St
Schedule: Jun 16, 2025 - Aug 5, 2025</content>
<id>urn:uuid:1f924a6e-a923-455e-9960-8c6ffb9066ff</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ea38cd74-b088-4cd8-8598-6b58c815e507"/>
<published>2025-07-10T07:00:00Z</published>
<title>41st Av - Fraser ST to Cambie St</title>
<updated>2025-07-29T21:58:23.1763401Z</updated>
<georss:line>49.23315953921053 -123.10565456835069 49.233181579616655 -123.10627995488323</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Curb lanes only – Fraser St to Cambie St. 

Location: 41st Av - Fraser ST to Cambie St
Schedule: Jun 16, 2025 - Aug 5, 2025</content>
<id>urn:uuid:6dd557eb-00b2-4ac2-b4da-3547d4aca92e</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ea38cd74-b088-4cd8-8598-6b58c815e507"/>
<published>2025-07-10T07:00:00Z</published>
<title>41st Av - Fraser ST to Cambie St</title>
<updated>2025-07-29T21:58:23.1763401Z</updated>
<georss:line>49.23303829221928 -123.0995681839052 49.23303722119104 -123.09928668707488</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Curb lanes only – Fraser St to Cambie St. 

Location: 41st Av - Fraser ST to Cambie St
Schedule: Jun 16, 2025 - Aug 5, 2025</content>
<id>urn:uuid:00138ab2-cc0b-424e-a90a-1e0ed9c606ab</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ea38cd74-b088-4cd8-8598-6b58c815e507"/>
<published>2025-07-10T07:00:00Z</published>
<title>41st Av - Fraser ST to Cambie St</title>
<updated>2025-07-29T21:58:23.1763401Z</updated>
<georss:line>49.233050340310484 -123.09999118513242 49.23303829221928 -123.0995681839052</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Curb lanes only – Fraser St to Cambie St. 

Location: 41st Av - Fraser ST to Cambie St
Schedule: Jun 16, 2025 - Aug 5, 2025</content>
<id>urn:uuid:b438be49-b0a6-4f58-870c-d7d4159d9376</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ea38cd74-b088-4cd8-8598-6b58c815e507"/>
<published>2025-07-10T07:00:00Z</published>
<title>41st Av - Fraser ST to Cambie St</title>
<updated>2025-07-29T21:58:23.1763401Z</updated>
<georss:line>49.23306705130443 -123.10085257139453 49.233050340310484 -123.09999118513242</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Curb lanes only – Fraser St to Cambie St. 

Location: 41st Av - Fraser ST to Cambie St
Schedule: Jun 16, 2025 - Aug 5, 2025</content>
<id>urn:uuid:ea3422ec-a8b1-4934-8dac-8d0174c088f4</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ea38cd74-b088-4cd8-8598-6b58c815e507"/>
<published>2025-07-10T07:00:00Z</published>
<title>41st Av - Fraser ST to Cambie St</title>
<updated>2025-07-29T21:58:23.1763401Z</updated>
<georss:line>49.23307915124383 -123.10151859325092 49.23306705130443 -123.10085257139453</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Curb lanes only – Fraser St to Cambie St. 

Location: 41st Av - Fraser ST to Cambie St
Schedule: Jun 16, 2025 - Aug 5, 2025</content>
<id>urn:uuid:e07cb431-0ce3-46c3-9074-19d06ddc1950</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ea38cd74-b088-4cd8-8598-6b58c815e507"/>
<published>2025-07-10T07:00:00Z</published>
<title>41st Av - Fraser ST to Cambie St</title>
<updated>2025-07-29T21:58:23.1763401Z</updated>
<georss:line>49.23309216367434 -123.10217578497006 49.23307915124383 -123.10151859325092</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Curb lanes only – Fraser St to Cambie St. 

Location: 41st Av - Fraser ST to Cambie St
Schedule: Jun 16, 2025 - Aug 5, 2025</content>
<id>urn:uuid:52ef9958-a5c9-4466-8bf0-9c811bee545c</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ea38cd74-b088-4cd8-8598-6b58c815e507"/>
<published>2025-07-10T07:00:00Z</published>
<title>41st Av - Fraser ST to Cambie St</title>
<updated>2025-07-29T21:58:23.1763401Z</updated>
<georss:line>49.23312218707443 -123.10372322552577 49.23309216367434 -123.10217578497006</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Curb lanes only – Fraser St to Cambie St. 

Location: 41st Av - Fraser ST to Cambie St
Schedule: Jun 16, 2025 - Aug 5, 2025</content>
<id>urn:uuid:db741f75-c7f4-4c45-877f-42abb42ca8b7</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ea38cd74-b088-4cd8-8598-6b58c815e507"/>
<published>2025-07-10T07:00:00Z</published>
<title>41st Av - Fraser ST to Cambie St</title>
<updated>2025-07-29T21:58:23.1763401Z</updated>
<georss:line>49.23295448925944 -123.09456169605798 49.232891510313834 -123.09055769579486</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Curb lanes only – Fraser St to Cambie St. 

Location: 41st Av - Fraser ST to Cambie St
Schedule: Jun 16, 2025 - Aug 5, 2025</content>
<id>urn:uuid:f3b9e9b6-512d-4416-a969-2edb6e10e372</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ea38cd74-b088-4cd8-8598-6b58c815e507"/>
<published>2025-07-10T07:00:00Z</published>
<title>41st Av - Fraser ST to Cambie St</title>
<updated>2025-07-29T21:58:23.1763401Z</updated>
<georss:line>49.232995824326196 -123.09721452315824 49.23295448925944 -123.09456169605798</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Curb lanes only – Fraser St to Cambie St. 

Location: 41st Av - Fraser ST to Cambie St
Schedule: Jun 16, 2025 - Aug 5, 2025</content>
<id>urn:uuid:db68ca7c-2639-4c0d-9e0b-9a39a109b8b4</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ea38cd74-b088-4cd8-8598-6b58c815e507"/>
<published>2025-07-10T07:00:00Z</published>
<title>41st Av - Fraser ST to Cambie St</title>
<updated>2025-07-29T21:58:23.1763401Z</updated>
<georss:line>49.23302435631973 -123.09859544526837 49.232995824326196 -123.09721452315824</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Curb lanes only – Fraser St to Cambie St. 

Location: 41st Av - Fraser ST to Cambie St
Schedule: Jun 16, 2025 - Aug 5, 2025</content>
<id>urn:uuid:7afde64c-e34d-4229-acc3-21e713f07514</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ea38cd74-b088-4cd8-8598-6b58c815e507"/>
<published>2025-07-10T07:00:00Z</published>
<title>41st Av - Fraser ST to Cambie St</title>
<updated>2025-07-29T21:58:23.1763401Z</updated>
<georss:line>49.23303722119104 -123.09928668707488 49.23302435631973 -123.09859544526837</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>City's external contractor will be working at 500 Pacific between Seymour Mews and Richards St to construct a protected bike lane and the associated roadway upgrades. Construction is scheduled to take place during normal working hours weekdays May 1 to May 16, including excavation, gravel base compaction, concrete works, utility adjustments, asphalt paving, boulevards, landscaping, and road marking restoration.
Location: 500 Pacific St between Seymour Mews and Richards St.
Schedule: May 1, 2025 - May 16, 2025</content>
<id>urn:uuid:99489eb4-a494-423b-b434-f10e2490b66e</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1cb02fce-6529-4af8-8709-81cfaaf9e59d"/>
<published>2025-04-24T07:00:00Z</published>
<title>500 Pacific St - Protected Bike Lane</title>
<updated>2025-04-25T22:12:41.231165Z</updated>
<georss:line>49.274347360414396 -123.1284317783053 49.27375015157841 -123.12753012611418</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>As part of the AB41 Project, a cyclist detour is being implemented. This entry shows the bike detour route.
Location: 
Schedule: Feb 5, 2026 - Sep 30, 2026</content>
<id>urn:uuid:9fd68bb4-2c6f-478c-abfa-2cc4e381d208</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1c37b205-339a-4e58-b386-063b90f6e129"/>
<published>2026-02-05T08:00:00Z</published>
<title>AB41 Cyclist Detour</title>
<updated>2026-03-26T19:33:49.2010216Z</updated>
<georss:line>49.23826816935889 -123.15482193704074 49.23824039388259 -123.15045798691376 49.236354760348405 -123.15048584168701 49.23638073719849 -123.15194198665031 49.233535019909255 -123.15206872623412 49.23360134557299 -123.1555561096584</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>The construction at the Arbutus Greenways and W 41st Ave is anticipated to begin on Monday, Feb 2nd, and approximate completion is end of September 2026. During construction, traffic at intersection of W 41st Ave and W/E Blvd will be retained, with intermittent closure. Travel lanes at  West and East Boulevard and W 41st Avenue will be reduced at times.

Project Overview:
The Arbutus Greenway &amp; 41st Ave Project is a safety improvement project at one of the key intersections on the Arbutus Greenway. The project will add to the previous intersection improvements, focusing largely on optimizing the Arbutus Greenway crossing at 41st Avenue. It will better delineate active transportation modes, allow for wider pedestrian areas, and provides a new seating area on the north side of 41st. It will also include integrated Green Rainwater Infrastructure, which will enhance greenspace and reduce the strain to our storm water system. The project will be funded partially through federal grants and will be built by an external contractor.

There will be a pause of construction during FIFA, and resume post FIFA until completion.

For any questions or comments please reach out to arbutus.w41st@vancouver.ca

Location: Arbutus Greenway at W 41st; W &amp; E Boulevards at W 41st; 
Schedule: Feb 2, 2026 - Sep 30, 2026; All days; 7:00 AM - 5:00 PM</content>
<id>urn:uuid:56d551d4-5cf0-4381-a901-e521b9037469</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/fb77a4aa-83da-421c-9383-8c34b17aace3"/>
<published>2026-02-02T08:00:00Z</published>
<title>Arbutus Greenway &amp; 41st Avenue Intersection Improvements</title>
<updated>2026-04-18T01:01:08.2149651Z</updated>
<georss:line>49.23526534993135 -123.15501234482247 49.2348046502394 -123.1550215700295</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>The construction at the Arbutus Greenways and W 41st Ave is anticipated to begin on Monday, Feb 2nd, and approximate completion is end of September 2026. During construction, traffic at intersection of W 41st Ave and W/E Blvd will be retained, with intermittent closure. Travel lanes at  West and East Boulevard and W 41st Avenue will be reduced at times.

Project Overview:
The Arbutus Greenway &amp; 41st Ave Project is a safety improvement project at one of the key intersections on the Arbutus Greenway. The project will add to the previous intersection improvements, focusing largely on optimizing the Arbutus Greenway crossing at 41st Avenue. It will better delineate active transportation modes, allow for wider pedestrian areas, and provides a new seating area on the north side of 41st. It will also include integrated Green Rainwater Infrastructure, which will enhance greenspace and reduce the strain to our storm water system. The project will be funded partially through federal grants and will be built by an external contractor.

There will be a pause of construction during FIFA, and resume post FIFA until completion.

For any questions or comments please reach out to arbutus.w41st@vancouver.ca

Location: Arbutus Greenway at W 41st; W &amp; E Boulevards at W 41st; 
Schedule: Feb 2, 2026 - Sep 30, 2026; All days; 7:00 AM - 5:00 PM</content>
<id>urn:uuid:fad336cd-509f-4474-a40b-16a9ef490ea2</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/fb77a4aa-83da-421c-9383-8c34b17aace3"/>
<published>2026-02-02T08:00:00Z</published>
<title>Arbutus Greenway &amp; 41st Avenue Intersection Improvements</title>
<updated>2026-04-18T01:01:08.2149651Z</updated>
<georss:line>49.235092604926365 -123.15557714054434 49.23584724233962 -123.15557133113963</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>The construction at the Arbutus Greenways and W 41st Ave is anticipated to begin on Monday, Feb 2nd, and approximate completion is end of September 2026. During construction, traffic at intersection of W 41st Ave and W/E Blvd will be retained, with intermittent closure. Travel lanes at  West and East Boulevard and W 41st Avenue will be reduced at times.

Project Overview:
The Arbutus Greenway &amp; 41st Ave Project is a safety improvement project at one of the key intersections on the Arbutus Greenway. The project will add to the previous intersection improvements, focusing largely on optimizing the Arbutus Greenway crossing at 41st Avenue. It will better delineate active transportation modes, allow for wider pedestrian areas, and provides a new seating area on the north side of 41st. It will also include integrated Green Rainwater Infrastructure, which will enhance greenspace and reduce the strain to our storm water system. The project will be funded partially through federal grants and will be built by an external contractor.

There will be a pause of construction during FIFA, and resume post FIFA until completion.

For any questions or comments please reach out to arbutus.w41st@vancouver.ca

Location: Arbutus Greenway at W 41st; W &amp; E Boulevards at W 41st; 
Schedule: Feb 2, 2026 - Sep 30, 2026; All days; 7:00 AM - 5:00 PM</content>
<id>urn:uuid:2633f239-61f7-4c03-ab85-8418b8a28b18</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/fb77a4aa-83da-421c-9383-8c34b17aace3"/>
<published>2026-02-02T08:00:00Z</published>
<title>Arbutus Greenway &amp; 41st Avenue Intersection Improvements</title>
<updated>2026-04-18T01:01:08.2149651Z</updated>
<georss:polygon>49.23560106671948 -123.15531010663821 49.23559879390933 -123.1551917113242 49.23566243348924 -123.15519519333303 49.235664706296404 -123.15531707129347 49.23560106671948 -123.15531010663821</georss:polygon>
</entry>
<entry>
<category term="Under Construction"/>
<content>The construction at the Arbutus Greenways and W 41st Ave is anticipated to begin on Monday, Feb 2nd, and approximate completion is end of September 2026. During construction, traffic at intersection of W 41st Ave and W/E Blvd will be retained, with intermittent closure. Travel lanes at  West and East Boulevard and W 41st Avenue will be reduced at times.

Project Overview:
The Arbutus Greenway &amp; 41st Ave Project is a safety improvement project at one of the key intersections on the Arbutus Greenway. The project will add to the previous intersection improvements, focusing largely on optimizing the Arbutus Greenway crossing at 41st Avenue. It will better delineate active transportation modes, allow for wider pedestrian areas, and provides a new seating area on the north side of 41st. It will also include integrated Green Rainwater Infrastructure, which will enhance greenspace and reduce the strain to our storm water system. The project will be funded partially through federal grants and will be built by an external contractor.

There will be a pause of construction during FIFA, and resume post FIFA until completion.

For any questions or comments please reach out to arbutus.w41st@vancouver.ca

Location: Arbutus Greenway at W 41st; W &amp; E Boulevards at W 41st; 
Schedule: Feb 2, 2026 - Sep 30, 2026; All days; 7:00 AM - 5:00 PM</content>
<id>urn:uuid:f1445d39-4e65-4601-b00c-474ed9ca4398</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/fb77a4aa-83da-421c-9383-8c34b17aace3"/>
<published>2026-02-02T08:00:00Z</published>
<title>Arbutus Greenway &amp; 41st Avenue Intersection Improvements</title>
<updated>2026-04-18T01:01:08.2149651Z</updated>
<georss:polygon>49.23644702692803 -123.15534069534246 49.23640322576884 -123.15534361320918 49.23639751256371 -123.15511310868386 49.236450835756756 -123.15511019081715 49.23644702692803 -123.15534069534246</georss:polygon>
</entry>
<entry>
<category term="Under Construction"/>
<content>The construction at the Arbutus Greenways and W 41st Ave is anticipated to begin on Monday, Feb 2nd, and approximate completion is end of September 2026. During construction, traffic at intersection of W 41st Ave and W/E Blvd will be retained, with intermittent closure. Travel lanes at  West and East Boulevard and W 41st Avenue will be reduced at times.

Project Overview:
The Arbutus Greenway &amp; 41st Ave Project is a safety improvement project at one of the key intersections on the Arbutus Greenway. The project will add to the previous intersection improvements, focusing largely on optimizing the Arbutus Greenway crossing at 41st Avenue. It will better delineate active transportation modes, allow for wider pedestrian areas, and provides a new seating area on the north side of 41st. It will also include integrated Green Rainwater Infrastructure, which will enhance greenspace and reduce the strain to our storm water system. The project will be funded partially through federal grants and will be built by an external contractor.

There will be a pause of construction during FIFA, and resume post FIFA until completion.

For any questions or comments please reach out to arbutus.w41st@vancouver.ca

Location: Arbutus Greenway at W 41st; W &amp; E Boulevards at W 41st; 
Schedule: Feb 2, 2026 - Sep 30, 2026; All days; 7:00 AM - 5:00 PM</content>
<id>urn:uuid:b9bcc06a-dd3e-428e-bbac-fc371c17c453</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/fb77a4aa-83da-421c-9383-8c34b17aace3"/>
<published>2026-02-02T08:00:00Z</published>
<title>Arbutus Greenway &amp; 41st Avenue Intersection Improvements</title>
<updated>2026-04-18T01:01:08.2149651Z</updated>
<georss:polygon>49.23735611838674 -123.15530928665721 49.23730385063047 -123.15530928665721 49.2373009469089 -123.15506904023925 49.23736482967408 -123.15506459109574 49.23735611838674 -123.15530928665721</georss:polygon>
</entry>
<entry>
<category term="Under Construction"/>
<content>The construction at the Arbutus Greenways and W 41st Ave is anticipated to begin on Monday, Feb 2nd, and approximate completion is end of September 2026. During construction, traffic at intersection of W 41st Ave and W/E Blvd will be retained, with intermittent closure. Travel lanes at  West and East Boulevard and W 41st Avenue will be reduced at times.

Project Overview:
The Arbutus Greenway &amp; 41st Ave Project is a safety improvement project at one of the key intersections on the Arbutus Greenway. The project will add to the previous intersection improvements, focusing largely on optimizing the Arbutus Greenway crossing at 41st Avenue. It will better delineate active transportation modes, allow for wider pedestrian areas, and provides a new seating area on the north side of 41st. It will also include integrated Green Rainwater Infrastructure, which will enhance greenspace and reduce the strain to our storm water system. The project will be funded partially through federal grants and will be built by an external contractor.

There will be a pause of construction during FIFA, and resume post FIFA until completion.

For any questions or comments please reach out to arbutus.w41st@vancouver.ca

Location: Arbutus Greenway at W 41st; W &amp; E Boulevards at W 41st; 
Schedule: Feb 2, 2026 - Sep 30, 2026; All days; 7:00 AM - 5:00 PM</content>
<id>urn:uuid:528858d7-70bf-4518-9268-c470bd7879de</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/fb77a4aa-83da-421c-9383-8c34b17aace3"/>
<published>2026-02-02T08:00:00Z</published>
<title>Arbutus Greenway &amp; 41st Avenue Intersection Improvements</title>
<updated>2026-04-18T01:01:08.2149651Z</updated>
<georss:line>49.23455208137449 -123.15562107938426 49.23429923594438 -123.15561672841014</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>The construction at the Arbutus Greenways and W 41st Ave is anticipated to begin on Monday, Feb 2nd, and approximate completion is end of September 2026. During construction, traffic at intersection of W 41st Ave and W/E Blvd will be retained, with intermittent closure. Travel lanes at  West and East Boulevard and W 41st Avenue will be reduced at times.

Project Overview:
The Arbutus Greenway &amp; 41st Ave Project is a safety improvement project at one of the key intersections on the Arbutus Greenway. The project will add to the previous intersection improvements, focusing largely on optimizing the Arbutus Greenway crossing at 41st Avenue. It will better delineate active transportation modes, allow for wider pedestrian areas, and provides a new seating area on the north side of 41st. It will also include integrated Green Rainwater Infrastructure, which will enhance greenspace and reduce the strain to our storm water system. The project will be funded partially through federal grants and will be built by an external contractor.

There will be a pause of construction during FIFA, and resume post FIFA until completion.

For any questions or comments please reach out to arbutus.w41st@vancouver.ca

Location: Arbutus Greenway at W 41st; W &amp; E Boulevards at W 41st; 
Schedule: Feb 2, 2026 - Sep 30, 2026; All days; 7:00 AM - 5:00 PM</content>
<id>urn:uuid:8903e805-9685-4bac-ac7e-25446996c460</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/fb77a4aa-83da-421c-9383-8c34b17aace3"/>
<published>2026-02-02T08:00:00Z</published>
<title>Arbutus Greenway &amp; 41st Avenue Intersection Improvements</title>
<updated>2026-04-18T01:01:08.2149651Z</updated>
<georss:line>49.23455208137449 -123.15502491459182 49.23431344079859 -123.15502491459182</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>The construction at the Arbutus Greenways and W 41st Ave is anticipated to begin on Monday, Feb 2nd, and approximate completion is end of September 2026. During construction, traffic at intersection of W 41st Ave and W/E Blvd will be retained, with intermittent closure. Travel lanes at  West and East Boulevard and W 41st Avenue will be reduced at times.

Project Overview:
The Arbutus Greenway &amp; 41st Ave Project is a safety improvement project at one of the key intersections on the Arbutus Greenway. The project will add to the previous intersection improvements, focusing largely on optimizing the Arbutus Greenway crossing at 41st Avenue. It will better delineate active transportation modes, allow for wider pedestrian areas, and provides a new seating area on the north side of 41st. It will also include integrated Green Rainwater Infrastructure, which will enhance greenspace and reduce the strain to our storm water system. The project will be funded partially through federal grants and will be built by an external contractor.

There will be a pause of construction during FIFA, and resume post FIFA until completion.

For any questions or comments please reach out to arbutus.w41st@vancouver.ca

Location: Arbutus Greenway at W 41st; W &amp; E Boulevards at W 41st; 
Schedule: Feb 2, 2026 - Sep 30, 2026; All days; 7:00 AM - 5:00 PM</content>
<id>urn:uuid:9972ade2-e44c-4317-b3fc-819da091ada4</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/fb77a4aa-83da-421c-9383-8c34b17aace3"/>
<published>2026-02-02T08:00:00Z</published>
<title>Arbutus Greenway &amp; 41st Avenue Intersection Improvements</title>
<updated>2026-04-18T01:01:08.2149651Z</updated>
<georss:polygon>49.2348900162182 -123.1553647427007 49.23433557829705 -123.15537087444855 49.23433557829705 -123.15523291004021 49.23488200991457 -123.15524210725263 49.2348900162182 -123.1553647427007</georss:polygon>
</entry>
<entry>
<category term="Under Construction"/>
<content>The construction at the Arbutus Greenways and W 41st Ave is anticipated to begin on Monday, Feb 2nd, and approximate completion is end of September 2026. During construction, traffic at intersection of W 41st Ave and W/E Blvd will be retained, with intermittent closure. Travel lanes at  West and East Boulevard and W 41st Avenue will be reduced at times.

Project Overview:
The Arbutus Greenway &amp; 41st Ave Project is a safety improvement project at one of the key intersections on the Arbutus Greenway. The project will add to the previous intersection improvements, focusing largely on optimizing the Arbutus Greenway crossing at 41st Avenue. It will better delineate active transportation modes, allow for wider pedestrian areas, and provides a new seating area on the north side of 41st. It will also include integrated Green Rainwater Infrastructure, which will enhance greenspace and reduce the strain to our storm water system. The project will be funded partially through federal grants and will be built by an external contractor.

There will be a pause of construction during FIFA, and resume post FIFA until completion.

For any questions or comments please reach out to arbutus.w41st@vancouver.ca

Location: Arbutus Greenway at W 41st; W &amp; E Boulevards at W 41st; 
Schedule: Feb 2, 2026 - Sep 30, 2026; All days; 7:00 AM - 5:00 PM</content>
<id>urn:uuid:bb635806-0c69-4162-955b-f337097e7814</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/fb77a4aa-83da-421c-9383-8c34b17aace3"/>
<published>2026-02-02T08:00:00Z</published>
<title>Arbutus Greenway &amp; 41st Avenue Intersection Improvements</title>
<updated>2026-04-18T01:01:08.2149651Z</updated>
<georss:line>49.23478193141088 -123.15501829722831 49.23456576103325 -123.15502749525942 49.234579772113335 -123.15576943920449</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>The construction at the Arbutus Greenways and W 41st Ave is anticipated to begin on Monday, Feb 2nd, and approximate completion is end of September 2026. During construction, traffic at intersection of W 41st Ave and W/E Blvd will be retained, with intermittent closure. Travel lanes at  West and East Boulevard and W 41st Avenue will be reduced at times.

Project Overview:
The Arbutus Greenway &amp; 41st Ave Project is a safety improvement project at one of the key intersections on the Arbutus Greenway. The project will add to the previous intersection improvements, focusing largely on optimizing the Arbutus Greenway crossing at 41st Avenue. It will better delineate active transportation modes, allow for wider pedestrian areas, and provides a new seating area on the north side of 41st. It will also include integrated Green Rainwater Infrastructure, which will enhance greenspace and reduce the strain to our storm water system. The project will be funded partially through federal grants and will be built by an external contractor.

There will be a pause of construction during FIFA, and resume post FIFA until completion.

For any questions or comments please reach out to arbutus.w41st@vancouver.ca

Location: Arbutus Greenway at W 41st; W &amp; E Boulevards at W 41st; 
Schedule: Feb 2, 2026 - Sep 30, 2026; All days; 7:00 AM - 5:00 PM</content>
<id>urn:uuid:7c35515e-e940-4f7d-bf6e-f203a1222494</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/fb77a4aa-83da-421c-9383-8c34b17aace3"/>
<published>2026-02-02T08:00:00Z</published>
<title>Arbutus Greenway &amp; 41st Avenue Intersection Improvements</title>
<updated>2026-04-18T01:01:08.2149651Z</updated>
<georss:line>49.2345833322525 -123.15560367362862 49.23459185469167 -123.15616937741912</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>The construction at the Arbutus Greenways and W 41st Ave is anticipated to begin on Monday, Feb 2nd, and approximate completion is end of September 2026. During construction, traffic at intersection of W 41st Ave and W/E Blvd will be retained, with intermittent closure. Travel lanes at  West and East Boulevard and W 41st Avenue will be reduced at times.

Project Overview:
The Arbutus Greenway &amp; 41st Ave Project is a safety improvement project at one of the key intersections on the Arbutus Greenway. The project will add to the previous intersection improvements, focusing largely on optimizing the Arbutus Greenway crossing at 41st Avenue. It will better delineate active transportation modes, allow for wider pedestrian areas, and provides a new seating area on the north side of 41st. It will also include integrated Green Rainwater Infrastructure, which will enhance greenspace and reduce the strain to our storm water system. The project will be funded partially through federal grants and will be built by an external contractor.

There will be a pause of construction during FIFA, and resume post FIFA until completion.

For any questions or comments please reach out to arbutus.w41st@vancouver.ca

Location: Arbutus Greenway at W 41st; W &amp; E Boulevards at W 41st; 
Schedule: Feb 2, 2026 - Sep 30, 2026; All days; 7:00 AM - 5:00 PM</content>
<id>urn:uuid:ef667125-52b2-42a1-a49a-cf8695fcdfb8</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/fb77a4aa-83da-421c-9383-8c34b17aace3"/>
<published>2026-02-02T08:00:00Z</published>
<title>Arbutus Greenway &amp; 41st Avenue Intersection Improvements</title>
<updated>2026-04-18T01:01:08.2149651Z</updated>
<georss:line>49.235060149475544 -123.15560388135778 49.234583775263076 -123.15562534255712</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Sidewalk construction 
Contractor Jack CEWE  Arsh Deol	Project Manager Cell: 604-992-8318
Location: Ash St from W59th to W63rd
Schedule: Oct 27, 2025 - Mar 31, 2026</content>
<id>urn:uuid:0130e04f-f0a1-4059-9519-e9c28d738c54</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/54711a32-2724-4456-95ad-62458a8ed477"/>
<published>2025-10-24T07:00:00Z</published>
<title>Ash St WITT Sidewalk - Jack CEWE</title>
<updated>2025-10-24T23:06:57.0120714Z</updated>
<georss:line>49.21694594134894 -123.12003570835405 49.21323893891591 -123.12018728191572</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Traffic Impacts
- Lane (Alleyway) Closure
- Sidewalk Closure
- Parking Lane Closure
- Travel Lane Closure
- Total Road Closure 

Crews on site facilitating installation of New BC Hydro Duct Bank. 

WO# W02461712-01
Location: - [WORK COMPLETE] Both sides of 1100 Block Bidwell St from Davie St to Pendrell St. 
- [WORK COMPLETE] Both sides of 1600 Block Pendrell St from Bidwell St to Cardero St.
- [WORK COMPLETE] Both sides of 1400-1500 Block Pendrell St from Cardero St to Broughton St. 
- Both sides of 1100-1300 Block Pendrell St from Broughton St to 30m East of Bute St. 
- Both sides of 1100 Block Jervis St from Pendrell St to See-Em-La Lane. 
Schedule: Recurring schedule as follows:
- Oct 21, 2024 - Dec 20, 2024; Weekdays; 7:00 AM - 8:00 PM
Except:
- Does not occur Nov 11, 2024 (Remembrance Day)
</content>
<id>urn:uuid:947675e6-6d2e-47ed-bcab-7f10d673b171</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/4899465a-c3f0-4916-b794-4cab60fc4fe0"/>
<published>2024-10-09T07:00:00Z</published>
<title>BC Hydro - Pendrell Duct Bank - 1100 Bidwell | 1100-1700 Pendrell St | 1100 Jervis St </title>
<updated>2025-12-06T02:00:59.0356546Z</updated>
<georss:line>49.28249306935513 -123.13231335491912 49.282241623685934 -123.13192374674678</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Traffic Impacts
- Lane (Alleyway) Closure
- Sidewalk Closure
- Parking Lane Closure
- Travel Lane Closure
- Total Road Closure 

Crews on site facilitating installation of New BC Hydro Duct Bank. 

WO# W02461712-01
Location: - [WORK COMPLETE] Both sides of 1100 Block Bidwell St from Davie St to Pendrell St. 
- [WORK COMPLETE] Both sides of 1600 Block Pendrell St from Bidwell St to Cardero St.
- [WORK COMPLETE] Both sides of 1400-1500 Block Pendrell St from Cardero St to Broughton St. 
- Both sides of 1100-1300 Block Pendrell St from Broughton St to 30m East of Bute St. 
- Both sides of 1100 Block Jervis St from Pendrell St to See-Em-La Lane. 
Schedule: Recurring schedule as follows:
- Oct 21, 2024 - Dec 20, 2024; Weekdays; 7:00 AM - 8:00 PM
Except:
- Does not occur Nov 11, 2024 (Remembrance Day)
</content>
<id>urn:uuid:47b19dc6-54c4-448a-a447-1f333436de40</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/4899465a-c3f0-4916-b794-4cab60fc4fe0"/>
<published>2024-10-09T07:00:00Z</published>
<title>BC Hydro - Pendrell Duct Bank - 1100 Bidwell | 1100-1700 Pendrell St | 1100 Jervis St </title>
<updated>2025-12-06T02:00:59.0356546Z</updated>
<georss:line>49.28277309072433 -123.13273526958415 49.282492377213515 -123.13230746271176</georss:line>
</entry>
<entry>
<category term="Road Closure"/>
<content>Crews will be onsite to conduct Underground Utility Construction on behalf of BC Hydro

Traffic Impacts: Total road closure at both sides of 0 blk of E17th Ave from Ontario St to 10m East of Quebec St

WO# W02583304-03/461-U07-02838
Location: B/S of 0 blk of E17th Ave
Schedule: Jun 2, 2026 - Jun 16, 2026; Weekdays; 7:00 AM - 8:00 PM</content>
<id>urn:uuid:7d874b07-7f06-454a-a324-a98599c3f573</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/78bde76d-915d-4c3f-bcf1-d61aabd8d71a"/>
<published>2026-05-25T07:00:00Z</published>
<title>BC Hydro - Underground Utility Construction - 0 blk of E17th ave - Jun 2-16, 2026</title>
<updated>2026-05-26T15:52:41.4728403Z</updated>
<georss:line>49.255752665320585 -123.10496394067283 49.25572100426089 -123.10310442803471</georss:line>
</entry>
<entry>
<category term="Road Closure"/>
<content>Crews will be onsite to conduct Underground Utility Construction on behalf of BC Hydro

Traffic Impacts: Total road closure at
- Both sides of 1200-1300 blk of Bute St from 30m South of Burnaby St to Panteges Lane

WO#W02525350 / 455-U07-02435 / LM-VAN-205 / DY-1042 

Extension to Friday, June 19, 2026

Location: B/S of 1200-1300 blk of Bute St

Schedule: May 25, 2026 - Jun 19, 2026; Weekdays; 7:00 AM - 8:00 PM</content>
<id>urn:uuid:858355a4-936d-42b1-bd40-9a9d8826c89f</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/f20f1628-128d-495c-8fee-1384d7bcf19f"/>
<published>2026-05-20T07:00:00Z</published>
<title>BC Hydro - Underground Utility Construction - 1200-1300 Bute St - May 25 to Jun 5, 2026</title>
<updated>2026-05-29T15:24:39.9147806Z</updated>
<georss:line>49.281426614117606 -123.13392921869399 49.2809976524168 -123.13457600569858</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Parking lane, and travel lane closure on both sides of 1300 Block of Thurlow St to facilitate underground utility construction by BC Hydro.

WO#DY1685
Location: Both sides of 1300 Block of Thurlow St from Burnaby St to Pacific St.
Schedule: Apr 27, 2026 - Jun 19, 2026; M - Sa; 7:00 AM - 6:00 PM</content>
<id>urn:uuid:4ab99ebb-45a1-45ab-9287-5da24350eb30</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/023bd65b-6b4c-4be4-a56e-6f2e18bdf559"/>
<published>2026-04-17T07:00:00Z</published>
<title>BC Hydro - Underground Utility Construction - 1300 Block of Thurlow St</title>
<updated>2026-06-03T22:16:47.0855741Z</updated>
<georss:line>49.27831024441642 -123.13435636761156 49.27966540258109 -123.13227910334855</georss:line>
</entry>
<entry>
<category term="Road Closure"/>
<content>Crews will be onsite to conduct Underground Utility Construction on behalf of BC Hydro

Traffic Impacts: Full closure at both sides of 1500 blk of W35th Ave from Granville St to 55m West of Granville St

WO# W02584392-01/458-U07-01173

Extension to Jun 18
Location: B/S 1500 blk of W35th Ave
Schedule: May 21, 2026 - Jun 18, 2026; Weekdays; 7:00 AM - 8:00 PM</content>
<id>urn:uuid:8d9af6a5-f4be-44be-af13-fe724e5e46d5</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/c5a0c737-faae-4d0c-931e-ddf4d09940b5"/>
<published>2026-05-12T07:00:00Z</published>
<title>BC Hydro - Underground Utility Construction - 1500 blk W 35th Ave - May 21- June 4, 2026</title>
<updated>2026-06-03T15:54:40.1465223Z</updated>
<georss:line>49.23996154147801 -123.13940350711964 49.23996154147801 -123.1398732361817</georss:line>
</entry>
<entry>
<category term="Road Closure"/>
<content>Crews will be onsite to conduct underground utility construction on behalf of BC Hydro

Traffic Impacts: Total road closure at North side of 1500 blk of W34th Ave from Granville St to 70m West of Granville St

WO# W02588559-02/458-U07-01256
Location: N/S of 1500 blk of W34th Ave
Schedule: Jun 4, 2026 - Jun 18, 2026; Weekdays; 7:00 AM - 8:00 PM</content>
<id>urn:uuid:72d6b720-7bf8-4e90-a3af-9382744ed0bc</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/954db709-c718-42ae-a05d-6db9b45ba6be"/>
<published>2026-05-28T07:00:00Z</published>
<title>BC Hydro - Underground Utility Construction - 1500 blk W34th Ave - Jun 4-18, 2026</title>
<updated>2026-05-28T16:31:30.0468951Z</updated>
<georss:line>49.24089759448307 -123.13941652866284 49.240918608409146 -123.14023192020333</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Crews will be onsite to conduct Underground Utility Construction on behalf of BC Hydro

Traffic Impacts: 
- Laneway closure at both sides of Lane East of 3900 blk of Victoria Dr from E23rd Ave to Lane North of E23rd Ave
- Laneway closure at both sides of Lane North of 2000 blk of E23rd Ave from Lane East of Victoria Dr to 20m East of Lane East of Victoria Dr
- Parking closure at North side of 2000 blk of E23rd Ave from Lane East of Victoria Dr to 50m East of Lane East of Victoria Dr

WO# W02588318-04/461-U07-02819
Location: B/S of LE of 3900 blk Victoria Dr
B/S of LN of 2000 blk E23rd Ave
N/S of 2000 blk of E23rd Ave
Schedule: Jun 3, 2026 - Jul 17, 2026; Weekdays; 7:00 AM - 8:00 PM</content>
<id>urn:uuid:26778876-c072-4a04-b8b7-2d5ced3a12dc</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/846d4aa2-4611-4434-bdc2-4048ab937155"/>
<published>2026-05-26T07:00:00Z</published>
<title>BC Hydro - Underground Utility Construction - 3900 blk Victoria Dr - Jun 3-17, 2026</title>
<updated>2026-05-26T21:51:41.7208132Z</updated>
<georss:line>49.24982934842197 -123.06437985276683 49.2493930752438 -123.06441219211706 49.2493930752438 -123.06404028958944</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Crews will be onsite to conduct Underground Utility Construction on behalf of BC Hydro

Traffic Impacts: 
- Laneway closure at both sides of Lane East of 3900 blk of Victoria Dr from E23rd Ave to Lane North of E23rd Ave
- Laneway closure at both sides of Lane North of 2000 blk of E23rd Ave from Lane East of Victoria Dr to 20m East of Lane East of Victoria Dr
- Parking closure at North side of 2000 blk of E23rd Ave from Lane East of Victoria Dr to 50m East of Lane East of Victoria Dr

WO# W02588318-04/461-U07-02819
Location: B/S of LE of 3900 blk Victoria Dr
B/S of LN of 2000 blk E23rd Ave
N/S of 2000 blk of E23rd Ave
Schedule: Jun 3, 2026 - Jul 17, 2026; Weekdays; 7:00 AM - 8:00 PM</content>
<id>urn:uuid:3ec36b6c-a05a-4e07-993e-cf5f64c1fbe1</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/846d4aa2-4611-4434-bdc2-4048ab937155"/>
<published>2026-05-26T07:00:00Z</published>
<title>BC Hydro - Underground Utility Construction - 3900 blk Victoria Dr - Jun 3-17, 2026</title>
<updated>2026-05-26T21:51:41.7208132Z</updated>
<georss:line>49.24983638505455 -123.06436907298342 49.24983638505455 -123.06409957839819</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Crews will be onsite to conduct Underground Utility Construction on behalf of BC Hydro

Traffic Impacts: Parking Lane closure at
- Both sides of Lane South of 900 blk of W57th Ave from 30m West to 75 West of Laurel St
- West side of 7300 blk of Laurel St from W57th Ave from Lane South of W57th Ave

WO# W02587226-01/461-U07-01170
Location: B/S of LS of 900 blk of W57th Ave
W/S of 7300 blk of Laurel St
Schedule: May 29, 2026 - Jun 12, 2026; Weekdays; 7:00 AM - 8:00 PM</content>
<id>urn:uuid:1d5eb659-105f-4d2c-ac46-229fd45056b4</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/c7cd90ba-9844-4b08-a5ba-24e94f8bd018"/>
<published>2026-05-20T07:00:00Z</published>
<title>BC Hydro - Underground Utility Construction - 900 blk W57th Ave - May 29-June 12</title>
<updated>2026-05-20T16:31:11.7358005Z</updated>
<georss:line>49.2191835145762 -123.1265648299947 49.21919407607507 -123.12724934624123</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Crews will be onsite to conduct Underground Utility Construction on behalf of BC Hydro

Traffic Impacts: Parking Lane closure at
- Both sides of Lane South of 900 blk of W57th Ave from 30m West to 75 West of Laurel St
- West side of 7300 blk of Laurel St from W57th Ave from Lane South of W57th Ave

WO# W02587226-01/461-U07-01170
Location: B/S of LS of 900 blk of W57th Ave
W/S of 7300 blk of Laurel St
Schedule: May 29, 2026 - Jun 12, 2026; Weekdays; 7:00 AM - 8:00 PM</content>
<id>urn:uuid:65d50acb-613e-44c8-8fd0-1a132f0e6d5f</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/c7cd90ba-9844-4b08-a5ba-24e94f8bd018"/>
<published>2026-05-20T07:00:00Z</published>
<title>BC Hydro - Underground Utility Construction - 900 blk W57th Ave - May 29-June 12</title>
<updated>2026-05-20T16:31:11.7358005Z</updated>
<georss:line>49.2191406813933 -123.12612634837451 49.21864531570628 -123.12611932614044</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Crews will be onsite to conduct Underground Utility Construction on behalf of BC Hydro

Traffic Impacts: Laneway closure &amp; Parking Lane closure at
- Both sides of Lane North of 3900 blk of W35th Ave from Crown St to 40m East of Crown St
- Both sides of 5000 blk of Crowns St from W35th Ave to Lane North of W35th Ave

WO# : W02590186-04 / 453-U07-01231

Location: B/S of LN of 3900 blk of W35th Ave
B/S of 5000 blk of Crown St
Schedule: Jun 17, 2026 - Jun 30, 2026; Weekdays; 7:00 AM - 8:00 PM</content>
<id>urn:uuid:4b55399c-4a5c-4fb3-bf6f-4984a8b2b188</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/27c0639e-0fb3-48fc-a365-5253c2880ad5"/>
<published>2026-06-08T07:00:00Z</published>
<title>BC Hydro - Underground Utility Construction - LN 3900 W 35 Ave - Jun 17-30, 2026</title>
<updated>2026-06-08T17:04:54.9894912Z</updated>
<georss:line>49.24097412443774 -123.19368515139357 49.24097060549005 -123.19316233189821</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Crews will be onsite to conduct Underground Utility Construction on behalf of BC Hydro

Traffic Impacts: Laneway closure &amp; Parking Lane closure at
- Both sides of Lane North of 3900 blk of W35th Ave from Crown St to 40m East of Crown St
- Both sides of 5000 blk of Crowns St from W35th Ave to Lane North of W35th Ave

WO# : W02590186-04 / 453-U07-01231

Location: B/S of LN of 3900 blk of W35th Ave
B/S of 5000 blk of Crown St
Schedule: Jun 17, 2026 - Jun 30, 2026; Weekdays; 7:00 AM - 8:00 PM</content>
<id>urn:uuid:2364dbcb-0a38-4e7a-a690-e6fd89765f02</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/27c0639e-0fb3-48fc-a365-5253c2880ad5"/>
<published>2026-06-08T07:00:00Z</published>
<title>BC Hydro - Underground Utility Construction - LN 3900 W 35 Ave - Jun 17-30, 2026</title>
<updated>2026-06-08T17:04:54.9894912Z</updated>
<georss:line>49.240499064231955 -123.19370671096038 49.24094949179863 -123.19370132106869</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Crews will be onsite to conduct Underground Utility Construction on behalf of BC Hydro

Traffic Impacts:
- Laneway closure at both side of Lane South of 4500 blk of W4th from 100m to 140m west of Sasamat St
- Parking lane closure at both sides of Lane South of W4th Ave to W5th Ave

WO# W02581171-02/453-U07-01236
Location: B/S of LS of 4500 blk of W4th 
B/S of 2000 blk of Sasamat St
Schedule: Jun 1, 2026 - Jul 15, 2026; Weekdays; 7:00 AM - 8:00 PM</content>
<id>urn:uuid:432192c9-8044-4684-82e3-2eb6120e23e5</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/45aecfb2-3616-494e-8ea7-6ded8eaac984"/>
<published>2026-05-25T07:00:00Z</published>
<title>BC Hydro - Underground Utility Construction at LS of 4500 blk of W4th Ave</title>
<updated>2026-05-25T18:16:20.711751Z</updated>
<georss:line>49.268581931136595 -123.20991231868591 49.26861006696814 -123.21084476995082</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Crews will be onsite to conduct Underground Utility Construction on behalf of BC Hydro

Traffic Impacts:
- Laneway closure at both side of Lane South of 4500 blk of W4th from 100m to 140m west of Sasamat St
- Parking lane closure at both sides of Lane South of W4th Ave to W5th Ave

WO# W02581171-02/453-U07-01236
Location: B/S of LS of 4500 blk of W4th 
B/S of 2000 blk of Sasamat St
Schedule: Jun 1, 2026 - Jul 15, 2026; Weekdays; 7:00 AM - 8:00 PM</content>
<id>urn:uuid:315de332-fbfb-4de9-a2a4-d40e9e6d84b3</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/45aecfb2-3616-494e-8ea7-6ded8eaac984"/>
<published>2026-05-25T07:00:00Z</published>
<title>BC Hydro - Underground Utility Construction at LS of 4500 blk of W4th Ave</title>
<updated>2026-05-25T18:16:20.711751Z</updated>
<georss:line>49.268560192438315 -123.20893841218697 49.268158224871826 -123.20894696810673</georss:line>
</entry>
<entry>
<category term="Road Closure"/>
<content>Crews will be onsite to conduct Utility Maintenance on behalf of BC Hydro 

Traffic Impacts: Total Road closure at both sides of 1000 blk of Comox St from Burrard St to 50m West of Burrard St

WO# 2L025-V07-00100
Location: B/S of 1000 Comox St
Schedule: Jun 1, 2026 - Jun 15, 2026; Weekdays; 7:00 AM - 8:00 PM</content>
<id>urn:uuid:e54c5b1e-d29e-4aa9-a630-926d60759586</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/3c1baee3-ee78-4d4f-af1a-670a028a23bd"/>
<published>2026-05-22T07:00:00Z</published>
<title>BC Hydro - Utility Maintenance - 1000 Comox st - Jun 1-15, 2026</title>
<updated>2026-05-22T21:38:56.1242127Z</updated>
<georss:line>49.28049426960558 -123.12709379857893 49.280725236908296 -123.1274478501689</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Parking lane closure on Both Sides of 700-800 Block of W 8th Avenue and Both Sides of 2300 Block of Willow Street to facilitate overhead maintenance.

WO# M219238-3/4
Location: Both Sides of 700-800 Block of W 8th Avenue From West PL of 801 to East PL of 795. Both Sides of 2300 Block of Willow Street From W 8th Avenue to Lane North of W 8th Avenue.
Schedule: Jun 22, 2026 8:00 AM - 5:00 PM</content>
<id>urn:uuid:f243be0e-9982-473b-8cf9-b92292231f36</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a5160029-d472-46b2-a950-855bb7bda6ac"/>
<published>2026-06-08T07:00:00Z</published>
<title>BC Hydro Overhead Maintenance on 700-800 Block of W 8th Avenue</title>
<updated>2026-06-08T16:21:58.1347814Z</updated>
<georss:line>49.264273167851655 -123.12259905931336 49.26424516253408 -123.12098973390441</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Parking lane closure on Both Sides of 700-800 Block of W 8th Avenue and Both Sides of 2300 Block of Willow Street to facilitate overhead maintenance.

WO# M219238-3/4
Location: Both Sides of 700-800 Block of W 8th Avenue From West PL of 801 to East PL of 795. Both Sides of 2300 Block of Willow Street From W 8th Avenue to Lane North of W 8th Avenue.
Schedule: Jun 22, 2026 8:00 AM - 5:00 PM</content>
<id>urn:uuid:7710cb01-79ce-40e6-80f6-ead94f0eb514</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a5160029-d472-46b2-a950-855bb7bda6ac"/>
<published>2026-06-08T07:00:00Z</published>
<title>BC Hydro Overhead Maintenance on 700-800 Block of W 8th Avenue</title>
<updated>2026-06-08T16:21:58.1347814Z</updated>
<georss:line>49.264266166523754 -123.12179439660882 49.26468974507404 -123.12178903219076</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Alleyway lane closure on Both Sides of Lane West of 500 Block of Hamilton Street and Both Sides of Lane North of 300 Block of Dunsmuir Street to facilitate parking/staging vehicles.

WO# 80044208 
Location: Both Sides of Lane West of 500 Block of Hamilton Street From Lane South of W Pender Street to Lane North of Dunsmuir Street. Both Sides of Lane North of 300 Block of Dunsmuir Street From Lane East of Homer Street to Hamilton Street.
Schedule: Jun 12, 2026 - Jul 10, 2026; Weekdays; 8:00 AM - 8:00 PM</content>
<id>urn:uuid:0fa14a10-7ab0-430a-93ba-88e89f33d2ab</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/7599bb01-eaa3-41ce-902f-ac2c77581411"/>
<published>2026-06-01T07:00:00Z</published>
<title>BC Hydro Parking/Staging Vehicles on Lane West of 500 Block of Hamilton Street</title>
<updated>2026-06-01T18:42:00.8131858Z</updated>
<georss:line>49.2821408250646 -123.11192318812282 49.281799632780235 -123.1124247612086 49.281481184518356 -123.11195001021295</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Parking lane closure on Both Sides of 200-300 Block of E Kent Ave South to facilitate a pole installation/removal.

WO# 2572872-01
Location: Both Sides of 200-300 Block of E Kent Ave South From Main Street to E PL of 268.
Schedule: Jun 23, 2026 8:00 AM - 5:00 PM</content>
<id>urn:uuid:dc5529b7-173a-48e8-bfae-3f4dd68cb53f</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/702afd49-9132-4ce8-b81f-f74b008ba860"/>
<published>2026-06-09T07:00:00Z</published>
<title>BC Hydro Pole Installation/Removal on 200-300 Block of E Kent Ave South</title>
<updated>2026-06-09T20:22:36.6946739Z</updated>
<georss:line>49.20696385905049 -123.10248227683554 49.207047972443235 -123.10153428468277</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Parking lane closure on Both Sides of 2200 Block of Willow Street and Both Sides of 700 Block of W 7th Avenue to facilitate a pole installation/removal.

WO# 2588501-01
Location: Both Sides of 2200 Block of Willow Street From Lane North of W 7th Avenue to W 7th Avenue. Both Sides of 700 Block of W 7th Avenue From Willow Street to E PL of 777.
Schedule: Jun 23, 2026 8:00 AM - 5:00 PM</content>
<id>urn:uuid:b6c40f54-0293-4a5f-80f8-dfea38d042fb</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ebd152ec-2526-45e8-8239-ee533bbfe4f9"/>
<published>2026-06-09T07:00:00Z</published>
<title>BC Hydro Pole Installation/Removal on 2200 Block of Willow Street</title>
<updated>2026-06-09T20:16:57.570086Z</updated>
<georss:line>49.26507867735839 -123.12176735275146 49.265515551080085 -123.12175448427517</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Parking lane closure on Both Sides of 2200 Block of Willow Street and Both Sides of 700 Block of W 7th Avenue to facilitate a pole installation/removal.

WO# 2588501-01
Location: Both Sides of 2200 Block of Willow Street From Lane North of W 7th Avenue to W 7th Avenue. Both Sides of 700 Block of W 7th Avenue From Willow Street to E PL of 777.
Schedule: Jun 23, 2026 8:00 AM - 5:00 PM</content>
<id>urn:uuid:b83af3bd-66fe-435a-920b-837ae032636e</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ebd152ec-2526-45e8-8239-ee533bbfe4f9"/>
<published>2026-06-09T07:00:00Z</published>
<title>BC Hydro Pole Installation/Removal on 2200 Block of Willow Street</title>
<updated>2026-06-09T20:16:57.570086Z</updated>
<georss:line>49.26508147801448 -123.1217673530787 49.265075876808964 -123.12098236391641</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Parking lane closure on Both Sides of 2500 Block of Highbury Street to facilitate a pole installation/removal.

WO# 2586691-01
Location: Both Sides of 2500 Block of Highbury Street From W Broadway to W 10th Avenue.
Schedule: Jun 24, 2026 8:00 AM - 5:00 PM</content>
<id>urn:uuid:bae346e1-523c-4901-9948-2ea88e029d57</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/5a5bf2d4-697f-41ad-8e8c-d23c056b1ce9"/>
<published>2026-06-09T07:00:00Z</published>
<title>BC Hydro Pole Installation/Removal on 2500 Block of Highbury Street</title>
<updated>2026-06-09T16:28:44.399255Z</updated>
<georss:line>49.26441340605973 -123.18780103757571 49.26352283172923 -123.18781819587134</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Parking and Travel lane closure on Both Sides of 2700 Block of E 21st Avenue to facilitate underground utility construction.

WO# W02574358-02/461-U07-02687
Location: Both Sides of 2700 Block of E 21st Avenue From Slocan Street to Kaslo Street. 
Schedule: May 15, 2026 - Jun 26, 2026; Weekdays; 7:00 AM - 8:00 PM</content>
<id>urn:uuid:2b5a3c18-a63b-4355-a0ab-ed2b9cbe6d76</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/186ef934-1304-4df6-b3c6-93097106c0c6"/>
<published>2026-05-05T07:00:00Z</published>
<title>BC Hydro Underground Utility Construction on 2700 Block of E 21st Avenue </title>
<updated>2026-06-08T18:00:53.8737752Z</updated>
<georss:line>49.25155307980327 -123.04962019025764 49.25153347100823 -123.047106509436</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Travel and Parking lane closure on Both Sides of 300-400 Block of W 45th Avenue and Both Sides of Lane East of 6100 Block of Cambie Street to facilitate underground utility construction.

WO# W02581733-02/459-U07-01165
Location: Both Sides of 300-400 Block of W 45th Avenue From Cambie Street to Lane East of Cambie Street. Both Sides of Lane East of 6100 Block of Cambie Street From W 45th Avenue to Lane South of W 45th Avenue.
Schedule: Jun 15, 2026 - Jun 29, 2026; Weekdays; 7:00 AM - 8:00 PM</content>
<id>urn:uuid:fb4a1430-a45a-4897-907f-9747aad1d7bd</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d3706f85-3351-46ed-bbd4-c152e3f13d91"/>
<published>2026-06-01T07:00:00Z</published>
<title>BC Hydro Underground Utility Construction on 300-400 Block of W 45th Avenue</title>
<updated>2026-06-01T20:45:41.043166Z</updated>
<georss:line>49.229830513132725 -123.11633970558897 49.229795482054726 -123.11540093243376</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Travel and Parking lane closure on Both Sides of 300-400 Block of W 45th Avenue and Both Sides of Lane East of 6100 Block of Cambie Street to facilitate underground utility construction.

WO# W02581733-02/459-U07-01165
Location: Both Sides of 300-400 Block of W 45th Avenue From Cambie Street to Lane East of Cambie Street. Both Sides of Lane East of 6100 Block of Cambie Street From W 45th Avenue to Lane South of W 45th Avenue.
Schedule: Jun 15, 2026 - Jun 29, 2026; Weekdays; 7:00 AM - 8:00 PM</content>
<id>urn:uuid:d5ed4760-a6c1-483b-92f0-3a1299cf8dbe</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d3706f85-3351-46ed-bbd4-c152e3f13d91"/>
<published>2026-06-01T07:00:00Z</published>
<title>BC Hydro Underground Utility Construction on 300-400 Block of W 45th Avenue</title>
<updated>2026-06-01T20:45:41.043166Z</updated>
<georss:line>49.229795482054726 -123.1154116612698 49.22924549087398 -123.11543848335997</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Reduced lanes on Both Sides of 3400 Block of W 6th Avenue to facilitate underground utility construction.

WO# W02582980-01/453-U07-01219
Location: Both Sides of 3400 Block of W 6th Avenue From Collingwood Street to Lane East of Collingwood Street. 
Schedule: Recurring schedule as follows:
- Jun 5, 2026 - Jun 19, 2026; Weekdays; 9:30 AM - 2:30 PM
- Jun 6, 2026 - Jun 20, 2026; Sa; 7:00 AM - 8:00 PM
</content>
<id>urn:uuid:e471c8be-dfb5-4494-831b-0c9e16c65202</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/fcb723aa-bb33-4ef3-b38b-06be149f5bfd"/>
<published>2026-05-28T07:00:00Z</published>
<title>BC Hydro Underground Utility Construction on 3400 Block of W 6th Avenue</title>
<updated>2026-05-28T18:08:30.4830776Z</updated>
<georss:line>49.26685632686238 -123.18178740106252 49.266817821562455 -123.18038192353873</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Parking and Travel lane closure on Both Sides of 400 Block of W 39th Avenue, Both Sides of Lane East of 5400 Block of Cambie Street and Both Sides of Lane North of 400 Block of W 39th Avenue to facilitate underground utility construction.

WO# W02585726-03/461-U07-02808
Location: Both Sides of 400 Block of W 39th Avenue From Cambie Street to 35m East of Lane East of Cambie Street. Both Sides of Lane East of 5400 Block of Cambie Street From W 39th Avenue to Lane North of W 39th Avenue. Both Sides of Lane North of 400 Block of W 39th Avenue From Lane East of Cambie Street to Alberta Street.
Schedule: May 25, 2026 - Jun 22, 2026; Weekdays; 7:00 AM - 8:00 PM</content>
<id>urn:uuid:e4ce962b-eacf-49dd-97a6-4c4e212ad7fd</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/dd9389eb-309d-4eeb-8821-3411ff4cc2f7"/>
<published>2026-05-14T07:00:00Z</published>
<title>BC Hydro Underground Utility Construction on 400 Block of W 39th Avenue</title>
<updated>2026-06-02T16:56:29.3719165Z</updated>
<georss:line>49.23540804531359 -123.11612364012868 49.23535900733444 -123.1147771712032</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Parking and Travel lane closure on Both Sides of 400 Block of W 39th Avenue, Both Sides of Lane East of 5400 Block of Cambie Street and Both Sides of Lane North of 400 Block of W 39th Avenue to facilitate underground utility construction.

WO# W02585726-03/461-U07-02808
Location: Both Sides of 400 Block of W 39th Avenue From Cambie Street to 35m East of Lane East of Cambie Street. Both Sides of Lane East of 5400 Block of Cambie Street From W 39th Avenue to Lane North of W 39th Avenue. Both Sides of Lane North of 400 Block of W 39th Avenue From Lane East of Cambie Street to Alberta Street.
Schedule: May 25, 2026 - Jun 22, 2026; Weekdays; 7:00 AM - 8:00 PM</content>
<id>urn:uuid:e68d9f4a-d76a-4d84-b058-3283527b4f4c</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/dd9389eb-309d-4eeb-8821-3411ff4cc2f7"/>
<published>2026-05-14T07:00:00Z</published>
<title>BC Hydro Underground Utility Construction on 400 Block of W 39th Avenue</title>
<updated>2026-06-02T16:56:29.3719165Z</updated>
<georss:line>49.235380023617154 -123.11525460440792 49.235838876894405 -123.11523851115382</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Parking and Travel lane closure on Both Sides of 400 Block of W 39th Avenue, Both Sides of Lane East of 5400 Block of Cambie Street and Both Sides of Lane North of 400 Block of W 39th Avenue to facilitate underground utility construction.

WO# W02585726-03/461-U07-02808
Location: Both Sides of 400 Block of W 39th Avenue From Cambie Street to 35m East of Lane East of Cambie Street. Both Sides of Lane East of 5400 Block of Cambie Street From W 39th Avenue to Lane North of W 39th Avenue. Both Sides of Lane North of 400 Block of W 39th Avenue From Lane East of Cambie Street to Alberta Street.
Schedule: May 25, 2026 - Jun 22, 2026; Weekdays; 7:00 AM - 8:00 PM</content>
<id>urn:uuid:5538a22f-f58f-4bfc-b6ae-a25d3e554491</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/dd9389eb-309d-4eeb-8821-3411ff4cc2f7"/>
<published>2026-05-14T07:00:00Z</published>
<title>BC Hydro Underground Utility Construction on 400 Block of W 39th Avenue</title>
<updated>2026-06-02T16:56:29.3719165Z</updated>
<georss:line>49.235835374213764 -123.11524387557188 49.235754812490796 -123.11334487158933</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Parking lane closure on the South Side of 4700-4800 Block of Drummond Drive to facilitate underground utility construction.

WO# W02556161-02/452-U07-01098
Location: South Side of 4700-4800 Block of Drummond Drive From 80m East of Fannin Avenue to 135m East of Fannin Avenue.
Schedule: Jun 15, 2026 - Jun 29, 2026; Weekdays; 7:00 AM - 8:00 PM</content>
<id>urn:uuid:413bd34e-2092-43ae-8ade-dd8f62ee2908</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/b8931c12-5a19-4391-afa1-0b138f036059"/>
<published>2026-06-04T07:00:00Z</published>
<title>BC Hydro Underground Utility Construction on 4700-4800 Block of Drummond Drive</title>
<updated>2026-06-04T15:20:34.4651846Z</updated>
<georss:line>49.27370988357927 -123.21909720253937 49.273503383490294 -123.21803504776946 49.27322338198883 -123.21714455437657 49.27296437918497 -123.21647400212288</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Travel lane closure on Both Sides of 6000 Block of Dunbar Street to facilitate underground utility construction.

WO# W02585723-02/453-U07-01251
Location: Both Sides of 6000 Block of Dunbar Street From Lane North of SW Marine Drive to W 44th Avenue. 
Schedule: Recurring schedule as follows:
- May 21, 2026 - Jun 26, 2026; Weekdays; 7:00 AM - 8:00 PM
- May 23, 2026 - Jun 13, 2026; Sa; 7:00 AM - 8:00 PM
</content>
<id>urn:uuid:199c29af-9359-45bb-aede-68233e473bf0</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/7902b2e0-44f8-4df2-a6df-7eae11b85d6e"/>
<published>2026-05-13T07:00:00Z</published>
<title>BC Hydro Underground Utility Construction on 6000 Block of Dunbar Street</title>
<updated>2026-06-05T16:17:47.6126511Z</updated>
<georss:line>49.23136550919202 -123.18541541460259 49.232237747922454 -123.18539395693045</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Travel lane closure on Both Sides of 900 Block of Terminal Avenue to facilitate underground utility construction.

WO# W02588157-01/460-U07-01404
Location: Both Sides of 900 Block of Terminal Avenue From Glen Drive to Cottrell Street. 
Schedule: May 5, 2026 - Jun 11, 2026; Weekdays; 7:00 AM - 8:00 PM</content>
<id>urn:uuid:828ce051-8636-4b36-bd9c-e3480f8f86aa</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e5028f07-e1c8-475e-b521-8a01b3ce9b91"/>
<published>2026-04-27T07:00:00Z</published>
<title>BC Hydro Underground Utility Construction on 900 Block of Terminal Avenue</title>
<updated>2026-05-26T21:40:27.5133146Z</updated>
<georss:line>49.27002018980164 -123.08386025426687 49.26963866042536 -123.08169839380089 49.26966316240055 -123.08144090173546</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Alleyway and Parking lane closure on Both Sides of Lane East of 3500 Block of Main Street and the South Side of 200 Block of E 19th Avenue to facilitate underground utility construction.

WO# W02578524-02/461-U07-02520
Location: Both Sides of Lane East of 3500 Block of Main Street From E 19th Avenue to Lane South of E 19th Avenue. South Side of 200 Block of E 19th Avenue From Main Street to Lane East of Main Street.
Schedule: Jun 11, 2026 - Jun 25, 2026; Weekdays; 7:00 AM - 8:00 PM</content>
<id>urn:uuid:1781a173-6e16-4436-bb30-43f5eb532355</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a3e691f4-92c6-4b81-a029-5554c2d730a6"/>
<published>2026-06-08T07:00:00Z</published>
<title>BC Hydro Underground Utility Construction on Lane East of 3500 Block of Main Street</title>
<updated>2026-06-02T19:51:15.515112Z</updated>
<georss:line>49.25389212253606 -123.10015588637788 49.25343553776392 -123.10016875518146</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Alleyway and Parking lane closure on Both Sides of Lane East of 3500 Block of Main Street and the South Side of 200 Block of E 19th Avenue to facilitate underground utility construction.

WO# W02578524-02/461-U07-02520
Location: Both Sides of Lane East of 3500 Block of Main Street From E 19th Avenue to Lane South of E 19th Avenue. South Side of 200 Block of E 19th Avenue From Main Street to Lane East of Main Street.
Schedule: Jun 11, 2026 - Jun 25, 2026; Weekdays; 7:00 AM - 8:00 PM</content>
<id>urn:uuid:8b2ad518-1c33-4100-b7db-c866cebc0a15</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a3e691f4-92c6-4b81-a029-5554c2d730a6"/>
<published>2026-06-08T07:00:00Z</published>
<title>BC Hydro Underground Utility Construction on Lane East of 3500 Block of Main Street</title>
<updated>2026-06-02T19:51:15.515112Z</updated>
<georss:line>49.25388371908957 -123.10086795286549 49.25387251467018 -123.10014730739371</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Parking and Alleyway lane closure on Both Sides of Lane East of 4100 Block of Blenheim Street and the North Side of 3200 Block of W 26th Avenue to facilitate underground utility construction.

WO# W02584874-03/453-U07-01243
Location: Both Sides of Lane East of 4100 Block of Blenheim Street From W 26th Avenue to Lane North of W 26th Avenue. North Side of 3200 Block of W 26th Avenue From Blenheim Street to Lane East of Blenheim Street.
Schedule: Jun 18, 2026 - Jul 2, 2026; Weekdays; 7:00 AM - 8:00 PM</content>
<id>urn:uuid:5688d13c-daf3-463d-85bb-1e163b76972b</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/74a12ee9-f015-4f34-b536-8e11a256cb22"/>
<published>2026-06-08T07:00:00Z</published>
<title>BC Hydro Underground Utility Construction on Lane East of 4100 Block of Blenheim Street</title>
<updated>2026-06-08T21:55:24.6715955Z</updated>
<georss:line>49.249006088233756 -123.17797871268436 49.249457811489094 -123.1779840771024</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Parking and Alleyway lane closure on Both Sides of Lane East of 4100 Block of Blenheim Street and the North Side of 3200 Block of W 26th Avenue to facilitate underground utility construction.

WO# W02584874-03/453-U07-01243
Location: Both Sides of Lane East of 4100 Block of Blenheim Street From W 26th Avenue to Lane North of W 26th Avenue. North Side of 3200 Block of W 26th Avenue From Blenheim Street to Lane East of Blenheim Street.
Schedule: Jun 18, 2026 - Jul 2, 2026; Weekdays; 7:00 AM - 8:00 PM</content>
<id>urn:uuid:e74ac305-9e96-417e-9736-8ae0588b398e</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/74a12ee9-f015-4f34-b536-8e11a256cb22"/>
<published>2026-06-08T07:00:00Z</published>
<title>BC Hydro Underground Utility Construction on Lane East of 4100 Block of Blenheim Street</title>
<updated>2026-06-08T21:55:24.6715955Z</updated>
<georss:line>49.249013091726624 -123.17861707843002 49.24900958998029 -123.17797871268445</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Parking and Alleyway lane closure on Both Sides of Lane East of 4400 Block of Maple Crescent and Both Sides of 1800 Block of W 29th Avenue to facilitate underground utility construction.

WO# W02564388-02/457-U07-03371
Location: Both Sides of Lane East of 4400 Block of Maple Crescent From 45m North of W 29th Avenue to 70m North of W 29th Avenue. Both Sides of 1800 Block of W 29th Avenue From Maple Crescent to Lane East of Maple Crescent.
Schedule: May 28, 2026 - Jun 11, 2026; Weekdays; 7:00 AM - 8:00 PM</content>
<id>urn:uuid:a206246e-b612-4604-b3d1-38178d1d5e35</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/c0f11089-e6c1-4cb5-8a54-fe9ff1b7fb88"/>
<published>2026-05-21T07:00:00Z</published>
<title>BC Hydro Underground Utility Construction on Lane East of 4400 Block of Maple Crescent</title>
<updated>2026-05-19T21:19:15.5299625Z</updated>
<georss:line>49.24591542916207 -123.14785285623785 49.24663603231704 -123.14824936939961</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Parking and Alleyway lane closure on Both Sides of Lane East of 4400 Block of Maple Crescent and Both Sides of 1800 Block of W 29th Avenue to facilitate underground utility construction.

WO# W02564388-02/457-U07-03371
Location: Both Sides of Lane East of 4400 Block of Maple Crescent From 45m North of W 29th Avenue to 70m North of W 29th Avenue. Both Sides of 1800 Block of W 29th Avenue From Maple Crescent to Lane East of Maple Crescent.
Schedule: May 28, 2026 - Jun 11, 2026; Weekdays; 7:00 AM - 8:00 PM</content>
<id>urn:uuid:49e2fdad-4ae1-4bb4-9ed1-8506fe460a0c</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/c0f11089-e6c1-4cb5-8a54-fe9ff1b7fb88"/>
<published>2026-05-21T07:00:00Z</published>
<title>BC Hydro Underground Utility Construction on Lane East of 4400 Block of Maple Crescent</title>
<updated>2026-05-19T21:19:15.5299625Z</updated>
<georss:line>49.24558418665703 -123.1483944642007 49.24557855684472 -123.14766608678369</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Alleyway and Parking lane closure on Both Sides of Lane East of 4500 Block of Magnolia Street and the East Side of 4500 Block of Magnolia Street to facilitate underground utility construction.

WO# W02589345-01 / 457-U07-03413 
Location: Both Sides of Lane East of 4500 Block of Magnolia Street From North PL of 4478 to South PL of 4538. East Side of 4500 Block of Magnolia Street From South PL of 4538 to 40m South of South PL of 4538.
Schedule: Jun 16, 2026 - Jun 29, 2026; Weekdays; 7:00 AM - 8:00 PM</content>
<id>urn:uuid:45cf6ca6-acd4-4da6-b1ee-46e3b0e0c46f</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e6925713-87b3-4a99-b1ae-8a46f2d299c2"/>
<published>2026-06-03T07:00:00Z</published>
<title>BC Hydro Underground Utility Construction on Lane East of 4500 Block of Magnolia Street</title>
<updated>2026-06-03T18:59:44.4327711Z</updated>
<georss:line>49.24627671670123 -123.14935714149446 49.24562114908903 -123.14885097357282</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Alleyway and Parking lane closure on Both Sides of Lane East of 4500 Block of Magnolia Street and the East Side of 4500 Block of Magnolia Street to facilitate underground utility construction.

WO# W02589345-01 / 457-U07-03413 
Location: Both Sides of Lane East of 4500 Block of Magnolia Street From North PL of 4478 to South PL of 4538. East Side of 4500 Block of Magnolia Street From South PL of 4538 to 40m South of South PL of 4538.
Schedule: Jun 16, 2026 - Jun 29, 2026; Weekdays; 7:00 AM - 8:00 PM</content>
<id>urn:uuid:6d474d16-5498-403a-b329-69554fe421cf</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e6925713-87b3-4a99-b1ae-8a46f2d299c2"/>
<published>2026-06-03T07:00:00Z</published>
<title>BC Hydro Underground Utility Construction on Lane East of 4500 Block of Magnolia Street</title>
<updated>2026-06-03T18:59:44.4327711Z</updated>
<georss:line>49.24545025177531 -123.14975178098527 49.245032811808386 -123.14976464946156</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Parking and Alleyway lane closure on Both Sides of Lane East of 7200 Block of Fraser Street and the North Side of 700 Block of E 57th Avenue to facilitate underground utility construction.

WO# W02500381-02/461-U07-02841
Location: Both Sides of Lane East of 7200 Block of Fraser Street From E 56th Avenue to 10m South of E 57th Avenue. North Side of 700 Block of E 57th Avenue From Lane East of Fraser Street to 50m East of Lane East of Fraser Street. 
Schedule: Jun 10, 2026 - Jun 24, 2026; Weekdays; 7:00 AM - 8:00 PM</content>
<id>urn:uuid:f8555b4c-c745-4c8c-9bfb-67264efa853b</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/eee3f6ff-7a53-4c13-b888-e205c30b8712"/>
<published>2026-05-29T07:00:00Z</published>
<title>BC Hydro Underground Utility Construction on Lane East of 7200 Block of Fraser Street</title>
<updated>2026-05-29T17:06:52.4170829Z</updated>
<georss:line>49.219117720665224 -123.09025726964461 49.21809458117221 -123.09030554940686</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Parking and Alleyway lane closure on Both Sides of Lane East of 7200 Block of Fraser Street and the North Side of 700 Block of E 57th Avenue to facilitate underground utility construction.

WO# W02500381-02/461-U07-02841
Location: Both Sides of Lane East of 7200 Block of Fraser Street From E 56th Avenue to 10m South of E 57th Avenue. North Side of 700 Block of E 57th Avenue From Lane East of Fraser Street to 50m East of Lane East of Fraser Street. 
Schedule: Jun 10, 2026 - Jun 24, 2026; Weekdays; 7:00 AM - 8:00 PM</content>
<id>urn:uuid:53c50b2e-0712-4ba8-9ad7-4c3ce273f4c3</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/eee3f6ff-7a53-4c13-b888-e205c30b8712"/>
<published>2026-05-29T07:00:00Z</published>
<title>BC Hydro Underground Utility Construction on Lane East of 7200 Block of Fraser Street</title>
<updated>2026-05-29T17:06:52.4170829Z</updated>
<georss:line>49.21829780919555 -123.09031091382492 49.21828729742174 -123.08953843762862</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Alleyway and Parking lane closure on Both Sides of Lane North of 3400 Block of E 47th Avenue, Both Sides of 6000-6200 Block of Battison Street and Both Sides of Lane West of 6000-6200 Block of Battison Street to facilitate underground utility construction.

WO# W02583871-02/461-U07-02823
Location: Both Sides of Lane North of 3400 Block of E 47th Avenue From 40m West of Battison Street to 70m West of Battison Street. Both Sides of 6000-6200 Block of Battison Street From E 47th Avenue to Lane North of E 47th Avenue. Both Sides of Lane West of 6000-6200 Block of Battison Street From Lane North of E 47th Avenue to 55m North of Lane North of E 47th Avenue.
Schedule: May 13, 2026 - Jun 10, 2026; Weekdays; 7:00 AM - 8:00 PM</content>
<id>urn:uuid:d1c971db-a735-4ac4-8024-6c6ed12a73ed</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/dddd1702-6910-4036-ace1-113f4323ec04"/>
<published>2026-05-04T07:00:00Z</published>
<title>BC Hydro Underground Utility Construction on Lane North of 3400 Block of E 47th Avenue </title>
<updated>2026-05-21T16:33:56.2118804Z</updated>
<georss:line>49.22697121728663 -123.03118205775476 49.22697121728663 -123.03198672045923</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Alleyway and Parking lane closure on Both Sides of Lane North of 3400 Block of E 47th Avenue, Both Sides of 6000-6200 Block of Battison Street and Both Sides of Lane West of 6000-6200 Block of Battison Street to facilitate underground utility construction.

WO# W02583871-02/461-U07-02823
Location: Both Sides of Lane North of 3400 Block of E 47th Avenue From 40m West of Battison Street to 70m West of Battison Street. Both Sides of 6000-6200 Block of Battison Street From E 47th Avenue to Lane North of E 47th Avenue. Both Sides of Lane West of 6000-6200 Block of Battison Street From Lane North of E 47th Avenue to 55m North of Lane North of E 47th Avenue.
Schedule: May 13, 2026 - Jun 10, 2026; Weekdays; 7:00 AM - 8:00 PM</content>
<id>urn:uuid:5d02f6cc-86b4-4fb7-82c9-be0f3515d1a8</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/dddd1702-6910-4036-ace1-113f4323ec04"/>
<published>2026-05-04T07:00:00Z</published>
<title>BC Hydro Underground Utility Construction on Lane North of 3400 Block of E 47th Avenue </title>
<updated>2026-05-21T16:33:56.2118804Z</updated>
<georss:line>49.226414187968714 -123.03059733618956 49.226957204047494 -123.0305866073535</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Alleyway and Parking lane closure on Both Sides of Lane North of 3400 Block of E 47th Avenue, Both Sides of 6000-6200 Block of Battison Street and Both Sides of Lane West of 6000-6200 Block of Battison Street to facilitate underground utility construction.

WO# W02583871-02/461-U07-02823
Location: Both Sides of Lane North of 3400 Block of E 47th Avenue From 40m West of Battison Street to 70m West of Battison Street. Both Sides of 6000-6200 Block of Battison Street From E 47th Avenue to Lane North of E 47th Avenue. Both Sides of Lane West of 6000-6200 Block of Battison Street From Lane North of E 47th Avenue to 55m North of Lane North of E 47th Avenue.
Schedule: May 13, 2026 - Jun 10, 2026; Weekdays; 7:00 AM - 8:00 PM</content>
<id>urn:uuid:d3704c71-937f-4866-a0d0-0b3afd4b329c</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/dddd1702-6910-4036-ace1-113f4323ec04"/>
<published>2026-05-04T07:00:00Z</published>
<title>BC Hydro Underground Utility Construction on Lane North of 3400 Block of E 47th Avenue </title>
<updated>2026-05-21T16:33:56.2118804Z</updated>
<georss:line>49.22697472059582 -123.03135908354977 49.22768588721439 -123.03131616820554</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Alleyway and Parking lane closure on Both Sides of Lane North of 3600 Block of W 6th Avenue and the East Side of 2100 Block of Alma Street to facilitate underground utility construction.

WO# W02591365-01/453-U07-01247
Location: Both Sides of Lane North of 3600 Block of W 6th Avenue From Alma Street to 70m East of Alma Street. East Side of 2100 Block of Alma Street From W 6th Avenue to Lane North of W 6th Avenue.
Schedule: Jun 5, 2026 - Jun 19, 2026; Weekdays; 7:00 AM - 8:00 PM</content>
<id>urn:uuid:6ad95c73-0444-4ebf-a9e2-7d5213bb65f3</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/083542cf-20f1-4dac-9372-3a656110084d"/>
<published>2026-05-28T07:00:00Z</published>
<title>BC Hydro Underground Utility Construction on Lane North of 3600 Block of W 6th Avenue</title>
<updated>2026-05-28T16:43:17.346452Z</updated>
<georss:line>49.26734219414996 -123.18578252060395 49.26733869370386 -123.1848008321045</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Alleyway and Parking lane closure on Both Sides of Lane North of 3600 Block of W 6th Avenue and the East Side of 2100 Block of Alma Street to facilitate underground utility construction.

WO# W02591365-01/453-U07-01247
Location: Both Sides of Lane North of 3600 Block of W 6th Avenue From Alma Street to 70m East of Alma Street. East Side of 2100 Block of Alma Street From W 6th Avenue to Lane North of W 6th Avenue.
Schedule: Jun 5, 2026 - Jun 19, 2026; Weekdays; 7:00 AM - 8:00 PM</content>
<id>urn:uuid:3e0d1f1c-61a2-49a3-ae9a-bac43ae1d7aa</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/083542cf-20f1-4dac-9372-3a656110084d"/>
<published>2026-05-28T07:00:00Z</published>
<title>BC Hydro Underground Utility Construction on Lane North of 3600 Block of W 6th Avenue</title>
<updated>2026-05-28T16:43:17.346452Z</updated>
<georss:line>49.26692913979636 -123.18575569851379 49.26734919504139 -123.18573960525971</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Parking and Alleyway lane closure on Both Sides of Lane North of 2100 Block of W 10th Avenue and the East Side of 2500 Block of Yew Street to facilitate underground utility construction.

WO# W02557116-02/457-U07-03434
Location: Both Sides of Lane North of 2100 Block of W 10th Avenue and the East Side of 2500 Block of Yew Street to facilitate underground utility construction.
Schedule: Jun 16, 2026 - Jun 30, 2026; Weekdays; 7:00 AM - 8:00 PM</content>
<id>urn:uuid:6d232da0-1c42-4404-b299-473cb8e5d73e</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/800dc182-7a69-4160-b31c-6ecc362c9553"/>
<published>2026-06-09T07:00:00Z</published>
<title>BC Hydro Underground Utility Construction on Lane North of W 10th Avenue</title>
<updated>2026-06-05T19:18:35.6629985Z</updated>
<georss:line>49.263337764449915 -123.15294543995005 49.26336016920271 -123.15453686573508</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Parking and Alleyway lane closure on Both Sides of Lane North of 2100 Block of W 10th Avenue and the East Side of 2500 Block of Yew Street to facilitate underground utility construction.

WO# W02557116-02/457-U07-03434
Location: Both Sides of Lane North of 2100 Block of W 10th Avenue and the East Side of 2500 Block of Yew Street to facilitate underground utility construction.
Schedule: Jun 16, 2026 - Jun 30, 2026; Weekdays; 7:00 AM - 8:00 PM</content>
<id>urn:uuid:d607e9c3-8626-4192-ad2e-e827df1a16e3</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/800dc182-7a69-4160-b31c-6ecc362c9553"/>
<published>2026-06-09T07:00:00Z</published>
<title>BC Hydro Underground Utility Construction on Lane North of W 10th Avenue</title>
<updated>2026-06-05T19:18:35.6629985Z</updated>
<georss:line>49.26290927325098 -123.15534759250446 49.263376972653816 -123.15533043420882</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Parking and Alleyway lane closure on Both Sides of Lane South of 3500 Block of E Hastings Street and Both Sides of 400 Block of Skeena Street to facilitate underground utility construction.

WO# W02589018-02/462-U07-01194
Location: Both Sides of Lane South of 3500 Block of E Hastings Street From 70m East of Skeena Street to 130m East of Skeena Street. Both Sides of 400 Block of Skeena Street From E Pender Street to Lane South of E Hastings.
Schedule: May 13, 2026 - Jun 10, 2026; Weekdays; 7:00 AM - 8:00 PM</content>
<id>urn:uuid:632b16af-4adf-4971-ba27-5bb0488e719d</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ae9eb703-54e9-40bc-b741-f726829ad035"/>
<published>2026-05-04T07:00:00Z</published>
<title>BC Hydro Underground Utility Construction on Lane South of 3500 Block of E Hastings Street</title>
<updated>2026-05-21T16:38:08.5503755Z</updated>
<georss:line>49.28071175467781 -123.02770854076381 49.28071525417505 -123.02620113929747</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Parking and Alleyway lane closure on Both Sides of Lane South of 3500 Block of E Hastings Street and Both Sides of 400 Block of Skeena Street to facilitate underground utility construction.

WO# W02589018-02/462-U07-01194
Location: Both Sides of Lane South of 3500 Block of E Hastings Street From 70m East of Skeena Street to 130m East of Skeena Street. Both Sides of 400 Block of Skeena Street From E Pender Street to Lane South of E Hastings.
Schedule: May 13, 2026 - Jun 10, 2026; Weekdays; 7:00 AM - 8:00 PM</content>
<id>urn:uuid:311c7292-45ab-40c2-ba1a-c05e13426958</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ae9eb703-54e9-40bc-b741-f726829ad035"/>
<published>2026-05-04T07:00:00Z</published>
<title>BC Hydro Underground Utility Construction on Lane South of 3500 Block of E Hastings Street</title>
<updated>2026-05-21T16:38:08.5503755Z</updated>
<georss:line>49.28020082541829 -123.02833081325524 49.28072925216145 -123.02831472000113</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Parking lane closure on Both Sides of 1000-900 Block of W 7th Avenue to facilitate utility maintenance.

WO# 2496438-02
Location: Both Sides of 1000-900 Block of W 7th Avenue From East PL of 1071 to West PL of 973.
Schedule: Jun 17, 2026 8:00 AM - 5:00 PM</content>
<id>urn:uuid:06b4a404-e6fc-4005-9637-a9bdf160719c</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/693b4075-46d0-4c48-a322-f677af7db935"/>
<published>2026-06-03T07:00:00Z</published>
<title>BC Hydro Utility Maintenance on 1000-900 Block of W 7th Avenue</title>
<updated>2026-06-03T19:53:55.7282653Z</updated>
<georss:line>49.26518609867918 -123.12834213709476 49.26514129092831 -123.12564829482338</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Parking lane closure on Both Sides of 1500 Block of W 36th Avenue to facilitate utility maintenance.

WO# 2587444-01
Location: Both Sides of 1500 Block of W 36th Avenue From Connaught Drive to Granville Street. 
Schedule: Jun 15, 2026 7:00 AM - 3:00 PM</content>
<id>urn:uuid:1d40f5fe-2bf8-4288-979c-59a81af88350</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/922de198-bf5d-42a4-b36d-ca03da6e178e"/>
<published>2026-05-29T07:00:00Z</published>
<title>BC Hydro Utility Maintenance on 1500 Block of W 36th Avenue</title>
<updated>2026-05-29T19:11:00.6438437Z</updated>
<georss:line>49.239048489801206 -123.14246595676961 49.23901206429906 -123.13942895005799</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Parking and Travel lane closure on the North Side of 1600 Block of W King Edward Ave, the North Side of 1800 Block of W King Edward Avenue and Both Sides of 3900-4000 Block of Marguerite Street to facilitate utility maintenance.

WO# 61078
Location: North Side of 1600 Block of W King Edward Avenue From Alexandra Street to W PL of 1657. North Side of 1800 Block of W King Edward Avenue From Angus Drive to Pine Crescent. Both Sides of 3900-4000 Block of Marguerite Street From W King Edward Avenue to Lane North of W King Edward Avenue. 
Schedule: Jun 8, 2026 - Jun 16, 2026; Weekdays; 8:00 AM - 5:00 PM</content>
<id>urn:uuid:3ba45db6-12c3-4fce-b7fb-aa92326e6d11</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e5a49fd3-7bf9-4a6d-8896-fcfd36688e1f"/>
<published>2026-05-27T07:00:00Z</published>
<title>BC Hydro Utility Maintenance on 1600 Block of W King Edward Ave</title>
<updated>2026-05-27T17:26:32.4669017Z</updated>
<georss:line>49.249476357835306 -123.14149466571388 49.249515576944844 -123.14374239377112</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Parking and Travel lane closure on the North Side of 1600 Block of W King Edward Ave, the North Side of 1800 Block of W King Edward Avenue and Both Sides of 3900-4000 Block of Marguerite Street to facilitate utility maintenance.

WO# 61078
Location: North Side of 1600 Block of W King Edward Avenue From Alexandra Street to W PL of 1657. North Side of 1800 Block of W King Edward Avenue From Angus Drive to Pine Crescent. Both Sides of 3900-4000 Block of Marguerite Street From W King Edward Avenue to Lane North of W King Edward Avenue. 
Schedule: Jun 8, 2026 - Jun 16, 2026; Weekdays; 8:00 AM - 5:00 PM</content>
<id>urn:uuid:f9fcc76d-12da-4045-a41b-0e3b63e10d87</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e5a49fd3-7bf9-4a6d-8896-fcfd36688e1f"/>
<published>2026-05-27T07:00:00Z</published>
<title>BC Hydro Utility Maintenance on 1600 Block of W King Edward Ave</title>
<updated>2026-05-27T17:26:32.4669017Z</updated>
<georss:line>49.24956763472312 -123.14754401422766 49.24955082646326 -123.14609843346472</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Parking and Travel lane closure on the North Side of 1600 Block of W King Edward Ave, the North Side of 1800 Block of W King Edward Avenue and Both Sides of 3900-4000 Block of Marguerite Street to facilitate utility maintenance.

WO# 61078
Location: North Side of 1600 Block of W King Edward Avenue From Alexandra Street to W PL of 1657. North Side of 1800 Block of W King Edward Avenue From Angus Drive to Pine Crescent. Both Sides of 3900-4000 Block of Marguerite Street From W King Edward Avenue to Lane North of W King Edward Avenue. 
Schedule: Jun 8, 2026 - Jun 16, 2026; Weekdays; 8:00 AM - 5:00 PM</content>
<id>urn:uuid:b32e0dbf-521c-463a-890b-093dbd896a25</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e5a49fd3-7bf9-4a6d-8896-fcfd36688e1f"/>
<published>2026-05-27T07:00:00Z</published>
<title>BC Hydro Utility Maintenance on 1600 Block of W King Edward Ave</title>
<updated>2026-05-27T17:26:32.4669017Z</updated>
<georss:line>49.24950880552137 -123.14466572117801 49.24972170926361 -123.14467001099737 49.24996542671971 -123.14460566763415 49.250267970805595 -123.14452845546737</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Parking lane closure on Both Sides of 3000 Block of Pine Street to facilitate utility maintenance.

WO# 2590425-02
Location: Both Sides of 3000 Block of Pine Street From Lane North of W 15th Avenue to W 15th Avenue.
Schedule: Jun 11, 2026 8:00 AM - 5:00 PM</content>
<id>urn:uuid:3e29dd77-59cd-4cea-bca2-e4241d21c04a</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e7d15835-a3bc-461c-9cce-f9b5e3c503a8"/>
<published>2026-05-28T07:00:00Z</published>
<title>BC Hydro Utility Maintenance on 3000 Block of Pine Street</title>
<updated>2026-05-28T18:55:59.2128818Z</updated>
<georss:line>49.25853427545712 -123.1435933963028 49.25808263525431 -123.14360948955691</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Parking lane closure on Both Sides of 3100 Block of Point Grey Road to facilitate utility maintenance.

WO# 2594274-01
Location: Both Sides of 3100 Block of Point Grey Road From Musqueamview Street to Balaclava Street. 
Schedule: Jun 17, 2026 8:00 AM - 5:00 PM</content>
<id>urn:uuid:4ead3a94-3025-48d5-aa9e-6c295f1b606b</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/85636b8c-08be-4973-92cb-569ca913fb34"/>
<published>2026-06-08T07:00:00Z</published>
<title>BC Hydro Utility Maintenance on 3100 Block of Point Grey Road</title>
<updated>2026-06-04T16:05:42.2298684Z</updated>
<georss:line>49.27135221022189 -123.17572908547963 49.2711141986681 -123.17373888639057</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Parking lane closure on Both Sides of 3400 Block of Point Grey Road to facilitate utility maintenance.

WO# 2559850-01
Location: Both Sides of 3400 Block of Point Grey Road From Collingwood Street to Waterloo Street. 
Schedule: Jun 12, 2026 8:00 AM - 5:00 PM</content>
<id>urn:uuid:19c385cf-874f-4a7f-8859-66b483a431c7</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/4abb6e93-df77-497a-8d2b-5b0114e5a889"/>
<published>2026-06-03T07:00:00Z</published>
<title>BC Hydro Utility Maintenance on 3400 Block of Point Grey Road</title>
<updated>2026-06-03T21:38:39.8206189Z</updated>
<georss:line>49.27194501829365 -123.18159554388795 49.27174341098265 -123.17960089962786</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Parking lane closure on Both Sides of 700-1000 Block of E 54th Avenue to facilitate utility maintenance.

WO# 2592406-01
Location: Both Sides of 700-1000 Block of E 54th Avenue From E PL of 747 to W PL of 895.
Schedule: Jun 15, 2026 8:00 AM - 5:00 PM</content>
<id>urn:uuid:45403c9c-5a5c-4461-809d-79a86241c5db</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/9f390620-25c3-4c65-a3cf-4091daae8d89"/>
<published>2026-06-03T07:00:00Z</published>
<title>BC Hydro Utility Maintenance on 700-1000 Block of E 54th Avenue</title>
<updated>2026-06-03T18:43:50.6091799Z</updated>
<georss:line>49.22061752388072 -123.08926662036909 49.220581084787 -123.08591218649705</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Travel lane closure and Single lane alternating traffic in effect on the East Side of 8100-8700 Block of Yukon Street and Both Sides of 400 Block of W Kent Ave South to facilitate utility maintenance.

WO# 6227-30005
Location: East Side of 8100-8700 Block of Yukon Street From 60m North of Interurban Way to 180m South of Interurban Way. Both Sides of 400 Block of W Kent Ave South From 40m West of Yukon Street to 50m East of Yukon Street. 
Schedule: Jun 18, 2026 8:00 AM - 5:00 PM</content>
<id>urn:uuid:40a2d800-bc4c-4c25-97a7-a85364f09837</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/72c5bd52-a766-4a74-99a8-4d0eb63864bd"/>
<published>2026-06-09T07:00:00Z</published>
<title>BC Hydro Utility Maintenance on 8100-8700 Block of Yukon Street</title>
<updated>2026-06-09T20:56:34.5898041Z</updated>
<georss:line>49.21039828498655 -123.11508195596171 49.20788620672451 -123.11523637964076</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Travel lane closure and Single lane alternating traffic in effect on the East Side of 8100-8700 Block of Yukon Street and Both Sides of 400 Block of W Kent Ave South to facilitate utility maintenance.

WO# 6227-30005
Location: East Side of 8100-8700 Block of Yukon Street From 60m North of Interurban Way to 180m South of Interurban Way. Both Sides of 400 Block of W Kent Ave South From 40m West of Yukon Street to 50m East of Yukon Street. 
Schedule: Jun 18, 2026 8:00 AM - 5:00 PM</content>
<id>urn:uuid:34c368f5-eebe-45ff-aa79-b81d3dfe30eb</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/72c5bd52-a766-4a74-99a8-4d0eb63864bd"/>
<published>2026-06-09T07:00:00Z</published>
<title>BC Hydro Utility Maintenance on 8100-8700 Block of Yukon Street</title>
<updated>2026-06-09T20:56:34.5898041Z</updated>
<georss:line>49.205818838342964 -123.11607358966069 49.206015107462434 -123.11396741696981</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Parking lane closure on Both Sides of 8300 Block of Ash Street to facilitate utility maintenance.

WO# 2586017-01 
Location: Both Sides of 8300 Block of Ash Street From W 68th Avenue to W 69th Avenue.
Schedule: Jun 18, 2026 8:00 AM - 5:00 PM</content>
<id>urn:uuid:4aeb6790-856c-4fca-9533-4c1c2b683db1</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/41e4cc72-578b-4e0d-ac3b-4daa7023b034"/>
<published>2026-06-04T07:00:00Z</published>
<title>BC Hydro Utility Maintenance on 8300 Block of Ash Street</title>
<updated>2026-06-04T16:13:10.7115315Z</updated>
<georss:line>49.21024596576896 -123.12030817857953 49.20933478866448 -123.1203350006697</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Alleyway lane closure on Both Sides of Lane North of 100 Block of W 6th Avenue to facilitate utility maintenance.

WO# 2591439-01-02
Location: Both Sides of Lane North of 100 Block of W 6th Avenue From Columbia Street to Manitoba Street. 
Schedule: Jun 17, 2026 8:00 AM - 5:00 PM</content>
<id>urn:uuid:38b8888e-a24a-4293-9307-af815e72c225</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/80c12df9-b52c-49e2-bb82-81c11a0861e4"/>
<published>2026-06-03T07:00:00Z</published>
<title>BC Hydro Utility Maintenance on Lane North of 100 Block of W 6th Avenue</title>
<updated>2026-06-03T18:14:42.0620988Z</updated>
<georss:line>49.266119939203975 -123.10944995519503 49.266069531528956 -123.10673037564379</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Alleyway lane closure on Both Sides of Lane South of 300 Block of W 6th Avenue to facilitate utility maintenance.

WO# 
Location: Both Sides of Lane South of 300 Block of W 6th Avenue From Yukon Street to Alberta Street.
Schedule: Jun 4, 2026 - Jun 12, 2026; Weekdays; 9:00 AM - 5:00 PM</content>
<id>urn:uuid:084f32a9-7e82-4a18-8ba1-71bd530c6b59</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/89bdcf0e-19c1-4ebe-9d21-bbabfb88318c"/>
<published>2026-06-01T07:00:00Z</published>
<title>BC Hydro Utility Maintenance on Lane South of 300 Block of W 6th Avenue</title>
<updated>2026-06-01T17:09:20.5783357Z</updated>
<georss:line>49.2652771415342 -123.11281896384456 49.265235134406595 -123.11090386660794</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Alleyway and Parking lane closure on Both Sides of Lane West of 6300 Block of Fraser Street to facilitate utility maintenance.

WO# 2581476-01
Location: Both Sides of Lane West of 6300 Block of Fraser Street From E 47th Avenue to Lane South of E 47th Avenue.
Schedule: Jun 10, 2026 8:00 AM - 5:00 PM</content>
<id>urn:uuid:66bd6650-862b-42a5-b683-4fa792beee39</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/af6e566b-17d4-404f-a087-2bd87b0279c4"/>
<published>2026-05-28T07:00:00Z</published>
<title>BC Hydro Utility Maintenance on Lane West of 6300 Block of Fraser Street</title>
<updated>2026-05-28T17:58:11.3901517Z</updated>
<georss:line>49.22739196489411 -123.09136920369447 49.22696806626067 -123.09138529694857</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>April 2026: ongoing project currently working at W12th on Vine St

Sewer Renewal work on local streets. 
Schedule: Starting construction in Dec 2025 to Q3 2027
Traffic Impact: TBD

Location: Vine St, W 10th Av to W 16th Av

Schedule: Dec 1, 2025 - Sep 1, 2027</content>
<id>urn:uuid:f9adbd36-7a1e-4fe9-a02c-a06c272bea2c</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1454f05e-3a84-4233-b212-d21427234c92"/>
<published>2025-11-04T08:00:00Z</published>
<title>Balaclava Vine Sewer Renewal Project</title>
<updated>2026-04-23T16:04:08.0380043Z</updated>
<georss:line>49.260118517212646 -123.15547535569931 49.26006546030388 -123.152987651183</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>April 2026: ongoing project currently working at W12th on Vine St

Sewer Renewal work on local streets. 
Schedule: Starting construction in Dec 2025 to Q3 2027
Traffic Impact: TBD

Location: Vine St, W 10th Av to W 16th Av

Schedule: Dec 1, 2025 - Sep 1, 2027</content>
<id>urn:uuid:1f64f4d1-32c6-411c-bfce-b0a538919e32</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1454f05e-3a84-4233-b212-d21427234c92"/>
<published>2025-11-04T08:00:00Z</published>
<title>Balaclava Vine Sewer Renewal Project</title>
<updated>2026-04-23T16:04:08.0380043Z</updated>
<georss:line>49.260100670139906 -123.15543895777647 49.26013835213425 -123.1578071091858</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>April 2026: ongoing project currently working at W12th on Vine St

Sewer Renewal work on local streets. 
Schedule: Starting construction in Dec 2025 to Q3 2027
Traffic Impact: TBD

Location: Vine St, W 10th Av to W 16th Av

Schedule: Dec 1, 2025 - Sep 1, 2027</content>
<id>urn:uuid:010b5d74-b1c7-4228-8269-fd148490bf5e</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1454f05e-3a84-4233-b212-d21427234c92"/>
<published>2025-11-04T08:00:00Z</published>
<title>Balaclava Vine Sewer Renewal Project</title>
<updated>2026-04-23T16:04:08.0380043Z</updated>
<georss:line>49.26013835213425 -123.1578071091858 49.26017601255188 -123.16017527791472</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>April 2026: ongoing project currently working at W12th on Vine St

Sewer Renewal work on local streets. 
Schedule: Starting construction in Dec 2025 to Q3 2027
Traffic Impact: TBD

Location: Vine St, W 10th Av to W 16th Av

Schedule: Dec 1, 2025 - Sep 1, 2027</content>
<id>urn:uuid:0c3df9e3-72cc-44b0-82e0-cc463cb553bf</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1454f05e-3a84-4233-b212-d21427234c92"/>
<published>2025-11-04T08:00:00Z</published>
<title>Balaclava Vine Sewer Renewal Project</title>
<updated>2026-04-23T16:04:08.0380043Z</updated>
<georss:line>49.26017601255188 -123.16017527791472 49.26021361351624 -123.16254481071739</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>April 2026: ongoing project currently working at W12th on Vine St

Sewer Renewal work on local streets. 
Schedule: Starting construction in Dec 2025 to Q3 2027
Traffic Impact: TBD

Location: Vine St, W 10th Av to W 16th Av

Schedule: Dec 1, 2025 - Sep 1, 2027</content>
<id>urn:uuid:b64e54fc-75a6-4b92-9419-c3ac7d6ee808</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1454f05e-3a84-4233-b212-d21427234c92"/>
<published>2025-11-04T08:00:00Z</published>
<title>Balaclava Vine Sewer Renewal Project</title>
<updated>2026-04-23T16:04:08.0380043Z</updated>
<georss:line>49.26021361351624 -123.16254481071739 49.26024932220972 -123.16480693388586</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>April 2026: ongoing project currently working at W12th on Vine St

Sewer Renewal work on local streets. 
Schedule: Starting construction in Dec 2025 to Q3 2027
Traffic Impact: TBD

Location: Vine St, W 10th Av to W 16th Av

Schedule: Dec 1, 2025 - Sep 1, 2027</content>
<id>urn:uuid:1a8ce82a-a159-4df6-af26-a31696c2e6d5</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1454f05e-3a84-4233-b212-d21427234c92"/>
<published>2025-11-04T08:00:00Z</published>
<title>Balaclava Vine Sewer Renewal Project</title>
<updated>2026-04-23T16:04:08.0380043Z</updated>
<georss:line>49.26060663809716 -123.15861344048133 49.26059602682494 -123.15781672465583</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>April 2026: ongoing project currently working at W12th on Vine St

Sewer Renewal work on local streets. 
Schedule: Starting construction in Dec 2025 to Q3 2027
Traffic Impact: TBD

Location: Vine St, W 10th Av to W 16th Av

Schedule: Dec 1, 2025 - Sep 1, 2027</content>
<id>urn:uuid:83ab96d8-f26a-4ef3-99c6-587639892092</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1454f05e-3a84-4233-b212-d21427234c92"/>
<published>2025-11-04T08:00:00Z</published>
<title>Balaclava Vine Sewer Renewal Project</title>
<updated>2026-04-23T16:04:08.0380043Z</updated>
<georss:line>49.25729581046292 -123.15391444306162 49.257985584535845 -123.15386566454168</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>April 2026: ongoing project currently working at W12th on Vine St

Sewer Renewal work on local streets. 
Schedule: Starting construction in Dec 2025 to Q3 2027
Traffic Impact: TBD

Location: Vine St, W 10th Av to W 16th Av

Schedule: Dec 1, 2025 - Sep 1, 2027</content>
<id>urn:uuid:03d344d3-c1f5-4b20-baad-931f66610849</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1454f05e-3a84-4233-b212-d21427234c92"/>
<published>2025-11-04T08:00:00Z</published>
<title>Balaclava Vine Sewer Renewal Project</title>
<updated>2026-04-23T16:04:08.0380043Z</updated>
<georss:line>49.258297395990354 -123.15787611234535 49.25833504612072 -123.16024417926518</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>April 2026: ongoing project currently working at W12th on Vine St

Sewer Renewal work on local streets. 
Schedule: Starting construction in Dec 2025 to Q3 2027
Traffic Impact: TBD

Location: Vine St, W 10th Av to W 16th Av

Schedule: Dec 1, 2025 - Sep 1, 2027</content>
<id>urn:uuid:d7436044-fa4f-4fae-a853-2252005fcfc8</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1454f05e-3a84-4233-b212-d21427234c92"/>
<published>2025-11-04T08:00:00Z</published>
<title>Balaclava Vine Sewer Renewal Project</title>
<updated>2026-04-23T16:04:08.0380043Z</updated>
<georss:line>49.259218093790054 -123.15784214808028 49.25925524205479 -123.16020937782272</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>April 2026: ongoing project currently working at W12th on Vine St

Sewer Renewal work on local streets. 
Schedule: Starting construction in Dec 2025 to Q3 2027
Traffic Impact: TBD

Location: Vine St, W 10th Av to W 16th Av

Schedule: Dec 1, 2025 - Sep 1, 2027</content>
<id>urn:uuid:4e3f0719-af50-4174-86c1-3848b434182a</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1454f05e-3a84-4233-b212-d21427234c92"/>
<published>2025-11-04T08:00:00Z</published>
<title>Balaclava Vine Sewer Renewal Project</title>
<updated>2026-04-23T16:04:08.0380043Z</updated>
<georss:line>49.25830393854895 -123.15784924366912 49.258261491465845 -123.15539405816608</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>April 2026: ongoing project currently working at W12th on Vine St

Sewer Renewal work on local streets. 
Schedule: Starting construction in Dec 2025 to Q3 2027
Traffic Impact: TBD

Location: Vine St, W 10th Av to W 16th Av

Schedule: Dec 1, 2025 - Sep 1, 2027</content>
<id>urn:uuid:1d43db67-4886-4715-b924-eda3b7917478</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1454f05e-3a84-4233-b212-d21427234c92"/>
<published>2025-11-04T08:00:00Z</published>
<title>Balaclava Vine Sewer Renewal Project</title>
<updated>2026-04-23T16:04:08.0380043Z</updated>
<georss:line>49.26299163464361 -123.15771517687449 49.26296022145232 -123.15771517687449 49.257399771575166 -123.15790772214478</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>April 2026: ongoing project currently working at W12th on Vine St

Sewer Renewal work on local streets. 
Schedule: Starting construction in Dec 2025 to Q3 2027
Traffic Impact: TBD

Location: Vine St, W 10th Av to W 16th Av

Schedule: Dec 1, 2025 - Sep 1, 2027</content>
<id>urn:uuid:da3c4b4b-fd96-472e-bedf-e068a206c965</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1454f05e-3a84-4233-b212-d21427234c92"/>
<published>2025-11-04T08:00:00Z</published>
<title>Balaclava Vine Sewer Renewal Project</title>
<updated>2026-04-23T16:04:08.0380043Z</updated>
<georss:line>49.25739977157514 -123.15949622062477 49.25728981285974 -123.15388833962727</georss:line>
</entry>
<entry>
<category term="Road Closure"/>
<content>Sewer Renewal work on local streets. 

Tentative Schedule: Starting construction in November 2025. Work will start along W 12th to complete spine and laterals (From east of Alma St to Musqueamview St). Approximately in Q2 2027, the crew will progress to W 13th spine and laterals (Dunbar St to Balaclava St). 

Traffic Impact: Will need the entire road width, however, we will accommodate parking access when it is safe to do so.
Location: Various local streets, W 12th and W 13th (between east of Alma St and Balaclava St)
Schedule: Nov 1, 2025 - Jul 31, 2027</content>
<id>urn:uuid:96cc6369-3925-404a-8d86-f60d1db9eccb</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/68b6a6a6-4040-4bd4-9538-e684cb0279ec"/>
<published>2025-09-18T07:00:00Z</published>
<title>Balaclava-Alma Sewer Package</title>
<updated>2026-03-03T23:28:20.602559Z</updated>
<georss:line>49.260621467576584 -123.1779747593158 49.26064149775178 -123.1792388627956</georss:line>
</entry>
<entry>
<category term="Road Closure"/>
<content>Sewer Renewal work on local streets. 

Tentative Schedule: Starting construction in November 2025. Work will start along W 12th to complete spine and laterals (From east of Alma St to Musqueamview St). Approximately in Q2 2027, the crew will progress to W 13th spine and laterals (Dunbar St to Balaclava St). 

Traffic Impact: Will need the entire road width, however, we will accommodate parking access when it is safe to do so.
Location: Various local streets, W 12th and W 13th (between east of Alma St and Balaclava St)
Schedule: Nov 1, 2025 - Jul 31, 2027</content>
<id>urn:uuid:6f7b4a70-fb52-4de0-b5a1-d1d9e26d2a3c</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/68b6a6a6-4040-4bd4-9538-e684cb0279ec"/>
<published>2025-09-18T07:00:00Z</published>
<title>Balaclava-Alma Sewer Package</title>
<updated>2026-03-03T23:28:20.602559Z</updated>
<georss:line>49.261093568670674 -123.17922248172604 49.26064149775178 -123.1792388627956</georss:line>
</entry>
<entry>
<category term="Road Closure"/>
<content>Sewer Renewal work on local streets. 

Tentative Schedule: Starting construction in November 2025. Work will start along W 12th to complete spine and laterals (From east of Alma St to Musqueamview St). Approximately in Q2 2027, the crew will progress to W 13th spine and laterals (Dunbar St to Balaclava St). 

Traffic Impact: Will need the entire road width, however, we will accommodate parking access when it is safe to do so.
Location: Various local streets, W 12th and W 13th (between east of Alma St and Balaclava St)
Schedule: Nov 1, 2025 - Jul 31, 2027</content>
<id>urn:uuid:a6082d57-e324-42ff-9272-4c78fbaed550</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/68b6a6a6-4040-4bd4-9538-e684cb0279ec"/>
<published>2025-09-18T07:00:00Z</published>
<title>Balaclava-Alma Sewer Package</title>
<updated>2026-03-03T23:28:20.602559Z</updated>
<georss:line>49.26154521671549 -123.17920614006941 49.261093568670674 -123.17922248172604</georss:line>
</entry>
<entry>
<category term="Road Closure"/>
<content>Sewer Renewal work on local streets. 

Tentative Schedule: Starting construction in November 2025. Work will start along W 12th to complete spine and laterals (From east of Alma St to Musqueamview St). Approximately in Q2 2027, the crew will progress to W 13th spine and laterals (Dunbar St to Balaclava St). 

Traffic Impact: Will need the entire road width, however, we will accommodate parking access when it is safe to do so.
Location: Various local streets, W 12th and W 13th (between east of Alma St and Balaclava St)
Schedule: Nov 1, 2025 - Jul 31, 2027</content>
<id>urn:uuid:9da835ae-5200-42b8-91f7-e0471cd396d6</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/68b6a6a6-4040-4bd4-9538-e684cb0279ec"/>
<published>2025-09-18T07:00:00Z</published>
<title>Balaclava-Alma Sewer Package</title>
<updated>2026-03-03T23:28:20.602559Z</updated>
<georss:line>49.26059158809352 -123.17604134034049 49.260621467576584 -123.1779747593158</georss:line>
</entry>
<entry>
<category term="Road Closure"/>
<content>Sewer Renewal work on local streets. 

Tentative Schedule: Starting construction in November 2025. Work will start along W 12th to complete spine and laterals (From east of Alma St to Musqueamview St). Approximately in Q2 2027, the crew will progress to W 13th spine and laterals (Dunbar St to Balaclava St). 

Traffic Impact: Will need the entire road width, however, we will accommodate parking access when it is safe to do so.
Location: Various local streets, W 12th and W 13th (between east of Alma St and Balaclava St)
Schedule: Nov 1, 2025 - Jul 31, 2027</content>
<id>urn:uuid:372c908e-9a80-4dc7-8b32-f9f23f2e920b</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/68b6a6a6-4040-4bd4-9538-e684cb0279ec"/>
<published>2025-09-18T07:00:00Z</published>
<title>Balaclava-Alma Sewer Package</title>
<updated>2026-03-03T23:28:20.602559Z</updated>
<georss:line>49.26107354772839 -123.17795810560438 49.260621467576584 -123.1779747593158</georss:line>
</entry>
<entry>
<category term="Road Closure"/>
<content>Sewer Renewal work on local streets. 

Tentative Schedule: Starting construction in November 2025. Work will start along W 12th to complete spine and laterals (From east of Alma St to Musqueamview St). Approximately in Q2 2027, the crew will progress to W 13th spine and laterals (Dunbar St to Balaclava St). 

Traffic Impact: Will need the entire road width, however, we will accommodate parking access when it is safe to do so.
Location: Various local streets, W 12th and W 13th (between east of Alma St and Balaclava St)
Schedule: Nov 1, 2025 - Jul 31, 2027</content>
<id>urn:uuid:48106cd3-835d-4d85-88ee-18f70ba8692a</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/68b6a6a6-4040-4bd4-9538-e684cb0279ec"/>
<published>2025-09-18T07:00:00Z</published>
<title>Balaclava-Alma Sewer Package</title>
<updated>2026-03-03T23:28:20.602559Z</updated>
<georss:line>49.26152509691633 -123.17794158713141 49.26107354772839 -123.17795810560438</georss:line>
</entry>
<entry>
<category term="Road Closure"/>
<content>Sewer Renewal work on local streets. 

Tentative Schedule: Starting construction in November 2025. Work will start along W 12th to complete spine and laterals (From east of Alma St to Musqueamview St). Approximately in Q2 2027, the crew will progress to W 13th spine and laterals (Dunbar St to Balaclava St). 

Traffic Impact: Will need the entire road width, however, we will accommodate parking access when it is safe to do so.
Location: Various local streets, W 12th and W 13th (between east of Alma St and Balaclava St)
Schedule: Nov 1, 2025 - Jul 31, 2027</content>
<id>urn:uuid:f546b4e0-e589-4915-baaf-d42577dedb9a</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/68b6a6a6-4040-4bd4-9538-e684cb0279ec"/>
<published>2025-09-18T07:00:00Z</published>
<title>Balaclava-Alma Sewer Package</title>
<updated>2026-03-03T23:28:20.602559Z</updated>
<georss:line>49.260621467576584 -123.1779747593158 49.26016952360615 -123.1779905748598</georss:line>
</entry>
<entry>
<category term="Road Closure"/>
<content>Sewer Renewal work on local streets. 

Tentative Schedule: Starting construction in November 2025. Work will start along W 12th to complete spine and laterals (From east of Alma St to Musqueamview St). Approximately in Q2 2027, the crew will progress to W 13th spine and laterals (Dunbar St to Balaclava St). 

Traffic Impact: Will need the entire road width, however, we will accommodate parking access when it is safe to do so.
Location: Various local streets, W 12th and W 13th (between east of Alma St and Balaclava St)
Schedule: Nov 1, 2025 - Jul 31, 2027</content>
<id>urn:uuid:8c5c6ed5-6667-4a51-8edf-177751c43741</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/68b6a6a6-4040-4bd4-9538-e684cb0279ec"/>
<published>2025-09-18T07:00:00Z</published>
<title>Balaclava-Alma Sewer Package</title>
<updated>2026-03-03T23:28:20.602559Z</updated>
<georss:line>49.26150803351891 -123.17626087862311 49.261493363466 -123.17574385863014</georss:line>
</entry>
<entry>
<category term="Road Closure"/>
<content>Sewer Renewal work on local streets. 

Tentative Schedule: Starting construction in November 2025. Work will start along W 12th to complete spine and laterals (From east of Alma St to Musqueamview St). Approximately in Q2 2027, the crew will progress to W 13th spine and laterals (Dunbar St to Balaclava St). 

Traffic Impact: Will need the entire road width, however, we will accommodate parking access when it is safe to do so.
Location: Various local streets, W 12th and W 13th (between east of Alma St and Balaclava St)
Schedule: Nov 1, 2025 - Jul 31, 2027</content>
<id>urn:uuid:f3f93bc0-bb24-4bb5-8dbb-4c9edb64bc9d</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/68b6a6a6-4040-4bd4-9538-e684cb0279ec"/>
<published>2025-09-18T07:00:00Z</published>
<title>Balaclava-Alma Sewer Package</title>
<updated>2026-03-03T23:28:20.602559Z</updated>
<georss:line>49.261705889777176 -123.17601360819172 49.26130486008219 -123.17603595377528</georss:line>
</entry>
<entry>
<category term="Road Closure"/>
<content>Sewer Renewal work on local streets. 

Tentative Schedule: Starting construction in November 2025. Work will start along W 12th to complete spine and laterals (From east of Alma St to Musqueamview St). Approximately in Q2 2027, the crew will progress to W 13th spine and laterals (Dunbar St to Balaclava St). 

Traffic Impact: Will need the entire road width, however, we will accommodate parking access when it is safe to do so.
Location: Various local streets, W 12th and W 13th (between east of Alma St and Balaclava St)
Schedule: Nov 1, 2025 - Jul 31, 2027</content>
<id>urn:uuid:8d514f23-bcec-4cc8-aab5-f45771e63b07</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/68b6a6a6-4040-4bd4-9538-e684cb0279ec"/>
<published>2025-09-18T07:00:00Z</published>
<title>Balaclava-Alma Sewer Package</title>
<updated>2026-03-03T23:28:20.602559Z</updated>
<georss:line>49.2601095458792 -123.17412244066087 49.26013955347133 -123.17605779167296</georss:line>
</entry>
<entry>
<category term="Road Closure"/>
<content>Sewer Renewal work on local streets. 

Tentative Schedule: Starting construction in November 2025. Work will start along W 12th to complete spine and laterals (From east of Alma St to Musqueamview St). Approximately in Q2 2027, the crew will progress to W 13th spine and laterals (Dunbar St to Balaclava St). 

Traffic Impact: Will need the entire road width, however, we will accommodate parking access when it is safe to do so.
Location: Various local streets, W 12th and W 13th (between east of Alma St and Balaclava St)
Schedule: Nov 1, 2025 - Jul 31, 2027</content>
<id>urn:uuid:4d7ceba6-de8b-4c10-a466-b217d1b1a9ce</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/68b6a6a6-4040-4bd4-9538-e684cb0279ec"/>
<published>2025-09-18T07:00:00Z</published>
<title>Balaclava-Alma Sewer Package</title>
<updated>2026-03-03T23:28:20.602559Z</updated>
<georss:line>49.2605684988371 -123.17455225666042 49.26059158809352 -123.17604134034049</georss:line>
</entry>
<entry>
<category term="Road Closure"/>
<content>Sewer Renewal work on local streets. 

Tentative Schedule: Starting construction in November 2025. Work will start along W 12th to complete spine and laterals (From east of Alma St to Musqueamview St). Approximately in Q2 2027, the crew will progress to W 13th spine and laterals (Dunbar St to Balaclava St). 

Traffic Impact: Will need the entire road width, however, we will accommodate parking access when it is safe to do so.
Location: Various local streets, W 12th and W 13th (between east of Alma St and Balaclava St)
Schedule: Nov 1, 2025 - Jul 31, 2027</content>
<id>urn:uuid:bc19cafb-c399-4191-b271-944ce3e5f626</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/68b6a6a6-4040-4bd4-9538-e684cb0279ec"/>
<published>2025-09-18T07:00:00Z</published>
<title>Balaclava-Alma Sewer Package</title>
<updated>2026-03-03T23:28:20.602559Z</updated>
<georss:line>49.26056158006156 -123.17410609535392 49.2605684988371 -123.17455225666042</georss:line>
</entry>
<entry>
<category term="Road Closure"/>
<content>Sewer Renewal work on local streets. 

Tentative Schedule: Starting construction in November 2025. Work will start along W 12th to complete spine and laterals (From east of Alma St to Musqueamview St). Approximately in Q2 2027, the crew will progress to W 13th spine and laterals (Dunbar St to Balaclava St). 

Traffic Impact: Will need the entire road width, however, we will accommodate parking access when it is safe to do so.
Location: Various local streets, W 12th and W 13th (between east of Alma St and Balaclava St)
Schedule: Nov 1, 2025 - Jul 31, 2027</content>
<id>urn:uuid:0cd3f75c-8971-41d3-8984-2c26b4d90ade</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/68b6a6a6-4040-4bd4-9538-e684cb0279ec"/>
<published>2025-09-18T07:00:00Z</published>
<title>Balaclava-Alma Sewer Package</title>
<updated>2026-03-03T23:28:20.602559Z</updated>
<georss:line>49.26013955347133 -123.17605779167296 49.26059158809352 -123.17604134034049</georss:line>
</entry>
<entry>
<category term="Road Closure"/>
<content>Sewer Renewal work on local streets. 

Tentative Schedule: Starting construction in November 2025. Work will start along W 12th to complete spine and laterals (From east of Alma St to Musqueamview St). Approximately in Q2 2027, the crew will progress to W 13th spine and laterals (Dunbar St to Balaclava St). 

Traffic Impact: Will need the entire road width, however, we will accommodate parking access when it is safe to do so.
Location: Various local streets, W 12th and W 13th (between east of Alma St and Balaclava St)
Schedule: Nov 1, 2025 - Jul 31, 2027</content>
<id>urn:uuid:d0f7077a-ef66-41f4-99bb-52c6f774dfb2</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/68b6a6a6-4040-4bd4-9538-e684cb0279ec"/>
<published>2025-09-18T07:00:00Z</published>
<title>Balaclava-Alma Sewer Package</title>
<updated>2026-03-03T23:28:20.602559Z</updated>
<georss:line>49.26065060089243 -123.17997953579035 49.260664263670975 -123.1807120206562</georss:line>
</entry>
<entry>
<category term="Road Closure"/>
<content>Sewer Renewal work on local streets. 

Tentative Schedule: Starting construction in November 2025. Work will start along W 12th to complete spine and laterals (From east of Alma St to Musqueamview St). Approximately in Q2 2027, the crew will progress to W 13th spine and laterals (Dunbar St to Balaclava St). 

Traffic Impact: Will need the entire road width, however, we will accommodate parking access when it is safe to do so.
Location: Various local streets, W 12th and W 13th (between east of Alma St and Balaclava St)
Schedule: Nov 1, 2025 - Jul 31, 2027</content>
<id>urn:uuid:f2720da7-6ed7-46e2-bba4-cc0e29d45c76</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/68b6a6a6-4040-4bd4-9538-e684cb0279ec"/>
<published>2025-09-18T07:00:00Z</published>
<title>Balaclava-Alma Sewer Package</title>
<updated>2026-03-03T23:28:20.602559Z</updated>
<georss:line>49.26111650519499 -123.18069596976927 49.260664263670975 -123.1807120206562</georss:line>
</entry>
<entry>
<category term="Road Closure"/>
<content>Sewer Renewal work on local streets. 

Tentative Schedule: Starting construction in November 2025. Work will start along W 12th to complete spine and laterals (From east of Alma St to Musqueamview St). Approximately in Q2 2027, the crew will progress to W 13th spine and laterals (Dunbar St to Balaclava St). 

Traffic Impact: Will need the entire road width, however, we will accommodate parking access when it is safe to do so.
Location: Various local streets, W 12th and W 13th (between east of Alma St and Balaclava St)
Schedule: Nov 1, 2025 - Jul 31, 2027</content>
<id>urn:uuid:9160958f-1017-4277-8d83-ddff6918d054</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/68b6a6a6-4040-4bd4-9538-e684cb0279ec"/>
<published>2025-09-18T07:00:00Z</published>
<title>Balaclava-Alma Sewer Package</title>
<updated>2026-03-03T23:28:20.602559Z</updated>
<georss:line>49.26156835948126 -123.18068017832381 49.26111650519499 -123.18069596976927</georss:line>
</entry>
<entry>
<category term="Road Closure"/>
<content>Sewer Renewal work on local streets. 

Tentative Schedule: Starting construction in November 2025. Work will start along W 12th to complete spine and laterals (From east of Alma St to Musqueamview St). Approximately in Q2 2027, the crew will progress to W 13th spine and laterals (Dunbar St to Balaclava St). 

Traffic Impact: Will need the entire road width, however, we will accommodate parking access when it is safe to do so.
Location: Various local streets, W 12th and W 13th (between east of Alma St and Balaclava St)
Schedule: Nov 1, 2025 - Jul 31, 2027</content>
<id>urn:uuid:505b8eae-a96f-46b3-9ebc-dd4334500486</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/68b6a6a6-4040-4bd4-9538-e684cb0279ec"/>
<published>2025-09-18T07:00:00Z</published>
<title>Balaclava-Alma Sewer Package</title>
<updated>2026-03-03T23:28:20.602559Z</updated>
<georss:line>49.26064149775178 -123.1792388627956 49.26065060089243 -123.17997953579035</georss:line>
</entry>
<entry>
<category term="Road Closure"/>
<content>Sewer Renewal work on local streets. 

Tentative Schedule: Starting construction in November 2025. Work will start along W 12th to complete spine and laterals (From east of Alma St to Musqueamview St). Approximately in Q2 2027, the crew will progress to W 13th spine and laterals (Dunbar St to Balaclava St). 

Traffic Impact: Will need the entire road width, however, we will accommodate parking access when it is safe to do so.
Location: Various local streets, W 12th and W 13th (between east of Alma St and Balaclava St)
Schedule: Nov 1, 2025 - Jul 31, 2027</content>
<id>urn:uuid:408ca653-29fd-46ba-b0a4-728a83e2ba97</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/68b6a6a6-4040-4bd4-9538-e684cb0279ec"/>
<published>2025-09-18T07:00:00Z</published>
<title>Balaclava-Alma Sewer Package</title>
<updated>2026-03-03T23:28:20.602559Z</updated>
<georss:line>49.260664263670975 -123.1807120206562 49.2606845170485 -123.18198101998435</georss:line>
</entry>
<entry>
<category term="Road Closure"/>
<content>Sewer Renewal work on local streets. 

Tentative Schedule: Starting construction in November 2025. Work will start along W 12th to complete spine and laterals (From east of Alma St to Musqueamview St). Approximately in Q2 2027, the crew will progress to W 13th spine and laterals (Dunbar St to Balaclava St). 

Traffic Impact: Will need the entire road width, however, we will accommodate parking access when it is safe to do so.
Location: Various local streets, W 12th and W 13th (between east of Alma St and Balaclava St)
Schedule: Nov 1, 2025 - Jul 31, 2027</content>
<id>urn:uuid:dccb9ea0-cd18-46ba-baac-93e237e0ca27</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/68b6a6a6-4040-4bd4-9538-e684cb0279ec"/>
<published>2025-09-18T07:00:00Z</published>
<title>Balaclava-Alma Sewer Package</title>
<updated>2026-03-03T23:28:20.602559Z</updated>
<georss:line>49.260664263670975 -123.1807120206562 49.26021237242642 -123.18072838864501</georss:line>
</entry>
<entry>
<category term="Road Closure"/>
<content>Sewer Renewal work on local streets. 

Tentative Schedule: Starting construction in November 2025. Work will start along W 12th to complete spine and laterals (From east of Alma St to Musqueamview St). Approximately in Q2 2027, the crew will progress to W 13th spine and laterals (Dunbar St to Balaclava St). 

Traffic Impact: Will need the entire road width, however, we will accommodate parking access when it is safe to do so.
Location: Various local streets, W 12th and W 13th (between east of Alma St and Balaclava St)
Schedule: Nov 1, 2025 - Jul 31, 2027</content>
<id>urn:uuid:343aa8ab-a016-4bcc-9e93-4e3850d30155</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/68b6a6a6-4040-4bd4-9538-e684cb0279ec"/>
<published>2025-09-18T07:00:00Z</published>
<title>Balaclava-Alma Sewer Package</title>
<updated>2026-03-03T23:28:20.602559Z</updated>
<georss:line>49.26064149775178 -123.1792388627956 49.26055096693983 -123.1792465750446 49.260189681386095 -123.17925928514082</georss:line>
</entry>
<entry>
<category term="Road Closure"/>
<content>Sewer Renewal work on local streets. 

Tentative Schedule: Starting construction in November 2025. Work will start along W 12th to complete spine and laterals (From east of Alma St to Musqueamview St). Approximately in Q2 2027, the crew will progress to W 13th spine and laterals (Dunbar St to Balaclava St). 

Traffic Impact: Will need the entire road width, however, we will accommodate parking access when it is safe to do so.
Location: Various local streets, W 12th and W 13th (between east of Alma St and Balaclava St)
Schedule: Nov 1, 2025 - Jul 31, 2027</content>
<id>urn:uuid:7fe94340-e3b7-4983-97f2-50f3c4fc171c</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/68b6a6a6-4040-4bd4-9538-e684cb0279ec"/>
<published>2025-09-18T07:00:00Z</published>
<title>Balaclava-Alma Sewer Package</title>
<updated>2026-03-03T23:28:20.602559Z</updated>
<georss:line>49.26161829407502 -123.18388311522561 49.26165086615623 -123.1859399699366</georss:line>
</entry>
<entry>
<category term="Road Closure"/>
<content>Sewer Renewal work on local streets. 

Tentative Schedule: Starting construction in November 2025. Work will start along W 12th to complete spine and laterals (From east of Alma St to Musqueamview St). Approximately in Q2 2027, the crew will progress to W 13th spine and laterals (Dunbar St to Balaclava St). 

Traffic Impact: Will need the entire road width, however, we will accommodate parking access when it is safe to do so.
Location: Various local streets, W 12th and W 13th (between east of Alma St and Balaclava St)
Schedule: Nov 1, 2025 - Jul 31, 2027</content>
<id>urn:uuid:03ef3be7-0e44-4d65-ac34-052e217599d1</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/68b6a6a6-4040-4bd4-9538-e684cb0279ec"/>
<published>2025-09-18T07:00:00Z</published>
<title>Balaclava-Alma Sewer Package</title>
<updated>2026-03-03T23:28:20.602559Z</updated>
<georss:line>49.26070848373351 -123.18354266760774 49.26071420560129 -123.18391543511454</georss:line>
</entry>
<entry>
<category term="Road Closure"/>
<content>Sewer Renewal work on local streets. 

Tentative Schedule: Starting construction in November 2025. Work will start along W 12th to complete spine and laterals (From east of Alma St to Musqueamview St). Approximately in Q2 2027, the crew will progress to W 13th spine and laterals (Dunbar St to Balaclava St). 

Traffic Impact: Will need the entire road width, however, we will accommodate parking access when it is safe to do so.
Location: Various local streets, W 12th and W 13th (between east of Alma St and Balaclava St)
Schedule: Nov 1, 2025 - Jul 31, 2027</content>
<id>urn:uuid:f446e8e3-9221-463a-b7df-58891291a54b</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/68b6a6a6-4040-4bd4-9538-e684cb0279ec"/>
<published>2025-09-18T07:00:00Z</published>
<title>Balaclava-Alma Sewer Package</title>
<updated>2026-03-03T23:28:20.602559Z</updated>
<georss:line>49.26161829407502 -123.18388311522561 49.261166294307685 -123.18389960533196</georss:line>
</entry>
<entry>
<category term="Road Closure"/>
<content>Sewer Renewal work on local streets. 

Tentative Schedule: Starting construction in November 2025. Work will start along W 12th to complete spine and laterals (From east of Alma St to Musqueamview St). Approximately in Q2 2027, the crew will progress to W 13th spine and laterals (Dunbar St to Balaclava St). 

Traffic Impact: Will need the entire road width, however, we will accommodate parking access when it is safe to do so.
Location: Various local streets, W 12th and W 13th (between east of Alma St and Balaclava St)
Schedule: Nov 1, 2025 - Jul 31, 2027</content>
<id>urn:uuid:96e4f440-60a5-48a9-98c5-3e8401bad38f</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/68b6a6a6-4040-4bd4-9538-e684cb0279ec"/>
<published>2025-09-18T07:00:00Z</published>
<title>Balaclava-Alma Sewer Package</title>
<updated>2026-03-03T23:28:20.602559Z</updated>
<georss:line>49.26158806507942 -123.18194881397396 49.26161829407502 -123.18388311522561</georss:line>
</entry>
<entry>
<category term="Road Closure"/>
<content>Sewer Renewal work on local streets. 

Tentative Schedule: Starting construction in November 2025. Work will start along W 12th to complete spine and laterals (From east of Alma St to Musqueamview St). Approximately in Q2 2027, the crew will progress to W 13th spine and laterals (Dunbar St to Balaclava St). 

Traffic Impact: Will need the entire road width, however, we will accommodate parking access when it is safe to do so.
Location: Various local streets, W 12th and W 13th (between east of Alma St and Balaclava St)
Schedule: Nov 1, 2025 - Jul 31, 2027</content>
<id>urn:uuid:07ff3be3-08f6-435b-b27e-35ff0dfc889d</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/68b6a6a6-4040-4bd4-9538-e684cb0279ec"/>
<published>2025-09-18T07:00:00Z</published>
<title>Balaclava-Alma Sewer Package</title>
<updated>2026-03-03T23:28:20.602559Z</updated>
<georss:line>49.2606845170485 -123.18198101998435 49.26070848373351 -123.18354266760774</georss:line>
</entry>
<entry>
<category term="Road Closure"/>
<content>Sewer Renewal work on local streets. 

Tentative Schedule: Starting construction in November 2025. Work will start along W 12th to complete spine and laterals (From east of Alma St to Musqueamview St). Approximately in Q2 2027, the crew will progress to W 13th spine and laterals (Dunbar St to Balaclava St). 

Traffic Impact: Will need the entire road width, however, we will accommodate parking access when it is safe to do so.
Location: Various local streets, W 12th and W 13th (between east of Alma St and Balaclava St)
Schedule: Nov 1, 2025 - Jul 31, 2027</content>
<id>urn:uuid:0fa513ac-84f4-4753-9ffa-a9a66a5f42f6</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/68b6a6a6-4040-4bd4-9538-e684cb0279ec"/>
<published>2025-09-18T07:00:00Z</published>
<title>Balaclava-Alma Sewer Package</title>
<updated>2026-03-03T23:28:20.602559Z</updated>
<georss:line>49.26158806507942 -123.18194881397396 49.261136065824815 -123.1819651568113</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Permanent upgrades to the temporary bike lanes on Beatty Street from Smithe Street to W Georgia Street. Includes upgraded traffic infrastructure at the intersection of Beatty &amp; Robson, as well as raising the intersection at Beatty &amp; Robson.

https://vancouver.ca/streets-transportation/beatty-street-upgrades.aspx 

PM - Josh Randall
Location: Beatty St Bike Lane, Smithe to Georgia, Robson &amp; Beatty intersection
Schedule: Jul 7, 2025 - May 8, 2026</content>
<id>urn:uuid:d2c90e95-a5aa-4c07-bd0b-77e78bbc6031</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/3c67438e-557e-4347-bfda-6bd240c6396f"/>
<published>2025-07-03T07:00:00Z</published>
<title>Beatty Street Transportation Upgrades (BTU)</title>
<updated>2026-04-10T16:11:10.3407695Z</updated>
<georss:line>49.2765346369973 -123.11559588299933 49.27872384151891 -123.11228634874148</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>*Route is TBD - it will be similar to 2024 route - I may need to remove the bridge portion - will update soon

Approx. closure times: 18:00-22:30

Start/end point: David Lam Park - lining up along 1400 Homer st and 1300 Pacific blvd 
Exit via 200 Beach Crescent and onto the Seawall heading westbound to Hornby, travelling northbound along Hornby on bike lanes to Drake, continuing in the bike lane east to Granville and over the Granville st bridge to W 5th Ave turning north along Fir to W 1st Ave and back along the seawall back to David Lam Park 

Location: David Lam Park, along Seawall westbound to Hornby, north along Hornby bike lane to Drake turning east to Granville and south over the Granville st bridge's new bike lane to W 5th ave, turning north along Fir to W 1st and back onto the seawall back to David Lam Park
Schedule: Sep 18, 2026 6:00 PM - 10:30 PM</content>
<id>urn:uuid:482d89ee-9f40-4c69-91ec-b277f27d54a9</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/2e010cb4-5cf3-4e7f-a219-ee0a762377cc"/>
<published>2026-05-21T07:00:00Z</published>
<title>Bike the Night</title>
<updated>2026-05-21T16:02:20.9637879Z</updated>
<georss:line>49.273232755670875 -123.12357693248518 49.2725467961252 -123.12250995059212</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>*Route is TBD - it will be similar to 2024 route - I may need to remove the bridge portion - will update soon

Approx. closure times: 18:00-22:30

Start/end point: David Lam Park - lining up along 1400 Homer st and 1300 Pacific blvd 
Exit via 200 Beach Crescent and onto the Seawall heading westbound to Hornby, travelling northbound along Hornby on bike lanes to Drake, continuing in the bike lane east to Granville and over the Granville st bridge to W 5th Ave turning north along Fir to W 1st Ave and back along the seawall back to David Lam Park 

Location: David Lam Park, along Seawall westbound to Hornby, north along Hornby bike lane to Drake turning east to Granville and south over the Granville st bridge's new bike lane to W 5th ave, turning north along Fir to W 1st and back onto the seawall back to David Lam Park
Schedule: Sep 18, 2026 6:00 PM - 10:30 PM</content>
<id>urn:uuid:5d2183b1-1296-4887-99dd-67ba5692c629</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/2e010cb4-5cf3-4e7f-a219-ee0a762377cc"/>
<published>2026-05-21T07:00:00Z</published>
<title>Bike the Night</title>
<updated>2026-05-21T16:02:20.9637879Z</updated>
<georss:line>49.273232755670875 -123.12366709996907 49.272860378760726 -123.12518491781415 49.27287997760922 -123.12574095209922 49.272252810354786 -123.1258762033251 49.271743231523004 -123.1264322361426 49.27152763879292 -123.12676284951652 49.27106705068911 -123.12605653682536 49.27185102705619 -123.124824249346 49.27184122766772 -123.12350179291519 49.27108665025011 -123.1223746993662 49.271243446697184 -123.12211922482844 49.27091025415987 -123.12153313618298 49.27096905300644 -123.12100715919344 49.27109645002773 -123.12058637760181 49.271223847198485 -123.12018062392417 49.271929424246935 -123.11972978650458 49.27278198304947 -123.11968470276261 49.273036767877954 -123.11935408865497 49.273271952705386 -123.11884313884565 49.27337974537656 -123.11798654701465 49.27322295595883 -123.11720509695489 49.27271338690929 -123.11634850585766 49.27260559278196 -123.11601789174995 49.272546795886 -123.11556705433038 49.27301716909167 -123.1135382859422 49.27358553073111 -123.11209560619947 49.27379131546644 -123.11203549454359 49.2740950907714 -123.11140432215616 49.27418328332092 -123.11095348473656 49.274134287718795 -123.11036739609108 49.274438061150846 -123.11024717277921 49.27444786002346 -123.10975125161765 49.2750162054177 -123.10966108413372 49.2750162054177 -123.10859410077309 49.27572172834351 -123.1085039332892 49.27566293480291 -123.10650522072905 49.27558454402413 -123.103725058109 49.27407549264487 -123.10345455712482 49.27347773874885 -123.10256791019962 49.272007821313025 -123.10264304830203 49.272007821313025 -123.10468684607176 49.27203722009099 -123.10692600525576 49.27222341170528 -123.10951080646167 49.271762830815305 -123.11018706259107 49.271547237931685 -123.11131415614005 49.271547237931685 -123.11209560766736 49.27134144407401 -123.1137186223779 49.27096905300641 -123.11459024138914 49.270939653591824 -123.11496593923873 49.270684857932025 -123.11559711162616 49.269744062557265 -123.11741548921853 49.2688914512521 -123.11837727571368 49.268254433188844 -123.1187078898213 49.26776441369719 -123.11884314104718 49.267617406900655 -123.11932403429475 49.267695810579994 -123.12090196526333 49.26805842597622 -123.12127766164542 49.2684504396228 -123.12178861218854 49.267833016479756 -123.12389252014667 49.267607606431966 -123.12435838548025 49.26763700783218 -123.12533519988932 49.26797022271572 -123.12574095356696 49.26806822659461 -123.12770961029919 49.268058426215475 -123.129543014338 49.26793102087041 -123.1298285461713 49.26791142029498 -123.13056491395665 49.267509601877435 -123.13082038849443 49.26712738132139 -123.13149664462381 49.26716658332671 -123.13184228664551 49.26768601036616 -123.13242837529097 49.26799962389984 -123.13317977099041 49.268254433188844 -123.1335254130121 49.26869544657018 -123.13504323232473 49.26927365838131 -123.13559926514223 49.269783262961994 -123.13636568875557 49.26972446270213 -123.13689166574508 49.269822463215974 -123.13701188832317 49.26999886343498 -123.13725233568076 49.27033206212781 -123.13761300561636 49.27059665948664 -123.13758294978838 49.27126304654695 -123.13910076910102 49.27107685082939 -123.13995736019828 49.271321844973045 -123.14018277890806</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>*Route is TBD - it will be similar to 2024 route - I may need to remove the bridge portion - will update soon

Approx. closure times: 18:00-22:30

Start/end point: David Lam Park - lining up along 1400 Homer st and 1300 Pacific blvd 
Exit via 200 Beach Crescent and onto the Seawall heading westbound to Hornby, travelling northbound along Hornby on bike lanes to Drake, continuing in the bike lane east to Granville and over the Granville st bridge to W 5th Ave turning north along Fir to W 1st Ave and back along the seawall back to David Lam Park 

Location: David Lam Park, along Seawall westbound to Hornby, north along Hornby bike lane to Drake turning east to Granville and south over the Granville st bridge's new bike lane to W 5th ave, turning north along Fir to W 1st and back onto the seawall back to David Lam Park
Schedule: Sep 18, 2026 6:00 PM - 10:30 PM</content>
<id>urn:uuid:ef6e4668-8173-4a9e-8e70-7d05bfadee88</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/2e010cb4-5cf3-4e7f-a219-ee0a762377cc"/>
<published>2026-05-21T07:00:00Z</published>
<title>Bike the Night</title>
<updated>2026-05-21T16:02:20.9637879Z</updated>
<georss:line>49.271287071543355 -123.14026223487785 49.27089783828711 -123.1417273254433</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>*Route is TBD - it will be similar to 2024 route - I may need to remove the bridge portion - will update soon

Approx. closure times: 18:00-22:30

Start/end point: David Lam Park - lining up along 1400 Homer st and 1300 Pacific blvd 
Exit via 200 Beach Crescent and onto the Seawall heading westbound to Hornby, travelling northbound along Hornby on bike lanes to Drake, continuing in the bike lane east to Granville and over the Granville st bridge to W 5th Ave turning north along Fir to W 1st Ave and back along the seawall back to David Lam Park 

Location: David Lam Park, along Seawall westbound to Hornby, north along Hornby bike lane to Drake turning east to Granville and south over the Granville st bridge's new bike lane to W 5th ave, turning north along Fir to W 1st and back onto the seawall back to David Lam Park
Schedule: Sep 18, 2026 6:00 PM - 10:30 PM</content>
<id>urn:uuid:f503b9db-badd-4499-a7b6-7759d91f3c9b</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/2e010cb4-5cf3-4e7f-a219-ee0a762377cc"/>
<published>2026-05-21T07:00:00Z</published>
<title>Bike the Night</title>
<updated>2026-05-21T16:02:20.9637879Z</updated>
<georss:line>49.27069020866017 -123.12681885289606 49.271107880502484 -123.12622796698265</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>*Route is TBD - it will be similar to 2024 route - I may need to remove the bridge portion - will update soon

Approx. closure times: 18:00-22:30

Start/end point: David Lam Park - lining up along 1400 Homer st and 1300 Pacific blvd 
Exit via 200 Beach Crescent and onto the Seawall heading westbound to Hornby, travelling northbound along Hornby on bike lanes to Drake, continuing in the bike lane east to Granville and over the Granville st bridge to W 5th Ave turning north along Fir to W 1st Ave and back along the seawall back to David Lam Park 

Location: David Lam Park, along Seawall westbound to Hornby, north along Hornby bike lane to Drake turning east to Granville and south over the Granville st bridge's new bike lane to W 5th ave, turning north along Fir to W 1st and back onto the seawall back to David Lam Park
Schedule: Sep 18, 2026 6:00 PM - 10:30 PM</content>
<id>urn:uuid:57e166cc-2070-40aa-942b-b222a2951f22</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/2e010cb4-5cf3-4e7f-a219-ee0a762377cc"/>
<published>2026-05-21T07:00:00Z</published>
<title>Bike the Night</title>
<updated>2026-05-21T16:02:20.9637879Z</updated>
<georss:line>49.27069020866017 -123.12706505535999 49.271878957690234 -123.12878847260745 49.271782573700904 -123.12942859901368 49.274682703692264 -123.13385976487213 49.277352439328865 -123.12976768720414 49.276091873898736 -123.12782170760472 49.26832968259308 -123.13978741194936</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>*Route is TBD - it will be similar to 2024 route - I may need to remove the bridge portion - will update soon

Approx. closure times: 18:00-22:30

Start/end point: David Lam Park - lining up along 1400 Homer st and 1300 Pacific blvd 
Exit via 200 Beach Crescent and onto the Seawall heading westbound to Hornby, travelling northbound along Hornby on bike lanes to Drake, continuing in the bike lane east to Granville and over the Granville st bridge to W 5th Ave turning north along Fir to W 1st Ave and back along the seawall back to David Lam Park 

Location: David Lam Park, along Seawall westbound to Hornby, north along Hornby bike lane to Drake turning east to Granville and south over the Granville st bridge's new bike lane to W 5th ave, turning north along Fir to W 1st and back onto the seawall back to David Lam Park
Schedule: Sep 18, 2026 6:00 PM - 10:30 PM</content>
<id>urn:uuid:9a28ceae-d908-4e67-a5e2-44fa3ce41da8</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/2e010cb4-5cf3-4e7f-a219-ee0a762377cc"/>
<published>2026-05-21T07:00:00Z</published>
<title>Bike the Night</title>
<updated>2026-05-21T16:02:20.9637879Z</updated>
<georss:line>49.26830266587339 -123.13982881577063 49.267109412663615 -123.14027735716749 49.26710040686925 -123.14089841448644 49.27008573764053 -123.14079490493319</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>*Route is TBD - it will be similar to 2024 route - I may need to remove the bridge portion - will update soon

Approx. closure times: 18:00-22:30

Start/end point: David Lam Park - lining up along 1400 Homer st and 1300 Pacific blvd 
Exit via 200 Beach Crescent and onto the Seawall heading westbound to Hornby, travelling northbound along Hornby on bike lanes to Drake, continuing in the bike lane east to Granville and over the Granville st bridge to W 5th Ave turning north along Fir to W 1st Ave and back along the seawall back to David Lam Park 

Location: David Lam Park, along Seawall westbound to Hornby, north along Hornby bike lane to Drake turning east to Granville and south over the Granville st bridge's new bike lane to W 5th ave, turning north along Fir to W 1st and back onto the seawall back to David Lam Park
Schedule: Sep 18, 2026 6:00 PM - 10:30 PM</content>
<id>urn:uuid:07de32e6-4edc-44dd-98ad-b241b0fd85a0</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/2e010cb4-5cf3-4e7f-a219-ee0a762377cc"/>
<published>2026-05-21T07:00:00Z</published>
<title>Bike the Night</title>
<updated>2026-05-21T16:02:20.9637879Z</updated>
<georss:line>49.27009474288994 -123.14080870620694 49.27027484753293 -123.14080180557005 49.27093672644767 -123.14151257116835 49.27136896910895 -123.14022905270923</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Installation of rain garden within Greenway on E 37th Abe between Ross and the lane. Project includes light excavation and backfilling. Use of hydrovac and replanting is planned. The work is expected to resolve ponding issues on the roadway. *EXACT DATES TBD 
Location: E 37th Ave within bike greenway. 
Schedule: Sep 15, 2025 - Oct 31, 2025</content>
<id>urn:uuid:f452a31c-5a81-4b8f-88f0-5620dcd315de</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/dd0efd0a-8254-45de-8577-f9018f22e24d"/>
<published>2025-08-13T07:00:00Z</published>
<title>Bioretention Rehabilitation </title>
<updated>2025-08-13T17:16:58.0611528Z</updated>
<georss:line>49.236433254535285 -123.0820295023116 49.23643501417081 -123.08183007631852 49.2364068599949 -123.08184355104778 49.236405100358354 -123.08203219725745 49.23643501417081 -123.0820295023116</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:b59dd867-5c48-4222-b5ca-2d876639c67f</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.2675859500483 -123.08907382494587 49.2675704338437 -123.08862864179663 49.2672146884577 -123.08652034692945</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:2c2ba4b5-584d-4653-ab1a-85c0f0adae14</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26865929461647 -123.09452909397015 49.26763560722236 -123.09493234898628</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:784e35ee-fbeb-4430-976f-4b0662d5e3c6</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.267900100313966 -123.09355595197076 49.2679340780615 -123.09321850126157 49.26790275357919 -123.093032736289 49.26799335986769 -123.0925315683679 49.26798516725634 -123.09146707537391 49.26787579577646 -123.09080416033514</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:d6de6f6d-4313-4258-8517-94c4b331e893</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.267900100313966 -123.09355595197076 49.2679340780615 -123.09321850126157 49.26790275357919 -123.093032736289 49.26799335986769 -123.0925315683679 49.26798516725634 -123.09146707537391 49.26787579577646 -123.09080416033514</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:73e0d222-9aa2-42d4-940f-a78989530f40</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.2675859500483 -123.08907382494587 49.26668207997923 -123.0890691188959</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:7f0d0105-3d93-418f-a0e0-1b5f78bb81dc</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26678131982263 -123.09093377881625 49.26677464810194 -123.08990728000572 49.26677388561734 -123.0898583171454 49.26677255638302 -123.08980939449444 49.26677067838949 -123.08976051208715 49.266768233635815 -123.08971168363809 49.26676524010159 -123.089662922927 49.26676167977533 -123.08961425741376 49.26675757064754 -123.08956568713268 49.26675291269697 -123.0895172395763 49.266747696928604 -123.08946891472988 49.266741923321376 -123.08942074008606 49.26673560985515 -123.08937272942427 49.266728747524326 -123.08932489647532 49.26672133631848 -123.08927725498614 49.266713394217675 -123.0892298187362 49.26670489422597 -123.08918260142372 49.26669586331852 -123.08913561684426 49.266686301485095 -123.08908887874468 49.26668207997923 -123.0890691188959</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:6021637e-e594-48e8-97e5-08757556dcb1</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.2675859500483 -123.08907382494587 49.26668207997923 -123.0890691188959</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:043ddf3a-dfcd-42b5-b3b6-ca688c36f892</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26678131982263 -123.09093377881625 49.26677464810194 -123.08990728000572 49.26677388561734 -123.0898583171454 49.26677255638302 -123.08980939449444 49.26677067838949 -123.08976051208715 49.266768233635815 -123.08971168363809 49.26676524010159 -123.089662922927 49.26676167977533 -123.08961425741376 49.26675757064754 -123.08956568713268 49.26675291269697 -123.0895172395763 49.266747696928604 -123.08946891472988 49.266741923321376 -123.08942074008606 49.26673560985515 -123.08937272942427 49.266728747524326 -123.08932489647532 49.26672133631848 -123.08927725498614 49.266713394217675 -123.0892298187362 49.26670489422597 -123.08918260142372 49.26669586331852 -123.08913561684426 49.266686301485095 -123.08908887874468 49.26668207997923 -123.0890691188959</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:efbfb9e7-01d5-44f2-be32-42ba5bfd9053</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26787579577646 -123.09080416033514 49.26691784742579 -123.09082138500293 49.26678131982263 -123.09093377881625</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:047cfafa-ba72-4d3b-b84a-a781deed8336</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26679817184163 -123.09292984997964 49.26678131982263 -123.09093377881625</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:f56403cb-cea7-4647-b97e-9a3a02a75370</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26679817184163 -123.09292984997964 49.26678131982263 -123.09093377881625</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:da034a62-0f26-48e8-a1ea-0502feb7267b</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26787579577646 -123.09080416033514 49.26691784742579 -123.09082138500293 49.26678131982263 -123.09093377881625</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:2be0bac7-4907-47e1-800a-5c4c14e350e1</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.2675859500483 -123.08907382494587 49.2675704338437 -123.08862864179663 49.2672146884577 -123.08652034692945</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:6deecf37-56a3-4ae7-b61e-754fe84b489d</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.266081245301706 -123.08132267980551 49.26579086854983 -123.08131365306879 49.265236747026705 -123.08132509936372</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:9d17f451-7510-4bb9-ba2a-fb625cafb45a</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.266081245301706 -123.08132267980551 49.26579086854983 -123.08131365306879 49.265236747026705 -123.08132509936372</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:1f458415-12ac-4fa4-9f01-884370e7d8ef</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.266081245301706 -123.08132267980551 49.26579086854983 -123.08131365306879 49.265236747026705 -123.08132509936372</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:200aee9a-1cff-44e7-a39a-b1f1f2befc23</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26668207997923 -123.0890691188959 49.26622481925625 -123.08667814468097</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:a0e2efe1-f40d-4a28-9dfa-998f6ac720cb</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26668207997923 -123.0890691188959 49.26622481925625 -123.08667814468097</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:90c05db0-7d86-4327-8010-0bbb7907b8d0</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.2672146884577 -123.08652034692945 49.26657565989822 -123.0865210439916 49.26622481925625 -123.08667814468097</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:14e8176a-b785-40a9-a29a-35a44984edda</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26668207997923 -123.0890691188959 49.26622481925625 -123.08667814468097</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:a53c4dbb-1366-4f35-bb18-781f9159a6f5</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26668207997923 -123.0890691188959 49.26622481925625 -123.08667814468097</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:e2ac76d9-ec45-4595-9c91-939ab9492639</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.2672146884577 -123.08652034692945 49.26657565989822 -123.0865210439916 49.26622481925625 -123.08667814468097</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:a3f2f806-558f-4e01-8948-73ef88ec7144</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26688381528513 -123.09621568778786 49.266840945775044 -123.09591079752258 49.26681788564565 -123.09561345111051 49.266814336813724 -123.09512876373132</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:c9cf9446-904d-4120-8e95-45ff69bcf7da</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26688381528513 -123.09621568778786 49.266840945775044 -123.09591079752258 49.26681788564565 -123.09561345111051 49.266814336813724 -123.09512876373132</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:946011d7-a4e8-4b9d-a4c3-7cc2b985c650</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26688381528513 -123.09621568778786 49.266840945775044 -123.09591079752258 49.26681788564565 -123.09561345111051 49.266814336813724 -123.09512876373132</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:fb6f8660-c158-4218-acae-f888881b74a6</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26865929461647 -123.09452909397015 49.26763560722236 -123.09493234898628</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:fc9d7c21-9989-46e7-8f7d-a76e87612ee9</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26688381528513 -123.09621568778786 49.266840945775044 -123.09591079752258 49.26681788564565 -123.09561345111051 49.266814336813724 -123.09512876373132</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:d54b1865-38b0-436e-a6bc-aee16d9af50c</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26763560722236 -123.09493234898628 49.267268385178625 -123.09507700458663 49.26724522439858 -123.09508567481512 49.26722192939144 -123.09509349254877 49.26719851814758 -123.09510045782324 49.26717500866906 -123.09510655692876 49.26715140996234 -123.09511177613811 49.26712773100016 -123.09511614296113 49.267103989795686 -123.09511962994232 49.267080204327954 -123.09512225086316 49.267056383603546 -123.09512399199664 49.267032536617734 -123.09512485336126 49.266814336813724 -123.09512876373132</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:c0aaf443-d4de-483a-80ff-cce40e385800</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26688381528513 -123.09621568778786 49.266840945775044 -123.09591079752258 49.26681788564565 -123.09561345111051 49.266814336813724 -123.09512876373132</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:a4b2148b-f8b4-4995-955a-ec69d3a7d2dd</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26688381528513 -123.09621568778786 49.266840945775044 -123.09591079752258 49.26681788564565 -123.09561345111051 49.266814336813724 -123.09512876373132</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:96298395-e7b9-44e4-9ad2-c89572c63ed3</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26865929461647 -123.09452909397015 49.26763560722236 -123.09493234898628</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:e9f991f2-019e-411f-a2a1-a41a20ac7a2f</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26663716156904 -123.09634080048708 49.26633979946658 -123.09673762799424 49.26634268390791 -123.09689152692698</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:f9360ee5-8211-459f-a456-1034badc3d35</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26688381528513 -123.09621568778786 49.26663716156904 -123.09634080048708</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:b40a42cd-6f98-477d-aa94-c0fb52822a57</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26688381528513 -123.09621568778786 49.26663716156904 -123.09634080048708</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:5260d5c2-21a6-4cf2-ba73-4cadcd87e970</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26688381528513 -123.09621568778786 49.26663716156904 -123.09634080048708</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:15c75142-cc7e-4720-9156-c4ab84536a16</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.266814336813724 -123.09512876373132 49.26679817184163 -123.09292984997964</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:c1986d47-9531-4da0-aff1-95e2a10da080</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26763560722236 -123.09493234898628 49.267268385178625 -123.09507700458663 49.26724522439858 -123.09508567481512 49.26722192939144 -123.09509349254877 49.26719851814758 -123.09510045782324 49.26717500866906 -123.09510655692876 49.26715140996234 -123.09511177613811 49.26712773100016 -123.09511614296113 49.267103989795686 -123.09511962994232 49.267080204327954 -123.09512225086316 49.267056383603546 -123.09512399199664 49.267032536617734 -123.09512485336126 49.266814336813724 -123.09512876373132</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:abcfca9e-b813-4c23-a319-26f69767a645</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.266814336813724 -123.09512876373132 49.26679817184163 -123.09292984997964</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:e36601e1-0a23-4b3d-bf5b-716ed4bbe2ec</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26688381528513 -123.09621568778786 49.266840945775044 -123.09591079752258 49.26681788564565 -123.09561345111051 49.266814336813724 -123.09512876373132</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:ec25b188-6207-4282-aa78-f6590af5e36d</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26763560722236 -123.09493234898628 49.267268385178625 -123.09507700458663 49.26724522439858 -123.09508567481512 49.26722192939144 -123.09509349254877 49.26719851814758 -123.09510045782324 49.26717500866906 -123.09510655692876 49.26715140996234 -123.09511177613811 49.26712773100016 -123.09511614296113 49.267103989795686 -123.09511962994232 49.267080204327954 -123.09512225086316 49.267056383603546 -123.09512399199664 49.267032536617734 -123.09512485336126 49.266814336813724 -123.09512876373132</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:d3467c1d-4b72-44df-838c-cc08035e5317</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26543901141707 -123.09693020944272 49.26498716648197 -123.09694911719525</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:1d428acd-1907-4a5c-973b-2947fd803fcd</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26543901141707 -123.09693020944272 49.26498716648197 -123.09694911719525</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:b59dd01f-2f84-4cba-a00d-33bca07a473d</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26634268390791 -123.09689152692698 49.26621742763572 -123.09671745801079 49.26564964085506 -123.09572444043597</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:48c20086-c94d-46e8-9cfd-ca96e11d3dc4</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26589070359162 -123.0969110673825 49.26543901141707 -123.09693020944272</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:6b2b6ecc-12f2-4c9d-8fb8-6b614d5fcb9a</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26589070359162 -123.0969110673825 49.26543901141707 -123.09693020944272</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:f335ce7c-c762-48c6-afed-ecd11ac6ba50</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26634268390791 -123.09689152692698 49.26589070359162 -123.0969110673825</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:80ad0011-ffc6-4147-831d-29e7a024b6be</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26634268390791 -123.09689152692698 49.26589070359162 -123.0969110673825</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:a382ef4c-7315-43a7-acc4-aa3cd884395b</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26663716156904 -123.09634080048708 49.26625296876355 -123.0956680832334 49.26619421655073 -123.09567357774495</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:a350769c-4cd4-4bc2-b48a-30e01f48e965</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26663716156904 -123.09634080048708 49.26633979946658 -123.09673762799424 49.26634268390791 -123.09689152692698</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:afffb474-e4db-4f9d-b9c8-edcaa1575db3</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26809678321396 -123.09777869739959 49.267769409574186 -123.09821632086738</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:be161898-8a6f-4558-b47c-d334ad2a05a8</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26838842180999 -123.09738903993909 49.26809678321396 -123.09777869739959</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:09e14bdb-2050-4621-ae90-d54fb2f4f9f1</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26838842180999 -123.09738903993909 49.26809678321396 -123.09777869739959</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:854fb1cc-7077-4458-9dc0-e73bd6c9788c</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26838842180999 -123.09738903993909 49.26809678321396 -123.09777869739959</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:33812b5d-621b-4ef2-9298-a8a2b7c1416c</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26809678321396 -123.09777869739959 49.267769409574186 -123.09821632086738</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:f6ad8ca9-28f3-43ef-a847-4d43baddfe65</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26809678321396 -123.09777869739959 49.267769409574186 -123.09821632086738</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:8f6ba14f-fcec-47af-91aa-6c2b97d23b3c</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26838842180999 -123.09738903993909 49.26809678321396 -123.09777869739959</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:98c07f5c-e5cb-4d34-901e-71de591a5b15</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26809678321396 -123.09777869739959 49.267769409574186 -123.09821632086738</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:8293eef1-7afc-43ad-a103-990fd45a0a14</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26838842180999 -123.09738903993909 49.26809678321396 -123.09777869739959</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:96306059-7a63-422e-acb3-0b2e73e402fc</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.267178925261106 -123.09716707323 49.26717844926759 -123.0971661788304 49.267069580220664 -123.09690928001858 49.26697887627924 -123.09663640424365 49.266907342316216 -123.09635052228587 49.26688381528513 -123.09621568778786</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:d8a5598a-136f-4c2e-b5a0-8f17ae20b9f3</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.267178925261106 -123.09716707323 49.26717844926759 -123.0971661788304 49.267069580220664 -123.09690928001858 49.26697887627924 -123.09663640424365 49.266907342316216 -123.09635052228587 49.26688381528513 -123.09621568778786</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:6b862b79-e20b-4907-9813-334b20580797</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.267178925261106 -123.09716707323 49.26717844926759 -123.0971661788304 49.267069580220664 -123.09690928001858 49.26697887627924 -123.09663640424365 49.266907342316216 -123.09635052228587 49.26688381528513 -123.09621568778786</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:8afd5bf9-9a9c-4f94-84be-8f5bb7b79daf</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.267769409574186 -123.09821632086738 49.267289309427355 -123.09737594887785 49.267178925261106 -123.09716707323</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:88dec58f-af30-4ac4-bfc8-ca020f079d4b</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.267769409574186 -123.09821632086738 49.267289309427355 -123.09737594887785 49.267178925261106 -123.09716707323</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:1204bd1b-d83c-47cd-ad77-e58530831dde</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26838842180999 -123.09738903993909 49.26785391624239 -123.09644752765816 49.267836904956454 -123.09641682762721 49.267820496970245 -123.09638537277402 49.26780470124416 -123.09635320435295 49.267789526761106 -123.09632033612685 49.26777499148804 -123.0962867956216 49.2677611043853 -123.09625262409118 49.26774789241492 -123.0962178490789 49.26773534656965 -123.09618248431195 49.267723484805146 -123.09614657106155 49.26771232507696 -123.09611015059888 49.267701858377876 -123.09607323665087 49.26769212065409 -123.09603587052338 49.26768276253168 -123.09599631957215 49.26767433129942 -123.09595628933211 49.26766682691098 -123.09591583478412 49.267660258327055 -123.09587499718073 49.26765463449664 -123.09583383152005 49.26764996436913 -123.09579239280015 49.26764625690524 -123.09575072227328 49.267643512059124 -123.09570887492 49.26764172978511 -123.09566690572068 49.26764091903274 -123.09562486967323 49.26763560722236 -123.09493234898628</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:2bf5c623-b4c7-4b01-8fd0-24f1cc7b041a</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.267769409574186 -123.09821632086738 49.267289309427355 -123.09737594887785 49.267178925261106 -123.09716707323</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:9f03f701-14e6-494d-8535-99c0b5402459</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.267769409574186 -123.09821632086738 49.267289309427355 -123.09737594887785 49.267178925261106 -123.09716707323</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:1041aa66-74de-4241-ac9f-884d26fab795</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.267769409574186 -123.09821632086738 49.267289309427355 -123.09737594887785 49.267178925261106 -123.09716707323</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:47a59e42-963c-434e-b904-f4116a407e43</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.267178925261106 -123.09716707323 49.26717844926759 -123.0971661788304 49.267069580220664 -123.09690928001858 49.26697887627924 -123.09663640424365 49.266907342316216 -123.09635052228587 49.26688381528513 -123.09621568778786</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:92b3f25b-baaf-4aca-b36d-cf14facc1b09</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26498716648197 -123.09694911719525 49.26453554618061 -123.09696827245652</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:82ca20b7-6dde-4f36-a180-0d84000a14df</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26498716648197 -123.09694911719525 49.26453554618061 -123.09696827245652</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:bf1800d7-cc1a-4040-88da-5bb034a113ae</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26498716648197 -123.09694911719525 49.26453554618061 -123.09696827245652</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:1b076cb7-fd7f-4382-bffa-deb83e205895</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26453554618061 -123.09696827245652 49.264083070963125 -123.09698782429663</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:065818af-4803-4673-9227-c7a654a4cf25</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.267178925261106 -123.09716707323 49.26717844926759 -123.0971661788304 49.267069580220664 -123.09690928001858 49.26697887627924 -123.09663640424365 49.266907342316216 -123.09635052228587 49.26688381528513 -123.09621568778786</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:e62271dc-570e-440b-a116-858a36834166</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.267178925261106 -123.09716707323 49.26717844926759 -123.0971661788304 49.267069580220664 -123.09690928001858 49.26697887627924 -123.09663640424365 49.266907342316216 -123.09635052228587 49.26688381528513 -123.09621568778786</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:a0414e18-208f-4460-8a01-ce5711ea086c</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26498716648197 -123.09694911719525 49.26453554618061 -123.09696827245652</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:0b2dcb07-fbba-4b9d-81f8-78582a6ab7e9</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.267178925261106 -123.09716707323 49.26717844926759 -123.0971661788304 49.267069580220664 -123.09690928001858 49.26697887627924 -123.09663640424365 49.266907342316216 -123.09635052228587 49.26688381528513 -123.09621568778786</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:a27f76dd-305a-48e5-8fe6-f5e1fbfb79ec</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26366657593525 -123.09893880167829 49.26363106450691 -123.09700612594295</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:29d6d938-c12d-4cb5-a537-260550ab1107</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26453554618061 -123.09696827245652 49.264083070963125 -123.09698782429663</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:46bd976a-91bc-46ab-ac11-042b774d2938</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26453554618061 -123.09696827245652 49.264083070963125 -123.09698782429663</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:5a1ced16-59fc-4cea-b6c9-85c57452f2b7</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26453554618061 -123.09696827245652 49.264083070963125 -123.09698782429663</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:8ad67b27-dfa5-4562-a8d2-2e9ea7ed1840</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26363106450691 -123.09700612594295 49.263178642352386 -123.09702666680003</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:334b365c-64c0-4ee3-8cee-3e09a33b41de</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26363106450691 -123.09700612594295 49.263178642352386 -123.09702666680003</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:2814caef-e689-4770-8b6a-a06fbe1b1eea</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.264083070963125 -123.09698782429663 49.26363106450691 -123.09700612594295</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:45a80adc-1fcb-4daa-a36a-f67ee55db622</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26366657593525 -123.09893880167829 49.26363106450691 -123.09700612594295</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:18e09a6e-c5e6-4354-9413-4da6a59c2d27</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.264083070963125 -123.09698782429663 49.26363106450691 -123.09700612594295</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:3c7cb507-9ebe-4d30-b97e-f5394bb244fa</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.264083070963125 -123.09698782429663 49.26363106450691 -123.09700612594295</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:6b73f7b1-03e4-4bb3-b7a5-83f2c7b7bb50</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26366657593525 -123.09893880167829 49.26363106450691 -123.09700612594295</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:96cbb8d1-22a9-450e-be1a-7dff77611237</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.264083070963125 -123.09698782429663 49.26363106450691 -123.09700612594295</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:63b14fbc-9b1b-472f-a00c-322c95f6b619</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26366657593525 -123.09893880167829 49.26363106450691 -123.09700612594295</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:89049def-531a-4496-ba39-f3d849325734</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26363106450691 -123.09700612594295 49.263178642352386 -123.09702666680003</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:8b8f7402-9bf3-4e90-bdcf-9c643c100184</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26321467652605 -123.09895774530729 49.263178642352386 -123.09702666680003</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:f3d5af30-a965-4903-a32f-999c045e8d84</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26363106450691 -123.09700612594295 49.263178642352386 -123.09702666680003</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:2bed3fa5-35b3-4fbd-8402-1de3e9203f5b</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26321467652605 -123.09895774530729 49.263178642352386 -123.09702666680003</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:06e316ae-3410-4a3c-be5d-15a8b3207ae3</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26363106450691 -123.09700612594295 49.263178642352386 -123.09702666680003</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:d8c7f1f5-72c0-4837-a6e7-9932663aedd9</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26321467652605 -123.09895774530729 49.263178642352386 -123.09702666680003</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:f670945b-31f6-4171-bdb8-ba1095000006</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26363106450691 -123.09700612594295 49.263178642352386 -123.09702666680003</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:62dd451b-9e9c-4ec2-8265-230198e98d70</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26363106450691 -123.09700612594295 49.263178642352386 -123.09702666680003</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:ed15495c-b5a0-4788-97e0-9c5aba10b829</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26321467652605 -123.09895774530729 49.263178642352386 -123.09702666680003</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:ebc1ed44-cd02-43fc-a217-ce762b53247e</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26373958056618 -123.10294462230799 49.263718227794186 -123.101744216102</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:efddfb59-d0a1-49fb-bfc5-80d354963447</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26373958056618 -123.10294462230799 49.263718227794186 -123.101744216102</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:57894508-3142-4f5e-bd02-3102b78fdf48</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26373958056618 -123.10294462230799 49.263718227794186 -123.101744216102</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:d26908e9-cf75-4f1c-9157-89b089ab28bc</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26373958056618 -123.10294462230799 49.263718227794186 -123.101744216102</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:a408bb9f-5838-425d-ba97-8f6f377bc81e</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26373958056618 -123.10294462230799 49.263718227794186 -123.101744216102</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:7fb7839a-85a5-40f7-abdd-718e036075d1</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26373958056618 -123.10294462230799 49.263718227794186 -123.101744216102</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:8eb5f424-bd05-4e1c-b13c-c6e4318b6c55</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26373958056618 -123.10294462230799 49.263718227794186 -123.101744216102</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:6cfb1b20-a4f2-4e67-aa99-96675b437a69</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26373958056618 -123.10294462230799 49.263718227794186 -123.101744216102</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:8aae8377-03b5-4846-8b19-1ad069077bce</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26373958056618 -123.10294462230799 49.263718227794186 -123.101744216102</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:4b88b94c-ef34-41f1-adbe-556d2f52553f</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.2644537502124 -123.10091057704929 49.26370371182469 -123.1009416636927</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:404619d5-d7c8-4820-9389-0659b1748705</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.2644537502124 -123.10091057704929 49.26370371182469 -123.1009416636927</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:211bb925-4c8d-4b37-ab8a-fe606ff6a62b</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.2644537502124 -123.10091057704929 49.26370371182469 -123.1009416636927</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:bb1713da-8668-4af1-9ff3-423c451e107b</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.263718227794186 -123.101744216102 49.26370371182469 -123.1009416636927</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:6dbdbe6c-ade6-40e7-af2d-0208b2f200bb</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.263718227794186 -123.101744216102 49.26370371182469 -123.1009416636927</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:628de472-aa1e-4606-ab27-ea1a3cacb2b0</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.263718227794186 -123.101744216102 49.26370371182469 -123.1009416636927</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:8d80ce27-b3a7-4525-be5a-5dfa2aaac576</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.263718227794186 -123.101744216102 49.26370371182469 -123.1009416636927</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:7cc6f65e-32be-4f72-bb6c-c9c30fdaa051</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26373958056618 -123.10294462230799 49.263718227794186 -123.101744216102</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:7c23b75f-6cb1-4465-9a0e-6e47c368ff7e</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26373958056618 -123.10294462230799 49.263718227794186 -123.101744216102</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:f151be33-a843-41c8-8fc5-684e9a6df9aa</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.263718227794186 -123.101744216102 49.26370371182469 -123.1009416636927</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:67fd64cd-0303-4011-99a8-df87625cf8b8</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.263718227794186 -123.101744216102 49.26370371182469 -123.1009416636927</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:7c56b2e7-a4cf-4693-88cd-e8fe079afe60</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.263718227794186 -123.101744216102 49.26370371182469 -123.1009416636927</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:ffa1e584-61bb-4c97-aa41-efaa21fde3ee</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.263718227794186 -123.101744216102 49.26370371182469 -123.1009416636927</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:bd04ae09-27e6-4ed2-94f8-41eb87b61d74</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.2644537502124 -123.10091057704929 49.26370371182469 -123.1009416636927</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:647ad837-ef44-40b6-8167-2c2690eb7d03</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.263718227794186 -123.101744216102 49.26370371182469 -123.1009416636927</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:4f348c26-1304-4e9c-bd97-79301238650e</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.263718227794186 -123.101744216102 49.26370371182469 -123.1009416636927</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:21bf8786-54a6-49e6-94f0-d499ec03a07e</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.263718227794186 -123.101744216102 49.26370371182469 -123.1009416636927</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:a5509f99-1c77-48dd-bfdd-30ed9724bd65</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.263718227794186 -123.101744216102 49.26370371182469 -123.1009416636927</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:8c50af0c-752c-4701-9225-5df498643548</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26373958056618 -123.10294462230799 49.26331509000124 -123.10296232191241</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:7aaf99f5-cac5-4e55-8ee2-e2152d087022</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26373958056618 -123.10294462230799 49.26331509000124 -123.10296232191241</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:f3d666ad-ff40-419c-a1da-70319582c94c</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26373958056618 -123.10294462230799 49.26331509000124 -123.10296232191241</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:d5594602-3945-477e-a57f-7220b4349c06</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26388484191983 -123.11094527432377 49.263432886047525 -123.11096475426379</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:bbca9162-2de0-46f9-a5b1-3b90df483390</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26388484191983 -123.11094527432377 49.263432886047525 -123.11096475426379</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:0f20a36a-8060-47b4-b41b-db87c8536bba</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26388484191983 -123.11094527432377 49.263432886047525 -123.11096475426379</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:34a47c9f-4ad6-4dde-9506-1e9494ec3bfc</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26373958056618 -123.10294462230799 49.263718227794186 -123.101744216102</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:fe3d8436-1864-4a67-b41c-fa638fd23a2f</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26388484191983 -123.11094527432377 49.263432886047525 -123.11096475426379</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:de764e6f-a950-4b7a-965c-16208adf97cc</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26373958056618 -123.10294462230799 49.26331509000124 -123.10296232191241</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:76309368-d99e-4e5d-9f64-604714f1bb2d</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26301117888204 -123.10491120337669 49.26305702704843 -123.10684544983077</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:134e3b0d-18d1-4870-88c7-5414ba88eb3e</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26301117888204 -123.10491120337669 49.26305702704843 -123.10684544983077</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:3c144891-407b-4225-a546-2716e33c8670</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26301117888204 -123.10491120337669 49.26305702704843 -123.10684544983077</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:6b5e91b3-8281-4ddd-9465-c5c71e2daf5f</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26305702704843 -123.10684544983077 49.2631188603624 -123.10946855373669</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:927e9112-44e4-492f-85de-b8067e90ea7a</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26305702704843 -123.10684544983077 49.2631188603624 -123.10946855373669</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:50e234c7-7a5f-48a6-865d-c8a0d15ef2ec</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26305702704843 -123.10684544983077 49.2631188603624 -123.10946855373669</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:1c110d62-97e3-4648-ba7a-423d7d2c5bbe</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26305702704843 -123.10684544983077 49.2631188603624 -123.10946855373669</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:a1012334-dd40-4e74-9cb5-c88f13b8d14a</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26373958056618 -123.10294462230799 49.26331509000124 -123.10296232191241</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:76a6fb27-47f8-4760-8fa9-dd36c9e1f84a</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26373958056618 -123.10294462230799 49.26331509000124 -123.10296232191241</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:409f8481-0f68-4d92-b027-212bcf67b51f</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26301117888204 -123.10491120337669 49.26296573076257 -123.10297621915663</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:3ceb7ad0-2f19-4472-8fb7-f11043c908b4</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26301117888204 -123.10491120337669 49.26296573076257 -123.10297621915663</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:9b0c3c58-8e0d-4fb0-a2b4-21a9350fbc7d</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26301117888204 -123.10491120337669 49.26296573076257 -123.10297621915663</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:4d872de0-9357-4d45-8444-1827cf84efcf</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26301117888204 -123.10491120337669 49.26296573076257 -123.10297621915663</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:374545ec-0199-4aba-87a5-1b76b7cff581</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26301117888204 -123.10491120337669 49.26296573076257 -123.10297621915663</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:56ce0d6e-cebc-4329-8f15-648b82a50b26</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26301117888204 -123.10491120337669 49.26305702704843 -123.10684544983077</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:c0a53e36-46f6-4490-be63-62b201af5f71</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26301117888204 -123.10491120337669 49.26296573076257 -123.10297621915663</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:8f60b2b0-ba93-456b-b794-fbbf3d8a136b</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26301117888204 -123.10491120337669 49.26305702704843 -123.10684544983077</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:0c926f82-9b72-4942-88f3-962b76ad3dba</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26301117888204 -123.10491120337669 49.26305702704843 -123.10684544983077</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:791a2069-5006-43cf-8f63-722bb463a652</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.262890923592096 -123.10025905216366 49.262864874612006 -123.09952943205008</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:052ca8de-f15a-498b-9b39-3b2b8ac371cd</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.262919066812884 -123.10097498786797 49.262890923592096 -123.10025905216366</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:210cdbe3-b4d5-4509-883b-a1b46d09d009</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.262919066812884 -123.10097498786797 49.262890923592096 -123.10025905216366</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:b0103bab-20a6-4bae-9360-a0de79ea7497</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26370371182469 -123.1009416636927 49.262919066812884 -123.10097498786797</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:a19c4096-e8a9-41ab-841c-89a3084c9d39</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26284341288704 -123.09897345499519 49.26279681791607 -123.09704319491928</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:4be8a379-9348-46aa-92da-df279493cdf5</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.263178642352386 -123.09702666680003 49.26279681791607 -123.09704319491928</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:1bbf133d-5d87-41df-80f8-859b9fc0996a</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.262864874612006 -123.09952943205008 49.26284341288704 -123.09897345499519</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:f4332fa3-f6af-4a3f-8082-6afac220e128</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.262864874612006 -123.09952943205008 49.26284341288704 -123.09897345499519</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:bf0b990e-56e8-46ab-a6fd-cd8eafecd63f</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.262890923592096 -123.10025905216366 49.262864874612006 -123.09952943205008</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:b368547a-7389-4b52-a098-1a52a1d1f559</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.262864874612006 -123.09952943205008 49.26284341288704 -123.09897345499519</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:08f86131-3079-488f-bdaf-c1eccd000ae1</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.262864874612006 -123.09952943205008 49.26284341288704 -123.09897345499519</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:85534825-4c7e-436f-a786-c97d7ed6965e</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.262890923592096 -123.10025905216366 49.262864874612006 -123.09952943205008</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:1cae22b5-c12f-494e-86e7-0694f96959e5</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.262890923592096 -123.10025905216366 49.262864874612006 -123.09952943205008</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:e239c218-7a6d-479e-b106-875aa8f541e9</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26284341288704 -123.09897345499519 49.26279681791607 -123.09704319491928</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:d3e588af-a82b-4db3-b6f6-dda244ebdfa1</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26284341288704 -123.09897345499519 49.26279681791607 -123.09704319491928</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:9e52a3ce-ba66-4708-b6d6-ccaf6486c35d</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26284341288704 -123.09897345499519 49.26279681791607 -123.09704319491928</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:d1888a49-ebc1-4860-bdd5-016a37341aae</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.263178642352386 -123.09702666680003 49.26279681791607 -123.09704319491928</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:ce015350-c4a8-499e-b617-18465cbf0680</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.263178642352386 -123.09702666680003 49.26279681791607 -123.09704319491928</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:048a1dd9-5d55-4361-8c57-f6562cbe8781</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.263178642352386 -123.09702666680003 49.26279681791607 -123.09704319491928</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:be85498c-0e4c-49b4-b417-366d0491159d</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.263178642352386 -123.09702666680003 49.26279681791607 -123.09704319491928</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:c03c2a64-bba8-4c79-92f3-aa83fa3ab91f</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.263178642352386 -123.09702666680003 49.26279681791607 -123.09704319491928</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:fd151236-f78f-4968-bbca-16776d3f3ae6</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.263178642352386 -123.09702666680003 49.26279681791607 -123.09704319491928</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:90910aec-7987-47b2-bb1e-1a04fa8f8553</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26293767603903 -123.10177678003613 49.262919066812884 -123.10097498786797</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:b386348a-177c-4985-ac45-0381a3ae6a7a</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.263718227794186 -123.101744216102 49.26293767603903 -123.10177678003613</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:b730d4b1-b5f6-48ee-886d-ca08b0241c37</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26370371182469 -123.1009416636927 49.262919066812884 -123.10097498786797</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:cac49bfc-5905-40cf-acc0-a1d5e755c3df</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.263718227794186 -123.101744216102 49.26293767603903 -123.10177678003613</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:b67163b7-3e01-4762-82aa-4a1d113b3861</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.263718227794186 -123.101744216102 49.26293767603903 -123.10177678003613</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:1174bf58-5461-4241-8d5f-1a1f13b0ecbb</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.263718227794186 -123.101744216102 49.26293767603903 -123.10177678003613</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:af05f3c3-70b4-42f9-a12c-6e5bd71e1fcb</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.263718227794186 -123.101744216102 49.26293767603903 -123.10177678003613</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:54c33013-7c58-4521-a7e9-00fe0da3a9ca</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.263718227794186 -123.101744216102 49.26293767603903 -123.10177678003613</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:2beb7879-dc13-4746-9b3d-ee1104ef4f4d</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.263718227794186 -123.101744216102 49.26293767603903 -123.10177678003613</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:a5377844-4714-4fe3-8408-6459c5658c09</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26248271710409 -123.10165339634827 49.26202749769334 -123.10167259656046</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:33d18fc5-d7f8-485d-aa5a-6e6ee4fbd571</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26248271710409 -123.10165339634827 49.26202749769334 -123.10167259656046</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:408ca5b4-18f0-4244-9bf0-312c02b62ba6</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26248271710409 -123.10165339634827 49.26202749769334 -123.10167259656046</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:84db58a4-05c6-4950-ad17-860ee5e5683c</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26248271710409 -123.10165339634827 49.26202749769334 -123.10167259656046</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:e725a612-42e8-4cf0-958b-47e598fd8fce</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.262919066812884 -123.10097498786797 49.262890923592096 -123.10025905216366</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:4142a246-8f3a-44b8-8f33-2d93a25935ff</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.262919066812884 -123.10097498786797 49.262890923592096 -123.10025905216366</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:0cc9b97e-172c-4640-9195-dd58608c817b</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26370371182469 -123.1009416636927 49.262919066812884 -123.10097498786797</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:db62fa8d-0122-4d81-b66a-32ad03cda933</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26370371182469 -123.1009416636927 49.262919066812884 -123.10097498786797</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:20fb5f1d-814b-42e8-b4ec-0474b8d06d61</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26293767603903 -123.10177678003613 49.262919066812884 -123.10097498786797</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:01b63958-4f7b-495a-8fd2-5bd7aa53282b</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26202749769334 -123.10167259656046 49.26201617549364 -123.10101308629662</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:06884887-5a8b-44ab-91e5-a953907a0cc4</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.262919066812884 -123.10097498786797 49.26201617549364 -123.10101308629662</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:393a6f15-74da-4cb8-afc0-913c80f9a051</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.262919066812884 -123.10097498786797 49.26201617549364 -123.10101308629662</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:b88d7231-a4ca-4d95-be29-f87eed859890</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.262919066812884 -123.10097498786797 49.26201617549364 -123.10101308629662</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:a5047414-d31f-4020-924b-55b4aaa90c0d</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26202749769334 -123.10167259656046 49.26201617549364 -123.10101308629662</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:c0773021-3340-48a4-aa69-b7a4cb95c517</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26202749769334 -123.10167259656046 49.26201617549364 -123.10101308629662</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:1b292dc8-29b4-43a0-9dbe-ecd9a1bd1471</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.262919066812884 -123.10097498786797 49.26201617549364 -123.10101308629662</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:ee1db640-8b2b-47b7-80e4-445e57910495</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26202749769334 -123.10167259656046 49.26201617549364 -123.10101308629662</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:8c2dc137-c987-4684-8f6c-abf99263031f</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26248271710409 -123.10165339634827 49.26202749769334 -123.10167259656046</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:2270191f-49b9-4b5d-9a78-d26c63be016d</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.263718227794186 -123.101744216102 49.26293767603903 -123.10177678003613</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:530d0618-34bc-4bf9-b157-a7c3229b9e66</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.263718227794186 -123.101744216102 49.26293767603903 -123.10177678003613</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:c40bcc33-9326-4446-9c01-dc5b32d3792f</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.263718227794186 -123.101744216102 49.26293767603903 -123.10177678003613</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:1b0a85cc-bb6b-4745-bc8b-6d9bd3693692</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.263718227794186 -123.101744216102 49.26293767603903 -123.10177678003613</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:870d4b0d-514c-4052-98ba-4610afa3b426</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26296573076257 -123.10297621915663 49.26293767603903 -123.10177678003613</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:8c0ad528-5d73-4d13-b96a-502d1b4ac849</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26296573076257 -123.10297621915663 49.26293767603903 -123.10177678003613</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:7e6adfa2-b7d1-4904-a8d2-78fcf3e2f262</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26296573076257 -123.10297621915663 49.26293767603903 -123.10177678003613</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:168060a9-8ff6-42dc-b76c-186ebc87e7e1</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26296573076257 -123.10297621915663 49.26293767603903 -123.10177678003613</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:76c5b635-bf49-4e69-a82f-010ff6bdec2f</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26296573076257 -123.10297621915663 49.26293767603903 -123.10177678003613</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:785c9dde-967d-4887-b4cb-1a984419103c</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26253066887506 -123.10299604033806 49.262503670320655 -123.10285909076467 49.26248271710409 -123.10165339634827</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:86d75ecf-e5f9-432f-956a-37814bc40512</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26253066887506 -123.10299604033806 49.262503670320655 -123.10285909076467 49.26248271710409 -123.10165339634827</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:2378eb4c-58ed-41a9-8db0-c64b0dacbc14</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26253066887506 -123.10299604033806 49.262503670320655 -123.10285909076467 49.26248271710409 -123.10165339634827</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:14129f8c-a02e-4724-984b-1d89a255dfb9</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26253066887506 -123.10299604033806 49.262503670320655 -123.10285909076467 49.26248271710409 -123.10165339634827</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:ccb1d7d9-a997-4908-9409-c0838dcdc1b2</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26253066887506 -123.10299604033806 49.262503670320655 -123.10285909076467 49.26248271710409 -123.10165339634827</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:c2dc9cfc-a9f5-4d5f-a784-f1e51477bb35</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26293767603903 -123.10177678003613 49.262919066812884 -123.10097498786797</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:eeea7cdb-193c-4c98-9052-82bcb6d61c08</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26293767603903 -123.10177678003613 49.262919066812884 -123.10097498786797</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:1fa595b3-81a6-4efa-83bf-15c7646bd026</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.263718227794186 -123.101744216102 49.26293767603903 -123.10177678003613</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:5615e0c6-0070-4498-8eed-9336c45bb2c4</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26296573076257 -123.10297621915663 49.26293767603903 -123.10177678003613</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:245c8aae-2073-42e9-8413-8354bfe9c248</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.262051178705775 -123.10301688197815 49.26202749769334 -123.10167259656046</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:51f2ea4e-142d-42f0-be72-f2a9d82a0355</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.262051178705775 -123.10301688197815 49.26202749769334 -123.10167259656046</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:4771047e-3c5d-4cc3-9dd2-94e3926fd9bb</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.262051178705775 -123.10301688197815 49.26202749769334 -123.10167259656046</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:6e53cefa-6acd-4795-b437-45ca4e8a2442</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.262051178705775 -123.10301688197815 49.26202749769334 -123.10167259656046</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:419693f1-177d-4fb0-87ac-52fa97b9acac</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26253066887506 -123.10299604033806 49.262051178705775 -123.10301688197815</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:1c67b744-3c26-4616-a8a7-1f1de961bc05</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26253066887506 -123.10299604033806 49.262051178705775 -123.10301688197815</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:48b1b440-a57a-4169-a92f-e4252b2079a7</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26253066887506 -123.10299604033806 49.262051178705775 -123.10301688197815</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:2dfa3889-ecfb-4889-8661-2be6493e82d4</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26253066887506 -123.10299604033806 49.262051178705775 -123.10301688197815</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:6503445d-cef4-421f-8e3b-114c08cc4cab</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26253066887506 -123.10299604033806 49.262051178705775 -123.10301688197815</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:c932a366-dd5e-4a9d-b7a4-7ad389026d1a</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.264309596656005 -123.12573413928676 49.264323030261096 -123.12657104069605</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:a004b74c-c286-4e8b-8d76-121d744a36ed</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.264309596656005 -123.12573413928676 49.264323030261096 -123.12657104069605</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:162939a0-f1ce-43fc-ae16-548e5a7f056c</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.264309596656005 -123.12573413928676 49.264323030261096 -123.12657104069605</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:726e958d-ae96-4f01-a99d-8bb8dc6cc698</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.264309596656005 -123.12573413928676 49.264323030261096 -123.12657104069605</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:4e8cadb7-8a00-46d2-b1b6-659b94c9321c</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26428451580733 -123.12417244500723 49.26385173035064 -123.12418833376523</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:cc385873-e3f5-443e-b26f-772b93ed7b24</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26428451580733 -123.12417244500723 49.26385173035064 -123.12418833376523</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:ace630ce-806b-4901-982d-77ea522fab3b</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.264323030261096 -123.12657104069605 49.2638901364771 -123.12658697693531</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:cd5bab7c-6299-443d-bbf9-9a266b99191d</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.264323030261096 -123.12657104069605 49.2638901364771 -123.12658697693531</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:0274ca9a-fea7-4901-a2d5-ceedb0fbd55c</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26428451580733 -123.12417244500723 49.264309596656005 -123.12573413928676</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:57102888-3f0a-491b-a9c9-2c7bd5283193</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26428451580733 -123.12417244500723 49.264309596656005 -123.12573413928676</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:0a10fbef-90c3-46a6-8261-2bfbd2239651</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26428451580733 -123.12417244500723 49.264309596656005 -123.12573413928676</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:1386426a-5c68-489e-81c8-9b52f422ff51</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.264309596656005 -123.12573413928676 49.264323030261096 -123.12657104069605</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:70f94508-8571-42c2-9547-b78a015bd007</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.264309596656005 -123.12573413928676 49.264323030261096 -123.12657104069605</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:c3f85b75-7358-45a6-a7bb-efd8c53384ae</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26392215728225 -123.11288288107619 49.263830580700215 -123.11288838997562 49.26346970567877 -123.1129030431776</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:fd59412d-b6ff-4764-92ff-1c032b3eb7d7</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26395948062307 -123.11481596877503 49.263506858322586 -123.11483557678204</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:6a486c6c-3c4a-40d4-952b-ce519f985b16</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26395948062307 -123.11481596877503 49.263506858322586 -123.11483557678204</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:251e0c3b-3bd4-4652-9d49-55f52c94c956</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26395948062307 -123.11481596877503 49.263506858322586 -123.11483557678204</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:d853cde5-3a31-41e3-a6ac-f234a6c89754</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26395948062307 -123.11481596877503 49.263506858322586 -123.11483557678204</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:cbabfa56-0ae1-4ba0-81a3-c8106d073b3d</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26395948062307 -123.11481596877503 49.263506858322586 -123.11483557678204</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:e8a19a13-72a5-4ecd-a401-1863acfb298f</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26395948062307 -123.11481596877503 49.263506858322586 -123.11483557678204</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:56c2abd0-5d29-4001-8f2b-090e1d700136</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26395948062307 -123.11481596877503 49.263506858322586 -123.11483557678204</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:9ae966fd-8b01-4da5-9215-b4a6f5a935ec</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26428451580733 -123.12417244500723 49.26385173035064 -123.12418833376523</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:8ee8fa62-b4ef-4685-b1ea-988428a3c756</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26447465923704 -123.13607883429394 49.26404236729229 -123.13609435918927</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:c7a85a9d-24e4-45fb-861e-345d32dd591e</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26447465923704 -123.13607883429394 49.26404236729229 -123.13609435918927</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:ff8bc1c9-eda6-4b3e-a12c-10726ec2505a</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26404236729229 -123.13609435918927 49.26407036482027 -123.13784345606082</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:0e730fb9-7ea5-4441-b66f-005835beea81</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26404236729229 -123.13609435918927 49.26407036482027 -123.13784345606082</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:25fbc149-cece-4e60-835a-12e07c1c6b7d</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26404236729229 -123.13609435918927 49.26407036482027 -123.13784345606082</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:d6af1011-4077-4c1c-ac82-d08aca0161a8</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26404236729229 -123.13609435918927 49.26407036482027 -123.13784345606082</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:495f0432-1e43-420a-b547-f4ae70b536a2</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26404236729229 -123.13609435918927 49.26407036482027 -123.13784345606082</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:f4b014aa-b764-4dec-a907-a6c3b40e5934</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26404236729229 -123.13609435918927 49.26407036482027 -123.13784345606082</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:168ee0a5-f30a-4d80-a61d-fbec183dd3a1</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26447465923704 -123.13607883429394 49.26404236729229 -123.13609435918927</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:6ff0e0c6-b666-4d6b-9fc5-ce54aef7f664</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26404236729229 -123.13609435918927 49.263565159374224 -123.13611231678367</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:34a111a5-1f46-4902-b195-d14e7e2447c2</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.264323030261096 -123.12657104069605 49.2638901364771 -123.12658697693531</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:516824de-4e7e-476b-af8f-dcef650ee46f</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.264323030261096 -123.12657104069605 49.2638901364771 -123.12658697693531</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:f5cbd5e5-a985-4faa-83d5-37d15f82433f</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.264323030261096 -123.12657104069605 49.2638901364771 -123.12658697693531</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:311630bf-86df-45a8-8fd4-ba02bfc03154</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.264323030261096 -123.12657104069605 49.2638901364771 -123.12658697693531</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:8ab4bf95-7e11-45b0-98b4-d0aa852fcd7e</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26447465923704 -123.13607883429394 49.26404236729229 -123.13609435918927</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:ce1f03a9-486e-4335-a571-22e68ad33161</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26404236729229 -123.13609435918927 49.26407036482027 -123.13784345606082</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:69a8d0a7-40db-4708-b994-87dd1ae2662d</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26447465923704 -123.13607883429394 49.26404236729229 -123.13609435918927</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:51b8ba11-5d3a-4304-a54f-7827caaab167</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26447465923704 -123.13607883429394 49.26404236729229 -123.13609435918927</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:d7ac439e-e037-43e7-b391-4cde7591ea61</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26404236729229 -123.13609435918927 49.263565159374224 -123.13611231678367</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:1be08876-1958-4a6e-8116-615bb769009e</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.263526288950885 -123.13374165085081 49.263565159374224 -123.13611231678367</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:469908d6-13a5-4ada-a36d-4a4ed2d94886</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.263526288950885 -123.13374165085081 49.263565159374224 -123.13611231678367</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:22148e6b-93b9-44df-9634-19a9bf09ae1d</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.2634884290168 -123.13137301181327 49.26352625297011 -123.13374165075358</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:67c1e5c9-61af-4f2e-9d98-4d7f8a8665f7</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.2634884290168 -123.13137301181327 49.26352625297011 -123.13374165075358</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:0e3241b3-9669-417d-a4e4-d99152bb2131</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26404236729229 -123.13609435918927 49.263565159374224 -123.13611231678367</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:adab757c-d758-41b3-b018-e69698a5d800</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26404236729229 -123.13609435918927 49.263565159374224 -123.13611231678367</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:de3171ad-6c15-48ad-a181-6932035405a5</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26404236729229 -123.13609435918927 49.263565159374224 -123.13611231678367</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:63ae12f8-ddb7-4486-b567-ef59d1296fcf</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26404236729229 -123.13609435918927 49.263565159374224 -123.13611231678367</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:6f5447a3-8c7f-4135-9b66-cf50efadca4a</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26383417496476 -123.15294300168014 49.26387222068513 -123.1553128979588</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:5b305c1e-45b1-4208-96d2-925504d367de</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26383417496476 -123.15294300168014 49.26387222068513 -123.1553128979588</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:a31b805b-9932-42f7-8ddc-132b6fc63f51</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26470661194173 -123.15051065974244 49.26427342751617 -123.15052617962391</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:8a70ef4d-30ea-4874-8422-1a507782cccb</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26470661194173 -123.15051065974244 49.26427342751617 -123.15052617962391</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:3dbe68d4-c2ea-4aba-bcf3-07fa215f711b</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.264745299246954 -123.15290925608184 49.264312158207105 -123.15292573099457</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:aef7d044-bc80-4b00-b2a5-26db9c6db7bd</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.264312158207105 -123.15292573099457 49.26383417496476 -123.15294300168014</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:0e098104-1ae7-4e3c-9f60-961eca56c8ee</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.264745299246954 -123.15290925608184 49.264312158207105 -123.15292573099457</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:6083cfc0-3301-45a1-afea-a3a651da095b</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26470661194173 -123.15051065974244 49.264745299246954 -123.15290925608184</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:a3a72f56-64e3-4289-afbc-bb4124ca68cd</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26470661194173 -123.15051065974244 49.264745299246954 -123.15290925608184</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:7fe5b9f4-7742-47dd-897a-addfd73577f5</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.263719471123494 -123.14577325537245 49.26375735519022 -123.14814539417256</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:ab0fc341-de20-47e9-b7b8-3092fefa10b8</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26375735519022 -123.14814539417256 49.26379556025475 -123.15054446344313</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:5d9ddbf5-948e-42a5-af23-3d131ceb758c</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26375735519022 -123.14814539417256 49.26379556025475 -123.15054446344313</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:43845d86-ecc5-43e0-ace3-df6396ff00ce</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26427342751617 -123.15052617962391 49.26379556025475 -123.15054446344313</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:c6369d7a-b571-451b-9d11-f86cdf25cd77</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26427342751617 -123.15052617962391 49.26379556025475 -123.15054446344313</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:33705f48-361e-4308-93a5-16200a28473d</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26379556025475 -123.15054446344313 49.26383417496476 -123.15294300168014</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:0a6c97a2-61af-426d-8d18-9b3d8003ed7f</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26382526347635 -123.15238947560277 49.26473646960329 -123.15236175409926</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:d21e760d-d8de-4420-9b05-baf93ab77fa6</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26382526347635 -123.15238947560277 49.26473646960329 -123.15236175409926</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:d588b703-6047-46d6-85ee-0917ca083be8</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.264312158207105 -123.15292573099457 49.26383417496476 -123.15294300168014</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:46618f1c-ac51-4957-b5ee-a7c53ab92ae4</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.263565159374224 -123.13611231678367 49.26359252687024 -123.13786149125536</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:a26707fb-8075-4cdc-b0df-6b8991e00bf8</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.263565159374224 -123.13611231678367 49.26359252687024 -123.13786149125536</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:9a5bdf06-e82a-47d7-af62-2c72315455ff</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.263565159374224 -123.13611231678367 49.26359252687024 -123.13786149125536</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:97450e48-446a-4e36-aff1-7652c216a688</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26359252687024 -123.13786149125536 49.26360354027881 -123.1385731086041</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:13af9638-06e4-4c30-8298-c6cc0895d994</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26360354027881 -123.1385731086041 49.263614980691614 -123.13928504360099</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:2a439c9d-1985-4bb7-a8e6-ba10a6ce07d6</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26364303668302 -123.1410351032416 49.26368116692203 -123.14340323569911</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:035260bb-c0a0-4f04-b886-65bd726e3321</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.263614980691614 -123.13928504360099 49.26364303668302 -123.1410351032416</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:a7da485d-667b-4e4a-8c85-bf2bd768bfc2</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26364303668302 -123.1410351032416 49.26368116692203 -123.14340323569911</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:78ea6f81-c530-4a30-9407-b16319ef00fc</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26368116692203 -123.14340323569911 49.263719471123494 -123.14577325537245</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:87c1d4de-33e9-4894-97ba-c8ba9aa1f4cd</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26392215728225 -123.11288288107619 49.263830580700215 -123.11288838997562 49.26346970567877 -123.1129030431776</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:aba75a56-53a1-485e-b8f5-e325e81aa180</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26392215728225 -123.11288288107619 49.263830580700215 -123.11288838997562 49.26346970567877 -123.1129030431776</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:dd323d98-222d-435b-9311-c62ca0e93fcd</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26392215728225 -123.11288288107619 49.263830580700215 -123.11288838997562 49.26346970567877 -123.1129030431776</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:5744e44f-22a2-42fa-8661-c84bc06694d7</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26392215728225 -123.11288288107619 49.263830580700215 -123.11288838997562 49.26346970567877 -123.1129030431776</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:eb970ff5-5015-4a8d-946c-3be11e7bcd38</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26346970567877 -123.1129030431776 49.263187640128876 -123.11291515457648</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:8a401c9a-437b-42ae-aa07-d7c5699cc2e3</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26346970567877 -123.1129030431776 49.263187640128876 -123.11291515457648</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:4ac1aae0-ea12-4029-80b5-52f312fc7475</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26346970567877 -123.1129030431776 49.263187640128876 -123.11291515457648</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:22b9fbcb-4c30-4233-94fb-6e373fc21a36</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26346970567877 -123.1129030431776 49.263187640128876 -123.11291515457648</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:4bb50f80-ab8f-422e-9f9e-ca4d5fee1871</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26388484191983 -123.11094527432377 49.263432886047525 -123.11096475426379</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:ced87a7a-60ac-420d-bc4b-66038d858302</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26388484191983 -123.11094527432377 49.263432886047525 -123.11096475426379</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:1bf91735-2d61-4cbe-b8df-ab79298322c8</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26388484191983 -123.11094527432377 49.263432886047525 -123.11096475426379</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:17d206c1-9a2a-4285-b103-8fc399dbe3b1</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26392215728225 -123.11288288107619 49.263830580700215 -123.11288838997562 49.26346970567877 -123.1129030431776</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:0de85dd5-0acb-4466-91ff-b3aeb36f081d</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26392215728225 -123.11288288107619 49.263830580700215 -123.11288838997562 49.26346970567877 -123.1129030431776</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:1c7a09e9-7534-4f32-b20e-6a523148bc9f</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.2631188603624 -123.10946855373669 49.263152340600584 -123.11097716874485</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:6e740df8-769d-46a5-b3d8-94bebd010415</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.2631188603624 -123.10946855373669 49.263152340600584 -123.11097716874485</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:487b1571-6569-43fc-9f68-f16f1c9ded58</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.263432886047525 -123.11096475426379 49.263152340600584 -123.11097716874485</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:f1fc2095-29f4-40a3-9343-27da40e5953e</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.263432886047525 -123.11096475426379 49.263152340600584 -123.11097716874485</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:b180915f-e23f-452f-a319-7f94dd592ea9</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.263432886047525 -123.11096475426379 49.263152340600584 -123.11097716874485</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:d1cd8772-4b8d-4860-a1c7-9f17cd25bb21</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.263432886047525 -123.11096475426379 49.263152340600584 -123.11097716874485</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:32939062-8b58-4c6d-b775-f62d052c2d4d</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.263432886047525 -123.11096475426379 49.263152340600584 -123.11097716874485</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:115751ff-cfdd-442f-8690-6da533c9acab</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.263432886047525 -123.11096475426379 49.263152340600584 -123.11097716874485</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:86163f66-4722-4c8e-a56d-3311548f7005</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.263432886047525 -123.11096475426379 49.263152340600584 -123.11097716874485</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:9561cf91-401f-45ac-a2af-ffcf34f631cd</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.263506858322586 -123.11483557678204 49.263340294026676 -123.11484467401556 49.26322406705316 -123.11489886007084</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:ae34e3cd-1842-46a1-ae19-187c2822845b</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.263266138588506 -123.11751840372688 49.26330411134447 -123.11988732399374</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:e62d67fa-f8a6-4a7e-b591-32d621146902</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.263266138588506 -123.11751840372688 49.26330411134447 -123.11988732399374</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:e508eee3-7d83-4031-9b21-57703a29a2a6</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.263266138588506 -123.11751840372688 49.26330411134447 -123.11988732399374</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:0f23e5da-ae09-45e8-9463-72d484a7d8e4</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.263266138588506 -123.11751840372688 49.26330411134447 -123.11988732399374</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:4f7060c9-85c5-4164-8fa0-5217e897f2ae</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26330411134447 -123.11988732399374 49.26333585681982 -123.12183802717281</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:6568d16a-a2b7-4930-a49a-b3bed0a5dbe8</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26330411134447 -123.11988732399374 49.26333585681982 -123.12183802717281</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:c2c18b98-ea8f-47b6-818e-8420974bb176</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26330411134447 -123.11988732399374 49.26333585681982 -123.12183802717281</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:f9021954-b90f-4713-96eb-f5e34e672d5d</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26330411134447 -123.11988732399374 49.26333585681982 -123.12183802717281</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:fabbff82-7295-4a75-9d54-a222bb46bf25</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26322406705316 -123.11489886007084 49.263266138588506 -123.11751840372688</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:b3ee5ec4-a2f6-4efd-a1ad-8c2018668dab</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.263506858322586 -123.11483557678204 49.263340294026676 -123.11484467401556 49.26322406705316 -123.11489886007084</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:a6a6d5ce-526e-415c-93a1-652d4e85b46b</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26322406705316 -123.11489886007084 49.263266138588506 -123.11751840372688</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:8b6aa78b-92be-4163-8c6c-98373a784811</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26322406705316 -123.11489886007084 49.263266138588506 -123.11751840372688</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:11b68852-16d7-4574-9cac-8d8b902fd38d</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.263506858322586 -123.11483557678204 49.263340294026676 -123.11484467401556 49.26322406705316 -123.11489886007084</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:116e2480-0b6b-459a-aa8c-a4ed2551f7a4</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.263506858322586 -123.11483557678204 49.263340294026676 -123.11484467401556 49.26322406705316 -123.11489886007084</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:5057d3e2-8717-469b-921e-27d5af78c194</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.263506858322586 -123.11483557678204 49.263340294026676 -123.11484467401556 49.26322406705316 -123.11489886007084</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:68098354-b67c-4045-9c70-d72b22d80367</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.263506858322586 -123.11483557678204 49.263340294026676 -123.11484467401556 49.26322406705316 -123.11489886007084</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:49613cbf-3717-4e5b-8715-db8482c2f0b5</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.263506858322586 -123.11483557678204 49.263340294026676 -123.11484467401556 49.26322406705316 -123.11489886007084</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:83339690-83c8-4152-af93-e74d1f6d76f4</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.263187640128876 -123.11291515457648 49.26322406705316 -123.11489886007084</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:3a54be52-ca8b-4a83-bb7e-d53a94ffbd95</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.263187640128876 -123.11291515457648 49.26322406705316 -123.11489886007084</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:ee62cdfb-8a3e-48b6-8891-9c15f1ba564e</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26346970567877 -123.1129030431776 49.263187640128876 -123.11291515457648</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:ca01d2b0-2f4c-46e1-9a8d-503bbfbbfe4d</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.263152340600584 -123.11097716874485 49.263187640128876 -123.11291515457648</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:1b25f67f-a0c1-49cd-9633-d804fcaa0d6b</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.263152340600584 -123.11097716874485 49.263187640128876 -123.11291515457648</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:dd513740-6c2a-440f-b0c3-34a323904bb5</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.263187640128876 -123.11291515457648 49.26322406705316 -123.11489886007084</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:940998a1-9e9d-4da9-9137-8884e16d9405</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.263187640128876 -123.11291515457648 49.26322406705316 -123.11489886007084</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:f37d1d16-28fe-402d-a432-0811a1f38eb1</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26346970567877 -123.1129030431776 49.263187640128876 -123.11291515457648</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:7e887638-9747-4dce-9650-5b19b44b34e5</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26346970567877 -123.1129030431776 49.263187640128876 -123.11291515457648</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:7bb8c9fb-7be0-4cd7-9513-0f83516e55e4</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.2638901364771 -123.12658697693531 49.26341212086578 -123.12660458426438</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:15e4f705-0d2e-4ac6-9b8f-1150a021f24f</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.2638901364771 -123.12658697693531 49.26341212086578 -123.12660458426438</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:bb302e15-0de6-4b42-a3c6-3872550c7ae1</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.2638901364771 -123.12658697693531 49.26341212086578 -123.12660458426438</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:254b77f7-03b4-45e3-8f95-9a40f1638376</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.2638901364771 -123.12658697693531 49.26341212086578 -123.12660458426438</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:a0b71db4-f319-4a27-8888-c7d93e4408d3</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26341212086578 -123.12660458426438 49.2634505139813 -123.12900217715648</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:a8c9fee4-87d7-4a1e-9cd9-0d52a014a3b4</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.2634505139813 -123.12900217715648 49.2634884290168 -123.13137301181327</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:48807cb0-c9d2-4121-acdd-515f9ea9296d</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26341212086578 -123.12660458426438 49.2634505139813 -123.12900217715648</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:7955c497-6777-447b-9f6e-ad90720fc96b</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.2634505139813 -123.12900217715648 49.2634884290168 -123.13137301181327</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:818c8bdf-cdfb-4305-a042-a527547a14c8</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.2638901364771 -123.12658697693531 49.26341212086578 -123.12660458426438</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:e79be1b4-79b8-4107-9f1a-ce603b81c911</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26379556025475 -123.15054446344313 49.26329014919253 -123.15056307545694</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:bf68c896-e943-49d4-aafd-fdfc12cc1063</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26383417496476 -123.15294300168014 49.263328384490904 -123.15296253641276</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:19c5c7cc-5a12-476d-9820-6c22a73bcb5f</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26333585681982 -123.12183802717281 49.26337366117119 -123.12420590913786</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:287ee32d-8dc4-4e0b-a6b1-0bba9cf6043f</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26383417496476 -123.15294300168014 49.263328384490904 -123.15296253641276</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:763aebfd-ed34-4c70-87b4-0c8319fd54f7</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26337366117119 -123.12420590913786 49.26341212086578 -123.12660458426438</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:00c331d8-1843-45d9-8c89-534f7e1b6d7c</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.2638901364771 -123.12658697693531 49.26341212086578 -123.12660458426438</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:56896ab2-3e96-4dfa-bce3-fcacaf633db7</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.263565159374224 -123.13611231678367 49.263059041522325 -123.13612967222771</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:67d72bf8-31d4-4365-80cc-7653d1e24223</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.263565159374224 -123.13611231678367 49.263059041522325 -123.13612967222771</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:47e9bc33-a90d-4bd9-a8dc-f2af23717a88</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.263565159374224 -123.13611231678367 49.263059041522325 -123.13612967222771</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:47c9eab0-2e1d-4f0d-b48c-87d4c8ab3a3d</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.263565159374224 -123.13611231678367 49.263059041522325 -123.13612967222771</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:252e6226-6b10-4b0a-a610-923efcb903d9</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.263565159374224 -123.13611231678367 49.263059041522325 -123.13612967222771</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:d3aae447-57d5-43c6-b80e-866c834dfefe</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26329014919253 -123.15056307545694 49.263328384490904 -123.15296253641276</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:b006a22a-bb0d-4709-9636-32eba8bce9d0</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.263565159374224 -123.13611231678367 49.263059041522325 -123.13612967222771</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:e33d5696-f1ce-493b-b9c1-07a9963682ff</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26379556025475 -123.15054446344313 49.26329014919253 -123.15056307545694</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:c07277a6-230e-4252-8d9a-cda9e40fd819</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26329014919253 -123.15056307545694 49.263328384490904 -123.15296253641276</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:25e65a05-77bd-45d8-b296-d61c59e3977c</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26268651720608 -123.11293345949241 49.262718004765475 -123.11491784815064</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:81a6c4c3-1b43-483b-a770-1cb25cafbfd3</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.263152340600584 -123.11097716874485 49.26304059671145 -123.11098281453887 49.26265228257785 -123.11098282336297</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:30535bfd-1b27-4584-b77a-8cace521f5fb</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.263152340600584 -123.11097716874485 49.26304059671145 -123.11098281453887 49.26265228257785 -123.11098282336297</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:3faa4b5c-7bf3-47d9-89d1-1ee003c01c12</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.263152340600584 -123.11097716874485 49.26304059671145 -123.11098281453887 49.26265228257785 -123.11098282336297</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:612f9947-9448-402c-adcc-4c7c55eae981</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.263152340600584 -123.11097716874485 49.26304059671145 -123.11098281453887 49.26265228257785 -123.11098282336297</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:dfa8c38f-4b55-4748-8f42-635dd2eabb0e</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.263152340600584 -123.11097716874485 49.26304059671145 -123.11098281453887 49.26265228257785 -123.11098282336297</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:b4558649-0a1a-4378-9960-b8a6a2415193</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26268651720608 -123.11293345949241 49.26222609848756 -123.11295081238318</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:b9d9e2a4-d07d-4ad4-aef7-801544bdda3f</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26268651720608 -123.11293345949241 49.26222609848756 -123.11295081238318</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:a4f975b4-56b6-4b5e-ad6e-ab05b26bb210</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26268651720608 -123.11293345949241 49.26222609848756 -123.11295081238318</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:5048fab4-401a-41da-b74f-1ea28d60bfd7</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26268651720608 -123.11293345949241 49.26222609848756 -123.11295081238318</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:791347b0-7f7b-4941-95a1-b57e1e31bfc9</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26268651720608 -123.11293345949241 49.26222609848756 -123.11295081238318</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:7375f3a3-be73-4691-87a1-52778875ea2e</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26268651720608 -123.11293345949241 49.26222609848756 -123.11295081238318</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:150aa1e3-fcf2-47ca-b611-a64e05193c3c</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26268651720608 -123.11293345949241 49.26222609848756 -123.11295081238318</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:0e402abc-3e32-4fa5-a70f-c647e46df91c</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.263152340600584 -123.11097716874485 49.26304059671145 -123.11098281453887 49.26265228257785 -123.11098282336297</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:d788896b-2d3e-4278-b5b6-cd5c47d623eb</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.263152340600584 -123.11097716874485 49.26304059671145 -123.11098281453887 49.26265228257785 -123.11098282336297</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:b8c404b9-e8e6-45f0-9816-cc3ab4d6acf1</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26322406705316 -123.11489886007084 49.262718004765475 -123.11491784815064</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:d3fad614-b232-48a1-9481-fb8a7a414389</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26322406705316 -123.11489886007084 49.262718004765475 -123.11491784815064</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:7472fb8e-bd1b-4d65-881c-738934ef6753</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26322406705316 -123.11489886007084 49.262718004765475 -123.11491784815064</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:9ac45150-2130-43c5-8cce-62ee71d1f00f</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26322406705316 -123.11489886007084 49.262718004765475 -123.11491784815064</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:e6e246c5-1d46-45e2-8a85-1fba1e883403</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26322406705316 -123.11489886007084 49.262718004765475 -123.11491784815064</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:9d17e965-fa3c-40bb-ad84-0465a2cb4ced</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26322406705316 -123.11489886007084 49.262718004765475 -123.11491784815064</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:53699978-fc33-4c0c-adda-82576ed88285</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26286802036566 -123.12422466571381 49.262407096483344 -123.12424176116347</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:f8e673d4-8e77-418a-8d01-2cd47b019794</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26268651720608 -123.11293345949241 49.262718004765475 -123.11491784815064</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:c8d62da2-995b-402f-bebf-5e15d1d3fffd</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26268651720608 -123.11293345949241 49.262718004765475 -123.11491784815064</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:8e6342dc-74ab-4edf-9d85-1cd66d7bdbf1</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26268651720608 -123.11293345949241 49.262718004765475 -123.11491784815064</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:c6ba47ca-9e77-4f3d-882e-dd1526f9d7dc</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26268651720608 -123.11293345949241 49.262718004765475 -123.11491784815064</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:a2f4bd8b-35b4-4930-a29a-a1a4c1fb0942</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26268651720608 -123.11293345949241 49.262718004765475 -123.11491784815064</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:2e5fd157-3f99-469b-adb7-dfc19adc4434</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26268651720608 -123.11293345949241 49.262718004765475 -123.11491784815064</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:b153c11a-884c-4d3c-8df9-0ba79dd76962</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26268651720608 -123.11293345949241 49.262718004765475 -123.11491784815064</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:7269ab57-a49b-4aad-9a23-70e51837fb11</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26322406705316 -123.11489886007084 49.262718004765475 -123.11491784815064</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:5ee22bc9-3d60-46f8-8e6b-25680a06624b</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.262718004765475 -123.11491784815064 49.26225784655719 -123.11493525191679</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:f5d1ca8c-d18e-403c-800c-351c5afc0e21</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.262718004765475 -123.11491784815064 49.26225784655719 -123.11493525191679</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:01e037a1-1fbe-4a20-8f93-e3b3a4fac9e7</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.262718004765475 -123.11491784815064 49.26225784655719 -123.11493525191679</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:b9b06deb-3c15-405e-9158-0afa98b8ac89</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.262718004765475 -123.11491784815064 49.26225784655719 -123.11493525191679</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:6b3a69fe-3cf0-4941-84bf-a56860cfafcc</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.262718004765475 -123.11491784815064 49.26225784655719 -123.11493525191679</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:c2c60432-79db-44a6-aa7d-758ec738d12d</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26286802036566 -123.12422466571381 49.262407096483344 -123.12424176116347</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:9496843f-a82e-442c-940d-0d916a3524fd</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.262718004765475 -123.11491784815064 49.26225784655719 -123.11493525191679</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:854aebad-9db7-4ff2-b9fb-e34c12bf94e5</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.262718004765475 -123.11491784815064 49.26225784655719 -123.11493525191679</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:05360d93-0792-40a7-8ba9-8b12590d6bf8</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26286802036566 -123.12422466571381 49.262407096483344 -123.12424176116347</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:60b75700-dbd9-4dc8-8b20-4f3178867b3e</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26286802036566 -123.12422466571381 49.26288369021097 -123.12519954198356</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:29b5b991-d4fc-4db0-a57d-63bc1e2221af</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.263328384490904 -123.15296253641276 49.26286825656257 -123.15297987536017</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:55f18861-9423-4474-9454-7f57c2181dc8</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.263328384490904 -123.15296253641276 49.26286825656257 -123.15297987536017</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:2ad4afd1-3018-4f4b-a5b1-fc65bc02934d</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26341212086578 -123.12660458426438 49.26290655164061 -123.12662333027362</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:cf3f1eac-f0f0-4b12-9917-a0f5fdb348dd</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26341212086578 -123.12660458426438 49.26290655164061 -123.12662333027362</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:9ffe9859-3a69-4c23-b9b4-a053f262c173</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26341212086578 -123.12660458426438 49.26290655164061 -123.12662333027362</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:4a3044dd-5c58-4e42-b821-c2806be9645c</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26341212086578 -123.12660458426438 49.26290655164061 -123.12662333027362</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:b3c3e0e4-a74e-4930-9da6-cfba4ceb4deb</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26341212086578 -123.12660458426438 49.26290655164061 -123.12662333027362</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:68325d96-e945-469d-94ed-349980fc1ed7</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26341212086578 -123.12660458426438 49.26290655164061 -123.12662333027362</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:6512029b-2a45-40da-8571-15c9e91c4c8a</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.263059041522325 -123.13612967222771 49.262598502185995 -123.1361471664595</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:5c8a3e2b-8481-4147-9a4e-714224d8b648</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.263059041522325 -123.13612967222771 49.262598502185995 -123.1361471664595</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:a4faaee2-e031-451f-9ec9-ee76f4925d10</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26286802036566 -123.12422466571381 49.26288369021097 -123.12519954198356</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:648c31bb-56f0-46ec-be64-66371a56e7dd</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.263059041522325 -123.13612967222771 49.262598502185995 -123.1361471664595</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:83af62da-3ae4-408d-931e-ad270c73591a</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26285899270036 -123.15241403025168 49.26382526347635 -123.15238947560277</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:f3c6e6df-f9e7-423d-a2ab-8e950bc4c3c3</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26285899270036 -123.15241403025168 49.26382526347635 -123.15238947560277</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:00df278f-4419-4b4f-b524-5a1be0961b36</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26329014919253 -123.15056307545694 49.26283022879312 -123.15058020367758</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:79db359b-e828-48d6-81f7-e68b60a1f165</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26329014919253 -123.15056307545694 49.26283022879312 -123.15058020367758</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:1e4f8fab-bb99-4e97-bb13-adcf90dea138</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26286802036566 -123.12422466571381 49.26288369021097 -123.12519954198356</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:24262547-5e7b-4f6a-be7d-d0e1b57a371d</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26290655164061 -123.12662333027362 49.26244577133269 -123.12664041750735</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:84b51795-80a3-4771-888c-8e802fea9e61</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26290655164061 -123.12662333027362 49.26244577133269 -123.12664041750735</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:5e90d670-7ae3-4a00-bad4-a00995fe51b4</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26290655164061 -123.12662333027362 49.26244577133269 -123.12664041750735</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:2c4b4114-c90a-4897-ae00-a833f604fa35</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26290655164061 -123.12662333027362 49.26244577133269 -123.12664041750735</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:f4972108-9d0c-48e2-8c2d-041f36b31eaf</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26290655164061 -123.12662333027362 49.26244577133269 -123.12664041750735</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:07b25d7d-9f98-4303-962c-2e725dbe95a4</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.263059041522325 -123.13612967222771 49.262598502185995 -123.1361471664595</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:372cbe13-a69c-4706-9aed-0e1391dcdd02</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26290655164061 -123.12662333027362 49.26244577133269 -123.12664041750735</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:2b4a38e4-23f9-4aed-896d-4466a1d63d2c</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.263059041522325 -123.13612967222771 49.262598502185995 -123.1361471664595</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:34d34276-5a5b-4639-92bf-3e8398ae4d94</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.263059041522325 -123.13612967222771 49.262598502185995 -123.1361471664595</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Re-opening May 20 @ 7am. 
Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

Full closure to vehicle traffic: Broadway between Main Street and Quebec Street
Detour via Main St --&gt; E 8th Av --&gt; Quebec St
Location: Broadway - Main Street to Quebec Street
Schedule: Jan 26, 2026 7:00 AM - May 20, 2026 7:00 AM</content>
<id>urn:uuid:5cba5129-df41-42d9-b2eb-09aeb6c08cbf</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/595dacda-d252-4c24-b8cd-e3bfef1415f5"/>
<published>2025-10-24T07:00:00Z</published>
<title>Broadway Subway – FULL Road Closure</title>
<updated>2026-05-19T20:38:32.7612949Z</updated>
<georss:line>49.26293206479838 -123.10176134138447 49.262913455480145 -123.10095954934879</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Re-opening May 20 @ 7am. 
Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

Full closure to vehicle traffic: Broadway between Main Street and Quebec Street
Detour via Main St --&gt; E 8th Av --&gt; Quebec St
Location: Broadway - Main Street to Quebec Street
Schedule: Jan 26, 2026 7:00 AM - May 20, 2026 7:00 AM</content>
<id>urn:uuid:506a0b57-1f46-4f91-b891-a9832cf9ea10</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/595dacda-d252-4c24-b8cd-e3bfef1415f5"/>
<published>2025-10-24T07:00:00Z</published>
<title>Broadway Subway – FULL Road Closure</title>
<updated>2026-05-19T20:38:32.7612949Z</updated>
<georss:line>49.262960119659624 -123.10296078030674 49.26293206479838 -123.10176134138447</georss:line>
</entry>
<entry>
<category term="Road Closure"/>
<content>
Please note map shows areas of concern that will require coordination above and beyond typical processes. During Broadway Subway early works, if you have work to undertake in the affected area please contact Greg Nowak, Katrina McCawley, or Brendan Wu to help facilitate and coordinate the work. If you have any uncertainty surrounding the boundaries, what coordination is required, or if there are any other questions related to coordination, please feel free to reach out to any of us.

Construction is expected to take 3-4 years, with major construction activities at Great Northern Way and Thornton, as well as along Broadway at each of the station locations:

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Broadway is expected to have full time bus lanes leading up to the construction sites and only 3-4 travel lanes through station locations.  The contractor’s construction scheme may also include utilities relocation that could impact areas within a block around the station (e.g. at 8th and Main St, Cambie between Broadway and 10th).  

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

As we are planning for work for 2020 and onward, please be mindful of any planned construction near Broadway Subway Project footprint with particular focus on all E/W and N/S arterial. 

Development falling along one of the identified areas below will be subject to changes in street-use availability during construction.
More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: 2500 Yukon St
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:1e872720-a805-47d1-9377-c89db127a911</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/9d5234cb-7222-4864-8b3c-da68a4070dd5"/>
<published>2026-04-22T07:00:00Z</published>
<title>Broadway Subway – FULL Road Closure</title>
<updated>2026-04-22T18:27:56.5139321Z</updated>
<georss:line>49.26314262917117 -123.11290372071929 49.26271116343494 -123.11292025581048</georss:line>
</entry>
<entry>
<category term="Road Closure"/>
<content>Please note map shows areas of concern that will require coordination above and beyond typical processes. During Broadway Subway early works, if you have work to undertake in the affected area please contact Greg Nowak, Katrina McCawley, or Brendan Wu to help facilitate and coordinate the work. If you have any uncertainty surrounding the boundaries, what coordination is required, or if there are any other questions related to coordination, please feel free to reach out to any of us.

Construction is expected to take 3-4 years, with major construction activities at Great Northern Way and Thornton, as well as along Broadway at each of the station locations:

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Broadway is expected to have full time bus lanes leading up to the construction sites and only 3-4 travel lanes through station locations.  The contractor’s construction scheme may also include utilities relocation that could impact areas within a block around the station (e.g. at 8th and Main St, Cambie between Broadway and 10th).  

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

As we are planning for work for 2020 and onward, please be mindful of any planned construction near Broadway Subway Project footprint with particular focus on all E/W and N/S arterial. 

Development falling along one of the identified areas below will be subject to changes in street-use availability during construction.
More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: 2500 Quebec St from Broadway to Lane South
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:8b43d63e-224c-490b-a730-fd2e51aa5982</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/8c9e9b93-e601-45b1-952d-5cfc44133302"/>
<published>2026-04-23T07:00:00Z</published>
<title>Broadway Subway – FULL Road Closure </title>
<updated>2026-04-23T21:32:48.1796633Z</updated>
<georss:line>49.26291993074807 -123.10296640189127 49.262549373000354 -123.10298400887085</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

Full Closures:
•	Quebec St from E Broadway to the lane north
•	Quebec St from E Broadway to the lane south
•	Yukon St from W Broadway to the lane south
•	Laneway south of Broadway from Ash to Cambie (at Cambie)
•	Laurel St from W Broadway to the lane north (1 lane open to emergency services) 
•	Laurel St from W Broadway to the lane south (1 lane open to emergency services) 
•	Cypress St from W Broadway to the lane north (Duration ~3 months for TBM Extraction)

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Mar 31, 2026</content>
<id>urn:uuid:488ca33c-1e2e-4c4f-9d35-47c40d6560eb</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1cbc4ee7-698c-4ceb-bcc7-9c9d5c2814d5"/>
<published>2024-05-16T07:00:00Z</published>
<title>Broadway Subway – FULL Road Closures</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26331509000124 -123.10296232191241 49.26296573076257 -123.10297621915663</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

Full Closures:
•	Quebec St from E Broadway to the lane north
•	Quebec St from E Broadway to the lane south
•	Yukon St from W Broadway to the lane south
•	Laneway south of Broadway from Ash to Cambie (at Cambie)
•	Laurel St from W Broadway to the lane north (1 lane open to emergency services) 
•	Laurel St from W Broadway to the lane south (1 lane open to emergency services) 
•	Cypress St from W Broadway to the lane north (Duration ~3 months for TBM Extraction)

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Mar 31, 2026</content>
<id>urn:uuid:c6451bac-83f1-44a9-b158-9dc4bb37b771</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1cbc4ee7-698c-4ceb-bcc7-9c9d5c2814d5"/>
<published>2024-05-16T07:00:00Z</published>
<title>Broadway Subway – FULL Road Closures</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26296573076257 -123.10297621915663 49.26253066887506 -123.10299604033806</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

Full Closures:
•	Quebec St from E Broadway to the lane north
•	Quebec St from E Broadway to the lane south
•	Yukon St from W Broadway to the lane south
•	Laneway south of Broadway from Ash to Cambie (at Cambie)
•	Laurel St from W Broadway to the lane north (1 lane open to emergency services) 
•	Laurel St from W Broadway to the lane south (1 lane open to emergency services) 
•	Cypress St from W Broadway to the lane north (Duration ~3 months for TBM Extraction)

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Mar 31, 2026</content>
<id>urn:uuid:fec9c077-6b27-4548-be4a-134ae63177f6</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1cbc4ee7-698c-4ceb-bcc7-9c9d5c2814d5"/>
<published>2024-05-16T07:00:00Z</published>
<title>Broadway Subway – FULL Road Closures</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.263187640128876 -123.11291515457648 49.26268651720608 -123.11293345949241</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

Full Closures:
•	Quebec St from E Broadway to the lane north
•	Quebec St from E Broadway to the lane south
•	Yukon St from W Broadway to the lane south
•	Laneway south of Broadway from Ash to Cambie (at Cambie)
•	Laurel St from W Broadway to the lane north (1 lane open to emergency services) 
•	Laurel St from W Broadway to the lane south (1 lane open to emergency services) 
•	Cypress St from W Broadway to the lane north (Duration ~3 months for TBM Extraction)

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Mar 31, 2026</content>
<id>urn:uuid:d7c4d3bc-05fc-441e-9f72-1a00019b48c5</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1cbc4ee7-698c-4ceb-bcc7-9c9d5c2814d5"/>
<published>2024-05-16T07:00:00Z</published>
<title>Broadway Subway – FULL Road Closures</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.262718004765446 -123.11491784815064 49.262760158011474 -123.11753622444502</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

Full Closures:
•	Quebec St from E Broadway to the lane north
•	Quebec St from E Broadway to the lane south
•	Yukon St from W Broadway to the lane south
•	Laneway south of Broadway from Ash to Cambie (at Cambie)
•	Laurel St from W Broadway to the lane north (1 lane open to emergency services) 
•	Laurel St from W Broadway to the lane south (1 lane open to emergency services) 
•	Cypress St from W Broadway to the lane north (Duration ~3 months for TBM Extraction)

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Mar 31, 2026</content>
<id>urn:uuid:9edd920f-d14a-4482-b1c7-d94590fca035</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1cbc4ee7-698c-4ceb-bcc7-9c9d5c2814d5"/>
<published>2024-05-16T07:00:00Z</published>
<title>Broadway Subway – FULL Road Closures</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26385173035064 -123.12418833376523 49.26337366117119 -123.12420590913786</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

Full Closures:
•	Quebec St from E Broadway to the lane north
•	Quebec St from E Broadway to the lane south
•	Yukon St from W Broadway to the lane south
•	Laneway south of Broadway from Ash to Cambie (at Cambie)
•	Laurel St from W Broadway to the lane north (1 lane open to emergency services) 
•	Laurel St from W Broadway to the lane south (1 lane open to emergency services) 
•	Cypress St from W Broadway to the lane north (Duration ~3 months for TBM Extraction)

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Mar 31, 2026</content>
<id>urn:uuid:f0ee9743-76d1-45fb-a4bf-dacb1f73a598</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1cbc4ee7-698c-4ceb-bcc7-9c9d5c2814d5"/>
<published>2024-05-16T07:00:00Z</published>
<title>Broadway Subway – FULL Road Closures</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26337366117119 -123.12420590913786 49.26286802036566 -123.12422466571381</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

Full Closures:
•	Quebec St from E Broadway to the lane north
•	Quebec St from E Broadway to the lane south
•	Yukon St from W Broadway to the lane south
•	Laneway south of Broadway from Ash to Cambie (at Cambie)
•	Laurel St from W Broadway to the lane north (1 lane open to emergency services) 
•	Laurel St from W Broadway to the lane south (1 lane open to emergency services) 
•	Cypress St from W Broadway to the lane north (Duration ~3 months for TBM Extraction)

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Mar 31, 2026</content>
<id>urn:uuid:6bb33834-eb03-49cd-9bc6-b36c41f10e5b</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1cbc4ee7-698c-4ceb-bcc7-9c9d5c2814d5"/>
<published>2024-05-16T07:00:00Z</published>
<title>Broadway Subway – FULL Road Closures</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
<georss:line>49.26423539325219 -123.14812689528398 49.26375735519022 -123.14814539417256</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

Full Closure
Location: Arbutus from W 8th Av to Broadway
Schedule: Jun 1, 2026 - Jun 6, 2026</content>
<id>urn:uuid:4f0ba912-a6d5-4555-86e4-aecec2cd6eb7</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/b4535aa5-3c24-4e33-8199-566ed18de6c3"/>
<published>2026-06-02T07:00:00Z</published>
<title>Broadway Subway – FULL Road Closures </title>
<updated>2026-06-02T15:00:26.5374142Z</updated>
<georss:line>49.264306552831954 -123.15291028384895 49.26382856961291 -123.1529275546611</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

Full Closure
Location: Arbutus from W 8th Av to Broadway
Schedule: Jun 1, 2026 - Jun 6, 2026</content>
<id>urn:uuid:9f3453bc-f9a9-4fe3-a998-ac184f17eed5</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/b4535aa5-3c24-4e33-8199-566ed18de6c3"/>
<published>2026-06-02T07:00:00Z</published>
<title>Broadway Subway – FULL Road Closures </title>
<updated>2026-06-02T15:00:26.5374142Z</updated>
<georss:line>49.2647396938506 -123.1528938088216 49.264306552831954 -123.15291028384895</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

Reduced Lanes: Broadway between Main Street and Quebec Street
Location: Broadway - Main Street to Quebec Street
Schedule: May 20, 2026 - Sep 30, 2026</content>
<id>urn:uuid:6ab76de0-9672-4a92-aa02-935943489c43</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/89df52ca-14e1-4f07-96e9-409a7907ed07"/>
<published>2025-11-04T08:00:00Z</published>
<title>Broadway Subway – Reduced Lanes</title>
<updated>2026-05-20T17:00:36.8707249Z</updated>
<georss:line>49.26293206479838 -123.10176134138447 49.262913455480145 -123.10095954934879</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

Reduced Lanes: Broadway between Main Street and Quebec Street
Location: Broadway - Main Street to Quebec Street
Schedule: May 20, 2026 - Sep 30, 2026</content>
<id>urn:uuid:f10f6295-3158-4659-88f4-856413923ed4</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/89df52ca-14e1-4f07-96e9-409a7907ed07"/>
<published>2025-11-04T08:00:00Z</published>
<title>Broadway Subway – Reduced Lanes</title>
<updated>2026-05-20T17:00:36.8707249Z</updated>
<georss:line>49.262960119659624 -123.10296078030674 49.26293206479838 -123.10176134138447</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Closure of 2500 Carolina from Broadway to alley south. Approx 10:00 to 18:00.
Location: 
Schedule: Aug 29, 2026</content>
<id>urn:uuid:99bac2b0-d635-4442-91e3-fe1763f3fee6</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ac31e55d-f605-4837-983c-a50fa5f38523"/>
<published>2026-01-02T08:00:00Z</published>
<title>Broadway and Carolina Block Party</title>
<updated>2026-01-02T19:44:39.8517998Z</updated>
<georss:line>49.262489799942614 -123.09105344883959 49.26199242088822 -123.09106238831065</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Closure of 2500 Carolina from Broadway to alley south. Approx 10:00 to 18:00.
Location: 
Schedule: Aug 29, 2026</content>
<id>urn:uuid:b1f4da69-71dd-4799-a2ed-a18a420152cd</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ac31e55d-f605-4837-983c-a50fa5f38523"/>
<published>2026-01-02T08:00:00Z</published>
<title>Broadway and Carolina Block Party</title>
<updated>2026-01-02T19:44:39.8517998Z</updated>
<georss:line>49.26199242088822 -123.09106238831065 49.261540333488426 -123.09107028394136</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Intersection of 800 Bute St and Rosemary Brown lane will be closed due to planned construction activities as part of the capital improvements project for Bute / Robson.  Drivers will be unable to travel east / west at this intersection due to existing pavement removal to facilitate new design related to capital project works being carried out.
Location: 
Schedule: May 5, 2025 - May 8, 2025</content>
<id>urn:uuid:7a78d4d9-9af4-41ee-8e22-57ed6f587b47</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/6d243e08-0ace-46df-8b83-aaecd0fb1fa8"/>
<published>2025-05-05T07:00:00Z</published>
<title>Bute Robson Plaza construction</title>
<updated>2025-05-05T15:18:11.2692286Z</updated>
<georss:line>49.28573071186838 -123.12764458483045 49.285580248567896 -123.1274192792732</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Construction for Bute-Robson Plaza (Eihu to Haro) continues until Q4 2025. 
Scope of Project: creating a permanent public space/plaza, continuation of the cycling facility, sidewalk widening along Robson St.
Traffic Impacts: Robson St. has re-opened to two-way traffic. 
Permanent closure of Bute b/w Haro and Robson St, Rosemary Brown lane and Haro St only thru traffic.


Location: Bute St from Haro St to Eihu Ln, Along Robson St ~50m on either side of Bute
Schedule: Jul 1, 2024 - Nov 30, 2025</content>
<id>urn:uuid:128ddee1-cae0-4444-bafa-c2b9737a3f19</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/8f67eb8f-aa60-4ad2-a7bb-9e266c3d228f"/>
<published>2024-07-03T07:00:00Z</published>
<title>Bute-Robson Plaza</title>
<updated>2026-02-15T02:01:11.9150208Z</updated>
<georss:line>49.285658505992046 -123.12752686679153 49.285306809701325 -123.12805828888578</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Construction for Bute-Robson Plaza (Eihu to Haro) continues until Q4 2025. 
Scope of Project: creating a permanent public space/plaza, continuation of the cycling facility, sidewalk widening along Robson St.
Traffic Impacts: Robson St. has re-opened to two-way traffic. 
Permanent closure of Bute b/w Haro and Robson St, Rosemary Brown lane and Haro St only thru traffic.


Location: Bute St from Haro St to Eihu Ln, Along Robson St ~50m on either side of Bute
Schedule: Jul 1, 2024 - Nov 30, 2025</content>
<id>urn:uuid:4eae58e4-dd11-4a38-9b5d-3f398053c462</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/8f67eb8f-aa60-4ad2-a7bb-9e266c3d228f"/>
<published>2024-07-03T07:00:00Z</published>
<title>Bute-Robson Plaza</title>
<updated>2026-02-15T02:01:11.9150208Z</updated>
<georss:line>49.28601035301298 -123.1269951900161 49.285658505992046 -123.12752686679153</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Construction for Bute-Robson Plaza (Eihu to Haro) continues until Q4 2025. 
Scope of Project: creating a permanent public space/plaza, continuation of the cycling facility, sidewalk widening along Robson St.
Traffic Impacts: Robson St. has re-opened to two-way traffic. 
Permanent closure of Bute b/w Haro and Robson St, Rosemary Brown lane and Haro St only thru traffic.


Location: Bute St from Haro St to Eihu Ln, Along Robson St ~50m on either side of Bute
Schedule: Jul 1, 2024 - Nov 30, 2025</content>
<id>urn:uuid:9f8da1f7-7f3a-40f4-8ff4-c9219d544248</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/8f67eb8f-aa60-4ad2-a7bb-9e266c3d228f"/>
<published>2024-07-03T07:00:00Z</published>
<title>Bute-Robson Plaza</title>
<updated>2026-02-15T02:01:11.9150208Z</updated>
<georss:line>49.286362287674194 -123.12646336839538 49.28601035301298 -123.1269951900161</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Construction for Bute-Robson Plaza (Eihu to Haro) continues until Q4 2025. 
Scope of Project: creating a permanent public space/plaza, continuation of the cycling facility, sidewalk widening along Robson St.
Traffic Impacts: Robson St. has re-opened to two-way traffic. 
Permanent closure of Bute b/w Haro and Robson St, Rosemary Brown lane and Haro St only thru traffic.


Location: Bute St from Haro St to Eihu Ln, Along Robson St ~50m on either side of Bute
Schedule: Jul 1, 2024 - Nov 30, 2025</content>
<id>urn:uuid:5a684d54-63cb-4ebb-861e-66160049d001</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/8f67eb8f-aa60-4ad2-a7bb-9e266c3d228f"/>
<published>2024-07-03T07:00:00Z</published>
<title>Bute-Robson Plaza</title>
<updated>2026-02-15T02:01:11.9150208Z</updated>
<georss:line>49.28600451833765 -123.12700757277959 49.28535429767987 -123.12600370502423</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Construction for Bute-Robson Plaza (Eihu to Haro) continues until Q4 2025. 
Scope of Project: creating a permanent public space/plaza, continuation of the cycling facility, sidewalk widening along Robson St.
Traffic Impacts: Robson St. has re-opened to two-way traffic. 
Permanent closure of Bute b/w Haro and Robson St, Rosemary Brown lane and Haro St only thru traffic.


Location: Bute St from Haro St to Eihu Ln, Along Robson St ~50m on either side of Bute
Schedule: Jul 1, 2024 - Nov 30, 2025</content>
<id>urn:uuid:03a5cc27-22c1-40c7-9925-8e1ad35ac900</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/8f67eb8f-aa60-4ad2-a7bb-9e266c3d228f"/>
<published>2024-07-03T07:00:00Z</published>
<title>Bute-Robson Plaza</title>
<updated>2026-02-15T02:01:11.9150208Z</updated>
<georss:line>49.28599795048257 -123.12700421567216 49.28647521141099 -123.12771263116697</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Community party for the Mount Pleasant neighbourhood
Location: 100 E 8th Ave
Schedule: Aug 22, 2026</content>
<id>urn:uuid:3bbe952e-5431-4b9e-8eea-ecf71c92db3f</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/990e45e1-937a-4722-93f9-2d6f05a73ee9"/>
<published>2026-02-11T08:00:00Z</published>
<title>CANCELLED - 8th Ave Block Party </title>
<updated>2026-05-20T18:30:46.3968557Z</updated>
<georss:line>49.26370357612984 -123.10097466648992 49.26371757894432 -123.10173104943213</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Permission to close and occupy the curb lane and sidewalk with a pedestrian provision on the 600-700 block of Quebec St to faciliate turf renewal at Andy Livingstone Park 
Location: Andy Livingstone Park
Schedule: Nov 3, 2025 - May 31, 2026</content>
<id>urn:uuid:030ac1d3-37db-4e3d-88f9-fef243a9a4ee</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/77a109ff-3f59-4687-b1c7-6c02530bcd2c"/>
<published>2025-10-14T07:00:00Z</published>
<title>COV Parks - Andy Livingstone - Turf Field Renewal</title>
<updated>2026-04-18T01:01:08.2149651Z</updated>
<georss:line>49.279078117814606 -123.10226689139711 49.27773835612459 -123.10224132741956</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Grind and Pave streets
Location:  2400 Lillooet St
Schedule: Jun 10, 2026 7:00 AM - 3:00 PM</content>
<id>urn:uuid:cf8e392f-18a4-43bc-8013-225690519f12</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/68bb64fa-8c6c-4051-bb5b-3a8db6a32aad"/>
<published>2026-06-08T07:00:00Z</published>
<title>COV Streets - grind &amp; pave</title>
<updated>2026-06-08T21:19:45.7012955Z</updated>
<georss:line>49.26293475320554 -123.03903315544925 49.2624836961385 -123.03903755521932</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Grind and Pave streets
Location:  2400 Lillooet St
Schedule: Jun 10, 2026 7:00 AM - 3:00 PM</content>
<id>urn:uuid:fea03934-f685-4d0b-8079-b677caa34e5f</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/68bb64fa-8c6c-4051-bb5b-3a8db6a32aad"/>
<published>2026-06-08T07:00:00Z</published>
<title>COV Streets - grind &amp; pave</title>
<updated>2026-06-08T21:19:45.7012955Z</updated>
<georss:line>49.2624836961385 -123.03903755521932 49.26190651651646 -123.03904410945547</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>To support the Cambie Bridge seismic upgrade and meet the additional power requirements for Cooper Park, the electrical design includes the replacement and upgrade of two kiosks.

All excavation and road crossings will be completed by a contractor engaged by the City of Vancouver (COV). In addition, BC Hydro will engage its own contractor to carry out excavation and road crossings required to supply power to the kiosks.

This work is being coordinated with the Cambie Bridge PDB team; however, it is being delivered independently by the Electrical Design team.

Location: Under the bridge at 0 Block Nelson Street, heading toward Marina Side Crescent. Road crossings are located at Marina Side Crescent, 1000 Block Pacific Boulevard South, and 0 Block Nelson Street.

Schedule: Aug 3, 2026 - Oct 30, 2026</content>
<id>urn:uuid:b1d93c73-8c46-4630-8d14-dd520f5f2470</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/f72258a1-0e4d-4c7d-86b5-f70649199f50"/>
<published>2026-02-19T08:00:00Z</published>
<title>Cambie Bridge Seismic Upgrade - Electrical Scope of work</title>
<updated>2026-02-19T21:54:18.7485994Z</updated>
<georss:line>49.273868416488654 -123.11486151852314 49.273382278625775 -123.11497183945251 49.273234406391 -123.11534217790609 49.273212462895 -123.11587682762766</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>To support the Cambie Bridge seismic upgrade and meet the additional power requirements for Cooper Park, the electrical design includes the replacement and upgrade of two kiosks.

All excavation and road crossings will be completed by a contractor engaged by the City of Vancouver (COV). In addition, BC Hydro will engage its own contractor to carry out excavation and road crossings required to supply power to the kiosks.

This work is being coordinated with the Cambie Bridge PDB team; however, it is being delivered independently by the Electrical Design team.

Location: Under the bridge at 0 Block Nelson Street, heading toward Marina Side Crescent. Road crossings are located at Marina Side Crescent, 1000 Block Pacific Boulevard South, and 0 Block Nelson Street.

Schedule: Aug 3, 2026 - Oct 30, 2026</content>
<id>urn:uuid:7186ad20-c849-41d3-97b2-ff69b79ca626</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/f72258a1-0e4d-4c7d-86b5-f70649199f50"/>
<published>2026-02-19T08:00:00Z</published>
<title>Cambie Bridge Seismic Upgrade - Electrical Scope of work</title>
<updated>2026-02-19T21:54:18.7485994Z</updated>
<georss:line>49.273868416488654 -123.11486151852314 49.27400106510038 -123.11491023150222 49.27412373170043 -123.11500145644801</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>To support the Cambie Bridge seismic upgrade and meet the additional power requirements for Cooper Park, the electrical design includes the replacement and upgrade of two kiosks.

All excavation and road crossings will be completed by a contractor engaged by the City of Vancouver (COV). In addition, BC Hydro will engage its own contractor to carry out excavation and road crossings required to supply power to the kiosks.

This work is being coordinated with the Cambie Bridge PDB team; however, it is being delivered independently by the Electrical Design team.

Location: Under the bridge at 0 Block Nelson Street, heading toward Marina Side Crescent. Road crossings are located at Marina Side Crescent, 1000 Block Pacific Boulevard South, and 0 Block Nelson Street.

Schedule: Aug 3, 2026 - Oct 30, 2026</content>
<id>urn:uuid:9ef521d6-d6da-4cfb-b53a-55afdf51e848</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/f72258a1-0e4d-4c7d-86b5-f70649199f50"/>
<published>2026-02-19T08:00:00Z</published>
<title>Cambie Bridge Seismic Upgrade - Electrical Scope of work</title>
<updated>2026-02-19T21:54:18.7485994Z</updated>
<georss:line>49.27412373170043 -123.11500145644801 49.27419964469226 -123.115089204917 49.274447348224385 -123.11538384310167 49.274591508187285 -123.11558778241047 49.27476890777908 -123.11584280476939 49.27486177544802 -123.11597597673138</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Median work at Cambie and 31st
Location: 
Schedule: Jul 15, 2024 - Oct 29, 2024</content>
<id>urn:uuid:ac1db009-366d-485b-83ed-457daf792b66</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/fd155ff8-f2f9-474e-aee1-f9c47a70d829"/>
<published>2024-09-13T07:00:00Z</published>
<title>Cambie and 31st Green Infrastructure </title>
<updated>2024-09-13T17:15:36.4957939Z</updated>
<georss:line>49.24320914600901 -123.11817269779047 49.24320509374863 -123.11817700215448 49.24319459453204 -123.11818752861954 49.24318517601958 -123.11819680741463 49.243174974444514 -123.11820655146147 49.24316428702855 -123.1182163905172 49.24315411323883 -123.11822535150228 49.24314365151713 -123.11823439422999 49.243132641086504 -123.1182434356437 49.24312226113591 -123.11825168170057 49.24311143133954 -123.1182600091134 49.243099809738396 -123.11826855445449 49.24308844066368 -123.11827645466516 49.243078170045976 -123.1182833408153 49.2430670354789 -123.11829062332778 49.24305580235793 -123.11829752091182 49.243044551414926 -123.1183042535832 49.24303288688847 -123.1183107929187 49.24302141164105 -123.11831696175278 49.24300996375894 -123.11832275969896 49.24299836312662 -123.11832839241065 49.24298615989889 -123.11833394124645 49.24297455101666 -123.11833884577165 49.24296348231161 -123.11834329820184 49.24295189189792 -123.11834773564449 49.24293950093772 -123.1183521436941 49.242927488325506 -123.1183560168293 49.24291573689814 -123.11835957459263 49.24290407578877 -123.11836277535927 49.242892036978674 -123.11836587904962 49.24288015153763 -123.11836854346126 49.24286839221256 -123.11837102956777 49.24285555364432 -123.11837333448821 49.242843750075 -123.1183751060659 49.242831676818014 -123.11837671213176 49.24281968489811 -123.1183779474423 49.242807819108236 -123.11837899070983 49.24279684425315 -123.11837963767994 49.242164044403665 -123.11840861121777</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Median work at Cambie and 31st
Location: 
Schedule: Jul 15, 2024 - Oct 29, 2024</content>
<id>urn:uuid:c4fc2059-5df1-4e7b-96e8-a82c65bad80d</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/fd155ff8-f2f9-474e-aee1-f9c47a70d829"/>
<published>2024-09-13T07:00:00Z</published>
<title>Cambie and 31st Green Infrastructure </title>
<updated>2024-09-13T17:15:36.4957939Z</updated>
<georss:line>49.243701656590616 -123.11733104807759 49.243358118747466 -123.11796772387692 49.24335044087735 -123.11798136215411 49.243342403337266 -123.11799486218015 49.243334573050475 -123.11800800548173 49.243325923593915 -123.11802173760371 49.24331766175817 -123.11803466004429 49.24330874277891 -123.11804806177872 49.24329971610808 -123.11806121594992 49.24329098724684 -123.11807342283635 49.24328228555248 -123.1180854511766 49.24327294487344 -123.11809779398536 49.243263892728265 -123.11810946426777 49.24325423750906 -123.1181215177987 49.243244339600324 -123.11813339213947 49.24323501846612 -123.1181442099509 49.243225508487484 -123.11815497235179 49.243215845771886 -123.11816555577768 49.24320914600901 -123.11817269779047</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Construction requires additional street use on Cambie, resulting in 1 lane Southbound from July 23 to Aug 3. 
W. 18th remains a FULL closure. 
Completion anticipated in Q1 2026

Location: W. 18th, Cambie to Tupper
Schedule: Jun 16, 2025 - Apr 17, 2026</content>
<id>urn:uuid:da1168ab-0ebf-4acd-9ac6-39f2e087fe83</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/21c10050-74ba-4d33-93b4-2318ccbc14c8"/>
<published>2025-07-22T07:00:00Z</published>
<title>Cambie-18th Permanent Plaza Upgrade</title>
<updated>2026-03-13T21:04:00.9279448Z</updated>
<georss:line>49.25513392868106 -123.1159896480124 49.25490284154617 -123.11516352763581</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Construction requires additional street use on Cambie, resulting in 1 lane Southbound from July 23 to Aug 3. 
W. 18th remains a FULL closure. 
Completion anticipated in Q1 2026

Location: W. 18th, Cambie to Tupper
Schedule: Jun 16, 2025 - Apr 17, 2026</content>
<id>urn:uuid:ff4796c0-55e2-45c1-9a5e-0aaec6da0d65</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/21c10050-74ba-4d33-93b4-2318ccbc14c8"/>
<published>2025-07-22T07:00:00Z</published>
<title>Cambie-18th Permanent Plaza Upgrade</title>
<updated>2026-03-13T21:04:00.9279448Z</updated>
<georss:line>49.25512086958355 -123.11515859166776 49.254733696204056 -123.1151670650061</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content> Commercial Drive: North Grandview Highway to 1st Ave and intersecting streets
Location: 
Schedule: Sep 5, 2026</content>
<id>urn:uuid:f7fa0cd3-1460-42c9-ac80-0daa76ec8314</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/21458dd8-6e8f-4bf0-850b-beb975f99310"/>
<published>2026-05-20T07:00:00Z</published>
<title>Car Free Day Commercial Drive</title>
<updated>2026-05-20T16:47:51.5369636Z</updated>
<georss:line>49.2642396892752 -123.06931571314362 49.2642396892752 -123.06974827270818</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content> Commercial Drive: North Grandview Highway to 1st Ave and intersecting streets
Location: 
Schedule: Sep 5, 2026</content>
<id>urn:uuid:52c9f925-c8fc-420d-8cae-7b5375ebde14</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/21458dd8-6e8f-4bf0-850b-beb975f99310"/>
<published>2026-05-20T07:00:00Z</published>
<title>Car Free Day Commercial Drive</title>
<updated>2026-05-20T16:47:51.5369636Z</updated>
<georss:line>49.267075090776984 -123.06963271959937 49.267075090776984 -123.06897481521587</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content> Commercial Drive: North Grandview Highway to 1st Ave and intersecting streets
Location: 
Schedule: Sep 5, 2026</content>
<id>urn:uuid:1450a2f5-a0f8-4f07-a12d-f7aff75cd342</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/21458dd8-6e8f-4bf0-850b-beb975f99310"/>
<published>2026-05-20T07:00:00Z</published>
<title>Car Free Day Commercial Drive</title>
<updated>2026-05-20T16:47:51.5369636Z</updated>
<georss:line>49.26645497972953 -123.06967449130632 49.26644135082779 -123.069047915703</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content> Commercial Drive: North Grandview Highway to 1st Ave and intersecting streets
Location: 
Schedule: Sep 5, 2026</content>
<id>urn:uuid:fe028ff9-ab0d-422b-8f1e-e35b4d0dae57</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/21458dd8-6e8f-4bf0-850b-beb975f99310"/>
<published>2026-05-20T07:00:00Z</published>
<title>Car Free Day Commercial Drive</title>
<updated>2026-05-20T16:47:51.5369636Z</updated>
<georss:line>49.26578715911634 -123.06967449130632 49.265773530030145 -123.06897481521594</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content> Commercial Drive: North Grandview Highway to 1st Ave and intersecting streets
Location: 
Schedule: Sep 5, 2026</content>
<id>urn:uuid:59924e5b-8b10-4f55-898a-2ffb5aad2f77</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/21458dd8-6e8f-4bf0-850b-beb975f99310"/>
<published>2026-05-20T07:00:00Z</published>
<title>Car Free Day Commercial Drive</title>
<updated>2026-05-20T16:47:51.5369636Z</updated>
<georss:line>49.26959304271938 -123.06960660306805 49.26367374193501 -123.06965563643062</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content> Commercial Drive: North Grandview Highway to 1st Ave and intersecting streets
Location: 
Schedule: Sep 5, 2026</content>
<id>urn:uuid:5e2531c2-de52-43da-9886-805c5ff5dc1d</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/21458dd8-6e8f-4bf0-850b-beb975f99310"/>
<published>2026-05-20T07:00:00Z</published>
<title>Car Free Day Commercial Drive</title>
<updated>2026-05-20T16:47:51.5369636Z</updated>
<georss:line>49.26688428820785 -123.06973714886658 49.26693880330288 -123.07352793126675</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content> Commercial Drive: North Grandview Highway to 1st Ave and intersecting streets
Location: 
Schedule: Sep 5, 2026</content>
<id>urn:uuid:7721a4cb-31a9-40fc-a8c8-9b9eb61d6701</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/21458dd8-6e8f-4bf0-850b-beb975f99310"/>
<published>2026-05-20T07:00:00Z</published>
<title>Car Free Day Commercial Drive</title>
<updated>2026-05-20T16:47:51.5369636Z</updated>
<georss:line>49.26511932946437 -123.07038461032343 49.26507844164101 -123.06916278789694</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content> Commercial Drive: North Grandview Highway to 1st Ave and intersecting streets
Location: 
Schedule: Sep 5, 2026</content>
<id>urn:uuid:da02c8f7-f8ed-4fef-90c7-0a9d448598a4</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/21458dd8-6e8f-4bf0-850b-beb975f99310"/>
<published>2026-05-20T07:00:00Z</published>
<title>Car Free Day Commercial Drive</title>
<updated>2026-05-20T16:47:51.5369636Z</updated>
<georss:line>49.26869688282349 -123.07019663764237 49.268683254541 -123.0690270298495</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content> Commercial Drive: North Grandview Highway to 1st Ave and intersecting streets
Location: 
Schedule: Sep 5, 2026</content>
<id>urn:uuid:d7b26a84-09cc-4376-aa50-c66b68450ddc</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/21458dd8-6e8f-4bf0-850b-beb975f99310"/>
<published>2026-05-20T07:00:00Z</published>
<title>Car Free Day Commercial Drive</title>
<updated>2026-05-20T16:47:51.5369636Z</updated>
<georss:line>49.26597796592816 -123.0697580347201 49.26599159495791 -123.07030106690965</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content> Commercial Drive: North Grandview Highway to 1st Ave and intersecting streets
Location: 
Schedule: Sep 5, 2026</content>
<id>urn:uuid:af1b2955-39be-4b2e-afda-5e8fbfc6e7aa</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/21458dd8-6e8f-4bf0-850b-beb975f99310"/>
<published>2026-05-20T07:00:00Z</published>
<title>Car Free Day Commercial Drive</title>
<updated>2026-05-20T16:47:51.5369636Z</updated>
<georss:line>49.26960315515964 -123.07032195276304 49.26958271311 -123.06905835862965</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content> Commercial Drive: North Grandview Highway to 1st Ave and intersecting streets
Location: 
Schedule: Sep 5, 2026</content>
<id>urn:uuid:283ad17e-2ebc-44f7-8f1e-5f6ff008c993</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/21458dd8-6e8f-4bf0-850b-beb975f99310"/>
<published>2026-05-20T07:00:00Z</published>
<title>Car Free Day Commercial Drive</title>
<updated>2026-05-20T16:47:51.5369636Z</updated>
<georss:line>49.267851922190715 -123.07030106690958 49.26779059383961 -123.06901658692274</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Main Street: 10th Avenue to King Edward Avenue
Location: 
Schedule: Sep 13, 2026</content>
<id>urn:uuid:9ccee70c-b222-4fd9-8e00-cd98b7c45414</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/8c36263c-80ef-4c9b-9c66-68ff6f366c92"/>
<published>2026-05-20T07:00:00Z</published>
<title>Car Free Day Main St</title>
<updated>2026-05-20T16:51:02.2561994Z</updated>
<georss:line>49.25274395661913 -123.10148702504999 49.252737205422505 -123.10106295719493</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Main Street: 10th Avenue to King Edward Avenue
Location: 
Schedule: Sep 13, 2026</content>
<id>urn:uuid:b622c84a-a054-4752-acd6-d111eb412c12</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/8c36263c-80ef-4c9b-9c66-68ff6f366c92"/>
<published>2026-05-20T07:00:00Z</published>
<title>Car Free Day Main St</title>
<updated>2026-05-20T16:51:02.2561994Z</updated>
<georss:line>49.253020754885426 -123.10090781041869 49.25300725256699 -123.10025619395844</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Main Street: 10th Avenue to King Edward Avenue
Location: 
Schedule: Sep 13, 2026</content>
<id>urn:uuid:097c4452-f194-407c-9f45-edc12d4abd30</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/8c36263c-80ef-4c9b-9c66-68ff6f366c92"/>
<published>2026-05-20T07:00:00Z</published>
<title>Car Free Day Main St</title>
<updated>2026-05-20T16:51:02.2561994Z</updated>
<georss:line>49.25345282712567 -123.10093883977393 49.253446076025966 -123.10019413524797</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Main Street: 10th Avenue to King Edward Avenue
Location: 
Schedule: Sep 13, 2026</content>
<id>urn:uuid:98085b98-7ee5-480a-918c-b4bde4c29ed7</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/8c36263c-80ef-4c9b-9c66-68ff6f366c92"/>
<published>2026-05-20T07:00:00Z</published>
<title>Car Free Day Main St</title>
<updated>2026-05-20T16:51:02.2561994Z</updated>
<georss:line>49.25372287035529 -123.10148702505 49.25372287035529 -123.10098021224762</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Main Street: 10th Avenue to King Edward Avenue
Location: 
Schedule: Sep 13, 2026</content>
<id>urn:uuid:b50bfce6-e2f1-4360-97a2-fabd99a2ddca</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/8c36263c-80ef-4c9b-9c66-68ff6f366c92"/>
<published>2026-05-20T07:00:00Z</published>
<title>Car Free Day Main St</title>
<updated>2026-05-20T16:51:02.2561994Z</updated>
<georss:line>49.25391865077302 -123.10096986912922 49.25387814454339 -123.10019413524797</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Main Street: 10th Avenue to King Edward Avenue
Location: 
Schedule: Sep 13, 2026</content>
<id>urn:uuid:22344809-ea1d-424c-b1a6-165c85b60d9d</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/8c36263c-80ef-4c9b-9c66-68ff6f366c92"/>
<published>2026-05-20T07:00:00Z</published>
<title>Car Free Day Main St</title>
<updated>2026-05-20T16:51:02.2561994Z</updated>
<georss:line>49.25460050064916 -123.1014766819316 49.254607251590926 -123.10098021224762</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Main Street: 10th Avenue to King Edward Avenue
Location: 
Schedule: Sep 13, 2026</content>
<id>urn:uuid:b791920e-f92f-4108-9284-948b1f8a4082</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/8c36263c-80ef-4c9b-9c66-68ff6f366c92"/>
<published>2026-05-20T07:00:00Z</published>
<title>Car Free Day Main St</title>
<updated>2026-05-20T16:51:02.2561994Z</updated>
<georss:line>49.261983354773776 -123.10093951255 49.255337509188024 -123.10133704464123 49.25467886314098 -123.1009700919416</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Main Street: 10th Avenue to King Edward Avenue
Location: 
Schedule: Sep 13, 2026</content>
<id>urn:uuid:73271e66-d50e-42c9-bb47-f9595f72f08f</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/8c36263c-80ef-4c9b-9c66-68ff6f366c92"/>
<published>2026-05-20T07:00:00Z</published>
<title>Car Free Day Main St</title>
<updated>2026-05-20T16:51:02.2561994Z</updated>
<georss:line>49.254796277586024 -123.10101124160286 49.25478952667012 -123.1003285957874</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Main Street: 10th Avenue to King Edward Avenue
Location: 
Schedule: Sep 13, 2026</content>
<id>urn:uuid:9e3fd260-7d48-4287-8513-0274d49066b0</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/8c36263c-80ef-4c9b-9c66-68ff6f366c92"/>
<published>2026-05-20T07:00:00Z</published>
<title>Car Free Day Main St</title>
<updated>2026-05-20T16:51:02.2561994Z</updated>
<georss:line>49.251184405672944 -123.10095952601078 49.25119115708188 -123.1002975664321</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Main Street: 10th Avenue to King Edward Avenue
Location: 
Schedule: Sep 13, 2026</content>
<id>urn:uuid:4b255f87-baf4-44d2-9131-0201b440c502</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/8c36263c-80ef-4c9b-9c66-68ff6f366c92"/>
<published>2026-05-20T07:00:00Z</published>
<title>Car Free Day Main St</title>
<updated>2026-05-20T16:51:02.2561994Z</updated>
<georss:line>49.25074556210879 -123.10101124160285 49.25071180475001 -123.10039065449787</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Main Street: 10th Avenue to King Edward Avenue
Location: 
Schedule: Sep 13, 2026</content>
<id>urn:uuid:83eb5618-19d2-484f-9a86-ef622a039471</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/8c36263c-80ef-4c9b-9c66-68ff6f366c92"/>
<published>2026-05-20T07:00:00Z</published>
<title>Car Free Day Main St</title>
<updated>2026-05-20T16:51:02.2561994Z</updated>
<georss:line>49.25208908624839 -123.10100089848443 49.25208908624839 -123.10040099761628</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Main Street: 10th Avenue to King Edward Avenue
Location: 
Schedule: Sep 13, 2026</content>
<id>urn:uuid:8676d21e-4a85-412c-9139-a9738cc8fde8</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/8c36263c-80ef-4c9b-9c66-68ff6f366c92"/>
<published>2026-05-20T07:00:00Z</published>
<title>Car Free Day Main St</title>
<updated>2026-05-20T16:51:02.2561994Z</updated>
<georss:line>49.2525279178694 -123.10095952601075 49.25252116664328 -123.10042168385311</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Main Street: 10th Avenue to King Edward Avenue
Location: 
Schedule: Sep 13, 2026</content>
<id>urn:uuid:0ace4b09-ef96-4b30-95e1-635148096fc0</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/8c36263c-80ef-4c9b-9c66-68ff6f366c92"/>
<published>2026-05-20T07:00:00Z</published>
<title>Car Free Day Main St</title>
<updated>2026-05-20T16:51:02.2561994Z</updated>
<georss:line>49.249371637701785 -123.10106398576336 49.249371637701785 -123.10048477113205</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Main Street: 10th Avenue to King Edward Avenue
Location: 
Schedule: Sep 13, 2026</content>
<id>urn:uuid:0cc6075f-32e8-4d6d-849d-c0376183600a</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/8c36263c-80ef-4c9b-9c66-68ff6f366c92"/>
<published>2026-05-20T07:00:00Z</published>
<title>Car Free Day Main St</title>
<updated>2026-05-20T16:51:02.2561994Z</updated>
<georss:line>49.25459957975633 -123.10104263590374 49.25396596796983 -123.1008988210369 49.248826371842426 -123.10107858962041</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Main Street: 10th Avenue to King Edward Avenue
Location: 
Schedule: Sep 13, 2026</content>
<id>urn:uuid:e5b0d6b7-9c0d-490c-b6af-0df37607c633</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/8c36263c-80ef-4c9b-9c66-68ff6f366c92"/>
<published>2026-05-20T07:00:00Z</published>
<title>Car Free Day Main St</title>
<updated>2026-05-20T16:51:02.2561994Z</updated>
<georss:line>49.25182578540327 -123.10159045623413 49.25181903408108 -123.1010629571949</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Main Street: 10th Avenue to King Edward Avenue
Location: 
Schedule: Sep 13, 2026</content>
<id>urn:uuid:d180717c-2fdb-499b-9d20-451c41a379ae</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/8c36263c-80ef-4c9b-9c66-68ff6f366c92"/>
<published>2026-05-20T07:00:00Z</published>
<title>Car Free Day Main St</title>
<updated>2026-05-20T16:51:02.2561994Z</updated>
<georss:line>49.25841741523362 -123.10175594612885 49.258390413545385 -123.10058717374781</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Main Street: 10th Avenue to King Edward Avenue
Location: 
Schedule: Sep 13, 2026</content>
<id>urn:uuid:3e3fff6f-f557-48a7-bf0e-2c254d38b3d2</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/8c36263c-80ef-4c9b-9c66-68ff6f366c92"/>
<published>2026-05-20T07:00:00Z</published>
<title>Car Free Day Main St</title>
<updated>2026-05-20T16:51:02.2561994Z</updated>
<georss:line>49.259305101807314 -123.10183454506469 49.259278100604746 -123.10047959655216</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Main Street: 10th Avenue to King Edward Avenue
Location: 
Schedule: Sep 13, 2026</content>
<id>urn:uuid:b8371cd4-5545-40d8-bf14-4c458673f61f</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/8c36263c-80ef-4c9b-9c66-68ff6f366c92"/>
<published>2026-05-20T07:00:00Z</published>
<title>Car Free Day Main St</title>
<updated>2026-05-20T16:51:02.2561994Z</updated>
<georss:line>49.256612240442195 -123.10195246537877 49.25660548977464 -123.10078369299772</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Main Street: 10th Avenue to King Edward Avenue
Location: 
Schedule: Sep 13, 2026</content>
<id>urn:uuid:be9f5363-5c55-480a-b822-c1d01b84e5dc</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/8c36263c-80ef-4c9b-9c66-68ff6f366c92"/>
<published>2026-05-20T07:00:00Z</published>
<title>Car Free Day Main St</title>
<updated>2026-05-20T16:51:02.2561994Z</updated>
<georss:line>49.25751682154478 -123.10193177914192 49.2574965699105 -123.10061820310305</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Main Street: 10th Avenue to King Edward Avenue
Location: 
Schedule: Sep 13, 2026</content>
<id>urn:uuid:96f85d2d-ff87-4afa-bea9-6c2a175b7fd2</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/8c36263c-80ef-4c9b-9c66-68ff6f366c92"/>
<published>2026-05-20T07:00:00Z</published>
<title>Car Free Day Main St</title>
<updated>2026-05-20T16:51:02.2561994Z</updated>
<georss:line>49.25571439355136 -123.10193177914192 49.25568739038431 -123.10074232052405</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Main Street: 10th Avenue to King Edward Avenue
Location: 
Schedule: Sep 13, 2026</content>
<id>urn:uuid:b892b1d8-4a5b-4d4b-acfd-ffda7deed74f</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/8c36263c-80ef-4c9b-9c66-68ff6f366c92"/>
<published>2026-05-20T07:00:00Z</published>
<title>Car Free Day Main St</title>
<updated>2026-05-20T16:51:02.2561994Z</updated>
<georss:line>49.26020963355634 -123.10176214323579 49.260202883380856 -123.10046925343373</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Main Street: 10th Avenue to King Edward Avenue
Location: 
Schedule: Sep 13, 2026</content>
<id>urn:uuid:803fb3ab-f8b7-4dd3-b091-ccbfa1045622</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/8c36263c-80ef-4c9b-9c66-68ff6f366c92"/>
<published>2026-05-20T07:00:00Z</published>
<title>Car Free Day Main St</title>
<updated>2026-05-20T16:51:02.2561994Z</updated>
<georss:line>49.261129285203566 -123.10164836893318 49.26109553494561 -123.10046925343372</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Main Street: 10th Avenue to King Edward Avenue
Location: 
Schedule: Sep 13, 2026</content>
<id>urn:uuid:a092b0c5-d6bd-43c0-a8fe-8106be033a4f</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/8c36263c-80ef-4c9b-9c66-68ff6f366c92"/>
<published>2026-05-20T07:00:00Z</published>
<title>Car Free Day Main St</title>
<updated>2026-05-20T16:51:02.2561994Z</updated>
<georss:line>49.26203378351866 -123.10157596710428 49.26199328394867 -123.10039685160483</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Main Street: 10th Avenue to King Edward Avenue
Location: 
Schedule: Sep 13, 2026</content>
<id>urn:uuid:7de3c86c-e0a5-4467-8d08-dbe5157c8036</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/8c36263c-80ef-4c9b-9c66-68ff6f366c92"/>
<published>2026-05-20T07:00:00Z</published>
<title>Car Free Day Main St</title>
<updated>2026-05-20T16:51:02.2561994Z</updated>
<georss:line>49.249540428846956 -123.10106398576336 49.249540428846956 -123.1016535435131</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Main Street: 10th Avenue to King Edward Avenue
Location: 
Schedule: Sep 13, 2026</content>
<id>urn:uuid:a52749d5-2a97-4637-b35f-9ff65c4e68ed</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/8c36263c-80ef-4c9b-9c66-68ff6f366c92"/>
<published>2026-05-20T07:00:00Z</published>
<title>Car Free Day Main St</title>
<updated>2026-05-20T16:51:02.2561994Z</updated>
<georss:line>49.250954857218346 -123.10104227095809 49.250961608658685 -123.1016214855894</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Main Street: 10th Avenue to King Edward Avenue
Location: 
Schedule: Sep 13, 2026</content>
<id>urn:uuid:d56bda73-d781-4526-a180-243daf0f258e</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/8c36263c-80ef-4c9b-9c66-68ff6f366c92"/>
<published>2026-05-20T07:00:00Z</published>
<title>Car Free Day Main St</title>
<updated>2026-05-20T16:51:02.2561994Z</updated>
<georss:line>49.2488179986949 -123.10170525910516 49.24878424001804 -123.1004537417768</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Main Street: 10th Avenue to King Edward Avenue
Location: 
Schedule: Sep 13, 2026</content>
<id>urn:uuid:9d1aa874-980c-463a-8f79-a1bf48810dcb</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/8c36263c-80ef-4c9b-9c66-68ff6f366c92"/>
<published>2026-05-20T07:00:00Z</published>
<title>Car Free Day Main St</title>
<updated>2026-05-20T16:51:02.2561994Z</updated>
<georss:line>49.2502662054502 -123.10160079935257 49.2502662054502 -123.10034928202418</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Celebrating our 17th year anniversary, a series of activities  will be presented to engage and connect our local  multicultural communities for their enjoyment to promote  and celebrate our Latin American Arts, Food and Culture. Carnaval del Sol, recreates the atmosphere of a vibrant city plaza in Latin America. The arts  showcased during this event include live musical bands, Native Canadian and Latin American  visual art, traditional folk dances, arts and crafts, dancing and  culinary shows
Location: Jonathon Roger's Park, 100- 300 W 8th ave, 2300 Columbia, 100 W 7th and 2300 Manitoba - *full closure along 100 - 300 W 8th, 2300 Columbia and Manitoba, 2300 - 2400 Alberta from lane north and south of W 8th*.

parking restriction: unit 00-300 W 8th Ave, Yukon to Ontario, 2200-2400 Manitoba &amp; Columbia, 2300-2400 Alberta
Schedule: Jul 8, 2026 - Jul 13, 2026</content>
<id>urn:uuid:e5fc2576-50c6-4cde-9207-c5c131752c86</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/23f8146e-c7d4-4da9-986a-b3359f1247fd"/>
<published>2026-03-10T07:00:00Z</published>
<title>Carnaval Del Sol</title>
<updated>2026-06-03T18:50:23.0170967Z</updated>
<georss:line>49.26387344717958 -123.10668239812658 49.263840600817616 -123.10497205060685</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Celebrating our 17th year anniversary, a series of activities  will be presented to engage and connect our local  multicultural communities for their enjoyment to promote  and celebrate our Latin American Arts, Food and Culture. Carnaval del Sol, recreates the atmosphere of a vibrant city plaza in Latin America. The arts  showcased during this event include live musical bands, Native Canadian and Latin American  visual art, traditional folk dances, arts and crafts, dancing and  culinary shows
Location: Jonathon Roger's Park, 100- 300 W 8th ave, 2300 Columbia, 100 W 7th and 2300 Manitoba - *full closure along 100 - 300 W 8th, 2300 Columbia and Manitoba, 2300 - 2400 Alberta from lane north and south of W 8th*.

parking restriction: unit 00-300 W 8th Ave, Yukon to Ontario, 2200-2400 Manitoba &amp; Columbia, 2300-2400 Alberta
Schedule: Jul 8, 2026 - Jul 13, 2026</content>
<id>urn:uuid:3a2172c0-afed-4850-b194-51629ae57e2a</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/23f8146e-c7d4-4da9-986a-b3359f1247fd"/>
<published>2026-03-10T07:00:00Z</published>
<title>Carnaval Del Sol</title>
<updated>2026-06-03T18:50:23.0170967Z</updated>
<georss:line>49.263961037371246 -123.1108241220224 49.263928191067606 -123.10963358436625</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Celebrating our 17th year anniversary, a series of activities  will be presented to engage and connect our local  multicultural communities for their enjoyment to promote  and celebrate our Latin American Arts, Food and Culture. Carnaval del Sol, recreates the atmosphere of a vibrant city plaza in Latin America. The arts  showcased during this event include live musical bands, Native Canadian and Latin American  visual art, traditional folk dances, arts and crafts, dancing and  culinary shows
Location: Jonathon Roger's Park, 100- 300 W 8th ave, 2300 Columbia, 100 W 7th and 2300 Manitoba - *full closure along 100 - 300 W 8th, 2300 Columbia and Manitoba, 2300 - 2400 Alberta from lane north and south of W 8th*.

parking restriction: unit 00-300 W 8th Ave, Yukon to Ontario, 2200-2400 Manitoba &amp; Columbia, 2300-2400 Alberta
Schedule: Jul 8, 2026 - Jul 13, 2026</content>
<id>urn:uuid:823765bf-d7eb-4914-b89b-f460795a1a4b</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/23f8146e-c7d4-4da9-986a-b3359f1247fd"/>
<published>2026-03-10T07:00:00Z</published>
<title>Carnaval Del Sol</title>
<updated>2026-06-03T18:50:23.0170967Z</updated>
<georss:polygon>49.264264389735644 -123.10830174468063 49.264264389735644 -123.10795523177302 49.26426159660372 -123.10795950971014 49.264264389735644 -123.10830174468063</georss:polygon>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Celebrating our 17th year anniversary, a series of activities  will be presented to engage and connect our local  multicultural communities for their enjoyment to promote  and celebrate our Latin American Arts, Food and Culture. Carnaval del Sol, recreates the atmosphere of a vibrant city plaza in Latin America. The arts  showcased during this event include live musical bands, Native Canadian and Latin American  visual art, traditional folk dances, arts and crafts, dancing and  culinary shows
Location: Jonathon Roger's Park, 100- 300 W 8th ave, 2300 Columbia, 100 W 7th and 2300 Manitoba - *full closure along 100 - 300 W 8th, 2300 Columbia and Manitoba, 2300 - 2400 Alberta from lane north and south of W 8th*.

parking restriction: unit 00-300 W 8th Ave, Yukon to Ontario, 2200-2400 Manitoba &amp; Columbia, 2300-2400 Alberta
Schedule: Jul 8, 2026 - Jul 13, 2026</content>
<id>urn:uuid:cdca23b0-7dfe-4b53-8753-c2aa18624c7f</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/23f8146e-c7d4-4da9-986a-b3359f1247fd"/>
<published>2026-03-10T07:00:00Z</published>
<title>Carnaval Del Sol</title>
<updated>2026-06-03T18:50:23.0170967Z</updated>
<georss:line>49.26459606161126 -123.10490497815512 49.26463985555057 -123.10668239812658</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Celebrating our 17th year anniversary, a series of activities  will be presented to engage and connect our local  multicultural communities for their enjoyment to promote  and celebrate our Latin American Arts, Food and Culture. Carnaval del Sol, recreates the atmosphere of a vibrant city plaza in Latin America. The arts  showcased during this event include live musical bands, Native Canadian and Latin American  visual art, traditional folk dances, arts and crafts, dancing and  culinary shows
Location: Jonathon Roger's Park, 100- 300 W 8th ave, 2300 Columbia, 100 W 7th and 2300 Manitoba - *full closure along 100 - 300 W 8th, 2300 Columbia and Manitoba, 2300 - 2400 Alberta from lane north and south of W 8th*.

parking restriction: unit 00-300 W 8th Ave, Yukon to Ontario, 2200-2400 Manitoba &amp; Columbia, 2300-2400 Alberta
Schedule: Jul 8, 2026 - Jul 13, 2026</content>
<id>urn:uuid:9f2bd5a0-0b78-4168-b719-45f480c6fc8d</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/23f8146e-c7d4-4da9-986a-b3359f1247fd"/>
<published>2026-03-10T07:00:00Z</published>
<title>Carnaval Del Sol</title>
<updated>2026-06-03T18:50:23.0170967Z</updated>
<georss:line>49.265592375875826 -123.10934852808381 49.264880724462444 -123.10936529619674</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Celebrating our 17th year anniversary, a series of activities  will be presented to engage and connect our local  multicultural communities for their enjoyment to promote  and celebrate our Latin American Arts, Food and Culture. Carnaval del Sol, recreates the atmosphere of a vibrant city plaza in Latin America. The arts  showcased during this event include live musical bands, Native Canadian and Latin American  visual art, traditional folk dances, arts and crafts, dancing and  culinary shows
Location: Jonathon Roger's Park, 100- 300 W 8th ave, 2300 Columbia, 100 W 7th and 2300 Manitoba - *full closure along 100 - 300 W 8th, 2300 Columbia and Manitoba, 2300 - 2400 Alberta from lane north and south of W 8th*.

parking restriction: unit 00-300 W 8th Ave, Yukon to Ontario, 2200-2400 Manitoba &amp; Columbia, 2300-2400 Alberta
Schedule: Jul 8, 2026 - Jul 13, 2026</content>
<id>urn:uuid:1c50f9cf-ce6b-4efa-8bbc-7efd8cff27d5</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/23f8146e-c7d4-4da9-986a-b3359f1247fd"/>
<published>2026-03-10T07:00:00Z</published>
<title>Carnaval Del Sol</title>
<updated>2026-06-03T18:50:23.0170967Z</updated>
<georss:line>49.26484787877098 -123.1108241220224 49.26474934156536 -123.10490497815512</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Celebrating our 17th year anniversary, a series of activities  will be presented to engage and connect our local  multicultural communities for their enjoyment to promote  and celebrate our Latin American Arts, Food and Culture. Carnaval del Sol, recreates the atmosphere of a vibrant city plaza in Latin America. The arts  showcased during this event include live musical bands, Native Canadian and Latin American  visual art, traditional folk dances, arts and crafts, dancing and  culinary shows
Location: Jonathon Roger's Park, 100- 300 W 8th ave, 2300 Columbia, 100 W 7th and 2300 Manitoba - *full closure along 100 - 300 W 8th, 2300 Columbia and Manitoba, 2300 - 2400 Alberta from lane north and south of W 8th*.

parking restriction: unit 00-300 W 8th Ave, Yukon to Ontario, 2200-2400 Manitoba &amp; Columbia, 2300-2400 Alberta
Schedule: Jul 8, 2026 - Jul 13, 2026</content>
<id>urn:uuid:20693087-1115-48fa-af82-7a0a8e3ad0fe</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/23f8146e-c7d4-4da9-986a-b3359f1247fd"/>
<published>2026-03-10T07:00:00Z</published>
<title>Carnaval Del Sol</title>
<updated>2026-06-03T18:50:23.0170967Z</updated>
<georss:line>49.26388740017211 -123.11100470854481 49.26392484498351 -123.11282174227411</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Celebrating our 17th year anniversary, a series of activities  will be presented to engage and connect our local  multicultural communities for their enjoyment to promote  and celebrate our Latin American Arts, Food and Culture. Carnaval del Sol, recreates the atmosphere of a vibrant city plaza in Latin America. The arts  showcased during this event include live musical bands, Native Canadian and Latin American  visual art, traditional folk dances, arts and crafts, dancing and  culinary shows
Location: Jonathon Roger's Park, 100- 300 W 8th ave, 2300 Columbia, 100 W 7th and 2300 Manitoba - *full closure along 100 - 300 W 8th, 2300 Columbia and Manitoba, 2300 - 2400 Alberta from lane north and south of W 8th*.

parking restriction: unit 00-300 W 8th Ave, Yukon to Ontario, 2200-2400 Manitoba &amp; Columbia, 2300-2400 Alberta
Schedule: Jul 8, 2026 - Jul 13, 2026</content>
<id>urn:uuid:71244809-f76e-47ea-b683-9d75a9bbbea6</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/23f8146e-c7d4-4da9-986a-b3359f1247fd"/>
<published>2026-03-10T07:00:00Z</published>
<title>Carnaval Del Sol</title>
<updated>2026-06-03T18:50:23.0170967Z</updated>
<georss:line>49.26400597531065 -123.11278348893245 49.2639872529393 -123.11100470854481</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Celebrating our 17th year anniversary, a series of activities  will be presented to engage and connect our local  multicultural communities for their enjoyment to promote  and celebrate our Latin American Arts, Food and Culture. Carnaval del Sol, recreates the atmosphere of a vibrant city plaza in Latin America. The arts  showcased during this event include live musical bands, Native Canadian and Latin American  visual art, traditional folk dances, arts and crafts, dancing and  culinary shows
Location: Jonathon Roger's Park, 100- 300 W 8th ave, 2300 Columbia, 100 W 7th and 2300 Manitoba - *full closure along 100 - 300 W 8th, 2300 Columbia and Manitoba, 2300 - 2400 Alberta from lane north and south of W 8th*.

parking restriction: unit 00-300 W 8th Ave, Yukon to Ontario, 2200-2400 Manitoba &amp; Columbia, 2300-2400 Alberta
Schedule: Jul 8, 2026 - Jul 13, 2026</content>
<id>urn:uuid:4cc1f8f1-0621-46b9-9cc9-6afd41c32902</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/23f8146e-c7d4-4da9-986a-b3359f1247fd"/>
<published>2026-03-10T07:00:00Z</published>
<title>Carnaval Del Sol</title>
<updated>2026-06-03T18:50:23.0170967Z</updated>
<georss:line>49.264299291534485 -123.11093776519692 49.26399349373057 -123.11092820186148</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Celebrating our 17th year anniversary, a series of activities  will be presented to engage and connect our local  multicultural communities for their enjoyment to promote  and celebrate our Latin American Arts, Food and Culture. Carnaval del Sol, recreates the atmosphere of a vibrant city plaza in Latin America. The arts  showcased during this event include live musical bands, Native Canadian and Latin American  visual art, traditional folk dances, arts and crafts, dancing and  culinary shows
Location: Jonathon Roger's Park, 100- 300 W 8th ave, 2300 Columbia, 100 W 7th and 2300 Manitoba - *full closure along 100 - 300 W 8th, 2300 Columbia and Manitoba, 2300 - 2400 Alberta from lane north and south of W 8th*.

parking restriction: unit 00-300 W 8th Ave, Yukon to Ontario, 2200-2400 Manitoba &amp; Columbia, 2300-2400 Alberta
Schedule: Jul 8, 2026 - Jul 13, 2026</content>
<id>urn:uuid:998ed190-1818-4c01-bf2d-8141fcb0ee7d</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/23f8146e-c7d4-4da9-986a-b3359f1247fd"/>
<published>2026-03-10T07:00:00Z</published>
<title>Carnaval Del Sol</title>
<updated>2026-06-03T18:50:23.0170967Z</updated>
<georss:line>49.2631179753227 -123.10674947057834 49.26553763396774 -123.10666563001364</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Celebrating our 17th year anniversary, a series of activities  will be presented to engage and connect our local  multicultural communities for their enjoyment to promote  and celebrate our Latin American Arts, Food and Culture. Carnaval del Sol, recreates the atmosphere of a vibrant city plaza in Latin America. The arts  showcased during this event include live musical bands, Native Canadian and Latin American  visual art, traditional folk dances, arts and crafts, dancing and  culinary shows
Location: Jonathon Roger's Park, 100- 300 W 8th ave, 2300 Columbia, 100 W 7th and 2300 Manitoba - *full closure along 100 - 300 W 8th, 2300 Columbia and Manitoba, 2300 - 2400 Alberta from lane north and south of W 8th*.

parking restriction: unit 00-300 W 8th Ave, Yukon to Ontario, 2200-2400 Manitoba &amp; Columbia, 2300-2400 Alberta
Schedule: Jul 8, 2026 - Jul 13, 2026</content>
<id>urn:uuid:cf96c445-9c43-40c8-8807-be0749bcb9b7</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/23f8146e-c7d4-4da9-986a-b3359f1247fd"/>
<published>2026-03-10T07:00:00Z</published>
<title>Carnaval Del Sol</title>
<updated>2026-06-03T18:50:23.0170967Z</updated>
<georss:line>49.26553763396774 -123.10679977491715 49.26313987268583 -123.1069171500702</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Celebrating our 17th year anniversary, a series of activities  will be presented to engage and connect our local  multicultural communities for their enjoyment to promote  and celebrate our Latin American Arts, Food and Culture. Carnaval del Sol, recreates the atmosphere of a vibrant city plaza in Latin America. The arts  showcased during this event include live musical bands, Native Canadian and Latin American  visual art, traditional folk dances, arts and crafts, dancing and  culinary shows
Location: Jonathon Roger's Park, 100- 300 W 8th ave, 2300 Columbia, 100 W 7th and 2300 Manitoba - *full closure along 100 - 300 W 8th, 2300 Columbia and Manitoba, 2300 - 2400 Alberta from lane north and south of W 8th*.

parking restriction: unit 00-300 W 8th Ave, Yukon to Ontario, 2200-2400 Manitoba &amp; Columbia, 2300-2400 Alberta
Schedule: Jul 8, 2026 - Jul 13, 2026</content>
<id>urn:uuid:9aed4806-d4e9-4013-a237-5098663cfaa7</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/23f8146e-c7d4-4da9-986a-b3359f1247fd"/>
<published>2026-03-10T07:00:00Z</published>
<title>Carnaval Del Sol</title>
<updated>2026-06-03T18:50:23.0170967Z</updated>
<georss:line>49.26319461765502 -123.10934852808381 49.263720163702686 -123.10934852808381</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Celebrating our 17th year anniversary, a series of activities  will be presented to engage and connect our local  multicultural communities for their enjoyment to promote  and celebrate our Latin American Arts, Food and Culture. Carnaval del Sol, recreates the atmosphere of a vibrant city plaza in Latin America. The arts  showcased during this event include live musical bands, Native Canadian and Latin American  visual art, traditional folk dances, arts and crafts, dancing and  culinary shows
Location: Jonathon Roger's Park, 100- 300 W 8th ave, 2300 Columbia, 100 W 7th and 2300 Manitoba - *full closure along 100 - 300 W 8th, 2300 Columbia and Manitoba, 2300 - 2400 Alberta from lane north and south of W 8th*.

parking restriction: unit 00-300 W 8th Ave, Yukon to Ontario, 2200-2400 Manitoba &amp; Columbia, 2300-2400 Alberta
Schedule: Jul 8, 2026 - Jul 13, 2026</content>
<id>urn:uuid:cd9c6ecc-037d-4bda-9b22-263fa90f8e39</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/23f8146e-c7d4-4da9-986a-b3359f1247fd"/>
<published>2026-03-10T07:00:00Z</published>
<title>Carnaval Del Sol</title>
<updated>2026-06-03T18:50:23.0170967Z</updated>
<georss:line>49.26320556632078 -123.10953297568861 49.26561427280919 -123.10951620921318</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Celebrating our 17th year anniversary, a series of activities  will be presented to engage and connect our local  multicultural communities for their enjoyment to promote  and celebrate our Latin American Arts, Food and Culture. Carnaval del Sol, recreates the atmosphere of a vibrant city plaza in Latin America. The arts  showcased during this event include live musical bands, Native Canadian and Latin American  visual art, traditional folk dances, arts and crafts, dancing and  culinary shows
Location: Jonathon Roger's Park, 100- 300 W 8th ave, 2300 Columbia, 100 W 7th and 2300 Manitoba - *full closure along 100 - 300 W 8th, 2300 Columbia and Manitoba, 2300 - 2400 Alberta from lane north and south of W 8th*.

parking restriction: unit 00-300 W 8th Ave, Yukon to Ontario, 2200-2400 Manitoba &amp; Columbia, 2300-2400 Alberta
Schedule: Jul 8, 2026 - Jul 13, 2026</content>
<id>urn:uuid:77b74125-92b0-4b3e-a1a3-e84e5c7b8f3f</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/23f8146e-c7d4-4da9-986a-b3359f1247fd"/>
<published>2026-03-10T07:00:00Z</published>
<title>Carnaval Del Sol</title>
<updated>2026-06-03T18:50:23.0170967Z</updated>
<georss:line>49.263698266329754 -123.10498881871979 49.26380775443377 -123.11089119201787</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Celebrating our 17th year anniversary, a series of activities  will be presented to engage and connect our local  multicultural communities for their enjoyment to promote  and celebrate our Latin American Arts, Food and Culture. Carnaval del Sol, recreates the atmosphere of a vibrant city plaza in Latin America. The arts  showcased during this event include live musical bands, Native Canadian and Latin American  visual art, traditional folk dances, arts and crafts, dancing and  culinary shows
Location: Jonathon Roger's Park, 100- 300 W 8th ave, 2300 Columbia, 100 W 7th and 2300 Manitoba - *full closure along 100 - 300 W 8th, 2300 Columbia and Manitoba, 2300 - 2400 Alberta from lane north and south of W 8th*.

parking restriction: unit 00-300 W 8th Ave, Yukon to Ontario, 2200-2400 Manitoba &amp; Columbia, 2300-2400 Alberta
Schedule: Jul 8, 2026 - Jul 13, 2026</content>
<id>urn:uuid:dc2d4cee-99fd-4747-9f44-ed5f230f1e12</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/23f8146e-c7d4-4da9-986a-b3359f1247fd"/>
<published>2026-03-10T07:00:00Z</published>
<title>Carnaval Del Sol</title>
<updated>2026-06-03T18:50:23.0170967Z</updated>
<georss:line>49.26383245834265 -123.10692068507723 49.263888324160405 -123.10938762654591 49.26471699302954 -123.10940188842409 49.264689060597675 -123.10682086515922 49.26382314736691 -123.10684938613048</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Celebrating our 17th year anniversary, a series of activities  will be presented to engage and connect our local  multicultural communities for their enjoyment to promote  and celebrate our Latin American Arts, Food and Culture. Carnaval del Sol, recreates the atmosphere of a vibrant city plaza in Latin America. The arts  showcased during this event include live musical bands, Native Canadian and Latin American  visual art, traditional folk dances, arts and crafts, dancing and  culinary shows
Location: Jonathon Roger's Park, 100- 300 W 8th ave, 2300 Columbia, 100 W 7th and 2300 Manitoba - *full closure along 100 - 300 W 8th, 2300 Columbia and Manitoba, 2300 - 2400 Alberta from lane north and south of W 8th*.

parking restriction: unit 00-300 W 8th Ave, Yukon to Ontario, 2200-2400 Manitoba &amp; Columbia, 2300-2400 Alberta
Schedule: Jul 8, 2026 - Jul 13, 2026</content>
<id>urn:uuid:a9ef0950-671d-431a-8f01-a675a8c68a0e</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/23f8146e-c7d4-4da9-986a-b3359f1247fd"/>
<published>2026-03-10T07:00:00Z</published>
<title>Carnaval Del Sol</title>
<updated>2026-06-03T18:50:23.0170967Z</updated>
<georss:line>49.264654505080586 -123.10948109999158 49.263882211456405 -123.10944525815127 49.26381980317254 -123.10925410050291 49.26379640011717 -123.10697217117037 49.2638900122721 -123.10678101468874 49.26466230558373 -123.10676906740865</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Celebrating our 17th year anniversary, a series of activities  will be presented to engage and connect our local  multicultural communities for their enjoyment to promote  and celebrate our Latin American Arts, Food and Culture. Carnaval del Sol, recreates the atmosphere of a vibrant city plaza in Latin America. The arts  showcased during this event include live musical bands, Native Canadian and Latin American  visual art, traditional folk dances, arts and crafts, dancing and  culinary shows
Location: Jonathon Roger's Park, 100- 300 W 8th ave, 2300 Columbia, 100 W 7th and 2300 Manitoba - *full closure along 100 - 300 W 8th, 2300 Columbia and Manitoba, 2300 - 2400 Alberta from lane north and south of W 8th*.

parking restriction: unit 00-300 W 8th Ave, Yukon to Ontario, 2200-2400 Manitoba &amp; Columbia, 2300-2400 Alberta
Schedule: Jul 8, 2026 - Jul 13, 2026</content>
<id>urn:uuid:4ab43bdc-0017-431d-a50c-47c48a547bea</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/23f8146e-c7d4-4da9-986a-b3359f1247fd"/>
<published>2026-03-10T07:00:00Z</published>
<title>Carnaval Del Sol</title>
<updated>2026-06-03T18:50:23.0170967Z</updated>
<georss:line>49.26382499209001 -123.11097601853858 49.263431819357805 -123.11098558187399</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>This proactive work is part of the City’s ongoing efforts to ensure public safety at this former landfill site to support long-term safety and mitigate any potential buildup of methane gas. The City is installing four wind-activated vertical vents at specific areas of China Creek South Park. These vents will safely release methane that may accumulate underground. 
Location: 
Schedule: Sep 17, 2025 - Sep 27, 2025</content>
<id>urn:uuid:47cd06c3-2de8-491f-a5b6-31b149ab4cd4</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/dcdb2fb8-cfe9-4853-bacf-21c7759b63f4"/>
<published>2025-09-24T07:00:00Z</published>
<title>China Creek South Park - Gas Vent Installation</title>
<updated>2026-04-18T01:01:08.2149651Z</updated>
<georss:polygon>49.2622692334198 -123.08040354967405 49.2619550087411 -123.08042151341019 49.26194328384494 -123.07997242802197 49.26155636240199 -123.07998320565076 49.26154932740775 -123.07930778133631 49.26146611644924 -123.07931133659947 49.26146611644924 -123.07863050602337 49.2622520775019 -123.07862542684511 49.2622692334198 -123.08040354967405</georss:polygon>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:448a305e-362e-4b99-80ad-833b91af32e8</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.24233434803617 -123.04709168084288 49.24200241923259 -123.04741066453914</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:f7b074a9-6d45-48a2-b370-2bcb04f99a98</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.24302115842477 -123.04643223451117 49.24233434803617 -123.04709168084288</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:cfa543e0-721b-4451-afb4-a827eeeceda2</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.242644903493215 -123.042536588389 49.24077389080685 -123.04433913374717</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:d45ace20-155e-424e-bf61-19cef3033ea5</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.24141119019592 -123.04241000048467 49.24139453566892 -123.04244631069388 49.24039280483112 -123.04339851063482</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:0a41accd-d35b-4974-8384-438c04198502</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.24199301349543 -123.04611361994337 49.24162298673065 -123.04646941898088</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:54c21102-7ee4-4e2c-ae8d-30f3c7513dc3</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.25066051872946 -123.0496157600847 49.25065602818799 -123.04900910314416</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:0ad05a35-36c5-4a38-b759-a71f1adf5a8c</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.25065602818799 -123.04900910314416 49.250657174350465 -123.04891530805115</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:96b71fa9-2cfe-4c96-b8ce-f6c35be16ab9</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.250657174350465 -123.04891530805115 49.250641075912654 -123.04708946796448</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:f735a98c-900d-4cd3-b9e9-3ca0f046c37e</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.25150841468397 -123.04433529399623 49.25089400676663 -123.04433052528157 49.25088707201547 -123.04432904877588 49.2508733195458 -123.04432584853103 49.250859603199245 -123.04432227731112 49.25084593196567 -123.04431834886563 49.250832305850366 -123.0443140494537 49.250818733843175 -123.04430939282483 49.25080521594941 -123.04430436523816 49.25079176115892 -123.04429898044313 49.25077836946639 -123.04429325218108 49.25076504088227 -123.0442871529701 49.250751784396556 -123.04428069655961 49.250738608999086 -123.04427389669894 49.25072550569453 -123.0442667533803 49.250712492478584 -123.04425925287894 49.25069956935124 -123.04425139519519 49.250686727306544 -123.04424320780319 49.25067398434021 -123.04423467697823 49.25066134944214 -123.04422581646966 49.25064880462699 -123.04421661252053 49.250636376880465 -123.04420706515513 49.25062405719669 -123.04419720184767</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:c9e73ff6-67a5-4db9-be67-e457f1e597c2</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.25060991893042 -123.04159903898328 49.250607481073075 -123.04099550430846</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:da8547e2-1050-4181-8926-2977958aa53c</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.25062405719669 -123.04419720184767 49.25060991893042 -123.04159903898328</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:7cc9b4a1-3406-4983-8e31-9e9286626bf4</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.250607481073075 -123.04099550430846 49.250606550312455 -123.03966777850619</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:b757bd2a-2e26-4679-9b83-3aeed828b9f2</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.25477569481714 -123.03905035809974 49.25474524764806 -123.03891218416564 49.2547388829328 -123.03653085585863</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:8be28322-82a0-4255-8fa4-08058c103e60</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.256349390377096 -123.04157564858735 49.256398379950355 -123.04114392418933 49.25639717547645 -123.03904171510091</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:0ae65a92-2252-4adb-9798-b338db7d4b6c</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.24462277629863 -123.05034505414416 49.24462192021011 -123.04964185965532</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:d035e10b-bc39-4ffe-90d9-4a9cdde2e1e7</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.24462192021011 -123.04964185965532 49.24462149800203 -123.04951477025553</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:30c5ed44-9dd2-4566-a7fd-0d9299c9e5a4</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.24462149800203 -123.04951477025553 49.24461948377433 -123.04892191536462</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:904dc844-ab25-4d7c-b257-4408b638fec1</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.24461948377433 -123.04892191536462 49.244613098561814 -123.04712239815645</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:5a8d9cd6-02b1-4ac1-b3b3-de902a835a0b</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.24365410629733 -123.04302167537237 49.24343144075766 -123.04248008217446</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:8df002a8-72a6-4a9e-9d59-70c33fd008e6</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.24064938127 -123.051267604828 49.240248754670404 -123.05042185515748 49.23968398609753 -123.04900589743275</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:5bbe44b4-efe3-4a90-8093-26328ae0793d</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.24111980155078 -123.05025256466416 49.239957748849775 -123.0473630419764</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:b47f215c-a60b-4a58-8a7e-28061531e63a</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.24180526373698 -123.04957010991774 49.241460700191794 -123.0499065636856</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:c914c241-442d-49cc-a902-a7212bfdc6ed</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.24204664391053 -123.04933439047065 49.24180526373698 -123.04957010991774</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:f1c262ec-2c53-4cce-a6da-5bcda230e8f1</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.242477105160276 -123.04890384831059 49.24204664391053 -123.04933439047065</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:0a9dd74f-83f0-4b9a-b4f3-2b8637461428</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.24160170205306 -123.04906306502376 49.240648782931146 -123.04669595533122</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:8fd580b1-ffc4-4869-8022-0673cab98e03</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.24180526373698 -123.04957010991774 49.24160170205306 -123.04906306502376</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:2ed04fe7-b501-4e27-be84-ed7522569185</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.243018932759526 -123.02372135724465 49.24256727310208 -123.02372059135364</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:720f54c1-6ea5-4b96-be5b-fe9a7adf4636</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.2445072624127 -123.02378417188697 49.244323646165014 -123.02372358971223 49.243018932759526 -123.02372135724465</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:0c779b36-50dc-48ef-ae56-7cd3a734fd87</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.24450938257891 -123.02427293537305 49.24450726241267 -123.02378417188697</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:227483b9-a8a3-44fa-b400-a757aa408d73</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.244510446661224 -123.0245160118987 49.24450938257891 -123.02427293537305</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:676c3650-9dec-49f3-9d4b-8acb5347144d</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.25063252074992 -123.02372982798191 49.247898302014136 -123.02374332958179</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:3ed7b818-143c-4087-990d-f6129b3652e9</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.2445072624127 -123.02378417188697 49.244323646165014 -123.02372358971223 49.243018932759526 -123.02372135724465</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:649b892b-1520-4e9e-80d7-ed7764f7963b</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.246203601022415 -123.02855118145507 49.24535186003291 -123.02855313600463</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:be9a9acc-548e-49f4-8206-0d14d595b7f4</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.25645620651963 -123.0266944731591 49.256797694848814 -123.02617026231763 49.25679751175687 -123.02602508404614</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:04818675-77e0-49f4-89cb-b26ee48a836f</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.25679751175687 -123.02602508404614 49.25679775199356 -123.0259968291243 49.2566702881783 -123.02580344372805 49.25664992301145 -123.02580344685462</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:a6a64b1f-3c05-438d-97a6-f92269c9f9d4</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.257174342343944 -123.02778863872526 49.25752825315698 -123.02724676126226 49.2575642556931 -123.02715466215004 49.25758129928968 -123.02704956545489 49.257580194628474 -123.02602368149698</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:f926365b-8cd1-413a-b6f8-9af29c436016</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.25621345640266 -123.02632527190953 49.256553530297765 -123.02580341034894 49.25664992301145 -123.02580344685462</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:7f6db0bb-3aec-4964-b33a-2a9178956206</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.244512258660905 -123.02495962789352 49.244510446661224 -123.0245160118987</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:273ebba9-0c1c-413f-a81a-ef56ed673db9</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.24790734729751 -123.02625563053682 49.24790036234393 -123.02447410619367</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:c33ffabd-5ab2-489d-abcf-406fc6f5f774</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.24790036234393 -123.02447410619367 49.247898302014136 -123.02374332958179</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:4c3e39a7-ed07-4d02-b3fe-1ec5e3e7c86c</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.2470232626346 -123.02375054944015 49.246184347132356 -123.02376183961626</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:856193eb-3f6f-442a-a55d-da2d3d01d34e</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.246184347132356 -123.02376183961626 49.24534598022143 -123.02377310219919</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:c18e1052-b7c4-4028-afd6-4bef0a7ac54e</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.240520053971295 -123.02550256953894 49.2403644785627 -123.02514570922621 49.24036440975459 -123.02513121542479</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:e45d3be2-6446-4c14-abc7-8049007442a1</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.244516129115226 -123.02584820656318 49.24451429118383 -123.02545616788913</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:f7a7a616-9bdd-4597-9c78-1e86556fde16</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.24451429118383 -123.02545616788913 49.244512258660905 -123.02495962789352</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:92d9a904-b3bc-4d6c-a694-f41052b0a646</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.244517655036276 -123.02626155478568 49.244516129115226 -123.02584820656318</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:9d32f7a4-9f67-4ce6-a576-fd68e6e89c99</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.244516129115226 -123.02584820656318 49.24403056063119 -123.02631198032621</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:4195900e-6cfb-4a99-84ce-0bf2c80a035c</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.24234519643608 -123.0270853577528 49.24151748790601 -123.02506490783966</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:25652b2c-80d7-422d-8eb2-88a37903191a</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.24403056063119 -123.02631198032621 49.24331709492321 -123.02701202851676</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:ce30c130-f0fd-4f09-afa1-81ffc755122e</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.24331709492321 -123.02701202851676 49.242671307086084 -123.02762843881457 49.24258933705261 -123.02768872008788</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:878c1a9e-9ee2-49db-a72d-1de6f5a6ac43</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.23983503408704 -123.02956347790746 49.23964727482556 -123.02910924355112</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:17db4a13-e042-4fae-8e2c-ad89140c6c01</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.24006155346325 -123.03011596649567 49.23983503408704 -123.02956347790746</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:bda31a9e-1875-4161-be19-4c0c6596ab66</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.240287945344306 -123.03066435235381 49.24006155346325 -123.03011596649567</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:c8415308-3dde-44e8-b55a-fe5d6f156d37</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.24149726361597 -123.02790314424439 49.240520053971295 -123.02550256953894</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:2995a93e-706c-47c6-85aa-c1fdfc340711</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.24134575068666 -123.0303876556756 49.24112781853364 -123.02985289293667</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:279f3569-f8f1-492c-bd54-9b312cb9e81c</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.24174823054216 -123.02849369987885 49.24149726361597 -123.02790314424439</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:817ffa92-e251-4e72-9f59-dfe1657cae76</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.23865982647965 -123.02670815222102 49.23844161554186 -123.02617688267745</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:7bea1b6f-fd9e-4f1a-b631-08d8a018881d</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.239176551454136 -123.02509317709882 49.23860650433065 -123.0250960067558</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:99e77636-3d48-46ba-b445-ac077e2364c1</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.23902619160603 -123.02759737751377 49.238833300714674 -123.02712860694913</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:1f369960-f7c3-4d5c-b194-5501564cc6e5</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.23949759926953 -123.02587413482402 49.239176551454136 -123.02509317709882</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:2399d89d-e507-46fd-8d4c-d49f72e12d25</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.238833300714674 -123.02712860694913 49.23865982647965 -123.02670815222102</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:a60adc55-721d-49e4-9489-4a1d52f618a1</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.23959152013944 -123.02509228829908 49.239176551454136 -123.02509317709882</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:62966819-2359-4107-a799-cff1f413cd89</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.23967947275966 -123.02631791155022 49.23949759926953 -123.02587413482402</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:b8ec1b51-8607-4519-8edc-54b816bbe5f5</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.23959152013944 -123.02509228829908 49.23958947303194 -123.0243600269274</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:35ab379b-af9a-4294-88a2-dfc13163260c</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.237833035724805 -123.02469526392113 49.237698797826766 -123.02436515528856</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:8458c45a-5dc5-4834-b8c1-5646d348742a</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.23958906174201 -123.02421983092289 49.23958718451189 -123.02364191559184</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:791f85fd-fbbe-4c6d-af96-719eb4ce3274</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.23958947303194 -123.0243600269274 49.23958906174201 -123.02421983092289</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:0f6c9815-64a6-45fd-8515-2b30f1228ba2</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.24151270882885 -123.02427678344469 49.24151263939774 -123.02370144310366</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:aaeeb5c1-1c3c-49f2-b80b-0ec51a5d1118</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.24256727310208 -123.02372059135364 49.24247633477748 -123.02370344304927 49.24151263939774 -123.02370144310366</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:f6e9ff16-fe19-4d7d-a511-4032df4e85bf</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.24151748790601 -123.02506490783966 49.24151270882885 -123.02427678344469</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:9656f2f8-ce11-485b-a398-c2802c0d3f6c</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.239036843085984 -123.03372746418148 49.23890341963076 -123.03340764065018</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:dc8bed94-b8be-478e-a900-55bde7c15450</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.23796039947848 -123.03126824061573 49.23775459513075 -123.03094216237555 49.237342354920145 -123.02994136022546</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:d7d897cf-ed2f-4c2f-b8c8-cadb48d46c63</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.238256391092364 -123.03184954095418 49.238002786444014 -123.032115761986 49.23746820087996 -123.03262295602883</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:a19d0f43-aa0a-4204-b80f-8b38b8d8633e</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.23858041393984 -123.03153552752305 49.238256391092364 -123.03184954095418</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:0ee9af87-225c-41f5-b34a-5f7122eead37</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.23890341963076 -123.03340764065018 49.23848002372259 -123.03239274758806</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:a40f970c-3a50-47ed-8893-0d19c3864fb7</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.24006155346325 -123.03011596649567 49.23858041393984 -123.03153552752305</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:6bd8d1cd-cc36-4cf7-9f3b-23bfe489a0d7</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.238256391092364 -123.03184954095418 49.23796039947848 -123.03126824061573</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:309b6f2c-a23f-4205-8d63-7b298c033325</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.238478006085415 -123.03378405365918 49.238104938944105 -123.03287434653043</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:86f10f82-5043-4076-9e02-d24cf1160487</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.23848002372259 -123.03239274758806 49.238256391092364 -123.03184954095418</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:1d3bde01-93b2-4306-bd5d-1e4ad03e7181</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.23238205056717 -123.03079788958097 49.232310259265944 -123.03086600265517</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:75fd0893-880d-41ea-85ca-076f4cd31563</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.232753661523816 -123.03320414203377 49.23246774803536 -123.03263379745269 49.2324205390976 -123.03254470236239 49.232404232517666 -123.03250631337848</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:8c49e40f-d03b-499e-afe3-7e569dc974f9</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.23329120222337 -123.03162457766096 49.232808269120426 -123.0320993863701</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:9716d2b4-d391-4d90-8fd9-998696d4b186</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.23422114448002 -123.03164190232793 49.233949704864386 -123.03097419542276</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:c33e0fd4-efa0-4c53-bdf6-f7c93c6138c6</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.23432419349868 -123.0306090251441 49.233949704864386 -123.03097419542276</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:13bd5288-6e39-42c8-866f-b65d2e674b53</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.233949704864386 -123.03097419542276 49.23329120222337 -123.03162457766096</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:a60fe01d-e621-49f3-a72c-a08ffe3b31fc</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.23556773635332 -123.03369837024445 49.23432419349868 -123.0306090251441</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:2b9fd5e0-bbe8-4915-9fc3-e9f31c9cddf0</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.23644805094031 -123.03362385475643 49.236118758525976 -123.03394313988504</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:dadb02bb-4f6b-496e-bf8c-25b62c894951</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.23758497275932 -123.0364584865757 49.23725192193831 -123.03562839836405</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:e0d8604a-f2e5-4eb9-aeec-7eea4e3fa9cf</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.23725192193831 -123.03562839836405 49.236896473611154 -123.03598055697225</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:355f07d5-586f-451f-90cc-0cfa7746df9a</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.23725192193831 -123.03562839836405 49.2368653017877 -123.03466751930625</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:1b686583-3a0e-470b-8475-f62454513804</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.23900899286036 -123.03508972583451 49.238478006085415 -123.03378405365918</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:c329bd84-3bc8-4971-ba1c-5189eec749ea</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.23943082180685 -123.03468240719981 49.239036843085984 -123.03372746418148</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:240cb425-d628-4665-88d8-72d932667294</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.23833154205926 -123.0383205775574 49.237867963824385 -123.03716213602111</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:91628fa9-54a8-4a27-a7b7-addfb72106eb</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.237867963824385 -123.03716213602111 49.23758497275932 -123.0364584865757</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:a2135739-f5b3-4b9b-8a04-6fa2dd185e17</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.23981136349846 -123.03709226638873 49.23900899286036 -123.03508972583451</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:acaff958-d297-4140-aeaf-d68a3827d250</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.23318401270842 -123.03403747460898 49.232753661523816 -123.03320414203377</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:4e71d311-7c96-4224-a2e3-1a8621cdd5f1</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.23650424647997 -123.03500929285266 49.23588122667704 -123.03562720643212 49.2358156305703 -123.03572353738565 49.23503783849114 -123.03650037698961</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:cd062916-34f8-4614-af34-5a79c33abb14</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.23363981891285 -123.03488568852612 49.23318401270842 -123.03403747460898</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:6b145f1f-8950-4cd3-898f-1eb54868d02f</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.23480953616834 -123.03523496927836 49.234529251821584 -123.0355038826546</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:7e496a44-4db1-4781-9bfc-1267fb7d3c75</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.23415350403323 -123.0358766127863 49.23363981891285 -123.03488568852612</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:8b182317-93df-4204-a86f-77687b974454</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.23543796953328 -123.03461570796692 49.23480953616834 -123.03523496927836</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:702a9a8d-552f-4117-a8c3-541fb404895e</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.23520666363089 -123.03404764215308 49.23422114448002 -123.03164190232793</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:5d837ab6-791e-4ad6-b9e4-6ff80ad76e93</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.23542223728086 -123.03744091649676 49.235046358012596 -123.03781167420486</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:2d894193-14ad-43b1-954b-cc191b8dd568</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.236896473611154 -123.03598055697225 49.23542223728086 -123.03744091649676</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:e5d94e20-14cc-4ad6-83d7-604db5c1d552</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.236896473611154 -123.03598055697225 49.23542223728086 -123.03744091649676</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:cd69ea1e-e9e5-4205-8bc5-edae29e06d80</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.235796787288194 -123.03426260441354 49.23543796953328 -123.03461570796692</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:a15d9154-d1ba-49b9-bf98-953ecedadce3</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.235796787288194 -123.03426260441354 49.23556773635332 -123.03369837024445</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:43f12238-c947-4747-b83e-ab1fd9c6a34d</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.236118758525976 -123.03394313988504 49.235796787288194 -123.03426260441354</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:e9ea67b8-e9c6-43ad-8e78-8388c72f1ae4</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.23691394124333 -123.03808855834804 49.23686211197125 -123.03813904390194 49.23668520984458 -123.03846947840321 49.23605400676371 -123.03910540838346</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:1cee2593-e682-408a-95ef-1ef9df73e5d4</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.23665222730233 -123.03413755624916 49.23644805094031 -123.03362385475643</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:4c66dccf-c9bd-4c58-8eb3-8f341f3fc7eb</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.2368653017877 -123.03466751930625 49.23665222730233 -123.03413755624916</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:3b77735c-5745-45d2-94c7-b12b46bd93b5</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.240833702814996 -123.03199745623917 49.240287945344306 -123.03066435235381</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:d30c18d3-ad74-44ed-bd16-bab14b5a7e07</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.241235772640664 -123.03298671659866 49.240833702814996 -123.03199745623917</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:5cf2b264-46e8-4279-ad78-f5847f214ef4</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.242475428533425 -123.03601501391276 49.24205440648166 -123.03641663154468</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:c8ae05d3-823d-42ca-8e44-d1c70da4e7cb</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.2417156373464 -123.03128832042249 49.24134575068666 -123.0303876556756</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:61e1f31b-1e23-4100-b268-0bb017c761cd</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.24208036449036 -123.03218252437095 49.2417156373464 -123.03128832042249</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:c62c44fe-876b-4d71-8b46-b4707b3c3d22</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.242475428533425 -123.03601501391276 49.24204884906911 -123.03495527635933</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:8f631bc4-80f5-438e-a572-185a9b4072b1</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.24204884906911 -123.03495527635933 49.241235772640664 -123.03298671659866</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:d0215dd8-7c1b-4fa0-a790-6316197ff85b</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.24279045626514 -123.03391625044391 49.24208036449036 -123.03218252437095</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:39666029-ac02-45da-a394-fbfbdf0347f8</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.244570392163524 -123.03664340836951 49.24456601321006 -123.03548526178751</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:1971ed58-88d7-42f3-b4c1-d4ca13d787c9</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.24627268891311 -123.03663400597857 49.24626482645158 -123.03456337041735</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:9a6b0cfd-70e6-4ed8-9662-aa2927f522f4</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.24787729776304 -123.03457871713809 49.247876193257355 -123.03381250498131</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:a689d492-5f03-4e68-a4fb-8b9555823b63</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.247876193257355 -123.03381250498131 49.24787171452331 -123.03309494483375</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:9f40d004-9e3f-4cc3-bbbe-15d825333ede</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.244159783060184 -123.03440269109177 49.242475428533425 -123.03601501391276</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:9a4632db-1e2b-4e6f-9603-f2a92d5c3d26</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.24332040409402 -123.0309935751167 49.24292333108562 -123.03137976001277</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:35aae3f9-af18-481e-8d67-cdf95c33d47e</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.243997815768466 -123.03602290822435 49.24321229728602 -123.03676709824367</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:75cf6b45-b8ef-409c-90ab-ea41c92c5849</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.24456601321006 -123.03548526178751 49.244562515105486 -123.034562003644</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:192c9974-7b2e-42aa-bb0e-2c5bf1d0ba76</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.24415928878432 -123.0317296842481 49.24390915361974 -123.03111854394726</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:614de232-7a4d-438e-9f4e-63bb78afa0f4</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.24390915361974 -123.03111854394726 49.243751288113145 -123.03057628584939</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:44b4059a-7a3f-4374-a094-54bccd0585c2</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.244562515105486 -123.034562003644 49.24455762327443 -123.0339805517545</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:150db9dd-b8d7-480f-b692-e16a37cfda69</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.243751288113145 -123.03057628584939 49.24332040409402 -123.0309935751167</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:7de7cc80-c1aa-4163-9f16-ec7d868642f3</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.24369654493975 -123.03777659406477 49.2433412276599 -123.03812188618257</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:66f82d8f-6f11-4946-8a68-91c76f388c26</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.24408349619142 -123.03740727730597 49.24369654493975 -123.03777659406477</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:64a75cbf-938d-48a9-ba5b-9b488d4bb0c8</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.244205814858276 -123.03729143805356 49.24408349619142 -123.03740727730597</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:1ef59fec-3e8d-4608-8e76-fab96f11700c</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.24457088065182 -123.03694546799856 49.244205814858276 -123.03729143805356</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:8120cb5e-4411-4644-ad64-0ec882c7c63d</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.24458099717637 -123.0403431312209 49.24434640372937 -123.04056787946966</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:83070fe1-1b0e-47b7-9bbf-72e51ef665c0</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.24434640372937 -123.04056787946966 49.24348622992454 -123.0413919702304</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:a898a64c-f22c-4d27-8797-4a964699d19c</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.24457440284476 -123.03911614823278 49.24457088065182 -123.03694546799856</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:6dde7e9e-fac9-4c97-80f5-0e90f67b67b3</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.24458098818113 -123.04034313121356 49.24457440284476 -123.03911614823278</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:a0b8f1ac-139f-4bb3-aef8-aceeef8d66e0</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.24188313902445 -123.04067093441043 49.24157593033135 -123.04096038595422</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:779e534a-bf7d-46ef-a541-540c4608826b</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.24000515990852 -123.042440833698 49.23962489234955 -123.04150754908004</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:6879eb1a-8723-4747-971b-2a239b77f518</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.24163427380438 -123.03681739122335 49.24124636155642 -123.03718740801324</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:546ce81b-fbf9-4383-8e8d-fc50c6111ed1</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.24121392375568 -123.03721835001764 49.24068089885648 -123.03772674574823</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:96188569-34ef-4bd7-8ac3-2a1932e3208e</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.24157593033135 -123.04096038595422 49.24000515990852 -123.042440833698</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:9fc25b3e-8c99-4043-b3d0-0faae826a83e</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.242261939972934 -123.04159867602799 49.24141119019592 -123.04241000048467</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:0adb11a3-91f3-40bb-97e7-0a18c15f7371</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.24205440648166 -123.03641663154468 49.24163427380438 -123.03681739122335</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:8bd75e44-9451-4adf-a70a-138a773d835e</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.24290703088349 -123.03706135060791 49.24167642213891 -123.03823993758061</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:497c8af9-1b3b-4ce8-80c1-0308e6413a03</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.24211288658586 -123.03929282024014 49.241751349431325 -123.0396367528281</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:9a9cf09d-5183-4adc-a86b-deaa51eafbb1</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.24273625393718 -123.04080527257555 49.2423550716037 -123.03987840550089</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:9cf7275f-b1a5-45fc-8671-3a854a42b8bc</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.24249707958168 -123.03892847091555 49.24211288658586 -123.03929282024014</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:269aa881-d843-41a2-86b9-36a4b6193d6d</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.2433412276599 -123.03812188618257 49.24249707958168 -123.03892847091555</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:e4301694-0c55-4fc7-8a73-1a257f42e2c7</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.24321229728602 -123.03676709824367 49.24290703088349 -123.03706135060791</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:8648dd9e-a559-4aa7-a132-2d41ce5ffffb</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.24312662839776 -123.0417391685242 49.24273625393718 -123.04080527257555</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:c7d10da6-d1bf-401b-8f11-36263a069012</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.24343144075766 -123.04248008217446 49.24312662839776 -123.0417391685242</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:e76ad811-8bb5-4e08-ace2-6c1428294d7e</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.24348622992454 -123.0413919702304 49.24312662839776 -123.0417391685242</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:46ca2e0c-3e23-4d53-85c6-f7eaf69f48de</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.23663232155462 -123.03063763717593 49.23624389672463 -123.02974694926569</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:61abb681-cb07-4b14-b051-4a0f7b60fd0a</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.237342354920145 -123.02994136022546 49.23726562830467 -123.02975635473321 49.23652588386892 -123.02815090848279</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:62f1e6ee-6d91-4f9d-8415-53b9ddd8200c</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.23844161554186 -123.02617688267745 49.23682354880458 -123.02780319717039</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:876e5872-ccdf-41f3-b453-96f5767dde10</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.238833300714674 -123.02712860694913 49.23729918172927 -123.02861233111558</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:2346600d-d8d5-464a-ba8d-58be392feeae</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.23775614655969 -123.02955168674518 49.23763197322151 -123.02966861417855</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:011100bc-2459-41b7-945e-6fe25783374b</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.23924234430933 -123.02813179065002 49.23775614655969 -123.02955168674518</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:24574054-c240-4213-978c-48ba436de92d</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.23924234430933 -123.02813179065002 49.23902619160603 -123.02759737751377</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:604eaa24-572f-4c71-b5e4-996b1fca4fe1</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.23964727482556 -123.02910924355112 49.23924234430933 -123.02813179065002</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:f8d8720d-b390-4938-bc8b-15998120a1b9</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.23412512430417 -123.02481473567332 49.23293096709321 -123.02482251654635</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:34013a67-b9a8-4ded-a5d4-89f727ba46c9</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.23293096709321 -123.02482251654635 49.232693672013056 -123.02482405971105</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:3754922b-e3e2-42d2-947c-16d8d56b24e0</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.23958718451189 -123.02364191559184 49.2374003685552 -123.02364382534596</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:90f98cd6-2fac-40ea-995f-2fc50937dc7d</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.23754423924541 -123.02398926561821 49.2374003685552 -123.02364382534596</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:b134d767-b284-4848-b14d-4a26314f2166</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.237698797826766 -123.02436515528856 49.23754423924541 -123.02398926561821</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:78391630-cbf3-49aa-b4fb-12e0ad04f081</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.23655038596135 -123.02444036429618 49.23622227075009 -123.02364120246529</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:7bf11d99-deb6-4a61-b341-bd44fe8a6c6a</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.23412512430417 -123.02481473567332 49.23293096709321 -123.02482251654635</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:d386c880-0caa-410f-b342-696223c29699</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.23498900988966 -123.02481551183388 49.2345248262568 -123.02397204758702 49.234392454832914 -123.02365363988848</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:27d357f8-aa73-4dcb-a536-7fcff4c4f5fb</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.234014855957156 -123.03040423023734 49.233564238699984 -123.03040491521716</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:18914e33-e37d-47a6-bf98-06727c11bdd0</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.23283371918325 -123.0303940961323 49.23280544276628 -123.03044473741451 49.23238205056717 -123.03079788958097</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:0d323f47-9157-4f8d-8efb-495ad72ff96b</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.2345480321471 -123.03040138433147 49.234014855957156 -123.03040423023734</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:68de26da-caa9-44e6-83bf-fbcc8b0b2776</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.233564238699984 -123.03040491521716 49.23283371918325 -123.0303940961323</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:14ecf605-0f71-4068-92de-401ab4a359a2</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.23469641798988 -123.03040058251715 49.2345480321471 -123.03040138433147</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:9ddbe315-20b2-4e78-a54b-28c33019d52e</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.23652588386892 -123.02815090848279 49.2356306572631 -123.02620796730525</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:8cda4689-76cb-4413-a528-2f18f629a156</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.23517090048222 -123.0304305312971 49.23504868142692 -123.03039869698382 49.23469641798988 -123.03040058251715</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:01b3cfc7-8437-4769-b8c7-dc4f96b968bf</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.23624389672463 -123.02974694926569 49.23584589803721 -123.02887633938073</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:cf22a5a6-b995-4863-854d-57e891b70687</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.234125446296275 -123.02592893944902 49.23264240184588 -123.02591732552138</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:0709531f-0963-4ffc-83de-64b030721b2b</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.2356306572631 -123.02620796730525 49.23498900988966 -123.02481551183388</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:04ca99e1-336c-4b4f-8fca-6ac4b9c48487</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.23264240184588 -123.02591732552138 49.23219406122422 -123.02591393171994</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:a08b3829-a1da-4fe8-ae19-930e79c1bbd2</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.23803414462111 -123.02518495569711 49.236406847518225 -123.0269148617266</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:ce34694b-1a4e-432a-8aaa-e6b4c76d1694</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.23698305489091 -123.02549202531851 49.23655038596135 -123.02444036429618</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:0df247bb-3238-4951-8d97-f741a5aab048</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.23803414462111 -123.02518495569711 49.237833035724805 -123.02469526392113</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:6c765e98-3dba-479c-a254-ae043c597431</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.23844161554186 -123.02617688267745 49.23803414462111 -123.02518495569711</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:9bf902c2-bc1b-445d-b8e2-9e12bf88208b</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.23860650433065 -123.0250960067558 49.238135711038524 -123.02509714197545 49.23803414462111 -123.02518495569711</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:56ddeab0-c03e-49dd-a5f4-55217064567b</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.24159975230103 -123.0575031797116 49.24023816634394 -123.05452340517236</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:ed5570da-99ed-4f79-ac6a-183a05138c76</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.24259930936336 -123.05732778314218 49.24253874578221 -123.05714348985163 49.24234346366393 -123.05671453412127</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:526ade5b-1cc1-4d87-9853-31e0dced03ce</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.24234346366393 -123.05671453412127 49.241342857355164 -123.05451582871699</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:2403450b-25e7-4149-aafc-2725bf8ca547</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.2424371108161 -123.0516562148154 49.241506853868515 -123.05256558401744</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:35a358e1-812a-4683-b100-deafe264e8fb</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.2433349034462 -123.05895507029628 49.243107993862736 -123.05845103485197</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:651f90d2-969d-4244-9b63-ec8dd1b91461</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.243107993862736 -123.05845103485197 49.24288047883769 -123.05794810242894</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:65445c16-af6f-4862-86c8-e9ba7d85b606</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.24288047883769 -123.05794810242894 49.24259930936336 -123.05732778314218</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:7ee10a6f-1ceb-4060-a2f8-07dcc7b9d5f3</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.244620567043796 -123.05425171203117 49.244622152199724 -123.05257416671884</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:6e165016-0748-40f1-8f51-fbb21d664316</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.24462283575576 -123.05104999273456 49.24289421180484 -123.05273351672894</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:7ebc3352-0bcc-462a-afb7-c3f33e86a4f2</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.244622152199724 -123.05257416671884 49.2441656663884 -123.0530173902781</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:7c033ac2-ebab-49cd-a744-ce9fa87c6705</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.2441656663884 -123.0530173902781 49.24371392114827 -123.05345668140582</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:97b626ce-61d0-4b98-80d6-5941a82a3dbd</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.24371392114827 -123.05345668140582 49.243350160508356 -123.05381041137485</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:283742e8-211d-4470-b3ec-42cbb5b2e91b</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.24473092726055 -123.06050485808645 49.24430944158135 -123.06097627304368</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:f07968e3-f90e-4f62-846f-90a6aed7183c</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.24473092726055 -123.06050485808645 49.24446296157183 -123.05994821247607</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:2708cc79-008f-46c4-b6fd-1134e4f9ceee</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.24446296157183 -123.05994821247607 49.24399339062339 -123.05897279462047 49.24399282695026 -123.05850685731758</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:39f1a439-a5e5-4c91-bf49-c01b1d77bae7</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.247935945568 -123.0522478775216 49.24793571354854 -123.05190450796684</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:95e08a82-6164-4059-b9a1-2266e8a89cdb</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.24793571354854 -123.05190450796684 49.24793509143208 -123.05038380312035</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:7a5701ff-c2a4-4479-8b16-4d2e3cd16ced</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.25540437173865 -123.05298222125447 49.25491868303166 -123.05298425747168</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:7a67c713-45fa-4539-9332-bddefeeff68a</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.255713493002304 -123.0529808343113 49.25540437173865 -123.05298222125447</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:a436707a-3040-45d8-bfbc-85a36fd203dc</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.25828262805621 -123.05597011989458 49.258276775527804 -123.05594461975355 49.25826192162498 -123.05587606595044 49.25824785045046 -123.05580712826338 49.258234570985394 -123.05573783418573 49.25822208322916 -123.05566818371452 49.25821039615653 -123.05559821808609 49.25820599617657 -123.0555635667396 49.25820001195936 -123.05551242188064 49.25819460348541 -123.05546112650491 49.2581897887317 -123.055409708117 49.25818556770466 -123.05535815297202 49.25818192239399 -123.05530650227735 49.2581788797786 -123.0552547698044 49.258176421868 -123.05520295553134 49.25817455765065 -123.0551510732093 49.25817328710684 -123.05509916406588 49.25817260124131 -123.05504722808914 49.25817251803795 -123.05499527904037 49.25817302849495 -123.05494333065076 49.258174132599265 -123.05489141040465 49.25817478195842 -123.05475512069556</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:d855f651-27e9-49a1-946b-6bf66ac46440</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.258468761021845 -123.05660806947404 49.25846741353175 -123.05660441224386 49.25844499261049 -123.05654083811173 49.25842330055471 -123.05647667391216 49.25840234634538 -123.05641194713968 49.25838212997482 -123.05634667153522 49.258362669419114 -123.0562808746034 49.258343955682165 -123.05621455633147 49.25832600673351 -123.05614775796697 49.25830882256554 -123.0560804932504 49.258292412166156 -123.05601277593247 49.25828262805621 -123.05597011989458</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:9c446d89-494d-4446-bb38-88e26ecb55f3</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.259155018881614 -123.0547515735818 49.259157203349076 -123.05299906096533</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:9543c433-2036-4af1-a304-3504ef115ea1</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.26040160603105 -123.06143470020034 49.26039209393417 -123.06012596951084</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:8a0df9b9-41ca-44ba-9bc8-9ba5ca7b39f8</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.26039209393417 -123.06012596951084 49.26038831930384 -123.05959864566289</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:02769af5-229c-48d4-b7a1-f7115f8e09ba</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.26038831930384 -123.05959864566289 49.260378016515176 -123.05819336510126</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:47874379-1206-4820-aba1-4ca56fb91e81</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.24356492190606 -123.06180955058649 49.242353158592294 -123.05915782541173</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:0caad24d-5d5e-4140-8bdf-13b714124a09</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.24396212777316 -123.06136473249362 49.24356492190606 -123.06180955058649</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:5c80b45a-8b29-4191-b9e5-4f0302d3132e</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.24430944158135 -123.06097627304368 49.24396212777316 -123.06136473249362</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:7a3f3d38-833d-4d4e-82c6-6db0ca48e2e8</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.24430944158135 -123.06097627304368 49.24404141478169 -123.06042038520232</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:2eef397d-f5b9-4802-a229-ba79e5106404</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.24404141478169 -123.06042038520232 49.2433349034462 -123.05895507029628</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:687b1f6a-35a0-4c29-930f-20e435e68415</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.26229015717084 -123.06589456722607 49.26227584414818 -123.06396063599296</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:2cefeccc-fba3-4a2d-ae4d-d56977f49190</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.248503454303034 -123.06440034447537 49.24849597316992 -123.06269429617241</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:1214ca18-b6de-43b9-9d1d-046c3084c461</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.244475147236074 -123.06370197121754 49.24356492190606 -123.06180955058649</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:f09077fb-3eb1-4cd9-a31d-ad16724990ba</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.24320382340821 -123.06221683089284 49.242841778359264 -123.06262520317428</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:adad1844-c5bd-43e0-93d4-019b87895b15</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.24356492190606 -123.06180955058649 49.24320382340821 -123.06221683089284</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:cb2fa033-3200-4817-ad28-3ced05c4b906</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.24850635052036 -123.06505903684683 49.248503454303034 -123.06440034447537</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:5ab40aa5-ca89-4984-ac3d-d94f572223b0</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.25027241544029 -123.06367761964005 49.25026123739343 -123.06256902952308</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:53b053bd-c1cc-42e1-9873-0a9ec358cff0</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.25027948501122 -123.06434448929036 49.25027241544029 -123.06367761964005</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:349ca9ec-6ef2-4faa-b469-eaf0483727d0</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.25952743810734 -123.06401109609985 49.25951246383704 -123.06207728628912</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:d445ab72-69ed-4bc9-9d0c-170af38f8046</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.23736133597245 -123.04093426154414 49.23708880259818 -123.04119975612626</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:9e23ba04-4657-44b2-9833-61ccc4123d16</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.23843856873191 -123.03988479982202 49.23736133597245 -123.04093426154414</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:95b8404f-e672-4725-9e5a-5502d981a906</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.23881674742168 -123.03951636971841 49.23843856873191 -123.03988479982202</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:56d536ef-9348-4998-82dc-81158863ee67</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.237366305244706 -123.0392644787199 49.23673737188352 -123.03987950117774</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:3517b148-ee1d-4950-b485-9966a6efbea8</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.23962489234955 -123.04150754908004 49.23924092100364 -123.04057192658875</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:493b6a86-0727-4dd9-9b36-303f0f8406a7</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.24149392286856 -123.03971774122506 49.23962489234955 -123.04150754908004</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:5b241cc2-5c88-437a-a55c-cd197e551dc9</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.23924092100364 -123.04057192658875 49.23881674742168 -123.03951636971841</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:4679fdd8-43f7-4bb8-8f5e-6381a8fa4397</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.23881674742168 -123.03951636971841 49.238579194198365 -123.0389271500164</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:8b33d13a-7d74-498e-98df-333ba33186ac</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.23916965613631 -123.03917783502472 49.23881674742168 -123.03951636971841</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:1435fa40-7cba-473e-8611-bb98774fe1bc</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.2379816030074 -123.03866278286583 49.237366305244706 -123.0392644787199</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:289aad04-b3a7-46d0-ae22-b196c103f4bd</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.24068089885648 -123.03772674574823 49.23916965613631 -123.03917783502472</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:f173d81b-7b97-4aba-af71-09351674ff08</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.238579194198365 -123.0389271500164 49.238388327826016 -123.03845955003577</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:10a8086f-0ef0-427a-b30b-b80c633e270e</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.23833154205926 -123.0383205775574 49.2379816030074 -123.03866278286583</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:6c167981-c53a-443b-946f-bf45e2f32481</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.238388327826016 -123.03845955003577 49.23833154205926 -123.0383205775574</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:bed661cd-0e8d-4161-84e9-039f0f9b2001</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.23611882558956 -123.0442915304801 49.23594291744541 -123.04231600102635</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:7080c754-b351-45c7-a421-0ff16f46884a</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.23605400676371 -123.03910540838346 49.235638958365314 -123.0395244532365</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:07638ba1-891e-477b-aad2-8ac6b558278f</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.235638958365314 -123.0395244532365 49.23563770095777 -123.039518820122 49.23562148802469 -123.03945009545335 49.23560449231442 -123.03938180978648 49.235586722809046 -123.0393140043419 49.23556817951399 -123.03924666538536 49.23554887141137 -123.03917983413714 49.235528798492766 -123.0391135380734 49.23550796975431 -123.0390477772036 49.235486394182914 -123.03898257901082 49.23546408076547 -123.0389179709779 49.23544102949376 -123.0388539805806 49.23541724936399 -123.03879060782792 49.23541188388319 -123.03877666078048 49.235384247981585 -123.0387036418649</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:94d1092e-730f-4c73-b8f7-641bbe6de02b</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.23594291744541 -123.04231600102635 49.23580693671647 -123.04078930276677</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:88ebdc31-6e83-48c9-95e8-3366f3e33d2f</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.23580693671647 -123.04078930276677 49.23576961870339 -123.04037026932062 49.23576311342143 -123.04029789807498 49.2357557894598 -123.04022571850001 49.23574763782369 -123.04015373059192 49.235738649499126 -123.04008198929445 49.23572886047231 -123.04001048090329 49.23571824373889 -123.0399392603475 49.235706826289885 -123.03986831391535 49.235694599111696 -123.0397976965503 49.235681562200085 -123.03972742199241 49.23566772455098 -123.03965749025214 49.23565308615085 -123.03958794254311 49.235638958365314 -123.0395244532365</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:0babc0c2-9977-4dd7-9c9b-00312b680fce</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.23673737188352 -123.03987950117774 49.23580693671647 -123.04078930276677</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:efc49942-8465-4693-b058-d62274077b8d</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.23708880259818 -123.04119975612626 49.23594291744541 -123.04231600102635</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:4b577260-1912-410b-ac14-483642b15131</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.23613601329353 -123.04448457810122 49.23611882558956 -123.0442915304801</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:cb427a7e-7697-49f3-b59c-e897dd6d49da</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.23649977332923 -123.04391706818247 49.236118933569315 -123.0442914344177</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:a99d171e-3440-4d69-a732-217f3f5f17d0</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.23670774174386 -123.04667438170083 49.23651996282089 -123.04618986204062 49.2365003109081 -123.04613808233789 49.23647508872631 -123.0460692360292 49.23645066734804 -123.04599971741725 49.23642703776048 -123.0459295677026 49.236422078491074 -123.04591420505517</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:fe6806fe-16e3-485c-8de9-43d9f4f31bca</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.236422078491074 -123.04591420505517 49.23640420895222 -123.04585880062811 49.23638219890725 -123.04578742994494 49.23636100761354 -123.04571548312441 49.23634064405985 -123.04564297390907 49.23632237468868 -123.04557468395325</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:7e28cb97-b429-4e8d-bad8-f9463d2748b2</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.23632237468868 -123.04557468395325 49.23632110822891 -123.04556994350709 49.23630240910953 -123.04549640566067 49.23628455569062 -123.04542237411201 49.23626754796044 -123.04534787633185 49.23625139489715 -123.04527295353618 49.23623610550061 -123.04519759199268 49.23622167075328 -123.04512184663776 49.23620810864486 -123.0450457174841 49.23619541915858 -123.04496924573905 49.23618360228838 -123.04489244513583 49.23617265802298 -123.04481534314466 49.236162604341644 -123.04473796725182 49.236153441238486 -123.04466033119033 49.236145168707765 -123.0445824486932 49.236137777732466 -123.04450437469617 49.23613601329353 -123.04448457810122</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:b486f98a-aa48-43e9-9d29-ab0d0a1449b7</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.23760276459487 -123.04283030491405 49.23649977332923 -123.04391706818247</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:045f6593-aeb2-4856-8454-cd80243a7999</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.24000515990852 -123.042440833698 49.23855264773732 -123.04387602683539</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:5d6d732b-cb6a-48c5-9a0f-1b2e4ac52495</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.23798244805599 -123.04245613504759 49.23760276459487 -123.04283030491405</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:25801427-a638-4b38-a782-38ea1aee1e07</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.24000926267095 -123.05402937949036 49.23933035615701 -123.0525662689314</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:121ac7de-2323-4c4a-8084-aa1dafeb2080</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.23933035615701 -123.0525662689314 49.23887290748087 -123.05157867085211</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:72b785fd-889c-455f-aa00-17580e2bdf1e</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.23902302670459 -123.0496542444143 49.23862532042406 -123.04868108020956</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:0e1fe85e-4938-495b-9655-af83017ec6d4</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.24042842153011 -123.04614876171318 49.23973739091451 -123.04681502875003</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:f2f50326-bff9-45f3-ae5e-cec334f05e57</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.24077389080685 -123.04433913374717 49.23931340752077 -123.04576405139544</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:2667df58-ea19-47b7-b648-d04c5268ab6e</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
<georss:line>49.23862532042406 -123.04868108020956 49.23840194950313 -123.04812535239195</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:c8a651d9-0a6d-4a97-a204-3f1877b9ff79</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.25486183682074 -123.055261676189 49.25490164600785 -123.05366655330593</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:4ca2541b-6b42-43fb-8de0-c382085ccba0</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.25540437173862 -123.05298222125447 49.25491868303166 -123.05298425747168</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:9da674ad-f2e6-4d60-9a8f-f22915654d38</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.255713493002304 -123.0529808343113 49.25540437173862 -123.05298222125447</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:5057ed34-d9b8-4aa7-b35a-c927ef67acb2</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.25817478195842 -123.05475512069556 49.25818373398553 -123.05299584719236</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:f209aa50-8cdd-408e-a7d2-5edfa79a84f4</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.25838641234077 -123.04955414240041 49.25819521055669 -123.05077542540637</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:b2197776-c324-403f-ab59-82ba31602893</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.25490164600785 -123.05366655330593 49.25491868303166 -123.05298425747168</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:df1d3699-04be-4d2c-b46b-43a0744d15df</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.253221962842844 -123.05017686003622 49.2532216845199 -123.04957134392079</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:8bd49287-10de-4c15-98c6-3501c2d7eb16</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.25406075534232 -123.05016248412586 49.25406219821619 -123.04954953881065</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:7c521e32-bda8-404c-9fc9-5b8a1d504f28</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.252382891667594 -123.04958643043034 49.25154453979903 -123.04960071988755</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:fc932f80-c196-49ca-b218-c0c8d8b85195</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.253159374076404 -123.04957262821574 49.252382891667594 -123.04958643043034</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:7325cb11-99ca-420c-ad2d-d20d4bf47902</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.25235918952899 -123.04706980284449 49.25235001104812 -123.04509360246328</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:a4348b81-17c8-4f87-a19f-ef0001236f2f</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.25235001104812 -123.04509360246328 49.25234695853828 -123.04433469827359</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:fc62e802-60be-4d66-aaf8-12faf52dab53</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.25280459610556 -123.05220141584397 49.25238478569864 -123.05220898447843</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:99dbf089-4593-403b-aecb-76e4eba29fb9</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.25322362349405 -123.05219473947128 49.25280459610556 -123.05220141584397</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:13d3c6e2-2879-4681-91cc-034e53fff73a</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.253216900799856 -123.05453867374273 49.25322435615172 -123.05299599340582 49.25322362349405 -123.05219473947128</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:e6f1dd92-c0ef-4f97-8308-4a474cc356bc</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.25322362349405 -123.05219473947128 49.253221962842844 -123.05017686003622</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:fe5619ed-f4de-4bfa-9689-7d61ed3443d3</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.25406244354113 -123.05217968319779 49.25406075534232 -123.05016248412586</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:a2bdf518-75a6-4056-952d-561352f3cc70</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.25062405719669 -123.04419720184767 49.25060761125411 -123.04418067047273 49.250520337865595 -123.04409098762677 49.25043410873627 -123.04399898380275 49.25034894183517 -123.04390470024556 49.25026486413225 -123.04380816446667</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:ec47bfb3-b05c-479d-a3fe-450054dd80bb</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.25150841468397 -123.04433529399623 49.25089400676663 -123.04433052528157 49.25088707201547 -123.04432904877588 49.2508733195458 -123.04432584853103 49.250859603199245 -123.04432227731112 49.25084593196567 -123.04431834886563 49.250832305850366 -123.0443140494537 49.250818733843175 -123.04430939282483 49.25080521594941 -123.04430436523816 49.25079176115892 -123.04429898044313 49.25077836946639 -123.04429325218108 49.25076504088227 -123.0442871529701 49.250751784396556 -123.04428069655961 49.250738608999086 -123.04427389669894 49.25072550569453 -123.0442667533803 49.250712492478584 -123.04425925287894 49.25069956935124 -123.04425139519519 49.250686727306544 -123.04424320780319 49.25067398434021 -123.04423467697823 49.25066134944214 -123.04422581646966 49.25064880462699 -123.04421661252053 49.250636376880465 -123.04420706515513 49.25062405719669 -123.04419720184767</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:d9f8b420-a50a-4bae-a02b-79644931ed8a</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.250641075912654 -123.04708946796448 49.25063725029179 -123.04638446765259</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:3ea405ad-0dcb-448a-811d-bbee3ce0519a</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.25066051872946 -123.0496157600847 49.25065602818799 -123.04900910314416</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:6ba240ca-8ddb-464a-a8eb-1a90a9374b52</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.25065602818799 -123.04900910314416 49.250657174350465 -123.04891530805115</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:cf675e2c-9766-4931-8410-be5a2099c779</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.250657174350465 -123.04891530805115 49.250641075912654 -123.04708946796448</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:024f0459-9cd7-4a59-9cec-8a0d3074bc0e</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.25063725029179 -123.04638446765259 49.25063012400901 -123.04509459179786</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:6107ad1f-66f0-44ae-994d-0c1e6c829ffc</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.25063012400901 -123.04509459179786 49.25062405719669 -123.04419720184767</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:f8ff8cb3-7793-4c46-8c27-7a3e1812b5aa</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.24792153688011 -123.04707521608573 49.24791758119946 -123.04638028476774</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:4e5aa3fe-706a-46c3-8e62-bf9e60e2c14b</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.25026486413225 -123.04380816446667 49.250256340715 -123.0437974664952 49.25023630922345 -123.04377142349783 49.25021658377156 -123.0437448311559 49.2501971553483 -123.0437177306843 49.25017805094396 -123.04369010836609 49.25015925255755 -123.04366199166715 49.25014078717942 -123.04363336687054 49.2501226458036 -123.04360426144999 49.25010484642024 -123.04357467542128 49.250087389023804 -123.04354462252526 49.25007026461867 -123.04351410275379 49.250053500184976 -123.0434831298714 49.250037095717204 -123.0434517176186 49.250035603611025 -123.04344878950783</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:aed73517-1777-4776-a2fc-b38fe14a2f00</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.247532888072215 -123.0496349675278 49.24710771918558 -123.04963580541988</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:828fa174-bb3e-4065-a849-56d166ea7c06</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.247914811645046 -123.04583690975171 49.24790661832267 -123.04433525660778</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:cc07216a-1410-418b-bdd0-15e12d7fda6f</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.24793053346423 -123.04891249069296 49.24792153688011 -123.04707521608573</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:746d1499-5968-4636-8c94-36b6616919ac</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.24791758119946 -123.04638028476774 49.247914811645046 -123.04583690975171</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:3800c198-c3f3-424f-9848-0b85d4770a77</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.249703142539005 -123.04638096804949 49.249692143686104 -123.04433594855136</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:9b9ce237-449d-40b7-bc5a-90b7f6de956a</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.24970667493855 -123.04707713321342 49.249703142539005 -123.04638096804949</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:526fa55e-a1d4-4d58-bbaa-c23c2c9ba31b</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.25063456054056 -123.05663419236892 49.25064034980633 -123.05588433783056</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:bba667fb-6d48-4a95-8c6e-ae4a80173fd8</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.25064034980633 -123.05588433783056 49.25065083512433 -123.05457366227192</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:a03e7027-fd61-4d26-b210-e92da4a2f699</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.25235806641166 -123.05662787785552 49.25151970051883 -123.05663226427299</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:d23ee8fe-9a14-44ef-b075-cda9ec325db1</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.25065083512433 -123.05457366227192 49.250663194140714 -123.05302926707583 49.25066243911817 -123.0522382091848</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:843df9d2-6a13-4586-8926-b8a3e4feeb58</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.25238478569864 -123.05220898447843 49.25238315140501 -123.05019313177844</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:e159e06f-e638-466c-8906-7495e568e0ca</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.25066243911817 -123.0522382091848 49.25066089523381 -123.05022249540902</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:35154587-6f05-46b3-9c9c-c4bad3b6fb04</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.25066089523381 -123.05022249540902 49.25066051872946 -123.0496157600847</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:b8a2212e-ecd0-4832-ac13-f594d5a3f71e</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.25238315140501 -123.05019313177844 49.252382891667594 -123.04958643043034</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:43d45df4-c68d-4d37-b64b-3e7921e966a7</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.2484388757515 -123.056642357181 49.24710210212979 -123.05664565075728</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:60ec52fa-b21d-4968-9771-a82d09e92f2b</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.248106746605686 -123.05799875101467 49.24773813390874 -123.05801111138223</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:0198da16-035b-418d-8415-4742bc42bb7b</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.24811809818158 -123.05908243581675 49.248112719758126 -123.05856869265477</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:53e016a6-d1ca-46b4-9f90-9f24c8904f47</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.24793571354854 -123.05190450796684 49.24793509143208 -123.05038380312035</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:99c94f35-59c0-4584-87be-038fcce90ec3</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.248112719758126 -123.05856869265477 49.24810675543537 -123.05799908079263</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:c533bcf1-3175-48d5-9f18-e3cd2b191dff</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.248838025972674 -123.05797424262093 49.248106746605686 -123.05799875101467</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:138c9429-7390-482f-94b6-db20ca75ba38</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.247935945568 -123.0522478775216 49.24793571354854 -123.05190450796684</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:4bd28056-648d-46d0-b79e-361c7f2ac0a8</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.24793509143208 -123.05038380312035 49.24793367194127 -123.04963161819175</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:736ef0e6-c562-4849-bc88-b535fd87527d</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.24882067022071 -123.05458469850961 49.24882947061829 -123.05224332418773</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:a1a650ce-4964-48f2-81c5-812cd2b06041</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.24972372391886 -123.05223926613823 49.2492767411909 -123.05224133655344</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:f8f67a28-5233-401d-ac03-015bc6178905</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.2492767411909 -123.05224133655344 49.24882947061829 -123.05224332418773</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:0b0e5d56-5879-43ac-afce-ab2ac87b38e2</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.24987011936082 -123.0592175787223 49.24965497582889 -123.05857393845947</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:6b9316de-ec33-43cd-a564-ad1392638d0e</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.249715302259034 -123.0545788419046 49.24972372391886 -123.05223926613823</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:b162379b-be11-4660-9873-0e8e30513127</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.24972284552001 -123.05036861128227 49.2497225048113 -123.04961769190759</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:5733b3a4-df8e-4a39-b038-b38a8b8783aa</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.24972372391886 -123.05223926613823 49.24972284552001 -123.05036861128227</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:fbc72332-f9e8-418d-8fdf-e3b63c69d484</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.25176495935935 -123.05931310757136 49.25029407143168 -123.06026500673649</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:7e1711bc-a269-4c2d-b518-9b5e7d7dc09c</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.254730359761425 -123.03097378363681 49.25473017815065 -123.0306767468692 49.25483891158237 -123.03050976426317</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:74f48cc1-6f7a-4e61-8ff5-9bb5bf75bbdd</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.25473073498844 -123.03161426444048 49.254730359761425 -123.03097378363681</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:c087d0ec-bd25-4616-acf5-949a827190a3</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.25483891158237 -123.03050976426317 49.25529347794071 -123.0298127733542</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:a14331c8-b3ac-4c6e-b518-20653bf3a08a</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.257266812881994 -123.02974072618531 49.2572667733244 -123.03010187472651 49.256442126254655 -123.03041781101295 49.25632672045498 -123.03040713081086 49.25622449314383 -123.03032608305725 49.25558954574012 -123.02935909541577</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:72b59dc3-6d9e-4706-b631-2a0650d978b4</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.26131726012531 -123.03375681542566 49.2581502401421 -123.03377199925741</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:253d52a3-412e-4463-ae0f-d1de1653ef3c</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.26945992380871 -123.03369273214106 49.26946262140069 -123.03096344447113</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:07135324-3415-45ec-8539-ed0121a19153</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.257580194628474 -123.02602368149698 49.257579955977945 -123.02560217150953 49.257560847127024 -123.02545298201679 49.25750518540147 -123.02532720563865 49.25710659494263 -123.02472060004631 49.25702443262011 -123.0246365493338 49.256926858779025 -123.02460725616857 49.25664849273363 -123.02460790111917</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:b3786491-1055-418f-8591-482a00751a5b</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.25679751175687 -123.02602508404614 49.25679775199356 -123.0259968291243 49.2566702881783 -123.02580344372805 49.25664992301145 -123.02580344685462</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:c482425b-3fba-43fe-8821-db079dc263e4</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.26246496173093 -123.02368395994766 49.26109699562116 -123.0236940255651</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:4b0bc41b-bb20-4229-a9c0-ea758aab23d0</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.26663908808828 -123.02569674000165 49.266635457097465 -123.02366088433047</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:eea13327-f2f6-4bac-b8bf-d89d1a56fe24</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.26846671423809 -123.02633646432213 49.26740787462896 -123.02584502896406 49.26663908808828 -123.02569674000165</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:0ed09449-7d22-4657-8aed-df86d4632151</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.261203675770815 -123.02848745825314 49.26125966797909 -123.02835321192812 49.261297159780185 -123.02809637221914 49.261320597431364 -123.02788953857174 49.26131130632146 -123.02766112211557 49.26127452175601 -123.02532098437268 49.26128666239791 -123.02492054615412</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:67bbc9d0-2e7a-4499-a4e6-dfbb413a23e8</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.26011486156858 -123.02369990494773 49.258159246510445 -123.02371089756546</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:a3d7fa4c-1ef8-46f0-aeef-27bd70416218</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.25274166061607 -123.03379793638692 49.25232146594789 -123.03380100244507</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:d9fc3a13-05c6-4e03-a522-861b8788fe6f</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.252737977054096 -123.03105788615605 49.25280121360862 -123.03105732119661 49.25286943132372 -123.03103143352318 49.25291745073244 -123.03098703686649 49.25293173008049 -123.03097236971726 49.25344160604433 -123.03019115154767</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:e287ab41-86c7-4ec8-a2d2-53fa20c40b09</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.253158390759836 -123.0337994301637 49.25274166061607 -123.03379793638692</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:cb194703-0989-417b-a626-eb91cfd1188d</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.25315797137438 -123.03304139552046 49.25315722368248 -123.03260193490605 49.25317647056676 -123.03245243764015 49.2532320691854 -123.0323270807282 49.25350924912141 -123.03190196629998</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:ef490a65-5d0b-4ce6-98f9-061aecef4ac9</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.253158390759836 -123.0337994301637 49.25315797137438 -123.03304139552046</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:29a90e06-3060-4e05-a370-9fb89dbfbb75</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.25358919048327 -123.02461693408945 49.25193815273681 -123.02462138981362</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:1e86040c-d806-4546-b13b-93d5bdfafc81</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.254210265727664 -123.02461530531035 49.25358919048327 -123.02461693408945</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:2c654f8b-ca86-4c86-9f13-8fe563ea4653</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.25515083876098 -123.02661646894653 49.25465364699477 -123.02585998581065</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:54988761-795b-4327-8a28-b6cc639ed95e</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.25621345640266 -123.02632527190953 49.256553530297765 -123.02580341034894 49.25664992301145 -123.02580344685462</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:7613e1dc-601a-408b-b429-d811aa6e054f</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.25645620651963 -123.0266944731591 49.256797694848814 -123.02617026231763 49.25679751175687 -123.02602508404614</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:94599217-0587-4848-980b-13a3da0f8462</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.24965848356763 -123.03308761988234 49.24964678384649 -123.03106792897849</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:eb7a2c2f-cee4-476a-8f2a-fb641629b4d2</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.24966238681466 -123.03380462841992 49.24965848356763 -123.03308761988234</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:f841215a-19a3-4f7a-b5de-5bdd9fe5c40b</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.2496626461398 -123.03456978210912 49.24966238681466 -123.03380462841992</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:053bcfbb-ebd3-4241-86b9-646ef3eac473</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.252321905895144 -123.03456384756295 49.25232146594789 -123.03380100244507</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:905e3a10-7f98-4b43-bb8c-0edef560f716</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.24790734729751 -123.02625563053682 49.24790036234393 -123.02447410619367</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:4bb9ff91-23e6-4f1a-9b3e-ce9d6ec0d55a</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.25064067294636 -123.02457827107851 49.25063252074992 -123.02372982798191</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:0af90af5-b6d6-4783-b14a-73542e14ec80</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.250647727663306 -123.0253577202277 49.25064067294636 -123.02457827107851</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:d267dddd-198a-4cc6-8e93-b2f91fc1b5d2</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.250655958930224 -123.02624106609429 49.250654559960935 -123.02610302304159 49.250647727663306 -123.0253577202277</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:bbb8a109-e6d8-4b48-af86-3b1bd3c1375a</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.2471020078834 -123.03381927227781 49.24709330162409 -123.03310104726104</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:5b9fcfc8-cc85-44c8-be8f-21d4a40168c0</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.247876193257355 -123.03381250498131 49.2471020078834 -123.03381927227781</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:60cdae91-88c1-4815-abfb-ca22d38778e0</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.24787171452331 -123.03309494483375 49.247858467367195 -123.03107668612435</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:1f81c4d2-daa1-4367-b331-bf75d1a854f8</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.247858467367195 -123.03107668612435 49.24788832845661 -123.02854368889427</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:be9c5f45-b83f-4bbe-a2fd-32ece9c4547c</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.247876193257355 -123.03381250498131 49.24787171452331 -123.03309494483375</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:34533bed-4849-4e9c-abee-c5b37a5c51b5</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.24787729776304 -123.03457871713809 49.247876193257355 -123.03381250498131</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:69b300b9-c0f1-44f8-a994-fe3ec8206ca0</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.24456601321006 -123.03548526178751 49.244562515105486 -123.034562003644</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:3a76bcc8-e2f2-4d86-9da9-f5ae73a6ef20</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.24620360103259 -123.02855114023572 49.24619817461186 -123.02789778281377</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:9d873f19-27de-40a4-a5a9-797448db69f1</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.24624152047673 -123.02921656676781 49.246245509828555 -123.02855108196096</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:38ddf448-ac30-4a5e-a5ee-c01250a7ab81</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.24626482645158 -123.03456337041735 49.24626434255313 -123.03382776843969</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:2f334120-d0ea-410f-942d-a854c4b1fc68</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.247072379316876 -123.02854734054381 49.247038131390724 -123.02841390521597 49.247035839383784 -123.02788980464624</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:3296ef85-1d5f-4641-81f6-e5f4b71ee51e</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.24709330162409 -123.03310104726104 49.247067875970004 -123.03107930892638</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:a7591938-cd53-4c30-8f81-85976fc216f6</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.24626434255313 -123.03382776843969 49.2462551416603 -123.0331093628835</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:fe2c328a-0e0c-44b1-b1c6-0b8a78497a6b</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.2462551416603 -123.0331093628835 49.246229590400304 -123.03108694421782 49.24624152047673 -123.02921656676781</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:77a70c15-780f-4d2e-8ac2-5d0ba383524e</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.24451429118383 -123.02545616788913 49.244512258660905 -123.02495962789352</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:b3532461-2e1c-45c0-8ee4-686328835cfd</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.2470232626346 -123.02375054944015 49.246184347132356 -123.02376183961626</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:f91b3e68-6ffb-46dd-8c2a-88710987a115</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.247035839383784 -123.02788980464624 49.247029591442015 -123.02626178779735</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:5ec8bc9e-62ed-4d5c-8d05-dd333e9b3fcd</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.24619817461186 -123.02789778281377 49.24619474692474 -123.02624937768039</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:1cbe87ec-64ad-4870-a576-b3d0b1ab9910</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.24747162393078 -123.02854592190474 49.247072379316876 -123.02854734054381</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:c72b2bc7-a0f2-4312-af02-6a72d92fcf02</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.24788832845661 -123.02854368889427 49.24747162393078 -123.02854592190474</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:76b624e7-ea53-4f8f-895a-6403503d8c73</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.25063252074992 -123.02372982798191 49.247898302014136 -123.02374332958179</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:e234d55f-fa25-4237-801e-18c00c5ead3c</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.24790036234393 -123.02447410619367 49.247898302014136 -123.02374332958179</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:47ff220b-51a7-4d48-a22b-7f4a1f39ae80</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.25063112041326 -123.02852941301784 49.250655958930224 -123.02624106609429</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:97640533-c031-4580-bf3a-5fc7b4f3b29e</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.24455762327443 -123.0339805517545 49.24455313008042 -123.03334797620437</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:bb2c5af2-1fcd-4069-acc8-1454ead3eea4</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.244562515105486 -123.034562003644 49.24455762327443 -123.0339805517545</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:b1deb24f-ad30-4f7f-bec4-8338284ede08</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.243751288113145 -123.03057628584939 49.24332040409402 -123.0309935751167</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:b72e771b-a456-40ef-a4e6-6560e02407ec</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.24332040409402 -123.0309935751167 49.24292333108562 -123.03137976001277</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:0d0bb57c-e32f-4e3b-a6c7-46b61b9e7e49</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.24453014966315 -123.03138069575925 49.24415928878432 -123.0317296842481</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:6303a132-299d-4e43-9ed9-31c5ffa2f5d2</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.24455762327443 -123.0339805517545 49.244159783060184 -123.03440269109177</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:f570931c-c455-47b6-90c4-cf7a1415adab</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.24455313008042 -123.03334797620437 49.24455055841628 -123.03312572709117</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:951a81e4-e97f-411a-bc96-a28f3e8a2cef</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.24455055841628 -123.03312572709117 49.24453014966315 -123.03138069575925</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:9934ec0d-3e6c-4bdf-9bc5-fe8b99dc6349</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.244516129115226 -123.02584820656318 49.24403056063119 -123.02631198032621</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:53f27a45-60e9-4820-b84e-c63ad0552df3</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.24450726241267 -123.02378417188697 49.244323646165014 -123.02372358971223 49.243018932759526 -123.02372135724465</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:a863d9c7-381f-434c-a8e2-fce019ab2232</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.243018932759526 -123.02372135724465 49.24256727310208 -123.02372059135364</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:914c980d-386b-4612-a087-ef859cdefcf6</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.244512258660905 -123.02495962789352 49.24307216816416 -123.02495210131605</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:32001715-8fbd-406b-8ca8-59186094c64b</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.24403056063119 -123.02631198032621 49.24331709492321 -123.02701202851676</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:76c84f03-efdb-485c-acee-e49eb4e4a974</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.24450938257891 -123.02427293537305 49.24450726241267 -123.02378417188697</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:6e96ab82-f614-4869-93c7-12b1ad151f1b</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.244510446661224 -123.0245160118987 49.24450938257891 -123.02427293537305</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:bd19bd58-eca6-4796-9e7c-4fdbddcca678</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.244512258660905 -123.02495962789352 49.244510446661224 -123.0245160118987</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:0e8abcb9-6fe9-4101-938c-b2014b8aaaae</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.2572220645296 -123.04430154668299 49.25631847335376 -123.04431160837154</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:3371c520-0cb2-41fd-ae11-be686858c1b8</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.25817082439218 -123.04428139638524 49.2572220645296 -123.04430154668299</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:032f8242-1a0c-4a55-8b66-1e182f574723</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.259204868615456 -123.04428230775994 49.25817082439218 -123.04428139638524</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:bfe7c729-0519-4d9d-8e6d-2ce198a7cd02</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.256349390377096 -123.04157564858735 49.256398379950355 -123.04114392418933 49.25639717547645 -123.03904171510091</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:e1c0ebf0-b4a6-4ee5-84ce-388c60279400</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.26201150746908 -123.04957814096949 49.26199723026738 -123.0470218618647</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:efbb4765-21e5-4872-9521-bc9874d76b09</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.25792358240096 -123.04955241467545 49.2574142734901 -123.04955223463391</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:41b4395d-4172-4e51-81a0-fecd9f4980f9</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.2574142734901 -123.04955223463391 49.25680196934562 -123.04955200646525</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:cde04abb-98e5-4fd0-b29e-c8add0696108</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.258187217792084 -123.04702548486276 49.2581754738963 -123.04505186681253</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:ad3df0f1-3b9a-439d-b919-ff24b92e2d88</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.259052558648904 -123.0470218816611 49.25904714823693 -123.04604987790078 49.25905257169225 -123.04593854803436 49.25907556464031 -123.04568600763778 49.25911944134185 -123.04544001427884 49.25918317031895 -123.04505488678292 49.25920470563591 -123.04465900036604 49.259204868615456 -123.04428230775994</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:249c1b62-49c8-463d-8c6f-8eae9efd8eb8</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.2581754738963 -123.04505186681253 49.25817082439218 -123.04428139638524</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:bc36bbc4-1955-4f75-a269-1d0bb330c237</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.255413991424575 -123.04432188878387 49.2544365401657 -123.04433210348454</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:d4d46f99-bb4e-47de-98db-bd3adf53d138</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.25477569481714 -123.03905035809974 49.25474524764806 -123.03891218416564 49.2547388829328 -123.03653085585863</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:d71f9899-ffb3-4323-848f-9c6cef4a0c06</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.255413991424575 -123.04432188878387 49.255407245527266 -123.04356371773336</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:cd700edf-538c-47cc-84fc-f3c4b0c4b316</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.25541837508044 -123.0450813908984 49.255413991424575 -123.04432188878387</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:2f1b1afb-b7f7-4ad1-b67f-50449347c61f</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.25631847335376 -123.04431160837154 49.255413991424575 -123.04432188878387</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:5b398b22-48e1-41af-808e-638afbd54180</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.250606550312455 -123.03966777850619 49.25060607158579 -123.03906641659485</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:6a87366e-3c37-4527-b58f-45daea65cf68</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.250607481073075 -123.04099550430846 49.250606550312455 -123.03966777850619</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:09a793f8-b31a-4f9a-b3ff-557f0b96029e</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.25060991893042 -123.04159903898328 49.250607481073075 -123.04099550430846</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:9949edb8-ffce-47e6-b967-864abf8101d0</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.25232743690472 -123.03905617710994 49.252324195253266 -123.03653685172262</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:85e394c8-b7ac-4dd8-8235-9b2fc8f804b6</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.25233063408709 -123.04159640360407 49.25232743690472 -123.03905617710994</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:1891d4e8-ff2f-4144-abf1-461f2ce93f65</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.244570392163524 -123.03664340836951 49.24456601321006 -123.03548526178751</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:41d2cec9-2ec5-43aa-bbea-89a7a391de2d</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.24627268891311 -123.03663400597857 49.24626482645158 -123.03456337041735</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:8d20ac15-d328-4b94-b9c6-88b1feb24680</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.24965739534338 -123.03654925654921 49.2496626461398 -123.03456978210912</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:b61b1c0b-30ee-4429-8a99-3b3d47bf7554</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.250103560443165 -123.03654319640631 49.24965739534338 -123.03654925654921</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:fc38511e-f707-47b0-9702-45af1da29a5a</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.25059951432402 -123.03653634843893 49.250103560443165 -123.03654319640631</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:ae18e92f-9e98-446a-96d6-674316810b5b</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.252324195253266 -123.03653685172262 49.252321905895144 -123.03456384756295</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:d43f3783-1644-479d-adb6-670531dfe0b0</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.24369654493975 -123.03777659406477 49.2433412276599 -123.03812188618257</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:5ddb0260-0a6d-45f2-b78c-98716ab8768d</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.24434640372937 -123.04056787946966 49.24348622992454 -123.0413919702304</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:440c306a-2f61-49c1-b498-ea3261eb4f02</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.24408349619142 -123.03740727730597 49.24369654493975 -123.03777659406477</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:2bef4a74-9531-4d06-b39a-17b858b8b02f</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.24456601321006 -123.03548526178751 49.24411374455562 -123.03591310637123</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:111d7303-2f03-4c8b-8fef-a20d72bcd6b6</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.244205814858276 -123.03729143805356 49.24408349619142 -123.03740727730597</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:83991e48-e693-40fd-aee6-075746e6e297</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.24411374455562 -123.03591310637123 49.243997815768466 -123.03602290822435</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:fc08e202-5c87-4bcc-a85e-ad84373ae987</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.24457088065182 -123.03694546799856 49.244205814858276 -123.03729143805356</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:40f0f0cc-825f-4f86-826f-88c834326a87</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.24458099717637 -123.0403431312209 49.24434640372937 -123.04056787946966</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:105f0323-7145-4f88-a30a-7576302c8277</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.24457088065182 -123.03694546799856 49.244570392163524 -123.03664340836951</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:87dd4ad7-cfb0-410d-b783-d62220eb3870</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.24457440284476 -123.03911614823278 49.24457088065182 -123.03694546799856</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:ad98cdb1-da13-4395-913a-e946954a5178</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.24458098818113 -123.04034313121356 49.24457440284476 -123.03911614823278</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:693ebeb0-4d22-459b-9cc2-6bf2b0a83329</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.24625502830065 -123.03767810792586 49.24627268891311 -123.03663400597857</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:575fc483-9bed-4eeb-992b-51e2a608168b</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.247070412146826 -123.04162909635093 49.247057009668595 -123.03910496017207</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:ff488fc6-2058-4201-828f-b91fcdd1240d</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.24312662839776 -123.0417391685242 49.24273625393718 -123.04080527257555</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:72677493-0088-404f-8f49-bfa449d4d564</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.24249707958168 -123.03892847091555 49.24211288658586 -123.03929282024014</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:7473f399-db76-4ef7-af88-9ccd83f58316</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.2433412276599 -123.03812188618257 49.24249707958168 -123.03892847091555</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:841ea00d-6d6c-4e4e-b5ef-d6a6890bc353</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.244159783060184 -123.03440269109177 49.242475428533425 -123.03601501391276</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:c3cce89f-b37c-4913-b7f7-658a89e31935</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.24273625393718 -123.04080527257555 49.2423550716037 -123.03987840550089</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:bfbd4434-3312-4bc4-90a8-568fc57acf1d</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.24321229728602 -123.03676709824367 49.24290703088349 -123.03706135060791</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:14447361-9bff-40ec-8be2-3d84ff95ccdc</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.24348622992454 -123.0413919702304 49.24312662839776 -123.0417391685242</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:4a730b33-ab0d-4de4-833b-23cb071cb6e9</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.243997815768466 -123.03602290822435 49.24321229728602 -123.03676709824367</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:45408398-81d0-4dad-8bb1-d9a023fafa16</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.24256727310208 -123.02372059135364 49.24247633477748 -123.02370344304927 49.24151263939774 -123.02370144310366</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:9faa647e-8a40-42ed-813e-cfd6498debbd</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.24151270882885 -123.02427678344469 49.24151263939774 -123.02370144310366</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:e95fd3bf-1ad7-41a0-b5d3-64fd25f40cb2</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.24151748790601 -123.02506490783966 49.24151270882885 -123.02427678344469</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:32a74952-29f1-4bf7-8641-f63fe17396a0</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.24234519643608 -123.0270853577528 49.24151748790601 -123.02506490783966</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:ed457111-792a-4011-9a68-ac3315780412</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.23959152013944 -123.02509228829908 49.239176551454136 -123.02509317709882</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:1607f7ca-5473-4f01-a197-8f2f6f75dd35</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.23967947275966 -123.02631791155022 49.23949759926953 -123.02587413482402</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:e750d285-89dd-4438-b995-45e9ed4d8001</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.23958906174201 -123.02421983092289 49.23958718451189 -123.02364191559184</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:a1ab231d-52d9-4b15-9e1c-6e14d64f2e2e</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.23958947303194 -123.0243600269274 49.23958906174201 -123.02421983092289</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:637de7c2-6384-4fca-b339-2f938fd336c4</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.240520053971295 -123.02550256953894 49.2403644785627 -123.02514570922621 49.24036440975459 -123.02513121542479</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:4483e542-0cb1-4e5b-9b20-2d5a7934df8f</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.23959152013944 -123.02509228829908 49.23958947303194 -123.0243600269274</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:fa596da5-2ca4-4194-b152-684d878c5b39</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.24149726361597 -123.02790314424439 49.240520053971295 -123.02550256953894</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:6544fcc7-3d55-44e2-9272-b8fa2ae4cfb5</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.24174823054216 -123.02849369987885 49.24149726361597 -123.02790314424439</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:77d1e861-cb48-49c3-939d-62b727e5f11b</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.23803414462111 -123.02518495569711 49.237833035724805 -123.02469526392113</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:53d21859-2b88-4b9e-b867-bf7c05271de6</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.237833035724805 -123.02469526392113 49.237698797826766 -123.02436515528856</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:723e5ff2-e927-4b4c-8465-7b84678aeaa8</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.23844161554186 -123.02617688267745 49.23803414462111 -123.02518495569711</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:22518387-e91c-4b0c-aec3-9b6999231e06</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.23860650433065 -123.0250960067558 49.238135711038524 -123.02509714197545 49.23803414462111 -123.02518495569711</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:5a2144ff-6119-4f60-b814-ac11bade52c0</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.23865982647965 -123.02670815222102 49.23844161554186 -123.02617688267745</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:efefe998-af18-43a6-8454-2a9ff3149b19</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.239176551454136 -123.02509317709882 49.23860650433065 -123.0250960067558</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:2d86846b-49b3-4b4d-9b4e-983ce0ba1c3e</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.238833300714674 -123.02712860694913 49.23865982647965 -123.02670815222102</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:4f1fd063-b052-4ef8-9371-e23d2aa383ea</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.23949759926953 -123.02587413482402 49.239176551454136 -123.02509317709882</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:dec5f4cd-e307-47e4-bdb1-5ff799a3c9df</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.24134575068666 -123.0303876556756 49.24112781853364 -123.02985289293667</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:e459c761-6c62-4164-9cc0-71433f60052c</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.2417156373464 -123.03128832042249 49.24134575068666 -123.0303876556756</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:79f9d382-a9be-461e-98e3-e0335abdf864</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.24205440648166 -123.03641663154468 49.24163427380438 -123.03681739122335</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:29da2405-ab8f-4cdb-a5b8-753cc4a920af</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.24208036449036 -123.03218252437095 49.2417156373464 -123.03128832042249</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:cb47bc41-0b68-4920-b923-7f07f7f1a237</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.241985278850535 -123.02904832684223 49.24174823054216 -123.02849369987885</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:77fc0f63-8adc-48a4-97ef-a0f2ca9a294f</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.24272456846046 -123.03089352706725 49.241985278850535 -123.02904832684223</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:9b834b89-f5c5-48b2-b20d-fa2fef81e8ff</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.242475428533425 -123.03601501391276 49.24205440648166 -123.03641663154468</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:7f89edc4-65fd-4ed8-9160-5d8a0c72358c</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.24279045626514 -123.03391625044391 49.24208036449036 -123.03218252437095</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:3ed3c7b4-32d5-4844-81c0-3a5e13083951</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.23981136349846 -123.03709226638873 49.23900899286036 -123.03508972583451</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:35283164-4e6e-4131-9bc9-14cd93c0fdaa</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.23943082180685 -123.03468240719981 49.239036843085984 -123.03372746418148</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:cbf80ae2-0131-4004-991b-0836d43dc56d</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.24039568363804 -123.0337842214633 49.23999010146841 -123.03280192054613</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:b75f27a3-e860-4108-b616-2dbe771763f4</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.24042139162293 -123.02976286670453 49.24006155346325 -123.03011596649567</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:25988237-863b-4297-9dc8-498de4854bb9</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.24139093379969 -123.03622239029728 49.24039568363804 -123.0337842214633</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:e1694506-8a8f-4d13-868d-17bab0f4f13f</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.24090651509775 -123.02930072646058 49.24042139162293 -123.02976286670453</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:f7a8b8b1-1ee0-4fba-a277-1d21b3df498a</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.24112781853364 -123.02985289293667 49.24090651509775 -123.02930072646058</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:83157357-fe6c-488b-964a-dd1d0aa62131</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.24174823054216 -123.02849369987885 49.24090651509775 -123.02930072646058</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:6131e7a6-1e14-4fa5-ad6d-07b3acf48476</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.24006155346325 -123.03011596649567 49.23858041393984 -123.03153552752305</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:54e6e78b-122d-4135-8c01-5f7bafb9e027</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.23858041393984 -123.03153552752305 49.238256391092364 -123.03184954095418</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:59807411-9723-4a2c-a941-bf484fbcd63e</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.23924234430933 -123.02813179065002 49.23775614655969 -123.02955168674518</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:b24059dc-01eb-4048-b7b6-caeecc1ee24a</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.23890341963076 -123.03340764065018 49.23848002372259 -123.03239274758806</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:3bc40a21-12de-42e2-9bb9-0365ef940e30</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.23848002372259 -123.03239274758806 49.238256391092364 -123.03184954095418</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:e8ad9e67-5139-4992-b0dc-93cdabab6b30</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.238256391092364 -123.03184954095418 49.23796039947848 -123.03126824061573</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:c6568e0c-76ad-4ab7-b058-37af66a00015</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.237867963824385 -123.03716213602111 49.23758497275932 -123.0364584865757</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:be2d5d2a-b7cc-429f-91f9-6da1eba8db48</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.239036843085984 -123.03372746418148 49.23890341963076 -123.03340764065018</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:4034cd3a-415a-4aa4-9999-bc8a76a6bbc9</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.241458380521266 -123.03771098921655 49.24124636155642 -123.03718740801324</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:e1e734c5-5c71-4a1d-b175-397e8b822ae9</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.24167642213891 -123.03823993758061 49.241458380521266 -123.03771098921655</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:eb397b43-5997-4be5-ab51-b41ec47d128c</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.24188313902445 -123.04067093441043 49.24157593033135 -123.04096038595422</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:1475609b-0e05-409e-ab91-1467d43532bc</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.241895379143614 -123.03876798457271 49.24167642213891 -123.03823993758061</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:297c3c20-2560-49a1-b028-1b22a64015f4</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.24211288658586 -123.03929282024014 49.241751349431325 -123.0396367528281</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:db9c143a-9869-4e23-a030-5f0dfcfccdb0</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.24290703088349 -123.03706135060791 49.24167642213891 -123.03823993758061</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:2d01b0f1-4a55-4df9-9adf-b73ee963e710</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.241751349431325 -123.0396367528281 49.24173304714358 -123.03965415865811</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:5efcf541-5036-458b-9161-915f613936f6</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.24211288658586 -123.03929282024014 49.241895379143614 -123.03876798457271</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:eaf41d49-efb9-4505-b2b9-c57ff96f6d75</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.23962489234955 -123.04150754908004 49.23924092100364 -123.04057192658875</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:677a6502-26c1-4c68-a144-fba31505e079</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.24149392286856 -123.03971774122506 49.23962489234955 -123.04150754908004</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:69cb00e1-9f3b-4469-a20e-fa079fc86777</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.24090652460015 -123.03827928042612 49.24068089885648 -123.03772674574823</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:29ec9dc6-a02a-41a6-b428-1822be9db7b9</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.24121392375568 -123.03721835001764 49.240885622149364 -123.03753148794304</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:ed158905-07f9-4bbd-8da4-c46f9ae51e5c</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.24121392375568 -123.03721835001764 49.24068089885648 -123.03772674574823</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:73558b0a-4509-46be-9f94-20106f03517d</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.24111061281957 -123.0387790616329 49.24090652460015 -123.03827928042612</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:7e5f6eb5-eee0-4793-b1d8-5325366b4ae3</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.24149392286856 -123.03971774122506 49.24111061281957 -123.0387790616329</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:c3d2ecab-ce6e-4c15-87e1-6c51cb8bdb88</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.24163427380438 -123.03681739122335 49.24124636155642 -123.03718740801324</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:7d6e994c-b429-47af-97b0-c4fdffaa0c3a</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.23833154205926 -123.0383205775574 49.237867963824385 -123.03716213602111</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:3289e33f-ddee-45b8-bd61-4b13e068fc8e</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.23881674742168 -123.03951636971841 49.238579194198365 -123.0389271500164</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:4a51b678-5cda-469a-b707-f9259b401fbe</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.23916965613631 -123.03917783502472 49.23881674742168 -123.03951636971841</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:5ec3d273-04ca-476a-b1ee-4e29667ec00e</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.238579194198365 -123.0389271500164 49.238388327826016 -123.03845955003577</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:1e282fe2-ea2d-4abc-a1df-fd3c3ec5713e</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.238388327826016 -123.03845955003577 49.23833154205926 -123.0383205775574</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:7d18bca9-7290-4a09-8b26-2c5fee71880e</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.23833154205926 -123.0383205775574 49.2379816030074 -123.03866278286583</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:80818958-be19-4f82-ae7c-9fecee4e15ae</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.23924092100364 -123.04057192658875 49.23881674742168 -123.03951636971841</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:a315fc44-072d-453a-a8cf-8844cc1e8c56</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.24068089885648 -123.03772674574823 49.23916965613631 -123.03917783502472</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:f8134d0f-63df-49e4-9e9c-2b55997c4893</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.23844161554186 -123.02617688267745 49.23682354880458 -123.02780319717039</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:e66bb09e-b9a7-42ec-a9bf-be6623371ed6</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.23754423924541 -123.02398926561821 49.2374003685552 -123.02364382534596</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:17cece16-ab9f-4824-83f2-052be8ee2ed8</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.237698797826766 -123.02436515528856 49.23754423924541 -123.02398926561821</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:44ba4ef4-213d-4270-aa72-50746281f1d3</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.23958718451189 -123.02364191559184 49.2374003685552 -123.02364382534596</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:6f8b03ac-2ec3-4cc8-83a1-bb755448c169</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.234914307544244 -123.02364226785636 49.234392454832914 -123.02365363988848</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:86878fe6-a232-4d2c-bc98-5b7a35181faa</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.236406847518225 -123.0269148617266 49.234914307544244 -123.02364226785636</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:2a589c66-cf96-4a02-995a-fa4243e23d93</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.2356306572631 -123.02620796730525 49.23498900988966 -123.02481551183388</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:44b91c69-2ae9-4ef3-ad6b-e68601d5ce4a</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.23652588386892 -123.02815090848279 49.2356306572631 -123.02620796730525</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:f2083992-efdc-4a80-949c-f915e9ea10d8</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.23803414462111 -123.02518495569711 49.236406847518225 -123.0269148617266</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:449f2535-46a3-4378-84b0-24cd69cf8d52</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.23655038596135 -123.02444036429618 49.23622227075009 -123.02364120246529</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:07920f9a-7cc4-4b2c-9726-9a670f162984</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.23682354880458 -123.02780319717039 49.236406847518225 -123.0269148617266</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:2eeae6e5-cbcc-49d4-aa24-019a085e98ce</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.23698305489091 -123.02549202531851 49.23655038596135 -123.02444036429618</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:959d870a-f443-4471-a123-880d987f7496</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.23412478623061 -123.02700393891377 49.234125446296275 -123.02592893944902</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:5ac3b4c3-9a7f-4d07-a799-d2332ead7772</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.23412512430417 -123.02481473567332 49.23293096709321 -123.02482251654635</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:5159ed7d-d905-4895-8eef-97c46d7c8a87</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.23293096709321 -123.02482251654635 49.232693672013056 -123.02482405971105</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:064880a0-bff7-4376-9aed-e4ff6718da3f</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.234125446296275 -123.02592893944902 49.23264240184588 -123.02591732552138</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:4c956e55-2bd7-43d2-baab-f387fef97844</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.23264240184588 -123.02591732552138 49.23219406122422 -123.02591393171994</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:6bcf2ae7-3bd4-4c68-9c30-160cb044dad9</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.232693672013056 -123.02482405971105 49.23224854152147 -123.02482600694361</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:5bbe6a47-4970-4bf7-bbe9-64ed55d346a8</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.234125446296275 -123.02592893944902 49.23412512430417 -123.02481473567332</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:a8700d13-89c1-4dae-9123-b9fccf6cf651</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.23498900988966 -123.02481551183388 49.2345248262568 -123.02397204758702 49.234392454832914 -123.02365363988848</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:f1d30a7b-7d6c-466e-81a8-510878817b8a</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.23624389672463 -123.02974694926569 49.23584589803721 -123.02887633938073</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:e10cf719-f090-4022-a9e3-c1f144a10f51</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.23644805094031 -123.03362385475643 49.236118758525976 -123.03394313988504</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:fd9afbdc-b127-4a17-9480-d74d630a0a30</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.238833300714674 -123.02712860694913 49.23729918172927 -123.02861233111558</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:bd5d7b9d-ee58-4403-90dd-0d2bb05c22fe</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.23729918172927 -123.02861233111558 49.23721469813307 -123.0286859004718</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:9521d783-8b89-4ba7-bbfc-7d57a0252846</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.237342354920145 -123.02994136022546 49.23726562830467 -123.02975635473321 49.23652588386892 -123.02815090848279</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:2d4caab7-32ab-4915-bf4f-2a1f7303006c</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.23720888733331 -123.03200703859531 49.23663232155462 -123.03063763717593</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:9ee667f5-bc58-4252-9359-000e4463aab1</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.23796039947848 -123.03126824061573 49.23775459513075 -123.03094216237555 49.237342354920145 -123.02994136022546</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:fd0c4cc8-746c-4d44-9a59-1aa6daaf9ab5</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.238833300714674 -123.02712860694913 49.23729918172927 -123.02861233111558</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:63893ec7-7d10-4cf5-a8a4-ed93b5523590</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.2345480321471 -123.03040138433147 49.234014855957156 -123.03040423023734</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:8b287b08-33e5-4fc3-9d92-d167f0886ec2</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.23556773635332 -123.03369837024445 49.23432419349868 -123.0306090251441</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:f0c72c7c-9ed7-425c-a92e-cfa781da616f</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.23520666363089 -123.03404764215308 49.23422114448002 -123.03164190232793</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:281f2893-700a-43eb-9fd8-a3f225181bd8</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.23469641798988 -123.03040058251715 49.2345480321471 -123.03040138433147</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:aef2a9d4-a4eb-4947-8929-f4039dd29674</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.23517090048222 -123.0304305312971 49.23504868142692 -123.03039869698382 49.23469641798988 -123.03040058251715</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:39609c6d-e5a5-4d4f-8587-4ef31d032845</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.23482374114536 -123.02926896833287 49.23481722080331 -123.02922864747457 49.23480864482056 -123.02917136068194 49.23480070755505 -123.02911374460557 49.234793444931995 -123.02905601905037 49.23478685695471 -123.02899817027746 49.234780898688086 -123.02894003341882 49.23477562406529 -123.02888175960659 49.23477101507862 -123.02882341751099 49.234767071758625 -123.02876488350016 49.23476380304581 -123.02870637736282 49.23476120000953 -123.02864763809575 49.234759262578166 -123.02858895416541 49.23475799976393 -123.02853025689163 49.23475742029461 -123.02847263146934 49.2347502627218 -123.02813138248219</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:16f84797-9df9-4bb0-9d2b-d141adbc2fe3</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.23517090048222 -123.0304305312971 49.23508064738249 -123.0302049741555 49.235060906965 -123.0301546445997 49.23504174235731 -123.0301037934397 49.235023162546895 -123.0300524481531 49.2350051675331 -123.0300006087387 49.23498777529866 -123.0299483026794 49.23497097684759 -123.02989552996834 49.23495479015921 -123.02984233182492 49.23493920624122 -123.02978869450557 49.23492424307284 -123.0297346592295 49.23490990065008 -123.02968023973168 49.23489617897232 -123.02962543601033 49.234883087023746 -123.02957028927914 49.23487063380267 -123.02951478580489 49.23485881030277 -123.02945896679033 49.23484762551888 -123.02940283223887 49.234837088435256 -123.02934642336376 49.23482719005983 -123.02928972642107 49.23482374114536 -123.02926896833287</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:2e93476c-955a-4132-ba47-8df0ffa002da</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.23584589803721 -123.02887633938073 49.235398427815056 -123.02789451620369</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:6135d52b-1002-436e-95b1-aeec4d93f65e</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.234014855957156 -123.03040423023734 49.233564238699984 -123.03040491521716</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:145cb169-c1d4-4334-814c-5498fc5fcdbc</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.23318401270842 -123.03403747460898 49.232753661523816 -123.03320414203377</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:45575e88-d9f3-4f9a-a44a-3290c69f5b10</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.23432419349868 -123.0306090251441 49.233949704864386 -123.03097419542276</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:cb9434c3-38a5-49ca-9602-cf88f6797531</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.233564238699984 -123.03040491521716 49.23283371918325 -123.0303940961323</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:c9510ce0-31c1-4a38-bfc2-fb30a0b22e37</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.232753661523816 -123.03320414203377 49.23246774803536 -123.03263379745269 49.2324205390976 -123.03254470236239 49.232404232517666 -123.03250631337848</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:391ce1a3-fec8-41e2-83ed-5f332e2adeb2</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.232808269120426 -123.0320993863701 49.232404232517666 -123.03250631337848</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:817be5c4-f482-43d5-84ac-59700c3c5a66</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.23329120222337 -123.03162457766096 49.232808269120426 -123.0320993863701</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:7b673d17-f3b4-4477-9bc4-80a17dc331e9</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.233949704864386 -123.03097419542276 49.23329120222337 -123.03162457766096</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:c554a815-30ef-4db0-8a33-dc451055a393</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.23665222730233 -123.03413755624916 49.23644805094031 -123.03362385475643</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:9faa6791-0311-44ac-982c-9e203f4c6f84</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.2368653017877 -123.03466751930625 49.23665222730233 -123.03413755624916</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:77e12f44-61c4-4915-a565-358a799f33fc</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.237366305244706 -123.0392644787199 49.23673737188352 -123.03987950117774</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:3e014ce7-1c36-4a11-bbea-b9d50e5a6e81</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.23725192193831 -123.03562839836405 49.2368653017877 -123.03466751930625</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:9d84fdf4-8522-4de2-96ee-29a3de9ab271</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.23736133597245 -123.04093426154414 49.23708880259818 -123.04119975612626</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:a08f0a79-fd10-4dfd-943f-aadb21465f51</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.23758497275932 -123.0364584865757 49.23725192193831 -123.03562839836405</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:5824e421-123b-4a73-9047-b733730447f5</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.23843856873191 -123.03988479982202 49.23736133597245 -123.04093426154414</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:a61703da-0b23-40a8-8158-f6490f8851a5</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.2379816030074 -123.03866278286583 49.237366305244706 -123.0392644787199</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:89c4e48d-2034-4016-a5e8-492828f961d1</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.235796787288194 -123.03426260441354 49.23543796953328 -123.03461570796692</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:38adc29c-6f76-4ff0-b018-2a776066a471</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.235796787288194 -123.03426260441354 49.23556773635332 -123.03369837024445</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:0eb5df41-201b-49c8-afcc-0c134a35b83b</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.23605400676371 -123.03910540838346 49.235638958365314 -123.0395244532365</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:4724ee37-7963-47ff-9b5c-b9aba2248fe5</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.23580693671647 -123.04078930276677 49.23576961870339 -123.04037026932062 49.23576311342143 -123.04029789807498 49.2357557894598 -123.04022571850001 49.23574763782369 -123.04015373059192 49.235738649499126 -123.04008198929445 49.23572886047231 -123.04001048090329 49.23571824373889 -123.0399392603475 49.235706826289885 -123.03986831391535 49.235694599111696 -123.0397976965503 49.235681562200085 -123.03972742199241 49.23566772455098 -123.03965749025214 49.23565308615085 -123.03958794254311 49.235638958365314 -123.0395244532365</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:9a0a74db-7e89-4dac-b742-17263a395462</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.236118758525976 -123.03394313988504 49.235796787288194 -123.03426260441354</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:2d91edbc-97bf-4355-8a44-24ac3c834dc4</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.23673737188352 -123.03987950117774 49.23580693671647 -123.04078930276677</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:76a09f37-5f0b-485b-ab93-bc3844b4061f</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.23708880259818 -123.04119975612626 49.23594291744541 -123.04231600102635</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:987e65d7-80e6-43a7-8121-b2f13bb5a918</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.23691394124333 -123.03808855834804 49.23686211197125 -123.03813904390194 49.23668520984458 -123.03846947840321 49.23605400676371 -123.03910540838346</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:4377a5d4-1c7e-4e72-b44e-f46ee0050bd9</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.23457593626034 -123.03467768937634 49.23436763921319 -123.03417477377002 49.234156149960654 -123.03372220429738 49.23357898501388 -123.03228322395788</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:47c7b6cb-73eb-4c26-b016-2e391b805631</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.23363981891285 -123.03488568852612 49.23318401270842 -123.03403747460898</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:56a2d88c-3da4-4632-bf06-9431722b08ab</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.23415350403323 -123.0358766127863 49.23363981891285 -123.03488568852612</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:f9d0b884-5a83-4302-bb52-e3862816100d</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.23480953616834 -123.03523496927836 49.234529251821584 -123.0355038826546</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:120e1969-c8b7-4646-91bf-f1c529262e06</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.23480953616834 -123.03523496927836 49.23457593626034 -123.03467768937634</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:9959357f-9b9a-429a-a17d-bd5cf96315fa</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.23503783849114 -123.03650037698961 49.23465059806543 -123.03688100710528</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:38468fa4-7f10-4078-b1f7-4561ae02e66e</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.23543796953328 -123.03461570796692 49.23480953616834 -123.03523496927836</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:ddf58b9b-3439-41e4-bc52-c0fec05b3d6d</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.23650424647997 -123.03500929285266 49.23588122667704 -123.03562720643212 49.2358156305703 -123.03572353738565 49.23503783849114 -123.03650037698961</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:7ece9e67-8fac-4290-92f3-1b075fbeaa42</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.260651052746226 -123.06205642194712 49.26040160603105 -123.06143470020034</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:65805523-4629-4c61-b5d7-bd825ad7dce5</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.26040160603105 -123.06143470020034 49.259880450250904 -123.06013584805089</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:2d16ea3b-1990-4f13-b1ec-aa39ca034976</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.25828692461391 -123.0582333728568 49.257750978297764 -123.05823837694363</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:c88b0817-3947-4402-9497-a583383431e1</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.258468761021845 -123.05660806947404 49.25846741353175 -123.05660441224386 49.25844499261049 -123.05654083811173 49.25842330055471 -123.05647667391216 49.25840234634538 -123.05641194713968 49.25838212997482 -123.05634667153522 49.258362669419114 -123.0562808746034 49.258343955682165 -123.05621455633147 49.25832600673351 -123.05614775796697 49.25830882256554 -123.0560804932504 49.258292412166156 -123.05601277593247 49.25828262805621 -123.05597011989458</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:343e2e16-61e3-40d4-8f15-11de74c5f08f</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.25828262805621 -123.05597011989458 49.258276775527804 -123.05594461975355 49.25826192162501 -123.05587606595044 49.25824785045046 -123.05580712826338 49.258234570985394 -123.05573783418573 49.25822208322916 -123.05566818371452 49.25821039615653 -123.05559821808609 49.25820599617657 -123.0555635667396 49.25820001195936 -123.05551242188064 49.25819460348541 -123.05546112650491 49.2581897887317 -123.055409708117 49.25818556770466 -123.05535815297202 49.25818192239399 -123.05530650227735 49.2581788797786 -123.0552547698044 49.258176421868 -123.05520295553134 49.25817455765065 -123.0551510732093 49.25817328710684 -123.05509916406588 49.25817260124131 -123.05504722808914 49.25817251803795 -123.05499527904037 49.25817302849495 -123.05494333065076 49.258174132599265 -123.05489141040465 49.25817478195842 -123.05475512069556</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:768c1e7a-d582-425d-b674-19e247abd089</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.25580052478895 -123.06788487749965 49.25469582207867 -123.06793082793804</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:7d3341a1-4064-49d3-8e17-cb397f3b9dec</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.25676164531194 -123.05826282935831 49.25510055781376 -123.05827046636428</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:e90c53de-3949-49d6-b247-566d2ef1ed17</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.257750978297764 -123.05823837694363 49.25676164531194 -123.05826282935831</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:99c6ff19-266a-47db-b36a-60eb8b9d3912</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.2568413524977 -123.06921856746614 49.2568310449488 -123.06785216756637</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:08cac5af-b906-4301-b5b5-6dbbafa3b0c9</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.2568310449488 -123.06785216756637 49.25682173452816 -123.06664739789298</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:ed6f6c5a-49c4-48c5-8cd2-c54b329e2c10</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.256816871768336 -123.06599856938095 49.25622345385105 -123.06602050838107</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:e140ffa5-f467-4f68-a839-f559a7fe13cc</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.25622345385105 -123.06602050838107 49.25580358425833 -123.06603602705779</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:0630be34-598b-4392-891d-37abe712d198</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.25956127169502 -123.06981554054606 49.25955568027504 -123.06916645488967</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:a3181a4b-c182-4f91-8d35-7ef99e4efb8c</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.25955568027504 -123.06916645488967 49.259554667592994 -123.06900970892045</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:793e8a5e-caef-48d5-b31d-da38d62a72ae</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.259554667592994 -123.06900970892045 49.25953538568754 -123.06659668269334</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:519c2368-aa71-4e1a-8ce4-70669d65162c</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.25952646610895 -123.06529797993734 49.25952743810734 -123.06401109609985</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:ba3cc121-f15f-4d14-b166-c13d8a269859</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.25952743810734 -123.06401109609985 49.25951246383704 -123.06207728628912</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:53b3d3ce-2e70-497e-bce2-644733a58de3</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.253073466029946 -123.06401753671585 49.252659644413626 -123.06428655642671</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:1096187b-076c-470f-af39-37dcdb2b8821</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.25351465119408 -123.06695940582861 49.25288050891564 -123.06612679404225</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:948d3948-1bb3-4b6c-adcf-5c42aa166c98</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.253490175494335 -123.06374663360175 49.253073466029946 -123.06401753671585</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:45badaab-268f-4ec6-86de-ca7631a44a2e</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.2536670556249 -123.06438268347198 49.253490175494335 -123.06374663360175</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:21ecdc62-66b6-4fb9-8a91-02aa1e044437</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.25414389546091 -123.06609736978179 49.2536670556249 -123.06438268347198</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:ab2639ca-ea0a-4c0f-9dc9-4ea5b4c615e1</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.25469582207867 -123.06793082793804 49.2542807184075 -123.06794834282424</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:40202f0b-a6c5-4027-82f6-130093146564</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.24939243947932 -123.06503403892243 49.24850635052036 -123.06505903684683</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:cf3d06a6-7901-4eda-a1ce-a94f17c573b3</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.24938487355655 -123.06437721116468 49.24936433494517 -123.06259753470343</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:b87608fa-5c04-42c1-8c8d-523afc54432a</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.24939243947932 -123.06503403892243 49.24938487355655 -123.06437721116468</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:3e0b18dc-fbe7-4728-b60c-86714389f181</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.25029407143168 -123.06026500673649 49.25020742904093 -123.06031744647271</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:87bfb41f-30ae-4831-a342-b46c38de19d8</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.25099838774494 -123.06176536364651 49.25055899231998 -123.06070692361975</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:90c22918-5ea9-4818-b6ae-4bb774332236</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.25027241544032 -123.06367761964005 49.25026123739343 -123.06256902952308</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:f4549462-5884-45d5-aa4c-74470976b0cd</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.25027948501122 -123.06434448929036 49.25027241544032 -123.06367761964005</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:5ddbd1f6-cc62-4dcc-9a50-788181f47af4</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.251392317512824 -123.06150883916916 49.25099838774494 -123.06176536364651</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:c843c742-0948-4080-8675-71ed1e98b52e</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.246742475872566 -123.06274996235359 49.246739914755125 -123.06110063080735</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:d32be76b-ad55-4bff-a359-d835bef16c97</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.247632576088904 -123.06508367909379 49.24675801891968 -123.06510834693701</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:47d27bc2-3254-4b5a-8dc1-af40291df75a</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.247629501052415 -123.06442329432919 49.24762155932541 -123.06272126020446</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:d3e250e8-14b3-4dac-b604-6c98c041981d</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.247632576088904 -123.06508367909379 49.247629501052415 -123.06442329432919</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:fc944979-6579-4fa2-806f-69b626206f33</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.248503454303034 -123.06440034447537 49.24849597316992 -123.06269429617241</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:0423c8b3-a3d5-4a17-abac-b6617744589e</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.24850635052036 -123.06505903684683 49.247632576088904 -123.06508367909379</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:313f7970-e082-49f0-8c95-8a410d6b6884</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.24850635052036 -123.06505903684683 49.248503454303034 -123.06440034447537</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:d13cd067-b1ec-4014-8d31-42898988607d</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.248132865950055 -123.06049498617256 49.24811809818158 -123.05908243581675</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:dd24f996-191b-47a1-978c-6ec05c390415</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.25180870678213 -123.06123718169802 49.251392317512824 -123.06150883916916</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:93eb288a-ee65-4ce3-b92c-26ff8828b52a</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.25180870678213 -123.06123718169802 49.251492535377366 -123.06010341183472</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:5ab17608-089a-48f5-af79-180e484abe8b</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.25222413225083 -123.06096674146367 49.25180870678213 -123.06123718169802</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:0937bde5-d34c-41d3-b3d5-96cc82df8a8d</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.25208335434223 -123.0646611824668 49.2520784591604 -123.06466436408238 49.252071719290086 -123.064668738791 49.25198108681906 -123.06479112490975 49.25188497529166 -123.06521846551028</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:377b9f13-31b8-428a-81f7-798a22da5ea5</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.252659644413626 -123.06428655642671 49.25208335434223 -123.0646611824668</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:63245e03-12b7-4941-bf55-0fd60aa1eaf2</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.252631935843425 -123.0607006022031 49.25222413225083 -123.06096674146367</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:2c5a793c-4c6a-4bf5-b842-5179a2ae2ebc</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.24626450257733 -123.04436008431524 49.24625641850281 -123.04416537033485 49.24625459222699 -123.04383535240709</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:a143894f-5cdf-4303-8186-f8aec7a33d18</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.246680792186964 -123.0470891504205 49.24626200737421 -123.04709611670675</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:ef411b5e-fd95-4a2e-b025-340bd3c7c8c0</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.24709945986285 -123.04708259610867 49.246680792186964 -123.0470891504205</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:0829f044-8728-4123-86f7-c4c3095bb296</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.24710771918558 -123.04963580541988 49.24626893068822 -123.04963866062988</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:91fe8f51-ddc9-43f7-9849-1f414baed28f</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.24462149800203 -123.04951477025553 49.2446194837743 -123.04892191536462</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:82643341-c631-4697-b258-884c4fe297fe</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.24462277629863 -123.05034505414416 49.24462192021011 -123.04964185965532</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:70638357-6ed5-4fdc-aeb9-de09cc2cff23</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.24462192021011 -123.04964185965532 49.24462149800203 -123.04951477025553</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:ce2b8960-dbff-42b2-a4ea-4aee23331c0a</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.24542993814242 -123.04437260911855 49.24541539685251 -123.04165596730635</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:676677ce-819f-4f19-a31d-d0d5ef1c2920</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.24462277629863 -123.05034505414416 49.24462192021011 -123.04964185965532</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:35c961a5-560b-4442-9d8d-c44cf7e62f4c</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.24545102051812 -123.05042957023663 49.245451147329675 -123.05034505821516</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:6b312fb1-613f-4397-9d4e-239e2093db0a</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.245451147329675 -123.05034505821516 49.24545147087747 -123.0496389266153</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:c35971be-84b4-4012-9fae-0f646034c8ff</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.24625459222699 -123.04383535240709 49.246242974695804 -123.04163511948654</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:acac3240-9854-4af9-9a2d-db292dfc113a</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.24233434803617 -123.04709168084288 49.24200241923259 -123.04741066453914</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:cd7da4a0-6d07-4122-b5a7-7e7eada7264c</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.242477105160276 -123.04890384831059 49.24204664391053 -123.04933439047065</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:fdce6c96-df59-4dd4-8bfe-cf0fb38821d6</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.24302115842477 -123.04643223451117 49.24233434803617 -123.04709168084288</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:56f9b335-44b2-414e-8efe-65504d438dae</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.24343144075766 -123.04248008217446 49.24312662839776 -123.0417391685242</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:350caf4b-0b8b-4a3b-9b37-cf3d766bc6d5</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.24365410629733 -123.04302167537237 49.24343144075766 -123.04248008217446</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:fe63b6f0-52a7-4c4d-aa66-140adb8993fd</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.244611443654776 -123.04650026525788 49.24460849928133 -123.04587762285128</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:df45f6b9-63a7-4473-be9f-13e2d9ea194f</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.2446194837743 -123.04892191536462 49.244613098561814 -123.04712239815645</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:7e4bf130-5dbf-43da-b039-a71f5c197fdb</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.244613098561814 -123.04712239815645 49.244611443654776 -123.04650026525788</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:fc42423a-14a5-46bc-9383-b17610a0c77d</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.24462138562984 -123.05594909957766 49.244620567043796 -123.05425171203117</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:755b2081-e471-426d-af9e-8ff7b89d3c04</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.244620567043796 -123.05425171203117 49.244622152199724 -123.05257416671884</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:8f4d3d39-d1fb-460f-9744-8668994d7514</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.244622152199724 -123.05257416671884 49.24462240159892 -123.05204320983557</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:78c3b895-fa64-460b-a006-3e5ae91a8ea3</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.24462283575576 -123.05104999273456 49.24462277629863 -123.05034505414416</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:1edb2ceb-c2ec-4d77-b1a1-cfdfa29c4cbf</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.2454505022869 -123.05204429997723 49.24545102051812 -123.05042957023663</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:6ee02496-ab0b-48da-a39a-f7a884001870</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.24462240159892 -123.05204320983557 49.24462283575576 -123.05104999273456</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:3a1f7a07-e81a-4864-be4f-379b703c46fd</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.24544850788004 -123.05594591222442 49.245447771040006 -123.05424673774999</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:237dbda3-3f92-422b-983f-96e418c93fe1</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.24580178868683 -123.05740859765454 49.245799474328805 -123.05664847488161</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:9ac716ea-c02f-44e7-a02a-c3fed6a238bb</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.243350160508385 -123.05381041137485 49.2431220389162 -123.05327213315068</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:33d51328-0c8d-40ab-ba8a-0bcc550dfe24</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.24371392114827 -123.05345668140582 49.243350160508385 -123.05381041137485</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:7a7fff27-7afc-4c92-a5fb-33f55e560925</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.24399229878756 -123.057894694033 49.243604792305604 -123.05789616448031 49.243559313899 -123.05794698703022</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:76ecb42f-0867-4b4b-939b-02ae8522fc88</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.2441656663884 -123.0530173902781 49.24371392114827 -123.05345668140582</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:b0dbb066-f6c4-477f-a069-7450acd244ed</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.24399207390678 -123.05789469377008 49.243991477443615 -123.05741358840673</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:bbbc6d50-436f-4b23-b906-8b82598941f1</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.244619907040885 -123.05603029745724 49.24462138562984 -123.05594909957766</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:a97b0a94-1230-4634-8448-79553ef51803</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.244622152199724 -123.05257416671884 49.2441656663884 -123.0530173902781</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:8c2fb53c-45ae-49e2-81fb-ef061c14e9b7</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.24462196001204 -123.05665320065323 49.244619907040885 -123.05603029745724</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:2739a044-f721-4f0a-aac5-0045c21ae03c</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.24259930936336 -123.05732778314218 49.24253874578221 -123.05714348985163 49.24234346366393 -123.05671453412127</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:6064722d-117e-4318-8446-eb8e2b5ad36a</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.24328135693463 -123.05082884119429 49.2424371108161 -123.0516562148154</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:81dda3b2-47d9-4e40-917b-e0db12060521</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.24259930936336 -123.05732778314218 49.242250657194916 -123.05771872617694</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:5502bdc6-0e85-458d-903f-a4f562eca226</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.242662944533976 -123.05219813025796 49.2424371108161 -123.0516562148154</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:7d636786-0404-40ad-8eca-2f72f81826bf</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.24288047883769 -123.05794810242894 49.24259930936336 -123.05732778314218</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:70890c62-35c2-4a63-b8b7-31b2aa19a512</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.24289421180484 -123.05273351672894 49.242662944533976 -123.05219813025796</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:fe88d523-a956-4885-a31e-1b60d51c4a6d</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.24462283575576 -123.05104999273456 49.24289421180484 -123.05273351672894</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:a7ee04d3-7c87-413a-97ec-2471343cb4f3</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.2431220389162 -123.05327213315068 49.24289421180484 -123.05273351672894</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:6f766b0c-fb5e-4e12-a960-4d3af884eef0</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.244910978985644 -123.06280812247758 49.24490273717771 -123.06111825864576</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:c1ca8da1-4451-4861-bea7-678f7816d2bb</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.24582294837103 -123.064431303692 49.24581800197936 -123.06277932041648</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:c269b9d3-a9ab-4c44-bb93-d400cee5df0f</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.24582504564097 -123.0651346682876 49.245164524188 -123.06515328208691</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:bb317629-de86-40f8-8170-add5d303fddc</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.24580879445176 -123.05971846557406 49.24580178868683 -123.05740859765454</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:641a0c30-1cbf-43ec-ba48-26d4794a4d72</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.244912638851304 -123.06321174781968 49.244910978985644 -123.06280812247758</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:c57ddd41-7868-4836-a06f-7a22aacd8ab7</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.246739914755125 -123.06110063080735 49.246739032831556 -123.06053749841183</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:06e74ff2-930b-489b-b4a3-dd4d998cc009</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.24581091281314 -123.06041916428777 49.24580879445176 -123.05971846557406</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:e2362e70-3bf9-4aa2-bbe4-13f334d3a8cc</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.24582504564097 -123.0651346682876 49.24582294837103 -123.064431303692</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:58fdffa3-4e1c-4715-9b47-a448933bc73d</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.24430944158135 -123.06097627304368 49.24404141478169 -123.06042038520232</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:bfa781a4-ec16-4644-b320-957426e9f834</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.244621073986906 -123.06517481108048 49.244068081351514 -123.06519356546622</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:2e2e42b4-4e52-4f59-bb1f-f37b41dc26d3</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.2448749526946 -123.06325397590777 49.244475147236074 -123.06370197121754</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:0b333d22-a92c-4335-a46e-0e6de65bf01e</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.24473092726055 -123.06050485808645 49.24430944158135 -123.06097627304368</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:0a3b514b-ae10-44f7-a4b5-762492d4b0fc</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.24473092726055 -123.06050485808645 49.24446296157183 -123.05994821247607</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:8f76772a-329d-4f29-b861-e6a9a1f3e771</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.24469900119317 -123.06517216576815 49.244621073986906 -123.06517481108048</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:436ebd2b-bc6f-4a2e-94ab-302340d90e89</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.244912638851304 -123.06321174781968 49.2448749526946 -123.06325397590777</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:4f85a5c6-d25b-41b9-940e-b2464e3c9ff7</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.245164524188 -123.06515328208691 49.24469900119317 -123.06517216576815</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:c108395a-522c-436e-a710-2b89b4003d69</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.243107993862736 -123.05845103485197 49.24288047883769 -123.05794810242894</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:0fd1c46e-baeb-4add-bc3d-ef3d31aeb4e4</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.2433349034462 -123.05895507029628 49.243107993862736 -123.05845103485197</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:235f0354-dee1-443d-9a78-0ac445c826f7</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.243559313899 -123.05794698703022 49.243107993862736 -123.05845103485197</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:e94c89f8-fd1b-45d7-8f5a-d2f4cf4e7f46</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.24404141478169 -123.06042038520232 49.2433349034462 -123.05895507029628</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:7720258d-1275-456c-9cbe-43998fdad86d</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.24399282695026 -123.05850685731758 49.24399207390678 -123.05789469377008</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:cbe10a03-69b6-4304-957a-e67fbebaf439</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.24430944158135 -123.06097627304368 49.24396212777316 -123.06136473249362</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:fbf71eed-2415-4354-8625-014ceb9e2e4f</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.244475147236074 -123.06370197121754 49.24356492190606 -123.06180955058649</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:144fe60f-1ed4-47fa-bcfb-50711b0b7365</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.24446296157183 -123.05994821247607 49.24399339062339 -123.05897279462047 49.24399282695026 -123.05850685731758</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:318dbc6e-f065-4cca-900b-7e58447fc5b9</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.24000515990852 -123.042440833698 49.23962489234955 -123.04150754908004</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:c201bff4-fcff-48cc-a5b5-1604ed77a74e</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.24157593033135 -123.04096038595422 49.24000515990852 -123.042440833698</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:d70377bb-11f1-4420-b476-f6e9ee977e8b</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.242644903493215 -123.042536588389 49.24077389080685 -123.04433913374717</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:d6a9feed-4ed5-4231-8457-96a282c01c8b</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.24141119019592 -123.04241000048467 49.24139453566892 -123.04244631069388 49.24039280483112 -123.04339851063482</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:43f604c5-21ae-4ba3-b1bb-03ffc66a80e7</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.23760276459487 -123.04283030491405 49.23649977332923 -123.04391706818247</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:b9b9e20b-4b00-41e1-9ea2-1c87dc7acbf6</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.23798244805599 -123.04245613504759 49.23760276459487 -123.04283030491405</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:596df03e-4974-4bff-8663-2da8a0c5a114</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.23862212401153 -123.04404933431779 49.23855264773732 -123.04387602683539</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:eec36b01-d5aa-4748-b6fd-de8bcae86161</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.23875708572814 -123.04438595984065 49.23862212401153 -123.04404933431779</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:fe7f53ce-bb72-4b1f-a4ef-10c5d1a8689c</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.238835431124954 -123.04458107853209 49.23875708572814 -123.04438595984065</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:706c53f4-c33b-4e4d-b42a-6f752448b399</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.23931340752077 -123.04576405139544 49.23921532935128 -123.0455213091474</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:4313dfd4-ba27-4db0-a140-97f231b5ed71</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.239106779355325 -123.04525778670586 49.238835431124954 -123.04458107853209</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:b3d2f735-64e3-439e-9a50-11bb058fd370</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.23921532935128 -123.0455213091474 49.239106779355325 -123.04525778670586</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:fde7755b-5b4f-4d3e-ba3c-23329d0f2abb</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.231571343689325 -123.04309146749105 49.231110771439006 -123.04310814025501</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:89ba1090-a950-4770-b2a6-ee55d7445aea</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.23203311581352 -123.04308941041522 49.231571343689325 -123.04309146749105</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:95382843-f155-4ec4-92fc-ada115d507ef</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.23247596214074 -123.04308667751674 49.23203311581352 -123.04308941041522</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:26d895b9-a03f-4205-974b-679b8fcdfd31</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.23296734370885 -123.04309226965944 49.23247596214074 -123.04308667751674</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:beecdd2c-4e89-4cff-b868-c8b6be9c4c45</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.23611882558956 -123.0442915304801 49.23594291744541 -123.04231600102635</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:130b1b4b-8ea7-48ef-bee8-d893b784fa78</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.23594291744541 -123.04231600102635 49.23580693671647 -123.04078930276677</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:a11273b6-a781-49ee-9e7e-1f3d4e13dbf8</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.23613601329353 -123.04448457810122 49.23611882558956 -123.0442915304801</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:5960413a-8479-4e0b-a047-91dc08e82048</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.23632237468868 -123.04557468395325 49.23632110822891 -123.04556994350709 49.23630240910953 -123.04549640566067 49.23628455569062 -123.04542237411201 49.23626754796044 -123.04534787633185 49.23625139489715 -123.04527295353618 49.23623610550061 -123.04519759199268 49.23622167075328 -123.04512184663776 49.23620810864486 -123.0450457174841 49.23619541915858 -123.04496924573905 49.23618360228838 -123.04489244513583 49.23617265802298 -123.04481534314466 49.236162604341644 -123.04473796725182 49.236153441238486 -123.04466033119033 49.236145168707765 -123.0445824486932 49.236137777732466 -123.04450437469617 49.23613601329353 -123.04448457810122</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:30bdb063-5f7b-4dfd-bdac-056fabdbaf30</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.24042842153011 -123.04614876171318 49.23973739091451 -123.04681502875003</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:631558df-b665-488c-b98e-b00186530e60</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.24111980155078 -123.05025256466416 49.239957748849775 -123.0473630419764</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:8ec24f9d-8753-4245-a290-8cf088c445c2</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.240648782931146 -123.04669595533122 49.24042842153011 -123.04614876171318</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:30d0cbdf-bc82-4c48-af1f-65146dca6e20</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.24204664391053 -123.04933439047065 49.24180526373698 -123.04957010991774</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:ba6b79bd-f28c-4bdb-b04d-608d518cd2d1</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.24180526373698 -123.04957010991774 49.24160170205306 -123.04906306502376</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:9e3a4b88-5012-4e11-a622-8167074b33c6</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.241460700191794 -123.0499065636856 49.24119327556494 -123.0501677084404 49.241184564394416 -123.05017640975908 49.24117595207528 -123.05018533098918 49.241167447596865 -123.0501944858781 49.24115904196975 -123.0502038606783 49.2411507531784 -123.05021346914629 49.241142572239454 -123.05022328379621 49.241134499141026 -123.05023333210478 49.241126551891284 -123.05024357287508 49.24111980155078 -123.05025256466416</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:64652f55-d193-44b0-8584-be0b3132c47c</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.24180526373698 -123.04957010991774 49.241460700191794 -123.0499065636856</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:e32639d0-3dc8-427f-8bdd-26c4dcdadcc0</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.24160170205306 -123.04906306502376 49.240648782931146 -123.04669595533122</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:59c2b0a0-4ebe-4997-95d8-acadb3a3ff49</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.23862532042406 -123.04868108020956 49.23840194950313 -123.04812535239195</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:2c041b8e-dbb9-41b5-bdc5-680b8d6f5fbd</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.23902302670459 -123.0496542444143 49.23862532042406 -123.04868108020956</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:9f228d52-9015-4fa1-b96e-e1c3dd626550</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.23921532935128 -123.0455213091474 49.23885822327156 -123.04587239258971</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:2b48c00c-b402-4935-93c4-bcf69c823cad</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.23929237675068 -123.04802413145062 49.23906914640051 -123.04746893501917</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:51454c75-1137-4a97-8fc0-6bf87679045b</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.23968398609753 -123.04900589743275 49.23929237675068 -123.04802413145062</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:2fd59d81-0cce-4985-8ef2-c31b1a607c29</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.24077389080685 -123.04433913374717 49.23931340752077 -123.04576405139544</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:ee6b3bde-96ea-45df-a546-fd0ed45b6c51</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.23950138621839 -123.04622564088281 49.23931340752077 -123.04576405139544</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:24b4254c-f48f-4b6d-82ec-b9caca3f6444</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.23973739091451 -123.04681502875003 49.23950138621839 -123.04622564088281</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:7d56f503-e951-4a6e-81e4-ac9f7898a847</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.236422078491074 -123.04591420505517 49.23640420895222 -123.04585880062811 49.23638219890725 -123.04578742994494 49.23636100761354 -123.04571548312441 49.23634064405985 -123.04564297390907 49.23632237468868 -123.04557468395325</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:5c0a4912-3f3b-44b6-a344-69573feb4f39</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.23805302978826 -123.04666410984291 49.237434359885754 -123.0472712401168</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:6c36686a-64d9-4aa9-bc9d-18682dafd0fe</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.23706212115647 -123.04759373777198 49.23670774174386 -123.04667438170083</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:15c465cd-b535-43ba-b02c-90ae9c540708</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.237434359885754 -123.0472712401168 49.23707420684363 -123.04762508406347</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:c6bc1d3a-5998-4971-8894-7d02c36885df</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.237602591088915 -123.04884462165494 49.23732529402821 -123.04824677457988 49.23730289831701 -123.04819780669943 49.23727621660058 -123.04813744646604 49.237250110948054 -123.04807612524556 49.23722477009821 -123.04801422786458 49.237200724193514 -123.04795314230073 49.23707420684363 -123.04762508406347</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:7042d654-42c9-42ad-97de-fe28bec72dd5</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.23670774174386 -123.04667438170083 49.23651996282089 -123.04618986204062 49.2365003109081 -123.04613808233789 49.23647508872631 -123.0460692360292 49.23645066734804 -123.04599971741725 49.23642703776048 -123.0459295677026 49.236422078491074 -123.04591420505517</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:b168affc-82f1-4abf-8086-3b0d0cd22300</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.23840194950313 -123.04812535239195 49.2376244925247 -123.04889184498558</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:96d3faf1-b012-48a8-8d04-d52e728b34b2</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.23885822327156 -123.04587239258971 49.23805302978826 -123.04666410984291</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:1e3147df-ebf4-4786-a957-f52201d7eb20</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.24118698817168 -123.05179773528647 49.24083641245426 -123.05095776624269</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:afb436f7-ce83-40f9-81a7-a5f351d1a42b</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.24188574912884 -123.0581278620067 49.24159975230103 -123.0575031797116</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:02f1f471-0387-42a1-914d-017551af67ad</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.242353158592294 -123.05915782541173 49.24188574912884 -123.0581278620067</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:c61a6de3-9f1e-4567-9f68-7f87d4b2d08c</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.241506853868515 -123.05256558401744 49.24118698817168 -123.05179773528647</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:c89252c2-93b8-435d-a0da-1af1a5487920</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.242250657194916 -123.05771872617694 49.24188574912884 -123.0581278620067</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:c4bd7d85-2efa-45d7-ab64-0f29fcf21b49</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.24234346366393 -123.05671453412127 49.241342857355164 -123.05451582871699</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:4445ba13-d41b-4480-8fc7-929ce930edb1</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.24111980155078 -123.05025256466416 49.2411119979721 -123.05026338258587 49.2411043202419 -123.05027439296917 49.24109676835431 -123.05028560955233 49.24108934230921 -123.05029703233544 49.241082051107696 -123.05030864758925 49.2410748947498 -123.05032045531375 49.24106787323538 -123.05033245550895 49.24106099555971 -123.05034464818398 49.24105425273939 -123.0503570058531 49.24104764476243 -123.05036955599297 49.241041189631204 -123.05038227114527 49.241034878350376 -123.05039515130088 49.24102871990928 -123.05040821020731 49.24102270532444 -123.05042142037884 49.2410168525804 -123.05043479557213 49.24101114369256 -123.05044832203062 49.241005596651405 -123.05046199977266 49.24100020246152 -123.05047582878926 49.240994970124234 -123.05048979535125 49.24098989064416 -123.05050389944957 49.24098498201781 -123.05051812736437 49.24098023524982 -123.0505324790865 49.240975650334235 -123.05054696835447 49.24097365053649 -123.0505534920235 49.24092835652874 -123.05070396287161</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:a2cd8a8e-7c90-493d-8ee5-0404e53a71b0</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.2424371108161 -123.0516562148154 49.241506853868515 -123.05256558401744</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:75bc23ab-b244-4304-96bc-81370a349af6</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.240318513782995 -123.05160109950836 49.23998476120417 -123.05192711320369</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:ac1b3047-1213-4db2-bc42-280c25a68b4f</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.2400341184061 -123.0540830263169 49.24000926267095 -123.05402937949036</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:819482df-a6e5-4c30-89d3-1572370dbd8d</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.241506853868515 -123.05256558401744 49.24038623742328 -123.05365796704702</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:158c174f-4739-44fe-a741-c69620c95710</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.24064938127 -123.051267604828 49.240644908211095 -123.05127306801957 49.24063247028204 -123.05128772758594 49.2406198615941 -123.05130204351212 49.2406071001318 -123.05131602955508 49.24059417690617 -123.0513296719674 49.240581109907765 -123.05134297076785 49.240571858756624 -123.05135206962105 49.24031863077016 -123.051600989725</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:0366c9fb-773e-4433-aa6f-9cfd2f2a8a96</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.24023816634394 -123.05452340517236 49.2400341184061 -123.0540830263169</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:6d9dedde-1b2d-4778-a77f-b91145136b93</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.24159975230103 -123.0575031797116 49.24023816634394 -123.05452340517236</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:49371bf0-6660-42ba-8167-01bcbe5980ce</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.24083641245426 -123.05095776624269 49.24082755240224 -123.05097756775002 49.24081845857381 -123.05099713545856 49.240809148959556 -123.05101646938668 49.24079962357166 -123.05103554205772 49.24078987341508 -123.05105435346228 49.24077991648039 -123.05107290361882 49.240769743772546 -123.05109119251802 49.240759364298924 -123.05110919269248 49.24074878704283 -123.05112693162802 49.24073800302736 -123.0511443681005 49.24072702123573 -123.05116152959572 49.24071584168027 -123.05117838863714 49.24070447335626 -123.05119494523403 49.240692925259225 -123.05121119939577 49.240681188393836 -123.05122715111304 49.240669271767786 -123.05124277291873 49.24065717536902 -123.05125809228932 49.24064938127 -123.051267604828</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:05d1c0dd-7183-4e1f-9dc8-812fa2966db9</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.24092835652874 -123.05070396287161 49.240912161268966 -123.0507536515325 49.240911440533495 -123.05075619238305 49.24090626050955 -123.05077385455164 49.24090088264802 -123.05079137913043 49.24089529795387 -123.05080876611015 49.24088952442966 -123.05082598803234 49.240883553068215 -123.05084307236434 49.240877383887636 -123.05085997789102 49.240871025877226 -123.05087671835983 49.24086447903707 -123.05089329377063 49.24085773437801 -123.05090969037575 49.2408508098907 -123.05092590819353 49.24084370558111 -123.05094193348566 49.24083641245426 -123.05095776624269</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:2e957c55-b621-4ea3-85ac-0374ad440171</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.23828621887898 -123.05031594617267 49.2376244925247 -123.04889184498558</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:a64ff07f-da44-40ab-b3e8-0788b7cc25d6</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.23998476120417 -123.05192711320369 49.239757045424454 -123.05214953995646</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:578c193e-2156-4ff9-a1c0-029692d180de</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.23998476120417 -123.05192711320369 49.23958424741838 -123.05108116359757 49.23902302670459 -123.0496542444143</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:9c0ac15f-32d3-46c5-8403-8bb31fe9997c</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.24064938127 -123.051267604828 49.240248754670404 -123.05042185515748 49.23968398609753 -123.04900589743275</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:0df2e4d6-9b38-4397-adc5-d0e046fa3fec</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.239757045424454 -123.05214953995646 49.239656803205065 -123.0522474136244</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:6dd6bc4b-c042-4fdb-911a-5e2a9f93f355</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.239656803205065 -123.0522474136244 49.23933035615701 -123.0525662689314</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:0fcf6fe7-0903-466f-8636-ea4bf4076f34</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.23933035615701 -123.0525662689314 49.23887290748087 -123.05157867085211</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:f6401eb4-4aac-4873-8195-1802f6e9578c</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
<georss:line>49.24000926267095 -123.05402937949036 49.23933035615701 -123.0525662689314</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:e2024953-40e0-45e3-9157-80bec1383b63</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.27479197411395 -123.0617835739591 49.27477663007835 -123.05984903024542</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:f0e37e39-021f-4a90-96cd-e771431c1a13</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.275696935033636 -123.06176636445585 49.27568163587975 -123.05983144171077</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:9abe27f5-25b0-4a6a-9dae-d11b7919cbd4</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.27570760745647 -123.06317296126693 49.275696935033636 -123.06176636445585</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:3249e8bc-86f0-47a7-b1a3-3fc7b4cb308c</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.27571160844485 -123.06370066894321 49.27570760745647 -123.06317296126693</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:11b1f170-bf6d-4d20-8157-1520e226f3b8</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.27568163587975 -123.05983144171077 49.27566651936101 -123.05789821138669</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:d9d3e4fc-af20-4311-8c0e-c79a273cacd8</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.27476158664743 -123.05791414440094 49.27475749268217 -123.05728489284041</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:19d52efa-fd44-49b2-99ac-2b027faaa20f</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.27566651936101 -123.05789821138669 49.275656307200535 -123.05657791341673</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:b0794d2b-4150-4801-a106-58bb0671ad3c</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.27475749268217 -123.05728489284041 49.27475165119958 -123.05658021941574</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:bfd51056-3958-4e34-b466-51a2bb988e34</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.275806933043555 -123.05657492365732 49.275656307200535 -123.05657791341673</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:d7cb7825-db32-4ed8-b7b8-b0d7623ae986</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.275806933043555 -123.05657492365732 49.27580556447188 -123.05580067549678</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:003c21b6-5ad9-42f4-9db9-8c4f594022c6</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.27910081484484 -123.05786699300111 49.27909371422436 -123.05656595165468</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:20e6e313-5fea-4c5c-9287-b6dd42460c54</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.279636251026034 -123.0565628186508 49.27909371422436 -123.05656595165468</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:897311f3-303a-4c17-89ff-6a45e46f887a</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.28022441139663 -123.05655953151943 49.279636251026034 -123.0565628186508</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:60b731d4-17f6-41a1-bbb3-def1bbc62ba3</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.280749459581415 -123.06171023830522 49.28025177753656 -123.06172115294548</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:2083aa81-56a7-47d2-9a11-235297f857ad</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.28117427953768 -123.06170140497193 49.280749459581415 -123.06171023830522</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:68d85160-2e3e-4514-890e-a395b7483856</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.28117427953768 -123.06170140497193 49.28116350397079 -123.05976625967678</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:ed6eb491-af69-4d91-be70-e5a972e0d6de</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.2802621344824 -123.06365464005337 49.28025177753656 -123.06172115294548</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:ed1341b8-2659-484e-b5a7-807073a3ce66</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.279122080641116 -123.0617404628203 49.2791109915031 -123.05980416002885</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:260d75ee-54b2-402b-a4a2-1a3539db10d2</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.28021916016229 -123.05195783521054 49.28021586783751 -123.04933102680226</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:2f82040a-f18c-4692-b504-2b5fd712f456</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.27786437500549 -123.04933067504456 49.27745742270258 -123.04933363755292</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:dd2acaf8-f65b-4074-a77a-51983a2539b2</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.278271659872246 -123.04932824902069 49.27786437500549 -123.04933067504456</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:8bb27e73-fb29-4cb5-993b-15f95e764d91</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.278271659872246 -123.04932824902069 49.27827065771689 -123.04857255108598</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:0b848d0e-d4e6-475e-b193-61f67a6f6ffa</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.27827065771689 -123.04857255108598 49.27826988473117 -123.04746721038815</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:40c16dc4-ff49-4508-9cef-cf5766f6344a</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.27826988473117 -123.04746721038815 49.27826951985807 -123.04670705854663</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:91dc4f11-748c-4df8-b029-1e5207cc565d</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.27663419316613 -123.05464992030437 49.2766309399112 -123.05199238234036</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:7b42ec44-52b9-4e37-b03d-994ed3220b7d</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.27746344569522 -123.05458315279942 49.277458808010294 -123.05196036620521</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:70d617c6-0dec-47e1-8324-b7931448a10a</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.27746524136481 -123.05579552234235 49.277463541332594 -123.05464724826872</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:a73f4e8e-9c99-4f96-b9c3-e96dd9f8bf47</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.27746639153921 -123.05657497940507 49.27746524136481 -123.05579552234235</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:1301c2b5-9cfe-4dcb-a11c-8aee7d6977c0</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.27749127986894 -123.05981050573372 49.27747643319603 -123.05787658632192</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:f74e5ac8-b3e2-444c-9e8f-878caeb08669</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.27658616403022 -123.05981532303011 49.276571488978306 -123.05788014687292</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:1eb890ac-56d9-4cb7-94a3-410aa77a4a59</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.27376865434363 -123.06288448336375 49.273764849748204 -123.06238598254744</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:d579e3a4-2008-402c-b99b-f0e9ebf1037b</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.273773617709736 -123.06354576922735 49.27376865434363 -123.06288448336375</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:e944ef44-c426-4cc5-9f52-69f2599fc4eb</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.27378139383029 -123.06459252352154 49.273773617709736 -123.06354576922735</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:198ce5f3-8300-41a4-8c5e-cba5ff0b95c4</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.27378502749605 -123.06509013086846 49.27378139383029 -123.06459252352154</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:eacd45fa-24c5-4379-9d00-b084560576e7</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.27378940750475 -123.06567943476045 49.27378502749605 -123.06509013086846</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:2692a025-0a35-4532-91a0-8ba010291dfe</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.273764849748204 -123.06238598254744 49.27376055679622 -123.0618043229307</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:43fee9e5-b756-48d4-8639-be9fd0abd8f1</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.273007816526956 -123.06508947943566 49.27298779257697 -123.0624169924121</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:049299ad-0d7b-4557-970f-a239f39d5f09</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.27301236245839 -123.06568755877113 49.273007816526956 -123.06508947943566</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:2c3ee290-f79d-4ef0-be5b-f8bebe0beab7</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.27580556447188 -123.05580067549678 49.27580350425353 -123.05465331942503</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:a2c7cc08-7add-4514-8308-d91d58a56370</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.2741456897472 -123.05465676689444 49.274143381789315 -123.05201781282014</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:21a984e3-ce37-4e44-b303-91c0e8ca83ed</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.27497503829221 -123.05465405383043 49.274971854829886 -123.0520015680233</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:b75bd9f6-28e0-4b20-a907-6de89c243baa</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.274143381789315 -123.05201781282014 49.274141889189735 -123.04939266235834</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:674ffccd-62c8-4732-b052-7c2d0a6d2d6f</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.27580115987166 -123.05199516714076 49.27580037214483 -123.05056772450388</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:c13db9c2-d6e8-4e15-b477-ebebb9cbddbe</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.2766309399112 -123.05199238234036 49.276628545656706 -123.04934978993283</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:f5efcb0f-59ed-4dd4-aa0e-f6192f4d3242</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.27580037214483 -123.05056772450388 49.27579925616155 -123.04936254561261</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:ad71fc1d-c610-4485-a253-6682cbeedee8</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.27579925616155 -123.04936254561261 49.27579807520539 -123.04684062393059</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:3300a5d6-9cd3-4310-92fb-a5b5f6433674</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.274139351501475 -123.04686858303417 49.27372563282833 -123.0468759583631</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:efd134aa-b727-4636-ac92-7756015c1b0e</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.27455357373526 -123.04686155175283 49.27421488463153 -123.04686725234563 49.274139351501475 -123.04686858303417</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:24a1ebb4-df7f-4942-809c-956dcd6b06cb</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.27744844792986 -123.03883546588816 49.27744659440319 -123.03821650857884</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:266ec1db-0c36-4965-9aad-ca80d3c18bfd</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.27826163110751 -123.03883320339467 49.278258382205024 -123.03620652742003</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:601712ac-d7c3-4db8-b89a-d1e6f9ef0e2c</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.27907563263423 -123.03883123020442 49.27907255468321 -123.0362042636456</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:8163c80e-e2b1-4a0d-ba62-d5dcb3134e4b</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.27641199761044 -123.0388839943546 49.27537540547772 -123.03889893459719</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:ebe38b89-49d0-42cb-af8d-1b0fcdc2170b</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.27641036710864 -123.03694484033386 49.276409403202734 -123.03632515433894</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:91c3420e-13f7-41da-a943-337dd4e83bb0</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.27641119901267 -123.0382311203297 49.27641036710864 -123.03694484033386</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:511fb6b7-b1e1-4eff-a651-0575bb0db382</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.27641199761044 -123.0388839943546 49.27641119901267 -123.0382311203297</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:004988be-470c-4de2-8efc-d4f0fc31efa8</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.27641488733232 -123.0413642640636 49.276412611993266 -123.0407299762772</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:a796ec35-b4f4-4535-aaa7-dbfa76ba9737</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.2766230665963 -123.03632263034105 49.276621283135825 -123.03359530923835</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:abd7f0df-fe43-49f7-b9e9-e76875f59c78</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.27744516012288 -123.0369287713681 49.277444429326096 -123.03631124483775</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:2f9b2ffa-cd80-4633-90ce-a3c2f92a3783</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.27744659440319 -123.03821650857884 49.27744516012288 -123.0369287713681</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:34eb89f7-4cde-4322-8386-87defb2b7ded</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.27537791357514 -123.04138898175304 49.27374024946536 -123.04141514768014</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:0aa64cb3-2b20-4a3d-8e28-475f7147fa5c</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.27325471580474 -123.03762927117228 49.273253688518224 -123.03637091139835</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:58159400-1678-4c5b-a033-55bfb0e97483</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.273256527233116 -123.03889572877695 49.27325471580474 -123.03762927117228</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:fd6a2be3-ba6b-4b53-9165-3730352cec3c</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.27372065363073 -123.03889081468638 49.273256527233116 -123.03889572877695</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:52ffaa48-b084-4e2e-a360-2381d8504efd</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.27374024946536 -123.04141514768014 49.27325873369145 -123.04142443641308</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:63db672e-2cf5-4591-9692-eb1f91be6fa6</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.273253688518224 -123.03637091139835 49.27325076747249 -123.03439499637376</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:c8e13d93-1cbc-4afb-bb72-494a2014ebdf</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.27413584175528 -123.03635779868921 49.27413314126184 -123.03363172764169</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:5eac57fe-4163-4dfb-9274-3dbe70a9e791</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.27496118078423 -123.03634619727677 49.27495838084414 -123.03362089179787</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:b3a9d67f-eb02-47b7-b9f6-defab53f618f</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.276411437774925 -123.04410035452361 49.27641173160907 -123.04334761462034</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:437df351-ab4c-4622-91a3-d5b290471ecb</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.27641173160907 -123.04334761462034 49.27641488733232 -123.0413642640636</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:4254ef9b-8663-43b2-b15c-d0baba805e23</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.27745545566782 -123.04670763718248 49.277454309658026 -123.04408379627628</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:b27110da-2f5a-4d8d-8bf8-a0c8ed0c8e22</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.28021350470013 -123.04670562205827 49.27962546265698 -123.04670619417426</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:cf5da874-a0b6-45e5-8101-7dcb125eb1ee</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.27908291830107 -123.04670645177471 49.278676363100146 -123.0467065490659</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:fa446045-0b27-4c47-9e2f-81910f28b7a7</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.278264803572796 -123.04145635999728 49.27826163110751 -123.03883320339467</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:39f0c93d-9502-4b69-b8c4-0af9cd01bcc9</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.27962546265698 -123.04670619417426 49.27908291830107 -123.04670645177471</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:a7a0a4a9-f7a6-4f21-a4c8-47a58adf0233</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.278676363100146 -123.0467065490659 49.27826951985807 -123.04670705854663</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:0adb2600-4bb1-44c1-9baa-0184bf4e510f</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.27538284584725 -123.04684704969567 49.274968623551416 -123.04685438366234</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:4956e64f-b23f-4ccf-a7be-6cc4e27a69f2</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.275379527192115 -123.04336614960579 49.2753783836545 -123.04271723447653</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:03c6548e-0a8d-487f-bf65-371f42128727</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.27538031287352 -123.04411832484882 49.275379527192115 -123.04336614960579</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:8bc07f73-fd50-400b-a3c2-fbe635072fe8</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.27538100755012 -123.04486060155342 49.27538031287352 -123.04411832484882</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:b1c128ea-497e-4c20-960b-f9112d18b92e</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.275381623346874 -123.04551707762354 49.27538100755012 -123.04486060155342</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:a946c1bf-a62c-437b-95b9-fdb4c90d4798</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.27538223323279 -123.04617901161797 49.275381623346874 -123.04551707762354</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:05a1c215-e9e6-41c2-a1dd-5150ea42078f</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.27538284584725 -123.04684704969567 49.27538223323279 -123.04617901161797</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:5204867d-a76d-4221-8f63-a2933d9d5061</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.27579807520539 -123.04684062393059 49.27538284584725 -123.04684704969567</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:903bbeba-5dcf-4aed-b4b5-8a707a7bf700</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.268500900799324 -123.04423046078874 49.268497571269364 -123.04347548749391</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:c3b51e4b-467a-47f0-98d8-03b2067a5323</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.26948250430854 -123.04148251422481 49.26947828310611 -123.03895709091054</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:a515fa70-9171-44f8-bcad-4558d4751b20</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.26948801114054 -123.04345990352684 49.26948250430854 -123.04148251422481</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:8fd0e9f4-9ecf-461a-859f-1d9a9e1ba230</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.2694901081789 -123.0442155369063 49.26948801114054 -123.04345990352684</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:c061ea8a-ed2e-42c0-9b59-8fbfeea8978a</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.26949219208291 -123.04496910840095 49.2694901081789 -123.0442155369063</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:20053a04-cb2c-4f74-aa32-2a3b9c611732</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.27421368939946 -123.0455371604761 49.273263997572144 -123.04555450145631</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:baec3748-9b32-4406-a232-c841ddb1590e</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.275381623346874 -123.04551707762354 49.27421368939946 -123.0455371604761</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:3739d4b7-d124-4f00-8033-16262ccf0aab</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.274968623551416 -123.04685438366234 49.27455357373526 -123.04686155175283</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:6f09a31c-f25d-4e00-bd9b-d68f77bd9ee5</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.26723720480487 -123.05659300076039 49.26678475470092 -123.05659420147038</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:af9ac840-b006-47a9-b51a-480b919d93df</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.26758276479268 -123.0565920901505 49.26723720480487 -123.05659300076039</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:10d6806a-ca6d-4375-9e55-70d45980ea62</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.267689645877965 -123.0565918000217 49.26758276479268 -123.0565920901505</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:dd7db241-bb7d-4d93-a791-4adb68dce797</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.26904519581436 -123.05659027133278 49.26859411349892 -123.05659070388548</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:b44d72b3-42bf-42da-aa4e-bbfc07d4ed5d</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.269505849528684 -123.05658872252994 49.26904519581436 -123.05659027133278</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:f5da8b8b-9140-40b9-9f1b-b49f4b5d4e61</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.26477800650349 -123.05215954665029 49.26477788486531 -123.0495334237096</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:ae334824-f835-4de7-9d5a-907704327b34</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.264778667819854 -123.05469773006136 49.26477800650349 -123.05215954665029</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:74728d7f-7881-4a24-a118-8745b53d1cd2</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.26477866787289 -123.05584466322799 49.264778667819854 -123.05469773006136</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:c2d01c7c-487e-408b-b7f8-414e22b6c158</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.265728328416486 -123.05469526101206 49.26572674504254 -123.05214709013256</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:d3a561c3-05c7-410f-a689-4232a3ac669a</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.26667645492972 -123.05213457919308 49.26667302207048 -123.04950941058671</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:14409441-4ee9-4af7-af7f-34f2cdbd1c66</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.264768667348534 -123.04700815255707 49.26476426271205 -123.04503585938178</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:b2eb8bb3-ff37-4836-8504-fc1e34d0fa74</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.26667302207048 -123.04950941058671 49.26668255867537 -123.04698496773135</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:49c66592-f859-4ef4-b74f-a6b0af5d5a54</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.266674061923226 -123.04500984545672 49.2666703221868 -123.04425884456488</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:9ff6b18e-204a-40f2-b731-9fbf237f3d44</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.26668255867537 -123.04698496773135 49.26666595517665 -123.04542885494865</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:81a1b95e-7183-4ded-a29f-3719b52d0ecd</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.26666595517665 -123.04542885494865 49.266674061923226 -123.04500984545672</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:ee1efab8-6fee-41e3-a4d1-66517d42197d</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.26477788486531 -123.0495334237096 49.264768667348534 -123.04700815255707</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:cb96c8a5-44b4-4cd8-83c8-32254946d214</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.265719014709504 -123.0469975506225 49.265714120172106 -123.04503545930119</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:e52c407b-6ca6-42d4-8aa4-3ad8f2d4ff9d</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.265714120172106 -123.04503545930119 49.26571212155875 -123.04427171898563</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:67a91058-35d7-4443-9490-18a3037d107a</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.2647625325624 -123.0442757626305 49.26476009578164 -123.0435156790571</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:521587e0-ff5b-4073-82f2-506eec84bad4</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.268470966946865 -123.03644273723026 49.268462550011066 -123.03370817698857</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:23fbded1-2ef2-4776-85df-99b64e135412</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.268497571269364 -123.04347548749391 49.26849113803959 -123.04149854937526</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:097fd729-1290-42b9-908e-8227a9c0153a</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.274941958765396 -123.02427274224019 49.27494283265531 -123.02361506319855</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:ac724505-eda6-44ed-80cb-f93a6346056b</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.26846294095506 -123.02365349690257 49.266635457097465 -123.02366088433047</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:65fa918c-c80c-45aa-9bc2-1d8210b6b16f</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.270309225696735 -123.02363872233244 49.269456750358955 -123.02364264510658</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:f2ddea46-a2c9-4c5a-8fd1-62ad7e78c0ac</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.269456750358955 -123.02364264510658 49.26846294095506 -123.02365349690257</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:7b2febb2-4d02-4006-988c-fbfc2a6cf6c9</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.27324250005799 -123.02774061222301 49.27310792536099 -123.02769342490662 49.272922457426546 -123.02763969323007 49.27236100712926 -123.0274785253105 49.270320783950126 -123.02689122834887</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:e934ae21-a165-4369-bba4-b639dc7007cd</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.274936425329685 -123.02609508841842 49.274941958765396 -123.02427274224019</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:1ddb6289-066f-46fa-8ab1-a7774b8cc951</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.281120575893624 -123.0256963025615 49.280695094915416 -123.02569685145961</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:14562e11-3ba5-4960-ae14-d35f9d567178</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.280695094915416 -123.02569685145961 49.28019740059898 -123.02569748657214</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:6d621155-7ae6-443a-bc5e-2463ad20f43f</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.28019740059898 -123.02569748657214 49.28019666188982 -123.02359397800313</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:b5034919-26b7-4d6a-92d2-07ec79a38b5f</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.23958718451189 -123.02364191559184 49.2374003685552 -123.02364382534596</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:a368f21c-278c-453f-a470-7044a8e2ce0c</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.24331709492321 -123.02701202851676 49.242671307086084 -123.02762843881457 49.24258933705261 -123.02768872008788</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:62fdc17c-07dd-41bc-b4a1-223bad9e86cc</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.24403056063119 -123.02631198032621 49.24331709492321 -123.02701202851676</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:b9d4759b-729d-464e-80ab-628d0d2482c5</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.244516129115226 -123.02584820656318 49.24403056063119 -123.02631198032621</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:ec78358f-fd64-4f47-9297-d644aad424ec</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.24450938257891 -123.02427293537305 49.24450726241267 -123.02378417188697</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:85ca63f4-e49a-46f3-bb16-e08404a9aae3</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.244510446661224 -123.0245160118987 49.24450938257891 -123.02427293537305</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:8ad7d7d9-69f2-4ceb-af4d-d63472675e44</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.244512258660905 -123.02495962789352 49.244510446661224 -123.0245160118987</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:b4cb8df8-b4a1-41a0-999c-e0568e13a53f</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.26501596274613 -123.02571652838306 49.26527659898841 -123.02493553080758 49.2654823760121 -123.02411718017417 49.2655617261772 -123.02366523670345</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:fbadc5e0-1e9d-46b0-b1e1-1c246aa9feb3</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.27824878911275 -123.02832998013642 49.278250635595924 -123.02570329447285</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:c07706a1-5e31-4f26-81fd-f3180bed137b</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.27906904233586 -123.0283270402316 49.27906753354824 -123.02570035051016</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:0a3e7f20-1f18-467d-a4bb-5f9b4af4e4af</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.279069471506006 -123.0290619612314 49.27906904233586 -123.0283270402316</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:2414f3a9-5794-4fa2-b5ab-320e6bdf5235</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.280200049250936 -123.02905914700759 49.28019954826297 -123.02832356295328</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:dde9443f-234a-4473-9668-66b24eb65078</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.27907004744458 -123.03021821783913 49.279069471506006 -123.0290619612314</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:6d9dad04-71c8-449c-8f10-34e294ac5ce8</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.28020113372776 -123.0308441826281 49.28020053548349 -123.03021457753933</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:5f953bfb-a89d-4bf2-a825-09e48798597b</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.28020053548349 -123.03021457753933 49.280200049250936 -123.02905914700759</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:0dc0fabc-cb76-4d60-884b-70b4ed87f128</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.28019954826297 -123.02832356295328 49.28019740059898 -123.02569748657214</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:b22fa575-5a75-4017-8683-3e57ad5a6b8d</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.26846237764636 -123.03098209036553 49.26846372624934 -123.02846719768787</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:45d00d51-1134-4ec6-9051-491dd6917337</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.27411220348361 -123.02839211454656 49.274112006013695 -123.02610152729734</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:cbf4438c-75d3-4d3e-b4ba-46b8c270da86</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.2749447713841 -123.03054216600027 49.274937025666645 -123.02839400397652</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:0fe58f3a-279c-48b0-aa20-abcc1f19699f</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.2741201086736 -123.03017307156817 49.27411865547708 -123.02984586550625</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:9aa2ad91-b5d4-4634-9541-79cff7b189e5</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.27411865547708 -123.02984586550625 49.27411220348361 -123.02839211454656</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:8521f2bd-57ac-44ec-a7ea-9a96a10b0f19</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.27743824638392 -123.03019632325363 49.27743583067465 -123.02909386019405</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:a209014b-8d42-4152-9d9b-6f1d4f65e03e</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.27743583067465 -123.02909386019405 49.27743425649183 -123.02833380312782</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:e0ebb213-925d-4fa4-be7c-2c32df1190ef</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.27825431229809 -123.03085817462097 49.27781869537449 -123.03085174349198 49.27743822280706 -123.03076311731745</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:d4d51a4b-5d19-4c18-9d28-3230081ffed0</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.24006155346325 -123.03011596649567 49.23858041393984 -123.03153552752305</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:0ac894b7-fe6b-4639-be93-1c782a580075</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.237342354920145 -123.02994136022546 49.23726562830467 -123.02975635473321 49.23652588386892 -123.02815090848279</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:866d620d-5f5c-4da3-adf2-d8986b5badca</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.238256391092364 -123.03184954095418 49.23796039947848 -123.03126824061573</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:aa151fac-24fe-4409-8524-01718548321a</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.23796039947848 -123.03126824061573 49.23775459513075 -123.03094216237555 49.237342354920145 -123.02994136022546</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:f551fa05-fb0d-426e-a308-6f5823819ed4</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.262098407911964 -123.03101470693859 49.26212823180495 -123.03089612685865 49.26225856815472 -123.03050565178597 49.262414902329624 -123.03013815718157 49.262595515434924 -123.0297976275073 49.26269610334515 -123.02964405355326 49.2634558150956 -123.02848487870642</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:b668dd3f-83df-45d7-9d9a-05ba51120740</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.23858041393984 -123.03153552752305 49.238256391092364 -123.03184954095418</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:34e2af61-0e2c-45b8-a130-d6ec07240ab7</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.2634558150956 -123.02848487870642 49.264134348933055 -123.02744994484966 49.26434209611165 -123.02713271962004 49.26470332147508 -123.0264516093328 49.26501596274613 -123.02571652838306</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:0ff83862-ffc9-49e3-8046-39fd9ec4f926</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.26567355147927 -123.02850018915318 49.2634558150956 -123.02848487870642</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:2c1683d7-d012-4daf-b72c-33778d7530fd</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.26754748328801 -123.03297149814658 49.26754849785948 -123.03099607484526</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:834e6282-91bb-49c8-94d6-bb5f270d84a4</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.272273945941464 -123.03365476845899 49.271340529167446 -123.03366775653679</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:ce04861f-8c5c-45bf-b1dc-85850478956d</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.27325089861165 -123.03364406406307 49.27324713805933 -123.03094252521342</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:56efbb67-68e7-4f86-b9a0-86017e85ce00</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.27325076747249 -123.03439499637376 49.27325089861165 -123.03364406406307</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:6ee13928-0d05-43cf-97d1-b02be39c9d72</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.27495838084414 -123.03362089179787 49.27494851181828 -123.03138716122264</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:4b8f813b-c1e6-4c92-96fa-62606252a198</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.275795944575606 -123.03360708065618 49.27579166124289 -123.03180129116852</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:e2c00c39-bb23-43f7-ab98-fc7cb112f401</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.27906961405256 -123.03358022603706 49.278663211690144 -123.03358066505642</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:037f337c-e67d-4397-aae7-514017925958</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.278663211690144 -123.03358066505642 49.278256557154265 -123.03358206630732</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:a0acd996-6bb4-44c1-8f17-c7837dd1f0d4</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.24455762327443 -123.0339805517545 49.244159783060184 -123.03440269109177</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:09c36e7b-fe2d-4345-9744-a406b39f1ecd</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.24456601321006 -123.03548526178751 49.244562515105486 -123.034562003644</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:8063dffe-39e6-475f-af76-635cdfaa43f2</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.26291584365987 -123.033755266903 49.26189134301694 -123.03375756434897</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:ec09ab4f-c79c-4c44-a65c-845687a403e9</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.263820797624334 -123.03375379498337 49.26291584365987 -123.033755266903</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:517db1f4-37c5-42a1-9a06-5f7736427115</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.264725816018654 -123.03374682509053 49.263820797624334 -123.03375379498337</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:df280d7f-7582-436a-b22f-e5127cdc356f</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.26663181241108 -123.03373546540234 49.26567568197564 -123.03374795395864</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:77c539b4-acd8-4a25-85aa-f8b3f099c7dc</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.267547131133114 -123.03372414443491 49.26663181241108 -123.03373546540234</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:54e5a2ad-a69e-4aff-9f70-c12f31e29418</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.267547131133114 -123.03372414443491 49.26754748328801 -123.03297149814658</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:305416d0-0eb9-4b7f-8d05-b816bc585eb1</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.23480953616834 -123.03523496927836 49.234529251821584 -123.0355038826546</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:bb71f88e-4274-4c3c-a170-e28dfa2a1c4b</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.235796787288194 -123.03426260441354 49.23543796953328 -123.03461570796692</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:e4486d66-3293-49b8-9207-2d17ef12e09c</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.238256391092364 -123.03184954095418 49.238002786444014 -123.032115761986 49.23746820087996 -123.03262295602883</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:92397489-9ee6-427e-9770-07858b3b5503</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.23543796953328 -123.03461570796692 49.23480953616834 -123.03523496927836</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:d8563f7a-7119-4c4a-9ea5-de60ca52e7fe</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.23848002372259 -123.03239274758806 49.238256391092364 -123.03184954095418</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:af93045f-7d53-4136-8d15-b8e541d46d1d</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.23890341963076 -123.03340764065018 49.23848002372259 -123.03239274758806</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:60672a10-41a0-498c-a5f3-3c666869dd43</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.239036843085984 -123.03372746418148 49.23890341963076 -123.03340764065018</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:b0e7f8ab-d5e5-418d-bc5b-b20eabd335e1</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.23943082180685 -123.03468240719981 49.239036843085984 -123.03372746418148</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:ef15f799-3cde-459f-a61e-8fdaa3d16acf</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.26866437133771 -123.06577109408676 49.26865996727054 -123.06517743872523</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:91abffd0-3528-4cf4-b991-652cb9d8b97b</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.26865996727054 -123.06517743872523 49.26864985795541 -123.06383784822538</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:a9c3b5aa-0edd-4964-82ef-73ecaf592e40</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.265936454400304 -123.06389001593186 49.26592070455163 -123.06195610592944</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:02480567-1b61-4dc8-982e-9ded27a5e64c</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.266841381257905 -123.06387243547128 49.2668267284935 -123.06193858769865</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:b82f3e21-274c-40ed-8220-828c894dc0eb</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.26773069200814 -123.0619217810432 49.267715520092594 -123.0599893967598</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:e18ddac3-f218-4761-bc1e-a007aa91c351</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.26709025390994 -123.06911980476237 49.267083958322246 -123.06701081077621 49.267144722325526 -123.0667908397188</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:135a3639-08a9-4d01-ad23-71823272ed08</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.26709406181598 -123.06966907004929 49.26709025390994 -123.06911980476237</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:0377b144-c29c-4e2f-893d-a001abe28cff</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.26953963520057 -123.06188790602862 49.26952455350113 -123.05995391163313</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:e5da390f-1c57-4d47-a15f-2882e284232d</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.270458801505555 -123.06380383647118 49.270443742609785 -123.06187034169369</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:6af84f5b-5f45-46c5-82d1-a9777f2b4460</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.270820375304226 -123.06186297711542 49.270443742609785 -123.06187034169369</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:74cdb06d-a370-43bf-a4a3-581e7dfb7742</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.27123316943303 -123.06185414549815 49.270820375304226 -123.06186297711542</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:8ae33643-a8db-4636-883a-d8cdf39065e4</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.271248579480755 -123.06378752036103 49.27123316943303 -123.06185414549815</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:b088060b-3af9-4115-8421-c0af11038933</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.27206109857315 -123.05990276749093 49.27204829901743 -123.05796157063541</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:cb5c81c2-b67c-4f65-addd-3517190baaee</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.272066409166854 -123.06055196081074 49.27206109857315 -123.05990276749093</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:7592b9e1-83ac-4c19-b72d-ed9701017a03</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.272071228004705 -123.0611716526631 49.272066409166854 -123.06055196081074</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:26930844-a685-4672-a237-473fb7fc44f6</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.27209226516217 -123.06377186435081 49.272076837892655 -123.06183655941788</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:73a05fa4-09f8-4f29-98c9-66eafe3d3213</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.27210322266629 -123.0651241001565 49.27209226516217 -123.06377186435081</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:58c04ac0-9655-412c-bf44-5ffd430f1eb4</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.27210788655316 -123.06570425639931 49.27210322266629 -123.0651241001565</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:9b1ecb50-2bf3-4168-b1b0-76b7677dba3a</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.270433541976445 -123.05658860139896 49.270432656705026 -123.05587544491178</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:e493cbc4-8c4d-4838-b78b-6389628fbaa3</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.270432656705026 -123.05587544491178 49.27043188558841 -123.05529063979104</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:c3d0e18e-6d9e-4d53-a11d-412c414602a9</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.27043188558841 -123.05529063979104 49.27043106380759 -123.05469259673946</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:d729ca82-ddd7-4aaa-97df-e93c65375b17</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.27043106380759 -123.05469259673946 49.27043062555629 -123.05415252318089</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:51edc3f0-3a8c-4e0f-8860-18183b3b62f4</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.271362221397766 -123.05468793495548 49.27043106380759 -123.05469259673946</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:33c2c218-a4be-4b91-b938-79c559716163</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.27250156648543 -123.05796196421757 49.27204829901743 -123.05796157063541</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:bc2d5654-ae03-4b68-81f0-3a8e3c5e4ca5</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.27295076451199 -123.05795156147876 49.27250156648543 -123.05796196421757</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:d05209d1-37bb-4f99-8390-99142e7308e8</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.27295076451199 -123.05795156147876 49.272945375276265 -123.05730451505882</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:74bc2e9a-d24a-4511-8f6f-7b0f51fd0afd</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.272945375276265 -123.05730451505882 49.27301235789321 -123.05680367099839 49.273073093494276 -123.05658350980558</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:bb482cfa-e7f8-4084-90d9-01959dcfc00e</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.27298779257697 -123.0624169924121 49.27298319308852 -123.06182012336863</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:b9b07930-b29c-40b1-a2e9-fb9c2f3bc16b</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.27298319308852 -123.06182012336863 49.272076837892655 -123.06183655941788</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:34f1ab35-935d-4f4b-b019-fd5ad5321af5</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.27298319308852 -123.06182012336863 49.27297760177868 -123.06115392596524</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:4be24e8a-853d-4d7c-8644-9b7fe7c6289e</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.273887633180294 -123.06180178718849 49.273872028331226 -123.05986774593325</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:7a2decaf-27ba-4922-b093-9d6dc9f2474a</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.27297760177868 -123.06115392596524 49.27297276482457 -123.06053429147488</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:d61b8571-2e4e-487f-897d-9625d19ba9b6</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.27297276482457 -123.06053429147488 49.27296686916503 -123.05988563544368</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:7403e770-99b7-4109-8f25-e7a5b963b33a</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.27135919045355 -123.04943651320207 49.2713552136735 -123.04691448528507</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:0c818253-5c67-4238-b904-74d7430473f9</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.272290649246 -123.04942078258593 49.272288110815 -123.04690006950527</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:9cfcc8b7-77ea-46fb-9f19-9b1236c95936</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.273267298561905 -123.04940774975108 49.27326477030735 -123.04688341261823</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:0868b517-f0d1-4861-9910-65a3ab968e8d</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.27372563282833 -123.0468759583631 49.27326477030735 -123.04688341261823</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:11a35c78-2407-4ffa-a6fc-bdeca5dff4b8</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.272292590399076 -123.05204716874805 49.272290649246 -123.04942078258593</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:19b4c55e-2049-441f-99c9-44b754474971</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.27326923161107 -123.05203282677131 49.273267298561905 -123.04940774975108</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:379c94ff-df58-4138-b9ea-3e5e1c1cfd3b</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.26417192682112 -123.06972673879854 49.264167062297616 -123.06906463236959</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:b45c8e44-8d16-41b2-a69b-151c0f55aced</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.264167062297616 -123.06906463236959 49.2641435949013 -123.06585830242565</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:3caa3c36-0d28-4a47-90f8-461a243691d5</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.26325842681803 -123.06855594397722 49.26324307394077 -123.06650573532612</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:f81940b5-804f-4b9e-8d96-52590dde8f39</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.26324307394077 -123.06650573532612 49.26323810909753 -123.06587677954536</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:7d9d02c0-5366-44da-9b7e-1e39ca83132a</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.26323810909753 -123.06587677954536 49.26322528902048 -123.06394277196792</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:05fe42bc-15a6-43f8-a120-d60e26f6ec59</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.2695080192577 -123.05208987702976 49.26950483703831 -123.04946516327679</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:d9795a7f-2a04-4ac4-9e47-19494ea35c99</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.26893411534061 -123.04947341769358 49.26851793195138 -123.04947959962362</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:e3f7d5d9-9833-4b87-aa85-d94515fc65a8</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.26950483703831 -123.04946516327679 49.26893411534061 -123.04947341769358</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:dc5484cc-1971-47e9-89d0-fdc5567e7597</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.27042664373738 -123.04945073003515 49.27042474487928 -123.04692939771155</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:33025e69-60cf-4971-9a78-55efcea92a94</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.26949782017218 -123.0469439830422 49.26949219208291 -123.04496910840095</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:df5d35df-d280-458d-acd7-b1708bd37196</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.26201150746908 -123.04957814096949 49.26187477837914 -123.04958267700408 49.258735848788405 -123.04955544053428</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:59a283db-3355-4c25-a3f8-294764414fae</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.26453883344931 -123.05811521138268 49.26408639765589 -123.05812327052392</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:c2fe244c-654d-44e3-a541-404a05652ad1</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.262016741533415 -123.05470337749718 49.26201580473625 -123.05300793598103</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:ed675f4c-41d9-43bd-946c-b5ddb79a5938</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.26408102853185 -123.05740152734134 49.264075029499 -123.05659768620751</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:08a6b8dd-de0e-4158-9eba-b8d5b293cbc4</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.26408639765589 -123.05812327052392 49.26408102853185 -123.05740152734134</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:da6f22e0-4b28-450d-9071-61c853ffbc4b</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.26201580473625 -123.05300793598103 49.26201533392816 -123.05220464329963</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:a51c902f-fba1-4c80-9679-25e01e01c622</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.264115905624095 -123.0619925240703 49.26408639765589 -123.05812327052392</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:518f0014-40bd-4c3f-9575-d5ac477c7131</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.26499045077506 -123.05810688998157 49.26453883344931 -123.05811521138268</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:dd445a8a-8430-4e7b-8255-8b385f831fa3</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.24457088065182 -123.03694546799856 49.244570392163524 -123.03664340836951</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:9afb58a9-5eab-4c86-b0d5-ba17e52bd1fe</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.24457440284476 -123.03911614823278 49.24457088065182 -123.03694546799856</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:204826a5-4863-441c-9f10-dd3b88cc965a</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.263855636380185 -123.04351763266071 49.26384873192001 -123.04155241137953</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:c2da4787-11dc-49cc-9380-a8baf01c2d06</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.2629438115969 -123.04156009064855 49.26293475320554 -123.03903315544925</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:1568ef12-5b28-4e22-96b4-4526a341ad77</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.26190651651646 -123.03904410945547 49.26190372762028 -123.03791080622922</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:a7cb5eff-97d8-4357-85dd-6ca68e30a2e7</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.263858531570605 -123.04427858241243 49.263855636380185 -123.04351763266071</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:696092b5-cc08-4831-83e5-00d554a70142</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.2647625325624 -123.0442757626305 49.263858531570605 -123.04427858241243</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:9ec92a76-2fa8-4ab2-b08d-620f789f0c14</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.26476009578164 -123.0435156790571 49.26475317504324 -123.04154559737057</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:6c60547a-facb-4f97-b2e2-839e104df2d7</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.23950138621839 -123.04622564088281 49.23931340752077 -123.04576405139544</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:486194a0-3a75-4857-ba6a-2002deb869fc</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.23973739091451 -123.04681502875003 49.23950138621839 -123.04622564088281</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:64896ad4-e65d-4351-9d91-d8cc13eb7a46</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.24042842153011 -123.04614876171318 49.23973739091451 -123.04681502875003</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:3a5db08c-a21e-4ab0-853c-144375c5cc26</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.2446194837743 -123.04892191536462 49.244613098561814 -123.04712239815645</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:0cca9f8e-e0d6-43d4-9598-c2fc2941b4fe</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.24462149800203 -123.04951477025553 49.2446194837743 -123.04892191536462</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:576d8270-3ced-45e3-a10f-f8d5dd6b64ac</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.258735848788405 -123.04955544053428 49.25838641234077 -123.04955414240041</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:9726fd8d-5549-468d-b2f3-50d2fb622909</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.262953433100904 -123.04428119495388 49.26195196944218 -123.04428223681381</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:24a62c36-08d4-482f-9d9b-ba043478362e</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.263858531570605 -123.04427858241243 49.262953433100904 -123.04428119495388</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:c60aa61f-cfe7-48d7-ba05-685ae24bd15e</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.244475147236074 -123.06370197121754 49.24356492190606 -123.06180955058649</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:804b8e79-b8d6-4d27-a107-884eb79eb92f</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.23828621887898 -123.05031594617267 49.2376244925247 -123.04889184498558</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:f69855bf-b36b-4454-8431-18e828c7030c</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.241506853868515 -123.05256558401744 49.24038623742328 -123.05365796704702</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:289b80b9-bbed-4576-bef1-5092a9319210</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.24159975230103 -123.0575031797116 49.24023816634394 -123.05452340517236</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:999e69bd-3445-4c6f-8b36-1c8b4740b40e</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.24038623742328 -123.05365796704702 49.24000926267095 -123.05402937949036</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:3ad4a66c-7233-4545-9cff-3fbac94cc1f0</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.2424371108161 -123.0516562148154 49.241506853868515 -123.05256558401744</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:57b3c40b-74bf-48ff-8c38-d1e4c5292f05</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.244620567043796 -123.05425171203117 49.244622152199724 -123.05257416671884</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:fd86aa2f-bd50-4131-9530-8f495ff116af</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.24188574912884 -123.0581278620067 49.24159975230103 -123.0575031797116</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:1c73eff5-fdbe-4478-a91a-b04ee057b8e8</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.23805302978826 -123.04666410984291 49.237434359885754 -123.0472712401168</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:7e3d1750-682d-413a-8702-d31f64abcd65</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.239106779355325 -123.04525778670586 49.238835431124954 -123.04458107853209</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:e8147c4e-274a-4b36-89c2-cc025a2ab861</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.23885822327156 -123.04587239258971 49.23805302978826 -123.04666410984291</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:7f41cc51-e707-4e6d-96eb-08946cb31384</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.237434359885754 -123.0472712401168 49.23707420684363 -123.04762508406347</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:1cd5a0e8-c7cf-4a98-9e3a-e7d33f197549</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.23921532935128 -123.0455213091474 49.23885822327156 -123.04587239258971</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:4fd5a28f-e3b9-4d6e-a64f-411ade35d9bb</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.23840194950313 -123.04812535239195 49.2376244925247 -123.04889184498558</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:ce2d1532-a999-4a6a-aa8c-d302bbc598fb</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.23921532935128 -123.0455213091474 49.239106779355325 -123.04525778670586</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:44aeb545-ac7a-45ae-9b38-a0e5cbfa9bc3</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.23931340752077 -123.04576405139544 49.23921532935128 -123.0455213091474</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:23c63a6b-c805-4cb1-9306-9e4ddc780e74</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.234529251821584 -123.0355038826546 49.23415350403323 -123.0358766127863</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:7230a904-5b84-413e-a036-dc562b82f5f1</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.23594291744541 -123.04231600102635 49.23580693671647 -123.04078930276677</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:98dea722-ac6e-4f49-8d6a-443490e38a31</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.23708880259818 -123.04119975612626 49.23594291744541 -123.04231600102635</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:9ec9d41d-7665-4aa1-a2ab-7a237e7a50c3</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.23736133597245 -123.04093426154414 49.23708880259818 -123.04119975612626</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:384f76a7-1926-4ec8-8321-2bced527d12d</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.23843856873191 -123.03988479982202 49.23736133597245 -123.04093426154414</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:e96dbddd-ece9-45d2-86d9-45018aadc9b1</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.24024914254838 -123.03667381466128 49.23943082180685 -123.03468240719981</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:48d7af2a-d506-4eec-bf25-0838132d7594</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.244159783060184 -123.03440269109177 49.242475428533425 -123.03601501391276</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:d26746b4-0818-4612-9d66-4b7276ea7ad9</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
<georss:line>49.244570392163524 -123.03664340836951 49.24456601321006 -123.03548526178751</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:69de4624-d7eb-4b40-98b3-9a21e041b6e3</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.25187074610841 -123.05792447742049 49.251701794913146 -123.05731710605143</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:adedcd3d-8644-473c-8166-06be3e7af197</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.24969649203345 -123.05663710416222 49.24970356819557 -123.05588609731942</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:4a59b62f-a0e4-42ac-85cb-49f5ddad802f</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.25063456054056 -123.05663419236892 49.25064034980633 -123.05588433783056</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:1af416bc-3b7d-4b9c-9c59-7cff2ef782d0</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.25235806641166 -123.05662787785552 49.25151970051883 -123.05663226427299</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:0d579836-9dd5-4ba4-a4d3-b869b8e617db</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.24970356819557 -123.05588609731942 49.249715302259034 -123.0545788419046</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:a51763c5-04bb-4785-af8d-42270b439503</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.25236363616639 -123.05586682512664 49.25237227653551 -123.0547288463037</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:6f841549-e445-4c1e-8c06-13f83c123141</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.25235806641166 -123.05662787785552 49.25236377109468 -123.0558668252789</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:1f7a3864-2664-490f-b870-78af16bf1bfb</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.25218051448206 -123.059044176887 49.25176495935935 -123.05931310757136</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:d299dcb5-3be3-4ce2-8241-9ff44fc71ee0</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.2519612264459 -123.0617840988797 49.25180870678213 -123.06123718169802</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:550f3de4-0dae-4913-aabe-db914b2a5038</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.252056744976954 -123.05859311856693 49.25187074610841 -123.05792447742049</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:ac6d93be-ff1c-4d9b-99c5-135c18817d33</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.25222413225083 -123.06096674146367 49.25180870678213 -123.06123718169802</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:2ab9ea2d-71ee-49d4-9c29-f978bc0b91d2</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.25219899756678 -123.06263533503267 49.25196119045037 -123.06178412631755</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:819e54b0-7796-49c6-a2c4-b6ecaa8fa029</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.25218051448206 -123.059044176887 49.252056744976954 -123.05859311856693</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:423cc546-5811-4054-b1e1-b292a3b3cd3f</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.25261321155858 -123.06236557621129 49.25219899756678 -123.06263533503267</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:dc5ecb48-9190-4f03-bf54-1fe77d221d06</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.252631935843425 -123.0607006022031 49.25222413225083 -123.06096674146367</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:c0a807bf-e11d-4a43-8fb1-66222155210a</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.252659644413626 -123.06428655642671 49.25234643034341 -123.06316206809136</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:84df0c4c-f9b0-4a5f-baf1-0bb09ac091e3</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.25154453979903 -123.04960071988755 49.25066051872946 -123.0496157600847</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:5923db43-31b4-4d57-bde9-4add0fd39a2d</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.252382891667594 -123.04958643043034 49.25154453979903 -123.04960071988755</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:69c42b42-5b5d-437a-86bb-e9495f7ebcae</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.25154634355019 -123.05222327065529 49.25154491638472 -123.05020745230435</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:97398bd1-5a73-4390-82a3-fe34a4dbc1e1</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.25196559625985 -123.0522158253488 49.25154634355019 -123.05222327065529</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:16852af4-fa6e-4f87-8417-868833c4d57d</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.25238478569864 -123.05220898447843 49.25196559625985 -123.0522158253488</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:37acd682-7a70-4d5a-a293-6436bd7794c4</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.25154491638472 -123.05020745230435 49.25154453979903 -123.04960071988755</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:951b2657-fd71-490b-ba2e-e314702c58ba</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.25063725029179 -123.04638446765259 49.25063012400901 -123.04509459179786</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:2544ebd0-7f8d-4949-8d5d-071048e26b06</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.250641075912654 -123.04708946796448 49.25063725029179 -123.04638446765259</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:e4853b5f-0a4c-4d7b-a9fa-2d456748c2dd</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.25235918952899 -123.04706980284449 49.25194008220444 -123.04707455739019</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:b1dc6531-1c34-4f7f-a6a5-01b33641506b</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.25234695853828 -123.04433469827359 49.25150841468397 -123.04433529399623</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:9b9ac4c3-ab8c-41cb-9f87-692113cc9e73</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.251521451595806 -123.04707931231124 49.251512132835046 -123.04509419967951</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:52c79a44-e3eb-4626-a1a4-439302113e00</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.2497225048113 -123.04961769190759 49.249717884333705 -123.04891438006415</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:508ad4a4-d75c-4365-afa2-9fcd860a37b2</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.24972284552001 -123.05036861128227 49.2497225048113 -123.04961769190759</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:4015d942-f3ba-4e69-9042-c4d8bd8f3df2</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.24972372391886 -123.05223926613823 49.24972284552001 -123.05036861128227</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:716356b4-3deb-415c-8c57-b76e09a04d7a</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.25064034980633 -123.05588433783056 49.25065083512433 -123.05457366227192</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:2481a935-8b68-49af-8302-02beede575cb</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.250657174350465 -123.04891530805115 49.250641075912654 -123.04708946796448</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:c1257b50-6111-43d5-bc3f-7e504c650841</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.25219899756678 -123.06263533503267 49.251500477883525 -123.06309023509084</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:1b933bc9-4eb4-4c01-939b-e3c8428ab4d7</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.251392317512824 -123.06150883916916 49.25099838774494 -123.06176536364651</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:1d358c34-ae4d-40b0-b548-e02cc62c5c8d</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.25180870678213 -123.06123718169802 49.251392317512824 -123.06150883916916</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:863d3674-e859-4d4a-a7b3-ddda1ecad3b2</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.25176495935935 -123.05931310757136 49.25029407143168 -123.06026500673649</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:9b312239-c77e-4ee1-bd16-56ac6a4df5fa</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.25542993571128 -123.04703991969367 49.25542207292227 -123.0456975461002</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:f9f341ad-2f7b-44ac-804a-1ae7269a709c</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.257238841512645 -123.04703024591252 49.25722642999233 -123.0450619148356</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:e18a4350-0a27-448f-92f8-ba2dcb1f0679</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.25542207292227 -123.0456975461002 49.25541837508044 -123.0450813908984</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:7e467ad4-4cb2-4ce3-8f73-b2a6d3c57078</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.25631847335376 -123.04431160837154 49.255413991424575 -123.04432188878387</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:51300602-8a05-4649-9ef5-6bcf9afd4e0b</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.2572220645296 -123.04430154668299 49.25631847335376 -123.04431160837154</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:42956fd6-1b2e-4642-9acc-fec9ed8cc67b</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.25817082439218 -123.04428139638524 49.2572220645296 -123.04430154668299</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:2a81de3a-32ba-4239-8629-0c6960da28c5</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.25542993571128 -123.04703991969367 49.25492891876766 -123.047043181478</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:ec0f6471-70c6-44d0-8fb1-216d3dfea80e</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.25492891876766 -123.047043181478 49.25443928949875 -123.04704700370546</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:419a8ebb-5e53-4965-b4f4-e27419a1b493</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.25235918952899 -123.04706980284449 49.25235001104812 -123.04509360246328</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:d794f9a8-6fa7-4dd8-8651-9dd001e62e9d</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.25277795500449 -123.04706504789584 49.25235918952899 -123.04706980284449</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:0b929ac8-4aad-462b-9f1d-2a6833644b89</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.253197017297055 -123.04706027940973 49.25277795500449 -123.04706504789584</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:4cf9d15a-9068-4553-a5ec-afe9bd3c5626</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.25235001104812 -123.04509360246328 49.25234695853828 -123.04433469827359</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:c0305523-f8f8-4514-ae62-7737804bcdb1</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.25318469272696 -123.04433403310658 49.25234695853828 -123.04433469827359</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:f1af262a-90bf-40dc-becf-4208b1bb0f15</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.254391896215594 -123.04433387745608 49.254023227304515 -123.04433353354692</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:91948f70-109c-45dc-ba8e-e30ff2cf4c89</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.25361634043699 -123.04705546986781 49.253197017297055 -123.04706027940973</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:fcdd4a62-972a-414e-9e8c-98b7fceb5cca</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.25403879428413 -123.04704967380128 49.25361634043699 -123.04705546986781</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:4243f6ce-1538-47ad-8103-8116de58ff10</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.25792358240099 -123.04955241467545 49.2574142734901 -123.04955223463391</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:91010cfb-0a2d-48a9-8ce3-a78f2cd507db</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.258187217792056 -123.04702548486276 49.2581754738963 -123.04505186681253</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:9a50889e-da67-4f61-8123-384b9dcf10d2</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.2581754738963 -123.04505186681253 49.25817082439218 -123.04428139638524</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:48c0a876-2d19-4220-9ade-d559cace7f0a</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.259052558648904 -123.0470218816611 49.25904714823693 -123.04604987790078 49.25905257169225 -123.04593854803436 49.25907556464031 -123.04568600763778 49.25911944134185 -123.04544001427884 49.25918317031895 -123.04505488678292 49.25920470563591 -123.04465900036604 49.259204868615456 -123.04428230775994</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:099949c9-480c-495c-9900-5e1e99995796</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.26201150746908 -123.04957814096949 49.26199723026738 -123.0470218618647</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:6d5da37b-ed0d-4bb9-a8df-56f193e66f60</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.25280459610556 -123.05220141584397 49.25238478569864 -123.05220898447843</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:ff287c4c-4b9d-4692-9bef-53f1b0301b7f</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.25322362349405 -123.05219473947128 49.25280459610556 -123.05220141584397</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:6c8f3279-0917-41a7-9821-0ec4da2ea266</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.25322362349405 -123.05219473947128 49.253221962842844 -123.05017686003622</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:50139f7e-8d41-40f7-bc7e-de22a156cc3e</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.2544758336679 -123.04955114839396 49.25406219821619 -123.04954953881065</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:17412abc-a72b-4c34-8daf-e5107b9edcb1</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.25406075534232 -123.05016248412586 49.25406219821619 -123.04954953881065</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:1e364b07-207e-4c90-811e-93c966a79c05</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.25406244354113 -123.05217968319779 49.25406075534232 -123.05016248412586</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:11086a57-d1da-4237-9238-f6daf8856e51</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.253221962842844 -123.05017686003622 49.2532216845199 -123.04957134392079</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:f0cc0513-65d7-4845-b909-aa78eeaf964c</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.255713493002304 -123.0529808343113 49.25540437173865 -123.05298222125447</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:b575ba24-fcd8-47db-83d5-fd7d70d332e2</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.2574142734901 -123.04955223463391 49.25680196934562 -123.04955200646525</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:5af0585a-134a-4b96-ba80-c81a61633d36</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.25680196934562 -123.04955200646525 49.25634943812955 -123.04955184205018</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:86d8b275-ee1a-40c4-8f11-8de191f9613a</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.254943548958465 -123.04955131424047 49.2544758336679 -123.04955114839396</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:919cb93b-6765-43d7-afdb-75aa55e94d1d</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.25544495129009 -123.0495515000722 49.25542993571128 -123.04703991969367</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:b95f4135-2e2b-4b4f-8958-c2492e2c1e09</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.256394951022656 -123.03651900879478 49.25598964369445 -123.03652187055388</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:f6cacbe9-d32b-48fb-9b49-17c0978f1dd4</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.256349390377096 -123.04157564858735 49.256398379950355 -123.04114392418933 49.25639717547645 -123.03904171510091</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:59c7b2a3-3505-420c-9f7b-5faa9a1ca472</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.25720720524944 -123.03903669195567 49.25719645753668 -123.03889869163662 49.257197236009546 -123.03651333396837</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:a774b685-cfba-4438-bc34-e14079044237</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.25813771670343 -123.03903191483629 49.25814367851049 -123.03650655589954</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:2016f3e6-434f-425b-9813-a51debdac954</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.259204868615456 -123.04428230775994 49.25817082439218 -123.04428139638524</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:ee60b8de-74eb-4499-ad66-31802728b5da</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.257197417190696 -123.04156746925766 49.25720868379787 -123.04142944561295 49.25720720524944 -123.03903669195567</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:e5df76fe-94e2-4f79-96ab-9186ef6afc52</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.25814305089213 -123.04155939909752 49.25813771670343 -123.03903191483629</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:73f47dd4-2a1f-4c72-999d-22adb392c70a</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.25557116316435 -123.03378930034901 49.254786427910005 -123.03379445396206</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:74656410-f108-40db-91e3-41b7f4fdc37e</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.25694962860484 -123.03378025032568 49.256429479326016 -123.03378361960854</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:089225b2-83b3-4cdf-92f8-2f221176769a</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.25724884599461 -123.03377824192773 49.25694962860484 -123.03378025032568</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:66924448-571a-4257-8807-febae4d8346a</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.25773908608943 -123.03377496207221 49.25724884599461 -123.03377824192773</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:04f696c8-ba1f-4492-ae68-f6b7600457e5</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.26011486156858 -123.02369990494773 49.258159246510445 -123.02371089756546</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:6cce5dd0-7276-48a2-a6c0-0bcc4e610431</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.26846671423809 -123.02633646432213 49.26740787462896 -123.02584502896406 49.26663908808828 -123.02569674000165</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:29b104f4-8bde-461d-a046-5711725c638a</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.26663908808828 -123.02569674000165 49.266635457097465 -123.02366088433047</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:080b207d-19f7-4305-8b73-5acfb0d8c758</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.262464961730956 -123.02368395994766 49.26109699562116 -123.0236940255651</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:fcc7fed9-9496-4f0a-9e1a-9fa487c2e16a</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.26131726012531 -123.03375681542566 49.25815024014207 -123.03377199925741</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:8cfb2f87-fe5f-47ec-920d-8f2e9a0715ef</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.261203675770815 -123.02848745825314 49.26125966797912 -123.02835321192812 49.261297159780185 -123.02809637221914 49.261320597431364 -123.02788953857174 49.26131130632146 -123.02766112211557 49.26127452175601 -123.02532098437268 49.26128666239791 -123.02492054615412</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:2bafec89-43b7-422f-ace6-948d4d02870d</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.26946265899241 -123.0344531350561 49.26945992380871 -123.03369273214106</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:7e38e5b8-43cf-4c4d-b6bc-3ef43a8e84ed</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.26945992380871 -123.03369273214106 49.26946262140069 -123.03096344447113</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:77fa39ab-aaa4-4692-ad28-2a2e4e30185f</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.269469464684164 -123.03642991887985 49.26946265899241 -123.0344531350561</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:8027f858-eca6-4951-8ea8-eaadd8ce812c</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.25813860562698 -123.03031496946434 49.25814857116731 -123.02851766632608</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:5c7f490a-a8b4-4f5e-907b-e235ed360589</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.2581502401421 -123.03377199925741 49.25773908608943 -123.03377496207221</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:c2c9d061-136b-4cce-8587-9d7ccd5fed0c</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.258142387677225 -123.0320010303986 49.25813912490892 -123.03103564421403 49.25813860562698 -123.03031496946434</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:728c431c-dc62-4ea6-841f-796837565b6b</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.2581502401421 -123.03377199925741 49.258142387677225 -123.0320010303986</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:fca9f7b5-6221-4da0-927b-565a86b32103</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.25515083876098 -123.02661646894653 49.25465364699477 -123.02585998581065</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:4750e5e5-348c-4784-a218-d3f4de7d3a73</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.25664849273363 -123.02460790111917 49.255947312442856 -123.02462320524178 49.25582134989645 -123.02471933978028 49.255494721942995 -123.0252309698644</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:1c2922cd-f30c-4285-8d90-f858d786f50e</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.25621345640266 -123.02632527190953 49.256553530297765 -123.02580341034894 49.25664992301145 -123.02580344685462</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:dee6244b-61a5-44bc-8713-768116cad5a5</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.25645620651963 -123.0266944731591 49.256797694848814 -123.02617026231763 49.25679751175687 -123.02602508404614</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:db957960-5b6c-4dde-9531-839a274c5173</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.25679751175687 -123.02602508404614 49.25679775199359 -123.0259968291243 49.25667028817827 -123.02580344372805 49.25664992301145 -123.02580344685462</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:069d0558-74c8-4a1c-89d6-eab63ebfca56</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.25400387728257 -123.03905274500649 49.25400052767793 -123.03653319680484</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:6d7b8405-9f46-471a-b620-7e50e89bf00a</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.25477569481714 -123.03905035809974 49.25474524764806 -123.03891218416564 49.2547388829328 -123.03653085585863</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:47e69eaf-b024-4cd6-8aef-74bc822f343e</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.25477682383567 -123.04158892200437 49.25477569481714 -123.03905035809974</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:5d439375-77de-47b8-b7d3-f8700b819815</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.255586237453315 -123.03904561049711 49.25558491209216 -123.0365245402993</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:2cf0b46e-547e-447b-9bc4-00afeb03ffea</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.25598964369445 -123.03652187055388 49.25558491209216 -123.0365245402993</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:e79ab4e3-6ccf-461a-a3ee-1ff578ef8c45</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.254388074100746 -123.04357502378676 49.2543784871707 -123.04159286113054</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:c5ee8363-79c4-4928-9d41-a648d0f676d9</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.255407245527266 -123.04356371773336 49.25539763973782 -123.0415834244387</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:5d43424d-87f7-4e1a-95c4-53b6d22190b3</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.25483891158237 -123.03050976426317 49.25403372516544 -123.02928322404793</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:42bfaf29-2c3c-4ef7-b872-c5325c672785</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.257266812881994 -123.02974072618531 49.2572667733244 -123.03010187472651 49.256442126254655 -123.03041781101295 49.25632672045498 -123.03040713081086 49.25622449314383 -123.03032608305725 49.25558954574012 -123.02935909541577</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:f95b2a4e-245e-4a95-9ea3-08ebf6f55073</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.25403372516544 -123.02928322404793 49.253736600912504 -123.02883087179697</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:7de6702c-4235-4056-8cea-960ae289a7d6</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.257265043725766 -123.02851612657726 49.25726447726291 -123.0279259392435 49.257174342343944 -123.02778863872526</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:090011a6-df23-4b46-9ccf-0ebbe2f69426</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.253158390759836 -123.0337994301637 49.25315797137438 -123.03304139552046</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:08b9784e-13e7-4ad6-92c3-f03c5668dd0b</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.25473170089933 -123.0337948151235 49.25399762691919 -123.03379889006072</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:b594f626-ec54-44f3-aa3a-42d2de701296</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.25473170089933 -123.0337948151235 49.25399762691919 -123.03379889006072</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:facd2844-8053-43d6-b98c-ec9b3d94ed2b</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.25473119270259 -123.03239733389898 49.25464112555474 -123.03232607698331 49.25434588424994 -123.03232698355176</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:ff8bdbba-343a-44b5-a381-0b70fb189b0a</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.254786427910005 -123.03379445396206 49.25473170089933 -123.0337948151235</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:ff95da60-d5d0-4cde-954b-8e802c9ffab3</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.25177146057109 -123.02765089969492 49.2515969092845 -123.02738229751671 49.25154142940315 -123.02725696020336 49.25152170198271 -123.02710784289636 49.2515207872392 -123.02623868003796</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:43515eb8-785d-4b73-8fbf-bc2a56de2eff</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.25331214410579 -123.02372649517622 49.252418450683564 -123.0237277708111</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:50ee8560-8fd5-48f5-abc3-fae47545170e</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.25420963348097 -123.023724685382 49.25331214410579 -123.02372649517622</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:0b15b284-8aa1-49ed-9543-7dd754ad599e</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.254210265727664 -123.02461530531035 49.25358919048327 -123.02461693408945</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:064d9ec0-6ca5-4630-8f53-d9d36268e89d</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.254525842216 -123.0275746441659 49.25366553870927 -123.0262654316164 49.25360996794589 -123.02613893595381 49.253590886709134 -123.02598997810277 49.25359014065964 -123.02525742785252</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:f3e49216-4e40-4565-867c-2d348c606e9b</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.25148395533836 -123.03456594209538 49.25148570030396 -123.03380631309294</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:56f5333d-82e3-4fb4-93e6-5af7ebd3c848</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.25274166061607 -123.03379793638692 49.25232146594789 -123.03380100244507</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:1226e4aa-9d00-4004-a12a-87dc332060da</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.253158390759836 -123.0337994301637 49.25274166061607 -123.03379793638692</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:6edb5eab-87f6-402a-8b72-d804293fa751</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.25315797137438 -123.03304139552046 49.25315722368248 -123.03260193490605 49.25317647056676 -123.03245243764015 49.2532320691854 -123.0323270807282 49.25350924912141 -123.03190196629998</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:e88b45d2-d25a-4147-ba1b-c6409a0e9c55</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.25399762691919 -123.03379889006072 49.253158390759836 -123.0337994301637</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:8e0c71f2-92b7-4642-b25a-091664786175</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.25148619078453 -123.03653863799616 49.25106701314323 -123.03653938670179</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:6a314121-9607-48ac-a7c6-29926d215d6a</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.25148619078453 -123.03653863799616 49.25148395533836 -123.03456594209538</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:7e2f6559-681d-4a0f-b86e-0000e413628c</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.251489513500104 -123.03905752230743 49.25148619078453 -123.03653863799616</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:91c95f50-807b-4214-8345-cbe1d15cd84c</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.252324195253266 -123.03653685172262 49.252321905895144 -123.03456384756295</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:5d81c1a2-f8db-4e8b-ac84-07b46a653ecb</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.25232743690472 -123.03905617710994 49.252324195253266 -123.03653685172262</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:090542d2-4729-4c15-98e9-d78769abce9f</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.25233063408709 -123.04159640360407 49.25232743690472 -123.03905617710994</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:0189def0-d7c7-4afc-b724-d0e0b0ffecc0</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.25316588181687 -123.03905510712117 49.253162532383726 -123.03653518931752</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:bc0e4e95-dd69-48ba-b038-e413e7d815c7</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.25274347175903 -123.03653607557217 49.252324195253266 -123.03653685172262</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:1505e9c3-e7cd-448c-af73-e95abc063029</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.253162532383726 -123.03653518931752 49.25274347175903 -123.03653607557217</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:ee5c59e3-c0c0-441b-9416-87b532505d7c</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.25231869162113 -123.03105855753975 49.25231776489554 -123.03045112839395 49.25229866201539 -123.03030298350234 49.25224312262378 -123.0301765692681 49.251177484088515 -123.02855457188858 49.251094500714174 -123.02852803110078</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:800560eb-0e9d-410b-9f4f-9e9ac1bc98e3</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.252737977054096 -123.03105788615605 49.25280121360862 -123.03105732119661 49.25286943132372 -123.03103143352318 49.25291745073247 -123.03098703686649 49.25293173008049 -123.03097236971726 49.25344160604433 -123.03019115154767</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:c860c073-24b8-4561-9c9b-ff059dc9b122</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.25061475542802 -123.02996138187012 49.25063112041326 -123.02852941301784</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:3d7acd80-6591-47f7-af2d-9ffb27f57fbd</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.25314466518813 -123.0297389230445 49.25177146057109 -123.02765089969492</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:d7a49649-8343-4574-bf96-a1f1eadf12e1</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.253736600912504 -123.02883087179697 49.25263199045742 -123.02714938698482</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:a54d4eff-7864-447c-90fa-ff79808f2425</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.25063112041326 -123.02852941301784 49.250655958930224 -123.02624106609429</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:c426d2f7-5edb-4209-bf8d-e883a0ae6185</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.25060457336036 -123.03846477908354 49.250600761491796 -123.03713872765454</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:4ce9bef6-5635-484f-813f-74d23c97a067</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.250600761491796 -123.03713872765454 49.25059951432402 -123.03653634843893</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:b7f13092-214c-4c3b-9f33-13ec6d3fd432</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.25106701314323 -123.03653938670179 49.25059951432402 -123.03653634843893</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:19cf5457-acdc-4193-844b-d3fd86292304</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.25059951432402 -123.03653634843893 49.25060093094021 -123.03456352552514</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:3916ae6d-6cba-4c86-87e9-3ed27400a9c3</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.252324195253266 -123.03653685172262 49.25190554843448 -123.03653746343018</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:71aec516-fcf6-4ee6-9d61-b43d2cc60b5a</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.25062405719669 -123.04419720184767 49.25060761125411 -123.04418067047273 49.250520337865595 -123.04409098762677 49.25043410873627 -123.04399898380275 49.25034894183517 -123.04390470024556 49.25026486413225 -123.04380816446667</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:17f1f488-691c-4212-a305-7c5b163b681b</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.25062405719669 -123.04419720184767 49.25060991893042 -123.04159903898328</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:b873df53-8a14-408a-9c02-71a425af8839</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.25060991893042 -123.04159903898328 49.250607481073075 -123.04099550430846</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:f605c043-e490-472a-8f34-a9db02c5e2a4</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.250607481073075 -123.04099550430846 49.250606550312455 -123.03966777850619</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:9dbdf65b-d3b3-414a-ba33-b1fa66653dc1</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.250606550312455 -123.03966777850619 49.25060607158579 -123.03906641659485</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:0c905f8d-eb33-4151-97c3-42e15a4bef6d</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.25060607158579 -123.03906641659485 49.25060457336036 -123.03846477908354</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:c3819305-756a-4bc2-bf45-2461928bec27</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.25060012101491 -123.03380469156389 49.250600221236084 -123.03308561097043</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:e6ed82af-ae17-409d-9e37-858ccc7901d0</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.24965848356763 -123.03308761988234 49.24964678384649 -123.03106792897849</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:426477d5-78bb-4b4d-9908-05cdf89ce37b</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.25060093094021 -123.03456352552514 49.25060012101491 -123.03380469156389</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:149b82d4-01dc-4ccb-958e-70bc15b9250a</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.248781087839546 -123.02853957300607 49.248801572862135 -123.02625130928328</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:276e39c9-348d-4efa-845b-df6174bf9df2</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.24966238681466 -123.03380462841992 49.2487716782413 -123.03380889817022</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:79ece260-5999-47a6-85fb-cfd66d41d29e</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.25148570030396 -123.03380631309294 49.25060012101491 -123.03380469156389</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:f05c3cdf-6eea-4dc9-aa4c-0da34559078e</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.25060012101491 -123.03380469156389 49.24966238681466 -123.03380462841992</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:40e06212-2f85-48a4-8855-1595816c09ff</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.250600221236084 -123.03308561097043 49.250600475681125 -123.03120111440586 49.250602041575206 -123.0310649007811</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:e687686f-7514-4bba-b74c-ebcdf5bbf24b</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.250602041575206 -123.0310649007811 49.25061475542802 -123.02996138187012</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:dd6e1a54-60ad-4144-a7bb-1cd94ba5f347</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.25109697123386 -123.02372936353629 49.25063252074992 -123.02372982798191</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:2c470d43-ead4-43b1-97f7-9fde83b8938a</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.25063252074992 -123.02372982798191 49.247898302014136 -123.02374332958179</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:7efb6472-500b-4577-810f-fad7a65f7426</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.24790734729751 -123.02625563053682 49.24790036234393 -123.02447410619367</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:7c967feb-f559-41b1-81f5-d37458034004</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.25151827156736 -123.02372904329721 49.25109697123386 -123.02372936353629</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:87b3c207-1401-4421-88e6-f941564d3b22</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.24790036234393 -123.02447410619367 49.247898302014136 -123.02374332958179</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:bae22b61-fd56-4922-b0b0-a31742a9be05</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.250647727663306 -123.0253577202277 49.25064067294636 -123.02457827107851</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:e1c843ce-f2c5-4756-b103-736ad44badde</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.250655958930224 -123.02624106609429 49.250654559960935 -123.02610302304159 49.250647727663306 -123.0253577202277</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:2b4358d3-7309-413e-8f98-df0d2ea77c70</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.25064067294636 -123.02457827107851 49.25063252074992 -123.02372982798191</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:5d744c45-09f0-4ecd-956b-d1c208de53fb</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.252418450683564 -123.0237277708111 49.25151827156736 -123.02372904329721</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:93525888-21d5-4401-8485-78d5dae4a79e</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.249210861487114 -123.03655505524105 49.24876150309947 -123.03656083800439</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:d7b556a4-5fc5-4d62-9f6e-04e80024ce7d</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.24876150309947 -123.03656083800439 49.24876963431129 -123.03457554794134</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:d92ee3ff-05ac-4f1b-a62c-2edc5c43ad05</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.247899505243794 -123.04338179998096 49.24789393996289 -123.04233164102996</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:bf9517cb-2ca1-4abb-a47d-674a1dd8ce8e</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.249669599332805 -123.04160942016102 49.24877657893626 -123.04161299794478</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:9cd87a00-4cf9-4138-be32-475f8a88df7f</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.24965739534338 -123.03654925654921 49.249210861487114 -123.03655505524105</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:cc85f2e3-46b8-4270-a1b0-e502925f8cbe</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.250103560443165 -123.03654319640631 49.24965739534338 -123.03654925654921</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:bc29d88c-d817-464a-8645-e2c5097951c9</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.25059951432402 -123.03653634843893 49.250103560443165 -123.03654319640631</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:dbf5ae1d-0ed4-420e-b4ec-ca6ca87a8eea</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.25026486413225 -123.04380816446667 49.250256340715 -123.0437974664952 49.25023630922345 -123.04377142349783 49.25021658377156 -123.0437448311559 49.2501971553483 -123.0437177306843 49.25017805094396 -123.04369010836609 49.25015925255755 -123.04366199166715 49.25014078717942 -123.04363336687054 49.2501226458036 -123.04360426144999 49.25010484642024 -123.04357467542128 49.250087389023804 -123.04354462252526 49.25007026461867 -123.04351410275379 49.250053500184976 -123.0434831298714 49.250037095717204 -123.0434517176186 49.250035603611025 -123.04344878950783</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:a18bf4cd-7096-4217-905a-2ca5014b726f</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.24965739534338 -123.03654925654921 49.2496626461398 -123.03456978210912</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:d1098610-feba-4706-b929-4b94067e9e30</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.247029524416064 -123.02624006479579 49.24702427945118 -123.02448142254231</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:a3ad0121-1330-4aed-b413-1bbe6783bca6</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.24747162393078 -123.02854592190474 49.247072379316876 -123.02854734054381</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:288b2ba1-1da4-4692-9231-16287bb4bd17</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.247035839383784 -123.02788980464624 49.247029591442015 -123.02626178779735</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:42a9568b-a294-4bab-afa5-2b306b8e6952</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.24788832845661 -123.02854368889427 49.24747162393078 -123.02854592190474</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:fb8beba5-8a25-4e6e-94da-35a133ab77d9</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.24788832845661 -123.02854368889427 49.24790734729751 -123.02625563053682</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:9db74bcd-fe39-4d1c-927a-4c7873974bc3</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.244512258660905 -123.02495962789352 49.244510446661224 -123.0245160118987</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:1f26effb-ff89-4722-a697-5ce223dd043d</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.24451429118383 -123.02545616788913 49.244512258660905 -123.02495962789352</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:23c6234a-15bb-429f-b133-4ffff30f2976</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.2470232626346 -123.02375054944015 49.246184347132356 -123.02376183961626</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:10aa72b0-0004-407f-9495-400830fff093</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.24535186003291 -123.02855313600463 49.24452698760865 -123.02855538077304</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:555a797d-f05a-430f-b0de-69fbf2849749</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.244517655036276 -123.02626155478568 49.244516129115226 -123.02584820656318</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:586c0e8d-1417-4927-8eba-3c5f56bc0ed7</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.244516129115226 -123.02584820656318 49.24451429118383 -123.02545616788913</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:169b59f2-5413-4895-b7a8-a435889f5936</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.24619817461186 -123.02789778281377 49.24619474692474 -123.02624937768039</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:b0b55696-cc9a-4d23-8ffb-202bf1158291</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.24620360103259 -123.02855114023572 49.24619817461186 -123.02789778281377</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:e7c79a82-d1f2-49b7-ad59-2a1de2389546</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.24624152047673 -123.02921656676781 49.246245509828555 -123.02855108196096</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:d3d04332-920b-4716-8a11-16f435bb1ad8</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.23682354880458 -123.02780319717039 49.236406847518225 -123.0269148617266</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:250a3cae-e61c-42e2-b2ad-bda9be31f6f9</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.23958718451189 -123.02364191559184 49.2374003685552 -123.02364382534596</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:8098e0e1-8112-4a20-a16d-bdfa92e1bc77</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.24256727310208 -123.02372059135364 49.24247633477748 -123.02370344304927 49.24151263939774 -123.02370144310366</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:3bcb93df-d22a-4d18-b05d-8510952425dd</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.244510446661224 -123.0245160118987 49.24450938257891 -123.02427293537305</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:de745dd1-294d-489a-89c0-be472171dd7f</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.24450938257891 -123.02427293537305 49.24450726241267 -123.02378417188697</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:4c3892d5-feba-47be-b306-3b79b9cae584</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.24450726241267 -123.02378417188697 49.244323646165014 -123.02372358971223 49.243018932759526 -123.02372135724465</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:51f8e413-556d-4e25-a8a2-da7f396129be</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.24331709492321 -123.02701202851676 49.242671307086084 -123.02762843881457 49.24258933705261 -123.02768872008788</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:071f6a34-c7e0-470c-9644-480705f3c9aa</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.244516129115226 -123.02584820656318 49.24403056063119 -123.02631198032621</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:418ea170-6398-4e7f-bb1e-f17d17269d1d</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.24403056063119 -123.02631198032621 49.24331709492321 -123.02701202851676</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:9c533ff1-c84b-40a3-b04b-f06887b41358</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.24626434255313 -123.03382776843969 49.2462551416603 -123.0331093628835</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:9ce29857-b22b-4c5a-92ba-d1f3c7a8e5b2</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.247104010514136 -123.03455994409305 49.2471020078834 -123.03381927227781</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:ceee69e8-7f1b-4210-803a-b3e6c3cc45cd</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.24709330162409 -123.03310104726104 49.247067875970004 -123.03107930892638</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:cb00c70f-0d86-4719-a141-014dffa9f4b9</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.2471020078834 -123.03381927227781 49.24709330162409 -123.03310104726104</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:82ae78c0-e28b-4287-9c60-9a2ca9f4328d</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.24626482645158 -123.03456337041735 49.24626434255313 -123.03382776843969</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:241adc6b-a210-4feb-b42f-87d74bdb226b</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.247876193257355 -123.03381250498131 49.2471020078834 -123.03381927227781</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:c74095ff-717c-44a2-ad63-72bf5a913c40</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.247858467367195 -123.03107668612435 49.24788832845661 -123.02854368889427</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:3e7f8d14-d62b-4ea4-99d9-f507ee95287f</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.24787171452331 -123.03309494483375 49.247858467367195 -123.03107668612435</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:aee37d53-fcb4-4748-9908-18cc0414513d</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.2487716782413 -123.03380889817022 49.247876193257355 -123.03381250498131</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:730981e9-f25a-434f-aaf0-101f5d9d2bca</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.24006155346325 -123.03011596649567 49.23858041393984 -123.03153552752305</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:956915eb-4a00-4cb4-8087-be7f96788a0c</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.24626434255313 -123.03382776843969 49.245369845200855 -123.03383633540474</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:278b18b8-9dd7-4c4e-8284-c78dee2b84db</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.239036843085984 -123.03372746418148 49.23890341963076 -123.03340764065018</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:dc406485-87d1-4e93-ba4d-2daab688f3c0</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.244562515105486 -123.034562003644 49.24455762327443 -123.0339805517545</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:2213cc45-d35e-42a2-81f6-312949eb5662</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.245370689313376 -123.03457039925541 49.245369845200855 -123.03383633540474</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:7c504252-73f9-4413-9545-3c117cdd310e</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.23943082180685 -123.03468240719981 49.239036843085984 -123.03372746418148</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:981253c3-9bdc-40ae-aefb-7100e4309876</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.24536057257248 -123.03311732449625 49.2453359309759 -123.03109116455803 49.245347982685075 -123.02920250611523</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:21a6b12a-d8a5-4121-beb3-d2444d33c6f6</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.24204884906911 -123.03495527635933 49.241235772640664 -123.03298671659866</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:7cc10804-1330-413a-86aa-46efdb46345f</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.2462551416603 -123.0331093628835 49.246229590400304 -123.03108694421782 49.24624152047673 -123.02921656676781</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:bc4b0da5-4dd4-49d0-842f-2560e2c8da26</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.23775614655969 -123.02955168674518 49.23772587580564 -123.02941759131458 49.23765935213626 -123.02925558765868 49.23757762510138 -123.02909824622228 49.23729918172927 -123.02861233111558</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:75811b70-875a-44a1-88be-51c3b497a36b</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.23543796953328 -123.03461570796692 49.23480953616834 -123.03523496927836</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:c6920d53-d811-43cc-8cad-1dd3d1f9d15d</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.238256391092364 -123.03184954095418 49.238002786444014 -123.032115761986 49.23746820087996 -123.03262295602883</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:65f7e21d-9fe0-4013-8f63-6bec1da16f26</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.235796787288194 -123.03426260441354 49.23543796953328 -123.03461570796692</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:cefd760a-d553-439b-b544-693d2c93dc24</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.23644805094031 -123.03362385475643 49.236118758525976 -123.03394313988504</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:39a1d558-59ee-4210-a259-bfedef4b3e40</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.236118758525976 -123.03394313988504 49.235796787288194 -123.03426260441354</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:21821eac-0c71-4a96-be59-42d4e291174d</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.237967946770596 -123.03004691270456 49.23775614655969 -123.02955168674518</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:c9e4d990-2a3a-4acf-97e8-c7d4196d98eb</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.23890341963076 -123.03340764065018 49.23848002372259 -123.03239274758806</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:45179d1b-661c-4e88-925c-6907632fff0a</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.23858041393984 -123.03153552752305 49.238256391092364 -123.03184954095418</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:7d343580-e2d8-4c50-b07a-6266ab51d280</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.2471098252436 -123.03656394656248 49.247019734090685 -123.03663312970704 49.246691444046064 -123.03663351886978</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:96882ab2-2d5b-46f5-ae25-99ed7fb4bab8</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.24747491973764 -123.03910289943259 49.247057009668595 -123.03910496017207</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:049b6518-0a33-45d1-b4bd-0591f1000f37</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.247070412146826 -123.04162909635093 49.247057009668595 -123.03910496017207</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:b016eaea-d922-4064-89d7-10824346aded</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.24789164223435 -123.03910134611209 49.24747491973764 -123.03910289943259</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:21cd77d9-143a-4870-8c24-54dea4ec2404</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.247890384539915 -123.04162001641076 49.24749954989093 -123.04162264202623</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:98f61f24-1124-4a08-9e2f-565ad5bc3ade</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.247890384539915 -123.04162001641076 49.24788569968297 -123.04101170393372</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:bf38a3a6-08da-4502-88c6-386336eef848</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.24877657893626 -123.04161299794478 49.247890384539915 -123.04162001641076</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:f40ec981-3689-45a2-b569-c0e57232885c</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.24789393996289 -123.04233164102996 49.247890384539915 -123.04162001641076</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:ffee2677-cd3b-44b3-890f-e855b93425fe</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.24788569968297 -123.04101170393372 49.247889755973546 -123.03969996632932</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:d6507eb4-e6cd-41ff-95da-daa635d2a566</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.244570392163524 -123.03664340836951 49.24456601321006 -123.03548526178751</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:82b098de-4ec8-4f1d-a11c-24cfcefba1b5</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.24457088065182 -123.03694546799856 49.244570392163524 -123.03664340836951</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:da2c60d0-c114-450c-aab1-ea5f3ab050ba</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.24457440284476 -123.03911614823278 49.24457088065182 -123.03694546799856</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:a381fa9f-f530-4877-b7a0-230f775d7896</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.24627268891311 -123.03663400597857 49.24582540049337 -123.0366356948034</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:de0a4b81-b545-4b67-9c42-0b47305874f8</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.24458098818113 -123.04034313121356 49.24457440284476 -123.03911614823278</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:ab613e51-d592-4898-b012-36fccb32fdc8</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.24538138598021 -123.03663840274957 49.245370689313376 -123.03457039925541</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:00fe4f3b-61d9-45bd-9fdb-a803cc329467</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.24625459222699 -123.04383535240709 49.246242974695804 -123.04163511948654</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:bcca3ea8-ce0a-49ec-8f76-538ea8bc8e7d</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.24627268891311 -123.03663400597857 49.24626482645158 -123.03456337041735</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:b8874ddc-2373-4f2d-8cff-87159c43bd05</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.246691444046064 -123.03663351886978 49.24627268891311 -123.03663400597857</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:3a988fb3-603e-489f-a168-49f68153c0d2</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.23580693671647 -123.04078930276677 49.23576961870339 -123.04037026932062 49.23576311342143 -123.04029789807498 49.2357557894598 -123.04022571850001 49.23574763782369 -123.04015373059192 49.235738649499126 -123.04008198929445 49.23572886047231 -123.04001048090329 49.23571824373889 -123.0399392603475 49.235706826289885 -123.03986831391535 49.235694599111696 -123.0397976965503 49.235681562200085 -123.03972742199241 49.23566772455098 -123.03965749025214 49.23565308615085 -123.03958794254311 49.235638958365314 -123.0395244532365</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:27a1457d-a6f2-4744-a266-6ce2698edb9c</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.23480953616834 -123.03523496927836 49.234529251821584 -123.0355038826546</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:6195f9f3-e622-4983-bac2-cbe69f2e3c5f</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.23594291744541 -123.04231600102635 49.23580693671647 -123.04078930276677</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:75853839-5b08-4a2b-aff0-73850d0a5ec7</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.23736133597245 -123.04093426154414 49.23708880259818 -123.04119975612626</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:4e028152-03c4-4587-8347-9b798fa060f0</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.23708880259818 -123.04119975612626 49.23594291744541 -123.04231600102635</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:631fb25d-d1de-4106-9893-7df2d5e458f4</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.23843856873191 -123.03988479982202 49.23736133597245 -123.04093426154414</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:f7d3e583-772c-4918-b900-e00067cb3b31</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.242475428533425 -123.03601501391276 49.24204884906911 -123.03495527635933</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:5c7be920-e6a5-41f1-94f9-98f11742e0ea</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.244159783060184 -123.03440269109177 49.242475428533425 -123.03601501391276</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:ba3d8847-fb60-43d4-9dae-8c3755653588</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.24456601321006 -123.03548526178751 49.244562515105486 -123.034562003644</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:ea0aeb9f-1a3a-43bc-9898-01566316f513</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.25660945780896 -123.05500969005767 49.25616284454952 -123.05501137879894</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:072b4e2b-d652-465b-aec7-e60d62743d12</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.25709997683586 -123.0550076652833 49.25660945780896 -123.05500969005767</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:4c386376-ea16-46db-a8e9-4113e46eb3cf</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.257750978297764 -123.05823837694363 49.25676164531194 -123.05826282935831</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:7bb9984c-43f7-4ce8-b6c1-8f9158a33419</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.25828692461391 -123.0582333728568 49.257750978297764 -123.05823837694363</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:59018d77-20d0-40c0-bfac-d1a64cf1bd8e</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.25486183682074 -123.055261676189 49.25490164600785 -123.05366655330593</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:aee308f5-eb17-46c8-adb8-ffedb0e737f5</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.25490164600785 -123.05366655330593 49.25491868303166 -123.05298425747168</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:d2f4fa6c-55d6-46ba-8b93-746b04ac0f2e</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.25540437173865 -123.05298222125447 49.25491868303166 -123.05298425747168</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:8eda978c-fde5-444d-852e-9d91bae97d8d</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.25676164531194 -123.05826282935831 49.25510055781376 -123.05827046636428</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:03bd7a68-f4fe-46b0-b430-1ca2b7848fb7</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.256014405218934 -123.055011955929 49.255715718338536 -123.05501346547346</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:098be443-8635-40a7-9b45-9559274a549b</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.25616284454952 -123.05501137879894 49.256014405218934 -123.055011955929</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:fc518ff0-4a0f-4d6f-a455-1b3f2d2e0dce</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.25660945780896 -123.05500969005767 49.25660745657419 -123.05366080299906</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:b960da7b-773b-4c8c-9f9e-1b0cfe0208a2</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.25828262805621 -123.05597011989458 49.258276775527804 -123.05594461975355 49.25826192162498 -123.05587606595044 49.25824785045046 -123.05580712826338 49.258234570985394 -123.05573783418573 49.25822208322916 -123.05566818371452 49.25821039615653 -123.05559821808609 49.25820599617657 -123.0555635667396 49.25820001195936 -123.05551242188064 49.25819460348541 -123.05546112650491 49.2581897887317 -123.055409708117 49.25818556770466 -123.05535815297202 49.25818192239399 -123.05530650227735 49.2581788797786 -123.0552547698044 49.258176421868 -123.05520295553134 49.25817455765065 -123.0551510732093 49.25817328710684 -123.05509916406588 49.25817260124131 -123.05504722808914 49.25817251803795 -123.05499527904037 49.25817302849495 -123.05494333065076 49.258174132599265 -123.05489141040465 49.25817478195842 -123.05475512069556</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:005a98ff-bd71-400f-ae41-37f3ad434dd5</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.25817478195842 -123.05475512069556 49.25818373398553 -123.05299584719236</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:bec09a3d-c22e-4b76-90b9-fe4121ced6a5</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.25838641234077 -123.04955414240041 49.25819521055669 -123.05077542540637</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:ca9ad650-0bb4-4a73-88e6-a4adf6285425</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.258468761021845 -123.05660806947404 49.25846741353175 -123.05660441224386 49.25844499261049 -123.05654083811173 49.25842330055471 -123.05647667391216 49.25840234634538 -123.05641194713968 49.25838212997482 -123.05634667153522 49.258362669419114 -123.0562808746034 49.258343955682165 -123.05621455633147 49.25832600673351 -123.05614775796697 49.25830882256554 -123.0560804932504 49.258292412166156 -123.05601277593247 49.25828262805621 -123.05597011989458</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:4162cd06-847e-41c3-8800-078f88dd5234</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.259155018881614 -123.0547515735818 49.25915720334905 -123.05299906096533</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:8a5f5dd2-370f-4de0-ad32-c881379fdf9e</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.26008834129976 -123.05660498788315 49.26008937008888 -123.05595179496653</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:78a7d15e-5fd7-4179-81bd-8ec6f75b286e</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.26008834129976 -123.05660498788315 49.25962023911683 -123.05660588185137</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:81af69c5-91aa-4b4d-b4c4-c4fa0987ab24</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.25962023911683 -123.05660588185137 49.25946193225647 -123.05660618181965</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:45f76de2-aba5-45dc-837b-6b17e42dcdc9</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.2603662125758 -123.05660446731747 49.26008834129976 -123.05660498788315</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:2c6a4b34-0833-41c5-add6-13944da4b840</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.252765505663405 -123.05662647504721 49.25235806641166 -123.05662787785552</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:d300f282-c8a5-40f8-9fcb-6e4b8f772ea0</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.25346804260309 -123.05662402183678 49.25277739736623 -123.05662643368284</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:1ae627c6-190b-413a-9635-5a1a65750d87</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.253216900799856 -123.05453867374273 49.25322435615175 -123.05299599340582 49.25322362349405 -123.05219473947128</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:c27fd304-63cd-4a41-aa9d-0ee958d8e489</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.25405114631684 -123.05453478314173 49.25406244354113 -123.05217968319779</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:897b2032-51c5-40c0-a8fc-4a66359b128c</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.26008937008888 -123.05595179496653 49.26009151843016 -123.05475329675247</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:e17e7a03-01ec-4362-802f-e833c852f0aa</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.26038831930384 -123.05959864566289 49.260378016515176 -123.05819336510126</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:f010b499-1ecb-4f91-ba52-cd36433e5da8</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.26039209393417 -123.06012596951084 49.26038831930384 -123.05959864566289</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:334d34e2-c59a-4a91-9e0f-24e8fca3bb4f</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.26173425514662 -123.05816740290152 49.261281881791035 -123.05817606593982</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:05e67277-e25d-4ba4-b477-33e06719c90f</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.26223269336205 -123.05815785923444 49.26173425514662 -123.05816740290152</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:506445a2-92af-444c-98c1-ec1b3b948be7</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.26214932532875 -123.05660107778434 49.26126990807143 -123.05660273835406</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:a5ef9cc4-231b-4b8b-9566-16792414edd6</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.262031448941144 -123.05584978220568 49.262021159933 -123.05558551126747 49.262016741533415 -123.05470337749718</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:f6586c41-1f9e-4de2-9184-dc8cc93f625e</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.26214932532875 -123.05660107778434 49.26208264908891 -123.05624038131353 49.2620327816536 -123.05588404795563 49.262031448941144 -123.05584978220568</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:75eb0055-9c81-4984-90bf-b7acb37431af</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.26297181160018 -123.05659981936839 49.262221071163964 -123.05660093993208 49.26214932532875 -123.05660107778434</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:73d47401-b34f-4a87-9bff-16e020dce1c4</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.25303048433648 -123.062093824172 49.252631935843425 -123.0607006022031</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:b7796d03-70ae-4ab8-a262-070b5d73a039</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.25268362391586 -123.06231971304778 49.25261321155858 -123.06236557621129</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:92780a54-97db-467c-9897-dc7b9b904f59</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.25303048433648 -123.062093824172 49.25268362391586 -123.06231971304778</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:405986cb-8ea9-40c2-b2b7-7da26882acfb</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.25369176270755 -123.06610789701321 49.25288050891561 -123.06612679404225</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:bc2e1097-ce61-479d-82bc-e29160b24f5a</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.25351465119408 -123.06695940582861 49.25288050891561 -123.06612679404225</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:132f42bf-d10f-4589-a9e1-0e73bd523812</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.2536670556249 -123.06438268347198 49.253490175494335 -123.06374663360175</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:6a8ea138-e801-495b-81ff-6000c9151d9c</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.25414389546091 -123.06609736978179 49.2536670556249 -123.06438268347198</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:5342e395-8a0a-4f03-889e-617090e680a9</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.25414389546091 -123.06609736978179 49.25369176270755 -123.06610789701321</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:0e7cc7bd-06f3-43e7-85cd-405c205f3773</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.2542807184075 -123.06794834282424 49.25416564943495 -123.06781417291491 49.25351465119408 -123.06695940582861</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:134956f0-996f-4009-b490-92afd12b9b57</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.25953019930367 -123.06594699357264 49.25952646610895 -123.06529797993734</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:4841f12c-e787-4b0f-ad21-097d599af94e</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.25953538568754 -123.06659668269334 49.25953019930367 -123.06594699357264</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:032b1862-9f41-45f3-af85-bd3282002d41</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.260651052746226 -123.06205642194712 49.26040160603105 -123.06143470020034</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:21dc702a-93d4-427c-b41b-a1bc9f3eb11e</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.263210970669775 -123.062008172512 49.26275780562321 -123.06201671723008</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:fcf2968d-a809-4cb0-bb5f-716118d10468</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.26275780562321 -123.06201671723008 49.262261490098695 -123.06202607360244</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:b1888721-7427-4184-ad96-9e1465aa0c43</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.26229015717084 -123.06589456722607 49.26227584414818 -123.06396063599296</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:bc166346-b0c9-4f47-bfa2-33f8d8ba7b7c</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.259554667592994 -123.06900970892045 49.25953538568754 -123.06659668269334</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:979f99d4-263f-4474-aebc-2075ae40a6fb</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.26040160603105 -123.06143470020034 49.259880450250904 -123.06013584805089</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:a521e7f0-94a8-4bf4-a756-f316121128db</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.26040160603105 -123.06143470020034 49.26039209393417 -123.06012596951084</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:92b8eb6b-3e93-42ef-bc7e-bf38bb685b66</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.25580052478895 -123.06788487749965 49.25469582207867 -123.06793082793804</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:62894002-d4ce-4401-893b-9866485ec8c6</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.2562914965969 -123.06786293052224 49.25583629970632 -123.06788327746563</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:f0cc457d-9de3-4453-8ac7-1e25af6d44c8</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.256816871768336 -123.06599856938095 49.25622345385105 -123.06602050838107</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:7713189e-292e-4206-8750-c11fc58f4a92</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.256816871768336 -123.06599856938095 49.256814881167855 -123.06530673003348</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:0164fea5-190b-43c4-803a-9aaa04620e0f</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.2568413524977 -123.06921856746614 49.2568310449488 -123.06785216756637</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:4eebf793-7825-452f-bd77-878333f21a71</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.25952743810734 -123.06401109609985 49.25951246383704 -123.06207728628912</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:132f1a7c-2fa9-440a-bd87-5cbc57cfddd2</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.2568310449488 -123.06785216756637 49.25682173452816 -123.06664739789298</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:b8443890-3cdc-4b88-8fce-5b75032cf381</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.25682173452816 -123.06664739789298 49.256816871768336 -123.06599856938095</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:11ab67f7-d217-4cb8-bfbc-2083162de568</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.25952646610895 -123.06529797993734 49.25952743810734 -123.06401109609985</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:eb00a697-f36a-4ee7-ba1e-bd489cb7acda</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.24710527342094 -123.04891655320027 49.24709945986285 -123.04708259610867</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:5e7df937-e15f-4b7e-9edb-53e026d09872</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.24710771918558 -123.04963580541988 49.24710527342094 -123.04891655320027</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:5dc30d48-1e14-48f8-9ede-c7ba7d05f3e1</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.24752352442755 -123.05190615065074 49.247523766339725 -123.05176795243355 49.247525959784696 -123.05130728855744</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:1f3e6e43-2bf2-48fd-be6e-3945b3024141</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.247525959784696 -123.05130728855744 49.247529740439006 -123.05042271498398</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:d2374716-7655-46b7-ac0d-f4f16a63901d</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.247529740439006 -123.05042271498398 49.247532888072215 -123.0496349675278</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:5e5b627b-8c2c-4e26-a207-1d7ecd0ef76c</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.24793509143208 -123.05038380312035 49.24793367194127 -123.04963161819175</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:fe44d28c-ff0a-45e1-9eaf-7ff7dabcfab8</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.24793571354854 -123.05190450796684 49.24793509143208 -123.05038380312035</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:6f27b139-b86a-49d4-857c-7eab1c3b0393</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.24882067022071 -123.05458469850961 49.24882947061829 -123.05224332418773</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:b7c7669a-8d1e-4d86-b470-83a435fd9412</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.249715302259034 -123.0545788419046 49.24972372391886 -123.05223926613823</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:625be401-973f-4825-97a0-342fca122f9d</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.244475147236074 -123.06370197121754 49.24356492190606 -123.06180955058649</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:cc184302-acca-475b-ac20-94c59718a882</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.24188574912884 -123.0581278620067 49.24159975230103 -123.0575031797116</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:573f77c6-e723-4040-bc8a-27676690dfdf</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.248112719758126 -123.05856869265477 49.24810675543537 -123.05799908079263</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:bd59f7ad-9d25-4499-bb52-bbd310b20c7d</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.242353158592294 -123.05915782541173 49.24188574912884 -123.0581278620067</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:1486ad24-10fa-4825-9fce-b7564906bcde</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.24811809818158 -123.05908243581675 49.248112719758126 -123.05856869265477</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:718da108-0b71-452e-aa0b-adaae1e32370</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.248132865950055 -123.06049498617256 49.24811809818158 -123.05908243581675</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:60b3599e-6712-46d3-af58-048e0ae4b757</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.248503454303034 -123.06440034447537 49.24849597316992 -123.06269429617241</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:ccb1eb8f-fd02-4dad-a5b6-44a5abe86254</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.24850635052036 -123.06505903684683 49.248503454303034 -123.06440034447537</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:64dc69c3-7022-49e2-816e-253a31853492</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.250008643638125 -123.06043776646483 49.248869326033685 -123.06047251333769</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:4b2c1970-0a11-46f2-8df7-7f3c1f87be97</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.24042842153011 -123.04614876171318 49.23973739091451 -123.04681502875003</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:7e447517-f840-4988-b0f2-3d28ce4b0514</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.24542993814242 -123.04437260911855 49.24541539685251 -123.04165596730635</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:2eb61d1a-0d35-4075-8630-f56906f99c39</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.24626450257733 -123.04436008431524 49.24625641850281 -123.04416537033485 49.24625459222699 -123.04383535240709</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:190f98fb-c4c9-42ad-95f2-9824710ea930</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.247914811645046 -123.04583690975171 49.24790661832267 -123.04433525660778</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:f5ace805-9d4a-4067-b3a4-40ee68daa809</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.24791758119946 -123.04638028476774 49.247914811645046 -123.04583690975171</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:92612277-778e-48c2-8866-6587a0649822</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.24792153688011 -123.04707521608573 49.24791758119946 -123.04638028476774</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:700b108c-1278-4acd-b042-a070c1a115c7</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.249703142539005 -123.04638096804949 49.249692143686104 -123.04433594855136</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:5d22f2a9-dce8-45f4-b8a3-6eeccab15a6d</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.25150841468397 -123.04433529399623 49.25089400676663 -123.04433052528157 49.25088707201547 -123.04432904877588 49.2508733195458 -123.04432584853103 49.250859603199245 -123.04432227731112 49.25084593196567 -123.04431834886563 49.250832305850366 -123.0443140494537 49.250818733843175 -123.04430939282483 49.25080521594941 -123.04430436523816 49.25079176115892 -123.04429898044313 49.25077836946639 -123.04429325218108 49.25076504088227 -123.0442871529701 49.250751784396556 -123.04428069655961 49.250738608999086 -123.04427389669894 49.25072550569453 -123.0442667533803 49.250712492478584 -123.04425925287894 49.25069956935124 -123.04425139519519 49.250686727306544 -123.04424320780319 49.25067398434021 -123.04423467697823 49.25066134944214 -123.04422581646966 49.25064880462699 -123.04421661252053 49.250636376880465 -123.04420706515513 49.25062405719669 -123.04419720184767</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:c1dca35a-1491-418e-8202-049f1fb2dc20</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.25063012400901 -123.04509459179786 49.25062405719669 -123.04419720184767</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:cfe445df-a77d-4c7a-bd1d-dddf0b9f5c02</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.23805302978826 -123.04666410984291 49.237434359885754 -123.0472712401168</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:60c9ab39-369e-4925-b260-b0d334528bd3</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.23875708572814 -123.04438595984065 49.23862212401153 -123.04404933431779</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:b6599b8f-790b-4ef6-8740-ddcd79ef59d1</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.239106779355325 -123.04525778670586 49.238835431124954 -123.04458107853209</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:b6b12ea7-3304-4058-b761-19a6adcf1cb5</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.23885822327156 -123.04587239258971 49.23805302978826 -123.04666410984291</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:8c69987d-dcbc-47f2-8e0a-16359afbfdf0</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.238835431124954 -123.04458107853209 49.23875708572814 -123.04438595984065</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:e032f8d1-c6b8-494b-9d6b-32c30465ee6b</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.23921532935128 -123.0455213091474 49.239106779355325 -123.04525778670586</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:3a711da8-6c83-4da4-a0da-bbff564abac6</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.23931340752077 -123.04576405139544 49.23921532935128 -123.0455213091474</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:26db726f-01b3-4f7b-b4f2-881d858c0e83</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.23950138621839 -123.04622564088281 49.23931340752077 -123.04576405139544</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:024c823d-4d99-4997-84ae-bdddb524d536</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.23973739091451 -123.04681502875003 49.23950138621839 -123.04622564088281</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:9e9731e1-a310-4a8b-81e0-215d74f212a8</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.237434359885754 -123.0472712401168 49.23707420684363 -123.04762508406347</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:4f8195b0-108f-4a82-9dea-0d0a538f83a3</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.23828621887898 -123.05031594617267 49.2376244925247 -123.04889184498558</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:650edaf8-a2fc-4ab0-a4f3-b9f8ac8fbddb</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.23887290748087 -123.05157867085211 49.23828621887898 -123.05031594617267</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:746baefa-fc6e-42d5-84eb-3aab52d4b11e</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.23840194950313 -123.04812535239195 49.2376244925247 -123.04889184498558</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:8ad13de2-fdc3-415c-858d-6f55521e2170</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.241506853868515 -123.05256558401744 49.24038623742328 -123.05365796704702</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:d3d68b3b-3980-4bda-ae28-025f37759d2e</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.2424371108161 -123.0516562148154 49.241506853868515 -123.05256558401744</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:1f4b8f27-adf9-40cb-9fd6-f0edb2b8daf2</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.2446194837743 -123.04892191536462 49.244613098561814 -123.04712239815645</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:0626ce76-6fcb-4adf-a090-ce85ff40cba4</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.24462149800203 -123.04951477025553 49.2446194837743 -123.04892191536462</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:e3ef5b15-c4ce-48c2-b727-e13c901af1bb</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
<georss:line>49.244620567043796 -123.05425171203117 49.244622152199724 -123.05257416671884</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:9ae156af-99b4-4edf-8b00-de2518a7d75a</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.2595909902073 -123.07368565716759 49.2591393082902 -123.07369406909676</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:c03d92d0-5c77-477d-a314-db76693ee9c7</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.25959639950514 -123.07428473091424 49.2595909902073 -123.07368565716759</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:afff9464-ff85-47d5-860e-d51cd31e2f3e</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.25959681715247 -123.07437659313767 49.25959639950514 -123.07428473091424</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:c2a325b8-f201-466f-a8ea-58e25dd03d8c</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.25962215364831 -123.07755517603569 49.25959681715247 -123.07437659313767</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:0a338c7f-f6af-47e8-b283-680bd36fc293</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.2591393082902 -123.07369406909676 49.258687293128816 -123.07370308508395</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:e603987c-46ea-444b-be9f-9395dc47a418</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.25965331328888 -123.08142489223164 49.25962215364831 -123.07755517603569</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:18e25582-e2d8-4907-badd-cfb285b79961</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.25793691851504 -123.08726577670517 49.25789042735701 -123.08712790708809 49.25787594594482 -123.08533089808022</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:2ef85745-9843-4bdd-8eeb-762842e86b02</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.258344039765234 -123.08725668187319 49.25793691851504 -123.08726577670517</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:93e56db2-3a89-4c97-ab5c-65a5d375f88f</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.25879610990066 -123.08724780356192 49.258344039765234 -123.08725668187319</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:36ce058a-e39b-449b-bb09-5889519f592d</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.25785974462721 -123.08339810615162 49.25784456591455 -123.0814617714861</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:896364fb-4dc2-4025-996c-53665797b1f1</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.260121589664294 -123.08334977397186 49.25966913204903 -123.08336017175709</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:507428d3-252b-4c02-8b2e-a9de360f412b</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.25926407335311 -123.08917281647223 49.25881157997091 -123.089182157532</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:9ecd1a5a-96e5-402d-b580-bc5479ee329a</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.25971659387554 -123.08916322791242 49.25926407335311 -123.08917281647223</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:8d114460-c157-4a83-8742-52a106ad7ce0</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.25793691851504 -123.08726577670517 49.25789115732252 -123.08719765426753 49.25754047245542 -123.08720617553435</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:19f9c1e4-02fb-489e-9997-ba2c52068d6d</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.26020105618775 -123.10107497437178 49.25929748924693 -123.10111371348165</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:b859b31a-a7b2-47aa-abbf-0c6b1d6ae561</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.25750287457416 -123.10060598435075 49.25747287737806 -123.09840000638755</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:157520df-0094-44f3-b904-90765a3dfb76</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.259285651766135 -123.10049486426357 49.25931003525599 -123.10042535828248 49.25928013111627 -123.0983385654655</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:8ba3cce7-3f73-47bf-bfbd-8711e157521d</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.25747287737806 -123.09840000638755 49.257466154320184 -123.09787478000058</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:9aa9b25d-516c-46be-93e6-6e8f58e32f99</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.25884515827752 -123.09498439130832 49.257779064158626 -123.09307146341465</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:470a9eba-6f7a-4a0d-bf81-5d9af3390244</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.257779064158626 -123.09307146341465 49.25777652271245 -123.09306625003813 49.25775754780537 -123.09302653832972 49.25773904102212 -123.09298634652649 49.25772099337806 -123.092945660868 49.25770341385683 -123.09290449511346 49.25768630243587 -123.09286287674819 49.25766967710504 -123.09282080580513 49.25765352886867 -123.0927782822667 49.257637866688384 -123.09273534737781 49.25762270855415 -123.0926920011712 49.25760804544822 -123.09264827111501 49.257593877392196 -123.09260412972242 49.25758021333684 -123.09255963198093 49.257567071272035 -123.09251477792311 49.25755443319608 -123.09246958125718 49.25754231708788 -123.09242405575849 49.25753072294714 -123.09237820142584 49.257519650740505 -123.09233205948678 49.25750910947383 -123.09228561621386 49.257499099113744 -123.09223891283452 49.25748962866621 -123.09219193562124 49.25748068910278 -123.0921447257846 49.25747228942927 -123.09209726959706 49.257464438607826 -123.09204960830257 49.25745713663815 -123.0920017418997 49.25745037450292 -123.09195369785597 49.257444170203314 -123.09190546246043 49.25743851471094 -123.09185707692346 49.25743340801486 -123.09180855498637</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:b46aa6a1-a155-4348-99e5-13ee218931ed</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.25707494722235 -123.08745062324512 49.257065248238575 -123.0872154529887</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:865fa40c-c6a7-423a-9272-882f7a8a4bc5</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.25747124484545 -123.08720675445662 49.257065248238575 -123.0872154529887</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:6ebacba1-7546-4dde-b81d-4e3c8ca17e47</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.257119306448914 -123.08854397036465 49.25707494722235 -123.08745062324512</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:1844cc4e-3ca1-423a-be64-2d8999edfc43</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.25714032150381 -123.08905602438881 49.257119306448914 -123.08854397036465</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:27fda46d-ca5d-4169-adc7-43a2dcb21858</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.2571550454478 -123.08941864168355 49.25714032150381 -123.08905602438881</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:74c86c79-1353-4d91-b534-93237ec5055c</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.257466154320184 -123.09787478000058 49.257446909548946 -123.096478530942</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:c845f591-19a3-43a0-8b96-6b6bc5e45b62</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.25653822247145 -123.07427438317511 49.25651049581532 -123.07357677842934</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:9ecd7a01-14ec-4b5c-8f9d-2ef1c9a38fc1</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.25656996168769 -123.07503371309436 49.25653822247145 -123.07427438317511</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:ab26d090-c79e-4895-9e02-286e49a79cd8</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.256603589719674 -123.0758679444621 49.25656996168769 -123.07503371309436</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:be02dc31-7c6a-4479-91e3-d8e0c9ea66c9</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.256975177351705 -123.07591621518658 49.25692564508236 -123.0758958548982 49.25681157700424 -123.07586808459163 49.256696237534754 -123.07585867271405 49.256603589719674 -123.0758679444621</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:55f5a124-a7d9-4f26-9ef8-af107a47d729</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.25776569733054 -123.07694581617669 49.2575265908678 -123.07643790426859 49.257515935872675 -123.07641775442387 49.25743434187592 -123.07629284286753 49.257344652001166 -123.07618164840352 49.25724784596878 -123.07608538188886 49.25714497554955 -123.07600511683295 49.25703718260769 -123.07594170697075 49.25701598661547 -123.0759329890083</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:3bb84bde-e991-4d22-baa1-d94f8cdaa909</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.25776569733054 -123.07694581617669 49.2575265908678 -123.07643790426859 49.257515935872675 -123.07641775442387 49.25743434187592 -123.07629284286753 49.257344652001166 -123.07618164840352 49.25724784596878 -123.07608538188886 49.25714497554955 -123.07600511683295 49.25703718260769 -123.07594170697075 49.25701598661547 -123.0759329890083</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:08d51b69-4b65-4221-a477-a8b964e20f4e</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.26057366005304 -123.08333992510082 49.26025608765241 -123.08334755409928</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:53eca4ee-5274-483e-b86d-bd1e9373f96d</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.26055420773662 -123.08087828646617 49.260526787004665 -123.07753725611747</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:7bb6dd01-514c-4d96-9bb3-10f794ba7a23</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.26046365459101 -123.06979835560973 49.26001226056553 -123.06980728458704</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:f81f1790-76f6-4a56-9a2c-78e38ad97f6c</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.26091673950398 -123.06978971747955 49.26046365459101 -123.06979835560973</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:a4500299-2640-41d3-af0a-5f26d2a359e9</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.26057366005304 -123.08333992510082 49.26055852386423 -123.08140566960572</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:981ef387-c5d8-481b-9bc3-ee89ef1993c4</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.26055852386423 -123.08140566960572 49.26055420773662 -123.08087828646617</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:d532a939-4299-4dc1-9953-cd5490c26e62</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.26322528902048 -123.06394277196792 49.263210970669775 -123.062008172512</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:9430a7fe-c8e7-451d-8982-fe39d9b977b4</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.26323810909753 -123.06587677954536 49.26322528902048 -123.06394277196792</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:11ad1d4d-558b-4c3e-b95f-41f95ba793cb</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.26324307394077 -123.06650573532612 49.26323810909753 -123.06587677954536</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:5e30087c-3a75-4e9a-b5ba-870b07f771e0</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.263258426818055 -123.06855594397722 49.26324307394077 -123.06650573532612</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:501dc73e-f474-4d56-b943-1f5cce1be91e</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.264115905624095 -123.0619925240703 49.26408639765589 -123.05812327052392</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:18c0334a-6037-46e5-b906-6b37623d5da1</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.26412975700953 -123.06392618241742 49.264115905624095 -123.0619925240703</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:60b27f32-4111-47df-8dc6-25641e62aa56</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.2641435949013 -123.06585830242565 49.26412975700953 -123.06392618241742</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:f1fb6ff6-c9a7-4f9c-b041-d9eef7de0511</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.264167062297616 -123.06906463236959 49.2641435949013 -123.06585830242565</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:d5680596-339b-4b3a-8d1f-349b011bd941</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.265936454400304 -123.06389001593186 49.26592070455163 -123.06195610592944</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:3b1e00ba-8fb7-406c-bad5-e64e223f6c48</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.26779247529845 -123.06965535919082 49.26778446364011 -123.06900563986498</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:666f9f9b-df32-47f0-9a30-1b41f277eb25</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.26865996727054 -123.06517743872523 49.26864985795541 -123.06383784822538</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:5ea82dd5-ea2b-4428-8168-e1cd6fe12ac6</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.26866437133771 -123.06577109408676 49.26865996727054 -123.06517743872523</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:9976c65b-e980-4e8a-800a-a162b119dbd4</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.26911698753804 -123.06576247208723 49.26866437133771 -123.06577109408676</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:4591e19b-e837-4b1d-922a-bd015ce8a50d</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.268668694860025 -123.06642134183495 49.26866437133771 -123.06577109408676</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:6a5839f5-ef74-462c-b5fb-63ee0ff673ba</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.26868889642955 -123.06898778050973 49.268668694860025 -123.06642134183495</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:bc947d90-1989-42eb-9ec7-338d0a4bab53</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.26869787070004 -123.06963745807995 49.26868889642955 -123.06898778050973</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:1526b41a-ff21-4d2d-8700-7e65b59fba98</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.26641497164272 -123.06743630084581 49.266411934784486 -123.06705932914385</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:50c8a5ef-a86e-49d4-b99e-d3d05813eaec</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.266428019207495 -123.06913333987076 49.26641497164272 -123.06743630084581</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:11974191-a4df-4089-9751-ac949dd0eb34</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.266841381257905 -123.06387243547128 49.2668267284935 -123.06193858769865</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:5179a7b8-67fc-46c4-a952-ec984fe045a4</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.266841381257905 -123.06387243547128 49.2668267284935 -123.06193858769865</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:51c91742-10fc-43cb-95d7-512d06fa5b39</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.26709025390994 -123.06911980476237 49.267083958322246 -123.06701081077621 49.267144722325526 -123.0667908397188</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:e7dc414c-2981-46db-b088-3365c2bd7f79</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.26779247529845 -123.06965535919082 49.26733850031306 -123.06966416337949</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:aab06b8a-d3db-4f2f-848e-9883fe97f98f</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.26776041563684 -123.06578923279781 49.267749756520146 -123.0643836586195</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:d40af37c-47c3-42de-9507-f1d5499c7d04</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.267764586689964 -123.06643852000478 49.26776041563684 -123.06578923279781</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:be5df2f3-498a-49a5-9165-e40f3de53f27</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.26778446364011 -123.06900563986498 49.267764586689964 -123.06643852000478</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:e17930bd-e5f4-46d1-9c10-e8e0aa2d0ff0</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.259684406934184 -123.08529373365495 49.25968136482982 -123.08490526752638</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:991dc70e-09a9-466c-a030-a7a8ebd2da1c</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.26013674715608 -123.0852841917036 49.259684406934184 -123.08529373365495</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:db9f865a-fcde-4785-9df4-20b34463b4c8</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.260589420123495 -123.08527470513161 49.26013674715608 -123.0852841917036</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:160867c8-ee8f-40f9-a107-bd400d1821b5</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.260589420123495 -123.08527470513161 49.26057366005304 -123.08333992510082</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:fe37a830-3b49-4e60-b5ab-79690017ff0b</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.25968136482982 -123.08490526752638 49.25966913204903 -123.08336017175709</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:01811c93-feeb-4e3e-bf40-7c3c5d00918b</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.26025608765241 -123.08334755409928 49.260121589664294 -123.08334977397186</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:07dad9f1-1434-4a6e-b31f-ca90ec2a70d4</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.262458202634775 -123.08717781373677 49.26244259608046 -123.08523663791357</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:f454cf57-fc2e-42f7-ba54-fc04e3e88fa9</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.265979515472054 -123.06969239352023 49.26577100433326 -123.06969633338028</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:a32e4243-8700-48cf-93e3-caa72151771b</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.26688474088576 -123.0696734488081 49.26643238518594 -123.0696818838325</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:8d05cd45-d386-4cea-8a28-260048c922a3</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.26643238518594 -123.0696818838325 49.265979515472054 -123.06969239352023</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:672dc407-86d7-4cf0-86d8-58ad8aa931cd</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.26417192682112 -123.06972673879854 49.264167062297616 -123.06906463236959</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:5ce17a7c-8909-4114-82d3-504d58588d80</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.26643238518594 -123.0696818838325 49.266428019207495 -123.06913333987076</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:53f6d3ac-8259-42f4-a05a-19d450f28d43</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.26733850031306 -123.06966416337949 49.26709406181598 -123.06966907004929</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:4b71068b-7fd6-4134-a12a-1501dcbdc173</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.26709406181598 -123.06966907004929 49.26688474088576 -123.0696734488081</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:8eec8d3a-ccdb-4e7d-96ce-fd1a04f9d1db</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.26709406181598 -123.06966907004929 49.26709025390994 -123.06911980476237</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:f604f33d-7c6b-48bb-9b79-760fde4c1597</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.261369581510195 -123.06978107885315 49.26091673950398 -123.06978971747955</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:4e33934e-3550-497c-b28b-724dc60d319f</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.26149384845942 -123.08525570241443 49.261478222831784 -123.08332114839503</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:7898afc2-6183-48dc-87f9-1af799b327e7</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.26180827397275 -123.06977251633357 49.261369581510195 -123.06978107885315</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:c80d9abb-ceb9-4bfe-a0f4-e2a1db6ba667</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.261430889683794 -123.07751905985212 49.26140054371646 -123.07364933208568</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:3b9ea854-e3c7-4a88-9b90-7520fd86e79f</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.26185251416658 -123.0736395591472 49.26140054371646 -123.07364933208568</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:f6a0fddc-0550-4e23-a419-dfa562f945e2</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.261961385136004 -123.08718205140596 49.26150952169738 -123.08719152220505</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:20b897d4-5b0a-4e1a-abd5-d0df25cf3180</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.26231945954066 -123.06976268143178 49.26180827397275 -123.06977251633357</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:b77d9d16-2add-43e2-9ad3-e801e334b751</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.262350161566616 -123.07363084358012 49.26185251416658 -123.0736395591472</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:38c0441e-aa89-4c4c-bb6a-89d9cb24d2fb</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.262458202634775 -123.08717781373677 49.261961385136004 -123.08718205140596</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:459ccb15-8fee-4d0f-a134-b54f68731b89</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.25682173452816 -123.06664739789298 49.256816871768336 -123.06599856938095</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:359c80c5-9951-4e7b-8a54-bdfe7f845b04</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.25487893658203 -123.06607148523602 49.25414389546091 -123.06609736978179</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:8745ab10-b18e-4e0e-a94b-ae827d16b897</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.25208335434223 -123.0646611824668 49.2520784591604 -123.06466436408238 49.252071719290086 -123.064668738791 49.25198108681906 -123.06479112490975 49.25188497529166 -123.06521846551028</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:b9c0defa-c24a-42be-9c1e-adcf04cc93d3</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.25139523243061 -123.06503926682993 49.251196445157234 -123.06431947659638</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:fac5bdeb-235d-4115-9ccf-c2de323c1054</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.252659644413626 -123.06428655642671 49.25208335434223 -123.0646611824668</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:adf3e59b-5eb5-4663-abce-3c6428dc9b5f</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.2568310449488 -123.06785216756637 49.25682173452816 -123.06664739789298</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:e90841a2-3828-4c1f-812e-e464eff9b3da</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.25859826191089 -123.06209510535284 49.258583992997586 -123.06016164938714</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:6a8d4e58-4958-489c-9e1e-9468fed13df8</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.25953538568754 -123.06659668269334 49.25953019930367 -123.06594699357264</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:67acf740-7711-4e2a-80da-4d69376ea8d8</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.25955568027504 -123.06916645488967 49.259554667592994 -123.06900970892045</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:fd5f4b87-2149-44a0-a927-25cd31a0378d</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.259554667592994 -123.06900970892045 49.25953538568754 -123.06659668269334</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:76ee5367-166b-48f4-a61e-7f256015c2eb</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.25956127169499 -123.06981554054606 49.25955568027504 -123.06916645488967</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:216017bc-dde3-4616-96a0-2f248f777e92</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.26001226056553 -123.06980728458704 49.25956127169499 -123.06981554054606</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:f3806955-2f3b-4795-81e0-9a7a98c7317e</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.24765235930661 -123.06991347821838 49.24737560870858 -123.06991902318869</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:9b7edc27-8f12-4e0b-ab16-45abee6dfcfc</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.24801399860266 -123.06990672023122 49.24765235930661 -123.06991347821838</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:bedb23d6-3f77-4707-8e79-adb842a833ab</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.24910577173185 -123.0698847652773 49.24801399860266 -123.06990672023122</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:5f22504a-18b7-4f46-a4d0-8a6e11ed3b83</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.25029460076689 -123.0657754062736 49.248034112693944 -123.06583239350142</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:e5da18af-130c-4686-a65e-ec8da62f74e9</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.25034580560083 -123.06986009176771 49.24997816625276 -123.06986748774803</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:b2a2e512-88b5-408f-9e84-954552ca23f8</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.25139523243061 -123.06503926682993 49.25128435449864 -123.06501228460988 49.25100968877797 -123.06499017173944 49.250286255313284 -123.0650088304099</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:218e1724-a8f4-47b1-8760-d90a9585af06</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.251014234493425 -123.06365974840722 49.25070922497025 -123.06255540118279</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:9521b80e-078b-491d-a927-e815297d9c91</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.24997816625276 -123.06986748774803 49.24910577173185 -123.0698847652773</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:a5d4d84a-85f7-4a57-a201-729b2309ac59</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.251196445157234 -123.06431947659638 49.251014234493425 -123.06365974840722</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:696856a7-b340-440e-88f2-3913c9dea076</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.25250603656852 -123.07014052675822 49.252504752322636 -123.07004815432535</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:95a8c19f-f15a-4aa1-9575-a46f3fb934bf</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.252504752322636 -123.07004815432535 49.25249483887228 -123.06937850158181</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:59be7121-98e5-4b32-a9e4-68993194c068</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.25430161080939 -123.0693170370571 49.25249483887228 -123.06937850158181</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:17860537-36a8-4fe0-9c9e-cddaee43f8c8</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.2542807184075 -123.06794834282424 49.25247242780327 -123.06802373413278</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:0e613970-f097-4e9d-a1c7-b3b418db81ac</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.2542807184075 -123.06794834282424 49.25416564943495 -123.06781417291491 49.25351465119408 -123.06695940582861</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:1f0ff6a6-a037-48c8-a4b1-8e13e371a12d</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.25351465119408 -123.06695940582861 49.25288050891564 -123.06612679404225</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:639e4439-e91d-4a01-a3a5-c99329d7de3f</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.25085101592251 -123.07199523381058 49.25037405181317 -123.07201174389655</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:4cdcaef7-1db0-4fd7-a753-699925693a7e</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.251177594656866 -123.07198382260518 49.25085101592251 -123.07199523381058</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:4d1c3fe4-1c2a-4a8b-989b-054e9724266d</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.25162966848984 -123.07196799035634 49.251177594656866 -123.07198382260518</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:b54d9d3b-60b4-42ff-8690-e29607233de4</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.25253221436452 -123.07193717465309 49.25252564463929 -123.0715221842461</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:f5131031-e2df-4488-ac1d-53e7c990bf96</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.25252564463929 -123.0715221842461 49.25251197277274 -123.07055522734048</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:e1313cca-ddb5-4394-81ec-b3357a8b2c65</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.25251197277274 -123.07055522734048 49.25250603656852 -123.07014052675822</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:fc2bcd32-fa1d-4fff-9943-5980e8d14ad8</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.25249483887228 -123.06937850158181 49.25159471410953 -123.06940813058665</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:ccc7bf6d-f428-4c12-99dc-aeb25ed1f3b8</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.25036204618755 -123.0710918665145 49.25035053810856 -123.0702145322346</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:8b5ed871-4740-4599-8623-c4965822ba77</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.25035053810856 -123.0702145322346 49.25034580560083 -123.06986009176771</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:3f4c867d-1fa0-467e-887b-152a1c1dcfe1</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.27907136185135 -123.03281933473542 49.27907083112919 -123.03201781385884</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:ac5c89ae-2a79-4b76-8990-a023b2350563</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.28019954826297 -123.02832356295328 49.28019740059898 -123.02569748657214</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:c3e91974-f6ad-4745-ba2c-74816566e776</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.28020097808684 -123.0343304921929 49.28020014611769 -123.0335802374133</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:77d68112-b948-4317-bf28-faca73697bd4</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.28020221751066 -123.03543924471138 49.28020097808684 -123.0343304921929</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:e2537675-e7eb-404f-9c4f-de6fdc2c5048</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.28020292535436 -123.03620262997994 49.28020221751066 -123.03543924471138</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:44161e0b-f4fa-4205-80dc-ca4c792c64f4</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.278256557154265 -123.03358206630732 49.27784998374605 -123.03358278016314</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:4064e0f9-cf72-47b5-a99d-453d333bf705</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.27824878911275 -123.02832998013642 49.278250635595924 -123.02570329447285</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:e683f1a2-7976-42d3-8db7-efbc079e1128</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.27866036384481 -123.02832899223291 49.27824878911275 -123.02832998013642</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:e2742968-9c5c-44a9-8bd3-42521a75ada6</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.27825036344967 -123.02908952726905 49.27824878911275 -123.02832998013642</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:ed1060a9-b864-4628-b2c8-a12234a90539</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.27825279585383 -123.03019710925713 49.27825036344967 -123.02908952726905</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:aee5fef8-8af6-4c30-ae80-609b3f525682</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.27825431229809 -123.03085817462097 49.27825279585383 -123.03019710925713</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:db67ffb9-1d05-4189-8b04-bb3bf26cbf8c</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.27826163110751 -123.03883320339467 49.278258382205024 -123.03620652742003</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:64b4e35f-a43d-49ec-95cd-786e7f7b1651</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.27906904233586 -123.0283270402316 49.27866036384481 -123.02832899223291</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:61c87657-1123-48e0-a22a-14c1e206dfe1</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.27906961405256 -123.03358022603706 49.27907136185135 -123.03281933473542</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:d7acbbf9-445b-477d-b98d-de6c4f831413</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.27413584175528 -123.03635779868921 49.27413314126184 -123.03363172764169</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:30938e1f-6435-4ff1-8bbe-10b0ab4bc949</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.270417467034804 -123.03894312165853 49.27041346082956 -123.03641564401583</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:5260cb4f-6799-4e2a-b91c-c1becab7baf8</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.27495838084414 -123.03362089179787 49.27494851181828 -123.03138716122264</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:294e956c-4522-4a84-ab32-a454560a271a</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.27641172553473 -123.03957936315912 49.27641199761044 -123.0388839943546</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:14a708f2-8e57-4083-b850-90c9a2af04e3</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.276412611993266 -123.0407299762772 49.27641172553473 -123.03957936315912</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:cb6188e8-eea6-4c27-80f5-7cdecbf0e8c3</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.277842044432674 -123.02833231815171 49.27743425649183 -123.02833380312782</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:953011ba-91e4-41f7-a1b8-ee6a179dad73</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.27641488733232 -123.0413642640636 49.276412611993266 -123.0407299762772</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:cec7536b-fdee-45fe-9992-2ddf822c8ba9</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.27784998374605 -123.03358278016314 49.277442942603585 -123.03358334245827</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:8851a904-3278-4e7a-9329-ce2c6a414969</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.27824878911275 -123.02832998013642 49.277842044432674 -123.02833231815171</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:4977d5f8-2891-4789-b312-e9c7aa594fd1</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.27521088138016 -123.05658242191942 49.274977421648714 -123.05657969402661</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:2875fe47-5e83-4d36-9a52-3529f9f5fc10</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.275656307200535 -123.05657791341673 49.27521088138016 -123.05658242191942</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:d307aa33-f297-47ab-b910-2ac2abefe334</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.27827065771689 -123.04857255108598 49.27826988473117 -123.04746721038815</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:29b37dfd-dbd6-4e7b-9672-0829f124713f</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.278264803572796 -123.04145635999728 49.27826163110751 -123.03883320339467</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:b324c8a5-e0ab-45dc-9484-fa0c79fcd2fd</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.27826988473117 -123.04746721038815 49.27826951985807 -123.04670705854663</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:79335a62-7c99-43f0-9572-30b4b32e17a8</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.278271659872246 -123.04932824902069 49.27827065771689 -123.04857255108598</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:30637002-7420-4571-9333-04d629d6183f</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.27745545566782 -123.04670763718248 49.277454309658026 -123.04408379627628</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:1c72eed4-79ea-4f87-9b95-d48b7e924b78</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.27865008618147 -123.04933048251996 49.278271659872246 -123.04932824902069</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:cafe6934-1593-49cb-9a0a-488fa64af276</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.2790856229214 -123.04933258053411 49.27865008618147 -123.04933048251996</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:20ec0a15-6be2-46f3-8e00-f54750058aac</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.27181910393503 -123.04417805479692 49.27135316813121 -123.04418555687188</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:92b782e7-332a-4739-ae3d-a096942d818e</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.272286056162045 -123.04417053974407 49.27181910393503 -123.04417805479692</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:77218c26-d9ea-4dd2-bda8-636b83690f2c</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.27275860753747 -123.052039809401 49.272292590399076 -123.05204716874805</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:1c362a08-dd73-4fcf-a741-6d047cd4e8b5</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.2722950651025 -123.05412037511933 49.272292590399076 -123.05204716874805</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:fa71929c-a6db-42fe-9513-687d5503cadf</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.272296076956906 -123.05468419704395 49.2722950651025 -123.05412037511933</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:19080827-4448-4421-8575-6bd8be981373</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.27414568974723 -123.05465676689444 49.274143381789315 -123.05201781282014</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:589bffcb-ef25-4a5e-8ddd-6610601de285</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.273269231611096 -123.05203282677131 49.27275860753747 -123.052039809401</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:fd9552b8-3e82-4d43-ba1e-7831bee42881</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.275381623346874 -123.04551707762354 49.27421368939946 -123.0455371604761</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:4dc5726b-14dd-4c67-86c3-c028ffd992c9</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.274977421648714 -123.05657969402661 49.27475165119958 -123.05658021941574</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:c94edd58-342e-436e-96df-d3e6ed7346af</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.26848399883596 -123.05210613262963 49.26848149179594 -123.04948103400184</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:c6bced0b-ab57-4b1e-9112-638633467c80</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.268497571269364 -123.04347548749391 49.26849113803959 -123.04149854937526</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:fb9e2aa6-5055-4db8-8152-490187f5b3de</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.26851793195138 -123.04947959962362 49.268514513712574 -123.04695785452137</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:77f69d76-97ea-4450-b115-2ff47d4b3bd1</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.27088701683576 -123.0441919313914 49.270422699932084 -123.04419984704187</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:fcdfba33-4ee3-49bf-a6ed-6abe0e2af9dd</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.27135316813121 -123.04418555687188 49.27088701683576 -123.0441919313914</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:3aa02b3f-4b92-450a-a259-5e9be0af952f</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.268500900799324 -123.04423046078874 49.268497571269364 -123.04347548749391</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:5768bd2d-069a-400f-9ad1-f09638a2f840</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.271350195837414 -123.04145317748328 49.27134739557832 -123.03892671142583</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:ee5c7025-84b2-456a-bac2-f45feaa75d07</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.27135176450955 -123.04359451322325 49.271350195837414 -123.04145317748328</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:5d3fad8f-04d0-4785-b319-7d268f487a2d</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.27135316813121 -123.04418555687188 49.27135176450955 -123.04359451322325</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:6de7ce2a-b443-4e91-8fdd-0f8d614a7725</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.27476158664743 -123.05791414440094 49.27475749268217 -123.05728489284041</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:c70aee27-7b12-4d7b-85cf-9e9213b4b5de</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.27479197411395 -123.0617835739591 49.27477663007835 -123.05984903024542</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:7a5be0c0-97ec-40a1-bcbc-0fc2b7747030</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.27566651936101 -123.05789821138669 49.275656307200535 -123.05657791341673</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:e72b3db6-b582-4567-b7d7-6f16bc685632</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.27568163587975 -123.05983144171077 49.27566651936101 -123.05789821138669</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:ce8102c5-5c6e-4173-bc50-8c4f9bcb5454</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.275696935033636 -123.06176636445585 49.27568163587975 -123.05983144171077</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:25929086-3acb-48a6-ad93-66dcd4eda77a</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.27658616403022 -123.05981532303011 49.27657148897828 -123.05788014687292</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:1a0f1f9b-6375-4c12-b717-0906fb727f3a</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.27749127986897 -123.05981050573372 49.27747643319603 -123.05787658632192</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:eb9edf05-8da5-4b38-938e-61a824540d8d</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.279122080641116 -123.0617404628203 49.27831773077844 -123.06174194729455</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:d6128a91-c140-4361-8a3e-c9600f8cddf4</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.28117427953768 -123.06170140497193 49.28116350397079 -123.05976625967678</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:278f5548-2869-4c53-a030-612874551478</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.27295076451199 -123.05795156147876 49.27250156648543 -123.05796196421757</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:f43ea782-749f-49a9-9c42-f9ec12cff651</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.27295076451199 -123.05795156147876 49.272945375276265 -123.05730451505882</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:5ef2590d-5e01-4db1-9573-b10102abb78a</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.27297276482457 -123.06053429147488 49.27296686916503 -123.05988563544368</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:3676d6f5-e57d-4b31-84dd-764b9b38858b</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.273887633180294 -123.06180178718849 49.27376055686241 -123.06180419920383</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:17743685-a085-422b-96df-d5bffa4021c2</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.272945375276265 -123.05730451505882 49.27301235789321 -123.05680367099839 49.273073093494276 -123.05658350980558</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:8e5e5e48-e6db-424e-a7e3-b0e78ce63dbd</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.27297760177868 -123.06115392596524 49.27297276482457 -123.06053429147488</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:aa9c0b45-a2d5-40e2-8ea4-b9dfc71bf85d</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.27298319308852 -123.06182012336863 49.27297760177868 -123.06115392596524</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:5ad4f964-1d06-4421-8b2d-e1105de93e81</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.273887633180294 -123.06180178718849 49.273872028331226 -123.05986774593325</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:4ddd8429-822e-45c4-9aff-f69d06596d00</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.27475749268217 -123.05728489284041 49.27475165119958 -123.05658021941574</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:9c0b67b0-500f-431c-bf28-087aa7cfb1d4</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.272066409166854 -123.06055196081074 49.27206109857315 -123.05990276749093</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:05c469d1-93a1-429d-b15b-0bdfd04c52a0</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.27250156648543 -123.05796196421757 49.27204829901743 -123.05796157063541</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:32295f8d-6941-46ca-b552-bcffa5da4df2</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.27123316943303 -123.06185414549815 49.270820375304226 -123.06186297711542</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:6a51327c-130b-494a-aea7-b8d466e14f1e</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.270820375304226 -123.06186297711542 49.270443742609785 -123.06187034169369</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:f973c40c-6b60-435f-87bd-e32a17927faa</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.27206109857315 -123.05990276749093 49.27204829901743 -123.05796157063541</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:2ab7efb6-7969-477b-b1f9-dd996f9d16bb</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.26953963520057 -123.06188790602862 49.26952455350113 -123.05995391163313</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:a5240469-ad0d-4515-8161-24cdfa7a6dea</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.272071228004705 -123.0611716526631 49.272066409166854 -123.06055196081074</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:37169cf9-c21a-41c8-82b2-0125eef88808</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.272076837892655 -123.06183655941788 49.272071228004705 -123.0611716526631</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:944837aa-b438-4232-bba2-0785d43c5908</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.27298319308852 -123.06182012336863 49.272076837892655 -123.06183655941788</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:ba40e080-c48f-4734-aeb6-801f9d580af3</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.262904693468414 -123.03101359039852 49.262912482997706 -123.03299563768614</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:1c742d0d-d9b5-4048-b900-0a5ee07e6b41</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.26567355147927 -123.02850018915318 49.2634558150956 -123.02848487870642</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:52ca1717-f255-4ae8-8cea-3128f9b54357</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.26291584365987 -123.033755266903 49.262912482997706 -123.03299563768614</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:b99d2115-2dfa-463b-8f84-b70fcfc0dcf1</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.26472809236819 -123.0345062890097 49.264725816018654 -123.03374682509053</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:78c54b27-67bc-46b8-9f80-ab0216c2170f</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.26846294095506 -123.02365349690257 49.266635457097465 -123.02366088433047</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:1e39f18f-73bf-46c0-83cf-7dff25c26b10</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.268462550011066 -123.03370817698857 49.26846237764636 -123.03098209036553</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:28b32b81-249a-44f2-9be5-c27c28e650f4</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.268470966946865 -123.03644273723026 49.268462550011066 -123.03370817698857</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:590fcc85-dc26-4cf9-b705-8f21db0f89ae</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.25814857116731 -123.02851766632608 49.25817225299028 -123.02621180611212 49.25816341518765 -123.02451121564614</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:ca1b41fa-3403-4fa1-935b-ccd8e486184a</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.25861351671048 -123.0285135226319 49.25814857116731 -123.02851766632608</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:9b22778d-10bf-4b16-8ec3-470e9bf7a16f</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.26131726012531 -123.03375681542566 49.25815024014207 -123.03377199925741</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:a47083d5-eaf6-47c4-9b7f-908e0753d715</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.26011486156858 -123.02369990494773 49.258159246510445 -123.02371089756546</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:3363e6ce-9016-42ab-9014-a4174f102477</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.260102434520974 -123.02849901500595 49.25861351671048 -123.0285135226319</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:634aff40-ceea-471f-bcfb-ad73ec994042</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.260102434520974 -123.02849901500595 49.26011486156858 -123.02369990494773</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:18fb4121-668b-4cc1-b431-c9951f8e92b1</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.260512432396524 -123.03024751223607 49.261203675770815 -123.02848745825314</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:d046bb77-68fb-4bf5-b18e-90a6fd2db9b5</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.261203675770815 -123.02848745825314 49.26125966797912 -123.02835321192812 49.261297159780185 -123.02809637221914 49.261320597431364 -123.02788953857174 49.26131130632146 -123.02766112211557 49.26127452175601 -123.02532098437268 49.26128666239791 -123.02492054615412</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:18ea4e77-203e-4728-965c-be7bae17f17f</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.26189134301694 -123.03375756434897 49.26131726012531 -123.03375681542566</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:13df6e09-5587-4acf-a3e3-0361368f7c13</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.257580194628474 -123.02602368149698 49.257579955977945 -123.02560217150953 49.257560847127024 -123.02545298201679 49.25750518540147 -123.02532720563865 49.25710659494263 -123.02472060004631 49.25702443262011 -123.0246365493338 49.256926858779025 -123.02460725616857 49.25664849273363 -123.02460790111917</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:98a03ff5-2d12-4413-b32b-f904a3bd30fd</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.257174342343944 -123.02778863872526 49.25752825315698 -123.02724676126226 49.2575642556931 -123.02715466215004 49.25758129928968 -123.02704956545489 49.257580194628474 -123.02602368149698</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:e9e31eda-2f63-4b0b-8827-d62d2295e5eb</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.25694962860484 -123.03378025032568 49.256429479326016 -123.03378361960854</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:f6a4d1bb-c7c5-46db-adf2-59af31009d3f</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.25724884599461 -123.03377824192773 49.25694962860484 -123.03378025032568</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:bcf9964f-8613-4c09-8796-966c6af48b31</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.25773908608943 -123.03377496207221 49.25724884599461 -123.03377824192773</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:fa5940d5-bfbe-4d37-9656-d34ca24c225d</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.25815024014207 -123.03377199925741 49.25773908608943 -123.03377496207221</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:2d6b20e0-de03-4c59-8c6c-42745e740b7d</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.25813860562698 -123.03031496946434 49.25814857116731 -123.02851766632608</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:756f6dff-8cb9-4352-81b7-049f3bec7eff</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.258142387677225 -123.0320010303986 49.25813912490892 -123.03103564421403 49.25813860562698 -123.03031496946434</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:699b3159-0e0c-456a-9eba-3b1043202147</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.25815024014207 -123.03377199925741 49.258142387677225 -123.0320010303986</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:cc500a41-1a59-4ce0-8d4b-51b3eac100cd</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.26474401847176 -123.03901543585819 49.2647352736106 -123.03648728235704</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:327416b4-683c-45ec-8a49-63e5b64437d8</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.265702456832884 -123.04154508857427 49.26569374201708 -123.03901195114511</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:7ccf6dfd-f2cd-4439-a449-f2f2ab01f67d</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.26665473041254 -123.03899952689163 49.266644384495834 -123.03646996877228</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:87ce922a-857f-4949-be64-0ede6c1d70d9</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.26668255867537 -123.04698496773135 49.26666595517665 -123.04542885494865</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:dbe1f933-6b9a-429a-a514-d20edbadb18a</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.2675675325068 -123.03898373773505 49.2675571493827 -123.03645696454448</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:da68c3cc-5827-4975-a48c-045820af48ef</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.266674061923226 -123.04500984545672 49.2666703221868 -123.04425884456488</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:acb8d550-cb46-41e4-bf09-df831de50cc0</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.26667756576319 -123.0546934649434 49.26667645492972 -123.05213457919308</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:9dc983c4-238e-4923-94bc-e888dc7c5a91</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.26666595517665 -123.04542885494865 49.266674061923226 -123.04500984545672</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:66147793-7446-4046-b270-c5cf43ac1268</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.267580542046886 -123.05211977917622 49.267577541072086 -123.04949354585348</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:7f5a621e-743d-4c0b-9323-986d68d4d349</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.25817082439218 -123.04428139638524 49.25816536104358 -123.04353251581075</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:d4ee5e1c-d216-4e65-bc49-87206bf0b363</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.262016741533415 -123.05470337749718 49.26201580473625 -123.05300793598103</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:2b06e0f0-b8af-42d9-bc2c-cbc9e8b198dc</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.2647352736106 -123.03648728235704 49.26472809236819 -123.0345062890097</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:0e632f85-d669-4f1c-a2fe-dcb478e127ec</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.26387554859798 -123.05469946702819 49.26387442272801 -123.05217422197147</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:1dcae213-bd93-4e67-a914-b66588a04d11</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.26296992122997 -123.05218904699089 49.26296893440485 -123.0495683519754</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:d46a0c34-26c7-472f-b4df-6c8a4b5b5caa</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.26293475320554 -123.03903315544925 49.26292553220955 -123.03650431059053</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:017d515b-fb95-4ca6-ac74-af0bd44b42f4</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.2629438115969 -123.04156009064855 49.26293475320554 -123.03903315544925</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:05defd3e-2355-4d6b-ba8c-9c20165ac8c3</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.26384873192001 -123.04155241137953 49.26383959253283 -123.03902508629307</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:590715ca-5058-40eb-a034-fcd1f182b1dd</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.26387442272801 -123.05217422197147 49.26387341043542 -123.04954919068666</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:39c193df-2855-4e57-8333-a63d233f57e6</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.257238841512645 -123.04703024591252 49.25722642999233 -123.0450619148356</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:8050c5a6-e861-4119-aa9c-a09a5ecbe86a</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.256394951022656 -123.03651900879478 49.25598964369445 -123.03652187055388</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:760381cb-72e6-4540-b829-ec603daad469</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.25814305089213 -123.04155939909752 49.25813771670343 -123.03903191483629</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:dde8e55d-2cd7-4cf0-9f3a-bd0386d2f7ed</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.25813771670343 -123.03903191483629 49.25814367851049 -123.03650655589954</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:8b222ef6-7850-4464-9b16-1cd318b10f90</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.257207205249415 -123.03903669195567 49.25719645753668 -123.03889869163662 49.257197236009546 -123.03651333396837</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:a018f394-3f13-4754-a5e4-3be92543d984</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.25633437061725 -123.04703526839356 49.25588244090858 -123.04703788980001</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:90d996aa-c4b7-4fc7-9c11-d0072bb09620</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.256786902997476 -123.04703257880122 49.25633437061725 -123.04703526839356</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:053c8d84-b4a5-47a6-a29b-b82e6fc6fee3</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.257238841512645 -123.04703024591252 49.256786902997476 -123.04703257880122</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:1e11704b-bc74-4fca-8f1c-8522da3d15cc</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.25816536104358 -123.04353251581075 49.25814305089213 -123.04155939909752</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:8a430383-302d-455f-9f5f-cf08b2017ca2</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.26173425514662 -123.05816740290152 49.261281881791035 -123.05817606593982</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:24efbdfd-89c3-4aad-9de9-fcf2157a3642</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.26223269336205 -123.05815785923444 49.26173425514662 -123.05816740290152</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:72f473ba-d6b6-4fa6-af08-56a5677dc5b7</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.26499045077506 -123.05810688998157 49.26453883344931 -123.05811521138268</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:68df58e0-d311-4f18-aa8d-225da5806d19</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.26223269336205 -123.05815785923444 49.26222721400845 -123.05742305844184</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:308aaf5a-2809-43ef-9c21-264d81da77b8</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.26222721400845 -123.05742305844184 49.26222409253694 -123.0570055324409 49.26214932532875 -123.05660107778434</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:60ed19de-719a-4e30-928a-0e30745de971</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.266795876130146 -123.05807389032496 49.26678475470092 -123.05659420147038</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:3d8e241a-8288-46cc-9cf3-645f005a2edf</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.26453883344931 -123.05811521138268 49.26408639765589 -123.05812327052392</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:5773f067-955c-4f73-8ae4-585bb12bedcc</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.267715520092594 -123.0599893967598 49.2677008010121 -123.0580581825921</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:9fe68949-5909-4a7f-b09c-5c434aa85b2b</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.26773069200814 -123.0619217810432 49.267715520092594 -123.0599893967598</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:ffe0d720-6f06-49b9-84d0-42812aa8660f</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.257566352692976 -123.0550055861572 49.25755308792324 -123.05488543065121 49.25754042932917 -123.05475763480881 49.25752923695572 -123.05462953830548 49.25751951080193 -123.05450114113015 49.257511250828 -123.05437252572906 49.257504457033235 -123.05424369209094 49.25749913837987 -123.05411470892884 49.257495294854664 -123.05398560371702 49.25749216368362 -123.0538717676858 49.25748983461054 -123.05373507806338 49.257489070561235 -123.0535983489197 49.25748986252134 -123.05346162146094 49.25749221947348 -123.05332492316968 49.25749613239074 -123.05318832273785 49.257501610262466 -123.05305183390522 49.25750558549581 -123.05297483655778</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:fbd3a3c4-c69a-4545-a625-ac305d030669</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.259926281717554 -123.05820201468319 49.2594739981694 -123.05821067720893</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:b3b37d63-e204-408c-a37e-33c6adbc3f6c</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.260378016515176 -123.05819336510126 49.259926281717554 -123.05820201468319</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:22ac4bbc-9b86-447b-a476-6544415ef7d3</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.26008834129976 -123.05660498788315 49.26008937008888 -123.05595179496653</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:be81f93e-4c0a-435f-a06f-a4948066a0e4</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.26008937008888 -123.05595179496653 49.26009151843016 -123.05475329675247</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:396d8ddc-f206-43fc-b0f3-2e8808b6d2d6</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.26009151843016 -123.05475329675247 49.26009405312351 -123.05300211197147</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:c5aadf4f-9348-49a6-903f-a87b7a228508</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.26082985022393 -123.05818471548139 49.260378016515176 -123.05819336510126</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:63aa7f95-f250-4f56-87d2-10eb97c6eb5e</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.26040160603105 -123.06143470020034 49.26039209393417 -123.06012596951084</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:e7d7508c-20dd-40e1-8acf-0a8ba1e327e2</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.261281881791035 -123.05817606593982 49.26082985022393 -123.05818471548139</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:50e724be-d7dd-4904-ad67-2ca4cc28e877</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.25645970404028 -123.05661404493573 49.256238099123834 -123.05581658481735</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:2362e836-915f-4e9f-a157-335754d89bb2</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.256238099123834 -123.05581658481735 49.25622669516247 -123.05577524805048</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:ed6e8e1f-6c6b-4dac-9c41-b037bd6aa705</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.25622669516247 -123.05577524805048 49.256014405218934 -123.055011955929</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:830ea62e-3aaf-43d9-8adb-84f5199a86da</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.25616284454952 -123.05501137879894 49.256014405218934 -123.055011955929</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:ffb17b3d-a88c-4e6d-b766-941ccd8f55d2</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.25660945780896 -123.05500969005767 49.25616284454952 -123.05501137879894</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:83089961-0279-4b51-8037-1b8f0d5efede</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.25674979997555 -123.05661355216591 49.25645970404028 -123.05661404493573</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:17b982a5-9685-481b-a615-0421151b4f52</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.25660945780896 -123.05500969005767 49.256607456574216 -123.05366080299906</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:5e8e2ae8-2d40-4a41-ab22-a66ec66a531f</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.25709997683586 -123.0550076652833 49.25660945780896 -123.05500969005767</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:728b31ab-4fea-496b-98d8-94ac098749a4</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.257566352692976 -123.0550055861572 49.25709997683586 -123.0550076652833</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:387bb0ce-7a76-4a0c-bb42-3d4cae6218b5</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.25350924912141 -123.03190196629998 49.25403902823609 -123.0310892233025 49.25412187003414 -123.0310043086358 49.25421934104111 -123.03097518164886 49.254730359761396 -123.03097378363681</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:eecb7600-d3f1-48f9-b8d1-18c6638db39f</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.254525842216 -123.0275746441659 49.25366553870927 -123.0262654316164 49.25360996794589 -123.02613893595381 49.253590886709134 -123.02598997810277 49.25359014065964 -123.02525742785252</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:4daa169c-32b6-486c-a7df-a997ba9fe4a8</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.25359014065964 -123.02525742785252 49.25358919048327 -123.02461693408945</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:84f46fd6-492c-4b63-9844-6aef0f7f2307</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.25515083876098 -123.02661646894653 49.25465364699477 -123.02585998581065</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:c40cc006-7a3b-4985-b418-b3d6be77b909</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.25557116316435 -123.03378930034901 49.254786427910005 -123.03379445396206</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:b7b81f70-69dd-47a3-8f37-b87607d61784</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.257266812881994 -123.02974072618531 49.2572667733244 -123.03010187472651 49.256442126254655 -123.03041781101295 49.25632672045498 -123.03040713081086 49.25622449314383 -123.03032608305725 49.25558954574012 -123.02935909541577</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:1afc7eb3-890e-4b0b-a8ea-8d767fd193ea</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.25664849273363 -123.02460790111917 49.255947312442856 -123.02462320524178 49.25582134989645 -123.02471933978028 49.255494721942995 -123.0252309698644</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:2e27dbd2-1e65-42f3-a8be-6940b6be24da</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.250647727663306 -123.0253577202277 49.25064067294636 -123.02457827107851</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:c02b341a-cb83-419f-9785-e71fbfed9ab3</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.25231869162113 -123.03105855753975 49.25231776489554 -123.03045112839395 49.25229866201539 -123.03030298350234 49.25224312262378 -123.0301765692681 49.251177484088515 -123.02855457188858 49.251094500714174 -123.02852803110078</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:1f8af6a7-0bcf-4f31-b5cc-b924d60119b1</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.25177146057109 -123.02765089969492 49.2515969092845 -123.02738229751671 49.25154142940315 -123.02725696020336 49.25152170198271 -123.02710784289636 49.2515207872392 -123.02623868003796</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:10d84bab-b774-4cfd-81c7-30f22bfe084f</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.25193997376789 -123.02623794030676 49.2515207872392 -123.02623868003796</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:f9f233c5-5502-4de5-b91a-7e48366972e9</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.25314466518813 -123.0297389230445 49.25177146057109 -123.02765089969492</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:e6d7bd42-fb58-4738-8f87-503b0cb7a4cf</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.252737977054096 -123.03105788615605 49.25231869162113 -123.03105855753975</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:776dcd0d-4f94-4240-862a-ff8b4c9984bf</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.25344160604433 -123.03019115154767 49.25314466518813 -123.0297389230445</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:517a15c9-afe2-41b9-bcc8-9d54c0fe23f7</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.252737977054096 -123.03105788615605 49.25280121360862 -123.03105732119661 49.25286943132372 -123.03103143352318 49.25291745073247 -123.03098703686649 49.25293173008049 -123.03097236971726 49.25344160604433 -123.03019115154767</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:ec2f15bb-8482-4acc-ad89-77c9650faa6f</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.25315797137438 -123.03304139552046 49.25315722368248 -123.03260193490605 49.25317647056676 -123.03245243764015 49.2532320691854 -123.0323270807282 49.25350924912141 -123.03190196629998</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:e310aa0d-72f2-457d-863e-2624eab7fc9b</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.24450938257891 -123.02427293537305 49.24450726241267 -123.02378417188697</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:19e4dc41-634a-4778-a82a-2c6afc4cbd05</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.24307216816416 -123.02495210131605 49.2425728250314 -123.02495011864046</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:240e241e-6225-48a7-9e99-69838f0c6152</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.244512258660905 -123.02495962789352 49.24307216816416 -123.02495210131605</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:bedaef3e-678d-4926-8fd0-786d001f4784</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.244510446661224 -123.0245160118987 49.24450938257891 -123.02427293537305</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:a1c6256e-9a28-4def-ae4f-f2c1faba154c</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.24256727310208 -123.02372059135364 49.24247633477748 -123.02370344304927 49.24151263939774 -123.02370144310366</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:71d3ff91-8d8b-4b86-9c37-b315b96a154c</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.244512258660905 -123.02495962789352 49.244510446661224 -123.0245160118987</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:5ae181c7-eb69-4412-aa4f-0f6c485d83af</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.25064067294636 -123.02457827107851 49.25063252074992 -123.02372982798191</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:557e387f-39d7-463d-b872-25b0e3f7a17a</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.24965848356763 -123.03308761988234 49.24964678384649 -123.03106792897849</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:dcd21328-2c1b-4ccb-a23e-f15edfca277d</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.251094500714174 -123.02852803110078 49.25063112041326 -123.02852941301784</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:89f972e2-e499-4c91-98d4-2fdeeeabff56</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.25403879428413 -123.04704967380128 49.25361634043699 -123.04705546986781</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:1ba1bd7f-22c2-4583-96b5-1560a7a2cf65</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.25598964369445 -123.03652187055388 49.25558491209216 -123.0365245402993</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:e1bc821f-855e-47eb-ba6e-c8b474453985</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.254391896215566 -123.04433387745608 49.254023227304515 -123.04433353354692</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:db6d93e7-dbee-4439-9f1a-92f3cc2a3d5c</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.25542207292227 -123.0456975461002 49.25541837508044 -123.0450813908984</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:39d439b1-ce8b-4f2f-839d-7997f7e91970</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.25542993571128 -123.04703991969367 49.25542207292227 -123.0456975461002</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:826af054-bcac-4587-bb0e-a6f2cd5ec8d0</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.25541837508044 -123.0450813908984 49.255413991424575 -123.04432188878387</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:7e9799d3-8b04-4020-8110-1136408971b7</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.25588244090858 -123.04703788980001 49.25542993571128 -123.04703991969367</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:332d4b22-daa3-4ee0-aebb-44149b82fce3</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.25473170089933 -123.0337948151235 49.25399762691919 -123.03379889006072</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:ae1769b5-25d2-408f-9972-f97c76c20b2f</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.254786427910005 -123.03379445396206 49.25473170089933 -123.0337948151235</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:7666fc81-9d88-45fd-98d3-d286c566a62e</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.23950138621839 -123.04622564088281 49.23931340752077 -123.04576405139544</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:2ad91661-52d0-4a94-abba-c53d57f42df2</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.23973739091451 -123.04681502875003 49.23950138621839 -123.04622564088281</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:c626d251-6628-4955-9ff7-a7c733f7ef5e</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.24042842153011 -123.04614876171318 49.23973739091451 -123.04681502875003</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:8202ba41-d0f2-4b90-a66d-9286c99147ce</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.24966238681466 -123.03380462841992 49.24965848356763 -123.03308761988234</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:41a82a94-acaf-42a9-a040-414a3e15f059</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.25060012101491 -123.03380469156389 49.24966238681466 -123.03380462841992</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:5cbc07a4-bf9d-4a9c-a24a-8650171a939e</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.25361634043699 -123.04705546986781 49.253197017297055 -123.04706027940973</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:85c2826c-3cbc-4607-a2ef-0320d9f7b5d5</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.253158390759836 -123.0337994301637 49.25315797137438 -123.03304139552046</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:13c4d7ee-ed54-406f-bd06-4c799dd051d1</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.25148619078453 -123.03653863799616 49.25106701314323 -123.03653938670179</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:94d78725-b9d5-41e7-8229-8055bc755ab3</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.25106701314323 -123.03653938670179 49.25059951432402 -123.03653634843893</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:298e47b4-e071-473f-98fa-50fd69f6a462</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.235796787288194 -123.03426260441354 49.23543796953328 -123.03461570796692</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:75189884-3de0-4cd0-a4c4-358e5a9a51a0</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.23543796953328 -123.03461570796692 49.23480953616834 -123.03523496927836</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:84130175-1639-411d-acf3-9db581707992</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.23805302978826 -123.04666410984291 49.237434359885754 -123.0472712401168</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:a1296409-ea81-4ef2-b205-16ca4e4e963a</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.23885822327156 -123.04587239258971 49.23805302978826 -123.04666410984291</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:706c42d7-e345-4360-8a8c-a3f890666a94</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.23594291744541 -123.04231600102635 49.23580693671647 -123.04078930276677</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:58e129a0-38a7-4d9a-b1f4-17316004e837</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.239106779355325 -123.04525778670586 49.238835431124954 -123.04458107853209</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:858d9059-01dd-47b7-b8c1-e933c3ddb30a</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.23921532935128 -123.0455213091474 49.23885822327156 -123.04587239258971</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:a3e48747-7730-4eb4-a177-d0c12fbc3e68</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.23921532935128 -123.0455213091474 49.239106779355325 -123.04525778670586</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:ae127cc0-3027-4a48-9f98-1d0f3336c914</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.23931340752077 -123.04576405139544 49.23921532935128 -123.0455213091474</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:fd269188-2807-4380-a953-63eea2d97992</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.25322362349405 -123.05219473947128 49.253221962842844 -123.05017686003622</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:e951986b-f513-4a69-9d67-397a6a25e4ff</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.25405114631684 -123.05453478314173 49.25406244354113 -123.05217968319779</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:395bad02-fa54-4178-b108-df896d92274e</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.25406075534232 -123.05016248412586 49.25406219821619 -123.04954953881065</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:40269d11-4dd3-4e47-b59c-acec7696df3d</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.255444951290116 -123.0495515000722 49.25542993571128 -123.04703991969367</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:cccb426e-f775-4a9e-8653-dc40c138bb02</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.25406244354113 -123.05217968319779 49.25406075534232 -123.05016248412586</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:c3b36dda-38ce-42fc-99a7-9a4b4aeceb75</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.25645970404028 -123.05661404493573 49.2550966217926 -123.05661627886418</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:7d6d2119-c00c-442e-89fe-34e37010ee02</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.25676164531194 -123.05826282935831 49.25510055781376 -123.05827046636428</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:82ee53a6-9385-499c-91cc-07bb122fc24a</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.2544758336679 -123.04955114839396 49.25406219821619 -123.04954953881065</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:3d5d0fca-689d-476a-a581-4a879777e56e</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.256014405218934 -123.055011955929 49.255715718338536 -123.05501346547346</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:506ff3e5-4036-4837-be7e-0ceba6ac2655</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.250008643638125 -123.06043776646483 49.24892584286985 -123.05781969562833</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:7807f735-dad8-4863-bb29-336950bb7095</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.25154491638472 -123.05020745230435 49.25154453979903 -123.04960071988755</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:cbb6928f-ee55-4d92-86de-a0bd1938ccae</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.252382891667594 -123.04958643043034 49.25154453979903 -123.04960071988755</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:1a760c3b-b05e-4072-ad7f-896fed103929</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.25154634355019 -123.05222327065529 49.25154491638472 -123.05020745230435</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:70ec99ad-d182-46c4-abba-fe3d996ede47</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.252631935843425 -123.0607006022031 49.25218051448206 -123.059044176887</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:017b9fee-674d-463e-9aaa-7b91ee9d4ef3</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.25238315140501 -123.05019313177844 49.252382891667594 -123.04958643043034</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:3e21f048-4420-4937-87b2-9762c56d3f10</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.253216900799856 -123.05453867374273 49.25322435615175 -123.05299599340582 49.25322362349405 -123.05219473947128</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:6c2acb7d-f4c1-404c-8933-7c0ebc0c5340</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.25238478569864 -123.05220898447843 49.25238315140501 -123.05019313177844</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:0831b9d7-b30d-4225-84a5-c97e2923392b</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.253221962842844 -123.05017686003622 49.2532216845199 -123.04957134392079</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:1a8693b8-1ed6-4056-aac9-bf090f2fd16e</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.237434359885754 -123.0472712401168 49.23707420684363 -123.04762508406347</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:a67402ef-3657-484c-84c4-4c24e5413276</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.24462192021011 -123.04964185965532 49.24462149800203 -123.04951477025553</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:f1875dd9-1ee1-4e3f-b072-033a8c89d3b4</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.23828621887898 -123.05031594617267 49.2376244925247 -123.04889184498558</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:bc967996-2618-4052-be0e-6f019aa43be4</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.24462149800203 -123.04951477025553 49.2446194837743 -123.04892191536462</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:abab6d17-e037-4f83-ab3a-c87546c3558f</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.23840194950313 -123.04812535239195 49.2376244925247 -123.04889184498558</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:4d76adc0-0329-4cd0-b4bf-26fb43150bd2</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.2446194837743 -123.04892191536462 49.244613098561814 -123.04712239815645</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:7b72f59f-fd9a-4603-844c-378f4b70878f</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.244620567043796 -123.05425171203117 49.244622152199724 -123.05257416671884</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:0e3a0f9d-5f12-4c42-bdee-7445224ca911</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.24462277629863 -123.05034505414416 49.24462192021011 -123.04964185965532</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:32cdffb8-8c1f-4734-a467-4d3f1272247a</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.24462283575576 -123.05104999273456 49.24462277629863 -123.05034505414416</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:bed0069c-6cca-4f8c-afdd-139e12048406</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.27931461354265 -123.06560902109749 49.279140861283 -123.0656114166599</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:ad1d3d8a-1167-41d8-abb5-6b7a793e6434</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.27968371769586 -123.06560031258672 49.27931461354265 -123.06560902109749</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:a880623a-bd5e-4165-bac2-891c744c9f75</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.27967404178972 -123.06366532240112 49.279664450681935 -123.06172983812225</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:db3a2a24-93c8-4a3b-98ad-1002a8ad71b4</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.27976640221206 -123.06559885485784 49.27968371769586 -123.06560031258672</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:baa3dc79-bbec-4003-84ff-f5e458986214</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.27976640221206 -123.06559885485784 49.28027174759836 -123.06558963941282</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:5dffc11f-2add-4a2b-89f9-eadc11a3234c</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.28117690514296 -123.0655741616909 49.28067591404641 -123.06558242077215</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:79804927-fed5-4baf-871d-61e87cac1db6</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.28067591404641 -123.06558242077215 49.28027174759836 -123.06558963941282</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:f7b2b993-474d-4b28-9ddb-2f4f30379836</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.27378139383029 -123.06459252352154 49.273773617709736 -123.06354576922735</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:d0540435-30d3-4f2e-964e-522c61067387</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.27378502749605 -123.06509013086846 49.27378139383029 -123.06459252352154</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:4197cf11-5791-40ff-8d67-482e1a28718c</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.27481632073864 -123.06500321365164 49.274813126075486 -123.0645725067262</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:60f1b563-4011-4fd1-b18d-cdc4f47dd04e</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.27571160844485 -123.06370066894321 49.27525913693847 -123.06370911861353</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:beab7aa0-8971-4b09-9e02-1a6bc630be40</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.27570760745647 -123.06317296126693 49.275696935033636 -123.06176636445585</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:a808c649-9926-4fe1-b9c3-61228108cca3</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.27571160844485 -123.06370066894321 49.27570760745647 -123.06317296126693</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:44c75e73-27c7-4acc-a0a9-3fb0501819bf</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.274813126075486 -123.0645725067262 49.274806620200195 -123.06371796675924</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:d6542c28-8cb4-4e90-a9e2-9d4436eaf030</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.27525913693847 -123.06370911861353 49.274806620200195 -123.06371796675924</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:a5de725f-1a09-43fd-8983-a4b8b0b5235d</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.27872975449512 -123.06561150375484 49.27834601905775 -123.06561327700632</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:165829e7-2411-468a-b5a2-3d900d9af88c</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.270458801505555 -123.06380383647118 49.270443742609785 -123.06187034169369</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:413e83e5-aae9-42ed-bbe2-11c5d0dad9bf</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.27210322266629 -123.0651241001565 49.27209226516217 -123.06377186435081</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:a511ee2a-3c19-4ae6-b140-046cbe0bfaaa</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.27298779257697 -123.0624169924121 49.27298319308852 -123.06182012336863</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:d5bdcfdd-c8fc-4304-8427-7d95517a68e9</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.27209226516217 -123.06377186435081 49.272076837892655 -123.06183655941788</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:2c2b978a-992c-4624-893c-9b80131391b9</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.273007816526956 -123.06508947943566 49.27298779257697 -123.0624169924121</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:6dc648e3-8bac-4483-b57a-1eff7cb7a40e</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.271248579480755 -123.06378752036103 49.27123316943303 -123.06185414549815</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:3cfe174a-3d49-4620-93a4-fa59ea67244c</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.27376484974823 -123.06238598254744 49.27376055679622 -123.0618043229307</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:fed544a8-cb38-4dbc-ad14-f7fc2ab2fa9f</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.27376865434363 -123.06288448336375 49.27376484974823 -123.06238598254744</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:e4f07f8d-3fa0-43c7-9ef2-f0322b3d4abb</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.273773617709736 -123.06354576922735 49.27376865434363 -123.06288448336375</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:27b0803d-3987-4fd8-8832-a9ff6bfb0fd5</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.273926027115095 -123.06694779428689 49.27391779659351 -123.06567809299767</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:62a340a0-d024-4b82-9d51-d40c9d3b58b4</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.274821220962 -123.06565930326168 49.27481632073864 -123.06500321365164</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:5d96ffdc-c877-460b-a8b0-446f0e817c54</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.27663064352498 -123.06561883806468 49.27617824425528 -123.0656266792648</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:58ce92f9-55af-4c83-9d24-da5dc64ad758</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.27617824425528 -123.0656266792648 49.27572615957763 -123.06563487819066</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:3604bb8d-00e4-4227-86f6-b04933162c1b</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.27795627313128 -123.06561801195888 49.27753464301142 -123.06561613276082</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:b5ff6e4f-c996-4f71-9488-0ad81cba51d8</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.27663064352498 -123.06561883806468 49.27661550740831 -123.06368467519006</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:d3bd89e1-5f99-4af0-bcf5-42fb8cb03ce1</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.27834601905775 -123.06561327700632 49.27795627313128 -123.06561801195888</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:15da87d4-3672-4619-adca-d26c3c81238f</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.279140861283 -123.0656114166599 49.27886436590825 -123.06561408837337</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:76f80842-d2bf-4078-81dc-db623b6eaf9e</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.27886436590825 -123.06561408837337 49.27872975449512 -123.06561150375484</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:beb52dd2-0fbb-42e5-99c7-eed124cecf8c</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.271685710197204 -123.06571309856655 49.271263660258285 -123.06572103346913</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:7ec0cde4-ca74-4245-8fe9-bda9e3d38861</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.27210788655316 -123.06570425639931 49.271685710197204 -123.06571309856655</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:1264bb76-ae21-41cf-8276-9b7eb6d6a49d</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.27210788655316 -123.06570425639931 49.27210322266629 -123.0651241001565</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:fe51b3f0-3707-4bf9-90c8-775d233fdeb2</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.27301236245839 -123.06568755877113 49.27255803750046 -123.06569615233593</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:c9d691ca-9b76-405d-87de-6c2419db4f4d</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.27378940750472 -123.06567943476045 49.27301236245839 -123.06568755877113</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:0430e7a3-a86c-4081-afa1-e046c6e4d83d</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.27301236245839 -123.06568755877113 49.273007816526956 -123.06508947943566</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:040884a2-af19-4d7d-990b-e2cf8a8f5417</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.27378940750472 -123.06567943476045 49.27378502749605 -123.06509013086846</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:13732f41-f701-450e-8230-fe4b5f05795b</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.27391779659351 -123.06567809299767 49.27378940750472 -123.06567943476045</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:b36c6265-12ce-40fd-9c6b-ec027ff0c882</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.27255803750046 -123.06569615233593 49.27210788655316 -123.06570425639931</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:2668c7c6-734d-411a-9605-b3890fa3736a</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.2708415017357 -123.06573004033277 49.271263660258285 -123.06572103346913</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:07cb3ecd-86ba-4539-b212-c85086b2f870</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.27048034052709 -123.06702133559473 49.27047731741402 -123.06638374002628</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:a1fb838e-5353-4332-945a-3d0e6af6c836</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.27047731741402 -123.06638374002628 49.27047386545823 -123.06573481682861</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:4ead471d-b373-442f-9fba-847ee7596b11</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.26956824560082 -123.06575354571105 49.26955432506222 -123.06382128252581</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:4a9482e8-1432-46c9-b760-f4ce898cbed9</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.27002244682154 -123.06574151640027 49.26956824560082 -123.06575354571105</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:52e15f3f-d107-4989-aaa3-f7b2143e5fc5</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.26956824560082 -123.06575354571105 49.26911698753804 -123.06576247208723</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:3a25fa32-3a0d-4857-9c9c-c4634af7690c</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.27002244682154 -123.06574151640027 49.27047386545823 -123.06573481682861</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:ae775e9c-1f59-4d23-be62-7e27e11956b6</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.2708415017357 -123.06573004033277 49.27047386545823 -123.06573481682861</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:8ed9d368-3636-47bb-9be1-580cf8613659</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.271263660258285 -123.06572103346913 49.271248579480755 -123.06378752036103</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:6daaf1d0-74ef-4b6b-bacb-f09ed22d65e4</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.275739867928166 -123.06758590122851 49.27572615957763 -123.06563487819066</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:25d86743-4716-45e6-bab0-dd856fda08f9</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.27574891627407 -123.06886695160046 49.275739867928166 -123.06758590122851</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:fc97dcc6-dc00-4abd-ab39-41f34687bcf4</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.279833573257235 -123.07042142330559 49.27947130100779 -123.07043681511705 49.27938009571383 -123.07044200609258</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:292003b0-b73c-463c-b1d0-61f71ddb4520</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.27575213641623 -123.0695131255573 49.27574891627407 -123.06886695160046</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:5c284fd0-7b90-4351-9686-191dcc5e5a1e</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.28025802085469 -123.06829155439354 49.280230791923884 -123.06573320964844 49.28027174759836 -123.06558963941282</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:ac58c5e2-4e4c-41e6-b880-05bb4f39d7d3</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.28028602080491 -123.07040823577839 49.279833573257235 -123.07042142330559</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:77e6179e-7dc4-434f-8b83-8fdf0e636544</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.27935002745849 -123.06831016796359 49.27931461354265 -123.06560902109749</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:e1ec8a7f-9e7d-4d91-b358-dd3d5b10b57d</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.27754008722229 -123.06835882645667 49.27750556496528 -123.06575260285808 49.27753464301142 -123.06561613276082</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:ee14ba1e-f81d-4f04-b1ea-0a0f2681cb93</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.27663478346298 -123.06756611668531 49.27663064352498 -123.06561883806468</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:547132f4-5c51-4779-a4ff-132e9be9f248</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.27303930299354 -123.0695608244746 49.27303014693646 -123.06891357790195</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:89290465-d7d5-4fd9-86d2-feae7008b38d</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.27393013641873 -123.06761463548757 49.27347409465352 -123.0676209270966</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:56ab763c-6f9f-43ec-9d1e-9b97816c068b</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.27393013641873 -123.06761463548757 49.273926027115095 -123.06694779428689</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:1603ab09-30cb-4b05-af26-e86b3d21e7a1</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.27393812845952 -123.0689016314335 49.27393013641873 -123.06761463548757</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:82da2bd3-cff1-4fc3-be4a-f034ba97072b</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.274846524769345 -123.0695335056495 49.27394215546181 -123.06955197585849</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:3a418790-f8e0-408d-be6b-44fe45b9a18d</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.27394215546181 -123.06955197585849 49.27393909926383 -123.06903839281901</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:e011d97f-685e-4cd9-9120-c41892a16ae4</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.27393909926383 -123.06903839281901 49.27393812845952 -123.0689016314335</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:bd671498-b07d-4b7b-aa9a-4be41828261a</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.27484395377351 -123.06888502105674 49.27483398259545 -123.06759804008533</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:1ca1d70d-b1bc-4055-897d-339990457ffb</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.274846524769345 -123.0695335056495 49.27484395377351 -123.06888502105674</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:0f6820c5-8a15-49bc-bd66-821e8769dcbf</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.26959963962048 -123.06962166815636 49.26869787070004 -123.06963745807995</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:57aa0050-9412-445b-8c01-80c6c8d1b319</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.269594102586524 -123.06897004531356 49.26958312371488 -123.06768509649802</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:67828fc6-6a43-4263-b45f-231c572afbdb</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.26959963962048 -123.06962166815636 49.269595145029115 -123.06909216874702</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:6a621394-d462-46f3-862e-648397077a34</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.27212106276832 -123.0676403167812 49.27210788655316 -123.06570425639931</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:114a0bf6-ad38-4854-871e-fe31beaf0762</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.27303930299354 -123.0695608244746 49.27213567375938 -123.06957471683789</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:8824eb55-fa38-4a24-8f7e-3919cfd3d8e2</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.27049081172197 -123.06766817909737 49.27048034052709 -123.06702133559473</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:00da8272-5502-40c1-9957-7aca51173638</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.273024655589495 -123.06762676021391 49.27301236245839 -123.06568755877113</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:7caa5466-1a2c-4a81-b750-3fcb8c57a1a8</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.27347409465352 -123.0676209270966 49.273024655589495 -123.06762676021391</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:54906b44-7e7c-470f-bee0-d686e31b7d85</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.27303014693646 -123.06891357790195 49.273024655589495 -123.06762676021391</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:f6eb306d-1130-4e73-93c0-ac8e612e8584</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.260666866542266 -123.09495396773224 49.260650396481395 -123.09301861668666</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:888bc77f-394a-425c-98c3-2e8173e46b02</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.26111812606388 -123.09494687577758 49.260666866542266 -123.09495396773224</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:53ed8134-8783-4b0d-b231-94a48e0bbcb2</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.26156965638799 -123.09493858848619 49.26147871674891 -123.09494719647107 49.26111812606388 -123.09494687577758</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:b638df8d-59b1-4a2e-87f0-517fc51269c4</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.26110334642851 -123.09301221120494 49.260650396481395 -123.09301861668666</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:7b1ec3ef-a290-46ca-b505-cd9112eb9d9e</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.261540333488426 -123.09107028394136 49.2615251209111 -123.08913461370165</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:f60f9ff6-eb65-4d7c-bc9f-0171c3d31d7c</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.2615251209111 -123.08913461370165 49.26150952169738 -123.08719152220505</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:9ca8f448-c54e-4fef-83ee-e34bdf61c852</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.261556036485786 -123.09300455441476 49.26110334642851 -123.09301221120494</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:0c68f38e-137f-408e-a409-44d8df57ae30</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.261073052222855 -123.089141702272 49.26062105551327 -123.08914872212912</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:898e3ffc-b4a0-4f89-bc68-a8580a7534cf</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.2615251209111 -123.08913461370165 49.261073052222855 -123.089141702272</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:703a3c1c-563a-4302-a16e-74dae71b96eb</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.25971659387554 -123.08916322791242 49.259700574824166 -123.08722881012326</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:ac55b197-0da0-41bb-85b4-40ef29b03ee4</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.260169076344624 -123.08915627789821 49.25971659387554 -123.08916322791242</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:bc78abdf-3b31-412a-99d6-0ac1e51040da</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.26062105551327 -123.08914872212912 49.260169076344624 -123.08915627789821</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:ae530703-a9b3-4515-922f-e001a4b85078</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.259700574824166 -123.08722881012326 49.259684406934184 -123.08529373365495</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:f32409b4-dbe5-489f-9b1d-c8b7e8c8fc6e</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.26201541088088 -123.09493136201647 49.26156965638799 -123.09493858848619</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:221a9331-29b3-4cf9-95b7-ae95f59be12c</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.26252126366933 -123.09492249142306 49.26201541088088 -123.09493136201647</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:7341f0fd-a9ca-472c-8c6b-fb98add89999</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.26200815916809 -123.09299769358644 49.261556036485786 -123.09300455441476</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:bf282c2d-57b5-498e-975b-3f8cdc58b81a</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.261977036825385 -123.08912729108141 49.2615251209111 -123.08913461370165</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:1609b39e-ad14-4b4a-8f96-4c7a6c7ac32c</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.26247371365085 -123.08911893564974 49.261977036825385 -123.08912729108141</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:52f54d16-f58d-496c-87e7-a4b470ce21f3</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.262505808060126 -123.09298896649051 49.26200815916809 -123.09299769358644</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:b1496d06-854b-4272-bbd0-1bd81a615c6c</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.26067697420146 -123.09617557795994 49.26067184837865 -123.09555588727332</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:53a32df1-45b2-4276-851a-175aec102ce2</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.2610564131536 -123.09613953660053 49.26067697420146 -123.09617557795994</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:4ba30bc5-672f-46cc-8218-061b1dadfd54</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.26150796288644 -123.09609721625486 49.26112759786068 -123.09613278917</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:c3d60529-243f-4741-8275-846c5a706ed9</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.26067184837865 -123.09555588727332 49.260666866542266 -123.09495396773224</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:e2ad7bb8-3bec-43e4-a8d9-c433c60bc0d9</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.26199846511983 -123.10032715499278 49.26196842662722 -123.09863878819723</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:97479a81-1c72-4454-a80d-948743d2a071</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.262859263114194 -123.09951399377532 49.26283780132587 -123.09895801681458</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:263bc962-d0a1-41b3-9a35-c55a69f5ce66</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.26283780132587 -123.09895801681458 49.26279120613333 -123.09702775705814</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:6371dd4f-d23b-43d5-a6d9-edefb5037e2c</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.26279120613333 -123.09702775705814 49.26278748763556 -123.09690328053892 49.26278709632629 -123.09688721257669 49.26278667412262 -123.0968758039036 49.26278594410317 -123.09685602429275 49.262785220472125 -123.09683935092778 49.26278427222374 -123.09682236100284 49.262783278098624 -123.09680644305142 49.26278219396187 -123.09679059364655 49.26278098403989 -123.09677456531932 49.26277967509952 -123.09675861926563 49.26277828505064 -123.09674285173128 49.26277678714936 -123.09672697403192 49.26277510996323 -123.0967103537861 49.26277323484598 -123.09669377438782 49.26277148457808 -123.09667848720729 49.26276956319242 -123.09666344709261 49.26276748099511 -123.09664708720375 49.26276512925003 -123.09663035569153 49.26276281258686 -123.09661469631156 49.262760405854806 -123.09659917420105 49.2627578912587 -123.0965835556709 49.262755277724835 -123.09656792320489 49.26275255610881 -123.09655245546227 49.26274973565836 -123.09653685008472 49.26274663688304 -123.09652061192456 49.262743519460656 -123.09650515715977 49.26274070646093 -123.09649139354927 49.26263197533012 -123.09599112084881</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:4833c5b2-f54b-4ef9-9846-bc9f00b8e714</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.261578239413865 -123.09609005461785 49.26156965638799 -123.09493858848619</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:14eb7745-424b-4741-ace9-f78994fe4bdf</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.261105000652435 -123.10103637208277 49.26020105618775 -123.10107497437178</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:00c53f41-a4d8-4a33-a1ce-f8f4780c1ae4</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.260192480638096 -123.10043902335613 49.26017959708548 -123.09830830237881</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:91c1725b-6f7d-4b12-8efa-e46761ea0c72</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.26107966731891 -123.09776706798105 49.25985097545416 -123.09655846321844</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:199f65c5-7821-4dcb-a590-b3f8c8252d88</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.259747849352976 -123.09303433350692 49.25973213833288 -123.0910994739866</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:7dc3294a-a738-4e7d-a661-b518b9a24cb8</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.2601991903272 -123.09302656462611 49.259747849352976 -123.09303433350692</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:4a021d79-a568-41d8-b13b-1d49468180e6</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.260650396481395 -123.09301861668666 49.2601991903272 -123.09302656462611</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:025c7d7b-7f21-4168-95fd-d599c8659021</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.26020105618775 -123.10107497437178 49.260192480638096 -123.10043902335613</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:08d44b1b-e72d-447f-b018-64dbacb058ef</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.25473434630132 -123.08560146630914 49.253847649758 -123.08370092466257</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:8b1ba034-85f6-4b53-90de-734ac3b0ea7a</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.25562212705037 -123.0875017619182 49.25473434630132 -123.08560146630914</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:b9aa5126-c2e5-42cb-92d1-459096f4cbee</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.25625193738804 -123.07835139016439 49.256243899797425 -123.07781287461734</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:edd8b6a7-6061-42b4-bf4b-c754b6ee34e0</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.25627354662251 -123.07974106070735 49.25625193738804 -123.07835139016439</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:55a4cd0c-ebf9-408a-9762-859d53d7b940</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.25395249049734 -123.07596623137229 49.25350040665285 -123.0759830447081</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:ef84dc22-0888-4118-99bc-e2f802107a75</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.25353067388551 -123.07791688162794 49.25350040665285 -123.0759830447081</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:3cc67352-d8d3-4c68-8914-2bfd25706332</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.256213592643434 -123.0758823810864 49.256028367685815 -123.07588916079553</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:b7ce5a3f-25d8-4e2e-9465-b4ebb2647312</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.256028367685815 -123.07588916079553 49.25576114022084 -123.07589914039718</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:5978e938-dcc3-448f-9eaf-d470d035c7fb</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.25576114022084 -123.07589914039718 49.25530906551393 -123.07591596869722</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:bc756ce4-1cf3-4a7e-8916-f6557beb35fd</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.254405015015095 -123.07594950086269 49.25395249049734 -123.07596623137229</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:4d862947-c131-4212-8459-05eeccaa4303</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.25645683952675 -123.07223654444545 49.2564003778277 -123.07088384479972</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:62ae01d3-6853-4793-8eaa-07b43f5e288a</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.25648041738549 -123.07282180922056 49.25645683952675 -123.07223654444545</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:d642cc5b-d82a-47b3-ba0b-796d89a097b3</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.25651049581532 -123.07357677842934 49.25648041738549 -123.07282180922056</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:4c9ea9d6-d9d9-463d-828f-0b5cf276a982</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.25217705549247 -123.07795604425841 49.25177861817397 -123.0779736791045</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:62dee017-576c-4637-b958-074c467b97b0</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.25262620865428 -123.07795054033284 49.25217705549247 -123.07795604425841</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:076aa3ea-aa5d-46d3-913c-414f0fb0a145</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.25262620865428 -123.07795054033284 49.252595951066695 -123.07601657383968</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:4a0b48a1-d03e-4dad-8268-7be4fb0ca691</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.251717893497755 -123.07778377462263 49.2516934513699 -123.07604390743796</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:f5adcbc1-55dc-4a0c-ad70-456e11978b93</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.252595951066695 -123.07601657383968 49.25214452704182 -123.07602839914091</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:d9d0675a-914e-4625-bf04-764e67a6a678</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.25214452704182 -123.07602839914091 49.2516934513699 -123.07604390743796</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:7d44de55-0625-4b0f-969c-7be7e43925fc</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.25206421551317 -123.07989734993012 49.2511781449646 -123.07799594222396</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:a0064e02-31bf-45eb-95ac-fa15288206d4</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.2511781449646 -123.07799594222396 49.25018531977673 -123.076264097348 49.25011314321398 -123.07609868345953</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:8e5fd2b2-7c3e-4003-916e-2d10737b7e76</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.25172058824975 -123.07797625352494 49.2511781449646 -123.07799594222396</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:ff0b0793-e2d7-4f14-b708-73d1860ba19d</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.25172058824975 -123.07797625352494 49.251717893497755 -123.07778377462263</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:9ab71d96-e0df-4937-ab5a-c2f3004d886e</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.25177861817397 -123.0779736791045 49.25172058824975 -123.07797625352494</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:1ec03fe7-6ca7-4158-b6a1-93ba2f9585a1</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.25217705549247 -123.07795604425841 49.25177861817397 -123.0779736791045</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:7cceb36b-3526-44a3-840b-be7d540c2af5</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.25037405181317 -123.07201174389655 49.25036204618755 -123.0710918665145</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:3b0a783a-6cf8-4e96-bbf3-8c0037bb03b9</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.25003745876373 -123.08577799495417 49.24958494977585 -123.08579563730422</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:fd9a64b8-d250-41b1-aa0f-180f0cf05463</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.25048949910553 -123.08576150571751 49.25003745876373 -123.08577799495417</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:14e86ba0-dd2b-4b73-8dbd-d89ea644d95d</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.25094154911872 -123.08574405432454 49.25048949910553 -123.08576150571751</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:5e5328b9-ad3c-48c3-a7d6-8bc22aebedff</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
<georss:line>49.2529536934814 -123.08179499743795 49.25206421551317 -123.07989734993012</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 5, 2025 - Aug 23, 2025</content>
<id>urn:uuid:f3b7e9e9-0164-4e14-a5a0-1af0f0631034</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/70b9f514-8251-49cd-9483-17f0d9376d99"/>
<published>2025-08-05T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-08-05T16:51:37.8381377Z</updated>
<georss:line>49.277842044432674 -123.02833231815171 49.27743425649183 -123.02833380312782</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 5, 2025 - Aug 23, 2025</content>
<id>urn:uuid:d26cd457-00dc-4acb-88a8-b60c9cca6613</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/70b9f514-8251-49cd-9483-17f0d9376d99"/>
<published>2025-08-05T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-08-05T16:51:37.8381377Z</updated>
<georss:line>49.27824878911275 -123.02832998013642 49.277842044432674 -123.02833231815171</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 5, 2025 - Aug 23, 2025</content>
<id>urn:uuid:a63c1900-794d-4445-aa4b-8686b915917b</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/70b9f514-8251-49cd-9483-17f0d9376d99"/>
<published>2025-08-05T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-08-05T16:51:37.8381377Z</updated>
<georss:line>49.27824878911275 -123.02832998013642 49.278250635595924 -123.02570329447285</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 5, 2025 - Aug 23, 2025</content>
<id>urn:uuid:761ba347-9960-4026-bdbb-acd1399f61ed</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/70b9f514-8251-49cd-9483-17f0d9376d99"/>
<published>2025-08-05T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-08-05T16:51:37.8381377Z</updated>
<georss:line>49.27866036384481 -123.02832899223291 49.27824878911275 -123.02832998013642</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 5, 2025 - Aug 23, 2025</content>
<id>urn:uuid:95f0eb72-8778-449a-ab0b-dc6e95773e80</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/70b9f514-8251-49cd-9483-17f0d9376d99"/>
<published>2025-08-05T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-08-05T16:51:37.8381377Z</updated>
<georss:line>49.28019954826297 -123.02832356295328 49.28019740059898 -123.02569748657214</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 5, 2025 - Aug 23, 2025</content>
<id>urn:uuid:db9ae049-aaae-4e1d-9759-9422081aec22</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/70b9f514-8251-49cd-9483-17f0d9376d99"/>
<published>2025-08-05T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-08-05T16:51:37.8381377Z</updated>
<georss:line>49.28020292535436 -123.03620262997994 49.28020221751066 -123.03543924471138</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 5, 2025 - Aug 23, 2025</content>
<id>urn:uuid:34fe9696-09ea-4d79-8dcc-c1642c40d129</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/70b9f514-8251-49cd-9483-17f0d9376d99"/>
<published>2025-08-05T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-08-05T16:51:37.8381377Z</updated>
<georss:line>49.28020221751066 -123.03543924471138 49.28020097808684 -123.0343304921929</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 5, 2025 - Aug 23, 2025</content>
<id>urn:uuid:6c333977-5ae9-4126-bf1e-59558407703e</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/70b9f514-8251-49cd-9483-17f0d9376d99"/>
<published>2025-08-05T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-08-05T16:51:37.8381377Z</updated>
<georss:line>49.28020097808684 -123.0343304921929 49.28020014611769 -123.0335802374133</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 5, 2025 - Aug 23, 2025</content>
<id>urn:uuid:2e616a7c-9936-4cc8-afb0-cc77fe19f239</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/70b9f514-8251-49cd-9483-17f0d9376d99"/>
<published>2025-08-05T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-08-05T16:51:37.8381377Z</updated>
<georss:line>49.27825431229809 -123.03085817462097 49.27825279585383 -123.03019710925713</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 5, 2025 - Aug 23, 2025</content>
<id>urn:uuid:39998f17-eee3-44fd-80f8-678a8e679055</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/70b9f514-8251-49cd-9483-17f0d9376d99"/>
<published>2025-08-05T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-08-05T16:51:37.8381377Z</updated>
<georss:line>49.27825279585383 -123.03019710925713 49.27825036344967 -123.02908952726905</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 5, 2025 - Aug 23, 2025</content>
<id>urn:uuid:41f74c2e-fbd3-4af3-9c72-e3edc46aa466</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/70b9f514-8251-49cd-9483-17f0d9376d99"/>
<published>2025-08-05T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-08-05T16:51:37.8381377Z</updated>
<georss:line>49.27663064352498 -123.06561883806468 49.27661550740831 -123.06368467519006</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 5, 2025 - Aug 23, 2025</content>
<id>urn:uuid:4fb925e5-1e63-405b-8f65-0bd035ea65e9</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/70b9f514-8251-49cd-9483-17f0d9376d99"/>
<published>2025-08-05T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-08-05T16:51:37.8381377Z</updated>
<georss:line>49.27571160844485 -123.06370066894321 49.27570760745647 -123.06317296126693</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 5, 2025 - Aug 23, 2025</content>
<id>urn:uuid:d70bbc5f-3394-4761-a55e-5b340741eba7</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/70b9f514-8251-49cd-9483-17f0d9376d99"/>
<published>2025-08-05T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-08-05T16:51:37.8381377Z</updated>
<georss:line>49.27570760745647 -123.06317296126693 49.275696935033636 -123.06176636445585</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 5, 2025 - Aug 23, 2025</content>
<id>urn:uuid:afa01da8-b9ef-4c25-82bd-02c223c72263</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/70b9f514-8251-49cd-9483-17f0d9376d99"/>
<published>2025-08-05T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-08-05T16:51:37.8381377Z</updated>
<georss:line>49.273887633180294 -123.06180178718849 49.273872028331226 -123.05986774593325</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 5, 2025 - Aug 23, 2025</content>
<id>urn:uuid:dc6022c9-ba17-4b6c-8f1a-610e0618d906</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/70b9f514-8251-49cd-9483-17f0d9376d99"/>
<published>2025-08-05T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-08-05T16:51:37.8381377Z</updated>
<georss:line>49.27479197411395 -123.0617835739591 49.27477663007835 -123.05984903024542</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 5, 2025 - Aug 23, 2025</content>
<id>urn:uuid:a4a4b304-074d-4d3d-aad3-f86882c597df</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/70b9f514-8251-49cd-9483-17f0d9376d99"/>
<published>2025-08-05T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-08-05T16:51:37.8381377Z</updated>
<georss:line>49.28117427953768 -123.06170140497193 49.28116350397079 -123.05976625967678</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 5, 2025 - Aug 23, 2025</content>
<id>urn:uuid:1eea5b47-8425-4f88-ba9d-68e120577de4</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/70b9f514-8251-49cd-9483-17f0d9376d99"/>
<published>2025-08-05T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-08-05T16:51:37.8381377Z</updated>
<georss:line>49.27749127986894 -123.05981050573372 49.27747643319603 -123.05787658632192</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 5, 2025 - Aug 23, 2025</content>
<id>urn:uuid:0524bc5a-09b9-473d-a482-29bdff3d0085</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/70b9f514-8251-49cd-9483-17f0d9376d99"/>
<published>2025-08-05T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-08-05T16:51:37.8381377Z</updated>
<georss:line>49.27209226516217 -123.06377186435081 49.272076837892655 -123.06183655941788</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 5, 2025 - Aug 23, 2025</content>
<id>urn:uuid:7a02324c-4934-41f8-8aca-699f1dfdeacc</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/70b9f514-8251-49cd-9483-17f0d9376d99"/>
<published>2025-08-05T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-08-05T16:51:37.8381377Z</updated>
<georss:line>49.27275860753747 -123.052039809401 49.272292590399076 -123.05204716874805</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 5, 2025 - Aug 23, 2025</content>
<id>urn:uuid:b87ad414-10b2-464d-bdbe-bcfd01688122</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/70b9f514-8251-49cd-9483-17f0d9376d99"/>
<published>2025-08-05T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-08-05T16:51:37.8381377Z</updated>
<georss:line>49.27326923161107 -123.05203282677131 49.27275860753747 -123.052039809401</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 5, 2025 - Aug 23, 2025</content>
<id>urn:uuid:f3c1167b-e336-4d6d-81ad-74fb94a37918</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/70b9f514-8251-49cd-9483-17f0d9376d99"/>
<published>2025-08-05T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-08-05T16:51:37.8381377Z</updated>
<georss:line>49.273926027115095 -123.06694779428689 49.27391779659351 -123.06567809299767</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 5, 2025 - Aug 23, 2025</content>
<id>urn:uuid:16859d88-343d-4ba3-95d0-0ae17077d59d</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/70b9f514-8251-49cd-9483-17f0d9376d99"/>
<published>2025-08-05T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-08-05T16:51:37.8381377Z</updated>
<georss:line>49.27745545566782 -123.04670763718248 49.277454309658026 -123.04408379627628</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 5, 2025 - Aug 23, 2025</content>
<id>urn:uuid:0befc655-1410-4a6e-b71a-79521768ad21</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/70b9f514-8251-49cd-9483-17f0d9376d99"/>
<published>2025-08-05T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-08-05T16:51:37.8381377Z</updated>
<georss:line>49.275381623346874 -123.04551707762354 49.27421368939946 -123.0455371604761</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 5, 2025 - Aug 23, 2025</content>
<id>urn:uuid:3a9737ab-6b9f-4363-8eaf-d62155a1584c</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/70b9f514-8251-49cd-9483-17f0d9376d99"/>
<published>2025-08-05T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-08-05T16:51:37.8381377Z</updated>
<georss:line>49.272286056162045 -123.04417053974407 49.27181910393503 -123.04417805479692</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 5, 2025 - Aug 23, 2025</content>
<id>urn:uuid:0116b617-db24-470c-8f23-59257d4027b4</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/70b9f514-8251-49cd-9483-17f0d9376d99"/>
<published>2025-08-05T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-08-05T16:51:37.8381377Z</updated>
<georss:line>49.27826163110751 -123.03883320339467 49.278258382205024 -123.03620652742003</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 5, 2025 - Aug 23, 2025</content>
<id>urn:uuid:ea93bcf9-a0d5-433c-8459-a822fb5fb497</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/70b9f514-8251-49cd-9483-17f0d9376d99"/>
<published>2025-08-05T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-08-05T16:51:37.8381377Z</updated>
<georss:line>49.27413584175528 -123.03635779868921 49.27413314126184 -123.03363172764169</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 5, 2025 - Aug 23, 2025</content>
<id>urn:uuid:dfc3f3e9-4cb0-4e83-a461-93f1a89164e5</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/70b9f514-8251-49cd-9483-17f0d9376d99"/>
<published>2025-08-05T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-08-05T16:51:37.8381377Z</updated>
<georss:line>49.270417467034804 -123.03894312165853 49.27041346082956 -123.03641564401583</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 5, 2025 - Aug 23, 2025</content>
<id>urn:uuid:234f0871-2b37-494e-9d66-bf3854b7f7cd</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/70b9f514-8251-49cd-9483-17f0d9376d99"/>
<published>2025-08-05T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-08-05T16:51:37.8381377Z</updated>
<georss:line>49.27088701683576 -123.0441919313914 49.270422699932084 -123.04419984704187</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 5, 2025 - Aug 23, 2025</content>
<id>urn:uuid:f3397d3b-4041-4a65-87f0-3702b29e4ae3</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/70b9f514-8251-49cd-9483-17f0d9376d99"/>
<published>2025-08-05T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-08-05T16:51:37.8381377Z</updated>
<georss:line>49.27135316813121 -123.04418555687188 49.27088701683576 -123.0441919313914</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 5, 2025 - Aug 23, 2025</content>
<id>urn:uuid:f5b8c903-461d-4fc0-8df8-8d9690a3995c</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/70b9f514-8251-49cd-9483-17f0d9376d99"/>
<published>2025-08-05T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-08-05T16:51:37.8381377Z</updated>
<georss:line>49.271350195837414 -123.04145317748328 49.27134739557832 -123.03892671142583</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 5, 2025 - Aug 23, 2025</content>
<id>urn:uuid:b1f77fbd-8bf1-4c64-8cdd-6cdd5b054eb9</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/70b9f514-8251-49cd-9483-17f0d9376d99"/>
<published>2025-08-05T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-08-05T16:51:37.8381377Z</updated>
<georss:line>49.27135176450955 -123.04359451322325 49.271350195837414 -123.04145317748328</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 5, 2025 - Aug 23, 2025</content>
<id>urn:uuid:37878293-4f3a-468d-b9c7-269f51730ba7</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/70b9f514-8251-49cd-9483-17f0d9376d99"/>
<published>2025-08-05T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-08-05T16:51:37.8381377Z</updated>
<georss:line>49.27181910393503 -123.04417805479692 49.27135316813121 -123.04418555687188</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 5, 2025 - Aug 23, 2025</content>
<id>urn:uuid:6004540c-460f-455b-b811-345bf9abce09</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/70b9f514-8251-49cd-9483-17f0d9376d99"/>
<published>2025-08-05T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-08-05T16:51:37.8381377Z</updated>
<georss:line>49.26865996727054 -123.06517743872523 49.26864985795541 -123.06383784822538</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 5, 2025 - Aug 23, 2025</content>
<id>urn:uuid:9c2ea97e-80d6-4cd9-8bcb-8a038ca06b0e</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/70b9f514-8251-49cd-9483-17f0d9376d99"/>
<published>2025-08-05T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-08-05T16:51:37.8381377Z</updated>
<georss:line>49.266841381257905 -123.06387243547128 49.2668267284935 -123.06193858769865</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 5, 2025 - Aug 23, 2025</content>
<id>urn:uuid:aca9b26e-4bd0-45b9-ac66-c015ed855c18</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/70b9f514-8251-49cd-9483-17f0d9376d99"/>
<published>2025-08-05T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-08-05T16:51:37.8381377Z</updated>
<georss:line>49.26773069200814 -123.0619217810432 49.267715520092594 -123.0599893967598</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 5, 2025 - Aug 23, 2025</content>
<id>urn:uuid:0ad1ffca-0f86-4d71-b761-a378b7118444</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/70b9f514-8251-49cd-9483-17f0d9376d99"/>
<published>2025-08-05T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-08-05T16:51:37.8381377Z</updated>
<georss:line>49.267715520092594 -123.0599893967598 49.2677008010121 -123.0580581825921</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 5, 2025 - Aug 23, 2025</content>
<id>urn:uuid:3139a99d-fee5-49f8-854e-40a11d34ec3a</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/70b9f514-8251-49cd-9483-17f0d9376d99"/>
<published>2025-08-05T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-08-05T16:51:37.8381377Z</updated>
<georss:line>49.26667756576319 -123.0546934649434 49.26667645492972 -123.05213457919308</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 5, 2025 - Aug 23, 2025</content>
<id>urn:uuid:8ab82cf1-761f-4955-b278-34a283077974</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/70b9f514-8251-49cd-9483-17f0d9376d99"/>
<published>2025-08-05T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-08-05T16:51:37.8381377Z</updated>
<georss:line>49.267580542046886 -123.05211977917622 49.267577541072086 -123.04949354585348</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 5, 2025 - Aug 23, 2025</content>
<id>urn:uuid:5658bae7-a86f-413e-9435-00de4dbed2af</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/70b9f514-8251-49cd-9483-17f0d9376d99"/>
<published>2025-08-05T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-08-05T16:51:37.8381377Z</updated>
<georss:line>49.26848399883596 -123.05210613262963 49.26848149179594 -123.04948103400184</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 5, 2025 - Aug 23, 2025</content>
<id>urn:uuid:f044636a-db99-48e5-90fd-823a031c5048</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/70b9f514-8251-49cd-9483-17f0d9376d99"/>
<published>2025-08-05T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-08-05T16:51:37.8381377Z</updated>
<georss:line>49.26851793195138 -123.04947959962362 49.268514513712574 -123.04695785452137</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 5, 2025 - Aug 23, 2025</content>
<id>urn:uuid:378b0c91-e33b-46c5-be80-e548055ec449</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/70b9f514-8251-49cd-9483-17f0d9376d99"/>
<published>2025-08-05T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-08-05T16:51:37.8381377Z</updated>
<georss:line>49.26668255867537 -123.04698496773135 49.26666595517665 -123.04542885494865</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 5, 2025 - Aug 23, 2025</content>
<id>urn:uuid:b6dd0d09-8968-4662-bd37-7dc83e31cecc</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/70b9f514-8251-49cd-9483-17f0d9376d99"/>
<published>2025-08-05T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-08-05T16:51:37.8381377Z</updated>
<georss:line>49.26666595517665 -123.04542885494865 49.266674061923226 -123.04500984545672</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 5, 2025 - Aug 23, 2025</content>
<id>urn:uuid:6f7ef514-a9dd-4bc9-877e-468e57273c6e</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/70b9f514-8251-49cd-9483-17f0d9376d99"/>
<published>2025-08-05T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-08-05T16:51:37.8381377Z</updated>
<georss:line>49.266674061923226 -123.04500984545672 49.2666703221868 -123.04425884456488</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 5, 2025 - Aug 23, 2025</content>
<id>urn:uuid:97f78e8e-785e-4f71-8926-beb367858a7b</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/70b9f514-8251-49cd-9483-17f0d9376d99"/>
<published>2025-08-05T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-08-05T16:51:37.8381377Z</updated>
<georss:line>49.2675675325068 -123.03898373773505 49.2675571493827 -123.03645696454448</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 5, 2025 - Aug 23, 2025</content>
<id>urn:uuid:af730c48-569a-4cde-aa45-4ea7a3bdbc45</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/70b9f514-8251-49cd-9483-17f0d9376d99"/>
<published>2025-08-05T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-08-05T16:51:37.8381377Z</updated>
<georss:line>49.26665473041254 -123.03899952689163 49.266644384495834 -123.03646996877228</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 5, 2025 - Aug 23, 2025</content>
<id>urn:uuid:6555c0dd-6e68-40de-b841-06d744e8125c</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/70b9f514-8251-49cd-9483-17f0d9376d99"/>
<published>2025-08-05T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-08-05T16:51:37.8381377Z</updated>
<georss:line>49.25148570030396 -123.03380631309294 49.25060012101491 -123.03380469156389</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 5, 2025 - Aug 23, 2025</content>
<id>urn:uuid:34061455-dd23-428e-9a3f-386d5eec6183</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/70b9f514-8251-49cd-9483-17f0d9376d99"/>
<published>2025-08-05T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-08-05T16:51:37.8381377Z</updated>
<georss:line>49.25060012101491 -123.03380469156389 49.24966238681466 -123.03380462841992</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 5, 2025 - Aug 23, 2025</content>
<id>urn:uuid:f1d8987e-1b8a-44cc-8fc3-4d9bb7a62439</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/70b9f514-8251-49cd-9483-17f0d9376d99"/>
<published>2025-08-05T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-08-05T16:51:37.8381377Z</updated>
<georss:line>49.25399762691919 -123.03379889006072 49.253158390759836 -123.0337994301637</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 5, 2025 - Aug 23, 2025</content>
<id>urn:uuid:e8fb4aa9-d936-4dec-8acc-fb04ce7a2e76</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/70b9f514-8251-49cd-9483-17f0d9376d99"/>
<published>2025-08-05T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-08-05T16:51:37.8381377Z</updated>
<georss:line>49.25473170089933 -123.0337948151235 49.25399762691919 -123.03379889006072</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 5, 2025 - Aug 23, 2025</content>
<id>urn:uuid:f0d722df-5a26-486d-806a-5e91ead81a2a</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/70b9f514-8251-49cd-9483-17f0d9376d99"/>
<published>2025-08-05T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-08-05T16:51:37.8381377Z</updated>
<georss:line>49.25063112041326 -123.02852941301784 49.250655958930224 -123.02624106609429</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 5, 2025 - Aug 23, 2025</content>
<id>urn:uuid:96101415-809e-4b01-b602-82cf27fca831</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/70b9f514-8251-49cd-9483-17f0d9376d99"/>
<published>2025-08-05T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-08-05T16:51:37.8381377Z</updated>
<georss:line>49.26296992122997 -123.05218904699089 49.26296893440485 -123.0495683519754</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 5, 2025 - Aug 23, 2025</content>
<id>urn:uuid:5b190a9c-cf5a-4f6d-97fa-6fd7548404de</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/70b9f514-8251-49cd-9483-17f0d9376d99"/>
<published>2025-08-05T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-08-05T16:51:37.8381377Z</updated>
<georss:line>49.25792358240096 -123.04955241467545 49.2574142734901 -123.04955223463391</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 5, 2025 - Aug 23, 2025</content>
<id>urn:uuid:042eaf8a-9679-434c-b778-eb6922192d54</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/70b9f514-8251-49cd-9483-17f0d9376d99"/>
<published>2025-08-05T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-08-05T16:51:37.8381377Z</updated>
<georss:line>49.2574142734901 -123.04955223463391 49.25680196934562 -123.04955200646525</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 5, 2025 - Aug 23, 2025</content>
<id>urn:uuid:ed73510b-a4bd-4e34-8546-74ce67e447e5</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/70b9f514-8251-49cd-9483-17f0d9376d99"/>
<published>2025-08-05T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-08-05T16:51:37.8381377Z</updated>
<georss:line>49.25680196934562 -123.04955200646525 49.25634943812955 -123.04955184205018</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 5, 2025 - Aug 23, 2025</content>
<id>urn:uuid:fbed095b-7858-4c13-9d0a-5a89f48878e5</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/70b9f514-8251-49cd-9483-17f0d9376d99"/>
<published>2025-08-05T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-08-05T16:51:37.8381377Z</updated>
<georss:line>49.25724884599461 -123.03377824192773 49.25694962860484 -123.03378025032568</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 5, 2025 - Aug 23, 2025</content>
<id>urn:uuid:1c569a6b-2140-4f02-bda2-2cb559453aee</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/70b9f514-8251-49cd-9483-17f0d9376d99"/>
<published>2025-08-05T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-08-05T16:51:37.8381377Z</updated>
<georss:line>49.25773908608943 -123.03377496207221 49.25724884599461 -123.03377824192773</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 5, 2025 - Aug 23, 2025</content>
<id>urn:uuid:6df39274-1e82-4dcc-882b-87ec1a5eea4b</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/70b9f514-8251-49cd-9483-17f0d9376d99"/>
<published>2025-08-05T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-08-05T16:51:37.8381377Z</updated>
<georss:line>49.257690483155926 -123.04702789895917 49.25767844145588 -123.04505685663673</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 5, 2025 - Aug 23, 2025</content>
<id>urn:uuid:c0586dd9-f723-4339-b376-faa729793596</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/70b9f514-8251-49cd-9483-17f0d9376d99"/>
<published>2025-08-05T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-08-05T16:51:37.8381377Z</updated>
<georss:line>49.25814305089213 -123.04155939909752 49.25813771670343 -123.03903191483629</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 5, 2025 - Aug 23, 2025</content>
<id>urn:uuid:0322a740-c318-42b3-ae32-79f1ce8ac593</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/70b9f514-8251-49cd-9483-17f0d9376d99"/>
<published>2025-08-05T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-08-05T16:51:37.8381377Z</updated>
<georss:line>49.2581754738963 -123.04505186681253 49.25817082439218 -123.04428139638524</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 5, 2025 - Aug 23, 2025</content>
<id>urn:uuid:c29ddef3-4bdb-4b5f-ab4e-e1568fd80083</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/70b9f514-8251-49cd-9483-17f0d9376d99"/>
<published>2025-08-05T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-08-05T16:51:37.8381377Z</updated>
<georss:line>49.258187217792084 -123.04702548486276 49.2581754738963 -123.04505186681253</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 5, 2025 - Aug 23, 2025</content>
<id>urn:uuid:961af8b1-fdf0-45fe-a5fb-a85253391a58</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/70b9f514-8251-49cd-9483-17f0d9376d99"/>
<published>2025-08-05T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-08-05T16:51:37.8381377Z</updated>
<georss:line>49.2629438115969 -123.04156009064855 49.26293475320554 -123.03903315544925</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 5, 2025 - Aug 23, 2025</content>
<id>urn:uuid:c5a6d6ab-7ee4-47c0-9952-cb381e202300</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/70b9f514-8251-49cd-9483-17f0d9376d99"/>
<published>2025-08-05T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-08-05T16:51:37.8381377Z</updated>
<georss:line>49.26293475320554 -123.03903315544925 49.26292553220955 -123.03650431059053</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 5, 2025 - Aug 23, 2025</content>
<id>urn:uuid:0e38c3b6-0bc9-4113-9cef-a1818b96b981</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/70b9f514-8251-49cd-9483-17f0d9376d99"/>
<published>2025-08-05T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-08-05T16:51:37.8381377Z</updated>
<georss:line>49.26383959253283 -123.03902508629307 49.26338728550115 -123.03902860557471</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 5, 2025 - Aug 23, 2025</content>
<id>urn:uuid:adb89d69-2cbe-48b0-9548-6870cccf54b0</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/70b9f514-8251-49cd-9483-17f0d9376d99"/>
<published>2025-08-05T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-08-05T16:51:37.8381377Z</updated>
<georss:line>49.26474401847176 -123.03901543585819 49.26473527361057 -123.03648728235704</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 5, 2025 - Aug 23, 2025</content>
<id>urn:uuid:6a6d1eba-c08a-40b2-81d1-4dec7ccf0c7d</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/70b9f514-8251-49cd-9483-17f0d9376d99"/>
<published>2025-08-05T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-08-05T16:51:37.8381377Z</updated>
<georss:line>49.26473527361057 -123.03648728235704 49.26472809236819 -123.0345062890097</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 5, 2025 - Aug 23, 2025</content>
<id>urn:uuid:556be714-9d7d-41c2-8e50-b05317b5f5d5</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/70b9f514-8251-49cd-9483-17f0d9376d99"/>
<published>2025-08-05T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-08-05T16:51:37.8381377Z</updated>
<georss:line>49.262904693468414 -123.03101359039852 49.262912482997706 -123.03299563768614</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 5, 2025 - Aug 23, 2025</content>
<id>urn:uuid:902f98f4-7f41-4c47-8059-de3a019e4b99</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/70b9f514-8251-49cd-9483-17f0d9376d99"/>
<published>2025-08-05T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-08-05T16:51:37.8381377Z</updated>
<georss:line>49.26043198749653 -123.06528107412284 49.260422119875784 -123.063994551293</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 5, 2025 - Aug 23, 2025</content>
<id>urn:uuid:61f9eefd-c2c4-4eb0-a513-698147d48e7d</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/70b9f514-8251-49cd-9483-17f0d9376d99"/>
<published>2025-08-05T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-08-05T16:51:37.8381377Z</updated>
<georss:line>49.26227584414818 -123.06396063599296 49.262261490098695 -123.06202607360244</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 5, 2025 - Aug 23, 2025</content>
<id>urn:uuid:2f8dd4cc-c9de-4d22-894b-a81b3b271bac</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/70b9f514-8251-49cd-9483-17f0d9376d99"/>
<published>2025-08-05T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-08-05T16:51:37.8381377Z</updated>
<georss:line>49.26322528902048 -123.06394277196792 49.263210970669775 -123.062008172512</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 5, 2025 - Aug 23, 2025</content>
<id>urn:uuid:86b0a870-fe88-4907-bc49-053095b8c505</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/70b9f514-8251-49cd-9483-17f0d9376d99"/>
<published>2025-08-05T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-08-05T16:51:37.8381377Z</updated>
<georss:line>49.26173425514662 -123.05816740290152 49.261281881791035 -123.05817606593982</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 5, 2025 - Aug 23, 2025</content>
<id>urn:uuid:28c4cea5-c745-444e-959d-b2acdd1fd189</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/70b9f514-8251-49cd-9483-17f0d9376d99"/>
<published>2025-08-05T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-08-05T16:51:37.8381377Z</updated>
<georss:line>49.26223269336205 -123.05815785923444 49.26173425514662 -123.05816740290152</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 5, 2025 - Aug 23, 2025</content>
<id>urn:uuid:8e5f6f83-28f5-43e1-b02f-7a835d482719</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/70b9f514-8251-49cd-9483-17f0d9376d99"/>
<published>2025-08-05T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-08-05T16:51:37.8381377Z</updated>
<georss:line>49.261281881791035 -123.05817606593982 49.26082985022393 -123.05818471548139</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 5, 2025 - Aug 23, 2025</content>
<id>urn:uuid:68807c44-cf1d-4d29-bf70-6f8d5baca77d</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/70b9f514-8251-49cd-9483-17f0d9376d99"/>
<published>2025-08-05T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-08-05T16:51:37.8381377Z</updated>
<georss:line>49.26082985022393 -123.05818471548139 49.260378016515176 -123.05819336510126</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 5, 2025 - Aug 23, 2025</content>
<id>urn:uuid:60306f23-b69c-4b82-ac60-8c9c06d57a9e</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/70b9f514-8251-49cd-9483-17f0d9376d99"/>
<published>2025-08-05T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-08-05T16:51:37.8381377Z</updated>
<georss:line>49.25487893658203 -123.06607148523602 49.254054530786874 -123.06660930364713</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 5, 2025 - Aug 23, 2025</content>
<id>urn:uuid:b975b925-ea69-4437-ae7f-e049b63ab53a</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/70b9f514-8251-49cd-9483-17f0d9376d99"/>
<published>2025-08-05T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-08-05T16:51:37.8381377Z</updated>
<georss:line>49.254054530786874 -123.06660930364713 49.25351465119408 -123.06695940582861</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 5, 2025 - Aug 23, 2025</content>
<id>urn:uuid:25b702c7-6fe5-4f69-a007-9642af3730e5</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/70b9f514-8251-49cd-9483-17f0d9376d99"/>
<published>2025-08-05T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-08-05T16:51:37.8381377Z</updated>
<georss:line>49.26144137134034 -123.04702211714373 49.260926251782365 -123.04702206753123</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 5, 2025 - Aug 23, 2025</content>
<id>urn:uuid:b9a826e0-2acd-48a7-8034-ad365d8bedc6</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/70b9f514-8251-49cd-9483-17f0d9376d99"/>
<published>2025-08-05T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-08-05T16:51:37.8381377Z</updated>
<georss:line>49.26199723026738 -123.0470218618647 49.26144137134034 -123.04702211714373</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 5, 2025 - Aug 23, 2025</content>
<id>urn:uuid:2004cb2a-4b74-4883-a825-f0f8a9bded09</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/70b9f514-8251-49cd-9483-17f0d9376d99"/>
<published>2025-08-05T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-08-05T16:51:37.8381377Z</updated>
<georss:line>49.260926251782365 -123.04702206753123 49.26045811414846 -123.04702203507273</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 5, 2025 - Aug 23, 2025</content>
<id>urn:uuid:9899bace-4bbf-4885-a16d-002092cab116</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/70b9f514-8251-49cd-9483-17f0d9376d99"/>
<published>2025-08-05T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-08-05T16:51:37.8381377Z</updated>
<georss:line>49.26045811414846 -123.04702203507273 49.259052558648904 -123.0470218816611</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 5, 2025 - Aug 23, 2025</content>
<id>urn:uuid:d8d04b90-50fe-40f9-976f-4b51a6831c22</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/70b9f514-8251-49cd-9483-17f0d9376d99"/>
<published>2025-08-05T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-08-05T16:51:37.8381377Z</updated>
<georss:line>49.259052558648904 -123.0470218816611 49.25904714823693 -123.04604987790078 49.25905257169225 -123.04593854803436 49.25907556464031 -123.04568600763778 49.25911944134185 -123.04544001427884 49.25918317031895 -123.04505488678292 49.25920470563591 -123.04465900036604 49.259204868615456 -123.04428230775994</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 5, 2025 - Aug 23, 2025</content>
<id>urn:uuid:02bc4a05-18b2-4ff2-bedf-e6be8c47a595</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/70b9f514-8251-49cd-9483-17f0d9376d99"/>
<published>2025-08-05T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-08-05T16:51:37.8381377Z</updated>
<georss:line>49.25151970051883 -123.05663226427299 49.250634560331775 -123.05663461834025</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 5, 2025 - Aug 23, 2025</content>
<id>urn:uuid:b1770e23-75d3-443f-b30c-10aabe3a1209</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/70b9f514-8251-49cd-9483-17f0d9376d99"/>
<published>2025-08-05T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-08-05T16:51:37.8381377Z</updated>
<georss:line>49.25235806641166 -123.05662787785552 49.25151970051883 -123.05663226427299</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 5, 2025 - Aug 23, 2025</content>
<id>urn:uuid:3a5a612c-df89-43a2-b391-732f5da91888</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/70b9f514-8251-49cd-9483-17f0d9376d99"/>
<published>2025-08-05T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-08-05T16:51:37.8381377Z</updated>
<georss:line>49.257769777915314 -123.05661029353121 49.25776145961143 -123.05656893134245 49.25774674564255 -123.056490895561 49.2577329313296 -123.05641247604768 49.257720007656616 -123.05633371401716 49.25770799261318 -123.05625460948596 49.257696877190114 -123.05617518992567 49.257686670362006 -123.05609549657132 49.257675303796475 -123.05601435892525 49.2576489099433 -123.05581381920044 49.257624809837665 -123.05561262260477 49.25760301245151 -123.05541081035014 49.25758352675069 -123.05520843739097 49.257566352692976 -123.0550055861572</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 5, 2025 - Aug 23, 2025</content>
<id>urn:uuid:d27c862e-9c00-46fb-af16-6de0a6952b24</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/70b9f514-8251-49cd-9483-17f0d9376d99"/>
<published>2025-08-05T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-08-05T16:51:37.8381377Z</updated>
<georss:line>49.257566352692976 -123.0550055861572 49.25755308792324 -123.05488543065121 49.25754042932917 -123.05475763480881 49.25752923695572 -123.05462953830548 49.25751951080193 -123.05450114113015 49.257511250828 -123.05437252572906 49.257504457033235 -123.05424369209094 49.25749913837987 -123.05411470892884 49.257495294854664 -123.05398560371702 49.25749216368362 -123.0538717676858 49.25748983461054 -123.05373507806338 49.257489070561235 -123.0535983489197 49.25748986252137 -123.05346162146094 49.25749221947348 -123.05332492316968 49.25749613239074 -123.05318832273785 49.257501610262466 -123.05305183390522 49.25750558549581 -123.05297483655778</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 5, 2025 - Aug 23, 2025</content>
<id>urn:uuid:0bb1f548-d468-43b3-93bf-38effaf51e97</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/70b9f514-8251-49cd-9483-17f0d9376d99"/>
<published>2025-08-05T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-08-05T16:51:37.8381377Z</updated>
<georss:line>49.262016741533415 -123.05470337749718 49.26201580473625 -123.05300793598103</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 5, 2025 - Aug 23, 2025</content>
<id>urn:uuid:97f02ec5-327a-491b-a844-04e4a6c7ebeb</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/70b9f514-8251-49cd-9483-17f0d9376d99"/>
<published>2025-08-05T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-08-05T16:51:37.8381377Z</updated>
<georss:line>49.26201580473625 -123.05300793598103 49.26201533392816 -123.05220464329963</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 5, 2025 - Aug 23, 2025</content>
<id>urn:uuid:75840865-9312-41ca-89cf-a36ec86b3130</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/70b9f514-8251-49cd-9483-17f0d9376d99"/>
<published>2025-08-05T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-08-05T16:51:37.8381377Z</updated>
<georss:line>49.25150841468397 -123.04433529399623 49.25089400676663 -123.04433052528157 49.25088707201547 -123.04432904877588 49.2508733195458 -123.04432584853103 49.250859603199245 -123.04432227731112 49.25084593196567 -123.04431834886563 49.250832305850366 -123.0443140494537 49.250818733843175 -123.04430939282483 49.25080521594941 -123.04430436523816 49.25079176115892 -123.04429898044313 49.25077836946639 -123.04429325218108 49.25076504088227 -123.0442871529701 49.250751784396556 -123.04428069655961 49.25073860899906 -123.04427389669894 49.25072550569453 -123.0442667533803 49.250712492478584 -123.04425925287894 49.25069956935124 -123.04425139519519 49.250686727306544 -123.04424320780319 49.25067398434021 -123.04423467697823 49.25066134944214 -123.04422581646966 49.25064880462699 -123.04421661252053 49.250636376880465 -123.04420706515513 49.25062405719669 -123.04419720184767</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 5, 2025 - Aug 23, 2025</content>
<id>urn:uuid:beae7704-804f-4e97-bcaa-9a5f04132984</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/70b9f514-8251-49cd-9483-17f0d9376d99"/>
<published>2025-08-05T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-08-05T16:51:37.8381377Z</updated>
<georss:line>49.252346958538254 -123.04433469827359 49.25150841468397 -123.04433529399623</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 5, 2025 - Aug 23, 2025</content>
<id>urn:uuid:523c045e-9c08-497b-add2-7b31a3f8efae</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/70b9f514-8251-49cd-9483-17f0d9376d99"/>
<published>2025-08-05T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-08-05T16:51:37.8381377Z</updated>
<georss:line>49.25060607158579 -123.03906641659485 49.25060457336036 -123.03846477908354</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 5, 2025 - Aug 23, 2025</content>
<id>urn:uuid:6ac6fa4b-6267-4220-812d-cd3848e7f5f0</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/70b9f514-8251-49cd-9483-17f0d9376d99"/>
<published>2025-08-05T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-08-05T16:51:37.8381377Z</updated>
<georss:line>49.25060457336036 -123.03846477908354 49.250600761491796 -123.03713872765454</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 5, 2025 - Aug 23, 2025</content>
<id>urn:uuid:a48e8e36-0a23-402f-8b95-0fc33c5534a3</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/70b9f514-8251-49cd-9483-17f0d9376d99"/>
<published>2025-08-05T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-08-05T16:51:37.8381377Z</updated>
<georss:line>49.250600761491796 -123.03713872765454 49.25059951432402 -123.03653634843893</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 5, 2025 - Aug 23, 2025</content>
<id>urn:uuid:736a7086-aed4-4108-a71e-677a4fd91b7b</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/70b9f514-8251-49cd-9483-17f0d9376d99"/>
<published>2025-08-05T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-08-05T16:51:37.8381377Z</updated>
<georss:line>49.249669599332805 -123.04160942016102 49.24877657893626 -123.04161299794478</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 5, 2025 - Aug 23, 2025</content>
<id>urn:uuid:b43d3e96-0773-4ac1-82ec-9df71d50cebb</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/70b9f514-8251-49cd-9483-17f0d9376d99"/>
<published>2025-08-05T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-08-05T16:51:37.8381377Z</updated>
<georss:line>49.250145620104945 -123.04160266121411 49.249669599332805 -123.04160942016102</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 5, 2025 - Aug 23, 2025</content>
<id>urn:uuid:db91a367-1f49-4721-a59c-2412a8ebafa6</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/70b9f514-8251-49cd-9483-17f0d9376d99"/>
<published>2025-08-05T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-08-05T16:51:37.8381377Z</updated>
<georss:line>49.24877657893626 -123.04161299794478 49.247890384539915 -123.04162001641076</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 5, 2025 - Aug 23, 2025</content>
<id>urn:uuid:05879a62-055f-4a92-9005-971565b82157</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/70b9f514-8251-49cd-9483-17f0d9376d99"/>
<published>2025-08-05T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-08-05T16:51:37.8381377Z</updated>
<georss:line>49.26453883344931 -123.05811521138268 49.26408639765589 -123.05812327052392</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 5, 2025 - Aug 23, 2025</content>
<id>urn:uuid:b988ee63-9635-4d2d-bb94-52c70925e8eb</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/70b9f514-8251-49cd-9483-17f0d9376d99"/>
<published>2025-08-05T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-08-05T16:51:37.8381377Z</updated>
<georss:line>49.2641435949013 -123.06585830242565 49.26412975700953 -123.06392618241742</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 5, 2025 - Aug 23, 2025</content>
<id>urn:uuid:a7176e9e-3bc9-4014-afb1-0de301e1ec60</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/70b9f514-8251-49cd-9483-17f0d9376d99"/>
<published>2025-08-05T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-08-05T16:51:37.8381377Z</updated>
<georss:line>49.264167062297616 -123.06906463236959 49.2641435949013 -123.06585830242565</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 5, 2025 - Aug 23, 2025</content>
<id>urn:uuid:c119f859-25f0-4399-b150-e7b6f948f65d</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/70b9f514-8251-49cd-9483-17f0d9376d99"/>
<published>2025-08-05T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-08-05T16:51:37.8381377Z</updated>
<georss:line>49.26417192682112 -123.06972673879854 49.264167062297616 -123.06906463236959</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 5, 2025 - Aug 23, 2025</content>
<id>urn:uuid:783a6533-e281-42a5-affb-ed3f628d31a5</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/70b9f514-8251-49cd-9483-17f0d9376d99"/>
<published>2025-08-05T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-08-05T16:51:37.8381377Z</updated>
<georss:line>49.26499045077506 -123.05810688998157 49.26453883344931 -123.05811521138268</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 5, 2025 - Aug 23, 2025</content>
<id>urn:uuid:4157c8fa-8824-43ea-897b-666b9bc1fe88</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/70b9f514-8251-49cd-9483-17f0d9376d99"/>
<published>2025-08-05T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-08-05T16:51:37.8381377Z</updated>
<georss:line>49.26870200536675 -123.07022226147227 49.268697870700066 -123.06963745807995</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 5, 2025 - Aug 23, 2025</content>
<id>urn:uuid:18a0f829-0e71-4fc9-9119-f6252f680b4c</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/70b9f514-8251-49cd-9483-17f0d9376d99"/>
<published>2025-08-05T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-08-05T16:51:37.8381377Z</updated>
<georss:line>49.268697870700066 -123.06963745807995 49.26868889642955 -123.06898778050973</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 5, 2025 - Aug 23, 2025</content>
<id>urn:uuid:9efad274-42e7-4cf5-879a-2780501948db</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/70b9f514-8251-49cd-9483-17f0d9376d99"/>
<published>2025-08-05T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-08-05T16:51:37.8381377Z</updated>
<georss:line>49.274846524769345 -123.0695335056495 49.27394215546181 -123.06955197585849</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 5, 2025 - Aug 23, 2025</content>
<id>urn:uuid:a4d8c281-2507-4166-9614-bc4b434242bc</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/70b9f514-8251-49cd-9483-17f0d9376d99"/>
<published>2025-08-05T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-08-05T16:51:37.8381377Z</updated>
<georss:line>49.27393013641873 -123.06761463548757 49.273926027115095 -123.06694779428689</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 5, 2025 - Aug 23, 2025</content>
<id>urn:uuid:e3703f99-9313-4be7-9e70-505039b080d1</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/70b9f514-8251-49cd-9483-17f0d9376d99"/>
<published>2025-08-05T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-08-05T16:51:37.8381377Z</updated>
<georss:line>49.26557798999593 -123.1528621459935 49.265616208254386 -123.15523204369055</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 5, 2025 - Aug 23, 2025</content>
<id>urn:uuid:2990e0c4-c0a6-46d5-98f1-9a8eee7b5dc7</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/70b9f514-8251-49cd-9483-17f0d9376d99"/>
<published>2025-08-05T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-08-05T16:51:37.8381377Z</updated>
<georss:line>49.26866437133771 -123.06577109408676 49.26865996727054 -123.06517743872523</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 5, 2025 - Aug 23, 2025</content>
<id>urn:uuid:e9203cef-f22b-4a97-864e-6010db730425</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/70b9f514-8251-49cd-9483-17f0d9376d99"/>
<published>2025-08-05T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-08-05T16:51:37.8381377Z</updated>
<georss:line>49.26911698753804 -123.06576247208723 49.26866437133771 -123.06577109408676</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 5, 2025 - Aug 23, 2025</content>
<id>urn:uuid:a5d2f74e-88d9-439c-8563-0167e9d89901</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/70b9f514-8251-49cd-9483-17f0d9376d99"/>
<published>2025-08-05T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-08-05T16:51:37.8381377Z</updated>
<georss:line>49.26956824560082 -123.06575354571105 49.26911698753804 -123.06576247208723</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 5, 2025 - Aug 23, 2025</content>
<id>urn:uuid:d398c5db-e509-454c-92bb-1c2c1a8cef3e</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/70b9f514-8251-49cd-9483-17f0d9376d99"/>
<published>2025-08-05T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-08-05T16:51:37.8381377Z</updated>
<georss:line>49.25451228310072 -123.16038777722099 49.25455008093573 -123.16274212951826</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 5, 2025 - Aug 23, 2025</content>
<id>urn:uuid:2aa68830-d588-49c4-a602-ce1e28face21</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/70b9f514-8251-49cd-9483-17f0d9376d99"/>
<published>2025-08-05T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-08-05T16:51:37.8381377Z</updated>
<georss:line>49.25953538568754 -123.06659668269334 49.25953019930367 -123.06594699357264</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 5, 2025 - Aug 23, 2025</content>
<id>urn:uuid:e192c1fc-8001-4ba2-ae11-2a9aad996100</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/70b9f514-8251-49cd-9483-17f0d9376d99"/>
<published>2025-08-05T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-08-05T16:51:37.8381377Z</updated>
<georss:line>49.25953019930367 -123.06594699357264 49.25952646610895 -123.06529797993734</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 5, 2025 - Aug 23, 2025</content>
<id>urn:uuid:e028b3b0-f092-4f56-91db-009853dd5f62</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/70b9f514-8251-49cd-9483-17f0d9376d99"/>
<published>2025-08-05T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-08-05T16:51:37.8381377Z</updated>
<georss:line>49.26043483042022 -123.06592980982678 49.26043198749653 -123.06528107412284</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Sep 15, 2025 - Sep 29, 2025</content>
<id>urn:uuid:33e3ce80-735c-42e2-b48d-2be57e033f2d</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/dda1ffda-3109-444a-a777-ab7ec086e094"/>
<published>2025-09-18T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-09-18T16:36:09.3921386Z</updated>
<georss:line>49.25973213833288 -123.0910994739866 49.25971659387554 -123.08916322791242</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Sep 15, 2025 - Sep 29, 2025</content>
<id>urn:uuid:5de560f5-99f5-4a75-aeb4-339b9e84fce3</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/dda1ffda-3109-444a-a777-ab7ec086e094"/>
<published>2025-09-18T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-09-18T16:36:09.3921386Z</updated>
<georss:line>49.26063593447006 -123.09108509856512 49.26018396471244 -123.09109196323043</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Sep 15, 2025 - Sep 29, 2025</content>
<id>urn:uuid:d6c903f1-e5d8-4415-aa45-74b35080a7ec</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/dda1ffda-3109-444a-a777-ab7ec086e094"/>
<published>2025-09-18T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-09-18T16:36:09.3921386Z</updated>
<georss:line>49.261088120347296 -123.09107789057985 49.26063593447006 -123.09108509856512</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Sep 15, 2025 - Sep 29, 2025</content>
<id>urn:uuid:5538e964-430d-402e-ae22-34886b634fed</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/dda1ffda-3109-444a-a777-ab7ec086e094"/>
<published>2025-09-18T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-09-18T16:36:09.3921386Z</updated>
<georss:line>49.25971659387554 -123.08916322791242 49.259700574824166 -123.08722881012326</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Sep 15, 2025 - Sep 29, 2025</content>
<id>urn:uuid:d902ac9a-73c8-4d8d-b027-a55cdd654550</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/dda1ffda-3109-444a-a777-ab7ec086e094"/>
<published>2025-09-18T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-09-18T16:36:09.3921386Z</updated>
<georss:line>49.261977036825385 -123.08912729108141 49.2615251209111 -123.08913461370165</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Sep 15, 2025 - Sep 29, 2025</content>
<id>urn:uuid:a1dec907-4476-4c1a-b0e7-327a3359955e</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/dda1ffda-3109-444a-a777-ab7ec086e094"/>
<published>2025-09-18T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-09-18T16:36:09.3921386Z</updated>
<georss:line>49.26247371365085 -123.08911893564974 49.261977036825385 -123.08912729108141</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Sep 15, 2025 - Sep 29, 2025</content>
<id>urn:uuid:5e2c0aad-e5b3-4499-8657-79de560d47e6</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/dda1ffda-3109-444a-a777-ab7ec086e094"/>
<published>2025-09-18T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-09-18T16:36:09.3921386Z</updated>
<georss:line>49.261436433978815 -123.07816844586972 49.261430889683794 -123.07751905985212</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Sep 15, 2025 - Sep 29, 2025</content>
<id>urn:uuid:34c14e26-bc7b-43c1-99bb-4d8861db4afe</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/dda1ffda-3109-444a-a777-ab7ec086e094"/>
<published>2025-09-18T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-09-18T16:36:09.3921386Z</updated>
<georss:line>49.26144140886859 -123.07880326246753 49.261436433978815 -123.07816844586972</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Sep 15, 2025 - Sep 29, 2025</content>
<id>urn:uuid:a075f2a1-8766-455c-97e4-f3e49f4833f5</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/dda1ffda-3109-444a-a777-ab7ec086e094"/>
<published>2025-09-18T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-09-18T16:36:09.3921386Z</updated>
<georss:line>49.26866437133771 -123.06577109408676 49.26865996727054 -123.06517743872523</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Sep 15, 2025 - Sep 29, 2025</content>
<id>urn:uuid:b33ff792-edc3-40e2-9894-a18f7e8cda4b</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/dda1ffda-3109-444a-a777-ab7ec086e094"/>
<published>2025-09-18T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-09-18T16:36:09.3921386Z</updated>
<georss:line>49.26865996727054 -123.06517743872523 49.26864985795541 -123.06383784822538</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Sep 15, 2025 - Sep 29, 2025</content>
<id>urn:uuid:170bf5cb-2c84-43ae-b45d-7340c32bcb8a</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/dda1ffda-3109-444a-a777-ab7ec086e094"/>
<published>2025-09-18T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-09-18T16:36:09.3921386Z</updated>
<georss:line>49.26773069200814 -123.0619217810432 49.267715520092594 -123.0599893967598</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Sep 15, 2025 - Sep 29, 2025</content>
<id>urn:uuid:294edd77-e586-453f-9584-7daa7d6cbe40</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/dda1ffda-3109-444a-a777-ab7ec086e094"/>
<published>2025-09-18T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-09-18T16:36:09.3921386Z</updated>
<georss:line>49.26667645492972 -123.05213457919308 49.26667302207048 -123.04950941058671</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Sep 15, 2025 - Sep 29, 2025</content>
<id>urn:uuid:b90dfc54-6a2e-425d-9352-df651455bd21</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/dda1ffda-3109-444a-a777-ab7ec086e094"/>
<published>2025-09-18T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-09-18T16:36:09.3921386Z</updated>
<georss:line>49.267580542046886 -123.05211977917622 49.267577541072086 -123.04949354585348</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Sep 15, 2025 - Sep 29, 2025</content>
<id>urn:uuid:ef1c567b-9d8e-4452-a8e6-e907aae839b8</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/dda1ffda-3109-444a-a777-ab7ec086e094"/>
<published>2025-09-18T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-09-18T16:36:09.3921386Z</updated>
<georss:line>49.26848399883596 -123.05210613262963 49.26848149179594 -123.04948103400184</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Sep 15, 2025 - Sep 29, 2025</content>
<id>urn:uuid:36ca3ae6-5551-483b-be19-bce955953ab5</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/dda1ffda-3109-444a-a777-ab7ec086e094"/>
<published>2025-09-18T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-09-18T16:36:09.3921386Z</updated>
<georss:line>49.26851793195138 -123.04947959962362 49.268514513712574 -123.04695785452137</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Sep 15, 2025 - Sep 29, 2025</content>
<id>urn:uuid:1536dbac-6778-42f2-a0d0-739833b6344c</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/dda1ffda-3109-444a-a777-ab7ec086e094"/>
<published>2025-09-18T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-09-18T16:36:09.3921386Z</updated>
<georss:line>49.26668255867537 -123.04698496773135 49.26666595517665 -123.04542885494865</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Sep 15, 2025 - Sep 29, 2025</content>
<id>urn:uuid:e450c6bc-20e5-4a22-a960-02351c605e38</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/dda1ffda-3109-444a-a777-ab7ec086e094"/>
<published>2025-09-18T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-09-18T16:36:09.3921386Z</updated>
<georss:line>49.26666595517665 -123.04542885494865 49.266674061923226 -123.04500984545672</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Sep 15, 2025 - Sep 29, 2025</content>
<id>urn:uuid:10251fe3-e666-4342-9799-bda3ef6d9562</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/dda1ffda-3109-444a-a777-ab7ec086e094"/>
<published>2025-09-18T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-09-18T16:36:09.3921386Z</updated>
<georss:line>49.26849757126939 -123.04347548749391 49.26849113803959 -123.04149854937526</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Sep 15, 2025 - Sep 29, 2025</content>
<id>urn:uuid:bd9d80f7-f757-4120-80b0-bcdab235e827</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/dda1ffda-3109-444a-a777-ab7ec086e094"/>
<published>2025-09-18T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-09-18T16:36:09.3921386Z</updated>
<georss:line>49.26738577665347 -123.10471358623758 49.267350624587635 -123.10277879624145</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Sep 15, 2025 - Sep 29, 2025</content>
<id>urn:uuid:be664fe4-4bc8-4a48-bddd-d6babb0800f3</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/dda1ffda-3109-444a-a777-ab7ec086e094"/>
<published>2025-09-18T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-09-18T16:36:09.3921386Z</updated>
<georss:line>49.265004799072244 -123.06004033458693 49.26499045077506 -123.05810688998157</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Sep 15, 2025 - Sep 29, 2025</content>
<id>urn:uuid:269e6105-c136-4b71-85b3-10e5f784b23c</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/dda1ffda-3109-444a-a777-ab7ec086e094"/>
<published>2025-09-18T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-09-18T16:36:09.3921386Z</updated>
<georss:line>49.267715520092594 -123.0599893967598 49.2677008010121 -123.0580581825921</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Sep 15, 2025 - Sep 29, 2025</content>
<id>urn:uuid:eca99c94-d39f-4d0f-8da6-4c3888abb580</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/dda1ffda-3109-444a-a777-ab7ec086e094"/>
<published>2025-09-18T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-09-18T16:36:09.3921386Z</updated>
<georss:line>49.265728328416486 -123.05469526101206 49.26572674504254 -123.05214709013256</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Sep 15, 2025 - Sep 29, 2025</content>
<id>urn:uuid:5acbc0f6-0784-4583-8177-9e6a41095c8b</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/dda1ffda-3109-444a-a777-ab7ec086e094"/>
<published>2025-09-18T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-09-18T16:36:09.3921386Z</updated>
<georss:line>49.26117740985069 -123.10497389954418 49.26115130295682 -123.10357163246776</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Sep 15, 2025 - Sep 29, 2025</content>
<id>urn:uuid:a333675b-0a3d-4fef-8ab0-721a785de973</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/dda1ffda-3109-444a-a777-ab7ec086e094"/>
<published>2025-09-18T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-09-18T16:36:09.3921386Z</updated>
<georss:line>49.26115130295682 -123.10357163246776 49.261141424841014 -123.1030399688293</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Sep 15, 2025 - Sep 29, 2025</content>
<id>urn:uuid:193086e8-2bae-4adf-baf6-6673089552ab</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/dda1ffda-3109-444a-a777-ab7ec086e094"/>
<published>2025-09-18T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-09-18T16:36:09.3921386Z</updated>
<georss:line>49.260636684334884 -123.09829230543497 49.26017959708548 -123.09830830237881</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Sep 15, 2025 - Sep 29, 2025</content>
<id>urn:uuid:16e9ff2f-3e47-462b-b3da-4aed3781efe6</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/dda1ffda-3109-444a-a777-ab7ec086e094"/>
<published>2025-09-18T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-09-18T16:36:09.3921386Z</updated>
<georss:line>49.2610886449047 -123.09827556959398 49.260636684334884 -123.09829230543497</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Sep 15, 2025 - Sep 29, 2025</content>
<id>urn:uuid:b409eee4-df85-48dc-be74-38a6dd74c0a3</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/dda1ffda-3109-444a-a777-ab7ec086e094"/>
<published>2025-09-18T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-09-18T16:36:09.3921386Z</updated>
<georss:line>49.262010564205696 -123.10099764801556 49.261105000652435 -123.10103637208277</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Sep 15, 2025 - Sep 29, 2025</content>
<id>urn:uuid:d63bc425-cff8-477d-969d-34523643ce7f</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/dda1ffda-3109-444a-a777-ab7ec086e094"/>
<published>2025-09-18T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-09-18T16:36:09.3921386Z</updated>
<georss:line>49.259554667592994 -123.06900970892045 49.25953538568754 -123.06659668269334</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Sep 15, 2025 - Sep 29, 2025</content>
<id>urn:uuid:8f50d228-001b-446c-8eef-5ec8acf07d2e</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/dda1ffda-3109-444a-a777-ab7ec086e094"/>
<published>2025-09-18T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-09-18T16:36:09.3921386Z</updated>
<georss:line>49.25953538568754 -123.06659668269334 49.25953019930367 -123.06594699357264</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Sep 15, 2025 - Sep 29, 2025</content>
<id>urn:uuid:b2cc5b40-ef96-46c2-b3c7-496110dc59c5</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/dda1ffda-3109-444a-a777-ab7ec086e094"/>
<published>2025-09-18T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-09-18T16:36:09.3921386Z</updated>
<georss:line>49.263210970669775 -123.062008172512 49.26318251529429 -123.05813966442754</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Sep 15, 2025 - Sep 29, 2025</content>
<id>urn:uuid:196574a2-2f54-44db-8676-d19036d114a5</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/dda1ffda-3109-444a-a777-ab7ec086e094"/>
<published>2025-09-18T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-09-18T16:36:09.3921386Z</updated>
<georss:line>49.26223269336205 -123.05815785923444 49.26222721400845 -123.05742305844184</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Sep 15, 2025 - Sep 29, 2025</content>
<id>urn:uuid:67c8c6b6-cf67-4f80-92f5-41b5f1cd11ca</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/dda1ffda-3109-444a-a777-ab7ec086e094"/>
<published>2025-09-18T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-09-18T16:36:09.3921386Z</updated>
<georss:line>49.26222721400845 -123.05742305844184 49.26222409253694 -123.0570055324409 49.26214932532875 -123.05660107778434</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Sep 15, 2025 - Sep 29, 2025</content>
<id>urn:uuid:6f39ea1e-816d-45b9-bd50-e67d6205d39f</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/dda1ffda-3109-444a-a777-ab7ec086e094"/>
<published>2025-09-18T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-09-18T16:36:09.3921386Z</updated>
<georss:line>49.26201580473625 -123.05300793598103 49.26103145164166 -123.05300475137798</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Sep 15, 2025 - Sep 29, 2025</content>
<id>urn:uuid:73932494-787a-4938-8d73-90ff4df6853f</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/dda1ffda-3109-444a-a777-ab7ec086e094"/>
<published>2025-09-18T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-09-18T16:36:09.3921386Z</updated>
<georss:line>49.278271659872246 -123.04932824902069 49.27827065771689 -123.04857255108598</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Sep 15, 2025 - Sep 29, 2025</content>
<id>urn:uuid:1741b207-2192-4350-929d-f63bb9bd551c</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/dda1ffda-3109-444a-a777-ab7ec086e094"/>
<published>2025-09-18T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-09-18T16:36:09.3921386Z</updated>
<georss:line>49.27827065771689 -123.04857255108598 49.27826988473117 -123.04746721038815</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Sep 15, 2025 - Sep 29, 2025</content>
<id>urn:uuid:0f808390-b5b2-415b-9c8d-ea2981ffb0ed</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/dda1ffda-3109-444a-a777-ab7ec086e094"/>
<published>2025-09-18T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-09-18T16:36:09.3921386Z</updated>
<georss:line>49.27745545566782 -123.04670763718248 49.277454309658026 -123.04408379627628</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Sep 15, 2025 - Sep 29, 2025</content>
<id>urn:uuid:00dc4350-01a3-4695-8a5c-ce1ad880d082</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/dda1ffda-3109-444a-a777-ab7ec086e094"/>
<published>2025-09-18T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-09-18T16:36:09.3921386Z</updated>
<georss:line>49.278676363100146 -123.0467065490659 49.27826951985807 -123.04670705854663</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Sep 15, 2025 - Sep 29, 2025</content>
<id>urn:uuid:45cae857-7817-4678-ab86-95b21b7b3fa3</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/dda1ffda-3109-444a-a777-ab7ec086e094"/>
<published>2025-09-18T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-09-18T16:36:09.3921386Z</updated>
<georss:line>49.27908291830107 -123.04670645177471 49.278676363100146 -123.0467065490659</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Sep 15, 2025 - Sep 29, 2025</content>
<id>urn:uuid:76bb8666-edf1-4202-986d-3d6f3bae8b8c</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/dda1ffda-3109-444a-a777-ab7ec086e094"/>
<published>2025-09-18T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-09-18T16:36:09.3921386Z</updated>
<georss:line>49.278264803572824 -123.04145635999728 49.27826163110751 -123.03883320339467</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Sep 15, 2025 - Sep 29, 2025</content>
<id>urn:uuid:e28da3d7-3c52-4619-8659-ce5b331d0293</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/dda1ffda-3109-444a-a777-ab7ec086e094"/>
<published>2025-09-18T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-09-18T16:36:09.3921386Z</updated>
<georss:line>49.276412611993266 -123.0407299762772 49.2764117255347 -123.03957936315912</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Sep 15, 2025 - Sep 29, 2025</content>
<id>urn:uuid:12351b97-7ada-401f-849f-2c8127032933</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/dda1ffda-3109-444a-a777-ab7ec086e094"/>
<published>2025-09-18T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-09-18T16:36:09.3921386Z</updated>
<georss:line>49.2764117255347 -123.03957936315912 49.27641199761044 -123.0388839943546</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Sep 15, 2025 - Sep 29, 2025</content>
<id>urn:uuid:366b331d-8cdd-46a6-90eb-4742c94d7515</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/dda1ffda-3109-444a-a777-ab7ec086e094"/>
<published>2025-09-18T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-09-18T16:36:09.3921386Z</updated>
<georss:line>49.27826163110751 -123.03883320339467 49.278258382205024 -123.03620652742003</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Sep 15, 2025 - Sep 29, 2025</content>
<id>urn:uuid:349fe943-b86f-4d96-9905-1dc174e5e6fc</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/dda1ffda-3109-444a-a777-ab7ec086e094"/>
<published>2025-09-18T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-09-18T16:36:09.3921386Z</updated>
<georss:line>49.27967404178972 -123.06366532240112 49.279664450681935 -123.06172983812225</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Sep 15, 2025 - Sep 29, 2025</content>
<id>urn:uuid:8bfe344a-5279-42e7-83ab-1c6e5fb46b47</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/dda1ffda-3109-444a-a777-ab7ec086e094"/>
<published>2025-09-18T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-09-18T16:36:09.3921386Z</updated>
<georss:line>49.28117427953768 -123.06170140497193 49.28116350397079 -123.05976625967678</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Sep 15, 2025 - Sep 29, 2025</content>
<id>urn:uuid:2887b135-cac4-417a-b264-c15ba8681180</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/dda1ffda-3109-444a-a777-ab7ec086e094"/>
<published>2025-09-18T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-09-18T16:36:09.3921386Z</updated>
<georss:line>49.27702403763976 -123.05787821546967 49.276571488978306 -123.05788014687292</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Sep 15, 2025 - Sep 29, 2025</content>
<id>urn:uuid:bbcfa262-663a-4817-b887-3d6f10d765e1</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/dda1ffda-3109-444a-a777-ab7ec086e094"/>
<published>2025-09-18T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-09-18T16:36:09.3921386Z</updated>
<georss:line>49.27747643319603 -123.05787658632192 49.27702403763976 -123.05787821546967</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Sep 15, 2025 - Sep 29, 2025</content>
<id>urn:uuid:4ba12418-13c2-4c75-be7b-059a52784d3a</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/dda1ffda-3109-444a-a777-ab7ec086e094"/>
<published>2025-09-18T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-09-18T16:36:09.3921386Z</updated>
<georss:line>49.27568163587975 -123.05983144171077 49.27566651936101 -123.05789821138669</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Sep 15, 2025 - Sep 29, 2025</content>
<id>urn:uuid:516db3db-6ff7-4953-9a99-77a41296413d</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/dda1ffda-3109-444a-a777-ab7ec086e094"/>
<published>2025-09-18T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-09-18T16:36:09.3921386Z</updated>
<georss:line>49.27570760745647 -123.06317296126693 49.275696935033636 -123.06176636445585</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Sep 15, 2025 - Sep 29, 2025</content>
<id>urn:uuid:8c2e0ac5-653c-4b6e-8ea1-d69a2f75a652</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/dda1ffda-3109-444a-a777-ab7ec086e094"/>
<published>2025-09-18T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-09-18T16:36:09.3921386Z</updated>
<georss:line>49.27571160844485 -123.06370066894321 49.27570760745647 -123.06317296126693</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Sep 15, 2025 - Sep 29, 2025</content>
<id>urn:uuid:f6b5a1fc-305b-4250-b7e7-73014035c12d</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/dda1ffda-3109-444a-a777-ab7ec086e094"/>
<published>2025-09-18T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-09-18T16:36:09.3921386Z</updated>
<georss:line>49.2741456897472 -123.05465676689444 49.274143381789315 -123.05201781282014</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Sep 15, 2025 - Sep 29, 2025</content>
<id>urn:uuid:a4a93fc5-fcab-44e2-be5a-c8e05cb49048</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/dda1ffda-3109-444a-a777-ab7ec086e094"/>
<published>2025-09-18T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-09-18T16:36:09.3921386Z</updated>
<georss:line>49.27538031287352 -123.04411832484882 49.27421236135831 -123.0441379457971</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Sep 15, 2025 - Sep 29, 2025</content>
<id>urn:uuid:b3b857b2-1db3-4fc6-ba4f-c4c2e8433377</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/dda1ffda-3109-444a-a777-ab7ec086e094"/>
<published>2025-09-18T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-09-18T16:36:09.3921386Z</updated>
<georss:line>49.275381623346874 -123.04551707762354 49.27421368939946 -123.0455371604761</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Sep 15, 2025 - Sep 29, 2025</content>
<id>urn:uuid:fb8edb96-76b9-4cb3-8483-1e67bdff22ff</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/dda1ffda-3109-444a-a777-ab7ec086e094"/>
<published>2025-09-18T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-09-18T16:36:09.3921386Z</updated>
<georss:line>49.274976630362715 -123.05580221502495 49.27497503829221 -123.05465405383043</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Sep 15, 2025 - Sep 29, 2025</content>
<id>urn:uuid:b6277a54-27b9-4c12-b77c-58e3812e3cc6</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/dda1ffda-3109-444a-a777-ab7ec086e094"/>
<published>2025-09-18T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-09-18T16:36:09.3921386Z</updated>
<georss:line>49.274977421648714 -123.05657969402661 49.274976630362715 -123.05580221502495</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Sep 15, 2025 - Sep 29, 2025</content>
<id>urn:uuid:4cc8dd41-b6ad-415c-b94a-cbbe9279ce00</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/dda1ffda-3109-444a-a777-ab7ec086e094"/>
<published>2025-09-18T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-09-18T16:36:09.3921386Z</updated>
<georss:line>49.272945375276265 -123.05730451505882 49.27301235789321 -123.05680367099839 49.273073093494276 -123.05658350980558</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Sep 15, 2025 - Sep 29, 2025</content>
<id>urn:uuid:8effdd74-3058-43e6-8ff0-9d73425b7aaf</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/dda1ffda-3109-444a-a777-ab7ec086e094"/>
<published>2025-09-18T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-09-18T16:36:09.3921386Z</updated>
<georss:line>49.27295076451199 -123.05795156147876 49.272945375276265 -123.05730451505882</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Sep 15, 2025 - Sep 29, 2025</content>
<id>urn:uuid:42ff7741-e519-4fb2-b460-d957dd883a77</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/dda1ffda-3109-444a-a777-ab7ec086e094"/>
<published>2025-09-18T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-09-18T16:36:09.3921386Z</updated>
<georss:line>49.273887633180294 -123.06180178718849 49.273872028331226 -123.05986774593325</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Sep 15, 2025 - Sep 29, 2025</content>
<id>urn:uuid:e1f4ec66-03a9-4938-bd28-572b1daee573</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/dda1ffda-3109-444a-a777-ab7ec086e094"/>
<published>2025-09-18T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-09-18T16:36:09.3921386Z</updated>
<georss:line>49.27479197411395 -123.0617835739591 49.27477663007835 -123.05984903024542</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Sep 15, 2025 - Sep 29, 2025</content>
<id>urn:uuid:a68cfcf7-c8d7-444b-85b2-2628b665b8e3</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/dda1ffda-3109-444a-a777-ab7ec086e094"/>
<published>2025-09-18T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-09-18T16:36:09.3921386Z</updated>
<georss:line>49.27209226516217 -123.06377186435081 49.272076837892655 -123.06183655941788</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Sep 15, 2025 - Sep 29, 2025</content>
<id>urn:uuid:fcd92ae6-3ed4-4820-8ee8-0d349fd63d53</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/dda1ffda-3109-444a-a777-ab7ec086e094"/>
<published>2025-09-18T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-09-18T16:36:09.3921386Z</updated>
<georss:line>49.27210322266629 -123.0651241001565 49.27209226516217 -123.06377186435081</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Sep 15, 2025 - Sep 29, 2025</content>
<id>urn:uuid:28b3d824-e2b8-48c5-a14c-bf313ff5ef1b</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/dda1ffda-3109-444a-a777-ab7ec086e094"/>
<published>2025-09-18T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-09-18T16:36:09.3921386Z</updated>
<georss:line>49.272292590399076 -123.05204716874805 49.272290649246 -123.04942078258593</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Sep 15, 2025 - Sep 29, 2025</content>
<id>urn:uuid:fee69cc6-02cd-4265-bb0d-98d44b4df96c</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/dda1ffda-3109-444a-a777-ab7ec086e094"/>
<published>2025-09-18T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-09-18T16:36:09.3921386Z</updated>
<georss:line>49.2722950651025 -123.05412037511933 49.272292590399076 -123.05204716874805</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Sep 15, 2025 - Sep 29, 2025</content>
<id>urn:uuid:b15f278d-33ac-4553-b8d5-2eb5897f7f74</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/dda1ffda-3109-444a-a777-ab7ec086e094"/>
<published>2025-09-18T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-09-18T16:36:09.3921386Z</updated>
<georss:line>49.27210788655316 -123.06570425639931 49.27210322266629 -123.0651241001565</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Sep 15, 2025 - Sep 29, 2025</content>
<id>urn:uuid:3acb447e-559d-464c-9860-8177f9f0e712</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/dda1ffda-3109-444a-a777-ab7ec086e094"/>
<published>2025-09-18T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-09-18T16:36:09.3921386Z</updated>
<georss:line>49.27088701683576 -123.0441919313914 49.270422699932084 -123.04419984704187</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Sep 15, 2025 - Sep 29, 2025</content>
<id>urn:uuid:4b732bfb-c84d-47a3-a2f5-560b37cc7ff9</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/dda1ffda-3109-444a-a777-ab7ec086e094"/>
<published>2025-09-18T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-09-18T16:36:09.3921386Z</updated>
<georss:line>49.27135316813121 -123.04418555687188 49.27088701683576 -123.0441919313914</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Sep 15, 2025 - Sep 29, 2025</content>
<id>urn:uuid:ec52bcd0-46dc-481e-8b33-e3361c8e8114</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/dda1ffda-3109-444a-a777-ab7ec086e094"/>
<published>2025-09-18T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-09-18T16:36:09.3921386Z</updated>
<georss:line>49.271350195837414 -123.04145317748328 49.27134739557832 -123.03892671142583</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Sep 15, 2025 - Sep 29, 2025</content>
<id>urn:uuid:1074ea49-4c76-4c21-aa3b-a802867688ca</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/dda1ffda-3109-444a-a777-ab7ec086e094"/>
<published>2025-09-18T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-09-18T16:36:09.3921386Z</updated>
<georss:line>49.27135176450955 -123.04359451322325 49.271350195837414 -123.04145317748328</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Sep 15, 2025 - Sep 29, 2025</content>
<id>urn:uuid:5b3e674b-8b36-45c0-b036-7afc4b91adc7</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/dda1ffda-3109-444a-a777-ab7ec086e094"/>
<published>2025-09-18T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-09-18T16:36:09.3921386Z</updated>
<georss:line>49.27181910393503 -123.04417805479692 49.27135316813121 -123.04418555687188</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Sep 15, 2025 - Sep 29, 2025</content>
<id>urn:uuid:29fe8a22-78f0-485a-8f42-e01e32510580</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/dda1ffda-3109-444a-a777-ab7ec086e094"/>
<published>2025-09-18T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-09-18T16:36:09.3921386Z</updated>
<georss:line>49.272286056162045 -123.04417053974407 49.27181910393503 -123.04417805479692</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Sep 15, 2025 - Sep 29, 2025</content>
<id>urn:uuid:d6dffae7-09a2-4ab3-971b-fa6465100e6f</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/dda1ffda-3109-444a-a777-ab7ec086e094"/>
<published>2025-09-18T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-09-18T16:36:09.3921386Z</updated>
<georss:line>49.25750287457416 -123.10060598435075 49.25747287737806 -123.09840000638755</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Sep 15, 2025 - Sep 29, 2025</content>
<id>urn:uuid:d20d8053-c859-4dd7-b341-8d024c64fd53</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/dda1ffda-3109-444a-a777-ab7ec086e094"/>
<published>2025-09-18T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-09-18T16:36:09.3921386Z</updated>
<georss:line>49.2565647206973 -123.09843130713013 49.25653493313797 -123.0964958144786</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Sep 15, 2025 - Sep 29, 2025</content>
<id>urn:uuid:189cb7fe-85e4-43d7-b0aa-37b8ffda5e57</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/dda1ffda-3109-444a-a777-ab7ec086e094"/>
<published>2025-09-18T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-09-18T16:36:09.3921386Z</updated>
<georss:line>49.25653493313797 -123.0964958144786 49.256530381204016 -123.09605364938737</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Sep 15, 2025 - Sep 29, 2025</content>
<id>urn:uuid:b1481571-169f-4a69-a54f-c4c054e10c3b</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/dda1ffda-3109-444a-a777-ab7ec086e094"/>
<published>2025-09-18T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-09-18T16:36:09.3921386Z</updated>
<georss:line>49.256530381204016 -123.09605364938737 49.256490579013075 -123.09377412085719</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Sep 15, 2025 - Sep 29, 2025</content>
<id>urn:uuid:f8149c0b-c8f1-4f8c-92ee-ad3cfd75fd74</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/dda1ffda-3109-444a-a777-ab7ec086e094"/>
<published>2025-09-18T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-09-18T16:36:09.3921386Z</updated>
<georss:line>49.256490579013075 -123.09377412085719 49.2564665709624 -123.0922317940607</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Sep 15, 2025 - Sep 29, 2025</content>
<id>urn:uuid:49f1fe5f-daa4-439c-87aa-634ed1e5fad0</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/dda1ffda-3109-444a-a777-ab7ec086e094"/>
<published>2025-09-18T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-09-18T16:36:09.3921386Z</updated>
<georss:line>49.257325201457434 -123.09353944824717 49.257279293478206 -123.09243969875625</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Sep 15, 2025 - Sep 29, 2025</content>
<id>urn:uuid:85492b13-153d-4ed2-9183-a837d6520960</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/dda1ffda-3109-444a-a777-ab7ec086e094"/>
<published>2025-09-18T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-09-18T16:36:09.3921386Z</updated>
<georss:line>49.257279293478206 -123.09243969875625 49.25725362508177 -123.09181429586987</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Sep 15, 2025 - Sep 29, 2025</content>
<id>urn:uuid:4284ed91-aab2-4e40-991d-767bc0b7b4d5</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/dda1ffda-3109-444a-a777-ab7ec086e094"/>
<published>2025-09-18T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-09-18T16:36:09.3921386Z</updated>
<georss:line>49.2564665709624 -123.0922317940607 49.256460125171316 -123.09184312655161</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Sep 15, 2025 - Sep 29, 2025</content>
<id>urn:uuid:acf80e58-10f1-4ca6-bf4f-3290f829fa14</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/dda1ffda-3109-444a-a777-ab7ec086e094"/>
<published>2025-09-18T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-09-18T16:36:09.3921386Z</updated>
<georss:line>49.25685961566032 -123.09182685426595 49.256460125171316 -123.09184312655161</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Sep 15, 2025 - Sep 29, 2025</content>
<id>urn:uuid:ac42e970-539f-4f92-a670-ba8075f2d25e</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/dda1ffda-3109-444a-a777-ab7ec086e094"/>
<published>2025-09-18T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-09-18T16:36:09.3921386Z</updated>
<georss:line>49.25725362508177 -123.09181429586987 49.25685961566032 -123.09182685426595</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Sep 15, 2025 - Sep 29, 2025</content>
<id>urn:uuid:ff85fd15-4ad3-4900-81dc-1f089a4dbf85</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/dda1ffda-3109-444a-a777-ab7ec086e094"/>
<published>2025-09-18T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-09-18T16:36:09.3921386Z</updated>
<georss:line>49.25639176851246 -123.08747577461429 49.25638342921275 -123.08695242736304</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Sep 15, 2025 - Sep 29, 2025</content>
<id>urn:uuid:aafd129b-a096-4112-b59f-6dd46be87333</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/dda1ffda-3109-444a-a777-ab7ec086e094"/>
<published>2025-09-18T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-09-18T16:36:09.3921386Z</updated>
<georss:line>49.25639742712977 -123.08785431130384 49.25639176851246 -123.08747577461429</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Sep 15, 2025 - Sep 29, 2025</content>
<id>urn:uuid:f470bc50-56b7-45ff-8376-7ba34d7604bd</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/dda1ffda-3109-444a-a777-ab7ec086e094"/>
<published>2025-09-18T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-09-18T16:36:09.3921386Z</updated>
<georss:line>49.25671756713942 -123.08985405867537 49.25641867259367 -123.08920593614579</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Sep 15, 2025 - Sep 29, 2025</content>
<id>urn:uuid:8a78a48e-8f03-4b1e-a955-9752eada3c3f</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/dda1ffda-3109-444a-a777-ab7ec086e094"/>
<published>2025-09-18T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-09-18T16:36:09.3921386Z</updated>
<georss:line>49.25721685411253 -123.09092523041457 49.25671756713942 -123.08985405867537</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Sep 15, 2025 - Sep 29, 2025</content>
<id>urn:uuid:cc978fab-4942-4c20-9289-a6cf8e3257b1</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/dda1ffda-3109-444a-a777-ab7ec086e094"/>
<published>2025-09-18T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-09-18T16:36:09.3921386Z</updated>
<georss:line>49.254975383562964 -123.08365933733917 49.25452338859009 -123.0836761908418</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Sep 15, 2025 - Sep 29, 2025</content>
<id>urn:uuid:5d51db6b-ed6e-46e9-8d86-b5370b6ef592</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/dda1ffda-3109-444a-a777-ab7ec086e094"/>
<published>2025-09-18T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-09-18T16:36:09.3921386Z</updated>
<georss:line>49.25562212705037 -123.0875017619182 49.25473434630132 -123.08560146630914</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Sep 15, 2025 - Sep 29, 2025</content>
<id>urn:uuid:e40032d2-af18-438f-86b8-0f834bd4e7a4</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/dda1ffda-3109-444a-a777-ab7ec086e094"/>
<published>2025-09-18T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-09-18T16:36:09.3921386Z</updated>
<georss:line>49.255427396816685 -123.08364203006737 49.254975383562964 -123.08365933733917</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Sep 15, 2025 - Sep 29, 2025</content>
<id>urn:uuid:829c644a-9d16-496a-bd02-062f06f38fed</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/dda1ffda-3109-444a-a777-ab7ec086e094"/>
<published>2025-09-18T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-09-18T16:36:09.3921386Z</updated>
<georss:line>49.25641867259367 -123.08920593614579 49.25562212705037 -123.0875017619182</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Sep 15, 2025 - Sep 29, 2025</content>
<id>urn:uuid:28e729e4-95c6-407b-a834-21974fa78a41</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/dda1ffda-3109-444a-a777-ab7ec086e094"/>
<published>2025-09-18T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-09-18T16:36:09.3921386Z</updated>
<georss:line>49.25636956959576 -123.08607279346295 49.25636113102735 -123.08554129714719</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Sep 15, 2025 - Sep 29, 2025</content>
<id>urn:uuid:fc283437-e6a3-4673-b2ba-31d9da015f8c</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/dda1ffda-3109-444a-a777-ab7ec086e094"/>
<published>2025-09-18T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-09-18T16:36:09.3921386Z</updated>
<georss:line>49.25638342921275 -123.08695242736304 49.25636956959576 -123.08607279346295</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Sep 15, 2025 - Sep 29, 2025</content>
<id>urn:uuid:b4292146-148c-4779-a842-24abee08a6fb</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/dda1ffda-3109-444a-a777-ab7ec086e094"/>
<published>2025-09-18T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-09-18T16:36:09.3921386Z</updated>
<georss:line>49.2529536934814 -123.08179499743795 49.25206421551317 -123.07989734993012</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Sep 15, 2025 - Sep 29, 2025</content>
<id>urn:uuid:4025fabe-91b2-429e-b273-b9ce86f9ac22</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/dda1ffda-3109-444a-a777-ab7ec086e094"/>
<published>2025-09-18T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-09-18T16:36:09.3921386Z</updated>
<georss:line>49.25355591086404 -123.08177478881431 49.2529536934814 -123.08179499743795</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Sep 15, 2025 - Sep 29, 2025</content>
<id>urn:uuid:387a22e0-d60f-445c-a3c6-17e8c94a3169</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/dda1ffda-3109-444a-a777-ab7ec086e094"/>
<published>2025-09-18T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-09-18T16:36:09.3921386Z</updated>
<georss:line>49.256831240341114 -123.08148250448055 49.256759975621435 -123.07972267322918</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Sep 15, 2025 - Sep 29, 2025</content>
<id>urn:uuid:c1fae8df-0109-417b-9a8e-96711b910fb4</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/dda1ffda-3109-444a-a777-ab7ec086e094"/>
<published>2025-09-18T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-09-18T16:36:09.3921386Z</updated>
<georss:line>49.25206421551317 -123.07989734993012 49.2511781449646 -123.07799594222396</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Sep 15, 2025 - Sep 29, 2025</content>
<id>urn:uuid:2268343f-0c2f-4968-b6d1-d3bb84774497</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/dda1ffda-3109-444a-a777-ab7ec086e094"/>
<published>2025-09-18T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-09-18T16:36:09.3921386Z</updated>
<georss:line>49.2511781449646 -123.07799594222396 49.25018531977673 -123.076264097348 49.25011314321395 -123.07609868345953</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 21, 2025 - Sep 21, 2025; Weekdays</content>
<id>urn:uuid:a3a8ab4b-7433-49b4-8961-1f2e92c30cdf</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d39f2623-3141-4451-98ca-a51ddb6cf27f"/>
<published>2025-08-21T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-12-05T17:12:50.6177833Z</updated>
<georss:line>49.261540333488426 -123.09107028394136 49.261088120347296 -123.09107789057985</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 21, 2025 - Sep 21, 2025; Weekdays</content>
<id>urn:uuid:d6ee1773-69fb-4101-ae5f-9c96b29fc375</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d39f2623-3141-4451-98ca-a51ddb6cf27f"/>
<published>2025-08-21T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-12-05T17:12:50.6177833Z</updated>
<georss:line>49.25971659387554 -123.08916322791242 49.259700574824166 -123.08722881012326</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 21, 2025 - Sep 21, 2025; Weekdays</content>
<id>urn:uuid:d84bffd9-f603-4816-9006-655750c58c7a</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d39f2623-3141-4451-98ca-a51ddb6cf27f"/>
<published>2025-08-21T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-12-05T17:12:50.6177833Z</updated>
<georss:line>49.261977036825385 -123.08912729108141 49.2615251209111 -123.08913461370165</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 21, 2025 - Sep 21, 2025; Weekdays</content>
<id>urn:uuid:1acde442-bb93-47e1-a72c-80a2f552b0ee</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d39f2623-3141-4451-98ca-a51ddb6cf27f"/>
<published>2025-08-21T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-12-05T17:12:50.6177833Z</updated>
<georss:line>49.26247371365085 -123.08911893564974 49.261977036825385 -123.08912729108141</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 21, 2025 - Sep 21, 2025; Weekdays</content>
<id>urn:uuid:78faf152-f732-4c79-908f-06379261156b</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d39f2623-3141-4451-98ca-a51ddb6cf27f"/>
<published>2025-08-21T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-12-05T17:12:50.6177833Z</updated>
<georss:line>49.260636684334884 -123.09829230543497 49.26017959708548 -123.09830830237881</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 21, 2025 - Sep 21, 2025; Weekdays</content>
<id>urn:uuid:796df28f-dbf9-41ef-98c1-5b985b454de5</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d39f2623-3141-4451-98ca-a51ddb6cf27f"/>
<published>2025-08-21T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-12-05T17:12:50.6177833Z</updated>
<georss:line>49.2610886449047 -123.09827556959398 49.260636684334884 -123.09829230543497</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 21, 2025 - Sep 21, 2025; Weekdays</content>
<id>urn:uuid:b74be2c6-a727-471e-bb34-b174a4a87cfb</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d39f2623-3141-4451-98ca-a51ddb6cf27f"/>
<published>2025-08-21T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-12-05T17:12:50.6177833Z</updated>
<georss:line>49.26106663276977 -123.09684912733182 49.2610564131536 -123.09613953660053</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 21, 2025 - Sep 21, 2025; Weekdays</content>
<id>urn:uuid:c4d5e37b-d21b-4960-95f8-eef48dfd450f</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d39f2623-3141-4451-98ca-a51ddb6cf27f"/>
<published>2025-08-21T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-12-05T17:12:50.6177833Z</updated>
<georss:line>49.25973213833288 -123.0910994739866 49.25971659387554 -123.08916322791242</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 21, 2025 - Sep 21, 2025; Weekdays</content>
<id>urn:uuid:04aa4ae8-952e-45b7-a438-14d5697e7a29</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d39f2623-3141-4451-98ca-a51ddb6cf27f"/>
<published>2025-08-21T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-12-05T17:12:50.6177833Z</updated>
<georss:line>49.26063593447006 -123.09108509856512 49.26018396471244 -123.09109196323043</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 21, 2025 - Sep 21, 2025; Weekdays</content>
<id>urn:uuid:ef5aa35c-e50f-48fd-80ac-4ac737e44dfa</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d39f2623-3141-4451-98ca-a51ddb6cf27f"/>
<published>2025-08-21T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-12-05T17:12:50.6177833Z</updated>
<georss:line>49.261088120347296 -123.09107789057985 49.26063593447006 -123.09108509856512</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 21, 2025 - Sep 21, 2025; Weekdays</content>
<id>urn:uuid:606cb00a-ffae-4caa-9912-8478d59372bf</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d39f2623-3141-4451-98ca-a51ddb6cf27f"/>
<published>2025-08-21T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-12-05T17:12:50.6177833Z</updated>
<georss:line>49.26107966731891 -123.09776706798105 49.26106663276977 -123.09684912733182</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 21, 2025 - Sep 21, 2025; Weekdays</content>
<id>urn:uuid:87522370-9bc6-445b-bdee-d4f0ef63fdc9</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d39f2623-3141-4451-98ca-a51ddb6cf27f"/>
<published>2025-08-21T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-12-05T17:12:50.6177833Z</updated>
<georss:line>49.262010564205696 -123.10099764801556 49.261105000652435 -123.10103637208277</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 21, 2025 - Sep 21, 2025; Weekdays</content>
<id>urn:uuid:a05bd601-31ef-4403-a960-7390d7b49785</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d39f2623-3141-4451-98ca-a51ddb6cf27f"/>
<published>2025-08-21T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-12-05T17:12:50.6177833Z</updated>
<georss:line>49.262859263114194 -123.09951399377532 49.26196842662722 -123.09863878819723</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 21, 2025 - Sep 21, 2025; Weekdays</content>
<id>urn:uuid:82b205bf-6d8c-4e6e-b279-ef69dfc6af6f</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d39f2623-3141-4451-98ca-a51ddb6cf27f"/>
<published>2025-08-21T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-12-05T17:12:50.6177833Z</updated>
<georss:line>49.25920136011334 -123.08143448374645 49.25874886779005 -123.08144322212125</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 21, 2025 - Sep 21, 2025; Weekdays</content>
<id>urn:uuid:e065650c-8e46-4903-91f2-7d5bb45d7384</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d39f2623-3141-4451-98ca-a51ddb6cf27f"/>
<published>2025-08-21T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-12-05T17:12:50.6177833Z</updated>
<georss:line>49.26055420773662 -123.08087828646617 49.260526787004665 -123.07753725611747</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 21, 2025 - Sep 21, 2025; Weekdays</content>
<id>urn:uuid:5de2d2bf-983d-4b27-8160-a308cb3b8c36</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d39f2623-3141-4451-98ca-a51ddb6cf27f"/>
<published>2025-08-21T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-12-05T17:12:50.6177833Z</updated>
<georss:line>49.261436433978815 -123.07816844586972 49.261430889683794 -123.07751905985212</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 21, 2025 - Sep 21, 2025; Weekdays</content>
<id>urn:uuid:a8eaacf8-2ba3-4b52-8c38-e418812b1fe8</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d39f2623-3141-4451-98ca-a51ddb6cf27f"/>
<published>2025-08-21T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-12-05T17:12:50.6177833Z</updated>
<georss:line>49.26144140886859 -123.07880326246753 49.261436433978815 -123.07816844586972</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 21, 2025 - Sep 21, 2025; Weekdays</content>
<id>urn:uuid:29542be1-9e30-40c2-b8e8-507921e5830f</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d39f2623-3141-4451-98ca-a51ddb6cf27f"/>
<published>2025-08-21T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-12-05T17:12:50.6177833Z</updated>
<georss:line>49.25965331328888 -123.08142489223164 49.25920136011334 -123.08143448374645</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 21, 2025 - Sep 21, 2025; Weekdays</content>
<id>urn:uuid:0b3ecba4-9e6b-488d-997d-ae2d01a90c99</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d39f2623-3141-4451-98ca-a51ddb6cf27f"/>
<published>2025-08-21T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-12-05T17:12:50.6177833Z</updated>
<georss:line>49.258764784785484 -123.08337905741452 49.25874886779005 -123.08144322212125</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 21, 2025 - Sep 21, 2025; Weekdays</content>
<id>urn:uuid:d081c664-d078-471f-9726-2bb380278681</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d39f2623-3141-4451-98ca-a51ddb6cf27f"/>
<published>2025-08-21T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-12-05T17:12:50.6177833Z</updated>
<georss:line>49.25874886779005 -123.08144322212125 49.258283088672925 -123.08145313412979</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 21, 2025 - Sep 21, 2025; Weekdays</content>
<id>urn:uuid:a17b0c4d-220f-4998-be6b-83bf4ab09922</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d39f2623-3141-4451-98ca-a51ddb6cf27f"/>
<published>2025-08-21T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-12-05T17:12:50.6177833Z</updated>
<georss:line>49.258283088672925 -123.08145313412979 49.25784456591455 -123.0814617714861</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 21, 2025 - Sep 21, 2025; Weekdays</content>
<id>urn:uuid:1b06d515-48f7-4903-9d63-0fbcc104ee40</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d39f2623-3141-4451-98ca-a51ddb6cf27f"/>
<published>2025-08-21T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-12-05T17:12:50.6177833Z</updated>
<georss:line>49.25776569733054 -123.07694581617669 49.2575265908678 -123.07643790426859 49.257515935872675 -123.07641775442387 49.25743434187592 -123.07629284286753 49.257344652001166 -123.07618164840352 49.25724784596878 -123.07608538188886 49.25714497554955 -123.07600511683295 49.25703718260769 -123.07594170697075 49.25701598661547 -123.0759329890083</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 21, 2025 - Sep 21, 2025; Weekdays</content>
<id>urn:uuid:6b3df12a-7ad9-4519-b37e-296d4596691e</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d39f2623-3141-4451-98ca-a51ddb6cf27f"/>
<published>2025-08-21T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-12-05T17:12:50.6177833Z</updated>
<georss:line>49.25781557843004 -123.07758749997357 49.25736147399738 -123.07759944536652</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 21, 2025 - Sep 21, 2025; Weekdays</content>
<id>urn:uuid:bb348f58-4aaa-4410-a430-6620664eabd6</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d39f2623-3141-4451-98ca-a51ddb6cf27f"/>
<published>2025-08-21T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-12-05T17:12:50.6177833Z</updated>
<georss:line>49.25869279593704 -123.07439433779166 49.258690880658435 -123.07419740781468</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 21, 2025 - Sep 21, 2025; Weekdays</content>
<id>urn:uuid:13870b76-c9bb-4ba1-9357-129d996dcd46</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d39f2623-3141-4451-98ca-a51ddb6cf27f"/>
<published>2025-08-21T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-12-05T17:12:50.6177833Z</updated>
<georss:line>49.25871803306751 -123.07757280751346 49.25869279593704 -123.07439433779166</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 21, 2025 - Sep 21, 2025; Weekdays</content>
<id>urn:uuid:c7cd942f-495f-4cbf-a8eb-79b018121756</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d39f2623-3141-4451-98ca-a51ddb6cf27f"/>
<published>2025-08-21T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-12-05T17:12:50.6177833Z</updated>
<georss:line>49.258690880658435 -123.07419740781468 49.258687293128816 -123.07370308508395</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 21, 2025 - Sep 21, 2025; Weekdays</content>
<id>urn:uuid:098b4924-00ef-4028-aa9d-4713f544a21d</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d39f2623-3141-4451-98ca-a51ddb6cf27f"/>
<published>2025-08-21T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-12-05T17:12:50.6177833Z</updated>
<georss:line>49.25826523522693 -123.07758145694443 49.25781557843004 -123.07758749997357</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 21, 2025 - Sep 21, 2025; Weekdays</content>
<id>urn:uuid:078d1736-cb7d-4f10-822a-86151c6377d2</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d39f2623-3141-4451-98ca-a51ddb6cf27f"/>
<published>2025-08-21T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-12-05T17:12:50.6177833Z</updated>
<georss:line>49.2585680567455 -123.07757152797708 49.25826523522693 -123.07758145694443</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 21, 2025 - Sep 21, 2025; Weekdays</content>
<id>urn:uuid:a83a3503-2e0e-4ae2-84f6-925702e07f9b</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d39f2623-3141-4451-98ca-a51ddb6cf27f"/>
<published>2025-08-21T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-12-05T17:12:50.6177833Z</updated>
<georss:line>49.25683818941974 -123.08165412152363 49.256831240341114 -123.08148250448055</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 21, 2025 - Sep 21, 2025; Weekdays</content>
<id>urn:uuid:002ef303-83a7-4af5-9d90-d6ece0c526c5</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d39f2623-3141-4451-98ca-a51ddb6cf27f"/>
<published>2025-08-21T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-12-05T17:12:50.6177833Z</updated>
<georss:line>49.25691342914067 -123.08349897777168 49.25683818941974 -123.08165412152363</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 21, 2025 - Sep 21, 2025; Weekdays</content>
<id>urn:uuid:0b0de62e-71f5-46af-b051-8bd759a533dd</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d39f2623-3141-4451-98ca-a51ddb6cf27f"/>
<published>2025-08-21T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-12-05T17:12:50.6177833Z</updated>
<georss:line>49.25693172529242 -123.08394601961223 49.25691342914067 -123.08349897777168</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 21, 2025 - Sep 21, 2025; Weekdays</content>
<id>urn:uuid:d63c8465-7b62-4f10-9e33-b63d1177a70f</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d39f2623-3141-4451-98ca-a51ddb6cf27f"/>
<published>2025-08-21T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-12-05T17:12:50.6177833Z</updated>
<georss:line>49.25693900762613 -123.08412437187422 49.25693172529242 -123.08394601961223</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 21, 2025 - Sep 21, 2025; Weekdays</content>
<id>urn:uuid:a69b0b11-f075-434a-a2d5-4b30b9f23b1b</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d39f2623-3141-4451-98ca-a51ddb6cf27f"/>
<published>2025-08-21T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-12-05T17:12:50.6177833Z</updated>
<georss:line>49.256967505476865 -123.08482425747341 49.25693900762613 -123.08412437187422</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 21, 2025 - Sep 21, 2025; Weekdays</content>
<id>urn:uuid:4098c5e6-d71c-4c31-9898-25ec698e041a</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d39f2623-3141-4451-98ca-a51ddb6cf27f"/>
<published>2025-08-21T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-12-05T17:12:50.6177833Z</updated>
<georss:line>49.25697399113079 -123.08498324505089 49.256967505476865 -123.08482425747341</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 21, 2025 - Sep 21, 2025; Weekdays</content>
<id>urn:uuid:ad1d156a-7429-4a55-af46-cf631ad4752b</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d39f2623-3141-4451-98ca-a51ddb6cf27f"/>
<published>2025-08-21T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-12-05T17:12:50.6177833Z</updated>
<georss:line>49.25668174333845 -123.07779744272207 49.25667398793584 -123.07761246760121</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 21, 2025 - Sep 21, 2025; Weekdays</content>
<id>urn:uuid:a99cb723-a347-4a79-b0a2-44f8f3a2dd2d</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d39f2623-3141-4451-98ca-a51ddb6cf27f"/>
<published>2025-08-21T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-12-05T17:12:50.6177833Z</updated>
<georss:line>49.25667398793584 -123.07761246760121 49.256648216143674 -123.0769677851926</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 21, 2025 - Sep 21, 2025; Weekdays</content>
<id>urn:uuid:38763779-fa82-4e19-a74e-7c93e3954eab</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d39f2623-3141-4451-98ca-a51ddb6cf27f"/>
<published>2025-08-21T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-12-05T17:12:50.6177833Z</updated>
<georss:line>49.25736147399738 -123.07759944536652 49.25667398793584 -123.07761246760121</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 21, 2025 - Sep 21, 2025; Weekdays</content>
<id>urn:uuid:0610f0e2-a12a-4c7a-916b-c1fd5aab6c5f</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d39f2623-3141-4451-98ca-a51ddb6cf27f"/>
<published>2025-08-21T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-12-05T17:12:50.6177833Z</updated>
<georss:line>49.256648216143674 -123.0769677851926 49.256603589719674 -123.0758679444621</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 21, 2025 - Sep 21, 2025; Weekdays</content>
<id>urn:uuid:7681c8ef-3dcd-4efa-9af4-251b21a428be</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d39f2623-3141-4451-98ca-a51ddb6cf27f"/>
<published>2025-08-21T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-12-05T17:12:50.6177833Z</updated>
<georss:line>49.256975177351705 -123.07591621518658 49.25692564508236 -123.0758958548982 49.25681157700424 -123.07586808459163 49.256696237534754 -123.07585867271405 49.256603589719674 -123.0758679444621</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 21, 2025 - Sep 21, 2025; Weekdays</content>
<id>urn:uuid:e0ec697e-b2f6-4bfc-a023-1d5f2b889903</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d39f2623-3141-4451-98ca-a51ddb6cf27f"/>
<published>2025-08-21T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-12-05T17:12:50.6177833Z</updated>
<georss:line>49.257792885605 -123.07500990873542 49.25656996168769 -123.07503371309436</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 21, 2025 - Sep 21, 2025; Weekdays</content>
<id>urn:uuid:d38d0405-57ff-4160-b8c1-b336e59a5687</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d39f2623-3141-4451-98ca-a51ddb6cf27f"/>
<published>2025-08-21T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-12-05T17:12:50.6177833Z</updated>
<georss:line>49.25064034980633 -123.05588433783056 49.25065083512433 -123.05457366227192</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 21, 2025 - Sep 21, 2025; Weekdays</content>
<id>urn:uuid:adf71c1b-7b7f-4a2c-9f21-574e25ef828a</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d39f2623-3141-4451-98ca-a51ddb6cf27f"/>
<published>2025-08-21T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-12-05T17:12:50.6177833Z</updated>
<georss:line>49.244620567043796 -123.05425171203117 49.244622152199724 -123.05257416671884</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 21, 2025 - Sep 21, 2025; Weekdays</content>
<id>urn:uuid:7f31c7f2-99db-45fe-876c-466e335fcf74</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d39f2623-3141-4451-98ca-a51ddb6cf27f"/>
<published>2025-08-21T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-12-05T17:12:50.6177833Z</updated>
<georss:line>49.244622152199724 -123.05257416671884 49.24462240159892 -123.05204320983557</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 21, 2025 - Sep 21, 2025; Weekdays</content>
<id>urn:uuid:f4c04886-be48-49ae-b0b6-1de14d9826ed</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d39f2623-3141-4451-98ca-a51ddb6cf27f"/>
<published>2025-08-21T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-12-05T17:12:50.6177833Z</updated>
<georss:line>49.25150841468397 -123.04433529399623 49.25089400676663 -123.04433052528157 49.25088707201547 -123.04432904877588 49.2508733195458 -123.04432584853103 49.250859603199245 -123.04432227731112 49.25084593196567 -123.04431834886563 49.250832305850366 -123.0443140494537 49.250818733843175 -123.04430939282483 49.25080521594941 -123.04430436523816 49.25079176115892 -123.04429898044313 49.25077836946639 -123.04429325218108 49.25076504088227 -123.0442871529701 49.250751784396556 -123.04428069655961 49.250738608999086 -123.04427389669894 49.25072550569453 -123.0442667533803 49.250712492478584 -123.04425925287894 49.25069956935124 -123.04425139519519 49.250686727306544 -123.04424320780319 49.25067398434021 -123.04423467697823 49.25066134944214 -123.04422581646966 49.25064880462699 -123.04421661252053 49.250636376880465 -123.04420706515513 49.25062405719669 -123.04419720184767</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 21, 2025 - Sep 21, 2025; Weekdays</content>
<id>urn:uuid:4d683ad3-aa51-4226-9cd5-ee6df1e9548b</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d39f2623-3141-4451-98ca-a51ddb6cf27f"/>
<published>2025-08-21T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-12-05T17:12:50.6177833Z</updated>
<georss:line>49.25645970404028 -123.05661404493573 49.2550966217926 -123.05661627886418</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 21, 2025 - Sep 21, 2025; Weekdays</content>
<id>urn:uuid:4029830f-4c79-4a4c-bb92-6d4c148d010a</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d39f2623-3141-4451-98ca-a51ddb6cf27f"/>
<published>2025-08-21T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-12-05T17:12:50.6177833Z</updated>
<georss:line>49.25674979997555 -123.05661355216591 49.25645970404028 -123.05661404493573</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 21, 2025 - Sep 21, 2025; Weekdays</content>
<id>urn:uuid:ce19c917-bb3c-41ea-b6c3-35001d64d854</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d39f2623-3141-4451-98ca-a51ddb6cf27f"/>
<published>2025-08-21T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-12-05T17:12:50.6177833Z</updated>
<georss:line>49.257566352692976 -123.0550055861572 49.25755308792324 -123.05488543065121 49.25754042932917 -123.05475763480881 49.25752923695572 -123.05462953830548 49.25751951080193 -123.05450114113015 49.257511250828 -123.05437252572906 49.257504457033235 -123.05424369209094 49.25749913837987 -123.05411470892884 49.257495294854664 -123.05398560371702 49.25749216368362 -123.0538717676858 49.25748983461054 -123.05373507806338 49.257489070561235 -123.0535983489197 49.25748986252134 -123.05346162146094 49.25749221947348 -123.05332492316968 49.25749613239074 -123.05318832273785 49.257501610262466 -123.05305183390522 49.25750558549581 -123.05297483655778</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 21, 2025 - Sep 21, 2025; Weekdays</content>
<id>urn:uuid:f57f624c-093f-42e5-826f-e9414352bd6f</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d39f2623-3141-4451-98ca-a51ddb6cf27f"/>
<published>2025-08-21T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-12-05T17:12:50.6177833Z</updated>
<georss:line>49.258187217792056 -123.04702548486276 49.2581754738963 -123.04505186681253</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 21, 2025 - Sep 21, 2025; Weekdays</content>
<id>urn:uuid:713d0684-ae9e-43c0-8ea7-6fd8e35f58fa</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d39f2623-3141-4451-98ca-a51ddb6cf27f"/>
<published>2025-08-21T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-12-05T17:12:50.6177833Z</updated>
<georss:line>49.2581754738963 -123.04505186681253 49.25817082439218 -123.04428139638524</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 21, 2025 - Sep 21, 2025; Weekdays</content>
<id>urn:uuid:184d4df1-4df5-40b3-bfd6-f58686364080</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d39f2623-3141-4451-98ca-a51ddb6cf27f"/>
<published>2025-08-21T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-12-05T17:12:50.6177833Z</updated>
<georss:line>49.255413991424575 -123.04432188878387 49.255407245527266 -123.04356371773336</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 21, 2025 - Sep 21, 2025; Weekdays</content>
<id>urn:uuid:57871986-376c-43f1-a41b-cb3f1b86303f</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d39f2623-3141-4451-98ca-a51ddb6cf27f"/>
<published>2025-08-21T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-12-05T17:12:50.6177833Z</updated>
<georss:line>49.25541837508044 -123.0450813908984 49.255413991424575 -123.04432188878387</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 21, 2025 - Sep 21, 2025; Weekdays</content>
<id>urn:uuid:d2e7473e-8d2d-4222-9c01-5a2d3cc2ea73</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d39f2623-3141-4451-98ca-a51ddb6cf27f"/>
<published>2025-08-21T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-12-05T17:12:50.6177833Z</updated>
<georss:line>49.25414389546091 -123.06609736978179 49.25369176270755 -123.06610789701321</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 21, 2025 - Sep 21, 2025; Weekdays</content>
<id>urn:uuid:65da67a7-c990-4fe4-8933-f7b104c849a3</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d39f2623-3141-4451-98ca-a51ddb6cf27f"/>
<published>2025-08-21T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-12-05T17:12:50.6177833Z</updated>
<georss:line>49.25487893658203 -123.06607148523602 49.25414389546091 -123.06609736978179</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 21, 2025 - Sep 21, 2025; Weekdays</content>
<id>urn:uuid:5b7f1d24-7e53-496a-aa78-fc60fd2bc964</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d39f2623-3141-4451-98ca-a51ddb6cf27f"/>
<published>2025-08-21T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-12-05T17:12:50.6177833Z</updated>
<georss:line>49.25580358425833 -123.06603602705779 49.25487893658203 -123.06607148523602</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 21, 2025 - Sep 21, 2025; Weekdays</content>
<id>urn:uuid:a026c128-4614-481e-be41-39acd6c9ecc6</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d39f2623-3141-4451-98ca-a51ddb6cf27f"/>
<published>2025-08-21T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-12-05T17:12:50.6177833Z</updated>
<georss:line>49.25622345385105 -123.06602050838107 49.25580358425833 -123.06603602705779</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 21, 2025 - Sep 21, 2025; Weekdays</content>
<id>urn:uuid:d8130bbe-1226-4637-9474-9ff928683356</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d39f2623-3141-4451-98ca-a51ddb6cf27f"/>
<published>2025-08-21T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-12-05T17:12:50.6177833Z</updated>
<georss:line>49.25063456054056 -123.05663419236892 49.25064034980633 -123.05588433783056</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 21, 2025 - Sep 21, 2025; Weekdays</content>
<id>urn:uuid:bb54c364-6e55-4d24-8baa-b7920133b028</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d39f2623-3141-4451-98ca-a51ddb6cf27f"/>
<published>2025-08-21T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-12-05T17:12:50.6177833Z</updated>
<georss:line>49.25235806641166 -123.05662787785552 49.25151970051883 -123.05663226427299</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 21, 2025 - Sep 21, 2025; Weekdays</content>
<id>urn:uuid:407fd578-6468-4ad0-88e1-4f627b00f618</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d39f2623-3141-4451-98ca-a51ddb6cf27f"/>
<published>2025-08-21T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-12-05T17:12:50.6177833Z</updated>
<georss:line>49.252765505663405 -123.05662647504721 49.25235806641166 -123.05662787785552</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 21, 2025 - Sep 21, 2025; Weekdays</content>
<id>urn:uuid:fc3ad684-9b2c-4721-b0e1-6cee6736e18e</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d39f2623-3141-4451-98ca-a51ddb6cf27f"/>
<published>2025-08-21T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-12-05T17:12:50.6177833Z</updated>
<georss:line>49.25346804260309 -123.05662402183678 49.25277739736623 -123.05662643368284</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 21, 2025 - Sep 21, 2025; Weekdays</content>
<id>urn:uuid:7ed42a97-a3f5-4381-8de6-454905791762</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d39f2623-3141-4451-98ca-a51ddb6cf27f"/>
<published>2025-08-21T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-12-05T17:12:50.6177833Z</updated>
<georss:line>49.25369176270755 -123.06610789701321 49.25288050891561 -123.06612679404225</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 21, 2025 - Sep 21, 2025; Weekdays</content>
<id>urn:uuid:46de2111-368e-447c-b355-06cd52a20836</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d39f2623-3141-4451-98ca-a51ddb6cf27f"/>
<published>2025-08-21T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-12-05T17:12:50.6177833Z</updated>
<georss:line>49.24638411680823 -123.0677782753535 49.24609942477815 -123.06716550459382</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 21, 2025 - Sep 21, 2025; Weekdays</content>
<id>urn:uuid:13d7e49c-9179-4b69-82ed-91f81e2cf5ec</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d39f2623-3141-4451-98ca-a51ddb6cf27f"/>
<published>2025-08-21T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-12-05T17:12:50.6177833Z</updated>
<georss:line>49.24609942477815 -123.06716550459382 49.245797237449665 -123.06651508439758</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 21, 2025 - Sep 21, 2025; Weekdays</content>
<id>urn:uuid:bdb5d2b7-d259-4824-b243-8db11acd8049</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d39f2623-3141-4451-98ca-a51ddb6cf27f"/>
<published>2025-08-21T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-12-05T17:12:50.6177833Z</updated>
<georss:line>49.245797237449665 -123.06651508439758 49.24548454390401 -123.06584205654494</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 21, 2025 - Sep 21, 2025; Weekdays</content>
<id>urn:uuid:ba01adb8-1bb0-44c7-b252-c1fb5120c31a</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d39f2623-3141-4451-98ca-a51ddb6cf27f"/>
<published>2025-08-21T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-12-05T17:12:50.6177833Z</updated>
<georss:line>49.24548454390401 -123.06584205654494 49.24516452418803 -123.06515328208691</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 21, 2025 - Sep 21, 2025; Weekdays</content>
<id>urn:uuid:7685d930-8b4c-4e52-bf05-2f3ad16ccf2e</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d39f2623-3141-4451-98ca-a51ddb6cf27f"/>
<published>2025-08-21T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-12-05T17:12:50.6177833Z</updated>
<georss:line>49.24939243947932 -123.06503403892243 49.24850635052036 -123.06505903684683</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 21, 2025 - Sep 21, 2025; Weekdays</content>
<id>urn:uuid:9e9a22bf-8088-4f60-be03-d474eb12a079</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d39f2623-3141-4451-98ca-a51ddb6cf27f"/>
<published>2025-08-21T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-12-05T17:12:50.6177833Z</updated>
<georss:line>49.25694962860484 -123.03378025032568 49.256429479326016 -123.03378361960854</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 21, 2025 - Sep 21, 2025; Weekdays</content>
<id>urn:uuid:c637ab72-ff0e-4b0c-b70c-fbaaef0035e6</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d39f2623-3141-4451-98ca-a51ddb6cf27f"/>
<published>2025-08-21T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-12-05T17:12:50.6177833Z</updated>
<georss:line>49.25588555773129 -123.02890557692858 49.25619513792421 -123.02843088353154</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 21, 2025 - Sep 21, 2025; Weekdays</content>
<id>urn:uuid:2b286da6-7e4e-4655-96d4-fa61af7c21be</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d39f2623-3141-4451-98ca-a51ddb6cf27f"/>
<published>2025-08-21T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-12-05T17:12:50.6177833Z</updated>
<georss:line>49.25619513792421 -123.02843088353154 49.25649206576233 -123.02888307708578</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 21, 2025 - Sep 21, 2025; Weekdays</content>
<id>urn:uuid:576a1c2c-613e-4a85-86d8-329b66cc8e55</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d39f2623-3141-4451-98ca-a51ddb6cf27f"/>
<published>2025-08-21T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-12-05T17:12:50.6177833Z</updated>
<georss:line>49.25619513792421 -123.02843088353154 49.25657798234053 -123.02784375559158</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 21, 2025 - Sep 21, 2025; Weekdays</content>
<id>urn:uuid:87a5d0fe-a113-4579-95d6-2e524e98d72c</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d39f2623-3141-4451-98ca-a51ddb6cf27f"/>
<published>2025-08-21T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-12-05T17:12:50.6177833Z</updated>
<georss:line>49.25063252074992 -123.02372982798191 49.247898302014136 -123.02374332958179</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 21, 2025 - Sep 21, 2025; Weekdays</content>
<id>urn:uuid:80197f8c-4c6e-404f-9f3f-2226d85ae996</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d39f2623-3141-4451-98ca-a51ddb6cf27f"/>
<published>2025-08-21T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-12-05T17:12:50.6177833Z</updated>
<georss:line>49.25274166061607 -123.03379793638692 49.25232146594789 -123.03380100244507</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 21, 2025 - Sep 21, 2025; Weekdays</content>
<id>urn:uuid:636dbf8f-376e-4430-81c0-06b62c0c96e1</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d39f2623-3141-4451-98ca-a51ddb6cf27f"/>
<published>2025-08-21T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-12-05T17:12:50.6177833Z</updated>
<georss:line>49.253158390759836 -123.0337994301637 49.25274166061607 -123.03379793638692</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 21, 2025 - Sep 21, 2025; Weekdays</content>
<id>urn:uuid:dfcf0aa1-0cf9-47d8-9d23-412bf1861a62</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d39f2623-3141-4451-98ca-a51ddb6cf27f"/>
<published>2025-08-21T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-12-05T17:12:50.6177833Z</updated>
<georss:line>49.25473170089933 -123.0337948151235 49.25399762691919 -123.03379889006072</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 21, 2025 - Sep 21, 2025; Weekdays</content>
<id>urn:uuid:c149a283-7afe-4987-83d0-2b898c4cabd9</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d39f2623-3141-4451-98ca-a51ddb6cf27f"/>
<published>2025-08-21T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-12-05T17:12:50.6177833Z</updated>
<georss:line>49.25515083876098 -123.02661646894653 49.25465364699477 -123.02585998581065</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 21, 2025 - Sep 21, 2025; Weekdays</content>
<id>urn:uuid:1abf4f40-41ef-47a7-92cb-c4d69ee63bb9</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d39f2623-3141-4451-98ca-a51ddb6cf27f"/>
<published>2025-08-21T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-12-05T17:12:50.6177833Z</updated>
<georss:line>49.25151827156736 -123.02372904329721 49.25109697123386 -123.02372936353629</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 21, 2025 - Sep 21, 2025; Weekdays</content>
<id>urn:uuid:37774c73-7cbd-4311-b54c-9af12ff2e1a4</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d39f2623-3141-4451-98ca-a51ddb6cf27f"/>
<published>2025-08-21T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-12-05T17:12:50.6177833Z</updated>
<georss:line>49.25109697123386 -123.02372936353629 49.25063252074992 -123.02372982798191</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 21, 2025 - Sep 21, 2025; Weekdays</content>
<id>urn:uuid:55141d9e-d7c6-4f30-9341-e7f0ba23058f</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d39f2623-3141-4451-98ca-a51ddb6cf27f"/>
<published>2025-08-21T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-12-05T17:12:50.6177833Z</updated>
<georss:line>49.25231869162113 -123.03105855753975 49.25231776489554 -123.03045112839395 49.25229866201539 -123.03030298350234 49.25224312262375 -123.0301765692681 49.251177484088515 -123.02855457188858 49.251094500714174 -123.02852803110078</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 21, 2025 - Sep 21, 2025; Weekdays</content>
<id>urn:uuid:e721b4b1-323a-4a18-b00e-e1408ed69a31</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d39f2623-3141-4451-98ca-a51ddb6cf27f"/>
<published>2025-08-21T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-12-05T17:12:50.6177833Z</updated>
<georss:line>49.25724884599461 -123.03377824192773 49.25694962860484 -123.03378025032568</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 21, 2025 - Sep 21, 2025; Weekdays</content>
<id>urn:uuid:a23d68bb-73f1-493e-801f-d17d1643c89f</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d39f2623-3141-4451-98ca-a51ddb6cf27f"/>
<published>2025-08-21T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-12-05T17:12:50.6177833Z</updated>
<georss:line>49.25773908608943 -123.03377496207221 49.25724884599461 -123.03377824192773</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 21, 2025 - Sep 21, 2025; Weekdays</content>
<id>urn:uuid:1080300d-0f20-49cd-99ec-32fd4b3faf9e</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d39f2623-3141-4451-98ca-a51ddb6cf27f"/>
<published>2025-08-21T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-12-05T17:12:50.6177833Z</updated>
<georss:line>49.25814367851049 -123.03650655589954 49.25814851567168 -123.0345240344136</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 21, 2025 - Sep 21, 2025; Weekdays</content>
<id>urn:uuid:fff129c8-962f-4990-bdf0-ac2791869d22</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d39f2623-3141-4451-98ca-a51ddb6cf27f"/>
<published>2025-08-21T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-12-05T17:12:50.6177833Z</updated>
<georss:line>49.25814851567168 -123.0345240344136 49.2581502401421 -123.03377199925741</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 21, 2025 - Sep 21, 2025; Weekdays</content>
<id>urn:uuid:0855d97d-8c3d-4c6a-9b62-4a26f86c68f1</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d39f2623-3141-4451-98ca-a51ddb6cf27f"/>
<published>2025-08-21T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-12-05T17:12:50.6177833Z</updated>
<georss:line>49.25477682383567 -123.04158892200437 49.25477569481714 -123.03905035809974</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 21, 2025 - Sep 21, 2025; Weekdays</content>
<id>urn:uuid:9707d95b-5cd5-4216-b4d3-286b5ba2e885</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d39f2623-3141-4451-98ca-a51ddb6cf27f"/>
<published>2025-08-21T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-12-05T17:12:50.6177833Z</updated>
<georss:line>49.25477569481714 -123.03905035809974 49.25438405147327 -123.03905195929946</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 21, 2025 - Sep 21, 2025; Weekdays</content>
<id>urn:uuid:8a2dab45-fcdd-47da-a135-2b736feab9d5</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d39f2623-3141-4451-98ca-a51ddb6cf27f"/>
<published>2025-08-21T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-12-05T17:12:50.6177833Z</updated>
<georss:line>49.25518039952067 -123.03904777773573 49.25477569481714 -123.03905035809974</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 21, 2025 - Sep 21, 2025; Weekdays</content>
<id>urn:uuid:247e7e1f-a6b1-447f-af18-f4c3b982a885</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d39f2623-3141-4451-98ca-a51ddb6cf27f"/>
<published>2025-08-21T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-12-05T17:12:50.6177833Z</updated>
<georss:line>49.255586237453315 -123.03904561049711 49.25518039952067 -123.03904777773573</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 21, 2025 - Sep 21, 2025; Weekdays</content>
<id>urn:uuid:d992c260-6ed1-49a2-8a8f-ad046741ed11</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d39f2623-3141-4451-98ca-a51ddb6cf27f"/>
<published>2025-08-21T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-12-05T17:12:50.6177833Z</updated>
<georss:line>49.254786427910005 -123.03379445396206 49.25473170089933 -123.0337948151235</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 21, 2025 - Sep 21, 2025; Weekdays</content>
<id>urn:uuid:e44eb238-65f4-48e1-9b4e-a6340d0c6497</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d39f2623-3141-4451-98ca-a51ddb6cf27f"/>
<published>2025-08-21T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-12-05T17:12:50.6177833Z</updated>
<georss:line>49.25557116316435 -123.03378930034901 49.254786427910005 -123.03379445396206</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 21, 2025 - Sep 21, 2025; Weekdays</content>
<id>urn:uuid:2a71a019-96ff-412b-9f37-5b4ed9fe1c51</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d39f2623-3141-4451-98ca-a51ddb6cf27f"/>
<published>2025-08-21T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-12-05T17:12:50.6177833Z</updated>
<georss:line>49.2555877451353 -123.04158207247326 49.255586237453315 -123.03904561049711</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 21, 2025 - Sep 21, 2025; Weekdays</content>
<id>urn:uuid:acdbfea7-b60d-4430-856c-db5ae56bebf8</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d39f2623-3141-4451-98ca-a51ddb6cf27f"/>
<published>2025-08-21T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-12-05T17:12:50.6177833Z</updated>
<georss:line>49.247876193257355 -123.03381250498131 49.2471020078834 -123.03381927227781</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 21, 2025 - Sep 21, 2025; Weekdays</content>
<id>urn:uuid:6cb30bbe-2cb2-496e-bf13-cfba96a9de8a</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d39f2623-3141-4451-98ca-a51ddb6cf27f"/>
<published>2025-08-21T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-12-05T17:12:50.6177833Z</updated>
<georss:line>49.24626434255313 -123.03382776843969 49.245369845200855 -123.03383633540474</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 21, 2025 - Sep 21, 2025; Weekdays</content>
<id>urn:uuid:843263bb-3cd1-465d-908c-a03af9669856</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d39f2623-3141-4451-98ca-a51ddb6cf27f"/>
<published>2025-08-21T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-12-05T17:12:50.6177833Z</updated>
<georss:line>49.24877657893626 -123.04161299794478 49.247890384539915 -123.04162001641076</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 21, 2025 - Sep 21, 2025; Weekdays</content>
<id>urn:uuid:fb3bcf0d-dc2e-4aef-9f44-5d73743702df</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d39f2623-3141-4451-98ca-a51ddb6cf27f"/>
<published>2025-08-21T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-12-05T17:12:50.6177833Z</updated>
<georss:line>49.25060012101491 -123.03380469156389 49.24966238681466 -123.03380462841992</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 21, 2025 - Sep 21, 2025; Weekdays</content>
<id>urn:uuid:1fced597-481b-4504-a05f-5c53509f18d5</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d39f2623-3141-4451-98ca-a51ddb6cf27f"/>
<published>2025-08-21T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-12-05T17:12:50.6177833Z</updated>
<georss:line>49.2487716782413 -123.03380889817022 49.247876193257355 -123.03381250498131</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 21, 2025 - Sep 21, 2025; Weekdays</content>
<id>urn:uuid:20cc272e-3cab-420c-ad4f-ead1e5455422</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d39f2623-3141-4451-98ca-a51ddb6cf27f"/>
<published>2025-08-21T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-12-05T17:12:50.6177833Z</updated>
<georss:line>49.25148570030396 -123.03380631309294 49.25060012101491 -123.03380469156389</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 21, 2025 - Sep 21, 2025; Weekdays</content>
<id>urn:uuid:dd56e9c9-a13b-4f90-addd-0fef1db0847c</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d39f2623-3141-4451-98ca-a51ddb6cf27f"/>
<published>2025-08-21T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-12-05T17:12:50.6177833Z</updated>
<georss:line>49.249669599332805 -123.04160942016102 49.24877657893626 -123.04161299794478</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 21, 2025 - Sep 21, 2025; Weekdays</content>
<id>urn:uuid:9f739d70-e86c-4c8f-9c9d-9eb9cd71a71b</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d39f2623-3141-4451-98ca-a51ddb6cf27f"/>
<published>2025-08-21T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-12-05T17:12:50.6177833Z</updated>
<georss:line>49.25234695853828 -123.04433469827359 49.25150841468397 -123.04433529399623</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 21, 2025 - Sep 21, 2025; Weekdays</content>
<id>urn:uuid:5203f2eb-a25b-4d20-9f7b-43a02f6ea8a9</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d39f2623-3141-4451-98ca-a51ddb6cf27f"/>
<published>2025-08-21T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-12-05T17:12:50.6177833Z</updated>
<georss:line>49.25318469272696 -123.04433403310658 49.25234695853828 -123.04433469827359</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 21, 2025 - Sep 21, 2025; Weekdays</content>
<id>urn:uuid:e8f91550-18f3-4251-92d1-5538945c0856</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d39f2623-3141-4451-98ca-a51ddb6cf27f"/>
<published>2025-08-21T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-12-05T17:12:50.6177833Z</updated>
<georss:line>49.26293475320554 -123.03903315544925 49.26292553220955 -123.03650431059053</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 21, 2025 - Sep 21, 2025; Weekdays</content>
<id>urn:uuid:1913f8ea-871b-4fa7-a7c6-ca74c7e77ba1</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d39f2623-3141-4451-98ca-a51ddb6cf27f"/>
<published>2025-08-21T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-12-05T17:12:50.6177833Z</updated>
<georss:line>49.26474401847176 -123.03901543585819 49.2647352736106 -123.03648728235704</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 21, 2025 - Sep 21, 2025; Weekdays</content>
<id>urn:uuid:ad172f80-a936-48cf-b93b-e5d2c295e7a3</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d39f2623-3141-4451-98ca-a51ddb6cf27f"/>
<published>2025-08-21T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-12-05T17:12:50.6177833Z</updated>
<georss:line>49.2647352736106 -123.03648728235704 49.26472809236819 -123.0345062890097</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 21, 2025 - Sep 21, 2025; Weekdays</content>
<id>urn:uuid:e8c9301d-bd86-44fe-bcef-0edab2648973</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d39f2623-3141-4451-98ca-a51ddb6cf27f"/>
<published>2025-08-21T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-12-05T17:12:50.6177833Z</updated>
<georss:line>49.26291837254095 -123.03451231169143 49.26291584365987 -123.033755266903</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 21, 2025 - Sep 21, 2025; Weekdays</content>
<id>urn:uuid:9a4f7e79-a9e3-492d-8ed4-d0e7bb457487</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d39f2623-3141-4451-98ca-a51ddb6cf27f"/>
<published>2025-08-21T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-12-05T17:12:50.6177833Z</updated>
<georss:line>49.26472809236819 -123.0345062890097 49.264725816018654 -123.03374682509053</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 21, 2025 - Sep 21, 2025; Weekdays</content>
<id>urn:uuid:4a45bde9-01d4-4c79-9715-18a6c6f49dc3</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d39f2623-3141-4451-98ca-a51ddb6cf27f"/>
<published>2025-08-21T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-12-05T17:12:50.6177833Z</updated>
<georss:line>49.26383959253283 -123.03902508629307 49.26383092010147 -123.03649612687866</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 21, 2025 - Sep 21, 2025; Weekdays</content>
<id>urn:uuid:f7ccd77f-2c79-435d-9b7c-019cedcae861</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d39f2623-3141-4451-98ca-a51ddb6cf27f"/>
<published>2025-08-21T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-12-05T17:12:50.6177833Z</updated>
<georss:line>49.2675675325068 -123.03898373773505 49.2675571493827 -123.03645696454448</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 21, 2025 - Sep 21, 2025; Weekdays</content>
<id>urn:uuid:0ee686ab-b98d-4256-a8ee-1efb669999b4</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d39f2623-3141-4451-98ca-a51ddb6cf27f"/>
<published>2025-08-21T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-12-05T17:12:50.6177833Z</updated>
<georss:line>49.268470966946865 -123.03644273723026 49.268462550011066 -123.03370817698857</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 21, 2025 - Sep 21, 2025; Weekdays</content>
<id>urn:uuid:1658c77c-4e84-45c2-b44a-0c80c5af8394</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d39f2623-3141-4451-98ca-a51ddb6cf27f"/>
<published>2025-08-21T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-12-05T17:12:50.6177833Z</updated>
<georss:line>49.26948801114054 -123.04345990352684 49.26948250430854 -123.04148251422481</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 21, 2025 - Sep 21, 2025; Weekdays</content>
<id>urn:uuid:efdbdadd-9e51-45e3-957e-7ffdb26c7298</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d39f2623-3141-4451-98ca-a51ddb6cf27f"/>
<published>2025-08-21T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-12-05T17:12:50.6177833Z</updated>
<georss:line>49.2694901081789 -123.0442155369063 49.26948801114054 -123.04345990352684</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 21, 2025 - Sep 21, 2025; Weekdays</content>
<id>urn:uuid:7b6942f4-3751-4213-8dc3-b3f8655ec94e</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d39f2623-3141-4451-98ca-a51ddb6cf27f"/>
<published>2025-08-21T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-12-05T17:12:50.6177833Z</updated>
<georss:line>49.270417467034804 -123.03894312165853 49.27041346082956 -123.03641564401583</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 21, 2025 - Sep 21, 2025; Weekdays</content>
<id>urn:uuid:36aa99f9-681d-4278-921a-a3d248d9d381</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d39f2623-3141-4451-98ca-a51ddb6cf27f"/>
<published>2025-08-21T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-12-05T17:12:50.6177833Z</updated>
<georss:line>49.26754849785951 -123.03099607484526 49.26754931592353 -123.02848170941193</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 21, 2025 - Sep 21, 2025; Weekdays</content>
<id>urn:uuid:bd004f77-697e-492d-9e1e-05f0205d0cdb</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d39f2623-3141-4451-98ca-a51ddb6cf27f"/>
<published>2025-08-21T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-12-05T17:12:50.6177833Z</updated>
<georss:line>49.268462550011066 -123.03370817698857 49.26846237764636 -123.03098209036553</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 21, 2025 - Sep 21, 2025; Weekdays</content>
<id>urn:uuid:e54b23b6-5bb7-46ec-ba9f-55ef92110828</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d39f2623-3141-4451-98ca-a51ddb6cf27f"/>
<published>2025-08-21T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-12-05T17:12:50.6177833Z</updated>
<georss:line>49.27495838084414 -123.03362089179787 49.27494851181828 -123.03138716122264</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 21, 2025 - Sep 21, 2025; Weekdays</content>
<id>urn:uuid:32587e9e-decf-47c0-8993-27ad22d385b1</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d39f2623-3141-4451-98ca-a51ddb6cf27f"/>
<published>2025-08-21T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-12-05T17:12:50.6177833Z</updated>
<georss:line>49.277842044432674 -123.02833231815171 49.27743425649183 -123.02833380312782</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 21, 2025 - Sep 21, 2025; Weekdays</content>
<id>urn:uuid:990e488c-603e-413e-b651-6f544edcbca5</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d39f2623-3141-4451-98ca-a51ddb6cf27f"/>
<published>2025-08-21T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-12-05T17:12:50.6177833Z</updated>
<georss:line>49.27824878911275 -123.02832998013642 49.277842044432674 -123.02833231815171</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 21, 2025 - Sep 21, 2025; Weekdays</content>
<id>urn:uuid:fd3d75e2-3086-4b57-8891-3d8b9811f107</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d39f2623-3141-4451-98ca-a51ddb6cf27f"/>
<published>2025-08-21T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-12-05T17:12:50.6177833Z</updated>
<georss:line>49.27825036344967 -123.02908952726905 49.27824878911275 -123.02832998013642</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 21, 2025 - Sep 21, 2025; Weekdays</content>
<id>urn:uuid:5dc545db-d06f-43d1-a225-e03124c68930</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d39f2623-3141-4451-98ca-a51ddb6cf27f"/>
<published>2025-08-21T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-12-05T17:12:50.6177833Z</updated>
<georss:line>49.27413584175528 -123.03635779868921 49.27413314126184 -123.03363172764169</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 21, 2025 - Sep 21, 2025; Weekdays</content>
<id>urn:uuid:f8878bae-0a7e-4293-8131-69b3ded14cd4</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d39f2623-3141-4451-98ca-a51ddb6cf27f"/>
<published>2025-08-21T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-12-05T17:12:50.6177833Z</updated>
<georss:line>49.28020292535436 -123.03620262997994 49.28020221751066 -123.03543924471138</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 21, 2025 - Sep 21, 2025; Weekdays</content>
<id>urn:uuid:e05aa1bc-cc66-43e6-9194-2f76401d03ec</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d39f2623-3141-4451-98ca-a51ddb6cf27f"/>
<published>2025-08-21T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-12-05T17:12:50.6177833Z</updated>
<georss:line>49.28020221751066 -123.03543924471138 49.28020097808684 -123.0343304921929</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 21, 2025 - Sep 21, 2025; Weekdays</content>
<id>urn:uuid:99db1685-c748-4e3c-95b0-e621460f08b9</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d39f2623-3141-4451-98ca-a51ddb6cf27f"/>
<published>2025-08-21T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-12-05T17:12:50.6177833Z</updated>
<georss:line>49.28020097808684 -123.0343304921929 49.28020014611769 -123.0335802374133</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 21, 2025 - Sep 21, 2025; Weekdays</content>
<id>urn:uuid:cc7be790-2ce9-46ee-82e1-74788ddd1743</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d39f2623-3141-4451-98ca-a51ddb6cf27f"/>
<published>2025-08-21T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-12-05T17:12:50.6177833Z</updated>
<georss:line>49.27825431229809 -123.03085817462097 49.27825279585383 -123.03019710925713</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 21, 2025 - Sep 21, 2025; Weekdays</content>
<id>urn:uuid:1dd08031-bc21-4e4a-9912-8adc5b14cbfb</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d39f2623-3141-4451-98ca-a51ddb6cf27f"/>
<published>2025-08-21T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-12-05T17:12:50.6177833Z</updated>
<georss:line>49.27825279585383 -123.03019710925713 49.27825036344967 -123.02908952726905</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 21, 2025 - Sep 21, 2025; Weekdays</content>
<id>urn:uuid:bfb5b528-2dd3-4ca0-a8ae-f8fbef3502f5</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d39f2623-3141-4451-98ca-a51ddb6cf27f"/>
<published>2025-08-21T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-12-05T17:12:50.6177833Z</updated>
<georss:line>49.27824878911275 -123.02832998013642 49.278250635595924 -123.02570329447285</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 21, 2025 - Sep 21, 2025; Weekdays</content>
<id>urn:uuid:5456478a-f09a-429d-8a40-082d6425276e</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d39f2623-3141-4451-98ca-a51ddb6cf27f"/>
<published>2025-08-21T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-12-05T17:12:50.6177833Z</updated>
<georss:line>49.27866036384481 -123.02832899223291 49.27824878911275 -123.02832998013642</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 21, 2025 - Sep 21, 2025; Weekdays</content>
<id>urn:uuid:b3207a9e-7cff-4534-a603-d6906aec5ac8</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d39f2623-3141-4451-98ca-a51ddb6cf27f"/>
<published>2025-08-21T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-12-05T17:12:50.6177833Z</updated>
<georss:line>49.27906904233586 -123.0283270402316 49.27866036384481 -123.02832899223291</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 21, 2025 - Sep 21, 2025; Weekdays</content>
<id>urn:uuid:04a1da9f-efab-4f2e-9c4e-c972ca7a872d</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d39f2623-3141-4451-98ca-a51ddb6cf27f"/>
<published>2025-08-21T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-12-05T17:12:50.6177833Z</updated>
<georss:line>49.28019954826297 -123.02832356295328 49.28019740059898 -123.02569748657214</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 21, 2025 - Sep 21, 2025; Weekdays</content>
<id>urn:uuid:6922dc3d-cf25-443f-a9c7-5b38f46cf547</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d39f2623-3141-4451-98ca-a51ddb6cf27f"/>
<published>2025-08-21T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-12-05T17:12:50.6177833Z</updated>
<georss:line>49.25815024014207 -123.03377199925741 49.25773908608943 -123.03377496207221</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 21, 2025 - Sep 21, 2025; Weekdays</content>
<id>urn:uuid:b840ee48-0a62-4de8-befe-5f78626faa84</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d39f2623-3141-4451-98ca-a51ddb6cf27f"/>
<published>2025-08-21T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-12-05T17:12:50.6177833Z</updated>
<georss:line>49.26131726012531 -123.03375681542566 49.25815024014207 -123.03377199925741</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 21, 2025 - Sep 21, 2025; Weekdays</content>
<id>urn:uuid:9078062f-aee4-4de4-bb09-3ab4e81c5762</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d39f2623-3141-4451-98ca-a51ddb6cf27f"/>
<published>2025-08-21T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-12-05T17:12:50.6177833Z</updated>
<georss:line>49.26011486156858 -123.02369990494773 49.258159246510445 -123.02371089756546</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 21, 2025 - Sep 21, 2025; Weekdays</content>
<id>urn:uuid:5f1c2ddc-8f46-4a8e-a096-b15dbece5ead</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d39f2623-3141-4451-98ca-a51ddb6cf27f"/>
<published>2025-08-21T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-12-05T17:12:50.6177833Z</updated>
<georss:line>49.26291584365987 -123.033755266903 49.262912482997706 -123.03299563768614</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 21, 2025 - Sep 21, 2025; Weekdays</content>
<id>urn:uuid:23bf40bb-0927-449f-927a-4c0a013f3faf</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d39f2623-3141-4451-98ca-a51ddb6cf27f"/>
<published>2025-08-21T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-12-05T17:12:50.6177833Z</updated>
<georss:line>49.262098407911964 -123.03101470693859 49.26212823180495 -123.03089612685865 49.26225856815472 -123.03050565178597 49.262414902329596 -123.03013815718157 49.262595515434896 -123.0297976275073 49.26269610334515 -123.02964405355326 49.2634558150956 -123.02848487870642</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 21, 2025 - Sep 21, 2025; Weekdays</content>
<id>urn:uuid:2b976643-02f7-4b62-9088-d297802e9280</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d39f2623-3141-4451-98ca-a51ddb6cf27f"/>
<published>2025-08-21T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-12-05T17:12:50.6177833Z</updated>
<georss:line>49.26567494770143 -123.03298888891568 49.26567300420885 -123.03100953866398</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 21, 2025 - Sep 21, 2025; Weekdays</content>
<id>urn:uuid:69409e62-bdca-43a1-b8a1-12245dbe9180</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d39f2623-3141-4451-98ca-a51ddb6cf27f"/>
<published>2025-08-21T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-12-05T17:12:50.6177833Z</updated>
<georss:line>49.26567568197564 -123.03374795395864 49.26567494770143 -123.03298888891568</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 21, 2025 - Sep 21, 2025; Weekdays</content>
<id>urn:uuid:27d5944a-bad3-452c-8986-a11314b46fe6</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d39f2623-3141-4451-98ca-a51ddb6cf27f"/>
<published>2025-08-21T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-12-05T17:12:50.6177833Z</updated>
<georss:line>49.266186157741146 -123.03647723221631 49.26568250507941 -123.03648483315565</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 21, 2025 - Sep 21, 2025; Weekdays</content>
<id>urn:uuid:b550fe88-2415-43e0-b066-0ad8573a7a1b</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d39f2623-3141-4451-98ca-a51ddb6cf27f"/>
<published>2025-08-21T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-12-05T17:12:50.6177833Z</updated>
<georss:line>49.265702456832884 -123.04154508857427 49.26569374201708 -123.03901195114511</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 21, 2025 - Sep 21, 2025; Weekdays</content>
<id>urn:uuid:4e4681ef-b9fc-4ab0-bc9f-60ac2134a9fa</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d39f2623-3141-4451-98ca-a51ddb6cf27f"/>
<published>2025-08-21T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-12-05T17:12:50.6177833Z</updated>
<georss:line>49.26665473041254 -123.03899952689163 49.266644384495834 -123.03646996877228</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 21, 2025 - Sep 21, 2025; Weekdays</content>
<id>urn:uuid:485c7cd6-3641-4aef-bbad-5068c031ba4a</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d39f2623-3141-4451-98ca-a51ddb6cf27f"/>
<published>2025-08-21T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-12-05T17:12:50.6177833Z</updated>
<georss:line>49.266644384495834 -123.03646996877228 49.266186157741146 -123.03647723221631</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 21, 2025 - Sep 21, 2025; Weekdays</content>
<id>urn:uuid:bb5fc44a-8c97-48be-ab61-262734793868</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d39f2623-3141-4451-98ca-a51ddb6cf27f"/>
<published>2025-08-21T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-12-05T17:12:50.6177833Z</updated>
<georss:line>49.26568250507941 -123.03648483315565 49.26567773407868 -123.0345052743043</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 21, 2025 - Sep 21, 2025; Weekdays</content>
<id>urn:uuid:54ad8431-8ee1-4afb-ae1a-d9dbd19fb9b0</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d39f2623-3141-4451-98ca-a51ddb6cf27f"/>
<published>2025-08-21T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-12-05T17:12:50.6177833Z</updated>
<georss:line>49.26567773407868 -123.0345052743043 49.26567568197564 -123.03374795395864</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 21, 2025 - Sep 21, 2025; Weekdays</content>
<id>urn:uuid:5f9365ed-10a0-4d01-83ad-44b5661493fc</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d39f2623-3141-4451-98ca-a51ddb6cf27f"/>
<published>2025-08-21T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-12-05T17:12:50.6177833Z</updated>
<georss:line>49.254391896215566 -123.04433387745608 49.254023227304515 -123.04433353354692</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 21, 2025 - Sep 21, 2025; Weekdays</content>
<id>urn:uuid:94e3a4aa-2fd1-4e1e-84b9-9b733c306858</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d39f2623-3141-4451-98ca-a51ddb6cf27f"/>
<published>2025-08-21T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-12-05T17:12:50.6177833Z</updated>
<georss:line>49.255413991424575 -123.04432188878387 49.2544365401657 -123.04433210348454</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 21, 2025 - Sep 21, 2025; Weekdays</content>
<id>urn:uuid:5adfc89f-5981-4747-a192-4d8495ac6831</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d39f2623-3141-4451-98ca-a51ddb6cf27f"/>
<published>2025-08-21T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-12-05T17:12:50.6177833Z</updated>
<georss:line>49.2629438115969 -123.04156009064855 49.26293475320554 -123.03903315544925</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 21, 2025 - Sep 21, 2025; Weekdays</content>
<id>urn:uuid:08e7a53c-e97f-4658-8664-b08771ca07fb</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d39f2623-3141-4451-98ca-a51ddb6cf27f"/>
<published>2025-08-21T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-12-05T17:12:50.6177833Z</updated>
<georss:line>49.25814305089213 -123.04155939909752 49.25813771670343 -123.03903191483629</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 21, 2025 - Sep 21, 2025; Weekdays</content>
<id>urn:uuid:fd016a63-c143-4a95-8aba-e36a166d54a5</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d39f2623-3141-4451-98ca-a51ddb6cf27f"/>
<published>2025-08-21T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-12-05T17:12:50.6177833Z</updated>
<georss:line>49.26384873192001 -123.04155241137953 49.26383959253283 -123.03902508629307</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 21, 2025 - Sep 21, 2025; Weekdays</content>
<id>urn:uuid:bd9db1d7-7675-4c5e-b6d4-d11a23f27e61</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d39f2623-3141-4451-98ca-a51ddb6cf27f"/>
<published>2025-08-21T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-12-05T17:12:50.6177833Z</updated>
<georss:line>49.26476009578164 -123.0435156790571 49.26475317504324 -123.04154559737057</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 21, 2025 - Sep 21, 2025; Weekdays</content>
<id>urn:uuid:d7c93050-736f-47dd-88ec-89b729cb7b2f</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d39f2623-3141-4451-98ca-a51ddb6cf27f"/>
<published>2025-08-21T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-12-05T17:12:50.6177833Z</updated>
<georss:line>49.26571212155875 -123.04427171898563 49.2647625325624 -123.0442757626305</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 21, 2025 - Sep 21, 2025; Weekdays</content>
<id>urn:uuid:de763cc7-5eb5-46b2-9d62-cefbcb09c71c</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d39f2623-3141-4451-98ca-a51ddb6cf27f"/>
<published>2025-08-21T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-12-05T17:12:50.6177833Z</updated>
<georss:line>49.2647625325624 -123.0442757626305 49.263858531570605 -123.04427858241243</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 21, 2025 - Sep 21, 2025; Weekdays</content>
<id>urn:uuid:af52fb02-7589-4fa3-932a-c91b9b3bc132</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d39f2623-3141-4451-98ca-a51ddb6cf27f"/>
<published>2025-08-21T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-12-05T17:12:50.6177833Z</updated>
<georss:line>49.27660381000584 -123.06213839663214 49.27660091548108 -123.06174887814993</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 21, 2025 - Sep 21, 2025; Weekdays</content>
<id>urn:uuid:d8606310-e27c-4644-bac2-d4374ddad6c2</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d39f2623-3141-4451-98ca-a51ddb6cf27f"/>
<published>2025-08-21T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-12-05T17:12:50.6177833Z</updated>
<georss:line>49.27479197411395 -123.0617835739591 49.27477663007835 -123.05984903024542</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 21, 2025 - Sep 21, 2025; Weekdays</content>
<id>urn:uuid:5efb7fb3-dc54-44a5-ab15-18007781b029</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d39f2623-3141-4451-98ca-a51ddb6cf27f"/>
<published>2025-08-21T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-12-05T17:12:50.6177833Z</updated>
<georss:line>49.27906961405256 -123.03358022603706 49.27907136185135 -123.03281933473542</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 21, 2025 - Sep 21, 2025; Weekdays</content>
<id>urn:uuid:8d215c0f-02bd-4ff0-98ed-8fa73ab5f3b7</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d39f2623-3141-4451-98ca-a51ddb6cf27f"/>
<published>2025-08-21T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-12-05T17:12:50.6177833Z</updated>
<georss:line>49.27907136185135 -123.03281933473542 49.27907083112919 -123.03201781385884</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 21, 2025 - Sep 21, 2025; Weekdays</content>
<id>urn:uuid:7fde71f3-c2fa-4f4e-8b45-7f8bd528a4c2</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d39f2623-3141-4451-98ca-a51ddb6cf27f"/>
<published>2025-08-21T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-12-05T17:12:50.6177833Z</updated>
<georss:line>49.262016741533415 -123.05470337749718 49.26201580473625 -123.05300793598103</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 21, 2025 - Sep 21, 2025; Weekdays</content>
<id>urn:uuid:1661cce4-4cbe-4d99-a689-da5c726a0f41</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d39f2623-3141-4451-98ca-a51ddb6cf27f"/>
<published>2025-08-21T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-12-05T17:12:50.6177833Z</updated>
<georss:line>49.26387554859798 -123.05469946702819 49.26387442272801 -123.05217422197147</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 21, 2025 - Sep 21, 2025; Weekdays</content>
<id>urn:uuid:33124983-7fee-47c4-9965-4058ac82c695</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d39f2623-3141-4451-98ca-a51ddb6cf27f"/>
<published>2025-08-21T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-12-05T17:12:50.6177833Z</updated>
<georss:line>49.26201580473625 -123.05300793598103 49.26201533392816 -123.05220464329963</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 21, 2025 - Sep 21, 2025; Weekdays</content>
<id>urn:uuid:0f253ba8-3851-4666-b9c1-f9c1c08b2c5b</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d39f2623-3141-4451-98ca-a51ddb6cf27f"/>
<published>2025-08-21T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-12-05T17:12:50.6177833Z</updated>
<georss:line>49.26342200559196 -123.05218162062725 49.26342101149743 -123.04955650340223</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 21, 2025 - Sep 21, 2025; Weekdays</content>
<id>urn:uuid:33595c5e-0f79-4472-ad3f-7204c9d49c1e</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d39f2623-3141-4451-98ca-a51ddb6cf27f"/>
<published>2025-08-21T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-12-05T17:12:50.6177833Z</updated>
<georss:line>49.26387442272801 -123.05217422197147 49.26387341043542 -123.04954919068666</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 21, 2025 - Sep 21, 2025; Weekdays</content>
<id>urn:uuid:bf69aef8-fc72-410a-9098-5af29e3aea5d</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d39f2623-3141-4451-98ca-a51ddb6cf27f"/>
<published>2025-08-21T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-12-05T17:12:50.6177833Z</updated>
<georss:line>49.26955432506222 -123.06382128252581 49.26953963520057 -123.06188790602862</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 21, 2025 - Sep 21, 2025; Weekdays</content>
<id>urn:uuid:ef8fd149-7049-488c-b406-004be620730b</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d39f2623-3141-4451-98ca-a51ddb6cf27f"/>
<published>2025-08-21T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-12-05T17:12:50.6177833Z</updated>
<georss:line>49.26952455350113 -123.05995391163313 49.26950925946397 -123.05802004189414</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 21, 2025 - Sep 21, 2025; Weekdays</content>
<id>urn:uuid:c360ee24-9351-4182-8501-dd277c11c0c2</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d39f2623-3141-4451-98ca-a51ddb6cf27f"/>
<published>2025-08-21T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-12-05T17:12:50.6177833Z</updated>
<georss:line>49.27295076451199 -123.05795156147876 49.272945375276265 -123.05730451505882</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 21, 2025 - Sep 21, 2025; Weekdays</content>
<id>urn:uuid:77a699a3-65d0-49ba-adc9-b6011f45eb86</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d39f2623-3141-4451-98ca-a51ddb6cf27f"/>
<published>2025-08-21T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-12-05T17:12:50.6177833Z</updated>
<georss:line>49.272945375276265 -123.05730451505882 49.27301235789321 -123.05680367099839 49.273073093494276 -123.05658350980558</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 21, 2025 - Sep 21, 2025; Weekdays</content>
<id>urn:uuid:fba5e56a-1751-4fba-b013-d1e6baddda98</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d39f2623-3141-4451-98ca-a51ddb6cf27f"/>
<published>2025-08-21T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-12-05T17:12:50.6177833Z</updated>
<georss:line>49.27136223081612 -123.05587155967461 49.27136253945494 -123.05528601619352</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 21, 2025 - Sep 21, 2025; Weekdays</content>
<id>urn:uuid:12d5dfd7-aa10-4dac-b8ba-8ef4ad30ca45</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d39f2623-3141-4451-98ca-a51ddb6cf27f"/>
<published>2025-08-21T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-12-05T17:12:50.6177833Z</updated>
<georss:line>49.2713618924042 -123.05658545674078 49.27136223081612 -123.05587155967461</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 21, 2025 - Sep 21, 2025; Weekdays</content>
<id>urn:uuid:d86173cb-54c9-43f9-98a8-cad85b7a737b</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d39f2623-3141-4451-98ca-a51ddb6cf27f"/>
<published>2025-08-21T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-12-05T17:12:50.6177833Z</updated>
<georss:line>49.271202450889746 -123.05798598362227 49.27118929384733 -123.05658301861541</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 21, 2025 - Sep 21, 2025; Weekdays</content>
<id>urn:uuid:b0650487-80d4-4019-b084-19f69afc1725</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d39f2623-3141-4451-98ca-a51ddb6cf27f"/>
<published>2025-08-21T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-12-05T17:12:50.6177833Z</updated>
<georss:line>49.274813126075486 -123.0645725067262 49.274806620200195 -123.06371796675924</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 21, 2025 - Sep 21, 2025; Weekdays</content>
<id>urn:uuid:637c2b46-fec7-4bec-80f7-8d1680fe571c</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d39f2623-3141-4451-98ca-a51ddb6cf27f"/>
<published>2025-08-21T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-12-05T17:12:50.6177833Z</updated>
<georss:line>49.27481632073864 -123.06500321365164 49.274813126075486 -123.0645725067262</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 21, 2025 - Sep 21, 2025; Weekdays</content>
<id>urn:uuid:2a944c19-4fd4-4fa4-9092-bd6b506f9a66</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d39f2623-3141-4451-98ca-a51ddb6cf27f"/>
<published>2025-08-21T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-12-05T17:12:50.6177833Z</updated>
<georss:line>49.274821220962 -123.06565930326168 49.27481632073864 -123.06500321365164</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 21, 2025 - Sep 21, 2025; Weekdays</content>
<id>urn:uuid:7ef159bc-3812-4121-8ffd-0e8a7b48198a</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d39f2623-3141-4451-98ca-a51ddb6cf27f"/>
<published>2025-08-21T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-12-05T17:12:50.6177833Z</updated>
<georss:line>49.27661550740831 -123.06368467519006 49.27660381000584 -123.06213839663214</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 21, 2025 - Sep 21, 2025; Weekdays</content>
<id>urn:uuid:8acf28b2-e31c-4b6c-8724-875343ff08f0</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d39f2623-3141-4451-98ca-a51ddb6cf27f"/>
<published>2025-08-21T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-12-05T17:12:50.6177833Z</updated>
<georss:line>49.27663064352498 -123.06561883806468 49.27661550740831 -123.06368467519006</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 21, 2025 - Sep 21, 2025; Weekdays</content>
<id>urn:uuid:f3cc1b18-e4ff-4a88-bc4f-f1ee189e2339</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d39f2623-3141-4451-98ca-a51ddb6cf27f"/>
<published>2025-08-21T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-12-05T17:12:50.6177833Z</updated>
<georss:line>49.27378940750475 -123.06567943476045 49.27378502749605 -123.06509013086846</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 21, 2025 - Sep 21, 2025; Weekdays</content>
<id>urn:uuid:a5786c7f-0709-431d-bd86-3504df1e9e28</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d39f2623-3141-4451-98ca-a51ddb6cf27f"/>
<published>2025-08-21T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-12-05T17:12:50.6177833Z</updated>
<georss:line>49.27378502749605 -123.06509013086846 49.27378139383029 -123.06459252352154</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 21, 2025 - Sep 21, 2025; Weekdays</content>
<id>urn:uuid:d529e037-b267-4969-af41-943d15f35d2e</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d39f2623-3141-4451-98ca-a51ddb6cf27f"/>
<published>2025-08-21T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-12-05T17:12:50.6177833Z</updated>
<georss:line>49.273007816526956 -123.06508947943566 49.27298779257697 -123.0624169924121</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 21, 2025 - Sep 21, 2025; Weekdays</content>
<id>urn:uuid:3110a92b-0867-4bbe-9e56-4b93a22ccf4e</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d39f2623-3141-4451-98ca-a51ddb6cf27f"/>
<published>2025-08-21T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-12-05T17:12:50.6177833Z</updated>
<georss:line>49.27378139383029 -123.06459252352154 49.273773617709736 -123.06354576922735</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 21, 2025 - Sep 21, 2025; Weekdays</content>
<id>urn:uuid:4b26458b-0e02-4148-aea8-e5c2a796646e</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d39f2623-3141-4451-98ca-a51ddb6cf27f"/>
<published>2025-08-21T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-12-05T17:12:50.6177833Z</updated>
<georss:line>49.27480515206375 -123.06352541415129 49.273773617709736 -123.06354576922735</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 21, 2025 - Sep 21, 2025; Weekdays</content>
<id>urn:uuid:e4591e01-98d3-430c-a23f-af4ca7123d39</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d39f2623-3141-4451-98ca-a51ddb6cf27f"/>
<published>2025-08-21T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-12-05T17:12:50.6177833Z</updated>
<georss:line>49.25953538568754 -123.06659668269334 49.25953019930367 -123.06594699357264</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 21, 2025 - Sep 21, 2025; Weekdays</content>
<id>urn:uuid:b1b6517b-5aee-4ed7-af8c-e7c4aff84904</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d39f2623-3141-4451-98ca-a51ddb6cf27f"/>
<published>2025-08-21T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-12-05T17:12:50.6177833Z</updated>
<georss:line>49.25953019930367 -123.06594699357264 49.25952646610895 -123.06529797993734</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 21, 2025 - Sep 21, 2025; Weekdays</content>
<id>urn:uuid:6c29b162-c4b7-45d7-8315-93bc2dfbe400</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d39f2623-3141-4451-98ca-a51ddb6cf27f"/>
<published>2025-08-21T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-12-05T17:12:50.6177833Z</updated>
<georss:line>49.26501857543613 -123.0619735321971 49.26456717293675 -123.06198330303141</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 21, 2025 - Sep 21, 2025; Weekdays</content>
<id>urn:uuid:1f9996f6-8078-40ca-80cb-180174409ac0</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d39f2623-3141-4451-98ca-a51ddb6cf27f"/>
<published>2025-08-21T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-12-05T17:12:50.6177833Z</updated>
<georss:line>49.26223269336205 -123.05815785923444 49.26222721400845 -123.05742305844184</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 21, 2025 - Sep 21, 2025; Weekdays</content>
<id>urn:uuid:371a75d4-aec5-44b7-a4fc-0f71d81a22aa</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d39f2623-3141-4451-98ca-a51ddb6cf27f"/>
<published>2025-08-21T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-12-05T17:12:50.6177833Z</updated>
<georss:line>49.26222721400845 -123.05742305844184 49.26222409253694 -123.0570055324409 49.26214932532875 -123.05660107778434</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 21, 2025 - Sep 21, 2025; Weekdays</content>
<id>urn:uuid:df212f51-4cca-4387-9bcb-10f9bd6f278b</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d39f2623-3141-4451-98ca-a51ddb6cf27f"/>
<published>2025-08-21T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-12-05T17:12:50.6177833Z</updated>
<georss:line>49.26456717293675 -123.06198330303141 49.264115905624095 -123.0619925240703</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 21, 2025 - Sep 21, 2025; Weekdays</content>
<id>urn:uuid:1557404c-eab2-4eeb-b8e6-4a2cedfcaae5</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d39f2623-3141-4451-98ca-a51ddb6cf27f"/>
<published>2025-08-21T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-12-05T17:12:50.6177833Z</updated>
<georss:line>49.26108215447823 -123.07365534541273 49.26094814203873 -123.0736581971123</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 21, 2025 - Sep 21, 2025; Weekdays</content>
<id>urn:uuid:69e077c9-504d-4198-b17e-198a1dde14f1</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d39f2623-3141-4451-98ca-a51ddb6cf27f"/>
<published>2025-08-21T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-12-05T17:12:50.6177833Z</updated>
<georss:line>49.26140054371646 -123.07364933208568 49.26108215447823 -123.07365534541273</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 21, 2025 - Sep 21, 2025; Weekdays</content>
<id>urn:uuid:9e8006dc-bcc7-481a-9efa-a4e9175a6c34</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d39f2623-3141-4451-98ca-a51ddb6cf27f"/>
<published>2025-08-21T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-12-05T17:12:50.6177833Z</updated>
<georss:line>49.26094814203873 -123.0736581971123 49.26049607318228 -123.07366700750184</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 21, 2025 - Sep 21, 2025; Weekdays</content>
<id>urn:uuid:4b1a33a8-5302-44da-81a7-6e1231c703c7</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d39f2623-3141-4451-98ca-a51ddb6cf27f"/>
<published>2025-08-21T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-12-05T17:12:50.6177833Z</updated>
<georss:line>49.27303014693646 -123.06891357790195 49.273024655589495 -123.06762676021391</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 21, 2025 - Sep 21, 2025; Weekdays</content>
<id>urn:uuid:b5f31df6-ca0b-4db6-a7e9-e182505f5dd1</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d39f2623-3141-4451-98ca-a51ddb6cf27f"/>
<published>2025-08-21T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-12-05T17:12:50.6177833Z</updated>
<georss:line>49.27049081172197 -123.06766817909737 49.26958312371488 -123.06768509649802</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 21, 2025 - Sep 21, 2025; Weekdays</content>
<id>urn:uuid:b0527a52-1aa9-4979-8d10-56d61da616ac</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d39f2623-3141-4451-98ca-a51ddb6cf27f"/>
<published>2025-08-21T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-12-05T17:12:50.6177833Z</updated>
<georss:line>49.27127642373412 -123.06765483327989 49.27049081172197 -123.06766817909737</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 21, 2025 - Sep 21, 2025; Weekdays</content>
<id>urn:uuid:83dcc652-a30e-482a-a006-240d9a3e8705</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d39f2623-3141-4451-98ca-a51ddb6cf27f"/>
<published>2025-08-21T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-12-05T17:12:50.6177833Z</updated>
<georss:line>49.27212106276832 -123.0676403167812 49.27210788655316 -123.06570425639931</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 21, 2025 - Sep 21, 2025; Weekdays</content>
<id>urn:uuid:d96a5f79-67a8-4e20-be57-4e8d94a4c1ce</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d39f2623-3141-4451-98ca-a51ddb6cf27f"/>
<published>2025-08-21T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-12-05T17:12:50.6177833Z</updated>
<georss:line>49.273024655589495 -123.06762676021391 49.27301236245839 -123.06568755877113</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 21, 2025 - Sep 21, 2025; Weekdays</content>
<id>urn:uuid:ff9eaf10-9494-4661-b6ca-6db94cb6a18f</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d39f2623-3141-4451-98ca-a51ddb6cf27f"/>
<published>2025-08-21T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-12-05T17:12:50.6177833Z</updated>
<georss:line>49.27047386545823 -123.06573481682861 49.270458801505555 -123.06380383647118</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 21, 2025 - Sep 21, 2025; Weekdays</content>
<id>urn:uuid:147745a2-16a7-4ef8-b47c-6f69b034465f</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d39f2623-3141-4451-98ca-a51ddb6cf27f"/>
<published>2025-08-21T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-12-05T17:12:50.6177833Z</updated>
<georss:line>49.26963157782046 -123.07349130845786 49.26961806717745 -123.07155638813505</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 21, 2025 - Sep 21, 2025; Weekdays</content>
<id>urn:uuid:4f619d04-185c-4e7a-9303-c57d6e89f47a</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d39f2623-3141-4451-98ca-a51ddb6cf27f"/>
<published>2025-08-21T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-12-05T17:12:50.6177833Z</updated>
<georss:line>49.25725362508177 -123.09181429586987 49.25685961566032 -123.09182685426595</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 21, 2025 - Sep 21, 2025; Weekdays</content>
<id>urn:uuid:71e23328-05e9-44f7-ab55-eebea990888f</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d39f2623-3141-4451-98ca-a51ddb6cf27f"/>
<published>2025-08-21T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-12-05T17:12:50.6177833Z</updated>
<georss:line>49.25721685411253 -123.09092523041457 49.25671756713942 -123.08985405867537</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 21, 2025 - Sep 21, 2025; Weekdays</content>
<id>urn:uuid:485c5d68-4995-4bf8-9276-25b6a8b60962</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d39f2623-3141-4451-98ca-a51ddb6cf27f"/>
<published>2025-08-21T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-12-05T17:12:50.6177833Z</updated>
<georss:line>49.25641867259367 -123.08920593614579 49.25642902796642 -123.08986513368238</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 21, 2025 - Sep 21, 2025; Weekdays</content>
<id>urn:uuid:258fffca-0f7d-40b3-81ec-5b8f340ac8eb</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d39f2623-3141-4451-98ca-a51ddb6cf27f"/>
<published>2025-08-21T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-12-05T17:12:50.6177833Z</updated>
<georss:line>49.25671756713942 -123.08985405867537 49.25641867259367 -123.08920593614579</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 21, 2025 - Sep 21, 2025; Weekdays</content>
<id>urn:uuid:e39d9f3b-6271-45fe-80db-bb144c0d8963</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d39f2623-3141-4451-98ca-a51ddb6cf27f"/>
<published>2025-08-21T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-12-05T17:12:50.6177833Z</updated>
<georss:line>49.25641867259367 -123.08920593614579 49.25639742712977 -123.08785431130384</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 21, 2025 - Sep 21, 2025; Weekdays</content>
<id>urn:uuid:914c8b7a-2e13-453c-8ede-b701c5f3b91d</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d39f2623-3141-4451-98ca-a51ddb6cf27f"/>
<published>2025-08-21T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-12-05T17:12:50.6177833Z</updated>
<georss:line>49.256831240341114 -123.08148250448055 49.256759975621435 -123.07972267322918</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 21, 2025 - Sep 21, 2025; Weekdays</content>
<id>urn:uuid:915c7b06-cc64-46ec-b91b-8927840ab99a</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d39f2623-3141-4451-98ca-a51ddb6cf27f"/>
<published>2025-08-21T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-12-05T17:12:50.6177833Z</updated>
<georss:line>49.25653493313797 -123.0964958144786 49.256530381204016 -123.09605364938737</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 21, 2025 - Sep 21, 2025; Weekdays</content>
<id>urn:uuid:122fafa7-6f2d-45b1-a53d-b93b417fc04b</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d39f2623-3141-4451-98ca-a51ddb6cf27f"/>
<published>2025-08-21T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-12-05T17:12:50.6177833Z</updated>
<georss:line>49.256490579013075 -123.09377412085719 49.2564665709624 -123.0922317940607</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 21, 2025 - Sep 21, 2025; Weekdays</content>
<id>urn:uuid:1410264a-839f-4bd5-a203-970c24103e91</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d39f2623-3141-4451-98ca-a51ddb6cf27f"/>
<published>2025-08-21T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-12-05T17:12:50.6177833Z</updated>
<georss:line>49.2564665709624 -123.0922317940607 49.256460125171316 -123.09184312655161</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 21, 2025 - Sep 21, 2025; Weekdays</content>
<id>urn:uuid:bc352d66-c93a-4a90-ba9f-24ddb36a7fcc</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d39f2623-3141-4451-98ca-a51ddb6cf27f"/>
<published>2025-08-21T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-12-05T17:12:50.6177833Z</updated>
<georss:line>49.25685961566032 -123.09182685426595 49.256460125171316 -123.09184312655161</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 21, 2025 - Sep 21, 2025; Weekdays</content>
<id>urn:uuid:98b98e3a-1b93-4ab6-827e-214c6169fca7</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d39f2623-3141-4451-98ca-a51ddb6cf27f"/>
<published>2025-08-21T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-12-05T17:12:50.6177833Z</updated>
<georss:line>49.256530381204016 -123.09605364938737 49.256490579013075 -123.09377412085719</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 21, 2025 - Sep 21, 2025; Weekdays</content>
<id>urn:uuid:4dd06aea-e3cd-4317-a840-d414ae18df58</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d39f2623-3141-4451-98ca-a51ddb6cf27f"/>
<published>2025-08-21T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-12-05T17:12:50.6177833Z</updated>
<georss:line>49.2565647206973 -123.09843130713013 49.25653493313797 -123.0964958144786</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 21, 2025 - Sep 21, 2025; Weekdays</content>
<id>urn:uuid:2cd07b84-18c7-4dec-8375-546fe9834418</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d39f2623-3141-4451-98ca-a51ddb6cf27f"/>
<published>2025-08-21T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-12-05T17:12:50.6177833Z</updated>
<georss:line>49.25750287457416 -123.10060598435075 49.25747287737806 -123.09840000638755</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 21, 2025 - Sep 21, 2025; Weekdays</content>
<id>urn:uuid:d0a5b783-5add-4c20-9a3e-c5ba04729499</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d39f2623-3141-4451-98ca-a51ddb6cf27f"/>
<published>2025-08-21T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-12-05T17:12:50.6177833Z</updated>
<georss:line>49.254975383562964 -123.08365933733917 49.25452338859009 -123.0836761908418</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 21, 2025 - Sep 21, 2025; Weekdays</content>
<id>urn:uuid:d62204bf-979d-42c6-8448-556f1b98a1d1</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d39f2623-3141-4451-98ca-a51ddb6cf27f"/>
<published>2025-08-21T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-12-05T17:12:50.6177833Z</updated>
<georss:line>49.25562212705037 -123.0875017619182 49.25473434630132 -123.08560146630914</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 21, 2025 - Sep 21, 2025; Weekdays</content>
<id>urn:uuid:f6071fe6-7e46-45ad-bd87-b0a44a4eba52</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d39f2623-3141-4451-98ca-a51ddb6cf27f"/>
<published>2025-08-21T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-12-05T17:12:50.6177833Z</updated>
<georss:line>49.255427396816685 -123.08364203006737 49.254975383562964 -123.08365933733917</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 21, 2025 - Sep 21, 2025; Weekdays</content>
<id>urn:uuid:4a0547e5-7bcc-4572-b5d4-de379e80b990</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d39f2623-3141-4451-98ca-a51ddb6cf27f"/>
<published>2025-08-21T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-12-05T17:12:50.6177833Z</updated>
<georss:line>49.25636956959576 -123.08607279346295 49.25636113102735 -123.08554129714719</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 21, 2025 - Sep 21, 2025; Weekdays</content>
<id>urn:uuid:7b2f795e-3015-4dcb-909a-39a1005a7fb0</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d39f2623-3141-4451-98ca-a51ddb6cf27f"/>
<published>2025-08-21T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-12-05T17:12:50.6177833Z</updated>
<georss:line>49.25638342921275 -123.08695242736304 49.25636956959576 -123.08607279346295</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 21, 2025 - Sep 21, 2025; Weekdays</content>
<id>urn:uuid:9818beaa-4b5d-4365-b55c-8accbe6a6e8a</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d39f2623-3141-4451-98ca-a51ddb6cf27f"/>
<published>2025-08-21T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-12-05T17:12:50.6177833Z</updated>
<georss:line>49.25639176851246 -123.08747577461429 49.25638342921275 -123.08695242736304</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 21, 2025 - Sep 21, 2025; Weekdays</content>
<id>urn:uuid:578b9fba-a048-4dcb-99d9-63e967bfa8b9</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d39f2623-3141-4451-98ca-a51ddb6cf27f"/>
<published>2025-08-21T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-12-05T17:12:50.6177833Z</updated>
<georss:line>49.25485711678337 -123.07593267320819 49.254405015015095 -123.07594950086269</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 21, 2025 - Sep 21, 2025; Weekdays</content>
<id>urn:uuid:c660acf1-74e1-4be9-8007-7dc609b7f8ef</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d39f2623-3141-4451-98ca-a51ddb6cf27f"/>
<published>2025-08-21T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-12-05T17:12:50.6177833Z</updated>
<georss:line>49.25530906551393 -123.07591596869722 49.25485711678337 -123.07593267320819</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 21, 2025 - Sep 21, 2025; Weekdays</content>
<id>urn:uuid:7ba4d640-04e3-441b-93e0-9837bfc0e83e</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d39f2623-3141-4451-98ca-a51ddb6cf27f"/>
<published>2025-08-21T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-12-05T17:12:50.6177833Z</updated>
<georss:line>49.25530906551393 -123.07591596869722 49.255338113926 -123.07574716131079 49.25533498276238 -123.07552858486986 49.25536820756324 -123.07509241270778 49.25536751468999 -123.0750512533719</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 21, 2025 - Sep 21, 2025; Weekdays</content>
<id>urn:uuid:d44bdb5f-8426-427c-af40-b3f99b01c396</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d39f2623-3141-4451-98ca-a51ddb6cf27f"/>
<published>2025-08-21T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-12-05T17:12:50.6177833Z</updated>
<georss:line>49.256028367685815 -123.07588916079553 49.25576114022081 -123.07589914039718</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 21, 2025 - Sep 21, 2025; Weekdays</content>
<id>urn:uuid:b38af104-e734-4153-809e-7dd5ef02143a</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d39f2623-3141-4451-98ca-a51ddb6cf27f"/>
<published>2025-08-21T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-12-05T17:12:50.6177833Z</updated>
<georss:line>49.256213592643434 -123.0758823810864 49.256028367685815 -123.07588916079553</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 21, 2025 - Sep 21, 2025; Weekdays</content>
<id>urn:uuid:83aee5c6-88e8-4183-946f-c066543ce30e</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d39f2623-3141-4451-98ca-a51ddb6cf27f"/>
<published>2025-08-21T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-12-05T17:12:50.6177833Z</updated>
<georss:line>49.256603589719674 -123.0758679444621 49.256213592643434 -123.0758823810864</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 21, 2025 - Sep 21, 2025; Weekdays</content>
<id>urn:uuid:02229a0a-10c7-41cd-8eae-aa1ede76ba71</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d39f2623-3141-4451-98ca-a51ddb6cf27f"/>
<published>2025-08-21T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-12-05T17:12:50.6177833Z</updated>
<georss:line>49.25536751468999 -123.0750512533719 49.25535755495159 -123.07447054240167</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 21, 2025 - Sep 21, 2025; Weekdays</content>
<id>urn:uuid:d4747154-9cbb-4b8b-9e9a-1d27fa5ce94c</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d39f2623-3141-4451-98ca-a51ddb6cf27f"/>
<published>2025-08-21T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-12-05T17:12:50.6177833Z</updated>
<georss:line>49.25648041738549 -123.07282180922056 49.255534860330044 -123.07286123305566</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 21, 2025 - Sep 21, 2025; Weekdays</content>
<id>urn:uuid:c4a4e440-0fc2-41b8-8981-ae69399b1f0a</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d39f2623-3141-4451-98ca-a51ddb6cf27f"/>
<published>2025-08-21T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-12-05T17:12:50.6177833Z</updated>
<georss:line>49.254698652445796 -123.07095902367844 49.25432652816488 -123.07097540672217</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 21, 2025 - Sep 21, 2025; Weekdays</content>
<id>urn:uuid:0f7a17bf-d613-4573-8b0a-e8a0b6f66aed</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d39f2623-3141-4451-98ca-a51ddb6cf27f"/>
<published>2025-08-21T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-12-05T17:12:50.6177833Z</updated>
<georss:line>49.25574558917205 -123.07091293438103 49.254698652445796 -123.07095902367844</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 21, 2025 - Sep 21, 2025; Weekdays</content>
<id>urn:uuid:c8c91482-137e-4bc6-93c4-e16d7140cc3b</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d39f2623-3141-4451-98ca-a51ddb6cf27f"/>
<published>2025-08-21T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-12-05T17:12:50.6177833Z</updated>
<georss:line>49.25353067388551 -123.07791688162794 49.25350040665285 -123.0759830447081</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 21, 2025 - Sep 21, 2025; Weekdays</content>
<id>urn:uuid:cf9086f5-7d84-4601-855a-b38793c3590d</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d39f2623-3141-4451-98ca-a51ddb6cf27f"/>
<published>2025-08-21T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-12-05T17:12:50.6177833Z</updated>
<georss:line>49.25395249049734 -123.07596623137229 49.25350040665285 -123.0759830447081</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 21, 2025 - Sep 21, 2025; Weekdays</content>
<id>urn:uuid:716f5b2d-5bf9-4f78-8ec4-30fb1b190d38</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d39f2623-3141-4451-98ca-a51ddb6cf27f"/>
<published>2025-08-21T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-12-05T17:12:50.6177833Z</updated>
<georss:line>49.25398277543465 -123.0779009104871 49.25353067388551 -123.07791688162794</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 21, 2025 - Sep 21, 2025; Weekdays</content>
<id>urn:uuid:50d63181-63e9-41a0-9f54-f0d109de194b</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d39f2623-3141-4451-98ca-a51ddb6cf27f"/>
<published>2025-08-21T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-12-05T17:12:50.6177833Z</updated>
<georss:line>49.254405015015095 -123.07594950086269 49.25395249049734 -123.07596623137229</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 21, 2025 - Sep 21, 2025; Weekdays</content>
<id>urn:uuid:9f29f8fd-b1a1-425c-a95c-eb1cd18666ab</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d39f2623-3141-4451-98ca-a51ddb6cf27f"/>
<published>2025-08-21T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-12-05T17:12:50.6177833Z</updated>
<georss:line>49.25443522309021 -123.07787852205571 49.25398277543465 -123.0779009104871</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 21, 2025 - Sep 21, 2025; Weekdays</content>
<id>urn:uuid:e69628d2-c9a8-4a47-9cbc-ba7260787361</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d39f2623-3141-4451-98ca-a51ddb6cf27f"/>
<published>2025-08-21T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-12-05T17:12:50.6177833Z</updated>
<georss:line>49.25443522309021 -123.07787852205571 49.254405015015095 -123.07594950086269</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 21, 2025 - Sep 21, 2025; Weekdays</content>
<id>urn:uuid:15a501b0-40e2-4b9c-ad1a-8afc487fd93e</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d39f2623-3141-4451-98ca-a51ddb6cf27f"/>
<published>2025-08-21T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-12-05T17:12:50.6177833Z</updated>
<georss:line>49.2511781449646 -123.07799594222396 49.25018531977673 -123.076264097348 49.25011314321395 -123.07609868345953</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 21, 2025 - Sep 21, 2025; Weekdays</content>
<id>urn:uuid:f22eb811-7b43-418c-85a2-592daa47764f</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d39f2623-3141-4451-98ca-a51ddb6cf27f"/>
<published>2025-08-21T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-12-05T17:12:50.6177833Z</updated>
<georss:line>49.25206421551317 -123.07989734993012 49.2511781449646 -123.07799594222396</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 21, 2025 - Sep 21, 2025; Weekdays</content>
<id>urn:uuid:c1e04864-f773-41af-9c29-79d6c6929e88</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d39f2623-3141-4451-98ca-a51ddb6cf27f"/>
<published>2025-08-21T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-12-05T17:12:50.6177833Z</updated>
<georss:line>49.2529536934814 -123.08179499743795 49.25206421551317 -123.07989734993012</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 21, 2025 - Sep 21, 2025; Weekdays</content>
<id>urn:uuid:46c1cd70-9cbd-4003-b9f9-f9c8889a7a28</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d39f2623-3141-4451-98ca-a51ddb6cf27f"/>
<published>2025-08-21T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-12-05T17:12:50.6177833Z</updated>
<georss:line>49.25355591083485 -123.08177483003978 49.25266397891389 -123.07987431133033</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 21, 2025 - Sep 21, 2025; Weekdays</content>
<id>urn:uuid:3f2c3026-9f74-45d8-99f7-48ec49fe0189</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d39f2623-3141-4451-98ca-a51ddb6cf27f"/>
<published>2025-08-21T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-12-05T17:12:50.6177833Z</updated>
<georss:line>49.25166164168124 -123.07396956759892 49.25165008243789 -123.07327850034238</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 21, 2025 - Sep 21, 2025; Weekdays</content>
<id>urn:uuid:bf93e57a-ed92-4cc8-be58-a9be4f4d6f0c</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d39f2623-3141-4451-98ca-a51ddb6cf27f"/>
<published>2025-08-21T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-12-05T17:12:50.6177833Z</updated>
<georss:line>49.2489721579085 -123.07335078330375 49.248436716096336 -123.0722098247414</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 21, 2025 - Sep 21, 2025; Weekdays</content>
<id>urn:uuid:3f00f58d-0a75-4c5b-8f45-e112916d304f</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d39f2623-3141-4451-98ca-a51ddb6cf27f"/>
<published>2025-08-21T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-12-05T17:12:50.6177833Z</updated>
<georss:line>49.25165008243789 -123.07327850034238 49.25163965116283 -123.07258949625854</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 21, 2025 - Sep 21, 2025; Weekdays</content>
<id>urn:uuid:b7e52dd3-be3b-42ef-b67d-41286ea4f3ee</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d39f2623-3141-4451-98ca-a51ddb6cf27f"/>
<published>2025-08-21T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-12-05T17:12:50.6177833Z</updated>
<georss:line>49.25163965116283 -123.07258949625854 49.25162966848984 -123.07196799035634</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 21, 2025 - Sep 21, 2025; Weekdays</content>
<id>urn:uuid:cbb4e124-f64a-43ac-a9f1-8803bce1a8fb</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d39f2623-3141-4451-98ca-a51ddb6cf27f"/>
<published>2025-08-21T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-12-05T17:12:50.6177833Z</updated>
<georss:line>49.248436716096336 -123.0722098247414 49.248009889085154 -123.07128831430735</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 21, 2025 - Sep 21, 2025; Weekdays</content>
<id>urn:uuid:0d47b98e-ec2f-4606-bb4f-db1709777406</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d39f2623-3141-4451-98ca-a51ddb6cf27f"/>
<published>2025-08-21T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-12-05T17:12:50.6177833Z</updated>
<georss:line>49.25252564463929 -123.0715221842461 49.25251197277274 -123.07055522734048</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 21, 2025 - Sep 21, 2025; Weekdays</content>
<id>urn:uuid:d36bd1b5-dd80-45d3-ae7e-8ed567fceb63</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d39f2623-3141-4451-98ca-a51ddb6cf27f"/>
<published>2025-08-21T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-12-05T17:12:50.6177833Z</updated>
<georss:line>49.25251197277274 -123.07055522734048 49.25250603656852 -123.07014052675822</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 21, 2025 - Sep 21, 2025; Weekdays</content>
<id>urn:uuid:d8ddbeeb-e89d-4f30-9170-d98263d102ec</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d39f2623-3141-4451-98ca-a51ddb6cf27f"/>
<published>2025-08-21T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-12-05T17:12:50.6177833Z</updated>
<georss:line>49.252504752322665 -123.07004815432535 49.25249483887228 -123.06937850158181</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 21, 2025 - Sep 21, 2025; Weekdays</content>
<id>urn:uuid:53d16b2e-f2aa-4fc9-a35a-73c8f421555f</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d39f2623-3141-4451-98ca-a51ddb6cf27f"/>
<published>2025-08-21T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-12-05T17:12:50.6177833Z</updated>
<georss:line>49.25250603656852 -123.07014052675822 49.252504752322665 -123.07004815432535</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Oct 15, 2025 - Nov 15, 2025</content>
<id>urn:uuid:a4265374-7267-4264-b1e2-8b4ffe383f96</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/dca65fde-26de-4ff1-a588-802ab790b1bb"/>
<published>2025-10-20T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-10-20T21:07:39.0613911Z</updated>
<georss:line>49.25660945780896 -123.05500969005767 49.25660745657419 -123.05366080299906</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Oct 15, 2025 - Nov 15, 2025</content>
<id>urn:uuid:5d1874f3-8fc3-4265-aa95-57f23b159ecd</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/dca65fde-26de-4ff1-a588-802ab790b1bb"/>
<published>2025-10-20T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-10-20T21:07:39.0613911Z</updated>
<georss:line>49.26195196944218 -123.04428223681381 49.261027108833645 -123.04428319600383</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Oct 15, 2025 - Nov 15, 2025</content>
<id>urn:uuid:138dfad4-991b-4737-af23-59e4750f2e0b</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/dca65fde-26de-4ff1-a588-802ab790b1bb"/>
<published>2025-10-20T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-10-20T21:07:39.0613911Z</updated>
<georss:line>49.26295068153601 -123.04352108391178 49.2629438115969 -123.04156009064855</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Oct 15, 2025 - Nov 15, 2025</content>
<id>urn:uuid:b38b8574-6edf-4021-92f4-c096d78418b3</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/dca65fde-26de-4ff1-a588-802ab790b1bb"/>
<published>2025-10-20T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-10-20T21:07:39.0613911Z</updated>
<georss:line>49.2629591283156 -123.0460949712022 49.26295597284522 -123.04504112721118</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Oct 15, 2025 - Nov 15, 2025</content>
<id>urn:uuid:6a7982ac-0edb-4590-a412-3529615a4a4a</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/dca65fde-26de-4ff1-a588-802ab790b1bb"/>
<published>2025-10-20T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-10-20T21:07:39.0613911Z</updated>
<georss:line>49.260926251782365 -123.04702206753123 49.26045811414846 -123.04702203507273</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Oct 15, 2025 - Nov 15, 2025</content>
<id>urn:uuid:f8568f5d-c667-43ce-a7e2-abf95a03db58</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/dca65fde-26de-4ff1-a588-802ab790b1bb"/>
<published>2025-10-20T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-10-20T21:07:39.0613911Z</updated>
<georss:line>49.26144137134034 -123.04702211714373 49.260926251782365 -123.04702206753123</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Oct 15, 2025 - Nov 15, 2025</content>
<id>urn:uuid:7f9cd270-8861-4af2-b9b7-f3bfa1395041</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/dca65fde-26de-4ff1-a588-802ab790b1bb"/>
<published>2025-10-20T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-10-20T21:07:39.0613911Z</updated>
<georss:line>49.26045811414846 -123.04702203507273 49.259052558648904 -123.0470218816611</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Oct 15, 2025 - Nov 15, 2025</content>
<id>urn:uuid:fa1faae7-d34c-4f1d-b0ad-8ccba07be9fc</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/dca65fde-26de-4ff1-a588-802ab790b1bb"/>
<published>2025-10-20T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-10-20T21:07:39.0613911Z</updated>
<georss:line>49.246278553178286 -123.04585743374838 49.24460849928133 -123.04587762285128</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Oct 15, 2025 - Nov 15, 2025</content>
<id>urn:uuid:8b964f44-6880-433a-97d3-7060a2e6c7d2</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/dca65fde-26de-4ff1-a588-802ab790b1bb"/>
<published>2025-10-20T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-10-20T21:07:39.0613911Z</updated>
<georss:line>49.2454250048429 -123.04710885413019 49.244613098561814 -123.04712239815645</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Oct 15, 2025 - Nov 15, 2025</content>
<id>urn:uuid:28ff3399-198b-496c-8f4e-2663394829ed</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/dca65fde-26de-4ff1-a588-802ab790b1bb"/>
<published>2025-10-20T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-10-20T21:07:39.0613911Z</updated>
<georss:line>49.25236363616639 -123.05586682512664 49.25237227653551 -123.0547288463037</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Oct 15, 2025 - Nov 15, 2025</content>
<id>urn:uuid:7dc0d2eb-bb5b-48b5-ad3a-82f779ba29c3</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/dca65fde-26de-4ff1-a588-802ab790b1bb"/>
<published>2025-10-20T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-10-20T21:07:39.0613911Z</updated>
<georss:line>49.25237227653551 -123.0547288463037 49.25237290112253 -123.05464455663284</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Oct 15, 2025 - Nov 15, 2025</content>
<id>urn:uuid:32aade55-fc5e-4d91-8a7a-2271378f8db2</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/dca65fde-26de-4ff1-a588-802ab790b1bb"/>
<published>2025-10-20T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-10-20T21:07:39.0613911Z</updated>
<georss:line>49.25237290112253 -123.05464455663284 49.252385536990374 -123.0530086171008 49.25238478569864 -123.05220898447843</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Oct 15, 2025 - Nov 15, 2025</content>
<id>urn:uuid:cd153cb9-498c-4b5d-8c9f-226eaa72b642</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/dca65fde-26de-4ff1-a588-802ab790b1bb"/>
<published>2025-10-20T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-10-20T21:07:39.0613911Z</updated>
<georss:line>49.25406244354113 -123.05217968319779 49.25406075534232 -123.05016248412586</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Oct 15, 2025 - Nov 15, 2025</content>
<id>urn:uuid:776f87df-0a53-4042-b466-962c5ee1dda9</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/dca65fde-26de-4ff1-a588-802ab790b1bb"/>
<published>2025-10-20T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-10-20T21:07:39.0613911Z</updated>
<georss:line>49.24675801891968 -123.06510834693701 49.24582504564097 -123.0651346682876</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Oct 15, 2025 - Nov 15, 2025</content>
<id>urn:uuid:116f6cae-7adf-471a-88a4-0d568265f636</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/dca65fde-26de-4ff1-a588-802ab790b1bb"/>
<published>2025-10-20T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-10-20T21:07:39.0613911Z</updated>
<georss:line>49.24544812001693 -123.05664955681411 49.24544850788004 -123.05594591222442</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Oct 15, 2025 - Nov 15, 2025</content>
<id>urn:uuid:6ffb9b20-b99e-40ce-aac7-78374f0185dc</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/dca65fde-26de-4ff1-a588-802ab790b1bb"/>
<published>2025-10-20T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-10-20T21:07:39.0613911Z</updated>
<georss:line>49.24544850788004 -123.05594591222442 49.245447771040006 -123.05424673774999</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Oct 15, 2025 - Nov 15, 2025</content>
<id>urn:uuid:1ce5c066-8d01-4629-88c7-1c291b77e7fb</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/dca65fde-26de-4ff1-a588-802ab790b1bb"/>
<published>2025-10-20T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-10-20T21:07:39.0613911Z</updated>
<georss:line>49.245447771040006 -123.05424673774999 49.2454505022869 -123.05204429997723</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Oct 15, 2025 - Nov 15, 2025</content>
<id>urn:uuid:055dd0ab-57ad-4fcb-8817-0d78fe2836f4</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/dca65fde-26de-4ff1-a588-802ab790b1bb"/>
<published>2025-10-20T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-10-20T21:07:39.0613911Z</updated>
<georss:line>49.24462149800203 -123.04951477025553 49.24461948377433 -123.04892191536462</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Oct 15, 2025 - Nov 15, 2025</content>
<id>urn:uuid:82746025-60d4-427a-8335-bf6747a9e131</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/dca65fde-26de-4ff1-a588-802ab790b1bb"/>
<published>2025-10-20T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-10-20T21:07:39.0613911Z</updated>
<georss:line>49.24461948377433 -123.04892191536462 49.244613098561814 -123.04712239815645</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Oct 15, 2025 - Nov 15, 2025</content>
<id>urn:uuid:ce432334-8197-47ca-9778-7e0ee9615774</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/dca65fde-26de-4ff1-a588-802ab790b1bb"/>
<published>2025-10-20T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-10-20T21:07:39.0613911Z</updated>
<georss:line>49.262904693468414 -123.03101359039852 49.262912482997706 -123.03299563768614</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Oct 15, 2025 - Nov 15, 2025</content>
<id>urn:uuid:a931d33c-9507-4f0e-8de5-d27bde769fbf</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/dca65fde-26de-4ff1-a588-802ab790b1bb"/>
<published>2025-10-20T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-10-20T21:07:39.0613911Z</updated>
<georss:line>49.250602041575206 -123.0310649007811 49.25061475542802 -123.02996138187012</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Oct 15, 2025 - Nov 15, 2025</content>
<id>urn:uuid:d3931927-eca9-472e-841c-0dc87d7db03f</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/dca65fde-26de-4ff1-a588-802ab790b1bb"/>
<published>2025-10-20T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-10-20T21:07:39.0613911Z</updated>
<georss:line>49.26471487095725 -123.03101094501139 49.26426305979075 -123.03101144533143</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Oct 15, 2025 - Nov 15, 2025</content>
<id>urn:uuid:f92bfd27-7d1b-4d94-902f-832f5e8ca5ca</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/dca65fde-26de-4ff1-a588-802ab790b1bb"/>
<published>2025-10-20T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-10-20T21:07:39.0613911Z</updated>
<georss:line>49.2651669427203 -123.03101129704065 49.26471487095725 -123.03101094501139</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Oct 15, 2025 - Nov 15, 2025</content>
<id>urn:uuid:042599b9-c8c9-4825-9f4c-56c6e5d05859</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/dca65fde-26de-4ff1-a588-802ab790b1bb"/>
<published>2025-10-20T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-10-20T21:07:39.0613911Z</updated>
<georss:line>49.25061475542802 -123.02996138187012 49.25063112041326 -123.02852941301784</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Oct 15, 2025 - Nov 15, 2025</content>
<id>urn:uuid:8366230c-37a4-4baa-93dc-5fc3e58b3f5c</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/dca65fde-26de-4ff1-a588-802ab790b1bb"/>
<published>2025-10-20T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-10-20T21:07:39.0613911Z</updated>
<georss:line>49.2634558150956 -123.02848487870642 49.264134348933055 -123.02744994484966 49.26434209611165 -123.02713271962004 49.26470332147508 -123.0264516093328 49.26501596274613 -123.02571652838306</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Oct 15, 2025 - Nov 15, 2025</content>
<id>urn:uuid:1281b217-6267-4172-95c5-94714fe0b499</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/dca65fde-26de-4ff1-a588-802ab790b1bb"/>
<published>2025-10-20T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-10-20T21:07:39.0613911Z</updated>
<georss:line>49.26567568197564 -123.03374795395864 49.26567494770143 -123.03298888891568</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Oct 15, 2025 - Nov 15, 2025</content>
<id>urn:uuid:5dec1de5-350b-4977-b401-8a65133bfa2e</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/dca65fde-26de-4ff1-a588-802ab790b1bb"/>
<published>2025-10-20T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-10-20T21:07:39.0613911Z</updated>
<georss:line>49.26567773407868 -123.0345052743043 49.26567568197564 -123.03374795395864</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Oct 15, 2025 - Nov 15, 2025</content>
<id>urn:uuid:55ec821b-f253-46d2-9b84-f49fd7217a8a</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/dca65fde-26de-4ff1-a588-802ab790b1bb"/>
<published>2025-10-20T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-10-20T21:07:39.0613911Z</updated>
<georss:line>49.26754931592353 -123.02848170941193 49.267091953733456 -123.02848716431332</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Oct 15, 2025 - Nov 15, 2025</content>
<id>urn:uuid:46a15cf0-e204-4a39-8435-cf0f24b87ed5</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/dca65fde-26de-4ff1-a588-802ab790b1bb"/>
<published>2025-10-20T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-10-20T21:07:39.0613911Z</updated>
<georss:line>49.26800733543766 -123.02847336816325 49.26754931592353 -123.02848170941193</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Oct 15, 2025 - Nov 15, 2025</content>
<id>urn:uuid:8149e3db-feef-4450-88ef-923c6ebdab75</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/dca65fde-26de-4ff1-a588-802ab790b1bb"/>
<published>2025-10-20T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-10-20T21:07:39.0613911Z</updated>
<georss:line>49.268497571269364 -123.04347548749391 49.26849113803959 -123.04149854937526</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Oct 15, 2025 - Nov 15, 2025</content>
<id>urn:uuid:05e40f0a-e9a3-46b8-969b-32e4741cdcfa</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/dca65fde-26de-4ff1-a588-802ab790b1bb"/>
<published>2025-10-20T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-10-20T21:07:39.0613911Z</updated>
<georss:line>49.26948801114054 -123.04345990352684 49.26948250430854 -123.04148251422481</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Oct 15, 2025 - Nov 15, 2025</content>
<id>urn:uuid:1496a298-b5f0-4913-a170-34dcce3c1fbd</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/dca65fde-26de-4ff1-a588-802ab790b1bb"/>
<published>2025-10-20T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-10-20T21:07:39.0613911Z</updated>
<georss:line>49.26948250430854 -123.04148251422481 49.26947828310611 -123.03895709091054</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Oct 15, 2025 - Nov 15, 2025</content>
<id>urn:uuid:da628244-aab3-46d3-93bd-cce7f0417c6e</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/dca65fde-26de-4ff1-a588-802ab790b1bb"/>
<published>2025-10-20T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-10-20T21:07:39.0613911Z</updated>
<georss:line>49.268470966946865 -123.03644273723026 49.268462550011066 -123.03370817698857</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Oct 15, 2025 - Nov 15, 2025</content>
<id>urn:uuid:9b2f1388-c9c2-40e7-aa1e-f3cc3a830cd2</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/dca65fde-26de-4ff1-a588-802ab790b1bb"/>
<published>2025-10-20T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-10-20T21:07:39.0613911Z</updated>
<georss:line>49.26846372624934 -123.02846719768787 49.26800733543766 -123.02847336816325</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Oct 15, 2025 - Nov 15, 2025</content>
<id>urn:uuid:b1e0aa6c-490a-4810-b9ce-34c16b56348c</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/dca65fde-26de-4ff1-a588-802ab790b1bb"/>
<published>2025-10-20T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-10-20T21:07:39.0613911Z</updated>
<georss:line>49.262971053384916 -123.05470032278009 49.26296992122997 -123.05218904699089</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Oct 15, 2025 - Nov 15, 2025</content>
<id>urn:uuid:00961c30-6464-409c-ab3b-fdc0780fbf45</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/dca65fde-26de-4ff1-a588-802ab790b1bb"/>
<published>2025-10-20T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-10-20T21:07:39.0613911Z</updated>
<georss:line>49.26296206587318 -123.04701983729827 49.2629591283156 -123.0460949712022</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Oct 15, 2025 - Nov 15, 2025</content>
<id>urn:uuid:be715486-a23e-40f0-b76a-5148991c9e9c</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/dca65fde-26de-4ff1-a588-802ab790b1bb"/>
<published>2025-10-20T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-10-20T21:07:39.0613911Z</updated>
<georss:line>49.26773069200814 -123.0619217810432 49.267715520092594 -123.0599893967598</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Oct 15, 2025 - Nov 15, 2025</content>
<id>urn:uuid:e92b2142-d3dc-43ab-9fc4-67b83c09aa0b</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/dca65fde-26de-4ff1-a588-802ab790b1bb"/>
<published>2025-10-20T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-10-20T21:07:39.0613911Z</updated>
<georss:line>49.26950483703831 -123.04946516327679 49.26949782017218 -123.0469439830422</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Oct 15, 2025 - Nov 15, 2025</content>
<id>urn:uuid:073f701b-6da7-4139-b7cf-df8de83b7349</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/dca65fde-26de-4ff1-a588-802ab790b1bb"/>
<published>2025-10-20T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-10-20T21:07:39.0613911Z</updated>
<georss:line>49.26865996727054 -123.06517743872523 49.26864985795541 -123.06383784822538</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Oct 15, 2025 - Nov 15, 2025</content>
<id>urn:uuid:afe8855e-a33f-470b-9941-e245ba004be5</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/dca65fde-26de-4ff1-a588-802ab790b1bb"/>
<published>2025-10-20T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-10-20T21:07:39.0613911Z</updated>
<georss:line>49.268635069414955 -123.0619044931965 49.268619906678026 -123.0599711938642</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Oct 15, 2025 - Nov 15, 2025</content>
<id>urn:uuid:0326f90c-af92-4788-89d5-8fc77809c7b5</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/dca65fde-26de-4ff1-a588-802ab790b1bb"/>
<published>2025-10-20T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-10-20T21:07:39.0613911Z</updated>
<georss:line>49.26866437133771 -123.06577109408676 49.26865996727054 -123.06517743872523</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Oct 15, 2025 - Nov 15, 2025</content>
<id>urn:uuid:ffb88383-a837-4e6a-b306-931f09a9b128</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/dca65fde-26de-4ff1-a588-802ab790b1bb"/>
<published>2025-10-20T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-10-20T21:07:39.0613911Z</updated>
<georss:line>49.2695080192577 -123.05208987702976 49.26950483703831 -123.04946516327679</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Oct 15, 2025 - Nov 15, 2025</content>
<id>urn:uuid:648b3e88-fcf4-4d00-8f19-84534c5f4b40</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/dca65fde-26de-4ff1-a588-802ab790b1bb"/>
<published>2025-10-20T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-10-20T21:07:39.0613911Z</updated>
<georss:line>49.26953963520057 -123.06188790602862 49.26952455350113 -123.05995391163313</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Oct 15, 2025 - Nov 15, 2025</content>
<id>urn:uuid:845663c5-f84a-4f14-bece-ca0c2faf652c</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/dca65fde-26de-4ff1-a588-802ab790b1bb"/>
<published>2025-10-20T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-10-20T21:07:39.0613911Z</updated>
<georss:line>49.24567694557135 -123.09861006941058 49.245662115173474 -123.09737665989807</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Oct 15, 2025 - Nov 15, 2025</content>
<id>urn:uuid:1b5d002c-1c56-400c-b4ff-a22a9c3a1913</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/dca65fde-26de-4ff1-a588-802ab790b1bb"/>
<published>2025-10-20T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-10-20T21:07:39.0613911Z</updated>
<georss:line>49.246064358263965 -123.0973514690358 49.245662115173474 -123.09737665989807</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Oct 15, 2025 - Nov 15, 2025</content>
<id>urn:uuid:260c83aa-3e08-4d81-b561-33a54ca8f1a2</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/dca65fde-26de-4ff1-a588-802ab790b1bb"/>
<published>2025-10-20T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-10-20T21:07:39.0613911Z</updated>
<georss:line>49.24752130135511 -123.0972727169608 49.246064358263965 -123.0973514690358</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Oct 15, 2025 - Nov 15, 2025</content>
<id>urn:uuid:a8b1af97-a925-4ba1-b97d-d150536ea109</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/dca65fde-26de-4ff1-a588-802ab790b1bb"/>
<published>2025-10-20T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-10-20T21:07:39.0613911Z</updated>
<georss:line>49.24831003324894 -123.09721556757837 49.24752130135511 -123.0972727169608</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Oct 15, 2025 - Nov 15, 2025</content>
<id>urn:uuid:b4d3afad-7824-415d-b16f-a074ec268f19</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/dca65fde-26de-4ff1-a588-802ab790b1bb"/>
<published>2025-10-20T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-10-20T21:07:39.0613911Z</updated>
<georss:line>49.24871405322898 -123.09718437298736 49.24831003324894 -123.09721556757837</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Oct 15, 2025 - Nov 15, 2025</content>
<id>urn:uuid:c7482d2e-5c39-4378-b328-24fe5e85397d</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/dca65fde-26de-4ff1-a588-802ab790b1bb"/>
<published>2025-10-20T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-10-20T21:07:39.0613911Z</updated>
<georss:line>49.24738074005927 -123.09681440030374 49.24565538796941 -123.09686157512687</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Oct 15, 2025 - Nov 15, 2025</content>
<id>urn:uuid:13f90c52-d030-4f80-a681-a532180b718f</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/dca65fde-26de-4ff1-a588-802ab790b1bb"/>
<published>2025-10-20T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-10-20T21:07:39.0613911Z</updated>
<georss:line>49.28019740059898 -123.02569748657214 49.28019666188982 -123.02359397800313</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Oct 15, 2025 - Nov 15, 2025</content>
<id>urn:uuid:a6be4853-9216-4e0a-8d66-a60a199b75ab</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/dca65fde-26de-4ff1-a588-802ab790b1bb"/>
<published>2025-10-20T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-10-20T21:07:39.0613911Z</updated>
<georss:line>49.281120575893624 -123.0256963025615 49.281117978125565 -123.02357826188435</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Oct 15, 2025 - Nov 15, 2025</content>
<id>urn:uuid:0512f98c-3f93-4723-be75-043d13430c0c</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/dca65fde-26de-4ff1-a588-802ab790b1bb"/>
<published>2025-10-20T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-10-20T21:07:39.0613911Z</updated>
<georss:line>49.281117978125565 -123.02357826188435 49.28069454687616 -123.02358460471527</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Oct 15, 2025 - Nov 15, 2025</content>
<id>urn:uuid:cd5abc2b-b9a8-4380-ae31-b3db97432a2d</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/dca65fde-26de-4ff1-a588-802ab790b1bb"/>
<published>2025-10-20T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-10-20T21:07:39.0613911Z</updated>
<georss:line>49.28069454687616 -123.02358460471527 49.28019666188982 -123.02359397800313</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Oct 15, 2025 - Nov 15, 2025</content>
<id>urn:uuid:9978b29d-b3c8-420c-bd35-ea299f5d277f</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/dca65fde-26de-4ff1-a588-802ab790b1bb"/>
<published>2025-10-20T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-10-20T21:07:39.0613911Z</updated>
<georss:line>49.275739867928166 -123.06758590122851 49.27572615957763 -123.06563487819066</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Oct 15, 2025 - Nov 15, 2025</content>
<id>urn:uuid:652ae1ad-f9e2-400e-9946-21ab815ddc8b</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/dca65fde-26de-4ff1-a588-802ab790b1bb"/>
<published>2025-10-20T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-10-20T21:07:39.0613911Z</updated>
<georss:line>49.27847099675992 -123.07044366733402 49.27822248679908 -123.07044379460619 49.27820249974866 -123.07044339492616 49.27818252202857 -123.07044244531289 49.278162562617325 -123.07044097327726 49.278142621514775 -123.07043897881985 49.27812269873772 -123.07043643444406 49.27810281226809 -123.07043335392477 49.27808297108419 -123.0704297647727 49.27806316620766 -123.07042563947839 49.27804340662516 -123.07042099180387 49.27802421398138 -123.07041594623006</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Oct 15, 2025 - Nov 15, 2025</content>
<id>urn:uuid:fda348f4-4185-4b7d-9bec-c369e19cf0aa</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/dca65fde-26de-4ff1-a588-802ab790b1bb"/>
<published>2025-10-20T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-10-20T21:07:39.0613911Z</updated>
<georss:line>49.27802421398138 -123.07041594623006 49.278007782889375 -123.0704108495969 49.277991415039736 -123.07040529935273 49.2779751194108 -123.07039932300813 49.27795888700746 -123.07039292055059 49.27794272683306 -123.07038607824474 49.277926656877895 -123.07037879611659 49.27791066813006 -123.0703711016509 49.27789476959293 -123.0703629811122 49.27787896126637 -123.07035443450094 49.277863261140766 -123.07034546184299 49.27784766021239 -123.07033607687454 49.27783216747633 -123.07032627960865 49.277816791936004 -123.0703160563099 49.277801542561434 -123.07030544823706 49.2777864013872 -123.0702944141192 49.277771404377205 -123.07028298150485 49.27775653353257 -123.07027116411722 49.27774179786513 -123.0702589344723 49.27772720634479 -123.07024633382878 49.277712758996586 -123.07023332094114 49.277698455786805 -123.07021995080389 49.277684323726106 -123.07020618220987 49.27767033581202 -123.07019204261809 49.27765836184665 -123.07017950072046 49.27756749922267 -123.07006468182422</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Oct 15, 2025 - Nov 15, 2025</content>
<id>urn:uuid:04ef2079-5193-49e0-b40f-935b61802b06</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/dca65fde-26de-4ff1-a588-802ab790b1bb"/>
<published>2025-10-20T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-10-20T21:07:39.0613911Z</updated>
<georss:line>49.27847099675992 -123.07044366733402 49.27844342634691 -123.06833186250923</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Oct 15, 2025 - Nov 15, 2025</content>
<id>urn:uuid:9ca6d26e-b153-41c8-a0b7-366e17af9e76</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/dca65fde-26de-4ff1-a588-802ab790b1bb"/>
<published>2025-10-20T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-10-20T21:07:39.0613911Z</updated>
<georss:line>49.281213803229576 -123.06826152528579 49.28117690514296 -123.0655741616909</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Oct 15, 2025 - Nov 15, 2025</content>
<id>urn:uuid:0b4d083a-42df-4f12-8b85-68bfc622143e</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/dca65fde-26de-4ff1-a588-802ab790b1bb"/>
<published>2025-10-20T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-10-20T21:07:39.0613911Z</updated>
<georss:line>49.278477454927895 -123.07092951617189 49.27847099675992 -123.07044366733402</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Oct 15, 2025 - Nov 15, 2025</content>
<id>urn:uuid:f9d41d85-8b0d-4a79-ad6f-fe11eda97e8a</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/dca65fde-26de-4ff1-a588-802ab790b1bb"/>
<published>2025-10-20T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-10-20T21:07:39.0613911Z</updated>
<georss:line>49.27849851502134 -123.07272012957266 49.278477454927895 -123.07092951617189</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Oct 15, 2025 - Nov 15, 2025</content>
<id>urn:uuid:6a6bf0b7-b2b8-4aaa-b6b1-6d0444e1f98b</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/dca65fde-26de-4ff1-a588-802ab790b1bb"/>
<published>2025-10-20T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-10-20T21:07:39.0613911Z</updated>
<georss:line>49.28117427953768 -123.06170140497193 49.28116350397079 -123.05976625967678</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Oct 15, 2025 - Nov 15, 2025</content>
<id>urn:uuid:842ca537-5723-4075-b42d-87b6ee6bef88</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/dca65fde-26de-4ff1-a588-802ab790b1bb"/>
<published>2025-10-20T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-10-20T21:07:39.0613911Z</updated>
<georss:line>49.28123472651038 -123.07038971833768 49.281213803229576 -123.06826152528579</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Oct 15, 2025 - Nov 15, 2025</content>
<id>urn:uuid:59fa6203-a63e-4efc-8346-d8729caa036d</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/dca65fde-26de-4ff1-a588-802ab790b1bb"/>
<published>2025-10-20T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-10-20T21:07:39.0613911Z</updated>
<georss:line>49.27047386545823 -123.06573481682861 49.270458801505555 -123.06380383647118</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Oct 15, 2025 - Nov 15, 2025</content>
<id>urn:uuid:869ed13e-b7f0-4171-80c7-475555149fdc</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/dca65fde-26de-4ff1-a588-802ab790b1bb"/>
<published>2025-10-20T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-10-20T21:07:39.0613911Z</updated>
<georss:line>49.2713618924042 -123.05658545674078 49.27136223081612 -123.05587155967461</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Oct 15, 2025 - Nov 15, 2025</content>
<id>urn:uuid:bb642a73-7e1a-4e4e-a083-3fbde3ce7f84</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/dca65fde-26de-4ff1-a588-802ab790b1bb"/>
<published>2025-10-20T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-10-20T21:07:39.0613911Z</updated>
<georss:line>49.27136253945494 -123.05528601619352 49.271362221397766 -123.05468793495548</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Oct 15, 2025 - Nov 15, 2025</content>
<id>urn:uuid:27d927f4-89e3-4e37-9687-64eac18fe1e0</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/dca65fde-26de-4ff1-a588-802ab790b1bb"/>
<published>2025-10-20T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-10-20T21:07:39.0613911Z</updated>
<georss:line>49.27136223081612 -123.05587155967461 49.27136253945494 -123.05528601619352</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Oct 15, 2025 - Nov 15, 2025</content>
<id>urn:uuid:954059fc-45aa-4a60-8fd1-ea7f6efcaf30</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/dca65fde-26de-4ff1-a588-802ab790b1bb"/>
<published>2025-10-20T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-10-20T21:07:39.0613911Z</updated>
<georss:line>49.273845250017644 -123.05658246835868 49.273073093494276 -123.05658350980558</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Oct 15, 2025 - Nov 15, 2025</content>
<id>urn:uuid:56dae574-987d-42df-9630-6dde2e89e6f2</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/dca65fde-26de-4ff1-a588-802ab790b1bb"/>
<published>2025-10-20T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-10-20T21:07:39.0613911Z</updated>
<georss:line>49.274849219569376 -123.07014987575835 49.274846524769345 -123.0695335056495</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Oct 15, 2025 - Nov 15, 2025</content>
<id>urn:uuid:290b6528-3a24-4385-a739-b51d11af1261</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/dca65fde-26de-4ff1-a588-802ab790b1bb"/>
<published>2025-10-20T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-10-20T21:07:39.0613911Z</updated>
<georss:line>49.27414805538996 -123.05658174239939 49.273845250017644 -123.05658246835868</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Oct 15, 2025 - Nov 15, 2025</content>
<id>urn:uuid:df7a0e55-4ed4-49d3-a17d-50736b5d3449</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/dca65fde-26de-4ff1-a588-802ab790b1bb"/>
<published>2025-10-20T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-10-20T21:07:39.0613911Z</updated>
<georss:line>49.273269231611096 -123.05203282677131 49.273267298561905 -123.04940774975108</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Oct 15, 2025 - Nov 15, 2025</content>
<id>urn:uuid:2f3d57b1-24f1-486e-99a5-446d3b4fb662</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/dca65fde-26de-4ff1-a588-802ab790b1bb"/>
<published>2025-10-20T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-10-20T21:07:39.0613911Z</updated>
<georss:line>49.274846524769345 -123.0695335056495 49.27484395377351 -123.06888502105674</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Oct 15, 2025 - Nov 15, 2025</content>
<id>urn:uuid:86433a56-9ddd-40b2-b8b7-a95bbb32646b</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/dca65fde-26de-4ff1-a588-802ab790b1bb"/>
<published>2025-10-20T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-10-20T21:07:39.0613911Z</updated>
<georss:line>49.2694901081789 -123.0442155369063 49.26948801114054 -123.04345990352684</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Oct 15, 2025 - Nov 15, 2025</content>
<id>urn:uuid:c43011fd-3a83-404b-871c-19f653b83a7f</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/dca65fde-26de-4ff1-a588-802ab790b1bb"/>
<published>2025-10-20T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-10-20T21:07:39.0613911Z</updated>
<georss:line>49.26949219208291 -123.04496910840095 49.2694901081789 -123.0442155369063</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Oct 15, 2025 - Nov 15, 2025</content>
<id>urn:uuid:22c581bd-7a22-4328-9f86-a437c2b6708a</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/dca65fde-26de-4ff1-a588-802ab790b1bb"/>
<published>2025-10-20T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-10-20T21:07:39.0613911Z</updated>
<georss:line>49.270417467034804 -123.03894312165853 49.27041346082956 -123.03641564401583</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Oct 15, 2025 - Nov 15, 2025</content>
<id>urn:uuid:d17967ff-09d4-46b2-aa05-63adf1327340</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/dca65fde-26de-4ff1-a588-802ab790b1bb"/>
<published>2025-10-20T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-10-20T21:07:39.0613911Z</updated>
<georss:line>49.27135316813121 -123.04418555687188 49.27088701683576 -123.0441919313914</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Oct 15, 2025 - Nov 15, 2025</content>
<id>urn:uuid:26467e5d-01aa-4ff5-a1ab-50ad5d920166</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/dca65fde-26de-4ff1-a588-802ab790b1bb"/>
<published>2025-10-20T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-10-20T21:07:39.0613911Z</updated>
<georss:line>49.27088701683576 -123.0441919313914 49.270422699932084 -123.04419984704187</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Oct 15, 2025 - Nov 15, 2025</content>
<id>urn:uuid:6f791dee-207e-48e7-8c48-3d052686261b</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/dca65fde-26de-4ff1-a588-802ab790b1bb"/>
<published>2025-10-20T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-10-20T21:07:39.0613911Z</updated>
<georss:line>49.28019954826297 -123.02832356295328 49.28019740059898 -123.02569748657214</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Oct 15, 2025 - Nov 15, 2025</content>
<id>urn:uuid:a911e938-e9b3-462f-8432-c3f5a38eb86f</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/dca65fde-26de-4ff1-a588-802ab790b1bb"/>
<published>2025-10-20T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-10-20T21:07:39.0613911Z</updated>
<georss:line>49.28020221751066 -123.03543924471138 49.28020097808684 -123.0343304921929</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Oct 15, 2025 - Nov 15, 2025</content>
<id>urn:uuid:174926b4-de1c-44e3-9931-ff5c170317fb</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/dca65fde-26de-4ff1-a588-802ab790b1bb"/>
<published>2025-10-20T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-10-20T21:07:39.0613911Z</updated>
<georss:line>49.28020292535436 -123.03620262997994 49.28020221751066 -123.03543924471138</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Oct 15, 2025 - Nov 15, 2025</content>
<id>urn:uuid:9771ead4-05be-4fa1-8513-801f21827e8c</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/dca65fde-26de-4ff1-a588-802ab790b1bb"/>
<published>2025-10-20T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-10-20T21:07:39.0613911Z</updated>
<georss:line>49.28112204004972 -123.02832198758676 49.281120575893624 -123.0256963025615</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Oct 15, 2025 - Nov 15, 2025</content>
<id>urn:uuid:598da0d1-dc72-453d-8bbc-072eefc0f41a</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/dca65fde-26de-4ff1-a588-802ab790b1bb"/>
<published>2025-10-20T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-10-20T21:07:39.0613911Z</updated>
<georss:line>49.23402971433708 -123.09952487385621 49.23357413664107 -123.0995401262113</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Oct 15, 2025 - Nov 15, 2025</content>
<id>urn:uuid:0bbad1e3-0c5e-4b0f-859e-6aa7064ba1e7</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/dca65fde-26de-4ff1-a588-802ab790b1bb"/>
<published>2025-10-20T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-10-20T21:07:39.0613911Z</updated>
<georss:line>49.23447750103438 -123.09952130910678 49.23402971433708 -123.09952487385621</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Oct 15, 2025 - Nov 15, 2025</content>
<id>urn:uuid:c57a12c5-0cd6-4de8-92cd-08293399a367</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/dca65fde-26de-4ff1-a588-802ab790b1bb"/>
<published>2025-10-20T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-10-20T21:07:39.0613911Z</updated>
<georss:line>49.23447750103438 -123.09952130910678 49.23442946301469 -123.09715826946719</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Oct 15, 2025 - Nov 15, 2025</content>
<id>urn:uuid:0532a6c9-51bf-46e0-8bae-1327f573791d</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/dca65fde-26de-4ff1-a588-802ab790b1bb"/>
<published>2025-10-20T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-10-20T21:07:39.0613911Z</updated>
<georss:line>49.23302435631973 -123.09859544526837 49.232995824326196 -123.09721452315824</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Oct 15, 2025 - Nov 15, 2025</content>
<id>urn:uuid:38c517fc-eeb0-442e-83e8-2c9c621b1ce2</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/dca65fde-26de-4ff1-a588-802ab790b1bb"/>
<published>2025-10-20T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-10-20T21:07:39.0613911Z</updated>
<georss:line>49.23397759050829 -123.09717495208439 49.233530595058824 -123.09718965221177</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Oct 15, 2025 - Nov 15, 2025</content>
<id>urn:uuid:ac468038-f88d-4b60-8d85-2d6e29974638</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/dca65fde-26de-4ff1-a588-802ab790b1bb"/>
<published>2025-10-20T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-10-20T21:07:39.0613911Z</updated>
<georss:line>49.23442946301469 -123.09715826946719 49.23397759050829 -123.09717495208439</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Oct 15, 2025 - Nov 15, 2025</content>
<id>urn:uuid:8ce1ce3b-c9c5-4198-b2f4-c17d24ea43a0</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/dca65fde-26de-4ff1-a588-802ab790b1bb"/>
<published>2025-10-20T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-10-20T21:07:39.0613911Z</updated>
<georss:line>49.23623456992445 -123.09643524499766 49.2361928918404 -123.09411582033987</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Oct 15, 2025 - Nov 15, 2025</content>
<id>urn:uuid:864b686b-9f9e-4aca-9a5a-2f42e0c5524a</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/dca65fde-26de-4ff1-a588-802ab790b1bb"/>
<published>2025-10-20T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-10-20T21:07:39.0613911Z</updated>
<georss:line>49.23625362365914 -123.09708820311874 49.23623456992445 -123.09643524499766</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Oct 15, 2025 - Nov 15, 2025</content>
<id>urn:uuid:9a01e314-ee7f-48a0-bc3f-591d63872be6</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/dca65fde-26de-4ff1-a588-802ab790b1bb"/>
<published>2025-10-20T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-10-20T21:07:39.0613911Z</updated>
<georss:line>49.23720102633254 -123.09933581893203 49.23715846602926 -123.0970544108261</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Oct 15, 2025 - Nov 15, 2025</content>
<id>urn:uuid:55805589-fa7f-4bf7-a3e8-1afbc7192fab</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/dca65fde-26de-4ff1-a588-802ab790b1bb"/>
<published>2025-10-20T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-10-20T21:07:39.0613911Z</updated>
<georss:line>49.23855242678215 -123.10019034698956 49.23812213205534 -123.10020898392655</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Oct 15, 2025 - Nov 15, 2025</content>
<id>urn:uuid:18d2048e-e3d7-4e6f-a32e-77157bc6283b</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/dca65fde-26de-4ff1-a588-802ab790b1bb"/>
<published>2025-10-20T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-10-20T21:07:39.0613911Z</updated>
<georss:line>49.24047452136219 -123.10010738226843 49.23855242678215 -123.10019034698956</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Oct 15, 2025 - Nov 15, 2025</content>
<id>urn:uuid:bf4314f7-0a65-4d81-95cd-ef12f07d91c3</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/dca65fde-26de-4ff1-a588-802ab790b1bb"/>
<published>2025-10-20T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-10-20T21:07:39.0613911Z</updated>
<georss:line>49.24047452136219 -123.10010738226843 49.240462703524486 -123.09949081555897</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Oct 15, 2025 - Nov 15, 2025</content>
<id>urn:uuid:24f5d89e-4e57-4644-a301-3ad24d12a339</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/dca65fde-26de-4ff1-a588-802ab790b1bb"/>
<published>2025-10-20T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-10-20T21:07:39.0613911Z</updated>
<georss:line>49.24568407972416 -123.09918691517048 49.24567694557135 -123.09861006941058</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Oct 15, 2025 - Nov 15, 2025</content>
<id>urn:uuid:884b12a5-6f29-4f82-b1da-176604916240</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/dca65fde-26de-4ff1-a588-802ab790b1bb"/>
<published>2025-10-20T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-10-20T21:07:39.0613911Z</updated>
<georss:line>49.24711091681141 -123.09912950945478 49.24568407972416 -123.09918691517048</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Oct 15, 2025 - Nov 15, 2025</content>
<id>urn:uuid:811e37d4-f26b-4288-9062-9f522318d46c</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/dca65fde-26de-4ff1-a588-802ab790b1bb"/>
<published>2025-10-20T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-10-20T21:07:39.0613911Z</updated>
<georss:line>49.247549609825796 -123.09911367967676 49.24752130135511 -123.0972727169608</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Oct 15, 2025 - Nov 15, 2025</content>
<id>urn:uuid:a054d572-d4af-4b3d-815e-950c0bce8bc3</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/dca65fde-26de-4ff1-a588-802ab790b1bb"/>
<published>2025-10-20T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-10-20T21:07:39.0613911Z</updated>
<georss:line>49.245662115173474 -123.09737665989807 49.24565538796941 -123.09686157512687</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Oct 15, 2025 - Nov 15, 2025</content>
<id>urn:uuid:0b5cbc84-4d0a-43a7-8cd7-ea90321bdf85</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/dca65fde-26de-4ff1-a588-802ab790b1bb"/>
<published>2025-10-20T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-10-20T21:07:39.0613911Z</updated>
<georss:line>49.245662115173474 -123.09737665989807 49.24441399921869 -123.09743019322248</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Oct 15, 2025 - Nov 15, 2025</content>
<id>urn:uuid:4eca3030-94eb-4f1c-9541-b9682b2249e6</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/dca65fde-26de-4ff1-a588-802ab790b1bb"/>
<published>2025-10-20T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-10-20T21:07:39.0613911Z</updated>
<georss:line>49.245301828661155 -123.0998952059527 49.24445486772103 -123.09993287426298</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Oct 15, 2025 - Nov 15, 2025</content>
<id>urn:uuid:b57d801a-bcc7-4a23-815c-7e33c991d405</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/dca65fde-26de-4ff1-a588-802ab790b1bb"/>
<published>2025-10-20T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-10-20T21:07:39.0613911Z</updated>
<georss:line>49.24474878878286 -123.09477498734192 49.24474160604052 -123.09416451901915</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Oct 15, 2025 - Nov 15, 2025</content>
<id>urn:uuid:2d740a4f-87ef-4488-b03a-ed1b1ed6346c</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/dca65fde-26de-4ff1-a588-802ab790b1bb"/>
<published>2025-10-20T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-10-20T21:07:39.0613911Z</updated>
<georss:line>49.245695042911024 -123.09987834374513 49.245301828661155 -123.0998952059527</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Oct 15, 2025 - Nov 15, 2025</content>
<id>urn:uuid:1f93a8b8-8996-4beb-8881-93878dfe0b6f</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/dca65fde-26de-4ff1-a588-802ab790b1bb"/>
<published>2025-10-20T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-10-20T21:07:39.0613911Z</updated>
<georss:line>49.24477339399857 -123.0968857074679 49.24474878878286 -123.09477498734192</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Oct 15, 2025 - Nov 15, 2025</content>
<id>urn:uuid:0ef970da-3e55-4623-a451-d56a20f823e7</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/dca65fde-26de-4ff1-a588-802ab790b1bb"/>
<published>2025-10-20T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-10-20T21:07:39.0613911Z</updated>
<georss:line>49.245623634472736 -123.09414154737803 49.24474160604052 -123.09416451901915</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Oct 15, 2025 - Nov 15, 2025</content>
<id>urn:uuid:fd3fe4c7-2ffd-4848-be08-7ee8b5b46104</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/dca65fde-26de-4ff1-a588-802ab790b1bb"/>
<published>2025-10-20T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-10-20T21:07:39.0613911Z</updated>
<georss:line>49.23312218707443 -123.10372322552577 49.23309216367434 -123.10217578497006</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Oct 15, 2025 - Nov 15, 2025</content>
<id>urn:uuid:a2630a16-2276-4c87-8d84-91cb6007268e</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/dca65fde-26de-4ff1-a588-802ab790b1bb"/>
<published>2025-10-20T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-10-20T21:07:39.0613911Z</updated>
<georss:line>49.23309216367434 -123.10217578497006 49.23307915124383 -123.10151859325092</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Oct 15, 2025 - Nov 15, 2025</content>
<id>urn:uuid:a35e06c3-bcc2-480a-bfef-d05bfbffaf0b</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/dca65fde-26de-4ff1-a588-802ab790b1bb"/>
<published>2025-10-20T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-10-20T21:07:39.0613911Z</updated>
<georss:line>49.23633662491201 -123.10163517923282 49.23543147948607 -123.10160277146323</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Oct 15, 2025 - Nov 15, 2025</content>
<id>urn:uuid:bf7be3eb-e812-4c48-b374-c9c2343d3c21</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/dca65fde-26de-4ff1-a588-802ab790b1bb"/>
<published>2025-10-20T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-10-20T21:07:39.0613911Z</updated>
<georss:line>49.234520406434285 -123.10156991318021 49.23361420789752 -123.10153791777307</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Oct 15, 2025 - Nov 15, 2025</content>
<id>urn:uuid:d6ebaac9-e298-458d-a1be-f0fd01afc1ce</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/dca65fde-26de-4ff1-a588-802ab790b1bb"/>
<published>2025-10-20T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-10-20T21:07:39.0613911Z</updated>
<georss:line>49.24223684609231 -123.0987437525813 49.24220435037654 -123.09684746138211</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Oct 15, 2025 - Nov 15, 2025</content>
<id>urn:uuid:9f06a104-55d6-49b1-86aa-b00ea93f078d</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/dca65fde-26de-4ff1-a588-802ab790b1bb"/>
<published>2025-10-20T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-10-20T21:07:39.0613911Z</updated>
<georss:line>49.24227172666457 -123.10078878628956 49.24223684609231 -123.0987437525813</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Oct 15, 2025 - Nov 15, 2025</content>
<id>urn:uuid:4e8bc5a9-692f-44a8-ab00-9d3cd38338cc</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/dca65fde-26de-4ff1-a588-802ab790b1bb"/>
<published>2025-10-20T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-10-20T21:07:39.0613911Z</updated>
<georss:line>49.243259059824766 -123.09998385084738 49.2426893577512 -123.1000123352908</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Oct 15, 2025 - Nov 15, 2025</content>
<id>urn:uuid:cda7d5b5-88b1-41c0-8d69-b289d9d607b3</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/dca65fde-26de-4ff1-a588-802ab790b1bb"/>
<published>2025-10-20T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-10-20T21:07:39.0613911Z</updated>
<georss:line>49.24441399921869 -123.09743019322248 49.24321465200708 -123.0974767855465</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Oct 15, 2025 - Nov 15, 2025</content>
<id>urn:uuid:9017697e-5480-41c5-b61c-297695924629</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/dca65fde-26de-4ff1-a588-802ab790b1bb"/>
<published>2025-10-20T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-10-20T21:07:39.0613911Z</updated>
<georss:line>49.24443452205696 -123.09866473710622 49.24323685270903 -123.09871571310326</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Oct 15, 2025 - Nov 15, 2025</content>
<id>urn:uuid:03e202aa-6eec-4c95-8d86-61a4f5fb4227</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/dca65fde-26de-4ff1-a588-802ab790b1bb"/>
<published>2025-10-20T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-10-20T21:07:39.0613911Z</updated>
<georss:line>49.24352033801472 -123.09691980181897 49.24348902439888 -123.09420255751425</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Oct 15, 2025 - Nov 15, 2025</content>
<id>urn:uuid:a38e4f7d-a8b5-462d-9551-8dfb793e0a7d</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/dca65fde-26de-4ff1-a588-802ab790b1bb"/>
<published>2025-10-20T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-10-20T21:07:39.0613911Z</updated>
<georss:line>49.24722533763398 -123.10117199436549 49.245976767167605 -123.10123957090892</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Oct 15, 2025 - Nov 15, 2025</content>
<id>urn:uuid:80a3b749-3ec4-4396-a7d6-27fd6c192021</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/dca65fde-26de-4ff1-a588-802ab790b1bb"/>
<published>2025-10-20T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-10-20T21:07:39.0613911Z</updated>
<georss:line>49.247583968703054 -123.10114094611683 49.24722533763398 -123.10117199436549</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Oct 15, 2025 - Nov 15, 2025</content>
<id>urn:uuid:93689c1f-0bbb-43be-9a75-b527663a49d8</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/dca65fde-26de-4ff1-a588-802ab790b1bb"/>
<published>2025-10-20T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-10-20T21:07:39.0613911Z</updated>
<georss:line>49.247573410470494 -123.10049938226113 49.247549609825796 -123.09911367967676</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Oct 15, 2025 - Nov 15, 2025</content>
<id>urn:uuid:4808d0d6-050d-4d6c-bc0e-aab04fbd12cb</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/dca65fde-26de-4ff1-a588-802ab790b1bb"/>
<published>2025-10-20T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-10-20T21:07:39.0613911Z</updated>
<georss:line>49.247583968703054 -123.10114094611683 49.247573410470494 -123.10049938226113</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Oct 15, 2025 - Nov 15, 2025</content>
<id>urn:uuid:439eb393-a85a-45fd-8c1c-eca204274152</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/dca65fde-26de-4ff1-a588-802ab790b1bb"/>
<published>2025-10-20T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-10-20T21:07:39.0613911Z</updated>
<georss:line>49.24048796505201 -123.10079499283557 49.24047452136219 -123.10010738226843</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Oct 15, 2025 - Nov 15, 2025</content>
<id>urn:uuid:ea5de8d2-7f0b-4cee-9389-9b1119ff808b</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/dca65fde-26de-4ff1-a588-802ab790b1bb"/>
<published>2025-10-20T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-10-20T21:07:39.0613911Z</updated>
<georss:line>49.24050237283865 -123.10148635628455 49.24048796505201 -123.10079499283557</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Oct 15, 2025 - Nov 15, 2025</content>
<id>urn:uuid:483f856a-c86c-45d4-8d1b-0ccb052ae90a</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/dca65fde-26de-4ff1-a588-802ab790b1bb"/>
<published>2025-10-20T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-10-20T21:07:39.0613911Z</updated>
<georss:line>49.245695042911024 -123.09987834374513 49.24568407972416 -123.09918691517048</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Oct 15, 2025 - Nov 15, 2025</content>
<id>urn:uuid:4aa7d2b0-40a8-4312-ba8a-a0c9c5d95ff9</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/dca65fde-26de-4ff1-a588-802ab790b1bb"/>
<published>2025-10-20T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-10-20T21:07:39.0613911Z</updated>
<georss:line>49.24570472383732 -123.10057069058055 49.245695042911024 -123.09987834374513</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Oct 15, 2025 - Nov 15, 2025</content>
<id>urn:uuid:78a9a64e-9fce-42ca-a548-52ff17d3a5ab</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/dca65fde-26de-4ff1-a588-802ab790b1bb"/>
<published>2025-10-20T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-10-20T21:07:39.0613911Z</updated>
<georss:line>49.245714130529336 -123.10125303465966 49.24570472383732 -123.10057069058055</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs. 
Location: 
Schedule: Jun 1, 2026 - Jun 30, 2026</content>
<id>urn:uuid:64e53eeb-55b4-4432-af95-9167d61dd1f4</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/414de0c7-c443-4a14-918e-7879deb2d0bb"/>
<published>2026-06-04T07:00:00Z</published>
<title>City-wide Cut Repair Program (CCRP)  </title>
<updated>2026-05-28T22:31:13.4912368Z</updated>
<georss:line>49.234789358988195 -123.09050739998122 49.232891510313834 -123.09055769579486</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs. 
Location: 
Schedule: Jun 1, 2026 - Jun 30, 2026</content>
<id>urn:uuid:5e4f0056-aa51-4d30-a8a4-3bda92df5ad9</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/414de0c7-c443-4a14-918e-7879deb2d0bb"/>
<published>2026-06-04T07:00:00Z</published>
<title>City-wide Cut Repair Program (CCRP)  </title>
<updated>2026-05-28T22:31:13.4912368Z</updated>
<georss:line>49.23989686965152 -123.08914130787902 49.23829136986683 -123.08919014048439</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs. 
Location: 
Schedule: Jun 1, 2026 - Jun 30, 2026</content>
<id>urn:uuid:0e1c4568-d6fd-4aa0-8a0e-447bddaea862</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/414de0c7-c443-4a14-918e-7879deb2d0bb"/>
<published>2026-06-04T07:00:00Z</published>
<title>City-wide Cut Repair Program (CCRP)  </title>
<updated>2026-05-28T22:31:13.4912368Z</updated>
<georss:line>49.243923599733165 -123.0878702922964 49.24350917160223 -123.08788159235107</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs. 
Location: 
Schedule: Jun 1, 2026 - Jun 30, 2026</content>
<id>urn:uuid:755def99-2ad3-44d1-b40e-1e698ba989c4</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/414de0c7-c443-4a14-918e-7879deb2d0bb"/>
<published>2026-06-04T07:00:00Z</published>
<title>City-wide Cut Repair Program (CCRP)  </title>
<updated>2026-05-28T22:31:13.4912368Z</updated>
<georss:line>49.244697961224034 -123.08784972456375 49.243923599733165 -123.0878702922964</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs. 
Location: 
Schedule: Jun 1, 2026 - Jun 30, 2026</content>
<id>urn:uuid:084a29be-505d-4e47-9394-b8c9b5f4f939</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/414de0c7-c443-4a14-918e-7879deb2d0bb"/>
<published>2026-06-04T07:00:00Z</published>
<title>City-wide Cut Repair Program (CCRP)  </title>
<updated>2026-05-28T22:31:13.4912368Z</updated>
<georss:line>49.24660619706364 -123.09087841639052 49.24659789560167 -123.09018823229042</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs. 
Location: 
Schedule: Jun 1, 2026 - Jun 30, 2026</content>
<id>urn:uuid:94f57e32-5640-432c-9f59-9997c2a96813</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/414de0c7-c443-4a14-918e-7879deb2d0bb"/>
<published>2026-06-04T07:00:00Z</published>
<title>City-wide Cut Repair Program (CCRP)  </title>
<updated>2026-05-28T22:31:13.4912368Z</updated>
<georss:line>49.24659789560167 -123.09018823229042 49.24659157781426 -123.08959108485259</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs. 
Location: 
Schedule: Jun 1, 2026 - Jun 30, 2026</content>
<id>urn:uuid:63d2c7f5-1cec-4196-9c75-9ffbffda4fe6</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/414de0c7-c443-4a14-918e-7879deb2d0bb"/>
<published>2026-06-04T07:00:00Z</published>
<title>City-wide Cut Repair Program (CCRP)  </title>
<updated>2026-05-28T22:31:13.4912368Z</updated>
<georss:line>49.2282777801598 -123.09068364472964 49.227372695373106 -123.09070602379579</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs. 
Location: 
Schedule: Jun 1, 2026 - Jun 30, 2026</content>
<id>urn:uuid:79efe5ab-53ef-426d-9031-c0d71d731cca</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/414de0c7-c443-4a14-918e-7879deb2d0bb"/>
<published>2026-06-04T07:00:00Z</published>
<title>City-wide Cut Repair Program (CCRP)  </title>
<updated>2026-05-28T22:31:13.4912368Z</updated>
<georss:line>49.22918262193923 -123.090661250689 49.2282777801598 -123.09068364472964</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs. 
Location: 
Schedule: Jun 1, 2026 - Jun 30, 2026</content>
<id>urn:uuid:3439df96-4f9d-4754-9761-b41c5f6526d3</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/414de0c7-c443-4a14-918e-7879deb2d0bb"/>
<published>2026-06-04T07:00:00Z</published>
<title>City-wide Cut Repair Program (CCRP)  </title>
<updated>2026-05-28T22:31:13.4912368Z</updated>
<georss:line>49.229292065286074 -123.0973725853608 49.22923675963008 -123.09397644962928</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs. 
Location: 
Schedule: Jun 1, 2026 - Jun 30, 2026</content>
<id>urn:uuid:09c6974a-9d8c-4130-8a72-8d3c67fe6530</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/414de0c7-c443-4a14-918e-7879deb2d0bb"/>
<published>2026-06-04T07:00:00Z</published>
<title>City-wide Cut Repair Program (CCRP)  </title>
<updated>2026-05-28T22:31:13.4912368Z</updated>
<georss:line>49.2309897418034 -123.09060449185188 49.23008844888196 -123.0906327042321</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs. 
Location: 
Schedule: Jun 1, 2026 - Jun 30, 2026</content>
<id>urn:uuid:37f32bde-8d23-473b-b27c-560aaf8bd79a</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/414de0c7-c443-4a14-918e-7879deb2d0bb"/>
<published>2026-06-04T07:00:00Z</published>
<title>City-wide Cut Repair Program (CCRP)  </title>
<updated>2026-05-28T22:31:13.4912368Z</updated>
<georss:line>49.231046680183226 -123.0939178115659 49.231000322948915 -123.09125243190911</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs. 
Location: 
Schedule: Jun 1, 2026 - Jun 30, 2026</content>
<id>urn:uuid:80b5625a-7a96-40ea-9c92-8c90980132a7</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/414de0c7-c443-4a14-918e-7879deb2d0bb"/>
<published>2026-06-04T07:00:00Z</published>
<title>City-wide Cut Repair Program (CCRP)  </title>
<updated>2026-05-28T22:31:13.4912368Z</updated>
<georss:line>49.24737560870858 -123.06991902318869 49.24694565321374 -123.0689938106278</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs. 
Location: 
Schedule: Jun 1, 2026 - Jun 30, 2026</content>
<id>urn:uuid:941f665b-9ddb-499c-bf32-f35690792d8f</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/414de0c7-c443-4a14-918e-7879deb2d0bb"/>
<published>2026-06-04T07:00:00Z</published>
<title>City-wide Cut Repair Program (CCRP)  </title>
<updated>2026-05-28T22:31:13.4912368Z</updated>
<georss:line>49.24694565321374 -123.0689938106278 49.24676741851047 -123.0686064530762</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs. 
Location: 
Schedule: Jun 1, 2026 - Jun 30, 2026</content>
<id>urn:uuid:dd4e3971-868a-4f83-98b5-b50b31221691</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/414de0c7-c443-4a14-918e-7879deb2d0bb"/>
<published>2026-06-04T07:00:00Z</published>
<title>City-wide Cut Repair Program (CCRP)  </title>
<updated>2026-05-28T22:31:13.4912368Z</updated>
<georss:line>49.24676741851047 -123.0686064530762 49.24638411680823 -123.0677782753535</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs. 
Location: 
Schedule: Jun 1, 2026 - Jun 30, 2026</content>
<id>urn:uuid:cd240953-2847-45cd-865e-c6f5639dde2b</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/414de0c7-c443-4a14-918e-7879deb2d0bb"/>
<published>2026-06-04T07:00:00Z</published>
<title>City-wide Cut Repair Program (CCRP)  </title>
<updated>2026-05-28T22:31:13.4912368Z</updated>
<georss:line>49.256786902997476 -123.04703257880122 49.25633437061725 -123.04703526839356</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs. 
Location: 
Schedule: Jun 1, 2026 - Jun 30, 2026</content>
<id>urn:uuid:db23dfcd-6175-4642-bde7-0737a472f7cf</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/414de0c7-c443-4a14-918e-7879deb2d0bb"/>
<published>2026-06-04T07:00:00Z</published>
<title>City-wide Cut Repair Program (CCRP)  </title>
<updated>2026-05-28T22:31:13.4912368Z</updated>
<georss:line>49.257238841512645 -123.04703024591252 49.256786902997476 -123.04703257880122</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs. 
Location: 
Schedule: Jun 1, 2026 - Jun 30, 2026</content>
<id>urn:uuid:b28d87ec-8b69-44b0-966c-33960a126a2d</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/414de0c7-c443-4a14-918e-7879deb2d0bb"/>
<published>2026-06-04T07:00:00Z</published>
<title>City-wide Cut Repair Program (CCRP)  </title>
<updated>2026-05-28T22:31:13.4912368Z</updated>
<georss:line>49.23444400492187 -123.1280574387114 49.23395164909414 -123.12807425680676</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs. 
Location: 
Schedule: Jun 1, 2026 - Jun 30, 2026</content>
<id>urn:uuid:554ae2c1-d364-499e-ba7b-bfa02ac33b05</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/414de0c7-c443-4a14-918e-7879deb2d0bb"/>
<published>2026-06-04T07:00:00Z</published>
<title>City-wide Cut Repair Program (CCRP)  </title>
<updated>2026-05-28T22:31:13.4912368Z</updated>
<georss:line>49.236744294605444 -123.12797883313004 49.23444400492187 -123.1280574387114</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs. 
Location: 
Schedule: Jun 1, 2026 - Jun 30, 2026</content>
<id>urn:uuid:3e88cb9f-e793-41da-a418-5263964c6cf9</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/414de0c7-c443-4a14-918e-7879deb2d0bb"/>
<published>2026-06-04T07:00:00Z</published>
<title>City-wide Cut Repair Program (CCRP)  </title>
<updated>2026-05-28T22:31:13.4912368Z</updated>
<georss:line>49.237537171720646 -123.12444671888439 49.23763267527437 -123.12723691776388</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs. 
Location: 
Schedule: Jun 1, 2026 - Jun 30, 2026</content>
<id>urn:uuid:5071fa1a-d231-4615-9274-5e1ad61d8e67</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/414de0c7-c443-4a14-918e-7879deb2d0bb"/>
<published>2026-06-04T07:00:00Z</published>
<title>City-wide Cut Repair Program (CCRP)  </title>
<updated>2026-05-28T22:31:13.4912368Z</updated>
<georss:line>49.23751282966191 -123.12373576200415 49.237537171720646 -123.12444671888439</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs. 
Location: 
Schedule: Jun 1, 2026 - Jun 30, 2026</content>
<id>urn:uuid:2d233899-5196-418a-bafa-4908d37f598d</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/414de0c7-c443-4a14-918e-7879deb2d0bb"/>
<published>2026-06-04T07:00:00Z</published>
<title>City-wide Cut Repair Program (CCRP)  </title>
<updated>2026-05-28T22:31:13.4912368Z</updated>
<georss:line>49.24570472383732 -123.10057069058055 49.245695042911024 -123.09987834374513</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs. 
Location: 
Schedule: Jun 1, 2026 - Jun 30, 2026</content>
<id>urn:uuid:c9588fdd-39eb-4b7a-b088-5695689af1f3</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/414de0c7-c443-4a14-918e-7879deb2d0bb"/>
<published>2026-06-04T07:00:00Z</published>
<title>City-wide Cut Repair Program (CCRP)  </title>
<updated>2026-05-28T22:31:13.4912368Z</updated>
<georss:line>49.245695042911024 -123.09987834374513 49.24568407972416 -123.09918691517048</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs. 
Location: 
Schedule: Jun 1, 2026 - Jun 30, 2026</content>
<id>urn:uuid:44c08a0c-5757-434e-a1fa-3c825c22ac89</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/414de0c7-c443-4a14-918e-7879deb2d0bb"/>
<published>2026-06-04T07:00:00Z</published>
<title>City-wide Cut Repair Program (CCRP)  </title>
<updated>2026-05-28T22:31:13.4912368Z</updated>
<georss:line>49.24447759001467 -123.10130613679647 49.24328539643665 -123.10135843406113</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs. 
Location: 
Schedule: Jun 1, 2026 - Jun 30, 2026</content>
<id>urn:uuid:dbf30721-3012-4ea7-b969-c18bb3b42355</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/414de0c7-c443-4a14-918e-7879deb2d0bb"/>
<published>2026-06-04T07:00:00Z</published>
<title>City-wide Cut Repair Program (CCRP)  </title>
<updated>2026-05-28T22:31:13.4912368Z</updated>
<georss:line>49.23722884416284 -123.10096998155954 49.23720102633254 -123.09933581893203</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs. 
Location: 
Schedule: Jun 1, 2026 - Jun 30, 2026</content>
<id>urn:uuid:bd3a697f-8dcb-4049-b2d3-d2a2c8c68fbd</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/414de0c7-c443-4a14-918e-7879deb2d0bb"/>
<published>2026-06-04T07:00:00Z</published>
<title>City-wide Cut Repair Program (CCRP)  </title>
<updated>2026-05-28T22:31:13.4912368Z</updated>
<georss:line>49.23724434722689 -123.10163191772078 49.23722884416284 -123.10096998155954</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs. 
Location: 
Schedule: Jun 1, 2026 - Jun 30, 2026</content>
<id>urn:uuid:6386b037-e259-4796-8113-422b34f10534</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/414de0c7-c443-4a14-918e-7879deb2d0bb"/>
<published>2026-06-04T07:00:00Z</published>
<title>City-wide Cut Repair Program (CCRP)  </title>
<updated>2026-05-28T22:31:13.4912368Z</updated>
<georss:line>49.23302816748938 -123.12890083154028 49.233129789111786 -123.13187158304157</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs. 
Location: 
Schedule: Jun 1, 2026 - Jun 30, 2026</content>
<id>urn:uuid:2f5c924a-0f72-4913-b446-4be75dec1b30</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/414de0c7-c443-4a14-918e-7879deb2d0bb"/>
<published>2026-06-04T07:00:00Z</published>
<title>City-wide Cut Repair Program (CCRP)  </title>
<updated>2026-05-28T22:31:13.4912368Z</updated>
<georss:line>49.23410620038615 -123.13259158136627 49.23413188943073 -123.13334304734644</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs. 
Location: 
Schedule: Jun 1, 2026 - Jun 30, 2026</content>
<id>urn:uuid:3daeb871-eac4-45d5-86a8-db10153a77ef</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/414de0c7-c443-4a14-918e-7879deb2d0bb"/>
<published>2026-06-04T07:00:00Z</published>
<title>City-wide Cut Repair Program (CCRP)  </title>
<updated>2026-05-28T22:31:13.4912368Z</updated>
<georss:line>49.23413188943073 -123.13334304734644 49.23415722573537 -123.13408421081617</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs. 
Location: 
Schedule: Jun 1, 2026 - Jun 30, 2026</content>
<id>urn:uuid:67804050-5f4e-4cb8-8adb-979049a6ca24</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/414de0c7-c443-4a14-918e-7879deb2d0bb"/>
<published>2026-06-04T07:00:00Z</published>
<title>City-wide Cut Repair Program (CCRP)  </title>
<updated>2026-05-28T22:31:13.4912368Z</updated>
<georss:line>49.23415722573537 -123.13408421081617 49.234182652752736 -123.13482835610569</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs. 
Location: 
Schedule: Jun 1, 2026 - Jun 30, 2026</content>
<id>urn:uuid:6b983b28-8ab9-4688-bc0c-2f66e3cb0c51</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/414de0c7-c443-4a14-918e-7879deb2d0bb"/>
<published>2026-06-04T07:00:00Z</published>
<title>City-wide Cut Repair Program (CCRP)  </title>
<updated>2026-05-28T22:31:13.4912368Z</updated>
<georss:line>49.24143459280421 -123.12781871361038 49.24146130209249 -123.12853000972672</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs. 
Location: 
Schedule: Jun 1, 2026 - Jun 30, 2026</content>
<id>urn:uuid:086aed26-4519-4dcc-9fde-ed6a62e8438d</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/414de0c7-c443-4a14-918e-7879deb2d0bb"/>
<published>2026-06-04T07:00:00Z</published>
<title>City-wide Cut Repair Program (CCRP)  </title>
<updated>2026-05-28T22:31:13.4912368Z</updated>
<georss:line>49.24146130209249 -123.12853000972672 49.24149498597316 -123.12942730269639</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs. 
Location: 
Schedule: Jun 1, 2026 - Jun 30, 2026</content>
<id>urn:uuid:af35b763-cdaa-460a-905e-d4a37ffc4b0b</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/414de0c7-c443-4a14-918e-7879deb2d0bb"/>
<published>2026-06-04T07:00:00Z</published>
<title>City-wide Cut Repair Program (CCRP)  </title>
<updated>2026-05-28T22:31:13.4912368Z</updated>
<georss:line>49.24149498597316 -123.12942730269639 49.24152042769313 -123.13010517147015</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs. 
Location: 
Schedule: Jun 1, 2026 - Jun 30, 2026</content>
<id>urn:uuid:c5ecfbc3-8a32-4fd2-98fe-f1663d753901</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/414de0c7-c443-4a14-918e-7879deb2d0bb"/>
<published>2026-06-04T07:00:00Z</published>
<title>City-wide Cut Repair Program (CCRP)  </title>
<updated>2026-05-28T22:31:13.4912368Z</updated>
<georss:line>49.24152042769313 -123.13010517147015 49.241546886921924 -123.13081038324563</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs. 
Location: 
Schedule: Jun 1, 2026 - Jun 30, 2026</content>
<id>urn:uuid:5f63595a-3b17-4444-81d9-736bb7bd12f4</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/414de0c7-c443-4a14-918e-7879deb2d0bb"/>
<published>2026-06-04T07:00:00Z</published>
<title>City-wide Cut Repair Program (CCRP)  </title>
<updated>2026-05-28T22:31:13.4912368Z</updated>
<georss:line>49.241546886921924 -123.13081038324563 49.24160215838586 -123.13228351793396</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs. 
Location: 
Schedule: Jun 1, 2026 - Jun 30, 2026</content>
<id>urn:uuid:e33cf56f-8680-4567-bed3-0e5c739fb102</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/414de0c7-c443-4a14-918e-7879deb2d0bb"/>
<published>2026-06-04T07:00:00Z</published>
<title>City-wide Cut Repair Program (CCRP)  </title>
<updated>2026-05-28T22:31:13.4912368Z</updated>
<georss:line>49.22598203492424 -123.12833634808197 49.225684117725365 -123.12834712689816</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs. 
Location: 
Schedule: Jun 1, 2026 - Jun 30, 2026</content>
<id>urn:uuid:97fd69f1-df82-4bf6-9611-5df2691bea3f</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/414de0c7-c443-4a14-918e-7879deb2d0bb"/>
<published>2026-06-04T07:00:00Z</published>
<title>City-wide Cut Repair Program (CCRP)  </title>
<updated>2026-05-28T22:31:13.4912368Z</updated>
<georss:line>49.22655267254024 -123.12831568622818 49.22598203492424 -123.12833634808197</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs. 
Location: 
Schedule: Jun 1, 2026 - Jun 30, 2026</content>
<id>urn:uuid:6b736a38-1918-459e-b282-5195c4aad53e</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/414de0c7-c443-4a14-918e-7879deb2d0bb"/>
<published>2026-06-04T07:00:00Z</published>
<title>City-wide Cut Repair Program (CCRP)  </title>
<updated>2026-05-28T22:31:13.4912368Z</updated>
<georss:line>49.227483832983864 -123.12829348514046 49.22655267254024 -123.12831568622818</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs. 
Location: 
Schedule: Jun 1, 2026 - Jun 30, 2026</content>
<id>urn:uuid:ac613a8d-3509-4f6a-92cd-16794d49a4f8</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/414de0c7-c443-4a14-918e-7879deb2d0bb"/>
<published>2026-06-04T07:00:00Z</published>
<title>City-wide Cut Repair Program (CCRP)  </title>
<updated>2026-05-28T22:31:13.4912368Z</updated>
<georss:line>49.22839238862821 -123.12826277779922 49.227483832983864 -123.12829348514046</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs. 
Location: 
Schedule: Jun 1, 2026 - Jun 30, 2026</content>
<id>urn:uuid:15d8f15c-c476-48e3-973c-bf8ab6937f70</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/414de0c7-c443-4a14-918e-7879deb2d0bb"/>
<published>2026-06-04T07:00:00Z</published>
<title>City-wide Cut Repair Program (CCRP)  </title>
<updated>2026-05-28T22:31:13.4912368Z</updated>
<georss:line>49.229302410390744 -123.12823203195352 49.22839238862821 -123.12826277779922</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs. 
Location: 
Schedule: Jun 1, 2026 - Jun 30, 2026</content>
<id>urn:uuid:efacc5c4-115f-480f-a639-85357a440e46</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/414de0c7-c443-4a14-918e-7879deb2d0bb"/>
<published>2026-06-04T07:00:00Z</published>
<title>City-wide Cut Repair Program (CCRP)  </title>
<updated>2026-05-28T22:31:13.4912368Z</updated>
<georss:line>49.232236074633704 -123.1056772686406 49.23171375518481 -123.10569796691206</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs. 
Location: 
Schedule: Jun 1, 2026 - Jun 30, 2026</content>
<id>urn:uuid:dad7e20d-71ea-4caf-a1d8-f41e0fdae723</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/414de0c7-c443-4a14-918e-7879deb2d0bb"/>
<published>2026-06-04T07:00:00Z</published>
<title>City-wide Cut Repair Program (CCRP)  </title>
<updated>2026-05-28T22:31:13.4912368Z</updated>
<georss:line>49.232618323596455 -123.10566239747993 49.232236074633704 -123.1056772686406</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs. 
Location: 
Schedule: Jun 1, 2026 - Jun 30, 2026</content>
<id>urn:uuid:759b7fd7-dddd-4107-9b78-15416655811d</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/414de0c7-c443-4a14-918e-7879deb2d0bb"/>
<published>2026-06-04T07:00:00Z</published>
<title>City-wide Cut Repair Program (CCRP)  </title>
<updated>2026-05-28T22:31:13.4912368Z</updated>
<georss:line>49.22570658938645 -123.10379867737157 49.22569466991948 -123.10316689740587</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs. 
Location: 
Schedule: Jun 1, 2026 - Jun 30, 2026</content>
<id>urn:uuid:6cf8a449-c714-40b4-87ff-e3cfe05be3f4</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/414de0c7-c443-4a14-918e-7879deb2d0bb"/>
<published>2026-06-04T07:00:00Z</published>
<title>City-wide Cut Repair Program (CCRP)  </title>
<updated>2026-05-28T22:31:13.4912368Z</updated>
<georss:line>49.22569466991948 -123.10316689740587 49.225676547602234 -123.10231379365948</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs. 
Location: 
Schedule: Jun 1, 2026 - Jun 30, 2026</content>
<id>urn:uuid:7bf51fb5-f544-49bd-ad3d-662dc9a2f73e</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/414de0c7-c443-4a14-918e-7879deb2d0bb"/>
<published>2026-06-04T07:00:00Z</published>
<title>City-wide Cut Repair Program (CCRP)  </title>
<updated>2026-05-28T22:31:13.4912368Z</updated>
<georss:line>49.22665888137874 -123.10157317709357 49.22566316181289 -123.10163200559309</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs. 
Location: 
Schedule: Jun 1, 2026 - Jun 30, 2026</content>
<id>urn:uuid:0cfa2d74-b87d-4145-bd2d-3cbfa3ec8cb0</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/414de0c7-c443-4a14-918e-7879deb2d0bb"/>
<published>2026-06-04T07:00:00Z</published>
<title>City-wide Cut Repair Program (CCRP)  </title>
<updated>2026-05-28T22:31:13.4912368Z</updated>
<georss:line>49.22390243446836 -123.12759973025929 49.22391409267951 -123.1284111832236</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs. 
Location: 
Schedule: Jun 1, 2026 - Jun 30, 2026</content>
<id>urn:uuid:de0f068d-42d5-4166-8df0-6bb995fc3f1e</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/414de0c7-c443-4a14-918e-7879deb2d0bb"/>
<published>2026-06-04T07:00:00Z</published>
<title>City-wide Cut Repair Program (CCRP)  </title>
<updated>2026-05-28T22:31:13.4912368Z</updated>
<georss:line>49.225684117725365 -123.12834712689816 49.22479910077695 -123.128379155606</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs. 
Location: 
Schedule: Jun 1, 2026 - Jun 30, 2026</content>
<id>urn:uuid:acaeeef9-e354-4b48-9667-7af806f55448</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/414de0c7-c443-4a14-918e-7879deb2d0bb"/>
<published>2026-06-04T07:00:00Z</published>
<title>City-wide Cut Repair Program (CCRP)  </title>
<updated>2026-05-28T22:31:13.4912368Z</updated>
<georss:line>49.223845900677674 -123.1236697447969 49.22326062016023 -123.12368963972652</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs. 
Location: 
Schedule: Jun 1, 2026 - Jun 30, 2026</content>
<id>urn:uuid:d3ff81c9-2f84-448c-9d8c-62d79cc76d29</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/414de0c7-c443-4a14-918e-7879deb2d0bb"/>
<published>2026-06-04T07:00:00Z</published>
<title>City-wide Cut Repair Program (CCRP)  </title>
<updated>2026-05-28T22:31:13.4912368Z</updated>
<georss:line>49.22546563620983 -123.12361684572284 49.223845900677674 -123.1236697447969</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs. 
Location: 
Schedule: Jun 1, 2026 - Jun 30, 2026</content>
<id>urn:uuid:6389f138-fc15-4348-bd4f-df310eab8c0a</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/414de0c7-c443-4a14-918e-7879deb2d0bb"/>
<published>2026-06-04T07:00:00Z</published>
<title>City-wide Cut Repair Program (CCRP)  </title>
<updated>2026-05-28T22:31:13.4912368Z</updated>
<georss:line>49.22154179521502 -123.12849354541824 49.220508631607515 -123.12852809613085</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs. 
Location: 
Schedule: Jun 1, 2026 - Jun 30, 2026</content>
<id>urn:uuid:cbf667c0-fc33-4a2a-be0f-c1aae7a11b58</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/414de0c7-c443-4a14-918e-7879deb2d0bb"/>
<published>2026-06-04T07:00:00Z</published>
<title>City-wide Cut Repair Program (CCRP)  </title>
<updated>2026-05-28T22:31:13.4912368Z</updated>
<georss:line>49.22392466069573 -123.1291467280453 49.22394583295201 -123.13062108733622</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs. 
Location: 
Schedule: Jun 1, 2026 - Jun 30, 2026</content>
<id>urn:uuid:d9086d2c-bafb-4bbe-b008-cd577d43f6a0</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/414de0c7-c443-4a14-918e-7879deb2d0bb"/>
<published>2026-06-04T07:00:00Z</published>
<title>City-wide Cut Repair Program (CCRP)  </title>
<updated>2026-05-28T22:31:13.4912368Z</updated>
<georss:line>49.22391409267951 -123.1284111832236 49.22280968996094 -123.1284511420282</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs. 
Location: 
Schedule: Jun 1, 2026 - Jun 30, 2026</content>
<id>urn:uuid:3b63f3c7-bc5f-45f9-9be1-0a2eda7269ca</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/414de0c7-c443-4a14-918e-7879deb2d0bb"/>
<published>2026-06-04T07:00:00Z</published>
<title>City-wide Cut Repair Program (CCRP)  </title>
<updated>2026-05-28T22:31:13.4912368Z</updated>
<georss:line>49.220508631607515 -123.12852809613085 49.21965173680465 -123.12855674454696 49.21951699899711 -123.12856264331133 49.21938233816934 -123.12857211265644 49.21924781725684 -123.12858518018112 49.21920403121217 -123.12859060070724</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs. 
Location: 
Schedule: Jun 1, 2026 - Jun 30, 2026</content>
<id>urn:uuid:55edee8d-d0cd-4177-95bd-805184fd39bd</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/414de0c7-c443-4a14-918e-7879deb2d0bb"/>
<published>2026-06-04T07:00:00Z</published>
<title>City-wide Cut Repair Program (CCRP)  </title>
<updated>2026-05-28T22:31:13.4912368Z</updated>
<georss:line>49.22154179521502 -123.12849354541824 49.22155218712183 -123.1292252230941</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs. 
Location: 
Schedule: Jun 1, 2026 - Jun 30, 2026</content>
<id>urn:uuid:c590ae44-ec20-426b-b6bc-fa2bccbfea62</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/414de0c7-c443-4a14-918e-7879deb2d0bb"/>
<published>2026-06-04T07:00:00Z</published>
<title>City-wide Cut Repair Program (CCRP)  </title>
<updated>2026-05-28T22:31:13.4912368Z</updated>
<georss:line>49.22391409267951 -123.1284111832236 49.22392466069573 -123.1291467280453</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs. 
Location: 
Schedule: Jun 1, 2026 - Jun 30, 2026</content>
<id>urn:uuid:3e1c00f1-9692-4889-adb1-43ae781863f0</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/414de0c7-c443-4a14-918e-7879deb2d0bb"/>
<published>2026-06-04T07:00:00Z</published>
<title>City-wide Cut Repair Program (CCRP)  </title>
<updated>2026-05-28T22:31:13.4912368Z</updated>
<georss:line>49.22155218712183 -123.1292252230941 49.22157315686667 -123.13070276601627</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs. 
Location: 
Schedule: Jun 1, 2026 - Jun 30, 2026</content>
<id>urn:uuid:38dd4228-30cf-4976-8d1d-c42851cdde10</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/414de0c7-c443-4a14-918e-7879deb2d0bb"/>
<published>2026-06-04T07:00:00Z</published>
<title>City-wide Cut Repair Program (CCRP)  </title>
<updated>2026-05-28T22:31:13.4912368Z</updated>
<georss:line>49.22842042934164 -123.12906816644295 49.22852441975806 -123.13203249508014</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs. 
Location: 
Schedule: Jun 1, 2026 - Jun 30, 2026</content>
<id>urn:uuid:38f5a2bd-8149-4d76-9058-a630fd33dd97</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/414de0c7-c443-4a14-918e-7879deb2d0bb"/>
<published>2026-06-04T07:00:00Z</published>
<title>City-wide Cut Repair Program (CCRP)  </title>
<updated>2026-05-28T22:31:13.4912368Z</updated>
<georss:line>49.23300098563408 -123.12810673008107 49.23302816748938 -123.12890083154028</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs. 
Location: 
Schedule: Jun 1, 2026 - Jun 30, 2026</content>
<id>urn:uuid:6906654a-2d02-4226-9b88-a2d1bfeb9963</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/414de0c7-c443-4a14-918e-7879deb2d0bb"/>
<published>2026-06-04T07:00:00Z</published>
<title>City-wide Cut Repair Program (CCRP)  </title>
<updated>2026-05-28T22:31:13.4912368Z</updated>
<georss:line>49.21776511849376 -123.11102963628767 49.21687526136819 -123.11105686405485</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs. 
Location: 
Schedule: Jun 1, 2026 - Jun 30, 2026</content>
<id>urn:uuid:066a037a-c698-468f-a710-da0130b9294e</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/414de0c7-c443-4a14-918e-7879deb2d0bb"/>
<published>2026-06-04T07:00:00Z</published>
<title>City-wide Cut Repair Program (CCRP)  </title>
<updated>2026-05-28T22:31:13.4912368Z</updated>
<georss:line>49.22195936060709 -123.10175414635056 49.22105661976556 -123.1017976661669</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs. 
Location: 
Schedule: Jun 1, 2026 - Jun 30, 2026</content>
<id>urn:uuid:ef89ed44-5a14-4470-92c4-5746a9559429</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/414de0c7-c443-4a14-918e-7879deb2d0bb"/>
<published>2026-06-04T07:00:00Z</published>
<title>City-wide Cut Repair Program (CCRP)  </title>
<updated>2026-05-28T22:31:13.4912368Z</updated>
<georss:line>49.22205521663932 -123.10608109184955 49.221150714938915 -123.10611063152575</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs. 
Location: 
Schedule: Jun 1, 2026 - Jun 30, 2026</content>
<id>urn:uuid:e9ea3dfe-692a-4c65-a062-13ea478812bd</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/414de0c7-c443-4a14-918e-7879deb2d0bb"/>
<published>2026-06-04T07:00:00Z</published>
<title>City-wide Cut Repair Program (CCRP)  </title>
<updated>2026-05-28T22:31:13.4912368Z</updated>
<georss:line>49.22199425068038 -123.10328750233519 49.22197492509869 -123.10240259903154</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs. 
Location: 
Schedule: Jun 1, 2026 - Jun 30, 2026</content>
<id>urn:uuid:d25a7a6c-5e70-4d04-8ea6-03a9fb84b07d</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/414de0c7-c443-4a14-918e-7879deb2d0bb"/>
<published>2026-06-04T07:00:00Z</published>
<title>City-wide Cut Repair Program (CCRP)  </title>
<updated>2026-05-28T22:31:13.4912368Z</updated>
<georss:line>49.222008224733116 -123.1039244717674 49.22199425068038 -123.10328750233519</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs. 
Location: 
Schedule: Jun 1, 2026 - Jun 30, 2026</content>
<id>urn:uuid:c321abee-5bde-419d-8196-66c28cf0d233</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/414de0c7-c443-4a14-918e-7879deb2d0bb"/>
<published>2026-06-04T07:00:00Z</published>
<title>City-wide Cut Repair Program (CCRP)  </title>
<updated>2026-05-28T22:31:13.4912368Z</updated>
<georss:line>49.232995824326196 -123.09721452315824 49.23295448925944 -123.09456169605798</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs. 
Location: 
Schedule: Jun 1, 2026 - Jun 30, 2026</content>
<id>urn:uuid:4a260546-edfc-4c3e-9b79-61008af98fe2</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/414de0c7-c443-4a14-918e-7879deb2d0bb"/>
<published>2026-06-04T07:00:00Z</published>
<title>City-wide Cut Repair Program (CCRP)  </title>
<updated>2026-05-28T22:31:13.4912368Z</updated>
<georss:line>49.21692931740654 -123.1160047684795 49.21693872465684 -123.11685438311734</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs. 
Location: 
Schedule: Jun 1, 2026 - Jun 30, 2026</content>
<id>urn:uuid:dcbc29f5-2967-4372-9eeb-5096f8887b89</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/414de0c7-c443-4a14-918e-7879deb2d0bb"/>
<published>2026-06-04T07:00:00Z</published>
<title>City-wide Cut Repair Program (CCRP)  </title>
<updated>2026-05-28T22:31:13.4912368Z</updated>
<georss:line>49.21318214429087 -123.11542043914628 49.213190273096075 -123.116221791907</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs. 
Location: 
Schedule: Jun 1, 2026 - Jun 30, 2026</content>
<id>urn:uuid:2cb77f7a-8005-4871-8767-8511189a4b9e</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/414de0c7-c443-4a14-918e-7879deb2d0bb"/>
<published>2026-06-04T07:00:00Z</published>
<title>City-wide Cut Repair Program (CCRP)  </title>
<updated>2026-05-28T22:31:13.4912368Z</updated>
<georss:line>49.21692339078834 -123.11534777643426 49.21692931740654 -123.1160047684795</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs. 
Location: 
Schedule: Jun 1, 2026 - Jun 30, 2026</content>
<id>urn:uuid:43cab879-b2cd-4d05-b209-8af225f24b94</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/414de0c7-c443-4a14-918e-7879deb2d0bb"/>
<published>2026-06-04T07:00:00Z</published>
<title>City-wide Cut Repair Program (CCRP)  </title>
<updated>2026-05-28T22:31:13.4912368Z</updated>
<georss:line>49.21317084171508 -123.11463003635957 49.21318214429087 -123.11542043914628</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs. 
Location: 
Schedule: Jun 1, 2026 - Jun 30, 2026</content>
<id>urn:uuid:81c739e3-43a0-4b4d-85a9-2366d2eeb44e</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/414de0c7-c443-4a14-918e-7879deb2d0bb"/>
<published>2026-06-04T07:00:00Z</published>
<title>City-wide Cut Repair Program (CCRP)  </title>
<updated>2026-05-28T22:31:13.4912368Z</updated>
<georss:line>49.21690530390481 -123.11331849588929 49.21690452337381 -123.11382873542023 49.21692339078834 -123.11534777643426</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs. 
Location: 
Schedule: Jun 1, 2026 - Jun 30, 2026</content>
<id>urn:uuid:5c686f83-a89e-476e-970f-10ba51c63c0a</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/414de0c7-c443-4a14-918e-7879deb2d0bb"/>
<published>2026-06-04T07:00:00Z</published>
<title>City-wide Cut Repair Program (CCRP)  </title>
<updated>2026-05-28T22:31:13.4912368Z</updated>
<georss:line>49.21096217924051 -123.1150599654849 49.20963840080606 -123.11512777968797</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs. 
Location: 
Schedule: Jun 1, 2026 - Jun 30, 2026</content>
<id>urn:uuid:52aeb7f4-d09a-4642-8ee5-a0b2687ba3d9</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/414de0c7-c443-4a14-918e-7879deb2d0bb"/>
<published>2026-06-04T07:00:00Z</published>
<title>City-wide Cut Repair Program (CCRP)  </title>
<updated>2026-05-28T22:31:13.4912368Z</updated>
<georss:line>49.207403800075184 -123.11023056488256 49.20688473897536 -123.11025530370043</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs. 
Location: 
Schedule: Jun 1, 2026 - Jun 30, 2026</content>
<id>urn:uuid:5f13dbdf-07e9-4374-8f49-66ed80fe184e</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/414de0c7-c443-4a14-918e-7879deb2d0bb"/>
<published>2026-06-04T07:00:00Z</published>
<title>City-wide Cut Repair Program (CCRP)  </title>
<updated>2026-05-28T22:31:13.4912368Z</updated>
<georss:line>49.214679329233775 -123.10988547794287 49.21424518448933 -123.10990060826065</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs. 
Location: 
Schedule: Jun 1, 2026 - Jun 30, 2026</content>
<id>urn:uuid:9ffaba0b-9f26-4411-8fe0-b79de2a9951b</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/414de0c7-c443-4a14-918e-7879deb2d0bb"/>
<published>2026-06-04T07:00:00Z</published>
<title>City-wide Cut Repair Program (CCRP)  </title>
<updated>2026-05-28T22:31:13.4912368Z</updated>
<georss:line>49.215112780681466 -123.10987100492609 49.214679329233775 -123.10988547794287</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs. 
Location: 
Schedule: Jun 1, 2026 - Jun 30, 2026</content>
<id>urn:uuid:4eb239bb-a3db-4005-b683-716c6923821e</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/414de0c7-c443-4a14-918e-7879deb2d0bb"/>
<published>2026-06-04T07:00:00Z</published>
<title>City-wide Cut Repair Program (CCRP)  </title>
<updated>2026-05-28T22:31:13.4912368Z</updated>
<georss:line>49.20942521582512 -123.10670263969419 49.20685871622172 -123.10683741235778</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs. 
Location: 
Schedule: Jun 1, 2026 - Jun 30, 2026</content>
<id>urn:uuid:e656f963-1bd9-4d51-8b4d-f7b4645a2793</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/414de0c7-c443-4a14-918e-7879deb2d0bb"/>
<published>2026-06-04T07:00:00Z</published>
<title>City-wide Cut Repair Program (CCRP)  </title>
<updated>2026-05-28T22:31:13.4912368Z</updated>
<georss:line>49.21342885220878 -123.09792285063008 49.21326382987192 -123.09530330547713</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs. 
Location: 
Schedule: Jun 1, 2026 - Jun 30, 2026</content>
<id>urn:uuid:7f5d088c-c632-40e1-b674-9494e4fd78e6</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/414de0c7-c443-4a14-918e-7879deb2d0bb"/>
<published>2026-06-04T07:00:00Z</published>
<title>City-wide Cut Repair Program (CCRP)  </title>
<updated>2026-05-28T22:31:13.4912368Z</updated>
<georss:line>49.21326382987192 -123.09530330547713 49.21320918629684 -123.09424745128219</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Apr 23, 2026 - May 8, 2026</content>
<id>urn:uuid:0d9ac9d4-7af3-44a9-9a48-740558f9511a</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/618f5b3a-1d35-4547-9a52-18598c012913"/>
<published>2026-04-23T07:00:00Z</published>
<title>City-wide Cut Repair Program (CCRP)  </title>
<updated>2026-05-08T19:48:00.2903855Z</updated>
<georss:line>49.25606606533796 -123.11816716930198 49.256089850579826 -123.11945120489699</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Apr 23, 2026 - May 8, 2026</content>
<id>urn:uuid:52cb8c42-97d9-4530-80d2-1ca90179af7f</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/618f5b3a-1d35-4547-9a52-18598c012913"/>
<published>2026-04-23T07:00:00Z</published>
<title>City-wide Cut Repair Program (CCRP)  </title>
<updated>2026-05-08T19:48:00.2903855Z</updated>
<georss:line>49.256089850579826 -123.11945120489699 49.256102790224645 -123.1201149182985</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Apr 23, 2026 - May 8, 2026</content>
<id>urn:uuid:19a183e0-c1b0-4de2-be73-9222ddc7f59d</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/618f5b3a-1d35-4547-9a52-18598c012913"/>
<published>2026-04-23T07:00:00Z</published>
<title>City-wide Cut Repair Program (CCRP)  </title>
<updated>2026-05-08T19:48:00.2903855Z</updated>
<georss:line>49.257044443826885 -123.1220308058425 49.25707793374775 -123.12373010439624</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Apr 23, 2026 - May 8, 2026</content>
<id>urn:uuid:6a2ec2bc-45ad-4e02-98cf-6e577eefe3fd</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/618f5b3a-1d35-4547-9a52-18598c012913"/>
<published>2026-04-23T07:00:00Z</published>
<title>City-wide Cut Repair Program (CCRP)  </title>
<updated>2026-05-08T19:48:00.2903855Z</updated>
<georss:line>49.25707793374775 -123.12373010439624 49.257090942552566 -123.12439030045189</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Apr 23, 2026 - May 8, 2026</content>
<id>urn:uuid:bdd90455-7627-4c74-94cf-382be99b39f1</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/618f5b3a-1d35-4547-9a52-18598c012913"/>
<published>2026-04-23T07:00:00Z</published>
<title>City-wide Cut Repair Program (CCRP)  </title>
<updated>2026-05-08T19:48:00.2903855Z</updated>
<georss:line>49.257090942552566 -123.12439030045189 49.25713504893346 -123.12663167380929</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Apr 23, 2026 - May 8, 2026</content>
<id>urn:uuid:ca54bdcc-e539-4873-908d-5a76ac7b2eae</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/618f5b3a-1d35-4547-9a52-18598c012913"/>
<published>2026-04-23T07:00:00Z</published>
<title>City-wide Cut Repair Program (CCRP)  </title>
<updated>2026-05-08T19:48:00.2903855Z</updated>
<georss:line>49.255241390880116 -123.12209646039717 49.25527325145569 -123.12379598161102</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Apr 23, 2026 - May 8, 2026</content>
<id>urn:uuid:2fc60e25-ad0e-4607-893d-263840105dc4</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/618f5b3a-1d35-4547-9a52-18598c012913"/>
<published>2026-04-23T07:00:00Z</published>
<title>City-wide Cut Repair Program (CCRP)  </title>
<updated>2026-05-08T19:48:00.2903855Z</updated>
<georss:line>49.254899475361526 -123.11515613345091 49.25399517461702 -123.11519444493455</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Apr 23, 2026 - May 8, 2026</content>
<id>urn:uuid:07d24cc2-0778-43bd-9084-d6067058934f</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/618f5b3a-1d35-4547-9a52-18598c012913"/>
<published>2026-04-23T07:00:00Z</published>
<title>City-wide Cut Repair Program (CCRP)  </title>
<updated>2026-05-08T19:48:00.2903855Z</updated>
<georss:line>49.25485318722846 -123.11446690982777 49.2548630391415 -123.11499013917677 49.254899475361526 -123.11515613345091</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Apr 23, 2026 - May 8, 2026</content>
<id>urn:uuid:8a3b7079-2786-407b-8faa-9dbb9df27818</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/618f5b3a-1d35-4547-9a52-18598c012913"/>
<published>2026-04-23T07:00:00Z</published>
<title>City-wide Cut Repair Program (CCRP)  </title>
<updated>2026-05-08T19:48:00.2903855Z</updated>
<georss:line>49.254899475361526 -123.11515613345091 49.25511022829073 -123.11590783079335 49.25512194564277 -123.11604565193426</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Apr 23, 2026 - May 8, 2026</content>
<id>urn:uuid:34b993a6-4038-4259-a363-75bc1e219075</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/618f5b3a-1d35-4547-9a52-18598c012913"/>
<published>2026-04-23T07:00:00Z</published>
<title>City-wide Cut Repair Program (CCRP)  </title>
<updated>2026-05-08T19:48:00.2903855Z</updated>
<georss:line>49.2558427024519 -123.11442541449907 49.255852165754106 -123.11491448961894 49.25588133274866 -123.11513585243864</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Apr 23, 2026 - May 8, 2026</content>
<id>urn:uuid:53c8f04f-8abd-494e-ba93-a6e06447c136</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/618f5b3a-1d35-4547-9a52-18598c012913"/>
<published>2026-04-23T07:00:00Z</published>
<title>City-wide Cut Repair Program (CCRP)  </title>
<updated>2026-05-08T19:48:00.2903855Z</updated>
<georss:line>49.25588133274866 -123.11513585243864 49.25602241441584 -123.11587299934429 49.256025550484225 -123.11601070670801</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Apr 23, 2026 - May 8, 2026</content>
<id>urn:uuid:f8ad51ca-ded5-46fb-a552-c06d2b171eb1</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/618f5b3a-1d35-4547-9a52-18598c012913"/>
<published>2026-04-23T07:00:00Z</published>
<title>City-wide Cut Repair Program (CCRP)  </title>
<updated>2026-05-08T19:48:00.2903855Z</updated>
<georss:line>49.25561346277968 -123.11818391275827 49.25516084089972 -123.11820192015925</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Apr 23, 2026 - May 8, 2026</content>
<id>urn:uuid:1a5344bc-079b-4288-8b76-89d709db85d6</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/618f5b3a-1d35-4547-9a52-18598c012913"/>
<published>2026-04-23T07:00:00Z</published>
<title>City-wide Cut Repair Program (CCRP)  </title>
<updated>2026-05-08T19:48:00.2903855Z</updated>
<georss:line>49.25516084089972 -123.11820192015925 49.25520111956587 -123.12014846035129</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Apr 23, 2026 - May 8, 2026</content>
<id>urn:uuid:fa0f8b57-7e6e-4371-a6f9-aad91f1821d3</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/618f5b3a-1d35-4547-9a52-18598c012913"/>
<published>2026-04-23T07:00:00Z</published>
<title>City-wide Cut Repair Program (CCRP)  </title>
<updated>2026-05-08T19:48:00.2903855Z</updated>
<georss:line>49.25565178897443 -123.12013123557156 49.25520111956587 -123.12014846035129</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Apr 23, 2026 - May 8, 2026</content>
<id>urn:uuid:bfe1713b-9250-439a-8db3-06234ea7a701</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/618f5b3a-1d35-4547-9a52-18598c012913"/>
<published>2026-04-23T07:00:00Z</published>
<title>City-wide Cut Repair Program (CCRP)  </title>
<updated>2026-05-08T19:48:00.2903855Z</updated>
<georss:line>49.256102790224645 -123.1201149182985 49.25565178897443 -123.12013123557156</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Apr 23, 2026 - May 8, 2026</content>
<id>urn:uuid:3a1cd74a-3764-4068-95a2-41664d231ebf</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/618f5b3a-1d35-4547-9a52-18598c012913"/>
<published>2026-04-23T07:00:00Z</published>
<title>City-wide Cut Repair Program (CCRP)  </title>
<updated>2026-05-08T19:48:00.2903855Z</updated>
<georss:line>49.2545888894326 -123.13891270423308 49.25314130194988 -123.13894617087209</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Apr 23, 2026 - May 8, 2026</content>
<id>urn:uuid:e185a5a8-3780-4bf0-8893-50953c1f64aa</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/618f5b3a-1d35-4547-9a52-18598c012913"/>
<published>2026-04-23T07:00:00Z</published>
<title>City-wide Cut Repair Program (CCRP)  </title>
<updated>2026-05-08T19:48:00.2903855Z</updated>
<georss:line>49.256649928522734 -123.13883762616128 49.2545888894326 -123.13891270423308</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Apr 23, 2026 - May 8, 2026</content>
<id>urn:uuid:2f635a37-6cc9-4e69-8fba-4825b31f1983</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/618f5b3a-1d35-4547-9a52-18598c012913"/>
<published>2026-04-23T07:00:00Z</published>
<title>City-wide Cut Repair Program (CCRP)  </title>
<updated>2026-05-08T19:48:00.2903855Z</updated>
<georss:line>49.25679502293434 -123.13652653299961 49.25680575860579 -123.13654566501269 49.256819249120554 -123.1365704529003 49.2568324513453 -123.13659561106 49.256845356316944 -123.13662111198131 49.25685798202582 -123.13664695571377 49.25687030150226 -123.13667312843992 49.25688232375751 -123.1366996164417 49.25689403977995 -123.13672643343675 49.25690544958562 -123.13675356568204 49.25691654421158 -123.13678098566697 49.25692732365769 -123.13680869339126 49.25693778790742 -123.13683670259728 49.256947928014256 -123.13686497203157 49.25695774396175 -123.13689351543655 49.256967235782156 -123.13692230532631 49.25697639446389 -123.13695135541828 49.256985220039354 -123.13698063822653 49.256993712508375 -123.13701015375057 49.25700186289188 -123.13703988822233 49.257009680184865 -123.13706984166618 49.25701714641306 -123.13710000028907 49.257024270604205 -123.13713033662981 49.25703104373031 -123.13716087814846 49.2570374658402 -123.13719158361619 49.25704353691731 -123.13722246677513 49.25704925699429 -123.13725350013927 49.25705461707577 -123.13728468368296 49.257059626173145 -123.13731600368781 49.25706427530744 -123.1373474463854 49.2570685644786 -123.1373790117752 49.25707249368651 -123.13741069985645 49.25707605398492 -123.13744246937524 49.25707925435259 -123.13747433409867 49.25708209480584 -123.13750628028326 49.257084566349334 -123.13753830790328 49.25708666901582 -123.13757038947261 49.25708840282161 -123.13760251124764 49.2570897767454 -123.13763468699557 49.257090781824814 -123.13766688920504 49.25709141805979 -123.13769911787537 49.25709168546669 -123.13773135926309 49.25709158406187 -123.13776359962466 49.257091113861804 -123.13779582521664 49.25709822936244 -123.13802166699008 49.25711497522619 -123.138077069769 49.257227530225634 -123.13821429004341</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Apr 23, 2026 - May 8, 2026</content>
<id>urn:uuid:9a686f2d-33b6-4d88-8299-d54efb3a0927</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/618f5b3a-1d35-4547-9a52-18598c012913"/>
<published>2026-04-23T07:00:00Z</published>
<title>City-wide Cut Repair Program (CCRP)  </title>
<updated>2026-05-08T19:48:00.2903855Z</updated>
<georss:line>49.25713504893346 -123.12663167380929 49.2571467033556 -123.12722428068237</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Apr 23, 2026 - May 8, 2026</content>
<id>urn:uuid:9995d725-4304-4b34-9b7d-5807652900bd</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/618f5b3a-1d35-4547-9a52-18598c012913"/>
<published>2026-04-23T07:00:00Z</published>
<title>City-wide Cut Repair Program (CCRP)  </title>
<updated>2026-05-08T19:48:00.2903855Z</updated>
<georss:line>49.25533681878059 -123.12729926580427 49.254431804293716 -123.12733676304241</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Apr 23, 2026 - May 8, 2026</content>
<id>urn:uuid:cb01579e-b0a0-4242-81c3-570e960e176b</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/618f5b3a-1d35-4547-9a52-18598c012913"/>
<published>2026-04-23T07:00:00Z</published>
<title>City-wide Cut Repair Program (CCRP)  </title>
<updated>2026-05-08T19:48:00.2903855Z</updated>
<georss:line>49.25398702697967 -123.13079082673521 49.25397939065624 -123.13087765568588 49.25396749878564 -123.13099687686272 49.25395424887617 -123.13111577832078 49.25393964099135 -123.13123430508291 49.25392369316958 -123.13135241596181 49.253906387437354 -123.13147009715856 49.2538877508442 -123.1315872937682 49.25386776544815 -123.13170396450826 49.25384645825207 -123.1318200956999 49.253692931720394 -123.13261055904499 49.25366599167225 -123.13275881655349 49.25364347676771 -123.1328917086429</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Apr 23, 2026 - May 8, 2026</content>
<id>urn:uuid:ae42fab5-8384-4b32-873a-3a7450556388</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/618f5b3a-1d35-4547-9a52-18598c012913"/>
<published>2026-04-23T07:00:00Z</published>
<title>City-wide Cut Repair Program (CCRP)  </title>
<updated>2026-05-08T19:48:00.2903855Z</updated>
<georss:line>49.25016969627839 -123.13905556316466 49.24941356838866 -123.13908372401313</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Apr 23, 2026 - May 8, 2026</content>
<id>urn:uuid:dffef3e8-8046-4644-af3a-98b5081b3f77</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/618f5b3a-1d35-4547-9a52-18598c012913"/>
<published>2026-04-23T07:00:00Z</published>
<title>City-wide Cut Repair Program (CCRP)  </title>
<updated>2026-05-08T19:48:00.2903855Z</updated>
<georss:line>49.25083599309656 -123.13903124406698 49.25016969627839 -123.13905556316466</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Apr 23, 2026 - May 8, 2026</content>
<id>urn:uuid:38f198b3-66f1-4d67-a88f-f8966afeebd5</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/618f5b3a-1d35-4547-9a52-18598c012913"/>
<published>2026-04-23T07:00:00Z</published>
<title>City-wide Cut Repair Program (CCRP)  </title>
<updated>2026-05-08T19:48:00.2903855Z</updated>
<georss:line>49.25150111166067 -123.13900675613027 49.25083599309656 -123.13903124406698</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Apr 23, 2026 - May 8, 2026</content>
<id>urn:uuid:0a426e67-b525-47b6-819b-33a3fbb952f5</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/618f5b3a-1d35-4547-9a52-18598c012913"/>
<published>2026-04-23T07:00:00Z</published>
<title>City-wide Cut Repair Program (CCRP)  </title>
<updated>2026-05-08T19:48:00.2903855Z</updated>
<georss:line>49.251922744859826 -123.13899183508713 49.25150111166067 -123.13900675613027</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Apr 23, 2026 - May 8, 2026</content>
<id>urn:uuid:2c2242d2-882e-4ff0-b3d9-04c34ddeec5d</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/618f5b3a-1d35-4547-9a52-18598c012913"/>
<published>2026-04-23T07:00:00Z</published>
<title>City-wide Cut Repair Program (CCRP)  </title>
<updated>2026-05-08T19:48:00.2903855Z</updated>
<georss:line>49.25314130194988 -123.13894617087209 49.251922744859826 -123.13899183508713</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Apr 23, 2026 - May 8, 2026</content>
<id>urn:uuid:0267f2de-e0a2-480a-bf97-48a51a1918ce</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/618f5b3a-1d35-4547-9a52-18598c012913"/>
<published>2026-04-23T07:00:00Z</published>
<title>City-wide Cut Repair Program (CCRP)  </title>
<updated>2026-05-08T19:48:00.2903855Z</updated>
<georss:line>49.25314130194988 -123.13894617087209 49.25310459333966 -123.13915469445607 49.25310023768466 -123.13917873020002 49.25309140556365 -123.13923000315255 49.25308315784238 -123.13928149759825 49.25307550351576 -123.13933321356407 49.253068442633264 -123.1393851098269 49.25306197517807 -123.13943720013012 49.25305610118312 -123.13948945699228 49.253050820681295 -123.13954185293187 49.253046142667614 -123.13959438797606 49.25304206717519 -123.1396470346435 49.25303859422041 -123.13969977919444 49.25303572380318 -123.13975262163076 49.25303346496841 -123.13980552075482 49.25303179972565 -123.13985847651782 49.253027552986254 -123.1400226776784 49.25302618318716 -123.14006928560462 49.25302343557337 -123.14013940165296 49.25301990545202 -123.14020941928553 49.25301556583756 -123.14027933842257 49.25301043475406 -123.1403491316284 49.253004503239936 -123.14041877139097 49.252997780290684 -123.14048825773244 49.252990265973295 -123.14055753568306 49.252981960271654 -123.14062661898124 49.25297286325289 -123.1406954526572 49.25296298389594 -123.1407640504751 49.252952322268214 -123.14083235746521 49.252940878370225 -123.14090037362459 49.252928661231266 -123.14096807149257 49.25291567984698 -123.14103545109182 49.25290192528999 -123.14110245742746 49.25288739754404 -123.14116910423827 49.2528721236626 -123.14123533663198 49.252863471396296 -123.1412711913737 49.25284702007784 -123.14133660958588 49.25282983165468 -123.14140158591702 49.252811897166026 -123.14146609285582 49.25279322562463 -123.14153011668402 49.25277382606026 -123.14159362994194 49.25275369849055 -123.14165661888576 49.25273286993567 -123.1417190561075 49.252711322422954 -123.14178092781214 49.25268907396054 -123.14184222030774 49.25266612458316 -123.14190290610938 49.252642492299 -123.1419629715254 49.25261816814759 -123.14202238904537 49.25259317911559 -123.14208115874516 49.25256751624249 -123.14213925311456 49.25254119753669 -123.14219665846244 49.25251422303296 -123.14225334730465</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Apr 23, 2026 - May 8, 2026</content>
<id>urn:uuid:ec408c26-04aa-44dd-a3d9-e283070f10bc</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/618f5b3a-1d35-4547-9a52-18598c012913"/>
<published>2026-04-23T07:00:00Z</published>
<title>City-wide Cut Repair Program (CCRP)  </title>
<updated>2026-05-08T19:48:00.2903855Z</updated>
<georss:line>49.24741353354074 -123.13915022796996 49.24742570246809 -123.13990383971345</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Apr 23, 2026 - May 8, 2026</content>
<id>urn:uuid:df80e04d-a7d2-439e-91d5-2ce239c92508</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/618f5b3a-1d35-4547-9a52-18598c012913"/>
<published>2026-04-23T07:00:00Z</published>
<title>City-wide Cut Repair Program (CCRP)  </title>
<updated>2026-05-08T19:48:00.2903855Z</updated>
<georss:line>49.24742570246809 -123.13990383971345 49.24745119857877 -123.14155500933019</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Apr 23, 2026 - May 8, 2026</content>
<id>urn:uuid:abd2b8e5-c5b4-4dfd-b990-125d22160b04</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/618f5b3a-1d35-4547-9a52-18598c012913"/>
<published>2026-04-23T07:00:00Z</published>
<title>City-wide Cut Repair Program (CCRP)  </title>
<updated>2026-05-08T19:48:00.2903855Z</updated>
<georss:line>49.24833440237046 -123.13912041607333 49.24834585191152 -123.13987399857223</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Apr 23, 2026 - May 8, 2026</content>
<id>urn:uuid:e7a4e339-060b-4674-9c81-b73f9ab34392</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/618f5b3a-1d35-4547-9a52-18598c012913"/>
<published>2026-04-23T07:00:00Z</published>
<title>City-wide Cut Repair Program (CCRP)  </title>
<updated>2026-05-08T19:48:00.2903855Z</updated>
<georss:line>49.24834585191152 -123.13987399857223 49.248371613889276 -123.14152143475083</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Apr 23, 2026 - May 8, 2026</content>
<id>urn:uuid:d6c63643-667f-494f-9b4a-95fc7afe3da2</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/618f5b3a-1d35-4547-9a52-18598c012913"/>
<published>2026-04-23T07:00:00Z</published>
<title>City-wide Cut Repair Program (CCRP)  </title>
<updated>2026-05-08T19:48:00.2903855Z</updated>
<georss:line>49.24939336550932 -123.1488221945516 49.249307640096305 -123.14904615689163 49.249299366186676 -123.14906575363709 49.24928447987517 -123.14909999173769 49.249269198297014 -123.14913381640778 49.249253530429996 -123.14916724141472 49.24923749430039 -123.14920023933108 49.249221071935864 -123.14923279636172 49.24920429032235 -123.14926491258771 49.249187140465125 -123.14929658798168 49.24916962239996 -123.14932779506218 49.24915176311288 -123.14935853391054 49.249133553644526 -123.14938877701832 49.24911499397763 -123.14941853812599 49.24909610212066 -123.14944780354718 49.249076878091756 -123.14947655954137 49.2490573308865 -123.14950480613578 49.24903746054082 -123.1495325158493 49.249017276050324 -123.1495596887093 49.24899678639278 -123.14958633848354 49.24897599162193 -123.14961242395077 49.248954909728496 -123.14963794516545 49.248933531699976 -123.14966291584123 49.248911875580376 -123.14968729481134 49.24888994133454 -123.14971110955702 49.24886774698882 -123.1497343326521 49.24884528356617 -123.1497569503294 49.24882256004429 -123.14977897635696 49.24879959444965 -123.14980038330881 49.24877638676463 -123.14982118492593 49.24875294602049 -123.14984135375522 49.24872928119487 -123.14986090356494 49.248705392305936 -123.14987982061527 49.24868128836704 -123.14989809119372 49.24865698736886 -123.14991571535542 49.24863248031647 -123.14993269307394 49.24861560876727 -123.14994385420265</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Apr 23, 2026 - May 8, 2026</content>
<id>urn:uuid:ad2d24b8-ece2-46ee-8a9b-37bcaf94b4fe</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/618f5b3a-1d35-4547-9a52-18598c012913"/>
<published>2026-04-23T07:00:00Z</published>
<title>City-wide Cut Repair Program (CCRP)  </title>
<updated>2026-05-08T19:48:00.2903855Z</updated>
<georss:line>49.24941356838866 -123.13908372401313 49.24945181846209 -123.14148202234432</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Apr 23, 2026 - May 8, 2026</content>
<id>urn:uuid:7d57302c-426a-4f18-8f04-f004c8e2f02d</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/618f5b3a-1d35-4547-9a52-18598c012913"/>
<published>2026-04-23T07:00:00Z</published>
<title>City-wide Cut Repair Program (CCRP)  </title>
<updated>2026-05-08T19:48:00.2903855Z</updated>
<georss:line>49.25084722410733 -123.13974288500069 49.25087357857612 -123.14142958188212</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Apr 23, 2026 - May 8, 2026</content>
<id>urn:uuid:f0916585-dcbd-4c5b-b4e1-f24bf44d62c9</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/618f5b3a-1d35-4547-9a52-18598c012913"/>
<published>2026-04-23T07:00:00Z</published>
<title>City-wide Cut Repair Program (CCRP)  </title>
<updated>2026-05-08T19:48:00.2903855Z</updated>
<georss:line>49.25083599309656 -123.13903124406698 49.25084722410733 -123.13974288500069</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Apr 23, 2026 - May 8, 2026</content>
<id>urn:uuid:78fa8ae2-c0bc-4ba5-a032-943a36d1d826</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/618f5b3a-1d35-4547-9a52-18598c012913"/>
<published>2026-04-23T07:00:00Z</published>
<title>City-wide Cut Repair Program (CCRP)  </title>
<updated>2026-05-08T19:48:00.2903855Z</updated>
<georss:line>49.24526360608235 -123.13922026230678 49.24363672705442 -123.13927280199786</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Apr 23, 2026 - May 8, 2026</content>
<id>urn:uuid:c86fb08d-341e-4a1b-8406-7688c0ec2972</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/618f5b3a-1d35-4547-9a52-18598c012913"/>
<published>2026-04-23T07:00:00Z</published>
<title>City-wide Cut Repair Program (CCRP)  </title>
<updated>2026-05-08T19:48:00.2903855Z</updated>
<georss:line>49.24400298129822 -123.13831849173347 49.24400066758574 -123.13832762182685 49.243987022347085 -123.13837975137022 49.24397278384575 -123.13843150826882 49.24395796109374 -123.13848287880707 49.2439425541082 -123.13853384924445 49.24392656292247 -123.13858439210128 49.24390999653244 -123.13863450740136 49.243892863966806 -123.13868416769034 49.243875165226086 -123.13873337296704 49.24385690933917 -123.13878209577723 49.243838096323145 -123.13883032238073 49.243818735173846 -123.13887805280172 49.24379882594141 -123.13892524582195 49.24377838661695 -123.13897190149096 49.24375741721761 -123.13901800606892 49.24363672705442 -123.13927280199786</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Apr 23, 2026 - May 8, 2026</content>
<id>urn:uuid:ebd61ba9-c7c4-4023-ab74-3111c5536ece</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/618f5b3a-1d35-4547-9a52-18598c012913"/>
<published>2026-04-23T07:00:00Z</published>
<title>City-wide Cut Repair Program (CCRP)  </title>
<updated>2026-05-08T19:48:00.2903855Z</updated>
<georss:line>49.245436303326244 -123.13921470242205 49.24526360608235 -123.13922026230678</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Apr 23, 2026 - May 8, 2026</content>
<id>urn:uuid:e8e73a14-51bd-4243-b6fc-b2712f79f296</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/618f5b3a-1d35-4547-9a52-18598c012913"/>
<published>2026-04-23T07:00:00Z</published>
<title>City-wide Cut Repair Program (CCRP)  </title>
<updated>2026-05-08T19:48:00.2903855Z</updated>
<georss:line>49.24649387909142 -123.13917989106876 49.245436303326244 -123.13921470242205</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Apr 23, 2026 - May 8, 2026</content>
<id>urn:uuid:9fab20b9-aad2-4e6e-8b8d-7c9852b7d5b7</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/618f5b3a-1d35-4547-9a52-18598c012913"/>
<published>2026-04-23T07:00:00Z</published>
<title>City-wide Cut Repair Program (CCRP)  </title>
<updated>2026-05-08T19:48:00.2903855Z</updated>
<georss:line>49.24625777760673 -123.1245062810301 49.24630921710414 -123.12765061731606</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Apr 23, 2026 - May 8, 2026</content>
<id>urn:uuid:2bb9b34d-4a24-4a03-83ca-91af4b23264c</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/618f5b3a-1d35-4547-9a52-18598c012913"/>
<published>2026-04-23T07:00:00Z</published>
<title>City-wide Cut Repair Program (CCRP)  </title>
<updated>2026-05-08T19:48:00.2903855Z</updated>
<georss:line>49.26039209393417 -123.06012596951084 49.26038831930384 -123.05959864566289</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Apr 23, 2026 - May 8, 2026</content>
<id>urn:uuid:a099c049-503f-4726-8e8d-f09567664576</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/618f5b3a-1d35-4547-9a52-18598c012913"/>
<published>2026-04-23T07:00:00Z</published>
<title>City-wide Cut Repair Program (CCRP)  </title>
<updated>2026-05-08T19:48:00.2903855Z</updated>
<georss:line>49.261311244768734 -123.06204398680846 49.26129657139313 -123.06010825283212</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Apr 23, 2026 - May 8, 2026</content>
<id>urn:uuid:14238211-03a0-4cd0-a5f0-d8b0c233271f</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/618f5b3a-1d35-4547-9a52-18598c012913"/>
<published>2026-04-23T07:00:00Z</published>
<title>City-wide Cut Repair Program (CCRP)  </title>
<updated>2026-05-08T19:48:00.2903855Z</updated>
<georss:line>49.263210970669775 -123.062008172512 49.26318251529429 -123.05813966442754</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Apr 23, 2026 - May 8, 2026</content>
<id>urn:uuid:fcc7b939-227d-46e5-8776-59862b06cf1c</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/618f5b3a-1d35-4547-9a52-18598c012913"/>
<published>2026-04-23T07:00:00Z</published>
<title>City-wide Cut Repair Program (CCRP)  </title>
<updated>2026-05-08T19:48:00.2903855Z</updated>
<georss:line>49.26323810909753 -123.06587677954536 49.26322528902048 -123.06394277196792</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Apr 23, 2026 - May 8, 2026</content>
<id>urn:uuid:ebde3254-be1b-4750-adc3-66484a4299b1</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/618f5b3a-1d35-4547-9a52-18598c012913"/>
<published>2026-04-23T07:00:00Z</published>
<title>City-wide Cut Repair Program (CCRP)  </title>
<updated>2026-05-08T19:48:00.2903855Z</updated>
<georss:line>49.263677356614295 -123.06393449079609 49.26322528902048 -123.06394277196792</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Apr 23, 2026 - May 8, 2026</content>
<id>urn:uuid:bbeb66f5-b43a-424d-9f6b-db5e59901858</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/618f5b3a-1d35-4547-9a52-18598c012913"/>
<published>2026-04-23T07:00:00Z</published>
<title>City-wide Cut Repair Program (CCRP)  </title>
<updated>2026-05-08T19:48:00.2903855Z</updated>
<georss:line>49.26412975700953 -123.06392618241742 49.263677356614295 -123.06393449079609</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Apr 23, 2026 - May 8, 2026</content>
<id>urn:uuid:337cd047-3639-491a-b374-6cce68d8dff9</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/618f5b3a-1d35-4547-9a52-18598c012913"/>
<published>2026-04-23T07:00:00Z</published>
<title>City-wide Cut Repair Program (CCRP)  </title>
<updated>2026-05-08T19:48:00.2903855Z</updated>
<georss:line>49.26501857543613 -123.0619735321971 49.265004799072244 -123.06004033458693</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Apr 23, 2026 - May 8, 2026</content>
<id>urn:uuid:17622262-ebaa-4dd6-a222-fc73aa7ab972</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/618f5b3a-1d35-4547-9a52-18598c012913"/>
<published>2026-04-23T07:00:00Z</published>
<title>City-wide Cut Repair Program (CCRP)  </title>
<updated>2026-05-08T19:48:00.2903855Z</updated>
<georss:line>49.2654696625072 -123.06196480542383 49.26501857543613 -123.0619735321971</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Apr 23, 2026 - May 8, 2026</content>
<id>urn:uuid:965d23ce-f3e0-461c-934a-c63d837334f0</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/618f5b3a-1d35-4547-9a52-18598c012913"/>
<published>2026-04-23T07:00:00Z</published>
<title>City-wide Cut Repair Program (CCRP)  </title>
<updated>2026-05-08T19:48:00.2903855Z</updated>
<georss:line>49.26503329009887 -123.06390824405752 49.26501857543613 -123.0619735321971</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Apr 23, 2026 - May 8, 2026</content>
<id>urn:uuid:59299a43-a291-42ad-b6fc-379eebdeb52d</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/618f5b3a-1d35-4547-9a52-18598c012913"/>
<published>2026-04-23T07:00:00Z</published>
<title>City-wide Cut Repair Program (CCRP)  </title>
<updated>2026-05-08T19:48:00.2903855Z</updated>
<georss:line>49.2650459664321 -123.06582717508493 49.26503329009887 -123.06390824405752</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Apr 23, 2026 - May 8, 2026</content>
<id>urn:uuid:9bd2e425-2ef7-4e75-b4b3-ccd2586cf7eb</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/618f5b3a-1d35-4547-9a52-18598c012913"/>
<published>2026-04-23T07:00:00Z</published>
<title>City-wide Cut Repair Program (CCRP)  </title>
<updated>2026-05-08T19:48:00.2903855Z</updated>
<georss:line>49.26592070455163 -123.06195610592944 49.2654696625072 -123.06196480542383</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Apr 23, 2026 - May 8, 2026</content>
<id>urn:uuid:6d333785-6aac-4dbe-a3fe-b62a2bb1b3db</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/618f5b3a-1d35-4547-9a52-18598c012913"/>
<published>2026-04-23T07:00:00Z</published>
<title>City-wide Cut Repair Program (CCRP)  </title>
<updated>2026-05-08T19:48:00.2903855Z</updated>
<georss:line>49.265907377735914 -123.06002274991798 49.26589405377595 -123.05809093442973</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Apr 23, 2026 - May 8, 2026</content>
<id>urn:uuid:60109109-b185-4ad6-b39e-a3ce1c0e4cb3</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/618f5b3a-1d35-4547-9a52-18598c012913"/>
<published>2026-04-23T07:00:00Z</published>
<title>City-wide Cut Repair Program (CCRP)  </title>
<updated>2026-05-08T19:48:00.2903855Z</updated>
<georss:line>49.266841381257905 -123.06387243547128 49.2668267284935 -123.06193858769865</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Apr 23, 2026 - May 8, 2026</content>
<id>urn:uuid:aab1624a-cba8-4ce0-a1d0-478c369f41cb</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/618f5b3a-1d35-4547-9a52-18598c012913"/>
<published>2026-04-23T07:00:00Z</published>
<title>City-wide Cut Repair Program (CCRP)  </title>
<updated>2026-05-08T19:48:00.2903855Z</updated>
<georss:line>49.26685606507439 -123.06582128080596 49.266841381257905 -123.06387243547128</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Apr 23, 2026 - May 8, 2026</content>
<id>urn:uuid:9e7713fd-7a18-4000-8a86-0853cf3a42a5</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/618f5b3a-1d35-4547-9a52-18598c012913"/>
<published>2026-04-23T07:00:00Z</published>
<title>City-wide Cut Repair Program (CCRP)  </title>
<updated>2026-05-08T19:48:00.2903855Z</updated>
<georss:line>49.26709025390994 -123.06911980476237 49.267083958322246 -123.06701081077621 49.267144722325526 -123.0667908397188</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Apr 23, 2026 - May 8, 2026</content>
<id>urn:uuid:a1609c0d-4b1e-43e2-aae4-7bbfaa4dbb42</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/618f5b3a-1d35-4547-9a52-18598c012913"/>
<published>2026-04-23T07:00:00Z</published>
<title>City-wide Cut Repair Program (CCRP)  </title>
<updated>2026-05-08T19:48:00.2903855Z</updated>
<georss:line>49.26709406181598 -123.06966907004929 49.26709025390994 -123.06911980476237</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Apr 23, 2026 - May 8, 2026</content>
<id>urn:uuid:377dded2-0fb6-47f1-ba52-bd4ddb9b3b26</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/618f5b3a-1d35-4547-9a52-18598c012913"/>
<published>2026-04-23T07:00:00Z</published>
<title>City-wide Cut Repair Program (CCRP)  </title>
<updated>2026-05-08T19:48:00.2903855Z</updated>
<georss:line>49.267749756520146 -123.0643836586195 49.26774582153902 -123.06385610462077</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Apr 23, 2026 - May 8, 2026</content>
<id>urn:uuid:61ba5ca8-97e9-4582-911e-6d0802fd2e81</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/618f5b3a-1d35-4547-9a52-18598c012913"/>
<published>2026-04-23T07:00:00Z</published>
<title>City-wide Cut Repair Program (CCRP)  </title>
<updated>2026-05-08T19:48:00.2903855Z</updated>
<georss:line>49.26774582153902 -123.06385610462077 49.26773069200814 -123.0619217810432</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Apr 23, 2026 - May 8, 2026</content>
<id>urn:uuid:ea137fce-ea67-4e06-a7d1-638fa71309e3</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/618f5b3a-1d35-4547-9a52-18598c012913"/>
<published>2026-04-23T07:00:00Z</published>
<title>City-wide Cut Repair Program (CCRP)  </title>
<updated>2026-05-08T19:48:00.2903855Z</updated>
<georss:line>49.26955432506222 -123.06382128252581 49.26953963520057 -123.06188790602862</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Apr 23, 2026 - May 8, 2026</content>
<id>urn:uuid:37ee8703-b9a5-4510-aa2b-863e4049803e</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/618f5b3a-1d35-4547-9a52-18598c012913"/>
<published>2026-04-23T07:00:00Z</published>
<title>City-wide Cut Repair Program (CCRP)  </title>
<updated>2026-05-08T19:48:00.2903855Z</updated>
<georss:line>49.267764586689964 -123.06643852000478 49.26776041563684 -123.06578923279781</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Apr 23, 2026 - May 8, 2026</content>
<id>urn:uuid:cc51d850-19ec-4d4f-a0bd-f527d2aced94</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/618f5b3a-1d35-4547-9a52-18598c012913"/>
<published>2026-04-23T07:00:00Z</published>
<title>City-wide Cut Repair Program (CCRP)  </title>
<updated>2026-05-08T19:48:00.2903855Z</updated>
<georss:line>49.26773069200814 -123.0619217810432 49.267715520092594 -123.0599893967598</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Apr 23, 2026 - May 8, 2026</content>
<id>urn:uuid:b62fc77d-e0c5-45cb-b295-c87514601d52</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/618f5b3a-1d35-4547-9a52-18598c012913"/>
<published>2026-04-23T07:00:00Z</published>
<title>City-wide Cut Repair Program (CCRP)  </title>
<updated>2026-05-08T19:48:00.2903855Z</updated>
<georss:line>49.26776041563684 -123.06578923279781 49.267749756520146 -123.0643836586195</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Apr 23, 2026 - May 8, 2026</content>
<id>urn:uuid:a062ee76-9d8c-458a-aeef-29096fb2f069</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/618f5b3a-1d35-4547-9a52-18598c012913"/>
<published>2026-04-23T07:00:00Z</published>
<title>City-wide Cut Repair Program (CCRP)  </title>
<updated>2026-05-08T19:48:00.2903855Z</updated>
<georss:line>49.26956824560082 -123.06575354571105 49.26955432506222 -123.06382128252581</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Apr 23, 2026 - May 8, 2026</content>
<id>urn:uuid:fc8b1817-81ae-4c7e-99dc-7f265fbe830e</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/618f5b3a-1d35-4547-9a52-18598c012913"/>
<published>2026-04-23T07:00:00Z</published>
<title>City-wide Cut Repair Program (CCRP)  </title>
<updated>2026-05-08T19:48:00.2903855Z</updated>
<georss:line>49.27044370661429 -123.06187036914173 49.27042857131502 -123.05993508841355</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Apr 23, 2026 - May 8, 2026</content>
<id>urn:uuid:4322af45-5972-43aa-8f34-b4a83f488e36</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/618f5b3a-1d35-4547-9a52-18598c012913"/>
<published>2026-04-23T07:00:00Z</published>
<title>City-wide Cut Repair Program (CCRP)  </title>
<updated>2026-05-08T19:48:00.2903855Z</updated>
<georss:line>49.24799079134874 -123.10110514551 49.247583968703054 -123.10114094611683</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Apr 23, 2026 - May 8, 2026</content>
<id>urn:uuid:560db853-ccfa-448b-8824-c6d7843669b4</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/618f5b3a-1d35-4547-9a52-18598c012913"/>
<published>2026-04-23T07:00:00Z</published>
<title>City-wide Cut Repair Program (CCRP)  </title>
<updated>2026-05-08T19:48:00.2903855Z</updated>
<georss:line>49.25859826191089 -123.06209510535284 49.258583992997586 -123.06016164938714</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Apr 23, 2026 - May 8, 2026</content>
<id>urn:uuid:65d0bf54-2571-43c9-909e-c0893679e9b6</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/618f5b3a-1d35-4547-9a52-18598c012913"/>
<published>2026-04-23T07:00:00Z</published>
<title>City-wide Cut Repair Program (CCRP)  </title>
<updated>2026-05-08T19:48:00.2903855Z</updated>
<georss:line>49.25905073478535 -123.06208632752941 49.25859826191089 -123.06209510535284</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Apr 23, 2026 - May 8, 2026</content>
<id>urn:uuid:15489e8d-e544-4afb-a925-028503672e93</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/618f5b3a-1d35-4547-9a52-18598c012913"/>
<published>2026-04-23T07:00:00Z</published>
<title>City-wide Cut Repair Program (CCRP)  </title>
<updated>2026-05-08T19:48:00.2903855Z</updated>
<georss:line>49.25951246383704 -123.06207728628912 49.25905073478535 -123.06208632752941</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Apr 23, 2026 - May 8, 2026</content>
<id>urn:uuid:775ee1b1-6c33-44db-a3d4-84f7f21d73fe</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/618f5b3a-1d35-4547-9a52-18598c012913"/>
<published>2026-04-23T07:00:00Z</published>
<title>City-wide Cut Repair Program (CCRP)  </title>
<updated>2026-05-08T19:48:00.2903855Z</updated>
<georss:line>49.247583968703054 -123.10114094611683 49.24722533763398 -123.10117199436549</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Apr 23, 2026 - May 8, 2026</content>
<id>urn:uuid:b02c4619-95ef-4dc6-bc01-dab7560796be</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/618f5b3a-1d35-4547-9a52-18598c012913"/>
<published>2026-04-23T07:00:00Z</published>
<title>City-wide Cut Repair Program (CCRP)  </title>
<updated>2026-05-08T19:48:00.2903855Z</updated>
<georss:line>49.259747849353005 -123.09303433350692 49.25973213833288 -123.0910994739866</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Apr 23, 2026 - May 8, 2026</content>
<id>urn:uuid:710536c7-dcc5-409b-a48d-808aaf3b293e</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/618f5b3a-1d35-4547-9a52-18598c012913"/>
<published>2026-04-23T07:00:00Z</published>
<title>City-wide Cut Repair Program (CCRP)  </title>
<updated>2026-05-08T19:48:00.2903855Z</updated>
<georss:line>49.25253160968089 -123.1009291826799 49.25207939813876 -123.10094367863911</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Apr 23, 2026 - May 8, 2026</content>
<id>urn:uuid:6cce00f3-4954-40c1-ab99-556af2d0e44a</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/618f5b3a-1d35-4547-9a52-18598c012913"/>
<published>2026-04-23T07:00:00Z</published>
<title>City-wide Cut Repair Program (CCRP)  </title>
<updated>2026-05-08T19:48:00.2903855Z</updated>
<georss:line>49.25207939813876 -123.10094367863911 49.25179896412507 -123.10095272578808</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Apr 23, 2026 - May 8, 2026</content>
<id>urn:uuid:c83acf60-1073-45a0-bc90-ff1286ac493f</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/618f5b3a-1d35-4547-9a52-18598c012913"/>
<published>2026-04-23T07:00:00Z</published>
<title>City-wide Cut Repair Program (CCRP)  </title>
<updated>2026-05-08T19:48:00.2903855Z</updated>
<georss:line>49.263855636380185 -123.04351763266071 49.26384873192001 -123.04155241137953</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Apr 23, 2026 - May 8, 2026</content>
<id>urn:uuid:5b4da689-4d27-4911-b1b6-07de4bb022ae</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/618f5b3a-1d35-4547-9a52-18598c012913"/>
<published>2026-04-23T07:00:00Z</published>
<title>City-wide Cut Repair Program (CCRP)  </title>
<updated>2026-05-08T19:48:00.2903855Z</updated>
<georss:line>49.26475317504324 -123.04154559737057 49.26474401847176 -123.03901543585819</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Apr 23, 2026 - May 8, 2026</content>
<id>urn:uuid:0f63055d-f22c-4d65-9ca3-0cd936bc12ca</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/618f5b3a-1d35-4547-9a52-18598c012913"/>
<published>2026-04-23T07:00:00Z</published>
<title>City-wide Cut Repair Program (CCRP)  </title>
<updated>2026-05-08T19:48:00.2903855Z</updated>
<georss:line>49.26474401847176 -123.03901543585819 49.2647352736106 -123.03648728235704</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Apr 23, 2026 - May 8, 2026</content>
<id>urn:uuid:a03caf2d-82ff-45ca-98f3-046f510584a1</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/618f5b3a-1d35-4547-9a52-18598c012913"/>
<published>2026-04-23T07:00:00Z</published>
<title>City-wide Cut Repair Program (CCRP)  </title>
<updated>2026-05-08T19:48:00.2903855Z</updated>
<georss:line>49.26569374201708 -123.03901195114511 49.26568250507941 -123.03648483315565</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Apr 23, 2026 - May 8, 2026</content>
<id>urn:uuid:e8fefd1e-8eaa-4c62-a8ec-874dc617f0ae</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/618f5b3a-1d35-4547-9a52-18598c012913"/>
<published>2026-04-23T07:00:00Z</published>
<title>City-wide Cut Repair Program (CCRP)  </title>
<updated>2026-05-08T19:48:00.2903855Z</updated>
<georss:line>49.262971053384916 -123.05470032278009 49.26251563496538 -123.0547006440623</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Apr 23, 2026 - May 8, 2026</content>
<id>urn:uuid:bb6c32e1-f300-4f79-aba8-b7adaefc8620</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/618f5b3a-1d35-4547-9a52-18598c012913"/>
<published>2026-04-23T07:00:00Z</published>
<title>City-wide Cut Repair Program (CCRP)  </title>
<updated>2026-05-08T19:48:00.2903855Z</updated>
<georss:line>49.26295068153601 -123.04352108391178 49.2629438115969 -123.04156009064855</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Apr 23, 2026 - May 8, 2026</content>
<id>urn:uuid:05a7083b-b173-4e62-be04-7dea1a5110e8</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/618f5b3a-1d35-4547-9a52-18598c012913"/>
<published>2026-04-23T07:00:00Z</published>
<title>City-wide Cut Repair Program (CCRP)  </title>
<updated>2026-05-08T19:48:00.2903855Z</updated>
<georss:line>49.26341368927203 -123.0470170089387 49.26296206587318 -123.04701983729827</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Apr 23, 2026 - May 8, 2026</content>
<id>urn:uuid:4ddd07ed-5006-4c49-9c14-fa68d1d22ce0</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/618f5b3a-1d35-4547-9a52-18598c012913"/>
<published>2026-04-23T07:00:00Z</published>
<title>City-wide Cut Repair Program (CCRP)  </title>
<updated>2026-05-08T19:48:00.2903855Z</updated>
<georss:line>49.26317690340338 -123.05741792039956 49.26317102870189 -123.05659922254495</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Apr 23, 2026 - May 8, 2026</content>
<id>urn:uuid:6018dce6-6372-415a-82b8-8ea25eaf94fe</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/618f5b3a-1d35-4547-9a52-18598c012913"/>
<published>2026-04-23T07:00:00Z</published>
<title>City-wide Cut Repair Program (CCRP)  </title>
<updated>2026-05-08T19:48:00.2903855Z</updated>
<georss:line>49.264075029499 -123.05659768620751 49.26387627128477 -123.05659807739934</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Apr 23, 2026 - May 8, 2026</content>
<id>urn:uuid:bfeb0d0e-5f3c-41a1-acce-220cd49dcf1c</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/618f5b3a-1d35-4547-9a52-18598c012913"/>
<published>2026-04-23T07:00:00Z</published>
<title>City-wide Cut Repair Program (CCRP)  </title>
<updated>2026-05-08T19:48:00.2903855Z</updated>
<georss:line>49.263865060909495 -123.04701383667404 49.26341368927203 -123.0470170089387</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Apr 23, 2026 - May 8, 2026</content>
<id>urn:uuid:5332d4d2-2907-46a0-9b8c-b02bd5bca2e5</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/618f5b3a-1d35-4547-9a52-18598c012913"/>
<published>2026-04-23T07:00:00Z</published>
<title>City-wide Cut Repair Program (CCRP)  </title>
<updated>2026-05-08T19:48:00.2903855Z</updated>
<georss:line>49.26387627128477 -123.05659807739934 49.26317102870189 -123.05659922254495</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Apr 23, 2026 - May 8, 2026</content>
<id>urn:uuid:4b67fb86-52ea-4d6f-a526-2008d131540f</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/618f5b3a-1d35-4547-9a52-18598c012913"/>
<published>2026-04-23T07:00:00Z</published>
<title>City-wide Cut Repair Program (CCRP)  </title>
<updated>2026-05-08T19:48:00.2903855Z</updated>
<georss:line>49.26318251529429 -123.05813966442754 49.26317690340338 -123.05741792039956</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Apr 23, 2026 - May 8, 2026</content>
<id>urn:uuid:696f6ad7-a861-4988-9a37-7ddbe940d4a8</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/618f5b3a-1d35-4547-9a52-18598c012913"/>
<published>2026-04-23T07:00:00Z</published>
<title>City-wide Cut Repair Program (CCRP)  </title>
<updated>2026-05-08T19:48:00.2903855Z</updated>
<georss:line>49.2647625325624 -123.0442757626305 49.263858531570605 -123.04427858241243</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Apr 23, 2026 - May 8, 2026</content>
<id>urn:uuid:4c0c1a49-b804-46da-9636-001ee45d3155</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/618f5b3a-1d35-4547-9a52-18598c012913"/>
<published>2026-04-23T07:00:00Z</published>
<title>City-wide Cut Repair Program (CCRP)  </title>
<updated>2026-05-08T19:48:00.2903855Z</updated>
<georss:line>49.2594739981694 -123.05821067720893 49.25911065154568 -123.05821675049292</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Apr 23, 2026 - May 8, 2026</content>
<id>urn:uuid:8a9a7e56-8051-463c-8227-2475a99fed8a</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/618f5b3a-1d35-4547-9a52-18598c012913"/>
<published>2026-04-23T07:00:00Z</published>
<title>City-wide Cut Repair Program (CCRP)  </title>
<updated>2026-05-08T19:48:00.2903855Z</updated>
<georss:line>49.259926281717554 -123.05820201468319 49.2594739981694 -123.05821067720893</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Apr 23, 2026 - May 8, 2026</content>
<id>urn:uuid:42eeb223-d103-4eff-b519-66e2e34716f8</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/618f5b3a-1d35-4547-9a52-18598c012913"/>
<published>2026-04-23T07:00:00Z</published>
<title>City-wide Cut Repair Program (CCRP)  </title>
<updated>2026-05-08T19:48:00.2903855Z</updated>
<georss:line>49.260378016515176 -123.05819336510126 49.259926281717554 -123.05820201468319</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Apr 23, 2026 - May 8, 2026</content>
<id>urn:uuid:df3d0042-6e0f-4961-89aa-d1f5d00654bb</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/618f5b3a-1d35-4547-9a52-18598c012913"/>
<published>2026-04-23T07:00:00Z</published>
<title>City-wide Cut Repair Program (CCRP)  </title>
<updated>2026-05-08T19:48:00.2903855Z</updated>
<georss:line>49.26008834129976 -123.05660498788315 49.26008937008888 -123.05595179496653</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Apr 23, 2026 - May 8, 2026</content>
<id>urn:uuid:18bebab3-5f3e-4151-ac89-0690413cf0f5</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/618f5b3a-1d35-4547-9a52-18598c012913"/>
<published>2026-04-23T07:00:00Z</published>
<title>City-wide Cut Repair Program (CCRP)  </title>
<updated>2026-05-08T19:48:00.2903855Z</updated>
<georss:line>49.26038831930384 -123.05959864566289 49.260378016515176 -123.05819336510126</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Apr 23, 2026 - May 8, 2026</content>
<id>urn:uuid:105274e4-f651-4128-b3eb-825da1f4cc51</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/618f5b3a-1d35-4547-9a52-18598c012913"/>
<published>2026-04-23T07:00:00Z</published>
<title>City-wide Cut Repair Program (CCRP)  </title>
<updated>2026-05-08T19:48:00.2903855Z</updated>
<georss:line>49.260378016515176 -123.05819336510126 49.26037237852077 -123.05743434773281</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Apr 23, 2026 - May 8, 2026</content>
<id>urn:uuid:a492fee6-e4cc-4cba-9db5-a0554b92a2ba</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/618f5b3a-1d35-4547-9a52-18598c012913"/>
<published>2026-04-23T07:00:00Z</published>
<title>City-wide Cut Repair Program (CCRP)  </title>
<updated>2026-05-08T19:48:00.2903855Z</updated>
<georss:line>49.26008937008888 -123.05595179496653 49.26009151843016 -123.05475329675247</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Apr 23, 2026 - May 8, 2026</content>
<id>urn:uuid:0e92e5a9-bd33-42b9-a1f1-25f7d4cf9247</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/618f5b3a-1d35-4547-9a52-18598c012913"/>
<published>2026-04-23T07:00:00Z</published>
<title>City-wide Cut Repair Program (CCRP)  </title>
<updated>2026-05-08T19:48:00.2903855Z</updated>
<georss:line>49.26009151843016 -123.05475329675247 49.26009405312351 -123.05300211197147</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Apr 23, 2026 - May 8, 2026</content>
<id>urn:uuid:30924c05-2aa3-4ec7-b064-035470f0482c</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/618f5b3a-1d35-4547-9a52-18598c012913"/>
<published>2026-04-23T07:00:00Z</published>
<title>City-wide Cut Repair Program (CCRP)  </title>
<updated>2026-05-08T19:48:00.2903855Z</updated>
<georss:line>49.26251563496538 -123.0547006440623 49.262016741533415 -123.05470337749718</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Apr 23, 2026 - May 8, 2026</content>
<id>urn:uuid:f33e9827-e847-410a-8aa6-b787946c78f3</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/618f5b3a-1d35-4547-9a52-18598c012913"/>
<published>2026-04-23T07:00:00Z</published>
<title>City-wide Cut Repair Program (CCRP)  </title>
<updated>2026-05-08T19:48:00.2903855Z</updated>
<georss:line>49.264778667819854 -123.05469773006136 49.26477800650349 -123.05215954665029</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Apr 23, 2026 - May 8, 2026</content>
<id>urn:uuid:ee4310dc-de8d-4227-916c-6ee6cee9d564</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/618f5b3a-1d35-4547-9a52-18598c012913"/>
<published>2026-04-23T07:00:00Z</published>
<title>City-wide Cut Repair Program (CCRP)  </title>
<updated>2026-05-08T19:48:00.2903855Z</updated>
<georss:line>49.26588864032297 -123.05734935792393 49.26588357033799 -123.05659469649513</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Apr 23, 2026 - May 8, 2026</content>
<id>urn:uuid:001420c4-3819-47ea-b093-64096b490b3b</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/618f5b3a-1d35-4547-9a52-18598c012913"/>
<published>2026-04-23T07:00:00Z</published>
<title>City-wide Cut Repair Program (CCRP)  </title>
<updated>2026-05-08T19:48:00.2903855Z</updated>
<georss:line>49.265728328416486 -123.05469526101206 49.26572674504254 -123.05214709013256</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Apr 23, 2026 - May 8, 2026</content>
<id>urn:uuid:5c563d11-a2b2-411c-b030-ef685ab47b46</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/618f5b3a-1d35-4547-9a52-18598c012913"/>
<published>2026-04-23T07:00:00Z</published>
<title>City-wide Cut Repair Program (CCRP)  </title>
<updated>2026-05-08T19:48:00.2903855Z</updated>
<georss:line>49.26589405377595 -123.05809093442973 49.26588864032297 -123.05734935792393</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Apr 23, 2026 - May 8, 2026</content>
<id>urn:uuid:748b17d8-be9a-4467-af01-8a5e363c489c</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/618f5b3a-1d35-4547-9a52-18598c012913"/>
<published>2026-04-23T07:00:00Z</published>
<title>City-wide Cut Repair Program (CCRP)  </title>
<updated>2026-05-08T19:48:00.2903855Z</updated>
<georss:line>49.26667645492972 -123.05213457919308 49.26667302207048 -123.04950941058671</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Apr 23, 2026 - May 8, 2026</content>
<id>urn:uuid:1ffce81c-bd94-4aad-9ab7-de83f83ef941</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/618f5b3a-1d35-4547-9a52-18598c012913"/>
<published>2026-04-23T07:00:00Z</published>
<title>City-wide Cut Repair Program (CCRP)  </title>
<updated>2026-05-08T19:48:00.2903855Z</updated>
<georss:line>49.26572674504254 -123.05214709013256 49.26572286134794 -123.04952510536516</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Apr 23, 2026 - May 8, 2026</content>
<id>urn:uuid:f283feb4-ff6c-42ed-af1d-a259399dfc69</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/618f5b3a-1d35-4547-9a52-18598c012913"/>
<published>2026-04-23T07:00:00Z</published>
<title>City-wide Cut Repair Program (CCRP)  </title>
<updated>2026-05-08T19:48:00.2903855Z</updated>
<georss:line>49.26667756576319 -123.0546934649434 49.26667645492972 -123.05213457919308</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Apr 23, 2026 - May 8, 2026</content>
<id>urn:uuid:f827c074-2b50-4c22-8617-7adfa03e3c1b</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/618f5b3a-1d35-4547-9a52-18598c012913"/>
<published>2026-04-23T07:00:00Z</published>
<title>City-wide Cut Repair Program (CCRP)  </title>
<updated>2026-05-08T19:48:00.2903855Z</updated>
<georss:line>49.267715520092594 -123.0599893967598 49.26730404856963 -123.05999742019853</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Apr 23, 2026 - May 8, 2026</content>
<id>urn:uuid:7b92d91a-edd2-4630-9e38-568f45f7d044</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/618f5b3a-1d35-4547-9a52-18598c012913"/>
<published>2026-04-23T07:00:00Z</published>
<title>City-wide Cut Repair Program (CCRP)  </title>
<updated>2026-05-08T19:48:00.2903855Z</updated>
<georss:line>49.26730404856963 -123.05999742019853 49.266733863912094 -123.06000892108351</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Apr 23, 2026 - May 8, 2026</content>
<id>urn:uuid:8d8ede9e-24fe-4d98-bf71-1c859f4136f1</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/618f5b3a-1d35-4547-9a52-18598c012913"/>
<published>2026-04-23T07:00:00Z</published>
<title>City-wide Cut Repair Program (CCRP)  </title>
<updated>2026-05-08T19:48:00.2903855Z</updated>
<georss:line>49.24186878762882 -123.13932246856898 49.240900078091784 -123.13936215369952</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Apr 23, 2026 - May 8, 2026</content>
<id>urn:uuid:98d30a48-1c54-40a8-b820-b48603e0d4be</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/618f5b3a-1d35-4547-9a52-18598c012913"/>
<published>2026-04-23T07:00:00Z</published>
<title>City-wide Cut Repair Program (CCRP)  </title>
<updated>2026-05-08T19:48:00.2903855Z</updated>
<georss:line>49.24183827701796 -123.1385960239159 49.24186878762882 -123.13932246856898</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Apr 23, 2026 - May 8, 2026</content>
<id>urn:uuid:15f7f8ea-fc6e-40c8-9d9e-43773464a9f3</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/618f5b3a-1d35-4547-9a52-18598c012913"/>
<published>2026-04-23T07:00:00Z</published>
<title>City-wide Cut Repair Program (CCRP)  </title>
<updated>2026-05-08T19:48:00.2903855Z</updated>
<georss:line>49.24186878762882 -123.13932246856898 49.24188517052559 -123.14027185156554</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Apr 23, 2026 - May 8, 2026</content>
<id>urn:uuid:e8a4048b-a989-402a-803f-131e06b32680</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/618f5b3a-1d35-4547-9a52-18598c012913"/>
<published>2026-04-23T07:00:00Z</published>
<title>City-wide Cut Repair Program (CCRP)  </title>
<updated>2026-05-08T19:48:00.2903855Z</updated>
<georss:line>49.24281242475814 -123.13929977506528 49.24186878762882 -123.13932246856898</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Apr 23, 2026 - May 8, 2026</content>
<id>urn:uuid:cb2d3b14-316d-44fb-bc07-6fca4b242c0b</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/618f5b3a-1d35-4547-9a52-18598c012913"/>
<published>2026-04-23T07:00:00Z</published>
<title>City-wide Cut Repair Program (CCRP)  </title>
<updated>2026-05-08T19:48:00.2903855Z</updated>
<georss:line>49.24363672705442 -123.13927280199786 49.24281242475814 -123.13929977506528</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Apr 23, 2026 - May 8, 2026</content>
<id>urn:uuid:0f7f203b-f3df-4d10-8b8f-a0618e591d0b</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/618f5b3a-1d35-4547-9a52-18598c012913"/>
<published>2026-04-23T07:00:00Z</published>
<title>City-wide Cut Repair Program (CCRP)  </title>
<updated>2026-05-08T19:48:00.2903855Z</updated>
<georss:line>49.24363672705442 -123.13927280199786 49.24318614007922 -123.14022995062925</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Apr 23, 2026 - May 8, 2026</content>
<id>urn:uuid:77386d82-ffa9-456b-954e-c3416dc8e009</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/618f5b3a-1d35-4547-9a52-18598c012913"/>
<published>2026-04-23T07:00:00Z</published>
<title>City-wide Cut Repair Program (CCRP)  </title>
<updated>2026-05-08T19:48:00.2903855Z</updated>
<georss:line>49.23433036869142 -123.13958801560997 49.23247420898784 -123.13965322376704</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Apr 23, 2026 - May 8, 2026</content>
<id>urn:uuid:e1e730a0-f9c2-493a-97c6-ac3fd98b40ae</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/618f5b3a-1d35-4547-9a52-18598c012913"/>
<published>2026-04-23T07:00:00Z</published>
<title>City-wide Cut Repair Program (CCRP)  </title>
<updated>2026-05-08T19:48:00.2903855Z</updated>
<georss:line>49.23537935634445 -123.13955304423058 49.23433036869142 -123.13958801560997</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Apr 23, 2026 - May 8, 2026</content>
<id>urn:uuid:8083644f-0d7f-41e7-b8fb-a6073aa77aeb</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/618f5b3a-1d35-4547-9a52-18598c012913"/>
<published>2026-04-23T07:00:00Z</published>
<title>City-wide Cut Repair Program (CCRP)  </title>
<updated>2026-05-08T19:48:00.2903855Z</updated>
<georss:line>49.236256142284134 -123.13952257294387 49.23537935634445 -123.13955304423058</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Apr 23, 2026 - May 8, 2026</content>
<id>urn:uuid:c774ac62-bfef-4ca0-a9e1-3b858c2d341e</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/618f5b3a-1d35-4547-9a52-18598c012913"/>
<published>2026-04-23T07:00:00Z</published>
<title>City-wide Cut Repair Program (CCRP)  </title>
<updated>2026-05-08T19:48:00.2903855Z</updated>
<georss:line>49.240900078091784 -123.13936215369952 49.23995082228157 -123.13939671282392</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Apr 23, 2026 - May 8, 2026</content>
<id>urn:uuid:18e67f59-8118-4fce-8b25-cedc2f7e4435</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/618f5b3a-1d35-4547-9a52-18598c012913"/>
<published>2026-04-23T07:00:00Z</published>
<title>City-wide Cut Repair Program (CCRP)  </title>
<updated>2026-05-08T19:48:00.2903855Z</updated>
<georss:line>49.21756473276804 -123.14088242528665 49.217567251506125 -123.1408897515234 49.2175728351784 -123.1409064653301 49.21757822978057 -123.1409233159216 49.21758342631725 -123.14094030327216 49.217588424788346 -123.14095742738168 49.21759323418911 -123.14097468827548 49.217597845541036 -123.1409920721961 49.21760224984871 -123.1410095791177 49.217606456124116 -123.14102719533389 49.217610464367255 -123.14104492084454 49.217614265582796 -123.14106275562379 49.21761785980425 -123.1410806722078 49.21762125599324 -123.14109869808568 49.21762444518808 -123.14111680576796 49.21762741837665 -123.1411350089606 49.21763018458776 -123.14115328022541 49.21763275281654 -123.14117161958771 49.21763509607737 -123.1411900269705 49.217637241372614 -123.14120848871856 49.21763917071178 -123.14122700478042 49.217640884094834 -123.14124557515582 49.217642390533854 -123.14126418613836 49.21764368103351 -123.14128283770216 49.21764474661535 -123.14130151608954 49.217645605269894 -123.14132022135149 49.217646257013854 -123.14133893975598 49.21764669283522 -123.14135768500894 49.2176787320696 -123.14385842122877</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Apr 23, 2026 - May 8, 2026</content>
<id>urn:uuid:cdc706cc-57cb-4635-b0ff-6c8a5a3eb8ab</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/618f5b3a-1d35-4547-9a52-18598c012913"/>
<published>2026-04-23T07:00:00Z</published>
<title>City-wide Cut Repair Program (CCRP)  </title>
<updated>2026-05-08T19:48:00.2903855Z</updated>
<georss:line>49.22696583019666 -123.1398432484298 49.224710095103745 -123.13993325301351</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Apr 23, 2026 - May 8, 2026</content>
<id>urn:uuid:d11833bb-b762-440d-afc3-a0f83f06eaae</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/618f5b3a-1d35-4547-9a52-18598c012913"/>
<published>2026-04-23T07:00:00Z</published>
<title>City-wide Cut Repair Program (CCRP)  </title>
<updated>2026-05-08T19:48:00.2903855Z</updated>
<georss:line>49.229537576932074 -123.13498758350674 49.22961972964748 -123.13735406521474</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Apr 23, 2026 - May 8, 2026</content>
<id>urn:uuid:3e01e12b-ac80-428b-a89d-a07f884727e0</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/618f5b3a-1d35-4547-9a52-18598c012913"/>
<published>2026-04-23T07:00:00Z</published>
<title>City-wide Cut Repair Program (CCRP)  </title>
<updated>2026-05-08T19:48:00.2903855Z</updated>
<georss:line>49.23247420898784 -123.13965322376704 49.230613921204764 -123.1397172892361</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Apr 23, 2026 - May 8, 2026</content>
<id>urn:uuid:278ae4cf-5151-49a9-93d3-a178893dff5c</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/618f5b3a-1d35-4547-9a52-18598c012913"/>
<published>2026-04-23T07:00:00Z</published>
<title>City-wide Cut Repair Program (CCRP)  </title>
<updated>2026-05-08T19:48:00.2903855Z</updated>
<georss:line>49.20790410755674 -123.14054399545374 49.207073617171744 -123.14057334168784</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Apr 23, 2026 - May 8, 2026</content>
<id>urn:uuid:56e174c2-6ef1-4278-b241-dafcfe0ee278</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/618f5b3a-1d35-4547-9a52-18598c012913"/>
<published>2026-04-23T07:00:00Z</published>
<title>City-wide Cut Repair Program (CCRP)  </title>
<updated>2026-05-08T19:48:00.2903855Z</updated>
<georss:line>49.20853434349988 -123.1405229361978 49.20790410755674 -123.14054399545374</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Apr 23, 2026 - May 8, 2026</content>
<id>urn:uuid:3438f66a-f96f-4a13-830d-a70c808207fe</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/618f5b3a-1d35-4547-9a52-18598c012913"/>
<published>2026-04-23T07:00:00Z</published>
<title>City-wide Cut Repair Program (CCRP)  </title>
<updated>2026-05-08T19:48:00.2903855Z</updated>
<georss:line>49.21269902222852 -123.1390710274852 49.210863162306794 -123.13914029439098</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Apr 23, 2026 - May 8, 2026</content>
<id>urn:uuid:86f9e88a-9ae2-4410-bcbf-7992db1aa0c7</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/618f5b3a-1d35-4547-9a52-18598c012913"/>
<published>2026-04-23T07:00:00Z</published>
<title>City-wide Cut Repair Program (CCRP)  </title>
<updated>2026-05-08T19:48:00.2903855Z</updated>
<georss:line>49.211377020900386 -123.14106630381062 49.21141803316988 -123.14359720302886</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Apr 23, 2026 - May 8, 2026</content>
<id>urn:uuid:fd732e9b-fbc8-438d-9b94-afe6b1ce7324</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/618f5b3a-1d35-4547-9a52-18598c012913"/>
<published>2026-04-23T07:00:00Z</published>
<title>City-wide Cut Repair Program (CCRP)  </title>
<updated>2026-05-08T19:48:00.2903855Z</updated>
<georss:line>49.21141803316988 -123.14359720302886 49.21145143550399 -123.14561401312372</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Apr 23, 2026 - May 8, 2026</content>
<id>urn:uuid:c04a2ec6-9417-4cac-bb83-920b819bd3ca</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/618f5b3a-1d35-4547-9a52-18598c012913"/>
<published>2026-04-23T07:00:00Z</published>
<title>City-wide Cut Repair Program (CCRP)  </title>
<updated>2026-05-08T19:48:00.2903855Z</updated>
<georss:line>49.21399898081643 -123.14033886126478 49.21314369943215 -123.14036896796884</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Feb 23, 2026 - Mar 20, 2026</content>
<id>urn:uuid:1b01905d-b7d0-42eb-b4d7-12e0b8b896e5</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e77049bd-78b1-4dbd-94b8-2b05d470247a"/>
<published>2026-02-19T08:00:00Z</published>
<title>City-wide Cut Repair Project  </title>
<updated>2026-02-26T22:30:08.9802006Z</updated>
<georss:line>49.25965331328888 -123.08142489223164 49.25962215364831 -123.07755517603569</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Feb 23, 2026 - Mar 20, 2026</content>
<id>urn:uuid:b7db3011-f0ae-4e51-aa34-bb05bc6572be</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e77049bd-78b1-4dbd-94b8-2b05d470247a"/>
<published>2026-02-19T08:00:00Z</published>
<title>City-wide Cut Repair Project  </title>
<updated>2026-02-26T22:30:08.9802006Z</updated>
<georss:line>49.260526787004665 -123.07753725611747 49.26050084360227 -123.07426657227472</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Feb 23, 2026 - Mar 20, 2026</content>
<id>urn:uuid:412b9e1a-7820-4a12-a6ee-00e30578922f</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e77049bd-78b1-4dbd-94b8-2b05d470247a"/>
<published>2026-02-19T08:00:00Z</published>
<title>City-wide Cut Repair Project  </title>
<updated>2026-02-26T22:30:08.9802006Z</updated>
<georss:line>49.261430889683794 -123.07751905985212 49.26140054371646 -123.07364933208568</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Feb 23, 2026 - Mar 20, 2026</content>
<id>urn:uuid:67c3990b-adde-41e0-a5b3-0c503e85b858</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e77049bd-78b1-4dbd-94b8-2b05d470247a"/>
<published>2026-02-19T08:00:00Z</published>
<title>City-wide Cut Repair Project  </title>
<updated>2026-02-26T22:30:08.9802006Z</updated>
<georss:line>49.26050084360227 -123.07426657227472 49.26049607318228 -123.07366700750184</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Feb 23, 2026 - Mar 20, 2026</content>
<id>urn:uuid:7bb89604-6fce-4076-9d09-f722dfbe0233</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e77049bd-78b1-4dbd-94b8-2b05d470247a"/>
<published>2026-02-19T08:00:00Z</published>
<title>City-wide Cut Repair Project  </title>
<updated>2026-02-26T22:30:08.9802006Z</updated>
<georss:line>49.25959639950514 -123.07428473091424 49.2595909902073 -123.07368565716759</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Feb 23, 2026 - Mar 20, 2026</content>
<id>urn:uuid:4c525cd0-f8e3-4fde-9a80-c06f9c3cb4fe</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e77049bd-78b1-4dbd-94b8-2b05d470247a"/>
<published>2026-02-19T08:00:00Z</published>
<title>City-wide Cut Repair Project  </title>
<updated>2026-02-26T22:30:08.9802006Z</updated>
<georss:line>49.25962215364831 -123.07755517603569 49.2595968171525 -123.07437659313767</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Feb 23, 2026 - Mar 20, 2026</content>
<id>urn:uuid:72b480c6-b1fe-4b75-983c-bd68a841fd7a</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e77049bd-78b1-4dbd-94b8-2b05d470247a"/>
<published>2026-02-19T08:00:00Z</published>
<title>City-wide Cut Repair Project  </title>
<updated>2026-02-26T22:30:08.9802006Z</updated>
<georss:line>49.2595968171525 -123.07437659313767 49.25959639950514 -123.07428473091424</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Feb 23, 2026 - Mar 20, 2026</content>
<id>urn:uuid:a1c16774-5b7b-4a51-984c-3728dbebccc6</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e77049bd-78b1-4dbd-94b8-2b05d470247a"/>
<published>2026-02-19T08:00:00Z</published>
<title>City-wide Cut Repair Project  </title>
<updated>2026-02-26T22:30:08.9802006Z</updated>
<georss:line>49.2526639788569 -123.07987439377972 49.25206421551317 -123.07989734993012</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Feb 23, 2026 - Mar 20, 2026</content>
<id>urn:uuid:4784810b-4d48-48df-a7af-3c048f8e22ae</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e77049bd-78b1-4dbd-94b8-2b05d470247a"/>
<published>2026-02-19T08:00:00Z</published>
<title>City-wide Cut Repair Project  </title>
<updated>2026-02-26T22:30:08.9802006Z</updated>
<georss:line>49.2526639788569 -123.07987439377972 49.25263436305465 -123.07847505529489</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Feb 23, 2026 - Mar 20, 2026</content>
<id>urn:uuid:2b472024-95d0-41b4-b240-7556ed973088</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e77049bd-78b1-4dbd-94b8-2b05d470247a"/>
<published>2026-02-19T08:00:00Z</published>
<title>City-wide Cut Repair Project  </title>
<updated>2026-02-26T22:30:08.9802006Z</updated>
<georss:line>49.25355591086404 -123.08177478881431 49.2529536934814 -123.08179499743795</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Feb 23, 2026 - Mar 20, 2026</content>
<id>urn:uuid:3d0625e4-dc69-49c0-a646-75ed7f31aaf0</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e77049bd-78b1-4dbd-94b8-2b05d470247a"/>
<published>2026-02-19T08:00:00Z</published>
<title>City-wide Cut Repair Project  </title>
<updated>2026-02-26T22:30:08.9802006Z</updated>
<georss:line>49.25404222243699 -123.08175787875093 49.25359011150928 -123.08177363602718</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Feb 23, 2026 - Mar 20, 2026</content>
<id>urn:uuid:c4df6bb5-b84f-47be-86f2-388bd665d64e</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e77049bd-78b1-4dbd-94b8-2b05d470247a"/>
<published>2026-02-19T08:00:00Z</published>
<title>City-wide Cut Repair Project  </title>
<updated>2026-02-26T22:30:08.9802006Z</updated>
<georss:line>49.254494171111986 -123.08174254692892 49.25404222243699 -123.08175787875093</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Feb 23, 2026 - Mar 20, 2026</content>
<id>urn:uuid:c1191940-bfb4-4a32-83d4-70e872557bb5</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e77049bd-78b1-4dbd-94b8-2b05d470247a"/>
<published>2026-02-19T08:00:00Z</published>
<title>City-wide Cut Repair Project  </title>
<updated>2026-02-26T22:30:08.9802006Z</updated>
<georss:line>49.25353067388551 -123.07791688162794 49.25350040665285 -123.0759830447081</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Feb 23, 2026 - Mar 20, 2026</content>
<id>urn:uuid:a1bae41c-5429-4bf9-8e47-1c9dd63aaf5f</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e77049bd-78b1-4dbd-94b8-2b05d470247a"/>
<published>2026-02-19T08:00:00Z</published>
<title>City-wide Cut Repair Project  </title>
<updated>2026-02-26T22:30:08.9802006Z</updated>
<georss:line>49.25139523243064 -123.06503926682993 49.25128435449864 -123.06501228460988 49.25100968877797 -123.06499017173944 49.250286255313284 -123.0650088304099</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Feb 23, 2026 - Mar 20, 2026</content>
<id>urn:uuid:4f084fdc-35df-4309-9d66-0712f2dc3811</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e77049bd-78b1-4dbd-94b8-2b05d470247a"/>
<published>2026-02-19T08:00:00Z</published>
<title>City-wide Cut Repair Project  </title>
<updated>2026-02-26T22:30:08.9802006Z</updated>
<georss:line>49.25188497529166 -123.06521846551028 49.251845544321014 -123.06519528686736 49.25156808794907 -123.06508132235842 49.25139523243064 -123.06503926682993</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Feb 23, 2026 - Mar 20, 2026</content>
<id>urn:uuid:fac7da7b-3e33-454d-883b-138524447088</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e77049bd-78b1-4dbd-94b8-2b05d470247a"/>
<published>2026-02-19T08:00:00Z</published>
<title>City-wide Cut Repair Project  </title>
<updated>2026-02-26T22:30:08.9802006Z</updated>
<georss:line>49.25288050891564 -123.06612679404225 49.252775006844445 -123.06599590168071 49.25261037572122 -123.06579188104301 49.252369556772095 -123.06555251388102 49.252113674811426 -123.06535292435392 49.25188497529166 -123.06521846551028</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Feb 23, 2026 - Mar 20, 2026</content>
<id>urn:uuid:177bd5fc-58e5-4087-9294-c06233b14f11</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e77049bd-78b1-4dbd-94b8-2b05d470247a"/>
<published>2026-02-19T08:00:00Z</published>
<title>City-wide Cut Repair Project  </title>
<updated>2026-02-26T22:30:08.9802006Z</updated>
<georss:line>49.25263436305465 -123.07847505529489 49.25262620865428 -123.07795054033284</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Feb 23, 2026 - Mar 20, 2026</content>
<id>urn:uuid:2ed0cba3-f570-4e2f-a1ef-c0032e39035c</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e77049bd-78b1-4dbd-94b8-2b05d470247a"/>
<published>2026-02-19T08:00:00Z</published>
<title>City-wide Cut Repair Project  </title>
<updated>2026-02-26T22:30:08.9802006Z</updated>
<georss:line>49.2529536934814 -123.08179499743795 49.25206421551317 -123.07989734993012</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Feb 23, 2026 - Mar 20, 2026</content>
<id>urn:uuid:3032d73a-7bc4-40b3-88bf-fa3ae62f0d99</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e77049bd-78b1-4dbd-94b8-2b05d470247a"/>
<published>2026-02-19T08:00:00Z</published>
<title>City-wide Cut Repair Project  </title>
<updated>2026-02-26T22:30:08.9802006Z</updated>
<georss:line>49.25262620865428 -123.07795054033284 49.252595951066695 -123.07601657383968</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Feb 23, 2026 - Mar 20, 2026</content>
<id>urn:uuid:5f93adf0-5d9d-41ce-ae83-8b6212b731fa</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e77049bd-78b1-4dbd-94b8-2b05d470247a"/>
<published>2026-02-19T08:00:00Z</published>
<title>City-wide Cut Repair Project  </title>
<updated>2026-02-26T22:30:08.9802006Z</updated>
<georss:line>49.25253221436452 -123.07193717465309 49.25208580799389 -123.07195236985312</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Feb 23, 2026 - Mar 20, 2026</content>
<id>urn:uuid:5cd3bd05-e713-4c40-bd6f-47c1932a7c7a</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e77049bd-78b1-4dbd-94b8-2b05d470247a"/>
<published>2026-02-19T08:00:00Z</published>
<title>City-wide Cut Repair Project  </title>
<updated>2026-02-26T22:30:08.9802006Z</updated>
<georss:line>49.25208580799389 -123.07195236985312 49.25162966848984 -123.07196799035634</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Feb 23, 2026 - Mar 20, 2026</content>
<id>urn:uuid:977e0f24-3161-4f61-9038-cfdd9e53dfb9</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e77049bd-78b1-4dbd-94b8-2b05d470247a"/>
<published>2026-02-19T08:00:00Z</published>
<title>City-wide Cut Repair Project  </title>
<updated>2026-02-26T22:30:08.9802006Z</updated>
<georss:line>49.24905026502509 -123.08053399268547 49.24904145642353 -123.08000645014494</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Feb 23, 2026 - Mar 20, 2026</content>
<id>urn:uuid:4b5df753-70a8-424a-b994-195400c754a3</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e77049bd-78b1-4dbd-94b8-2b05d470247a"/>
<published>2026-02-19T08:00:00Z</published>
<title>City-wide Cut Repair Project  </title>
<updated>2026-02-26T22:30:08.9802006Z</updated>
<georss:line>49.24906359226969 -123.0814119826336 49.24905026502509 -123.08053399268547</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Feb 23, 2026 - Mar 20, 2026</content>
<id>urn:uuid:1dc13385-5526-4a03-aad9-b8aab3885c3a</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e77049bd-78b1-4dbd-94b8-2b05d470247a"/>
<published>2026-02-19T08:00:00Z</published>
<title>City-wide Cut Repair Project  </title>
<updated>2026-02-26T22:30:08.9802006Z</updated>
<georss:line>49.24907242141927 -123.0819395531779 49.24906359226969 -123.0814119826336</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Feb 23, 2026 - Mar 20, 2026</content>
<id>urn:uuid:1b5f717a-09e0-4ff3-84b9-aed50d414c25</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e77049bd-78b1-4dbd-94b8-2b05d470247a"/>
<published>2026-02-19T08:00:00Z</published>
<title>City-wide Cut Repair Project  </title>
<updated>2026-02-26T22:30:08.9802006Z</updated>
<georss:line>49.251463904468636 -123.07991875188787 49.25130129364916 -123.0799247553839</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Feb 23, 2026 - Mar 20, 2026</content>
<id>urn:uuid:3231aff2-d5b6-4428-8a5f-13c7e5adb2d4</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e77049bd-78b1-4dbd-94b8-2b05d470247a"/>
<published>2026-02-19T08:00:00Z</published>
<title>City-wide Cut Repair Project  </title>
<updated>2026-02-26T22:30:08.9802006Z</updated>
<georss:line>49.25175235299497 -123.07990764731994 49.251463904468636 -123.07991875188787</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Feb 23, 2026 - Mar 20, 2026</content>
<id>urn:uuid:9f8d9ce2-f23b-436d-a46f-e08e6415aba9</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e77049bd-78b1-4dbd-94b8-2b05d470247a"/>
<published>2026-02-19T08:00:00Z</published>
<title>City-wide Cut Repair Project  </title>
<updated>2026-02-26T22:30:08.9802006Z</updated>
<georss:line>49.25206421551317 -123.07989734993012 49.25175235299497 -123.07990764731994</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Feb 23, 2026 - Mar 20, 2026</content>
<id>urn:uuid:9aee72c1-0203-4e7a-bd3e-81f89269fb03</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e77049bd-78b1-4dbd-94b8-2b05d470247a"/>
<published>2026-02-19T08:00:00Z</published>
<title>City-wide Cut Repair Project  </title>
<updated>2026-02-26T22:30:08.9802006Z</updated>
<georss:line>49.248009889085154 -123.07128831430735 49.24755468566238 -123.07130262197546</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Feb 23, 2026 - Mar 20, 2026</content>
<id>urn:uuid:4473db50-9d5a-4501-aa29-70268ddd7bff</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e77049bd-78b1-4dbd-94b8-2b05d470247a"/>
<published>2026-02-19T08:00:00Z</published>
<title>City-wide Cut Repair Project  </title>
<updated>2026-02-26T22:30:08.9802006Z</updated>
<georss:line>49.2484677080958 -123.07127722540335 49.248009889085154 -123.07128831430735</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Feb 23, 2026 - Mar 20, 2026</content>
<id>urn:uuid:bd3b7250-673e-4818-87ca-9ba31083a153</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e77049bd-78b1-4dbd-94b8-2b05d470247a"/>
<published>2026-02-19T08:00:00Z</published>
<title>City-wide Cut Repair Project  </title>
<updated>2026-02-26T22:30:08.9802006Z</updated>
<georss:line>49.25030731338998 -123.06708538697413 49.24807354180686 -123.06709366872963</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Feb 23, 2026 - Mar 20, 2026</content>
<id>urn:uuid:326995c6-ec15-4e3d-88f7-a5d8db088c9d</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e77049bd-78b1-4dbd-94b8-2b05d470247a"/>
<published>2026-02-19T08:00:00Z</published>
<title>City-wide Cut Repair Project  </title>
<updated>2026-02-26T22:30:08.9802006Z</updated>
<georss:line>49.248503454303034 -123.06440034447537 49.24849597316992 -123.06269429617241</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Feb 23, 2026 - Mar 20, 2026</content>
<id>urn:uuid:803e4872-9854-4fb7-902f-bcd98f4ef2c1</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e77049bd-78b1-4dbd-94b8-2b05d470247a"/>
<published>2026-02-19T08:00:00Z</published>
<title>City-wide Cut Repair Project  </title>
<updated>2026-02-26T22:30:08.9802006Z</updated>
<georss:line>49.24581800197936 -123.06277932041648 49.245812987414325 -123.06110953076947</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Feb 23, 2026 - Mar 20, 2026</content>
<id>urn:uuid:edc2b306-f8c8-4f75-a5d2-723ad6827410</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e77049bd-78b1-4dbd-94b8-2b05d470247a"/>
<published>2026-02-19T08:00:00Z</published>
<title>City-wide Cut Repair Project  </title>
<updated>2026-02-26T22:30:08.9802006Z</updated>
<georss:line>49.245812987414325 -123.06110953076947 49.24581091281314 -123.06041916428777</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Feb 23, 2026 - Mar 20, 2026</content>
<id>urn:uuid:9ffd19a2-1fcc-4061-9a0b-96465fc51afa</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e77049bd-78b1-4dbd-94b8-2b05d470247a"/>
<published>2026-02-19T08:00:00Z</published>
<title>City-wide Cut Repair Project  </title>
<updated>2026-02-26T22:30:08.9802006Z</updated>
<georss:line>49.248112719758126 -123.05856869265477 49.24810675543537 -123.05799908079263</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Feb 23, 2026 - Mar 20, 2026</content>
<id>urn:uuid:2b992d3b-b88a-4757-82e9-84539dc794ae</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e77049bd-78b1-4dbd-94b8-2b05d470247a"/>
<published>2026-02-19T08:00:00Z</published>
<title>City-wide Cut Repair Project  </title>
<updated>2026-02-26T22:30:08.9802006Z</updated>
<georss:line>49.24811809818158 -123.05908243581675 49.248112719758126 -123.05856869265477</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Feb 23, 2026 - Mar 20, 2026</content>
<id>urn:uuid:b33e2e28-d374-433b-9af5-c07e7abe019b</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e77049bd-78b1-4dbd-94b8-2b05d470247a"/>
<published>2026-02-19T08:00:00Z</published>
<title>City-wide Cut Repair Project  </title>
<updated>2026-02-26T22:30:08.9802006Z</updated>
<georss:line>49.248132865950055 -123.06049498617256 49.24811809818158 -123.05908243581675</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Feb 23, 2026 - Mar 20, 2026</content>
<id>urn:uuid:74f1ddd6-5b41-4b1b-a30e-e34a8d208f92</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e77049bd-78b1-4dbd-94b8-2b05d470247a"/>
<published>2026-02-19T08:00:00Z</published>
<title>City-wide Cut Repair Project  </title>
<updated>2026-02-26T22:30:08.9802006Z</updated>
<georss:line>49.25400387728257 -123.03905274500649 49.25400052767793 -123.03653319680484</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Feb 23, 2026 - Mar 20, 2026</content>
<id>urn:uuid:d266f90c-2646-4ab1-8076-f7caf38a0aeb</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e77049bd-78b1-4dbd-94b8-2b05d470247a"/>
<published>2026-02-19T08:00:00Z</published>
<title>City-wide Cut Repair Project  </title>
<updated>2026-02-26T22:30:08.9802006Z</updated>
<georss:line>49.24538138598021 -123.03663840274957 49.245370689313376 -123.03457039925541</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Feb 23, 2026 - Mar 20, 2026</content>
<id>urn:uuid:ebbeb03a-ae51-4864-be86-49e7035b27cd</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e77049bd-78b1-4dbd-94b8-2b05d470247a"/>
<published>2026-02-19T08:00:00Z</published>
<title>City-wide Cut Repair Project  </title>
<updated>2026-02-26T22:30:08.9802006Z</updated>
<georss:line>49.2471098252436 -123.03656394656248 49.247104010514136 -123.03455994409305</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Feb 23, 2026 - Mar 20, 2026</content>
<id>urn:uuid:2de56755-f1a8-41a0-bc97-dbd02180c841</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e77049bd-78b1-4dbd-94b8-2b05d470247a"/>
<published>2026-02-19T08:00:00Z</published>
<title>City-wide Cut Repair Project  </title>
<updated>2026-02-26T22:30:08.9802006Z</updated>
<georss:line>49.252324195253266 -123.03653685172262 49.252321905895144 -123.03456384756295</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Feb 23, 2026 - Mar 20, 2026</content>
<id>urn:uuid:1eb8f6ec-d48c-4f6f-bb4f-7481fc0bf55c</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e77049bd-78b1-4dbd-94b8-2b05d470247a"/>
<published>2026-02-19T08:00:00Z</published>
<title>City-wide Cut Repair Project  </title>
<updated>2026-02-26T22:30:08.9802006Z</updated>
<georss:line>49.248751568669064 -123.03107256116252 49.248781087839546 -123.02853957300607</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Feb 23, 2026 - Mar 20, 2026</content>
<id>urn:uuid:c7901136-adf9-4b0a-80ce-0574ede25347</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e77049bd-78b1-4dbd-94b8-2b05d470247a"/>
<published>2026-02-19T08:00:00Z</published>
<title>City-wide Cut Repair Project  </title>
<updated>2026-02-26T22:30:08.9802006Z</updated>
<georss:line>49.25473170089933 -123.0337948151235 49.25399762691919 -123.03379889006072</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Feb 23, 2026 - Mar 20, 2026</content>
<id>urn:uuid:0242bd06-1050-4148-b4c6-a973d09b48ad</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e77049bd-78b1-4dbd-94b8-2b05d470247a"/>
<published>2026-02-19T08:00:00Z</published>
<title>City-wide Cut Repair Project  </title>
<updated>2026-02-26T22:30:08.9802006Z</updated>
<georss:line>49.25642785357479 -123.03239330459986 49.25478495715555 -123.03239720417949</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Feb 23, 2026 - Mar 20, 2026</content>
<id>urn:uuid:cf370e76-d6fb-49b1-994c-12484b0828da</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e77049bd-78b1-4dbd-94b8-2b05d470247a"/>
<published>2026-02-19T08:00:00Z</published>
<title>City-wide Cut Repair Project  </title>
<updated>2026-02-26T22:30:08.9802006Z</updated>
<georss:line>49.247035839383784 -123.02788980464624 49.247029591442015 -123.02626178779735</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Feb 23, 2026 - Mar 20, 2026</content>
<id>urn:uuid:f3521527-8c29-46d1-a958-0a5fdb952695</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e77049bd-78b1-4dbd-94b8-2b05d470247a"/>
<published>2026-02-19T08:00:00Z</published>
<title>City-wide Cut Repair Project  </title>
<updated>2026-02-26T22:30:08.9802006Z</updated>
<georss:line>49.247029524416064 -123.02624006479579 49.24702427945118 -123.02448142254231</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Feb 23, 2026 - Mar 20, 2026</content>
<id>urn:uuid:4d91ebc7-30c4-4222-9d7d-2383e84a5cc0</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e77049bd-78b1-4dbd-94b8-2b05d470247a"/>
<published>2026-02-19T08:00:00Z</published>
<title>City-wide Cut Repair Project  </title>
<updated>2026-02-26T22:30:08.9802006Z</updated>
<georss:line>49.2445072624127 -123.02378417188697 49.244323646165014 -123.02372358971223 49.243018932759526 -123.02372135724465</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Feb 23, 2026 - Mar 20, 2026</content>
<id>urn:uuid:057f2329-8265-4999-afd7-055098c6ecd2</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e77049bd-78b1-4dbd-94b8-2b05d470247a"/>
<published>2026-02-19T08:00:00Z</published>
<title>City-wide Cut Repair Project  </title>
<updated>2026-02-26T22:30:08.9802006Z</updated>
<georss:line>49.243018932759526 -123.02372135724465 49.24256727310208 -123.02372059135364</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Feb 23, 2026 - Mar 20, 2026</content>
<id>urn:uuid:350e9122-9663-4431-a78a-8458c24c5851</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e77049bd-78b1-4dbd-94b8-2b05d470247a"/>
<published>2026-02-19T08:00:00Z</published>
<title>City-wide Cut Repair Project  </title>
<updated>2026-02-26T22:30:08.9802006Z</updated>
<georss:line>49.24926067299117 -123.04707870153764 49.24881399750967 -123.0470774661316</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Feb 23, 2026 - Mar 20, 2026</content>
<id>urn:uuid:09e07ea2-a93f-4b3d-91e1-ceeb5db27e46</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e77049bd-78b1-4dbd-94b8-2b05d470247a"/>
<published>2026-02-19T08:00:00Z</published>
<title>City-wide Cut Repair Project  </title>
<updated>2026-02-26T22:30:08.9802006Z</updated>
<georss:line>49.24970667493855 -123.04707713321342 49.24926067299117 -123.04707870153764</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Feb 23, 2026 - Mar 20, 2026</content>
<id>urn:uuid:529c1a1b-de82-425c-bfbe-eb4630f0c0da</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e77049bd-78b1-4dbd-94b8-2b05d470247a"/>
<published>2026-02-19T08:00:00Z</published>
<title>City-wide Cut Repair Project  </title>
<updated>2026-02-26T22:30:08.9802006Z</updated>
<georss:line>49.2540069215876 -123.04159308487905 49.25400387728257 -123.03905274500649</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Feb 23, 2026 - Mar 20, 2026</content>
<id>urn:uuid:4518bf1b-f925-43df-aabe-d0da0714fee3</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e77049bd-78b1-4dbd-94b8-2b05d470247a"/>
<published>2026-02-19T08:00:00Z</published>
<title>City-wide Cut Repair Project  </title>
<updated>2026-02-26T22:30:08.9802006Z</updated>
<georss:line>49.248777993627556 -123.04100237122779 49.24878068982022 -123.03969561043627</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Feb 23, 2026 - Mar 20, 2026</content>
<id>urn:uuid:8f5e71c4-2c69-4e17-ae47-947d0863f42e</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e77049bd-78b1-4dbd-94b8-2b05d470247a"/>
<published>2026-02-19T08:00:00Z</published>
<title>City-wide Cut Repair Project  </title>
<updated>2026-02-26T22:30:08.9802006Z</updated>
<georss:line>49.24878068982022 -123.03969561043627 49.248781991301485 -123.03909718509321</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Feb 23, 2026 - Mar 20, 2026</content>
<id>urn:uuid:feaadec6-4521-46f0-bdf3-d2a3c3c3e994</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e77049bd-78b1-4dbd-94b8-2b05d470247a"/>
<published>2026-02-19T08:00:00Z</published>
<title>City-wide Cut Repair Project  </title>
<updated>2026-02-26T22:30:08.9802006Z</updated>
<georss:line>49.24038623742328 -123.05365796704702 49.24000926267095 -123.05402937949036</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Feb 23, 2026 - Mar 20, 2026</content>
<id>urn:uuid:8fe1448a-335e-4b0e-ba42-2c98691382ba</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e77049bd-78b1-4dbd-94b8-2b05d470247a"/>
<published>2026-02-19T08:00:00Z</published>
<title>City-wide Cut Repair Project  </title>
<updated>2026-02-26T22:30:08.9802006Z</updated>
<georss:line>49.241506853868515 -123.05256558401744 49.24038623742328 -123.05365796704702</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Feb 23, 2026 - Mar 20, 2026</content>
<id>urn:uuid:d772ae65-602a-4ef9-bcf4-af2afcb8be61</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e77049bd-78b1-4dbd-94b8-2b05d470247a"/>
<published>2026-02-19T08:00:00Z</published>
<title>City-wide Cut Repair Project  </title>
<updated>2026-02-26T22:30:08.9802006Z</updated>
<georss:line>49.2441656663884 -123.0530173902781 49.24371392114827 -123.05345668140582</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Feb 23, 2026 - Mar 20, 2026</content>
<id>urn:uuid:2173dd1e-06e6-4eff-b419-7d5b5f4142ae</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e77049bd-78b1-4dbd-94b8-2b05d470247a"/>
<published>2026-02-19T08:00:00Z</published>
<title>City-wide Cut Repair Project  </title>
<updated>2026-02-26T22:30:08.9802006Z</updated>
<georss:line>49.244622152199724 -123.05257416671884 49.2441656663884 -123.0530173902781</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Feb 23, 2026 - Mar 20, 2026</content>
<id>urn:uuid:47de65ae-3b01-4c6f-af61-cbf510c18b77</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e77049bd-78b1-4dbd-94b8-2b05d470247a"/>
<published>2026-02-19T08:00:00Z</published>
<title>City-wide Cut Repair Project  </title>
<updated>2026-02-26T22:30:08.9802006Z</updated>
<georss:line>49.24462283575576 -123.05104999273456 49.24289421180484 -123.05273351672894</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Feb 23, 2026 - Mar 20, 2026</content>
<id>urn:uuid:f8c6ee96-8ebf-4906-8fe9-e7965bc7ff15</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e77049bd-78b1-4dbd-94b8-2b05d470247a"/>
<published>2026-02-19T08:00:00Z</published>
<title>City-wide Cut Repair Project  </title>
<updated>2026-02-26T22:30:08.9802006Z</updated>
<georss:line>49.23956835233926 -123.03320512472382 49.23926242090957 -123.0334968354493</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Feb 23, 2026 - Mar 20, 2026</content>
<id>urn:uuid:3b56312b-1924-4cf7-8f91-c386f0328dec</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e77049bd-78b1-4dbd-94b8-2b05d470247a"/>
<published>2026-02-19T08:00:00Z</published>
<title>City-wide Cut Repair Project  </title>
<updated>2026-02-26T22:30:08.9802006Z</updated>
<georss:line>49.23999010146841 -123.03280192054613 49.23956835233926 -123.03320512472382</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Feb 23, 2026 - Mar 20, 2026</content>
<id>urn:uuid:f988dbaa-d806-463e-bc5f-32fe526ef44b</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e77049bd-78b1-4dbd-94b8-2b05d470247a"/>
<published>2026-02-19T08:00:00Z</published>
<title>City-wide Cut Repair Project  </title>
<updated>2026-02-26T22:30:08.9802006Z</updated>
<georss:line>49.24040705369296 -123.03240229203047 49.23999010146841 -123.03280192054613</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Feb 23, 2026 - Mar 20, 2026</content>
<id>urn:uuid:200c5011-2ecb-47b3-a176-4365c5bc7391</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e77049bd-78b1-4dbd-94b8-2b05d470247a"/>
<published>2026-02-19T08:00:00Z</published>
<title>City-wide Cut Repair Project  </title>
<updated>2026-02-26T22:30:08.9802006Z</updated>
<georss:line>49.240833702814996 -123.03199745623917 49.24040705369296 -123.03240229203047</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Feb 23, 2026 - Mar 20, 2026</content>
<id>urn:uuid:479a2461-5df7-49e8-8876-a744e4a920de</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e77049bd-78b1-4dbd-94b8-2b05d470247a"/>
<published>2026-02-19T08:00:00Z</published>
<title>City-wide Cut Repair Project  </title>
<updated>2026-02-26T22:30:08.9802006Z</updated>
<georss:line>49.241235772640664 -123.03298671659866 49.240833702814996 -123.03199745623917</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Feb 23, 2026 - Mar 20, 2026</content>
<id>urn:uuid:4284dc62-b0e3-46a5-8abc-36e5a536cf45</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e77049bd-78b1-4dbd-94b8-2b05d470247a"/>
<published>2026-02-19T08:00:00Z</published>
<title>City-wide Cut Repair Project  </title>
<updated>2026-02-26T22:30:08.9802006Z</updated>
<georss:line>49.240833702814996 -123.03199745623917 49.240287945344335 -123.03066435235381</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Feb 23, 2026 - Mar 20, 2026</content>
<id>urn:uuid:d7536318-42dd-40be-8332-bf3a6da21278</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e77049bd-78b1-4dbd-94b8-2b05d470247a"/>
<published>2026-02-19T08:00:00Z</published>
<title>City-wide Cut Repair Project  </title>
<updated>2026-02-26T22:30:08.9802006Z</updated>
<georss:line>49.241665194197196 -123.03258218314258 49.241235772640664 -123.03298671659866</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Feb 23, 2026 - Mar 20, 2026</content>
<id>urn:uuid:42a688a7-f22c-4511-8cd6-cec8ee931364</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e77049bd-78b1-4dbd-94b8-2b05d470247a"/>
<published>2026-02-19T08:00:00Z</published>
<title>City-wide Cut Repair Project  </title>
<updated>2026-02-26T22:30:08.9802006Z</updated>
<georss:line>49.241235772640664 -123.03298671659866 49.24081395103795 -123.0333897781685</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Feb 23, 2026 - Mar 20, 2026</content>
<id>urn:uuid:461d399a-5e6f-4032-a461-7c1c583386bb</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e77049bd-78b1-4dbd-94b8-2b05d470247a"/>
<published>2026-02-19T08:00:00Z</published>
<title>City-wide Cut Repair Project  </title>
<updated>2026-02-26T22:30:08.9802006Z</updated>
<georss:line>49.24208036449036 -123.03218252437095 49.241665194197196 -123.03258218314258</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Feb 23, 2026 - Mar 20, 2026</content>
<id>urn:uuid:81515d1a-f94c-49d4-8965-30f2dd8972f9</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e77049bd-78b1-4dbd-94b8-2b05d470247a"/>
<published>2026-02-19T08:00:00Z</published>
<title>City-wide Cut Repair Project  </title>
<updated>2026-02-26T22:30:08.9802006Z</updated>
<georss:line>49.23816768716799 -123.03052345238461 49.238038635575634 -123.03064738147172</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Feb 23, 2026 - Mar 20, 2026</content>
<id>urn:uuid:6cb458e0-f4bb-45ab-8cf5-5c42ed9318ca</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e77049bd-78b1-4dbd-94b8-2b05d470247a"/>
<published>2026-02-19T08:00:00Z</published>
<title>City-wide Cut Repair Project  </title>
<updated>2026-02-26T22:30:08.9802006Z</updated>
<georss:line>49.23917348792838 -123.02956390731151 49.23816823603022 -123.0305228757454</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Feb 23, 2026 - Mar 20, 2026</content>
<id>urn:uuid:fc3b5e8c-ddad-4ee8-9c1c-4b0ea57fe976</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e77049bd-78b1-4dbd-94b8-2b05d470247a"/>
<published>2026-02-19T08:00:00Z</published>
<title>City-wide Cut Repair Project  </title>
<updated>2026-02-26T22:30:08.9802006Z</updated>
<georss:line>49.24006155346325 -123.03011596649567 49.23858041393984 -123.03153552752305</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Feb 23, 2026 - Mar 20, 2026</content>
<id>urn:uuid:7c2b4bf6-9639-463f-b19d-549630b88ea8</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e77049bd-78b1-4dbd-94b8-2b05d470247a"/>
<published>2026-02-19T08:00:00Z</published>
<title>City-wide Cut Repair Project  </title>
<updated>2026-02-26T22:30:08.9802006Z</updated>
<georss:line>49.23902619160603 -123.02759737751377 49.238833300714674 -123.02712860694913</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Feb 23, 2026 - Mar 20, 2026</content>
<id>urn:uuid:88329d22-b775-44f0-b862-314af13daf80</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e77049bd-78b1-4dbd-94b8-2b05d470247a"/>
<published>2026-02-19T08:00:00Z</published>
<title>City-wide Cut Repair Project  </title>
<updated>2026-02-26T22:30:08.9802006Z</updated>
<georss:line>49.23924234430933 -123.02813179065002 49.23902619160603 -123.02759737751377</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Feb 23, 2026 - Mar 20, 2026</content>
<id>urn:uuid:35fc2dfe-f66f-4fd0-bf37-7e66cbfa8de8</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e77049bd-78b1-4dbd-94b8-2b05d470247a"/>
<published>2026-02-19T08:00:00Z</published>
<title>City-wide Cut Repair Project  </title>
<updated>2026-02-26T22:30:08.9802006Z</updated>
<georss:line>49.23964727482556 -123.02910924355112 49.23924234430933 -123.02813179065002</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Feb 23, 2026 - Mar 20, 2026</content>
<id>urn:uuid:4beed5d4-f58e-4d13-ae16-92f5f7159186</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e77049bd-78b1-4dbd-94b8-2b05d470247a"/>
<published>2026-02-19T08:00:00Z</published>
<title>City-wide Cut Repair Project  </title>
<updated>2026-02-26T22:30:08.9802006Z</updated>
<georss:line>49.24141119019592 -123.04241000048467 49.24139453566892 -123.04244631069388 49.24039280483112 -123.04339851063482</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Feb 23, 2026 - Mar 20, 2026</content>
<id>urn:uuid:3f3078c9-58eb-4825-be8f-6fd7d3214f88</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e77049bd-78b1-4dbd-94b8-2b05d470247a"/>
<published>2026-02-19T08:00:00Z</published>
<title>City-wide Cut Repair Project  </title>
<updated>2026-02-26T22:30:08.9802006Z</updated>
<georss:line>49.242261939972934 -123.04159867602799 49.24141119019592 -123.04241000048467</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Feb 23, 2026 - Mar 20, 2026</content>
<id>urn:uuid:af462a0c-6248-43eb-a827-3d713d3cb778</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e77049bd-78b1-4dbd-94b8-2b05d470247a"/>
<published>2026-02-19T08:00:00Z</published>
<title>City-wide Cut Repair Project  </title>
<updated>2026-02-26T22:30:08.9802006Z</updated>
<georss:line>49.238858877896035 -123.04094633825162 49.23779300695463 -123.04199196267213</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Feb 23, 2026 - Mar 20, 2026</content>
<id>urn:uuid:c15f23d7-4ad2-473b-9227-a54a6bc4148d</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e77049bd-78b1-4dbd-94b8-2b05d470247a"/>
<published>2026-02-19T08:00:00Z</published>
<title>City-wide Cut Repair Project  </title>
<updated>2026-02-26T22:30:08.9802006Z</updated>
<georss:line>49.235796787288194 -123.03426260441354 49.23543796953328 -123.03461570796692</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Feb 23, 2026 - Mar 20, 2026</content>
<id>urn:uuid:4361b341-4acf-4078-a832-a02a52dc7e53</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e77049bd-78b1-4dbd-94b8-2b05d470247a"/>
<published>2026-02-19T08:00:00Z</published>
<title>City-wide Cut Repair Project  </title>
<updated>2026-02-26T22:30:08.9802006Z</updated>
<georss:line>49.236118758525976 -123.03394313988504 49.235796787288194 -123.03426260441354</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Feb 23, 2026 - Mar 20, 2026</content>
<id>urn:uuid:6b6546b8-93f9-43af-94d2-4d07bb80813c</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e77049bd-78b1-4dbd-94b8-2b05d470247a"/>
<published>2026-02-19T08:00:00Z</published>
<title>City-wide Cut Repair Project  </title>
<updated>2026-02-26T22:30:08.9802006Z</updated>
<georss:line>49.2766309399112 -123.05199238234036 49.276628545656706 -123.04934978993283</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Feb 23, 2026 - Mar 20, 2026</content>
<id>urn:uuid:8405aad9-c6d1-481f-87b2-0296146de612</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e77049bd-78b1-4dbd-94b8-2b05d470247a"/>
<published>2026-02-19T08:00:00Z</published>
<title>City-wide Cut Repair Project  </title>
<updated>2026-02-26T22:30:08.9802006Z</updated>
<georss:line>49.28021916016229 -123.05195783521054 49.28021586783754 -123.04933102680226</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Feb 23, 2026 - Mar 20, 2026</content>
<id>urn:uuid:f8e97a47-ef1c-4de1-92e1-61ce5abd6227</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e77049bd-78b1-4dbd-94b8-2b05d470247a"/>
<published>2026-02-19T08:00:00Z</published>
<title>City-wide Cut Repair Project  </title>
<updated>2026-02-26T22:30:08.9802006Z</updated>
<georss:line>49.274141889189735 -123.04939266235834 49.274139351501475 -123.04686858303417</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Feb 23, 2026 - Mar 20, 2026</content>
<id>urn:uuid:3f059bb0-3e54-4fc9-94d3-155c759e23bf</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e77049bd-78b1-4dbd-94b8-2b05d470247a"/>
<published>2026-02-19T08:00:00Z</published>
<title>City-wide Cut Repair Project  </title>
<updated>2026-02-26T22:30:08.9802006Z</updated>
<georss:line>49.27372472863502 -123.04015261197982 49.2732581363594 -123.04016081158296</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Feb 23, 2026 - Mar 20, 2026</content>
<id>urn:uuid:59dcf282-efa9-4be3-ac5b-61254c4acf71</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e77049bd-78b1-4dbd-94b8-2b05d470247a"/>
<published>2026-02-19T08:00:00Z</published>
<title>City-wide Cut Repair Project  </title>
<updated>2026-02-26T22:30:08.9802006Z</updated>
<georss:line>49.2753768209387 -123.04012586605138 49.27377601048923 -123.04015178751467</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Feb 23, 2026 - Mar 20, 2026</content>
<id>urn:uuid:16ff7fad-0fba-4698-91f9-614f3510c78b</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e77049bd-78b1-4dbd-94b8-2b05d470247a"/>
<published>2026-02-19T08:00:00Z</published>
<title>City-wide Cut Repair Project  </title>
<updated>2026-02-26T22:30:08.9802006Z</updated>
<georss:line>49.2724861664083 -123.05658337463603 49.27229515335998 -123.0565837335403</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Feb 23, 2026 - Mar 20, 2026</content>
<id>urn:uuid:38040306-ea52-4186-adc7-d2d80909eabd</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e77049bd-78b1-4dbd-94b8-2b05d470247a"/>
<published>2026-02-19T08:00:00Z</published>
<title>City-wide Cut Repair Project  </title>
<updated>2026-02-26T22:30:08.9802006Z</updated>
<georss:line>49.273073093494276 -123.05658350980558 49.2724861664083 -123.05658337463603</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Feb 23, 2026 - Mar 20, 2026</content>
<id>urn:uuid:8bcf8fde-aa1e-4dc6-8321-06cb163d6fbc</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e77049bd-78b1-4dbd-94b8-2b05d470247a"/>
<published>2026-02-19T08:00:00Z</published>
<title>City-wide Cut Repair Project  </title>
<updated>2026-02-26T22:30:08.9802006Z</updated>
<georss:line>49.27746639153921 -123.05657497940507 49.27746524136481 -123.05579552234235</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Feb 23, 2026 - Mar 20, 2026</content>
<id>urn:uuid:303aa388-8ee5-4bba-b750-9205e5716256</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e77049bd-78b1-4dbd-94b8-2b05d470247a"/>
<published>2026-02-19T08:00:00Z</published>
<title>City-wide Cut Repair Project  </title>
<updated>2026-02-26T22:30:08.9802006Z</updated>
<georss:line>49.27746524136481 -123.05579552234235 49.277463541332594 -123.05464724826872</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Feb 23, 2026 - Mar 20, 2026</content>
<id>urn:uuid:6805d682-9081-4b07-84c7-407c3ab325a3</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e77049bd-78b1-4dbd-94b8-2b05d470247a"/>
<published>2026-02-19T08:00:00Z</published>
<title>City-wide Cut Repair Project  </title>
<updated>2026-02-26T22:30:08.9802006Z</updated>
<georss:line>49.27844342634691 -123.06833186250923 49.27842149095548 -123.0657516069158 49.27834601905775 -123.06561327700632</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Feb 23, 2026 - Mar 20, 2026</content>
<id>urn:uuid:17c47aa5-6ec3-45e3-9790-0eecd9f013e8</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e77049bd-78b1-4dbd-94b8-2b05d470247a"/>
<published>2026-02-19T08:00:00Z</published>
<title>City-wide Cut Repair Project  </title>
<updated>2026-02-26T22:30:08.9802006Z</updated>
<georss:line>49.273024655589495 -123.06762676021391 49.27301236245839 -123.06568755877113</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Feb 23, 2026 - Mar 20, 2026</content>
<id>urn:uuid:ace263a2-1e10-42cc-808a-67af485d1d83</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e77049bd-78b1-4dbd-94b8-2b05d470247a"/>
<published>2026-02-19T08:00:00Z</published>
<title>City-wide Cut Repair Project  </title>
<updated>2026-02-26T22:30:08.9802006Z</updated>
<georss:line>49.27483398259545 -123.06759804008533 49.274821220962 -123.06565930326168</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Feb 23, 2026 - Mar 20, 2026</content>
<id>urn:uuid:77c58684-f229-4b96-a435-b6a2a63b8b58</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e77049bd-78b1-4dbd-94b8-2b05d470247a"/>
<published>2026-02-19T08:00:00Z</published>
<title>City-wide Cut Repair Project  </title>
<updated>2026-02-26T22:30:08.9802006Z</updated>
<georss:line>49.27047386545823 -123.06573481682861 49.270458801505555 -123.06380383647118</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Feb 23, 2026 - Mar 20, 2026</content>
<id>urn:uuid:a0e1ca89-5f69-4e1a-b320-6bab267b8ff1</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e77049bd-78b1-4dbd-94b8-2b05d470247a"/>
<published>2026-02-19T08:00:00Z</published>
<title>City-wide Cut Repair Project  </title>
<updated>2026-02-26T22:30:08.9802006Z</updated>
<georss:line>49.27479197411395 -123.0617835739591 49.27477663007835 -123.05984903024542</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Feb 23, 2026 - Mar 20, 2026</content>
<id>urn:uuid:2f2a045f-bc52-48ed-8efe-85ce0df5c099</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e77049bd-78b1-4dbd-94b8-2b05d470247a"/>
<published>2026-02-19T08:00:00Z</published>
<title>City-wide Cut Repair Project  </title>
<updated>2026-02-26T22:30:08.9802006Z</updated>
<georss:line>49.27641119901267 -123.0382311203297 49.27641036710864 -123.03694484033386</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Feb 23, 2026 - Mar 20, 2026</content>
<id>urn:uuid:daaa1e67-8477-41f4-9403-6512d86938bd</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e77049bd-78b1-4dbd-94b8-2b05d470247a"/>
<published>2026-02-19T08:00:00Z</published>
<title>City-wide Cut Repair Project  </title>
<updated>2026-02-26T22:30:08.9802006Z</updated>
<georss:line>49.27641036710864 -123.03694484033386 49.276409403202734 -123.03632515433894</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Feb 23, 2026 - Mar 20, 2026</content>
<id>urn:uuid:950e6225-2866-49fb-b66d-0f7f34e393e6</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e77049bd-78b1-4dbd-94b8-2b05d470247a"/>
<published>2026-02-19T08:00:00Z</published>
<title>City-wide Cut Repair Project  </title>
<updated>2026-02-26T22:30:08.9802006Z</updated>
<georss:line>49.27743425649183 -123.02833380312782 49.27742968983355 -123.02570561755924</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Feb 23, 2026 - Mar 20, 2026</content>
<id>urn:uuid:79b2ba48-c9b7-48e5-9cfb-3c6efe86be05</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e77049bd-78b1-4dbd-94b8-2b05d470247a"/>
<published>2026-02-19T08:00:00Z</published>
<title>City-wide Cut Repair Project  </title>
<updated>2026-02-26T22:30:08.9802006Z</updated>
<georss:line>49.28019954826297 -123.02832356295328 49.28019740059898 -123.02569748657214</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Feb 23, 2026 - Mar 20, 2026</content>
<id>urn:uuid:4bfce367-0110-4cf4-a10a-5cbf20b5e32a</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e77049bd-78b1-4dbd-94b8-2b05d470247a"/>
<published>2026-02-19T08:00:00Z</published>
<title>City-wide Cut Repair Project  </title>
<updated>2026-02-26T22:30:08.9802006Z</updated>
<georss:line>49.27323651558106 -123.02362476534203 49.27210023312165 -123.02363018891025</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Feb 23, 2026 - Mar 20, 2026</content>
<id>urn:uuid:a43a6b41-03fe-4bdf-805a-a476524ddc21</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e77049bd-78b1-4dbd-94b8-2b05d470247a"/>
<published>2026-02-19T08:00:00Z</published>
<title>City-wide Cut Repair Project  </title>
<updated>2026-02-26T22:30:08.9802006Z</updated>
<georss:line>49.26846237764636 -123.03098209036553 49.26846372624934 -123.02846719768787</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Feb 23, 2026 - Mar 20, 2026</content>
<id>urn:uuid:96ad84ac-5aa8-449e-8ddb-c516ce295997</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e77049bd-78b1-4dbd-94b8-2b05d470247a"/>
<published>2026-02-19T08:00:00Z</published>
<title>City-wide Cut Repair Project  </title>
<updated>2026-02-26T22:30:08.9802006Z</updated>
<georss:line>49.27041346082956 -123.03641564401583 49.270410613643435 -123.03443595221205</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Feb 23, 2026 - Mar 20, 2026</content>
<id>urn:uuid:f1b7925e-4c7b-4e5a-afc7-e2533ba80ff0</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e77049bd-78b1-4dbd-94b8-2b05d470247a"/>
<published>2026-02-19T08:00:00Z</published>
<title>City-wide Cut Repair Project  </title>
<updated>2026-02-26T22:30:08.9802006Z</updated>
<georss:line>49.26663181241108 -123.03373546540234 49.26567568197564 -123.03374795395864</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Feb 23, 2026 - Mar 20, 2026</content>
<id>urn:uuid:022c4b9e-50b4-4b4e-a314-94b4409261ad</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e77049bd-78b1-4dbd-94b8-2b05d470247a"/>
<published>2026-02-19T08:00:00Z</published>
<title>City-wide Cut Repair Project  </title>
<updated>2026-02-26T22:30:08.9802006Z</updated>
<georss:line>49.26569374201708 -123.03901195114511 49.26568250507941 -123.03648483315565</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Feb 23, 2026 - Mar 20, 2026</content>
<id>urn:uuid:49d451f4-674e-4ac8-bff0-4ca727e947db</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e77049bd-78b1-4dbd-94b8-2b05d470247a"/>
<published>2026-02-19T08:00:00Z</published>
<title>City-wide Cut Repair Project  </title>
<updated>2026-02-26T22:30:08.9802006Z</updated>
<georss:line>49.263171028742306 -123.05659914007799 49.26297181160018 -123.05659981936839</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Feb 23, 2026 - Mar 20, 2026</content>
<id>urn:uuid:1f5af904-16dc-4684-a11c-54d62fda0b0c</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e77049bd-78b1-4dbd-94b8-2b05d470247a"/>
<published>2026-02-19T08:00:00Z</published>
<title>City-wide Cut Repair Project  </title>
<updated>2026-02-26T22:30:08.9802006Z</updated>
<georss:line>49.263876271284744 -123.05659807739934 49.26317102870189 -123.05659922254495</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Feb 23, 2026 - Mar 20, 2026</content>
<id>urn:uuid:60bcb5aa-8583-4243-9121-060cce3bb027</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e77049bd-78b1-4dbd-94b8-2b05d470247a"/>
<published>2026-02-19T08:00:00Z</published>
<title>City-wide Cut Repair Project  </title>
<updated>2026-02-26T22:30:08.9802006Z</updated>
<georss:line>49.26251563496538 -123.0547006440623 49.262016741533415 -123.05470337749718</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Feb 23, 2026 - Mar 20, 2026</content>
<id>urn:uuid:8e9c979e-0a03-48bf-ad27-c1a32a16f9bb</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e77049bd-78b1-4dbd-94b8-2b05d470247a"/>
<published>2026-02-19T08:00:00Z</published>
<title>City-wide Cut Repair Project  </title>
<updated>2026-02-26T22:30:08.9802006Z</updated>
<georss:line>49.262971053384916 -123.05470032278009 49.26251563496538 -123.0547006440623</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Feb 23, 2026 - Mar 20, 2026</content>
<id>urn:uuid:bc22fe75-eaaf-4988-87b7-241a8d287cde</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e77049bd-78b1-4dbd-94b8-2b05d470247a"/>
<published>2026-02-19T08:00:00Z</published>
<title>City-wide Cut Repair Project  </title>
<updated>2026-02-26T22:30:08.9802006Z</updated>
<georss:line>49.263865060909495 -123.04701383667404 49.26341368927203 -123.0470170089387</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Feb 23, 2026 - Mar 20, 2026</content>
<id>urn:uuid:79b0eae9-555a-4c80-9738-defb631f0708</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e77049bd-78b1-4dbd-94b8-2b05d470247a"/>
<published>2026-02-19T08:00:00Z</published>
<title>City-wide Cut Repair Project  </title>
<updated>2026-02-26T22:30:08.9802006Z</updated>
<georss:line>49.26341368927203 -123.0470170089387 49.26296206587318 -123.04701983729827</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Feb 23, 2026 - Mar 20, 2026</content>
<id>urn:uuid:47d9c9bb-5d3a-4c74-a9f8-5d1636fdb531</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e77049bd-78b1-4dbd-94b8-2b05d470247a"/>
<published>2026-02-19T08:00:00Z</published>
<title>City-wide Cut Repair Project  </title>
<updated>2026-02-26T22:30:08.9802006Z</updated>
<georss:line>49.26088679060592 -123.06592123099502 49.26043483042022 -123.06592980982678</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Feb 23, 2026 - Mar 20, 2026</content>
<id>urn:uuid:c418b74a-53df-4213-a4a2-d8749ca896a8</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e77049bd-78b1-4dbd-94b8-2b05d470247a"/>
<published>2026-02-19T08:00:00Z</published>
<title>City-wide Cut Repair Project  </title>
<updated>2026-02-26T22:30:08.9802006Z</updated>
<georss:line>49.261340477857715 -123.06591261307886 49.26088679060592 -123.06592123099502</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Feb 23, 2026 - Mar 20, 2026</content>
<id>urn:uuid:e1e17a5d-eccb-40c7-84a5-dcc1a8ef4108</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e77049bd-78b1-4dbd-94b8-2b05d470247a"/>
<published>2026-02-19T08:00:00Z</published>
<title>City-wide Cut Repair Project  </title>
<updated>2026-02-26T22:30:08.9802006Z</updated>
<georss:line>49.262191613611606 -123.06589644267393 49.261340477857715 -123.06591261307886</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Feb 23, 2026 - Mar 20, 2026</content>
<id>urn:uuid:f87ec96c-56ae-445b-a1fc-6a0141d3f439</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e77049bd-78b1-4dbd-94b8-2b05d470247a"/>
<published>2026-02-19T08:00:00Z</published>
<title>City-wide Cut Repair Project  </title>
<updated>2026-02-26T22:30:08.9802006Z</updated>
<georss:line>49.263677356614295 -123.06393449079609 49.26322528902048 -123.06394277196792</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Feb 23, 2026 - Mar 20, 2026</content>
<id>urn:uuid:699a6a08-8114-4c8f-acf3-3aee5b8f33ef</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e77049bd-78b1-4dbd-94b8-2b05d470247a"/>
<published>2026-02-19T08:00:00Z</published>
<title>City-wide Cut Repair Project  </title>
<updated>2026-02-26T22:30:08.9802006Z</updated>
<georss:line>49.26412975700953 -123.06392618241742 49.263677356614295 -123.06393449079609</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Feb 23, 2026 - Mar 20, 2026</content>
<id>urn:uuid:2ff1e8d3-d015-4ec8-94a6-7ffa787642be</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e77049bd-78b1-4dbd-94b8-2b05d470247a"/>
<published>2026-02-19T08:00:00Z</published>
<title>City-wide Cut Repair Project  </title>
<updated>2026-02-26T22:30:08.9802006Z</updated>
<georss:line>49.266841381257905 -123.06387243547128 49.2668267284935 -123.06193858769865</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Feb 23, 2026 - Mar 20, 2026</content>
<id>urn:uuid:7a93029e-4b1e-4ac5-b5c7-16bc3c4964d4</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e77049bd-78b1-4dbd-94b8-2b05d470247a"/>
<published>2026-02-19T08:00:00Z</published>
<title>City-wide Cut Repair Project  </title>
<updated>2026-02-26T22:30:08.9802006Z</updated>
<georss:line>49.25639176851246 -123.08747577461429 49.25638342921275 -123.08695242736304</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Feb 23, 2026 - Mar 20, 2026</content>
<id>urn:uuid:1a4471fc-8b82-47ea-b438-8993dbcfa953</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e77049bd-78b1-4dbd-94b8-2b05d470247a"/>
<published>2026-02-19T08:00:00Z</published>
<title>City-wide Cut Repair Project  </title>
<updated>2026-02-26T22:30:08.9802006Z</updated>
<georss:line>49.25638342921275 -123.08695242736304 49.25636956959576 -123.08607279346295</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Feb 23, 2026 - Mar 20, 2026</content>
<id>urn:uuid:b44dbb53-f8f6-4163-91c3-ce55d397557c</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e77049bd-78b1-4dbd-94b8-2b05d470247a"/>
<published>2026-02-19T08:00:00Z</published>
<title>City-wide Cut Repair Project  </title>
<updated>2026-02-26T22:30:08.9802006Z</updated>
<georss:line>49.25636113102735 -123.08554129714719 49.25635280043355 -123.08500643426063</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Feb 23, 2026 - Mar 20, 2026</content>
<id>urn:uuid:1120af8c-682b-4241-bebc-5b2e50f77117</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e77049bd-78b1-4dbd-94b8-2b05d470247a"/>
<published>2026-02-19T08:00:00Z</published>
<title>City-wide Cut Repair Project  </title>
<updated>2026-02-26T22:30:08.9802006Z</updated>
<georss:line>49.25635280043355 -123.08500643426063 49.25633962195994 -123.0841469355265</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Feb 23, 2026 - Mar 20, 2026</content>
<id>urn:uuid:e3974f1e-9bce-43ea-8d92-b884c70fcb3f</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e77049bd-78b1-4dbd-94b8-2b05d470247a"/>
<published>2026-02-19T08:00:00Z</published>
<title>City-wide Cut Repair Project  </title>
<updated>2026-02-26T22:30:08.9802006Z</updated>
<georss:line>49.25633962195994 -123.0841469355265 49.256331629682336 -123.08360799212906</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Feb 23, 2026 - Mar 20, 2026</content>
<id>urn:uuid:a83dcbdb-d837-450b-806c-2878bf759806</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e77049bd-78b1-4dbd-94b8-2b05d470247a"/>
<published>2026-02-19T08:00:00Z</published>
<title>City-wide Cut Repair Project  </title>
<updated>2026-02-26T22:30:08.9802006Z</updated>
<georss:line>49.25636956959576 -123.08607279346295 49.25636113102735 -123.08554129714719</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Feb 23, 2026 - Mar 20, 2026</content>
<id>urn:uuid:806cff8d-734a-4033-af4a-94f04b94b693</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e77049bd-78b1-4dbd-94b8-2b05d470247a"/>
<published>2026-02-19T08:00:00Z</published>
<title>City-wide Cut Repair Project  </title>
<updated>2026-02-26T22:30:08.9802006Z</updated>
<georss:line>49.25785974462721 -123.08339810615162 49.25784456591455 -123.0814617714861</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Feb 23, 2026 - Mar 20, 2026</content>
<id>urn:uuid:fd960a6a-19ae-4828-8ece-3d7b4da5b2ab</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e77049bd-78b1-4dbd-94b8-2b05d470247a"/>
<published>2026-02-19T08:00:00Z</published>
<title>City-wide Cut Repair Project  </title>
<updated>2026-02-26T22:30:08.9802006Z</updated>
<georss:line>49.25641867259367 -123.08920593614579 49.25639742712977 -123.08785431130384</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Feb 23, 2026 - Mar 20, 2026</content>
<id>urn:uuid:ab4df6a8-ca45-4362-877e-b959b14c0b52</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e77049bd-78b1-4dbd-94b8-2b05d470247a"/>
<published>2026-02-19T08:00:00Z</published>
<title>City-wide Cut Repair Project  </title>
<updated>2026-02-26T22:30:08.9802006Z</updated>
<georss:line>49.25639742712977 -123.08785431130384 49.25639176851246 -123.08747577461429</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Feb 23, 2026 - Mar 20, 2026</content>
<id>urn:uuid:5f288c2f-0151-453b-b242-641ed1594c3c</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e77049bd-78b1-4dbd-94b8-2b05d470247a"/>
<published>2026-02-19T08:00:00Z</published>
<title>City-wide Cut Repair Project  </title>
<updated>2026-02-26T22:30:08.9802006Z</updated>
<georss:line>49.25504002939795 -123.08752431466307 49.2545868628539 -123.08754331582185</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Feb 23, 2026 - Mar 20, 2026</content>
<id>urn:uuid:214538b6-5f43-4c9c-9aa0-6efc28e98d08</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e77049bd-78b1-4dbd-94b8-2b05d470247a"/>
<published>2026-02-19T08:00:00Z</published>
<title>City-wide Cut Repair Project  </title>
<updated>2026-02-26T22:30:08.9802006Z</updated>
<georss:line>49.25549353663874 -123.08750674297048 49.25504002939795 -123.08752431466307</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Feb 23, 2026 - Mar 20, 2026</content>
<id>urn:uuid:b6e86fa3-dfd8-419f-a0c6-c50bcafbcd1c</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e77049bd-78b1-4dbd-94b8-2b05d470247a"/>
<published>2026-02-19T08:00:00Z</published>
<title>City-wide Cut Repair Project  </title>
<updated>2026-02-26T22:30:08.9802006Z</updated>
<georss:line>49.25562212705037 -123.0875017619182 49.25549353663874 -123.08750674297048</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Feb 23, 2026 - Mar 20, 2026</content>
<id>urn:uuid:710cda2b-f3ef-454c-8253-593ae8e957c0</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e77049bd-78b1-4dbd-94b8-2b05d470247a"/>
<published>2026-02-19T08:00:00Z</published>
<title>City-wide Cut Repair Project  </title>
<updated>2026-02-26T22:30:08.9802006Z</updated>
<georss:line>49.24932978870348 -123.09869807070446 49.249312204609936 -123.09728570267374</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Feb 23, 2026 - Mar 20, 2026</content>
<id>urn:uuid:c38fbbcd-7360-4ec4-8016-a6d215dc353b</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e77049bd-78b1-4dbd-94b8-2b05d470247a"/>
<published>2026-02-19T08:00:00Z</published>
<title>City-wide Cut Repair Project  </title>
<updated>2026-02-26T22:30:08.9802006Z</updated>
<georss:line>49.2565647206973 -123.09843130713013 49.25653493313797 -123.0964958144786</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Feb 23, 2026 - Mar 20, 2026</content>
<id>urn:uuid:5436265f-df79-48c6-998b-0f987ecfbcb8</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e77049bd-78b1-4dbd-94b8-2b05d470247a"/>
<published>2026-02-19T08:00:00Z</published>
<title>City-wide Cut Repair Project  </title>
<updated>2026-02-26T22:30:08.9802006Z</updated>
<georss:line>49.249312204609936 -123.09728570267374 49.249305749927316 -123.09675620775474</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Feb 23, 2026 - Mar 20, 2026</content>
<id>urn:uuid:e0549a3d-26be-4879-b34d-10cfd7d0e773</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e77049bd-78b1-4dbd-94b8-2b05d470247a"/>
<published>2026-02-19T08:00:00Z</published>
<title>City-wide Cut Repair Project  </title>
<updated>2026-02-26T22:30:08.9802006Z</updated>
<georss:line>49.24831003324894 -123.09721556757837 49.24752130135511 -123.0972727169608</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Feb 23, 2026 - Mar 20, 2026</content>
<id>urn:uuid:27003220-594a-4584-a0f1-10dc70741454</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e77049bd-78b1-4dbd-94b8-2b05d470247a"/>
<published>2026-02-19T08:00:00Z</published>
<title>City-wide Cut Repair Project  </title>
<updated>2026-02-26T22:30:08.9802006Z</updated>
<georss:line>49.24871405322898 -123.09718437298736 49.24831003324894 -123.09721556757837</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Feb 23, 2026 - Mar 20, 2026</content>
<id>urn:uuid:f175525f-c7a8-4496-87bc-ee83f666bba7</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e77049bd-78b1-4dbd-94b8-2b05d470247a"/>
<published>2026-02-19T08:00:00Z</published>
<title>City-wide Cut Repair Project  </title>
<updated>2026-02-26T22:30:08.9802006Z</updated>
<georss:line>49.25884317860533 -123.09305080166631 49.257779064158626 -123.09307146341465</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Feb 23, 2026 - Mar 20, 2026</content>
<id>urn:uuid:cb96cfc7-0718-4c99-a041-9e1ed25d2121</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e77049bd-78b1-4dbd-94b8-2b05d470247a"/>
<published>2026-02-19T08:00:00Z</published>
<title>City-wide Cut Repair Project  </title>
<updated>2026-02-26T22:30:08.9802006Z</updated>
<georss:line>49.2647396938506 -123.1528938088216 49.2647778135744 -123.1552629101132</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Feb 23, 2026 - Mar 20, 2026</content>
<id>urn:uuid:0df539fd-26cd-46d9-b329-517fb93ce915</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e77049bd-78b1-4dbd-94b8-2b05d470247a"/>
<published>2026-02-19T08:00:00Z</published>
<title>City-wide Cut Repair Project  </title>
<updated>2026-02-26T22:30:08.9802006Z</updated>
<georss:line>49.26017959708548 -123.09830830237881 49.25973263969891 -123.09832277988036</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Feb 23, 2026 - Mar 20, 2026</content>
<id>urn:uuid:f65f67ea-6b1c-4deb-838c-7b25bc6dfa7e</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e77049bd-78b1-4dbd-94b8-2b05d470247a"/>
<published>2026-02-19T08:00:00Z</published>
<title>City-wide Cut Repair Project  </title>
<updated>2026-02-26T22:30:08.9802006Z</updated>
<georss:line>49.260636684334884 -123.09829230543497 49.26017959708548 -123.09830830237881</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Feb 23, 2026 - Mar 20, 2026</content>
<id>urn:uuid:7fe79958-3a11-41be-bcde-548da0aea64c</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e77049bd-78b1-4dbd-94b8-2b05d470247a"/>
<published>2026-02-19T08:00:00Z</published>
<title>City-wide Cut Repair Project  </title>
<updated>2026-02-26T22:30:08.9802006Z</updated>
<georss:line>49.2610886449047 -123.09827556959398 49.260636684334884 -123.09829230543497</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Feb 23, 2026 - Mar 20, 2026</content>
<id>urn:uuid:3f9733e7-045c-4ba3-aa69-0bc05aea93d6</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e77049bd-78b1-4dbd-94b8-2b05d470247a"/>
<published>2026-02-19T08:00:00Z</published>
<title>City-wide Cut Repair Project  </title>
<updated>2026-02-26T22:30:08.9802006Z</updated>
<georss:line>49.26067697420149 -123.09617557795994 49.259797145966814 -123.09625918831847</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Feb 23, 2026 - Mar 20, 2026</content>
<id>urn:uuid:4969ed4a-a7a2-4905-bc77-986d2c64a70e</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e77049bd-78b1-4dbd-94b8-2b05d470247a"/>
<published>2026-02-19T08:00:00Z</published>
<title>City-wide Cut Repair Project  </title>
<updated>2026-02-26T22:30:08.9802006Z</updated>
<georss:line>49.262489799942614 -123.09105344883959 49.26247371365085 -123.08911893564974</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Feb 23, 2026 - Mar 20, 2026</content>
<id>urn:uuid:53c85381-25bc-4ef7-acfe-da31b023a5b4</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e77049bd-78b1-4dbd-94b8-2b05d470247a"/>
<published>2026-02-19T08:00:00Z</published>
<title>City-wide Cut Repair Project  </title>
<updated>2026-02-26T22:30:08.9802006Z</updated>
<georss:line>49.2615251209111 -123.08913461370165 49.26150952169738 -123.08719152220505</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Feb 23, 2026 - Mar 20, 2026</content>
<id>urn:uuid:533c6ba0-21e3-49f9-8729-bc5bb220da52</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e77049bd-78b1-4dbd-94b8-2b05d470247a"/>
<published>2026-02-19T08:00:00Z</published>
<title>City-wide Cut Repair Project  </title>
<updated>2026-02-26T22:30:08.9802006Z</updated>
<georss:line>49.262458202634775 -123.08717781373677 49.26244259608046 -123.08523663791357</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street Renewal - Dates TBC
Location: Clark Dr  - E 1st Av to E 12th Av

Schedule: Jul 1, 2026 - Sep 30, 2026</content>
<id>urn:uuid:632e47b5-3465-4add-b692-80a75026f3f2</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/af633ba5-f3fa-4127-b933-ad1819deab3a"/>
<published>2026-02-02T08:00:00Z</published>
<title>Clark Dr Street Renewal</title>
<updated>2026-03-30T21:51:59.5617724Z</updated>
<georss:line>49.26423538872177 -123.07746443281538 49.26332991039226 -123.07748238149387</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street Renewal - Dates TBC
Location: Clark Dr  - E 1st Av to E 12th Av

Schedule: Jul 1, 2026 - Sep 30, 2026</content>
<id>urn:uuid:e39ea998-13d1-4a0a-aa58-ef90eba15203</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/af633ba5-f3fa-4127-b933-ad1819deab3a"/>
<published>2026-02-02T08:00:00Z</published>
<title>Clark Dr Street Renewal</title>
<updated>2026-03-30T21:51:59.5617724Z</updated>
<georss:line>49.26518507914605 -123.07744526065908 49.26423538872177 -123.07746443281538</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street Renewal - Dates TBC
Location: Clark Dr  - E 1st Av to E 12th Av

Schedule: Jul 1, 2026 - Sep 30, 2026</content>
<id>urn:uuid:e8482694-86be-49fc-894f-9e513975e3ad</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/af633ba5-f3fa-4127-b933-ad1819deab3a"/>
<published>2026-02-02T08:00:00Z</published>
<title>Clark Dr Street Renewal</title>
<updated>2026-03-30T21:51:59.5617724Z</updated>
<georss:line>49.26557301179645 -123.0774369609304 49.26518507914605 -123.07744526065908</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street Renewal - Dates TBC
Location: Clark Dr  - E 1st Av to E 12th Av

Schedule: Jul 1, 2026 - Sep 30, 2026</content>
<id>urn:uuid:e4756326-8d43-44bf-b15e-99a1c2bc7cdc</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/af633ba5-f3fa-4127-b933-ad1819deab3a"/>
<published>2026-02-02T08:00:00Z</published>
<title>Clark Dr Street Renewal</title>
<updated>2026-03-30T21:51:59.5617724Z</updated>
<georss:line>49.26604269360698 -123.07742746944433 49.26557301179645 -123.0774369609304</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street Renewal - Dates TBC
Location: Clark Dr  - E 1st Av to E 12th Av

Schedule: Jul 1, 2026 - Sep 30, 2026</content>
<id>urn:uuid:b10a8aed-56f6-4c4b-8df1-942f88e3c6df</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/af633ba5-f3fa-4127-b933-ad1819deab3a"/>
<published>2026-02-02T08:00:00Z</published>
<title>Clark Dr Street Renewal</title>
<updated>2026-03-30T21:51:59.5617724Z</updated>
<georss:line>49.266265993538155 -123.0774228980131 49.26604269360698 -123.07742746944433</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street Renewal - Dates TBC
Location: Clark Dr  - E 1st Av to E 12th Av

Schedule: Jul 1, 2026 - Sep 30, 2026</content>
<id>urn:uuid:9f0897e3-2548-438c-831e-c34ffeb2d4fd</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/af633ba5-f3fa-4127-b933-ad1819deab3a"/>
<published>2026-02-02T08:00:00Z</published>
<title>Clark Dr Street Renewal</title>
<updated>2026-03-30T21:51:59.5617724Z</updated>
<georss:line>49.26694764116294 -123.07740895443763 49.266265993538155 -123.0774228980131</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street Renewal - Dates TBC
Location: Clark Dr  - E 1st Av to E 12th Av

Schedule: Jul 1, 2026 - Sep 30, 2026</content>
<id>urn:uuid:8f34d40e-e807-40ef-aab2-03ce8e3070cf</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/af633ba5-f3fa-4127-b933-ad1819deab3a"/>
<published>2026-02-02T08:00:00Z</published>
<title>Clark Dr Street Renewal</title>
<updated>2026-03-30T21:51:59.5617724Z</updated>
<georss:line>49.26785279471747 -123.0773915525051 49.26694764116294 -123.07740895443763</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street Renewal - Dates TBC
Location: Clark Dr  - E 1st Av to E 12th Av

Schedule: Jul 1, 2026 - Sep 30, 2026</content>
<id>urn:uuid:6b29131c-afb4-4e63-8840-1f2dee1b1da5</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/af633ba5-f3fa-4127-b933-ad1819deab3a"/>
<published>2026-02-02T08:00:00Z</published>
<title>Clark Dr Street Renewal</title>
<updated>2026-03-30T21:51:59.5617724Z</updated>
<georss:line>49.26875753531499 -123.07737270597427 49.26785279471747 -123.0773915525051</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street Renewal - Dates TBC
Location: Clark Dr  - E 1st Av to E 12th Av

Schedule: Jul 1, 2026 - Sep 30, 2026</content>
<id>urn:uuid:06164553-6148-45c0-85a1-55e95a40ffd3</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/af633ba5-f3fa-4127-b933-ad1819deab3a"/>
<published>2026-02-02T08:00:00Z</published>
<title>Clark Dr Street Renewal</title>
<updated>2026-03-30T21:51:59.5617724Z</updated>
<georss:line>49.26967184644283 -123.07735417615537 49.26875753531499 -123.07737270597427</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street Renewal - Dates TBC
Location: Clark Dr  - E 1st Av to E 12th Av

Schedule: Jul 1, 2026 - Sep 30, 2026</content>
<id>urn:uuid:b061c320-5237-472c-bb74-6c72eabdabe0</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/af633ba5-f3fa-4127-b933-ad1819deab3a"/>
<published>2026-02-02T08:00:00Z</published>
<title>Clark Dr Street Renewal</title>
<updated>2026-03-30T21:51:59.5617724Z</updated>
<georss:line>49.261430889683794 -123.07751905985212 49.26097811963629 -123.0775268306542</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street Renewal - Dates TBC
Location: Clark Dr  - E 1st Av to E 12th Av

Schedule: Jul 1, 2026 - Sep 30, 2026</content>
<id>urn:uuid:11b9ae2d-d5a6-41ce-8c82-a5a6e9fe20ad</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/af633ba5-f3fa-4127-b933-ad1819deab3a"/>
<published>2026-02-02T08:00:00Z</published>
<title>Clark Dr Street Renewal</title>
<updated>2026-03-30T21:51:59.5617724Z</updated>
<georss:line>49.26188348944109 -123.07751031281195 49.261430889683794 -123.07751905985212</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street Renewal - Dates TBC
Location: Clark Dr  - E 1st Av to E 12th Av

Schedule: Jul 1, 2026 - Sep 30, 2026</content>
<id>urn:uuid:7e70310b-eb92-48b9-8d35-25aa188c9200</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/af633ba5-f3fa-4127-b933-ad1819deab3a"/>
<published>2026-02-02T08:00:00Z</published>
<title>Clark Dr Street Renewal</title>
<updated>2026-03-30T21:51:59.5617724Z</updated>
<georss:line>49.26238120075024 -123.0775006329302 49.26188348944109 -123.07751031281195</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street Renewal - Dates TBC
Location: Clark Dr  - E 1st Av to E 12th Av

Schedule: Jul 1, 2026 - Sep 30, 2026</content>
<id>urn:uuid:95f6df10-60a5-44d5-9d26-04ad12089229</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/af633ba5-f3fa-4127-b933-ad1819deab3a"/>
<published>2026-02-02T08:00:00Z</published>
<title>Clark Dr Street Renewal</title>
<updated>2026-03-30T21:51:59.5617724Z</updated>
<georss:line>49.262878372414406 -123.07749078708167 49.26238120075024 -123.0775006329302</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street Renewal - Dates TBC
Location: Clark Dr  - E 1st Av to E 12th Av

Schedule: Jul 1, 2026 - Sep 30, 2026</content>
<id>urn:uuid:250fdc4f-e4b7-40ca-906e-08845f975a5b</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/af633ba5-f3fa-4127-b933-ad1819deab3a"/>
<published>2026-02-02T08:00:00Z</published>
<title>Clark Dr Street Renewal</title>
<updated>2026-03-30T21:51:59.5617724Z</updated>
<georss:line>49.26332991039226 -123.07748238149387 49.262878372414406 -123.07749078708167</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street Renewal - Dates TBC
Location: Clark Dr  - E 1st Av to E 12th Av

Schedule: Jul 1, 2026 - Sep 30, 2026</content>
<id>urn:uuid:6a628ab7-a128-490b-b88a-6482785098dd</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/af633ba5-f3fa-4127-b933-ad1819deab3a"/>
<published>2026-02-02T08:00:00Z</published>
<title>Clark Dr Street Renewal</title>
<updated>2026-03-30T21:51:59.5617724Z</updated>
<georss:line>49.26097811963629 -123.0775268306542 49.260526787004665 -123.07753725611747</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street Renewal - Dates TBC
Location: Clark Dr  - E 1st Av to E 12th Av

Schedule: Jul 1, 2026 - Sep 30, 2026</content>
<id>urn:uuid:97bf617c-a0f4-4c36-9609-60e876aed400</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/af633ba5-f3fa-4127-b933-ad1819deab3a"/>
<published>2026-02-02T08:00:00Z</published>
<title>Clark Dr Street Renewal</title>
<updated>2026-03-30T21:51:59.5617724Z</updated>
<georss:line>49.260526787004665 -123.07753725611747 49.26007494281862 -123.07754588017715</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street Renewal - Dates TBC
Location: Clark Dr  - E 1st Av to E 12th Av

Schedule: Jul 1, 2026 - Sep 30, 2026</content>
<id>urn:uuid:cb2259e9-230a-4868-9ca1-864893f346ad</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/af633ba5-f3fa-4127-b933-ad1819deab3a"/>
<published>2026-02-02T08:00:00Z</published>
<title>Clark Dr Street Renewal</title>
<updated>2026-03-30T21:51:59.5617724Z</updated>
<georss:line>49.26007494281862 -123.07754588017715 49.25962215364831 -123.07755517603569</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Seal replacement across on roadway and both sidewalks on W Cordova Street near Howe Street Intersection.

Rolling closures over multiple lanes required on Apr 30. Traffic at intersection of Howe and W Cordova may also be impacted.

Work extended to May 5.
Location: 
Schedule: Multiple occurrences as follows:
- Apr 30, 2026 (7 AM - 8 PM)
- May 5, 2026 (7 AM - 8 PM)
</content>
<id>urn:uuid:2798037f-8b79-4382-9ea8-3195ea189b59</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/072d600b-ef02-4bd2-b634-1fb447d56f33"/>
<published>2026-04-01T07:00:00Z</published>
<title>Cordova Viaduct Seal Replacement</title>
<updated>2026-04-30T23:21:20.7572292Z</updated>
<georss:line>49.28660185549498 -123.11386559838836 49.285982313595895 -123.11292786216386</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Work will begin just north of Memorial Park on Highbury St, heading north toward W 29th Avenue 
Location: 
Schedule: Apr 1, 2026 - Sep 30, 2026</content>
<id>urn:uuid:370c68ce-b63c-4ab5-93e1-836e109275ba</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/15675431-2744-452d-8953-b27b0d4c1fb3"/>
<published>2026-03-10T07:00:00Z</published>
<title>Dunbar West Sewer Package </title>
<updated>2026-03-10T17:56:21.2286284Z</updated>
<georss:line>49.24809192220249 -123.19086668463389 49.246639531332676 -123.19087334220342</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Work will begin just north of Memorial Park on Highbury St, heading north toward W 29th Avenue 
Location: 
Schedule: Apr 1, 2026 - Sep 30, 2026</content>
<id>urn:uuid:4866cbe8-149c-47be-a6e8-04641f17e3fc</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/15675431-2744-452d-8953-b27b0d4c1fb3"/>
<published>2026-03-10T07:00:00Z</published>
<title>Dunbar West Sewer Package </title>
<updated>2026-03-10T17:56:21.2286284Z</updated>
<georss:line>49.246639531332676 -123.19087334220342 49.246197286142916 -123.1908753472345</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Work will begin just north of Memorial Park on Highbury St, heading north toward W 29th Avenue 
Location: 
Schedule: Apr 1, 2026 - Sep 30, 2026</content>
<id>urn:uuid:97fddff8-7411-46e0-99ce-fc07a92f3993</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/15675431-2744-452d-8953-b27b0d4c1fb3"/>
<published>2026-03-10T07:00:00Z</published>
<title>Dunbar West Sewer Package </title>
<updated>2026-03-10T17:56:21.2286284Z</updated>
<georss:line>49.2461853797287 -123.18811482579021 49.24571128573453 -123.18812032051106</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Work will begin just north of Memorial Park on Highbury St, heading north toward W 29th Avenue 
Location: 
Schedule: Apr 1, 2026 - Sep 30, 2026</content>
<id>urn:uuid:d9d88797-da52-45f2-a6b4-61f6438bf3ee</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/15675431-2744-452d-8953-b27b0d4c1fb3"/>
<published>2026-03-10T07:00:00Z</published>
<title>Dunbar West Sewer Package </title>
<updated>2026-03-10T17:56:21.2286284Z</updated>
<georss:line>49.2461853797287 -123.18811482579021 49.246197286142916 -123.1908753472345</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Work will begin just north of Memorial Park on Highbury St, heading north toward W 29th Avenue 
Location: 
Schedule: Apr 1, 2026 - Sep 30, 2026</content>
<id>urn:uuid:2e102b2c-d740-4ff1-8f7f-3aaad021f885</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/15675431-2744-452d-8953-b27b0d4c1fb3"/>
<published>2026-03-10T07:00:00Z</published>
<title>Dunbar West Sewer Package </title>
<updated>2026-03-10T17:56:21.2286284Z</updated>
<georss:line>49.25008319099692 -123.19084859684526 49.2495158119811 -123.1908514526481</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Work will begin just north of Memorial Park on Highbury St, heading north toward W 29th Avenue 
Location: 
Schedule: Apr 1, 2026 - Sep 30, 2026</content>
<id>urn:uuid:74a9bf27-8a64-4bb3-97a6-6655e2bc55a9</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/15675431-2744-452d-8953-b27b0d4c1fb3"/>
<published>2026-03-10T07:00:00Z</published>
<title>Dunbar West Sewer Package </title>
<updated>2026-03-10T17:56:21.2286284Z</updated>
<georss:line>49.2495158119811 -123.1908514526481 49.249041394586555 -123.19085676905023</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Work will begin just north of Memorial Park on Highbury St, heading north toward W 29th Avenue 
Location: 
Schedule: Apr 1, 2026 - Sep 30, 2026</content>
<id>urn:uuid:c55f409e-fdd1-4aca-9376-c16f868640c0</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/15675431-2744-452d-8953-b27b0d4c1fb3"/>
<published>2026-03-10T07:00:00Z</published>
<title>Dunbar West Sewer Package </title>
<updated>2026-03-10T17:56:21.2286284Z</updated>
<georss:line>49.249041394586555 -123.19085676905023 49.24856696020663 -123.19086145323732</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Work will begin just north of Memorial Park on Highbury St, heading north toward W 29th Avenue 
Location: 
Schedule: Apr 1, 2026 - Sep 30, 2026</content>
<id>urn:uuid:3d0e167f-c479-49fa-a686-8e8febdcc7ea</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/15675431-2744-452d-8953-b27b0d4c1fb3"/>
<published>2026-03-10T07:00:00Z</published>
<title>Dunbar West Sewer Package </title>
<updated>2026-03-10T17:56:21.2286284Z</updated>
<georss:line>49.24856696020663 -123.19086145323732 49.24809192220249 -123.19086668463389</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Work will begin just north of Memorial Park on Highbury St, heading north toward W 29th Avenue 
Location: 
Schedule: Apr 1, 2026 - Sep 30, 2026</content>
<id>urn:uuid:b785740a-5a2e-4f9d-9c18-f6007a829931</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/15675431-2744-452d-8953-b27b0d4c1fb3"/>
<published>2026-03-10T07:00:00Z</published>
<title>Dunbar West Sewer Package </title>
<updated>2026-03-10T17:56:21.2286284Z</updated>
<georss:line>49.24571128573453 -123.18812032051106 49.24523670622975 -123.18812564842086</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>City's external contractor will be working at Dunlevy and Pender to construct a raised intersection and the associated infrastructure upgrades. Construction is scheduled to take place during normal working hours weekdays May 9 to mid-June, including excavation, gravel base compaction, concrete works, utility adjustments, asphalt paving, bio-retention bulge, street lighting upgrades, grass boulevards, and road marking restoration.
Location: Dunlevy and Pender intersection.
Schedule: May 9, 2025 - Jun 13, 2025</content>
<id>urn:uuid:33103c7f-4fa2-455d-9fd9-b38e45c8ae02</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/b5807bac-ad4e-45b0-8a95-44912c68f746"/>
<published>2025-04-24T07:00:00Z</published>
<title>Dunlevy and Pender - Raised Intersection and Green Infrustructure</title>
<updated>2025-04-24T19:21:08.7229018Z</updated>
<georss:polygon>49.28038755501797 -123.09559384776664 49.28038314326261 -123.09528275971914 49.28024858453418 -123.09528614111098 49.280255202185145 -123.0956039919421 49.28038755501797 -123.09559384776664</georss:polygon>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>E 19th Av - Knight St to 3525 Dumfries St        Jul 2026 - Aug 2026
E 20th Av - Clark Dr to Knight St                       Aug 2026 - Sep 2026




Location: 


Schedule: Jul 16, 2026 7:00 AM - Aug 27, 2026 3:00 PM</content>
<id>urn:uuid:43b83075-4e27-4f45-aaad-db81be67ff9b</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/42f7b9af-7654-458e-a7d4-4b83ceb4037d"/>
<published>2026-02-24T08:00:00Z</published>
<title>E 19th Av &amp; E 20th Av</title>
<updated>2026-05-28T18:59:48.3347678Z</updated>
<georss:line>49.25350524658401 -123.0759838515341 49.2534769597645 -123.07424642132919</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>E 19th Av - Knight St to 3525 Dumfries St        Jul 2026 - Aug 2026
E 20th Av - Clark Dr to Knight St                       Aug 2026 - Sep 2026




Location: 


Schedule: Jul 16, 2026 7:00 AM - Aug 27, 2026 3:00 PM</content>
<id>urn:uuid:4b15a7a5-82c3-4d7a-9987-c4b91db8205a</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/42f7b9af-7654-458e-a7d4-4b83ceb4037d"/>
<published>2026-02-24T08:00:00Z</published>
<title>E 19th Av &amp; E 20th Av</title>
<updated>2026-05-28T18:59:48.3347678Z</updated>
<georss:line>49.252628139314055 -123.07796940939944 49.25260944065721 -123.07601276921204</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>E 20th Av - Clark Dr to Knight St                   Oct 2025 to Nov 2025 



Location: E 20th Av - Clark Dr to Knight St


Schedule: Oct 29, 2025 - Nov 19, 2025; Weekdays; 7:00 AM - 3:00 PM</content>
<id>urn:uuid:e5638a39-75a7-44e5-89f5-193e13194f32</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/7a13bc14-9d74-4541-81cf-7f5fe2bbc51b"/>
<published>2025-01-07T08:00:00Z</published>
<title>E 20th Av - Clark Dr to Knight St</title>
<updated>2026-04-21T21:08:14.2337229Z</updated>
<georss:line>49.25262838289396 -123.07796729750848 49.252600436327214 -123.07604061299644</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content> E 3rd Av - Renfrew St to Rupert St -  OCT 2026 - DEC 2026 
E 2nd Av - Renfrew St to Nootka St -  DEC 2026 - JAN 2027

E 2nd Av - Nootka St to Lillooet St - 
Location: 
Schedule: Oct 7, 2026 - Jan 15, 2027; Weekdays; 7:00 AM - 3:00 PM</content>
<id>urn:uuid:5f400853-9902-4049-b3a0-1a3ec42f37fb</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/398d48e5-4d1e-46ad-b232-4c280ad5292c"/>
<published>2026-04-02T07:00:00Z</published>
<title>E 2nd Ave and E 3rd Ave</title>
<updated>2026-05-28T19:12:08.8889779Z</updated>
<georss:line>49.267545593650055 -123.03374022388378 49.26757711719952 -123.04424763044766</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>E King Edward Av - St Catherines St to Knight St           Jul 2026 - Dec 2026
E King Edward Av - Knight St to Kingsway                       Nov 2026 - Feb 2027

Location:                        
Schedule: Aug 28, 2026 - Feb 5, 2027; Weekdays; 7:00 AM - 3:00 PM</content>
<id>urn:uuid:3f820981-ae87-44bc-b867-d05562ccaa88</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/0a4e0683-e652-49af-b3ef-d40722ba1732"/>
<published>2025-01-01T08:00:00Z</published>
<title>E King Edward Av, St Catherines St to Kingsway</title>
<updated>2026-05-28T19:00:19.1177794Z</updated>
<georss:line>49.248582286125554 -123.08391631014528 49.248445038728846 -123.07221935690649</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>E King Edward Av - St Catherines St to Knight St           Jul 2026 - Dec 2026
E King Edward Av - Knight St to Kingsway                       Nov 2026 - Feb 2027

Location:                        
Schedule: Aug 28, 2026 - Feb 5, 2027; Weekdays; 7:00 AM - 3:00 PM</content>
<id>urn:uuid:34fc28f1-42e9-4bac-8876-ea3a549cfe7f</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/0a4e0683-e652-49af-b3ef-d40722ba1732"/>
<published>2025-01-01T08:00:00Z</published>
<title>E King Edward Av, St Catherines St to Kingsway</title>
<updated>2026-05-28T19:00:19.1177794Z</updated>
<georss:line>49.24859616125457 -123.08585234435154 49.24857723670047 -123.08391526991988</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Streets concrete and paving renewal works. 
Location: 
Schedule: Apr 1, 2026 - Nov 15, 2026</content>
<id>urn:uuid:77453bc0-015c-4aed-889b-6db4afc43f67</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/5418cb71-8d34-4fdf-afdd-8171f0c25fb4"/>
<published>2026-03-17T07:00:00Z</published>
<title>E. 49th Ave Streets Renewal, Knight to Killarney</title>
<updated>2026-03-18T15:50:38.0640752Z</updated>
<georss:line>49.225052693839814 -123.05981585886362 49.22503795051222 -123.05913465243485</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Streets concrete and paving renewal works. 
Location: 
Schedule: Apr 1, 2026 - Nov 15, 2026</content>
<id>urn:uuid:990a896e-2963-4eab-a647-45b870661dd7</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/5418cb71-8d34-4fdf-afdd-8171f0c25fb4"/>
<published>2026-03-17T07:00:00Z</published>
<title>E. 49th Ave Streets Renewal, Knight to Killarney</title>
<updated>2026-03-18T15:50:38.0640752Z</updated>
<georss:line>49.22509270379291 -123.06166531869745 49.225052693839814 -123.05981585886362</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Streets concrete and paving renewal works. 
Location: 
Schedule: Apr 1, 2026 - Nov 15, 2026</content>
<id>urn:uuid:74ca00bf-ee3c-46ac-9b2d-03db83e44e7d</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/5418cb71-8d34-4fdf-afdd-8171f0c25fb4"/>
<published>2026-03-17T07:00:00Z</published>
<title>E. 49th Ave Streets Renewal, Knight to Killarney</title>
<updated>2026-03-18T15:50:38.0640752Z</updated>
<georss:line>49.22510744976435 -123.06234730947428 49.22509270379291 -123.06166531869745</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Streets concrete and paving renewal works. 
Location: 
Schedule: Apr 1, 2026 - Nov 15, 2026</content>
<id>urn:uuid:c622d9c5-ce8c-4be6-9403-009940aaf26f</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/5418cb71-8d34-4fdf-afdd-8171f0c25fb4"/>
<published>2026-03-17T07:00:00Z</published>
<title>E. 49th Ave Streets Renewal, Knight to Killarney</title>
<updated>2026-03-18T15:50:38.0640752Z</updated>
<georss:line>49.22512264192929 -123.06302846345525 49.22510744976435 -123.06234730947428</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Streets concrete and paving renewal works. 
Location: 
Schedule: Apr 1, 2026 - Nov 15, 2026</content>
<id>urn:uuid:efdbd335-4b1e-4a09-b52a-11320444d818</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/5418cb71-8d34-4fdf-afdd-8171f0c25fb4"/>
<published>2026-03-17T07:00:00Z</published>
<title>E. 49th Ave Streets Renewal, Knight to Killarney</title>
<updated>2026-03-18T15:50:38.0640752Z</updated>
<georss:line>49.22516719020325 -123.06503403458092 49.22512264192929 -123.06302846345525</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Streets concrete and paving renewal works. 
Location: 
Schedule: Apr 1, 2026 - Nov 15, 2026</content>
<id>urn:uuid:97c39b95-274d-40bf-867b-3c13dd061e06</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/5418cb71-8d34-4fdf-afdd-8171f0c25fb4"/>
<published>2026-03-17T07:00:00Z</published>
<title>E. 49th Ave Streets Renewal, Knight to Killarney</title>
<updated>2026-03-18T15:50:38.0640752Z</updated>
<georss:line>49.22518112212509 -123.06573636630493 49.22517858179614 -123.06556871251107 49.22516719020325 -123.06503403458092</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Streets concrete and paving renewal works. 
Location: 
Schedule: Apr 1, 2026 - Nov 15, 2026</content>
<id>urn:uuid:74ca872e-ee75-4249-8c6d-013737acefd9</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/5418cb71-8d34-4fdf-afdd-8171f0c25fb4"/>
<published>2026-03-17T07:00:00Z</published>
<title>E. 49th Ave Streets Renewal, Knight to Killarney</title>
<updated>2026-03-18T15:50:38.0640752Z</updated>
<georss:line>49.22518706446789 -123.0664187322692 49.22518112212509 -123.06573636630493</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Streets concrete and paving renewal works. 
Location: 
Schedule: Apr 1, 2026 - Nov 15, 2026</content>
<id>urn:uuid:9073980e-860a-4a0b-bed7-ff33b5a76687</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/5418cb71-8d34-4fdf-afdd-8171f0c25fb4"/>
<published>2026-03-17T07:00:00Z</published>
<title>E. 49th Ave Streets Renewal, Knight to Killarney</title>
<updated>2026-03-18T15:50:38.0640752Z</updated>
<georss:line>49.225192592677246 -123.06707927457242 49.22518706446789 -123.0664187322692</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Streets concrete and paving renewal works. 
Location: 
Schedule: Apr 1, 2026 - Nov 15, 2026</content>
<id>urn:uuid:603f0c06-33cb-4404-b10c-9f1073e620e5</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/5418cb71-8d34-4fdf-afdd-8171f0c25fb4"/>
<published>2026-03-17T07:00:00Z</published>
<title>E. 49th Ave Streets Renewal, Knight to Killarney</title>
<updated>2026-03-18T15:50:38.0640752Z</updated>
<georss:line>49.225205468624154 -123.06842259742645 49.225192592677246 -123.06707927457242</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Streets concrete and paving renewal works. 
Location: 
Schedule: Apr 1, 2026 - Nov 15, 2026</content>
<id>urn:uuid:cb3b3bce-5f51-4709-a756-03a53397f549</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/5418cb71-8d34-4fdf-afdd-8171f0c25fb4"/>
<published>2026-03-17T07:00:00Z</published>
<title>E. 49th Ave Streets Renewal, Knight to Killarney</title>
<updated>2026-03-18T15:50:38.0640752Z</updated>
<georss:line>49.225210285656686 -123.06900469079261 49.225205468624154 -123.06842259742645</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Streets concrete and paving renewal works. 
Location: 
Schedule: Apr 1, 2026 - Nov 15, 2026</content>
<id>urn:uuid:9cc48d54-7a70-4c88-92f2-239c0951f8a4</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/5418cb71-8d34-4fdf-afdd-8171f0c25fb4"/>
<published>2026-03-17T07:00:00Z</published>
<title>E. 49th Ave Streets Renewal, Knight to Killarney</title>
<updated>2026-03-18T15:50:38.0640752Z</updated>
<georss:line>49.2252185751577 -123.06992405422945 49.225210285656686 -123.06900469079261</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Streets concrete and paving renewal works. 
Location: 
Schedule: Apr 1, 2026 - Nov 15, 2026</content>
<id>urn:uuid:504d6534-7390-4cbb-a2a1-6cf7551f4249</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/5418cb71-8d34-4fdf-afdd-8171f0c25fb4"/>
<published>2026-03-17T07:00:00Z</published>
<title>E. 49th Ave Streets Renewal, Knight to Killarney</title>
<updated>2026-03-18T15:50:38.0640752Z</updated>
<georss:line>49.225233917379654 -123.0717635356113 49.2252185751577 -123.06992405422945</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Streets concrete and paving renewal works. 
Location: 
Schedule: Apr 1, 2026 - Nov 15, 2026</content>
<id>urn:uuid:7c010e19-3a56-4b14-966d-6043bbad6b5b</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/5418cb71-8d34-4fdf-afdd-8171f0c25fb4"/>
<published>2026-03-17T07:00:00Z</published>
<title>E. 49th Ave Streets Renewal, Knight to Killarney</title>
<updated>2026-03-18T15:50:38.0640752Z</updated>
<georss:line>49.2252479361689 -123.07314799577073 49.225233917379654 -123.0717635356113</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Streets concrete and paving renewal works. 
Location: 
Schedule: Apr 1, 2026 - Nov 15, 2026</content>
<id>urn:uuid:c59aae97-aefc-4452-9af2-d70cd84f07c7</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/5418cb71-8d34-4fdf-afdd-8171f0c25fb4"/>
<published>2026-03-17T07:00:00Z</published>
<title>E. 49th Ave Streets Renewal, Knight to Killarney</title>
<updated>2026-03-18T15:50:38.0640752Z</updated>
<georss:line>49.22526115656649 -123.0745312331945 49.2252479361689 -123.07314799577073</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Streets concrete and paving renewal works. 
Location: 
Schedule: Apr 1, 2026 - Nov 15, 2026</content>
<id>urn:uuid:72dfa0c9-6d65-4cbb-b2a9-422973492157</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/5418cb71-8d34-4fdf-afdd-8171f0c25fb4"/>
<published>2026-03-17T07:00:00Z</published>
<title>E. 49th Ave Streets Renewal, Knight to Killarney</title>
<updated>2026-03-18T15:50:38.0640752Z</updated>
<georss:line>49.225277708955076 -123.0759109468328 49.22526115656649 -123.0745312331945</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Streets concrete and paving renewal works. 
Location: 
Schedule: Apr 1, 2026 - Nov 15, 2026</content>
<id>urn:uuid:e3cf4fba-831d-43e1-80fa-2bc94b781e54</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/5418cb71-8d34-4fdf-afdd-8171f0c25fb4"/>
<published>2026-03-17T07:00:00Z</published>
<title>E. 49th Ave Streets Renewal, Knight to Killarney</title>
<updated>2026-03-18T15:50:38.0640752Z</updated>
<georss:line>49.225294397305646 -123.07729137577881 49.225277708955076 -123.0759109468328</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Streets concrete and paving renewal works. 
Location: 
Schedule: Apr 1, 2026 - Nov 15, 2026</content>
<id>urn:uuid:f9d2796b-5c30-4bfa-af6e-e71acc0ed7c6</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/5418cb71-8d34-4fdf-afdd-8171f0c25fb4"/>
<published>2026-03-17T07:00:00Z</published>
<title>E. 49th Ave Streets Renewal, Knight to Killarney</title>
<updated>2026-03-18T15:50:38.0640752Z</updated>
<georss:line>49.22482639548838 -123.05620650584123 49.224816525324144 -123.05475048604428</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Streets concrete and paving renewal works. 
Location: 
Schedule: Apr 1, 2026 - Nov 15, 2026</content>
<id>urn:uuid:7c0ea2b8-4686-4fcd-bc0f-88b0e485148b</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/5418cb71-8d34-4fdf-afdd-8171f0c25fb4"/>
<published>2026-03-17T07:00:00Z</published>
<title>E. 49th Ave Streets Renewal, Knight to Killarney</title>
<updated>2026-03-18T15:50:38.0640752Z</updated>
<georss:line>49.224881398965664 -123.05767167056634 49.224876005025834 -123.05762917168359 49.224867729264986 -123.05755723777476 49.224860281125785 -123.05748509884192 49.22485366060093 -123.05741276861552 49.224847858681244 -123.0573402745493 49.22484289334332 -123.05726764412817 49.22483875558484 -123.05719489107203 49.22483544539878 -123.05712202911111 49.22483297175981 -123.05704909945366 49.224831334661076 -123.05697611582988 49.22483053409573 -123.05690309196996 49.22482639548838 -123.05620650584123</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Streets concrete and paving renewal works. 
Location: 
Schedule: Apr 1, 2026 - Nov 15, 2026</content>
<id>urn:uuid:3c2d86b0-a3b7-4c7d-ab9c-2d0947a3850b</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/5418cb71-8d34-4fdf-afdd-8171f0c25fb4"/>
<published>2026-03-17T07:00:00Z</published>
<title>E. 49th Ave Streets Renewal, Knight to Killarney</title>
<updated>2026-03-18T15:50:38.0640752Z</updated>
<georss:line>49.22499951896202 -123.05845280044481 49.224994531117204 -123.05840828297008 49.22498563507878 -123.0583365265694 49.22497592030243 -123.05826501644216 49.224965395770056 -123.05819378006997 49.22495405247997 -123.05812283117957 49.22494190840942 -123.0580521972631 49.22493347610157 -123.05800593164446 49.22492962769161 -123.05798490055632 49.22491727660437 -123.05791434886982 49.22490574420081 -123.05784348229491 49.22489501248296 -123.05777231454107 49.224885099433976 -123.05770085935995 49.224881398965664 -123.05767167056634</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Streets concrete and paving renewal works. 
Location: 
Schedule: Apr 1, 2026 - Nov 15, 2026</content>
<id>urn:uuid:142b06e1-8169-4ead-b165-f98c756adfac</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/5418cb71-8d34-4fdf-afdd-8171f0c25fb4"/>
<published>2026-03-17T07:00:00Z</published>
<title>E. 49th Ave Streets Renewal, Knight to Killarney</title>
<updated>2026-03-18T15:50:38.0640752Z</updated>
<georss:line>49.22503795051222 -123.05913465243485 49.225037358202485 -123.05906162848338 49.22503591128296 -123.05898863098417 49.22503364572762 -123.05891567371772 49.22503055252045 -123.05884279787868 49.225026622659186 -123.05877001719395 49.22502185613715 -123.05869734540106 49.22501626192886 -123.05862482371596 49.225009849029874 -123.05855245215302 49.22500259943595 -123.0584802581622 49.22499951896202 -123.05845280044481</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Streets concrete and paving renewal works. 
Location: 
Schedule: Apr 1, 2026 - Nov 15, 2026</content>
<id>urn:uuid:6f6aaa37-0971-4596-986c-4e009ff07f01</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/5418cb71-8d34-4fdf-afdd-8171f0c25fb4"/>
<published>2026-03-17T07:00:00Z</published>
<title>E. 49th Ave Streets Renewal, Knight to Killarney</title>
<updated>2026-03-18T15:50:38.0640752Z</updated>
<georss:line>49.224816525324144 -123.05475048604428 49.224800063094165 -123.05238588299545</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Streets concrete and paving renewal works. 
Location: 
Schedule: Apr 1, 2026 - Nov 15, 2026</content>
<id>urn:uuid:16c85a08-9650-4d04-890d-6fb6d7adf81e</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/5418cb71-8d34-4fdf-afdd-8171f0c25fb4"/>
<published>2026-03-17T07:00:00Z</published>
<title>E. 49th Ave Streets Renewal, Knight to Killarney</title>
<updated>2026-03-18T15:50:38.0640752Z</updated>
<georss:line>49.224800063094165 -123.05238588299545 49.22478372726104 -123.05032298682916</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Streets concrete and paving renewal works. 
Location: 
Schedule: Apr 1, 2026 - Nov 15, 2026</content>
<id>urn:uuid:5e1164f6-8b55-4dde-948b-7ec0d38a163d</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/5418cb71-8d34-4fdf-afdd-8171f0c25fb4"/>
<published>2026-03-17T07:00:00Z</published>
<title>E. 49th Ave Streets Renewal, Knight to Killarney</title>
<updated>2026-03-18T15:50:38.0640752Z</updated>
<georss:line>49.22478372726104 -123.05032298682916 49.22476874537372 -123.0487823502258</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Streets concrete and paving renewal works. 
Location: 
Schedule: Apr 1, 2026 - Nov 15, 2026</content>
<id>urn:uuid:c287ec7c-1ec9-4acc-8405-3a9970136006</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/5418cb71-8d34-4fdf-afdd-8171f0c25fb4"/>
<published>2026-03-17T07:00:00Z</published>
<title>E. 49th Ave Streets Renewal, Knight to Killarney</title>
<updated>2026-03-18T15:50:38.0640752Z</updated>
<georss:line>49.22476874537372 -123.0487823502258 49.22475261830644 -123.047242262821</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Streets concrete and paving renewal works. 
Location: 
Schedule: Apr 1, 2026 - Nov 15, 2026</content>
<id>urn:uuid:ae6866f9-a162-4fae-8fcb-6a877a86520a</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/5418cb71-8d34-4fdf-afdd-8171f0c25fb4"/>
<published>2026-03-17T07:00:00Z</published>
<title>E. 49th Ave Streets Renewal, Knight to Killarney</title>
<updated>2026-03-18T15:50:38.0640752Z</updated>
<georss:line>49.22475261830644 -123.047242262821 49.22473620706859 -123.04568645092084</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Closure of 1500 W. 66th from Granville St to the alleyway. 
Location: 1500 block West 66th Av
Schedule: Jun 27, 2026</content>
<id>urn:uuid:c4cd97c4-b7fe-4f79-871a-c06f404546f7</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/c860ce6a-4623-4b4e-a812-08a48112557d"/>
<published>2026-03-02T08:00:00Z</published>
<title>EVENT - Tour De Marpole</title>
<updated>2026-03-02T22:18:17.0367832Z</updated>
<georss:line>49.21136665285718 -123.14042853694843 49.211377020900386 -123.14106630381062</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Triathlon around Templeton Park
Location: 
Schedule: Jun 14, 2026</content>
<id>urn:uuid:df69c728-bf40-4eff-b158-465ecf4162ed</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/65b82174-d5ca-4665-93dc-f0bd776a919f"/>
<published>2026-05-31T07:00:00Z</published>
<title>EVENT - Tri It Triathlon</title>
<updated>2026-03-10T21:10:51.9860069Z</updated>
<georss:line>49.27749127986894 -123.05981050573372 49.27747643319603 -123.05787658632192</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Triathlon around Templeton Park
Location: 
Schedule: Jun 14, 2026</content>
<id>urn:uuid:8ccc453b-3de8-4d87-8880-0fe8343d0e43</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/65b82174-d5ca-4665-93dc-f0bd776a919f"/>
<published>2026-05-31T07:00:00Z</published>
<title>EVENT - Tri It Triathlon</title>
<updated>2026-03-10T21:10:51.9860069Z</updated>
<georss:line>49.2791109915031 -123.05980416002885 49.27910081484484 -123.05786699300111</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Triathlon around Templeton Park
Location: 
Schedule: Jun 14, 2026</content>
<id>urn:uuid:8ef10e67-3f80-4c56-8003-c0d90fdd2789</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/65b82174-d5ca-4665-93dc-f0bd776a919f"/>
<published>2026-05-31T07:00:00Z</published>
<title>EVENT - Tri It Triathlon</title>
<updated>2026-03-10T21:10:51.9860069Z</updated>
<georss:line>49.277879436538626 -123.05787422567423 49.27747643319603 -123.05787658632192</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Triathlon around Templeton Park
Location: 
Schedule: Jun 14, 2026</content>
<id>urn:uuid:b0abd1ac-7175-4c42-bcfd-1fc28fde394c</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/65b82174-d5ca-4665-93dc-f0bd776a919f"/>
<published>2026-05-31T07:00:00Z</published>
<title>EVENT - Tri It Triathlon</title>
<updated>2026-03-10T21:10:51.9860069Z</updated>
<georss:line>49.27910081484484 -123.05786699300111 49.278287279533146 -123.05787132070559</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Triathlon around Templeton Park
Location: 
Schedule: Jun 14, 2026</content>
<id>urn:uuid:6e52482b-35e0-4927-ac86-42e636ddba8e</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/65b82174-d5ca-4665-93dc-f0bd776a919f"/>
<published>2026-05-31T07:00:00Z</published>
<title>EVENT - Tri It Triathlon</title>
<updated>2026-03-10T21:10:51.9860069Z</updated>
<georss:line>49.278287279533146 -123.05787132070559 49.277879436538626 -123.05787422567423</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Triathlon around Templeton Park
Location: 
Schedule: Jun 14, 2026</content>
<id>urn:uuid:7f7102f8-7e2b-4b5d-90f7-f17153a58cd2</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/65b82174-d5ca-4665-93dc-f0bd776a919f"/>
<published>2026-05-31T07:00:00Z</published>
<title>EVENT - Tri It Triathlon</title>
<updated>2026-03-10T21:10:51.9860069Z</updated>
<georss:line>49.277520002926934 -123.06367952919118 49.277505617238404 -123.06174478314122</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Triathlon around Templeton Park
Location: 
Schedule: Jun 14, 2026</content>
<id>urn:uuid:cb414cc7-99c3-45d3-9923-c2b589810067</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/65b82174-d5ca-4665-93dc-f0bd776a919f"/>
<published>2026-05-31T07:00:00Z</published>
<title>EVENT - Tri It Triathlon</title>
<updated>2026-03-10T21:10:51.9860069Z</updated>
<georss:line>49.278330838957146 -123.0636771359273 49.277520002926934 -123.06367952919118</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Triathlon around Templeton Park
Location: 
Schedule: Jun 14, 2026</content>
<id>urn:uuid:ecfb5e62-7065-43ed-aae8-c00a5cbc3492</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/65b82174-d5ca-4665-93dc-f0bd776a919f"/>
<published>2026-05-31T07:00:00Z</published>
<title>EVENT - Tri It Triathlon</title>
<updated>2026-03-10T21:10:51.9860069Z</updated>
<georss:line>49.278330838957146 -123.0636771359273 49.27831773077844 -123.06174194729455</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Triathlon around Templeton Park
Location: 
Schedule: Jun 14, 2026</content>
<id>urn:uuid:ab2f581f-d40f-4d01-9f6f-e36966e02576</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/65b82174-d5ca-4665-93dc-f0bd776a919f"/>
<published>2026-05-31T07:00:00Z</published>
<title>EVENT - Tri It Triathlon</title>
<updated>2026-03-10T21:10:51.9860069Z</updated>
<georss:line>49.277505617238404 -123.06174478314122 49.27749127986894 -123.05981050573372</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Triathlon around Templeton Park
Location: 
Schedule: Jun 14, 2026</content>
<id>urn:uuid:3dd75b82-e16c-4d93-bc45-6c85284a3e04</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/65b82174-d5ca-4665-93dc-f0bd776a919f"/>
<published>2026-05-31T07:00:00Z</published>
<title>EVENT - Tri It Triathlon</title>
<updated>2026-03-10T21:10:51.9860069Z</updated>
<georss:line>49.279122080641116 -123.0617404628203 49.27831773077844 -123.06174194729455</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Triathlon around Templeton Park
Location: 
Schedule: Jun 14, 2026</content>
<id>urn:uuid:f705cb3f-db4d-4f49-8c91-89bcb4a33144</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/65b82174-d5ca-4665-93dc-f0bd776a919f"/>
<published>2026-05-31T07:00:00Z</published>
<title>EVENT - Tri It Triathlon</title>
<updated>2026-03-10T21:10:51.9860069Z</updated>
<georss:line>49.279122080641116 -123.0617404628203 49.2791109915031 -123.05980416002885</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Part of Growth Triggered Upgrades Program
Spring 2026 Construction 

The high-level objective of the project is to replace the existing Combined Sewer System (CSS) with separated sanitary and storm lines to eliminate sewer overflow and prevent flooding by increasing sewer capacity along E 35th Avenue.

The Project includes,
1) separation of approximately 75 m of combined sewer from east 35th Avenue from Main Street to Quebec Street
2) pavement restoration and markings associated with the sewer separation and associated road restorations.
3) mill and overlay at 50mm depth of the existing pavement that will not be included in the trench cut restoration.
Location: E 35th Av from Main St. to 5100 Quebec St (Laneway) and 5100 / 5000-4900 Block of Main - Parking Lanes Closed, both sides
Schedule: Nov 13, 2025 - Mar 9, 2026</content>
<id>urn:uuid:72a01e6f-94ef-4e22-b912-69a478fd352f</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/94dc0ade-f977-484d-bab7-f9f8a4ebed4c"/>
<published>2026-01-19T08:00:00Z</published>
<title>East 35th Ave Utility Upgrades (GTUUP)</title>
<updated>2026-03-02T19:28:41.4813194Z</updated>
<georss:line>49.23967258650072 -123.1015135801858 49.23845858782744 -123.10157429470716</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Part of Growth Triggered Upgrades Program
Spring 2026 Construction 

The high-level objective of the project is to replace the existing Combined Sewer System (CSS) with separated sanitary and storm lines to eliminate sewer overflow and prevent flooding by increasing sewer capacity along E 35th Avenue.

The Project includes,
1) separation of approximately 75 m of combined sewer from east 35th Avenue from Main Street to Quebec Street
2) pavement restoration and markings associated with the sewer separation and associated road restorations.
3) mill and overlay at 50mm depth of the existing pavement that will not be included in the trench cut restoration.
Location: E 35th Av from Main St. to 5100 Quebec St (Laneway) and 5100 / 5000-4900 Block of Main - Parking Lanes Closed, both sides
Schedule: Nov 13, 2025 - Mar 9, 2026</content>
<id>urn:uuid:bef2d0de-77d7-4c7a-98b2-0e6856aabb7c</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/94dc0ade-f977-484d-bab7-f9f8a4ebed4c"/>
<published>2026-01-19T08:00:00Z</published>
<title>East 35th Ave Utility Upgrades (GTUUP)</title>
<updated>2026-03-02T19:28:41.4813194Z</updated>
<georss:line>49.239097799011745 -123.10344126623913 49.239058158248724 -123.1015591160768</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Dual use pathway on north side E Broadway connecting Nootka and Lillooet.  New bike crossings at Nootka.
Grinding and paving works on Lillooet St to be completed June 10th, 2026 - westbound curb lane on E Broadway at Lillooet from 7:00 AM to 3:00 PM to stage trucking and equipment
Location: 3000 block E Broadway
Schedule: May 4, 2026 - Jun 10, 2026</content>
<id>urn:uuid:316da1cc-ccfd-4c09-b529-a53a4ae3d8ea</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/31243c7a-55e1-4d05-a43f-c2d1bd1e80ad"/>
<published>2026-04-01T07:00:00Z</published>
<title>Eastside Crosscut Phase I</title>
<updated>2026-06-08T21:21:20.0404253Z</updated>
<georss:line>49.26190932837744 -123.04015700277155 49.26190651651646 -123.03904410945547</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Dual use pathway on north side E Broadway connecting Nootka and Lillooet.  New bike crossings at Nootka.
Grinding and paving works on Lillooet St to be completed June 10th, 2026 - westbound curb lane on E Broadway at Lillooet from 7:00 AM to 3:00 PM to stage trucking and equipment
Location: 3000 block E Broadway
Schedule: May 4, 2026 - Jun 10, 2026</content>
<id>urn:uuid:83457990-b163-4242-a4ca-9a6d3ed8198f</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/31243c7a-55e1-4d05-a43f-c2d1bd1e80ad"/>
<published>2026-04-01T07:00:00Z</published>
<title>Eastside Crosscut Phase I</title>
<updated>2026-06-08T21:21:20.0404253Z</updated>
<georss:line>49.261912796273776 -123.04156791113188 49.26190932837744 -123.04015700277155</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Dual use pathway on north side E Broadway connecting Nootka and Lillooet.  New bike crossings at Nootka.
Grinding and paving works on Lillooet St to be completed June 10th, 2026 - westbound curb lane on E Broadway at Lillooet from 7:00 AM to 3:00 PM to stage trucking and equipment
Location: 3000 block E Broadway
Schedule: May 4, 2026 - Jun 10, 2026</content>
<id>urn:uuid:e1b09e54-6d41-4abc-899d-6975e17ff2e2</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/31243c7a-55e1-4d05-a43f-c2d1bd1e80ad"/>
<published>2026-04-01T07:00:00Z</published>
<title>Eastside Crosscut Phase I</title>
<updated>2026-06-08T21:21:20.0404253Z</updated>
<georss:line>49.26190651651646 -123.03904410945547 49.26190372762028 -123.03791080622922</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Full Closure
Location: BC Place and Surrounding Area
Schedule: Multiple occurrences as follows:
- Jun 13, 2026 11:00 AM - Jun 14, 2026 6:00 AM
- Jun 18, 2026 5:00 AM - Jun 19, 2026 12:01 AM
- Jun 21, 2026 8:00 AM - Jun 22, 2026 3:00 AM
- Jun 24, 2026 2:00 AM - 9:00 PM
- Jun 26, 2026 10:00 AM - Jun 27, 2026 5:00 AM
- Jul 2, 2026 10:00 AM - Jul 3, 2026 6:00 AM
- Jul 7, 2026 3:00 AM - 11:00 PM
</content>
<id>urn:uuid:cb5e86bf-194e-44ad-94a1-88eed0adcb95</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/9999274c-73fd-435a-a1aa-5288ae6085aa"/>
<published>2026-05-25T07:00:00Z</published>
<title>FIFA - Match Day Road Closure</title>
<updated>2026-05-26T15:43:47.2597827Z</updated>
<georss:line>49.27770902853348 -123.10409544468163 49.27769792686166 -123.10404730143875 49.27768630319022 -123.10399944583918 49.27767414849956 -123.10395190536225 49.27766147178531 -123.10390468002826 49.277648273035425 -123.1038577835869 49.27763456122082 -123.10381124355531 49.27762034533703 -123.10376505995343 49.2776056073819 -123.1037192464932 49.277590374328895 -123.10367381698072 49.277574646166215 -123.10362878516557 49.2775584228697 -123.10358417854556 49.27754170445212 -123.10353998337322 49.277524499884436 -123.10349622716518 49.27750681815007 -123.1034529236896 49.27748865923718 -123.10341008669565 49.27747003214151 -123.10336771620281 49.277450945834005 -123.10332583972752 49.2774313913325 -123.10328444350311 49.2774113865909 -123.10324356881303 49.277390931609716 -123.1032032156578 49.27737003537243 -123.10316339780503 49.277348706862455 -123.10312412902232 49.27732694608039 -123.10308540930991 49.27730476200972 -123.10304725243529 49.27728215463861 -123.10300967214705 49.277259141945876 -123.10297268223124 49.2772357239196 -123.10293629643634 49.27721190056056 -123.10290051476235 49.27718768984738 -123.10286535099507 49.27716310076346 -123.10283081890151 49.277138124314234 -123.10279691846277 49.277112787461334 -123.10276367723154 49.277087081222334 -123.1027310814404 49.277061023563675 -123.1026991586232 49.277034614485956 -123.10266790877948 49.27700786296046 -123.10263735942421 49.27698077800724 -123.10260748307888 49.276953368585424 -123.10257832100656 49.27692564369076 -123.10254987322529 49.2768976033359 -123.10252212598613 49.27686926547514 -123.10249512057052 49.27684063911633 -123.10246884324808 49.27681171525259 -123.10244330774759 49.27678252085781 -123.1024185278724 49.2767530559324 -123.10239450362154 49.27672332947202 -123.10237123501268 49.27669335046011 -123.10234873581169 49.276663127880084 -123.10232701978433 49.27663267073973 -123.10230607319987 49.276601988010356 -123.10228592357224</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Full Closure
Location: BC Place and Surrounding Area
Schedule: Multiple occurrences as follows:
- Jun 13, 2026 11:00 AM - Jun 14, 2026 6:00 AM
- Jun 18, 2026 5:00 AM - Jun 19, 2026 12:01 AM
- Jun 21, 2026 8:00 AM - Jun 22, 2026 3:00 AM
- Jun 24, 2026 2:00 AM - 9:00 PM
- Jun 26, 2026 10:00 AM - Jun 27, 2026 5:00 AM
- Jul 2, 2026 10:00 AM - Jul 3, 2026 6:00 AM
- Jul 7, 2026 3:00 AM - 11:00 PM
</content>
<id>urn:uuid:1359e18c-fdc2-4f11-a170-6f4fb9442ec2</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/9999274c-73fd-435a-a1aa-5288ae6085aa"/>
<published>2026-05-25T07:00:00Z</published>
<title>FIFA - Match Day Road Closure</title>
<updated>2026-05-26T15:43:47.2597827Z</updated>
<georss:line>49.27680761817879 -123.10213312410792 49.27675899326562 -123.1021500165762 49.27671256354694 -123.10217666106381 49.27667150837246 -123.10220847220069 49.27663717076766 -123.10224234565774 49.276601988010356 -123.10228592357224</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Full Closure
Location: BC Place and Surrounding Area
Schedule: Multiple occurrences as follows:
- Jun 13, 2026 11:00 AM - Jun 14, 2026 6:00 AM
- Jun 18, 2026 5:00 AM - Jun 19, 2026 12:01 AM
- Jun 21, 2026 8:00 AM - Jun 22, 2026 3:00 AM
- Jun 24, 2026 2:00 AM - 9:00 PM
- Jun 26, 2026 10:00 AM - Jun 27, 2026 5:00 AM
- Jul 2, 2026 10:00 AM - Jul 3, 2026 6:00 AM
- Jul 7, 2026 3:00 AM - 11:00 PM
</content>
<id>urn:uuid:cff7101b-40bd-4cd8-8323-8571edfd8631</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/9999274c-73fd-435a-a1aa-5288ae6085aa"/>
<published>2026-05-25T07:00:00Z</published>
<title>FIFA - Match Day Road Closure</title>
<updated>2026-05-26T15:43:47.2597827Z</updated>
<georss:line>49.27680761817879 -123.10213312410792 49.27764239669909 -123.10212474263511</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Full Closure
Location: BC Place and Surrounding Area
Schedule: Multiple occurrences as follows:
- Jun 13, 2026 11:00 AM - Jun 14, 2026 6:00 AM
- Jun 18, 2026 5:00 AM - Jun 19, 2026 12:01 AM
- Jun 21, 2026 8:00 AM - Jun 22, 2026 3:00 AM
- Jun 24, 2026 2:00 AM - 9:00 PM
- Jun 26, 2026 10:00 AM - Jun 27, 2026 5:00 AM
- Jul 2, 2026 10:00 AM - Jul 3, 2026 6:00 AM
- Jul 7, 2026 3:00 AM - 11:00 PM
</content>
<id>urn:uuid:c3b17031-2481-445a-92b4-4b3042eb97ed</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/9999274c-73fd-435a-a1aa-5288ae6085aa"/>
<published>2026-05-25T07:00:00Z</published>
<title>FIFA - Match Day Road Closure</title>
<updated>2026-05-26T15:43:47.2597827Z</updated>
<georss:line>49.27768568362893 -123.10056342483364 49.27764239669909 -123.10212474263511</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Full Closure
Location: BC Place and Surrounding Area
Schedule: Multiple occurrences as follows:
- Jun 13, 2026 11:00 AM - Jun 14, 2026 6:00 AM
- Jun 18, 2026 5:00 AM - Jun 19, 2026 12:01 AM
- Jun 21, 2026 8:00 AM - Jun 22, 2026 3:00 AM
- Jun 24, 2026 2:00 AM - 9:00 PM
- Jun 26, 2026 10:00 AM - Jun 27, 2026 5:00 AM
- Jul 2, 2026 10:00 AM - Jul 3, 2026 6:00 AM
- Jul 7, 2026 3:00 AM - 11:00 PM
</content>
<id>urn:uuid:51b67112-b949-4b07-9c54-9c4bea3aa4e4</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/9999274c-73fd-435a-a1aa-5288ae6085aa"/>
<published>2026-05-25T07:00:00Z</published>
<title>FIFA - Match Day Road Closure</title>
<updated>2026-05-26T15:43:47.2597827Z</updated>
<georss:line>49.27927350237343 -123.10221604895952 49.27906675357133 -123.10212850854367 49.27764239669909 -123.10212474263511</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Full Closure
Location: BC Place and Surrounding Area
Schedule: Multiple occurrences as follows:
- Jun 13, 2026 11:00 AM - Jun 14, 2026 6:00 AM
- Jun 18, 2026 5:00 AM - Jun 19, 2026 12:01 AM
- Jun 21, 2026 8:00 AM - Jun 22, 2026 3:00 AM
- Jun 24, 2026 2:00 AM - 9:00 PM
- Jun 26, 2026 10:00 AM - Jun 27, 2026 5:00 AM
- Jul 2, 2026 10:00 AM - Jul 3, 2026 6:00 AM
- Jul 7, 2026 3:00 AM - 11:00 PM
</content>
<id>urn:uuid:7622c620-44d2-4750-8df3-5c5c0969a6fc</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/9999274c-73fd-435a-a1aa-5288ae6085aa"/>
<published>2026-05-25T07:00:00Z</published>
<title>FIFA - Match Day Road Closure</title>
<updated>2026-05-26T15:43:47.2597827Z</updated>
<georss:line>49.27805537425138 -123.1061474701193 49.277873089391505 -123.10505215531674 49.277783109630064 -123.10446781536808 49.27773291827796 -123.10420684443734 49.27770902853348 -123.10409544468163</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Full Closure
Location: BC Place and Surrounding Area
Schedule: Multiple occurrences as follows:
- Jun 13, 2026 11:00 AM - Jun 14, 2026 6:00 AM
- Jun 18, 2026 5:00 AM - Jun 19, 2026 12:01 AM
- Jun 21, 2026 8:00 AM - Jun 22, 2026 3:00 AM
- Jun 24, 2026 2:00 AM - 9:00 PM
- Jun 26, 2026 10:00 AM - Jun 27, 2026 5:00 AM
- Jul 2, 2026 10:00 AM - Jul 3, 2026 6:00 AM
- Jul 7, 2026 3:00 AM - 11:00 PM
</content>
<id>urn:uuid:fbea6452-fdb9-4a1b-81c3-baaac1ee3192</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/9999274c-73fd-435a-a1aa-5288ae6085aa"/>
<published>2026-05-25T07:00:00Z</published>
<title>FIFA - Match Day Road Closure</title>
<updated>2026-05-26T15:43:47.2597827Z</updated>
<georss:line>49.27924571600633 -123.10443941948976 49.279211294137326 -123.10247734307299 49.27927350237343 -123.10221604895952</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Full Closure
Location: BC Place and Surrounding Area
Schedule: Multiple occurrences as follows:
- Jun 13, 2026 11:00 AM - Jun 14, 2026 6:00 AM
- Jun 18, 2026 5:00 AM - Jun 19, 2026 12:01 AM
- Jun 21, 2026 8:00 AM - Jun 22, 2026 3:00 AM
- Jun 24, 2026 2:00 AM - 9:00 PM
- Jun 26, 2026 10:00 AM - Jun 27, 2026 5:00 AM
- Jul 2, 2026 10:00 AM - Jul 3, 2026 6:00 AM
- Jul 7, 2026 3:00 AM - 11:00 PM
</content>
<id>urn:uuid:459255a6-7653-4dd1-975b-60ac9821af80</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/9999274c-73fd-435a-a1aa-5288ae6085aa"/>
<published>2026-05-25T07:00:00Z</published>
<title>FIFA - Match Day Road Closure</title>
<updated>2026-05-26T15:43:47.2597827Z</updated>
<georss:line>49.278653201654436 -123.10212757972039 49.27861910477907 -123.10056542869069</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Full Closure
Location: BC Place and Surrounding Area
Schedule: Multiple occurrences as follows:
- Jun 13, 2026 11:00 AM - Jun 14, 2026 6:00 AM
- Jun 18, 2026 5:00 AM - Jun 19, 2026 12:01 AM
- Jun 21, 2026 8:00 AM - Jun 22, 2026 3:00 AM
- Jun 24, 2026 2:00 AM - 9:00 PM
- Jun 26, 2026 10:00 AM - Jun 27, 2026 5:00 AM
- Jul 2, 2026 10:00 AM - Jul 3, 2026 6:00 AM
- Jul 7, 2026 3:00 AM - 11:00 PM
</content>
<id>urn:uuid:2e25c67b-45a8-4e11-8b85-f5435e7e92d6</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/9999274c-73fd-435a-a1aa-5288ae6085aa"/>
<published>2026-05-25T07:00:00Z</published>
<title>FIFA - Match Day Road Closure</title>
<updated>2026-05-26T15:43:47.2597827Z</updated>
<georss:line>49.274954517857594 -123.10192137668709 49.27445188932336 -123.10180391237725 49.27402874133216 -123.10170778501592 49.273730353438765 -123.101707171536 49.273015999953486 -123.10172809712668</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Full Closure
Location: BC Place and Surrounding Area
Schedule: Multiple occurrences as follows:
- Jun 13, 2026 11:00 AM - Jun 14, 2026 6:00 AM
- Jun 18, 2026 5:00 AM - Jun 19, 2026 12:01 AM
- Jun 21, 2026 8:00 AM - Jun 22, 2026 3:00 AM
- Jun 24, 2026 2:00 AM - 9:00 PM
- Jun 26, 2026 10:00 AM - Jun 27, 2026 5:00 AM
- Jul 2, 2026 10:00 AM - Jul 3, 2026 6:00 AM
- Jul 7, 2026 3:00 AM - 11:00 PM
</content>
<id>urn:uuid:e34e026b-e6fe-4dae-9248-ea00f89abecb</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/9999274c-73fd-435a-a1aa-5288ae6085aa"/>
<published>2026-05-25T07:00:00Z</published>
<title>FIFA - Match Day Road Closure</title>
<updated>2026-05-26T15:43:47.2597827Z</updated>
<georss:line>49.273015999953486 -123.10172809712668 49.272925897960334 -123.1009968351969 49.27277629612772 -123.10002804173709</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Full Closure
Location: BC Place and Surrounding Area
Schedule: Multiple occurrences as follows:
- Jun 13, 2026 11:00 AM - Jun 14, 2026 6:00 AM
- Jun 18, 2026 5:00 AM - Jun 19, 2026 12:01 AM
- Jun 21, 2026 8:00 AM - Jun 22, 2026 3:00 AM
- Jun 24, 2026 2:00 AM - 9:00 PM
- Jun 26, 2026 10:00 AM - Jun 27, 2026 5:00 AM
- Jul 2, 2026 10:00 AM - Jul 3, 2026 6:00 AM
- Jul 7, 2026 3:00 AM - 11:00 PM
</content>
<id>urn:uuid:1e314569-82df-419c-98db-d7281f8f5174</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/9999274c-73fd-435a-a1aa-5288ae6085aa"/>
<published>2026-05-25T07:00:00Z</published>
<title>FIFA - Match Day Road Closure</title>
<updated>2026-05-26T15:43:47.2597827Z</updated>
<georss:line>49.275343248106566 -123.10199928950072 49.274954517857594 -123.10192137668709</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Full Closure
Location: BC Place and Surrounding Area
Schedule: Multiple occurrences as follows:
- Jun 13, 2026 11:00 AM - Jun 14, 2026 6:00 AM
- Jun 18, 2026 5:00 AM - Jun 19, 2026 12:01 AM
- Jun 21, 2026 8:00 AM - Jun 22, 2026 3:00 AM
- Jun 24, 2026 2:00 AM - 9:00 PM
- Jun 26, 2026 10:00 AM - Jun 27, 2026 5:00 AM
- Jul 2, 2026 10:00 AM - Jul 3, 2026 6:00 AM
- Jul 7, 2026 3:00 AM - 11:00 PM
</content>
<id>urn:uuid:c12b7792-ef53-46c2-94a5-b4ccc60ed23e</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/9999274c-73fd-435a-a1aa-5288ae6085aa"/>
<published>2026-05-25T07:00:00Z</published>
<title>FIFA - Match Day Road Closure</title>
<updated>2026-05-26T15:43:47.2597827Z</updated>
<georss:line>49.276070501392894 -123.10207916694685 49.275343248106566 -123.10199928950072</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Full Closure
Location: BC Place and Surrounding Area
Schedule: Multiple occurrences as follows:
- Jun 13, 2026 11:00 AM - Jun 14, 2026 6:00 AM
- Jun 18, 2026 5:00 AM - Jun 19, 2026 12:01 AM
- Jun 21, 2026 8:00 AM - Jun 22, 2026 3:00 AM
- Jun 24, 2026 2:00 AM - 9:00 PM
- Jun 26, 2026 10:00 AM - Jun 27, 2026 5:00 AM
- Jul 2, 2026 10:00 AM - Jul 3, 2026 6:00 AM
- Jul 7, 2026 3:00 AM - 11:00 PM
</content>
<id>urn:uuid:34ea28f7-a6b6-45b9-966c-a0e06f1b98ed</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/9999274c-73fd-435a-a1aa-5288ae6085aa"/>
<published>2026-05-25T07:00:00Z</published>
<title>FIFA - Match Day Road Closure</title>
<updated>2026-05-26T15:43:47.2597827Z</updated>
<georss:line>49.27633943083228 -123.10277892580687 49.27602723277951 -123.10245720463807 49.27589755786187 -123.10233574710378 49.275747371728016 -123.10222678599436 49.275343248106566 -123.10199928950072</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Full Closure
Location: BC Place and Surrounding Area
Schedule: Multiple occurrences as follows:
- Jun 13, 2026 11:00 AM - Jun 14, 2026 6:00 AM
- Jun 18, 2026 5:00 AM - Jun 19, 2026 12:01 AM
- Jun 21, 2026 8:00 AM - Jun 22, 2026 3:00 AM
- Jun 24, 2026 2:00 AM - 9:00 PM
- Jun 26, 2026 10:00 AM - Jun 27, 2026 5:00 AM
- Jul 2, 2026 10:00 AM - Jul 3, 2026 6:00 AM
- Jul 7, 2026 3:00 AM - 11:00 PM
</content>
<id>urn:uuid:0be3d21a-5fca-4e60-a228-28661a01de81</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/9999274c-73fd-435a-a1aa-5288ae6085aa"/>
<published>2026-05-25T07:00:00Z</published>
<title>FIFA - Match Day Road Closure</title>
<updated>2026-05-26T15:43:47.2597827Z</updated>
<georss:line>49.273015999953486 -123.10172809712668 49.27255515024552 -123.10176789590383 49.272505638111426 -123.1017708459071 49.27245616079509 -123.10177511569579 49.2724067452819 -123.10178070532153 49.27235740056693 -123.10178761479887 49.272308144640164 -123.10179584416089 49.27225898650869 -123.1018053796753 49.272209953157756 -123.1018162213937 49.27216104458694 -123.10182836931232 49.27211227878615 -123.1018418234644 49.27206368275273 -123.10185657015484 49.272015256473935 -123.1018726231269 49.271967026959004 -123.10188995493857 49.27190315684058 -123.1019151727284</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Full Closure
Location: BC Place and Surrounding Area
Schedule: Multiple occurrences as follows:
- Jun 13, 2026 11:00 AM - Jun 14, 2026 6:00 AM
- Jun 18, 2026 5:00 AM - Jun 19, 2026 12:01 AM
- Jun 21, 2026 8:00 AM - Jun 22, 2026 3:00 AM
- Jun 24, 2026 2:00 AM - 9:00 PM
- Jun 26, 2026 10:00 AM - Jun 27, 2026 5:00 AM
- Jul 2, 2026 10:00 AM - Jul 3, 2026 6:00 AM
- Jul 7, 2026 3:00 AM - 11:00 PM
</content>
<id>urn:uuid:5ea958bd-f903-4251-bf44-571158d0f2cb</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/9999274c-73fd-435a-a1aa-5288ae6085aa"/>
<published>2026-05-25T07:00:00Z</published>
<title>FIFA - Match Day Road Closure</title>
<updated>2026-05-26T15:43:47.2597827Z</updated>
<georss:line>49.276601988010356 -123.10228592357224 49.27645291344814 -123.10221177377396 49.2762728285108 -123.10214205603354 49.276070501392894 -123.10207916694685</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Full Closure
Location: BC Place and Surrounding Area
Schedule: Multiple occurrences as follows:
- Jun 13, 2026 11:00 AM - Jun 14, 2026 6:00 AM
- Jun 18, 2026 5:00 AM - Jun 19, 2026 12:01 AM
- Jun 21, 2026 8:00 AM - Jun 22, 2026 3:00 AM
- Jun 24, 2026 2:00 AM - 9:00 PM
- Jun 26, 2026 10:00 AM - Jun 27, 2026 5:00 AM
- Jul 2, 2026 10:00 AM - Jul 3, 2026 6:00 AM
- Jul 7, 2026 3:00 AM - 11:00 PM
</content>
<id>urn:uuid:2f5b38d1-d478-45ad-b1a1-fc5656bae09c</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/9999274c-73fd-435a-a1aa-5288ae6085aa"/>
<published>2026-05-25T07:00:00Z</published>
<title>FIFA - Match Day Road Closure</title>
<updated>2026-05-26T15:43:47.2597827Z</updated>
<georss:line>49.27633943083228 -123.10277892580687 49.276601988010356 -123.10228592357224</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Full Closure
Location: BC Place and Surrounding Area
Schedule: Multiple occurrences as follows:
- Jun 13, 2026 11:00 AM - Jun 14, 2026 6:00 AM
- Jun 18, 2026 5:00 AM - Jun 19, 2026 12:01 AM
- Jun 21, 2026 8:00 AM - Jun 22, 2026 3:00 AM
- Jun 24, 2026 2:00 AM - 9:00 PM
- Jun 26, 2026 10:00 AM - Jun 27, 2026 5:00 AM
- Jul 2, 2026 10:00 AM - Jul 3, 2026 6:00 AM
- Jul 7, 2026 3:00 AM - 11:00 PM
</content>
<id>urn:uuid:30585531-7108-4ab8-84c9-38922a1743f1</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/9999274c-73fd-435a-a1aa-5288ae6085aa"/>
<published>2026-05-25T07:00:00Z</published>
<title>FIFA - Match Day Road Closure</title>
<updated>2026-05-26T15:43:47.2597827Z</updated>
<georss:line>49.277580764702776 -123.11398201313469 49.277267155098144 -123.11445671074371</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Full Closure
Location: BC Place and Surrounding Area
Schedule: Multiple occurrences as follows:
- Jun 13, 2026 11:00 AM - Jun 14, 2026 6:00 AM
- Jun 18, 2026 5:00 AM - Jun 19, 2026 12:01 AM
- Jun 21, 2026 8:00 AM - Jun 22, 2026 3:00 AM
- Jun 24, 2026 2:00 AM - 9:00 PM
- Jun 26, 2026 10:00 AM - Jun 27, 2026 5:00 AM
- Jul 2, 2026 10:00 AM - Jul 3, 2026 6:00 AM
- Jul 7, 2026 3:00 AM - 11:00 PM
</content>
<id>urn:uuid:8a2980be-29e4-4cff-8272-927b4f24027f</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/9999274c-73fd-435a-a1aa-5288ae6085aa"/>
<published>2026-05-25T07:00:00Z</published>
<title>FIFA - Match Day Road Closure</title>
<updated>2026-05-26T15:43:47.2597827Z</updated>
<georss:line>49.2780865632032 -123.11327153224639 49.27756664714639 -123.11402266961466</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Full Closure
Location: BC Place and Surrounding Area
Schedule: Multiple occurrences as follows:
- Jun 13, 2026 11:00 AM - Jun 14, 2026 6:00 AM
- Jun 18, 2026 5:00 AM - Jun 19, 2026 12:01 AM
- Jun 21, 2026 8:00 AM - Jun 22, 2026 3:00 AM
- Jun 24, 2026 2:00 AM - 9:00 PM
- Jun 26, 2026 10:00 AM - Jun 27, 2026 5:00 AM
- Jul 2, 2026 10:00 AM - Jul 3, 2026 6:00 AM
- Jul 7, 2026 3:00 AM - 11:00 PM
</content>
<id>urn:uuid:339398cc-a202-45e2-9ed1-2d6cb2e4b9c7</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/9999274c-73fd-435a-a1aa-5288ae6085aa"/>
<published>2026-05-25T07:00:00Z</published>
<title>FIFA - Match Day Road Closure</title>
<updated>2026-05-26T15:43:47.2597827Z</updated>
<georss:line>49.27789500733519 -123.11446846130269 49.277580764702776 -123.11398201313469</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Full Closure
Location: BC Place and Surrounding Area
Schedule: Multiple occurrences as follows:
- Jun 13, 2026 11:00 AM - Jun 14, 2026 6:00 AM
- Jun 18, 2026 5:00 AM - Jun 19, 2026 12:01 AM
- Jun 21, 2026 8:00 AM - Jun 22, 2026 3:00 AM
- Jun 24, 2026 2:00 AM - 9:00 PM
- Jun 26, 2026 10:00 AM - Jun 27, 2026 5:00 AM
- Jul 2, 2026 10:00 AM - Jul 3, 2026 6:00 AM
- Jul 7, 2026 3:00 AM - 11:00 PM
</content>
<id>urn:uuid:82b74d4e-3612-4527-9ea6-31a8117df549</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/9999274c-73fd-435a-a1aa-5288ae6085aa"/>
<published>2026-05-25T07:00:00Z</published>
<title>FIFA - Match Day Road Closure</title>
<updated>2026-05-26T15:43:47.2597827Z</updated>
<georss:line>49.27864756849311 -123.10761979398323 49.2786489494074 -123.10762445783162 49.27865534232731 -123.10764662106432 49.27866148321186 -123.10766896248859 49.27866736309133 -123.10769145458698 49.2786729909609 -123.10771409737879 49.27867835781237 -123.10773690459293 49.27868346368422 -123.10775983498272 49.27868829956827 -123.10778290227702 49.2786928834677 -123.10780609276595 49.27869718839693 -123.1078294063903 49.278701232359026 -123.1078528294402 49.27870501535392 -123.10787636191527 49.27870851940406 -123.10789999002715 49.2787117625125 -123.10792370006592 49.278714726689 -123.10794749199194 49.27871742092859 -123.1079713658245 49.278719827253695 -123.10799530777508 49.278721981657895 -123.10801930417315 49.278723848160354 -123.10804335493967 49.2787254447515 -123.10806746011357 49.27872677144413 -123.10809160594563 49.27872781925586 -123.10811577866708 49.27872858818674 -123.10813997827744 49.27872907824957 -123.10816419102754 49.27872929845245 -123.10818840318781 49.27872923978725 -123.10821262848702 49.27872890226692 -123.10823685317594 49.27872829489945 -123.10826106352505 49.27872739970746 -123.10828524574579 49.27872623466834 -123.10830941362593 49.27872479980795 -123.10833353966746 49.278723086131095 -123.10835762385028 49.278721093650745 -123.10838165242524 49.278718831362085 -123.10840562541165 49.27871629026993 -123.10842954278935 49.278713479382475 -123.1084533908289 49.27871039871263 -123.10847715578116 49.278707039278146 -123.10850082387722 49.27870341905654 -123.10852440890497 49.27869952906565 -123.10854789709552 49.27869536931837 -123.10857127469973 49.27869093981482 -123.1085945417172 49.27868624957611 -123.10861767066979 49.27868129857637 -123.10864068905478 49.278676077846484 -123.10866356935449 49.278670605389664 -123.10868629785928</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Full Closure
Location: BC Place and Surrounding Area
Schedule: Multiple occurrences as follows:
- Jun 13, 2026 11:00 AM - Jun 14, 2026 6:00 AM
- Jun 18, 2026 5:00 AM - Jun 19, 2026 12:01 AM
- Jun 21, 2026 8:00 AM - Jun 22, 2026 3:00 AM
- Jun 24, 2026 2:00 AM - 9:00 PM
- Jun 26, 2026 10:00 AM - Jun 27, 2026 5:00 AM
- Jul 2, 2026 10:00 AM - Jul 3, 2026 6:00 AM
- Jul 7, 2026 3:00 AM - 11:00 PM
</content>
<id>urn:uuid:66f361bb-fd06-41fe-a021-054244bd1818</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/9999274c-73fd-435a-a1aa-5288ae6085aa"/>
<published>2026-05-25T07:00:00Z</published>
<title>FIFA - Match Day Road Closure</title>
<updated>2026-05-26T15:43:47.2597827Z</updated>
<georss:line>49.2782090500865 -123.1149548326998 49.27789500733519 -123.11446846130269</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Full Closure
Location: BC Place and Surrounding Area
Schedule: Multiple occurrences as follows:
- Jun 13, 2026 11:00 AM - Jun 14, 2026 6:00 AM
- Jun 18, 2026 5:00 AM - Jun 19, 2026 12:01 AM
- Jun 21, 2026 8:00 AM - Jun 22, 2026 3:00 AM
- Jun 24, 2026 2:00 AM - 9:00 PM
- Jun 26, 2026 10:00 AM - Jun 27, 2026 5:00 AM
- Jul 2, 2026 10:00 AM - Jul 3, 2026 6:00 AM
- Jul 7, 2026 3:00 AM - 11:00 PM
</content>
<id>urn:uuid:430132fe-2050-4c00-81b3-60e360bef693</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/9999274c-73fd-435a-a1aa-5288ae6085aa"/>
<published>2026-05-25T07:00:00Z</published>
<title>FIFA - Match Day Road Closure</title>
<updated>2026-05-26T15:43:47.2597827Z</updated>
<georss:line>49.27787839139643 -123.11047814277904 49.27784189496805 -123.11081941093832</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Full Closure
Location: BC Place and Surrounding Area
Schedule: Multiple occurrences as follows:
- Jun 13, 2026 11:00 AM - Jun 14, 2026 6:00 AM
- Jun 18, 2026 5:00 AM - Jun 19, 2026 12:01 AM
- Jun 21, 2026 8:00 AM - Jun 22, 2026 3:00 AM
- Jun 24, 2026 2:00 AM - 9:00 PM
- Jun 26, 2026 10:00 AM - Jun 27, 2026 5:00 AM
- Jul 2, 2026 10:00 AM - Jul 3, 2026 6:00 AM
- Jul 7, 2026 3:00 AM - 11:00 PM
</content>
<id>urn:uuid:57fca23a-17eb-4597-99cd-00948077caf7</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/9999274c-73fd-435a-a1aa-5288ae6085aa"/>
<published>2026-05-25T07:00:00Z</published>
<title>FIFA - Match Day Road Closure</title>
<updated>2026-05-26T15:43:47.2597827Z</updated>
<georss:line>49.278670605389664 -123.10868629785928 49.27866545899204 -123.10870664853229 49.278659492051474 -123.10872910096438 49.27865328240537 -123.10875137412295 49.27864681203758 -123.10877349546577 49.27864008996926 -123.10879543751477 49.278633116213456 -123.10881718652091 49.27862589975243 -123.10883875625251 49.278618431604144 -123.10886013294073 49.27861072977197 -123.10888130287624 49.27860278526083 -123.10890226603902 49.27859459808383 -123.10892300868005 49.278586177236264 -123.10894353081902 49.278577522731155 -123.10896381870697 49.2785686435509 -123.10898388611226 49.27855953072631 -123.10900370551745 49.27855019323971 -123.109023290691 49.27854063111727 -123.10904261413526 49.27853085335414 -123.10906167586995 49.27802638254761 -123.11006089998584 49.27801621651403 -123.11008133531973 49.278006293097434 -123.1101020324092 49.2779966033024 -123.11012299123425 49.27798714714194 -123.1101441980465 49.27797794259317 -123.11016566663473 49.27796898068689 -123.11018736948192 49.27796027041825 -123.11020930660833 49.27795181180022 -123.11023146426558 49.277943604819484 -123.11025385620245 49.27793565848427 -123.11027646869069 49.27792797280756 -123.11029928798192 49.277920547802296 -123.11032230032785 49.277913383455285 -123.11034551947735 49.27790648878786 -123.11036891795364 49.27789986379986 -123.110392495757 49.277893499495946 -123.11041625286767 49.27788741389281 -123.11044016182902 49.277881606963916 -123.11046425013852 49.27787839139643 -123.11047814277904</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Full Closure
Location: BC Place and Surrounding Area
Schedule: Multiple occurrences as follows:
- Jun 13, 2026 11:00 AM - Jun 14, 2026 6:00 AM
- Jun 18, 2026 5:00 AM - Jun 19, 2026 12:01 AM
- Jun 21, 2026 8:00 AM - Jun 22, 2026 3:00 AM
- Jun 24, 2026 2:00 AM - 9:00 PM
- Jun 26, 2026 10:00 AM - Jun 27, 2026 5:00 AM
- Jul 2, 2026 10:00 AM - Jul 3, 2026 6:00 AM
- Jul 7, 2026 3:00 AM - 11:00 PM
</content>
<id>urn:uuid:32175e1f-1b7e-4345-89e9-635e7a0bc51e</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/9999274c-73fd-435a-a1aa-5288ae6085aa"/>
<published>2026-05-25T07:00:00Z</published>
<title>FIFA - Match Day Road Closure</title>
<updated>2026-05-26T15:43:47.2597827Z</updated>
<georss:line>49.27805537425138 -123.1061474701193 49.27805595585545 -123.10615082603475 49.27812283196377 -123.10641821591705 49.27820762807221 -123.10667346384601 49.2783094113712 -123.1069137495354 49.27836872061505 -123.10702602607387 49.27853797459352 -123.1073453637908 49.27855759456176 -123.10738250056993 49.278609257421834 -123.10750446826249 49.27864756849311 -123.10761979398323</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Full Closure
Location: BC Place and Surrounding Area
Schedule: Multiple occurrences as follows:
- Jun 13, 2026 11:00 AM - Jun 14, 2026 6:00 AM
- Jun 18, 2026 5:00 AM - Jun 19, 2026 12:01 AM
- Jun 21, 2026 8:00 AM - Jun 22, 2026 3:00 AM
- Jun 24, 2026 2:00 AM - 9:00 PM
- Jun 26, 2026 10:00 AM - Jun 27, 2026 5:00 AM
- Jul 2, 2026 10:00 AM - Jul 3, 2026 6:00 AM
- Jul 7, 2026 3:00 AM - 11:00 PM
</content>
<id>urn:uuid:a44f0fbd-1cbd-4d69-9d3f-2b32f6131b93</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/9999274c-73fd-435a-a1aa-5288ae6085aa"/>
<published>2026-05-25T07:00:00Z</published>
<title>FIFA - Match Day Road Closure</title>
<updated>2026-05-26T15:43:47.2597827Z</updated>
<georss:line>49.27924571600633 -123.10443941948976 49.279226837826144 -123.10444637784806 49.27920804015457 -123.1044538313335 49.27918932299144 -123.10446177994562 49.279170704314595 -123.10447023747074 49.27915219313158 -123.10447919017848 49.279133780459375 -123.10448862430042 49.27911547528075 -123.10449855360389 49.27909728660313 -123.10450896435866 49.27907922342155 -123.10451985658321 49.27906128572343 -123.10453124402596 49.279043482528664 -123.10454309920776 49.279025813824745 -123.10455543587703 49.279008297614155 -123.10456824032252 49.27899091591891 -123.10458149875694 49.278973695711954 -123.10459522498596 49.27895663699309 -123.10460941900905 49.27893973978709 -123.10462405332824 49.27892301307634 -123.10463914171113 49.27890646586846 -123.10465467042754 49.27889008916807 -123.1046706394582 49.2788739099729 -123.10468703511113 49.278857910279925 -123.1047038710968 49.278842108091965 -123.10472113370429 49.278826503421016 -123.10473880918452 49.27881110526221 -123.1047568975564 49.27879591361537 -123.10477539881973 49.27878093748785 -123.10479429924467 49.27876617689202 -123.10481358508227 49.27875164979295 -123.10483328386813 49.27873733823765 -123.10485335431764 49.278723260216196 -123.10487379646895 49.278709415715895 -123.10489462407078 49.27869581375674 -123.10491580964461 49.27868245433845 -123.10493735319042 49.27866934645607 -123.10495925472736 49.27865649010937 -123.10498151425553 49.27864388533564 -123.10500409052852 49.27863155009999 -123.10502701108234 49.278619466424374 -123.10505026213004 49.2786076613192 -123.10507381623157 49.2785961167813 -123.10509768709758 49.27858485080094 -123.10512187476652 49.27857386340287 -123.1051463517411 49.278563154586976 -123.10517111802146 49.27855273336067 -123.10519615987828 49.27854428571325 -123.10521720503031 49.27838864676838 -123.10562614610706 49.27838757341533 -123.10562934726863 49.27833235041581 -123.1057589071984 49.27826856358365 -123.10587894815666 49.278196924789654 -123.10598813802184 49.2781182087341 -123.10608529606648 49.27805537425138 -123.1061474701193</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Full Closure
Location: BC Place and Surrounding Area
Schedule: Multiple occurrences as follows:
- Jun 13, 2026 11:00 AM - Jun 14, 2026 6:00 AM
- Jun 18, 2026 5:00 AM - Jun 19, 2026 12:01 AM
- Jun 21, 2026 8:00 AM - Jun 22, 2026 3:00 AM
- Jun 24, 2026 2:00 AM - 9:00 PM
- Jun 26, 2026 10:00 AM - Jun 27, 2026 5:00 AM
- Jul 2, 2026 10:00 AM - Jul 3, 2026 6:00 AM
- Jul 7, 2026 3:00 AM - 11:00 PM
</content>
<id>urn:uuid:6e9cccc7-33f5-4687-b7d0-fa3def2dd67b</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/9999274c-73fd-435a-a1aa-5288ae6085aa"/>
<published>2026-05-25T07:00:00Z</published>
<title>FIFA - Match Day Road Closure</title>
<updated>2026-05-26T15:43:47.2597827Z</updated>
<georss:line>49.27709577831109 -123.1063807966682 49.27705592568134 -123.1042434461406 49.27705559735398 -123.10421851967504 49.277054981151196 -123.10419362010009 49.27705409507553 -123.10416873370578 49.27705293911475 -123.10414387424086 49.27705149527844 -123.10411904166784 49.27704978153221 -123.1040942635217 49.27704778889333 -123.10406952603556 49.27704552634458 -123.10404484297706 49.27704298489087 -123.10402021432778 49.27704017350263 -123.10399566760358 49.27703708318472 -123.10397120278598 49.27703373193992 -123.10394680616488 49.27703010175324 -123.10392250519952 49.27702620161983 -123.10389829990913 49.27702204052261 -123.10387420406134 49.2770176094665 -123.1038502176376 49.27701290843916 -123.10382635438658 49.2770079464359 -123.10380261432755 49.277002714449196 -123.10377901119026 49.27699723046953 -123.10375554501283 49.27699147650662 -123.10373221575776 49.276985470538506 -123.10370903721156 49.27697921254068 -123.103686036871 49.276972693542746 -123.10366318722102 49.27696592251519 -123.10364051577727 49.27695889945829 -123.1036180225401 49.276951624371975 -123.10359570750978 49.276944106227006 -123.10357359820199 49.27693634503575 -123.10355168086863 49.2769283317908 -123.10352996923946 49.276920084482725 -123.10350846335234 49.276911603099194 -123.10348717695575 49.2769028876281 -123.10346612379819 49.27689392908658 -123.10344529011272 49.276884745453 -123.10342468968543 49.27687533671502 -123.10340433626475 49.27686570287281 -123.10338422985087 49.276855843926484 -123.10336437044384 49.27684576885903 -123.10334477181091 49.27683547765835 -123.10332544770041 49.27682497033686 -123.1033063843642 49.27681424688231 -123.10328759555057 49.276803325272994 -123.10326909504548 49.27679219651384 -123.10325088283014 49.27678086960006 -123.10323295892333 49.27676934453194 -123.10321532332513 49.27675762128496 -123.10319800353206 49.27674570887905 -123.10318097206628 49.276733607277436 -123.10316427017261 49.2767213254877 -123.10314788412146 49.27670885451482 -123.10313181389404 49.27669622134454 -123.10311605954652 49.27668339896675 -123.10310064851909 49.276670414379566 -123.10308556711959 49.27665726757073 -123.1030708290962 49.276643958540376 -123.10305643444879 49.27663048728866 -123.10304238317715 49.27661686279862 -123.10302868904817 49.27660308507035 -123.10301535206165 49.27658917209433 -123.10300237225486 49.27657445864483 -123.10298928080293 49.27655974520604 -123.10297617561058 49.27654504076088 -123.1029630704448 49.276530345309396 -123.10294996530554 49.27651564087341 -123.1029368464071 49.27650094543108 -123.10292372753524 49.27648624999949 -123.10291059492297 49.27647155456637 -123.10289746231854 49.27645686813909 -123.10288431599244 49.27644217271515 -123.10287116965543 49.276427495292154 -123.10285800961552 49.27641280887258 -123.10284484956469 49.27639813145879 -123.10283167579227 49.27638345404347 -123.10281850202765 49.276368776638805 -123.10280531452271 49.27633943083228 -123.10277892580687</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Full Closure
Location: BC Place and Surrounding Area
Schedule: Multiple occurrences as follows:
- Jun 13, 2026 11:00 AM - Jun 14, 2026 6:00 AM
- Jun 18, 2026 5:00 AM - Jun 19, 2026 12:01 AM
- Jun 21, 2026 8:00 AM - Jun 22, 2026 3:00 AM
- Jun 24, 2026 2:00 AM - 9:00 PM
- Jun 26, 2026 10:00 AM - Jun 27, 2026 5:00 AM
- Jul 2, 2026 10:00 AM - Jul 3, 2026 6:00 AM
- Jul 7, 2026 3:00 AM - 11:00 PM
</content>
<id>urn:uuid:118c86a6-c08d-4261-b9ef-c97ecedeb7df</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/9999274c-73fd-435a-a1aa-5288ae6085aa"/>
<published>2026-05-25T07:00:00Z</published>
<title>FIFA - Match Day Road Closure</title>
<updated>2026-05-26T15:43:47.2597827Z</updated>
<georss:line>49.27784189496805 -123.11081941093832 49.27783893603768 -123.1108470389476 49.27784355327435 -123.11118127722119 49.27788194509196 -123.11165665222285 49.277852554626634 -123.11190172306388 49.27776946932991 -123.11232486692147 49.2773213809098 -123.11326712933324 49.27714129054252 -123.11354897123812 49.27695642813694 -123.11373428682387 49.276499373531976 -123.11392626069807 49.27638220100121 -123.11403693857447</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Full Closure
Location: BC Place and Surrounding Area
Schedule: Multiple occurrences as follows:
- Jun 13, 2026 11:00 AM - Jun 14, 2026 6:00 AM
- Jun 18, 2026 5:00 AM - Jun 19, 2026 12:01 AM
- Jun 21, 2026 8:00 AM - Jun 22, 2026 3:00 AM
- Jun 24, 2026 2:00 AM - 9:00 PM
- Jun 26, 2026 10:00 AM - Jun 27, 2026 5:00 AM
- Jul 2, 2026 10:00 AM - Jul 3, 2026 6:00 AM
- Jul 7, 2026 3:00 AM - 11:00 PM
</content>
<id>urn:uuid:8fda6ae2-cfec-46e5-af69-a858a88093b5</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/9999274c-73fd-435a-a1aa-5288ae6085aa"/>
<published>2026-05-25T07:00:00Z</published>
<title>FIFA - Match Day Road Closure</title>
<updated>2026-05-26T15:43:47.2597827Z</updated>
<georss:line>49.277267155098144 -123.11445671074371 49.27652657329401 -123.1155764524893</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Full Closure
Location: BC Place and Surrounding Area
Schedule: Multiple occurrences as follows:
- Jun 13, 2026 11:00 AM - Jun 14, 2026 6:00 AM
- Jun 18, 2026 5:00 AM - Jun 19, 2026 12:01 AM
- Jun 21, 2026 8:00 AM - Jun 22, 2026 3:00 AM
- Jun 24, 2026 2:00 AM - 9:00 PM
- Jun 26, 2026 10:00 AM - Jun 27, 2026 5:00 AM
- Jul 2, 2026 10:00 AM - Jul 3, 2026 6:00 AM
- Jul 7, 2026 3:00 AM - 11:00 PM
</content>
<id>urn:uuid:fba4a5d7-b239-4396-ae67-bd601527f686</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/9999274c-73fd-435a-a1aa-5288ae6085aa"/>
<published>2026-05-25T07:00:00Z</published>
<title>FIFA - Match Day Road Closure</title>
<updated>2026-05-26T15:43:47.2597827Z</updated>
<georss:line>49.27709065241473 -123.10638082990098 49.2766135025627 -123.1064010056534</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Full Closure
Location: BC Place and Surrounding Area
Schedule: Multiple occurrences as follows:
- Jun 13, 2026 11:00 AM - Jun 14, 2026 6:00 AM
- Jun 18, 2026 5:00 AM - Jun 19, 2026 12:01 AM
- Jun 21, 2026 8:00 AM - Jun 22, 2026 3:00 AM
- Jun 24, 2026 2:00 AM - 9:00 PM
- Jun 26, 2026 10:00 AM - Jun 27, 2026 5:00 AM
- Jul 2, 2026 10:00 AM - Jul 3, 2026 6:00 AM
- Jul 7, 2026 3:00 AM - 11:00 PM
</content>
<id>urn:uuid:484d6857-26b4-4875-a91d-8bda3ebb125b</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/9999274c-73fd-435a-a1aa-5288ae6085aa"/>
<published>2026-05-25T07:00:00Z</published>
<title>FIFA - Match Day Road Closure</title>
<updated>2026-05-26T15:43:47.2597827Z</updated>
<georss:line>49.27787839139643 -123.11047814277904 49.277809668558405 -123.1103271262401 49.27759633452797 -123.1098216814064 49.27752982513758 -123.1097069950615 49.277011678852915 -123.10911447446759 49.277001603450174 -123.10910579078521 49.27668056046571 -123.10898698513616</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Full Closure
Location: BC Place and Surrounding Area
Schedule: Multiple occurrences as follows:
- Jun 13, 2026 11:00 AM - Jun 14, 2026 6:00 AM
- Jun 18, 2026 5:00 AM - Jun 19, 2026 12:01 AM
- Jun 21, 2026 8:00 AM - Jun 22, 2026 3:00 AM
- Jun 24, 2026 2:00 AM - 9:00 PM
- Jun 26, 2026 10:00 AM - Jun 27, 2026 5:00 AM
- Jul 2, 2026 10:00 AM - Jul 3, 2026 6:00 AM
- Jul 7, 2026 3:00 AM - 11:00 PM
</content>
<id>urn:uuid:5feab17b-bb9b-493e-8cc2-e82ea522a0af</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/9999274c-73fd-435a-a1aa-5288ae6085aa"/>
<published>2026-05-25T07:00:00Z</published>
<title>FIFA - Match Day Road Closure</title>
<updated>2026-05-26T15:43:47.2597827Z</updated>
<georss:line>49.27711991764235 -123.10767644058164 49.27668056046571 -123.10898698513616</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Full Closure
Location: BC Place and Surrounding Area
Schedule: Multiple occurrences as follows:
- Jun 13, 2026 11:00 AM - Jun 14, 2026 6:00 AM
- Jun 18, 2026 5:00 AM - Jun 19, 2026 12:01 AM
- Jun 21, 2026 8:00 AM - Jun 22, 2026 3:00 AM
- Jun 24, 2026 2:00 AM - 9:00 PM
- Jun 26, 2026 10:00 AM - Jun 27, 2026 5:00 AM
- Jul 2, 2026 10:00 AM - Jul 3, 2026 6:00 AM
- Jul 7, 2026 3:00 AM - 11:00 PM
</content>
<id>urn:uuid:8ed35b13-9fef-4a65-a8dd-5bff52645320</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/9999274c-73fd-435a-a1aa-5288ae6085aa"/>
<published>2026-05-25T07:00:00Z</published>
<title>FIFA - Match Day Road Closure</title>
<updated>2026-05-26T15:43:47.2597827Z</updated>
<georss:line>49.27805537425138 -123.1061474701193 49.27803770375684 -123.1061615657906 49.27801987177699 -123.10617519365196 49.27800187832483 -123.10618833995505 49.277983750385886 -123.10620100475826 49.277965478965115 -123.1062131880427 49.27794706406277 -123.10622488980879 49.27792852369453 -123.10623608259843 49.27790985784796 -123.10624678016075 49.277891066523125 -123.10625698249613 49.27787216771057 -123.10626668964377 49.277853161422996 -123.10627588785565 49.27783405666841 -123.10628456340301 49.277814844426416 -123.10629274376419 49.27779555170784 -123.10630040150066 49.27777616950513 -123.10630755034217 49.27775670682604 -123.10631417656006 49.27773717266598 -123.10632028017427 49.277717576007376 -123.10632587495327 49.27769791687578 -123.10633093340063 49.27767820425359 -123.10633546928477 49.277658438141 -123.1063394826063 49.27763863654101 -123.10634295965603 49.27761879044584 -123.1063459141638 49.27759891785857 -123.10634833242037 49.27758347172812 -123.10634985279108 49.27709577831109 -123.1063807966682</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Full Closure
Location: BC Place and Surrounding Area
Schedule: Multiple occurrences as follows:
- Jun 13, 2026 11:00 AM - Jun 14, 2026 6:00 AM
- Jun 18, 2026 5:00 AM - Jun 19, 2026 12:01 AM
- Jun 21, 2026 8:00 AM - Jun 22, 2026 3:00 AM
- Jun 24, 2026 2:00 AM - 9:00 PM
- Jun 26, 2026 10:00 AM - Jun 27, 2026 5:00 AM
- Jul 2, 2026 10:00 AM - Jul 3, 2026 6:00 AM
- Jul 7, 2026 3:00 AM - 11:00 PM
</content>
<id>urn:uuid:3b7b0ef4-2452-447b-a3ee-2483f3b2d519</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/9999274c-73fd-435a-a1aa-5288ae6085aa"/>
<published>2026-05-25T07:00:00Z</published>
<title>FIFA - Match Day Road Closure</title>
<updated>2026-05-26T15:43:47.2597827Z</updated>
<georss:line>49.27709577831109 -123.1063807966682 49.27711991764235 -123.10767644058164</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Full Closure
Location: BC Place and Surrounding Area
Schedule: Multiple occurrences as follows:
- Jun 13, 2026 11:00 AM - Jun 14, 2026 6:00 AM
- Jun 18, 2026 5:00 AM - Jun 19, 2026 12:01 AM
- Jun 21, 2026 8:00 AM - Jun 22, 2026 3:00 AM
- Jun 24, 2026 2:00 AM - 9:00 PM
- Jun 26, 2026 10:00 AM - Jun 27, 2026 5:00 AM
- Jul 2, 2026 10:00 AM - Jul 3, 2026 6:00 AM
- Jul 7, 2026 3:00 AM - 11:00 PM
</content>
<id>urn:uuid:4a8737f8-c873-47f3-802e-a6d14e33cf1d</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/9999274c-73fd-435a-a1aa-5288ae6085aa"/>
<published>2026-05-25T07:00:00Z</published>
<title>FIFA - Match Day Road Closure</title>
<updated>2026-05-26T15:43:47.2597827Z</updated>
<georss:line>49.27864756849311 -123.10761979398323 49.27711991764235 -123.10767644058164</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Full Closure
Location: BC Place and Surrounding Area
Schedule: Multiple occurrences as follows:
- Jun 13, 2026 11:00 AM - Jun 14, 2026 6:00 AM
- Jun 18, 2026 5:00 AM - Jun 19, 2026 12:01 AM
- Jun 21, 2026 8:00 AM - Jun 22, 2026 3:00 AM
- Jun 24, 2026 2:00 AM - 9:00 PM
- Jun 26, 2026 10:00 AM - Jun 27, 2026 5:00 AM
- Jul 2, 2026 10:00 AM - Jul 3, 2026 6:00 AM
- Jul 7, 2026 3:00 AM - 11:00 PM
</content>
<id>urn:uuid:11629b55-f5e0-4f7a-9ea2-5dde5cb816df</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/9999274c-73fd-435a-a1aa-5288ae6085aa"/>
<published>2026-05-25T07:00:00Z</published>
<title>FIFA - Match Day Road Closure</title>
<updated>2026-05-26T15:43:47.2597827Z</updated>
<georss:line>49.27377494822585 -123.11448965554128 49.27402901896437 -123.11437839438015 49.27417420165597 -123.11423534431584 49.27441790021339 -123.11390156083247 49.27459419203632 -123.11344062173639 49.274801593374264 -123.11292405205975 49.274910478727605 -123.11278100199544</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Full Closure
Location: BC Place and Surrounding Area
Schedule: Multiple occurrences as follows:
- Jun 13, 2026 11:00 AM - Jun 14, 2026 6:00 AM
- Jun 18, 2026 5:00 AM - Jun 19, 2026 12:01 AM
- Jun 21, 2026 8:00 AM - Jun 22, 2026 3:00 AM
- Jun 24, 2026 2:00 AM - 9:00 PM
- Jun 26, 2026 10:00 AM - Jun 27, 2026 5:00 AM
- Jul 2, 2026 10:00 AM - Jul 3, 2026 6:00 AM
- Jul 7, 2026 3:00 AM - 11:00 PM
</content>
<id>urn:uuid:7b7f50dd-fa2d-4672-9224-feeae867ec07</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/9999274c-73fd-435a-a1aa-5288ae6085aa"/>
<published>2026-05-25T07:00:00Z</published>
<title>FIFA - Match Day Road Closure</title>
<updated>2026-05-26T15:43:47.2597827Z</updated>
<georss:line>49.27412373170043 -123.11500145644801 49.27405984247741 -123.11530471583183 49.27405427759413 -123.1153466328119 49.27404821915829 -123.1153963572245 49.27404273622716 -123.11544624793828 49.27403781085127 -123.11549626367044 49.27403347001598 -123.11554640448568 49.27402969574459 -123.1155966565962 49.27402649704581 -123.11564700627719 49.2740238739471 -123.11569742603552 49.27402181745319 -123.11574791585183 49.274020345581874 -123.11579844827503 49.274019458346885 -123.11584900955938 49.27401913777163 -123.11589958591709 49.27401931952187 -123.11593361144315</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Full Closure
Location: BC Place and Surrounding Area
Schedule: Multiple occurrences as follows:
- Jun 13, 2026 11:00 AM - Jun 14, 2026 6:00 AM
- Jun 18, 2026 5:00 AM - Jun 19, 2026 12:01 AM
- Jun 21, 2026 8:00 AM - Jun 22, 2026 3:00 AM
- Jun 24, 2026 2:00 AM - 9:00 PM
- Jun 26, 2026 10:00 AM - Jun 27, 2026 5:00 AM
- Jul 2, 2026 10:00 AM - Jul 3, 2026 6:00 AM
- Jul 7, 2026 3:00 AM - 11:00 PM
</content>
<id>urn:uuid:fde40e75-d056-4147-87c5-b9063c0f3ac0</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/9999274c-73fd-435a-a1aa-5288ae6085aa"/>
<published>2026-05-25T07:00:00Z</published>
<title>FIFA - Match Day Road Closure</title>
<updated>2026-05-26T15:43:47.2597827Z</updated>
<georss:line>49.27401931952187 -123.11593361144315 49.274019401860215 -123.1159501636445 49.27402024163126 -123.11600072897495 49.27402165709864 -123.1160512681626 49.27402365728511 -123.11610175373542 49.27402622420044 -123.11615218565292 49.27402936686755 -123.11620253644307 49.274033094281606 -123.11625280612866 49.27403738849401 -123.11630295342667 49.27404224049582 -123.11635299206523 49.274047677314286 -123.11640288086699 49.2740536809454 -123.11645263353873 49.27406025143091 -123.11650220883976 49.27406738877099 -123.11655160677161 49.274075092993655 -123.11660079984097 49.27421868718193 -123.11735212684935</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Full Closure
Location: BC Place and Surrounding Area
Schedule: Multiple occurrences as follows:
- Jun 13, 2026 11:00 AM - Jun 14, 2026 6:00 AM
- Jun 18, 2026 5:00 AM - Jun 19, 2026 12:01 AM
- Jun 21, 2026 8:00 AM - Jun 22, 2026 3:00 AM
- Jun 24, 2026 2:00 AM - 9:00 PM
- Jun 26, 2026 10:00 AM - Jun 27, 2026 5:00 AM
- Jul 2, 2026 10:00 AM - Jul 3, 2026 6:00 AM
- Jul 7, 2026 3:00 AM - 11:00 PM
</content>
<id>urn:uuid:f6931d74-67db-441c-aadf-56d7a448df91</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/9999274c-73fd-435a-a1aa-5288ae6085aa"/>
<published>2026-05-25T07:00:00Z</published>
<title>FIFA - Match Day Road Closure</title>
<updated>2026-05-26T15:43:47.2597827Z</updated>
<georss:line>49.27485072460357 -123.11301228043324 49.274604521560775 -123.11356756407069 49.274540622590905 -123.11375669515498 49.2744294053376 -123.11408588758314 49.274230214559196 -123.11459624679955 49.27412373170043 -123.11500145644801</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Full Closure
Location: BC Place and Surrounding Area
Schedule: Multiple occurrences as follows:
- Jun 13, 2026 11:00 AM - Jun 14, 2026 6:00 AM
- Jun 18, 2026 5:00 AM - Jun 19, 2026 12:01 AM
- Jun 21, 2026 8:00 AM - Jun 22, 2026 3:00 AM
- Jun 24, 2026 2:00 AM - 9:00 PM
- Jun 26, 2026 10:00 AM - Jun 27, 2026 5:00 AM
- Jul 2, 2026 10:00 AM - Jul 3, 2026 6:00 AM
- Jul 7, 2026 3:00 AM - 11:00 PM
</content>
<id>urn:uuid:ff9c36cd-cb1a-4de0-a4f1-5bb59d9e97ae</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/9999274c-73fd-435a-a1aa-5288ae6085aa"/>
<published>2026-05-25T07:00:00Z</published>
<title>FIFA - Match Day Road Closure</title>
<updated>2026-05-26T15:43:47.2597827Z</updated>
<georss:line>49.27668056046571 -123.10898698513616 49.276659774207616 -123.10905200979744 49.27663134956913 -123.10913759867042 49.27660195411693 -123.10922241540037 49.27657158786565 -123.1093064462355 49.27654026884636 -123.10938964996754 49.27650800608211 -123.10947199911683 49.27647479960078 -123.10955346618404 49.2764406764027 -123.10963403747785 49.27640563650283 -123.10971369924752 49.27636968893745 -123.10979241026614 49.276332851711715 -123.10987015682329 49.27629513386216 -123.10994689769252 49.27551831822748 -123.11153338711672 49.27499331722521 -123.11268901081883 49.27485370119757 -123.11300391485565</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Full Closure
Location: BC Place and Surrounding Area
Schedule: Multiple occurrences as follows:
- Jun 13, 2026 11:00 AM - Jun 14, 2026 6:00 AM
- Jun 18, 2026 5:00 AM - Jun 19, 2026 12:01 AM
- Jun 21, 2026 8:00 AM - Jun 22, 2026 3:00 AM
- Jun 24, 2026 2:00 AM - 9:00 PM
- Jun 26, 2026 10:00 AM - Jun 27, 2026 5:00 AM
- Jul 2, 2026 10:00 AM - Jul 3, 2026 6:00 AM
- Jul 7, 2026 3:00 AM - 11:00 PM
</content>
<id>urn:uuid:827b02c6-abc5-42d3-8b96-24ffcfbff5f1</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/9999274c-73fd-435a-a1aa-5288ae6085aa"/>
<published>2026-05-25T07:00:00Z</published>
<title>FIFA - Match Day Road Closure</title>
<updated>2026-05-26T15:43:47.2597827Z</updated>
<georss:line>49.2757560031298 -123.11438976710436 49.27485343075094 -123.1130045191387</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Full Closure
Location: BC Place and Surrounding Area
Schedule: Multiple occurrences as follows:
- Jun 13, 2026 11:00 AM - Jun 14, 2026 6:00 AM
- Jun 18, 2026 5:00 AM - Jun 19, 2026 12:01 AM
- Jun 21, 2026 8:00 AM - Jun 22, 2026 3:00 AM
- Jun 24, 2026 2:00 AM - 9:00 PM
- Jun 26, 2026 10:00 AM - Jun 27, 2026 5:00 AM
- Jul 2, 2026 10:00 AM - Jul 3, 2026 6:00 AM
- Jul 7, 2026 3:00 AM - 11:00 PM
</content>
<id>urn:uuid:4733b1b4-63a9-4721-a5bf-276418e4e6dd</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/9999274c-73fd-435a-a1aa-5288ae6085aa"/>
<published>2026-05-25T07:00:00Z</published>
<title>FIFA - Match Day Road Closure</title>
<updated>2026-05-26T15:43:47.2597827Z</updated>
<georss:line>49.27421868718193 -123.11735212684935 49.274439865996385 -123.118027151628</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Full Closure
Location: BC Place and Surrounding Area
Schedule: Multiple occurrences as follows:
- Jun 13, 2026 11:00 AM - Jun 14, 2026 6:00 AM
- Jun 18, 2026 5:00 AM - Jun 19, 2026 12:01 AM
- Jun 21, 2026 8:00 AM - Jun 22, 2026 3:00 AM
- Jun 24, 2026 2:00 AM - 9:00 PM
- Jun 26, 2026 10:00 AM - Jun 27, 2026 5:00 AM
- Jul 2, 2026 10:00 AM - Jul 3, 2026 6:00 AM
- Jul 7, 2026 3:00 AM - 11:00 PM
</content>
<id>urn:uuid:c122d124-3769-4ea8-b2a0-b0ef3be40b3d</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/9999274c-73fd-435a-a1aa-5288ae6085aa"/>
<published>2026-05-25T07:00:00Z</published>
<title>FIFA - Match Day Road Closure</title>
<updated>2026-05-26T15:43:47.2597827Z</updated>
<georss:line>49.274439865996385 -123.118027151628 49.27448474241024 -123.11835310537619 49.274489202227045 -123.11838120248719 49.27449544682656 -123.1184232027473 49.27450120551674 -123.11846535307852 49.274506487278416 -123.11850766724882 49.2745112831586 -123.11855010399263 49.27451559314312 -123.11859267705637 49.27451940827885 -123.11863534517435 49.27452274655619 -123.11867810838848 49.27452558998459 -123.11872096665434 49.27452794760154 -123.11876387874942 49.274529819392825 -123.11880685842011 49.27453118739632 -123.11884987812662 49.274532078611685 -123.11889292418495 49.2745324660533 -123.11893599652893 49.27453236775398 -123.11897905395762 49.27453177469033 -123.11902212394338 49.27453069589987 -123.1190651652637 49.274529113406544 -123.11910816412636 49.27452705419594 -123.11915112059508 49.274524500306 -123.11919400713 49.274521451736945 -123.11923682372986 49.274517917498116 -123.11927955666745</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Full Closure
Location: BC Place and Surrounding Area
Schedule: Multiple occurrences as follows:
- Jun 13, 2026 11:00 AM - Jun 14, 2026 6:00 AM
- Jun 18, 2026 5:00 AM - Jun 19, 2026 12:01 AM
- Jun 21, 2026 8:00 AM - Jun 22, 2026 3:00 AM
- Jun 24, 2026 2:00 AM - 9:00 PM
- Jun 26, 2026 10:00 AM - Jun 27, 2026 5:00 AM
- Jul 2, 2026 10:00 AM - Jul 3, 2026 6:00 AM
- Jul 7, 2026 3:00 AM - 11:00 PM
</content>
<id>urn:uuid:8eb591ab-026b-4908-b27d-8a3f5abc7472</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/9999274c-73fd-435a-a1aa-5288ae6085aa"/>
<published>2026-05-25T07:00:00Z</published>
<title>FIFA - Match Day Road Closure</title>
<updated>2026-05-26T15:43:47.2597827Z</updated>
<georss:line>49.27638220100121 -123.11403693857447 49.27612713398565 -123.11430045156051 49.27587888711861 -123.11463409259038 49.27579035733413 -123.11475104794609</georss:line>
</entry>
<entry>
<category term="Road Closure"/>
<content>Full closure 
Location: Pacific - Nelson to Carrall
Schedule: May 23, 2026 - Jul 31, 2026</content>
<id>urn:uuid:1fd172dc-1f2e-4ead-b420-64ad8a6815d3</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a140604c-784d-4a03-a7d5-b28af5e3e8e3"/>
<published>2026-04-28T07:00:00Z</published>
<title>FIFA - full closure</title>
<updated>2026-05-25T21:19:53.1525111Z</updated>
<georss:line>49.27709577831109 -123.1063807966682 49.27711991764235 -123.10767644058164</georss:line>
</entry>
<entry>
<category term="Road Closure"/>
<content>Full closure 
Location: Pacific - Nelson to Carrall
Schedule: May 23, 2026 - Jul 31, 2026</content>
<id>urn:uuid:50b2fcfb-4cf7-462b-97d9-5b2648f48318</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a140604c-784d-4a03-a7d5-b28af5e3e8e3"/>
<published>2026-04-28T07:00:00Z</published>
<title>FIFA - full closure</title>
<updated>2026-05-25T21:19:53.1525111Z</updated>
<georss:line>49.27711991764235 -123.10767644058164 49.27668056046571 -123.10898698513616</georss:line>
</entry>
<entry>
<category term="Road Closure"/>
<content>Full closure 
Location: Pacific - Nelson to Carrall
Schedule: May 23, 2026 - Jul 31, 2026</content>
<id>urn:uuid:b3da89c2-70e4-4595-a38d-e93d73862855</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a140604c-784d-4a03-a7d5-b28af5e3e8e3"/>
<published>2026-04-28T07:00:00Z</published>
<title>FIFA - full closure</title>
<updated>2026-05-25T21:19:53.1525111Z</updated>
<georss:line>49.27668056046571 -123.10898698513616 49.276659774207616 -123.10905200979744 49.27663134956913 -123.10913759867042 49.27660195411693 -123.10922241540037 49.27657158786565 -123.1093064462355 49.27654026884636 -123.10938964996754 49.27650800608211 -123.10947199911683 49.27647479960078 -123.10955346618404 49.2764406764027 -123.10963403747785 49.27640563650283 -123.10971369924752 49.27636968893742 -123.10979241026614 49.276332851711715 -123.10987015682329 49.27629513386216 -123.10994689769252 49.27551831822748 -123.11153338711672 49.27499331722521 -123.11268901081883 49.27485370119757 -123.11300391485565</georss:line>
</entry>
<entry>
<category term="Road Closure"/>
<content>Full closure 
Location: Pacific - Nelson to Carrall
Schedule: May 23, 2026 - Jul 31, 2026</content>
<id>urn:uuid:d22e08cb-737a-40af-a131-c375b61304ca</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a140604c-784d-4a03-a7d5-b28af5e3e8e3"/>
<published>2026-04-28T07:00:00Z</published>
<title>FIFA - full closure</title>
<updated>2026-05-25T21:19:53.1525111Z</updated>
<georss:line>49.27485072460357 -123.11301228043324 49.274604521560775 -123.11356756407069 49.274540622590905 -123.11375669515498 49.2744294053376 -123.11408588758314 49.274230214559196 -123.11459624679955 49.27412373170043 -123.11500145644801</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Signage required 

Please sign the south side of 1100blk Pacific Blvd from Cambie St to 40m west of Cambie St. Pay Station: 32-11-20

Effective dates:
Monday March 30, 2026 to July 31, 2026
7AM to 7PM

Permission to occupy and close the following locations for hoarding/scaffolding and cable bridge for FIFA:

Please refer to TO-2026-01718 &amp; TO-2026-01537
Location: 
Schedule: Mar 30, 2026 - Jul 31, 2026</content>
<id>urn:uuid:3f5ad4ae-079f-47af-a15a-3f6445f66bff</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/18634ab8-7fc4-4cc4-92eb-0494819dad30"/>
<published>2026-03-19T07:00:00Z</published>
<title>FIFA CABLE BRIDGE</title>
<updated>2026-04-29T17:41:53.4187262Z</updated>
<georss:line>49.27496804283456 -123.11290033043566 49.2756723276795 -123.11129697328438</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Permission to close and occupy the curb lanes for Accredited FIFA Vehicles Only.
Location: Multiple locations
Schedule: Jun 11, 2026 - Jul 8, 2026</content>
<id>urn:uuid:4fbb66d5-7650-4c82-ad4a-09d4bf6a1129</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/eba3e7ca-b443-4eb1-9d3b-5da85a0dbf7e"/>
<published>2026-05-26T07:00:00Z</published>
<title>FIFA Curb Space Usage</title>
<updated>2026-05-26T19:31:50.5295575Z</updated>
<georss:line>49.28608951825862 -123.12142742571332 49.285158713605824 -123.1199915149364</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Permission to close and occupy the curb lanes for Accredited FIFA Vehicles Only.
Location: Multiple locations
Schedule: Jun 11, 2026 - Jul 8, 2026</content>
<id>urn:uuid:4bb14f9a-002b-4462-b611-3df617c2ad4b</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/eba3e7ca-b443-4eb1-9d3b-5da85a0dbf7e"/>
<published>2026-05-26T07:00:00Z</published>
<title>FIFA Curb Space Usage</title>
<updated>2026-05-26T19:31:50.5295575Z</updated>
<georss:line>49.28374545092913 -123.12012333697835 49.28318206329766 -123.12098164386312</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Permission to close and occupy the curb lanes for Accredited FIFA Vehicles Only.
Location: Multiple locations
Schedule: Jun 11, 2026 - Jul 8, 2026</content>
<id>urn:uuid:9ef02fa0-23ef-43b1-8f54-003db5f7d714</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/eba3e7ca-b443-4eb1-9d3b-5da85a0dbf7e"/>
<published>2026-05-26T07:00:00Z</published>
<title>FIFA Curb Space Usage</title>
<updated>2026-05-26T19:31:50.5295575Z</updated>
<georss:line>49.28765816746406 -123.11629476629903 49.28796957787199 -123.11759831988027</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Permission to close and occupy the curb lanes for Accredited FIFA Vehicles Only.
Location: Multiple locations
Schedule: Jun 11, 2026 - Jul 8, 2026</content>
<id>urn:uuid:1f574771-a95d-45a6-9bc3-39c46395968b</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/eba3e7ca-b443-4eb1-9d3b-5da85a0dbf7e"/>
<published>2026-05-26T07:00:00Z</published>
<title>FIFA Curb Space Usage</title>
<updated>2026-05-26T19:31:50.5295575Z</updated>
<georss:line>49.29321305734274 -123.1293308631006 49.29329841763794 -123.12946277021437 49.293299746575826 -123.12946486413198 49.29330114727446 -123.12946713702506 49.29330252094144 -123.1294694511061 49.29330385858157 -123.12947180635159 49.2933051782006 -123.12947418905573 49.293306461808186 -123.12947659917144 49.2933077273793 -123.12947905049872 49.29330895692348 -123.12948154299033 49.29331016846203 -123.12948404918784 49.29331134397373 -123.12948659654967 49.29331248345858 -123.12948918507598 49.29331360493771 -123.12949178730808 49.29331469039002 -123.12949443070458 49.29331574882602 -123.12949710153622 49.29331677125063 -123.12949979977938 49.29331776665893 -123.12950252545764 49.29331873506635 -123.12950526481814 49.29331966744692 -123.12950804534304 49.293320563831486 -123.12951083952659 49.293321433199765 -123.12951366114525 49.293322266556544 -123.12951651017545 49.29332307291253 -123.12951937288786 49.29332384325701 -123.1295222630118 49.29332457760552 -123.12952516679438 49.29332528493768 -123.12952809801206 49.29332595627386 -123.12953104288837 49.29332659159854 -123.12953401517618 49.29332719993778 -123.12953698739334 49.29332776327041 -123.12953998699841 49.293328299602166 -123.1295430002857 49.293328799953315 -123.1295460134787 49.29332926429299 -123.12954905408324 49.29332969263663 -123.12955210834635 49.29333009399477 -123.12955516253881 49.29333045036179 -123.12955823036626 49.29333077972785 -123.12956131187592 49.29333107311339 -123.12956439329129 49.29333132150762 -123.12956748834166 49.29333154290106 -123.12957059707418 49.293331728313774 -123.12957370571243 49.29333187774594 -123.1295768142564 49.293331991197505 -123.12957992270607 49.29333206865297 -123.12958304481425 49.293332110127835 -123.12958616682816 49.29333212463263 -123.12958927501847 49.29333209414625 -123.12959239684372 49.29333202767927 -123.12959551857467 49.29333192524709 -123.12959862645843 49.29333179581397 -123.12960174802427 49.29333162142052 -123.12960485571936 49.29333141106193 -123.12960794956723 49.29333117370237 -123.12961105709714 49.29333089139794 -123.12961413700343 49.29333058209261 -123.12961723059178 49.29333023683745 -123.12962029658006 49.29332985560171 -123.12962336247395 49.293329438400775 -123.12962641452057 49.293328985234666 -123.12962945271998 49.29332849608795 -123.12963249082497 49.29332797099144 -123.12963550132986 49.29332741892489 -123.12963849801108 49.29332683087773 -123.12964149459788 49.293326206880806 -123.12964446358457 49.29332554693417 -123.12964740497108 49.29332486000203 -123.1296503462868 49.293324128124965 -123.12965325997874 49.293323378273016 -123.12965615987062 49.293322583476225 -123.12965903213872 49.293321761709336 -123.12966189058311 49.29332090399271 -123.12966472142737 49.29332001932153 -123.12966752469504 49.29331909868512 -123.12967031411539 49.29331814211443 -123.12967306218275 49.29331715857367 -123.12967579642637 49.29331614807836 -123.12967850309343 49.293315101633254 -123.12968118216024 49.293314028233624 -123.12968383365052 49.2933129188842 -123.12968645754061 49.29331178258022 -123.1296890538541 49.29331061933706 -123.12969160883814 49.293309429139356 -123.1296941362456 49.29330820299188 -123.12969663605286 49.29330695888498 -123.12969910830711 49.29330567884381 -123.12970153920834 49.29330437186346 -123.12970392878012 49.293303037928524 -123.1297062907753 49.29330167705453 -123.12970861144102 49.2933002892259 -123.12971090453011 49.29329888345322 -123.1297131563134 49.29329744174635 -123.1297153667436 49.292750650059304 -123.1305406495389 49.29217663616126 -123.13060931316086</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Permission to close and occupy the curb lanes for Accredited FIFA Vehicles Only.
Location: Multiple locations
Schedule: Jun 11, 2026 - Jul 8, 2026</content>
<id>urn:uuid:c2bad6f1-2bfd-4f36-9e92-7a6de418ab25</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/eba3e7ca-b443-4eb1-9d3b-5da85a0dbf7e"/>
<published>2026-05-26T07:00:00Z</published>
<title>FIFA Curb Space Usage</title>
<updated>2026-05-26T19:31:50.5295575Z</updated>
<georss:line>49.29142832036004 -123.12928876024114 49.292132902461276 -123.130377618384 49.29213505671649 -123.13038168106853 49.29213719288825 -123.13038582622102 49.29213927501141 -123.13039003999411 49.292141303101545 -123.13039430863527 49.29214329516441 -123.13039861843941 49.2921452241836 -123.13040299684039 49.29214711717549 -123.13040741640432 49.2921489471392 -123.1304118908126 49.29215073208047 -123.13041640636006 49.29215246298867 -123.13042097677557 49.29215413987936 -123.13042558830657 49.29215577174753 -123.13043024097675 49.29215734060304 -123.13043493473867 49.2921588644206 -123.1304396833923 49.29216032524096 -123.13044445938512 49.292161732043695 -123.1304492764934 49.292163093824 -123.13045413474079 49.292164392607106 -123.13045902032735 49.29216562837746 -123.13046394700555 49.29216681914093 -123.13046890107034 49.292167946891595 -123.13047389622675 49.29216902064019 -123.13047891874598 49.292170040402226 -123.13048395487553 49.292170997151516 -123.13048903209665 49.292171890919064 -123.1304941229043 49.29217273068454 -123.13049924107465 49.29217351644789 -123.1305043866078 49.29217423922958 -123.13050954572738 49.292174908009116 -123.1305147322097 49.292175513822485 -123.1305199185259 49.292176056638596 -123.13052513218103 49.29217654546812 -123.13053035944631 49.29217697131594 -123.13053560029797 49.29217733419756 -123.13054084098343 49.29217764307705 -123.1305461090315 49.2921778890059 -123.13055136316085 49.292178080932615 -123.13055664465276 49.292178209908684 -123.1305619122259 49.29217827590304 -123.13056719338528 49.292178278931175 -123.13057247437837 49.29217822798827 -123.13057775522891 49.29217811409475 -123.13058302216061 49.292177937219435 -123.13058830267849 49.29217769739353 -123.13059356927747 49.292177403612044 -123.13059882198124 49.292177046864424 -123.13060407451866 49.29217663616126 -123.13060931316086</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Permission to close and occupy the curb lanes for FIFA related activities.

2800blk Oxford St
3100blk E Pender St
Location: 
Schedule: Multiple occurrences as follows:
- Jun 9, 2026 7:00 AM - 7:00 PM (Both sides of 2800blk Oxford St from Renfrew St to 50m west of Renfrew St)
- Jul 20, 2026 7:00 AM - 7:00 PM (Both sides of 2800blk Oxford St from Renfrew St to 50m west of Renfrew St &amp; North side of 3100blk E Pender St from Lillooet St to 60m east of Lillooet St)
- Jun 10, 2026 7:00 AM - 7:00 PM (North side of 3100blk E Pender St from Lillooet St to 60m east of Lillooet St)
</content>
<id>urn:uuid:ea075f6a-5373-4875-8c9b-ee64f2ea97e8</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/5b0d540f-ae1e-49f7-a316-63a3fd499f6e"/>
<published>2026-06-02T07:00:00Z</published>
<title>FIFA Fan Festival Curb Space Use</title>
<updated>2026-06-02T17:55:07.5403592Z</updated>
<georss:line>49.285684345713946 -123.04607012782121 49.28568312849404 -123.04407106954474</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Permission to close and occupy the curb lanes for FIFA related activities.

2800blk Oxford St
3100blk E Pender St
Location: 
Schedule: Multiple occurrences as follows:
- Jun 9, 2026 7:00 AM - 7:00 PM (Both sides of 2800blk Oxford St from Renfrew St to 50m west of Renfrew St)
- Jul 20, 2026 7:00 AM - 7:00 PM (Both sides of 2800blk Oxford St from Renfrew St to 50m west of Renfrew St &amp; North side of 3100blk E Pender St from Lillooet St to 60m east of Lillooet St)
- Jun 10, 2026 7:00 AM - 7:00 PM (North side of 3100blk E Pender St from Lillooet St to 60m east of Lillooet St)
</content>
<id>urn:uuid:29bad830-d87e-4cb9-922c-9555a1440106</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/5b0d540f-ae1e-49f7-a316-63a3fd499f6e"/>
<published>2026-06-02T07:00:00Z</published>
<title>FIFA Fan Festival Curb Space Use</title>
<updated>2026-06-02T17:55:07.5403592Z</updated>
<georss:line>49.28020554482225 -123.03882891375952 49.28020292535436 -123.03620262997994</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Permission to close and occupy the curb lanes for FIFA related activities.

Effective dates &amp; times: Saturday May 30th to Wednesday July 22nd – Full-time

East side of 300blk Renfrew St from Franklin St to E Hastings St

Location: 
Schedule: May 30, 2026 - Jul 22, 2026</content>
<id>urn:uuid:10b17217-a3fe-40b5-9dc4-c968358e9e21</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/4cabb692-0f70-4971-aa74-4f6dc22340bc"/>
<published>2026-05-01T07:00:00Z</published>
<title>FIFA Fan Festival Curb Space Use</title>
<updated>2026-05-01T19:26:57.163206Z</updated>
<georss:line>49.28204016280364 -123.04406256225202 49.28117101475408 -123.04406256225202</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Permission to close and occupy the curb lanes for KIA Shuttle service to FIFA Fan Festival.

Effective dates &amp; times:
Friday July 3rd to Saturday July 4th
Friday July 10th to Saturday July 11th
Friday July 17th to Sunday July 19th
9AM to 6PM

Location:
South side of 2800blk E 12th Ave from Kaslo St to driveway east of Kaslo St
Location: 
Schedule: Multiple occurrences as follows:
- Jul 3, 2026 9:00 AM - Jul 4, 2026 6:00 PM (Friday &amp; Saturday only)
- Jul 10, 2026 9:00 AM - Jul 11, 2026 6:00 PM (Friday &amp; Saturday only)
- Jul 17, 2026 9:00 AM - Jul 19, 2026 6:00 PM (Friday, Saturday, &amp; Sunday only)
</content>
<id>urn:uuid:c01dfa38-40fa-4221-b72f-9c3e221339dd</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/340bf0fd-a858-48df-8fe3-d24e9ed818f7"/>
<published>2026-05-01T07:00:00Z</published>
<title>FIFA Fan Festival Curb Space Use</title>
<updated>2026-05-01T19:32:30.6632254Z</updated>
<georss:line>49.25906273341394 -123.04700270851087 49.25906098289724 -123.04665402133892</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Permission to close and occupy the curb lanes for FIFA related activities.

Effective dates &amp; times: Thursday June 11th to Monday July 20th – Full-time

Locations:
West side of 3200blk Bridgeway St from pole 22/83 to Miller Dr
South side of 2700blk E 29th Ave from 40m east of Slocan St to Modo Pole
South side of 2900-3000blk E Hastings St from Renfrew St to Lillooet St
East side of 00blk N Renfrew St from Dundas St to Oxford St
East side of 100blk N Renfrew St from Oxford St to 20m north of Oxford St
East side of 00blk Renfrew St from Dundas St to Triumph
East side of 500-600blk Renfrew St from Carlisle St to L/S of Turner St
East side of 1300-1400blk Renfrew St from Charles St to L/S Kitchener St
West side of 2700blk Renfrew St from E 12th Ave to Bradfield Court
East 2700blk Renfrew St from approx. 8m north of pole 10/26 to pole 08/26
West side of 3800blk Slocan St from E 22nd Ave to approx. 22m south of E 22nd Ave
Location: 
Schedule: Jun 11, 2026 - Jul 20, 2026</content>
<id>urn:uuid:9bea4a0e-1c34-4461-af9b-9ba88e278eb1</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdeaab47-86b0-4820-b279-933be86712d5"/>
<published>2026-05-01T07:00:00Z</published>
<title>FIFA Fan Festival Curb Space Use</title>
<updated>2026-05-01T19:24:47.1896798Z</updated>
<georss:line>49.28112381153815 -123.04403248107147 49.2811219852326 -123.03887264160429</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Permission to close and occupy the curb lanes for FIFA related activities.

Effective dates &amp; times: Thursday June 11th to Monday July 20th – Full-time

Locations:
West side of 3200blk Bridgeway St from pole 22/83 to Miller Dr
South side of 2700blk E 29th Ave from 40m east of Slocan St to Modo Pole
South side of 2900-3000blk E Hastings St from Renfrew St to Lillooet St
East side of 00blk N Renfrew St from Dundas St to Oxford St
East side of 100blk N Renfrew St from Oxford St to 20m north of Oxford St
East side of 00blk Renfrew St from Dundas St to Triumph
East side of 500-600blk Renfrew St from Carlisle St to L/S of Turner St
East side of 1300-1400blk Renfrew St from Charles St to L/S Kitchener St
West side of 2700blk Renfrew St from E 12th Ave to Bradfield Court
East 2700blk Renfrew St from approx. 8m north of pole 10/26 to pole 08/26
West side of 3800blk Slocan St from E 22nd Ave to approx. 22m south of E 22nd Ave
Location: 
Schedule: Jun 11, 2026 - Jul 20, 2026</content>
<id>urn:uuid:f22578b1-2af5-448c-a1a1-4629569bb60b</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdeaab47-86b0-4820-b279-933be86712d5"/>
<published>2026-05-01T07:00:00Z</published>
<title>FIFA Fan Festival Curb Space Use</title>
<updated>2026-05-01T19:24:47.1896798Z</updated>
<georss:line>49.28473812891946 -123.04407019727198 49.283884947623534 -123.04407771420578</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Permission to close and occupy the curb lanes for FIFA related activities.

Effective dates &amp; times: Thursday June 11th to Monday July 20th – Full-time

Locations:
West side of 3200blk Bridgeway St from pole 22/83 to Miller Dr
South side of 2700blk E 29th Ave from 40m east of Slocan St to Modo Pole
South side of 2900-3000blk E Hastings St from Renfrew St to Lillooet St
East side of 00blk N Renfrew St from Dundas St to Oxford St
East side of 100blk N Renfrew St from Oxford St to 20m north of Oxford St
East side of 00blk Renfrew St from Dundas St to Triumph
East side of 500-600blk Renfrew St from Carlisle St to L/S of Turner St
East side of 1300-1400blk Renfrew St from Charles St to L/S Kitchener St
West side of 2700blk Renfrew St from E 12th Ave to Bradfield Court
East 2700blk Renfrew St from approx. 8m north of pole 10/26 to pole 08/26
West side of 3800blk Slocan St from E 22nd Ave to approx. 22m south of E 22nd Ave
Location: 
Schedule: Jun 11, 2026 - Jul 20, 2026</content>
<id>urn:uuid:e1338f59-d770-404a-8196-a075fb2b39d6</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdeaab47-86b0-4820-b279-933be86712d5"/>
<published>2026-05-01T07:00:00Z</published>
<title>FIFA Fan Festival Curb Space Use</title>
<updated>2026-05-01T19:24:47.1896798Z</updated>
<georss:line>49.28449459854821 -123.03333909734494 49.28548761767638 -123.03302652521009</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Permission to close and occupy the curb lanes for FIFA related activities.

Effective dates &amp; times: Thursday June 11th to Monday July 20th – Full-time

Locations:
West side of 3200blk Bridgeway St from pole 22/83 to Miller Dr
South side of 2700blk E 29th Ave from 40m east of Slocan St to Modo Pole
South side of 2900-3000blk E Hastings St from Renfrew St to Lillooet St
East side of 00blk N Renfrew St from Dundas St to Oxford St
East side of 100blk N Renfrew St from Oxford St to 20m north of Oxford St
East side of 00blk Renfrew St from Dundas St to Triumph
East side of 500-600blk Renfrew St from Carlisle St to L/S of Turner St
East side of 1300-1400blk Renfrew St from Charles St to L/S Kitchener St
West side of 2700blk Renfrew St from E 12th Ave to Bradfield Court
East 2700blk Renfrew St from approx. 8m north of pole 10/26 to pole 08/26
West side of 3800blk Slocan St from E 22nd Ave to approx. 22m south of E 22nd Ave
Location: 
Schedule: Jun 11, 2026 - Jul 20, 2026</content>
<id>urn:uuid:18287877-d30b-4635-a277-3047c253f5ec</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdeaab47-86b0-4820-b279-933be86712d5"/>
<published>2026-05-01T07:00:00Z</published>
<title>FIFA Fan Festival Curb Space Use</title>
<updated>2026-05-01T19:24:47.1896798Z</updated>
<georss:line>49.28568355560253 -123.04406889937181 49.284774002807325 -123.04406514090499</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Permission to close and occupy the curb lanes for FIFA related activities.

Effective dates &amp; times: Thursday June 11th to Monday July 20th – Full-time

Locations:
West side of 3200blk Bridgeway St from pole 22/83 to Miller Dr
South side of 2700blk E 29th Ave from 40m east of Slocan St to Modo Pole
South side of 2900-3000blk E Hastings St from Renfrew St to Lillooet St
East side of 00blk N Renfrew St from Dundas St to Oxford St
East side of 100blk N Renfrew St from Oxford St to 20m north of Oxford St
East side of 00blk Renfrew St from Dundas St to Triumph
East side of 500-600blk Renfrew St from Carlisle St to L/S of Turner St
East side of 1300-1400blk Renfrew St from Charles St to L/S Kitchener St
West side of 2700blk Renfrew St from E 12th Ave to Bradfield Court
East 2700blk Renfrew St from approx. 8m north of pole 10/26 to pole 08/26
West side of 3800blk Slocan St from E 22nd Ave to approx. 22m south of E 22nd Ave
Location: 
Schedule: Jun 11, 2026 - Jul 20, 2026</content>
<id>urn:uuid:7ff0dba3-1c5a-4c18-8805-ab3ecb4cd17b</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdeaab47-86b0-4820-b279-933be86712d5"/>
<published>2026-05-01T07:00:00Z</published>
<title>FIFA Fan Festival Curb Space Use</title>
<updated>2026-05-01T19:24:47.1896798Z</updated>
<georss:line>49.28569258489878 -123.04406667265754 49.28591568015099 -123.04406667265754</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Permission to close and occupy the curb lanes for FIFA related activities.

Effective dates &amp; times: Thursday June 11th to Monday July 20th – Full-time

Locations:
West side of 3200blk Bridgeway St from pole 22/83 to Miller Dr
South side of 2700blk E 29th Ave from 40m east of Slocan St to Modo Pole
South side of 2900-3000blk E Hastings St from Renfrew St to Lillooet St
East side of 00blk N Renfrew St from Dundas St to Oxford St
East side of 100blk N Renfrew St from Oxford St to 20m north of Oxford St
East side of 00blk Renfrew St from Dundas St to Triumph
East side of 500-600blk Renfrew St from Carlisle St to L/S of Turner St
East side of 1300-1400blk Renfrew St from Charles St to L/S Kitchener St
West side of 2700blk Renfrew St from E 12th Ave to Bradfield Court
East 2700blk Renfrew St from approx. 8m north of pole 10/26 to pole 08/26
West side of 3800blk Slocan St from E 22nd Ave to approx. 22m south of E 22nd Ave
Location: 
Schedule: Jun 11, 2026 - Jul 20, 2026</content>
<id>urn:uuid:2766c37c-df9f-4943-b982-5dc245753af5</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdeaab47-86b0-4820-b279-933be86712d5"/>
<published>2026-05-01T07:00:00Z</published>
<title>FIFA Fan Festival Curb Space Use</title>
<updated>2026-05-01T19:24:47.1896798Z</updated>
<georss:line>49.24462350506994 -123.04893255350069 49.24462175404116 -123.04754585143998</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Permission to close and occupy the curb lanes for FIFA related activities.

Effective dates &amp; times: Thursday June 11th to Monday July 20th – Full-time

Locations:
West side of 3200blk Bridgeway St from pole 22/83 to Miller Dr
South side of 2700blk E 29th Ave from 40m east of Slocan St to Modo Pole
South side of 2900-3000blk E Hastings St from Renfrew St to Lillooet St
East side of 00blk N Renfrew St from Dundas St to Oxford St
East side of 100blk N Renfrew St from Oxford St to 20m north of Oxford St
East side of 00blk Renfrew St from Dundas St to Triumph
East side of 500-600blk Renfrew St from Carlisle St to L/S of Turner St
East side of 1300-1400blk Renfrew St from Charles St to L/S Kitchener St
West side of 2700blk Renfrew St from E 12th Ave to Bradfield Court
East 2700blk Renfrew St from approx. 8m north of pole 10/26 to pole 08/26
West side of 3800blk Slocan St from E 22nd Ave to approx. 22m south of E 22nd Ave
Location: 
Schedule: Jun 11, 2026 - Jul 20, 2026</content>
<id>urn:uuid:5e88abc0-1be6-4fef-97b3-9e41afbc2670</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdeaab47-86b0-4820-b279-933be86712d5"/>
<published>2026-05-01T07:00:00Z</published>
<title>FIFA Fan Festival Curb Space Use</title>
<updated>2026-05-01T19:24:47.1896798Z</updated>
<georss:line>49.27327141986811 -123.04415125022598 49.27183103801249 -123.04415763060732</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Permission to close and occupy the curb lanes for FIFA related activities.

Effective dates &amp; times: Thursday June 11th to Monday July 20th – Full-time

Locations:
West side of 3200blk Bridgeway St from pole 22/83 to Miller Dr
South side of 2700blk E 29th Ave from 40m east of Slocan St to Modo Pole
South side of 2900-3000blk E Hastings St from Renfrew St to Lillooet St
East side of 00blk N Renfrew St from Dundas St to Oxford St
East side of 100blk N Renfrew St from Oxford St to 20m north of Oxford St
East side of 00blk Renfrew St from Dundas St to Triumph
East side of 500-600blk Renfrew St from Carlisle St to L/S of Turner St
East side of 1300-1400blk Renfrew St from Charles St to L/S Kitchener St
West side of 2700blk Renfrew St from E 12th Ave to Bradfield Court
East 2700blk Renfrew St from approx. 8m north of pole 10/26 to pole 08/26
West side of 3800blk Slocan St from E 22nd Ave to approx. 22m south of E 22nd Ave
Location: 
Schedule: Jun 11, 2026 - Jul 20, 2026</content>
<id>urn:uuid:e6fa7602-6bd2-4eb3-9211-69ca35958f15</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdeaab47-86b0-4820-b279-933be86712d5"/>
<published>2026-05-01T07:00:00Z</published>
<title>FIFA Fan Festival Curb Space Use</title>
<updated>2026-05-01T19:24:47.1896798Z</updated>
<georss:line>49.27963672761578 -123.04406367804694 49.27868488902686 -123.04407171682361</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Permission to close and occupy the curb lanes for FIFA related activities.

Effective dates &amp; times: Thursday June 11th to Monday July 20th – Full-time

Locations:
West side of 3200blk Bridgeway St from pole 22/83 to Miller Dr
South side of 2700blk E 29th Ave from 40m east of Slocan St to Modo Pole
South side of 2900-3000blk E Hastings St from Renfrew St to Lillooet St
East side of 00blk N Renfrew St from Dundas St to Oxford St
East side of 100blk N Renfrew St from Oxford St to 20m north of Oxford St
East side of 00blk Renfrew St from Dundas St to Triumph
East side of 500-600blk Renfrew St from Carlisle St to L/S of Turner St
East side of 1300-1400blk Renfrew St from Charles St to L/S Kitchener St
West side of 2700blk Renfrew St from E 12th Ave to Bradfield Court
East 2700blk Renfrew St from approx. 8m north of pole 10/26 to pole 08/26
West side of 3800blk Slocan St from E 22nd Ave to approx. 22m south of E 22nd Ave
Location: 
Schedule: Jun 11, 2026 - Jul 20, 2026</content>
<id>urn:uuid:b0b215d4-100e-4552-a5ac-7a0cdbe8b8df</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdeaab47-86b0-4820-b279-933be86712d5"/>
<published>2026-05-01T07:00:00Z</published>
<title>FIFA Fan Festival Curb Space Use</title>
<updated>2026-05-01T19:24:47.1896798Z</updated>
<georss:line>49.259232060738725 -123.04427717067797 49.2599893493516 -123.04428013293821</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Permission to close and occupy the curb lanes for FIFA related activities.

Effective dates &amp; times: Thursday June 11th to Monday July 20th – Full-time

Locations:
West side of 3200blk Bridgeway St from pole 22/83 to Miller Dr
South side of 2700blk E 29th Ave from 40m east of Slocan St to Modo Pole
South side of 2900-3000blk E Hastings St from Renfrew St to Lillooet St
East side of 00blk N Renfrew St from Dundas St to Oxford St
East side of 100blk N Renfrew St from Oxford St to 20m north of Oxford St
East side of 00blk Renfrew St from Dundas St to Triumph
East side of 500-600blk Renfrew St from Carlisle St to L/S of Turner St
East side of 1300-1400blk Renfrew St from Charles St to L/S Kitchener St
West side of 2700blk Renfrew St from E 12th Ave to Bradfield Court
East 2700blk Renfrew St from approx. 8m north of pole 10/26 to pole 08/26
West side of 3800blk Slocan St from E 22nd Ave to approx. 22m south of E 22nd Ave
Location: 
Schedule: Jun 11, 2026 - Jul 20, 2026</content>
<id>urn:uuid:8d8310dd-d12b-4b0a-a43e-6f1e9a3282b3</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdeaab47-86b0-4820-b279-933be86712d5"/>
<published>2026-05-01T07:00:00Z</published>
<title>FIFA Fan Festival Curb Space Use</title>
<updated>2026-05-01T19:24:47.1896798Z</updated>
<georss:line>49.250644430332954 -123.04963321351681 49.25038884029496 -123.04964046457414</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Permission to close and occupy the curb lanes during all of the Match Days for FIFA related activities.

Saturday June 13th
Thursday June 18th
Sunday June 21st
Wednesday June 24th
Friday June 26th
Thursday July 2nd
Tuesday July 7th
Location: Multiple Locations
Schedule: Jun 13, 2026 - Jul 7, 2026</content>
<id>urn:uuid:a6d62cfc-66cf-446d-b48e-6b90319f706a</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/0c847d31-2d4c-4c02-8879-60afdde36bf2"/>
<published>2026-05-26T07:00:00Z</published>
<title>FIFA Match Days</title>
<updated>2026-05-26T19:25:29.2588315Z</updated>
<georss:line>49.28059258358684 -123.10761431926566 49.2797070864078 -123.10761716349298</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Permission to close and occupy the curb lanes during all of the Match Days for FIFA related activities.

Saturday June 13th
Thursday June 18th
Sunday June 21st
Wednesday June 24th
Friday June 26th
Thursday July 2nd
Tuesday July 7th
Location: Multiple Locations
Schedule: Jun 13, 2026 - Jul 7, 2026</content>
<id>urn:uuid:01b1364b-3f3e-46a3-9246-8a1aa7d5d36b</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/0c847d31-2d4c-4c02-8879-60afdde36bf2"/>
<published>2026-05-26T07:00:00Z</published>
<title>FIFA Match Days</title>
<updated>2026-05-26T19:25:29.2588315Z</updated>
<georss:line>49.2807204136985 -123.1056063221278 49.28010446501793 -123.10587582501667</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Permission to close and occupy the curb lanes during all of the Match Days for FIFA related activities.

Saturday June 13th
Thursday June 18th
Sunday June 21st
Wednesday June 24th
Friday June 26th
Thursday July 2nd
Tuesday July 7th
Location: Multiple Locations
Schedule: Jun 13, 2026 - Jul 7, 2026</content>
<id>urn:uuid:9b797fca-7bd8-4cea-94e0-82d91876cb4f</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/0c847d31-2d4c-4c02-8879-60afdde36bf2"/>
<published>2026-05-26T07:00:00Z</published>
<title>FIFA Match Days</title>
<updated>2026-05-26T19:25:29.2588315Z</updated>
<georss:line>49.2807204136985 -123.1056063221278 49.28075018204265 -123.10576990713355</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Permission to close and occupy the curb lanes during all of the Match Days for FIFA related activities.

Saturday June 13th
Thursday June 18th
Sunday June 21st
Wednesday June 24th
Friday June 26th
Thursday July 2nd
Tuesday July 7th
Location: Multiple Locations
Schedule: Jun 13, 2026 - Jul 7, 2026</content>
<id>urn:uuid:a14bb4ca-56de-4a33-9225-09137e07958a</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/0c847d31-2d4c-4c02-8879-60afdde36bf2"/>
<published>2026-05-26T07:00:00Z</published>
<title>FIFA Match Days</title>
<updated>2026-05-26T19:25:29.2588315Z</updated>
<georss:line>49.28075018204265 -123.10576990713355 49.28107819109158 -123.10757271128858</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Permission to close and occupy the curb lanes during all of the Match Days for FIFA related activities.

Saturday June 13th
Thursday June 18th
Sunday June 21st
Wednesday June 24th
Friday June 26th
Thursday July 2nd
Tuesday July 7th
Location: Multiple Locations
Schedule: Jun 13, 2026 - Jul 7, 2026</content>
<id>urn:uuid:6c260ed5-7708-4b36-9748-270af29bb0bf</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/0c847d31-2d4c-4c02-8879-60afdde36bf2"/>
<published>2026-05-26T07:00:00Z</published>
<title>FIFA Match Days</title>
<updated>2026-05-26T19:25:29.2588315Z</updated>
<georss:line>49.27924571600633 -123.10443941948976 49.279211294137326 -123.10247734307299 49.27927350237343 -123.10221604895952</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Permission to close and occupy the curb lanes during all of the Match Days for FIFA related activities.

Saturday June 13th
Thursday June 18th
Sunday June 21st
Wednesday June 24th
Friday June 26th
Thursday July 2nd
Tuesday July 7th
Location: Multiple Locations
Schedule: Jun 13, 2026 - Jul 7, 2026</content>
<id>urn:uuid:771b7712-4b05-4a0e-87d4-d7b8435e920e</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/0c847d31-2d4c-4c02-8879-60afdde36bf2"/>
<published>2026-05-26T07:00:00Z</published>
<title>FIFA Match Days</title>
<updated>2026-05-26T19:25:29.2588315Z</updated>
<georss:line>49.27953002832669 -123.10233644329747 49.27927350237343 -123.10221604895952</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Permission to close and occupy the curb lanes during all of the Match Days for FIFA related activities.

Saturday June 13th
Thursday June 18th
Sunday June 21st
Wednesday June 24th
Friday June 26th
Thursday July 2nd
Tuesday July 7th
Location: Multiple Locations
Schedule: Jun 13, 2026 - Jul 7, 2026</content>
<id>urn:uuid:2130b8e6-2c33-4e84-a974-94e353c1973b</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/0c847d31-2d4c-4c02-8879-60afdde36bf2"/>
<published>2026-05-26T07:00:00Z</published>
<title>FIFA Match Days</title>
<updated>2026-05-26T19:25:29.2588315Z</updated>
<georss:line>49.27998258433581 -123.10231671469197 49.27953002832669 -123.10233644329747</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Permission to close and occupy the curb lanes during all of the Match Days for FIFA related activities.

Saturday June 13th
Thursday June 18th
Sunday June 21st
Wednesday June 24th
Friday June 26th
Thursday July 2nd
Tuesday July 7th
Location: Multiple Locations
Schedule: Jun 13, 2026 - Jul 7, 2026</content>
<id>urn:uuid:3626d285-6d64-401c-8cc0-fafef19f5575</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/0c847d31-2d4c-4c02-8879-60afdde36bf2"/>
<published>2026-05-26T07:00:00Z</published>
<title>FIFA Match Days</title>
<updated>2026-05-26T19:25:29.2588315Z</updated>
<georss:line>49.28043456448188 -123.10229713578302 49.27998258433581 -123.10231671469197</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Permission to close and occupy the curb lanes during all of the Match Days for FIFA related activities.

Saturday June 13th
Thursday June 18th
Sunday June 21st
Wednesday June 24th
Friday June 26th
Thursday July 2nd
Tuesday July 7th
Location: Multiple Locations
Schedule: Jun 13, 2026 - Jul 7, 2026</content>
<id>urn:uuid:bbc58274-c120-4e38-a497-7804636701ee</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/0c847d31-2d4c-4c02-8879-60afdde36bf2"/>
<published>2026-05-26T07:00:00Z</published>
<title>FIFA Match Days</title>
<updated>2026-05-26T19:25:29.2588315Z</updated>
<georss:line>49.27709577831109 -123.1063807966682 49.27705592568134 -123.1042434461406 49.27705559735401 -123.10421851967504 49.277054981151196 -123.10419362010009 49.27705409507553 -123.10416873370578 49.27705293911475 -123.10414387424086 49.27705149527844 -123.10411904166784 49.27704978153221 -123.1040942635217 49.27704778889333 -123.10406952603556 49.27704552634458 -123.10404484297706 49.27704298489087 -123.10402021432778 49.27704017350263 -123.10399566760358 49.27703708318472 -123.10397120278598 49.27703373193992 -123.10394680616488 49.27703010175324 -123.10392250519952 49.27702620161983 -123.10389829990913 49.27702204052261 -123.10387420406134 49.2770176094665 -123.1038502176376 49.27701290843916 -123.10382635438658 49.2770079464359 -123.10380261432755 49.277002714449196 -123.10377901119026 49.27699723046953 -123.10375554501283 49.27699147650662 -123.10373221575776 49.276985470538506 -123.10370903721156 49.27697921254068 -123.103686036871 49.276972693542746 -123.10366318722102 49.27696592251522 -123.10364051577727 49.27695889945829 -123.1036180225401 49.276951624372 -123.10359570750978 49.276944106227006 -123.10357359820199 49.27693634503575 -123.10355168086863 49.27692833179083 -123.10352996923946 49.276920084482725 -123.10350846335234 49.276911603099194 -123.10348717695575 49.2769028876281 -123.10346612379819 49.27689392908658 -123.10344529011272 49.276884745452975 -123.10342468968543 49.27687533671502 -123.10340433626475 49.27686570287281 -123.10338422985087 49.276855843926484 -123.10336437044384 49.27684576885903 -123.10334477181091 49.27683547765835 -123.10332544770041 49.27682497033686 -123.1033063843642 49.27681424688231 -123.10328759555057 49.276803325272994 -123.10326909504548 49.27679219651381 -123.10325088283014 49.27678086960006 -123.10323295892333 49.27676934453194 -123.10321532332513 49.27675762128496 -123.10319800353206 49.27674570887905 -123.10318097206628 49.27673360727741 -123.10316427017261 49.2767213254877 -123.10314788412146 49.27670885451482 -123.10313181389404 49.27669622134451 -123.10311605954652 49.27668339896675 -123.10310064851909 49.276670414379566 -123.10308556711959 49.27665726757073 -123.1030708290962 49.276643958540376 -123.10305643444879 49.27663048728866 -123.10304238317715 49.27661686279862 -123.10302868904817 49.27660308507035 -123.10301535206165 49.27658917209433 -123.10300237225486 49.27657445864483 -123.10298928080293 49.27655974520604 -123.10297617561058 49.27654504076088 -123.1029630704448 49.276530345309396 -123.10294996530554 49.27651564087344 -123.1029368464071 49.27650094543108 -123.10292372753524 49.27648624999949 -123.10291059492297 49.27647155456637 -123.10289746231854 49.27645686813909 -123.10288431599244 49.27644217271515 -123.10287116965543 49.27642749529218 -123.10285800961552 49.27641280887258 -123.10284484956469 49.27639813145879 -123.10283167579227 49.27638345404347 -123.10281850202765 49.276368776638805 -123.10280531452271 49.27633943083228 -123.10277892580687</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Permission to close and occupy the curb lanes during all of the Match Days for FIFA related activities.

Saturday June 13th
Thursday June 18th
Sunday June 21st
Wednesday June 24th
Friday June 26th
Thursday July 2nd
Tuesday July 7th
Location: Multiple Locations
Schedule: Jun 13, 2026 - Jul 7, 2026</content>
<id>urn:uuid:cc0c8ddd-b414-4700-b4e4-f8c3126a464d</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/0c847d31-2d4c-4c02-8879-60afdde36bf2"/>
<published>2026-05-26T07:00:00Z</published>
<title>FIFA Match Days</title>
<updated>2026-05-26T19:25:29.2588315Z</updated>
<georss:line>49.27805537425138 -123.1061474701193 49.277873089391505 -123.10505215531674 49.277783109630064 -123.10446781536808 49.27773291827796 -123.10420684443734 49.27770902853348 -123.10409544468163</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Permission to close and occupy the curb lanes during all of the Match Days for FIFA related activities.

Saturday June 13th
Thursday June 18th
Sunday June 21st
Wednesday June 24th
Friday June 26th
Thursday July 2nd
Tuesday July 7th
Location: Multiple Locations
Schedule: Jun 13, 2026 - Jul 7, 2026</content>
<id>urn:uuid:170e36bf-ef01-4d3e-aaec-c7ace72292df</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/0c847d31-2d4c-4c02-8879-60afdde36bf2"/>
<published>2026-05-26T07:00:00Z</published>
<title>FIFA Match Days</title>
<updated>2026-05-26T19:25:29.2588315Z</updated>
<georss:line>49.27805537425138 -123.1061474701193 49.27805595585542 -123.10615082603475 49.27812283196377 -123.10641821591705 49.27820762807224 -123.10667346384601 49.2783094113712 -123.1069137495354 49.27836872061505 -123.10702602607387 49.27853797459349 -123.1073453637908 49.27855759456176 -123.10738250056993 49.278609257421834 -123.10750446826249 49.27864756849311 -123.10761979398323</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Permission to close and occupy the curb lanes during all of the Match Days for FIFA related activities.

Saturday June 13th
Thursday June 18th
Sunday June 21st
Wednesday June 24th
Friday June 26th
Thursday July 2nd
Tuesday July 7th
Location: Multiple Locations
Schedule: Jun 13, 2026 - Jul 7, 2026</content>
<id>urn:uuid:69b56a53-c6a4-4ec3-b181-665279840dca</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/0c847d31-2d4c-4c02-8879-60afdde36bf2"/>
<published>2026-05-26T07:00:00Z</published>
<title>FIFA Match Days</title>
<updated>2026-05-26T19:25:29.2588315Z</updated>
<georss:line>49.2797070864078 -123.10761716349298 49.27864756849311 -123.10761979398323</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Permission to close and occupy the curb lanes during all of the Match Days for FIFA related activities.

Saturday June 13th
Thursday June 18th
Sunday June 21st
Wednesday June 24th
Friday June 26th
Thursday July 2nd
Tuesday July 7th
Location: Multiple Locations
Schedule: Jun 13, 2026 - Jul 7, 2026</content>
<id>urn:uuid:f6090a4c-37e5-49bf-9fd1-77973ead2407</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/0c847d31-2d4c-4c02-8879-60afdde36bf2"/>
<published>2026-05-26T07:00:00Z</published>
<title>FIFA Match Days</title>
<updated>2026-05-26T19:25:29.2588315Z</updated>
<georss:line>49.27924571600633 -123.10443941948976 49.279283323673184 -123.10498666696365 49.27946776141545 -123.10613808592092</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Permission to close and occupy the curb lanes during all of the Match Days for FIFA related activities.

Saturday June 13th
Thursday June 18th
Sunday June 21st
Wednesday June 24th
Friday June 26th
Thursday July 2nd
Tuesday July 7th
Location: Multiple Locations
Schedule: Jun 13, 2026 - Jul 7, 2026</content>
<id>urn:uuid:9d857d01-510c-4fd3-8812-0ee18dd2ec40</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/0c847d31-2d4c-4c02-8879-60afdde36bf2"/>
<published>2026-05-26T07:00:00Z</published>
<title>FIFA Match Days</title>
<updated>2026-05-26T19:25:29.2588315Z</updated>
<georss:line>49.27946776141545 -123.10613808592092 49.2797070864078 -123.10761716349298</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Permission to close and occupy the curb lanes during all of the Match Days for FIFA related activities.

Saturday June 13th
Thursday June 18th
Sunday June 21st
Wednesday June 24th
Friday June 26th
Thursday July 2nd
Tuesday July 7th
Location: Multiple Locations
Schedule: Jun 13, 2026 - Jul 7, 2026</content>
<id>urn:uuid:065b442f-8afe-472d-82e2-4040a15f001d</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/0c847d31-2d4c-4c02-8879-60afdde36bf2"/>
<published>2026-05-26T07:00:00Z</published>
<title>FIFA Match Days</title>
<updated>2026-05-26T19:25:29.2588315Z</updated>
<georss:line>49.276070501392894 -123.10207916694685 49.276078638669674 -123.10197091755707 49.27605625137792 -123.10072804493997</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Permission to close and occupy the curb lanes during all of the Match Days for FIFA related activities.

Saturday June 13th
Thursday June 18th
Sunday June 21st
Wednesday June 24th
Friday June 26th
Thursday July 2nd
Tuesday July 7th
Location: Multiple Locations
Schedule: Jun 13, 2026 - Jul 7, 2026</content>
<id>urn:uuid:1d2d8046-1527-4733-8160-73041069130b</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/0c847d31-2d4c-4c02-8879-60afdde36bf2"/>
<published>2026-05-26T07:00:00Z</published>
<title>FIFA Match Days</title>
<updated>2026-05-26T19:25:29.2588315Z</updated>
<georss:line>49.27680761817879 -123.10213312410792 49.27678620107568 -123.10089372714191</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Permission to close and occupy the curb lanes during all of the Match Days for FIFA related activities.

Saturday June 13th
Thursday June 18th
Sunday June 21st
Wednesday June 24th
Friday June 26th
Thursday July 2nd
Tuesday July 7th
Location: Multiple Locations
Schedule: Jun 13, 2026 - Jul 7, 2026</content>
<id>urn:uuid:7ef3987b-e02c-46f2-bad8-e9ccf863453c</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/0c847d31-2d4c-4c02-8879-60afdde36bf2"/>
<published>2026-05-26T07:00:00Z</published>
<title>FIFA Match Days</title>
<updated>2026-05-26T19:25:29.2588315Z</updated>
<georss:line>49.279481467118444 -123.09972933378246 49.278622184132416 -123.09977133608331</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Permission to close and occupy the curb lanes during all of the Match Days for FIFA related activities.

Saturday June 13th
Thursday June 18th
Sunday June 21st
Wednesday June 24th
Friday June 26th
Thursday July 2nd
Tuesday July 7th
Location: Multiple Locations
Schedule: Jun 13, 2026 - Jul 7, 2026</content>
<id>urn:uuid:96ba8a9d-5a56-4fd7-928e-817da0969edc</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/0c847d31-2d4c-4c02-8879-60afdde36bf2"/>
<published>2026-05-26T07:00:00Z</published>
<title>FIFA Match Days</title>
<updated>2026-05-26T19:25:29.2588315Z</updated>
<georss:line>49.27927350237343 -123.10221604895952 49.2795092472719 -123.10122580782745 49.27949531605509 -123.10048111776135</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Permission to close and occupy the curb lanes during all of the Match Days for FIFA related activities.

Saturday June 13th
Thursday June 18th
Sunday June 21st
Wednesday June 24th
Friday June 26th
Thursday July 2nd
Tuesday July 7th
Location: Multiple Locations
Schedule: Jun 13, 2026 - Jul 7, 2026</content>
<id>urn:uuid:055ec48d-b20c-40a0-8364-dc97c7a5a333</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/0c847d31-2d4c-4c02-8879-60afdde36bf2"/>
<published>2026-05-26T07:00:00Z</published>
<title>FIFA Match Days</title>
<updated>2026-05-26T19:25:29.2588315Z</updated>
<georss:line>49.280385517433245 -123.09968911144007 49.279481467118444 -123.09972933378246</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Permission to close and occupy the curb lanes during all of the Match Days for FIFA related activities.

Saturday June 13th
Thursday June 18th
Sunday June 21st
Wednesday June 24th
Friday June 26th
Thursday July 2nd
Tuesday July 7th
Location: Multiple Locations
Schedule: Jun 13, 2026 - Jul 7, 2026</content>
<id>urn:uuid:2b4ec412-a0f1-4811-a5e2-48da3c6b5651</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/0c847d31-2d4c-4c02-8879-60afdde36bf2"/>
<published>2026-05-26T07:00:00Z</published>
<title>FIFA Match Days</title>
<updated>2026-05-26T19:25:29.2588315Z</updated>
<georss:line>49.281335658958966 -123.09964880177719 49.280385517433245 -123.09968911144007</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Permission to close and occupy the curb lanes during all of the Match Days for FIFA related activities.

Saturday June 13th
Thursday June 18th
Sunday June 21st
Wednesday June 24th
Friday June 26th
Thursday July 2nd
Tuesday July 7th
Location: Multiple Locations
Schedule: Jun 13, 2026 - Jul 7, 2026</content>
<id>urn:uuid:57e1c565-76ce-4cca-8664-8f205cf8d768</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/0c847d31-2d4c-4c02-8879-60afdde36bf2"/>
<published>2026-05-26T07:00:00Z</published>
<title>FIFA Match Days</title>
<updated>2026-05-26T19:25:29.2588315Z</updated>
<georss:line>49.27678620107568 -123.10089372714191 49.276781191570336 -123.10060393063932</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Permission to close and occupy the curb lanes during all of the Match Days for FIFA related activities.

Saturday June 13th
Thursday June 18th
Sunday June 21st
Wednesday June 24th
Friday June 26th
Thursday July 2nd
Tuesday July 7th
Location: Multiple Locations
Schedule: Jun 13, 2026 - Jul 7, 2026</content>
<id>urn:uuid:68e499a7-6452-4240-b671-a79316e414f7</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/0c847d31-2d4c-4c02-8879-60afdde36bf2"/>
<published>2026-05-26T07:00:00Z</published>
<title>FIFA Match Days</title>
<updated>2026-05-26T19:25:29.2588315Z</updated>
<georss:line>49.27927350237343 -123.10221604895952 49.27906675357133 -123.10212850854367 49.27764239669909 -123.10212474263511</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Permission to close and occupy the curb lanes during all of the Match Days for FIFA related activities.

Saturday June 13th
Thursday June 18th
Sunday June 21st
Wednesday June 24th
Friday June 26th
Thursday July 2nd
Tuesday July 7th
Location: Multiple Locations
Schedule: Jun 13, 2026 - Jul 7, 2026</content>
<id>urn:uuid:153be141-1e88-41c7-bb4a-e2001d3a4dda</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/0c847d31-2d4c-4c02-8879-60afdde36bf2"/>
<published>2026-05-26T07:00:00Z</published>
<title>FIFA Match Days</title>
<updated>2026-05-26T19:25:29.2588315Z</updated>
<georss:line>49.27605625137792 -123.10072804493997 49.27604094819114 -123.09988107729973</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Permission to close and occupy the curb lanes during all of the Match Days for FIFA related activities.

Saturday June 13th
Thursday June 18th
Sunday June 21st
Wednesday June 24th
Friday June 26th
Thursday July 2nd
Tuesday July 7th
Location: Multiple Locations
Schedule: Jun 13, 2026 - Jul 7, 2026</content>
<id>urn:uuid:301bccdf-e834-438c-8060-68e1a6971cc4</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/0c847d31-2d4c-4c02-8879-60afdde36bf2"/>
<published>2026-05-26T07:00:00Z</published>
<title>FIFA Match Days</title>
<updated>2026-05-26T19:25:29.2588315Z</updated>
<georss:line>49.276766393998656 -123.09984745655615 49.27604094819114 -123.09988107729973</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Permission to close and occupy the curb lanes during all of the Match Days for FIFA related activities.

Saturday June 13th
Thursday June 18th
Sunday June 21st
Wednesday June 24th
Friday June 26th
Thursday July 2nd
Tuesday July 7th
Location: Multiple Locations
Schedule: Jun 13, 2026 - Jul 7, 2026</content>
<id>urn:uuid:b97993a8-3098-41e2-9253-f3fc35d7e6b9</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/0c847d31-2d4c-4c02-8879-60afdde36bf2"/>
<published>2026-05-26T07:00:00Z</published>
<title>FIFA Match Days</title>
<updated>2026-05-26T19:25:29.2588315Z</updated>
<georss:line>49.276781191570336 -123.10060393063932 49.276766393998656 -123.09984745655615</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Permission to close and occupy the curb lanes during all of the Match Days for FIFA related activities.

Saturday June 13th
Thursday June 18th
Sunday June 21st
Wednesday June 24th
Friday June 26th
Thursday July 2nd
Tuesday July 7th
Location: Multiple Locations
Schedule: Jun 13, 2026 - Jul 7, 2026</content>
<id>urn:uuid:177ee574-3da7-4edd-bbc6-2ffabf6d9614</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/0c847d31-2d4c-4c02-8879-60afdde36bf2"/>
<published>2026-05-26T07:00:00Z</published>
<title>FIFA Match Days</title>
<updated>2026-05-26T19:25:29.2588315Z</updated>
<georss:line>49.27756373547254 -123.09981700459524 49.276766393998656 -123.09984745655615</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Permission to close and occupy the curb lanes during all of the Match Days for FIFA related activities.

Saturday June 13th
Thursday June 18th
Sunday June 21st
Wednesday June 24th
Friday June 26th
Thursday July 2nd
Tuesday July 7th
Location: Multiple Locations
Schedule: Jun 13, 2026 - Jul 7, 2026</content>
<id>urn:uuid:f8531217-c928-4c55-b27a-e1f57a5ed072</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/0c847d31-2d4c-4c02-8879-60afdde36bf2"/>
<published>2026-05-26T07:00:00Z</published>
<title>FIFA Match Days</title>
<updated>2026-05-26T19:25:29.2588315Z</updated>
<georss:line>49.277670881064836 -123.09981242258216 49.27756373547254 -123.09981700459524</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Permission to close and occupy the curb lanes during all of the Match Days for FIFA related activities.

Saturday June 13th
Thursday June 18th
Sunday June 21st
Wednesday June 24th
Friday June 26th
Thursday July 2nd
Tuesday July 7th
Location: Multiple Locations
Schedule: Jun 13, 2026 - Jul 7, 2026</content>
<id>urn:uuid:15bd32f3-a275-4149-8c19-4fb42e74e64f</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/0c847d31-2d4c-4c02-8879-60afdde36bf2"/>
<published>2026-05-26T07:00:00Z</published>
<title>FIFA Match Days</title>
<updated>2026-05-26T19:25:29.2588315Z</updated>
<georss:line>49.278578502725 -123.09977226537993 49.277670881064836 -123.09981242258216</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Permission to close and occupy the curb lanes during all of the Match Days for FIFA related activities.

Saturday June 13th
Thursday June 18th
Sunday June 21st
Wednesday June 24th
Friday June 26th
Thursday July 2nd
Tuesday July 7th
Location: Multiple Locations
Schedule: Jun 13, 2026 - Jul 7, 2026</content>
<id>urn:uuid:dd7ce5f1-653a-4686-8710-ceacad5ec7d5</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/0c847d31-2d4c-4c02-8879-60afdde36bf2"/>
<published>2026-05-26T07:00:00Z</published>
<title>FIFA Match Days</title>
<updated>2026-05-26T19:25:29.2588315Z</updated>
<georss:line>49.27770902853348 -123.10409544468163 49.27769792686166 -123.10404730143875 49.27768630319022 -123.10399944583918 49.27767414849956 -123.10395190536225 49.27766147178531 -123.10390468002826 49.277648273035425 -123.1038577835869 49.27763456122082 -123.10381124355531 49.27762034533703 -123.10376505995343 49.2776056073819 -123.1037192464932 49.277590374328895 -123.10367381698072 49.277574646166215 -123.10362878516557 49.2775584228697 -123.10358417854556 49.27754170445212 -123.10353998337322 49.277524499884436 -123.10349622716518 49.27750681815007 -123.1034529236896 49.27748865923718 -123.10341008669565 49.27747003214148 -123.10336771620281 49.277450945834005 -123.10332583972752 49.2774313913325 -123.10328444350311 49.2774113865909 -123.10324356881303 49.277390931609716 -123.1032032156578 49.27737003537243 -123.10316339780503 49.277348706862455 -123.10312412902232 49.27732694608039 -123.10308540930991 49.27730476200972 -123.10304725243529 49.27728215463861 -123.10300967214705 49.277259141945876 -123.10297268223124 49.2772357239196 -123.10293629643634 49.27721190056056 -123.10290051476235 49.27718768984738 -123.10286535099507 49.27716310076346 -123.10283081890151 49.277138124314234 -123.10279691846277 49.277112787461334 -123.10276367723154 49.277087081222334 -123.1027310814404 49.277061023563675 -123.1026991586232 49.277034614485956 -123.10266790877948 49.27700786296046 -123.10263735942421 49.27698077800724 -123.10260748307888 49.276953368585424 -123.10257832100656 49.27692564369076 -123.10254987322529 49.2768976033359 -123.10252212598613 49.27686926547514 -123.10249512057052 49.27684063911633 -123.10246884324808 49.27681171525259 -123.10244330774759 49.27678252085781 -123.1024185278724 49.2767530559324 -123.10239450362154 49.27672332947202 -123.10237123501268 49.27669335046011 -123.10234873581169 49.276663127880084 -123.10232701978433 49.27663267073973 -123.10230607319987 49.276601988010356 -123.10228592357224</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Permission to close and occupy the curb lanes during all of the Match Days for FIFA related activities.

Saturday June 13th
Thursday June 18th
Sunday June 21st
Wednesday June 24th
Friday June 26th
Thursday July 2nd
Tuesday July 7th
Location: Multiple Locations
Schedule: Jun 13, 2026 - Jul 7, 2026</content>
<id>urn:uuid:19d255c3-d631-4f11-959a-10b42db20545</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/0c847d31-2d4c-4c02-8879-60afdde36bf2"/>
<published>2026-05-26T07:00:00Z</published>
<title>FIFA Match Days</title>
<updated>2026-05-26T19:25:29.2588315Z</updated>
<georss:line>49.27764239669909 -123.10212474263511 49.27760014678799 -123.1029856833115 49.27760005505948 -123.10298767665441 49.27759881329598 -123.10301842948405 49.27759792232354 -123.1030491967915 49.27759738212987 -123.10307999232587 49.277597192727285 -123.10311080233936 49.277597354140255 -123.10314159933563 49.277597875351745 -123.10317239708262 49.27759873839588 -123.10320316804645 49.27759996126312 -123.10323391226535 49.277601525963064 -123.10326462970238 49.277603450510725 -123.10329529289889 49.27760571691576 -123.1033259018178 49.277608334185715 -123.10335644273015 49.27761130233287 -123.10338690188803 49.277614621345066 -123.10341729304062 49.27761828225175 -123.10344758867276 49.27762228506538 -123.10347777503654 49.2776266387811 -123.1035078521514 49.27763880251359 -123.1035756165658 49.277649166543966 -123.10364407841719 49.277657712991726 -123.10371311392424 49.277664441942306 -123.10378262684019 49.27767014178187 -123.10384615700416 49.27767747005785 -123.10390930564493 49.277686399884374 -123.10397196272372 49.277696922341306 -123.10403404573641 49.27770902853348 -123.10409544468163 49.277708823985506 -123.10409284577712</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Permission to close and occupy the curb lanes during all of the Match Days for FIFA related activities.

Saturday June 13th
Thursday June 18th
Sunday June 21st
Wednesday June 24th
Friday June 26th
Thursday July 2nd
Tuesday July 7th
Location: Multiple Locations
Schedule: Jun 13, 2026 - Jul 7, 2026</content>
<id>urn:uuid:93fe3b5b-48f6-4ee5-ac1f-571abc3fe8d5</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/0c847d31-2d4c-4c02-8879-60afdde36bf2"/>
<published>2026-05-26T07:00:00Z</published>
<title>FIFA Match Days</title>
<updated>2026-05-26T19:25:29.2588315Z</updated>
<georss:line>49.276070501392894 -123.10207916694685 49.275343248106566 -123.10199928950072</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Permission to close and occupy the curb lanes during all of the Match Days for FIFA related activities.

Saturday June 13th
Thursday June 18th
Sunday June 21st
Wednesday June 24th
Friday June 26th
Thursday July 2nd
Tuesday July 7th
Location: Multiple Locations
Schedule: Jun 13, 2026 - Jul 7, 2026</content>
<id>urn:uuid:b36cf9f4-d49b-4c43-9871-33f2c6147ea0</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/0c847d31-2d4c-4c02-8879-60afdde36bf2"/>
<published>2026-05-26T07:00:00Z</published>
<title>FIFA Match Days</title>
<updated>2026-05-26T19:25:29.2588315Z</updated>
<georss:line>49.275343248106566 -123.10199928950072 49.274954517857594 -123.10192137668709</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Permission to close and occupy the curb lanes during all of the Match Days for FIFA related activities.

Saturday June 13th
Thursday June 18th
Sunday June 21st
Wednesday June 24th
Friday June 26th
Thursday July 2nd
Tuesday July 7th
Location: Multiple Locations
Schedule: Jun 13, 2026 - Jul 7, 2026</content>
<id>urn:uuid:10c927c3-0845-4b36-af25-cb3b5108af2e</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/0c847d31-2d4c-4c02-8879-60afdde36bf2"/>
<published>2026-05-26T07:00:00Z</published>
<title>FIFA Match Days</title>
<updated>2026-05-26T19:25:29.2588315Z</updated>
<georss:line>49.27489600346405 -123.09848889466659 49.27447150490411 -123.09855996340778 49.27256196936884 -123.09864497912929</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Permission to close and occupy the curb lanes during all of the Match Days for FIFA related activities.

Saturday June 13th
Thursday June 18th
Sunday June 21st
Wednesday June 24th
Friday June 26th
Thursday July 2nd
Tuesday July 7th
Location: Multiple Locations
Schedule: Jun 13, 2026 - Jul 7, 2026</content>
<id>urn:uuid:06e7aeef-fc6a-4290-bd13-7b1a8ee01a70</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/0c847d31-2d4c-4c02-8879-60afdde36bf2"/>
<published>2026-05-26T07:00:00Z</published>
<title>FIFA Match Days</title>
<updated>2026-05-26T19:25:29.2588315Z</updated>
<georss:line>49.274954517857594 -123.10192137668709 49.27445188932336 -123.10180391237725 49.27402874133216 -123.10170778501592 49.273730353438765 -123.101707171536 49.273015999953486 -123.10172809712668</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Permission to close and occupy the curb lanes during all of the Match Days for FIFA related activities.

Saturday June 13th
Thursday June 18th
Sunday June 21st
Wednesday June 24th
Friday June 26th
Thursday July 2nd
Tuesday July 7th
Location: Multiple Locations
Schedule: Jun 13, 2026 - Jul 7, 2026</content>
<id>urn:uuid:355ba176-35cc-45ad-a3fc-3279adbb68a5</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/0c847d31-2d4c-4c02-8879-60afdde36bf2"/>
<published>2026-05-26T07:00:00Z</published>
<title>FIFA Match Days</title>
<updated>2026-05-26T19:25:29.2588315Z</updated>
<georss:line>49.27490679721254 -123.09909964668087 49.27489600346405 -123.09848889466659</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Permission to close and occupy the curb lanes during all of the Match Days for FIFA related activities.

Saturday June 13th
Thursday June 18th
Sunday June 21st
Wednesday June 24th
Friday June 26th
Thursday July 2nd
Tuesday July 7th
Location: Multiple Locations
Schedule: Jun 13, 2026 - Jul 7, 2026</content>
<id>urn:uuid:7a6a22f8-3834-4869-ac85-d4a87f71331a</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/0c847d31-2d4c-4c02-8879-60afdde36bf2"/>
<published>2026-05-26T07:00:00Z</published>
<title>FIFA Match Days</title>
<updated>2026-05-26T19:25:29.2588315Z</updated>
<georss:line>49.27492356625635 -123.09993284985319 49.27490679721254 -123.09909964668087</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Permission to close and occupy the curb lanes during all of the Match Days for FIFA related activities.

Saturday June 13th
Thursday June 18th
Sunday June 21st
Wednesday June 24th
Friday June 26th
Thursday July 2nd
Tuesday July 7th
Location: Multiple Locations
Schedule: Jun 13, 2026 - Jul 7, 2026</content>
<id>urn:uuid:009cba14-084d-46f9-96a8-a83784a3f4c1</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/0c847d31-2d4c-4c02-8879-60afdde36bf2"/>
<published>2026-05-26T07:00:00Z</published>
<title>FIFA Match Days</title>
<updated>2026-05-26T19:25:29.2588315Z</updated>
<georss:line>49.274954517857594 -123.10192137668709 49.27492356625635 -123.09993284985319</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Permission to close and occupy the curb lanes during all of the Match Days for FIFA related activities.

Saturday June 13th
Thursday June 18th
Sunday June 21st
Wednesday June 24th
Friday June 26th
Thursday July 2nd
Tuesday July 7th
Location: Multiple Locations
Schedule: Jun 13, 2026 - Jul 7, 2026</content>
<id>urn:uuid:6708bf13-65a7-4ccd-8bd0-e146490452ff</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/0c847d31-2d4c-4c02-8879-60afdde36bf2"/>
<published>2026-05-26T07:00:00Z</published>
<title>FIFA Match Days</title>
<updated>2026-05-26T19:25:29.2588315Z</updated>
<georss:line>49.27181308005444 -123.09805738676492 49.27128378004542 -123.09806310108392</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Permission to close and occupy the curb lanes during all of the Match Days for FIFA related activities.

Saturday June 13th
Thursday June 18th
Sunday June 21st
Wednesday June 24th
Friday June 26th
Thursday July 2nd
Tuesday July 7th
Location: Multiple Locations
Schedule: Jun 13, 2026 - Jul 7, 2026</content>
<id>urn:uuid:3dde7ca7-05dd-46b3-aa07-d86f2ac3256b</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/0c847d31-2d4c-4c02-8879-60afdde36bf2"/>
<published>2026-05-26T07:00:00Z</published>
<title>FIFA Match Days</title>
<updated>2026-05-26T19:25:29.2588315Z</updated>
<georss:line>49.272020937901715 -123.0954506742927 49.27166332225943 -123.09332887144973</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Permission to close and occupy the curb lanes during all of the Match Days for FIFA related activities.

Saturday June 13th
Thursday June 18th
Sunday June 21st
Wednesday June 24th
Friday June 26th
Thursday July 2nd
Tuesday July 7th
Location: Multiple Locations
Schedule: Jun 13, 2026 - Jul 7, 2026</content>
<id>urn:uuid:8c1d52fc-0edd-4f36-a39a-fefa6dd349d3</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/0c847d31-2d4c-4c02-8879-60afdde36bf2"/>
<published>2026-05-26T07:00:00Z</published>
<title>FIFA Match Days</title>
<updated>2026-05-26T19:25:29.2588315Z</updated>
<georss:line>49.271838285698806 -123.09938265240565 49.27181308005444 -123.09805738676492</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Permission to close and occupy the curb lanes during all of the Match Days for FIFA related activities.

Saturday June 13th
Thursday June 18th
Sunday June 21st
Wednesday June 24th
Friday June 26th
Thursday July 2nd
Tuesday July 7th
Location: Multiple Locations
Schedule: Jun 13, 2026 - Jul 7, 2026</content>
<id>urn:uuid:c4b295d1-04e8-4c28-aa56-b329f0fbe637</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/0c847d31-2d4c-4c02-8879-60afdde36bf2"/>
<published>2026-05-26T07:00:00Z</published>
<title>FIFA Match Days</title>
<updated>2026-05-26T19:25:29.2588315Z</updated>
<georss:line>49.27245902183637 -123.09805029510525 49.27181308005444 -123.09805738676492</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Permission to close and occupy the curb lanes during all of the Match Days for FIFA related activities.

Saturday June 13th
Thursday June 18th
Sunday June 21st
Wednesday June 24th
Friday June 26th
Thursday July 2nd
Tuesday July 7th
Location: Multiple Locations
Schedule: Jun 13, 2026 - Jul 7, 2026</content>
<id>urn:uuid:e6927985-b835-4384-9dda-2f04232ddb1a</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/0c847d31-2d4c-4c02-8879-60afdde36bf2"/>
<published>2026-05-26T07:00:00Z</published>
<title>FIFA Match Days</title>
<updated>2026-05-26T19:25:29.2588315Z</updated>
<georss:line>49.27267057952713 -123.09934583239954 49.272504804045724 -123.09935989270483 49.271838285698806 -123.09938265240565</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Permission to close and occupy the curb lanes during all of the Match Days for FIFA related activities.

Saturday June 13th
Thursday June 18th
Sunday June 21st
Wednesday June 24th
Friday June 26th
Thursday July 2nd
Tuesday July 7th
Location: Multiple Locations
Schedule: Jun 13, 2026 - Jul 7, 2026</content>
<id>urn:uuid:885c3d5e-9c30-47be-a778-1b828a8467d0</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/0c847d31-2d4c-4c02-8879-60afdde36bf2"/>
<published>2026-05-26T07:00:00Z</published>
<title>FIFA Match Days</title>
<updated>2026-05-26T19:25:29.2588315Z</updated>
<georss:line>49.271838285698806 -123.09938265240565 49.271392570173674 -123.09963762594046</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Permission to close and occupy the curb lanes during all of the Match Days for FIFA related activities.

Saturday June 13th
Thursday June 18th
Sunday June 21st
Wednesday June 24th
Friday June 26th
Thursday July 2nd
Tuesday July 7th
Location: Multiple Locations
Schedule: Jun 13, 2026 - Jul 7, 2026</content>
<id>urn:uuid:38e705b4-4a80-4219-a184-e3125fd9d495</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/0c847d31-2d4c-4c02-8879-60afdde36bf2"/>
<published>2026-05-26T07:00:00Z</published>
<title>FIFA Match Days</title>
<updated>2026-05-26T19:25:29.2588315Z</updated>
<georss:line>49.269295559061334 -123.10941867795283 49.269027344026085 -123.10996427343846</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Permission to close and occupy the curb lanes during all of the Match Days for FIFA related activities.

Saturday June 13th
Thursday June 18th
Sunday June 21st
Wednesday June 24th
Friday June 26th
Thursday July 2nd
Tuesday July 7th
Location: Multiple Locations
Schedule: Jun 13, 2026 - Jul 7, 2026</content>
<id>urn:uuid:1a453a8f-6bd9-4a05-b9cb-1e58b071a02e</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/0c847d31-2d4c-4c02-8879-60afdde36bf2"/>
<published>2026-05-26T07:00:00Z</published>
<title>FIFA Match Days</title>
<updated>2026-05-26T19:25:29.2588315Z</updated>
<georss:line>49.26927404012173 -123.1065725904193 49.26932447420572 -123.1092807711864 49.269295559061334 -123.10941867795283</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Permission to close and occupy the curb lanes during all of the Match Days for FIFA related activities.

Saturday June 13th
Thursday June 18th
Sunday June 21st
Wednesday June 24th
Friday June 26th
Thursday July 2nd
Tuesday July 7th
Location: Multiple Locations
Schedule: Jun 13, 2026 - Jul 7, 2026</content>
<id>urn:uuid:b3febbd2-7d7a-4383-be80-5c49845a43ee</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/0c847d31-2d4c-4c02-8879-60afdde36bf2"/>
<published>2026-05-26T07:00:00Z</published>
<title>FIFA Match Days</title>
<updated>2026-05-26T19:25:29.2588315Z</updated>
<georss:line>49.26923948656608 -123.1046370392008 49.26927404012173 -123.1065725904193</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Permission to close and occupy the curb lanes during all of the Match Days for FIFA related activities.

Saturday June 13th
Thursday June 18th
Sunday June 21st
Wednesday June 24th
Friday June 26th
Thursday July 2nd
Tuesday July 7th
Location: Multiple Locations
Schedule: Jun 13, 2026 - Jul 7, 2026</content>
<id>urn:uuid:5ac81807-699d-4915-ae1d-9721958f82b1</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/0c847d31-2d4c-4c02-8879-60afdde36bf2"/>
<published>2026-05-26T07:00:00Z</published>
<title>FIFA Match Days</title>
<updated>2026-05-26T19:25:29.2588315Z</updated>
<georss:line>49.26738577665347 -123.10471358623758 49.267350624587635 -123.10277879624145</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Permission to close and occupy the curb lanes during all of the Match Days for FIFA related activities.

Saturday June 13th
Thursday June 18th
Sunday June 21st
Wednesday June 24th
Friday June 26th
Thursday July 2nd
Tuesday July 7th
Location: Multiple Locations
Schedule: Jun 13, 2026 - Jul 7, 2026</content>
<id>urn:uuid:09d552e7-6ff2-4c12-8099-7d5cb5a44520</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/0c847d31-2d4c-4c02-8879-60afdde36bf2"/>
<published>2026-05-26T07:00:00Z</published>
<title>FIFA Match Days</title>
<updated>2026-05-26T19:25:29.2588315Z</updated>
<georss:line>49.26828984588735 -123.10467637863758 49.26825507166052 -123.10274083931236</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Permission to close and occupy the curb lanes during all of the Match Days for FIFA related activities.

Saturday June 13th
Thursday June 18th
Sunday June 21st
Wednesday June 24th
Friday June 26th
Thursday July 2nd
Tuesday July 7th
Location: Multiple Locations
Schedule: Jun 13, 2026 - Jul 7, 2026</content>
<id>urn:uuid:5045415c-29e1-477f-b095-05be6e51e9a6</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/0c847d31-2d4c-4c02-8879-60afdde36bf2"/>
<published>2026-05-26T07:00:00Z</published>
<title>FIFA Match Days</title>
<updated>2026-05-26T19:25:29.2588315Z</updated>
<georss:line>49.26923948656608 -123.1046370392008 49.269204388128315 -123.10270118715651</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Permission to close and occupy the curb lanes during all of the Match Days for FIFA related activities.

Saturday June 13th
Thursday June 18th
Sunday June 21st
Wednesday June 24th
Friday June 26th
Thursday July 2nd
Tuesday July 7th
Location: Multiple Locations
Schedule: Jun 13, 2026 - Jul 7, 2026</content>
<id>urn:uuid:ae13ad8e-58f3-40d5-9097-29f19a82cce6</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/0c847d31-2d4c-4c02-8879-60afdde36bf2"/>
<published>2026-05-26T07:00:00Z</published>
<title>FIFA Match Days</title>
<updated>2026-05-26T19:25:29.2588315Z</updated>
<georss:line>49.269204388128315 -123.10270118715651 49.26918211654669 -123.1014993957403</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Permission to close and occupy the curb lanes during all of the Match Days for FIFA related activities.

Saturday June 13th
Thursday June 18th
Sunday June 21st
Wednesday June 24th
Friday June 26th
Thursday July 2nd
Tuesday July 7th
Location: Multiple Locations
Schedule: Jun 13, 2026 - Jul 7, 2026</content>
<id>urn:uuid:39dfb92f-da75-44a8-8d9e-686e7293dd70</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/0c847d31-2d4c-4c02-8879-60afdde36bf2"/>
<published>2026-05-26T07:00:00Z</published>
<title>FIFA Match Days</title>
<updated>2026-05-26T19:25:29.2588315Z</updated>
<georss:line>49.26742034762535 -123.10664836400224 49.2674715039378 -123.10942790885262</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Permission to close and occupy the curb lanes during all of the Match Days for FIFA related activities.

Saturday June 13th
Thursday June 18th
Sunday June 21st
Wednesday June 24th
Friday June 26th
Thursday July 2nd
Tuesday July 7th
Location: Multiple Locations
Schedule: Jun 13, 2026 - Jul 7, 2026</content>
<id>urn:uuid:2a9e46fc-51df-48ba-b7b8-cd2d67802378</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/0c847d31-2d4c-4c02-8879-60afdde36bf2"/>
<published>2026-05-26T07:00:00Z</published>
<title>FIFA Match Days</title>
<updated>2026-05-26T19:25:29.2588315Z</updated>
<georss:line>49.268218192636795 -123.10073709126947 49.267314141968825 -123.10077509935041</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Permission to close and occupy the curb lanes during all of the Match Days for FIFA related activities.

Saturday June 13th
Thursday June 18th
Sunday June 21st
Wednesday June 24th
Friday June 26th
Thursday July 2nd
Tuesday July 7th
Location: Multiple Locations
Schedule: Jun 13, 2026 - Jul 7, 2026</content>
<id>urn:uuid:a1e12ac5-3dca-4d9e-a4ea-786e52222d3a</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/0c847d31-2d4c-4c02-8879-60afdde36bf2"/>
<published>2026-05-26T07:00:00Z</published>
<title>FIFA Match Days</title>
<updated>2026-05-26T19:25:29.2588315Z</updated>
<georss:line>49.26916798562371 -123.10069690680477 49.26886813055924 -123.1006970938137 49.268218192636795 -123.10073709126947</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Permission to close and occupy the curb lanes during all of the Match Days for FIFA related activities.

Saturday June 13th
Thursday June 18th
Sunday June 21st
Wednesday June 24th
Friday June 26th
Thursday July 2nd
Tuesday July 7th
Location: Multiple Locations
Schedule: Jun 13, 2026 - Jul 7, 2026</content>
<id>urn:uuid:d5b525ac-1a95-473e-8a3e-c8c79551b92a</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/0c847d31-2d4c-4c02-8879-60afdde36bf2"/>
<published>2026-05-26T07:00:00Z</published>
<title>FIFA Match Days</title>
<updated>2026-05-26T19:25:29.2588315Z</updated>
<georss:line>49.27492356625635 -123.09993284985319 49.27277629612772 -123.10002804173709</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Permission to close and occupy the curb lanes during all of the Match Days for FIFA related activities.

Saturday June 13th
Thursday June 18th
Sunday June 21st
Wednesday June 24th
Friday June 26th
Thursday July 2nd
Tuesday July 7th
Location: Multiple Locations
Schedule: Jun 13, 2026 - Jul 7, 2026</content>
<id>urn:uuid:7777589c-14ed-4eb0-918b-67c263e877db</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/0c847d31-2d4c-4c02-8879-60afdde36bf2"/>
<published>2026-05-26T07:00:00Z</published>
<title>FIFA Match Days</title>
<updated>2026-05-26T19:25:29.2588315Z</updated>
<georss:line>49.27604094819114 -123.09988107729973 49.27492356625635 -123.09993284985319</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Permission to close and occupy the curb lanes during all of the Match Days for FIFA related activities.

Saturday June 13th
Thursday June 18th
Sunday June 21st
Wednesday June 24th
Friday June 26th
Thursday July 2nd
Tuesday July 7th
Location: Multiple Locations
Schedule: Jun 13, 2026 - Jul 7, 2026</content>
<id>urn:uuid:fce62d4a-251c-4efa-b202-302fb36d54e5</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/0c847d31-2d4c-4c02-8879-60afdde36bf2"/>
<published>2026-05-26T07:00:00Z</published>
<title>FIFA Match Days</title>
<updated>2026-05-26T19:25:29.2588315Z</updated>
<georss:line>49.271392570173674 -123.09963762594046 49.27099257040254 -123.09985816929536 49.27092417268284 -123.09987697413158</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Permission to close and occupy the curb lanes during all of the Match Days for FIFA related activities.

Saturday June 13th
Thursday June 18th
Sunday June 21st
Wednesday June 24th
Friday June 26th
Thursday July 2nd
Tuesday July 7th
Location: Multiple Locations
Schedule: Jun 13, 2026 - Jul 7, 2026</content>
<id>urn:uuid:45a8ab41-856e-4001-b80f-e257fb98cc72</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/0c847d31-2d4c-4c02-8879-60afdde36bf2"/>
<published>2026-05-26T07:00:00Z</published>
<title>FIFA Match Days</title>
<updated>2026-05-26T19:25:29.2588315Z</updated>
<georss:line>49.27092417268284 -123.09987697413158 49.27043572464447 -123.10000174123262</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Permission to close and occupy the curb lanes during all of the Match Days for FIFA related activities.

Saturday June 13th
Thursday June 18th
Sunday June 21st
Wednesday June 24th
Friday June 26th
Thursday July 2nd
Tuesday July 7th
Location: Multiple Locations
Schedule: Jun 13, 2026 - Jul 7, 2026</content>
<id>urn:uuid:a18cf411-178d-46f1-a96c-01364c6c12bb</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/0c847d31-2d4c-4c02-8879-60afdde36bf2"/>
<published>2026-05-26T07:00:00Z</published>
<title>FIFA Match Days</title>
<updated>2026-05-26T19:25:29.2588315Z</updated>
<georss:line>49.2675072011603 -123.11305787123784 49.26689122969435 -123.11431754789174 49.26673690339342 -123.11461277440516</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Permission to close and occupy the curb lanes during all of the Match Days for FIFA related activities.

Saturday June 13th
Thursday June 18th
Sunday June 21st
Wednesday June 24th
Friday June 26th
Thursday July 2nd
Tuesday July 7th
Location: Multiple Locations
Schedule: Jun 13, 2026 - Jul 7, 2026</content>
<id>urn:uuid:0d30b246-87ee-4ad9-86f1-77a16f78ec7c</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/0c847d31-2d4c-4c02-8879-60afdde36bf2"/>
<published>2026-05-26T07:00:00Z</published>
<title>FIFA Match Days</title>
<updated>2026-05-26T19:25:29.2588315Z</updated>
<georss:line>49.26826743192447 -123.11151055347888 49.267539044583856 -123.11299307797061</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Permission to close and occupy the curb lanes during all of the Match Days for FIFA related activities.

Saturday June 13th
Thursday June 18th
Sunday June 21st
Wednesday June 24th
Friday June 26th
Thursday July 2nd
Tuesday July 7th
Location: Multiple Locations
Schedule: Jun 13, 2026 - Jul 7, 2026</content>
<id>urn:uuid:770688cc-9873-4a84-a476-f59ae2d6b14f</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/0c847d31-2d4c-4c02-8879-60afdde36bf2"/>
<published>2026-05-26T07:00:00Z</published>
<title>FIFA Match Days</title>
<updated>2026-05-26T19:25:29.2588315Z</updated>
<georss:line>49.26840895214005 -123.11122253725023 49.26826743192447 -123.11151055347888</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Permission to close and occupy the curb lanes during all of the Match Days for FIFA related activities.

Saturday June 13th
Thursday June 18th
Sunday June 21st
Wednesday June 24th
Friday June 26th
Thursday July 2nd
Tuesday July 7th
Location: Multiple Locations
Schedule: Jun 13, 2026 - Jul 7, 2026</content>
<id>urn:uuid:658691e2-84c3-43d7-8c7c-a64979af0a75</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/0c847d31-2d4c-4c02-8879-60afdde36bf2"/>
<published>2026-05-26T07:00:00Z</published>
<title>FIFA Match Days</title>
<updated>2026-05-26T19:25:29.2588315Z</updated>
<georss:line>49.269027344026085 -123.10996427343846 49.26840895214005 -123.11122253725023</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Permission to close and occupy the curb lanes during all of the Match Days for FIFA related activities.

Saturday June 13th
Thursday June 18th
Sunday June 21st
Wednesday June 24th
Friday June 26th
Thursday July 2nd
Tuesday July 7th
Location: Multiple Locations
Schedule: Jun 13, 2026 - Jul 7, 2026</content>
<id>urn:uuid:168da12b-7fb9-44e9-ab02-70cce6a7ba52</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/0c847d31-2d4c-4c02-8879-60afdde36bf2"/>
<published>2026-05-26T07:00:00Z</published>
<title>FIFA Match Days</title>
<updated>2026-05-26T19:25:29.2588315Z</updated>
<georss:line>49.27274758691732 -123.09290197803749 49.27210175139254 -123.08907367452264</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Permission to close and occupy the curb lanes during all of the Match Days for FIFA related activities.

Saturday June 13th
Thursday June 18th
Sunday June 21st
Wednesday June 24th
Friday June 26th
Thursday July 2nd
Tuesday July 7th
Location: Multiple Locations
Schedule: Jun 13, 2026 - Jul 7, 2026</content>
<id>urn:uuid:28a64245-6cac-483e-9583-f49856662a73</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/0c847d31-2d4c-4c02-8879-60afdde36bf2"/>
<published>2026-05-26T07:00:00Z</published>
<title>FIFA Match Days</title>
<updated>2026-05-26T19:25:29.2588315Z</updated>
<georss:line>49.27210175139254 -123.08907367452264 49.271754674171774 -123.08701665321726</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Permission to close and occupy the curb lanes during all of the Match Days for FIFA related activities.

Saturday June 13th
Thursday June 18th
Sunday June 21st
Wednesday June 24th
Friday June 26th
Thursday July 2nd
Tuesday July 7th
Location: Multiple Locations
Schedule: Jun 13, 2026 - Jul 7, 2026</content>
<id>urn:uuid:38f5333b-ced3-491e-84e3-a490d808f40e</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/0c847d31-2d4c-4c02-8879-60afdde36bf2"/>
<published>2026-05-26T07:00:00Z</published>
<title>FIFA Match Days</title>
<updated>2026-05-26T19:25:29.2588315Z</updated>
<georss:line>49.271754674171774 -123.08701665321726 49.271478874991374 -123.08537349336684</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Permission to close and occupy the curb lanes during all of the Match Days for FIFA related activities.

Saturday June 13th
Thursday June 18th
Sunday June 21st
Wednesday June 24th
Friday June 26th
Thursday July 2nd
Tuesday July 7th
Location: Multiple Locations
Schedule: Jun 13, 2026 - Jul 7, 2026</content>
<id>urn:uuid:862f451a-6dde-45fb-a7ec-25057899b535</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/0c847d31-2d4c-4c02-8879-60afdde36bf2"/>
<published>2026-05-26T07:00:00Z</published>
<title>FIFA Match Days</title>
<updated>2026-05-26T19:25:29.2588315Z</updated>
<georss:line>49.271478874991374 -123.08537349336684 49.271312559691864 -123.08439828606404 49.27081713107367 -123.0814533953075</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Permission to close and occupy the curb lanes during all of the Match Days for FIFA related activities.

Saturday June 13th
Thursday June 18th
Sunday June 21st
Wednesday June 24th
Friday June 26th
Thursday July 2nd
Tuesday July 7th
Location: Multiple Locations
Schedule: Jun 13, 2026 - Jul 7, 2026</content>
<id>urn:uuid:92b8ca35-708a-4d21-8c7c-d8100ca43a33</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/0c847d31-2d4c-4c02-8879-60afdde36bf2"/>
<published>2026-05-26T07:00:00Z</published>
<title>FIFA Match Days</title>
<updated>2026-05-26T19:25:29.2588315Z</updated>
<georss:line>49.26667646709885 -123.08905368125156 49.26621920611936 -123.08666270754058</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Permission to close and occupy the curb lanes during all of the Match Days for FIFA related activities.

Saturday June 13th
Thursday June 18th
Sunday June 21st
Wednesday June 24th
Friday June 26th
Thursday July 2nd
Tuesday July 7th
Location: Multiple Locations
Schedule: Jun 13, 2026 - Jul 7, 2026</content>
<id>urn:uuid:fbedbc3c-79fb-414b-b861-b80b6fc6d5a4</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/0c847d31-2d4c-4c02-8879-60afdde36bf2"/>
<published>2026-05-26T07:00:00Z</published>
<title>FIFA Match Days</title>
<updated>2026-05-26T19:25:29.2588315Z</updated>
<georss:line>49.26621920611936 -123.08666270754058 49.26589606709433 -123.08497312449758 49.26588555601626 -123.08491831786753</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Permission to close and occupy the curb lanes during all of the Match Days for FIFA related activities.

Saturday June 13th
Thursday June 18th
Sunday June 21st
Wednesday June 24th
Friday June 26th
Thursday July 2nd
Tuesday July 7th
Location: Multiple Locations
Schedule: Jun 13, 2026 - Jul 7, 2026</content>
<id>urn:uuid:ca883c85-23df-4adf-9369-27d20de74c1f</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/0c847d31-2d4c-4c02-8879-60afdde36bf2"/>
<published>2026-05-26T07:00:00Z</published>
<title>FIFA Match Days</title>
<updated>2026-05-26T19:25:29.2588315Z</updated>
<georss:line>49.26588555601626 -123.08491831786753 49.26550197831341 -123.0829178781986</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Permission to close and occupy the curb lanes during all of the Match Days for FIFA related activities.

Saturday June 13th
Thursday June 18th
Sunday June 21st
Wednesday June 24th
Friday June 26th
Thursday July 2nd
Tuesday July 7th
Location: Multiple Locations
Schedule: Jun 13, 2026 - Jul 7, 2026</content>
<id>urn:uuid:691a1a45-7137-4aef-99a2-efc3b27f4521</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/0c847d31-2d4c-4c02-8879-60afdde36bf2"/>
<published>2026-05-26T07:00:00Z</published>
<title>FIFA Match Days</title>
<updated>2026-05-26T19:25:29.2588315Z</updated>
<georss:line>49.2782090500865 -123.1149548326998 49.27851578606314 -123.11545083110816</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Permission to close and occupy the curb lanes during all of the Match Days for FIFA related activities.

Saturday June 13th
Thursday June 18th
Sunday June 21st
Wednesday June 24th
Friday June 26th
Thursday July 2nd
Tuesday July 7th
Location: Multiple Locations
Schedule: Jun 13, 2026 - Jul 7, 2026</content>
<id>urn:uuid:6ec5fde9-54e5-4e1d-b7d0-b9b9eaf8f9cc</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/0c847d31-2d4c-4c02-8879-60afdde36bf2"/>
<published>2026-05-26T07:00:00Z</published>
<title>FIFA Match Days</title>
<updated>2026-05-26T19:25:29.2588315Z</updated>
<georss:line>49.27933838349995 -123.11324504785219 49.279174520716595 -123.11350841873322 49.2782090500865 -123.1149548326998</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Permission to close and occupy the curb lanes during all of the Match Days for FIFA related activities.

Saturday June 13th
Thursday June 18th
Sunday June 21st
Wednesday June 24th
Friday June 26th
Thursday July 2nd
Tuesday July 7th
Location: Multiple Locations
Schedule: Jun 13, 2026 - Jul 7, 2026</content>
<id>urn:uuid:7d5dff37-f424-4413-8767-2d5e222d7d35</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/0c847d31-2d4c-4c02-8879-60afdde36bf2"/>
<published>2026-05-26T07:00:00Z</published>
<title>FIFA Match Days</title>
<updated>2026-05-26T19:25:29.2588315Z</updated>
<georss:line>49.27933838349995 -123.11324504785219 49.279174520716595 -123.11350841873322 49.2782090500865 -123.1149548326998</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Permission to close and occupy the curb lanes during all of the Match Days for FIFA related activities.

Saturday June 13th
Thursday June 18th
Sunday June 21st
Wednesday June 24th
Friday June 26th
Thursday July 2nd
Tuesday July 7th
Location: Multiple Locations
Schedule: Jun 13, 2026 - Jul 7, 2026</content>
<id>urn:uuid:aacb424a-0c05-47fd-b6ac-f8bc0816adee</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/0c847d31-2d4c-4c02-8879-60afdde36bf2"/>
<published>2026-05-26T07:00:00Z</published>
<title>FIFA Match Days</title>
<updated>2026-05-26T19:25:29.2588315Z</updated>
<georss:line>49.27851578606314 -123.11545083110816 49.278839464866905 -123.11592187997282</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Permission to close and occupy the curb lanes during all of the Match Days for FIFA related activities.

Saturday June 13th
Thursday June 18th
Sunday June 21st
Wednesday June 24th
Friday June 26th
Thursday July 2nd
Tuesday July 7th
Location: Multiple Locations
Schedule: Jun 13, 2026 - Jul 7, 2026</content>
<id>urn:uuid:2b918335-7fa0-457f-9bbb-384ca19849cd</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/0c847d31-2d4c-4c02-8879-60afdde36bf2"/>
<published>2026-05-26T07:00:00Z</published>
<title>FIFA Match Days</title>
<updated>2026-05-26T19:25:29.2588315Z</updated>
<georss:line>49.2799672342899 -123.11421616157196 49.278839464866905 -123.11592187997282</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Permission to close and occupy the curb lanes during all of the Match Days for FIFA related activities.

Saturday June 13th
Thursday June 18th
Sunday June 21st
Wednesday June 24th
Friday June 26th
Thursday July 2nd
Tuesday July 7th
Location: Multiple Locations
Schedule: Jun 13, 2026 - Jul 7, 2026</content>
<id>urn:uuid:63458c3a-17d6-40a0-aa3f-d5cd573f6f9b</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/0c847d31-2d4c-4c02-8879-60afdde36bf2"/>
<published>2026-05-26T07:00:00Z</published>
<title>FIFA Match Days</title>
<updated>2026-05-26T19:25:29.2588315Z</updated>
<georss:line>49.27870983959991 -123.11227364331891 49.278616913588024 -123.11241835840646 49.278442828547384 -123.11267824021576</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Permission to close and occupy the curb lanes during all of the Match Days for FIFA related activities.

Saturday June 13th
Thursday June 18th
Sunday June 21st
Wednesday June 24th
Friday June 26th
Thursday July 2nd
Tuesday July 7th
Location: Multiple Locations
Schedule: Jun 13, 2026 - Jul 7, 2026</content>
<id>urn:uuid:7ae43445-4c9f-4c74-b683-2ab6578ac5aa</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/0c847d31-2d4c-4c02-8879-60afdde36bf2"/>
<published>2026-05-26T07:00:00Z</published>
<title>FIFA Match Days</title>
<updated>2026-05-26T19:25:29.2588315Z</updated>
<georss:line>49.27985058753458 -123.11055085381176 49.27870983959991 -123.11227364331891</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Permission to close and occupy the curb lanes during all of the Match Days for FIFA related activities.

Saturday June 13th
Thursday June 18th
Sunday June 21st
Wednesday June 24th
Friday June 26th
Thursday July 2nd
Tuesday July 7th
Location: Multiple Locations
Schedule: Jun 13, 2026 - Jul 7, 2026</content>
<id>urn:uuid:6386017e-9628-47a3-8013-317ab2a5993b</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/0c847d31-2d4c-4c02-8879-60afdde36bf2"/>
<published>2026-05-26T07:00:00Z</published>
<title>FIFA Match Days</title>
<updated>2026-05-26T19:25:29.2588315Z</updated>
<georss:line>49.28055735669989 -123.10948340930592 49.27985058753458 -123.11055085381176</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Permission to close and occupy the curb lanes during all of the Match Days for FIFA related activities.

Saturday June 13th
Thursday June 18th
Sunday June 21st
Wednesday June 24th
Friday June 26th
Thursday July 2nd
Tuesday July 7th
Location: Multiple Locations
Schedule: Jun 13, 2026 - Jul 7, 2026</content>
<id>urn:uuid:8c752bed-eaee-45b7-ad44-9cd0c13383e7</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/0c847d31-2d4c-4c02-8879-60afdde36bf2"/>
<published>2026-05-26T07:00:00Z</published>
<title>FIFA Match Days</title>
<updated>2026-05-26T19:25:29.2588315Z</updated>
<georss:line>49.27867060538969 -123.10868629785928 49.27866545899204 -123.10870664853229 49.278659492051474 -123.10872910096438 49.27865328240537 -123.10875137412295 49.27864681203758 -123.10877349546577 49.27864008996926 -123.10879543751477 49.278633116213456 -123.10881718652091 49.27862589975243 -123.10883875625251 49.278618431604144 -123.10886013294073 49.27861072977197 -123.10888130287624 49.27860278526083 -123.10890226603902 49.27859459808383 -123.10892300868005 49.278586177236264 -123.10894353081902 49.278577522731155 -123.10896381870697 49.2785686435509 -123.10898388611226 49.27855953072631 -123.10900370551745 49.27855019323971 -123.109023290691 49.27854063111727 -123.10904261413526 49.27853085335414 -123.10906167586995 49.27802638254761 -123.11006089998584 49.27801621651403 -123.11008133531973 49.278006293097434 -123.1101020324092 49.2779966033024 -123.11012299123425 49.27798714714194 -123.1101441980465 49.27797794259314 -123.11016566663473 49.27796898068689 -123.11018736948192 49.27796027041825 -123.11020930660833 49.27795181180022 -123.11023146426558 49.277943604819484 -123.11025385620245 49.27793565848427 -123.11027646869069 49.27792797280756 -123.11029928798192 49.277920547802296 -123.11032230032785 49.277913383455285 -123.11034551947735 49.27790648878786 -123.11036891795364 49.27789986379983 -123.110392495757 49.277893499495946 -123.11041625286767 49.27788741389281 -123.11044016182902 49.277881606963916 -123.11046425013852 49.27787839139643 -123.11047814277904</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Permission to close and occupy the curb lanes during all of the Match Days for FIFA related activities.

Saturday June 13th
Thursday June 18th
Sunday June 21st
Wednesday June 24th
Friday June 26th
Thursday July 2nd
Tuesday July 7th
Location: Multiple Locations
Schedule: Jun 13, 2026 - Jul 7, 2026</content>
<id>urn:uuid:9d86f51f-ee1c-4dc4-892c-b886a6ede503</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/0c847d31-2d4c-4c02-8879-60afdde36bf2"/>
<published>2026-05-26T07:00:00Z</published>
<title>FIFA Match Days</title>
<updated>2026-05-26T19:25:29.2588315Z</updated>
<georss:line>49.28123843384853 -123.10845518787391 49.28055735669989 -123.10948340930592</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Permission to close and occupy the curb lanes during all of the Match Days for FIFA related activities.

Saturday June 13th
Thursday June 18th
Sunday June 21st
Wednesday June 24th
Friday June 26th
Thursday July 2nd
Tuesday July 7th
Location: Multiple Locations
Schedule: Jun 13, 2026 - Jul 7, 2026</content>
<id>urn:uuid:359c48ab-2c6d-4ae2-813a-d811256056da</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/0c847d31-2d4c-4c02-8879-60afdde36bf2"/>
<published>2026-05-26T07:00:00Z</published>
<title>FIFA Match Days</title>
<updated>2026-05-26T19:25:29.2588315Z</updated>
<georss:line>49.27864756849311 -123.10761979398323 49.2786489494074 -123.10762445783162 49.27865534232731 -123.10764662106432 49.27866148321186 -123.10766896248859 49.27866736309133 -123.10769145458698 49.2786729909609 -123.10771409737879 49.27867835781237 -123.10773690459293 49.27868346368422 -123.10775983498272 49.27868829956827 -123.10778290227702 49.2786928834677 -123.10780609276595 49.27869718839693 -123.1078294063903 49.278701232359026 -123.1078528294402 49.27870501535392 -123.10787636191527 49.27870851940406 -123.10789999002715 49.2787117625125 -123.10792370006592 49.278714726689 -123.10794749199194 49.27871742092859 -123.1079713658245 49.278719827253695 -123.10799530777508 49.278721981657895 -123.10801930417315 49.278723848160354 -123.10804335493967 49.2787254447515 -123.10806746011357 49.27872677144413 -123.10809160594563 49.27872781925586 -123.10811577866708 49.27872858818674 -123.10813997827744 49.27872907824957 -123.10816419102754 49.27872929845245 -123.10818840318781 49.27872923978725 -123.10821262848702 49.27872890226692 -123.10823685317594 49.27872829489945 -123.10826106352505 49.27872739970746 -123.10828524574579 49.27872623466834 -123.10830941362593 49.27872479980795 -123.10833353966746 49.278723086131095 -123.10835762385028 49.278721093650745 -123.10838165242524 49.278718831362085 -123.10840562541165 49.27871629026993 -123.10842954278935 49.278713479382475 -123.1084533908289 49.27871039871263 -123.10847715578116 49.278707039278146 -123.10850082387722 49.27870341905654 -123.10852440890497 49.27869952906565 -123.10854789709552 49.27869536931837 -123.10857127469973 49.27869093981482 -123.1085945417172 49.27868624957611 -123.10861767066979 49.27868129857637 -123.10864068905478 49.278676077846484 -123.10866356935449 49.27867060538969 -123.10868629785928</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Permission to close and occupy the curb lanes during all of the Match Days for FIFA related activities.

Saturday June 13th
Thursday June 18th
Sunday June 21st
Wednesday June 24th
Friday June 26th
Thursday July 2nd
Tuesday July 7th
Location: Multiple Locations
Schedule: Jun 13, 2026 - Jul 7, 2026</content>
<id>urn:uuid:0dc9451f-c46f-495a-82f1-b5d97172d3a0</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/0c847d31-2d4c-4c02-8879-60afdde36bf2"/>
<published>2026-05-26T07:00:00Z</published>
<title>FIFA Match Days</title>
<updated>2026-05-26T19:25:29.2588315Z</updated>
<georss:line>49.27864756849311 -123.10761979398323 49.27711991764235 -123.10767644058164</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Permission to close and occupy the curb lanes during all of the Match Days for FIFA related activities.

Saturday June 13th
Thursday June 18th
Sunday June 21st
Wednesday June 24th
Friday June 26th
Thursday July 2nd
Tuesday July 7th
Location: Multiple Locations
Schedule: Jun 13, 2026 - Jul 7, 2026</content>
<id>urn:uuid:9867dd2f-41e1-4431-af6d-61ff4ff0be9d</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/0c847d31-2d4c-4c02-8879-60afdde36bf2"/>
<published>2026-05-26T07:00:00Z</published>
<title>FIFA Match Days</title>
<updated>2026-05-26T19:25:29.2588315Z</updated>
<georss:line>49.277580764702776 -123.11398201313469 49.277267155098144 -123.11445671074371</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Permission to close and occupy the curb lanes during all of the Match Days for FIFA related activities.

Saturday June 13th
Thursday June 18th
Sunday June 21st
Wednesday June 24th
Friday June 26th
Thursday July 2nd
Tuesday July 7th
Location: Multiple Locations
Schedule: Jun 13, 2026 - Jul 7, 2026</content>
<id>urn:uuid:9964330e-5b9f-4026-8e06-f5cecb823a43</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/0c847d31-2d4c-4c02-8879-60afdde36bf2"/>
<published>2026-05-26T07:00:00Z</published>
<title>FIFA Match Days</title>
<updated>2026-05-26T19:25:29.2588315Z</updated>
<georss:line>49.27789500733519 -123.11446846130269 49.277580764702776 -123.11398201313469</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Permission to close and occupy the curb lanes during all of the Match Days for FIFA related activities.

Saturday June 13th
Thursday June 18th
Sunday June 21st
Wednesday June 24th
Friday June 26th
Thursday July 2nd
Tuesday July 7th
Location: Multiple Locations
Schedule: Jun 13, 2026 - Jul 7, 2026</content>
<id>urn:uuid:0993c8c3-d26b-446d-ba43-573ce9e26e12</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/0c847d31-2d4c-4c02-8879-60afdde36bf2"/>
<published>2026-05-26T07:00:00Z</published>
<title>FIFA Match Days</title>
<updated>2026-05-26T19:25:29.2588315Z</updated>
<georss:line>49.278442828547384 -123.11267824021576 49.277580764702776 -123.11398201313469</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Permission to close and occupy the curb lanes during all of the Match Days for FIFA related activities.

Saturday June 13th
Thursday June 18th
Sunday June 21st
Wednesday June 24th
Friday June 26th
Thursday July 2nd
Tuesday July 7th
Location: Multiple Locations
Schedule: Jun 13, 2026 - Jul 7, 2026</content>
<id>urn:uuid:9860e59b-2856-4c65-bb2e-15cc9388c6cd</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/0c847d31-2d4c-4c02-8879-60afdde36bf2"/>
<published>2026-05-26T07:00:00Z</published>
<title>FIFA Match Days</title>
<updated>2026-05-26T19:25:29.2588315Z</updated>
<georss:line>49.2782090500865 -123.1149548326998 49.27789500733519 -123.11446846130269</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Permission to close and occupy the curb lanes during all of the Match Days for FIFA related activities.

Saturday June 13th
Thursday June 18th
Sunday June 21st
Wednesday June 24th
Friday June 26th
Thursday July 2nd
Tuesday July 7th
Location: Multiple Locations
Schedule: Jun 13, 2026 - Jul 7, 2026</content>
<id>urn:uuid:b16cb26d-96da-41de-95b0-d4305f235acd</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/0c847d31-2d4c-4c02-8879-60afdde36bf2"/>
<published>2026-05-26T07:00:00Z</published>
<title>FIFA Match Days</title>
<updated>2026-05-26T19:25:29.2588315Z</updated>
<georss:line>49.2782090500865 -123.1149548326998 49.27789655469422 -123.11542675555046</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Permission to close and occupy the curb lanes during all of the Match Days for FIFA related activities.

Saturday June 13th
Thursday June 18th
Sunday June 21st
Wednesday June 24th
Friday June 26th
Thursday July 2nd
Tuesday July 7th
Location: Multiple Locations
Schedule: Jun 13, 2026 - Jul 7, 2026</content>
<id>urn:uuid:5acb714e-7941-4aea-a8a2-ed12f729add1</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/0c847d31-2d4c-4c02-8879-60afdde36bf2"/>
<published>2026-05-26T07:00:00Z</published>
<title>FIFA Match Days</title>
<updated>2026-05-26T19:25:29.2588315Z</updated>
<georss:line>49.273868416488654 -123.11486151852314 49.273382278625775 -123.11497183945251 49.273234406391 -123.11534217790609 49.273212462895 -123.11587682762766</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Permission to close and occupy the curb lanes during all of the Match Days for FIFA related activities.

Saturday June 13th
Thursday June 18th
Sunday June 21st
Wednesday June 24th
Friday June 26th
Thursday July 2nd
Tuesday July 7th
Location: Multiple Locations
Schedule: Jun 13, 2026 - Jul 7, 2026</content>
<id>urn:uuid:8d0653c8-05b0-45a0-9e39-75f2f18d05f8</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/0c847d31-2d4c-4c02-8879-60afdde36bf2"/>
<published>2026-05-26T07:00:00Z</published>
<title>FIFA Match Days</title>
<updated>2026-05-26T19:25:29.2588315Z</updated>
<georss:line>49.273868416488654 -123.11486151852314 49.27372736971796 -123.11448304036203 49.273799460145625 -123.11406164151752 49.274515915299645 -123.11248619022278</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Permission to close and occupy the curb lanes during all of the Match Days for FIFA related activities.

Saturday June 13th
Thursday June 18th
Sunday June 21st
Wednesday June 24th
Friday June 26th
Thursday July 2nd
Tuesday July 7th
Location: Multiple Locations
Schedule: Jun 13, 2026 - Jul 7, 2026</content>
<id>urn:uuid:62dd5529-56cc-46bd-8591-11e49b9a4e48</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/0c847d31-2d4c-4c02-8879-60afdde36bf2"/>
<published>2026-05-26T07:00:00Z</published>
<title>FIFA Match Days</title>
<updated>2026-05-26T19:25:29.2588315Z</updated>
<georss:line>49.27579035733413 -123.11475104794609 49.27492500345997 -123.11589446323376 49.27486177544802 -123.11597597673138</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Permission to close and occupy the curb lanes during all of the Match Days for FIFA related activities.

Saturday June 13th
Thursday June 18th
Sunday June 21st
Wednesday June 24th
Friday June 26th
Thursday July 2nd
Tuesday July 7th
Location: Multiple Locations
Schedule: Jun 13, 2026 - Jul 7, 2026</content>
<id>urn:uuid:5f4c4ad4-4eab-4b23-b370-5770a034e99c</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/0c847d31-2d4c-4c02-8879-60afdde36bf2"/>
<published>2026-05-26T07:00:00Z</published>
<title>FIFA Match Days</title>
<updated>2026-05-26T19:25:29.2588315Z</updated>
<georss:line>49.277267155098144 -123.11445671074371 49.27652657329401 -123.1155764524893</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Permission to close and occupy the curb lanes during all of the Match Days for FIFA related activities.

Saturday June 13th
Thursday June 18th
Sunday June 21st
Wednesday June 24th
Friday June 26th
Thursday July 2nd
Tuesday July 7th
Location: Multiple Locations
Schedule: Jun 13, 2026 - Jul 7, 2026</content>
<id>urn:uuid:94dca493-103a-41cb-8d82-f1c5ee88e72c</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/0c847d31-2d4c-4c02-8879-60afdde36bf2"/>
<published>2026-05-26T07:00:00Z</published>
<title>FIFA Match Days</title>
<updated>2026-05-26T19:25:29.2588315Z</updated>
<georss:line>49.273868416488654 -123.11486151852314 49.27400106510038 -123.11491023150222 49.27412373170043 -123.11500145644801</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Permission to close and occupy the curb lanes during all of the Match Days for FIFA related activities.

Saturday June 13th
Thursday June 18th
Sunday June 21st
Wednesday June 24th
Friday June 26th
Thursday July 2nd
Tuesday July 7th
Location: Multiple Locations
Schedule: Jun 13, 2026 - Jul 7, 2026</content>
<id>urn:uuid:a04812c4-c751-4845-92f9-612facdafcd7</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/0c847d31-2d4c-4c02-8879-60afdde36bf2"/>
<published>2026-05-26T07:00:00Z</published>
<title>FIFA Match Days</title>
<updated>2026-05-26T19:25:29.2588315Z</updated>
<georss:line>49.27412373170043 -123.11500145644801 49.27419964469226 -123.115089204917 49.274447348224385 -123.11538384310167 49.274591508187285 -123.11558778241047 49.27476890777908 -123.11584280476939 49.27486177544802 -123.11597597673138</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Permission to close and occupy the curb lanes during all of the Match Days for FIFA related activities.

Saturday June 13th
Thursday June 18th
Sunday June 21st
Wednesday June 24th
Friday June 26th
Thursday July 2nd
Tuesday July 7th
Location: Multiple Locations
Schedule: Jun 13, 2026 - Jul 7, 2026</content>
<id>urn:uuid:abbc89d3-4a4b-4e15-ab43-2ca51b856743</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/0c847d31-2d4c-4c02-8879-60afdde36bf2"/>
<published>2026-05-26T07:00:00Z</published>
<title>FIFA Match Days</title>
<updated>2026-05-26T19:25:29.2588315Z</updated>
<georss:line>49.27412373170043 -123.11500145644801 49.27405984247741 -123.11530471583183 49.27405427759413 -123.1153466328119 49.27404821915832 -123.1153963572245 49.27404273622716 -123.11544624793828 49.27403781085127 -123.11549626367044 49.27403347001598 -123.11554640448568 49.27402969574459 -123.1155966565962 49.27402649704584 -123.11564700627719 49.2740238739471 -123.11569742603552 49.27402181745322 -123.11574791585183 49.274020345581874 -123.11579844827503 49.274019458346885 -123.11584900955938 49.27401913777163 -123.11589958591709 49.27401931952187 -123.11593361144315</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Permission to close and occupy the curb lanes during all of the Match Days for FIFA related activities.

Saturday June 13th
Thursday June 18th
Sunday June 21st
Wednesday June 24th
Friday June 26th
Thursday July 2nd
Tuesday July 7th
Location: Multiple Locations
Schedule: Jun 13, 2026 - Jul 7, 2026</content>
<id>urn:uuid:8430cd1f-158a-47a3-937d-a616ee04a88b</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/0c847d31-2d4c-4c02-8879-60afdde36bf2"/>
<published>2026-05-26T07:00:00Z</published>
<title>FIFA Match Days</title>
<updated>2026-05-26T19:25:29.2588315Z</updated>
<georss:line>49.27715596483293 -123.11654524588734 49.27610458051561 -123.11813081113385</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Permission to close and occupy the curb lanes during all of the Match Days for FIFA related activities.

Saturday June 13th
Thursday June 18th
Sunday June 21st
Wednesday June 24th
Friday June 26th
Thursday July 2nd
Tuesday July 7th
Location: Multiple Locations
Schedule: Jun 13, 2026 - Jul 7, 2026</content>
<id>urn:uuid:219a8cbb-c1f6-487f-92fc-e1258ea17540</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/0c847d31-2d4c-4c02-8879-60afdde36bf2"/>
<published>2026-05-26T07:00:00Z</published>
<title>FIFA Match Days</title>
<updated>2026-05-26T19:25:29.2588315Z</updated>
<georss:line>49.27789655469422 -123.11542675555046 49.27715596483293 -123.11654524588734</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Permission to close and occupy the curb lanes during all of the Match Days for FIFA related activities.

Saturday June 13th
Thursday June 18th
Sunday June 21st
Wednesday June 24th
Friday June 26th
Thursday July 2nd
Tuesday July 7th
Location: Multiple Locations
Schedule: Jun 13, 2026 - Jul 7, 2026</content>
<id>urn:uuid:ab1cf582-fe93-4726-844e-d828af0034a9</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/0c847d31-2d4c-4c02-8879-60afdde36bf2"/>
<published>2026-05-26T07:00:00Z</published>
<title>FIFA Match Days</title>
<updated>2026-05-26T19:25:29.2588315Z</updated>
<georss:line>49.285158713605824 -123.1199915149364 49.28441949265854 -123.1211101043476</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Permission to close and occupy the curb lanes during all of the Match Days for FIFA related activities.

Saturday June 13th
Thursday June 18th
Sunday June 21st
Wednesday June 24th
Friday June 26th
Thursday July 2nd
Tuesday July 7th
Location: Multiple Locations
Schedule: Jun 13, 2026 - Jul 7, 2026</content>
<id>urn:uuid:37a5e34b-cf1f-4b7a-ae48-e8a6fd666499</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/0c847d31-2d4c-4c02-8879-60afdde36bf2"/>
<published>2026-05-26T07:00:00Z</published>
<title>FIFA Match Days</title>
<updated>2026-05-26T19:25:29.2588315Z</updated>
<georss:line>49.28555399477821 -123.11939490898948 49.285158713605824 -123.1199915149364</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Permission to close and occupy the curb lanes during all of the Match Days for FIFA related activities.

Saturday June 13th
Thursday June 18th
Sunday June 21st
Wednesday June 24th
Friday June 26th
Thursday July 2nd
Tuesday July 7th
Location: Multiple Locations
Schedule: Jun 13, 2026 - Jul 7, 2026</content>
<id>urn:uuid:e3c573ba-a0b9-417f-b4c4-053986f419e8</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/0c847d31-2d4c-4c02-8879-60afdde36bf2"/>
<published>2026-05-26T07:00:00Z</published>
<title>FIFA Match Days</title>
<updated>2026-05-26T19:25:29.2588315Z</updated>
<georss:line>49.273212462895 -123.11587682762766 49.27320859758382 -123.11644686369993 49.2732085293558 -123.11646100950072 49.273208623025255 -123.11647516942996 49.27320888768435 -123.11648924727812 49.27320930531508 -123.11650327049753 49.27320986683907 -123.11651732155063 49.2732106171629 -123.11653146927988 49.27321151154635 -123.11654547987601 49.27321256788281 -123.1165594496124 49.27321379505645 -123.11657348848836 49.27321515735008 -123.11658733522141 49.273216717341626 -123.11660137488326 49.273218403527466 -123.11661515364493 49.27322026055049 -123.11662900154677 49.2732222705869 -123.11664275357934 49.27322443358116 -123.11665646473185 49.27322675859793 -123.11667006628932 49.27322923655876 -123.11668364071427 49.273231876444925 -123.11669720177518 49.27323466041881 -123.11671059820992 49.27323760627644 -123.11672402252277 49.27324069622193 -123.11673728220963 49.27324393915322 -123.11675047352269 49.27324733507035 -123.11676359646206 49.27325086606635 -123.11677656850175 49.27325458593168 -123.11678956848382 49.27325841395992 -123.11680234876637 49.27326240392762 -123.11681510193864 49.273266493090944 -123.11682760789576 49.273270807020964 -123.11684022436425 49.27327522912799 -123.1168526073862 49.273279759342586 -123.11686482569809 49.2732844605336 -123.11687697567959 49.273289287808694 -123.11688897474085 49.27329425013525 -123.11690085039778 49.27329937447101 -123.11691263020877 49.27330460694236 -123.11692421781535 49.2733098218535 -123.11693537921599 49.27335474565328 -123.11704907959843 49.273364153271245 -123.11707705018597 49.27337569388837 -123.11711276558383 49.273386802517194 -123.11714868618549 49.27339748806912 -123.11718489449531 49.27340780441716 -123.1172214868716 49.27341766190236 -123.11725817440696 49.27342708727272 -123.11729519086882 49.27343613449909 -123.11733253638437 49.273444704857695 -123.11736999076105 49.27345286111898 -123.11740774660981 49.273460594371414 -123.11744572142453 49.273467886722244 -123.11748381893031 49.273474666517615 -123.11752173651398</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Permission to close and occupy the curb lanes during all of the Match Days for FIFA related activities.

Saturday June 13th
Thursday June 18th
Sunday June 21st
Wednesday June 24th
Friday June 26th
Thursday July 2nd
Tuesday July 7th
Location: Multiple Locations
Schedule: Jun 13, 2026 - Jul 7, 2026</content>
<id>urn:uuid:1889fc0c-1eeb-49cd-89ef-72f2e0bda021</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/0c847d31-2d4c-4c02-8879-60afdde36bf2"/>
<published>2026-05-26T07:00:00Z</published>
<title>FIFA Match Days</title>
<updated>2026-05-26T19:25:29.2588315Z</updated>
<georss:line>49.27401931952187 -123.11593361144315 49.274019401860215 -123.1159501636445 49.27402024163126 -123.11600072897495 49.27402165709864 -123.1160512681626 49.27402365728511 -123.11610175373542 49.27402622420044 -123.11615218565292 49.27402936686755 -123.11620253644307 49.274033094281606 -123.11625280612866 49.27403738849401 -123.11630295342667 49.27404224049582 -123.11635299206523 49.274047677314314 -123.11640288086699 49.2740536809454 -123.11645263353873 49.27406025143091 -123.11650220883976 49.27406738877099 -123.11655160677161 49.274075092993655 -123.11660079984097 49.27421868718193 -123.11735212684935</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Permission to close and occupy the curb lanes during all of the Match Days for FIFA related activities.

Saturday June 13th
Thursday June 18th
Sunday June 21st
Wednesday June 24th
Friday June 26th
Thursday July 2nd
Tuesday July 7th
Location: Multiple Locations
Schedule: Jun 13, 2026 - Jul 7, 2026</content>
<id>urn:uuid:41c1a43f-4499-4530-beba-cef859954770</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/0c847d31-2d4c-4c02-8879-60afdde36bf2"/>
<published>2026-05-26T07:00:00Z</published>
<title>FIFA Match Days</title>
<updated>2026-05-26T19:25:29.2588315Z</updated>
<georss:line>49.27421868718193 -123.11735212684935 49.274439865996385 -123.118027151628</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Permission to close and occupy the curb lanes during all of the Match Days for FIFA related activities.

Saturday June 13th
Thursday June 18th
Sunday June 21st
Wednesday June 24th
Friday June 26th
Thursday July 2nd
Tuesday July 7th
Location: Multiple Locations
Schedule: Jun 13, 2026 - Jul 7, 2026</content>
<id>urn:uuid:22988d8a-2e56-4093-978b-51c0d31018f2</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/0c847d31-2d4c-4c02-8879-60afdde36bf2"/>
<published>2026-05-26T07:00:00Z</published>
<title>FIFA Match Days</title>
<updated>2026-05-26T19:25:29.2588315Z</updated>
<georss:line>49.27486177544802 -123.11597597673138 49.274712932948404 -123.11618103227784 49.27470618478526 -123.11619173963969 49.27469427359654 -123.11621117840943 49.274682577984265 -123.11623092012569 49.27467111592489 -123.11625097857852 49.27465988744592 -123.11627132627262 49.27464888353808 -123.11629197693463 49.27463812219162 -123.11631293060691 49.27462760343411 -123.11633415979425 49.274617327265275 -123.1163556644968 49.27460730269411 -123.11637743098825 49.27459752071138 -123.11639947299517 49.274587999321085 -123.1164217768125 49.27457872955566 -123.11644431492397 49.27456972038246 -123.11646711484622 49.27456097184282 -123.11649013533658 49.274552483922804 -123.11651339014293 49.274544265617465 -123.11653687928671 49.27453631695434 -123.11656057527293 49.27452863793329 -123.11658447810186 49.274521237549436 -123.11660858779501 49.27451411583033 -123.11663287685748 49.27450725475779 -123.1166573727424 49.274500690354046 -123.11668203429205 49.2744944046147 -123.11670687521203 49.274488406562625 -123.11673186802868 49.27448269618378 -123.11675702648996 49.27447727349204 -123.1167823368487 49.27447213851502 -123.11680777161001 49.27446729122488 -123.11683335826955 49.27446274065841 -123.11685905560614 49.27445848680159 -123.1168848773678 49.27445452067309 -123.11691080978615 49.27445086026319 -123.11693685290408 49.27444748760931 -123.11696297918435 49.274444420701684 -123.11698918866998 49.27444165054513 -123.11701548134006 49.2744391861487 -123.11704184346881 49.274437018531046 -123.11706826128778 49.274438816028635 -123.1176719515555</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Permission to close and occupy the curb lanes during all of the Match Days for FIFA related activities.

Saturday June 13th
Thursday June 18th
Sunday June 21st
Wednesday June 24th
Friday June 26th
Thursday July 2nd
Tuesday July 7th
Location: Multiple Locations
Schedule: Jun 13, 2026 - Jul 7, 2026</content>
<id>urn:uuid:df7e29da-cf2f-4bd5-8606-b9f9d858d965</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/0c847d31-2d4c-4c02-8879-60afdde36bf2"/>
<published>2026-05-26T07:00:00Z</published>
<title>FIFA Match Days</title>
<updated>2026-05-26T19:25:29.2588315Z</updated>
<georss:line>49.274439865996385 -123.118027151628 49.27448474241024 -123.11835310537619 49.274489202227045 -123.11838120248719 49.27449544682656 -123.1184232027473 49.27450120551674 -123.11846535307852 49.274506487278416 -123.11850766724882 49.2745112831586 -123.11855010399263 49.27451559314312 -123.11859267705637 49.27451940827885 -123.11863534517435 49.27452274655619 -123.11867810838848 49.27452558998459 -123.11872096665434 49.27452794760154 -123.11876387874942 49.274529819392825 -123.11880685842011 49.27453118739632 -123.11884987812662 49.274532078611685 -123.11889292418495 49.2745324660533 -123.11893599652893 49.27453236775398 -123.11897905395762 49.27453177469033 -123.11902212394338 49.27453069589987 -123.1190651652637 49.274529113406544 -123.11910816412636 49.27452705419594 -123.11915112059508 49.274524500306 -123.11919400713 49.274521451736945 -123.11923682372986 49.274517917498116 -123.11927955666745</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Permission to close and occupy the curb lanes during all of the Match Days for FIFA related activities.

Saturday June 13th
Thursday June 18th
Sunday June 21st
Wednesday June 24th
Friday June 26th
Thursday July 2nd
Tuesday July 7th
Location: Multiple Locations
Schedule: Jun 13, 2026 - Jul 7, 2026</content>
<id>urn:uuid:b6cb7cda-2497-4363-9db5-26ae8deababc</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/0c847d31-2d4c-4c02-8879-60afdde36bf2"/>
<published>2026-05-26T07:00:00Z</published>
<title>FIFA Match Days</title>
<updated>2026-05-26T19:25:29.2588315Z</updated>
<georss:line>49.274893414877795 -123.12271349736868 49.27525166243217 -123.12326640383532</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Permission to close and occupy the curb lanes during all of the Match Days for FIFA related activities.

Saturday June 13th
Thursday June 18th
Sunday June 21st
Wednesday June 24th
Friday June 26th
Thursday July 2nd
Tuesday July 7th
Location: Multiple Locations
Schedule: Jun 13, 2026 - Jul 7, 2026</content>
<id>urn:uuid:3002103c-1212-4692-97f9-542f40d8d6df</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/0c847d31-2d4c-4c02-8879-60afdde36bf2"/>
<published>2026-05-26T07:00:00Z</published>
<title>FIFA Match Days</title>
<updated>2026-05-26T19:25:29.2588315Z</updated>
<georss:line>49.274438816028635 -123.1176719515555 49.274439865996385 -123.118027151628</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Permission to close and occupy the curb lane of the following locations during the FIFA World Cup.

East side of 200blk Cambie St from Water St to Trounce Alley

West side of 200blk Cambie St from L/S Water St to W Cordova St 

Effective Dates:
Saturday May 16th to Wednesday July 15th – Full-time
Location: East side of 200blk Cambie St from Water St to Trounce Alley
West side of 200blk Cambie St from L/S Water St to W Cordova St 
Schedule: May 16, 2026 - Jul 15, 2026</content>
<id>urn:uuid:d00254c3-74da-454c-ae3e-23a063c88777</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/6dee59c5-f711-424b-b4b4-0142b631cb6c"/>
<published>2026-04-13T07:00:00Z</published>
<title>FIFA Parking</title>
<updated>2026-06-01T21:29:51.4807924Z</updated>
<georss:line>49.28426624810055 -123.1088197868574 49.28358143730813 -123.10910833453087</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Permission to close and occupy the curb lane of the following locations during the FIFA World Cup.

North and south sides of 2900blk E 45th Ave from Rupert St to approximately 50m west of Rupert St

Effective Dates:
Thursday June 11th to Saturday July 11th – Full-time
Location: North and south side of 2900blk E 45th Ave from Rupert St to approximately 50m west of Rupert St
Schedule: Jun 11, 2026 - Jul 11, 2026</content>
<id>urn:uuid:4d32f1dc-7a23-47e8-9f00-d0b1551be89b</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/418bcbe0-bb0b-403f-803f-b06a91065c21"/>
<published>2026-04-13T07:00:00Z</published>
<title>FIFA Parking</title>
<updated>2026-04-14T17:08:56.7339918Z</updated>
<georss:line>49.22930775502513 -123.04318110828055 49.22930775502513 -123.0440766195771</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Permission to close and occupy the curb lane of the following locations during the FIFA World Cup.

North side of 900blk Pacific Blvd from Nelson St to 50m east of Nelson St
South side of 700blk Pacific Blvd from pole 10/07 to pole 08/07
South side of 700blk Pacific Blvd from pole 04/07 to Carrall St
East side of 700blk Pat Quinn Way from Pacific Blvd to Pole 08/07
West side of 700blk Pat Quinn Way from Pole 09/07 to Expo Blvd
South side of 1100blk Pacific Blvd from Davie St to Cambie St
North side of 00blk Pacific Blvd from Pat Quinn Way to Carrall St
West side of 00blk Nelson St from Expo Blvd to Pacific Blvd

Effective Dates:
Saturday May 23rd to Wednesday July 15th – Full-time
Location: Please see description.
Schedule: May 23, 2026 - Jul 14, 2026</content>
<id>urn:uuid:76fc85a4-b2a7-444a-b6d2-0a1af517cc47</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/0752710f-1539-40e8-86f3-7f7551589c3e"/>
<published>2026-04-13T07:00:00Z</published>
<title>FIFA Parking</title>
<updated>2026-04-13T19:46:26.5766006Z</updated>
<georss:line>49.275526967543925 -123.1115809742956 49.27606461549237 -123.11048595814779</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Permission to close and occupy the curb lane of the following locations during the FIFA World Cup.

North side of 900blk Pacific Blvd from Nelson St to 50m east of Nelson St
South side of 700blk Pacific Blvd from pole 10/07 to pole 08/07
South side of 700blk Pacific Blvd from pole 04/07 to Carrall St
East side of 700blk Pat Quinn Way from Pacific Blvd to Pole 08/07
West side of 700blk Pat Quinn Way from Pole 09/07 to Expo Blvd
South side of 1100blk Pacific Blvd from Davie St to Cambie St
North side of 00blk Pacific Blvd from Pat Quinn Way to Carrall St
West side of 00blk Nelson St from Expo Blvd to Pacific Blvd

Effective Dates:
Saturday May 23rd to Wednesday July 15th – Full-time
Location: Please see description.
Schedule: May 23, 2026 - Jul 14, 2026</content>
<id>urn:uuid:f3c466b9-c0ef-4e9b-94e1-dd8404af8cde</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/0752710f-1539-40e8-86f3-7f7551589c3e"/>
<published>2026-04-13T07:00:00Z</published>
<title>FIFA Parking</title>
<updated>2026-04-13T19:46:26.5766006Z</updated>
<georss:line>49.27610144047989 -123.11038435871134 49.27650651352778 -123.1095264079151 49.276830569570905 -123.10883778951285 49.277044150798844 -123.10827334819955 49.27713989380777 -123.10756215214475 49.27711779928373 -123.1064332695181</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Permission to close and occupy the curb lane of the following locations during the FIFA World Cup.

North side of 900blk Pacific Blvd from Nelson St to 50m east of Nelson St
South side of 700blk Pacific Blvd from pole 10/07 to pole 08/07
South side of 700blk Pacific Blvd from pole 04/07 to Carrall St
East side of 700blk Pat Quinn Way from Pacific Blvd to Pole 08/07
West side of 700blk Pat Quinn Way from Pole 09/07 to Expo Blvd
South side of 1100blk Pacific Blvd from Davie St to Cambie St
North side of 00blk Pacific Blvd from Pat Quinn Way to Carrall St
West side of 00blk Nelson St from Expo Blvd to Pacific Blvd

Effective Dates:
Saturday May 23rd to Wednesday July 15th – Full-time
Location: Please see description.
Schedule: May 23, 2026 - Jul 14, 2026</content>
<id>urn:uuid:878ef3db-a1ad-4779-afcb-408cbc4b3cb8</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/0752710f-1539-40e8-86f3-7f7551589c3e"/>
<published>2026-04-13T07:00:00Z</published>
<title>FIFA Parking</title>
<updated>2026-04-13T19:46:26.5766006Z</updated>
<georss:line>49.27861522077802 -123.10762098103558 49.27773679433869 -123.10765500761435 49.27713662093757 -123.10769033867251</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Permission to close and occupy the curb lane of the following locations during the FIFA World Cup.

North side of 900blk Pacific Blvd from Nelson St to 50m east of Nelson St
South side of 700blk Pacific Blvd from pole 10/07 to pole 08/07
South side of 700blk Pacific Blvd from pole 04/07 to Carrall St
East side of 700blk Pat Quinn Way from Pacific Blvd to Pole 08/07
West side of 700blk Pat Quinn Way from Pole 09/07 to Expo Blvd
South side of 1100blk Pacific Blvd from Davie St to Cambie St
North side of 00blk Pacific Blvd from Pat Quinn Way to Carrall St
West side of 00blk Nelson St from Expo Blvd to Pacific Blvd

Effective Dates:
Saturday May 23rd to Wednesday July 15th – Full-time
Location: Please see description.
Schedule: May 23, 2026 - Jul 14, 2026</content>
<id>urn:uuid:18687694-ccea-4f48-b00a-f0b932c3b95c</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/0752710f-1539-40e8-86f3-7f7551589c3e"/>
<published>2026-04-13T07:00:00Z</published>
<title>FIFA Parking</title>
<updated>2026-04-13T19:46:26.5766006Z</updated>
<georss:line>49.27404411215085 -123.12133407398795 49.27441278646822 -123.11992828849763 49.274520690625195 -123.11926674238454</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Permission to close and occupy the curb lane of the following locations during the FIFA World Cup.

North side of 900blk Pacific Blvd from Nelson St to 50m east of Nelson St
South side of 700blk Pacific Blvd from pole 10/07 to pole 08/07
South side of 700blk Pacific Blvd from pole 04/07 to Carrall St
East side of 700blk Pat Quinn Way from Pacific Blvd to Pole 08/07
West side of 700blk Pat Quinn Way from Pole 09/07 to Expo Blvd
South side of 1100blk Pacific Blvd from Davie St to Cambie St
North side of 00blk Pacific Blvd from Pat Quinn Way to Carrall St
West side of 00blk Nelson St from Expo Blvd to Pacific Blvd

Effective Dates:
Saturday May 23rd to Wednesday July 15th – Full-time
Location: Please see description.
Schedule: May 23, 2026 - Jul 14, 2026</content>
<id>urn:uuid:be714998-71ae-40dd-899a-6a2d5d34fbe5</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/0752710f-1539-40e8-86f3-7f7551589c3e"/>
<published>2026-04-13T07:00:00Z</published>
<title>FIFA Parking</title>
<updated>2026-04-13T19:46:26.5766006Z</updated>
<georss:line>49.274131615282954 -123.11500907858077 49.274213864374474 -123.11469526012603 49.27429086339967 -123.11452896316709</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Permission to close and occupy the curb lane of the following locations during the FIFA World Cup.

North side of 900blk Pacific Blvd from Nelson St to 50m east of Nelson St
South side of 700blk Pacific Blvd from pole 10/07 to pole 08/07
South side of 700blk Pacific Blvd from pole 04/07 to Carrall St
East side of 700blk Pat Quinn Way from Pacific Blvd to Pole 08/07
West side of 700blk Pat Quinn Way from Pole 09/07 to Expo Blvd
South side of 1100blk Pacific Blvd from Davie St to Cambie St
North side of 00blk Pacific Blvd from Pat Quinn Way to Carrall St
West side of 00blk Nelson St from Expo Blvd to Pacific Blvd

Effective Dates:
Saturday May 23rd to Wednesday July 15th – Full-time
Location: Please see description.
Schedule: May 23, 2026 - Jul 14, 2026</content>
<id>urn:uuid:0d29eb6c-9df3-45ad-b18e-b0b107a584cc</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/0752710f-1539-40e8-86f3-7f7551589c3e"/>
<published>2026-04-13T07:00:00Z</published>
<title>FIFA Parking</title>
<updated>2026-04-13T19:46:26.5766006Z</updated>
<georss:line>49.27485644548008 -123.1159692420871 49.274444144862315 -123.11538123142905 49.274159721571834 -123.11504667364083</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Permission to close and occupy the curb lane of the following locations during the FIFA World Cup.

North side of 500blk Evans Ave from Thornton St to 100m east of Thornton St – Multiple effective dates

Effective Dates:
Friday June 12, 2026 – 12:00am to 11:59pm
Wednesday June 17, 2026 – 12:00am to 11:59pm
Saturday June 20, 2026 – 12:00am to 11:59pm
Wednesday June 24, 2026 – 12:00am to 11:59pm
Friday June 26, 2026 – 12:00am to 11:59pm
Wednesday July 1, 2026 – 12:00am to 11:59pm
Monday July 6, 2026 – 12:00am to 11:59pm
Location: North side of 500blk Evans Ave from Thornton St to 100m east of Thornton St
Schedule: Multiple occurrences as follows:
- Jun 12, 2026
- Jun 17, 2026
- Jun 20, 2026
- Jun 24, 2026
- Jun 26, 2026
- Jul 1, 2026
- Jul 6, 2026
</content>
<id>urn:uuid:943bfff9-a654-4fbe-83c4-44bdc6b9c5d3</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/9a6308ca-42e8-486a-9032-aac30568d6e0"/>
<published>2026-04-13T07:00:00Z</published>
<title>FIFA Parking</title>
<updated>2026-04-13T20:03:24.3218106Z</updated>
<georss:line>49.27273937808977 -123.09289391380257 49.272143829904394 -123.08930486941715</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Permission to close and occupy the curb lane for FIFA related activities.
Location: Multiple locations
Schedule: Jun 12, 2026 - Jul 19, 2026</content>
<id>urn:uuid:59930c91-ec4e-4871-98d4-41b01129c668</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/50048e6c-f176-49bc-a301-3925acb36360"/>
<published>2026-05-26T07:00:00Z</published>
<title>FIFA Temporary Special Zones</title>
<updated>2026-05-26T19:37:23.3416036Z</updated>
<georss:line>49.27081505496693 -123.11517511083342 49.26909764118872 -123.11524417370681 49.267927949411416 -123.11529938796043</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Permission to close and occupy the curb lane for FIFA related activities.
Location: Multiple locations
Schedule: Jun 12, 2026 - Jul 19, 2026</content>
<id>urn:uuid:d22e1dbc-f0d4-4801-ac24-372bd4a396bc</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/50048e6c-f176-49bc-a301-3925acb36360"/>
<published>2026-05-26T07:00:00Z</published>
<title>FIFA Temporary Special Zones</title>
<updated>2026-05-26T19:37:23.3416036Z</updated>
<georss:line>49.26979519538071 -123.11081755211607 49.2690268079684 -123.11238183121478</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Permission to close and occupy the curb lane for FIFA related activities.
Location: Multiple locations
Schedule: Jun 12, 2026 - Jul 19, 2026</content>
<id>urn:uuid:e2c5f2c1-ea2c-4ba0-b04d-fac0bd52d7db</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/50048e6c-f176-49bc-a301-3925acb36360"/>
<published>2026-05-26T07:00:00Z</published>
<title>FIFA Temporary Special Zones</title>
<updated>2026-05-26T19:37:23.3416036Z</updated>
<georss:line>49.2690268079684 -123.11238183121478 49.26826661057794 -123.1139291868897</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Permission to close and occupy the curb lane for FIFA related activities.
Location: Multiple locations
Schedule: Jun 12, 2026 - Jul 19, 2026</content>
<id>urn:uuid:8f6c65c2-a9c7-4371-a6c7-94cbe4073e82</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/50048e6c-f176-49bc-a301-3925acb36360"/>
<published>2026-05-26T07:00:00Z</published>
<title>FIFA Temporary Special Zones</title>
<updated>2026-05-26T19:37:23.3416036Z</updated>
<georss:line>49.26702731269887 -123.08133573491756 49.26607563155079 -123.08130724355573</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Permission to close and occupy the curb lane for FIFA related activities.
Location: Multiple locations
Schedule: Jun 12, 2026 - Jul 19, 2026</content>
<id>urn:uuid:c398af34-c6ec-498a-bfc6-6a76e5c35a38</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/50048e6c-f176-49bc-a301-3925acb36360"/>
<published>2026-05-26T07:00:00Z</published>
<title>FIFA Temporary Special Zones</title>
<updated>2026-05-26T19:37:23.3416036Z</updated>
<georss:line>49.27031548250153 -123.02539498962092 49.270309225696735 -123.02363872233244</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Permission to close and occupy the curb lane for FIFA related activities.
Location: Multiple locations
Schedule: Jun 12, 2026 - Jul 19, 2026</content>
<id>urn:uuid:4961d87c-71a5-4c5e-ac37-d4de005fb2b2</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/50048e6c-f176-49bc-a301-3925acb36360"/>
<published>2026-05-26T07:00:00Z</published>
<title>FIFA Temporary Special Zones</title>
<updated>2026-05-26T19:37:23.3416036Z</updated>
<georss:line>49.270320783950126 -123.02689122834887 49.27031548250153 -123.02539498962092</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Permission to close and occupy the curb lane for FIFA related activities.
Location: Multiple locations
Schedule: Jun 12, 2026 - Jul 19, 2026</content>
<id>urn:uuid:780cf367-3481-43d2-beec-9416855ab2b8</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/50048e6c-f176-49bc-a301-3925acb36360"/>
<published>2026-05-26T07:00:00Z</published>
<title>FIFA Temporary Special Zones</title>
<updated>2026-05-26T19:37:23.3416036Z</updated>
<georss:line>49.27324250005799 -123.02774061222301 49.27310792536099 -123.02769342490662 49.272922457426546 -123.02763969323007 49.27236100712926 -123.0274785253105 49.270320783950126 -123.02689122834887</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Permission to close and occupy the curb lane for FIFA related activities.
Location: Multiple locations
Schedule: Jun 12, 2026 - Jul 19, 2026</content>
<id>urn:uuid:cefcd987-64de-4d21-8b1a-b2f13827ac61</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/50048e6c-f176-49bc-a301-3925acb36360"/>
<published>2026-05-26T07:00:00Z</published>
<title>FIFA Temporary Special Zones</title>
<updated>2026-05-26T19:37:23.3416036Z</updated>
<georss:line>49.27210023312165 -123.02363018891025 49.270309225696735 -123.02363872233244</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Permission to close and occupy the curb lane for FIFA related activities.
Location: Multiple locations
Schedule: Jun 12, 2026 - Jul 19, 2026</content>
<id>urn:uuid:8d1b5ade-1286-45e4-a921-fbfd764c0bc3</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/50048e6c-f176-49bc-a301-3925acb36360"/>
<published>2026-05-26T07:00:00Z</published>
<title>FIFA Temporary Special Zones</title>
<updated>2026-05-26T19:37:23.3416036Z</updated>
<georss:line>49.27062384732517 -123.14312918743758 49.270660996871385 -123.14549913731675</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Curb Space Closure @ Killarney Park
Location: 6100-6300 Raleigh St  - E / 
2800 E 46th Av - S / 
6000 Killarney St - E / 
2900 E 45th Av - S / 
6000-6100 Rupert St - SW / 
6200-6400 Kerr St - W / 
3000 E 49th Av - N / 
2800 E 48th Av - N / 
6300 Killarney St - W
Schedule: Jun 1, 2026 - Aug 1, 2026</content>
<id>urn:uuid:fc642540-f0c6-4a42-9df7-f4dc2ed72ead</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/739afc7a-9cc4-41cd-9de1-45c1e517325d"/>
<published>2025-10-14T07:00:00Z</published>
<title>FWC26 - Curb Space Requirement</title>
<updated>2026-01-16T21:50:06.3269658Z</updated>
<georss:line>49.22929442635751 -123.04312133890471 49.22914240599974 -123.0431226762519 49.229142253080425 -123.04312267611877 49.22911833473802 -123.04312254542158 49.229094425631814 -123.04312176918553 49.22907052575661 -123.04312036114663 49.2290466441076 -123.04311832131361 49.229022798680404 -123.04311563596804 49.22899898047464 -123.04311231883797 49.22897519848033 -123.0431083836672 49.22895147069818 -123.04310380300223 49.22892780612344 -123.04309857685182 49.2289041957504 -123.043092732679 49.22888065756959 -123.04308627050028 49.228857200586305 -123.04307916285441 49.228833824790286 -123.04307143721218 49.22881053917658 -123.04306309358226 49.22878735274037 -123.04305413197329 49.2287642744767 -123.04304455239387 49.228741313380766 -123.04303435485268 49.228718469447216 -123.04302355308536 49.22869575167624 -123.04301213336562 49.2286731690528 -123.04300012317182 49.228650721581744 -123.04298750876976 49.22862842725334 -123.0429742901758 49.22860628606236 -123.04296048112549 49.22858430699867 -123.04294609536223 49.22856249006722 -123.04293111915173 49.22854085325318 -123.04291556624507 49.228519396556294 -123.04289943664288 49.22849812896655 -123.04288274408835 49.22847705048869 -123.04286547484716 49.228456179102835 -123.04284765640516 49.228435505818595 -123.04282927502013 49.228415057611244 -123.04281035818565 49.228394816495154 -123.04279089215163 49.22837480945074 -123.04277089067672 49.22835502748234 -123.04275035375352 49.22833548857014 -123.04272930886754 49.22831619272401 -123.04270772854939 49.22829714892876 -123.04268564027682 49.22827835717899 -123.04266305778486 49.22825982647478 -123.04263996734669 49.22824155680564 -123.04261639643207 49.22822356616183 -123.04259234505668 49.22820585454815 -123.0425677994858 49.228188421949056 -123.04254280092393 49.228171277364595 -123.04251733564405 49.22815442978461 -123.0424914173887 49.22813787920384 -123.04246505989262 49.22760613184772 -123.04160411587667 49.227588296515506 -123.0415728271604 49.22757010119153 -123.04154201887657 49.227551563861795 -123.04151170477493 49.22753267553145 -123.0414818848481 49.227513454186436 -123.04145257284578 49.22749389083191 -123.04142376876047 49.227474012444105 -123.04139550008385 49.227453810028265 -123.04136776680834 49.227433292579946 -123.04134056894132 49.22741246908498 -123.04131393395924 49.22740474556687 -123.04130439572516 49.227391348543875 -123.0412878481349 49.22736992195698 -123.0412623251951 49.22734821630047 -123.04123739263113 49.22732622258931 -123.0412130229661 49.22730394979956 -123.04118927114529 49.2272814159368 -123.04116609597963 49.22725862099159 -123.04114352493774 49.22723557395457 -123.04112157176117 49.22721227482623 -123.04110023644935 49.227188741597274 -123.04107951901666 49.227164974263246 -123.04105943319702 49.227140972824486 -123.04103997898983 49.227116755266906 -123.04102117014381 49.22709233058603 -123.04100300666572 49.22706769877735 -123.04098550228929 49.22704287783171 -123.0409686570286 49.227017858749235 -123.04095248460997 49.22699265952559 -123.0409369713129 49.22698006880603 -123.04092950310122</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Curb Space Closure @ Killarney Park
Location: 6100-6300 Raleigh St  - E / 
2800 E 46th Av - S / 
6000 Killarney St - E / 
2900 E 45th Av - S / 
6000-6100 Rupert St - SW / 
6200-6400 Kerr St - W / 
3000 E 49th Av - N / 
2800 E 48th Av - N / 
6300 Killarney St - W
Schedule: Jun 1, 2026 - Aug 1, 2026</content>
<id>urn:uuid:685c3088-8bbf-47f0-9311-0dddbfbf861a</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/739afc7a-9cc4-41cd-9de1-45c1e517325d"/>
<published>2025-10-14T07:00:00Z</published>
<title>FWC26 - Curb Space Requirement</title>
<updated>2026-01-16T21:50:06.3269658Z</updated>
<georss:line>49.22751787421359 -123.04762640535257 49.22707474725419 -123.04765406645433</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Curb Space Closure @ Killarney Park
Location: 6100-6300 Raleigh St  - E / 
2800 E 46th Av - S / 
6000 Killarney St - E / 
2900 E 45th Av - S / 
6000-6100 Rupert St - SW / 
6200-6400 Kerr St - W / 
3000 E 49th Av - N / 
2800 E 48th Av - N / 
6300 Killarney St - W
Schedule: Jun 1, 2026 - Aug 1, 2026</content>
<id>urn:uuid:4b41cfb6-5a3a-481b-8e0a-fac28a40cc88</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/739afc7a-9cc4-41cd-9de1-45c1e517325d"/>
<published>2025-10-14T07:00:00Z</published>
<title>FWC26 - Curb Space Requirement</title>
<updated>2026-01-16T21:50:06.3269658Z</updated>
<georss:line>49.22797038903886 -123.04760637555292 49.22751787421359 -123.04762640535257</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Curb Space Closure @ Killarney Park
Location: 6100-6300 Raleigh St  - E / 
2800 E 46th Av - S / 
6000 Killarney St - E / 
2900 E 45th Av - S / 
6000-6100 Rupert St - SW / 
6200-6400 Kerr St - W / 
3000 E 49th Av - N / 
2800 E 48th Av - N / 
6300 Killarney St - W
Schedule: Jun 1, 2026 - Aug 1, 2026</content>
<id>urn:uuid:e5e5c4f6-4b1f-4c94-aaa5-66e48758dc5d</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/739afc7a-9cc4-41cd-9de1-45c1e517325d"/>
<published>2025-10-14T07:00:00Z</published>
<title>FWC26 - Curb Space Requirement</title>
<updated>2026-01-16T21:50:06.3269658Z</updated>
<georss:line>49.22885236387816 -123.04546606388992 49.22839983877793 -123.04549046752514</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Curb Space Closure @ Killarney Park
Location: 6100-6300 Raleigh St  - E / 
2800 E 46th Av - S / 
6000 Killarney St - E / 
2900 E 45th Av - S / 
6000-6100 Rupert St - SW / 
6200-6400 Kerr St - W / 
3000 E 49th Av - N / 
2800 E 48th Av - N / 
6300 Killarney St - W
Schedule: Jun 1, 2026 - Aug 1, 2026</content>
<id>urn:uuid:f2536fb3-0747-450d-8296-6159575e9716</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/739afc7a-9cc4-41cd-9de1-45c1e517325d"/>
<published>2025-10-14T07:00:00Z</published>
<title>FWC26 - Curb Space Requirement</title>
<updated>2026-01-16T21:50:06.3269658Z</updated>
<georss:line>49.228422925046004 -123.04757850280768 49.22839983877793 -123.04549046752514</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Curb Space Closure @ Killarney Park
Location: 6100-6300 Raleigh St  - E / 
2800 E 46th Av - S / 
6000 Killarney St - E / 
2900 E 45th Av - S / 
6000-6100 Rupert St - SW / 
6200-6400 Kerr St - W / 
3000 E 49th Av - N / 
2800 E 48th Av - N / 
6300 Killarney St - W
Schedule: Jun 1, 2026 - Aug 1, 2026</content>
<id>urn:uuid:0d5f28b8-c5a7-4237-959c-6ad6f704b4a9</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/739afc7a-9cc4-41cd-9de1-45c1e517325d"/>
<published>2025-10-14T07:00:00Z</published>
<title>FWC26 - Curb Space Requirement</title>
<updated>2026-01-16T21:50:06.3269658Z</updated>
<georss:line>49.228422925046004 -123.04757850280768 49.22797038903886 -123.04760637555292</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Curb Space Closure @ Killarney Park
Location: 6100-6300 Raleigh St  - E / 
2800 E 46th Av - S / 
6000 Killarney St - E / 
2900 E 45th Av - S / 
6000-6100 Rupert St - SW / 
6200-6400 Kerr St - W / 
3000 E 49th Av - N / 
2800 E 48th Av - N / 
6300 Killarney St - W
Schedule: Jun 1, 2026 - Aug 1, 2026</content>
<id>urn:uuid:4ec52bb9-e001-4b40-adce-ab719a1e5d95</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/739afc7a-9cc4-41cd-9de1-45c1e517325d"/>
<published>2025-10-14T07:00:00Z</published>
<title>FWC26 - Curb Space Requirement</title>
<updated>2026-01-16T21:50:06.3269658Z</updated>
<georss:line>49.22931237287608 -123.04544195511278 49.22885236387816 -123.04546606388992</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Curb Space Closure @ Killarney Park
Location: 6100-6300 Raleigh St  - E / 
2800 E 46th Av - S / 
6000 Killarney St - E / 
2900 E 45th Av - S / 
6000-6100 Rupert St - SW / 
6200-6400 Kerr St - W / 
3000 E 49th Av - N / 
2800 E 48th Av - N / 
6300 Killarney St - W
Schedule: Jun 1, 2026 - Aug 1, 2026</content>
<id>urn:uuid:92f7fd07-8583-497f-9e2b-a6fb910c0023</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/739afc7a-9cc4-41cd-9de1-45c1e517325d"/>
<published>2025-10-14T07:00:00Z</published>
<title>FWC26 - Curb Space Requirement</title>
<updated>2026-01-16T21:50:06.3269658Z</updated>
<georss:line>49.22931237287608 -123.04544195511278 49.22929442635751 -123.04312133890471</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Curb Space Closure @ Killarney Park
Location: 6100-6300 Raleigh St  - E / 
2800 E 46th Av - S / 
6000 Killarney St - E / 
2900 E 45th Av - S / 
6000-6100 Rupert St - SW / 
6200-6400 Kerr St - W / 
3000 E 49th Av - N / 
2800 E 48th Av - N / 
6300 Killarney St - W
Schedule: Jun 1, 2026 - Aug 1, 2026</content>
<id>urn:uuid:981ee8ce-bd18-4d35-8b39-261d50ab3cbb</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/739afc7a-9cc4-41cd-9de1-45c1e517325d"/>
<published>2025-10-14T07:00:00Z</published>
<title>FWC26 - Curb Space Requirement</title>
<updated>2026-01-16T21:50:06.3269658Z</updated>
<georss:line>49.226316717454125 -123.04560153326274 49.225879439639755 -123.04562456131767</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Curb Space Closure @ Killarney Park
Location: 6100-6300 Raleigh St  - E / 
2800 E 46th Av - S / 
6000 Killarney St - E / 
2900 E 45th Av - S / 
6000-6100 Rupert St - SW / 
6200-6400 Kerr St - W / 
3000 E 49th Av - N / 
2800 E 48th Av - N / 
6300 Killarney St - W
Schedule: Jun 1, 2026 - Aug 1, 2026</content>
<id>urn:uuid:735f67eb-7ac8-4c94-9614-101a6a49d814</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/739afc7a-9cc4-41cd-9de1-45c1e517325d"/>
<published>2025-10-14T07:00:00Z</published>
<title>FWC26 - Curb Space Requirement</title>
<updated>2026-01-16T21:50:06.3269658Z</updated>
<georss:line>49.22589415775985 -123.04771290815931 49.225879439639755 -123.04562456131767</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Curb Space Closure @ Killarney Park
Location: 6100-6300 Raleigh St  - E / 
2800 E 46th Av - S / 
6000 Killarney St - E / 
2900 E 45th Av - S / 
6000-6100 Rupert St - SW / 
6200-6400 Kerr St - W / 
3000 E 49th Av - N / 
2800 E 48th Av - N / 
6300 Killarney St - W
Schedule: Jun 1, 2026 - Aug 1, 2026</content>
<id>urn:uuid:2be4a1e5-08ff-4a76-be3b-70889c5ffd49</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/739afc7a-9cc4-41cd-9de1-45c1e517325d"/>
<published>2025-10-14T07:00:00Z</published>
<title>FWC26 - Curb Space Requirement</title>
<updated>2026-01-16T21:50:06.3269658Z</updated>
<georss:line>49.22474046710471 -123.04258858218746 49.224741924794756 -123.04104671312977</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Curb Space Closure @ Killarney Park
Location: 6100-6300 Raleigh St  - E / 
2800 E 46th Av - S / 
6000 Killarney St - E / 
2900 E 45th Av - S / 
6000-6100 Rupert St - SW / 
6200-6400 Kerr St - W / 
3000 E 49th Av - N / 
2800 E 48th Av - N / 
6300 Killarney St - W
Schedule: Jun 1, 2026 - Aug 1, 2026</content>
<id>urn:uuid:6e24c53a-eead-4868-b66d-65187bd528df</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/739afc7a-9cc4-41cd-9de1-45c1e517325d"/>
<published>2025-10-14T07:00:00Z</published>
<title>FWC26 - Curb Space Requirement</title>
<updated>2026-01-16T21:50:06.3269658Z</updated>
<georss:line>49.225131526385184 -123.0410250752644 49.224741924794756 -123.04104671312977</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Curb Space Closure @ Killarney Park
Location: 6100-6300 Raleigh St  - E / 
2800 E 46th Av - S / 
6000 Killarney St - E / 
2900 E 45th Av - S / 
6000-6100 Rupert St - SW / 
6200-6400 Kerr St - W / 
3000 E 49th Av - N / 
2800 E 48th Av - N / 
6300 Killarney St - W
Schedule: Jun 1, 2026 - Aug 1, 2026</content>
<id>urn:uuid:7ee848f8-f4cd-446f-b045-27ae68e8f233</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/739afc7a-9cc4-41cd-9de1-45c1e517325d"/>
<published>2025-10-14T07:00:00Z</published>
<title>FWC26 - Curb Space Requirement</title>
<updated>2026-01-16T21:50:06.3269658Z</updated>
<georss:line>49.22549993438872 -123.0410054521629 49.225131526385184 -123.0410250752644</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Curb Space Closure @ Killarney Park
Location: 6100-6300 Raleigh St  - E / 
2800 E 46th Av - S / 
6000 Killarney St - E / 
2900 E 45th Av - S / 
6000-6100 Rupert St - SW / 
6200-6400 Kerr St - W / 
3000 E 49th Av - N / 
2800 E 48th Av - N / 
6300 Killarney St - W
Schedule: Jun 1, 2026 - Aug 1, 2026</content>
<id>urn:uuid:fb4e0b23-beec-4ea6-a8bf-7fb780257cc8</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/739afc7a-9cc4-41cd-9de1-45c1e517325d"/>
<published>2025-10-14T07:00:00Z</published>
<title>FWC26 - Curb Space Requirement</title>
<updated>2026-01-16T21:50:06.3269658Z</updated>
<georss:line>49.22698006880603 -123.04092950310122 49.22549993438872 -123.0410054521629</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Curb Space Closure @ Killarney Park
Location: 6100-6300 Raleigh St  - E / 
2800 E 46th Av - S / 
6000 Killarney St - E / 
2900 E 45th Av - S / 
6000-6100 Rupert St - SW / 
6200-6400 Kerr St - W / 
3000 E 49th Av - N / 
2800 E 48th Av - N / 
6300 Killarney St - W
Schedule: Jun 1, 2026 - Aug 1, 2026</content>
<id>urn:uuid:09b4ec3c-7fcb-46ee-8054-1e4be2f3d36b</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/739afc7a-9cc4-41cd-9de1-45c1e517325d"/>
<published>2025-10-14T07:00:00Z</published>
<title>FWC26 - Curb Space Requirement</title>
<updated>2026-01-16T21:50:06.3269658Z</updated>
<georss:line>49.226368263838 -123.04768687122417 49.22589415775985 -123.04771290815931</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Curb Space Closure @ Killarney Park
Location: 6100-6300 Raleigh St  - E / 
2800 E 46th Av - S / 
6000 Killarney St - E / 
2900 E 45th Av - S / 
6000-6100 Rupert St - SW / 
6200-6400 Kerr St - W / 
3000 E 49th Av - N / 
2800 E 48th Av - N / 
6300 Killarney St - W
Schedule: Jun 1, 2026 - Aug 1, 2026</content>
<id>urn:uuid:cc0c991b-78d6-4e18-9f02-2aee816249ab</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/739afc7a-9cc4-41cd-9de1-45c1e517325d"/>
<published>2025-10-14T07:00:00Z</published>
<title>FWC26 - Curb Space Requirement</title>
<updated>2026-01-16T21:50:06.3269658Z</updated>
<georss:line>49.226735169355464 -123.0476704821003 49.226368263838 -123.04768687122417</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Curb Space Closure @ Killarney Park
Location: 6100-6300 Raleigh St  - E / 
2800 E 46th Av - S / 
6000 Killarney St - E / 
2900 E 45th Av - S / 
6000-6100 Rupert St - SW / 
6200-6400 Kerr St - W / 
3000 E 49th Av - N / 
2800 E 48th Av - N / 
6300 Killarney St - W
Schedule: Jun 1, 2026 - Aug 1, 2026</content>
<id>urn:uuid:d97eb07c-7173-4a6d-a1d6-5abf6be3cc1a</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/739afc7a-9cc4-41cd-9de1-45c1e517325d"/>
<published>2025-10-14T07:00:00Z</published>
<title>FWC26 - Curb Space Requirement</title>
<updated>2026-01-16T21:50:06.3269658Z</updated>
<georss:line>49.22707474725419 -123.04765406645433 49.226735169355464 -123.0476704821003</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Curb Space Closure @ Pinnacle Hotel Harbourfront


Location: 1100 W Hastings St - N / 
1100 W Cordova St - S
Schedule: Jun 1, 2026 - Aug 1, 2026</content>
<id>urn:uuid:ac84561d-e781-4421-8f7c-a165689f092b</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a69e0688-0335-4cef-baa0-4b90d5cb1003"/>
<published>2026-01-16T08:00:00Z</published>
<title>FWC26 - Curb Space Requirement</title>
<updated>2026-01-16T21:49:36.7847005Z</updated>
<georss:line>49.2883589794306 -123.11913946858223 49.28887657600498 -123.12090939752088 49.28906389473093 -123.12154925456585 49.28910706348705 -123.1216936436372 49.289151933463785 -123.12183678574628 49.28919845960286 -123.12197876330382 49.28923494827802 -123.12208544310802</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Curb Space Closure @ Pinnacle Hotel Harbourfront


Location: 1100 W Hastings St - N / 
1100 W Cordova St - S
Schedule: Jun 1, 2026 - Aug 1, 2026</content>
<id>urn:uuid:d51fc764-346f-49db-bdf7-d2ba123ee255</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a69e0688-0335-4cef-baa0-4b90d5cb1003"/>
<published>2026-01-16T08:00:00Z</published>
<title>FWC26 - Curb Space Requirement</title>
<updated>2026-01-16T21:49:36.7847005Z</updated>
<georss:line>49.28793339958469 -123.11978378180703 49.288802177134045 -123.1227521396862</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Curb Space Closure @ Thornton Park
Location: 1100-1300 Main Street - E / 
200 National Av - S / 
1100-1200 Station St - W / 
200 Terminal Av - N
Schedule: Jun 1, 2026 - Aug 1, 2026</content>
<id>urn:uuid:2201a4fd-267a-4ad6-ab55-5b143e16e15d</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/fc7039cb-3b49-4d2c-9861-19bcae14e176"/>
<published>2026-01-16T08:00:00Z</published>
<title>FWC26 - Curb Space Requirement</title>
<updated>2026-01-16T21:54:59.4637586Z</updated>
<georss:line>49.27489600346405 -123.09848889466659 49.27447150490411 -123.09855996340778 49.27256196936884 -123.09864497912929</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Curb Space Closure @ Thornton Park
Location: 1100-1300 Main Street - E / 
200 National Av - S / 
1100-1200 Station St - W / 
200 Terminal Av - N
Schedule: Jun 1, 2026 - Aug 1, 2026</content>
<id>urn:uuid:4367336d-9c3e-431b-9dde-8b096f51847a</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/fc7039cb-3b49-4d2c-9861-19bcae14e176"/>
<published>2026-01-16T08:00:00Z</published>
<title>FWC26 - Curb Space Requirement</title>
<updated>2026-01-16T21:54:59.4637586Z</updated>
<georss:line>49.27492356625635 -123.09993284985319 49.27277629612772 -123.10002804173709</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Curb Space Closure @ Thornton Park
Location: 1100-1300 Main Street - E / 
200 National Av - S / 
1100-1200 Station St - W / 
200 Terminal Av - N
Schedule: Jun 1, 2026 - Aug 1, 2026</content>
<id>urn:uuid:7a725d62-a3b0-42bc-ab4d-f98c66ea6b9c</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/fc7039cb-3b49-4d2c-9861-19bcae14e176"/>
<published>2026-01-16T08:00:00Z</published>
<title>FWC26 - Curb Space Requirement</title>
<updated>2026-01-16T21:54:59.4637586Z</updated>
<georss:line>49.27492356625635 -123.09993284985319 49.27490679721254 -123.09909964668087</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Curb Space Closure @ Thornton Park
Location: 1100-1300 Main Street - E / 
200 National Av - S / 
1100-1200 Station St - W / 
200 Terminal Av - N
Schedule: Jun 1, 2026 - Aug 1, 2026</content>
<id>urn:uuid:c4e52cf3-e3f7-4ec2-ac03-1e61acacb984</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/fc7039cb-3b49-4d2c-9861-19bcae14e176"/>
<published>2026-01-16T08:00:00Z</published>
<title>FWC26 - Curb Space Requirement</title>
<updated>2026-01-16T21:54:59.4637586Z</updated>
<georss:line>49.27490679721254 -123.09909964668087 49.27489600346405 -123.09848889466659</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Curb Space Closure @ Thornton Park
Location: 1100-1300 Main Street - E / 
200 National Av - S / 
1100-1200 Station St - W / 
200 Terminal Av - N
Schedule: Jun 1, 2026 - Aug 1, 2026</content>
<id>urn:uuid:78fcd32e-2be1-413a-bb76-bb40593fdb3f</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/fc7039cb-3b49-4d2c-9861-19bcae14e176"/>
<published>2026-01-16T08:00:00Z</published>
<title>FWC26 - Curb Space Requirement</title>
<updated>2026-01-16T21:54:59.4637586Z</updated>
<georss:line>49.27267057952713 -123.09934583239954 49.27256196936884 -123.09864497912929</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Curb Space Closure @ Thornton Park
Location: 1100-1300 Main Street - E / 
200 National Av - S / 
1100-1200 Station St - W / 
200 Terminal Av - N
Schedule: Jun 1, 2026 - Aug 1, 2026</content>
<id>urn:uuid:dde4cd97-2ba1-4a80-b8ba-7bc0c95802af</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/fc7039cb-3b49-4d2c-9861-19bcae14e176"/>
<published>2026-01-16T08:00:00Z</published>
<title>FWC26 - Curb Space Requirement</title>
<updated>2026-01-16T21:54:59.4637586Z</updated>
<georss:line>49.27277629612772 -123.10002804173709 49.27267057952713 -123.09934583239954</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Curb Space Closure

Location: 2800 E Hastings St - N (From Renfrew to Mid Block Kaslo - North Side)


Schedule: Jun 1, 2026 - Aug 1, 2026</content>
<id>urn:uuid:3f157232-0ed4-45da-af58-d97d0d94ac5b</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/45522b9b-ed14-4d86-bb9f-79bccba1f950"/>
<published>2026-01-30T08:00:00Z</published>
<title>FWC26 - Parking Restrictions for TransLink</title>
<updated>2026-01-30T21:54:26.4132669Z</updated>
<georss:line>49.28206570468936 -123.0448355080283 49.28206520557242 -123.0440753252476</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Curb Space Closure

Location: 2800 E Hastings St - N (From Renfrew to Mid Block Kaslo - North Side)


Schedule: Jun 1, 2026 - Aug 1, 2026</content>
<id>urn:uuid:779411e4-e2fb-4c8e-a14a-6022ec1c6e24</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/45522b9b-ed14-4d86-bb9f-79bccba1f950"/>
<published>2026-01-30T08:00:00Z</published>
<title>FWC26 - Parking Restrictions for TransLink</title>
<updated>2026-01-30T21:54:26.4132669Z</updated>
<georss:line>49.28207004148905 -123.04584128295815 49.28206686022503 -123.04480275408952</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Curb Space Closure
Location: 600 Burrard St - E (From Georgia to Dunsmuir - East Side)
Schedule: Jun 1, 2026 - Aug 1, 2026</content>
<id>urn:uuid:88ffd5b9-91da-484b-81fd-a9bf017671ba</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/aa833c84-6f59-4300-adaf-833936fb541f"/>
<published>2026-01-30T08:00:00Z</published>
<title>FWC26 - Parking Restrictions for TransLink</title>
<updated>2026-01-30T17:28:22.6193271Z</updated>
<georss:line>49.285158713605824 -123.1199915149364 49.28441949265854 -123.1211101043476</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Curb Space Closure
Location: 600 Burrard St - E (From Georgia to Dunsmuir - East Side)
Schedule: Jun 1, 2026 - Aug 1, 2026</content>
<id>urn:uuid:d697fca1-3576-4072-aeb2-ff04e375c52b</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/aa833c84-6f59-4300-adaf-833936fb541f"/>
<published>2026-01-30T08:00:00Z</published>
<title>FWC26 - Parking Restrictions for TransLink</title>
<updated>2026-01-30T17:28:22.6193271Z</updated>
<georss:line>49.28555399477821 -123.11939490898948 49.285158713605824 -123.1199915149364</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Curb Space Closure

Location: 2600-2700 Renfrew St - W (From Bradfield Court to 10th Av - West Side)

Schedule: Jun 1, 2026 - Aug 1, 2026</content>
<id>urn:uuid:eeb37cba-030e-48f0-9dc4-551959e6a829</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/47f6ebdd-5c37-4e8d-8628-a8eefa3557b6"/>
<published>2026-01-30T08:00:00Z</published>
<title>FWC26 - Parking Restrictions for TransLink</title>
<updated>2026-01-30T22:08:05.6973172Z</updated>
<georss:line>49.2609129595908 -123.04428332751363 49.26035460912121 -123.04428299285615</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Curb Space Closure

Location: 2600-2700 Renfrew St - W (From Bradfield Court to 10th Av - West Side)

Schedule: Jun 1, 2026 - Aug 1, 2026</content>
<id>urn:uuid:b82d3f54-7963-4843-8e55-6dcdd1f14248</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/47f6ebdd-5c37-4e8d-8628-a8eefa3557b6"/>
<published>2026-01-30T08:00:00Z</published>
<title>FWC26 - Parking Restrictions for TransLink</title>
<updated>2026-01-30T22:08:05.6973172Z</updated>
<georss:line>49.26035460912121 -123.04428299285615 49.259692750739134 -123.04428259308811</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Curb Space Closure

Location: 1400 Station St - W (From Terminal to Central - West Side)

Schedule: Jun 1, 2026 - Aug 1, 2026</content>
<id>urn:uuid:3d650c84-f821-4e82-8c2b-de80d85699cf</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/b3c9a31e-f623-4b95-b73f-a530dee08856"/>
<published>2026-01-30T08:00:00Z</published>
<title>FWC26 - Parking Restrictions for TransLink</title>
<updated>2026-01-30T21:47:47.8083507Z</updated>
<georss:line>49.27245902183637 -123.09805029510525 49.27181308005444 -123.09805738676492</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Curb Space Closure

Location: 1400 Station St - W (From Terminal to Central - West Side)

Schedule: Jun 1, 2026 - Aug 1, 2026</content>
<id>urn:uuid:eeb1719d-9a8f-4078-987c-b3cc33fd9a4d</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/b3c9a31e-f623-4b95-b73f-a530dee08856"/>
<published>2026-01-30T08:00:00Z</published>
<title>FWC26 - Parking Restrictions for TransLink</title>
<updated>2026-01-30T21:47:47.8083507Z</updated>
<georss:line>49.27181308005444 -123.09805738676492 49.27128378004542 -123.09806310108392</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Curb Space Closure

Location: 1400 Station St - W (From Terminal to Central - West Side)

Schedule: Jun 1, 2026 - Aug 1, 2026</content>
<id>urn:uuid:0c2e38c6-11e7-441b-8a87-dac28e6f0b2e</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/b3c9a31e-f623-4b95-b73f-a530dee08856"/>
<published>2026-01-30T08:00:00Z</published>
<title>FWC26 - Parking Restrictions for TransLink</title>
<updated>2026-01-30T21:47:47.8083507Z</updated>
<georss:line>49.27128378004542 -123.09806310108392 49.271021090994935 -123.0980659345943</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Curb Space Closure

Location: 300 Davie St - S (From Homer st to Hamilton St - South Side)

Schedule: Jun 1, 2026 - Aug 1, 2026</content>
<id>urn:uuid:f2935cc0-b37a-48f1-94cd-99549d88d950</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/3d18cc55-af7c-4125-9f7e-e96c2aa175a2"/>
<published>2026-01-30T08:00:00Z</published>
<title>FWC26 - Parking Restrictions for TransLink</title>
<updated>2026-01-30T21:31:25.3523277Z</updated>
<georss:line>49.274893414877795 -123.12271349736868 49.27525166243217 -123.12326640383532</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Curb Space Closure
Location: 700 - 1000 Great Northern Way - N (From Foley St to Glen Dr - North Side)
Schedule: Jun 1, 2026 - Aug 1, 2026</content>
<id>urn:uuid:b9f2c797-1e9b-4bf2-ad5e-2f3cde7a1408</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1a2f6972-b266-4dd9-b02d-3cb7151db781"/>
<published>2026-01-30T08:00:00Z</published>
<title>FWC26 - Parking Restrictions for TransLink</title>
<updated>2026-01-30T21:25:09.9741864Z</updated>
<georss:line>49.26588555601626 -123.08491831786753 49.26550197831341 -123.0829178781986</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Curb Space Closure
Location: 700 - 1000 Great Northern Way - N (From Foley St to Glen Dr - North Side)
Schedule: Jun 1, 2026 - Aug 1, 2026</content>
<id>urn:uuid:7887abf0-877c-4167-8c5a-83249d9d87ff</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1a2f6972-b266-4dd9-b02d-3cb7151db781"/>
<published>2026-01-30T08:00:00Z</published>
<title>FWC26 - Parking Restrictions for TransLink</title>
<updated>2026-01-30T21:25:09.9741864Z</updated>
<georss:line>49.26550197831341 -123.0829178781986 49.26532074272774 -123.08197276407257 49.26531205028439 -123.081926373726 49.26529953400666 -123.08185579945433 49.26528783649147 -123.08178488294442 49.26527693970891 -123.08171367914353 49.26526687064407 -123.08164218809296 49.265257611276894 -123.08157045099479 49.26524917060215 -123.08149846786046 49.26524155758551 -123.08142627993651 49.26523477222659 -123.08135388721945 49.265231133313904 -123.081309663342</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Curb Space Closure
Location: 700 - 1000 Great Northern Way - N (From Foley St to Glen Dr - North Side)
Schedule: Jun 1, 2026 - Aug 1, 2026</content>
<id>urn:uuid:15e8f44f-7197-4dde-88ab-3f529b12d2e6</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1a2f6972-b266-4dd9-b02d-3cb7151db781"/>
<published>2026-01-30T08:00:00Z</published>
<title>FWC26 - Parking Restrictions for TransLink</title>
<updated>2026-01-30T21:25:09.9741864Z</updated>
<georss:line>49.26621920611936 -123.08666270754058 49.26589606709433 -123.08497312449758 49.26588555601626 -123.08491831786753</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Curb Space Closure

Location: 2700 E 29th Av - S (From Slocan St to Atlin St - South Side)

Schedule: Jun 1, 2026 - Aug 1, 2026</content>
<id>urn:uuid:b647c529-5518-4437-b1e9-beca6c198811</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e73608a2-21ce-4ee2-8c1a-3ab490c3a2a3"/>
<published>2026-01-30T08:00:00Z</published>
<title>FWC26 - Parking Restrictions for TransLink</title>
<updated>2026-01-30T22:10:20.4111466Z</updated>
<georss:line>49.244613098561814 -123.04712239815645 49.244611443654776 -123.04650026525788</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Curb Space Closure

Location: 2700 E 29th Av - S (From Slocan St to Atlin St - South Side)

Schedule: Jun 1, 2026 - Aug 1, 2026</content>
<id>urn:uuid:63eec612-20f4-4ebe-ba97-4f3abda26b66</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e73608a2-21ce-4ee2-8c1a-3ab490c3a2a3"/>
<published>2026-01-30T08:00:00Z</published>
<title>FWC26 - Parking Restrictions for TransLink</title>
<updated>2026-01-30T22:10:20.4111466Z</updated>
<georss:line>49.244611443654776 -123.04650026525788 49.24460849928133 -123.04587762285128</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Curb Space Closure
Location: 200 E 10th Av - N (From Watson to Kingsway - North Side)
Schedule: Jun 1, 2026 - Aug 1, 2026</content>
<id>urn:uuid:c4f1bfc2-5cd9-4f85-823d-558b07e2e27b</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/7d8c3b0f-7df9-4508-8447-317d65d80e74"/>
<published>2026-01-30T08:00:00Z</published>
<title>FWC26 - Parking Restrictions for TransLink</title>
<updated>2026-01-30T17:17:19.4100336Z</updated>
<georss:line>49.26199846511983 -123.10032715499278 49.26196842662722 -123.09863878819723</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Curb Space Closure
Location: 200 National Av - N (From Main St to Station St - North Side)
Schedule: Jun 1, 2026 - Aug 1, 2026</content>
<id>urn:uuid:ade083a1-1bcb-4b64-91ca-03e5f1ff7adc</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d3f3877c-a67a-46f7-b247-14d6701ffd04"/>
<published>2026-01-30T08:00:00Z</published>
<title>FWC26 - Parking Restrictions for TransLink</title>
<updated>2026-01-30T17:15:30.6160605Z</updated>
<georss:line>49.27492356625635 -123.09993284985319 49.27490679721254 -123.09909964668087</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Curb Space Closure
Location: 200 National Av - N (From Main St to Station St - North Side)
Schedule: Jun 1, 2026 - Aug 1, 2026</content>
<id>urn:uuid:0916ef1b-6d0d-401f-840d-7bcd90f79742</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d3f3877c-a67a-46f7-b247-14d6701ffd04"/>
<published>2026-01-30T08:00:00Z</published>
<title>FWC26 - Parking Restrictions for TransLink</title>
<updated>2026-01-30T17:15:30.6160605Z</updated>
<georss:line>49.27490679721254 -123.09909964668087 49.27489600346405 -123.09848889466659</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Curb Space Closure

Location: 0 Renfrew St - E (From Oxford to Triumph St - East Side)

Schedule: Jun 1, 2026 - Aug 1, 2026</content>
<id>urn:uuid:10919051-37d6-4b4b-b3c4-9361ca4b4872</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/8c634e6a-857d-4b21-8e68-791f950acab6"/>
<published>2026-01-30T08:00:00Z</published>
<title>FWC26 - Parking Restrictions for TransLink</title>
<updated>2026-01-30T21:51:33.9139574Z</updated>
<georss:line>49.284777080474726 -123.04407237962444 49.285683056380634 -123.04407146825237</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Curb Space Closure

Location: 0 Renfrew St - E (From Oxford to Triumph St - East Side)

Schedule: Jun 1, 2026 - Aug 1, 2026</content>
<id>urn:uuid:b4904c84-9735-4f69-aa7a-9cd64fee35fe</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/8c634e6a-857d-4b21-8e68-791f950acab6"/>
<published>2026-01-30T08:00:00Z</published>
<title>FWC26 - Parking Restrictions for TransLink</title>
<updated>2026-01-30T21:51:33.9139574Z</updated>
<georss:line>49.284777080474726 -123.04407237962444 49.283873065420124 -123.04407316896955</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Curb Space Closure

Location: 900	Renfrew St - E (From Parker to Adanac - East Side - from 8:00pm to 2:00am)

Schedule: Jun 1, 2026 - Aug 1, 2026; All days; 8:00 PM - 2:00 AM</content>
<id>urn:uuid:54cf15f4-a13d-4bd0-95f6-ddfb8ab40ed7</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/0f6e4e2f-bb98-4cb1-aa6e-98fd0a65e5e8"/>
<published>2026-01-30T08:00:00Z</published>
<title>FWC26 - Parking Restrictions for TransLink</title>
<updated>2026-01-30T22:04:51.9155335Z</updated>
<georss:line>49.276411437774925 -123.04410035452361 49.27538031287352 -123.04411832484882</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Curb Space Closure

Location: 900	Renfrew St - E (From Parker to Adanac - East Side - from 8:00pm to 2:00am)

Schedule: Jun 1, 2026 - Aug 1, 2026; All days; 8:00 PM - 2:00 AM</content>
<id>urn:uuid:f64c9226-d340-484a-95c2-b003143d6071</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/0f6e4e2f-bb98-4cb1-aa6e-98fd0a65e5e8"/>
<published>2026-01-30T08:00:00Z</published>
<title>FWC26 - Parking Restrictions for TransLink</title>
<updated>2026-01-30T22:04:51.9155335Z</updated>
<georss:line>49.27703961129242 -123.04409021836584 49.27662485892546 -123.0440966403019</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Curb Space Closure

Location: 900	Renfrew St - E (From Parker to Adanac - East Side - from 8:00pm to 2:00am)

Schedule: Jun 1, 2026 - Aug 1, 2026; All days; 8:00 PM - 2:00 AM</content>
<id>urn:uuid:b3753f50-6d24-46fe-bc2c-ac7186cfa5b8</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/0f6e4e2f-bb98-4cb1-aa6e-98fd0a65e5e8"/>
<published>2026-01-30T08:00:00Z</published>
<title>FWC26 - Parking Restrictions for TransLink</title>
<updated>2026-01-30T22:04:51.9155335Z</updated>
<georss:line>49.27662485892546 -123.0440966403019 49.276411437774925 -123.04410035452361</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Curb Space Closure

Location: 900	Renfrew St - E (From Parker to Adanac - East Side - from 8:00pm to 2:00am)

Schedule: Jun 1, 2026 - Aug 1, 2026; All days; 8:00 PM - 2:00 AM</content>
<id>urn:uuid:9193d0a8-4266-4cfd-9502-d2892082df6d</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/0f6e4e2f-bb98-4cb1-aa6e-98fd0a65e5e8"/>
<published>2026-01-30T08:00:00Z</published>
<title>FWC26 - Parking Restrictions for TransLink</title>
<updated>2026-01-30T22:04:51.9155335Z</updated>
<georss:line>49.277454309658026 -123.04408379627628 49.27703961129242 -123.04409021836584</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Curb Space Closure

Location: 1400-1600 Station St - E (From Industrial Av to Terminal Av - East Side)

Schedule: Jun 1, 2026 - Aug 1, 2026</content>
<id>urn:uuid:b428bea2-9715-43be-968f-d6dc00a78f86</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/2b7efd36-2d06-4d2d-a691-4779f62454fe"/>
<published>2026-01-30T08:00:00Z</published>
<title>FWC26 - Parking Restrictions for TransLink</title>
<updated>2026-01-30T21:33:43.6333147Z</updated>
<georss:line>49.27049809708208 -123.098071015156 49.269880364420686 -123.09807762611396</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Curb Space Closure

Location: 1400-1600 Station St - E (From Industrial Av to Terminal Av - East Side)

Schedule: Jun 1, 2026 - Aug 1, 2026</content>
<id>urn:uuid:b766f644-7779-48d8-b065-b0700e067495</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/2b7efd36-2d06-4d2d-a691-4779f62454fe"/>
<published>2026-01-30T08:00:00Z</published>
<title>FWC26 - Parking Restrictions for TransLink</title>
<updated>2026-01-30T21:33:43.6333147Z</updated>
<georss:line>49.271021090994935 -123.0980659345943 49.27049809708208 -123.098071015156</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Curb Space Closure

Location: 1400-1600 Station St - E (From Industrial Av to Terminal Av - East Side)

Schedule: Jun 1, 2026 - Aug 1, 2026</content>
<id>urn:uuid:1b588801-5bf4-4e44-af7d-7e53b7ccb914</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/2b7efd36-2d06-4d2d-a691-4779f62454fe"/>
<published>2026-01-30T08:00:00Z</published>
<title>FWC26 - Parking Restrictions for TransLink</title>
<updated>2026-01-30T21:33:43.6333147Z</updated>
<georss:line>49.27181308005444 -123.09805738676492 49.27128378004542 -123.09806310108392</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Curb Space Closure

Location: 1400-1600 Station St - E (From Industrial Av to Terminal Av - East Side)

Schedule: Jun 1, 2026 - Aug 1, 2026</content>
<id>urn:uuid:6af76e19-76c3-40c2-84ef-40f8af4d9111</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/2b7efd36-2d06-4d2d-a691-4779f62454fe"/>
<published>2026-01-30T08:00:00Z</published>
<title>FWC26 - Parking Restrictions for TransLink</title>
<updated>2026-01-30T21:33:43.6333147Z</updated>
<georss:line>49.27128378004542 -123.09806310108392 49.271021090994935 -123.0980659345943</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Curb Space Closure

Location: 1400-1600 Station St - E (From Industrial Av to Terminal Av - East Side)

Schedule: Jun 1, 2026 - Aug 1, 2026</content>
<id>urn:uuid:984d9152-05b1-4284-9b99-76b42ac415f4</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/2b7efd36-2d06-4d2d-a691-4779f62454fe"/>
<published>2026-01-30T08:00:00Z</published>
<title>FWC26 - Parking Restrictions for TransLink</title>
<updated>2026-01-30T21:33:43.6333147Z</updated>
<georss:line>49.27245902183637 -123.09805029510525 49.27181308005444 -123.09805738676492</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Curb Space Closure
Location: 1400 Station St - both sides of the street

Schedule: Jun 1, 2026 - Aug 1, 2026</content>
<id>urn:uuid:282640cb-aede-4c0f-8eb4-88c8bf05da8f</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a0cae651-65c3-4ffd-9590-31a45ae834ab"/>
<published>2026-01-16T08:00:00Z</published>
<title>FWC26 - Translink Parking and Bus Zone</title>
<updated>2026-01-16T21:57:37.7595175Z</updated>
<georss:line>49.27245902183637 -123.09805029510525 49.27181308005444 -123.09805738676492</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Curb Space Closure
Location: 1400 Station St - both sides of the street

Schedule: Jun 1, 2026 - Aug 1, 2026</content>
<id>urn:uuid:9c09e8f1-7d08-4d5a-8fa8-93c0ef2cf7be</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a0cae651-65c3-4ffd-9590-31a45ae834ab"/>
<published>2026-01-16T08:00:00Z</published>
<title>FWC26 - Translink Parking and Bus Zone</title>
<updated>2026-01-16T21:57:37.7595175Z</updated>
<georss:line>49.27181308005444 -123.09805738676492 49.27128378004542 -123.09806310108392</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Curb Space Closure
Location: 1400 Station St - both sides of the street

Schedule: Jun 1, 2026 - Aug 1, 2026</content>
<id>urn:uuid:3d2e05f4-dc36-42d2-8137-52551836e722</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a0cae651-65c3-4ffd-9590-31a45ae834ab"/>
<published>2026-01-16T08:00:00Z</published>
<title>FWC26 - Translink Parking and Bus Zone</title>
<updated>2026-01-16T21:57:37.7595175Z</updated>
<georss:line>49.27128378004542 -123.09806310108392 49.271021090994935 -123.0980659345943</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Curb Space Closure

Location: 3200-4000 Granville St - E

Schedule: Jun 1, 2026 - Aug 1, 2026</content>
<id>urn:uuid:7b6ac3d9-2d55-4a65-ab99-73fa33af3827</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1dc028a2-842a-4048-86b2-2caa350f16e4"/>
<published>2026-01-16T08:00:00Z</published>
<title>FWC26 - Translink Parking and Bus Zone</title>
<updated>2026-01-16T22:02:02.0736271Z</updated>
<georss:line>49.256649928522734 -123.13883762616128 49.2545888894326 -123.13891270423308</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Curb Space Closure

Location: 3200-4000 Granville St - E

Schedule: Jun 1, 2026 - Aug 1, 2026</content>
<id>urn:uuid:62a3116c-463c-4f0a-b767-c2a7bd0bf580</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1dc028a2-842a-4048-86b2-2caa350f16e4"/>
<published>2026-01-16T08:00:00Z</published>
<title>FWC26 - Translink Parking and Bus Zone</title>
<updated>2026-01-16T22:02:02.0736271Z</updated>
<georss:line>49.25705391921369 -123.13880231338759 49.256649928522734 -123.13883762616128</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Curb Space Closure

Location: 900-1000 Station St - W

Schedule: Jun 1, 2026 - Aug 1, 2026</content>
<id>urn:uuid:bf7e6177-08f3-406c-bb30-9b9a6480c5b5</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/c55edde9-6c98-44d0-9181-006c7a782a53"/>
<published>2026-01-16T08:00:00Z</published>
<title>FWC26 - Translink Parking and Bus Zone</title>
<updated>2026-01-16T22:05:41.9864197Z</updated>
<georss:line>49.27675252676451 -123.09901777523407 49.27490679721254 -123.09909964668087</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Curb Space Closure
Location: 1400-1600 Western St - both sides of the street

Schedule: Jun 1, 2026 - Aug 1, 2026</content>
<id>urn:uuid:62a2326d-0b41-445f-9e84-abe150842a28</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/fd8bf4a8-edd4-4963-8889-8f0843637afa"/>
<published>2026-01-16T08:00:00Z</published>
<title>FWC26 - Translink Parking and Bus Zone</title>
<updated>2026-01-16T21:47:49.121932Z</updated>
<georss:line>49.27092417268284 -123.09987697413158 49.27043572464447 -123.10000174123262</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Curb Space Closure
Location: 1400-1600 Western St - both sides of the street

Schedule: Jun 1, 2026 - Aug 1, 2026</content>
<id>urn:uuid:01e6f093-8ed9-40c5-b354-3e3f52019f85</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/fd8bf4a8-edd4-4963-8889-8f0843637afa"/>
<published>2026-01-16T08:00:00Z</published>
<title>FWC26 - Translink Parking and Bus Zone</title>
<updated>2026-01-16T21:47:49.121932Z</updated>
<georss:line>49.271392570173674 -123.09963762594046 49.27099257040254 -123.09985816929536 49.27092417268284 -123.09987697413158</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Curb Space Closure
Location: 1400-1600 Western St - both sides of the street

Schedule: Jun 1, 2026 - Aug 1, 2026</content>
<id>urn:uuid:0dc95e04-0d62-467f-9efe-ad131c56fe18</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/fd8bf4a8-edd4-4963-8889-8f0843637afa"/>
<published>2026-01-16T08:00:00Z</published>
<title>FWC26 - Translink Parking and Bus Zone</title>
<updated>2026-01-16T21:47:49.121932Z</updated>
<georss:line>49.271838285698806 -123.09938265240565 49.271392570173674 -123.09963762594046</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Curb Space Closure
Location: 1400-1600 Western St - both sides of the street

Schedule: Jun 1, 2026 - Aug 1, 2026</content>
<id>urn:uuid:5e77c1b3-63b2-4340-b8a5-9d375f514a39</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/fd8bf4a8-edd4-4963-8889-8f0843637afa"/>
<published>2026-01-16T08:00:00Z</published>
<title>FWC26 - Translink Parking and Bus Zone</title>
<updated>2026-01-16T21:47:49.121932Z</updated>
<georss:line>49.27267057952713 -123.09934583239954 49.272504804045724 -123.09935989270483 49.271838285698806 -123.09938265240565</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Curb Space Closure

Location: 400-1100	Great Northern Way - N

Schedule: Jun 1, 2026 - Aug 1, 2026</content>
<id>urn:uuid:91303839-746e-4b34-934f-092ab9da3cee</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/9150bfe1-2237-415a-801f-28351d9df1e7"/>
<published>2026-01-16T08:00:00Z</published>
<title>FWC26 - Translink Parking and Bus Zone</title>
<updated>2026-01-16T22:20:04.3873146Z</updated>
<georss:line>49.2668087246295 -123.09511332508774 49.26679255940334 -123.09291441169006</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Curb Space Closure

Location: 400-1100	Great Northern Way - N

Schedule: Jun 1, 2026 - Aug 1, 2026</content>
<id>urn:uuid:f333737c-6a34-4021-843d-504fd8dd9dd5</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/9150bfe1-2237-415a-801f-28351d9df1e7"/>
<published>2026-01-16T08:00:00Z</published>
<title>FWC26 - Translink Parking and Bus Zone</title>
<updated>2026-01-16T22:20:04.3873146Z</updated>
<georss:line>49.26687820322374 -123.09620024895271 49.266835333680234 -123.09589535874748 49.26681227351736 -123.09559801238893 49.2668087246295 -123.09511332508774</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Curb Space Closure

Location: 400-1100	Great Northern Way - N

Schedule: Jun 1, 2026 - Aug 1, 2026</content>
<id>urn:uuid:f228edf2-cc44-4c3a-a432-ddf9eed0ead0</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/9150bfe1-2237-415a-801f-28351d9df1e7"/>
<published>2026-01-16T08:00:00Z</published>
<title>FWC26 - Translink Parking and Bus Zone</title>
<updated>2026-01-16T22:20:04.3873146Z</updated>
<georss:line>49.26679255940334 -123.09291441169006 49.26677570715384 -123.09091834084857</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Curb Space Closure

Location: 400-1100	Great Northern Way - N

Schedule: Jun 1, 2026 - Aug 1, 2026</content>
<id>urn:uuid:2a3614ce-e1f4-4161-b613-c1424f54374c</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/9150bfe1-2237-415a-801f-28351d9df1e7"/>
<published>2026-01-16T08:00:00Z</published>
<title>FWC26 - Translink Parking and Bus Zone</title>
<updated>2026-01-16T22:20:04.3873146Z</updated>
<georss:line>49.26677570715384 -123.09091834084857 49.26676903531455 -123.0898918422031 49.266768272824294 -123.08984287935073 49.2667669435844 -123.08979395670792 49.266765065585304 -123.08974507430895 49.26676262082603 -123.08969624586831 49.26675962728629 -123.08964748516574 49.26675606695457 -123.08959881966123 49.26675195782133 -123.089550249389 49.26674729986536 -123.08950180184155 49.266742084091646 -123.08945347700427 49.266736310479075 -123.08940530236961 49.26672999700756 -123.08935729171719 49.26672313467151 -123.08930945877768 49.266715723460464 -123.08926181729808 49.26670778135457 -123.08921438105783 49.26669928135769 -123.08916716375519 49.266690250445265 -123.08912017918563 49.26668068860681 -123.08907344109605 49.26667646709885 -123.08905368125156</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Curb Space Closure

Location: 400-1100	Great Northern Way - N

Schedule: Jun 1, 2026 - Aug 1, 2026</content>
<id>urn:uuid:1b0924c1-f16a-4038-b22c-7cb3182c436c</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/9150bfe1-2237-415a-801f-28351d9df1e7"/>
<published>2026-01-16T08:00:00Z</published>
<title>FWC26 - Translink Parking and Bus Zone</title>
<updated>2026-01-16T22:20:04.3873146Z</updated>
<georss:line>49.26667646709885 -123.08905368125156 49.26621920611936 -123.08666270754058</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Curb Space Closure

Location: 400-1100	Great Northern Way - N

Schedule: Jun 1, 2026 - Aug 1, 2026</content>
<id>urn:uuid:23a231ae-0179-470f-b6a1-c483bb959941</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/9150bfe1-2237-415a-801f-28351d9df1e7"/>
<published>2026-01-16T08:00:00Z</published>
<title>FWC26 - Translink Parking and Bus Zone</title>
<updated>2026-01-16T22:20:04.3873146Z</updated>
<georss:line>49.26621920611936 -123.08666270754058 49.26589606709433 -123.08497312449758 49.26588555601626 -123.08491831786753</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Curb Space Closure

Location: 400-1100	Great Northern Way - N

Schedule: Jun 1, 2026 - Aug 1, 2026</content>
<id>urn:uuid:859ad33f-53e1-47a0-bac6-9d85503ad4ae</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/9150bfe1-2237-415a-801f-28351d9df1e7"/>
<published>2026-01-16T08:00:00Z</published>
<title>FWC26 - Translink Parking and Bus Zone</title>
<updated>2026-01-16T22:20:04.3873146Z</updated>
<georss:line>49.26588555601626 -123.08491831786753 49.26550197831341 -123.0829178781986</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Curb Space Closure

Location: 400-1100	Great Northern Way - N

Schedule: Jun 1, 2026 - Aug 1, 2026</content>
<id>urn:uuid:5a77d8ac-2c2a-4ef3-b443-e9427a76c04a</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/9150bfe1-2237-415a-801f-28351d9df1e7"/>
<published>2026-01-16T08:00:00Z</published>
<title>FWC26 - Translink Parking and Bus Zone</title>
<updated>2026-01-16T22:20:04.3873146Z</updated>
<georss:line>49.26550197831341 -123.0829178781986 49.26532074272774 -123.08197276407257 49.26531205028439 -123.081926373726 49.26529953400666 -123.08185579945433 49.26528783649147 -123.08178488294442 49.26527693970891 -123.08171367914353 49.26526687064407 -123.08164218809296 49.265257611276894 -123.08157045099479 49.26524917060215 -123.08149846786046 49.26524155758551 -123.08142627993651 49.26523477222659 -123.08135388721945 49.265231133313904 -123.081309663342</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Curb Space Closure

Location: 200 Northern St - both sides of the street

Schedule: Jun 1, 2026 - Aug 1, 2026</content>
<id>urn:uuid:57e85e51-0532-4e67-893e-ff652fba476a</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e05e8ccc-25b8-47af-ad87-0075b9a0f517"/>
<published>2026-01-16T08:00:00Z</published>
<title>FWC26 - Translink Parking and Bus Zone</title>
<updated>2026-01-16T22:00:08.9128078Z</updated>
<georss:line>49.271838285698806 -123.09938265240565 49.27181308005444 -123.09805738676492</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Curb Space Closure

Location: 2900-3300 Hastings St - both sides of the street

Schedule: Jun 1, 2026 - Aug 1, 2026</content>
<id>urn:uuid:93d70d03-1cea-4f11-8168-5974809e8670</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ed25b2fd-6dd5-4a50-86e6-79d03671ee61"/>
<published>2026-01-16T08:00:00Z</published>
<title>FWC26 - Translink Parking and Bus Zone</title>
<updated>2026-01-16T22:26:04.6361323Z</updated>
<georss:line>49.28112324828129 -123.04407652069781 49.28113675701033 -123.04386910793018 49.28113206715713 -123.03882569507667</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Curb Space Closure

Location: 2900-3300 Hastings St - both sides of the street

Schedule: Jun 1, 2026 - Aug 1, 2026</content>
<id>urn:uuid:5cba1f50-9793-4984-a1bb-102c29fa6492</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ed25b2fd-6dd5-4a50-86e6-79d03671ee61"/>
<published>2026-01-16T08:00:00Z</published>
<title>FWC26 - Translink Parking and Bus Zone</title>
<updated>2026-01-16T22:26:04.6361323Z</updated>
<georss:line>49.28113206715713 -123.03882569507667 49.28112994195749 -123.03620065491015</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Curb Space Closure

Location: 2900-3300 Hastings St - both sides of the street

Schedule: Jun 1, 2026 - Aug 1, 2026</content>
<id>urn:uuid:01db2739-acd5-4112-ad71-fae149ad6444</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ed25b2fd-6dd5-4a50-86e6-79d03671ee61"/>
<published>2026-01-16T08:00:00Z</published>
<title>FWC26 - Translink Parking and Bus Zone</title>
<updated>2026-01-16T22:26:04.6361323Z</updated>
<georss:line>49.2811300409044 -123.03620065498257 49.2811277412323 -123.03378444214223 49.28111347237058 -123.03357703518842</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Curb Space Closure

Location: 2900-3300 Hastings St - both sides of the street

Schedule: Jun 1, 2026 - Aug 1, 2026</content>
<id>urn:uuid:fdb675e8-80ca-418f-9c4f-e76bba8b0474</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ed25b2fd-6dd5-4a50-86e6-79d03671ee61"/>
<published>2026-01-16T08:00:00Z</published>
<title>FWC26 - Translink Parking and Bus Zone</title>
<updated>2026-01-16T22:26:04.6361323Z</updated>
<georss:line>49.28111347237058 -123.03357703518842 49.281122488984806 -123.03148805443142</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Curb Space Closure

Location: 2900-3300 Hastings St - both sides of the street

Schedule: Jun 1, 2026 - Aug 1, 2026</content>
<id>urn:uuid:90471bb3-79f7-4dff-9bae-2279fdc6d657</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ed25b2fd-6dd5-4a50-86e6-79d03671ee61"/>
<published>2026-01-16T08:00:00Z</published>
<title>FWC26 - Translink Parking and Bus Zone</title>
<updated>2026-01-16T22:26:04.6361323Z</updated>
<georss:line>49.281122488984806 -123.03148805443142 49.28112530045806 -123.03083584932608</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Curb Space Closure

Location: 600	Homer St - both sides of the street


Schedule: Jun 1, 2026 - Aug 1, 2026</content>
<id>urn:uuid:800ef5d7-1f1c-4c36-b700-ed3d4c516315</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a5f1fabe-01e4-484d-8bd3-8862d3ea073d"/>
<published>2026-01-16T08:00:00Z</published>
<title>FWC26 - Translink Parking and Bus Zone</title>
<updated>2026-01-16T22:21:59.3364523Z</updated>
<georss:line>49.28172605119889 -123.113478181969 49.280596499891544 -123.11518701223562</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Curb Space Closure

Location: 900-1000	Station St - both sides of the street


Schedule: Jun 1, 2026 - Aug 1, 2026</content>
<id>urn:uuid:189920a8-8edd-466a-84d8-7a1176002bf2</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/2e47a0bb-f59c-462c-8fb6-c8797a13f618"/>
<published>2026-01-16T08:00:00Z</published>
<title>FWC26 - Translink Parking and Bus Zone</title>
<updated>2026-01-16T22:23:40.5436589Z</updated>
<georss:line>49.27675252676451 -123.09901777523407 49.27490679721254 -123.09909964668087</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Curb Space Closure

Location: 700-800 Renfrew St - E

Schedule: Jun 1, 2026 - Aug 1, 2026</content>
<id>urn:uuid:930d6acc-8159-4a96-b998-db97ac149ee7</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/3608e42c-b61d-470e-89df-db1c44b8b1e2"/>
<published>2026-01-16T08:00:00Z</published>
<title>FWC26 - Translink Parking and Bus Zone</title>
<updated>2026-01-16T22:28:04.9429014Z</updated>
<georss:line>49.27826792453436 -123.04408200541671 49.27786114393089 -123.04408333395689</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Curb Space Closure

Location: 700-800 Renfrew St - E

Schedule: Jun 1, 2026 - Aug 1, 2026</content>
<id>urn:uuid:ce7649ed-216a-45c9-9f08-4e258e2e337f</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/3608e42c-b61d-470e-89df-db1c44b8b1e2"/>
<published>2026-01-16T08:00:00Z</published>
<title>FWC26 - Translink Parking and Bus Zone</title>
<updated>2026-01-16T22:28:04.9429014Z</updated>
<georss:line>49.27786114393089 -123.04408333395689 49.277454309658026 -123.04408379627628</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Curb Space Closure

Location: 700-800 Renfrew St - E

Schedule: Jun 1, 2026 - Aug 1, 2026</content>
<id>urn:uuid:e260afa2-3acc-4a14-a002-515b584e38f3</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/3608e42c-b61d-470e-89df-db1c44b8b1e2"/>
<published>2026-01-16T08:00:00Z</published>
<title>FWC26 - Translink Parking and Bus Zone</title>
<updated>2026-01-16T22:28:04.9429014Z</updated>
<georss:line>49.277454309658026 -123.04408379627628 49.27703961129242 -123.04409021836584</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Curb Space Closure

Location: 700-800 Renfrew St - E

Schedule: Jun 1, 2026 - Aug 1, 2026</content>
<id>urn:uuid:5bc26a31-d75b-49c6-b21b-9733f467174c</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/3608e42c-b61d-470e-89df-db1c44b8b1e2"/>
<published>2026-01-16T08:00:00Z</published>
<title>FWC26 - Translink Parking and Bus Zone</title>
<updated>2026-01-16T22:28:04.9429014Z</updated>
<georss:line>49.27703961129242 -123.04409021836584 49.27662485892546 -123.0440966403019</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Expansion of the NEU by adding new heat pumps and accompanying electrical and mechanical works.  The majority of the project construction is within the FCEC building, however there are some works occurring outside of the building within the property lines.  The City's contractor will be utilizing the site to the east of the new extension of Wyllie Street as a laydown area for the duration of the project.  The project site shown on the map is for the laydown area.
Location: 1890 Spyglass Place and the laydown area to the east of Wyllie Street.
Schedule: Apr 1, 2022 - Nov 30, 2024</content>
<id>urn:uuid:f32349bf-ac1e-4fad-8076-4d6e662fe9f8</id>
<link href="vancouver.ca/neu-expansion"/>
<published>2023-06-02T07:00:00Z</published>
<title>False Creek Energy Centre - Low Carbon Expansion - Contractor Laydown Area</title>
<updated>2024-02-20T23:02:00.8503759Z</updated>
<georss:polygon>49.268516816046144 -123.11421672215279 49.26830329346333 -123.11394313683326 49.26851156550191 -123.11350593676386 49.268621826813444 -123.11373124232108 49.268516816046144 -123.11421672215279</georss:polygon>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>2nd annual event on both side of the VAG and parking along W/S 700 Howe st
Location: W/S 700 Howe st
Schedule: Sep 12, 2026 - Sep 13, 2026</content>
<id>urn:uuid:5b89bf83-b6ce-4299-ad51-b9f56b1906f9</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/0d5727de-9a46-4cd7-99fc-6b8549156d4b"/>
<published>2026-05-07T07:00:00Z</published>
<title>Fiesta Mexicana 2026</title>
<updated>2026-05-07T18:27:18.0700169Z</updated>
<georss:line>49.28281696019778 -123.11961882353052 49.28226930920138 -123.12043153286191</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Crews will be onsite to conduct Gas Service Connection on behalf of Fortis Bc

Traffic Impacts: Total road closure at both sides of 2700 blk of Grant St from West PL of 2735 to East PL of 2747 Grant St

WO#: 31536480
Location: B/S of 2700 blk of Grant St
Schedule: Jun 22, 2026 - Jun 26, 2026; Weekdays; 7:00 AM - 5:00 PM</content>
<id>urn:uuid:0c0ba852-81b1-49ed-8930-80ee781d7f75</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/2892686e-74d6-42b2-a0a9-dd953da75919"/>
<published>2026-06-09T07:00:00Z</published>
<title>Fortis BC - Gas Service Connection - 2700 blk of Grant St - Jun 22-26, 2026</title>
<updated>2026-06-09T16:10:19.5394005Z</updated>
<georss:line>49.271342683147935 -123.04779515599142 49.271360267060516 -123.04812932927712</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Crews will be onsite to conduct Gas Service Connection on behalf of Fortis BC

Traffic Impacts: Parking lane closure at west side of 3900 blk of Rupert St from North PL of 3949 to South PL of 3987 Rupert St

WO# 31511736
Location: W/S of 3900 blk of Rupert St
Schedule: Jun 10, 2026 - Jun 16, 2026; M, Tu, W, Th, F, Su; 7:00 AM - 5:00 PM</content>
<id>urn:uuid:55d2d74c-d9be-44ab-9c41-2bcc4ceae66e</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/431fbd3e-a619-4e73-ae99-1613c4138091"/>
<published>2026-06-01T07:00:00Z</published>
<title>Fortis BC - Gas Service Connection - 3900 blk Rupert St - Jun 10-16, 2026</title>
<updated>2026-06-01T20:43:35.0922302Z</updated>
<georss:line>49.2492124664019 -123.03381018364823 49.24896618055274 -123.03383174321505</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Crews will be onsite to conduct Gas Service Connections on behalf of Fortis BC

Traffic Impacts: Total road closure at both sides of 3900 blk of W35th Ave from 5000 blk Crown St to West PL of 3981 of W35th Ave

WO# 31535187
Location: B/S of 3900 blk of W35th Ave
Schedule: Jun 15, 2026 - Jun 19, 2026; Weekdays; 7:00 AM - 5:00 PM</content>
<id>urn:uuid:8f1089eb-7a70-4aaf-a878-2b74404abeae</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/7aa605b6-44b6-49e0-acc1-0a63e603a886"/>
<published>2026-06-03T07:00:00Z</published>
<title>Fortis BC - Gas Service Connection - 3900 blk W35th Ave - Jun 15 to 19, 2026</title>
<updated>2026-06-03T18:24:24.6567063Z</updated>
<georss:line>49.24050258321327 -123.19366898171846 49.24050962117505 -123.19310843298116</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Crews will be onsite to conduct Gas Service Connections on behalf of Fortis BC

Traffic Impacts: Lane way closure at both sides of Lane East of 1100 blk of Burrard St from South PL of 1160 to North PL of 1134 Burrard St

WO# 31536015

Extension to June 12, 2026

Location: B/S of LE of 1100 blk of Burrard St
Schedule: Jun 1, 2026 - Jun 12, 2026; Weekdays; 7:00 AM - 5:00 PM</content>
<id>urn:uuid:4746be20-01e4-4efd-8a1e-7bfe7641c1c9</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e65b55cd-db77-40de-a81a-be5f192ab937"/>
<published>2026-05-25T07:00:00Z</published>
<title>Fortis BC - Gas Service Connection - LE of 1100 blk Burrard - June 1 to 5, 2026</title>
<updated>2026-06-03T18:29:46.0809619Z</updated>
<georss:line>49.27903588323207 -123.1282086250828 49.279479219828175 -123.12752105456435</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Parking lane closure on Both Sides of 100 Block of E 22nd Avenue to facilitate a gas service connection.

WO# 31535909
Location: Both Sides of 100 Block of E 22nd Avenue From W PL of 125 to E PL of 155.
Schedule: Jun 10, 2026 - Jun 16, 2026; Weekdays; 7:00 AM - 5:00 PM</content>
<id>urn:uuid:aaedb807-ac72-49b0-8d72-4d976d6fc5d9</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d71d8ebe-af24-4904-baf6-786f41a8d88a"/>
<published>2026-05-27T07:00:00Z</published>
<title>FortisBC Gas Service Connection on 100 Block of E 22nd Avenue</title>
<updated>2026-05-27T22:14:54.7244454Z</updated>
<georss:line>49.25098112183446 -123.10242388756961 49.2509671154061 -123.10194345725506</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Travel and Parking lane closure on Both Sides of 1600-1700 Block of Drummond Drive to facilitate a gas service connection.

WO# 31541293
Location: Both Sides of 1600-1700 Block of Drummond Drive From North PL of 1626 to South PL of 1626.
Schedule: Jun 11, 2026 - Jun 17, 2026; Weekdays; 7:00 AM - 5:00 PM</content>
<id>urn:uuid:50157cac-a9c7-49c2-9381-0d9d220f183d</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/5509b9f3-71ce-4852-bb79-73bb0c9d1904"/>
<published>2026-06-02T07:00:00Z</published>
<title>FortisBC Gas Service Connection on 1600-1700 Block of Drummond Drive</title>
<updated>2026-06-02T21:08:25.9849021Z</updated>
<georss:line>49.27351369685195 -123.22228722635498 49.27325889570011 -123.22255317911936 49.273032093524904 -123.22265183874661</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Parking lane closure on Both Sides of 200 Block of E 39th Avenue to facilitate a gas service connection.

WO# 31542010
Location: Both Sides of 200 Block of E 39th Avenue From W PL of 219 to E PL of 241.
Schedule: Jun 26, 2026 - Jun 30, 2026; Weekdays; 7:00 AM - 5:00 PM</content>
<id>urn:uuid:1cecb377-8a38-4b50-813f-b9593d299c0e</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a92442f5-ec5c-493b-b170-e43e3f9ba678"/>
<published>2026-06-09T07:00:00Z</published>
<title>FortisBC Gas Service Connection on 200 Block of E 39th Avenue</title>
<updated>2026-06-09T20:41:31.3733685Z</updated>
<georss:line>49.23542855497092 -123.10091276253604 49.23541734636305 -123.10027790788794</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Parking lane closure on the North Side of 2000 Block of E 13th Avenue to facilitate a gas service connection.

WO# 31536217
Location: North Side of 2000 Block of E 13th Avenue From Semlin Drive to W PL of 2015.
Schedule: Jun 15, 2026 7:00 AM - Jun 19, 2026 5:00 PM</content>
<id>urn:uuid:34d809e8-3f1b-4aed-83ca-ad02c6f905f4</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/9bbf5ebd-1461-4a3f-b202-e7e33fbb58d0"/>
<published>2026-06-03T07:00:00Z</published>
<title>FortisBC Gas Service Connection on 2000 Block of E 13th Avenue</title>
<updated>2026-06-03T18:19:50.8202518Z</updated>
<georss:line>49.25864990722488 -123.06404109092067 49.25864990722488 -123.0635520812947</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Parking lane closure on the South Side of 2800 Block of E 43rd Avenue to facilitate a gas service connection.

WO# 31535513
Location: South Side of 2800 Block of E 43rd Avenue From W PL of 2842 to E PL of 2856.
Schedule: Jun 8, 2026 7:00 AM - Jun 19, 2026 5:00 PM</content>
<id>urn:uuid:3ec52330-c5fe-4324-a307-8ec36ac8b0d5</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/6e0f4ca2-7f2b-48e3-8deb-587e7c3d527d"/>
<published>2026-05-28T07:00:00Z</published>
<title>FortisBC Gas Service Connection on 2800 Block of E 43rd Avenue</title>
<updated>2026-06-09T16:14:44.6195546Z</updated>
<georss:line>49.23114361386965 -123.04712319768885 49.23115412290886 -123.04791176713923</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Parking lane closure on the North Side of 2800 Block of Trinity Street to facilitate a gas service connection.

WO# 31468329
Location: North Side of 2800 Block of Trinity Street From W PL of 2809 to E PL of 2821.
Schedule: Jun 8, 2026 7:00 AM - Jun 12, 2026 5:00 PM</content>
<id>urn:uuid:bc0f487d-5067-420d-992a-40e37cda4532</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/616f7822-92d7-43e1-ac66-fe47f7ad189f"/>
<published>2026-05-28T07:00:00Z</published>
<title>FortisBC Gas Service Connection on 2800 Block of Trinity Street</title>
<updated>2026-05-28T15:45:06.1053692Z</updated>
<georss:line>49.28970500790186 -123.04639637453992 49.28970500790186 -123.04581701739272</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Parking lane closure on the North Side of 2800 Block of Venables Street to facilitate a gas service connection.

WO# 31536196
Location: North Side of 2800 Block of Venables Street From W PL of 2875 to E PL of 2887.
Schedule: Jun 8, 2026 7:00 AM - Jun 12, 2026 5:00 PM</content>
<id>urn:uuid:bf3b5c92-b32e-42cb-adb6-f3212cf7a87e</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/94efcdd3-5ec9-4cd4-9e60-e40579db5e1b"/>
<published>2026-05-28T07:00:00Z</published>
<title>FortisBC Gas Service Connection on 2800 Block of Venables Street</title>
<updated>2026-05-28T15:58:11.3223824Z</updated>
<georss:line>49.27662930167938 -123.04446526440296 49.27662230210484 -123.045194825255</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Parking lane closure on Both Sides of 3400 Block of Garden Drive to facilitate a gas service connection.

WO# 31535503
Location: Both Sides of 3400 Block of Garden Drive From N PL of 3420 to S PL of 3436.
Schedule: Jun 10, 2026 - Jun 16, 2026; Weekdays; 7:00 AM - 5:00 PM</content>
<id>urn:uuid:d0fe51cd-cca0-49f2-8252-8a0ffbbed283</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/2873110a-41b3-4a72-bfcc-c8a6aaa1831c"/>
<published>2026-05-28T07:00:00Z</published>
<title>FortisBC Gas Service Connection on 3400 Block of Garden Drive</title>
<updated>2026-05-28T15:25:13.4731655Z</updated>
<georss:line>49.25319857045983 -123.05831508577944 49.25277839475436 -123.05831508577944</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Parking lane closure on Both Sides of 900 Block of E 27th Avenue to facilitate a gas service connection.

WO# 31536230
Location: Both Sides of 900 Block of E 27th Avenue From W PL of 941 to E PL of 957.
Schedule: Jun 11, 2026 7:00 AM - Jun 17, 2026 5:00 PM</content>
<id>urn:uuid:a0e2e9ce-962f-4943-ad9f-d11026d68123</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d03cf49c-b829-4032-87e0-3eca8da662e4"/>
<published>2026-05-28T07:00:00Z</published>
<title>FortisBC Gas Service Connection on 900 Block of E 27th Avenue</title>
<updated>2026-05-28T15:30:53.503108Z</updated>
<georss:line>49.24654075523614 -123.08449089989541 49.24655476292028 -123.08510780796882</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Alleyway lane closure on Both Sides of Lane East of 4900 Block of Victoria Drive to facilitate a gas service connection.

WO# 31535494
Location: Both Sides of Lane East of 4900 Block of Victoria Drive From North PL of 4936 to South PL of 4962.
Schedule: Jun 15, 2026 7:00 AM - Jun 19, 2026 5:00 PM</content>
<id>urn:uuid:7162d2f8-beae-4d22-bc9f-42ee9ce9d43c</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e74ee0a8-2425-4ab9-8de4-7e4475070d4a"/>
<published>2026-06-01T07:00:00Z</published>
<title>FortisBC Gas Service Connection on Lane East of 4900 Block of Victoria Drive</title>
<updated>2026-06-01T21:08:15.9314972Z</updated>
<georss:line>49.239501036555 -123.06475522721284 49.239199827447635 -123.0647605916309</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Alleyway lane closure on Both Sides of Lane North of 1500-1600 Block of E 58th Avenue to facilitate a gas service connection.

WO# 31540669
Location: Both Sides of Lane North of 1500-1600 Block of E 58th Avenue From W PL of 1605 to E PL of 1621.
Schedule: Jun 15, 2026 7:00 AM - Jun 19, 2026 5:00 PM</content>
<id>urn:uuid:41f0224d-a93c-4c2d-91c6-336760a0776c</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/757c42b5-7dbb-4009-ac7a-9a3113044ee9"/>
<published>2026-06-01T07:00:00Z</published>
<title>FortisBC Gas Service Connection on Lane North of 1500-1600 Block of E 58th Avenue</title>
<updated>2026-06-09T17:56:27.1011796Z</updated>
<georss:line>49.21765951205353 -123.07398698120512 49.21765811048709 -123.07344006261768</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Alleyway lane closure on Both Sides of Lane North of 3000 Block of E 54th Avenue to facilitate a gas service connection.

WO# 31540405
Location: Both Sides of Lane North of 3000 Block of E 54th Avenue From W PL of 3057 to E PL of 3075.
Schedule: Jun 4, 2026 - Jun 10, 2026; Weekdays; 7:00 AM - 5:00 PM</content>
<id>urn:uuid:aca97423-53cd-484e-b0eb-3968566b367c</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/6c0c4f10-5a86-45af-b57b-0579e681d04e"/>
<published>2026-05-26T07:00:00Z</published>
<title>FortisBC Gas Service Connection on Lane North of 3000 Block of E 54th Avenue</title>
<updated>2026-05-26T22:54:44.5050807Z</updated>
<georss:line>49.22069239514295 -123.04202733748431 49.2206867891141 -123.04139677265559</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Alleyway lane closure on Both Sides of Lane South of 1500-1600 Block of E 58th Avenue to facilitate a gas service connection.

WO# 31536786
Location: Both Sides of Lane South of 1500-1600 Block of E 58th Avenue From W PL of 1662 to E PL of 1676.
Schedule: Jun 8, 2026 7:00 AM - Jun 12, 2026 5:00 PM</content>
<id>urn:uuid:839cf8a4-73a7-4a63-bd33-7ae891f89ae8</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/061febb8-b283-4ccc-bbed-376fd6b27e7e"/>
<published>2026-05-27T07:00:00Z</published>
<title>FortisBC Gas Service Connection on Lane South of 1500-1600 Block of E 58th Avenue</title>
<updated>2026-05-27T19:20:18.0900377Z</updated>
<georss:line>49.216739828831294 -123.07252987762946 49.216748238706316 -123.07332773526805</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Alleyway lane closure on Both Sides of Lane South of 2300 Block of W 20th Avenue to facilitate a gas service connection.

WO# 31536292
Location: Both Sides of Lane South of 2300 Block of W 20th Avenue From W PL of 2356 to E PL of 2336.
Schedule: Jun 15, 2026 7:00 AM - Jun 19, 2026 5:00 PM</content>
<id>urn:uuid:9250b2e9-d1c1-47c6-81bf-bcacb4a046f1</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/0f7c1b24-6223-487d-90ce-1b26f909a22a"/>
<published>2026-06-01T07:00:00Z</published>
<title>FortisBC Gas Service Connection on Lane South of 2300 Block of W 20th Avenue</title>
<updated>2026-06-01T21:33:51.2021082Z</updated>
<georss:line>49.25405893035875 -123.15970977900716 49.254041423414236 -123.15889438746663</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Alleyway lane closure on Both Sides of Lane South of 2700 Block of W 20th Avenue to facilitate a gas service connection.

WO# 31536510
Location: Both Sides of Lane South of 2700 Block of W 20th Avenue From W PL of 2766 to E PL of 2754.
Schedule: Jun 18, 2026 - Jun 24, 2026; Weekdays; 7:00 AM - 5:00 PM</content>
<id>urn:uuid:409eb98e-1895-46bb-b0cb-027ed18d46a9</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/eda4a273-3034-4f6c-aab6-7175975f16c2"/>
<published>2026-06-04T07:00:00Z</published>
<title>FortisBC Gas Service Connection on Lane South of 2700 Block of W 20th Avenue</title>
<updated>2026-06-09T16:21:17.6476256Z</updated>
<georss:line>49.254601571341055 -123.16694793139949 49.254601571341055 -123.16628810798183</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Alleyway lane closure on Both Sides of Lane South of 800 Block of E 13th Avenue to facilitate a gas service connection.

WO# 31535775
Location: Both Sides of Lane South of 800 Block of E 13th Avenue From W PL of 874 to E PL of 892.
Schedule: Jun 4, 2026 - Jun 10, 2026; Weekdays; 7:00 AM - 5:00 PM</content>
<id>urn:uuid:bc72917b-097e-4823-88a6-ddc1a49fcb35</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/6523d5e8-abfc-40fa-8694-95ea12d1f98f"/>
<published>2026-05-26T07:00:00Z</published>
<title>FortisBC Gas Service Connection on Lane South of 800 Block of E 13th Avenue </title>
<updated>2026-05-26T23:00:41.4845574Z</updated>
<georss:line>49.258334439990136 -123.08591234673627 49.258334439990136 -123.08538044153482</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>This project will replace the aging storm sewer and outfall along Fraser Street south of E Kent Avenue with a new storm sewer and outfall structure.  The new storm sewer is designed for increased flow anticipated from climate change and to accommodate future growth in the community by connecting a larger catchment area in the future. The outfall design includes a tide gate to prevent Fraser River water levels from entering the sewer system, and a platform structure for safe operations and maintenance. The design also includes raising the shoreline elevation to reduce the probability of Fraser River overtopping and is an incremental step towards sea level rise adaptation. 
Location: South end of Fraser Street, south of East Kent Avenue South
Schedule: Sep 1, 2025 - Dec 19, 2025</content>
<id>urn:uuid:197b1022-3bac-401f-a977-ff21b8bfaa0f</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/330cb1f0-4f55-4e34-a5d5-dd96dd0a464c"/>
<published>2025-03-20T07:00:00Z</published>
<title>Fraser Street Outfall Replacement</title>
<updated>2026-04-18T01:01:08.2149651Z</updated>
<georss:line>49.20657710375073 -123.091264266488 49.205710957339335 -123.09127540700852</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Closure of the Fir St Off-ramp
Location: 
Schedule: Jan 7, 2026 - Feb 6, 2026</content>
<id>urn:uuid:3e10928d-eb4c-4b7b-bb4e-cb6e09aca80b</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/0af180dd-14e6-472c-a954-7f0b3d20b8e1"/>
<published>2026-01-30T08:00:00Z</published>
<title>GBSAR - Fir St Off-Ramp Closure</title>
<updated>2026-01-30T20:11:40.7901041Z</updated>
<georss:line>49.26853242075305 -123.13947926712845 49.2684474601983 -123.13961406802444 49.26840019555567 -123.13968424522147 49.26836625485896 -123.13973781357743 49.268332672516976 -123.13977769191911 49.268298406977294 -123.13981719713613 49.26827230956505 -123.13984142617718 49.26824346402839 -123.13986944129614 49.26822256701956 -123.13988525874544 49.268195173881566 -123.1399023911659 49.268170760139554 -123.13991788248563 49.268146167274466 -123.1399327272269 49.268121413276816 -123.13994692544148 49.26809650717527 -123.13996044966386 49.26807143997499 -123.13997329986958 49.26804623864504 -123.13998548988164 49.26802089420701 -123.13999700592976 49.26799542465156 -123.14000784806575 49.26796983899061 -123.14001800257022 49.26593344494037 -123.14057127415737 49.26586212409319 -123.14059909811574 49.265775380537235 -123.14063835542842 49.26566093426598 -123.14069769804809 49.26555599460468 -123.14075809832302 49.265485813165355 -123.14079571158697 49.26542848764359 -123.14082448197873 49.26534440681124 -123.14086355370237 49.265245073948506 -123.1409068428391 49.2651867761046 -123.1409289026027 49.26515273425042 -123.1409395542852 49.265097423728974 -123.14095348541629 49.265057691817276 -123.1409609320074 49.26496770160216 -123.14097009098958 49.26454852612369 -123.14098392003156</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Granville Bridge South Approach &amp; Ramps Rehabilitation Project - Phase 1 (GBSAR Ph 1) 
Hemlock Off-Ramp: Full closure of the off-ramp Closure hours will be 8PM – 6AM
Location: Hemlock On-Ramp
Schedule: Mar 23, 2026 - Apr 2, 2026; All days; 8:00 PM - 6:00 AM</content>
<id>urn:uuid:85c32bba-d02c-4a59-ae63-0fdf1bc068f8</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a44edc6f-a110-45dd-b5a6-f652404374c1"/>
<published>2025-03-07T08:00:00Z</published>
<title>GBSAR Ph 1 Hemlock On-Ramp</title>
<updated>2026-03-30T16:20:16.5390804Z</updated>
<georss:line>49.26953783310583 -123.1376784668858 49.2695196376375 -123.13769203880359 49.269509419242496 -123.1376994608411 49.26949635616208 -123.13770873070314 49.2694809346919 -123.1377193823676 49.2694658556762 -123.1377294988749 49.26945277550419 -123.13773801262968 49.269439002424974 -123.137746758137 49.26942282620922 -123.13775669287139 49.269408432658565 -123.13776527168577 49.26939291426859 -123.13777421851114 49.26937198660153 -123.13778581703495 49.26935218465712 -123.13779630524039 49.269326442965706 -123.13780923746575 49.2693147155224 -123.13781485449326 49.26929991921776 -123.13782172762062 49.26928950618341 -123.13782641356192 49.269272406458924 -123.1378338301134 49.269261786813956 -123.13783828178867 49.26924636163315 -123.13784449333244 49.26923876613557 -123.13784746884035 49.269226509139685 -123.13785210839431 49.26921300145432 -123.13785704687726 49.26920435342322 -123.13786010192557 49.269161888819326 -123.13787372977237 49.26914474678935 -123.13787890554606 49.269130223763995 -123.13788290644521 49.269112047863246 -123.13788759821574 49.26909719252478 -123.13789117205296 49.26908216652407 -123.13789453922023 49.26906645698881 -123.13789782200355 49.26905359087834 -123.13790031543385 49.26903561467509 -123.13790349567289 49.269021840364076 -123.1379057253924 49.26900914591627 -123.13790758697517 49.268995039194095 -123.1379094721128 49.268973546699556 -123.13791195523781 49.26895471762819 -123.137913730987 49.26893922648648 -123.1379149112105 49.268917573538886 -123.1379161704803 49.26890439494309 -123.1379166973357 49.26888675484179 -123.137917129278 49.26886904228681 -123.13791797340063 49.268850870469436 -123.13791924237103 49.26882253481614 -123.13791989192744 49.26880903331289 -123.13791964810089 49.268788957292344 -123.1379185886764 49.268766516821955 -123.13791645046949 49.26875673153776 -123.13791519979483 49.26874262962218 -123.13791305734135 49.2687221880972 -123.13790923394711 49.268695686698806 -123.1379029881094 49.26867488786016 -123.13789707433028 49.26866203865137 -123.13789294220274 49.26865080827767 -123.13788906201721 49.26863800481536 -123.13788428395821 49.26862275629054 -123.13787813823237 49.268612821712765 -123.13787384928374 49.26860115229724 -123.13786852455186 49.268586732360376 -123.13786151514572 49.2685689509519 -123.13785221454164 49.26855286037221 -123.13784313859078 49.26852672155442 -123.1378270241987 49.26850753222976 -123.13781409075658 49.26848380560506 -123.13779673222861 49.26844071608667 -123.13776112013866 49.26839093139711 -123.13771270573821 49.26834282794428 -123.13765745063507 49.26829661344206 -123.13759465437887 49.26825315187273 -123.13752393449931 49.268205427217595 -123.13744507907344 49.268160397153565 -123.13736951654815 49.268113644850445 -123.13728983936475 49.26806727103997 -123.13720953107196 49.268020755077515 -123.13712768300063 49.26797526391911 -123.13704633277193 49.2679205382928 -123.13694671642467 49.26786398396297 -123.13684169313825 49.26783214693788 -123.13678346036477 49.26778745382853 -123.13670403737794 49.2677560994816 -123.13664833533913 49.26772614544561 -123.13659509772913 49.267691703203894 -123.13653388900399 49.26767387617957 -123.1365021970873 49.26765648896827 -123.13647130365996 49.26763946977158 -123.13644107106484 49.2676250627091 -123.13641546426062 49.267609524618166 -123.13638784747627 49.26759326839928 -123.1363589641229 49.26758068573267 -123.1363347232204 49.267564968935034 -123.13630607506461 49.26754719422996 -123.13627573053586 49.26753706698338 -123.13625933149645 49.26752406575275 -123.13623913073378 49.26750791147509 -123.13621530618028 49.267491432345565 -123.1361923467275 49.26747059559085 -123.13616510038602 49.26745490371806 -123.13614579948774 49.26742887984685 -123.1361158997448 49.2674181262758 -123.13610428255222 49.26739801934963 -123.13608362247473 49.26738402084905 -123.13607001699586 49.26737075842945 -123.13605770564166 49.26735873544874 -123.13604700594483 49.267347610592395 -123.1360374908494 49.267336242687634 -123.13602812629235 49.2673215221879 -123.13601653947299 49.26730530007566 -123.13600445368962 49.26729191734648 -123.13599500113665 49.26727816557181 -123.13598575375923 49.26726352308012 -123.1359766688869 49.267249804906754 -123.13596944222073 49.26723699429104 -123.13596302904465 49.26722235822098 -123.13595612975912 49.2672109492988 -123.13595104002127 49.26719702261744 -123.13594518735917 49.26717853695186 -123.13593798885061 49.267164735134884 -123.13593304374947 49.267150717077755 -123.13592840046046 49.26714079897582 -123.13592533543566 49.26712691508595 -123.13592133856291 49.267112698034936 -123.13591762943484 49.26709716759157 -123.13591399917482 49.267078776796126 -123.13591026484139 49.26705820884533 -123.13590679944254 49.26703307100695 -123.1359036101521 49.267009766760935 -123.13590163551108 49.266976512834844 -123.13590049951542 49.26689324793418 -123.13590501303811 49.26680606380438 -123.13590724777148 49.26673186016123 -123.13590913327658 49.26665208829448 -123.13591118217319 49.26655653837443 -123.13591362757963 49.26645999896749 -123.1359160840045 49.26640196932169 -123.13591743660433 49.266349027887856 -123.13592140105541 49.26630328596053 -123.13593016866461 49.266261389616574 -123.13594264432452 49.266217436030956 -123.13596050248788 49.26618346776519 -123.13597781075507 49.26614660597863 -123.13600026554471</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Granville Bridge South Approach &amp; Ramps Rehabilitation Project - Phase 1 
Nightwork: March 8, 2026 to April 10, 2026 (10 PM – 6 AM)


Location: South Approach - Main Ramp 
Schedule: Dec 15, 2025 - Apr 10, 2026</content>
<id>urn:uuid:fe39b82b-ec9b-4e7f-a73f-666df0e0e7dd</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/3f2676bf-0247-4f20-b08e-6715a5c5c6c8"/>
<published>2025-03-07T08:00:00Z</published>
<title>GBSAR Ph 1 South Approach - Main Ramp</title>
<updated>2026-03-02T19:26:25.5609843Z</updated>
<georss:line>49.26953783310583 -123.1376784668858 49.26952468247069 -123.13770082296222 49.26950952282829 -123.1377257577321 49.269494075826714 -123.13775027929888 49.26947835945657 -123.13777438771262 49.26946236472298 -123.13779808294824 49.269446109649266 -123.1378213375635 49.2694295852406 -123.13784415153337 49.269412800492404 -123.13786652488301 49.269395764399974 -123.13788845763753 49.269378485991666 -123.13790992232984 49.26936096526771 -123.1379309189601 49.26934320221193 -123.13795146127461 49.269325205868995 -123.13797150806022 49.269306985201496 -123.13799108683453 49.269288540242485 -123.13801017010552 49.269269879987405 -123.13802875789862 49.269251013431614 -123.13804685023914 49.26923194958698 -123.13806443340644 49.269212679475004 -123.13808149362968 49.26919322105337 -123.13809805845173 49.269173574371536 -123.13811408663454 49.26915375738733 -123.13812960572115 49.26913375214329 -123.13814458816944 49.26911358564172 -123.13815902030922 49.2690932578499 -123.13817292963319 49.26907277781248 -123.13818627492866 49.26905213650167 -123.13819908366331 49.26903136091951 -123.13821134216698 49.26901045108269 -123.13822303669419 49.26898939797974 -123.13823418096648 49.26896822861275 -123.13824476131381 49.26894694299838 -123.13825476399077 49.26892555009891 -123.13826421651527 49.268904040968835 -123.13827307762466 49.268882442560766 -123.13828137488716 49.268860754891335 -123.13828909455745 49.26883897797708 -123.1382962228902 49.26881711178524 -123.13830278737825 49.26879519232946 -123.13830876063078 49.268773201619496 -123.13831414259826 49.26875114863415 -123.13831894705272 49.268729051396775 -123.1383231465531 49.26870690987445 -123.13832676859222 49.26868472408373 -123.13832979942487 49.26716658545854 -123.13842042744827</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Granville Bridge South Approach &amp; Ramps Rehabilitation Project - Phase 1 
Nightwork: March 8, 2026 to April 10, 2026 (10 PM – 6 AM)


Location: South Approach - Main Ramp 
Schedule: Dec 15, 2025 - Apr 10, 2026</content>
<id>urn:uuid:3f065e06-5dd2-45a7-886a-664ec7d1c76b</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/3f2676bf-0247-4f20-b08e-6715a5c5c6c8"/>
<published>2025-03-07T08:00:00Z</published>
<title>GBSAR Ph 1 South Approach - Main Ramp</title>
<updated>2026-03-02T19:26:25.5609843Z</updated>
<georss:line>49.26789905789002 -123.13839608458325 49.26677618183243 -123.13843782302602</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Granville Bridge South Approach &amp; Ramps Rehabilitation Project - Phase 1

Location: West 4th Ramp
Schedule: May 14, 2025 - Aug 26, 2025</content>
<id>urn:uuid:764cdefa-85e0-4ca8-b5e0-1890ece56fe0</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/36db0ed5-eb80-45ee-8ee9-b1cc29706434"/>
<published>2025-03-07T08:00:00Z</published>
<title>GBSAR Ph 1 W 4th Off-Ramp</title>
<updated>2025-08-27T20:02:50.1886695Z</updated>
<georss:line>49.26853242075305 -123.13947926712845 49.26848876464703 -123.13955575041108 49.268454075685554 -123.13962563330688 49.26843101200393 -123.1396777204113 49.26841588209979 -123.1397149017598 49.26840290572008 -123.13974903756582 49.26839061243098 -123.13978361515429 49.26837754855387 -123.13982313908986 49.268368870125386 -123.13985126626494 49.26836209564493 -123.13987446401839 49.26835623230144 -123.13989549248262 49.26835114493568 -123.13991454372048 49.26834535141538 -123.13993733185313 49.26834219645144 -123.13995024411349 49.268339456912315 -123.1399617966994 49.26833613820082 -123.13997622054657 49.26833147091327 -123.13999748605282 49.268328494363544 -123.14001162219888 49.26832380639695 -123.14003510073545 49.2683199496135 -123.14005558500685 49.26831719640285 -123.14007098640418 49.268314550965556 -123.14008652556427 49.26831180492917 -123.14010342528506 49.26830874020865 -123.1401234994114 49.268304756885385 -123.14015188722064 49.2683006875788 -123.14018441230608 49.268296384042145 -123.14022463444158 49.268291884684686 -123.1402779558822 49.268289315296784 -123.14031973620985 49.26828756391981 -123.14036195872329 49.26828657570542 -123.14041274711018 49.26828732322471 -123.14051558249277 49.26828990292424 -123.14076103705997 49.26829589817214 -123.14142037750173 49.26829650361111 -123.14149159688073 49.268297013930464 -123.14155231410095 49.26829742284693 -123.14160032979522 49.268297751952844 -123.1416400564676 49.26829624512587 -123.14167317983838 49.268294682403564 -123.14170052975787 49.26829342492877 -123.14172102133277 49.268291850882605 -123.1417429278301 49.26828862218227 -123.14177178502325 49.26828483526822 -123.14180105299059 49.26828292988472 -123.14181440856751 49.26828079865868 -123.14182854701365 49.268279021819865 -123.14183977233897 49.26827715497765 -123.14185103864321 49.268275252423706 -123.14186208490949 49.26826254381649 -123.14192669552351 49.2682501919555 -123.14197912824801 49.268241046544915 -123.14201352176848 49.26823442468353 -123.14203660963715 49.26822681103354 -123.1420615778415 49.26821967765497 -123.142083674523 49.26821274480318 -123.14210362741305 49.26819973729977 -123.14214055278144 49.268188120351596 -123.1421731659145 49.268167594352605 -123.14223078469537 49.26814352091668 -123.14229838648518 49.26812161440884 -123.14235209736081 49.26809276321143 -123.1424280015284 49.26806241775856 -123.14251201136267 49.26804388279618 -123.14256698264337 49.26802420584764 -123.14262889224625 49.26800623097293 -123.14268917095272 49.267990202759336 -123.14274643114629 49.26797050860543 -123.14282218261866</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Granville Bridge South Approach &amp; Ramps Rehabilitation Project - Phase 2
Location: West 4th Ramp
Schedule: Feb 6, 2026 - Feb 28, 2026</content>
<id>urn:uuid:395010ba-2bf9-4fd7-bcdc-d4f1aed52618</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1b14d18c-e6e9-4567-9aa4-2a37cb3a3dcb"/>
<published>2025-08-27T07:00:00Z</published>
<title>GBSAR Ph 2 W 4th Off-Ramp </title>
<updated>2026-02-03T16:29:14.998178Z</updated>
<georss:line>49.26853242075305 -123.13947926712845 49.26848876464703 -123.13955575041108 49.268454075685554 -123.13962563330688 49.26843101200393 -123.1396777204113 49.26841588209979 -123.1397149017598 49.26840290572008 -123.13974903756582 49.26839061243098 -123.13978361515429 49.26837754855387 -123.13982313908986 49.268368870125386 -123.13985126626494 49.26836209564493 -123.13987446401839 49.26835623230144 -123.13989549248262 49.26835114493568 -123.13991454372048 49.26834535141538 -123.13993733185313 49.26834219645144 -123.13995024411349 49.268339456912315 -123.1399617966994 49.26833613820082 -123.13997622054657 49.26833147091327 -123.13999748605282 49.268328494363544 -123.14001162219888 49.26832380639695 -123.14003510073545 49.2683199496135 -123.14005558500685 49.26831719640285 -123.14007098640418 49.268314550965556 -123.14008652556427 49.26831180492917 -123.14010342528506 49.26830874020865 -123.1401234994114 49.268304756885385 -123.14015188722064 49.2683006875788 -123.14018441230608 49.268296384042145 -123.14022463444158 49.268291884684686 -123.1402779558822 49.268289315296784 -123.14031973620985 49.26828756391981 -123.14036195872329 49.26828657570542 -123.14041274711018 49.26828732322471 -123.14051558249277 49.26828990292424 -123.14076103705997 49.26829589817214 -123.14142037750173 49.26829650361111 -123.14149159688073 49.268297013930464 -123.14155231410095 49.26829742284693 -123.14160032979522 49.268297751952844 -123.1416400564676 49.26829624512587 -123.14167317983838 49.268294682403564 -123.14170052975787 49.26829342492877 -123.14172102133277 49.268291850882605 -123.1417429278301 49.26828862218227 -123.14177178502325 49.26828483526822 -123.14180105299059 49.26828292988472 -123.14181440856751 49.26828079865868 -123.14182854701365 49.268279021819865 -123.14183977233897 49.26827715497765 -123.14185103864321 49.268275252423706 -123.14186208490949 49.26826254381649 -123.14192669552351 49.2682501919555 -123.14197912824801 49.268241046544915 -123.14201352176848 49.26823442468353 -123.14203660963715 49.26822681103354 -123.1420615778415 49.26821967765497 -123.142083674523 49.26821274480318 -123.14210362741305 49.26819973729977 -123.14214055278144 49.268188120351596 -123.1421731659145 49.268167594352605 -123.14223078469537 49.26814352091668 -123.14229838648518 49.26812161440884 -123.14235209736081 49.26809276321143 -123.1424280015284 49.26806241775856 -123.14251201136267 49.26804388279618 -123.14256698264337 49.26802420584764 -123.14262889224625 49.26800623097293 -123.14268917095272 49.267990202759336 -123.14274643114629 49.26797050860543 -123.14282218261866</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Delivery of Pedestrian Zone on Water Street from Columbia Street to Richards Street. Water Street will be closed to traffic on Sundays this summer from approximately 12pm to 8pm.
Location: Water St - Richards St to Columbia St
Schedule: Jul 5, 2026 - Sep 6, 2026; Su; 12:00 PM - 8:00 PM</content>
<id>urn:uuid:e3f48cfa-2b48-4c4a-a8e8-187f8b005888</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/4910f6ef-4879-43ab-9609-ce242ce799bb"/>
<published>2025-05-07T07:00:00Z</published>
<title>Gastown - Water Street Pedestrian Zone Pilot</title>
<updated>2026-03-03T19:07:22.2186193Z</updated>
<georss:line>49.283496673786686 -123.10426176613505 49.283884968733105 -123.10638331443363</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Delivery of Pedestrian Zone on Water Street from Columbia Street to Richards Street. Water Street will be closed to traffic on Sundays this summer from approximately 12pm to 8pm.
Location: Water St - Richards St to Columbia St
Schedule: Jul 5, 2026 - Sep 6, 2026; Su; 12:00 PM - 8:00 PM</content>
<id>urn:uuid:e62c0627-f992-480c-8f79-fd3b58e2dbd8</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/4910f6ef-4879-43ab-9609-ce242ce799bb"/>
<published>2025-05-07T07:00:00Z</published>
<title>Gastown - Water Street Pedestrian Zone Pilot</title>
<updated>2026-03-03T19:07:22.2186193Z</updated>
<georss:line>49.283884968733105 -123.10638331443363 49.28431923067458 -123.10877737817344</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Delivery of Pedestrian Zone on Water Street from Columbia Street to Richards Street. Water Street will be closed to traffic on Sundays this summer from approximately 12pm to 8pm.
Location: Water St - Richards St to Columbia St
Schedule: Jul 5, 2026 - Sep 6, 2026; Su; 12:00 PM - 8:00 PM</content>
<id>urn:uuid:797a9011-2986-4b37-8ab3-665db2ceeeba</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/4910f6ef-4879-43ab-9609-ce242ce799bb"/>
<published>2025-05-07T07:00:00Z</published>
<title>Gastown - Water Street Pedestrian Zone Pilot</title>
<updated>2026-03-03T19:07:22.2186193Z</updated>
<georss:line>49.28431923067458 -123.10877737817344 49.28446530399759 -123.10957636505753</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Delivery of Pedestrian Zone on Water Street from Columbia Street to Richards Street. Water Street will be closed to traffic on Sundays this summer from approximately 12pm to 8pm.
Location: Water St - Richards St to Columbia St
Schedule: Jul 5, 2026 - Sep 6, 2026; Su; 12:00 PM - 8:00 PM</content>
<id>urn:uuid:af41cf6e-9584-4133-9915-3355b2538e7d</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/4910f6ef-4879-43ab-9609-ce242ce799bb"/>
<published>2025-05-07T07:00:00Z</published>
<title>Gastown - Water Street Pedestrian Zone Pilot</title>
<updated>2026-03-03T19:07:22.2186193Z</updated>
<georss:line>49.28446530399759 -123.10957636505753 49.284638225232214 -123.11054175598821 49.28467794017715 -123.11095341031987</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Curb work, asphalt ramps, brick paver repairs on east side Granville. Roadway restoration on W 67th Ave (temp full closure of 67th required).
Location: W 67th Ave, immediately east of Granville plus east side Granville St between W 67th and W 68th.
Schedule: Nov 7, 2025 - Nov 14, 2025</content>
<id>urn:uuid:592d9c4a-64a7-4ec7-baff-3d289ae4ca34</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1144f13d-6f2d-4a85-959a-e2b73dd3c988"/>
<published>2025-11-03T08:00:00Z</published>
<title>Granville &amp; 67th/68th interim bike connection</title>
<updated>2025-11-07T21:23:11.8531208Z</updated>
<georss:line>49.210884665523395 -123.14044474616985 49.21051312739024 -123.14045679204209</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Curb work, asphalt ramps, brick paver repairs on east side Granville. Roadway restoration on W 67th Ave (temp full closure of 67th required).
Location: W 67th Ave, immediately east of Granville plus east side Granville St between W 67th and W 68th.
Schedule: Nov 7, 2025 - Nov 14, 2025</content>
<id>urn:uuid:f616ecca-09d8-45fe-8a1d-2aed95ba6815</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1144f13d-6f2d-4a85-959a-e2b73dd3c988"/>
<published>2025-11-03T08:00:00Z</published>
<title>Granville &amp; 67th/68th interim bike connection</title>
<updated>2025-11-07T21:23:11.8531208Z</updated>
<georss:line>49.21087445395716 -123.13980120588519 49.210884665523395 -123.14044474616985</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Closed EB curb lane for access to laydown area and staging of construction vehicles to support the bridge rehabilitation project. 
Location: Eastbound curb lane, 1500 Block of W. 4th Avenue
Schedule: May 1, 2026 - May 31, 2026</content>
<id>urn:uuid:7600d909-5494-4782-80f5-7b8f5e900a6f</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/89b74fcd-c274-4379-b2da-ef010e850e26"/>
<published>2026-05-05T07:00:00Z</published>
<title>Granville Bridge South Approach Rehabilitation Project Phase 1</title>
<updated>2026-05-05T19:46:38.4764115Z</updated>
<georss:line>49.26790180881696 -123.13914662840959 49.267892218420656 -123.13842345788653</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Granville Bridge South Approach &amp; Ramps Rehabilitation Project - Bearing Replacement (below bridge deck) 
Ongoing impacts below bridge deck on Anderson St leading into and out of Granville Island

Nov 10 to Mid-Dec 2025:  Anderson Street Impacts by Granville Island entrance
Location: Below Bridge Deck on Anderson Street  (1. Anderson St and W. 2nd Av / 2. Anderson St and W. 3rd Av)

Schedule: Mar 17, 2025 - Dec 31, 2025</content>
<id>urn:uuid:9a2a1cda-8d53-41a2-a092-836506a9f0b5</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/22661d2d-d9be-4918-ac54-2e53533c4538"/>
<published>2025-03-07T08:00:00Z</published>
<title>Granville Bridge South Approaches Rehab - Bearing Replacement (below bridge deck) </title>
<updated>2025-11-06T15:43:58.1795704Z</updated>
<georss:line>49.26878138295035 -123.1383628127809 49.269110658596304 -123.13834997369416 49.269345931211745 -123.1379937659976</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Granville Bridge South Approach &amp; Ramps Rehabilitation Project - Bearing Replacement (below bridge deck) 
Ongoing impacts below bridge deck on Anderson St leading into and out of Granville Island

Nov 10 to Mid-Dec 2025:  Anderson Street Impacts by Granville Island entrance
Location: Below Bridge Deck on Anderson Street  (1. Anderson St and W. 2nd Av / 2. Anderson St and W. 3rd Av)

Schedule: Mar 17, 2025 - Dec 31, 2025</content>
<id>urn:uuid:fd824004-fbb2-425c-8c99-ffe674a19b5a</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/22661d2d-d9be-4918-ac54-2e53533c4538"/>
<published>2025-03-07T08:00:00Z</published>
<title>Granville Bridge South Approaches Rehab - Bearing Replacement (below bridge deck) </title>
<updated>2025-11-06T15:43:58.1795704Z</updated>
<georss:line>49.269345931211745 -123.1379937659976 49.26990657817484 -123.13714486901962</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Granville Bridge South Approach &amp; Ramps Rehabilitation Project - Bearing Replacement (below bridge deck) 
Ongoing impacts below bridge deck on Anderson St leading into and out of Granville Island

Nov 10 to Mid-Dec 2025:  Anderson Street Impacts by Granville Island entrance
Location: Below Bridge Deck on Anderson Street  (1. Anderson St and W. 2nd Av / 2. Anderson St and W. 3rd Av)

Schedule: Mar 17, 2025 - Dec 31, 2025</content>
<id>urn:uuid:0000b0bf-c876-4ca1-8c8a-4bd618989f87</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/22661d2d-d9be-4918-ac54-2e53533c4538"/>
<published>2025-03-07T08:00:00Z</published>
<title>Granville Bridge South Approaches Rehab - Bearing Replacement (below bridge deck) </title>
<updated>2025-11-06T15:43:58.1795704Z</updated>
<georss:line>49.27064249595955 -123.13614615807028 49.26990657817484 -123.13714486901962</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Granville Bridge South Approach &amp; Ramps Rehabilitation Project - Bearing Replacement (below bridge deck) 
Ongoing impacts below bridge deck on Anderson St leading into and out of Granville Island

Nov 10 to Mid-Dec 2025:  Anderson Street Impacts by Granville Island entrance
Location: Below Bridge Deck on Anderson Street  (1. Anderson St and W. 2nd Av / 2. Anderson St and W. 3rd Av)

Schedule: Mar 17, 2025 - Dec 31, 2025</content>
<id>urn:uuid:adae2ffa-5fd5-44c7-a18b-5b6249cf367a</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/22661d2d-d9be-4918-ac54-2e53533c4538"/>
<published>2025-03-07T08:00:00Z</published>
<title>Granville Bridge South Approaches Rehab - Bearing Replacement (below bridge deck) </title>
<updated>2025-11-06T15:43:58.1795704Z</updated>
<georss:line>49.27107413836626 -123.13558863882974 49.27080825063618 -123.13593207063259</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Granville Bridge South Approach &amp; Ramps Rehabilitation Project - Bearing Replacement (below bridge deck) 
Ongoing impacts below bridge deck on Anderson St leading into and out of Granville Island

Nov 10 to Mid-Dec 2025:  Anderson Street Impacts by Granville Island entrance
Location: Below Bridge Deck on Anderson Street  (1. Anderson St and W. 2nd Av / 2. Anderson St and W. 3rd Av)

Schedule: Mar 17, 2025 - Dec 31, 2025</content>
<id>urn:uuid:2aa0d21e-972a-47c8-a34e-c6be44e73c0b</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/22661d2d-d9be-4918-ac54-2e53533c4538"/>
<published>2025-03-07T08:00:00Z</published>
<title>Granville Bridge South Approaches Rehab - Bearing Replacement (below bridge deck) </title>
<updated>2025-11-06T15:43:58.1795704Z</updated>
<georss:line>49.27080825063618 -123.13593207063259 49.27064249595955 -123.13614615807028</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>The contractor on GBSRR2 will be performing works over the Granville Bridge deck for one week.
Location: Granville Bridge - North side pf the bridge deck
Schedule: May 11, 2026 6:00 AM - May 22, 2026 6:00 PM</content>
<id>urn:uuid:339abcf6-40fc-4575-9601-072a8799c090</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/c23af4eb-110a-4201-b108-6701a2e309e0"/>
<published>2026-05-12T07:00:00Z</published>
<title>Granville Bridge Structural Repair and Recoating Phase 2 </title>
<updated>2026-05-12T18:45:57.0557672Z</updated>
<georss:line>49.27299988447345 -123.13248160954215 49.274407680044476 -123.1304218161159</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>W. 4th Ave Eastbound Off-ramp CLOSURE in place permanently. 
1. Granville Connector - Entire bridge, Howe Ramp, Fir/4th ramp, West 5th Av, Drake St - work expect through to end of July 2025
2. North Loops Reconfiguration – new “H road Network” - Portions of Continental, Neon, Rolston and Pacific Streets - “H Road Network” opened June 2025
3. South Approaches rehab - Mar-25 to Q2 2026

Location: Granville Bridge 
Schedule: Feb 21, 2023 7:00 AM - Jul 25, 2025 6:00 PM</content>
<id>urn:uuid:989e4135-e6e4-48ea-a46d-8013c459e45c</id>
<link href="https://vancouver.ca/streets-transportation/granville-bridge-connector.aspx"/>
<published>2023-01-31T08:00:00Z</published>
<title>Granville Connector</title>
<updated>2025-07-23T22:49:23.0993711Z</updated>
<georss:line>49.275365007644325 -123.12992316005534 49.27505329824126 -123.12945752811063</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>W. 4th Ave Eastbound Off-ramp CLOSURE in place permanently. 
1. Granville Connector - Entire bridge, Howe Ramp, Fir/4th ramp, West 5th Av, Drake St - work expect through to end of July 2025
2. North Loops Reconfiguration – new “H road Network” - Portions of Continental, Neon, Rolston and Pacific Streets - “H Road Network” opened June 2025
3. South Approaches rehab - Mar-25 to Q2 2026

Location: Granville Bridge 
Schedule: Feb 21, 2023 7:00 AM - Jul 25, 2025 6:00 PM</content>
<id>urn:uuid:8cab08ff-fc9b-401e-89f8-f552a2ea7b88</id>
<link href="https://vancouver.ca/streets-transportation/granville-bridge-connector.aspx"/>
<published>2023-01-31T08:00:00Z</published>
<title>Granville Connector</title>
<updated>2025-07-23T22:49:23.0993711Z</updated>
<georss:line>49.275365007644325 -123.12992316005534 49.27568389021357 -123.13039951270936</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>W. 4th Ave Eastbound Off-ramp CLOSURE in place permanently. 
1. Granville Connector - Entire bridge, Howe Ramp, Fir/4th ramp, West 5th Av, Drake St - work expect through to end of July 2025
2. North Loops Reconfiguration – new “H road Network” - Portions of Continental, Neon, Rolston and Pacific Streets - “H Road Network” opened June 2025
3. South Approaches rehab - Mar-25 to Q2 2026

Location: Granville Bridge 
Schedule: Feb 21, 2023 7:00 AM - Jul 25, 2025 6:00 PM</content>
<id>urn:uuid:49be1e8b-7db8-4a50-9e10-1930222b8533</id>
<link href="https://vancouver.ca/streets-transportation/granville-bridge-connector.aspx"/>
<published>2023-01-31T08:00:00Z</published>
<title>Granville Connector</title>
<updated>2025-07-23T22:49:23.0993711Z</updated>
<georss:line>49.27657602283301 -123.12902759892 49.276270416512006 -123.12948937173</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>W. 4th Ave Eastbound Off-ramp CLOSURE in place permanently. 
1. Granville Connector - Entire bridge, Howe Ramp, Fir/4th ramp, West 5th Av, Drake St - work expect through to end of July 2025
2. North Loops Reconfiguration – new “H road Network” - Portions of Continental, Neon, Rolston and Pacific Streets - “H Road Network” opened June 2025
3. South Approaches rehab - Mar-25 to Q2 2026

Location: Granville Bridge 
Schedule: Feb 21, 2023 7:00 AM - Jul 25, 2025 6:00 PM</content>
<id>urn:uuid:e7e2a0d1-b8b1-4ced-9662-d4da619b822e</id>
<link href="https://vancouver.ca/streets-transportation/granville-bridge-connector.aspx"/>
<published>2023-01-31T08:00:00Z</published>
<title>Granville Connector</title>
<updated>2025-07-23T22:49:23.0993711Z</updated>
<georss:line>49.27657602283301 -123.12902759892 49.276270416512006 -123.12948937173</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>W. 4th Ave Eastbound Off-ramp CLOSURE in place permanently. 
1. Granville Connector - Entire bridge, Howe Ramp, Fir/4th ramp, West 5th Av, Drake St - work expect through to end of July 2025
2. North Loops Reconfiguration – new “H road Network” - Portions of Continental, Neon, Rolston and Pacific Streets - “H Road Network” opened June 2025
3. South Approaches rehab - Mar-25 to Q2 2026

Location: Granville Bridge 
Schedule: Feb 21, 2023 7:00 AM - Jul 25, 2025 6:00 PM</content>
<id>urn:uuid:153c3df1-2f9f-4ebb-98b6-24a5b9defc9c</id>
<link href="https://vancouver.ca/streets-transportation/granville-bridge-connector.aspx"/>
<published>2023-01-31T08:00:00Z</published>
<title>Granville Connector</title>
<updated>2025-07-23T22:49:23.0993711Z</updated>
<georss:line>49.27673742568899 -123.12878371315001 49.27657602283301 -123.12902759892</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>W. 4th Ave Eastbound Off-ramp CLOSURE in place permanently. 
1. Granville Connector - Entire bridge, Howe Ramp, Fir/4th ramp, West 5th Av, Drake St - work expect through to end of July 2025
2. North Loops Reconfiguration – new “H road Network” - Portions of Continental, Neon, Rolston and Pacific Streets - “H Road Network” opened June 2025
3. South Approaches rehab - Mar-25 to Q2 2026

Location: Granville Bridge 
Schedule: Feb 21, 2023 7:00 AM - Jul 25, 2025 6:00 PM</content>
<id>urn:uuid:4c79a1d3-281e-485d-bff6-48e91267a7ae</id>
<link href="https://vancouver.ca/streets-transportation/granville-bridge-connector.aspx"/>
<published>2023-01-31T08:00:00Z</published>
<title>Granville Connector</title>
<updated>2025-07-23T22:49:23.0993711Z</updated>
<georss:line>49.27562958393901 -123.12849595733 49.275360705785005 -123.12890243010999</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>W. 4th Ave Eastbound Off-ramp CLOSURE in place permanently. 
1. Granville Connector - Entire bridge, Howe Ramp, Fir/4th ramp, West 5th Av, Drake St - work expect through to end of July 2025
2. North Loops Reconfiguration – new “H road Network” - Portions of Continental, Neon, Rolston and Pacific Streets - “H Road Network” opened June 2025
3. South Approaches rehab - Mar-25 to Q2 2026

Location: Granville Bridge 
Schedule: Feb 21, 2023 7:00 AM - Jul 25, 2025 6:00 PM</content>
<id>urn:uuid:d94cfa07-f20b-4fa8-9aa4-8cc6b5302890</id>
<link href="https://vancouver.ca/streets-transportation/granville-bridge-connector.aspx"/>
<published>2023-01-31T08:00:00Z</published>
<title>Granville Connector</title>
<updated>2025-07-23T22:49:23.0993711Z</updated>
<georss:line>49.275453414362005 -123.12680124793998 49.27530077785099 -123.12705251147</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>W. 4th Ave Eastbound Off-ramp CLOSURE in place permanently. 
1. Granville Connector - Entire bridge, Howe Ramp, Fir/4th ramp, West 5th Av, Drake St - work expect through to end of July 2025
2. North Loops Reconfiguration – new “H road Network” - Portions of Continental, Neon, Rolston and Pacific Streets - “H Road Network” opened June 2025
3. South Approaches rehab - Mar-25 to Q2 2026

Location: Granville Bridge 
Schedule: Feb 21, 2023 7:00 AM - Jul 25, 2025 6:00 PM</content>
<id>urn:uuid:b4c695df-7b14-44b7-be83-39b1feeb0c37</id>
<link href="https://vancouver.ca/streets-transportation/granville-bridge-connector.aspx"/>
<published>2023-01-31T08:00:00Z</published>
<title>Granville Connector</title>
<updated>2025-07-23T22:49:23.0993711Z</updated>
<georss:line>49.276095181865 -123.12779209585 49.27562958393901 -123.12849595733</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>W. 4th Ave Eastbound Off-ramp CLOSURE in place permanently. 
1. Granville Connector - Entire bridge, Howe Ramp, Fir/4th ramp, West 5th Av, Drake St - work expect through to end of July 2025
2. North Loops Reconfiguration – new “H road Network” - Portions of Continental, Neon, Rolston and Pacific Streets - “H Road Network” opened June 2025
3. South Approaches rehab - Mar-25 to Q2 2026

Location: Granville Bridge 
Schedule: Feb 21, 2023 7:00 AM - Jul 25, 2025 6:00 PM</content>
<id>urn:uuid:639cae6b-8f56-47b9-9089-ff3cd6c5679a</id>
<link href="https://vancouver.ca/streets-transportation/granville-bridge-connector.aspx"/>
<published>2023-01-31T08:00:00Z</published>
<title>Granville Connector</title>
<updated>2025-07-23T22:49:23.0993711Z</updated>
<georss:line>49.27562958393901 -123.12849595733 49.275360705785005 -123.12890243010999</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>W. 4th Ave Eastbound Off-ramp CLOSURE in place permanently. 
1. Granville Connector - Entire bridge, Howe Ramp, Fir/4th ramp, West 5th Av, Drake St - work expect through to end of July 2025
2. North Loops Reconfiguration – new “H road Network” - Portions of Continental, Neon, Rolston and Pacific Streets - “H Road Network” opened June 2025
3. South Approaches rehab - Mar-25 to Q2 2026

Location: Granville Bridge 
Schedule: Feb 21, 2023 7:00 AM - Jul 25, 2025 6:00 PM</content>
<id>urn:uuid:7cbeffd1-9cac-42c3-914b-1731a49d0c25</id>
<link href="https://vancouver.ca/streets-transportation/granville-bridge-connector.aspx"/>
<published>2023-01-31T08:00:00Z</published>
<title>Granville Connector</title>
<updated>2025-07-23T22:49:23.0993711Z</updated>
<georss:line>49.276095181865 -123.12779209585 49.27562958393901 -123.12849595733</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>W. 4th Ave Eastbound Off-ramp CLOSURE in place permanently. 
1. Granville Connector - Entire bridge, Howe Ramp, Fir/4th ramp, West 5th Av, Drake St - work expect through to end of July 2025
2. North Loops Reconfiguration – new “H road Network” - Portions of Continental, Neon, Rolston and Pacific Streets - “H Road Network” opened June 2025
3. South Approaches rehab - Mar-25 to Q2 2026

Location: Granville Bridge 
Schedule: Feb 21, 2023 7:00 AM - Jul 25, 2025 6:00 PM</content>
<id>urn:uuid:933f8f4d-459d-489f-9e57-d3d4b16dfcb1</id>
<link href="https://vancouver.ca/streets-transportation/granville-bridge-connector.aspx"/>
<published>2023-01-31T08:00:00Z</published>
<title>Granville Connector</title>
<updated>2025-07-23T22:49:23.0993711Z</updated>
<georss:line>49.275360705785005 -123.12890243010999 49.27383074132001 -123.13121166043001</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>W. 4th Ave Eastbound Off-ramp CLOSURE in place permanently. 
1. Granville Connector - Entire bridge, Howe Ramp, Fir/4th ramp, West 5th Av, Drake St - work expect through to end of July 2025
2. North Loops Reconfiguration – new “H road Network” - Portions of Continental, Neon, Rolston and Pacific Streets - “H Road Network” opened June 2025
3. South Approaches rehab - Mar-25 to Q2 2026

Location: Granville Bridge 
Schedule: Feb 21, 2023 7:00 AM - Jul 25, 2025 6:00 PM</content>
<id>urn:uuid:b21ec909-84b0-4752-bcec-852d1fdc73b7</id>
<link href="https://vancouver.ca/streets-transportation/granville-bridge-connector.aspx"/>
<published>2023-01-31T08:00:00Z</published>
<title>Granville Connector</title>
<updated>2025-07-23T22:49:23.0993711Z</updated>
<georss:line>49.27530077785099 -123.12705251147 49.275147228826995 -123.12729873941001 49.275077338618985 -123.12741081042 49.274995499532 -123.12754204222 49.27492882607001 -123.12764895169 49.274873661659996 -123.12773569513999 49.27481563765801 -123.12782971730998 49.27476782812698 -123.12791921518 49.27473963471397 -123.12797832619 49.274716007531 -123.12803229357002 49.274696046505994 -123.12808162366 49.274673437101 -123.12814246742 49.274654033892006 -123.12819975878 49.27464034843601 -123.12824368842999 49.274624508545 -123.12829983414998 49.274586862014985 -123.12843897295 49.274562957808 -123.12853154265999 49.274545447061 -123.12860170648 49.274521688872966 -123.12870035288 49.27450349405501 -123.12877888712002 49.274491091220995 -123.12883399664 49.274478361237016 -123.12889206103 49.27446680501501 -123.12894616913002 49.274368509466 -123.12937723053 49.274245444581 -123.12991586876 49.27418283706996 -123.13018846971 49.27414251679599 -123.13033548989 49.27412424492499 -123.13040160868 49.274106689392994 -123.13046262898 49.274090093404 -123.13051826273 49.27406038279099 -123.13061334473 49.27401681558601 -123.13074369363 49.274005760790004 -123.13077522869999 49.27399021291603 -123.13081865722002 49.27397730990401 -123.13085388543999 49.273971156409004 -123.1308704624 49.273963433253016 -123.13089100822998 49.27395728015898 -123.13090722775001 49.27394736519 -123.1309330468 49.273937342382 -123.13095876932998 49.273917848244 -123.13100775502 49.273902991835996 -123.13104420149 49.27388700879001 -123.13108261085999 49.27386580467601 -123.13113233427 49.27383074132001 -123.13121166043001</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>W. 4th Ave Eastbound Off-ramp CLOSURE in place permanently. 
1. Granville Connector - Entire bridge, Howe Ramp, Fir/4th ramp, West 5th Av, Drake St - work expect through to end of July 2025
2. North Loops Reconfiguration – new “H road Network” - Portions of Continental, Neon, Rolston and Pacific Streets - “H Road Network” opened June 2025
3. South Approaches rehab - Mar-25 to Q2 2026

Location: Granville Bridge 
Schedule: Feb 21, 2023 7:00 AM - Jul 25, 2025 6:00 PM</content>
<id>urn:uuid:e3c247a3-187d-4b0b-8903-1272276830a9</id>
<link href="https://vancouver.ca/streets-transportation/granville-bridge-connector.aspx"/>
<published>2023-01-31T08:00:00Z</published>
<title>Granville Connector</title>
<updated>2025-07-23T22:49:23.0993711Z</updated>
<georss:line>49.27626147504901 -123.12947353796999 49.276248501373004 -123.12949192650998 49.276206796384 -123.12955104424998 49.27616557785899 -123.12960948951002 49.27612054828799 -123.12967332768999 49.276060835959015 -123.12975548093 49.276039320310986 -123.12978677010001 49.27600980227601 -123.12983109892001 49.27598796265801 -123.12986249717001 49.275968315299 -123.1298881682 49.275951489525994 -123.12990841615002 49.27592360628199 -123.12993878109 49.27589444837599 -123.12996677798999 49.27587300028202 -123.12998594138999 49.275848915257 -123.13000629391 49.27582200503599 -123.1300272714 49.27579155900099 -123.13004887198001 49.275763797791 -123.13006668514001 49.27573200618801 -123.13008498261 49.27568562824001 -123.13010784727001 49.27562173179899 -123.13013502389998 49.275553803582994 -123.13016390835 49.27542079096099 -123.13022047468 49.275085695293996 -123.13036219859998 49.27499921385498 -123.13039558404 49.27491670634299 -123.13043068456001 49.27484667998303 -123.13046150109001 49.274775564393025 -123.13049302953999 49.27467353908898 -123.13054245833 49.274622623580996 -123.13056876076 49.27456019506502 -123.13060227777001 49.274510519134 -123.13063012309001 49.27446808674301 -123.13065582911 49.27441205111796 -123.13069169989 49.27438001290099 -123.13071321275 49.274345453172 -123.13073724848 49.274311979846004 -123.13076306049001 49.274280111902016 -123.13078512362 49.274253895125014 -123.13080524950001 49.274223075668004 -123.13083079348 49.274177870193995 -123.13086666504002 49.274088513273 -123.13094491333 49.274044642291045 -123.13098586106 49.274012512213005 -123.1310169416 49.27397646361601 -123.13105296082001 49.273946303445 -123.13108406024001 49.27392025807893 -123.13111162367998 49.27389021308102 -123.13114426305 49.273861617091 -123.13117620509999 49.27383074132001 -123.13121166043001</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>W. 4th Ave Eastbound Off-ramp CLOSURE in place permanently. 
1. Granville Connector - Entire bridge, Howe Ramp, Fir/4th ramp, West 5th Av, Drake St - work expect through to end of July 2025
2. North Loops Reconfiguration – new “H road Network” - Portions of Continental, Neon, Rolston and Pacific Streets - “H Road Network” opened June 2025
3. South Approaches rehab - Mar-25 to Q2 2026

Location: Granville Bridge 
Schedule: Feb 21, 2023 7:00 AM - Jul 25, 2025 6:00 PM</content>
<id>urn:uuid:ea8f5897-9344-43ab-a669-0e32a1a25e42</id>
<link href="https://vancouver.ca/streets-transportation/granville-bridge-connector.aspx"/>
<published>2023-01-31T08:00:00Z</published>
<title>Granville Connector</title>
<updated>2025-07-23T22:49:23.0993711Z</updated>
<georss:line>49.27469749405586 -123.1289260455324 49.27505329824126 -123.12945752811063</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>W. 4th Ave Eastbound Off-ramp CLOSURE in place permanently. 
1. Granville Connector - Entire bridge, Howe Ramp, Fir/4th ramp, West 5th Av, Drake St - work expect through to end of July 2025
2. North Loops Reconfiguration – new “H road Network” - Portions of Continental, Neon, Rolston and Pacific Streets - “H Road Network” opened June 2025
3. South Approaches rehab - Mar-25 to Q2 2026

Location: Granville Bridge 
Schedule: Feb 21, 2023 7:00 AM - Jul 25, 2025 6:00 PM</content>
<id>urn:uuid:3e4f523e-c428-42b6-938d-0b3b241486da</id>
<link href="https://vancouver.ca/streets-transportation/granville-bridge-connector.aspx"/>
<published>2023-01-31T08:00:00Z</published>
<title>Granville Connector</title>
<updated>2025-07-23T22:49:23.0993711Z</updated>
<georss:line>49.275360705785005 -123.12890243010999 49.27536870132897 -123.12887122948 49.27537202685102 -123.12885751775 49.275376527996 -123.12883819993 49.275380822295006 -123.12881884034 49.275384603883 -123.12879946565 49.27538867272901 -123.12878061412998 49.275391151852006 -123.12876765632 49.27539322430701 -123.12875638844 49.27539638356299 -123.12873849689 49.275398747 -123.12872441145 49.275401591405 -123.12870653283001 49.275404391780995 -123.12868780173 49.275407438575 -123.12866588175 49.27541011555303 -123.12864486817 49.27541258576099 -123.12862374407 49.27541546793799 -123.12859615952 49.275417480317 -123.1285741956 49.275419051225015 -123.12855286293 49.275420459863994 -123.12853184605 49.275422085250966 -123.12850196232002 49.27542386398099 -123.12844741525 49.275423594223014 -123.12841495574 49.275422568341014 -123.12839105922001 49.27542006750801 -123.12835882764 49.27541696713698 -123.12833185994998 49.275412520201996 -123.12830244164999 49.2754065906 -123.12827163097 49.27540009991699 -123.12824385713 49.27539066532796 -123.12821020531 49.275382292079 -123.12818473625 49.27536580576799 -123.12814250126 49.27534885363201 -123.12810663035002 49.275327468971994 -123.12806885079 49.275306994326996 -123.12803782382001 49.27527784505202 -123.12800161897998 49.27524636963901 -123.12797026116 49.27521292750299 -123.12794410872 49.27517786015801 -123.12792343751002 49.275141590137 -123.12790846855998 49.275104495026 -123.12789939532 49.27506460502204 -123.12789608894002 49.275029457372995 -123.12789920131 49.27499234238701 -123.12790808265 49.27495603043499 -123.12792286385002 49.27492091751603 -123.12794335345 49.274887417646966 -123.12796933256 49.274855872947 -123.12800052708 49.274826643612016 -123.12803658051 49.27480001789701 -123.12807712239999 49.274776329134 -123.12812168619001 49.274755811727005 -123.12816979130999 49.27473870012702 -123.12822091598 49.27472517485799 -123.128274497 49.274715380511 -123.12832992985999 49.274709443657 -123.12838663750001 49.274711972031014 -123.12850736268999 49.274718510832 -123.12856459765001 49.27473128545299 -123.12862795282 49.274744290727966 -123.12867801458 49.27483184596201 -123.12890751343001 49.274891697947 -123.12906241416998 49.274947234227994 -123.12921535182998 49.27504769059598 -123.12944208178</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>W. 4th Ave Eastbound Off-ramp CLOSURE in place permanently. 
1. Granville Connector - Entire bridge, Howe Ramp, Fir/4th ramp, West 5th Av, Drake St - work expect through to end of July 2025
2. North Loops Reconfiguration – new “H road Network” - Portions of Continental, Neon, Rolston and Pacific Streets - “H Road Network” opened June 2025
3. South Approaches rehab - Mar-25 to Q2 2026

Location: Granville Bridge 
Schedule: Feb 21, 2023 7:00 AM - Jul 25, 2025 6:00 PM</content>
<id>urn:uuid:0c1aea74-cfad-4889-bb7b-7e1a7fa83d68</id>
<link href="https://vancouver.ca/streets-transportation/granville-bridge-connector.aspx"/>
<published>2023-01-31T08:00:00Z</published>
<title>Granville Connector</title>
<updated>2025-07-23T22:49:23.0993711Z</updated>
<georss:line>49.275360705785005 -123.12890243010999 49.27540446691199 -123.12888672031 49.27544291618304 -123.12887521725 49.27549476001599 -123.12886306167 49.27554182252601 -123.12885527921 49.275596429123965 -123.12885007350002 49.275640776760014 -123.12884885547 49.275720855797005 -123.12885344967 49.27577355243699 -123.12886704622998 49.275833610506965 -123.12890987655 49.275898814435976 -123.12898438212 49.275933346047964 -123.12904159530001 49.275968041398016 -123.12912130082 49.27599330026396 -123.1292094781 49.27601029328599 -123.12932908945 49.276012178360986 -123.12938882974001 49.27600866905101 -123.12946216651001 49.27600078423299 -123.12952284358998 49.27598316393198 -123.1296019313 49.27595261697499 -123.1296894951 49.27592938731999 -123.12973319423 49.27590329262401 -123.12977294012002 49.275874621246004 -123.12980827983 49.27584369741601 -123.12983885676998 49.27581084535103 -123.1298643281 49.275776434164015 -123.12988441983 49.27574083292299 -123.12989889921998 49.27570444659801 -123.12990760238 49.27566765306301 -123.12991046157 49.27563086617499 -123.12990740914 49.275594499633 -123.12989851495001 49.275558931153995 -123.12988384872 49.275524565333995 -123.12986357652 49.27549455676899 -123.12984011252 49.27504769059598 -123.12944208178</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>W. 4th Ave Eastbound Off-ramp CLOSURE in place permanently. 
1. Granville Connector - Entire bridge, Howe Ramp, Fir/4th ramp, West 5th Av, Drake St - work expect through to end of July 2025
2. North Loops Reconfiguration – new “H road Network” - Portions of Continental, Neon, Rolston and Pacific Streets - “H Road Network” opened June 2025
3. South Approaches rehab - Mar-25 to Q2 2026

Location: Granville Bridge 
Schedule: Feb 21, 2023 7:00 AM - Jul 25, 2025 6:00 PM</content>
<id>urn:uuid:ee555bc2-7070-4c1f-9e9b-61f1f6a6e876</id>
<link href="https://vancouver.ca/streets-transportation/granville-bridge-connector.aspx"/>
<published>2023-01-31T08:00:00Z</published>
<title>Granville Connector</title>
<updated>2025-07-23T22:49:23.0993711Z</updated>
<georss:line>49.27469749405586 -123.1289260455324 49.274378264090956 -123.12844920232813</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>W. 4th Ave Eastbound Off-ramp CLOSURE in place permanently. 
1. Granville Connector - Entire bridge, Howe Ramp, Fir/4th ramp, West 5th Av, Drake St - work expect through to end of July 2025
2. North Loops Reconfiguration – new “H road Network” - Portions of Continental, Neon, Rolston and Pacific Streets - “H Road Network” opened June 2025
3. South Approaches rehab - Mar-25 to Q2 2026

Location: Granville Bridge 
Schedule: Feb 21, 2023 7:00 AM - Jul 25, 2025 6:00 PM</content>
<id>urn:uuid:ebd65c3c-0204-4667-95f6-757b59689bba</id>
<link href="https://vancouver.ca/streets-transportation/granville-bridge-connector.aspx"/>
<published>2023-01-31T08:00:00Z</published>
<title>Granville Connector</title>
<updated>2025-07-23T22:49:23.0993711Z</updated>
<georss:line>49.26722355143133 -123.13844293323197 49.26701585743834 -123.13865393389275 49.26685016835947 -123.1390544772148 49.266822164504504 -123.13954800367353 49.2669505152335 -123.13998430956416 49.26709986862576 -123.14027756452559 49.26711387047641 -123.14077109098433 49.26711387047641 -123.14091771830134</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>W. 4th Ave Eastbound Off-ramp CLOSURE in place permanently. 
1. Granville Connector - Entire bridge, Howe Ramp, Fir/4th ramp, West 5th Av, Drake St - work expect through to end of July 2025
2. North Loops Reconfiguration – new “H road Network” - Portions of Continental, Neon, Rolston and Pacific Streets - “H Road Network” opened June 2025
3. South Approaches rehab - Mar-25 to Q2 2026

Location: Granville Bridge 
Schedule: Feb 21, 2023 7:00 AM - Jul 25, 2025 6:00 PM</content>
<id>urn:uuid:c5430455-b6f0-410e-a2fd-26e4064018df</id>
<link href="https://vancouver.ca/streets-transportation/granville-bridge-connector.aspx"/>
<published>2023-01-31T08:00:00Z</published>
<title>Granville Connector</title>
<updated>2025-07-23T22:49:23.0993711Z</updated>
<georss:line>49.269537834034 -123.13767846689 49.268532421681016 -123.13947926713</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>W. 4th Ave Eastbound Off-ramp CLOSURE in place permanently. 
1. Granville Connector - Entire bridge, Howe Ramp, Fir/4th ramp, West 5th Av, Drake St - work expect through to end of July 2025
2. North Loops Reconfiguration – new “H road Network” - Portions of Continental, Neon, Rolston and Pacific Streets - “H Road Network” opened June 2025
3. South Approaches rehab - Mar-25 to Q2 2026

Location: Granville Bridge 
Schedule: Feb 21, 2023 7:00 AM - Jul 25, 2025 6:00 PM</content>
<id>urn:uuid:6fa42fc9-1bc9-48dc-9d4b-912f552b3fdb</id>
<link href="https://vancouver.ca/streets-transportation/granville-bridge-connector.aspx"/>
<published>2023-01-31T08:00:00Z</published>
<title>Granville Connector</title>
<updated>2025-07-23T22:49:23.0993711Z</updated>
<georss:line>49.269537834034 -123.13767846689 49.269524683399 -123.13770082296001 49.26950952375603 -123.13772575772998 49.269494076754995 -123.13775027929998 49.269478360384994 -123.13777438771 49.26946236565098 -123.13779808295 49.26944611057701 -123.13782133756 49.269429586169 -123.13784415153002 49.269412801421 -123.13786652487998 49.269395765328 -123.13788845764 49.269378486920004 -123.13790992232998 49.26936096619602 -123.13793091896 49.26934320314001 -123.13795146127 49.26932520679699 -123.13797150806 49.269306986130005 -123.13799108683001 49.269288541170994 -123.13801017011 49.26926988091603 -123.1380287579 49.26925101436001 -123.13804685024002 49.26923195051501 -123.13806443341 49.26921268040303 -123.13808149363 49.26919322198202 -123.13809805845 49.26917357529999 -123.13811408663 49.269153758314985 -123.13812960572 49.269133753071 -123.13814458816998 49.26911358657 -123.13815902031 49.269093258778014 -123.13817292963 49.26907277874099 -123.13818627493002 49.26905213743001 -123.13819908366001 49.26903136184799 -123.13821134217001 49.269010452011 -123.13822303669 49.26898939890802 -123.13823418097 49.26896822954103 -123.13824476131002 49.26894694392698 -123.13825476399 49.26892555102697 -123.13826421652 49.268904041897 -123.13827307762 49.26888244348902 -123.13828137489001 49.268860755820015 -123.13828909456001 49.268838978904995 -123.13829622289 49.26881711271301 -123.13830278738001 49.26879519325803 -123.13830876063 49.268773202548005 -123.13831414260001 49.26875114956201 -123.13831894704998 49.268729052325 -123.13832314654998 49.26870691080299 -123.13832676859 49.26868472501201 -123.13832979942 49.26716658638699 -123.13842042745</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>W. 4th Ave Eastbound Off-ramp CLOSURE in place permanently. 
1. Granville Connector - Entire bridge, Howe Ramp, Fir/4th ramp, West 5th Av, Drake St - work expect through to end of July 2025
2. North Loops Reconfiguration – new “H road Network” - Portions of Continental, Neon, Rolston and Pacific Streets - “H Road Network” opened June 2025
3. South Approaches rehab - Mar-25 to Q2 2026

Location: Granville Bridge 
Schedule: Feb 21, 2023 7:00 AM - Jul 25, 2025 6:00 PM</content>
<id>urn:uuid:e0a7e707-3c39-44b9-b8e8-fd982ceade57</id>
<link href="https://vancouver.ca/streets-transportation/granville-bridge-connector.aspx"/>
<published>2023-01-31T08:00:00Z</published>
<title>Granville Connector</title>
<updated>2025-07-23T22:49:23.0993711Z</updated>
<georss:line>49.26934593214 -123.137993766 49.26990657910301 -123.13714486901999</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>W. 4th Ave Eastbound Off-ramp CLOSURE in place permanently. 
1. Granville Connector - Entire bridge, Howe Ramp, Fir/4th ramp, West 5th Av, Drake St - work expect through to end of July 2025
2. North Loops Reconfiguration – new “H road Network” - Portions of Continental, Neon, Rolston and Pacific Streets - “H Road Network” opened June 2025
3. South Approaches rehab - Mar-25 to Q2 2026

Location: Granville Bridge 
Schedule: Feb 21, 2023 7:00 AM - Jul 25, 2025 6:00 PM</content>
<id>urn:uuid:d5f322fc-672c-4a9f-bfea-7f11175b10cf</id>
<link href="https://vancouver.ca/streets-transportation/granville-bridge-connector.aspx"/>
<published>2023-01-31T08:00:00Z</published>
<title>Granville Connector</title>
<updated>2025-07-23T22:49:23.0993711Z</updated>
<georss:line>49.27383074132001 -123.13121166043001 49.269537834034 -123.13767846689</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>W. 4th Ave Eastbound Off-ramp CLOSURE in place permanently. 
1. Granville Connector - Entire bridge, Howe Ramp, Fir/4th ramp, West 5th Av, Drake St - work expect through to end of July 2025
2. North Loops Reconfiguration – new “H road Network” - Portions of Continental, Neon, Rolston and Pacific Streets - “H Road Network” opened June 2025
3. South Approaches rehab - Mar-25 to Q2 2026

Location: Granville Bridge 
Schedule: Feb 21, 2023 7:00 AM - Jul 25, 2025 6:00 PM</content>
<id>urn:uuid:3baec514-2c32-46d5-86f4-d09689a1f379</id>
<link href="https://vancouver.ca/streets-transportation/granville-bridge-connector.aspx"/>
<published>2023-01-31T08:00:00Z</published>
<title>Granville Connector</title>
<updated>2025-07-23T22:49:23.0993711Z</updated>
<georss:line>49.27064249688797 -123.13614615807002 49.26990657910301 -123.13714486901999</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>W. 4th Ave Eastbound Off-ramp CLOSURE in place permanently. 
1. Granville Connector - Entire bridge, Howe Ramp, Fir/4th ramp, West 5th Av, Drake St - work expect through to end of July 2025
2. North Loops Reconfiguration – new “H road Network” - Portions of Continental, Neon, Rolston and Pacific Streets - “H Road Network” opened June 2025
3. South Approaches rehab - Mar-25 to Q2 2026

Location: Granville Bridge 
Schedule: Feb 21, 2023 7:00 AM - Jul 25, 2025 6:00 PM</content>
<id>urn:uuid:0577c200-e02d-4c62-99da-633b3aed1d79</id>
<link href="https://vancouver.ca/streets-transportation/granville-bridge-connector.aspx"/>
<published>2023-01-31T08:00:00Z</published>
<title>Granville Connector</title>
<updated>2025-07-23T22:49:23.0993711Z</updated>
<georss:line>49.274107794603026 -123.13086142055998 49.27349736775798 -123.13178318925</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>The Granville Street Sewer Upgrades Project is scheduled to begin in mid-September 2025 on Granville Street in the Marpole area. The project will replace the existing sewer system with a separated system designed to increase capacity, better manage stormwater, and support Vancouver’s long-term infrastructure goals.

- Construction begins mid-September 2025 with exploratory work, followed by sidewalk improvements and sewer trenching, with completion expected by end of Spring 2026. 
- Nighttime sewer construction will occur on Granville Street between fall 2025 and early 2026, with some weekend 24/7 work at key intersections; daytime work follows in early 2026 on W59 Avenue and W62 Avenue.
- Granville Street will remain open with lane closures, and traffic management will prioritize safety with signage, message boards, and public advisories.
- Residents, businesses, and key stakeholders will receive updates through letters, a dedicated Community Liaison Officer, media advisories, and the project webpage.
- No further impacts to Granville are expected as of May 2026.

Location: The Granville Street Sewer Upgrades Project is scheduled to begin in mid-September 2025 in the Marpole area. The project will replace the existing combined sewer with a separated system designed to increase capacity, improve stormwater management, and support Vancouver’s long-term infrastructure goals.

Construction will start in mid-September 2025 with exploratory work, followed by sidewalk improvements and sewer trenching. Completion is expected by late spring 2026.

Nighttime sewer construction on Granville Street will take place between fall 2025 and early 2026, with some 24/7 weekend work at key intersections. Daytime work will follow in early 2026 on West 59th Avenue and West 62nd Avenue.

Contact: granvillesewerupgrades@vancouver.ca or 311
Schedule: Sep 17, 2025 - Jul 31, 2026</content>
<id>urn:uuid:acce2c7f-9bb9-4ea7-934a-5c05af0109fe</id>
<link href="https://vancouver.ca/streets-transportation/granville-street-sewer-upgrades.aspx"/>
<published>2025-09-12T07:00:00Z</published>
<title>Granville Street Sewer Upgrades (Fraser Angus Group 4A) </title>
<updated>2026-05-26T15:58:32.2200612Z</updated>
<georss:line>49.21716235091938 -123.13949308498083 49.21737190945083 -123.14021747785908</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>The Granville Street Sewer Upgrades Project is scheduled to begin in mid-September 2025 on Granville Street in the Marpole area. The project will replace the existing sewer system with a separated system designed to increase capacity, better manage stormwater, and support Vancouver’s long-term infrastructure goals.

- Construction begins mid-September 2025 with exploratory work, followed by sidewalk improvements and sewer trenching, with completion expected by end of Spring 2026. 
- Nighttime sewer construction will occur on Granville Street between fall 2025 and early 2026, with some weekend 24/7 work at key intersections; daytime work follows in early 2026 on W59 Avenue and W62 Avenue.
- Granville Street will remain open with lane closures, and traffic management will prioritize safety with signage, message boards, and public advisories.
- Residents, businesses, and key stakeholders will receive updates through letters, a dedicated Community Liaison Officer, media advisories, and the project webpage.
- No further impacts to Granville are expected as of May 2026.

Location: The Granville Street Sewer Upgrades Project is scheduled to begin in mid-September 2025 in the Marpole area. The project will replace the existing combined sewer with a separated system designed to increase capacity, improve stormwater management, and support Vancouver’s long-term infrastructure goals.

Construction will start in mid-September 2025 with exploratory work, followed by sidewalk improvements and sewer trenching. Completion is expected by late spring 2026.

Nighttime sewer construction on Granville Street will take place between fall 2025 and early 2026, with some 24/7 weekend work at key intersections. Daytime work will follow in early 2026 on West 59th Avenue and West 62nd Avenue.

Contact: granvillesewerupgrades@vancouver.ca or 311
Schedule: Sep 17, 2025 - Jul 31, 2026</content>
<id>urn:uuid:6ef3041c-9dc1-418f-970c-9b8db557e5ee</id>
<link href="https://vancouver.ca/streets-transportation/granville-street-sewer-upgrades.aspx"/>
<published>2025-09-12T07:00:00Z</published>
<title>Granville Street Sewer Upgrades (Fraser Angus Group 4A) </title>
<updated>2026-05-26T15:58:32.2200612Z</updated>
<georss:line>49.21741093502715 -123.14022151216446 49.217357394953865 -123.13783422439096 49.21783925352531 -123.13781373265044</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>The Granville Street Sewer Upgrades Project is scheduled to begin in mid-September 2025 on Granville Street in the Marpole area. The project will replace the existing sewer system with a separated system designed to increase capacity, better manage stormwater, and support Vancouver’s long-term infrastructure goals.

- Construction begins mid-September 2025 with exploratory work, followed by sidewalk improvements and sewer trenching, with completion expected by end of Spring 2026. 
- Nighttime sewer construction will occur on Granville Street between fall 2025 and early 2026, with some weekend 24/7 work at key intersections; daytime work follows in early 2026 on W59 Avenue and W62 Avenue.
- Granville Street will remain open with lane closures, and traffic management will prioritize safety with signage, message boards, and public advisories.
- Residents, businesses, and key stakeholders will receive updates through letters, a dedicated Community Liaison Officer, media advisories, and the project webpage.
- No further impacts to Granville are expected as of May 2026.

Location: The Granville Street Sewer Upgrades Project is scheduled to begin in mid-September 2025 in the Marpole area. The project will replace the existing combined sewer with a separated system designed to increase capacity, improve stormwater management, and support Vancouver’s long-term infrastructure goals.

Construction will start in mid-September 2025 with exploratory work, followed by sidewalk improvements and sewer trenching. Completion is expected by late spring 2026.

Nighttime sewer construction on Granville Street will take place between fall 2025 and early 2026, with some 24/7 weekend work at key intersections. Daytime work will follow in early 2026 on West 59th Avenue and West 62nd Avenue.

Contact: granvillesewerupgrades@vancouver.ca or 311
Schedule: Sep 17, 2025 - Jul 31, 2026</content>
<id>urn:uuid:62065c6e-047a-44a2-8f9f-99a0ac102647</id>
<link href="https://vancouver.ca/streets-transportation/granville-street-sewer-upgrades.aspx"/>
<published>2025-09-12T07:00:00Z</published>
<title>Granville Street Sewer Upgrades (Fraser Angus Group 4A) </title>
<updated>2026-05-26T15:58:32.2200612Z</updated>
<georss:line>49.21741036389099 -123.1402168779755 49.21775458808645 -123.14020763252326</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>The Granville Street Sewer Upgrades Project is scheduled to begin in mid-September 2025 on Granville Street in the Marpole area. The project will replace the existing sewer system with a separated system designed to increase capacity, better manage stormwater, and support Vancouver’s long-term infrastructure goals.

- Construction begins mid-September 2025 with exploratory work, followed by sidewalk improvements and sewer trenching, with completion expected by end of Spring 2026. 
- Nighttime sewer construction will occur on Granville Street between fall 2025 and early 2026, with some weekend 24/7 work at key intersections; daytime work follows in early 2026 on W59 Avenue and W62 Avenue.
- Granville Street will remain open with lane closures, and traffic management will prioritize safety with signage, message boards, and public advisories.
- Residents, businesses, and key stakeholders will receive updates through letters, a dedicated Community Liaison Officer, media advisories, and the project webpage.
- No further impacts to Granville are expected as of May 2026.

Location: The Granville Street Sewer Upgrades Project is scheduled to begin in mid-September 2025 in the Marpole area. The project will replace the existing combined sewer with a separated system designed to increase capacity, improve stormwater management, and support Vancouver’s long-term infrastructure goals.

Construction will start in mid-September 2025 with exploratory work, followed by sidewalk improvements and sewer trenching. Completion is expected by late spring 2026.

Nighttime sewer construction on Granville Street will take place between fall 2025 and early 2026, with some 24/7 weekend work at key intersections. Daytime work will follow in early 2026 on West 59th Avenue and West 62nd Avenue.

Contact: granvillesewerupgrades@vancouver.ca or 311
Schedule: Sep 17, 2025 - Jul 31, 2026</content>
<id>urn:uuid:ce2c0a9a-3792-47f8-a52e-a92a8cc855f5</id>
<link href="https://vancouver.ca/streets-transportation/granville-street-sewer-upgrades.aspx"/>
<published>2025-09-12T07:00:00Z</published>
<title>Granville Street Sewer Upgrades (Fraser Angus Group 4A) </title>
<updated>2026-05-26T15:58:32.2200612Z</updated>
<georss:line>49.217856331722516 -123.13783155359224 49.21834248223129 -123.1378229986387</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>The Granville Street Sewer Upgrades Project is scheduled to begin in mid-September 2025 on Granville Street in the Marpole area. The project will replace the existing sewer system with a separated system designed to increase capacity, better manage stormwater, and support Vancouver’s long-term infrastructure goals.

- Construction begins mid-September 2025 with exploratory work, followed by sidewalk improvements and sewer trenching, with completion expected by end of Spring 2026. 
- Nighttime sewer construction will occur on Granville Street between fall 2025 and early 2026, with some weekend 24/7 work at key intersections; daytime work follows in early 2026 on W59 Avenue and W62 Avenue.
- Granville Street will remain open with lane closures, and traffic management will prioritize safety with signage, message boards, and public advisories.
- Residents, businesses, and key stakeholders will receive updates through letters, a dedicated Community Liaison Officer, media advisories, and the project webpage.
- No further impacts to Granville are expected as of May 2026.

Location: The Granville Street Sewer Upgrades Project is scheduled to begin in mid-September 2025 in the Marpole area. The project will replace the existing combined sewer with a separated system designed to increase capacity, improve stormwater management, and support Vancouver’s long-term infrastructure goals.

Construction will start in mid-September 2025 with exploratory work, followed by sidewalk improvements and sewer trenching. Completion is expected by late spring 2026.

Nighttime sewer construction on Granville Street will take place between fall 2025 and early 2026, with some 24/7 weekend work at key intersections. Daytime work will follow in early 2026 on West 59th Avenue and West 62nd Avenue.

Contact: granvillesewerupgrades@vancouver.ca or 311
Schedule: Sep 17, 2025 - Jul 31, 2026</content>
<id>urn:uuid:19defd0e-71f0-4269-a39e-f67323e79312</id>
<link href="https://vancouver.ca/streets-transportation/granville-street-sewer-upgrades.aspx"/>
<published>2025-09-12T07:00:00Z</published>
<title>Granville Street Sewer Upgrades (Fraser Angus Group 4A) </title>
<updated>2026-05-26T15:58:32.2200612Z</updated>
<georss:line>49.21730366488049 -123.136109065695 49.21734144434896 -123.13752981930332 49.21734918415942 -123.13782091359222</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>The Granville Street Sewer Upgrades Project is scheduled to begin in mid-September 2025 on Granville Street in the Marpole area. The project will replace the existing sewer system with a separated system designed to increase capacity, better manage stormwater, and support Vancouver’s long-term infrastructure goals.

- Construction begins mid-September 2025 with exploratory work, followed by sidewalk improvements and sewer trenching, with completion expected by end of Spring 2026. 
- Nighttime sewer construction will occur on Granville Street between fall 2025 and early 2026, with some weekend 24/7 work at key intersections; daytime work follows in early 2026 on W59 Avenue and W62 Avenue.
- Granville Street will remain open with lane closures, and traffic management will prioritize safety with signage, message boards, and public advisories.
- Residents, businesses, and key stakeholders will receive updates through letters, a dedicated Community Liaison Officer, media advisories, and the project webpage.
- No further impacts to Granville are expected as of May 2026.

Location: The Granville Street Sewer Upgrades Project is scheduled to begin in mid-September 2025 in the Marpole area. The project will replace the existing combined sewer with a separated system designed to increase capacity, improve stormwater management, and support Vancouver’s long-term infrastructure goals.

Construction will start in mid-September 2025 with exploratory work, followed by sidewalk improvements and sewer trenching. Completion is expected by late spring 2026.

Nighttime sewer construction on Granville Street will take place between fall 2025 and early 2026, with some 24/7 weekend work at key intersections. Daytime work will follow in early 2026 on West 59th Avenue and West 62nd Avenue.

Contact: granvillesewerupgrades@vancouver.ca or 311
Schedule: Sep 17, 2025 - Jul 31, 2026</content>
<id>urn:uuid:e1d70b64-91a4-45df-ba90-f434fb5da7dc</id>
<link href="https://vancouver.ca/streets-transportation/granville-street-sewer-upgrades.aspx"/>
<published>2025-09-12T07:00:00Z</published>
<title>Granville Street Sewer Upgrades (Fraser Angus Group 4A) </title>
<updated>2026-05-26T15:58:32.2200612Z</updated>
<georss:line>49.2150456174104 -123.1402752200398 49.21503353874709 -123.13912878396287</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>The Granville Street Sewer Upgrades Project is scheduled to begin in mid-September 2025 on Granville Street in the Marpole area. The project will replace the existing sewer system with a separated system designed to increase capacity, better manage stormwater, and support Vancouver’s long-term infrastructure goals.

- Construction begins mid-September 2025 with exploratory work, followed by sidewalk improvements and sewer trenching, with completion expected by end of Spring 2026. 
- Nighttime sewer construction will occur on Granville Street between fall 2025 and early 2026, with some weekend 24/7 work at key intersections; daytime work follows in early 2026 on W59 Avenue and W62 Avenue.
- Granville Street will remain open with lane closures, and traffic management will prioritize safety with signage, message boards, and public advisories.
- Residents, businesses, and key stakeholders will receive updates through letters, a dedicated Community Liaison Officer, media advisories, and the project webpage.
- No further impacts to Granville are expected as of May 2026.

Location: The Granville Street Sewer Upgrades Project is scheduled to begin in mid-September 2025 in the Marpole area. The project will replace the existing combined sewer with a separated system designed to increase capacity, improve stormwater management, and support Vancouver’s long-term infrastructure goals.

Construction will start in mid-September 2025 with exploratory work, followed by sidewalk improvements and sewer trenching. Completion is expected by late spring 2026.

Nighttime sewer construction on Granville Street will take place between fall 2025 and early 2026, with some 24/7 weekend work at key intersections. Daytime work will follow in early 2026 on West 59th Avenue and West 62nd Avenue.

Contact: granvillesewerupgrades@vancouver.ca or 311
Schedule: Sep 17, 2025 - Jul 31, 2026</content>
<id>urn:uuid:22511ced-7e98-465a-b899-666ede81a4e7</id>
<link href="https://vancouver.ca/streets-transportation/granville-street-sewer-upgrades.aspx"/>
<published>2025-09-12T07:00:00Z</published>
<title>Granville Street Sewer Upgrades (Fraser Angus Group 4A) </title>
<updated>2026-05-26T15:58:32.2200612Z</updated>
<georss:line>49.216606661428955 -123.13755536740472 49.21680953302737 -123.13826273925952</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>The Granville Street Sewer Upgrades Project is scheduled to begin in mid-September 2025 on Granville Street in the Marpole area. The project will replace the existing sewer system with a separated system designed to increase capacity, better manage stormwater, and support Vancouver’s long-term infrastructure goals.

- Construction begins mid-September 2025 with exploratory work, followed by sidewalk improvements and sewer trenching, with completion expected by end of Spring 2026. 
- Nighttime sewer construction will occur on Granville Street between fall 2025 and early 2026, with some weekend 24/7 work at key intersections; daytime work follows in early 2026 on W59 Avenue and W62 Avenue.
- Granville Street will remain open with lane closures, and traffic management will prioritize safety with signage, message boards, and public advisories.
- Residents, businesses, and key stakeholders will receive updates through letters, a dedicated Community Liaison Officer, media advisories, and the project webpage.
- No further impacts to Granville are expected as of May 2026.

Location: The Granville Street Sewer Upgrades Project is scheduled to begin in mid-September 2025 in the Marpole area. The project will replace the existing combined sewer with a separated system designed to increase capacity, improve stormwater management, and support Vancouver’s long-term infrastructure goals.

Construction will start in mid-September 2025 with exploratory work, followed by sidewalk improvements and sewer trenching. Completion is expected by late spring 2026.

Nighttime sewer construction on Granville Street will take place between fall 2025 and early 2026, with some 24/7 weekend work at key intersections. Daytime work will follow in early 2026 on West 59th Avenue and West 62nd Avenue.

Contact: granvillesewerupgrades@vancouver.ca or 311
Schedule: Sep 17, 2025 - Jul 31, 2026</content>
<id>urn:uuid:3afbd139-f97a-4050-bcff-da9334bcda26</id>
<link href="https://vancouver.ca/streets-transportation/granville-street-sewer-upgrades.aspx"/>
<published>2025-09-12T07:00:00Z</published>
<title>Granville Street Sewer Upgrades (Fraser Angus Group 4A) </title>
<updated>2026-05-26T15:58:32.2200612Z</updated>
<georss:line>49.217063073883395 -123.13753949678797 49.216606661428955 -123.13755536740472</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>The Granville Street Sewer Upgrades Project is scheduled to begin in mid-September 2025 on Granville Street in the Marpole area. The project will replace the existing sewer system with a separated system designed to increase capacity, better manage stormwater, and support Vancouver’s long-term infrastructure goals.

- Construction begins mid-September 2025 with exploratory work, followed by sidewalk improvements and sewer trenching, with completion expected by end of Spring 2026. 
- Nighttime sewer construction will occur on Granville Street between fall 2025 and early 2026, with some weekend 24/7 work at key intersections; daytime work follows in early 2026 on W59 Avenue and W62 Avenue.
- Granville Street will remain open with lane closures, and traffic management will prioritize safety with signage, message boards, and public advisories.
- Residents, businesses, and key stakeholders will receive updates through letters, a dedicated Community Liaison Officer, media advisories, and the project webpage.
- No further impacts to Granville are expected as of May 2026.

Location: The Granville Street Sewer Upgrades Project is scheduled to begin in mid-September 2025 in the Marpole area. The project will replace the existing combined sewer with a separated system designed to increase capacity, improve stormwater management, and support Vancouver’s long-term infrastructure goals.

Construction will start in mid-September 2025 with exploratory work, followed by sidewalk improvements and sewer trenching. Completion is expected by late spring 2026.

Nighttime sewer construction on Granville Street will take place between fall 2025 and early 2026, with some 24/7 weekend work at key intersections. Daytime work will follow in early 2026 on West 59th Avenue and West 62nd Avenue.

Contact: granvillesewerupgrades@vancouver.ca or 311
Schedule: Sep 17, 2025 - Jul 31, 2026</content>
<id>urn:uuid:abb20c42-91bc-487c-844f-ce8ee527b3d6</id>
<link href="https://vancouver.ca/streets-transportation/granville-street-sewer-upgrades.aspx"/>
<published>2025-09-12T07:00:00Z</published>
<title>Granville Street Sewer Upgrades (Fraser Angus Group 4A) </title>
<updated>2026-05-26T15:58:32.2200612Z</updated>
<georss:line>49.21737751420139 -123.14023291031187 49.216799377668565 -123.1402558269334</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>The Granville Street Sewer Upgrades Project is scheduled to begin in mid-September 2025 on Granville Street in the Marpole area. The project will replace the existing sewer system with a separated system designed to increase capacity, better manage stormwater, and support Vancouver’s long-term infrastructure goals.

- Construction begins mid-September 2025 with exploratory work, followed by sidewalk improvements and sewer trenching, with completion expected by end of Spring 2026. 
- Nighttime sewer construction will occur on Granville Street between fall 2025 and early 2026, with some weekend 24/7 work at key intersections; daytime work follows in early 2026 on W59 Avenue and W62 Avenue.
- Granville Street will remain open with lane closures, and traffic management will prioritize safety with signage, message boards, and public advisories.
- Residents, businesses, and key stakeholders will receive updates through letters, a dedicated Community Liaison Officer, media advisories, and the project webpage.
- No further impacts to Granville are expected as of May 2026.

Location: The Granville Street Sewer Upgrades Project is scheduled to begin in mid-September 2025 in the Marpole area. The project will replace the existing combined sewer with a separated system designed to increase capacity, improve stormwater management, and support Vancouver’s long-term infrastructure goals.

Construction will start in mid-September 2025 with exploratory work, followed by sidewalk improvements and sewer trenching. Completion is expected by late spring 2026.

Nighttime sewer construction on Granville Street will take place between fall 2025 and early 2026, with some 24/7 weekend work at key intersections. Daytime work will follow in early 2026 on West 59th Avenue and West 62nd Avenue.

Contact: granvillesewerupgrades@vancouver.ca or 311
Schedule: Sep 17, 2025 - Jul 31, 2026</content>
<id>urn:uuid:50862835-30a6-48d6-bae2-14ad50cd9b0f</id>
<link href="https://vancouver.ca/streets-transportation/granville-street-sewer-upgrades.aspx"/>
<published>2025-09-12T07:00:00Z</published>
<title>Granville Street Sewer Upgrades (Fraser Angus Group 4A) </title>
<updated>2026-05-26T15:58:32.2200612Z</updated>
<georss:line>49.21680953302737 -123.13826273925952 49.21700018193232 -123.13892754184673</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>The Granville Street Sewer Upgrades Project is scheduled to begin in mid-September 2025 on Granville Street in the Marpole area. The project will replace the existing sewer system with a separated system designed to increase capacity, better manage stormwater, and support Vancouver’s long-term infrastructure goals.

- Construction begins mid-September 2025 with exploratory work, followed by sidewalk improvements and sewer trenching, with completion expected by end of Spring 2026. 
- Nighttime sewer construction will occur on Granville Street between fall 2025 and early 2026, with some weekend 24/7 work at key intersections; daytime work follows in early 2026 on W59 Avenue and W62 Avenue.
- Granville Street will remain open with lane closures, and traffic management will prioritize safety with signage, message boards, and public advisories.
- Residents, businesses, and key stakeholders will receive updates through letters, a dedicated Community Liaison Officer, media advisories, and the project webpage.
- No further impacts to Granville are expected as of May 2026.

Location: The Granville Street Sewer Upgrades Project is scheduled to begin in mid-September 2025 in the Marpole area. The project will replace the existing combined sewer with a separated system designed to increase capacity, improve stormwater management, and support Vancouver’s long-term infrastructure goals.

Construction will start in mid-September 2025 with exploratory work, followed by sidewalk improvements and sewer trenching. Completion is expected by late spring 2026.

Nighttime sewer construction on Granville Street will take place between fall 2025 and early 2026, with some 24/7 weekend work at key intersections. Daytime work will follow in early 2026 on West 59th Avenue and West 62nd Avenue.

Contact: granvillesewerupgrades@vancouver.ca or 311
Schedule: Sep 17, 2025 - Jul 31, 2026</content>
<id>urn:uuid:c0efbb75-98ba-4ba3-a56d-40656be767e0</id>
<link href="https://vancouver.ca/streets-transportation/granville-street-sewer-upgrades.aspx"/>
<published>2025-09-12T07:00:00Z</published>
<title>Granville Street Sewer Upgrades (Fraser Angus Group 4A) </title>
<updated>2026-05-26T15:58:32.2200612Z</updated>
<georss:line>49.21700018193232 -123.13892754184673 49.21716235091938 -123.13949308498083</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>The Granville Street Sewer Upgrades Project is scheduled to begin in mid-September 2025 on Granville Street in the Marpole area. The project will replace the existing sewer system with a separated system designed to increase capacity, better manage stormwater, and support Vancouver’s long-term infrastructure goals.

- Construction begins mid-September 2025 with exploratory work, followed by sidewalk improvements and sewer trenching, with completion expected by end of Spring 2026. 
- Nighttime sewer construction will occur on Granville Street between fall 2025 and early 2026, with some weekend 24/7 work at key intersections; daytime work follows in early 2026 on W59 Avenue and W62 Avenue.
- Granville Street will remain open with lane closures, and traffic management will prioritize safety with signage, message boards, and public advisories.
- Residents, businesses, and key stakeholders will receive updates through letters, a dedicated Community Liaison Officer, media advisories, and the project webpage.
- No further impacts to Granville are expected as of May 2026.

Location: The Granville Street Sewer Upgrades Project is scheduled to begin in mid-September 2025 in the Marpole area. The project will replace the existing combined sewer with a separated system designed to increase capacity, improve stormwater management, and support Vancouver’s long-term infrastructure goals.

Construction will start in mid-September 2025 with exploratory work, followed by sidewalk improvements and sewer trenching. Completion is expected by late spring 2026.

Nighttime sewer construction on Granville Street will take place between fall 2025 and early 2026, with some 24/7 weekend work at key intersections. Daytime work will follow in early 2026 on West 59th Avenue and West 62nd Avenue.

Contact: granvillesewerupgrades@vancouver.ca or 311
Schedule: Sep 17, 2025 - Jul 31, 2026</content>
<id>urn:uuid:1f3bf8af-6e17-43c6-85df-55512c7cb0ae</id>
<link href="https://vancouver.ca/streets-transportation/granville-street-sewer-upgrades.aspx"/>
<published>2025-09-12T07:00:00Z</published>
<title>Granville Street Sewer Upgrades (Fraser Angus Group 4A) </title>
<updated>2026-05-26T15:58:32.2200612Z</updated>
<georss:line>49.21734144434896 -123.13752981930332 49.217063073883395 -123.13753949678797</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>The Granville Street Sewer Upgrades Project is scheduled to begin in mid-September 2025 on Granville Street in the Marpole area. The project will replace the existing sewer system with a separated system designed to increase capacity, better manage stormwater, and support Vancouver’s long-term infrastructure goals.

- Construction begins mid-September 2025 with exploratory work, followed by sidewalk improvements and sewer trenching, with completion expected by end of Spring 2026. 
- Nighttime sewer construction will occur on Granville Street between fall 2025 and early 2026, with some weekend 24/7 work at key intersections; daytime work follows in early 2026 on W59 Avenue and W62 Avenue.
- Granville Street will remain open with lane closures, and traffic management will prioritize safety with signage, message boards, and public advisories.
- Residents, businesses, and key stakeholders will receive updates through letters, a dedicated Community Liaison Officer, media advisories, and the project webpage.
- No further impacts to Granville are expected as of May 2026.

Location: The Granville Street Sewer Upgrades Project is scheduled to begin in mid-September 2025 in the Marpole area. The project will replace the existing combined sewer with a separated system designed to increase capacity, improve stormwater management, and support Vancouver’s long-term infrastructure goals.

Construction will start in mid-September 2025 with exploratory work, followed by sidewalk improvements and sewer trenching. Completion is expected by late spring 2026.

Nighttime sewer construction on Granville Street will take place between fall 2025 and early 2026, with some 24/7 weekend work at key intersections. Daytime work will follow in early 2026 on West 59th Avenue and West 62nd Avenue.

Contact: granvillesewerupgrades@vancouver.ca or 311
Schedule: Sep 17, 2025 - Jul 31, 2026</content>
<id>urn:uuid:78298b5d-9d41-4c62-b85e-18a9a87cb2af</id>
<link href="https://vancouver.ca/streets-transportation/granville-street-sewer-upgrades.aspx"/>
<published>2025-09-12T07:00:00Z</published>
<title>Granville Street Sewer Upgrades (Fraser Angus Group 4A) </title>
<updated>2026-05-26T15:58:32.2200612Z</updated>
<georss:line>49.21494141275218 -123.14032105204367 49.21400458540205 -123.14035429282731</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>The Granville Street Sewer Upgrades Project is scheduled to begin in mid-September 2025 on Granville Street in the Marpole area. The project will replace the existing sewer system with a separated system designed to increase capacity, better manage stormwater, and support Vancouver’s long-term infrastructure goals.

- Construction begins mid-September 2025 with exploratory work, followed by sidewalk improvements and sewer trenching, with completion expected by end of Spring 2026. 
- Nighttime sewer construction will occur on Granville Street between fall 2025 and early 2026, with some weekend 24/7 work at key intersections; daytime work follows in early 2026 on W59 Avenue and W62 Avenue.
- Granville Street will remain open with lane closures, and traffic management will prioritize safety with signage, message boards, and public advisories.
- Residents, businesses, and key stakeholders will receive updates through letters, a dedicated Community Liaison Officer, media advisories, and the project webpage.
- No further impacts to Granville are expected as of May 2026.

Location: The Granville Street Sewer Upgrades Project is scheduled to begin in mid-September 2025 in the Marpole area. The project will replace the existing combined sewer with a separated system designed to increase capacity, improve stormwater management, and support Vancouver’s long-term infrastructure goals.

Construction will start in mid-September 2025 with exploratory work, followed by sidewalk improvements and sewer trenching. Completion is expected by late spring 2026.

Nighttime sewer construction on Granville Street will take place between fall 2025 and early 2026, with some 24/7 weekend work at key intersections. Daytime work will follow in early 2026 on West 59th Avenue and West 62nd Avenue.

Contact: granvillesewerupgrades@vancouver.ca or 311
Schedule: Sep 17, 2025 - Jul 31, 2026</content>
<id>urn:uuid:d3b8912b-290e-4c89-a057-1e4346b9f729</id>
<link href="https://vancouver.ca/streets-transportation/granville-street-sewer-upgrades.aspx"/>
<published>2025-09-12T07:00:00Z</published>
<title>Granville Street Sewer Upgrades (Fraser Angus Group 4A) </title>
<updated>2026-05-26T15:58:32.2200612Z</updated>
<georss:line>49.21494141275218 -123.14032105204367 49.21400458540205 -123.14035429282731</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>The Granville Street Sewer Upgrades Project is scheduled to begin in mid-September 2025 on Granville Street in the Marpole area. The project will replace the existing sewer system with a separated system designed to increase capacity, better manage stormwater, and support Vancouver’s long-term infrastructure goals.

- Construction begins mid-September 2025 with exploratory work, followed by sidewalk improvements and sewer trenching, with completion expected by end of Spring 2026. 
- Nighttime sewer construction will occur on Granville Street between fall 2025 and early 2026, with some weekend 24/7 work at key intersections; daytime work follows in early 2026 on W59 Avenue and W62 Avenue.
- Granville Street will remain open with lane closures, and traffic management will prioritize safety with signage, message boards, and public advisories.
- Residents, businesses, and key stakeholders will receive updates through letters, a dedicated Community Liaison Officer, media advisories, and the project webpage.
- No further impacts to Granville are expected as of May 2026.

Location: The Granville Street Sewer Upgrades Project is scheduled to begin in mid-September 2025 in the Marpole area. The project will replace the existing combined sewer with a separated system designed to increase capacity, improve stormwater management, and support Vancouver’s long-term infrastructure goals.

Construction will start in mid-September 2025 with exploratory work, followed by sidewalk improvements and sewer trenching. Completion is expected by late spring 2026.

Nighttime sewer construction on Granville Street will take place between fall 2025 and early 2026, with some 24/7 weekend work at key intersections. Daytime work will follow in early 2026 on West 59th Avenue and West 62nd Avenue.

Contact: granvillesewerupgrades@vancouver.ca or 311
Schedule: Sep 17, 2025 - Jul 31, 2026</content>
<id>urn:uuid:207008c8-0e47-4b67-b39d-721209e299df</id>
<link href="https://vancouver.ca/streets-transportation/granville-street-sewer-upgrades.aspx"/>
<published>2025-09-12T07:00:00Z</published>
<title>Granville Street Sewer Upgrades (Fraser Angus Group 4A) </title>
<updated>2026-05-26T15:58:32.2200612Z</updated>
<georss:line>49.21493580812083 -123.14030562023386 49.214947003198546 -123.14098861075057</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>The Granville Street Sewer Upgrades Project is scheduled to begin in mid-September 2025 on Granville Street in the Marpole area. The project will replace the existing sewer system with a separated system designed to increase capacity, better manage stormwater, and support Vancouver’s long-term infrastructure goals.

- Construction begins mid-September 2025 with exploratory work, followed by sidewalk improvements and sewer trenching, with completion expected by end of Spring 2026. 
- Nighttime sewer construction will occur on Granville Street between fall 2025 and early 2026, with some weekend 24/7 work at key intersections; daytime work follows in early 2026 on W59 Avenue and W62 Avenue.
- Granville Street will remain open with lane closures, and traffic management will prioritize safety with signage, message boards, and public advisories.
- Residents, businesses, and key stakeholders will receive updates through letters, a dedicated Community Liaison Officer, media advisories, and the project webpage.
- No further impacts to Granville are expected as of May 2026.

Location: The Granville Street Sewer Upgrades Project is scheduled to begin in mid-September 2025 in the Marpole area. The project will replace the existing combined sewer with a separated system designed to increase capacity, improve stormwater management, and support Vancouver’s long-term infrastructure goals.

Construction will start in mid-September 2025 with exploratory work, followed by sidewalk improvements and sewer trenching. Completion is expected by late spring 2026.

Nighttime sewer construction on Granville Street will take place between fall 2025 and early 2026, with some 24/7 weekend work at key intersections. Daytime work will follow in early 2026 on West 59th Avenue and West 62nd Avenue.

Contact: granvillesewerupgrades@vancouver.ca or 311
Schedule: Sep 17, 2025 - Jul 31, 2026</content>
<id>urn:uuid:f88b79f1-4eca-42e8-8468-4140bff0313f</id>
<link href="https://vancouver.ca/streets-transportation/granville-street-sewer-upgrades.aspx"/>
<published>2025-09-12T07:00:00Z</published>
<title>Granville Street Sewer Upgrades (Fraser Angus Group 4A) </title>
<updated>2026-05-26T15:58:32.2200612Z</updated>
<georss:line>49.21589130877473 -123.14028889061171 49.21504574413578 -123.14031769487636</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>The Granville Street Sewer Upgrades Project is scheduled to begin in mid-September 2025 on Granville Street in the Marpole area. The project will replace the existing sewer system with a separated system designed to increase capacity, better manage stormwater, and support Vancouver’s long-term infrastructure goals.

- Construction begins mid-September 2025 with exploratory work, followed by sidewalk improvements and sewer trenching, with completion expected by end of Spring 2026. 
- Nighttime sewer construction will occur on Granville Street between fall 2025 and early 2026, with some weekend 24/7 work at key intersections; daytime work follows in early 2026 on W59 Avenue and W62 Avenue.
- Granville Street will remain open with lane closures, and traffic management will prioritize safety with signage, message boards, and public advisories.
- Residents, businesses, and key stakeholders will receive updates through letters, a dedicated Community Liaison Officer, media advisories, and the project webpage.
- No further impacts to Granville are expected as of May 2026.

Location: The Granville Street Sewer Upgrades Project is scheduled to begin in mid-September 2025 in the Marpole area. The project will replace the existing combined sewer with a separated system designed to increase capacity, improve stormwater management, and support Vancouver’s long-term infrastructure goals.

Construction will start in mid-September 2025 with exploratory work, followed by sidewalk improvements and sewer trenching. Completion is expected by late spring 2026.

Nighttime sewer construction on Granville Street will take place between fall 2025 and early 2026, with some 24/7 weekend work at key intersections. Daytime work will follow in early 2026 on West 59th Avenue and West 62nd Avenue.

Contact: granvillesewerupgrades@vancouver.ca or 311
Schedule: Sep 17, 2025 - Jul 31, 2026</content>
<id>urn:uuid:c3b41ce5-7ac2-4700-8df8-f4aa0efa8f49</id>
<link href="https://vancouver.ca/streets-transportation/granville-street-sewer-upgrades.aspx"/>
<published>2025-09-12T07:00:00Z</published>
<title>Granville Street Sewer Upgrades (Fraser Angus Group 4A) </title>
<updated>2026-05-26T15:58:32.2200612Z</updated>
<georss:line>49.21589130877473 -123.14028889061171 49.21504574413578 -123.14031769487636</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>The Granville Street Sewer Upgrades Project is scheduled to begin in mid-September 2025 on Granville Street in the Marpole area. The project will replace the existing sewer system with a separated system designed to increase capacity, better manage stormwater, and support Vancouver’s long-term infrastructure goals.

- Construction begins mid-September 2025 with exploratory work, followed by sidewalk improvements and sewer trenching, with completion expected by end of Spring 2026. 
- Nighttime sewer construction will occur on Granville Street between fall 2025 and early 2026, with some weekend 24/7 work at key intersections; daytime work follows in early 2026 on W59 Avenue and W62 Avenue.
- Granville Street will remain open with lane closures, and traffic management will prioritize safety with signage, message boards, and public advisories.
- Residents, businesses, and key stakeholders will receive updates through letters, a dedicated Community Liaison Officer, media advisories, and the project webpage.
- No further impacts to Granville are expected as of May 2026.

Location: The Granville Street Sewer Upgrades Project is scheduled to begin in mid-September 2025 in the Marpole area. The project will replace the existing combined sewer with a separated system designed to increase capacity, improve stormwater management, and support Vancouver’s long-term infrastructure goals.

Construction will start in mid-September 2025 with exploratory work, followed by sidewalk improvements and sewer trenching. Completion is expected by late spring 2026.

Nighttime sewer construction on Granville Street will take place between fall 2025 and early 2026, with some 24/7 weekend work at key intersections. Daytime work will follow in early 2026 on West 59th Avenue and West 62nd Avenue.

Contact: granvillesewerupgrades@vancouver.ca or 311
Schedule: Sep 17, 2025 - Jul 31, 2026</content>
<id>urn:uuid:71b0b749-7cd9-4ec0-a249-dc0f5524f1e5</id>
<link href="https://vancouver.ca/streets-transportation/granville-street-sewer-upgrades.aspx"/>
<published>2025-09-12T07:00:00Z</published>
<title>Granville Street Sewer Upgrades (Fraser Angus Group 4A) </title>
<updated>2026-05-26T15:58:32.2200612Z</updated>
<georss:line>49.216799377668565 -123.1402558269334 49.21589130877473 -123.14028889061171</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>The Granville Street Sewer Upgrades Project is scheduled to begin in mid-September 2025 on Granville Street in the Marpole area. The project will replace the existing sewer system with a separated system designed to increase capacity, better manage stormwater, and support Vancouver’s long-term infrastructure goals.

- Construction begins mid-September 2025 with exploratory work, followed by sidewalk improvements and sewer trenching, with completion expected by end of Spring 2026. 
- Nighttime sewer construction will occur on Granville Street between fall 2025 and early 2026, with some weekend 24/7 work at key intersections; daytime work follows in early 2026 on W59 Avenue and W62 Avenue.
- Granville Street will remain open with lane closures, and traffic management will prioritize safety with signage, message boards, and public advisories.
- Residents, businesses, and key stakeholders will receive updates through letters, a dedicated Community Liaison Officer, media advisories, and the project webpage.
- No further impacts to Granville are expected as of May 2026.

Location: The Granville Street Sewer Upgrades Project is scheduled to begin in mid-September 2025 in the Marpole area. The project will replace the existing combined sewer with a separated system designed to increase capacity, improve stormwater management, and support Vancouver’s long-term infrastructure goals.

Construction will start in mid-September 2025 with exploratory work, followed by sidewalk improvements and sewer trenching. Completion is expected by late spring 2026.

Nighttime sewer construction on Granville Street will take place between fall 2025 and early 2026, with some 24/7 weekend work at key intersections. Daytime work will follow in early 2026 on West 59th Avenue and West 62nd Avenue.

Contact: granvillesewerupgrades@vancouver.ca or 311
Schedule: Sep 17, 2025 - Jul 31, 2026</content>
<id>urn:uuid:3e024e7d-f842-46e9-8b62-03a76db398a1</id>
<link href="https://vancouver.ca/streets-transportation/granville-street-sewer-upgrades.aspx"/>
<published>2025-09-12T07:00:00Z</published>
<title>Granville Street Sewer Upgrades (Fraser Angus Group 4A) </title>
<updated>2026-05-26T15:58:32.2200612Z</updated>
<georss:line>49.21493429465153 -123.14030008704565 49.21507923870777 -123.14032782340233</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>The Granville Street Sewer Upgrades Project is scheduled to begin in mid-September 2025 on Granville Street in the Marpole area. The project will replace the existing sewer system with a separated system designed to increase capacity, better manage stormwater, and support Vancouver’s long-term infrastructure goals.

- Construction begins mid-September 2025 with exploratory work, followed by sidewalk improvements and sewer trenching, with completion expected by end of Spring 2026. 
- Nighttime sewer construction will occur on Granville Street between fall 2025 and early 2026, with some weekend 24/7 work at key intersections; daytime work follows in early 2026 on W59 Avenue and W62 Avenue.
- Granville Street will remain open with lane closures, and traffic management will prioritize safety with signage, message boards, and public advisories.
- Residents, businesses, and key stakeholders will receive updates through letters, a dedicated Community Liaison Officer, media advisories, and the project webpage.
- No further impacts to Granville are expected as of May 2026.

Location: The Granville Street Sewer Upgrades Project is scheduled to begin in mid-September 2025 in the Marpole area. The project will replace the existing combined sewer with a separated system designed to increase capacity, improve stormwater management, and support Vancouver’s long-term infrastructure goals.

Construction will start in mid-September 2025 with exploratory work, followed by sidewalk improvements and sewer trenching. Completion is expected by late spring 2026.

Nighttime sewer construction on Granville Street will take place between fall 2025 and early 2026, with some 24/7 weekend work at key intersections. Daytime work will follow in early 2026 on West 59th Avenue and West 62nd Avenue.

Contact: granvillesewerupgrades@vancouver.ca or 311
Schedule: Sep 17, 2025 - Jul 31, 2026</content>
<id>urn:uuid:10fd1802-d301-4b05-86ac-75d0d8e403a8</id>
<link href="https://vancouver.ca/streets-transportation/granville-street-sewer-upgrades.aspx"/>
<published>2025-09-12T07:00:00Z</published>
<title>Granville Street Sewer Upgrades (Fraser Angus Group 4A) </title>
<updated>2026-05-26T15:58:32.2200612Z</updated>
<georss:line>49.21051312739024 -123.14045679204209 49.20862421917869 -123.14051989586109</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>The Granville Street Sewer Upgrades Project is scheduled to begin in mid-September 2025 on Granville Street in the Marpole area. The project will replace the existing sewer system with a separated system designed to increase capacity, better manage stormwater, and support Vancouver’s long-term infrastructure goals.

- Construction begins mid-September 2025 with exploratory work, followed by sidewalk improvements and sewer trenching, with completion expected by end of Spring 2026. 
- Nighttime sewer construction will occur on Granville Street between fall 2025 and early 2026, with some weekend 24/7 work at key intersections; daytime work follows in early 2026 on W59 Avenue and W62 Avenue.
- Granville Street will remain open with lane closures, and traffic management will prioritize safety with signage, message boards, and public advisories.
- Residents, businesses, and key stakeholders will receive updates through letters, a dedicated Community Liaison Officer, media advisories, and the project webpage.
- No further impacts to Granville are expected as of May 2026.

Location: The Granville Street Sewer Upgrades Project is scheduled to begin in mid-September 2025 in the Marpole area. The project will replace the existing combined sewer with a separated system designed to increase capacity, improve stormwater management, and support Vancouver’s long-term infrastructure goals.

Construction will start in mid-September 2025 with exploratory work, followed by sidewalk improvements and sewer trenching. Completion is expected by late spring 2026.

Nighttime sewer construction on Granville Street will take place between fall 2025 and early 2026, with some 24/7 weekend work at key intersections. Daytime work will follow in early 2026 on West 59th Avenue and West 62nd Avenue.

Contact: granvillesewerupgrades@vancouver.ca or 311
Schedule: Sep 17, 2025 - Jul 31, 2026</content>
<id>urn:uuid:7d205f01-f479-4f1d-9ada-32fefd95d07c</id>
<link href="https://vancouver.ca/streets-transportation/granville-street-sewer-upgrades.aspx"/>
<published>2025-09-12T07:00:00Z</published>
<title>Granville Street Sewer Upgrades (Fraser Angus Group 4A) </title>
<updated>2026-05-26T15:58:32.2200612Z</updated>
<georss:line>49.210884665523395 -123.14044474616985 49.21051312739024 -123.14045679204209</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>The Granville Street Sewer Upgrades Project is scheduled to begin in mid-September 2025 on Granville Street in the Marpole area. The project will replace the existing sewer system with a separated system designed to increase capacity, better manage stormwater, and support Vancouver’s long-term infrastructure goals.

- Construction begins mid-September 2025 with exploratory work, followed by sidewalk improvements and sewer trenching, with completion expected by end of Spring 2026. 
- Nighttime sewer construction will occur on Granville Street between fall 2025 and early 2026, with some weekend 24/7 work at key intersections; daytime work follows in early 2026 on W59 Avenue and W62 Avenue.
- Granville Street will remain open with lane closures, and traffic management will prioritize safety with signage, message boards, and public advisories.
- Residents, businesses, and key stakeholders will receive updates through letters, a dedicated Community Liaison Officer, media advisories, and the project webpage.
- No further impacts to Granville are expected as of May 2026.

Location: The Granville Street Sewer Upgrades Project is scheduled to begin in mid-September 2025 in the Marpole area. The project will replace the existing combined sewer with a separated system designed to increase capacity, improve stormwater management, and support Vancouver’s long-term infrastructure goals.

Construction will start in mid-September 2025 with exploratory work, followed by sidewalk improvements and sewer trenching. Completion is expected by late spring 2026.

Nighttime sewer construction on Granville Street will take place between fall 2025 and early 2026, with some 24/7 weekend work at key intersections. Daytime work will follow in early 2026 on West 59th Avenue and West 62nd Avenue.

Contact: granvillesewerupgrades@vancouver.ca or 311
Schedule: Sep 17, 2025 - Jul 31, 2026</content>
<id>urn:uuid:c6a2521f-61bb-4e1b-b2c9-6f0f0609f463</id>
<link href="https://vancouver.ca/streets-transportation/granville-street-sewer-upgrades.aspx"/>
<published>2025-09-12T07:00:00Z</published>
<title>Granville Street Sewer Upgrades (Fraser Angus Group 4A) </title>
<updated>2026-05-26T15:58:32.2200612Z</updated>
<georss:line>49.21136665285718 -123.14042853694843 49.210884665523395 -123.14044474616985</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>The Granville Street Sewer Upgrades Project is scheduled to begin in mid-September 2025 on Granville Street in the Marpole area. The project will replace the existing sewer system with a separated system designed to increase capacity, better manage stormwater, and support Vancouver’s long-term infrastructure goals.

- Construction begins mid-September 2025 with exploratory work, followed by sidewalk improvements and sewer trenching, with completion expected by end of Spring 2026. 
- Nighttime sewer construction will occur on Granville Street between fall 2025 and early 2026, with some weekend 24/7 work at key intersections; daytime work follows in early 2026 on W59 Avenue and W62 Avenue.
- Granville Street will remain open with lane closures, and traffic management will prioritize safety with signage, message boards, and public advisories.
- Residents, businesses, and key stakeholders will receive updates through letters, a dedicated Community Liaison Officer, media advisories, and the project webpage.
- No further impacts to Granville are expected as of May 2026.

Location: The Granville Street Sewer Upgrades Project is scheduled to begin in mid-September 2025 in the Marpole area. The project will replace the existing combined sewer with a separated system designed to increase capacity, improve stormwater management, and support Vancouver’s long-term infrastructure goals.

Construction will start in mid-September 2025 with exploratory work, followed by sidewalk improvements and sewer trenching. Completion is expected by late spring 2026.

Nighttime sewer construction on Granville Street will take place between fall 2025 and early 2026, with some 24/7 weekend work at key intersections. Daytime work will follow in early 2026 on West 59th Avenue and West 62nd Avenue.

Contact: granvillesewerupgrades@vancouver.ca or 311
Schedule: Sep 17, 2025 - Jul 31, 2026</content>
<id>urn:uuid:dde99826-1880-4492-b915-280072686cf8</id>
<link href="https://vancouver.ca/streets-transportation/granville-street-sewer-upgrades.aspx"/>
<published>2025-09-12T07:00:00Z</published>
<title>Granville Street Sewer Upgrades (Fraser Angus Group 4A) </title>
<updated>2026-05-26T15:58:32.2200612Z</updated>
<georss:line>49.21314369943218 -123.14036896796884 49.212254461969934 -123.14039803010785</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>The Granville Street Sewer Upgrades Project is scheduled to begin in mid-September 2025 on Granville Street in the Marpole area. The project will replace the existing sewer system with a separated system designed to increase capacity, better manage stormwater, and support Vancouver’s long-term infrastructure goals.

- Construction begins mid-September 2025 with exploratory work, followed by sidewalk improvements and sewer trenching, with completion expected by end of Spring 2026. 
- Nighttime sewer construction will occur on Granville Street between fall 2025 and early 2026, with some weekend 24/7 work at key intersections; daytime work follows in early 2026 on W59 Avenue and W62 Avenue.
- Granville Street will remain open with lane closures, and traffic management will prioritize safety with signage, message boards, and public advisories.
- Residents, businesses, and key stakeholders will receive updates through letters, a dedicated Community Liaison Officer, media advisories, and the project webpage.
- No further impacts to Granville are expected as of May 2026.

Location: The Granville Street Sewer Upgrades Project is scheduled to begin in mid-September 2025 in the Marpole area. The project will replace the existing combined sewer with a separated system designed to increase capacity, improve stormwater management, and support Vancouver’s long-term infrastructure goals.

Construction will start in mid-September 2025 with exploratory work, followed by sidewalk improvements and sewer trenching. Completion is expected by late spring 2026.

Nighttime sewer construction on Granville Street will take place between fall 2025 and early 2026, with some 24/7 weekend work at key intersections. Daytime work will follow in early 2026 on West 59th Avenue and West 62nd Avenue.

Contact: granvillesewerupgrades@vancouver.ca or 311
Schedule: Sep 17, 2025 - Jul 31, 2026</content>
<id>urn:uuid:2a61fbb9-d9cf-41a3-8b90-ca885b4167ff</id>
<link href="https://vancouver.ca/streets-transportation/granville-street-sewer-upgrades.aspx"/>
<published>2025-09-12T07:00:00Z</published>
<title>Granville Street Sewer Upgrades (Fraser Angus Group 4A) </title>
<updated>2026-05-26T15:58:32.2200612Z</updated>
<georss:line>49.21314369943218 -123.14036896796884 49.213154326446784 -123.14100855712906</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>The Granville Street Sewer Upgrades Project is scheduled to begin in mid-September 2025 on Granville Street in the Marpole area. The project will replace the existing sewer system with a separated system designed to increase capacity, better manage stormwater, and support Vancouver’s long-term infrastructure goals.

- Construction begins mid-September 2025 with exploratory work, followed by sidewalk improvements and sewer trenching, with completion expected by end of Spring 2026. 
- Nighttime sewer construction will occur on Granville Street between fall 2025 and early 2026, with some weekend 24/7 work at key intersections; daytime work follows in early 2026 on W59 Avenue and W62 Avenue.
- Granville Street will remain open with lane closures, and traffic management will prioritize safety with signage, message boards, and public advisories.
- Residents, businesses, and key stakeholders will receive updates through letters, a dedicated Community Liaison Officer, media advisories, and the project webpage.
- No further impacts to Granville are expected as of May 2026.

Location: The Granville Street Sewer Upgrades Project is scheduled to begin in mid-September 2025 in the Marpole area. The project will replace the existing combined sewer with a separated system designed to increase capacity, improve stormwater management, and support Vancouver’s long-term infrastructure goals.

Construction will start in mid-September 2025 with exploratory work, followed by sidewalk improvements and sewer trenching. Completion is expected by late spring 2026.

Nighttime sewer construction on Granville Street will take place between fall 2025 and early 2026, with some 24/7 weekend work at key intersections. Daytime work will follow in early 2026 on West 59th Avenue and West 62nd Avenue.

Contact: granvillesewerupgrades@vancouver.ca or 311
Schedule: Sep 17, 2025 - Jul 31, 2026</content>
<id>urn:uuid:7dbed069-86ec-424c-bf79-635b268628a5</id>
<link href="https://vancouver.ca/streets-transportation/granville-street-sewer-upgrades.aspx"/>
<published>2025-09-12T07:00:00Z</published>
<title>Granville Street Sewer Upgrades (Fraser Angus Group 4A) </title>
<updated>2026-05-26T15:58:32.2200612Z</updated>
<georss:line>49.212254461969934 -123.14039803010785 49.21136665285718 -123.14042853694843</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>The Granville Street Sewer Upgrades Project is scheduled to begin in mid-September 2025 on Granville Street in the Marpole area. The project will replace the existing sewer system with a separated system designed to increase capacity, better manage stormwater, and support Vancouver’s long-term infrastructure goals.

- Construction begins mid-September 2025 with exploratory work, followed by sidewalk improvements and sewer trenching, with completion expected by end of Spring 2026. 
- Nighttime sewer construction will occur on Granville Street between fall 2025 and early 2026, with some weekend 24/7 work at key intersections; daytime work follows in early 2026 on W59 Avenue and W62 Avenue.
- Granville Street will remain open with lane closures, and traffic management will prioritize safety with signage, message boards, and public advisories.
- Residents, businesses, and key stakeholders will receive updates through letters, a dedicated Community Liaison Officer, media advisories, and the project webpage.
- No further impacts to Granville are expected as of May 2026.

Location: The Granville Street Sewer Upgrades Project is scheduled to begin in mid-September 2025 in the Marpole area. The project will replace the existing combined sewer with a separated system designed to increase capacity, improve stormwater management, and support Vancouver’s long-term infrastructure goals.

Construction will start in mid-September 2025 with exploratory work, followed by sidewalk improvements and sewer trenching. Completion is expected by late spring 2026.

Nighttime sewer construction on Granville Street will take place between fall 2025 and early 2026, with some 24/7 weekend work at key intersections. Daytime work will follow in early 2026 on West 59th Avenue and West 62nd Avenue.

Contact: granvillesewerupgrades@vancouver.ca or 311
Schedule: Sep 17, 2025 - Jul 31, 2026</content>
<id>urn:uuid:aed319ac-d540-42b8-b347-9f5462479925</id>
<link href="https://vancouver.ca/streets-transportation/granville-street-sewer-upgrades.aspx"/>
<published>2025-09-12T07:00:00Z</published>
<title>Granville Street Sewer Upgrades (Fraser Angus Group 4A) </title>
<updated>2026-05-26T15:58:32.2200612Z</updated>
<georss:line>49.21399428896328 -123.14036083448596 49.213232487750076 -123.14038718900731</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>The Street Tree Canopy Expansion Team will be installing 4 trees on Franklin Street West between Victoria Drive and Semlin Drive. The trees will be installed within the gravel boulevard on the south side. Large tree pits will be excavated and backfilled within the parking lane to provide adequate soil volume then backfilled. The gravel parking lane will be reinstated, and the tree pits will be protected with wood surrounds. The contractor will return in the fall to install the trees when rain is expected to return. 
Location: 1900 Block Franklin Street West 
Schedule: Multiple occurrences as follows:
- Aug 25, 2025 - Sep 5, 2025 (Exact dates subject to change)
- Oct 1, 2025 (Tree installation will occur in the fall. Dates TBD.)
</content>
<id>urn:uuid:0fc9aa2f-ab11-43ef-a5ed-fa843227e1b1</id>
<link href="https://review.vancouver.ca/streets-transportation/street-tree-canopy-expansion.aspx"/>
<published>2025-07-15T07:00:00Z</published>
<title>Gravel Boulevard Tree Canopy Enhancement </title>
<updated>2025-07-15T21:51:36.4400575Z</updated>
<georss:line>49.28216043048755 -123.06555274942752 49.282135433239574 -123.06360696160232</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>The Street Tree Canopy Expansion Team will be installing 11 trees on E Georgia between Clark Drive and Maclean Drive. The trees will be installed within the gravel boulevard on the north side. Large tree pits will be excavated and backfilled within the parking lane to provide adequate soil volume then backfilled. The gravel parking lane will be reinstated, and a tree pit will be protected with wood surrounds. The contractor will return in the fall to install the trees rain is expected to return. 
Location: 1300 East Georgia Street, north gravel boulevard between Clark Drive and McLean Drive. The west bound lane will be closed during excavation.
Schedule: Multiple occurrences as follows:
- Jul 21, 2025 - Aug 11, 2025
- Oct 1, 2025 (Tree installation will occur in the fall. Dates TBD.)
</content>
<id>urn:uuid:ff2f34d9-98cd-4431-a66c-3f7d9088afb1</id>
<link href="https://review.vancouver.ca/streets-transportation/street-tree-canopy-expansion.aspx"/>
<published>2025-07-15T07:00:00Z</published>
<title>Gravel Boulevard Tree Canopy Enhancement </title>
<updated>2025-07-15T20:30:14.3269302Z</updated>
<georss:line>49.278546583423406 -123.07419262874508 49.27857682568518 -123.07718263429364</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>The Street Tree Canopy Expansion Team will be installing 5 trees on East Graveley between Clark Drive and Maclean Drive. The trees will be installed within the gravel boulevard on the north side. Large tree pits will be excavated and backfilled within the parking lane to provide adequate soil volume then backfilled. The gravel parking lane will be reinstated, and a tree pit will be protected with wood surrounds. The contractor will return in the fall to install the trees rain is expected to return. 
Location: 1300 Block Graveley Street between Clark Drive and McLean Drive 
Schedule: Multiple occurrences as follows:
- Jul 9, 2025 - Jul 18, 2025
- Oct 1, 2025 (Tree installation will occur in the fall. Dates TBD.)
</content>
<id>urn:uuid:13fad432-4b2e-4f6c-8088-b286a766a197</id>
<link href="https://review.vancouver.ca/streets-transportation/street-tree-canopy-expansion.aspx"/>
<published>2025-07-15T07:00:00Z</published>
<title>Gravel Boulevard Tree Canopy Enhancement </title>
<updated>2025-07-15T21:21:10.2816946Z</updated>
<georss:line>49.2705831180817 -123.07728756542132 49.27057397430394 -123.07544242582775</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>The Street Tree Canopy Expansion Team will be installing 5 trees on 500 Woodland Drive between Francis Streets and East Pender. The trees will be installed within the gravel boulevard on the west side. Large tree pits will be excavated and backfilled within the gravel boulevard to provide adequate soil volume, then backfilled and protected with wood surrounds. The contractor will return in the fall to install the trees rain is expected to return. 
Location: 500 Woodland Drive between Francis Street and East Pender
Schedule: Multiple occurrences as follows:
- Aug 11, 2025 - Aug 22, 2025 (Exact dates subject to change)
- Oct 1, 2025 (Tree installation will occur in the fall. Dates TBD.)
</content>
<id>urn:uuid:ca845861-8a27-4ae5-a9b0-d9bb0d6e84bd</id>
<link href="https://review.vancouver.ca/streets-transportation/street-tree-canopy-expansion.aspx"/>
<published>2025-07-15T07:00:00Z</published>
<title>Gravel Boulevard Tree Canopy Enhancement </title>
<updated>2025-07-15T21:44:37.9640172Z</updated>
<georss:line>49.27941676840996 -123.07270513366731 49.28032221714582 -123.07272216371192</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>The Street Tree Canopy Expansion Team will be installing 8 trees on Lakewood Drive between Vaness Ave and E19th Ave. The trees will be installed within the gravel boulevard on the west side. Large tree pits will be excavated and backfilled within the parking lane to provide adequate soil volume then backfilled. The gravel parking lane will be reinstated, and a tree pit will be protected with wood surrounds. The contractor will return in the fall to install the trees rain is expected to return. 
Location: 3500 Lakewood Drive 
Schedule: Multiple occurrences as follows:
- Sep 2, 2025 - Sep 12, 2025 (Exact dates subject to change)
- Oct 1, 2025 (Tree installation will occur in the fall. Dates TBD.)
</content>
<id>urn:uuid:996bc425-63cf-4960-aed8-0088c10ffde9</id>
<link href="https://review.vancouver.ca/streets-transportation/street-tree-canopy-expansion.aspx"/>
<published>2025-07-15T07:00:00Z</published>
<title>Gravel Boulevard Tree Canopy Enhancement </title>
<updated>2025-08-25T23:27:04.7614619Z</updated>
<georss:line>49.252622020535966 -123.06075843900925 49.25100293633855 -123.06181280294786</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>The Street Tree Canopy Expansion Team will be installing 3 trees on Stainbury Avenue, east of Commercial Street. The trees will be installed within the gravel boulevard on the south side. Large tree pits will be excavated and backfilled within the parking lane to provide adequate soil volume then backfilled. The gravel parking lane will be reinstated, and a tree pit will be protected with wood surrounds. The contractor will return in the fall to install the trees rain is expected to return. 
Location: 1800 Stainsbury Ave 
Schedule: Multiple occurrences as follows:
- Sep 8, 2025 - Sep 12, 2025 (Exact dates subject to change)
- Oct 1, 2025 (Tree installation will occur in the fall. Dates TBD.)
</content>
<id>urn:uuid:935856e4-4467-4082-bdeb-c7ed76c83714</id>
<link href="https://review.vancouver.ca/streets-transportation/street-tree-canopy-expansion.aspx"/>
<published>2025-07-15T07:00:00Z</published>
<title>Gravel Boulevard Tree Canopy Enhancement </title>
<updated>2025-07-15T22:05:53.3187788Z</updated>
<georss:line>49.25233705308136 -123.0680211891454 49.252140026110226 -123.06739952070292</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>The Street Tree Canopy Expansion Team will be installing 4 trees at 2200 Manitoba Street. The trees will be installed within the gravel boulevard on the west side. Large tree pits will be excavated and backfilled within the parking lane to provide adequate soil volume then backfilled. The gravel parking lane will be reinstated, and a tree pits will be protected with wood surrounds. The contractor will return in the fall to install the trees when rain is expected to return. 
Location: 2200 Block Manitoba Street, on the west side between W6th and W7th Ave. South bound lane will be closed during excavation. 
Schedule: Multiple occurrences as follows:
- Jun 30, 2025 - Jul 11, 2025
- Oct 1, 2025 (Tree installation will occur in the fall. Dates TBD.)
</content>
<id>urn:uuid:30b2b3d9-5f0f-4f6e-9ef0-cd18f8960a12</id>
<link href="https://review.vancouver.ca/streets-transportation/street-tree-canopy-expansion.aspx"/>
<published>2025-07-15T07:00:00Z</published>
<title>Gravel Boulevard Tree Canopy Enhancement </title>
<updated>2025-07-15T21:13:15.6867972Z</updated>
<georss:line>49.265568468055534 -123.10675938553145 49.26476425617153 -123.1067858886889</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Rehabilitating existing GRI assets as well as the installation of 3 new assets. The work will take place on Nanaimo Street at the following intersections: E41st, E40th, E39, E38 &amp; E37th Aves. The majority of the work will take place within the parking lanes. Minor parking impacts will be anticipated. *Exact Dates TBD. 
Location: Nanaimo Street, E41st to E37th Avenues. 
Schedule: Jul 20, 2026 - Aug 31, 2026</content>
<id>urn:uuid:1d421062-7b0e-4c38-a4d7-c3d20dceb8dd</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/b522f6b4-468b-4acc-938a-db17f4518a47"/>
<published>2026-04-14T07:00:00Z</published>
<title>Green Infrastructure Bioretention Rehabilitation </title>
<updated>2026-04-14T17:55:42.5490695Z</updated>
<georss:polygon>49.232976531229525 -123.05911112288041 49.23288454733421 -123.05908764509846 49.23290498821464 -123.05848504869473 49.232976531229525 -123.05846157091278 49.232976531229525 -123.05911112288041</georss:polygon>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Rehabilitating existing GRI assets as well as the installation of 3 new assets. The work will take place on Nanaimo Street at the following intersections: E41st, E40th, E39, E38 &amp; E37th Aves. The majority of the work will take place within the parking lanes. Minor parking impacts will be anticipated. *Exact Dates TBD. 
Location: Nanaimo Street, E41st to E37th Avenues. 
Schedule: Jul 20, 2026 - Aug 31, 2026</content>
<id>urn:uuid:bfc8888d-74e4-4b41-9599-f3ae2dd9fd09</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/b522f6b4-468b-4acc-938a-db17f4518a47"/>
<published>2026-04-14T07:00:00Z</published>
<title>Green Infrastructure Bioretention Rehabilitation </title>
<updated>2026-04-14T17:55:42.5490695Z</updated>
<georss:polygon>49.23387332788241 -123.0590764240115 49.233608414492465 -123.05908162532404 49.23361860349527 -123.05889437807294 49.23386993156589 -123.05889437807294 49.23387332788241 -123.0590764240115</georss:polygon>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Rehabilitating existing GRI assets as well as the installation of 3 new assets. The work will take place on Nanaimo Street at the following intersections: E41st, E40th, E39, E38 &amp; E37th Aves. The majority of the work will take place within the parking lanes. Minor parking impacts will be anticipated. *Exact Dates TBD. 
Location: Nanaimo Street, E41st to E37th Avenues. 
Schedule: Jul 20, 2026 - Aug 31, 2026</content>
<id>urn:uuid:e1869de5-866b-4eb5-a38f-8d441d4b5faf</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/b522f6b4-468b-4acc-938a-db17f4518a47"/>
<published>2026-04-14T07:00:00Z</published>
<title>Green Infrastructure Bioretention Rehabilitation </title>
<updated>2026-04-14T17:55:42.5490695Z</updated>
<georss:polygon>49.23487536477302 -123.05906447244313 49.23470257254459 -123.05907344290999 49.23468792910762 -123.05889851880589 49.23489000815442 -123.05887609263868 49.23487536477302 -123.05906447244313</georss:polygon>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Rehabilitating existing GRI assets as well as the installation of 3 new assets. The work will take place on Nanaimo Street at the following intersections: E41st, E40th, E39, E38 &amp; E37th Aves. The majority of the work will take place within the parking lanes. Minor parking impacts will be anticipated. *Exact Dates TBD. 
Location: Nanaimo Street, E41st to E37th Avenues. 
Schedule: Jul 20, 2026 - Aug 31, 2026</content>
<id>urn:uuid:bde00c48-e821-4cfd-8687-46e43704ed72</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/b522f6b4-468b-4acc-938a-db17f4518a47"/>
<published>2026-04-14T07:00:00Z</published>
<title>Green Infrastructure Bioretention Rehabilitation </title>
<updated>2026-04-14T17:55:42.5490695Z</updated>
<georss:polygon>49.236057670280104 -123.05882347337844 49.236048884459535 -123.0589714860819 49.23593174003514 -123.05896251561504 49.23592295419212 -123.05880553244468 49.236057670280104 -123.05882347337844</georss:polygon>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Rehabilitating existing GRI assets as well as the installation of 3 new assets. The work will take place on Nanaimo Street at the following intersections: E41st, E40th, E39, E38 &amp; E37th Aves. The majority of the work will take place within the parking lanes. Minor parking impacts will be anticipated. *Exact Dates TBD. 
Location: Nanaimo Street, E41st to E37th Avenues. 
Schedule: Jul 20, 2026 - Aug 31, 2026</content>
<id>urn:uuid:ae1533e9-fc7b-4ba1-9391-a2abe87c139d</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/b522f6b4-468b-4acc-938a-db17f4518a47"/>
<published>2026-04-14T07:00:00Z</published>
<title>Green Infrastructure Bioretention Rehabilitation </title>
<updated>2026-04-14T17:55:42.5490695Z</updated>
<georss:polygon>49.23688353044125 -123.05888626664657 49.23669610239617 -123.05890420758034 49.23669610239617 -123.05880104721123 49.23689817322733 -123.05878310627749 49.23688353044125 -123.05888626664657</georss:polygon>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>HOLD for Sewer manhole sampling
Various locations

Tuesdays only: May 23, June 2,9,16,23
Location: 
Schedule: May 26, 2026 - Jun 23, 2026; Tu; 6:00 AM - 5:00 PM</content>
<id>urn:uuid:16cdb341-5f5f-4912-af55-d546f1af2b45</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/6206624a-76a7-4137-8782-f7c5e277e6f9"/>
<published>2026-05-15T07:00:00Z</published>
<title>HOLD for Sewer manhole sampling</title>
<updated>2026-05-15T20:57:16.7369462Z</updated>
<georss:line>49.27323782031192 -123.11672283053511 49.2733708125254 -123.11708973283984</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>HOLD for Sewer manhole sampling
Various locations

Tuesdays only: May 23, June 2,9,16,23
Location: 
Schedule: May 26, 2026 - Jun 23, 2026; Tu; 6:00 AM - 5:00 PM</content>
<id>urn:uuid:31648ff5-bb60-41b6-a182-e679209e7034</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/6206624a-76a7-4137-8782-f7c5e277e6f9"/>
<published>2026-05-15T07:00:00Z</published>
<title>HOLD for Sewer manhole sampling</title>
<updated>2026-05-15T20:57:16.7369462Z</updated>
<georss:line>49.27483100785963 -123.12590019341295 49.27446351545407 -123.12645272847001</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>HOLD for Sewer manhole sampling
Various locations

Tuesdays only: May 23, June 2,9,16,23
Location: 
Schedule: May 26, 2026 - Jun 23, 2026; Tu; 6:00 AM - 5:00 PM</content>
<id>urn:uuid:b9243738-e2ed-4a24-a1a2-4fcd89602873</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/6206624a-76a7-4137-8782-f7c5e277e6f9"/>
<published>2026-05-15T07:00:00Z</published>
<title>HOLD for Sewer manhole sampling</title>
<updated>2026-05-15T20:57:16.7369462Z</updated>
<georss:line>49.26593179284191 -123.12412824315429 49.26514766429975 -123.12416042966247</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>HOLD for Sewer manhole sampling
Various locations

Tuesdays only: May 23, June 2,9,16,23
Location: 
Schedule: May 26, 2026 - Jun 23, 2026; Tu; 6:00 AM - 5:00 PM</content>
<id>urn:uuid:313156e0-a28d-4780-b575-82c8829f8597</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/6206624a-76a7-4137-8782-f7c5e277e6f9"/>
<published>2026-05-15T07:00:00Z</published>
<title>HOLD for Sewer manhole sampling</title>
<updated>2026-05-15T20:57:16.7369462Z</updated>
<georss:line>49.27323691946219 -123.0364227413337 49.27277491363688 -123.03641737691567</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Joint repairs to overpass

[Traffic Impact Updates]:
May 19, 2025 to June 6, 2025: Eastbound curb lane closed.
Location: Lane closures impacting East Hastings from Glen Dr to Campbell Ave
Schedule: May 19, 2025 - Jun 6, 2025</content>
<id>urn:uuid:d223af84-910d-441d-b884-5c0d48debbc4</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/8508ef24-ba76-4ed2-a803-37ddca32ed81"/>
<published>2024-07-30T07:00:00Z</published>
<title>Hastings St Overpass Joint Replacement</title>
<updated>2025-06-02T21:40:40.7337042Z</updated>
<georss:line>49.28102022291779 -123.08242236196232 49.28101153355033 -123.0819925119647</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Joint repairs to overpass

[Traffic Impact Updates]:
May 19, 2025 to June 6, 2025: Eastbound curb lane closed.
Location: Lane closures impacting East Hastings from Glen Dr to Campbell Ave
Schedule: May 19, 2025 - Jun 6, 2025</content>
<id>urn:uuid:10bbaefc-ed53-45fc-a9b6-c71976934725</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/8508ef24-ba76-4ed2-a803-37ddca32ed81"/>
<published>2024-07-30T07:00:00Z</published>
<title>Hastings St Overpass Joint Replacement</title>
<updated>2025-06-02T21:40:40.7337042Z</updated>
<georss:line>49.28101153355033 -123.0819925119647 49.28099715746552 -123.08128205390987</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Joint repairs to overpass

[Traffic Impact Updates]:
May 19, 2025 to June 6, 2025: Eastbound curb lane closed.
Location: Lane closures impacting East Hastings from Glen Dr to Campbell Ave
Schedule: May 19, 2025 - Jun 6, 2025</content>
<id>urn:uuid:89523f85-1a7e-4706-ad6e-828cdca5dd12</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/8508ef24-ba76-4ed2-a803-37ddca32ed81"/>
<published>2024-07-30T07:00:00Z</published>
<title>Hastings St Overpass Joint Replacement</title>
<updated>2025-06-02T21:40:40.7337042Z</updated>
<georss:line>49.28105906352678 -123.08478532811243 49.28102022291779 -123.08242236196232</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Hastings Sunrise West Sewer Package 

- Project has been reinstated back into this Capital Plan starting 2026.  

Area is south of Venables and north of 5th east of Nanaimo and mostly west of Renfrew. Contact Bob Devlin. 

Sewer Scope on E. 1st to be integrated with Sewers scope from the Cassiar South Pkg 2. Includes Water scope interest and potential Streets interest.

 Constrained start time by the Broadway Subway project. 

The E. 1st Ave designs for HSW won’t be ready for IFC until 2025 or 2026, which will push construction into the 2027-2030 capital plan as a result.
Location: Various Locations
Schedule: Jan 3, 2028 - Jun 29, 2029; Weekdays; 7:00 AM - 4:00 PM</content>
<id>urn:uuid:372a3a7c-86a9-4177-86c6-db8add87c949</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/7af3f268-0498-4564-a5eb-757727e19fe2"/>
<published>2023-09-19T07:00:00Z</published>
<title>Hastings Sunrise West Sewer Renewal - Phase 3</title>
<updated>2026-01-10T02:00:36.0939044Z</updated>
<georss:line>49.26712909789009 -123.05469322177782 49.26712859262719 -123.05212790786648</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Hastings Sunrise West Sewer Package 

- Project has been reinstated back into this Capital Plan starting 2026.  

Area is south of Venables and north of 5th east of Nanaimo and mostly west of Renfrew. Contact Bob Devlin. 

Sewer Scope on E. 1st to be integrated with Sewers scope from the Cassiar South Pkg 2. Includes Water scope interest and potential Streets interest.

 Constrained start time by the Broadway Subway project. 

The E. 1st Ave designs for HSW won’t be ready for IFC until 2025 or 2026, which will push construction into the 2027-2030 capital plan as a result.
Location: Various Locations
Schedule: Jan 3, 2028 - Jun 29, 2029; Weekdays; 7:00 AM - 4:00 PM</content>
<id>urn:uuid:603c93ec-e101-47ca-af3e-c71d864105e0</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/7af3f268-0498-4564-a5eb-757727e19fe2"/>
<published>2023-09-19T07:00:00Z</published>
<title>Hastings Sunrise West Sewer Renewal - Phase 3</title>
<updated>2026-01-10T02:00:36.0939044Z</updated>
<georss:line>49.2671296551587 -123.05584126846465 49.26712909789009 -123.05469322177782</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Hastings Sunrise West Sewer Package 

- Project has been reinstated back into this Capital Plan starting 2026.  

Area is south of Venables and north of 5th east of Nanaimo and mostly west of Renfrew. Contact Bob Devlin. 

Sewer Scope on E. 1st to be integrated with Sewers scope from the Cassiar South Pkg 2. Includes Water scope interest and potential Streets interest.

 Constrained start time by the Broadway Subway project. 

The E. 1st Ave designs for HSW won’t be ready for IFC until 2025 or 2026, which will push construction into the 2027-2030 capital plan as a result.
Location: Various Locations
Schedule: Jan 3, 2028 - Jun 29, 2029; Weekdays; 7:00 AM - 4:00 PM</content>
<id>urn:uuid:5700e270-d41b-4b7a-b062-0b64e30d0b41</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/7af3f268-0498-4564-a5eb-757727e19fe2"/>
<published>2023-09-19T07:00:00Z</published>
<title>Hastings Sunrise West Sewer Renewal - Phase 3</title>
<updated>2026-01-10T02:00:36.0939044Z</updated>
<georss:line>49.26803365552581 -123.05469213227701 49.268032113006285 -123.05211303827289</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Hastings Sunrise West Sewer Package 

- Project has been reinstated back into this Capital Plan starting 2026.  

Area is south of Venables and north of 5th east of Nanaimo and mostly west of Renfrew. Contact Bob Devlin. 

Sewer Scope on E. 1st to be integrated with Sewers scope from the Cassiar South Pkg 2. Includes Water scope interest and potential Streets interest.

 Constrained start time by the Broadway Subway project. 

The E. 1st Ave designs for HSW won’t be ready for IFC until 2025 or 2026, which will push construction into the 2027-2030 capital plan as a result.
Location: Various Locations
Schedule: Jan 3, 2028 - Jun 29, 2029; Weekdays; 7:00 AM - 4:00 PM</content>
<id>urn:uuid:abcc37a3-71a3-4339-87df-33bc8b858901</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/7af3f268-0498-4564-a5eb-757727e19fe2"/>
<published>2023-09-19T07:00:00Z</published>
<title>Hastings Sunrise West Sewer Renewal - Phase 3</title>
<updated>2026-01-10T02:00:36.0939044Z</updated>
<georss:line>49.26803412315786 -123.05583955379566 49.26803365552581 -123.05469213227701</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Hastings Sunrise West Sewer Package 

- Project has been reinstated back into this Capital Plan starting 2026.  

Area is south of Venables and north of 5th east of Nanaimo and mostly west of Renfrew. Contact Bob Devlin. 

Sewer Scope on E. 1st to be integrated with Sewers scope from the Cassiar South Pkg 2. Includes Water scope interest and potential Streets interest.

 Constrained start time by the Broadway Subway project. 

The E. 1st Ave designs for HSW won’t be ready for IFC until 2025 or 2026, which will push construction into the 2027-2030 capital plan as a result.
Location: Various Locations
Schedule: Jan 3, 2028 - Jun 29, 2029; Weekdays; 7:00 AM - 4:00 PM</content>
<id>urn:uuid:8e66460b-9258-4624-a5cb-d1bd49114971</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/7af3f268-0498-4564-a5eb-757727e19fe2"/>
<published>2023-09-19T07:00:00Z</published>
<title>Hastings Sunrise West Sewer Renewal - Phase 3</title>
<updated>2026-01-10T02:00:36.0939044Z</updated>
<georss:line>49.26848609620697 -123.05583877175133 49.26803412315786 -123.05583955379566</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Hastings Sunrise West Sewer Package 

- Project has been reinstated back into this Capital Plan starting 2026.  

Area is south of Venables and north of 5th east of Nanaimo and mostly west of Renfrew. Contact Bob Devlin. 

Sewer Scope on E. 1st to be integrated with Sewers scope from the Cassiar South Pkg 2. Includes Water scope interest and potential Streets interest.

 Constrained start time by the Broadway Subway project. 

The E. 1st Ave designs for HSW won’t be ready for IFC until 2025 or 2026, which will push construction into the 2027-2030 capital plan as a result.
Location: Various Locations
Schedule: Jan 3, 2028 - Jun 29, 2029; Weekdays; 7:00 AM - 4:00 PM</content>
<id>urn:uuid:dd07148c-2544-4625-95e9-9593520edd41</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/7af3f268-0498-4564-a5eb-757727e19fe2"/>
<published>2023-09-19T07:00:00Z</published>
<title>Hastings Sunrise West Sewer Renewal - Phase 3</title>
<updated>2026-01-10T02:00:36.0939044Z</updated>
<georss:line>49.26622451539464 -123.05214057708791 49.26622060537056 -123.04951671029731</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Hastings Sunrise West Sewer Package 

- Project has been reinstated back into this Capital Plan starting 2026.  

Area is south of Venables and north of 5th east of Nanaimo and mostly west of Renfrew. Contact Bob Devlin. 

Sewer Scope on E. 1st to be integrated with Sewers scope from the Cassiar South Pkg 2. Includes Water scope interest and potential Streets interest.

 Constrained start time by the Broadway Subway project. 

The E. 1st Ave designs for HSW won’t be ready for IFC until 2025 or 2026, which will push construction into the 2027-2030 capital plan as a result.
Location: Various Locations
Schedule: Jan 3, 2028 - Jun 29, 2029; Weekdays; 7:00 AM - 4:00 PM</content>
<id>urn:uuid:fee65a4f-4724-4cad-8787-558e46fb280c</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/7af3f268-0498-4564-a5eb-757727e19fe2"/>
<published>2023-09-19T07:00:00Z</published>
<title>Hastings Sunrise West Sewer Renewal - Phase 3</title>
<updated>2026-01-10T02:00:36.0939044Z</updated>
<georss:line>49.26667645492972 -123.05213457919308 49.26667302207048 -123.04950941058671</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Hastings Sunrise West Sewer Package 

- Project has been reinstated back into this Capital Plan starting 2026.  

Area is south of Venables and north of 5th east of Nanaimo and mostly west of Renfrew. Contact Bob Devlin. 

Sewer Scope on E. 1st to be integrated with Sewers scope from the Cassiar South Pkg 2. Includes Water scope interest and potential Streets interest.

 Constrained start time by the Broadway Subway project. 

The E. 1st Ave designs for HSW won’t be ready for IFC until 2025 or 2026, which will push construction into the 2027-2030 capital plan as a result.
Location: Various Locations
Schedule: Jan 3, 2028 - Jun 29, 2029; Weekdays; 7:00 AM - 4:00 PM</content>
<id>urn:uuid:07f886ac-35db-4071-8a2c-cdd767a2d0d9</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/7af3f268-0498-4564-a5eb-757727e19fe2"/>
<published>2023-09-19T07:00:00Z</published>
<title>Hastings Sunrise West Sewer Renewal - Phase 3</title>
<updated>2026-01-10T02:00:36.0939044Z</updated>
<georss:line>49.26712859262719 -123.05212790786648 49.267125088039535 -123.04950183548291</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Hastings Sunrise West Sewer Package 

- Project has been reinstated back into this Capital Plan starting 2026.  

Area is south of Venables and north of 5th east of Nanaimo and mostly west of Renfrew. Contact Bob Devlin. 

Sewer Scope on E. 1st to be integrated with Sewers scope from the Cassiar South Pkg 2. Includes Water scope interest and potential Streets interest.

 Constrained start time by the Broadway Subway project. 

The E. 1st Ave designs for HSW won’t be ready for IFC until 2025 or 2026, which will push construction into the 2027-2030 capital plan as a result.
Location: Various Locations
Schedule: Jan 3, 2028 - Jun 29, 2029; Weekdays; 7:00 AM - 4:00 PM</content>
<id>urn:uuid:e0bfdde2-2977-4631-b4e0-a34a1d38d7b4</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/7af3f268-0498-4564-a5eb-757727e19fe2"/>
<published>2023-09-19T07:00:00Z</published>
<title>Hastings Sunrise West Sewer Renewal - Phase 3</title>
<updated>2026-01-10T02:00:36.0939044Z</updated>
<georss:line>49.267580542046886 -123.05211977917622 49.267577541072086 -123.04949354585348</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Hastings Sunrise West Sewer Package 

- Project has been reinstated back into this Capital Plan starting 2026.  

Area is south of Venables and north of 5th east of Nanaimo and mostly west of Renfrew. Contact Bob Devlin. 

Sewer Scope on E. 1st to be integrated with Sewers scope from the Cassiar South Pkg 2. Includes Water scope interest and potential Streets interest.

 Constrained start time by the Broadway Subway project. 

The E. 1st Ave designs for HSW won’t be ready for IFC until 2025 or 2026, which will push construction into the 2027-2030 capital plan as a result.
Location: Various Locations
Schedule: Jan 3, 2028 - Jun 29, 2029; Weekdays; 7:00 AM - 4:00 PM</content>
<id>urn:uuid:06f2d476-c350-498b-b535-632fd73da839</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/7af3f268-0498-4564-a5eb-757727e19fe2"/>
<published>2023-09-19T07:00:00Z</published>
<title>Hastings Sunrise West Sewer Renewal - Phase 3</title>
<updated>2026-01-10T02:00:36.0939044Z</updated>
<georss:line>49.26848399883596 -123.05210613262963 49.26848149179594 -123.04948103400184</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Hastings Sunrise West Sewer Package 

- Project has been reinstated back into this Capital Plan starting 2026.  

Area is south of Venables and north of 5th east of Nanaimo and mostly west of Renfrew. Contact Bob Devlin. 

Sewer Scope on E. 1st to be integrated with Sewers scope from the Cassiar South Pkg 2. Includes Water scope interest and potential Streets interest.

 Constrained start time by the Broadway Subway project. 

The E. 1st Ave designs for HSW won’t be ready for IFC until 2025 or 2026, which will push construction into the 2027-2030 capital plan as a result.
Location: Various Locations
Schedule: Jan 3, 2028 - Jun 29, 2029; Weekdays; 7:00 AM - 4:00 PM</content>
<id>urn:uuid:136453cb-1a54-496c-947c-6ebaa20cf3fa</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/7af3f268-0498-4564-a5eb-757727e19fe2"/>
<published>2023-09-19T07:00:00Z</published>
<title>Hastings Sunrise West Sewer Renewal - Phase 3</title>
<updated>2026-01-10T02:00:36.0939044Z</updated>
<georss:line>49.267580542046886 -123.05211977917622 49.26712859262719 -123.05212790786648</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Hastings Sunrise West Sewer Package 

- Project has been reinstated back into this Capital Plan starting 2026.  

Area is south of Venables and north of 5th east of Nanaimo and mostly west of Renfrew. Contact Bob Devlin. 

Sewer Scope on E. 1st to be integrated with Sewers scope from the Cassiar South Pkg 2. Includes Water scope interest and potential Streets interest.

 Constrained start time by the Broadway Subway project. 

The E. 1st Ave designs for HSW won’t be ready for IFC until 2025 or 2026, which will push construction into the 2027-2030 capital plan as a result.
Location: Various Locations
Schedule: Jan 3, 2028 - Jun 29, 2029; Weekdays; 7:00 AM - 4:00 PM</content>
<id>urn:uuid:72efb70b-a8b6-467d-9f75-aaeae7bf6b46</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/7af3f268-0498-4564-a5eb-757727e19fe2"/>
<published>2023-09-19T07:00:00Z</published>
<title>Hastings Sunrise West Sewer Renewal - Phase 3</title>
<updated>2026-01-10T02:00:36.0939044Z</updated>
<georss:line>49.26758321021052 -123.05268929900363 49.26757765362572 -123.0521357926201</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Hastings Sunrise West Sewer Package 

- Project has been reinstated back into this Capital Plan starting 2026.  

Area is south of Venables and north of 5th east of Nanaimo and mostly west of Renfrew. Contact Bob Devlin. 

Sewer Scope on E. 1st to be integrated with Sewers scope from the Cassiar South Pkg 2. Includes Water scope interest and potential Streets interest.

 Constrained start time by the Broadway Subway project. 

The E. 1st Ave designs for HSW won’t be ready for IFC until 2025 or 2026, which will push construction into the 2027-2030 capital plan as a result.
Location: Various Locations
Schedule: Jan 3, 2028 - Jun 29, 2029; Weekdays; 7:00 AM - 4:00 PM</content>
<id>urn:uuid:7d76e715-a159-4db2-928b-e5f9bb3a4233</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/7af3f268-0498-4564-a5eb-757727e19fe2"/>
<published>2023-09-19T07:00:00Z</published>
<title>Hastings Sunrise West Sewer Renewal - Phase 3</title>
<updated>2026-01-10T02:00:36.0939044Z</updated>
<georss:line>49.26622060537056 -123.04951671029731 49.266223504473146 -123.04699031863635</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Hastings Sunrise West Sewer Package 

- Project has been reinstated back into this Capital Plan starting 2026.  

Area is south of Venables and north of 5th east of Nanaimo and mostly west of Renfrew. Contact Bob Devlin. 

Sewer Scope on E. 1st to be integrated with Sewers scope from the Cassiar South Pkg 2. Includes Water scope interest and potential Streets interest.

 Constrained start time by the Broadway Subway project. 

The E. 1st Ave designs for HSW won’t be ready for IFC until 2025 or 2026, which will push construction into the 2027-2030 capital plan as a result.
Location: Various Locations
Schedule: Jan 3, 2028 - Jun 29, 2029; Weekdays; 7:00 AM - 4:00 PM</content>
<id>urn:uuid:e3f02904-e504-43cb-aadb-e643f9ba1b41</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/7af3f268-0498-4564-a5eb-757727e19fe2"/>
<published>2023-09-19T07:00:00Z</published>
<title>Hastings Sunrise West Sewer Renewal - Phase 3</title>
<updated>2026-01-10T02:00:36.0939044Z</updated>
<georss:line>49.26667302207048 -123.04950941058671 49.26668255867537 -123.04698496773135</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Hastings Sunrise West Sewer Package 

- Project has been reinstated back into this Capital Plan starting 2026.  

Area is south of Venables and north of 5th east of Nanaimo and mostly west of Renfrew. Contact Bob Devlin. 

Sewer Scope on E. 1st to be integrated with Sewers scope from the Cassiar South Pkg 2. Includes Water scope interest and potential Streets interest.

 Constrained start time by the Broadway Subway project. 

The E. 1st Ave designs for HSW won’t be ready for IFC until 2025 or 2026, which will push construction into the 2027-2030 capital plan as a result.
Location: Various Locations
Schedule: Jan 3, 2028 - Jun 29, 2029; Weekdays; 7:00 AM - 4:00 PM</content>
<id>urn:uuid:83269a05-1212-46fe-a4ab-bec65edd40a9</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/7af3f268-0498-4564-a5eb-757727e19fe2"/>
<published>2023-09-19T07:00:00Z</published>
<title>Hastings Sunrise West Sewer Renewal - Phase 3</title>
<updated>2026-01-10T02:00:36.0939044Z</updated>
<georss:line>49.267125088039535 -123.04950183548291 49.26714474765325 -123.04936375308989 49.26714101973349 -123.04697820037018</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Hastings Sunrise West Sewer Package 

- Project has been reinstated back into this Capital Plan starting 2026.  

Area is south of Venables and north of 5th east of Nanaimo and mostly west of Renfrew. Contact Bob Devlin. 

Sewer Scope on E. 1st to be integrated with Sewers scope from the Cassiar South Pkg 2. Includes Water scope interest and potential Streets interest.

 Constrained start time by the Broadway Subway project. 

The E. 1st Ave designs for HSW won’t be ready for IFC until 2025 or 2026, which will push construction into the 2027-2030 capital plan as a result.
Location: Various Locations
Schedule: Jan 3, 2028 - Jun 29, 2029; Weekdays; 7:00 AM - 4:00 PM</content>
<id>urn:uuid:9f4a9f75-a20d-4807-8d07-29741cd6ff23</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/7af3f268-0498-4564-a5eb-757727e19fe2"/>
<published>2023-09-19T07:00:00Z</published>
<title>Hastings Sunrise West Sewer Renewal - Phase 3</title>
<updated>2026-01-10T02:00:36.0939044Z</updated>
<georss:line>49.267577541072086 -123.04949354585348 49.26760200615564 -123.04899134263242 49.26759880640569 -123.04697071746854</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Hastings Sunrise West Sewer Package 

- Project has been reinstated back into this Capital Plan starting 2026.  

Area is south of Venables and north of 5th east of Nanaimo and mostly west of Renfrew. Contact Bob Devlin. 

Sewer Scope on E. 1st to be integrated with Sewers scope from the Cassiar South Pkg 2. Includes Water scope interest and potential Streets interest.

 Constrained start time by the Broadway Subway project. 

The E. 1st Ave designs for HSW won’t be ready for IFC until 2025 or 2026, which will push construction into the 2027-2030 capital plan as a result.
Location: Various Locations
Schedule: Jan 3, 2028 - Jun 29, 2029; Weekdays; 7:00 AM - 4:00 PM</content>
<id>urn:uuid:1c745b29-3ab4-44f0-870d-3b4cf0f7eeac</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/7af3f268-0498-4564-a5eb-757727e19fe2"/>
<published>2023-09-19T07:00:00Z</published>
<title>Hastings Sunrise West Sewer Renewal - Phase 3</title>
<updated>2026-01-10T02:00:36.0939044Z</updated>
<georss:line>49.26851793195138 -123.04947959962362 49.268514513712574 -123.04695785452137</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Hastings Sunrise West Sewer Package 

- Project has been reinstated back into this Capital Plan starting 2026.  

Area is south of Venables and north of 5th east of Nanaimo and mostly west of Renfrew. Contact Bob Devlin. 

Sewer Scope on E. 1st to be integrated with Sewers scope from the Cassiar South Pkg 2. Includes Water scope interest and potential Streets interest.

 Constrained start time by the Broadway Subway project. 

The E. 1st Ave designs for HSW won’t be ready for IFC until 2025 or 2026, which will push construction into the 2027-2030 capital plan as a result.
Location: Various Locations
Schedule: Jan 3, 2028 - Jun 29, 2029; Weekdays; 7:00 AM - 4:00 PM</content>
<id>urn:uuid:b2832ce9-b140-43c6-ba4d-9f83a8617588</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/7af3f268-0498-4564-a5eb-757727e19fe2"/>
<published>2023-09-19T07:00:00Z</published>
<title>Hastings Sunrise West Sewer Renewal - Phase 3</title>
<updated>2026-01-10T02:00:36.0939044Z</updated>
<georss:line>49.267588824074465 -123.04499848511065 49.26758576839839 -123.04424617884933</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Hastings Sunrise West Sewer Package 

- Project has been reinstated back into this Capital Plan starting 2026.  

Area is south of Venables and north of 5th east of Nanaimo and mostly west of Renfrew. Contact Bob Devlin. 

Sewer Scope on E. 1st to be integrated with Sewers scope from the Cassiar South Pkg 2. Includes Water scope interest and potential Streets interest.

 Constrained start time by the Broadway Subway project. 

The E. 1st Ave designs for HSW won’t be ready for IFC until 2025 or 2026, which will push construction into the 2027-2030 capital plan as a result.
Location: Various Locations
Schedule: Jan 3, 2028 - Jun 29, 2029; Weekdays; 7:00 AM - 4:00 PM</content>
<id>urn:uuid:e6d18590-30e2-4c09-9957-1ce89ec55e12</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/7af3f268-0498-4564-a5eb-757727e19fe2"/>
<published>2023-09-19T07:00:00Z</published>
<title>Hastings Sunrise West Sewer Renewal - Phase 3</title>
<updated>2026-01-10T02:00:36.0939044Z</updated>
<georss:line>49.26804634076973 -123.04499088736142 49.267588824074465 -123.04499848511065</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Hastings Sunrise West Sewer Package 

- Project has been reinstated back into this Capital Plan starting 2026.  

Area is south of Venables and north of 5th east of Nanaimo and mostly west of Renfrew. Contact Bob Devlin. 

Sewer Scope on E. 1st to be integrated with Sewers scope from the Cassiar South Pkg 2. Includes Water scope interest and potential Streets interest.

 Constrained start time by the Broadway Subway project. 

The E. 1st Ave designs for HSW won’t be ready for IFC until 2025 or 2026, which will push construction into the 2027-2030 capital plan as a result.
Location: Various Locations
Schedule: Jan 3, 2028 - Jun 29, 2029; Weekdays; 7:00 AM - 4:00 PM</content>
<id>urn:uuid:8208858f-d7ef-472c-aaa9-e7d02a84c00e</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/7af3f268-0498-4564-a5eb-757727e19fe2"/>
<published>2023-09-19T07:00:00Z</published>
<title>Hastings Sunrise West Sewer Renewal - Phase 3</title>
<updated>2026-01-10T02:00:36.0939044Z</updated>
<georss:line>49.2685044418802 -123.04498389482899 49.26804634076973 -123.04499088736142</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Hastings Sunrise West Sewer Package 

- Project has been reinstated back into this Capital Plan starting 2026.  

Area is south of Venables and north of 5th east of Nanaimo and mostly west of Renfrew. Contact Bob Devlin. 

Sewer Scope on E. 1st to be integrated with Sewers scope from the Cassiar South Pkg 2. Includes Water scope interest and potential Streets interest.

 Constrained start time by the Broadway Subway project. 

The E. 1st Ave designs for HSW won’t be ready for IFC until 2025 or 2026, which will push construction into the 2027-2030 capital plan as a result.
Location: Various Locations
Schedule: Jan 3, 2028 - Jun 29, 2029; Weekdays; 7:00 AM - 4:00 PM</content>
<id>urn:uuid:3419aa6c-d4de-4392-9bd8-27907a3fe406</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/7af3f268-0498-4564-a5eb-757727e19fe2"/>
<published>2023-09-19T07:00:00Z</published>
<title>Hastings Sunrise West Sewer Renewal - Phase 3</title>
<updated>2026-01-10T02:00:36.0939044Z</updated>
<georss:line>49.2685044418802 -123.04498389482899 49.268500900799324 -123.04423046078874</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Hastings Sunrise West Sewer Package 

- Project has been reinstated back into this Capital Plan starting 2026.  

Area is south of Venables and north of 5th east of Nanaimo and mostly west of Renfrew. Contact Bob Devlin. 

Sewer Scope on E. 1st to be integrated with Sewers scope from the Cassiar South Pkg 2. Includes Water scope interest and potential Streets interest.

 Constrained start time by the Broadway Subway project. 

The E. 1st Ave designs for HSW won’t be ready for IFC until 2025 or 2026, which will push construction into the 2027-2030 capital plan as a result.
Location: Various Locations
Schedule: Jan 3, 2028 - Jun 29, 2029; Weekdays; 7:00 AM - 4:00 PM</content>
<id>urn:uuid:b4bae17d-86fe-4fbc-b925-eaaa2d3d4f94</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/7af3f268-0498-4564-a5eb-757727e19fe2"/>
<published>2023-09-19T07:00:00Z</published>
<title>Hastings Sunrise West Sewer Renewal - Phase 3</title>
<updated>2026-01-10T02:00:36.0939044Z</updated>
<georss:line>49.26758576839839 -123.04424617884933 49.2666703221868 -123.04425884456488</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Hastings Sunrise West Sewer Package 

- Project has been reinstated back into this Capital Plan starting 2026.  

Area is south of Venables and north of 5th east of Nanaimo and mostly west of Renfrew. Contact Bob Devlin. 

Sewer Scope on E. 1st to be integrated with Sewers scope from the Cassiar South Pkg 2. Includes Water scope interest and potential Streets interest.

 Constrained start time by the Broadway Subway project. 

The E. 1st Ave designs for HSW won’t be ready for IFC until 2025 or 2026, which will push construction into the 2027-2030 capital plan as a result.
Location: Various Locations
Schedule: Jan 3, 2028 - Jun 29, 2029; Weekdays; 7:00 AM - 4:00 PM</content>
<id>urn:uuid:a074bbc8-b422-4f7c-8811-a8c538e67527</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/7af3f268-0498-4564-a5eb-757727e19fe2"/>
<published>2023-09-19T07:00:00Z</published>
<title>Hastings Sunrise West Sewer Renewal - Phase 3</title>
<updated>2026-01-10T02:00:36.0939044Z</updated>
<georss:line>49.2666703221868 -123.04425884456488 49.26666843253582 -123.04350264962707</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Hastings Sunrise West Sewer Package 

- Project has been reinstated back into this Capital Plan starting 2026.  

Area is south of Venables and north of 5th east of Nanaimo and mostly west of Renfrew. Contact Bob Devlin. 

Sewer Scope on E. 1st to be integrated with Sewers scope from the Cassiar South Pkg 2. Includes Water scope interest and potential Streets interest.

 Constrained start time by the Broadway Subway project. 

The E. 1st Ave designs for HSW won’t be ready for IFC until 2025 or 2026, which will push construction into the 2027-2030 capital plan as a result.
Location: Various Locations
Schedule: Jan 3, 2028 - Jun 29, 2029; Weekdays; 7:00 AM - 4:00 PM</content>
<id>urn:uuid:2b06cd09-f48e-47fb-8cc0-bc3dc4597080</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/7af3f268-0498-4564-a5eb-757727e19fe2"/>
<published>2023-09-19T07:00:00Z</published>
<title>Hastings Sunrise West Sewer Renewal - Phase 3</title>
<updated>2026-01-10T02:00:36.0939044Z</updated>
<georss:line>49.2666671258919 -123.04350020446425 49.2666671258919 -123.04243908178243</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Hastings Sunrise West Sewer Package 

- Project has been reinstated back into this Capital Plan starting 2026.  

Area is south of Venables and north of 5th east of Nanaimo and mostly west of Renfrew. Contact Bob Devlin. 

Sewer Scope on E. 1st to be integrated with Sewers scope from the Cassiar South Pkg 2. Includes Water scope interest and potential Streets interest.

 Constrained start time by the Broadway Subway project. 

The E. 1st Ave designs for HSW won’t be ready for IFC until 2025 or 2026, which will push construction into the 2027-2030 capital plan as a result.
Location: Various Locations
Schedule: Jan 3, 2028 - Jun 29, 2029; Weekdays; 7:00 AM - 4:00 PM</content>
<id>urn:uuid:0b8d9b30-bc2f-4a7e-8903-24a1ec959517</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/7af3f268-0498-4564-a5eb-757727e19fe2"/>
<published>2023-09-19T07:00:00Z</published>
<title>Hastings Sunrise West Sewer Renewal - Phase 3</title>
<updated>2026-01-10T02:00:36.0939044Z</updated>
<georss:line>49.26668255867537 -123.04698496773135 49.26666595517665 -123.04542885494865</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Hastings Sunrise West Sewer Package 

- Project has been reinstated back into this Capital Plan starting 2026.  

Area is south of Venables and north of 5th east of Nanaimo and mostly west of Renfrew. Contact Bob Devlin. 

Sewer Scope on E. 1st to be integrated with Sewers scope from the Cassiar South Pkg 2. Includes Water scope interest and potential Streets interest.

 Constrained start time by the Broadway Subway project. 

The E. 1st Ave designs for HSW won’t be ready for IFC until 2025 or 2026, which will push construction into the 2027-2030 capital plan as a result.
Location: Various Locations
Schedule: Jan 3, 2028 - Jun 29, 2029; Weekdays; 7:00 AM - 4:00 PM</content>
<id>urn:uuid:a043115e-317b-45a7-813a-28944636edf1</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/7af3f268-0498-4564-a5eb-757727e19fe2"/>
<published>2023-09-19T07:00:00Z</published>
<title>Hastings Sunrise West Sewer Renewal - Phase 3</title>
<updated>2026-01-10T02:00:36.0939044Z</updated>
<georss:line>49.26714101973349 -123.04697820037018 49.26713134436713 -123.04500340236434</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Hastings Sunrise West Sewer Package 

- Project has been reinstated back into this Capital Plan starting 2026.  

Area is south of Venables and north of 5th east of Nanaimo and mostly west of Renfrew. Contact Bob Devlin. 

Sewer Scope on E. 1st to be integrated with Sewers scope from the Cassiar South Pkg 2. Includes Water scope interest and potential Streets interest.

 Constrained start time by the Broadway Subway project. 

The E. 1st Ave designs for HSW won’t be ready for IFC until 2025 or 2026, which will push construction into the 2027-2030 capital plan as a result.
Location: Various Locations
Schedule: Jan 3, 2028 - Jun 29, 2029; Weekdays; 7:00 AM - 4:00 PM</content>
<id>urn:uuid:71ee29a4-b822-421a-ae0f-e3216d50a0da</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/7af3f268-0498-4564-a5eb-757727e19fe2"/>
<published>2023-09-19T07:00:00Z</published>
<title>Hastings Sunrise West Sewer Renewal - Phase 3</title>
<updated>2026-01-10T02:00:36.0939044Z</updated>
<georss:line>49.26759880640569 -123.04697071746854 49.267588824074465 -123.04499848511065</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Hastings Sunrise West Sewer Package 

- Project has been reinstated back into this Capital Plan starting 2026.  

Area is south of Venables and north of 5th east of Nanaimo and mostly west of Renfrew. Contact Bob Devlin. 

Sewer Scope on E. 1st to be integrated with Sewers scope from the Cassiar South Pkg 2. Includes Water scope interest and potential Streets interest.

 Constrained start time by the Broadway Subway project. 

The E. 1st Ave designs for HSW won’t be ready for IFC until 2025 or 2026, which will push construction into the 2027-2030 capital plan as a result.
Location: Various Locations
Schedule: Jan 3, 2028 - Jun 29, 2029; Weekdays; 7:00 AM - 4:00 PM</content>
<id>urn:uuid:bbbbe9f0-033b-48d7-bd9c-24d8d228b875</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/7af3f268-0498-4564-a5eb-757727e19fe2"/>
<published>2023-09-19T07:00:00Z</published>
<title>Hastings Sunrise West Sewer Renewal - Phase 3</title>
<updated>2026-01-10T02:00:36.0939044Z</updated>
<georss:line>49.268514513712574 -123.04695785452137 49.2685044418802 -123.04498389482899</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Hastings Sunrise West Sewer Package 

- Project has been reinstated back into this Capital Plan starting 2026.  

Area is south of Venables and north of 5th east of Nanaimo and mostly west of Renfrew. Contact Bob Devlin. 

Sewer Scope on E. 1st to be integrated with Sewers scope from the Cassiar South Pkg 2. Includes Water scope interest and potential Streets interest.

 Constrained start time by the Broadway Subway project. 

The E. 1st Ave designs for HSW won’t be ready for IFC until 2025 or 2026, which will push construction into the 2027-2030 capital plan as a result.
Location: Various Locations
Schedule: Jan 3, 2028 - Jun 29, 2029; Weekdays; 7:00 AM - 4:00 PM</content>
<id>urn:uuid:9e041338-bbee-4a0c-8b56-0f36bd91e705</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/7af3f268-0498-4564-a5eb-757727e19fe2"/>
<published>2023-09-19T07:00:00Z</published>
<title>Hastings Sunrise West Sewer Renewal - Phase 3</title>
<updated>2026-01-10T02:00:36.0939044Z</updated>
<georss:line>49.26713134436713 -123.04500340236434 49.266674061923226 -123.04500984545672</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Hastings Sunrise West Sewer Package 

- Project has been reinstated back into this Capital Plan starting 2026.  

Area is south of Venables and north of 5th east of Nanaimo and mostly west of Renfrew. Contact Bob Devlin. 

Sewer Scope on E. 1st to be integrated with Sewers scope from the Cassiar South Pkg 2. Includes Water scope interest and potential Streets interest.

 Constrained start time by the Broadway Subway project. 

The E. 1st Ave designs for HSW won’t be ready for IFC until 2025 or 2026, which will push construction into the 2027-2030 capital plan as a result.
Location: Various Locations
Schedule: Jan 3, 2028 - Jun 29, 2029; Weekdays; 7:00 AM - 4:00 PM</content>
<id>urn:uuid:3debd64b-26e6-4c87-9bec-b195b8054e85</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/7af3f268-0498-4564-a5eb-757727e19fe2"/>
<published>2023-09-19T07:00:00Z</published>
<title>Hastings Sunrise West Sewer Renewal - Phase 3</title>
<updated>2026-01-10T02:00:36.0939044Z</updated>
<georss:line>49.267588824074465 -123.04499848511065 49.26713134436713 -123.04500340236434</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Hastings Sunrise West Sewer Package 

- Project has been reinstated back into this Capital Plan starting 2026.  

Area is south of Venables and north of 5th east of Nanaimo and mostly west of Renfrew. Contact Bob Devlin. 

Sewer Scope on E. 1st to be integrated with Sewers scope from the Cassiar South Pkg 2. Includes Water scope interest and potential Streets interest.

 Constrained start time by the Broadway Subway project. 

The E. 1st Ave designs for HSW won’t be ready for IFC until 2025 or 2026, which will push construction into the 2027-2030 capital plan as a result.
Location: Various Locations
Schedule: Jan 3, 2028 - Jun 29, 2029; Weekdays; 7:00 AM - 4:00 PM</content>
<id>urn:uuid:ffd4ff8c-1f47-46b9-8ba2-4a4cb1922eff</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/7af3f268-0498-4564-a5eb-757727e19fe2"/>
<published>2023-09-19T07:00:00Z</published>
<title>Hastings Sunrise West Sewer Renewal - Phase 3</title>
<updated>2026-01-10T02:00:36.0939044Z</updated>
<georss:line>49.26622738497025 -123.04698392551171 49.26622738497025 -123.04603019143545</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Hastings Sunrise West Sewer Package 

- Project has been reinstated back into this Capital Plan starting 2026.  

Area is south of Venables and north of 5th east of Nanaimo and mostly west of Renfrew. Contact Bob Devlin. 

Sewer Scope on E. 1st to be integrated with Sewers scope from the Cassiar South Pkg 2. Includes Water scope interest and potential Streets interest.

 Constrained start time by the Broadway Subway project. 

The E. 1st Ave designs for HSW won’t be ready for IFC until 2025 or 2026, which will push construction into the 2027-2030 capital plan as a result.
Location: Various Locations
Schedule: Jan 3, 2028 - Jun 29, 2029; Weekdays; 7:00 AM - 4:00 PM</content>
<id>urn:uuid:e82882e0-24be-43c9-87b5-f7987fbd4cdc</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/7af3f268-0498-4564-a5eb-757727e19fe2"/>
<published>2023-09-19T07:00:00Z</published>
<title>Hastings Sunrise West Sewer Renewal - Phase 3</title>
<updated>2026-01-10T02:00:36.0939044Z</updated>
<georss:line>49.268500900799324 -123.04423046078874 49.26849757126939 -123.04347548749391</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Hastings Sunrise West Sewer Package 

- Project has been reinstated back into this Capital Plan starting 2026.  

Area is south of Venables and north of 5th east of Nanaimo and mostly west of Renfrew. Contact Bob Devlin. 

Sewer Scope on E. 1st to be integrated with Sewers scope from the Cassiar South Pkg 2. Includes Water scope interest and potential Streets interest.

 Constrained start time by the Broadway Subway project. 

The E. 1st Ave designs for HSW won’t be ready for IFC until 2025 or 2026, which will push construction into the 2027-2030 capital plan as a result.
Location: Various Locations
Schedule: Jan 3, 2028 - Jun 29, 2029; Weekdays; 7:00 AM - 4:00 PM</content>
<id>urn:uuid:a3665b9b-8cca-455b-8a66-f473f2301d80</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/7af3f268-0498-4564-a5eb-757727e19fe2"/>
<published>2023-09-19T07:00:00Z</published>
<title>Hastings Sunrise West Sewer Renewal - Phase 3</title>
<updated>2026-01-10T02:00:36.0939044Z</updated>
<georss:line>49.26849757126939 -123.04347548749391 49.26849113803959 -123.04149854937526</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Hastings Sunrise West Sewer Package 

- Project has been reinstated back into this Capital Plan starting 2026.  

Area is south of Venables and north of 5th east of Nanaimo and mostly west of Renfrew. Contact Bob Devlin. 

Sewer Scope on E. 1st to be integrated with Sewers scope from the Cassiar South Pkg 2. Includes Water scope interest and potential Streets interest.

 Constrained start time by the Broadway Subway project. 

The E. 1st Ave designs for HSW won’t be ready for IFC until 2025 or 2026, which will push construction into the 2027-2030 capital plan as a result.
Location: Various Locations
Schedule: Jan 3, 2028 - Jun 29, 2029; Weekdays; 7:00 AM - 4:00 PM</content>
<id>urn:uuid:83208910-95a3-4cf0-adff-ec078c0e75da</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/7af3f268-0498-4564-a5eb-757727e19fe2"/>
<published>2023-09-19T07:00:00Z</published>
<title>Hastings Sunrise West Sewer Renewal - Phase 3</title>
<updated>2026-01-10T02:00:36.0939044Z</updated>
<georss:line>49.26803521349345 -123.04150689560208 49.267577939907966 -123.04151447078547</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Hastings Sunrise West Sewer Package 

- Project has been reinstated back into this Capital Plan starting 2026.  

Area is south of Venables and north of 5th east of Nanaimo and mostly west of Renfrew. Contact Bob Devlin. 

Sewer Scope on E. 1st to be integrated with Sewers scope from the Cassiar South Pkg 2. Includes Water scope interest and potential Streets interest.

 Constrained start time by the Broadway Subway project. 

The E. 1st Ave designs for HSW won’t be ready for IFC until 2025 or 2026, which will push construction into the 2027-2030 capital plan as a result.
Location: Various Locations
Schedule: Jan 3, 2028 - Jun 29, 2029; Weekdays; 7:00 AM - 4:00 PM</content>
<id>urn:uuid:4092ef15-b662-4ebd-a71c-cf8a1dc4be2f</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/7af3f268-0498-4564-a5eb-757727e19fe2"/>
<published>2023-09-19T07:00:00Z</published>
<title>Hastings Sunrise West Sewer Renewal - Phase 3</title>
<updated>2026-01-10T02:00:36.0939044Z</updated>
<georss:line>49.26849113803959 -123.04149854937526 49.26803521349345 -123.04150689560208</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Hastings Sunrise West Sewer Package 

- Project has been reinstated back into this Capital Plan starting 2026.  

Area is south of Venables and north of 5th east of Nanaimo and mostly west of Renfrew. Contact Bob Devlin. 

Sewer Scope on E. 1st to be integrated with Sewers scope from the Cassiar South Pkg 2. Includes Water scope interest and potential Streets interest.

 Constrained start time by the Broadway Subway project. 

The E. 1st Ave designs for HSW won’t be ready for IFC until 2025 or 2026, which will push construction into the 2027-2030 capital plan as a result.
Location: Various Locations
Schedule: Jan 3, 2028 - Jun 29, 2029; Weekdays; 7:00 AM - 4:00 PM</content>
<id>urn:uuid:289ca20f-8472-4484-9346-5c68ba7a7b9c</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/7af3f268-0498-4564-a5eb-757727e19fe2"/>
<published>2023-09-19T07:00:00Z</published>
<title>Hastings Sunrise West Sewer Renewal - Phase 3</title>
<updated>2026-01-10T02:00:36.0939044Z</updated>
<georss:line>49.26806293160209 -123.04424478176371 49.267590624253415 -123.04426181272936 49.267590624253415 -123.04273754130391</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Hastings Sunrise West Sewer Package 

- Project has been reinstated back into this Capital Plan starting 2026.  

Area is south of Venables and north of 5th east of Nanaimo and mostly west of Renfrew. Contact Bob Devlin. 

Sewer Scope on E. 1st to be integrated with Sewers scope from the Cassiar South Pkg 2. Includes Water scope interest and potential Streets interest.

 Constrained start time by the Broadway Subway project. 

The E. 1st Ave designs for HSW won’t be ready for IFC until 2025 or 2026, which will push construction into the 2027-2030 capital plan as a result.
Location: Various Locations
Schedule: Jan 3, 2028 - Jun 29, 2029; Weekdays; 7:00 AM - 4:00 PM</content>
<id>urn:uuid:c2c9fcc3-e500-4153-bdf3-155b80cd117d</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/7af3f268-0498-4564-a5eb-757727e19fe2"/>
<published>2023-09-19T07:00:00Z</published>
<title>Hastings Sunrise West Sewer Renewal - Phase 3</title>
<updated>2026-01-10T02:00:36.0939044Z</updated>
<georss:line>49.26622451539464 -123.05214057708791 49.26572674504254 -123.05214709013256</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Hastings Sunrise West Sewer Package 

- Project has been reinstated back into this Capital Plan starting 2026.  

Area is south of Venables and north of 5th east of Nanaimo and mostly west of Renfrew. Contact Bob Devlin. 

Sewer Scope on E. 1st to be integrated with Sewers scope from the Cassiar South Pkg 2. Includes Water scope interest and potential Streets interest.

 Constrained start time by the Broadway Subway project. 

The E. 1st Ave designs for HSW won’t be ready for IFC until 2025 or 2026, which will push construction into the 2027-2030 capital plan as a result.
Location: Various Locations
Schedule: Jan 3, 2028 - Jun 29, 2029; Weekdays; 7:00 AM - 4:00 PM</content>
<id>urn:uuid:2995f46d-311c-44af-a83d-99f837f2f3d1</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/7af3f268-0498-4564-a5eb-757727e19fe2"/>
<published>2023-09-19T07:00:00Z</published>
<title>Hastings Sunrise West Sewer Renewal - Phase 3</title>
<updated>2026-01-10T02:00:36.0939044Z</updated>
<georss:line>49.266225609924305 -123.05584270865515 49.26572879581772 -123.05584308266539</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Hastings Sunrise West Sewer Package 

- Project has been reinstated back into this Capital Plan starting 2026.  

Area is south of Venables and north of 5th east of Nanaimo and mostly west of Renfrew. Contact Bob Devlin. 

Sewer Scope on E. 1st to be integrated with Sewers scope from the Cassiar South Pkg 2. Includes Water scope interest and potential Streets interest.

 Constrained start time by the Broadway Subway project. 

The E. 1st Ave designs for HSW won’t be ready for IFC until 2025 or 2026, which will push construction into the 2027-2030 capital plan as a result.
Location: Various Locations
Schedule: Jan 3, 2028 - Jun 29, 2029; Weekdays; 7:00 AM - 4:00 PM</content>
<id>urn:uuid:2d005a66-ae3c-4149-abba-8afd6160dd31</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/7af3f268-0498-4564-a5eb-757727e19fe2"/>
<published>2023-09-19T07:00:00Z</published>
<title>Hastings Sunrise West Sewer Renewal - Phase 3</title>
<updated>2026-01-10T02:00:36.0939044Z</updated>
<georss:line>49.26622561925575 -123.05469490349509 49.26622451539464 -123.05214057708791</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Hastings Sunrise West Sewer Package 

- Project has been reinstated back into this Capital Plan starting 2026.  

Area is south of Venables and north of 5th east of Nanaimo and mostly west of Renfrew. Contact Bob Devlin. 

Sewer Scope on E. 1st to be integrated with Sewers scope from the Cassiar South Pkg 2. Includes Water scope interest and potential Streets interest.

 Constrained start time by the Broadway Subway project. 

The E. 1st Ave designs for HSW won’t be ready for IFC until 2025 or 2026, which will push construction into the 2027-2030 capital plan as a result.
Location: Various Locations
Schedule: Jan 3, 2028 - Jun 29, 2029; Weekdays; 7:00 AM - 4:00 PM</content>
<id>urn:uuid:be10a240-758e-4150-a7b5-570bbc60c0a7</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/7af3f268-0498-4564-a5eb-757727e19fe2"/>
<published>2023-09-19T07:00:00Z</published>
<title>Hastings Sunrise West Sewer Renewal - Phase 3</title>
<updated>2026-01-10T02:00:36.0939044Z</updated>
<georss:line>49.266225609924305 -123.05584270865515 49.26622561925575 -123.05469490349509</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Hastings Sunrise West Sewer Package 

- Project has been reinstated back into this Capital Plan starting 2026.  

Area is south of Venables and north of 5th east of Nanaimo and mostly west of Renfrew. Contact Bob Devlin. 

Sewer Scope on E. 1st to be integrated with Sewers scope from the Cassiar South Pkg 2. Includes Water scope interest and potential Streets interest.

 Constrained start time by the Broadway Subway project. 

The E. 1st Ave designs for HSW won’t be ready for IFC until 2025 or 2026, which will push construction into the 2027-2030 capital plan as a result.
Location: Various Locations
Schedule: Jan 3, 2028 - Jun 29, 2029; Weekdays; 7:00 AM - 4:00 PM</content>
<id>urn:uuid:ad34ede4-5b5e-4a88-a967-4b5481465bc0</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/7af3f268-0498-4564-a5eb-757727e19fe2"/>
<published>2023-09-19T07:00:00Z</published>
<title>Hastings Sunrise West Sewer Renewal - Phase 3</title>
<updated>2026-01-10T02:00:36.0939044Z</updated>
<georss:line>49.26667755608349 -123.05584202284211 49.266593847040866 -123.05584143353731 49.266225609924305 -123.05584270865515</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Hastings Sunrise West Sewer Package 

- Project has been reinstated back into this Capital Plan starting 2026.  

Area is south of Venables and north of 5th east of Nanaimo and mostly west of Renfrew. Contact Bob Devlin. 

Sewer Scope on E. 1st to be integrated with Sewers scope from the Cassiar South Pkg 2. Includes Water scope interest and potential Streets interest.

 Constrained start time by the Broadway Subway project. 

The E. 1st Ave designs for HSW won’t be ready for IFC until 2025 or 2026, which will push construction into the 2027-2030 capital plan as a result.
Location: Various Locations
Schedule: Jan 3, 2028 - Jun 29, 2029; Weekdays; 7:00 AM - 4:00 PM</content>
<id>urn:uuid:52f992e3-d7ed-463f-96d5-babddce47eff</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/7af3f268-0498-4564-a5eb-757727e19fe2"/>
<published>2023-09-19T07:00:00Z</published>
<title>Hastings Sunrise West Sewer Renewal - Phase 3</title>
<updated>2026-01-10T02:00:36.0939044Z</updated>
<georss:line>49.26667747862791 -123.05321725893856 49.26667192194111 -123.05216985455125</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>This is a three phase project that will renew 4.5 kilometers of combined sewers with separated sewers. Phase 2 construction is underway and will continue south of East 1st for the rest of 2023. 

TDE &amp; GI are partners in this project with potential opportunity to combine the NE Sector Greenway build on Lillooet or Windermere, TBC.  



Phase 1
January to Summer 2023
Restart construction
Complete green rainwater infrastructure work

Phase 2 
March to Spring 2024

Phase 3
Early 2024 to December 2025
Location: E. 1st Ave and Windermere St
Schedule: Jan 2, 2023 - Dec 31, 2025</content>
<id>urn:uuid:5cbed257-e9b6-4a04-91b5-6107c8c44414</id>
<link href="https://vancouver.ca/streets-transportation/hastings-sunrise-sewer-renewal.aspx"/>
<published>2023-02-28T08:00:00Z</published>
<title>Hastings-Sunrise Sewer Renewal</title>
<updated>2025-01-29T22:36:35.0988166Z</updated>
<georss:line>49.268020625589685 -123.03646724693999 49.26756276839512 -123.03647239405537</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>This is a three phase project that will renew 4.5 kilometers of combined sewers with separated sewers. Phase 2 construction is underway and will continue south of East 1st for the rest of 2023. 

TDE &amp; GI are partners in this project with potential opportunity to combine the NE Sector Greenway build on Lillooet or Windermere, TBC.  



Phase 1
January to Summer 2023
Restart construction
Complete green rainwater infrastructure work

Phase 2 
March to Spring 2024

Phase 3
Early 2024 to December 2025
Location: E. 1st Ave and Windermere St
Schedule: Jan 2, 2023 - Dec 31, 2025</content>
<id>urn:uuid:d282adbc-0e19-4a40-bac0-fa5bedadfbed</id>
<link href="https://vancouver.ca/streets-transportation/hastings-sunrise-sewer-renewal.aspx"/>
<published>2023-02-28T08:00:00Z</published>
<title>Hastings-Sunrise Sewer Renewal</title>
<updated>2025-01-29T22:36:35.0988166Z</updated>
<georss:line>49.267573151227026 -123.03899916765127 49.26756276839512 -123.03647239405537</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>This is a three phase project that will renew 4.5 kilometers of combined sewers with separated sewers. Phase 2 construction is underway and will continue south of East 1st for the rest of 2023. 

TDE &amp; GI are partners in this project with potential opportunity to combine the NE Sector Greenway build on Lillooet or Windermere, TBC.  



Phase 1
January to Summer 2023
Restart construction
Complete green rainwater infrastructure work

Phase 2 
March to Spring 2024

Phase 3
Early 2024 to December 2025
Location: E. 1st Ave and Windermere St
Schedule: Jan 2, 2023 - Dec 31, 2025</content>
<id>urn:uuid:77c6a68c-9a18-482b-981a-c1121f6237d2</id>
<link href="https://vancouver.ca/streets-transportation/hastings-sunrise-sewer-renewal.aspx"/>
<published>2023-02-28T08:00:00Z</published>
<title>Hastings-Sunrise Sewer Renewal</title>
<updated>2025-01-29T22:36:35.0988166Z</updated>
<georss:line>49.26758028003903 -123.04347134785667 49.2675750804149 -123.03896917978238</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>This is a three phase project that will renew 4.5 kilometers of combined sewers with separated sewers. Phase 2 construction is underway and will continue south of East 1st for the rest of 2023. 

TDE &amp; GI are partners in this project with potential opportunity to combine the NE Sector Greenway build on Lillooet or Windermere, TBC.  



Phase 1
January to Summer 2023
Restart construction
Complete green rainwater infrastructure work

Phase 2 
March to Spring 2024

Phase 3
Early 2024 to December 2025
Location: E. 1st Ave and Windermere St
Schedule: Jan 2, 2023 - Dec 31, 2025</content>
<id>urn:uuid:656a006d-7155-4d30-b55a-a6b3a1b6b261</id>
<link href="https://vancouver.ca/streets-transportation/hastings-sunrise-sewer-renewal.aspx"/>
<published>2023-02-28T08:00:00Z</published>
<title>Hastings-Sunrise Sewer Renewal</title>
<updated>2025-01-29T22:36:35.0988166Z</updated>
<georss:line>49.26847658602364 -123.03645809825618 49.268020625589685 -123.03646724693999</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>This is a three phase project that will renew 4.5 kilometers of combined sewers with separated sewers. Phase 2 construction is underway and will continue south of East 1st for the rest of 2023. 

TDE &amp; GI are partners in this project with potential opportunity to combine the NE Sector Greenway build on Lillooet or Windermere, TBC.  



Phase 1
January to Summer 2023
Restart construction
Complete green rainwater infrastructure work

Phase 2 
March to Spring 2024

Phase 3
Early 2024 to December 2025
Location: E. 1st Ave and Windermere St
Schedule: Jan 2, 2023 - Dec 31, 2025</content>
<id>urn:uuid:59fc2e57-6133-4449-8339-9273f292ff1c</id>
<link href="https://vancouver.ca/streets-transportation/hastings-sunrise-sewer-renewal.aspx"/>
<published>2023-02-28T08:00:00Z</published>
<title>Hastings-Sunrise Sewer Renewal</title>
<updated>2025-01-29T22:36:35.0988166Z</updated>
<georss:line>49.26855066521904 -123.04199030012295 49.268529332970246 -123.03525567169063</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>This is a three phase project that will renew 4.5 kilometers of combined sewers with separated sewers. Phase 2 construction is underway and will continue south of East 1st for the rest of 2023. 

TDE &amp; GI are partners in this project with potential opportunity to combine the NE Sector Greenway build on Lillooet or Windermere, TBC.  



Phase 1
January to Summer 2023
Restart construction
Complete green rainwater infrastructure work

Phase 2 
March to Spring 2024

Phase 3
Early 2024 to December 2025
Location: E. 1st Ave and Windermere St
Schedule: Jan 2, 2023 - Dec 31, 2025</content>
<id>urn:uuid:52e0903f-36b5-432d-bab6-198530e9e8cf</id>
<link href="https://vancouver.ca/streets-transportation/hastings-sunrise-sewer-renewal.aspx"/>
<published>2023-02-28T08:00:00Z</published>
<title>Hastings-Sunrise Sewer Renewal</title>
<updated>2025-01-29T22:36:35.0988166Z</updated>
<georss:line>49.268027870361266 -123.03741340886428 49.268027870361266 -123.03653953729473</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>This is a three phase project that will renew 4.5 kilometers of combined sewers with separated sewers. Phase 2 construction is underway and will continue south of East 1st for the rest of 2023. 

TDE &amp; GI are partners in this project with potential opportunity to combine the NE Sector Greenway build on Lillooet or Windermere, TBC.  



Phase 1
January to Summer 2023
Restart construction
Complete green rainwater infrastructure work

Phase 2 
March to Spring 2024

Phase 3
Early 2024 to December 2025
Location: E. 1st Ave and Windermere St
Schedule: Jan 2, 2023 - Dec 31, 2025</content>
<id>urn:uuid:a93119f0-0614-47ce-8017-035e52e56ba3</id>
<link href="https://vancouver.ca/streets-transportation/hastings-sunrise-sewer-renewal.aspx"/>
<published>2023-02-28T08:00:00Z</published>
<title>Hastings-Sunrise Sewer Renewal</title>
<updated>2025-01-29T22:36:35.0988166Z</updated>
<georss:line>49.269447369024164 -123.03898531551609 49.26893641306657 -123.0389907159789 49.26894346077094 -123.04021122057986</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>This is a three phase project that will renew 4.5 kilometers of combined sewers with separated sewers. Phase 2 construction is underway and will continue south of East 1st for the rest of 2023. 

TDE &amp; GI are partners in this project with potential opportunity to combine the NE Sector Greenway build on Lillooet or Windermere, TBC.  



Phase 1
January to Summer 2023
Restart construction
Complete green rainwater infrastructure work

Phase 2 
March to Spring 2024

Phase 3
Early 2024 to December 2025
Location: E. 1st Ave and Windermere St
Schedule: Jan 2, 2023 - Dec 31, 2025</content>
<id>urn:uuid:dc1fe097-85b5-4970-b70f-0dd4e89b8441</id>
<link href="https://vancouver.ca/streets-transportation/hastings-sunrise-sewer-renewal.aspx"/>
<published>2023-02-28T08:00:00Z</published>
<title>Hastings-Sunrise Sewer Renewal</title>
<updated>2025-01-29T22:36:35.0988166Z</updated>
<georss:line>49.26894171193797 -123.0364508118813 49.26847658602364 -123.03645809825618</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>This is a three phase project that will renew 4.5 kilometers of combined sewers with separated sewers. Phase 2 construction is underway and will continue south of East 1st for the rest of 2023. 

TDE &amp; GI are partners in this project with potential opportunity to combine the NE Sector Greenway build on Lillooet or Windermere, TBC.  



Phase 1
January to Summer 2023
Restart construction
Complete green rainwater infrastructure work

Phase 2 
March to Spring 2024

Phase 3
Early 2024 to December 2025
Location: E. 1st Ave and Windermere St
Schedule: Jan 2, 2023 - Dec 31, 2025</content>
<id>urn:uuid:a29fd586-24c1-40e9-b74c-71c1e8fbb667</id>
<link href="https://vancouver.ca/streets-transportation/hastings-sunrise-sewer-renewal.aspx"/>
<published>2023-02-28T08:00:00Z</published>
<title>Hastings-Sunrise Sewer Renewal</title>
<updated>2025-01-29T22:36:35.0988166Z</updated>
<georss:line>49.26804383948712 -123.0389684741563 49.26856678527406 -123.0389684741563</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>This is a three phase project that will renew 4.5 kilometers of combined sewers with separated sewers. Phase 2 construction is underway and will continue south of East 1st for the rest of 2023. 

TDE &amp; GI are partners in this project with potential opportunity to combine the NE Sector Greenway build on Lillooet or Windermere, TBC.  



Phase 1
January to Summer 2023
Restart construction
Complete green rainwater infrastructure work

Phase 2 
March to Spring 2024

Phase 3
Early 2024 to December 2025
Location: E. 1st Ave and Windermere St
Schedule: Jan 2, 2023 - Dec 31, 2025</content>
<id>urn:uuid:fa0b051a-2acd-4f11-bb1f-b9929cf912af</id>
<link href="https://vancouver.ca/streets-transportation/hastings-sunrise-sewer-renewal.aspx"/>
<published>2023-02-28T08:00:00Z</published>
<title>Hastings-Sunrise Sewer Renewal</title>
<updated>2025-01-29T22:36:35.0988166Z</updated>
<georss:line>49.26572664867041 -123.04346873472214 49.26568726357766 -123.03572311468682</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>This is a three phase project that will renew 4.5 kilometers of combined sewers with separated sewers. Phase 2 construction is underway and will continue south of East 1st for the rest of 2023. 

TDE &amp; GI are partners in this project with potential opportunity to combine the NE Sector Greenway build on Lillooet or Windermere, TBC.  



Phase 1
January to Summer 2023
Restart construction
Complete green rainwater infrastructure work

Phase 2 
March to Spring 2024

Phase 3
Early 2024 to December 2025
Location: E. 1st Ave and Windermere St
Schedule: Jan 2, 2023 - Dec 31, 2025</content>
<id>urn:uuid:e679bad1-a5cf-4502-ab31-33d0b8761fe5</id>
<link href="https://vancouver.ca/streets-transportation/hastings-sunrise-sewer-renewal.aspx"/>
<published>2023-02-28T08:00:00Z</published>
<title>Hastings-Sunrise Sewer Renewal</title>
<updated>2025-01-29T22:36:35.0988166Z</updated>
<georss:line>49.2662064567875 -123.03997076364995 49.26619875290183 -123.03760958402624</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>This is a three phase project that will renew 4.5 kilometers of combined sewers with separated sewers. Phase 2 construction is underway and will continue south of East 1st for the rest of 2023. 

TDE &amp; GI are partners in this project with potential opportunity to combine the NE Sector Greenway build on Lillooet or Windermere, TBC.  



Phase 1
January to Summer 2023
Restart construction
Complete green rainwater infrastructure work

Phase 2 
March to Spring 2024

Phase 3
Early 2024 to December 2025
Location: E. 1st Ave and Windermere St
Schedule: Jan 2, 2023 - Dec 31, 2025</content>
<id>urn:uuid:41758a95-3721-4938-a0b8-755171cc1a87</id>
<link href="https://vancouver.ca/streets-transportation/hastings-sunrise-sewer-renewal.aspx"/>
<published>2023-02-28T08:00:00Z</published>
<title>Hastings-Sunrise Sewer Renewal</title>
<updated>2025-01-29T22:36:35.0988166Z</updated>
<georss:line>49.26661333351362 -123.03899827240302 49.264737736522676 -123.03903289029972</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>This is a three phase project that will renew 4.5 kilometers of combined sewers with separated sewers. Phase 2 construction is underway and will continue south of East 1st for the rest of 2023. 

TDE &amp; GI are partners in this project with potential opportunity to combine the NE Sector Greenway build on Lillooet or Windermere, TBC.  



Phase 1
January to Summer 2023
Restart construction
Complete green rainwater infrastructure work

Phase 2 
March to Spring 2024

Phase 3
Early 2024 to December 2025
Location: E. 1st Ave and Windermere St
Schedule: Jan 2, 2023 - Dec 31, 2025</content>
<id>urn:uuid:a4e71f88-b342-4402-8fe1-a03802a017d1</id>
<link href="https://vancouver.ca/streets-transportation/hastings-sunrise-sewer-renewal.aspx"/>
<published>2023-02-28T08:00:00Z</published>
<title>Hastings-Sunrise Sewer Renewal</title>
<updated>2025-01-29T22:36:35.0988166Z</updated>
<georss:line>49.266661093530246 -123.03900016815645 49.267597034379634 -123.0389921997174 49.267565836637374 -123.03643433077607 49.269489540793785 -123.03645048390324</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>This is a three phase project that will renew 4.5 kilometers of combined sewers with separated sewers. Phase 2 construction is underway and will continue south of East 1st for the rest of 2023. 

TDE &amp; GI are partners in this project with potential opportunity to combine the NE Sector Greenway build on Lillooet or Windermere, TBC.  



Phase 1
January to Summer 2023
Restart construction
Complete green rainwater infrastructure work

Phase 2 
March to Spring 2024

Phase 3
Early 2024 to December 2025
Location: E. 1st Ave and Windermere St
Schedule: Jan 2, 2023 - Dec 31, 2025</content>
<id>urn:uuid:3f4939b6-42ec-4eaf-b014-d969cfa4d072</id>
<link href="https://vancouver.ca/streets-transportation/hastings-sunrise-sewer-renewal.aspx"/>
<published>2023-02-28T08:00:00Z</published>
<title>Hastings-Sunrise Sewer Renewal</title>
<updated>2025-01-29T22:36:35.0988166Z</updated>
<georss:line>49.266743352901244 -123.04348522000592 49.26671660598333 -123.03644535491692</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>This is a three phase project that will renew 4.5 kilometers of combined sewers with separated sewers. Phase 2 construction is underway and will continue south of East 1st for the rest of 2023. 

TDE &amp; GI are partners in this project with potential opportunity to combine the NE Sector Greenway build on Lillooet or Windermere, TBC.  



Phase 1
January to Summer 2023
Restart construction
Complete green rainwater infrastructure work

Phase 2 
March to Spring 2024

Phase 3
Early 2024 to December 2025
Location: E. 1st Ave and Windermere St
Schedule: Jan 2, 2023 - Dec 31, 2025</content>
<id>urn:uuid:e073e0d8-ccd3-416f-8430-25c264b836e7</id>
<link href="https://vancouver.ca/streets-transportation/hastings-sunrise-sewer-renewal.aspx"/>
<published>2023-02-28T08:00:00Z</published>
<title>Hastings-Sunrise Sewer Renewal</title>
<updated>2025-01-29T22:36:35.0988166Z</updated>
<georss:line>49.2671154843259 -123.03900674744273 49.26710843345421 -123.03836562826372</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>This is a three phase project that will renew 4.5 kilometers of combined sewers with separated sewers. Phase 2 construction is underway and will continue south of East 1st for the rest of 2023. 

TDE &amp; GI are partners in this project with potential opportunity to combine the NE Sector Greenway build on Lillooet or Windermere, TBC.  



Phase 1
January to Summer 2023
Restart construction
Complete green rainwater infrastructure work

Phase 2 
March to Spring 2024

Phase 3
Early 2024 to December 2025
Location: E. 1st Ave and Windermere St
Schedule: Jan 2, 2023 - Dec 31, 2025</content>
<id>urn:uuid:c6f040f7-55ad-4510-8595-dfb01c7dee54</id>
<link href="https://vancouver.ca/streets-transportation/hastings-sunrise-sewer-renewal.aspx"/>
<published>2023-02-28T08:00:00Z</published>
<title>Hastings-Sunrise Sewer Renewal</title>
<updated>2025-01-29T22:36:35.0988166Z</updated>
<georss:line>49.267573151227026 -123.03899916765127 49.26711632765091 -123.03900632645663</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>This is a three phase project that will renew 4.5 kilometers of combined sewers with separated sewers. Phase 2 construction is underway and will continue south of East 1st for the rest of 2023. 

TDE &amp; GI are partners in this project with potential opportunity to combine the NE Sector Greenway build on Lillooet or Windermere, TBC.  



Phase 1
January to Summer 2023
Restart construction
Complete green rainwater infrastructure work

Phase 2 
March to Spring 2024

Phase 3
Early 2024 to December 2025
Location: E. 1st Ave and Windermere St
Schedule: Jan 2, 2023 - Dec 31, 2025</content>
<id>urn:uuid:9e0a0a4d-1fbc-4c4b-b0d9-cdbb8ec73f5c</id>
<link href="https://vancouver.ca/streets-transportation/hastings-sunrise-sewer-renewal.aspx"/>
<published>2023-02-28T08:00:00Z</published>
<title>Hastings-Sunrise Sewer Renewal</title>
<updated>2025-01-29T22:36:35.0988166Z</updated>
<georss:line>49.267564681165055 -123.03648214141053 49.26755948153931 -123.0354940549659</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>This is a three phase project that will renew 4.5 kilometers of combined sewers with separated sewers. Phase 2 construction is underway and will continue south of East 1st for the rest of 2023. 

TDE &amp; GI are partners in this project with potential opportunity to combine the NE Sector Greenway build on Lillooet or Windermere, TBC.  



Phase 1
January to Summer 2023
Restart construction
Complete green rainwater infrastructure work

Phase 2 
March to Spring 2024

Phase 3
Early 2024 to December 2025
Location: E. 1st Ave and Windermere St
Schedule: Jan 2, 2023 - Dec 31, 2025</content>
<id>urn:uuid:c61210f5-9cd0-4601-9f1b-ac294dfde220</id>
<link href="https://vancouver.ca/streets-transportation/hastings-sunrise-sewer-renewal.aspx"/>
<published>2023-02-28T08:00:00Z</published>
<title>Hastings-Sunrise Sewer Renewal</title>
<updated>2025-01-29T22:36:35.0988166Z</updated>
<georss:line>49.26477530273647 -123.04343096963198 49.264751530767 -123.03652776234509</georss:line>
</entry>
<entry>
<category term="Road Closure"/>
<content>The Hawks Ave Closure Pilot will involve the install of concrete barriers on Hawks Ave at the south side of the intersection with Prior St, with the intent for traffic calming on Hawks Ave as requested by the Strathcona Residents’ Association. Barriers and associated signage will be going in March 19th. 
Parking access will be retained via Malkin Ave. 

For any concerns or comments, please reach out to: PriorEnhancementPilot@vancouver.ca  

Location: 
Schedule: Mar 19, 2025 - Jan 1, 2028</content>
<id>urn:uuid:73661174-443c-402a-bc70-9451e6d4d129</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/3d8e433d-215c-4c98-acdf-1f504e12625f"/>
<published>2025-03-04T08:00:00Z</published>
<title>Hawks Ave Closure Pilot</title>
<updated>2025-03-04T20:22:52.3894486Z</updated>
<georss:polygon>49.27646261947456 -123.08745717210368 49.276458856839696 -123.08731300897043 49.27641370673874 -123.08731877585898 49.27641370673874 -123.08746293826577 49.27646261947456 -123.08745717210368</georss:polygon>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street concrete &amp; paving renewal on Helmcken Street from Hornby Street to Granville Street. 
Anticipated start in late Feb 2025.
Location: 
Schedule: Feb 18, 2025 - Apr 30, 2025</content>
<id>urn:uuid:6c54be60-a9cf-4f16-9b09-8cce8c511807</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/0eb290df-dd98-4298-b144-a4e5b5d0cf80"/>
<published>2025-02-14T08:00:00Z</published>
<title>Helmcken Street Renewal, Hornby to Granville</title>
<updated>2025-04-08T17:49:20.7033007Z</updated>
<georss:line>49.2791650238332 -123.12609895905958 49.27947889276945 -123.12658433022897</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street concrete &amp; paving renewal on Helmcken Street from Hornby Street to Granville Street. 
Anticipated start in late Feb 2025.
Location: 
Schedule: Feb 18, 2025 - Apr 30, 2025</content>
<id>urn:uuid:df5f95b4-1ddf-494b-b190-8ccd299fcc3c</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/0eb290df-dd98-4298-b144-a4e5b5d0cf80"/>
<published>2025-02-14T08:00:00Z</published>
<title>Helmcken Street Renewal, Hornby to Granville</title>
<updated>2025-04-08T17:49:20.7033007Z</updated>
<georss:line>49.27885119775203 -123.12561364915983 49.2791650238332 -123.12609895905958</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street concrete &amp; paving renewal on Helmcken Street from Hornby Street to Granville Street. 
Anticipated start in late Feb 2025.
Location: 
Schedule: Feb 18, 2025 - Apr 30, 2025</content>
<id>urn:uuid:c3b99a31-8e16-44d8-8bc3-447d75babf95</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/0eb290df-dd98-4298-b144-a4e5b5d0cf80"/>
<published>2025-02-14T08:00:00Z</published>
<title>Helmcken Street Renewal, Hornby to Granville</title>
<updated>2025-04-08T17:49:20.7033007Z</updated>
<georss:line>49.278537288788016 -123.12512822147508 49.27885119775203 -123.12561364915983</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street concrete &amp; paving renewal on Helmcken Street from Hornby Street to Granville Street. 
Anticipated start in late Feb 2025.
Location: 
Schedule: Feb 18, 2025 - Apr 30, 2025</content>
<id>urn:uuid:92c9f203-041b-45d1-9cc6-7f91a6c27951</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/0eb290df-dd98-4298-b144-a4e5b5d0cf80"/>
<published>2025-02-14T08:00:00Z</published>
<title>Helmcken Street Renewal, Hornby to Granville</title>
<updated>2025-04-08T17:49:20.7033007Z</updated>
<georss:line>49.2782098356017 -123.12462186783085 49.278537288788016 -123.12512822147508</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Update as of end of July 2024. The remainder of the work includes completing paver installation in the 400 block of Homer Street and final pave of 400 Homer Street and the Hastings/Homer intersection.


Location: Homer St from W Pender St to W Cordova St 
Schedule: Feb 17, 2023 - Sep 30, 2024</content>
<id>urn:uuid:9d7b5ecb-9b8a-45ae-8a55-51d4f943c94a</id>
<link href="https://vancouver.ca/streets-transportation/homer-street-upgrades.aspx"/>
<published>2023-02-21T21:00:00Z</published>
<title>Homer Street Upgrades Project (HStU)</title>
<updated>2024-08-27T21:26:01.6428986Z</updated>
<georss:line>49.284058069059 -123.1099523723 49.283740504022006 -123.11043281382</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Update as of end of July 2024. The remainder of the work includes completing paver installation in the 400 block of Homer Street and final pave of 400 Homer Street and the Hastings/Homer intersection.


Location: Homer St from W Pender St to W Cordova St 
Schedule: Feb 17, 2023 - Sep 30, 2024</content>
<id>urn:uuid:4eb8ada3-1be4-4550-8ca7-3aeb577b20eb</id>
<link href="https://vancouver.ca/streets-transportation/homer-street-upgrades.aspx"/>
<published>2023-02-21T21:00:00Z</published>
<title>Homer Street Upgrades Project (HStU)</title>
<updated>2024-08-27T21:26:01.6428986Z</updated>
<georss:line>49.283740504022006 -123.11043281382 49.28340931725302 -123.11093306005002</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Update as of end of July 2024. The remainder of the work includes completing paver installation in the 400 block of Homer Street and final pave of 400 Homer Street and the Hastings/Homer intersection.


Location: Homer St from W Pender St to W Cordova St 
Schedule: Feb 17, 2023 - Sep 30, 2024</content>
<id>urn:uuid:fd24475c-2a58-40cd-af1b-c01b652e10a4</id>
<link href="https://vancouver.ca/streets-transportation/homer-street-upgrades.aspx"/>
<published>2023-02-21T21:00:00Z</published>
<title>Homer Street Upgrades Project (HStU)</title>
<updated>2024-08-27T21:26:01.6428986Z</updated>
<georss:line>49.28340931725302 -123.11093306005002 49.283078316048005 -123.11143449625</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Update as of end of July 2024. The remainder of the work includes completing paver installation in the 400 block of Homer Street and final pave of 400 Homer Street and the Hastings/Homer intersection.


Location: Homer St from W Pender St to W Cordova St 
Schedule: Feb 17, 2023 - Sep 30, 2024</content>
<id>urn:uuid:bfe90ca1-6746-4e43-a07d-fcc724dcdfb9</id>
<link href="https://vancouver.ca/streets-transportation/homer-street-upgrades.aspx"/>
<published>2023-02-21T21:00:00Z</published>
<title>Homer Street Upgrades Project (HStU)</title>
<updated>2024-08-27T21:26:01.6428986Z</updated>
<georss:line>49.283078316048005 -123.11143449625 49.28276104264799 -123.11191388815</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Update as of end of July 2024. The remainder of the work includes completing paver installation in the 400 block of Homer Street and final pave of 400 Homer Street and the Hastings/Homer intersection.


Location: Homer St from W Pender St to W Cordova St 
Schedule: Feb 17, 2023 - Sep 30, 2024</content>
<id>urn:uuid:9dbee4cf-0774-4c13-af61-44f09224e438</id>
<link href="https://vancouver.ca/streets-transportation/homer-street-upgrades.aspx"/>
<published>2023-02-21T21:00:00Z</published>
<title>Homer Street Upgrades Project (HStU)</title>
<updated>2024-08-27T21:26:01.6428986Z</updated>
<georss:line>49.28418894524529 -123.11018337646486 49.283963265631115 -123.10980576686858</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Update as of end of July 2024. The remainder of the work includes completing paver installation in the 400 block of Homer Street and final pave of 400 Homer Street and the Hastings/Homer intersection.


Location: Homer St from W Pender St to W Cordova St 
Schedule: Feb 17, 2023 - Sep 30, 2024</content>
<id>urn:uuid:0cada60c-5295-4272-8fc3-7e1e5fa23c31</id>
<link href="https://vancouver.ca/streets-transportation/homer-street-upgrades.aspx"/>
<published>2023-02-21T21:00:00Z</published>
<title>Homer Street Upgrades Project (HStU)</title>
<updated>2024-08-27T21:26:01.6428986Z</updated>
<georss:line>49.28351531248873 -123.11117266360648 49.283263887092176 -123.11078076522315</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Update as of end of July 2024. The remainder of the work includes completing paver installation in the 400 block of Homer Street and final pave of 400 Homer Street and the Hastings/Homer intersection.


Location: Homer St from W Pender St to W Cordova St 
Schedule: Feb 17, 2023 - Sep 30, 2024</content>
<id>urn:uuid:35bac746-deee-42f4-9004-5cd40da03a38</id>
<link href="https://vancouver.ca/streets-transportation/homer-street-upgrades.aspx"/>
<published>2023-02-21T21:00:00Z</published>
<title>Homer Street Upgrades Project (HStU)</title>
<updated>2024-08-27T21:26:01.6428986Z</updated>
<georss:line>49.28289084469469 -123.11210407984288 49.282666847356865 -123.11172534934632</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Cordova Street: Cordova Street will be converted to a 2-way street for the 2025 summer Water Street Pedestrian Pilot. Modifications will be carried out on Cordova including traffic signal installations, minor civil works, paint line eradication, surveying, line painting, concrete barrier and sign installations. Starting May 12, two northern lanes of Cordova Street will be closed to traffic as the reconfiguration of the street is finalized. Eastbound vehicle travel will be retained during this work.  Once construction is completed in late May, Cordova Street will re-open as a two-way street for the summer. During this time, the City will be monitoring the performance of the street.

Water Street: There will be intermittent impacts to Water Street in late May and early June 2025 for the installation of the 2025 Water Street Pedestrian Pilot. The work will include the installation of concrete barriers, line painting, planters, furniture installation and removing bollards. Water Street works will be removed in September 2025. 


Location: Cordova St. - Richards to Gore
Powell St., Carrall to Gore
Gore Ave., Powell to Cordova
Main St., Powell to Cordova
Water St., Richards to Columbia

Schedule: Apr 14, 2025 - May 31, 2025</content>
<id>urn:uuid:989100b2-abd6-49ec-8d12-24d3de7163dd</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e9889b56-2d1f-4a5c-a526-e96eef45b4d3"/>
<published>2025-04-16T07:00:00Z</published>
<title>Interim Cordova 2-Way: Richards to Gore</title>
<updated>2025-12-14T02:00:53.584143Z</updated>
<georss:line>49.28293018940636 -123.10678798525701 49.28325806571897 -123.10858101656734</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Cordova Street: Cordova Street will be converted to a 2-way street for the 2025 summer Water Street Pedestrian Pilot. Modifications will be carried out on Cordova including traffic signal installations, minor civil works, paint line eradication, surveying, line painting, concrete barrier and sign installations. Starting May 12, two northern lanes of Cordova Street will be closed to traffic as the reconfiguration of the street is finalized. Eastbound vehicle travel will be retained during this work.  Once construction is completed in late May, Cordova Street will re-open as a two-way street for the summer. During this time, the City will be monitoring the performance of the street.

Water Street: There will be intermittent impacts to Water Street in late May and early June 2025 for the installation of the 2025 Water Street Pedestrian Pilot. The work will include the installation of concrete barriers, line painting, planters, furniture installation and removing bollards. Water Street works will be removed in September 2025. 


Location: Cordova St. - Richards to Gore
Powell St., Carrall to Gore
Gore Ave., Powell to Cordova
Main St., Powell to Cordova
Water St., Richards to Columbia

Schedule: Apr 14, 2025 - May 31, 2025</content>
<id>urn:uuid:47c0c967-de55-448b-9de3-96ded6a332b7</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e9889b56-2d1f-4a5c-a526-e96eef45b4d3"/>
<published>2025-04-16T07:00:00Z</published>
<title>Interim Cordova 2-Way: Richards to Gore</title>
<updated>2025-12-14T02:00:53.584143Z</updated>
<georss:line>49.283176281175685 -123.09881874827185 49.283189455333655 -123.099567135537</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Cordova Street: Cordova Street will be converted to a 2-way street for the 2025 summer Water Street Pedestrian Pilot. Modifications will be carried out on Cordova including traffic signal installations, minor civil works, paint line eradication, surveying, line painting, concrete barrier and sign installations. Starting May 12, two northern lanes of Cordova Street will be closed to traffic as the reconfiguration of the street is finalized. Eastbound vehicle travel will be retained during this work.  Once construction is completed in late May, Cordova Street will re-open as a two-way street for the summer. During this time, the City will be monitoring the performance of the street.

Water Street: There will be intermittent impacts to Water Street in late May and early June 2025 for the installation of the 2025 Water Street Pedestrian Pilot. The work will include the installation of concrete barriers, line painting, planters, furniture installation and removing bollards. Water Street works will be removed in September 2025. 


Location: Cordova St. - Richards to Gore
Powell St., Carrall to Gore
Gore Ave., Powell to Cordova
Main St., Powell to Cordova
Water St., Richards to Columbia

Schedule: Apr 14, 2025 - May 31, 2025</content>
<id>urn:uuid:de0a67e8-2aa5-4c18-a827-1862448a69a3</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e9889b56-2d1f-4a5c-a526-e96eef45b4d3"/>
<published>2025-04-16T07:00:00Z</published>
<title>Interim Cordova 2-Way: Richards to Gore</title>
<updated>2025-12-14T02:00:53.584143Z</updated>
<georss:line>49.283156126981766 -123.09773525875318 49.283176281175685 -123.09881874827185</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Cordova Street: Cordova Street will be converted to a 2-way street for the 2025 summer Water Street Pedestrian Pilot. Modifications will be carried out on Cordova including traffic signal installations, minor civil works, paint line eradication, surveying, line painting, concrete barrier and sign installations. Starting May 12, two northern lanes of Cordova Street will be closed to traffic as the reconfiguration of the street is finalized. Eastbound vehicle travel will be retained during this work.  Once construction is completed in late May, Cordova Street will re-open as a two-way street for the summer. During this time, the City will be monitoring the performance of the street.

Water Street: There will be intermittent impacts to Water Street in late May and early June 2025 for the installation of the 2025 Water Street Pedestrian Pilot. The work will include the installation of concrete barriers, line painting, planters, furniture installation and removing bollards. Water Street works will be removed in September 2025. 


Location: Cordova St. - Richards to Gore
Powell St., Carrall to Gore
Gore Ave., Powell to Cordova
Main St., Powell to Cordova
Water St., Richards to Columbia

Schedule: Apr 14, 2025 - May 31, 2025</content>
<id>urn:uuid:dbc05829-e41f-40a1-ad75-efa649d42354</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e9889b56-2d1f-4a5c-a526-e96eef45b4d3"/>
<published>2025-04-16T07:00:00Z</published>
<title>Interim Cordova 2-Way: Richards to Gore</title>
<updated>2025-12-14T02:00:53.584143Z</updated>
<georss:line>49.28325806571897 -123.10858101656734 49.28336830081875 -123.1091832523281</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Cordova Street: Cordova Street will be converted to a 2-way street for the 2025 summer Water Street Pedestrian Pilot. Modifications will be carried out on Cordova including traffic signal installations, minor civil works, paint line eradication, surveying, line painting, concrete barrier and sign installations. Starting May 12, two northern lanes of Cordova Street will be closed to traffic as the reconfiguration of the street is finalized. Eastbound vehicle travel will be retained during this work.  Once construction is completed in late May, Cordova Street will re-open as a two-way street for the summer. During this time, the City will be monitoring the performance of the street.

Water Street: There will be intermittent impacts to Water Street in late May and early June 2025 for the installation of the 2025 Water Street Pedestrian Pilot. The work will include the installation of concrete barriers, line painting, planters, furniture installation and removing bollards. Water Street works will be removed in September 2025. 


Location: Cordova St. - Richards to Gore
Powell St., Carrall to Gore
Gore Ave., Powell to Cordova
Main St., Powell to Cordova
Water St., Richards to Columbia

Schedule: Apr 14, 2025 - May 31, 2025</content>
<id>urn:uuid:030dcc97-d1c9-46cb-91ee-d491a67773d2</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e9889b56-2d1f-4a5c-a526-e96eef45b4d3"/>
<published>2025-04-16T07:00:00Z</published>
<title>Interim Cordova 2-Way: Richards to Gore</title>
<updated>2025-12-14T02:00:53.584143Z</updated>
<georss:line>49.28351872485797 -123.10911899996232 49.28336825607684 -123.10918300472729</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Cordova Street: Cordova Street will be converted to a 2-way street for the 2025 summer Water Street Pedestrian Pilot. Modifications will be carried out on Cordova including traffic signal installations, minor civil works, paint line eradication, surveying, line painting, concrete barrier and sign installations. Starting May 12, two northern lanes of Cordova Street will be closed to traffic as the reconfiguration of the street is finalized. Eastbound vehicle travel will be retained during this work.  Once construction is completed in late May, Cordova Street will re-open as a two-way street for the summer. During this time, the City will be monitoring the performance of the street.

Water Street: There will be intermittent impacts to Water Street in late May and early June 2025 for the installation of the 2025 Water Street Pedestrian Pilot. The work will include the installation of concrete barriers, line painting, planters, furniture installation and removing bollards. Water Street works will be removed in September 2025. 


Location: Cordova St. - Richards to Gore
Powell St., Carrall to Gore
Gore Ave., Powell to Cordova
Main St., Powell to Cordova
Water St., Richards to Columbia

Schedule: Apr 14, 2025 - May 31, 2025</content>
<id>urn:uuid:b6e44396-0d30-4e6b-a29b-2a37bc4068c0</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e9889b56-2d1f-4a5c-a526-e96eef45b4d3"/>
<published>2025-04-16T07:00:00Z</published>
<title>Interim Cordova 2-Way: Richards to Gore</title>
<updated>2025-12-14T02:00:53.584143Z</updated>
<georss:line>49.28351872485797 -123.10911899996232 49.28405806813055 -123.10995237230391</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Cordova Street: Cordova Street will be converted to a 2-way street for the 2025 summer Water Street Pedestrian Pilot. Modifications will be carried out on Cordova including traffic signal installations, minor civil works, paint line eradication, surveying, line painting, concrete barrier and sign installations. Starting May 12, two northern lanes of Cordova Street will be closed to traffic as the reconfiguration of the street is finalized. Eastbound vehicle travel will be retained during this work.  Once construction is completed in late May, Cordova Street will re-open as a two-way street for the summer. During this time, the City will be monitoring the performance of the street.

Water Street: There will be intermittent impacts to Water Street in late May and early June 2025 for the installation of the 2025 Water Street Pedestrian Pilot. The work will include the installation of concrete barriers, line painting, planters, furniture installation and removing bollards. Water Street works will be removed in September 2025. 


Location: Cordova St. - Richards to Gore
Powell St., Carrall to Gore
Gore Ave., Powell to Cordova
Main St., Powell to Cordova
Water St., Richards to Columbia

Schedule: Apr 14, 2025 - May 31, 2025</content>
<id>urn:uuid:abb99084-77b1-4b42-ac68-7cd8da3ffc3c</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e9889b56-2d1f-4a5c-a526-e96eef45b4d3"/>
<published>2025-04-16T07:00:00Z</published>
<title>Interim Cordova 2-Way: Richards to Gore</title>
<updated>2025-12-14T02:00:53.584143Z</updated>
<georss:line>49.28405806813055 -123.10995237230391 49.284163677415535 -123.11011616735397</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Cordova Street: Cordova Street will be converted to a 2-way street for the 2025 summer Water Street Pedestrian Pilot. Modifications will be carried out on Cordova including traffic signal installations, minor civil works, paint line eradication, surveying, line painting, concrete barrier and sign installations. Starting May 12, two northern lanes of Cordova Street will be closed to traffic as the reconfiguration of the street is finalized. Eastbound vehicle travel will be retained during this work.  Once construction is completed in late May, Cordova Street will re-open as a two-way street for the summer. During this time, the City will be monitoring the performance of the street.

Water Street: There will be intermittent impacts to Water Street in late May and early June 2025 for the installation of the 2025 Water Street Pedestrian Pilot. The work will include the installation of concrete barriers, line painting, planters, furniture installation and removing bollards. Water Street works will be removed in September 2025. 


Location: Cordova St. - Richards to Gore
Powell St., Carrall to Gore
Gore Ave., Powell to Cordova
Main St., Powell to Cordova
Water St., Richards to Columbia

Schedule: Apr 14, 2025 - May 31, 2025</content>
<id>urn:uuid:9dbf75bb-d8c8-41a8-b75f-e29040bc7406</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e9889b56-2d1f-4a5c-a526-e96eef45b4d3"/>
<published>2025-04-16T07:00:00Z</published>
<title>Interim Cordova 2-Way: Richards to Gore</title>
<updated>2025-12-14T02:00:53.584143Z</updated>
<georss:line>49.284163677415535 -123.11011616735397 49.28467794017715 -123.11095341031987</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Cordova Street: Cordova Street will be converted to a 2-way street for the 2025 summer Water Street Pedestrian Pilot. Modifications will be carried out on Cordova including traffic signal installations, minor civil works, paint line eradication, surveying, line painting, concrete barrier and sign installations. Starting May 12, two northern lanes of Cordova Street will be closed to traffic as the reconfiguration of the street is finalized. Eastbound vehicle travel will be retained during this work.  Once construction is completed in late May, Cordova Street will re-open as a two-way street for the summer. During this time, the City will be monitoring the performance of the street.

Water Street: There will be intermittent impacts to Water Street in late May and early June 2025 for the installation of the 2025 Water Street Pedestrian Pilot. The work will include the installation of concrete barriers, line painting, planters, furniture installation and removing bollards. Water Street works will be removed in September 2025. 


Location: Cordova St. - Richards to Gore
Powell St., Carrall to Gore
Gore Ave., Powell to Cordova
Main St., Powell to Cordova
Water St., Richards to Columbia

Schedule: Apr 14, 2025 - May 31, 2025</content>
<id>urn:uuid:fceb938c-c83b-41b1-b712-ed446d7909f6</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e9889b56-2d1f-4a5c-a526-e96eef45b4d3"/>
<published>2025-04-16T07:00:00Z</published>
<title>Interim Cordova 2-Way: Richards to Gore</title>
<updated>2025-12-14T02:00:53.584143Z</updated>
<georss:line>49.2836399642114 -123.10294948499836 49.28344939149255 -123.10411807620824 49.28329893882582 -123.10374904740512 49.28325881803718 -123.10268808959616 49.283308969017895 -123.10373367120498 49.28345942165399 -123.1041488286085 49.28387065651725 -123.10630149662664 49.2843019479331 -123.10876168864742 49.28468308604451 -123.11096048526593 49.28486362412164 -123.11125263306839 49.28469311595501 -123.11096048526593</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Cordova Street: Cordova Street will be converted to a 2-way street for the 2025 summer Water Street Pedestrian Pilot. Modifications will be carried out on Cordova including traffic signal installations, minor civil works, paint line eradication, surveying, line painting, concrete barrier and sign installations. Starting May 12, two northern lanes of Cordova Street will be closed to traffic as the reconfiguration of the street is finalized. Eastbound vehicle travel will be retained during this work.  Once construction is completed in late May, Cordova Street will re-open as a two-way street for the summer. During this time, the City will be monitoring the performance of the street.

Water Street: There will be intermittent impacts to Water Street in late May and early June 2025 for the installation of the 2025 Water Street Pedestrian Pilot. The work will include the installation of concrete barriers, line painting, planters, furniture installation and removing bollards. Water Street works will be removed in September 2025. 


Location: Cordova St. - Richards to Gore
Powell St., Carrall to Gore
Gore Ave., Powell to Cordova
Main St., Powell to Cordova
Water St., Richards to Columbia

Schedule: Apr 14, 2025 - May 31, 2025</content>
<id>urn:uuid:b6ca6baf-9e7e-449d-8111-678e6f4cc2c9</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e9889b56-2d1f-4a5c-a526-e96eef45b4d3"/>
<published>2025-04-16T07:00:00Z</published>
<title>Interim Cordova 2-Way: Richards to Gore</title>
<updated>2025-12-14T02:00:53.584143Z</updated>
<georss:line>49.282702221447096 -123.09767141452723 49.28224748887803 -123.09760686860726</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Cordova Street: Cordova Street will be converted to a 2-way street for the 2025 summer Water Street Pedestrian Pilot. Modifications will be carried out on Cordova including traffic signal installations, minor civil works, paint line eradication, surveying, line painting, concrete barrier and sign installations. Starting May 12, two northern lanes of Cordova Street will be closed to traffic as the reconfiguration of the street is finalized. Eastbound vehicle travel will be retained during this work.  Once construction is completed in late May, Cordova Street will re-open as a two-way street for the summer. During this time, the City will be monitoring the performance of the street.

Water Street: There will be intermittent impacts to Water Street in late May and early June 2025 for the installation of the 2025 Water Street Pedestrian Pilot. The work will include the installation of concrete barriers, line painting, planters, furniture installation and removing bollards. Water Street works will be removed in September 2025. 


Location: Cordova St. - Richards to Gore
Powell St., Carrall to Gore
Gore Ave., Powell to Cordova
Main St., Powell to Cordova
Water St., Richards to Columbia

Schedule: Apr 14, 2025 - May 31, 2025</content>
<id>urn:uuid:523559be-e98f-44d6-b787-1cb0059a4878</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e9889b56-2d1f-4a5c-a526-e96eef45b4d3"/>
<published>2025-04-16T07:00:00Z</published>
<title>Interim Cordova 2-Way: Richards to Gore</title>
<updated>2025-12-14T02:00:53.584143Z</updated>
<georss:line>49.28228493852146 -123.09960646763464 49.28227112533929 -123.09885880775992</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Cordova Street: Cordova Street will be converted to a 2-way street for the 2025 summer Water Street Pedestrian Pilot. Modifications will be carried out on Cordova including traffic signal installations, minor civil works, paint line eradication, surveying, line painting, concrete barrier and sign installations. Starting May 12, two northern lanes of Cordova Street will be closed to traffic as the reconfiguration of the street is finalized. Eastbound vehicle travel will be retained during this work.  Once construction is completed in late May, Cordova Street will re-open as a two-way street for the summer. During this time, the City will be monitoring the performance of the street.

Water Street: There will be intermittent impacts to Water Street in late May and early June 2025 for the installation of the 2025 Water Street Pedestrian Pilot. The work will include the installation of concrete barriers, line painting, planters, furniture installation and removing bollards. Water Street works will be removed in September 2025. 


Location: Cordova St. - Richards to Gore
Powell St., Carrall to Gore
Gore Ave., Powell to Cordova
Main St., Powell to Cordova
Water St., Richards to Columbia

Schedule: Apr 14, 2025 - May 31, 2025</content>
<id>urn:uuid:fd59cabe-cd3e-45b0-aac7-c1cd137612f9</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e9889b56-2d1f-4a5c-a526-e96eef45b4d3"/>
<published>2025-04-16T07:00:00Z</published>
<title>Interim Cordova 2-Way: Richards to Gore</title>
<updated>2025-12-14T02:00:53.584143Z</updated>
<georss:line>49.28227112533929 -123.09885880775992 49.28224748887803 -123.09760686860726</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Cordova Street: Cordova Street will be converted to a 2-way street for the 2025 summer Water Street Pedestrian Pilot. Modifications will be carried out on Cordova including traffic signal installations, minor civil works, paint line eradication, surveying, line painting, concrete barrier and sign installations. Starting May 12, two northern lanes of Cordova Street will be closed to traffic as the reconfiguration of the street is finalized. Eastbound vehicle travel will be retained during this work.  Once construction is completed in late May, Cordova Street will re-open as a two-way street for the summer. During this time, the City will be monitoring the performance of the street.

Water Street: There will be intermittent impacts to Water Street in late May and early June 2025 for the installation of the 2025 Water Street Pedestrian Pilot. The work will include the installation of concrete barriers, line painting, planters, furniture installation and removing bollards. Water Street works will be removed in September 2025. 


Location: Cordova St. - Richards to Gore
Powell St., Carrall to Gore
Gore Ave., Powell to Cordova
Main St., Powell to Cordova
Water St., Richards to Columbia

Schedule: Apr 14, 2025 - May 31, 2025</content>
<id>urn:uuid:44b9c541-03f9-484e-b606-ce38ec41efae</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e9889b56-2d1f-4a5c-a526-e96eef45b4d3"/>
<published>2025-04-16T07:00:00Z</published>
<title>Interim Cordova 2-Way: Richards to Gore</title>
<updated>2025-12-14T02:00:53.584143Z</updated>
<georss:line>49.282299229021845 -123.10035825384288 49.28228493852146 -123.09960646763464</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Cordova Street: Cordova Street will be converted to a 2-way street for the 2025 summer Water Street Pedestrian Pilot. Modifications will be carried out on Cordova including traffic signal installations, minor civil works, paint line eradication, surveying, line painting, concrete barrier and sign installations. Starting May 12, two northern lanes of Cordova Street will be closed to traffic as the reconfiguration of the street is finalized. Eastbound vehicle travel will be retained during this work.  Once construction is completed in late May, Cordova Street will re-open as a two-way street for the summer. During this time, the City will be monitoring the performance of the street.

Water Street: There will be intermittent impacts to Water Street in late May and early June 2025 for the installation of the 2025 Water Street Pedestrian Pilot. The work will include the installation of concrete barriers, line painting, planters, furniture installation and removing bollards. Water Street works will be removed in September 2025. 


Location: Cordova St. - Richards to Gore
Powell St., Carrall to Gore
Gore Ave., Powell to Cordova
Main St., Powell to Cordova
Water St., Richards to Columbia

Schedule: Apr 14, 2025 - May 31, 2025</content>
<id>urn:uuid:19aee67b-a3b5-443e-bffb-b13ed69e7995</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e9889b56-2d1f-4a5c-a526-e96eef45b4d3"/>
<published>2025-04-16T07:00:00Z</published>
<title>Interim Cordova 2-Way: Richards to Gore</title>
<updated>2025-12-14T02:00:53.584143Z</updated>
<georss:line>49.283189455333655 -123.099567135537 49.28228493852146 -123.09960646763464</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Cordova Street: Cordova Street will be converted to a 2-way street for the 2025 summer Water Street Pedestrian Pilot. Modifications will be carried out on Cordova including traffic signal installations, minor civil works, paint line eradication, surveying, line painting, concrete barrier and sign installations. Starting May 12, two northern lanes of Cordova Street will be closed to traffic as the reconfiguration of the street is finalized. Eastbound vehicle travel will be retained during this work.  Once construction is completed in late May, Cordova Street will re-open as a two-way street for the summer. During this time, the City will be monitoring the performance of the street.

Water Street: There will be intermittent impacts to Water Street in late May and early June 2025 for the installation of the 2025 Water Street Pedestrian Pilot. The work will include the installation of concrete barriers, line painting, planters, furniture installation and removing bollards. Water Street works will be removed in September 2025. 


Location: Cordova St. - Richards to Gore
Powell St., Carrall to Gore
Gore Ave., Powell to Cordova
Main St., Powell to Cordova
Water St., Richards to Columbia

Schedule: Apr 14, 2025 - May 31, 2025</content>
<id>urn:uuid:bca8b5dc-9a2f-4a8d-a373-356994077f3c</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e9889b56-2d1f-4a5c-a526-e96eef45b4d3"/>
<published>2025-04-16T07:00:00Z</published>
<title>Interim Cordova 2-Way: Richards to Gore</title>
<updated>2025-12-14T02:00:53.584143Z</updated>
<georss:line>49.282332969817475 -123.10221581369929 49.28235570101336 -123.10340834232835 49.28237120969038 -123.10366824665677 49.28239990526677 -123.10388752057223 49.282475700850796 -123.10430442445526</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Cordova Street: Cordova Street will be converted to a 2-way street for the 2025 summer Water Street Pedestrian Pilot. Modifications will be carried out on Cordova including traffic signal installations, minor civil works, paint line eradication, surveying, line painting, concrete barrier and sign installations. Starting May 12, two northern lanes of Cordova Street will be closed to traffic as the reconfiguration of the street is finalized. Eastbound vehicle travel will be retained during this work.  Once construction is completed in late May, Cordova Street will re-open as a two-way street for the summer. During this time, the City will be monitoring the performance of the street.

Water Street: There will be intermittent impacts to Water Street in late May and early June 2025 for the installation of the 2025 Water Street Pedestrian Pilot. The work will include the installation of concrete barriers, line painting, planters, furniture installation and removing bollards. Water Street works will be removed in September 2025. 


Location: Cordova St. - Richards to Gore
Powell St., Carrall to Gore
Gore Ave., Powell to Cordova
Main St., Powell to Cordova
Water St., Richards to Columbia

Schedule: Apr 14, 2025 - May 31, 2025</content>
<id>urn:uuid:b9d6e989-9186-4a19-b5bc-9c2993dab731</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e9889b56-2d1f-4a5c-a526-e96eef45b4d3"/>
<published>2025-04-16T07:00:00Z</published>
<title>Interim Cordova 2-Way: Richards to Gore</title>
<updated>2025-12-14T02:00:53.584143Z</updated>
<georss:line>49.282332969817475 -123.10221581369929 49.282299229021845 -123.10035825384288</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Cordova Street: Cordova Street will be converted to a 2-way street for the 2025 summer Water Street Pedestrian Pilot. Modifications will be carried out on Cordova including traffic signal installations, minor civil works, paint line eradication, surveying, line painting, concrete barrier and sign installations. Starting May 12, two northern lanes of Cordova Street will be closed to traffic as the reconfiguration of the street is finalized. Eastbound vehicle travel will be retained during this work.  Once construction is completed in late May, Cordova Street will re-open as a two-way street for the summer. During this time, the City will be monitoring the performance of the street.

Water Street: There will be intermittent impacts to Water Street in late May and early June 2025 for the installation of the 2025 Water Street Pedestrian Pilot. The work will include the installation of concrete barriers, line painting, planters, furniture installation and removing bollards. Water Street works will be removed in September 2025. 


Location: Cordova St. - Richards to Gore
Powell St., Carrall to Gore
Gore Ave., Powell to Cordova
Main St., Powell to Cordova
Water St., Richards to Columbia

Schedule: Apr 14, 2025 - May 31, 2025</content>
<id>urn:uuid:2324e41d-9cf2-4a8b-891d-b2c846947ad3</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e9889b56-2d1f-4a5c-a526-e96eef45b4d3"/>
<published>2025-04-16T07:00:00Z</published>
<title>Interim Cordova 2-Way: Richards to Gore</title>
<updated>2025-12-14T02:00:53.584143Z</updated>
<georss:line>49.282475700850796 -123.10430442445526 49.28293018940636 -123.10678798525701</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Cordova Street: Cordova Street will be converted to a 2-way street for the 2025 summer Water Street Pedestrian Pilot. Modifications will be carried out on Cordova including traffic signal installations, minor civil works, paint line eradication, surveying, line painting, concrete barrier and sign installations. Starting May 12, two northern lanes of Cordova Street will be closed to traffic as the reconfiguration of the street is finalized. Eastbound vehicle travel will be retained during this work.  Once construction is completed in late May, Cordova Street will re-open as a two-way street for the summer. During this time, the City will be monitoring the performance of the street.

Water Street: There will be intermittent impacts to Water Street in late May and early June 2025 for the installation of the 2025 Water Street Pedestrian Pilot. The work will include the installation of concrete barriers, line painting, planters, furniture installation and removing bollards. Water Street works will be removed in September 2025. 


Location: Cordova St. - Richards to Gore
Powell St., Carrall to Gore
Gore Ave., Powell to Cordova
Main St., Powell to Cordova
Water St., Richards to Columbia

Schedule: Apr 14, 2025 - May 31, 2025</content>
<id>urn:uuid:924939ce-f04e-44ed-8a6d-400a2a5ce1f3</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e9889b56-2d1f-4a5c-a526-e96eef45b4d3"/>
<published>2025-04-16T07:00:00Z</published>
<title>Interim Cordova 2-Way: Richards to Gore</title>
<updated>2025-12-14T02:00:53.584143Z</updated>
<georss:line>49.283156126981766 -123.09773525875318 49.282702221447096 -123.09767141452723</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Closure of Commercial Dr from Venables to Grandview and side streets to alley either side for special event. Venables, E 1st and Grandview open to through traffic. Additional event activations in and around Grandview Park.

Event areas:
900-2200 Commercial Drive, Venables to Grandview Cut
1600-1700 Parker St
1600-1700 Napier St
1600-1700 William St
1200 Cotton Dr
1600-1700 Charles St
1600-1700 Kitchener St
1600-1700 Grant St
1600-1700 Graveley St
1600-1700 E 2nd Av
1600-1700 E 3rd Av
1600-1700 E 4th Av
1700 McSpadden Av
1600-1700 E 5th Av
1600-1700 E 6th Av
1700 E 7th Av
Grandview Park
Location: 
Schedule: Jun 14, 2026</content>
<id>urn:uuid:e15bf824-6275-485b-9216-0c8970430e46</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/9de0d6af-f1d8-41f0-a90c-a9786c6978e4"/>
<published>2026-04-15T07:00:00Z</published>
<title>Italian Day on the Drive</title>
<updated>2026-04-15T17:17:40.2434087Z</updated>
<georss:line>49.27575775196681 -123.06952856254892 49.2753040802408 -123.06954267636496</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Closure of Commercial Dr from Venables to Grandview and side streets to alley either side for special event. Venables, E 1st and Grandview open to through traffic. Additional event activations in and around Grandview Park.

Event areas:
900-2200 Commercial Drive, Venables to Grandview Cut
1600-1700 Parker St
1600-1700 Napier St
1600-1700 William St
1200 Cotton Dr
1600-1700 Charles St
1600-1700 Kitchener St
1600-1700 Grant St
1600-1700 Graveley St
1600-1700 E 2nd Av
1600-1700 E 3rd Av
1600-1700 E 4th Av
1700 McSpadden Av
1600-1700 E 5th Av
1600-1700 E 6th Av
1700 E 7th Av
Grandview Park
Location: 
Schedule: Jun 14, 2026</content>
<id>urn:uuid:d6f01ed8-74f7-4574-9dd2-14cce4358570</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/9de0d6af-f1d8-41f0-a90c-a9786c6978e4"/>
<published>2026-04-15T07:00:00Z</published>
<title>Italian Day on the Drive</title>
<updated>2026-04-15T17:17:40.2434087Z</updated>
<georss:line>49.27575775196681 -123.06952856254892 49.27575453189942 -123.06888238848835</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Closure of Commercial Dr from Venables to Grandview and side streets to alley either side for special event. Venables, E 1st and Grandview open to through traffic. Additional event activations in and around Grandview Park.

Event areas:
900-2200 Commercial Drive, Venables to Grandview Cut
1600-1700 Parker St
1600-1700 Napier St
1600-1700 William St
1200 Cotton Dr
1600-1700 Charles St
1600-1700 Kitchener St
1600-1700 Grant St
1600-1700 Graveley St
1600-1700 E 2nd Av
1600-1700 E 3rd Av
1600-1700 E 4th Av
1700 McSpadden Av
1600-1700 E 5th Av
1600-1700 E 6th Av
1700 E 7th Av
Grandview Park
Location: 
Schedule: Jun 14, 2026</content>
<id>urn:uuid:9aa0157d-f578-4d0a-8418-a29035af9f6b</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/9de0d6af-f1d8-41f0-a90c-a9786c6978e4"/>
<published>2026-04-15T07:00:00Z</published>
<title>Italian Day on the Drive</title>
<updated>2026-04-15T17:17:40.2434087Z</updated>
<georss:line>49.27576255181958 -123.07011505887786 49.27575775196681 -123.06952856254892</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Closure of Commercial Dr from Venables to Grandview and side streets to alley either side for special event. Venables, E 1st and Grandview open to through traffic. Additional event activations in and around Grandview Park.

Event areas:
900-2200 Commercial Drive, Venables to Grandview Cut
1600-1700 Parker St
1600-1700 Napier St
1600-1700 William St
1200 Cotton Dr
1600-1700 Charles St
1600-1700 Kitchener St
1600-1700 Grant St
1600-1700 Graveley St
1600-1700 E 2nd Av
1600-1700 E 3rd Av
1600-1700 E 4th Av
1700 McSpadden Av
1600-1700 E 5th Av
1600-1700 E 6th Av
1700 E 7th Av
Grandview Park
Location: 
Schedule: Jun 14, 2026</content>
<id>urn:uuid:c20d3df2-1118-4fa6-8f1e-e7a0e2b75267</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/9de0d6af-f1d8-41f0-a90c-a9786c6978e4"/>
<published>2026-04-15T07:00:00Z</published>
<title>Italian Day on the Drive</title>
<updated>2026-04-15T17:17:40.2434087Z</updated>
<georss:line>49.27620670035168 -123.069515830401 49.27575775196681 -123.06952856254892</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Closure of Commercial Dr from Venables to Grandview and side streets to alley either side for special event. Venables, E 1st and Grandview open to through traffic. Additional event activations in and around Grandview Park.

Event areas:
900-2200 Commercial Drive, Venables to Grandview Cut
1600-1700 Parker St
1600-1700 Napier St
1600-1700 William St
1200 Cotton Dr
1600-1700 Charles St
1600-1700 Kitchener St
1600-1700 Grant St
1600-1700 Graveley St
1600-1700 E 2nd Av
1600-1700 E 3rd Av
1600-1700 E 4th Av
1700 McSpadden Av
1600-1700 E 5th Av
1600-1700 E 6th Av
1700 E 7th Av
Grandview Park
Location: 
Schedule: Jun 14, 2026</content>
<id>urn:uuid:8739f39c-946d-4856-94ba-4a784660d7cb</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/9de0d6af-f1d8-41f0-a90c-a9786c6978e4"/>
<published>2026-04-15T07:00:00Z</published>
<title>Italian Day on the Drive</title>
<updated>2026-04-15T17:17:40.2434087Z</updated>
<georss:line>49.27665432255546 -123.0695095028453 49.27620670035168 -123.069515830401</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Closure of Commercial Dr from Venables to Grandview and side streets to alley either side for special event. Venables, E 1st and Grandview open to through traffic. Additional event activations in and around Grandview Park.

Event areas:
900-2200 Commercial Drive, Venables to Grandview Cut
1600-1700 Parker St
1600-1700 Napier St
1600-1700 William St
1200 Cotton Dr
1600-1700 Charles St
1600-1700 Kitchener St
1600-1700 Grant St
1600-1700 Graveley St
1600-1700 E 2nd Av
1600-1700 E 3rd Av
1600-1700 E 4th Av
1700 McSpadden Av
1600-1700 E 5th Av
1600-1700 E 6th Av
1700 E 7th Av
Grandview Park
Location: 
Schedule: Jun 14, 2026</content>
<id>urn:uuid:cbba08c2-63be-4b3f-8095-da82c9616799</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/9de0d6af-f1d8-41f0-a90c-a9786c6978e4"/>
<published>2026-04-15T07:00:00Z</published>
<title>Italian Day on the Drive</title>
<updated>2026-04-15T17:17:40.2434087Z</updated>
<georss:line>49.273953596368244 -123.07022739655 49.27394777092681 -123.06956741236642</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Closure of Commercial Dr from Venables to Grandview and side streets to alley either side for special event. Venables, E 1st and Grandview open to through traffic. Additional event activations in and around Grandview Park.

Event areas:
900-2200 Commercial Drive, Venables to Grandview Cut
1600-1700 Parker St
1600-1700 Napier St
1600-1700 William St
1200 Cotton Dr
1600-1700 Charles St
1600-1700 Kitchener St
1600-1700 Grant St
1600-1700 Graveley St
1600-1700 E 2nd Av
1600-1700 E 3rd Av
1600-1700 E 4th Av
1700 McSpadden Av
1600-1700 E 5th Av
1600-1700 E 6th Av
1700 E 7th Av
Grandview Park
Location: 
Schedule: Jun 14, 2026</content>
<id>urn:uuid:f9ac2af8-4c32-467d-8638-130ca0bfb688</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/9de0d6af-f1d8-41f0-a90c-a9786c6978e4"/>
<published>2026-04-15T07:00:00Z</published>
<title>Italian Day on the Drive</title>
<updated>2026-04-15T17:17:40.2434087Z</updated>
<georss:line>49.274852140277034 -123.06954894239927 49.27394777092681 -123.06956741236642</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Closure of Commercial Dr from Venables to Grandview and side streets to alley either side for special event. Venables, E 1st and Grandview open to through traffic. Additional event activations in and around Grandview Park.

Event areas:
900-2200 Commercial Drive, Venables to Grandview Cut
1600-1700 Parker St
1600-1700 Napier St
1600-1700 William St
1200 Cotton Dr
1600-1700 Charles St
1600-1700 Kitchener St
1600-1700 Grant St
1600-1700 Graveley St
1600-1700 E 2nd Av
1600-1700 E 3rd Av
1600-1700 E 4th Av
1700 McSpadden Av
1600-1700 E 5th Av
1600-1700 E 6th Av
1700 E 7th Av
Grandview Park
Location: 
Schedule: Jun 14, 2026</content>
<id>urn:uuid:440fe877-4d6f-478e-bfa2-4c326d655f51</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/9de0d6af-f1d8-41f0-a90c-a9786c6978e4"/>
<published>2026-04-15T07:00:00Z</published>
<title>Italian Day on the Drive</title>
<updated>2026-04-15T17:17:40.2434087Z</updated>
<georss:line>49.274852140277034 -123.06954894239927 49.27484956935618 -123.06890045770258</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Closure of Commercial Dr from Venables to Grandview and side streets to alley either side for special event. Venables, E 1st and Grandview open to through traffic. Additional event activations in and around Grandview Park.

Event areas:
900-2200 Commercial Drive, Venables to Grandview Cut
1600-1700 Parker St
1600-1700 Napier St
1600-1700 William St
1200 Cotton Dr
1600-1700 Charles St
1600-1700 Kitchener St
1600-1700 Grant St
1600-1700 Graveley St
1600-1700 E 2nd Av
1600-1700 E 3rd Av
1600-1700 E 4th Av
1700 McSpadden Av
1600-1700 E 5th Av
1600-1700 E 6th Av
1700 E 7th Av
Grandview Park
Location: 
Schedule: Jun 14, 2026</content>
<id>urn:uuid:93326415-c0c8-4fda-8284-125c66039b03</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/9de0d6af-f1d8-41f0-a90c-a9786c6978e4"/>
<published>2026-04-15T07:00:00Z</published>
<title>Italian Day on the Drive</title>
<updated>2026-04-15T17:17:40.2434087Z</updated>
<georss:line>49.274854835005726 -123.07016531260693 49.274852140277034 -123.06954894239927</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Closure of Commercial Dr from Venables to Grandview and side streets to alley either side for special event. Venables, E 1st and Grandview open to through traffic. Additional event activations in and around Grandview Park.

Event areas:
900-2200 Commercial Drive, Venables to Grandview Cut
1600-1700 Parker St
1600-1700 Napier St
1600-1700 William St
1200 Cotton Dr
1600-1700 Charles St
1600-1700 Kitchener St
1600-1700 Grant St
1600-1700 Graveley St
1600-1700 E 2nd Av
1600-1700 E 3rd Av
1600-1700 E 4th Av
1700 McSpadden Av
1600-1700 E 5th Av
1600-1700 E 6th Av
1700 E 7th Av
Grandview Park
Location: 
Schedule: Jun 14, 2026</content>
<id>urn:uuid:c4122aad-df82-4d6b-a563-563a02b80d3d</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/9de0d6af-f1d8-41f0-a90c-a9786c6978e4"/>
<published>2026-04-15T07:00:00Z</published>
<title>Italian Day on the Drive</title>
<updated>2026-04-15T17:17:40.2434087Z</updated>
<georss:line>49.2753040802408 -123.06954267636496 49.274852140277034 -123.06954894239927</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Closure of Commercial Dr from Venables to Grandview and side streets to alley either side for special event. Venables, E 1st and Grandview open to through traffic. Additional event activations in and around Grandview Park.

Event areas:
900-2200 Commercial Drive, Venables to Grandview Cut
1600-1700 Parker St
1600-1700 Napier St
1600-1700 William St
1200 Cotton Dr
1600-1700 Charles St
1600-1700 Kitchener St
1600-1700 Grant St
1600-1700 Graveley St
1600-1700 E 2nd Av
1600-1700 E 3rd Av
1600-1700 E 4th Av
1700 McSpadden Av
1600-1700 E 5th Av
1600-1700 E 6th Av
1700 E 7th Av
Grandview Park
Location: 
Schedule: Jun 14, 2026</content>
<id>urn:uuid:db1dbbe4-5d47-453c-b241-e62498ed1ea2</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/9de0d6af-f1d8-41f0-a90c-a9786c6978e4"/>
<published>2026-04-15T07:00:00Z</published>
<title>Italian Day on the Drive</title>
<updated>2026-04-15T17:17:40.2434087Z</updated>
<georss:line>49.27305993972573 -123.07150755006597 49.27305029928999 -123.07024241850777</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Closure of Commercial Dr from Venables to Grandview and side streets to alley either side for special event. Venables, E 1st and Grandview open to through traffic. Additional event activations in and around Grandview Park.

Event areas:
900-2200 Commercial Drive, Venables to Grandview Cut
1600-1700 Parker St
1600-1700 Napier St
1600-1700 William St
1200 Cotton Dr
1600-1700 Charles St
1600-1700 Kitchener St
1600-1700 Grant St
1600-1700 Graveley St
1600-1700 E 2nd Av
1600-1700 E 3rd Av
1600-1700 E 4th Av
1700 McSpadden Av
1600-1700 E 5th Av
1600-1700 E 6th Av
1700 E 7th Av
Grandview Park
Location: 
Schedule: Jun 14, 2026</content>
<id>urn:uuid:e5968a33-25bc-4c33-a9d2-90ce77a6bc21</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/9de0d6af-f1d8-41f0-a90c-a9786c6978e4"/>
<published>2026-04-15T07:00:00Z</published>
<title>Italian Day on the Drive</title>
<updated>2026-04-15T17:17:40.2434087Z</updated>
<georss:line>49.27351196235651 -123.07149892395861 49.27305993972573 -123.07150755006597</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Closure of Commercial Dr from Venables to Grandview and side streets to alley either side for special event. Venables, E 1st and Grandview open to through traffic. Additional event activations in and around Grandview Park.

Event areas:
900-2200 Commercial Drive, Venables to Grandview Cut
1600-1700 Parker St
1600-1700 Napier St
1600-1700 William St
1200 Cotton Dr
1600-1700 Charles St
1600-1700 Kitchener St
1600-1700 Grant St
1600-1700 Graveley St
1600-1700 E 2nd Av
1600-1700 E 3rd Av
1600-1700 E 4th Av
1700 McSpadden Av
1600-1700 E 5th Av
1600-1700 E 6th Av
1700 E 7th Av
Grandview Park
Location: 
Schedule: Jun 14, 2026</content>
<id>urn:uuid:d3bdd9ff-df5e-4e8e-8ad6-8f01b783554f</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/9de0d6af-f1d8-41f0-a90c-a9786c6978e4"/>
<published>2026-04-15T07:00:00Z</published>
<title>Italian Day on the Drive</title>
<updated>2026-04-15T17:17:40.2434087Z</updated>
<georss:line>49.273961774343974 -123.07150126500629 49.27351196235651 -123.07149892395861</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Closure of Commercial Dr from Venables to Grandview and side streets to alley either side for special event. Venables, E 1st and Grandview open to through traffic. Additional event activations in and around Grandview Park.

Event areas:
900-2200 Commercial Drive, Venables to Grandview Cut
1600-1700 Parker St
1600-1700 Napier St
1600-1700 William St
1200 Cotton Dr
1600-1700 Charles St
1600-1700 Kitchener St
1600-1700 Grant St
1600-1700 Graveley St
1600-1700 E 2nd Av
1600-1700 E 3rd Av
1600-1700 E 4th Av
1700 McSpadden Av
1600-1700 E 5th Av
1600-1700 E 6th Av
1700 E 7th Av
Grandview Park
Location: 
Schedule: Jun 14, 2026</content>
<id>urn:uuid:67c235cf-61e5-4970-bb46-d9fae104508e</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/9de0d6af-f1d8-41f0-a90c-a9786c6978e4"/>
<published>2026-04-15T07:00:00Z</published>
<title>Italian Day on the Drive</title>
<updated>2026-04-15T17:17:40.2434087Z</updated>
<georss:line>49.273961774343974 -123.07150126500629 49.27395701591706 -123.0707706474546</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Closure of Commercial Dr from Venables to Grandview and side streets to alley either side for special event. Venables, E 1st and Grandview open to through traffic. Additional event activations in and around Grandview Park.

Event areas:
900-2200 Commercial Drive, Venables to Grandview Cut
1600-1700 Parker St
1600-1700 Napier St
1600-1700 William St
1200 Cotton Dr
1600-1700 Charles St
1600-1700 Kitchener St
1600-1700 Grant St
1600-1700 Graveley St
1600-1700 E 2nd Av
1600-1700 E 3rd Av
1600-1700 E 4th Av
1700 McSpadden Av
1600-1700 E 5th Av
1600-1700 E 6th Av
1700 E 7th Av
Grandview Park
Location: 
Schedule: Jun 14, 2026</content>
<id>urn:uuid:8edccd4b-9804-438c-8d0e-252f9b887bb0</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/9de0d6af-f1d8-41f0-a90c-a9786c6978e4"/>
<published>2026-04-15T07:00:00Z</published>
<title>Italian Day on the Drive</title>
<updated>2026-04-15T17:17:40.2434087Z</updated>
<georss:line>49.27395701591706 -123.0707706474546 49.273897341035195 -123.07077195058133 49.273892894295244 -123.0702315720967 49.273953596368244 -123.07022739655</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Closure of Commercial Dr from Venables to Grandview and side streets to alley either side for special event. Venables, E 1st and Grandview open to through traffic. Additional event activations in and around Grandview Park.

Event areas:
900-2200 Commercial Drive, Venables to Grandview Cut
1600-1700 Parker St
1600-1700 Napier St
1600-1700 William St
1200 Cotton Dr
1600-1700 Charles St
1600-1700 Kitchener St
1600-1700 Grant St
1600-1700 Graveley St
1600-1700 E 2nd Av
1600-1700 E 3rd Av
1600-1700 E 4th Av
1700 McSpadden Av
1600-1700 E 5th Av
1600-1700 E 6th Av
1700 E 7th Av
Grandview Park
Location: 
Schedule: Jun 14, 2026</content>
<id>urn:uuid:76fbee04-3dc6-48c6-9d2e-2f46defa037e</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/9de0d6af-f1d8-41f0-a90c-a9786c6978e4"/>
<published>2026-04-15T07:00:00Z</published>
<title>Italian Day on the Drive</title>
<updated>2026-04-15T17:17:40.2434087Z</updated>
<georss:line>49.27305029928999 -123.07024241850777 49.2730449184171 -123.06957626073961</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Closure of Commercial Dr from Venables to Grandview and side streets to alley either side for special event. Venables, E 1st and Grandview open to through traffic. Additional event activations in and around Grandview Park.

Event areas:
900-2200 Commercial Drive, Venables to Grandview Cut
1600-1700 Parker St
1600-1700 Napier St
1600-1700 William St
1200 Cotton Dr
1600-1700 Charles St
1600-1700 Kitchener St
1600-1700 Grant St
1600-1700 Graveley St
1600-1700 E 2nd Av
1600-1700 E 3rd Av
1600-1700 E 4th Av
1700 McSpadden Av
1600-1700 E 5th Av
1600-1700 E 6th Av
1700 E 7th Av
Grandview Park
Location: 
Schedule: Jun 14, 2026</content>
<id>urn:uuid:85084630-ff11-4308-b7af-79c3f883024b</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/9de0d6af-f1d8-41f0-a90c-a9786c6978e4"/>
<published>2026-04-15T07:00:00Z</published>
<title>Italian Day on the Drive</title>
<updated>2026-04-15T17:17:40.2434087Z</updated>
<georss:line>49.27214542577937 -123.07026094317901 49.272141289140876 -123.0695901528606</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Closure of Commercial Dr from Venables to Grandview and side streets to alley either side for special event. Venables, E 1st and Grandview open to through traffic. Additional event activations in and around Grandview Park.

Event areas:
900-2200 Commercial Drive, Venables to Grandview Cut
1600-1700 Parker St
1600-1700 Napier St
1600-1700 William St
1200 Cotton Dr
1600-1700 Charles St
1600-1700 Kitchener St
1600-1700 Grant St
1600-1700 Graveley St
1600-1700 E 2nd Av
1600-1700 E 3rd Av
1600-1700 E 4th Av
1700 McSpadden Av
1600-1700 E 5th Av
1600-1700 E 6th Av
1700 E 7th Av
Grandview Park
Location: 
Schedule: Jun 14, 2026</content>
<id>urn:uuid:d7ed6afa-acb6-4138-abc4-170d65d3f6ba</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/9de0d6af-f1d8-41f0-a90c-a9786c6978e4"/>
<published>2026-04-15T07:00:00Z</published>
<title>Italian Day on the Drive</title>
<updated>2026-04-15T17:17:40.2434087Z</updated>
<georss:line>49.2730449184171 -123.06957626073961 49.272141289140876 -123.0695901528606</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Closure of Commercial Dr from Venables to Grandview and side streets to alley either side for special event. Venables, E 1st and Grandview open to through traffic. Additional event activations in and around Grandview Park.

Event areas:
900-2200 Commercial Drive, Venables to Grandview Cut
1600-1700 Parker St
1600-1700 Napier St
1600-1700 William St
1200 Cotton Dr
1600-1700 Charles St
1600-1700 Kitchener St
1600-1700 Grant St
1600-1700 Graveley St
1600-1700 E 2nd Av
1600-1700 E 3rd Av
1600-1700 E 4th Av
1700 McSpadden Av
1600-1700 E 5th Av
1600-1700 E 6th Av
1700 E 7th Av
Grandview Park
Location: 
Schedule: Jun 14, 2026</content>
<id>urn:uuid:87a2be10-1a73-425f-9af3-1786cddfe966</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/9de0d6af-f1d8-41f0-a90c-a9786c6978e4"/>
<published>2026-04-15T07:00:00Z</published>
<title>Italian Day on the Drive</title>
<updated>2026-04-15T17:17:40.2434087Z</updated>
<georss:line>49.2730449184171 -123.06957626073961 49.27303576243463 -123.06892901406151</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Closure of Commercial Dr from Venables to Grandview and side streets to alley either side for special event. Venables, E 1st and Grandview open to through traffic. Additional event activations in and around Grandview Park.

Event areas:
900-2200 Commercial Drive, Venables to Grandview Cut
1600-1700 Parker St
1600-1700 Napier St
1600-1700 William St
1200 Cotton Dr
1600-1700 Charles St
1600-1700 Kitchener St
1600-1700 Grant St
1600-1700 Graveley St
1600-1700 E 2nd Av
1600-1700 E 3rd Av
1600-1700 E 4th Av
1700 McSpadden Av
1600-1700 E 5th Av
1600-1700 E 6th Av
1700 E 7th Av
Grandview Park
Location: 
Schedule: Jun 14, 2026</content>
<id>urn:uuid:e936e2fd-1d5f-4362-ad0e-8cfc84b8ba06</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/9de0d6af-f1d8-41f0-a90c-a9786c6978e4"/>
<published>2026-04-15T07:00:00Z</published>
<title>Italian Day on the Drive</title>
<updated>2026-04-15T17:17:40.2434087Z</updated>
<georss:line>49.27394777092681 -123.06956741236642 49.2730449184171 -123.06957626073961</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Closure of Commercial Dr from Venables to Grandview and side streets to alley either side for special event. Venables, E 1st and Grandview open to through traffic. Additional event activations in and around Grandview Park.

Event areas:
900-2200 Commercial Drive, Venables to Grandview Cut
1600-1700 Parker St
1600-1700 Napier St
1600-1700 William St
1200 Cotton Dr
1600-1700 Charles St
1600-1700 Kitchener St
1600-1700 Grant St
1600-1700 Graveley St
1600-1700 E 2nd Av
1600-1700 E 3rd Av
1600-1700 E 4th Av
1700 McSpadden Av
1600-1700 E 5th Av
1600-1700 E 6th Av
1700 E 7th Av
Grandview Park
Location: 
Schedule: Jun 14, 2026</content>
<id>urn:uuid:fb55cf13-0e15-46fa-9ccc-1ce67d7a1f21</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/9de0d6af-f1d8-41f0-a90c-a9786c6978e4"/>
<published>2026-04-15T07:00:00Z</published>
<title>Italian Day on the Drive</title>
<updated>2026-04-15T17:17:40.2434087Z</updated>
<georss:line>49.27394777092681 -123.06956741236642 49.27394471478823 -123.06905382924441</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Closure of Commercial Dr from Venables to Grandview and side streets to alley either side for special event. Venables, E 1st and Grandview open to through traffic. Additional event activations in and around Grandview Park.

Event areas:
900-2200 Commercial Drive, Venables to Grandview Cut
1600-1700 Parker St
1600-1700 Napier St
1600-1700 William St
1200 Cotton Dr
1600-1700 Charles St
1600-1700 Kitchener St
1600-1700 Grant St
1600-1700 Graveley St
1600-1700 E 2nd Av
1600-1700 E 3rd Av
1600-1700 E 4th Av
1700 McSpadden Av
1600-1700 E 5th Av
1600-1700 E 6th Av
1700 E 7th Av
Grandview Park
Location: 
Schedule: Jun 14, 2026</content>
<id>urn:uuid:a34b10f4-9200-4728-ad2b-7beda8c7e9d9</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/9de0d6af-f1d8-41f0-a90c-a9786c6978e4"/>
<published>2026-04-15T07:00:00Z</published>
<title>Italian Day on the Drive</title>
<updated>2026-04-15T17:17:40.2434087Z</updated>
<georss:line>49.27129663025252 -123.06960728920801 49.27096532561998 -123.06961171690715</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Closure of Commercial Dr from Venables to Grandview and side streets to alley either side for special event. Venables, E 1st and Grandview open to through traffic. Additional event activations in and around Grandview Park.

Event areas:
900-2200 Commercial Drive, Venables to Grandview Cut
1600-1700 Parker St
1600-1700 Napier St
1600-1700 William St
1200 Cotton Dr
1600-1700 Charles St
1600-1700 Kitchener St
1600-1700 Grant St
1600-1700 Graveley St
1600-1700 E 2nd Av
1600-1700 E 3rd Av
1600-1700 E 4th Av
1700 McSpadden Av
1600-1700 E 5th Av
1600-1700 E 6th Av
1700 E 7th Av
Grandview Park
Location: 
Schedule: Jun 14, 2026</content>
<id>urn:uuid:bc7fb302-5bb6-4813-82d8-334c6bdfba26</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/9de0d6af-f1d8-41f0-a90c-a9786c6978e4"/>
<published>2026-04-15T07:00:00Z</published>
<title>Italian Day on the Drive</title>
<updated>2026-04-15T17:17:40.2434087Z</updated>
<georss:line>49.27129663025252 -123.06960728920801 49.271291338945645 -123.06890548241898</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Closure of Commercial Dr from Venables to Grandview and side streets to alley either side for special event. Venables, E 1st and Grandview open to through traffic. Additional event activations in and around Grandview Park.

Event areas:
900-2200 Commercial Drive, Venables to Grandview Cut
1600-1700 Parker St
1600-1700 Napier St
1600-1700 William St
1200 Cotton Dr
1600-1700 Charles St
1600-1700 Kitchener St
1600-1700 Grant St
1600-1700 Graveley St
1600-1700 E 2nd Av
1600-1700 E 3rd Av
1600-1700 E 4th Av
1700 McSpadden Av
1600-1700 E 5th Av
1600-1700 E 6th Av
1700 E 7th Av
Grandview Park
Location: 
Schedule: Jun 14, 2026</content>
<id>urn:uuid:e6995ea9-e0a5-4689-914a-8fffc243f13d</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/9de0d6af-f1d8-41f0-a90c-a9786c6978e4"/>
<published>2026-04-15T07:00:00Z</published>
<title>Italian Day on the Drive</title>
<updated>2026-04-15T17:17:40.2434087Z</updated>
<georss:line>49.27141759841598 -123.0696059472537 49.27129663025252 -123.06960728920801</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Closure of Commercial Dr from Venables to Grandview and side streets to alley either side for special event. Venables, E 1st and Grandview open to through traffic. Additional event activations in and around Grandview Park.

Event areas:
900-2200 Commercial Drive, Venables to Grandview Cut
1600-1700 Parker St
1600-1700 Napier St
1600-1700 William St
1200 Cotton Dr
1600-1700 Charles St
1600-1700 Kitchener St
1600-1700 Grant St
1600-1700 Graveley St
1600-1700 E 2nd Av
1600-1700 E 3rd Av
1600-1700 E 4th Av
1700 McSpadden Av
1600-1700 E 5th Av
1600-1700 E 6th Av
1700 E 7th Av
Grandview Park
Location: 
Schedule: Jun 14, 2026</content>
<id>urn:uuid:f4c22d29-ee8f-4d77-a199-4656bff503ce</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/9de0d6af-f1d8-41f0-a90c-a9786c6978e4"/>
<published>2026-04-15T07:00:00Z</published>
<title>Italian Day on the Drive</title>
<updated>2026-04-15T17:17:40.2434087Z</updated>
<georss:line>49.271421450800915 -123.07013743112054 49.27141759841598 -123.0696059472537</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Closure of Commercial Dr from Venables to Grandview and side streets to alley either side for special event. Venables, E 1st and Grandview open to through traffic. Additional event activations in and around Grandview Park.

Event areas:
900-2200 Commercial Drive, Venables to Grandview Cut
1600-1700 Parker St
1600-1700 Napier St
1600-1700 William St
1200 Cotton Dr
1600-1700 Charles St
1600-1700 Kitchener St
1600-1700 Grant St
1600-1700 Graveley St
1600-1700 E 2nd Av
1600-1700 E 3rd Av
1600-1700 E 4th Av
1700 McSpadden Av
1600-1700 E 5th Av
1600-1700 E 6th Av
1700 E 7th Av
Grandview Park
Location: 
Schedule: Jun 14, 2026</content>
<id>urn:uuid:bd04a700-3cfb-40d4-89b8-f5b266f420f8</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/9de0d6af-f1d8-41f0-a90c-a9786c6978e4"/>
<published>2026-04-15T07:00:00Z</published>
<title>Italian Day on the Drive</title>
<updated>2026-04-15T17:17:40.2434087Z</updated>
<georss:line>49.272141289140876 -123.0695901528606 49.27141759841598 -123.0696059472537</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Closure of Commercial Dr from Venables to Grandview and side streets to alley either side for special event. Venables, E 1st and Grandview open to through traffic. Additional event activations in and around Grandview Park.

Event areas:
900-2200 Commercial Drive, Venables to Grandview Cut
1600-1700 Parker St
1600-1700 Napier St
1600-1700 William St
1200 Cotton Dr
1600-1700 Charles St
1600-1700 Kitchener St
1600-1700 Grant St
1600-1700 Graveley St
1600-1700 E 2nd Av
1600-1700 E 3rd Av
1600-1700 E 4th Av
1700 McSpadden Av
1600-1700 E 5th Av
1600-1700 E 6th Av
1700 E 7th Av
Grandview Park
Location: 
Schedule: Jun 14, 2026</content>
<id>urn:uuid:9b9415a8-b060-49a8-8181-8d645364f873</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/9de0d6af-f1d8-41f0-a90c-a9786c6978e4"/>
<published>2026-04-15T07:00:00Z</published>
<title>Italian Day on the Drive</title>
<updated>2026-04-15T17:17:40.2434087Z</updated>
<georss:line>49.272141289140876 -123.0695901528606 49.27213637984235 -123.06894143924531</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Closure of Commercial Dr from Venables to Grandview and side streets to alley either side for special event. Venables, E 1st and Grandview open to through traffic. Additional event activations in and around Grandview Park.

Event areas:
900-2200 Commercial Drive, Venables to Grandview Cut
1600-1700 Parker St
1600-1700 Napier St
1600-1700 William St
1200 Cotton Dr
1600-1700 Charles St
1600-1700 Kitchener St
1600-1700 Grant St
1600-1700 Graveley St
1600-1700 E 2nd Av
1600-1700 E 3rd Av
1600-1700 E 4th Av
1700 McSpadden Av
1600-1700 E 5th Av
1600-1700 E 6th Av
1700 E 7th Av
Grandview Park
Location: 
Schedule: Jun 14, 2026</content>
<id>urn:uuid:2e713bc0-a11f-4138-838a-01eb9f833efb</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/9de0d6af-f1d8-41f0-a90c-a9786c6978e4"/>
<published>2026-04-15T07:00:00Z</published>
<title>Italian Day on the Drive</title>
<updated>2026-04-15T17:17:40.2434087Z</updated>
<georss:line>49.270514723755895 -123.06962103541777 49.26960525488292 -123.0696371035004</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Closure of Commercial Dr from Venables to Grandview and side streets to alley either side for special event. Venables, E 1st and Grandview open to through traffic. Additional event activations in and around Grandview Park.

Event areas:
900-2200 Commercial Drive, Venables to Grandview Cut
1600-1700 Parker St
1600-1700 Napier St
1600-1700 William St
1200 Cotton Dr
1600-1700 Charles St
1600-1700 Kitchener St
1600-1700 Grant St
1600-1700 Graveley St
1600-1700 E 2nd Av
1600-1700 E 3rd Av
1600-1700 E 4th Av
1700 McSpadden Av
1600-1700 E 5th Av
1600-1700 E 6th Av
1700 E 7th Av
Grandview Park
Location: 
Schedule: Jun 14, 2026</content>
<id>urn:uuid:9e00786d-1f57-475e-be9f-b9c58982d637</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/9de0d6af-f1d8-41f0-a90c-a9786c6978e4"/>
<published>2026-04-15T07:00:00Z</published>
<title>Italian Day on the Drive</title>
<updated>2026-04-15T17:17:40.2434087Z</updated>
<georss:line>49.270514723755895 -123.06962103541777 49.27049642725066 -123.0676836143716</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Closure of Commercial Dr from Venables to Grandview and side streets to alley either side for special event. Venables, E 1st and Grandview open to through traffic. Additional event activations in and around Grandview Park.

Event areas:
900-2200 Commercial Drive, Venables to Grandview Cut
1600-1700 Parker St
1600-1700 Napier St
1600-1700 William St
1200 Cotton Dr
1600-1700 Charles St
1600-1700 Kitchener St
1600-1700 Grant St
1600-1700 Graveley St
1600-1700 E 2nd Av
1600-1700 E 3rd Av
1600-1700 E 4th Av
1700 McSpadden Av
1600-1700 E 5th Av
1600-1700 E 6th Av
1700 E 7th Av
Grandview Park
Location: 
Schedule: Jun 14, 2026</content>
<id>urn:uuid:e31b8052-a02f-41c8-a300-348389db07d3</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/9de0d6af-f1d8-41f0-a90c-a9786c6978e4"/>
<published>2026-04-15T07:00:00Z</published>
<title>Italian Day on the Drive</title>
<updated>2026-04-15T17:17:40.2434087Z</updated>
<georss:line>49.27051679678206 -123.07014962029012 49.270514723755895 -123.06962103541777</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Closure of Commercial Dr from Venables to Grandview and side streets to alley either side for special event. Venables, E 1st and Grandview open to through traffic. Additional event activations in and around Grandview Park.

Event areas:
900-2200 Commercial Drive, Venables to Grandview Cut
1600-1700 Parker St
1600-1700 Napier St
1600-1700 William St
1200 Cotton Dr
1600-1700 Charles St
1600-1700 Kitchener St
1600-1700 Grant St
1600-1700 Graveley St
1600-1700 E 2nd Av
1600-1700 E 3rd Av
1600-1700 E 4th Av
1700 McSpadden Av
1600-1700 E 5th Av
1600-1700 E 6th Av
1700 E 7th Av
Grandview Park
Location: 
Schedule: Jun 14, 2026</content>
<id>urn:uuid:e91385b8-b4a3-4c1f-b281-62a0c096ab24</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/9de0d6af-f1d8-41f0-a90c-a9786c6978e4"/>
<published>2026-04-15T07:00:00Z</published>
<title>Italian Day on the Drive</title>
<updated>2026-04-15T17:17:40.2434087Z</updated>
<georss:line>49.27096532561998 -123.06961171690715 49.270514723755895 -123.06962103541777</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Closure of Commercial Dr from Venables to Grandview and side streets to alley either side for special event. Venables, E 1st and Grandview open to through traffic. Additional event activations in and around Grandview Park.

Event areas:
900-2200 Commercial Drive, Venables to Grandview Cut
1600-1700 Parker St
1600-1700 Napier St
1600-1700 William St
1200 Cotton Dr
1600-1700 Charles St
1600-1700 Kitchener St
1600-1700 Grant St
1600-1700 Graveley St
1600-1700 E 2nd Av
1600-1700 E 3rd Av
1600-1700 E 4th Av
1700 McSpadden Av
1600-1700 E 5th Av
1600-1700 E 6th Av
1700 E 7th Av
Grandview Park
Location: 
Schedule: Jun 14, 2026</content>
<id>urn:uuid:d409c960-3f7b-4b4f-80b1-20d0615fa4eb</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/9de0d6af-f1d8-41f0-a90c-a9786c6978e4"/>
<published>2026-04-15T07:00:00Z</published>
<title>Italian Day on the Drive</title>
<updated>2026-04-15T17:17:40.2434087Z</updated>
<georss:line>49.267802514633075 -123.07025263190542 49.26779809047602 -123.06967079405132</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Closure of Commercial Dr from Venables to Grandview and side streets to alley either side for special event. Venables, E 1st and Grandview open to through traffic. Additional event activations in and around Grandview Park.

Event areas:
900-2200 Commercial Drive, Venables to Grandview Cut
1600-1700 Parker St
1600-1700 Napier St
1600-1700 William St
1200 Cotton Dr
1600-1700 Charles St
1600-1700 Kitchener St
1600-1700 Grant St
1600-1700 Graveley St
1600-1700 E 2nd Av
1600-1700 E 3rd Av
1600-1700 E 4th Av
1700 McSpadden Av
1600-1700 E 5th Av
1600-1700 E 6th Av
1700 E 7th Av
Grandview Park
Location: 
Schedule: Jun 14, 2026</content>
<id>urn:uuid:fc913073-102f-48df-994c-fb1b50808fd8</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/9de0d6af-f1d8-41f0-a90c-a9786c6978e4"/>
<published>2026-04-15T07:00:00Z</published>
<title>Italian Day on the Drive</title>
<updated>2026-04-15T17:17:40.2434087Z</updated>
<georss:line>49.26825109402381 -123.06966189223787 49.26779809047602 -123.06967079405132</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Closure of Commercial Dr from Venables to Grandview and side streets to alley either side for special event. Venables, E 1st and Grandview open to through traffic. Additional event activations in and around Grandview Park.

Event areas:
900-2200 Commercial Drive, Venables to Grandview Cut
1600-1700 Parker St
1600-1700 Napier St
1600-1700 William St
1200 Cotton Dr
1600-1700 Charles St
1600-1700 Kitchener St
1600-1700 Grant St
1600-1700 Graveley St
1600-1700 E 2nd Av
1600-1700 E 3rd Av
1600-1700 E 4th Av
1700 McSpadden Av
1600-1700 E 5th Av
1600-1700 E 6th Av
1700 E 7th Av
Grandview Park
Location: 
Schedule: Jun 14, 2026</content>
<id>urn:uuid:6fb33d8b-456e-447d-9ba6-459fdb465084</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/9de0d6af-f1d8-41f0-a90c-a9786c6978e4"/>
<published>2026-04-15T07:00:00Z</published>
<title>Italian Day on the Drive</title>
<updated>2026-04-15T17:17:40.2434087Z</updated>
<georss:line>49.26870348592033 -123.06965289318246 49.26825109402381 -123.06966189223787</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Closure of Commercial Dr from Venables to Grandview and side streets to alley either side for special event. Venables, E 1st and Grandview open to through traffic. Additional event activations in and around Grandview Park.

Event areas:
900-2200 Commercial Drive, Venables to Grandview Cut
1600-1700 Parker St
1600-1700 Napier St
1600-1700 William St
1200 Cotton Dr
1600-1700 Charles St
1600-1700 Kitchener St
1600-1700 Grant St
1600-1700 Graveley St
1600-1700 E 2nd Av
1600-1700 E 3rd Av
1600-1700 E 4th Av
1700 McSpadden Av
1600-1700 E 5th Av
1600-1700 E 6th Av
1700 E 7th Av
Grandview Park
Location: 
Schedule: Jun 14, 2026</content>
<id>urn:uuid:dae6e0b5-4672-46fe-9e51-a0642999b102</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/9de0d6af-f1d8-41f0-a90c-a9786c6978e4"/>
<published>2026-04-15T07:00:00Z</published>
<title>Italian Day on the Drive</title>
<updated>2026-04-15T17:17:40.2434087Z</updated>
<georss:line>49.26870348592033 -123.06965289318246 49.26869451172465 -123.06900321550651</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Closure of Commercial Dr from Venables to Grandview and side streets to alley either side for special event. Venables, E 1st and Grandview open to through traffic. Additional event activations in and around Grandview Park.

Event areas:
900-2200 Commercial Drive, Venables to Grandview Cut
1600-1700 Parker St
1600-1700 Napier St
1600-1700 William St
1200 Cotton Dr
1600-1700 Charles St
1600-1700 Kitchener St
1600-1700 Grant St
1600-1700 Graveley St
1600-1700 E 2nd Av
1600-1700 E 3rd Av
1600-1700 E 4th Av
1700 McSpadden Av
1600-1700 E 5th Av
1600-1700 E 6th Av
1700 E 7th Av
Grandview Park
Location: 
Schedule: Jun 14, 2026</content>
<id>urn:uuid:5a7e3659-4954-4c1a-b581-7b5fd0f9eb49</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/9de0d6af-f1d8-41f0-a90c-a9786c6978e4"/>
<published>2026-04-15T07:00:00Z</published>
<title>Italian Day on the Drive</title>
<updated>2026-04-15T17:17:40.2434087Z</updated>
<georss:line>49.26870762051942 -123.07023769666903 49.26870348592033 -123.06965289318246</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Closure of Commercial Dr from Venables to Grandview and side streets to alley either side for special event. Venables, E 1st and Grandview open to through traffic. Additional event activations in and around Grandview Park.

Event areas:
900-2200 Commercial Drive, Venables to Grandview Cut
1600-1700 Parker St
1600-1700 Napier St
1600-1700 William St
1200 Cotton Dr
1600-1700 Charles St
1600-1700 Kitchener St
1600-1700 Grant St
1600-1700 Graveley St
1600-1700 E 2nd Av
1600-1700 E 3rd Av
1600-1700 E 4th Av
1700 McSpadden Av
1600-1700 E 5th Av
1600-1700 E 6th Av
1700 E 7th Av
Grandview Park
Location: 
Schedule: Jun 14, 2026</content>
<id>urn:uuid:f32b12b9-0f68-4d1e-8352-982e27d4ad42</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/9de0d6af-f1d8-41f0-a90c-a9786c6978e4"/>
<published>2026-04-15T07:00:00Z</published>
<title>Italian Day on the Drive</title>
<updated>2026-04-15T17:17:40.2434087Z</updated>
<georss:line>49.26960525488292 -123.0696371035004 49.26870348592033 -123.06965289318246</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Closure of Commercial Dr from Venables to Grandview and side streets to alley either side for special event. Venables, E 1st and Grandview open to through traffic. Additional event activations in and around Grandview Park.

Event areas:
900-2200 Commercial Drive, Venables to Grandview Cut
1600-1700 Parker St
1600-1700 Napier St
1600-1700 William St
1200 Cotton Dr
1600-1700 Charles St
1600-1700 Kitchener St
1600-1700 Grant St
1600-1700 Graveley St
1600-1700 E 2nd Av
1600-1700 E 3rd Av
1600-1700 E 4th Av
1700 McSpadden Av
1600-1700 E 5th Av
1600-1700 E 6th Av
1700 E 7th Av
Grandview Park
Location: 
Schedule: Jun 14, 2026</content>
<id>urn:uuid:36d8bb96-7891-4676-9a55-1d238f519eba</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/9de0d6af-f1d8-41f0-a90c-a9786c6978e4"/>
<published>2026-04-15T07:00:00Z</published>
<title>Italian Day on the Drive</title>
<updated>2026-04-15T17:17:40.2434087Z</updated>
<georss:line>49.2670996769607 -123.06968450472297 49.267095869118066 -123.06913523934767</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Closure of Commercial Dr from Venables to Grandview and side streets to alley either side for special event. Venables, E 1st and Grandview open to through traffic. Additional event activations in and around Grandview Park.

Event areas:
900-2200 Commercial Drive, Venables to Grandview Cut
1600-1700 Parker St
1600-1700 Napier St
1600-1700 William St
1200 Cotton Dr
1600-1700 Charles St
1600-1700 Kitchener St
1600-1700 Grant St
1600-1700 Graveley St
1600-1700 E 2nd Av
1600-1700 E 3rd Av
1600-1700 E 4th Av
1700 McSpadden Av
1600-1700 E 5th Av
1600-1700 E 6th Av
1700 E 7th Av
Grandview Park
Location: 
Schedule: Jun 14, 2026</content>
<id>urn:uuid:75888b41-4e2e-42d7-a6a5-31df70efe6d3</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/9de0d6af-f1d8-41f0-a90c-a9786c6978e4"/>
<published>2026-04-15T07:00:00Z</published>
<title>Italian Day on the Drive</title>
<updated>2026-04-15T17:17:40.2434087Z</updated>
<georss:line>49.267344115469314 -123.06967959811854 49.2670996769607 -123.06968450472297</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Closure of Commercial Dr from Venables to Grandview and side streets to alley either side for special event. Venables, E 1st and Grandview open to through traffic. Additional event activations in and around Grandview Park.

Event areas:
900-2200 Commercial Drive, Venables to Grandview Cut
1600-1700 Parker St
1600-1700 Napier St
1600-1700 William St
1200 Cotton Dr
1600-1700 Charles St
1600-1700 Kitchener St
1600-1700 Grant St
1600-1700 Graveley St
1600-1700 E 2nd Av
1600-1700 E 3rd Av
1600-1700 E 4th Av
1700 McSpadden Av
1600-1700 E 5th Av
1600-1700 E 6th Av
1700 E 7th Av
Grandview Park
Location: 
Schedule: Jun 14, 2026</content>
<id>urn:uuid:7bb2bedd-7ec4-4749-9479-6c9f53f050c0</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/9de0d6af-f1d8-41f0-a90c-a9786c6978e4"/>
<published>2026-04-15T07:00:00Z</published>
<title>Italian Day on the Drive</title>
<updated>2026-04-15T17:17:40.2434087Z</updated>
<georss:line>49.26779809047602 -123.06967079405132 49.267344115469314 -123.06967959811854</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Closure of Commercial Dr from Venables to Grandview and side streets to alley either side for special event. Venables, E 1st and Grandview open to through traffic. Additional event activations in and around Grandview Park.

Event areas:
900-2200 Commercial Drive, Venables to Grandview Cut
1600-1700 Parker St
1600-1700 Napier St
1600-1700 William St
1200 Cotton Dr
1600-1700 Charles St
1600-1700 Kitchener St
1600-1700 Grant St
1600-1700 Graveley St
1600-1700 E 2nd Av
1600-1700 E 3rd Av
1600-1700 E 4th Av
1700 McSpadden Av
1600-1700 E 5th Av
1600-1700 E 6th Av
1700 E 7th Av
Grandview Park
Location: 
Schedule: Jun 14, 2026</content>
<id>urn:uuid:12dcdfbe-8a38-449e-8d65-9efa2cd9b549</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/9de0d6af-f1d8-41f0-a90c-a9786c6978e4"/>
<published>2026-04-15T07:00:00Z</published>
<title>Italian Day on the Drive</title>
<updated>2026-04-15T17:17:40.2434087Z</updated>
<georss:line>49.26779809047602 -123.06967079405132 49.267790078892574 -123.06902107461988</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Closure of Commercial Dr from Venables to Grandview and side streets to alley either side for special event. Venables, E 1st and Grandview open to through traffic. Additional event activations in and around Grandview Park.

Event areas:
900-2200 Commercial Drive, Venables to Grandview Cut
1600-1700 Parker St
1600-1700 Napier St
1600-1700 William St
1200 Cotton Dr
1600-1700 Charles St
1600-1700 Kitchener St
1600-1700 Grant St
1600-1700 Graveley St
1600-1700 E 2nd Av
1600-1700 E 3rd Av
1600-1700 E 4th Av
1700 McSpadden Av
1600-1700 E 5th Av
1600-1700 E 6th Av
1700 E 7th Av
Grandview Park
Location: 
Schedule: Jun 14, 2026</content>
<id>urn:uuid:089a3fcd-44ad-499f-9d6e-eb4fa8ddba80</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/9de0d6af-f1d8-41f0-a90c-a9786c6978e4"/>
<published>2026-04-15T07:00:00Z</published>
<title>Italian Day on the Drive</title>
<updated>2026-04-15T17:17:40.2434087Z</updated>
<georss:line>49.2670996769607 -123.06968450472297 49.26689035602058 -123.06968888342591</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Closure of Commercial Dr from Venables to Grandview and side streets to alley either side for special event. Venables, E 1st and Grandview open to through traffic. Additional event activations in and around Grandview Park.

Event areas:
900-2200 Commercial Drive, Venables to Grandview Cut
1600-1700 Parker St
1600-1700 Napier St
1600-1700 William St
1200 Cotton Dr
1600-1700 Charles St
1600-1700 Kitchener St
1600-1700 Grant St
1600-1700 Graveley St
1600-1700 E 2nd Av
1600-1700 E 3rd Av
1600-1700 E 4th Av
1700 McSpadden Av
1600-1700 E 5th Av
1600-1700 E 6th Av
1700 E 7th Av
Grandview Park
Location: 
Schedule: Jun 14, 2026</content>
<id>urn:uuid:2b0f4a52-db91-4a64-aac1-ef75caaa6197</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/9de0d6af-f1d8-41f0-a90c-a9786c6978e4"/>
<published>2026-04-15T07:00:00Z</published>
<title>Italian Day on the Drive</title>
<updated>2026-04-15T17:17:40.2434087Z</updated>
<georss:line>49.26692097818426 -123.07355936851415 49.26689035602058 -123.06968888342591</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Closure of Commercial Dr from Venables to Grandview and side streets to alley either side for special event. Venables, E 1st and Grandview open to through traffic. Additional event activations in and around Grandview Park.

Event areas:
900-2200 Commercial Drive, Venables to Grandview Cut
1600-1700 Parker St
1600-1700 Napier St
1600-1700 William St
1200 Cotton Dr
1600-1700 Charles St
1600-1700 Kitchener St
1600-1700 Grant St
1600-1700 Graveley St
1600-1700 E 2nd Av
1600-1700 E 3rd Av
1600-1700 E 4th Av
1700 McSpadden Av
1600-1700 E 5th Av
1600-1700 E 6th Av
1700 E 7th Av
Grandview Park
Location: 
Schedule: Jun 14, 2026</content>
<id>urn:uuid:f6bbee1b-96f3-4eb8-aa96-5d037d11aa40</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/9de0d6af-f1d8-41f0-a90c-a9786c6978e4"/>
<published>2026-04-15T07:00:00Z</published>
<title>Italian Day on the Drive</title>
<updated>2026-04-15T17:17:40.2434087Z</updated>
<georss:line>49.26598513056416 -123.06970782789624 49.265776619415504 -123.06971176770051</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Closure of Commercial Dr from Venables to Grandview and side streets to alley either side for special event. Venables, E 1st and Grandview open to through traffic. Additional event activations in and around Grandview Park.

Event areas:
900-2200 Commercial Drive, Venables to Grandview Cut
1600-1700 Parker St
1600-1700 Napier St
1600-1700 William St
1200 Cotton Dr
1600-1700 Charles St
1600-1700 Kitchener St
1600-1700 Grant St
1600-1700 Graveley St
1600-1700 E 2nd Av
1600-1700 E 3rd Av
1600-1700 E 4th Av
1700 McSpadden Av
1600-1700 E 5th Av
1600-1700 E 6th Av
1700 E 7th Av
Grandview Park
Location: 
Schedule: Jun 14, 2026</content>
<id>urn:uuid:75782912-f2e9-493b-8539-529c9cdaf6a7</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/9de0d6af-f1d8-41f0-a90c-a9786c6978e4"/>
<published>2026-04-15T07:00:00Z</published>
<title>Italian Day on the Drive</title>
<updated>2026-04-15T17:17:40.2434087Z</updated>
<georss:line>49.26643800029953 -123.06969731832929 49.26598513056416 -123.06970782789624</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Closure of Commercial Dr from Venables to Grandview and side streets to alley either side for special event. Venables, E 1st and Grandview open to through traffic. Additional event activations in and around Grandview Park.

Event areas:
900-2200 Commercial Drive, Venables to Grandview Cut
1600-1700 Parker St
1600-1700 Napier St
1600-1700 William St
1200 Cotton Dr
1600-1700 Charles St
1600-1700 Kitchener St
1600-1700 Grant St
1600-1700 Graveley St
1600-1700 E 2nd Av
1600-1700 E 3rd Av
1600-1700 E 4th Av
1700 McSpadden Av
1600-1700 E 5th Av
1600-1700 E 6th Av
1700 E 7th Av
Grandview Park
Location: 
Schedule: Jun 14, 2026</content>
<id>urn:uuid:ab693755-e459-4f94-b2c6-8436fb34fe2a</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/9de0d6af-f1d8-41f0-a90c-a9786c6978e4"/>
<published>2026-04-15T07:00:00Z</published>
<title>Italian Day on the Drive</title>
<updated>2026-04-15T17:17:40.2434087Z</updated>
<georss:line>49.26643800029953 -123.06969731832929 49.26643363438444 -123.06914877427906</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Closure of Commercial Dr from Venables to Grandview and side streets to alley either side for special event. Venables, E 1st and Grandview open to through traffic. Additional event activations in and around Grandview Park.

Event areas:
900-2200 Commercial Drive, Venables to Grandview Cut
1600-1700 Parker St
1600-1700 Napier St
1600-1700 William St
1200 Cotton Dr
1600-1700 Charles St
1600-1700 Kitchener St
1600-1700 Grant St
1600-1700 Graveley St
1600-1700 E 2nd Av
1600-1700 E 3rd Av
1600-1700 E 4th Av
1700 McSpadden Av
1600-1700 E 5th Av
1600-1700 E 6th Av
1700 E 7th Av
Grandview Park
Location: 
Schedule: Jun 14, 2026</content>
<id>urn:uuid:276967df-36b2-4937-8081-616b4d4e46db</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/9de0d6af-f1d8-41f0-a90c-a9786c6978e4"/>
<published>2026-04-15T07:00:00Z</published>
<title>Italian Day on the Drive</title>
<updated>2026-04-15T17:17:40.2434087Z</updated>
<georss:line>49.26689035602058 -123.06968888342591 49.26643800029953 -123.06969731832929</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Closure of Commercial Dr from Venables to Grandview and side streets to alley either side for special event. Venables, E 1st and Grandview open to through traffic. Additional event activations in and around Grandview Park.

Event areas:
900-2200 Commercial Drive, Venables to Grandview Cut
1600-1700 Parker St
1600-1700 Napier St
1600-1700 William St
1200 Cotton Dr
1600-1700 Charles St
1600-1700 Kitchener St
1600-1700 Grant St
1600-1700 Graveley St
1600-1700 E 2nd Av
1600-1700 E 3rd Av
1600-1700 E 4th Av
1700 McSpadden Av
1600-1700 E 5th Av
1600-1700 E 6th Av
1700 E 7th Av
Grandview Park
Location: 
Schedule: Jun 14, 2026</content>
<id>urn:uuid:d5c20b86-d9f8-469e-9a7e-71a919b358d4</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/9de0d6af-f1d8-41f0-a90c-a9786c6978e4"/>
<published>2026-04-15T07:00:00Z</published>
<title>Italian Day on the Drive</title>
<updated>2026-04-15T17:17:40.2434087Z</updated>
<georss:line>49.2650860542808 -123.0702817222486 49.26508136344475 -123.06972468450124</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Closure of Commercial Dr from Venables to Grandview and side streets to alley either side for special event. Venables, E 1st and Grandview open to through traffic. Additional event activations in and around Grandview Park.

Event areas:
900-2200 Commercial Drive, Venables to Grandview Cut
1600-1700 Parker St
1600-1700 Napier St
1600-1700 William St
1200 Cotton Dr
1600-1700 Charles St
1600-1700 Kitchener St
1600-1700 Grant St
1600-1700 Graveley St
1600-1700 E 2nd Av
1600-1700 E 3rd Av
1600-1700 E 4th Av
1700 McSpadden Av
1600-1700 E 5th Av
1600-1700 E 6th Av
1700 E 7th Av
Grandview Park
Location: 
Schedule: Jun 14, 2026</content>
<id>urn:uuid:ba3a42ea-ff64-4420-84b6-99caec4123f8</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/9de0d6af-f1d8-41f0-a90c-a9786c6978e4"/>
<published>2026-04-15T07:00:00Z</published>
<title>Italian Day on the Drive</title>
<updated>2026-04-15T17:17:40.2434087Z</updated>
<georss:line>49.26599008277981 -123.07026414768701 49.26598513056416 -123.06970782789624</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Closure of Commercial Dr from Venables to Grandview and side streets to alley either side for special event. Venables, E 1st and Grandview open to through traffic. Additional event activations in and around Grandview Park.

Event areas:
900-2200 Commercial Drive, Venables to Grandview Cut
1600-1700 Parker St
1600-1700 Napier St
1600-1700 William St
1200 Cotton Dr
1600-1700 Charles St
1600-1700 Kitchener St
1600-1700 Grant St
1600-1700 Graveley St
1600-1700 E 2nd Av
1600-1700 E 3rd Av
1600-1700 E 4th Av
1700 McSpadden Av
1600-1700 E 5th Av
1600-1700 E 6th Av
1700 E 7th Av
Grandview Park
Location: 
Schedule: Jun 14, 2026</content>
<id>urn:uuid:92083b34-9839-46e5-807e-084479670f94</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/9de0d6af-f1d8-41f0-a90c-a9786c6978e4"/>
<published>2026-04-15T07:00:00Z</published>
<title>Italian Day on the Drive</title>
<updated>2026-04-15T17:17:40.2434087Z</updated>
<georss:line>49.26508136344475 -123.06972468450124 49.264177541828246 -123.06974217269108</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Closure of Commercial Dr from Venables to Grandview and side streets to alley either side for special event. Venables, E 1st and Grandview open to through traffic. Additional event activations in and around Grandview Park.

Event areas:
900-2200 Commercial Drive, Venables to Grandview Cut
1600-1700 Parker St
1600-1700 Napier St
1600-1700 William St
1200 Cotton Dr
1600-1700 Charles St
1600-1700 Kitchener St
1600-1700 Grant St
1600-1700 Graveley St
1600-1700 E 2nd Av
1600-1700 E 3rd Av
1600-1700 E 4th Av
1700 McSpadden Av
1600-1700 E 5th Av
1600-1700 E 6th Av
1700 E 7th Av
Grandview Park
Location: 
Schedule: Jun 14, 2026</content>
<id>urn:uuid:b29bc456-5fe4-4cfc-adb6-d919299a7e9c</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/9de0d6af-f1d8-41f0-a90c-a9786c6978e4"/>
<published>2026-04-15T07:00:00Z</published>
<title>Italian Day on the Drive</title>
<updated>2026-04-15T17:17:40.2434087Z</updated>
<georss:line>49.26508136344475 -123.06972468450124 49.26507632627971 -123.06909552621154</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Closure of Commercial Dr from Venables to Grandview and side streets to alley either side for special event. Venables, E 1st and Grandview open to through traffic. Additional event activations in and around Grandview Park.

Event areas:
900-2200 Commercial Drive, Venables to Grandview Cut
1600-1700 Parker St
1600-1700 Napier St
1600-1700 William St
1200 Cotton Dr
1600-1700 Charles St
1600-1700 Kitchener St
1600-1700 Grant St
1600-1700 Graveley St
1600-1700 E 2nd Av
1600-1700 E 3rd Av
1600-1700 E 4th Av
1700 McSpadden Av
1600-1700 E 5th Av
1600-1700 E 6th Av
1700 E 7th Av
Grandview Park
Location: 
Schedule: Jun 14, 2026</content>
<id>urn:uuid:e5288a17-3633-419b-99ca-846eb20c0e1d</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/9de0d6af-f1d8-41f0-a90c-a9786c6978e4"/>
<published>2026-04-15T07:00:00Z</published>
<title>Italian Day on the Drive</title>
<updated>2026-04-15T17:17:40.2434087Z</updated>
<georss:line>49.265776619415504 -123.06971176770051 49.26508136344475 -123.06972468450124</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Closure of Commercial Dr from Venables to Grandview and side streets to alley either side for special event. Venables, E 1st and Grandview open to through traffic. Additional event activations in and around Grandview Park.

Event areas:
900-2200 Commercial Drive, Venables to Grandview Cut
1600-1700 Parker St
1600-1700 Napier St
1600-1700 William St
1200 Cotton Dr
1600-1700 Charles St
1600-1700 Kitchener St
1600-1700 Grant St
1600-1700 Graveley St
1600-1700 E 2nd Av
1600-1700 E 3rd Av
1600-1700 E 4th Av
1700 McSpadden Av
1600-1700 E 5th Av
1600-1700 E 6th Av
1700 E 7th Av
Grandview Park
Location: 
Schedule: Jun 14, 2026</content>
<id>urn:uuid:6df18e0d-7ec0-4740-8e8f-64e3db338f75</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/9de0d6af-f1d8-41f0-a90c-a9786c6978e4"/>
<published>2026-04-15T07:00:00Z</published>
<title>Italian Day on the Drive</title>
<updated>2026-04-15T17:17:40.2434087Z</updated>
<georss:line>49.265776619415504 -123.06971176770051 49.265758928782446 -123.06746409721909</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Closure of Commercial Dr from Venables to Grandview and side streets to alley either side for special event. Venables, E 1st and Grandview open to through traffic. Additional event activations in and around Grandview Park.

Event areas:
900-2200 Commercial Drive, Venables to Grandview Cut
1600-1700 Parker St
1600-1700 Napier St
1600-1700 William St
1200 Cotton Dr
1600-1700 Charles St
1600-1700 Kitchener St
1600-1700 Grant St
1600-1700 Graveley St
1600-1700 E 2nd Av
1600-1700 E 3rd Av
1600-1700 E 4th Av
1700 McSpadden Av
1600-1700 E 5th Av
1600-1700 E 6th Av
1700 E 7th Av
Grandview Park
Location: 
Schedule: Jun 14, 2026</content>
<id>urn:uuid:846d4ae1-9500-4f01-bb56-0657da65fdcb</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/9de0d6af-f1d8-41f0-a90c-a9786c6978e4"/>
<published>2026-04-15T07:00:00Z</published>
<title>Italian Day on the Drive</title>
<updated>2026-04-15T17:17:40.2434087Z</updated>
<georss:line>49.264177541828246 -123.06974217269108 49.264172677381225 -123.06908006615546</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Closure of Commercial Dr from Venables to Grandview and side streets to alley either side for special event. Venables, E 1st and Grandview open to through traffic. Additional event activations in and around Grandview Park.

Event areas:
900-2200 Commercial Drive, Venables to Grandview Cut
1600-1700 Parker St
1600-1700 Napier St
1600-1700 William St
1200 Cotton Dr
1600-1700 Charles St
1600-1700 Kitchener St
1600-1700 Grant St
1600-1700 Graveley St
1600-1700 E 2nd Av
1600-1700 E 3rd Av
1600-1700 E 4th Av
1700 McSpadden Av
1600-1700 E 5th Av
1600-1700 E 6th Av
1700 E 7th Av
Grandview Park
Location: 
Schedule: Jun 14, 2026</content>
<id>urn:uuid:0bdadcdd-dda3-43c3-9f86-3ee9ed5da5d6</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/9de0d6af-f1d8-41f0-a90c-a9786c6978e4"/>
<published>2026-04-15T07:00:00Z</published>
<title>Italian Day on the Drive</title>
<updated>2026-04-15T17:17:40.2434087Z</updated>
<georss:line>49.264177541828246 -123.06974217269108 49.26372354820842 -123.06975152525445</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Joyce Street Renewal 
Location: Joyce St - Vanness Av to south of Kingsway
Schedule: Multiple occurrences as follows:
- Mar 28, 2026 - Mar 29, 2026
- Apr 4, 2026 - Apr 5, 2026 (Back up date)
- May 23, 2026 - May 24, 2026
- Jul 15, 2026 - Aug 31, 2026 (Completion post FIFA)
</content>
<id>urn:uuid:6cdc461e-adf9-49ec-b06b-b971efbc1a35</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/21578386-d08a-4120-b8c3-0dcacf8f53e4"/>
<published>2025-11-17T08:00:00Z</published>
<title>Joyce St Street Renewal - Vanness Av to south of Kingsway</title>
<updated>2026-06-01T18:13:06.8386706Z</updated>
<georss:line>49.238256391092364 -123.03184954095418 49.238002786444014 -123.032115761986 49.23746820087996 -123.03262295602883</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Joyce Street Renewal 
Location: Joyce St - Vanness Av to south of Kingsway
Schedule: Multiple occurrences as follows:
- Mar 28, 2026 - Mar 29, 2026
- Apr 4, 2026 - Apr 5, 2026 (Back up date)
- May 23, 2026 - May 24, 2026
- Jul 15, 2026 - Aug 31, 2026 (Completion post FIFA)
</content>
<id>urn:uuid:245e8846-cfd4-44a3-8b12-a89f93a0e047</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/21578386-d08a-4120-b8c3-0dcacf8f53e4"/>
<published>2025-11-17T08:00:00Z</published>
<title>Joyce St Street Renewal - Vanness Av to south of Kingsway</title>
<updated>2026-06-01T18:13:06.8386706Z</updated>
<georss:line>49.23746820087996 -123.03262295602883 49.23644805094031 -123.03362385475643</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Joyce Street Renewal 
Location: Joyce St - Vanness Av to south of Kingsway
Schedule: Multiple occurrences as follows:
- Mar 28, 2026 - Mar 29, 2026
- Apr 4, 2026 - Apr 5, 2026 (Back up date)
- May 23, 2026 - May 24, 2026
- Jul 15, 2026 - Aug 31, 2026 (Completion post FIFA)
</content>
<id>urn:uuid:82747f92-8c4e-41d5-ace7-bc8acd875b02</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/21578386-d08a-4120-b8c3-0dcacf8f53e4"/>
<published>2025-11-17T08:00:00Z</published>
<title>Joyce St Street Renewal - Vanness Av to south of Kingsway</title>
<updated>2026-06-01T18:13:06.8386706Z</updated>
<georss:line>49.23644805094031 -123.03362385475643 49.236118758525976 -123.03394313988504</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Joyce Street Renewal 
Location: Joyce St - Vanness Av to south of Kingsway
Schedule: Multiple occurrences as follows:
- Mar 28, 2026 - Mar 29, 2026
- Apr 4, 2026 - Apr 5, 2026 (Back up date)
- May 23, 2026 - May 24, 2026
- Jul 15, 2026 - Aug 31, 2026 (Completion post FIFA)
</content>
<id>urn:uuid:cb5be1da-28f8-45ce-ad55-8d74645ff9c4</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/21578386-d08a-4120-b8c3-0dcacf8f53e4"/>
<published>2025-11-17T08:00:00Z</published>
<title>Joyce St Street Renewal - Vanness Av to south of Kingsway</title>
<updated>2026-06-01T18:13:06.8386706Z</updated>
<georss:line>49.236118758525976 -123.03394313988504 49.235796787288194 -123.03426260441354</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Joyce Street Renewal 
Location: Joyce St - Vanness Av to south of Kingsway
Schedule: Multiple occurrences as follows:
- Mar 28, 2026 - Mar 29, 2026
- Apr 4, 2026 - Apr 5, 2026 (Back up date)
- May 23, 2026 - May 24, 2026
- Jul 15, 2026 - Aug 31, 2026 (Completion post FIFA)
</content>
<id>urn:uuid:65a0b7ab-70b1-4f47-9fff-b2fb320d2ce2</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/21578386-d08a-4120-b8c3-0dcacf8f53e4"/>
<published>2025-11-17T08:00:00Z</published>
<title>Joyce St Street Renewal - Vanness Av to south of Kingsway</title>
<updated>2026-06-01T18:13:06.8386706Z</updated>
<georss:line>49.235796787288194 -123.03426260441354 49.23543796953328 -123.03461570796692</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Joyce Street Renewal 
Location: Joyce St - Vanness Av to south of Kingsway
Schedule: Multiple occurrences as follows:
- Mar 28, 2026 - Mar 29, 2026
- Apr 4, 2026 - Apr 5, 2026 (Back up date)
- May 23, 2026 - May 24, 2026
- Jul 15, 2026 - Aug 31, 2026 (Completion post FIFA)
</content>
<id>urn:uuid:93c99ae4-fd1e-401d-b406-f0ba16b8eb09</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/21578386-d08a-4120-b8c3-0dcacf8f53e4"/>
<published>2025-11-17T08:00:00Z</published>
<title>Joyce St Street Renewal - Vanness Av to south of Kingsway</title>
<updated>2026-06-01T18:13:06.8386706Z</updated>
<georss:line>49.23543796953328 -123.03461570796692 49.23480953616834 -123.03523496927836</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Joyce Street Renewal 
Location: Joyce St - Vanness Av to south of Kingsway
Schedule: Multiple occurrences as follows:
- Mar 28, 2026 - Mar 29, 2026
- Apr 4, 2026 - Apr 5, 2026 (Back up date)
- May 23, 2026 - May 24, 2026
- Jul 15, 2026 - Aug 31, 2026 (Completion post FIFA)
</content>
<id>urn:uuid:cfda9f84-31a9-41f9-a52b-9b6e13ac40ae</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/21578386-d08a-4120-b8c3-0dcacf8f53e4"/>
<published>2025-11-17T08:00:00Z</published>
<title>Joyce St Street Renewal - Vanness Av to south of Kingsway</title>
<updated>2026-06-01T18:13:06.8386706Z</updated>
<georss:line>49.23480953616834 -123.03523496927836 49.234529251821584 -123.0355038826546</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Joyce Street Renewal 
Location: Joyce St - Vanness Av to south of Kingsway
Schedule: Multiple occurrences as follows:
- Mar 28, 2026 - Mar 29, 2026
- Apr 4, 2026 - Apr 5, 2026 (Back up date)
- May 23, 2026 - May 24, 2026
- Jul 15, 2026 - Aug 31, 2026 (Completion post FIFA)
</content>
<id>urn:uuid:065605ec-3896-4e5d-bbf8-1eec34e5dfc7</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/21578386-d08a-4120-b8c3-0dcacf8f53e4"/>
<published>2025-11-17T08:00:00Z</published>
<title>Joyce St Street Renewal - Vanness Av to south of Kingsway</title>
<updated>2026-06-01T18:13:06.8386706Z</updated>
<georss:line>49.234529251821584 -123.0355038826546 49.23415350403323 -123.0358766127863</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Road and sidewalk construction along Kaslo St from 2nd to 8th Ave, 
Location: Kaslo St from 2nd to 8th Ave
Schedule: Nov 3, 2025 - Apr 30, 2026</content>
<id>urn:uuid:0cb03615-eed7-4f1d-9cad-6d66f7e4f53e</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/dc65be5a-e5fe-4887-b255-588e9c1565fe"/>
<published>2025-10-24T07:00:00Z</published>
<title>Kaslo St Road works and Sidewalk</title>
<updated>2025-10-24T23:26:51.3601516Z</updated>
<georss:line>49.26302928892375 -123.04700963622713 49.26643421671389 -123.04700164936011 49.26853241363429 -123.04697183681738</georss:line>
</entry>
<entry>
<category term="Road Closure"/>
<content>Chester St - E 35th Av to E 37th Av                     Apr 2026 - Jun 2026 
E 37th Av - Fraser St to Prince Albert St             May 2026 - Jun 2026
Prince Albert St - E 38th Av to E 39th Av             May 2026 - Jul 2026
E 39th Av - Prince Albert St to Windsor St           Jun 2026 - Jul 2026 
Location: 
Schedule: May 15, 2026 - Jul 30, 2026; Weekdays; 7:00 AM - 3:00 PM</content>
<id>urn:uuid:e5550fa0-5106-4c07-b5c7-591f59254fa5</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/56d3faad-3a24-4167-bad5-f41c54260776"/>
<published>2025-11-27T08:00:00Z</published>
<title>Kensington Cedar South-West</title>
<updated>2026-05-28T19:08:11.2637931Z</updated>
<georss:line>49.23829910788797 -123.08921266195411 49.236525473758434 -123.08926375485105</georss:line>
</entry>
<entry>
<category term="Road Closure"/>
<content>Chester St - E 35th Av to E 37th Av                     Apr 2026 - Jun 2026 
E 37th Av - Fraser St to Prince Albert St             May 2026 - Jun 2026
Prince Albert St - E 38th Av to E 39th Av             May 2026 - Jul 2026
E 39th Av - Prince Albert St to Windsor St           Jun 2026 - Jul 2026 
Location: 
Schedule: May 15, 2026 - Jul 30, 2026; Weekdays; 7:00 AM - 3:00 PM</content>
<id>urn:uuid:9bdb4ff6-871a-49f3-bded-771176c63620</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/56d3faad-3a24-4167-bad5-f41c54260776"/>
<published>2025-11-27T08:00:00Z</published>
<title>Kensington Cedar South-West</title>
<updated>2026-05-28T19:08:11.2637931Z</updated>
<georss:line>49.23655327415776 -123.0904644379292 49.236519913676716 -123.08805455629009</georss:line>
</entry>
<entry>
<category term="Road Closure"/>
<content>Chester St - E 35th Av to E 37th Av                     Apr 2026 - Jun 2026 
E 37th Av - Fraser St to Prince Albert St             May 2026 - Jun 2026
Prince Albert St - E 38th Av to E 39th Av             May 2026 - Jul 2026
E 39th Av - Prince Albert St to Windsor St           Jun 2026 - Jul 2026 
Location: 
Schedule: May 15, 2026 - Jul 30, 2026; Weekdays; 7:00 AM - 3:00 PM</content>
<id>urn:uuid:f55002ea-f5c6-4ede-a5ea-4e2f0f66e019</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/56d3faad-3a24-4167-bad5-f41c54260776"/>
<published>2025-11-27T08:00:00Z</published>
<title>Kensington Cedar South-West</title>
<updated>2026-05-28T19:08:11.2637931Z</updated>
<georss:line>49.23567150855419 -123.08810880520542 49.234759631017965 -123.08812583617106</georss:line>
</entry>
<entry>
<category term="Road Closure"/>
<content>Chester St - E 35th Av to E 37th Av                     Apr 2026 - Jun 2026 
E 37th Av - Fraser St to Prince Albert St             May 2026 - Jun 2026
Prince Albert St - E 38th Av to E 39th Av             May 2026 - Jul 2026
E 39th Av - Prince Albert St to Windsor St           Jun 2026 - Jul 2026 
Location: 
Schedule: May 15, 2026 - Jul 30, 2026; Weekdays; 7:00 AM - 3:00 PM</content>
<id>urn:uuid:503b1b02-ac55-42a1-ae1b-8708b74e8d33</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/56d3faad-3a24-4167-bad5-f41c54260776"/>
<published>2025-11-27T08:00:00Z</published>
<title>Kensington Cedar South-West</title>
<updated>2026-05-28T19:08:11.2637931Z</updated>
<georss:line>49.23477075157709 -123.08811732068823 49.23472626932548 -123.08479628238702</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Water scope COMPLETE. 
Street Renewal - Concrete and repaving substantially complete. 
 



Location: 
Schedule: Apr 14, 2025 - Oct 8, 2025</content>
<id>urn:uuid:f11877b4-2358-452f-a843-2a1895d3abc9</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/4255b4c4-45aa-4465-961c-cd719348210b"/>
<published>2025-03-14T07:00:00Z</published>
<title>Knight St Renewal - E. 57th to Knight St Bridge</title>
<updated>2025-09-29T22:40:16.0412004Z</updated>
<georss:line>49.21638873008553 -123.07705842977934 49.21590801922815 -123.07706313386643</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Water scope COMPLETE. 
Street Renewal - Concrete and repaving substantially complete. 
 



Location: 
Schedule: Apr 14, 2025 - Oct 8, 2025</content>
<id>urn:uuid:3f827839-f6ec-4015-b727-fb13aa2803b9</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/4255b4c4-45aa-4465-961c-cd719348210b"/>
<published>2025-03-14T07:00:00Z</published>
<title>Knight St Renewal - E. 57th to Knight St Bridge</title>
<updated>2025-09-29T22:40:16.0412004Z</updated>
<georss:line>49.216828829654816 -123.07705007851813 49.21638873008553 -123.07705842977934</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Water scope COMPLETE. 
Street Renewal - Concrete and repaving substantially complete. 
 



Location: 
Schedule: Apr 14, 2025 - Oct 8, 2025</content>
<id>urn:uuid:ba331b84-ba7e-464c-824a-0c4b247933a1</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/4255b4c4-45aa-4465-961c-cd719348210b"/>
<published>2025-03-14T07:00:00Z</published>
<title>Knight St Renewal - E. 57th to Knight St Bridge</title>
<updated>2025-09-29T22:40:16.0412004Z</updated>
<georss:line>49.21726196682485 -123.07704175748717 49.216828829654816 -123.07705007851813</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Water scope COMPLETE. 
Street Renewal - Concrete and repaving substantially complete. 
 



Location: 
Schedule: Apr 14, 2025 - Oct 8, 2025</content>
<id>urn:uuid:44b5987b-be60-4699-9edc-23e9d24ade27</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/4255b4c4-45aa-4465-961c-cd719348210b"/>
<published>2025-03-14T07:00:00Z</published>
<title>Knight St Renewal - E. 57th to Knight St Bridge</title>
<updated>2025-09-29T22:40:16.0412004Z</updated>
<georss:line>49.21770239917856 -123.07703336526143 49.21726196682485 -123.07704175748717</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Water scope COMPLETE. 
Street Renewal - Concrete and repaving substantially complete. 
 



Location: 
Schedule: Apr 14, 2025 - Oct 8, 2025</content>
<id>urn:uuid:5c50b6ae-bab2-4a7f-97b2-8f7d6f157d42</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/4255b4c4-45aa-4465-961c-cd719348210b"/>
<published>2025-03-14T07:00:00Z</published>
<title>Knight St Renewal - E. 57th to Knight St Bridge</title>
<updated>2025-09-29T22:40:16.0412004Z</updated>
<georss:line>49.2181272245179 -123.07702523701053 49.21770239917856 -123.07703336526143</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Water scope COMPLETE. 
Street Renewal - Concrete and repaving substantially complete. 
 



Location: 
Schedule: Apr 14, 2025 - Oct 8, 2025</content>
<id>urn:uuid:b31dfc1e-87d4-4587-9190-77ce6d6592de</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/4255b4c4-45aa-4465-961c-cd719348210b"/>
<published>2025-03-14T07:00:00Z</published>
<title>Knight St Renewal - E. 57th to Knight St Bridge</title>
<updated>2025-09-29T22:40:16.0412004Z</updated>
<georss:line>49.215536756057816 -123.07860155622886 49.21549091692904 -123.07816235936203 49.21548412592756 -123.07707346308686</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Water scope COMPLETE. 
Street Renewal - Concrete and repaving substantially complete. 
 



Location: 
Schedule: Apr 14, 2025 - Oct 8, 2025</content>
<id>urn:uuid:1f84420e-2710-4d96-bbbe-d7eaaacf433d</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/4255b4c4-45aa-4465-961c-cd719348210b"/>
<published>2025-03-14T07:00:00Z</published>
<title>Knight St Renewal - E. 57th to Knight St Bridge</title>
<updated>2025-09-29T22:40:16.0412004Z</updated>
<georss:line>49.21462709008492 -123.07707840250403 49.21419454886697 -123.07708303011007</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Water scope COMPLETE. 
Street Renewal - Concrete and repaving substantially complete. 
 



Location: 
Schedule: Apr 14, 2025 - Oct 8, 2025</content>
<id>urn:uuid:395640b6-7b7b-41fa-90e6-84d35ca8c54d</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/4255b4c4-45aa-4465-961c-cd719348210b"/>
<published>2025-03-14T07:00:00Z</published>
<title>Knight St Renewal - E. 57th to Knight St Bridge</title>
<updated>2025-09-29T22:40:16.0412004Z</updated>
<georss:line>49.21419454886697 -123.07708303011007 49.21376181822069 -123.07708839880816</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Water scope COMPLETE. 
Street Renewal - Concrete and repaving substantially complete. 
 



Location: 
Schedule: Apr 14, 2025 - Oct 8, 2025</content>
<id>urn:uuid:1b910a22-bbb0-4a8e-8661-d7fbc26adf6c</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/4255b4c4-45aa-4465-961c-cd719348210b"/>
<published>2025-03-14T07:00:00Z</published>
<title>Knight St Renewal - E. 57th to Knight St Bridge</title>
<updated>2025-09-29T22:40:16.0412004Z</updated>
<georss:line>49.21376181822069 -123.07708839880816 49.21288197394421 -123.07709827600489</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Water scope COMPLETE. 
Street Renewal - Concrete and repaving substantially complete. 
 



Location: 
Schedule: Apr 14, 2025 - Oct 8, 2025</content>
<id>urn:uuid:9828a19e-77a6-4c6d-b237-02649bfa05f4</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/4255b4c4-45aa-4465-961c-cd719348210b"/>
<published>2025-03-14T07:00:00Z</published>
<title>Knight St Renewal - E. 57th to Knight St Bridge</title>
<updated>2025-09-29T22:40:16.0412004Z</updated>
<georss:line>49.21505180561303 -123.07707341937561 49.21462709008492 -123.07707840250403</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Water scope COMPLETE. 
Street Renewal - Concrete and repaving substantially complete. 
 



Location: 
Schedule: Apr 14, 2025 - Oct 8, 2025</content>
<id>urn:uuid:291b5fb1-65a3-44e5-9fd5-4723a3c42f0b</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/4255b4c4-45aa-4465-961c-cd719348210b"/>
<published>2025-03-14T07:00:00Z</published>
<title>Knight St Renewal - E. 57th to Knight St Bridge</title>
<updated>2025-09-29T22:40:16.0412004Z</updated>
<georss:line>49.21547679126087 -123.07706799718542 49.21505180561303 -123.07707341937561</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Water scope COMPLETE. 
Street Renewal - Concrete and repaving substantially complete. 
 



Location: 
Schedule: Apr 14, 2025 - Oct 8, 2025</content>
<id>urn:uuid:906a6475-6831-4191-8641-b593b7cccc4a</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/4255b4c4-45aa-4465-961c-cd719348210b"/>
<published>2025-03-14T07:00:00Z</published>
<title>Knight St Renewal - E. 57th to Knight St Bridge</title>
<updated>2025-09-29T22:40:16.0412004Z</updated>
<georss:line>49.21590801922815 -123.07706313386643 49.21547679126087 -123.07706799718542</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Sewer Renewal Project

Full closure: Garden Dr – between E 8th Ave and E 4th Ave; and E 4th Ave – between Garden Dr and Templeton Dr
Location:  between E 8th Ave and E 4th Ave; and E 4th Ave – between Garden Dr and Templeton Dr
Schedule: Apr 1, 2024 - Sep 30, 2024</content>
<id>urn:uuid:68f3a1d6-d435-4af6-8e56-5f77a21f8f7a</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/3d616545-c79e-4ad9-ad9d-74e295b2d947"/>
<published>2022-10-26T07:00:00Z</published>
<title>Lakewood Dr &amp; Garden Dr Sewer Renewal Project</title>
<updated>2026-01-10T02:00:36.0939044Z</updated>
<georss:line>49.26589967020803 -123.05810636693613 49.265447639423655 -123.05811415196108</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Sewer Renewal Project

Full closure: Garden Dr – between E 8th Ave and E 4th Ave; and E 4th Ave – between Garden Dr and Templeton Dr
Location:  between E 8th Ave and E 4th Ave; and E 4th Ave – between Garden Dr and Templeton Dr
Schedule: Apr 1, 2024 - Sep 30, 2024</content>
<id>urn:uuid:da0e0141-77b1-4df6-9e6e-11f1482d2fc9</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/3d616545-c79e-4ad9-ad9d-74e295b2d947"/>
<published>2022-10-26T07:00:00Z</published>
<title>Lakewood Dr &amp; Garden Dr Sewer Renewal Project</title>
<updated>2026-01-10T02:00:36.0939044Z</updated>
<georss:line>49.26672415077479 -123.05809151403038 49.266350298321015 -123.05809735678676</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Sewer Renewal Project

Full closure: Garden Dr – between E 8th Ave and E 4th Ave; and E 4th Ave – between Garden Dr and Templeton Dr
Location:  between E 8th Ave and E 4th Ave; and E 4th Ave – between Garden Dr and Templeton Dr
Schedule: Apr 1, 2024 - Sep 30, 2024</content>
<id>urn:uuid:4a4ed737-81e9-45a4-bc22-76b1dfef857e</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/3d616545-c79e-4ad9-ad9d-74e295b2d947"/>
<published>2022-10-26T07:00:00Z</published>
<title>Lakewood Dr &amp; Garden Dr Sewer Renewal Project</title>
<updated>2026-01-10T02:00:36.0939044Z</updated>
<georss:line>49.266350298321015 -123.05809735678676 49.26589967020803 -123.05810636693613</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Sewer Renewal Project

Full closure: Garden Dr – between E 8th Ave and E 4th Ave; and E 4th Ave – between Garden Dr and Templeton Dr
Location:  between E 8th Ave and E 4th Ave; and E 4th Ave – between Garden Dr and Templeton Dr
Schedule: Apr 1, 2024 - Sep 30, 2024</content>
<id>urn:uuid:7288c45f-252f-41d0-b394-8f47bf29389b</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/3d616545-c79e-4ad9-ad9d-74e295b2d947"/>
<published>2022-10-26T07:00:00Z</published>
<title>Lakewood Dr &amp; Garden Dr Sewer Renewal Project</title>
<updated>2026-01-10T02:00:36.0939044Z</updated>
<georss:line>49.266350298321015 -123.05809735678676 49.26589967020803 -123.05810636693613</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Sewer Renewal Project

Full closure: Garden Dr – between E 8th Ave and E 4th Ave; and E 4th Ave – between Garden Dr and Templeton Dr
Location:  between E 8th Ave and E 4th Ave; and E 4th Ave – between Garden Dr and Templeton Dr
Schedule: Apr 1, 2024 - Sep 30, 2024</content>
<id>urn:uuid:a7c2de97-afd9-4f5b-9d85-5940c31fe8ac</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/3d616545-c79e-4ad9-ad9d-74e295b2d947"/>
<published>2022-10-26T07:00:00Z</published>
<title>Lakewood Dr &amp; Garden Dr Sewer Renewal Project</title>
<updated>2026-01-10T02:00:36.0939044Z</updated>
<georss:line>49.26672415077479 -123.05809151403038 49.266350298321015 -123.05809735678676</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Sewer Renewal Project

Full closure: Garden Dr – between E 8th Ave and E 4th Ave; and E 4th Ave – between Garden Dr and Templeton Dr
Location:  between E 8th Ave and E 4th Ave; and E 4th Ave – between Garden Dr and Templeton Dr
Schedule: Apr 1, 2024 - Sep 30, 2024</content>
<id>urn:uuid:bbd95569-6cea-4b1d-b329-2166930dcd8b</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/3d616545-c79e-4ad9-ad9d-74e295b2d947"/>
<published>2022-10-26T07:00:00Z</published>
<title>Lakewood Dr &amp; Garden Dr Sewer Renewal Project</title>
<updated>2026-01-10T02:00:36.0939044Z</updated>
<georss:line>49.266350298321015 -123.05809735678676 49.26589967020803 -123.05810636693613</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Sewer Renewal Project

Full closure: Garden Dr – between E 8th Ave and E 4th Ave; and E 4th Ave – between Garden Dr and Templeton Dr
Location:  between E 8th Ave and E 4th Ave; and E 4th Ave – between Garden Dr and Templeton Dr
Schedule: Apr 1, 2024 - Sep 30, 2024</content>
<id>urn:uuid:c979a536-4be0-4c97-a065-ce4e10938dc9</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/3d616545-c79e-4ad9-ad9d-74e295b2d947"/>
<published>2022-10-26T07:00:00Z</published>
<title>Lakewood Dr &amp; Garden Dr Sewer Renewal Project</title>
<updated>2026-01-10T02:00:36.0939044Z</updated>
<georss:line>49.266350298321015 -123.05809735678676 49.26589967020803 -123.05810636693613</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Sewer Renewal Project

Full closure: Garden Dr – between E 8th Ave and E 4th Ave; and E 4th Ave – between Garden Dr and Templeton Dr
Location:  between E 8th Ave and E 4th Ave; and E 4th Ave – between Garden Dr and Templeton Dr
Schedule: Apr 1, 2024 - Sep 30, 2024</content>
<id>urn:uuid:12261970-f334-4e18-80cf-c01cb15ee51f</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/3d616545-c79e-4ad9-ad9d-74e295b2d947"/>
<published>2022-10-26T07:00:00Z</published>
<title>Lakewood Dr &amp; Garden Dr Sewer Renewal Project</title>
<updated>2026-01-10T02:00:36.0939044Z</updated>
<georss:line>49.26589967020803 -123.05810636693613 49.265447639423655 -123.05811415196108</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Sewer Renewal Project

Full closure: Garden Dr – between E 8th Ave and E 4th Ave; and E 4th Ave – between Garden Dr and Templeton Dr
Location:  between E 8th Ave and E 4th Ave; and E 4th Ave – between Garden Dr and Templeton Dr
Schedule: Apr 1, 2024 - Sep 30, 2024</content>
<id>urn:uuid:651ade7a-4b13-4366-a139-e27c2553ff6d</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/3d616545-c79e-4ad9-ad9d-74e295b2d947"/>
<published>2022-10-26T07:00:00Z</published>
<title>Lakewood Dr &amp; Garden Dr Sewer Renewal Project</title>
<updated>2026-01-10T02:00:36.0939044Z</updated>
<georss:line>49.26672415077479 -123.05809151403038 49.266350298321015 -123.05809735678676</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Sewer Renewal Project

Full closure: Garden Dr – between E 8th Ave and E 4th Ave; and E 4th Ave – between Garden Dr and Templeton Dr
Location:  between E 8th Ave and E 4th Ave; and E 4th Ave – between Garden Dr and Templeton Dr
Schedule: Apr 1, 2024 - Sep 30, 2024</content>
<id>urn:uuid:31ce7d31-3aa1-41dc-a94a-c73550a9fe56</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/3d616545-c79e-4ad9-ad9d-74e295b2d947"/>
<published>2022-10-26T07:00:00Z</published>
<title>Lakewood Dr &amp; Garden Dr Sewer Renewal Project</title>
<updated>2026-01-10T02:00:36.0939044Z</updated>
<georss:line>49.2649960671647 -123.05812232224615 49.26454444981783 -123.05813064352644</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Sewer Renewal Project

Full closure: Garden Dr – between E 8th Ave and E 4th Ave; and E 4th Ave – between Garden Dr and Templeton Dr
Location:  between E 8th Ave and E 4th Ave; and E 4th Ave – between Garden Dr and Templeton Dr
Schedule: Apr 1, 2024 - Sep 30, 2024</content>
<id>urn:uuid:e3f3e031-d86d-4b02-9ac5-fbec6e6cb916</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/3d616545-c79e-4ad9-ad9d-74e295b2d947"/>
<published>2022-10-26T07:00:00Z</published>
<title>Lakewood Dr &amp; Garden Dr Sewer Renewal Project</title>
<updated>2026-01-10T02:00:36.0939044Z</updated>
<georss:line>49.2649960671647 -123.05812232224615 49.26454444981783 -123.05813064352644</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Sewer Renewal Project

Full closure: Garden Dr – between E 8th Ave and E 4th Ave; and E 4th Ave – between Garden Dr and Templeton Dr
Location:  between E 8th Ave and E 4th Ave; and E 4th Ave – between Garden Dr and Templeton Dr
Schedule: Apr 1, 2024 - Sep 30, 2024</content>
<id>urn:uuid:39434d46-025c-4a0b-902a-6617ea6ac95b</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/3d616545-c79e-4ad9-ad9d-74e295b2d947"/>
<published>2022-10-26T07:00:00Z</published>
<title>Lakewood Dr &amp; Garden Dr Sewer Renewal Project</title>
<updated>2026-01-10T02:00:36.0939044Z</updated>
<georss:line>49.265447639423655 -123.05811415196108 49.26511073052012 -123.05811932305129 49.2649960671647 -123.05812232224615</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Sewer Renewal Project

Full closure: Garden Dr – between E 8th Ave and E 4th Ave; and E 4th Ave – between Garden Dr and Templeton Dr
Location:  between E 8th Ave and E 4th Ave; and E 4th Ave – between Garden Dr and Templeton Dr
Schedule: Apr 1, 2024 - Sep 30, 2024</content>
<id>urn:uuid:fc204356-3776-45b1-8519-2a12d0a6682c</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/3d616545-c79e-4ad9-ad9d-74e295b2d947"/>
<published>2022-10-26T07:00:00Z</published>
<title>Lakewood Dr &amp; Garden Dr Sewer Renewal Project</title>
<updated>2026-01-10T02:00:36.0939044Z</updated>
<georss:line>49.265447639423655 -123.05811415196108 49.26511073052012 -123.05811932305129 49.2649960671647 -123.05812232224615</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Sewer Renewal Project

Full closure: Garden Dr – between E 8th Ave and E 4th Ave; and E 4th Ave – between Garden Dr and Templeton Dr
Location:  between E 8th Ave and E 4th Ave; and E 4th Ave – between Garden Dr and Templeton Dr
Schedule: Apr 1, 2024 - Sep 30, 2024</content>
<id>urn:uuid:59d36893-db82-4fd6-9e58-da8df550c79e</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/3d616545-c79e-4ad9-ad9d-74e295b2d947"/>
<published>2022-10-26T07:00:00Z</published>
<title>Lakewood Dr &amp; Garden Dr Sewer Renewal Project</title>
<updated>2026-01-10T02:00:36.0939044Z</updated>
<georss:line>49.26589967020803 -123.05810636693613 49.265447639423655 -123.05811415196108</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Sewer Renewal Project

Full closure: Garden Dr – between E 8th Ave and E 4th Ave; and E 4th Ave – between Garden Dr and Templeton Dr
Location:  between E 8th Ave and E 4th Ave; and E 4th Ave – between Garden Dr and Templeton Dr
Schedule: Apr 1, 2024 - Sep 30, 2024</content>
<id>urn:uuid:cca9fbeb-30dc-4209-99e4-75f668b7abd0</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/3d616545-c79e-4ad9-ad9d-74e295b2d947"/>
<published>2022-10-26T07:00:00Z</published>
<title>Lakewood Dr &amp; Garden Dr Sewer Renewal Project</title>
<updated>2026-01-10T02:00:36.0939044Z</updated>
<georss:line>49.265447639423655 -123.05811415196108 49.26511073052012 -123.05811932305129 49.2649960671647 -123.05812232224615</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Sewer Renewal Project

Full closure: Garden Dr – between E 8th Ave and E 4th Ave; and E 4th Ave – between Garden Dr and Templeton Dr
Location:  between E 8th Ave and E 4th Ave; and E 4th Ave – between Garden Dr and Templeton Dr
Schedule: Apr 1, 2024 - Sep 30, 2024</content>
<id>urn:uuid:08dbab5d-5339-4b7a-8b42-b9c4a95b8110</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/3d616545-c79e-4ad9-ad9d-74e295b2d947"/>
<published>2022-10-26T07:00:00Z</published>
<title>Lakewood Dr &amp; Garden Dr Sewer Renewal Project</title>
<updated>2026-01-10T02:00:36.0939044Z</updated>
<georss:line>49.26589967020803 -123.05810636693613 49.265447639423655 -123.05811415196108</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Sewer Renewal Project

Full closure: Garden Dr – between E 8th Ave and E 4th Ave; and E 4th Ave – between Garden Dr and Templeton Dr
Location:  between E 8th Ave and E 4th Ave; and E 4th Ave – between Garden Dr and Templeton Dr
Schedule: Apr 1, 2024 - Sep 30, 2024</content>
<id>urn:uuid:e5a617e8-c17a-4661-9479-a2219550504c</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/3d616545-c79e-4ad9-ad9d-74e295b2d947"/>
<published>2022-10-26T07:00:00Z</published>
<title>Lakewood Dr &amp; Garden Dr Sewer Renewal Project</title>
<updated>2026-01-10T02:00:36.0939044Z</updated>
<georss:line>49.26589967020803 -123.05810636693613 49.265447639423655 -123.05811415196108</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Sewer Renewal Project

Full closure: Garden Dr – between E 8th Ave and E 4th Ave; and E 4th Ave – between Garden Dr and Templeton Dr
Location:  between E 8th Ave and E 4th Ave; and E 4th Ave – between Garden Dr and Templeton Dr
Schedule: Apr 1, 2024 - Sep 30, 2024</content>
<id>urn:uuid:d66f0b4b-b17c-4f2b-8ae7-874adab87a78</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/3d616545-c79e-4ad9-ad9d-74e295b2d947"/>
<published>2022-10-26T07:00:00Z</published>
<title>Lakewood Dr &amp; Garden Dr Sewer Renewal Project</title>
<updated>2026-01-10T02:00:36.0939044Z</updated>
<georss:line>49.265447639423655 -123.05811415196108 49.26511073052012 -123.05811932305129 49.2649960671647 -123.05812232224615</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Sewer Renewal Project

Full closure: Garden Dr – between E 8th Ave and E 4th Ave; and E 4th Ave – between Garden Dr and Templeton Dr
Location:  between E 8th Ave and E 4th Ave; and E 4th Ave – between Garden Dr and Templeton Dr
Schedule: Apr 1, 2024 - Sep 30, 2024</content>
<id>urn:uuid:ddc638aa-7b08-40ec-99fe-043962b8e02d</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/3d616545-c79e-4ad9-ad9d-74e295b2d947"/>
<published>2022-10-26T07:00:00Z</published>
<title>Lakewood Dr &amp; Garden Dr Sewer Renewal Project</title>
<updated>2026-01-10T02:00:36.0939044Z</updated>
<georss:line>49.26454444981783 -123.05813064352644 49.2640920140031 -123.05813870254663</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Sewer Renewal Project

Full closure: Garden Dr – between E 8th Ave and E 4th Ave; and E 4th Ave – between Garden Dr and Templeton Dr
Location:  between E 8th Ave and E 4th Ave; and E 4th Ave – between Garden Dr and Templeton Dr
Schedule: Apr 1, 2024 - Sep 30, 2024</content>
<id>urn:uuid:7431389c-fa8c-448a-8fcd-03a9c252d835</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/3d616545-c79e-4ad9-ad9d-74e295b2d947"/>
<published>2022-10-26T07:00:00Z</published>
<title>Lakewood Dr &amp; Garden Dr Sewer Renewal Project</title>
<updated>2026-01-10T02:00:36.0939044Z</updated>
<georss:line>49.26454444981783 -123.05813064352644 49.2640920140031 -123.05813870254663</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Sewer Renewal Project

Full closure: Garden Dr – between E 8th Ave and E 4th Ave; and E 4th Ave – between Garden Dr and Templeton Dr
Location:  between E 8th Ave and E 4th Ave; and E 4th Ave – between Garden Dr and Templeton Dr
Schedule: Apr 1, 2024 - Sep 30, 2024</content>
<id>urn:uuid:63d461e1-ad4e-472a-89e2-6680dc43197d</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/3d616545-c79e-4ad9-ad9d-74e295b2d947"/>
<published>2022-10-26T07:00:00Z</published>
<title>Lakewood Dr &amp; Garden Dr Sewer Renewal Project</title>
<updated>2026-01-10T02:00:36.0939044Z</updated>
<georss:line>49.26454444981783 -123.05813064352644 49.2640920140031 -123.05813870254663</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Sewer Renewal Project

Full closure: Garden Dr – between E 8th Ave and E 4th Ave; and E 4th Ave – between Garden Dr and Templeton Dr
Location:  between E 8th Ave and E 4th Ave; and E 4th Ave – between Garden Dr and Templeton Dr
Schedule: Apr 1, 2024 - Sep 30, 2024</content>
<id>urn:uuid:88c9abc6-1d83-4c88-bc4f-3ea617b8daea</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/3d616545-c79e-4ad9-ad9d-74e295b2d947"/>
<published>2022-10-26T07:00:00Z</published>
<title>Lakewood Dr &amp; Garden Dr Sewer Renewal Project</title>
<updated>2026-01-10T02:00:36.0939044Z</updated>
<georss:line>49.2649960671647 -123.05812232224615 49.26454444981783 -123.05813064352644</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Sewer Renewal Project

Full closure: Garden Dr – between E 8th Ave and E 4th Ave; and E 4th Ave – between Garden Dr and Templeton Dr
Location:  between E 8th Ave and E 4th Ave; and E 4th Ave – between Garden Dr and Templeton Dr
Schedule: Apr 1, 2024 - Sep 30, 2024</content>
<id>urn:uuid:2d3c986f-7095-4275-bbf7-41e10aed8170</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/3d616545-c79e-4ad9-ad9d-74e295b2d947"/>
<published>2022-10-26T07:00:00Z</published>
<title>Lakewood Dr &amp; Garden Dr Sewer Renewal Project</title>
<updated>2026-01-10T02:00:36.0939044Z</updated>
<georss:line>49.2649960671647 -123.05812232224615 49.26454444981783 -123.05813064352644</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Sewer Renewal Project

Full closure: Garden Dr – between E 8th Ave and E 4th Ave; and E 4th Ave – between Garden Dr and Templeton Dr
Location:  between E 8th Ave and E 4th Ave; and E 4th Ave – between Garden Dr and Templeton Dr
Schedule: Apr 1, 2024 - Sep 30, 2024</content>
<id>urn:uuid:9fab0ab4-5591-434f-a10a-b8700ad01cb9</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/3d616545-c79e-4ad9-ad9d-74e295b2d947"/>
<published>2022-10-26T07:00:00Z</published>
<title>Lakewood Dr &amp; Garden Dr Sewer Renewal Project</title>
<updated>2026-01-10T02:00:36.0939044Z</updated>
<georss:line>49.26673948016389 -123.06002435412238 49.26673457246906 -123.05942553969516</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Sewer Renewal Project

Full closure: Garden Dr – between E 8th Ave and E 4th Ave; and E 4th Ave – between Garden Dr and Templeton Dr
Location:  between E 8th Ave and E 4th Ave; and E 4th Ave – between Garden Dr and Templeton Dr
Schedule: Apr 1, 2024 - Sep 30, 2024</content>
<id>urn:uuid:9dd60168-4644-44c2-9e4a-449d0e0f090f</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/3d616545-c79e-4ad9-ad9d-74e295b2d947"/>
<published>2022-10-26T07:00:00Z</published>
<title>Lakewood Dr &amp; Garden Dr Sewer Renewal Project</title>
<updated>2026-01-10T02:00:36.0939044Z</updated>
<georss:line>49.26673457246906 -123.05942553969516 49.266724150778856 -123.05809151403038</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Sewer Renewal Project

Full closure: Garden Dr – between E 8th Ave and E 4th Ave; and E 4th Ave – between Garden Dr and Templeton Dr
Location:  between E 8th Ave and E 4th Ave; and E 4th Ave – between Garden Dr and Templeton Dr
Schedule: Apr 1, 2024 - Sep 30, 2024</content>
<id>urn:uuid:f9ba192f-4fc9-4df8-83f9-7239a6e50ef2</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/3d616545-c79e-4ad9-ad9d-74e295b2d947"/>
<published>2022-10-26T07:00:00Z</published>
<title>Lakewood Dr &amp; Garden Dr Sewer Renewal Project</title>
<updated>2026-01-10T02:00:36.0939044Z</updated>
<georss:line>49.26363985674763 -123.05814727030167 49.26318813159912 -123.0581550962084</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Sewer Renewal Project

Full closure: Garden Dr – between E 8th Ave and E 4th Ave; and E 4th Ave – between Garden Dr and Templeton Dr
Location:  between E 8th Ave and E 4th Ave; and E 4th Ave – between Garden Dr and Templeton Dr
Schedule: Apr 1, 2024 - Sep 30, 2024</content>
<id>urn:uuid:8f288594-f57e-4ff2-be71-72cfe6c34a16</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/3d616545-c79e-4ad9-ad9d-74e295b2d947"/>
<published>2022-10-26T07:00:00Z</published>
<title>Lakewood Dr &amp; Garden Dr Sewer Renewal Project</title>
<updated>2026-01-10T02:00:36.0939044Z</updated>
<georss:line>49.26363985674763 -123.05814727030167 49.26318813159912 -123.0581550962084</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Sewer Renewal Project

Full closure: Garden Dr – between E 8th Ave and E 4th Ave; and E 4th Ave – between Garden Dr and Templeton Dr
Location:  between E 8th Ave and E 4th Ave; and E 4th Ave – between Garden Dr and Templeton Dr
Schedule: Apr 1, 2024 - Sep 30, 2024</content>
<id>urn:uuid:ccb4d029-7b19-40c9-bc60-75655db19ada</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/3d616545-c79e-4ad9-ad9d-74e295b2d947"/>
<published>2022-10-26T07:00:00Z</published>
<title>Lakewood Dr &amp; Garden Dr Sewer Renewal Project</title>
<updated>2026-01-10T02:00:36.0939044Z</updated>
<georss:line>49.2640920140031 -123.05813870254663 49.26363985674763 -123.05814727030167</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Sewer Renewal Project

Full closure: Garden Dr – between E 8th Ave and E 4th Ave; and E 4th Ave – between Garden Dr and Templeton Dr
Location:  between E 8th Ave and E 4th Ave; and E 4th Ave – between Garden Dr and Templeton Dr
Schedule: Apr 1, 2024 - Sep 30, 2024</content>
<id>urn:uuid:25a16580-7282-42ac-823b-df93f8a2b0d7</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/3d616545-c79e-4ad9-ad9d-74e295b2d947"/>
<published>2022-10-26T07:00:00Z</published>
<title>Lakewood Dr &amp; Garden Dr Sewer Renewal Project</title>
<updated>2026-01-10T02:00:36.0939044Z</updated>
<georss:line>49.2640920140031 -123.05813870254663 49.26363985674763 -123.05814727030167</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>This project is a sewer upgrade to provide a separated sewer main in the lane east of Garden Dr and north of E 10th Ave.
Traffic Impact: Will need the entire lane width, however, we will accommodate parking access when it is safe to do so.
Location: Garden Dr &amp; E 10th Ave.
Schedule: Sep 18, 2025 - Oct 31, 2025</content>
<id>urn:uuid:022cd025-aef1-45b1-bdbd-b2a4f6bd9903</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/fc6893a4-f043-4218-a447-fe846c46b43d"/>
<published>2025-09-18T07:00:00Z</published>
<title>Lane East of Garden Drive Sewer Upgrade</title>
<updated>2025-09-18T17:48:44.7969556Z</updated>
<georss:line>49.26222720501323 -123.05742305843143 49.261276218888185 -123.05743073742255</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>This project is a sewer main extension where a separated sewer and drainage pipe will be installed from 1847 Larch St to the existing separated sewer main along L/S W 3rd Ave.

Initially the sewer operations crew will shutdown Larch St from L/S W 3rd Ave to just before W 3rd Ave. Once work is complete, the sewer operations crews will shut down the intersection of Larch St and W 3rd Ave including the small sections.
Location: 1847 Larch St
Schedule: May 12, 2025 - Jun 6, 2025</content>
<id>urn:uuid:cbd99d91-fad9-4503-a2f3-cc025b6c9c3f</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/be066dd0-b0ae-414d-b2a8-18ae5bede434"/>
<published>2025-04-30T07:00:00Z</published>
<title>Larch St and W 3rd Ave to L/S W 3rd Ave Sewer Main Extension</title>
<updated>2025-05-29T19:43:58.4150328Z</updated>
<georss:line>49.26929902583049 -123.16221414090087 49.26858402789452 -123.1622373631512</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>This project is a sewer main extension where a separated sewer and drainage pipe will be installed from 1847 Larch St to the existing separated sewer main along L/S W 3rd Ave.

Initially the sewer operations crew will shutdown Larch St from L/S W 3rd Ave to just before W 3rd Ave. Once work is complete, the sewer operations crews will shut down the intersection of Larch St and W 3rd Ave including the small sections.
Location: 1847 Larch St
Schedule: May 12, 2025 - Jun 6, 2025</content>
<id>urn:uuid:d93dcece-c76a-4a58-bf61-7100d6249635</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/be066dd0-b0ae-414d-b2a8-18ae5bede434"/>
<published>2025-04-30T07:00:00Z</published>
<title>Larch St and W 3rd Ave to L/S W 3rd Ave Sewer Main Extension</title>
<updated>2025-05-29T19:43:58.4150328Z</updated>
<georss:line>49.26916159761737 -123.1622124984998 49.26916159761737 -123.16187644860513</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Precast barrier placement, roadway paint and new traffic signage.  Converting local roads to one-way vehicle traffic in vicinity of W 70th and Oak.
Location: 900-1000 blk W 71st
8500 blk Fremlin
8300-8600 blk Shaughnessy
8500-8600 blk Osler
8500-8600 blk Selkirk

Schedule: Sep 16, 2025 - Sep 18, 2025</content>
<id>urn:uuid:b4a7327b-a464-4052-801a-98e6e3664cd4</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/67de3e23-96cd-4174-9d26-1b5e924a11b5"/>
<published>2025-09-08T07:00:00Z</published>
<title>Marpole One-Ways (Neighbourhood Traffic Calming)</title>
<updated>2025-09-08T21:21:02.3109712Z</updated>
<georss:line>49.20806743508737 -123.13164208753783 49.20693839121927 -123.13168892606595</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Precast barrier placement, roadway paint and new traffic signage.  Converting local roads to one-way vehicle traffic in vicinity of W 70th and Oak.
Location: 900-1000 blk W 71st
8500 blk Fremlin
8300-8600 blk Shaughnessy
8500-8600 blk Osler
8500-8600 blk Selkirk

Schedule: Sep 16, 2025 - Sep 18, 2025</content>
<id>urn:uuid:f721c15a-7a03-49dc-99f5-9cee908c23bf</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/67de3e23-96cd-4174-9d26-1b5e924a11b5"/>
<published>2025-09-08T07:00:00Z</published>
<title>Marpole One-Ways (Neighbourhood Traffic Calming)</title>
<updated>2025-09-08T21:21:02.3109712Z</updated>
<georss:line>49.20849160122103 -123.13162450058327 49.20806743508737 -123.13164208753783</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Precast barrier placement, roadway paint and new traffic signage.  Converting local roads to one-way vehicle traffic in vicinity of W 70th and Oak.
Location: 900-1000 blk W 71st
8500 blk Fremlin
8300-8600 blk Shaughnessy
8500-8600 blk Osler
8500-8600 blk Selkirk

Schedule: Sep 16, 2025 - Sep 18, 2025</content>
<id>urn:uuid:a0529742-9efe-4c5b-a0d4-a453add48422</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/67de3e23-96cd-4174-9d26-1b5e924a11b5"/>
<published>2025-09-08T07:00:00Z</published>
<title>Marpole One-Ways (Neighbourhood Traffic Calming)</title>
<updated>2025-09-08T21:21:02.3109712Z</updated>
<georss:line>49.20891668939052 -123.1316108149482 49.20849160122103 -123.13162450058327</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Precast barrier placement, roadway paint and new traffic signage.  Converting local roads to one-way vehicle traffic in vicinity of W 70th and Oak.
Location: 900-1000 blk W 71st
8500 blk Fremlin
8300-8600 blk Shaughnessy
8500-8600 blk Osler
8500-8600 blk Selkirk

Schedule: Sep 16, 2025 - Sep 18, 2025</content>
<id>urn:uuid:d3d5cb26-6d1c-4762-bb29-90addef38223</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/67de3e23-96cd-4174-9d26-1b5e924a11b5"/>
<published>2025-09-08T07:00:00Z</published>
<title>Marpole One-Ways (Neighbourhood Traffic Calming)</title>
<updated>2025-09-08T21:21:02.3109712Z</updated>
<georss:line>49.20894931056753 -123.13298932619347 49.20851275340996 -123.1330028594197</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Precast barrier placement, roadway paint and new traffic signage.  Converting local roads to one-way vehicle traffic in vicinity of W 70th and Oak.
Location: 900-1000 blk W 71st
8500 blk Fremlin
8300-8600 blk Shaughnessy
8500-8600 blk Osler
8500-8600 blk Selkirk

Schedule: Sep 16, 2025 - Sep 18, 2025</content>
<id>urn:uuid:7bbe41eb-9665-4d1e-9fda-ec25e7a6f4cc</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/67de3e23-96cd-4174-9d26-1b5e924a11b5"/>
<published>2025-09-08T07:00:00Z</published>
<title>Marpole One-Ways (Neighbourhood Traffic Calming)</title>
<updated>2025-09-08T21:21:02.3109712Z</updated>
<georss:line>49.21075061765157 -123.13155181129842 49.20891668939052 -123.1316108149482</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Precast barrier placement, roadway paint and new traffic signage.  Converting local roads to one-way vehicle traffic in vicinity of W 70th and Oak.
Location: 900-1000 blk W 71st
8500 blk Fremlin
8300-8600 blk Shaughnessy
8500-8600 blk Osler
8500-8600 blk Selkirk

Schedule: Sep 16, 2025 - Sep 18, 2025</content>
<id>urn:uuid:d223a8a4-9689-4429-97a7-af15a4f64c84</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/67de3e23-96cd-4174-9d26-1b5e924a11b5"/>
<published>2025-09-08T07:00:00Z</published>
<title>Marpole One-Ways (Neighbourhood Traffic Calming)</title>
<updated>2025-09-08T21:21:02.3109712Z</updated>
<georss:line>49.21077151566553 -123.13293293702966 49.20894931056753 -123.13298932619347</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Precast barrier placement, roadway paint and new traffic signage.  Converting local roads to one-way vehicle traffic in vicinity of W 70th and Oak.
Location: 900-1000 blk W 71st
8500 blk Fremlin
8300-8600 blk Shaughnessy
8500-8600 blk Osler
8500-8600 blk Selkirk

Schedule: Sep 16, 2025 - Sep 18, 2025</content>
<id>urn:uuid:969a49f7-014b-40f1-b09d-a24cca82f352</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/67de3e23-96cd-4174-9d26-1b5e924a11b5"/>
<published>2025-09-08T07:00:00Z</published>
<title>Marpole One-Ways (Neighbourhood Traffic Calming)</title>
<updated>2025-09-08T21:21:02.3109712Z</updated>
<georss:line>49.20851673638893 -123.13327767669895 49.20743998093312 -123.13331728766941</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Precast barrier placement, roadway paint and new traffic signage.  Converting local roads to one-way vehicle traffic in vicinity of W 70th and Oak.
Location: 900-1000 blk W 71st
8500 blk Fremlin
8300-8600 blk Shaughnessy
8500-8600 blk Osler
8500-8600 blk Selkirk

Schedule: Sep 16, 2025 - Sep 18, 2025</content>
<id>urn:uuid:f710db4b-044f-4b1d-bf54-7b08d9414a83</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/67de3e23-96cd-4174-9d26-1b5e924a11b5"/>
<published>2025-09-08T07:00:00Z</published>
<title>Marpole One-Ways (Neighbourhood Traffic Calming)</title>
<updated>2025-09-08T21:21:02.3109712Z</updated>
<georss:line>49.208450183125734 -123.12886767894034 49.2068967072025 -123.12891384822628</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Precast barrier placement, roadway paint and new traffic signage.  Converting local roads to one-way vehicle traffic in vicinity of W 70th and Oak.
Location: 900-1000 blk W 71st
8500 blk Fremlin
8300-8600 blk Shaughnessy
8500-8600 blk Osler
8500-8600 blk Selkirk

Schedule: Sep 16, 2025 - Sep 18, 2025</content>
<id>urn:uuid:53c77b04-dfd2-4491-868e-a20cd58aeca1</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/67de3e23-96cd-4174-9d26-1b5e924a11b5"/>
<published>2025-09-08T07:00:00Z</published>
<title>Marpole One-Ways (Neighbourhood Traffic Calming)</title>
<updated>2025-09-08T21:21:02.3109712Z</updated>
<georss:line>49.210708716040216 -123.12879141663149 49.208450183125734 -123.12886767894034</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Precast barrier placement, roadway paint and new traffic signage.  Converting local roads to one-way vehicle traffic in vicinity of W 70th and Oak.
Location: 900-1000 blk W 71st
8500 blk Fremlin
8300-8600 blk Shaughnessy
8500-8600 blk Osler
8500-8600 blk Selkirk

Schedule: Sep 16, 2025 - Sep 18, 2025</content>
<id>urn:uuid:ad31c3af-58f7-4f53-af21-bccdeb524228</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/67de3e23-96cd-4174-9d26-1b5e924a11b5"/>
<published>2025-09-08T07:00:00Z</published>
<title>Marpole One-Ways (Neighbourhood Traffic Calming)</title>
<updated>2025-09-08T21:21:02.3109712Z</updated>
<georss:line>49.2088346554286 -123.12746929190784 49.20842894355172 -123.12748303538626</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Precast barrier placement, roadway paint and new traffic signage.  Converting local roads to one-way vehicle traffic in vicinity of W 70th and Oak.
Location: 900-1000 blk W 71st
8500 blk Fremlin
8300-8600 blk Shaughnessy
8500-8600 blk Osler
8500-8600 blk Selkirk

Schedule: Sep 16, 2025 - Sep 18, 2025</content>
<id>urn:uuid:dc23e2a6-1aaa-4447-ae36-5372dc305f92</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/67de3e23-96cd-4174-9d26-1b5e924a11b5"/>
<published>2025-09-08T07:00:00Z</published>
<title>Marpole One-Ways (Neighbourhood Traffic Calming)</title>
<updated>2025-09-08T21:21:02.3109712Z</updated>
<georss:line>49.21068695411404 -123.12740650274293 49.2088346554286 -123.12746929190784</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Precast barrier placement, roadway paint and new traffic signage.  Converting local roads to one-way vehicle traffic in vicinity of W 70th and Oak.
Location: 900-1000 blk W 71st
8500 blk Fremlin
8300-8600 blk Shaughnessy
8500-8600 blk Osler
8500-8600 blk Selkirk

Schedule: Sep 16, 2025 - Sep 18, 2025</content>
<id>urn:uuid:19986c32-f3d8-41da-a2dd-61229e68f859</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/67de3e23-96cd-4174-9d26-1b5e924a11b5"/>
<published>2025-09-08T07:00:00Z</published>
<title>Marpole One-Ways (Neighbourhood Traffic Calming)</title>
<updated>2025-09-08T21:21:02.3109712Z</updated>
<georss:line>49.2068967072025 -123.12891384822628 49.206905918503224 -123.12959700850747</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Precast barrier placement, roadway paint and new traffic signage.  Converting local roads to one-way vehicle traffic in vicinity of W 70th and Oak.
Location: 900-1000 blk W 71st
8500 blk Fremlin
8300-8600 blk Shaughnessy
8500-8600 blk Osler
8500-8600 blk Selkirk

Schedule: Sep 16, 2025 - Sep 18, 2025</content>
<id>urn:uuid:ccec1d0a-5499-4161-9ffa-c0a4907c5fd1</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/67de3e23-96cd-4174-9d26-1b5e924a11b5"/>
<published>2025-09-08T07:00:00Z</published>
<title>Marpole One-Ways (Neighbourhood Traffic Calming)</title>
<updated>2025-09-08T21:21:02.3109712Z</updated>
<georss:line>49.206905918503224 -123.12959700850747 49.206914286380425 -123.13029861847401</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Precast barrier placement, roadway paint and new traffic signage.  Converting local roads to one-way vehicle traffic in vicinity of W 70th and Oak.
Location: 900-1000 blk W 71st
8500 blk Fremlin
8300-8600 blk Shaughnessy
8500-8600 blk Osler
8500-8600 blk Selkirk

Schedule: Sep 16, 2025 - Sep 18, 2025</content>
<id>urn:uuid:73b3661e-c774-4bc9-9a98-052c4dc1735b</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/67de3e23-96cd-4174-9d26-1b5e924a11b5"/>
<published>2025-09-08T07:00:00Z</published>
<title>Marpole One-Ways (Neighbourhood Traffic Calming)</title>
<updated>2025-09-08T21:21:02.3109712Z</updated>
<georss:line>49.206914286380425 -123.13029861847401 49.20692611168374 -123.13099362048166</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Precast barrier placement, roadway paint and new traffic signage.  Converting local roads to one-way vehicle traffic in vicinity of W 70th and Oak.
Location: 900-1000 blk W 71st
8500 blk Fremlin
8300-8600 blk Shaughnessy
8500-8600 blk Osler
8500-8600 blk Selkirk

Schedule: Sep 16, 2025 - Sep 18, 2025</content>
<id>urn:uuid:124bfda9-9cae-4c76-800f-8bd4863b22a7</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/67de3e23-96cd-4174-9d26-1b5e924a11b5"/>
<published>2025-09-08T07:00:00Z</published>
<title>Marpole One-Ways (Neighbourhood Traffic Calming)</title>
<updated>2025-09-08T21:21:02.3109712Z</updated>
<georss:line>49.20692611168374 -123.13099362048166 49.20693839121927 -123.13168892606595</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Beginning in mid-July 2025, the City of Vancouver will begin upgrading aging sewer infrastructure along Highbury Street, between West 31st Avenue and the laneway south of West 33rd Avenue, including a section that runs beneath Memorial West Park.

What to Expect During Construction:
•	Access to park facilities and parking lots will be maintained at all times.
•	Access to the playground may be temporarily restricted due to safety concerns, if required
•	The intersection of West 33rd Avenue and Highbury Street will be closed to traffic.
•	The intersection of West 31st Avenue and Highbury Street will also be closed to traffic.
•	Highbury Street will be closed between:
           - West 30th Avenue and West 31st Avenue (north end of the park), and
           - West 33rd Avenue and West 34th Avenue (south end of the park)

Temporary parking restrictions will be in place along West 31st Avenue, West 33rd Avenue, Wallace Street, and Highbury Street to accommodate construction activities. Please watch for posted "No Parking" signs as work progresses.
***NOTE FOR 3-1-1 Agents***  - During the Holiday closure between Dec 24th and Jan 1st, 2026, please contact  Shane McElligott, W&amp;B Contractor at 647-643-1832 for any urgent matters***
Location: Alignment is along Highbury Street through Memorial West Park, between W 31st Ave and lane south of W 33rd Ave.
Schedule: Jul 7, 2025 - Jan 31, 2026; M - Sa; 7:00 AM - 7:00 PM</content>
<id>urn:uuid:69637ed3-0be1-4a1c-92e2-7c22070db7c9</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/9d7ad385-d4e0-46fb-8e14-7a40f958b1ef"/>
<published>2025-07-07T07:00:00Z</published>
<title>Memorial West Trenchless Sewer Upgrade</title>
<updated>2026-04-29T01:01:10.1972464Z</updated>
<georss:line>49.24519436177815 -123.18815934348683 49.241433898919325 -123.18817356592662</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Metro Vancouver emergency repair works to existing forcemain. 
Section 1: West 1st Avenue between Columbia St and Quebec St
Pause during FIFA
Location: W 1st Av - Columbia St to Quebec St
Schedule: Jun 24, 2025 - Oct 31, 2026</content>
<id>urn:uuid:a5fed59a-4dbc-4de1-bea0-6953d104362d</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/6665737b-1b89-4b1c-9f9b-d650e3de4f76"/>
<published>2025-04-24T07:00:00Z</published>
<title>Metro Vancouver Columbia Forcemain - Section 1</title>
<updated>2026-05-19T21:24:56.9034594Z</updated>
<georss:line>49.27017366184094 -123.10375242412442 49.27015364092304 -123.10266213821873</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Metro Vancouver emergency repair works to existing forcemain. 
Section 1: West 1st Avenue between Columbia St and Quebec St
Pause during FIFA
Location: W 1st Av - Columbia St to Quebec St
Schedule: Jun 24, 2025 - Oct 31, 2026</content>
<id>urn:uuid:5979e5e1-7c32-4310-b430-c7f8a9c158ea</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/6665737b-1b89-4b1c-9f9b-d650e3de4f76"/>
<published>2025-04-24T07:00:00Z</published>
<title>Metro Vancouver Columbia Forcemain - Section 1</title>
<updated>2026-05-19T21:24:56.9034594Z</updated>
<georss:line>49.27018918089729 -123.1045978633537 49.27017366184094 -123.10375242412442</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Metro Vancouver emergency repair works to existing forcemain. 
Section 1: West 1st Avenue between Columbia St and Quebec St
Pause during FIFA
Location: W 1st Av - Columbia St to Quebec St
Schedule: Jun 24, 2025 - Oct 31, 2026</content>
<id>urn:uuid:244464ab-8aa5-4925-8a77-c7603727716f</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/6665737b-1b89-4b1c-9f9b-d650e3de4f76"/>
<published>2025-04-24T07:00:00Z</published>
<title>Metro Vancouver Columbia Forcemain - Section 1</title>
<updated>2026-05-19T21:24:56.9034594Z</updated>
<georss:line>49.270189832195655 -123.10463357800873 49.270216700840734 -123.10610330988426</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Metro Vancouver emergency repair works to existing forcemain. 
Section 1: West 1st Avenue between Columbia St and Quebec St
Pause during FIFA
Location: W 1st Av - Columbia St to Quebec St
Schedule: Jun 24, 2025 - Oct 31, 2026</content>
<id>urn:uuid:c613eb21-2f9b-4f65-9165-0f57298f9144</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/6665737b-1b89-4b1c-9f9b-d650e3de4f76"/>
<published>2025-04-24T07:00:00Z</published>
<title>Metro Vancouver Columbia Forcemain - Section 1</title>
<updated>2026-05-19T21:24:56.9034594Z</updated>
<georss:line>49.270216700840734 -123.10610330988426 49.27022457119858 -123.10653392088008</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Metro Vancouver emergency repair works to existing forcemain. 
Section 1: West 1st Avenue between Columbia St and Quebec St
Pause during FIFA
Location: W 1st Av - Columbia St to Quebec St
Schedule: Jun 24, 2025 - Oct 31, 2026</content>
<id>urn:uuid:79272f05-d110-4d8b-99a9-ab777afb0d19</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/6665737b-1b89-4b1c-9f9b-d650e3de4f76"/>
<published>2025-04-24T07:00:00Z</published>
<title>Metro Vancouver Columbia Forcemain - Section 1</title>
<updated>2026-05-19T21:24:56.9034594Z</updated>
<georss:line>49.27022457119858 -123.10653392088008 49.270227490913356 -123.10669393597271</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Metro Vancouver emergency repair works to existing forcemain. 
Section 1: West 1st Avenue between Columbia St and Quebec St
Pause during FIFA
Location: W 1st Av - Columbia St to Quebec St
Schedule: Jun 24, 2025 - Oct 31, 2026</content>
<id>urn:uuid:416bcaa3-366a-4722-9a73-aa7252bf6c38</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/6665737b-1b89-4b1c-9f9b-d650e3de4f76"/>
<published>2025-04-24T07:00:00Z</published>
<title>Metro Vancouver Columbia Forcemain - Section 1</title>
<updated>2026-05-19T21:24:56.9034594Z</updated>
<georss:line>49.270227490913356 -123.10669393597271 49.27027706833496 -123.10941085493421</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Metro Vancouver emergency repair works to existing forcemain. 
Section 2: From Yukon St and W 8th Av to Alberta St and W 2nd Av
Location: Yukon St - W 8th Av to W 7th Av / W 7th Av - Yukon St to Alberta St / Alberta St- W 7th Av to W 3rd Av
Schedule: Aug 1, 2025 - Oct 31, 2026</content>
<id>urn:uuid:59480801-1462-49d1-9b79-46bb0626b41b</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/07511e9a-1668-409a-b259-ebc351d83f8d"/>
<published>2025-04-24T07:00:00Z</published>
<title>Metro Vancouver Columbia Forcemain - Section 2</title>
<updated>2026-05-19T21:27:23.8751059Z</updated>
<georss:line>49.26523591587778 -123.11087316663239 49.26478374607936 -123.11089075043989</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Metro Vancouver emergency repair works to existing forcemain. 
Section 2: From Yukon St and W 8th Av to Alberta St and W 2nd Av
Location: Yukon St - W 8th Av to W 7th Av / W 7th Av - Yukon St to Alberta St / Alberta St- W 7th Av to W 3rd Av
Schedule: Aug 1, 2025 - Oct 31, 2026</content>
<id>urn:uuid:b57c4248-920f-47da-ae37-f96012fd1f54</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/07511e9a-1668-409a-b259-ebc351d83f8d"/>
<published>2025-04-24T07:00:00Z</published>
<title>Metro Vancouver Columbia Forcemain - Section 2</title>
<updated>2026-05-19T21:27:23.8751059Z</updated>
<georss:line>49.265690149544184 -123.11085140859302 49.26523591587778 -123.11087316663239</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Metro Vancouver emergency repair works to existing forcemain. 
Section 2: From Yukon St and W 8th Av to Alberta St and W 2nd Av
Location: Yukon St - W 8th Av to W 7th Av / W 7th Av - Yukon St to Alberta St / Alberta St- W 7th Av to W 3rd Av
Schedule: Aug 1, 2025 - Oct 31, 2026</content>
<id>urn:uuid:29e3f350-3a01-46a9-a65b-030f6b0310bd</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/07511e9a-1668-409a-b259-ebc351d83f8d"/>
<published>2025-04-24T07:00:00Z</published>
<title>Metro Vancouver Columbia Forcemain - Section 2</title>
<updated>2026-05-19T21:27:23.8751059Z</updated>
<georss:line>49.26614174552549 -123.11083178852434 49.265690149544184 -123.11085140859302</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Metro Vancouver emergency repair works to existing forcemain. 
Section 2: From Yukon St and W 8th Av to Alberta St and W 2nd Av
Location: Yukon St - W 8th Av to W 7th Av / W 7th Av - Yukon St to Alberta St / Alberta St- W 7th Av to W 3rd Av
Schedule: Aug 1, 2025 - Oct 31, 2026</content>
<id>urn:uuid:a94d6498-ad1f-4e6f-b3d3-b755d23c700a</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/07511e9a-1668-409a-b259-ebc351d83f8d"/>
<published>2025-04-24T07:00:00Z</published>
<title>Metro Vancouver Columbia Forcemain - Section 2</title>
<updated>2026-05-19T21:27:23.8751059Z</updated>
<georss:line>49.266593251371404 -123.11081231910259 49.26614174552549 -123.11083178852434</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Metro Vancouver emergency repair works to existing forcemain. 
Section 2: From Yukon St and W 8th Av to Alberta St and W 2nd Av
Location: Yukon St - W 8th Av to W 7th Av / W 7th Av - Yukon St to Alberta St / Alberta St- W 7th Av to W 3rd Av
Schedule: Aug 1, 2025 - Oct 31, 2026</content>
<id>urn:uuid:c1d370c4-af3d-430e-ade5-b600f79b3f44</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/07511e9a-1668-409a-b259-ebc351d83f8d"/>
<published>2025-04-24T07:00:00Z</published>
<title>Metro Vancouver Columbia Forcemain - Section 2</title>
<updated>2026-05-19T21:27:23.8751059Z</updated>
<georss:line>49.26704531510421 -123.11079261690682 49.266593251371404 -123.11081231910259</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Metro Vancouver emergency repair works to existing forcemain. 
Section 2: From Yukon St and W 8th Av to Alberta St and W 2nd Av
Location: Yukon St - W 8th Av to W 7th Av / W 7th Av - Yukon St to Alberta St / Alberta St- W 7th Av to W 3rd Av
Schedule: Aug 1, 2025 - Oct 31, 2026</content>
<id>urn:uuid:4658df8d-2747-4896-a4e5-21a94bb9f065</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/07511e9a-1668-409a-b259-ebc351d83f8d"/>
<published>2025-04-24T07:00:00Z</published>
<title>Metro Vancouver Columbia Forcemain - Section 2</title>
<updated>2026-05-19T21:27:23.8751059Z</updated>
<georss:line>49.267497306678706 -123.11077307914489 49.26704531510421 -123.11079261690682</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Metro Vancouver emergency repair works to existing forcemain. 
Section 2: From Yukon St and W 8th Av to Alberta St and W 2nd Av
Location: Yukon St - W 8th Av to W 7th Av / W 7th Av - Yukon St to Alberta St / Alberta St- W 7th Av to W 3rd Av
Schedule: Aug 1, 2025 - Oct 31, 2026</content>
<id>urn:uuid:1492977e-bc13-4511-a373-072bd0e5ce89</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/07511e9a-1668-409a-b259-ebc351d83f8d"/>
<published>2025-04-24T07:00:00Z</published>
<title>Metro Vancouver Columbia Forcemain - Section 2</title>
<updated>2026-05-19T21:27:23.8751059Z</updated>
<georss:line>49.26794847077667 -123.11075341546834 49.267497306678706 -123.11077307914489</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Metro Vancouver emergency repair works to existing forcemain. 
Section 2: From Yukon St and W 8th Av to Alberta St and W 2nd Av
Location: Yukon St - W 8th Av to W 7th Av / W 7th Av - Yukon St to Alberta St / Alberta St- W 7th Av to W 3rd Av
Schedule: Aug 1, 2025 - Oct 31, 2026</content>
<id>urn:uuid:190915d9-60bd-4c08-a482-70fd51188f3a</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/07511e9a-1668-409a-b259-ebc351d83f8d"/>
<published>2025-04-24T07:00:00Z</published>
<title>Metro Vancouver Columbia Forcemain - Section 2</title>
<updated>2026-05-19T21:27:23.8751059Z</updated>
<georss:line>49.26809515230792 -123.11074735196848 49.26794847077667 -123.11075341546834</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Metro Vancouver emergency repair works to existing forcemain. 
Section 2: From Yukon St and W 8th Av to Alberta St and W 2nd Av
Location: Yukon St - W 8th Av to W 7th Av / W 7th Av - Yukon St to Alberta St / Alberta St- W 7th Av to W 3rd Av
Schedule: Aug 1, 2025 - Oct 31, 2026</content>
<id>urn:uuid:c428a169-bb99-4834-a2cf-a7ff521acf9b</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/07511e9a-1668-409a-b259-ebc351d83f8d"/>
<published>2025-04-24T07:00:00Z</published>
<title>Metro Vancouver Columbia Forcemain - Section 2</title>
<updated>2026-05-19T21:27:23.8751059Z</updated>
<georss:line>49.2634136875692 -123.11290345793252 49.26394370183738 -123.11287697366426</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Metro Vancouver emergency repair works to existing forcemain. 
Section 2: From Yukon St and W 8th Av to Alberta St and W 2nd Av
Location: Yukon St - W 8th Av to W 7th Av / W 7th Av - Yukon St to Alberta St / Alberta St- W 7th Av to W 3rd Av
Schedule: Aug 1, 2025 - Oct 31, 2026</content>
<id>urn:uuid:c142846a-6776-4846-a91f-084d32dbed1d</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/07511e9a-1668-409a-b259-ebc351d83f8d"/>
<published>2025-04-24T07:00:00Z</published>
<title>Metro Vancouver Columbia Forcemain - Section 2</title>
<updated>2026-05-19T21:27:23.8751059Z</updated>
<georss:line>49.26436861203334 -123.11284727692905 49.26391654728428 -123.11286744039334</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Metro Vancouver emergency repair works to existing forcemain. 
Section 2: From Yukon St and W 8th Av to Alberta St and W 2nd Av
Location: Yukon St - W 8th Av to W 7th Av / W 7th Av - Yukon St to Alberta St / Alberta St- W 7th Av to W 3rd Av
Schedule: Aug 1, 2025 - Oct 31, 2026</content>
<id>urn:uuid:10fcd2f8-04fb-4399-bcc3-097c986b7d55</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/07511e9a-1668-409a-b259-ebc351d83f8d"/>
<published>2025-04-24T07:00:00Z</published>
<title>Metro Vancouver Columbia Forcemain - Section 2</title>
<updated>2026-05-19T21:27:23.8751059Z</updated>
<georss:line>49.264820685295916 -123.11282756670643 49.26436861203334 -123.11284727692905</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Metro Vancouver emergency repair works to existing forcemain. 
Section 2: From Yukon St and W 8th Av to Alberta St and W 2nd Av
Location: Yukon St - W 8th Av to W 7th Av / W 7th Av - Yukon St to Alberta St / Alberta St- W 7th Av to W 3rd Av
Schedule: Aug 1, 2025 - Oct 31, 2026</content>
<id>urn:uuid:082b0b09-2ff0-41b5-a5d1-63c4c6134004</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/07511e9a-1668-409a-b259-ebc351d83f8d"/>
<published>2025-04-24T07:00:00Z</published>
<title>Metro Vancouver Columbia Forcemain - Section 2</title>
<updated>2026-05-19T21:27:23.8751059Z</updated>
<georss:line>49.26478374607936 -123.11089075043989 49.264820685295916 -123.11282756670643</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Metro Vancouver emergency repair works to existing forcemain.
Section 3: From Alberta St and W 2nd Av to 50 metres south of Columbia St and W 1st Av
Pause during FIFA
Location: West 2nd Av - Alberta St to Columbia St 
Schedule: Aug 1, 2025 - Oct 31, 2026</content>
<id>urn:uuid:9c31cbac-4dbb-4020-8b97-4d2957bb3c0c</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/3ed48c4a-312c-4451-b53f-6ecd74c2b24e"/>
<published>2025-04-24T07:00:00Z</published>
<title>Metro Vancouver Columbia Forcemain - Section 3</title>
<updated>2026-05-19T21:26:47.4974264Z</updated>
<georss:line>49.268399994419326 -123.11073398592595 49.26809515230792 -123.11074735196848</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Metro Vancouver emergency repair works to existing forcemain.
Section 3: From Alberta St and W 2nd Av to 50 metres south of Columbia St and W 1st Av
Pause during FIFA
Location: West 2nd Av - Alberta St to Columbia St 
Schedule: Aug 1, 2025 - Oct 31, 2026</content>
<id>urn:uuid:3fbb0a35-1c70-420f-8842-70d2f3545c3d</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/3ed48c4a-312c-4451-b53f-6ecd74c2b24e"/>
<published>2025-04-24T07:00:00Z</published>
<title>Metro Vancouver Columbia Forcemain - Section 3</title>
<updated>2026-05-19T21:26:47.4974264Z</updated>
<georss:line>49.26840895214005 -123.11122253725023 49.268399994419326 -123.11073398592595</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Metro Vancouver emergency repair works to existing forcemain.
Section 3: From Alberta St and W 2nd Av to 50 metres south of Columbia St and W 1st Av
Pause during FIFA
Location: West 2nd Av - Alberta St to Columbia St 
Schedule: Aug 1, 2025 - Oct 31, 2026</content>
<id>urn:uuid:55482ac3-9ee7-4be6-80b3-0c96ef173672</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/3ed48c4a-312c-4451-b53f-6ecd74c2b24e"/>
<published>2025-04-24T07:00:00Z</published>
<title>Metro Vancouver Columbia Forcemain - Section 3</title>
<updated>2026-05-19T21:26:47.4974264Z</updated>
<georss:line>49.269027344026085 -123.10996427343846 49.26840895214005 -123.11122253725023</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Metro Vancouver emergency repair works to existing forcemain.
Section 3: From Alberta St and W 2nd Av to 50 metres south of Columbia St and W 1st Av
Pause during FIFA
Location: West 2nd Av - Alberta St to Columbia St 
Schedule: Aug 1, 2025 - Oct 31, 2026</content>
<id>urn:uuid:58a4af2a-759f-44d3-9e42-445c5e377bde</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/3ed48c4a-312c-4451-b53f-6ecd74c2b24e"/>
<published>2025-04-24T07:00:00Z</published>
<title>Metro Vancouver Columbia Forcemain - Section 3</title>
<updated>2026-05-19T21:26:47.4974264Z</updated>
<georss:line>49.269295559061334 -123.10941867795283 49.269027344026085 -123.10996427343846</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Section 4: From 50m south of Columbia Street and West 1st Avenue to Columbia St and W 2nd Av
Pause during FIFA
Location: Columbia St - W 1st Av to W 2nd Av
Schedule: Multiple occurrences as follows:
- Oct 1, 2025 - May 19, 2026
- May 20, 2026 - Jun 3, 2026
- Jun 4, 2026 - Oct 31, 2026
</content>
<id>urn:uuid:44e226ab-f741-40a4-bd55-cdb9d4898b82</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/4721b864-f15e-481d-a7d9-a79b43ba42ad"/>
<published>2025-04-24T07:00:00Z</published>
<title>Metro Vancouver Columbia Forcemain - Section 4</title>
<updated>2026-05-19T21:25:59.9767818Z</updated>
<georss:line>49.2698247668211 -123.10941620553135 49.269295559061334 -123.10941867795283</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Section 4: From 50m south of Columbia Street and West 1st Avenue to Columbia St and W 2nd Av
Pause during FIFA
Location: Columbia St - W 1st Av to W 2nd Av
Schedule: Multiple occurrences as follows:
- Oct 1, 2025 - May 19, 2026
- May 20, 2026 - Jun 3, 2026
- Jun 4, 2026 - Oct 31, 2026
</content>
<id>urn:uuid:e20c8a1b-c340-4afb-862a-45a048afb519</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/4721b864-f15e-481d-a7d9-a79b43ba42ad"/>
<published>2025-04-24T07:00:00Z</published>
<title>Metro Vancouver Columbia Forcemain - Section 4</title>
<updated>2026-05-19T21:25:59.9767818Z</updated>
<georss:line>49.27027706833496 -123.10941085493421 49.27018615022885 -123.10941472282568 49.2698247668211 -123.10941620553135</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Section 5​: ​From W 1st Av and Quebec St to Quebec St and Terminal Av
Pause during FIFA
Paving work post FIFA
Location: Quebec St - W 1st Av to Terminal Av
Schedule: Dec 1, 2025 - May 29, 2026</content>
<id>urn:uuid:c0fcb519-503a-4149-9c53-18065a00fd40</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cfefb79a-4d67-495e-8529-61aeaf8ff00c"/>
<published>2025-04-24T07:00:00Z</published>
<title>Metro Vancouver Columbia Forcemain - Section 5</title>
<updated>2026-05-20T18:44:12.8094906Z</updated>
<georss:line>49.27121705165578 -123.10227804784854 49.27113568627442 -123.10232303759295 49.27109164286125 -123.10234667330701 49.271047339630144 -123.10236912622624 49.27100278557705 -123.10239039637207 49.27095798972209 -123.10241045627274 49.270912979014895 -123.10242934722696 49.270867753504774 -123.10244701425123 49.27082233115823 -123.10246348487912 49.27077673897355 -123.10247874542311 49.270730967968206 -123.10249278212113 49.27069491530207 -123.10250283867084</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Section 5​: ​From W 1st Av and Quebec St to Quebec St and Terminal Av
Pause during FIFA
Paving work post FIFA
Location: Quebec St - W 1st Av to Terminal Av
Schedule: Dec 1, 2025 - May 29, 2026</content>
<id>urn:uuid:0bf44adf-3670-4b52-9639-a37c6a796f4c</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cfefb79a-4d67-495e-8529-61aeaf8ff00c"/>
<published>2025-04-24T07:00:00Z</published>
<title>Metro Vancouver Columbia Forcemain - Section 5</title>
<updated>2026-05-20T18:44:12.8094906Z</updated>
<georss:line>49.27069491530207 -123.10250283867084 49.27068504512815 -123.10250559503233 49.27063898844415 -123.10251718419728 49.27059280692396 -123.10252753589144 49.27054650955088 -123.10253666388333 49.27050011433991 -123.1025445407206 49.27045363925731 -123.10255119393705 49.27040709332286 -123.10255659606166 49.27036049451485 -123.10256076088184 49.27031386082382 -123.1025636884383 49.27029154289448 -123.10256464566557 49.27015196867086 -123.10257001985619</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Parking lane closure on the South Side of 300 Block of W 4th Avenue and Both Sides of 2000 Block of Alberta Street to facilitate utility maintenance.

Pay Station: B4-03-20 (6 parking spots); Pay Station: 78-20-09 (6 parking spots); Pay Station: 78-20-14 (6 parking spots)

WO# Charge code: LP10291
Location: South Side of 300 Block of W 4th Avenue From Alberta Street to 60m West of Alberta Street. Both Sides of 2000 Block of Alberta Street From W 4th Avenue to Lane South of W 4th Avenue. 
Schedule: Apr 16, 2026 - Aug 28, 2026; Weekdays; 7:00 AM - 5:00 PM</content>
<id>urn:uuid:0bff16ec-0d9f-4981-a2fc-26f3a191a6fe</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/eb5568c3-afbe-439a-880f-11a7930da601"/>
<published>2026-04-08T07:00:00Z</published>
<title>Metro Vancouver Utility Maintenance on 300 Block of W 4th Avenue</title>
<updated>2026-06-04T14:55:08.9223195Z</updated>
<georss:line>49.267490296591376 -123.11077525816091 49.267507798765564 -123.11186959943899</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Parking lane closure on the South Side of 300 Block of W 4th Avenue and Both Sides of 2000 Block of Alberta Street to facilitate utility maintenance.

Pay Station: B4-03-20 (6 parking spots); Pay Station: 78-20-09 (6 parking spots); Pay Station: 78-20-14 (6 parking spots)

WO# Charge code: LP10291
Location: South Side of 300 Block of W 4th Avenue From Alberta Street to 60m West of Alberta Street. Both Sides of 2000 Block of Alberta Street From W 4th Avenue to Lane South of W 4th Avenue. 
Schedule: Apr 16, 2026 - Aug 28, 2026; Weekdays; 7:00 AM - 5:00 PM</content>
<id>urn:uuid:1d169c92-6527-4aaa-ab3a-ec48a663192e</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/eb5568c3-afbe-439a-880f-11a7930da601"/>
<published>2026-04-08T07:00:00Z</published>
<title>Metro Vancouver Utility Maintenance on 300 Block of W 4th Avenue</title>
<updated>2026-06-04T14:55:08.9223195Z</updated>
<georss:line>49.267500797896616 -123.110780622579 49.267066742082164 -123.11080208025112</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>East and West bound mowing
Location: 2500 to 4600 Blk of W 16th Ave
Schedule: Jun 9, 2026 - Jun 10, 2026; All days; 9:30 AM - 2:30 PM</content>
<id>urn:uuid:37b23e5d-277e-4ee0-969a-261e59ea52f6</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/db4bb236-191e-42df-8cd6-cd928a96c3ab"/>
<published>2026-06-02T07:00:00Z</published>
<title>Mowing 16th Ave. Medians</title>
<updated>2026-06-02T22:01:15.4211801Z</updated>
<georss:line>49.258400803799105 -123.215389571552 49.257633058569155 -123.16490747835309</georss:line>
</entry>
<entry>
<category term="Road Closure"/>
<content>*Upgrading critical sewer infrastructure along Kamloops Street between East Broadway and East 5th Avenue*

The existing combined sewer system will be replaced with a larger-capacity, separated system. One pipe for rainwater runoff and a second for sewage. The new sewer mains have a life expectancy of approximately 100 years to support the needs of the growing neighborhood.

The NEKSU project includes the replacement and separation of 1.8 km of combined sewer mains in the Hastings-Sunrise neighborhood.
Location: Nanaimo East Kamloops Sewer Upgrades is scheduled to begin with pre-work investigations December 2025, with major sewer work construction to begin in January 2026. 

Contact: eastkamloopsupgrades@vancouver.ca or 311
Schedule: Dec 1, 2025 - Dec 31, 2026; Weekdays; 7:00 AM - 5:00 PM</content>
<id>urn:uuid:48a4c6dc-9e17-49c6-9e3e-70087d3ce430</id>
<link href="https://vancouver.ca/streets-transportation/nanaimo-east-kamloops-sewer-upgrades.aspx"/>
<published>2025-11-10T08:00:00Z</published>
<title>Nanaimo East Kamloops Sewer Upgrades (NEKSU)</title>
<updated>2026-01-05T20:41:57.7172216Z</updated>
<georss:line>49.26523058551331 -123.05215199657462 49.26522995992116 -123.04952598656209</georss:line>
</entry>
<entry>
<category term="Road Closure"/>
<content>*Upgrading critical sewer infrastructure along Kamloops Street between East Broadway and East 5th Avenue*

The existing combined sewer system will be replaced with a larger-capacity, separated system. One pipe for rainwater runoff and a second for sewage. The new sewer mains have a life expectancy of approximately 100 years to support the needs of the growing neighborhood.

The NEKSU project includes the replacement and separation of 1.8 km of combined sewer mains in the Hastings-Sunrise neighborhood.
Location: Nanaimo East Kamloops Sewer Upgrades is scheduled to begin with pre-work investigations December 2025, with major sewer work construction to begin in January 2026. 

Contact: eastkamloopsupgrades@vancouver.ca or 311
Schedule: Dec 1, 2025 - Dec 31, 2026; Weekdays; 7:00 AM - 5:00 PM</content>
<id>urn:uuid:372d7662-f77b-45ad-8633-1f4b0766df49</id>
<link href="https://vancouver.ca/streets-transportation/nanaimo-east-kamloops-sewer-upgrades.aspx"/>
<published>2025-11-10T08:00:00Z</published>
<title>Nanaimo East Kamloops Sewer Upgrades (NEKSU)</title>
<updated>2026-01-05T20:41:57.7172216Z</updated>
<georss:line>49.26477718183645 -123.0521558211294 49.26478068246428 -123.05131360749871</georss:line>
</entry>
<entry>
<category term="Road Closure"/>
<content>*Upgrading critical sewer infrastructure along Kamloops Street between East Broadway and East 5th Avenue*

The existing combined sewer system will be replaced with a larger-capacity, separated system. One pipe for rainwater runoff and a second for sewage. The new sewer mains have a life expectancy of approximately 100 years to support the needs of the growing neighborhood.

The NEKSU project includes the replacement and separation of 1.8 km of combined sewer mains in the Hastings-Sunrise neighborhood.
Location: Nanaimo East Kamloops Sewer Upgrades is scheduled to begin with pre-work investigations December 2025, with major sewer work construction to begin in January 2026. 

Contact: eastkamloopsupgrades@vancouver.ca or 311
Schedule: Dec 1, 2025 - Dec 31, 2026; Weekdays; 7:00 AM - 5:00 PM</content>
<id>urn:uuid:7d989139-9053-4599-b1e7-67138a094a19</id>
<link href="https://vancouver.ca/streets-transportation/nanaimo-east-kamloops-sewer-upgrades.aspx"/>
<published>2025-11-10T08:00:00Z</published>
<title>Nanaimo East Kamloops Sewer Upgrades (NEKSU)</title>
<updated>2026-01-05T20:41:57.7172216Z</updated>
<georss:line>49.26296992122997 -123.05218904699089 49.26296893440485 -123.0495683519754</georss:line>
</entry>
<entry>
<category term="Road Closure"/>
<content>*Upgrading critical sewer infrastructure along Kamloops Street between East Broadway and East 5th Avenue*

The existing combined sewer system will be replaced with a larger-capacity, separated system. One pipe for rainwater runoff and a second for sewage. The new sewer mains have a life expectancy of approximately 100 years to support the needs of the growing neighborhood.

The NEKSU project includes the replacement and separation of 1.8 km of combined sewer mains in the Hastings-Sunrise neighborhood.
Location: Nanaimo East Kamloops Sewer Upgrades is scheduled to begin with pre-work investigations December 2025, with major sewer work construction to begin in January 2026. 

Contact: eastkamloopsupgrades@vancouver.ca or 311
Schedule: Dec 1, 2025 - Dec 31, 2026; Weekdays; 7:00 AM - 5:00 PM</content>
<id>urn:uuid:be5f2de7-b12f-4c81-851d-7c0eea5b4917</id>
<link href="https://vancouver.ca/streets-transportation/nanaimo-east-kamloops-sewer-upgrades.aspx"/>
<published>2025-11-10T08:00:00Z</published>
<title>Nanaimo East Kamloops Sewer Upgrades (NEKSU)</title>
<updated>2026-01-05T20:41:57.7172216Z</updated>
<georss:line>49.26387442272801 -123.05217422197147 49.26387341043542 -123.04954919068666</georss:line>
</entry>
<entry>
<category term="Road Closure"/>
<content>*Upgrading critical sewer infrastructure along Kamloops Street between East Broadway and East 5th Avenue*

The existing combined sewer system will be replaced with a larger-capacity, separated system. One pipe for rainwater runoff and a second for sewage. The new sewer mains have a life expectancy of approximately 100 years to support the needs of the growing neighborhood.

The NEKSU project includes the replacement and separation of 1.8 km of combined sewer mains in the Hastings-Sunrise neighborhood.
Location: Nanaimo East Kamloops Sewer Upgrades is scheduled to begin with pre-work investigations December 2025, with major sewer work construction to begin in January 2026. 

Contact: eastkamloopsupgrades@vancouver.ca or 311
Schedule: Dec 1, 2025 - Dec 31, 2026; Weekdays; 7:00 AM - 5:00 PM</content>
<id>urn:uuid:aa1ca732-8e8d-4524-bc44-0dde60fe2e8b</id>
<link href="https://vancouver.ca/streets-transportation/nanaimo-east-kamloops-sewer-upgrades.aspx"/>
<published>2025-11-10T08:00:00Z</published>
<title>Nanaimo East Kamloops Sewer Upgrades (NEKSU)</title>
<updated>2026-01-05T20:41:57.7172216Z</updated>
<georss:line>49.26296992122997 -123.05218904699089 49.26296893440485 -123.0495683519754</georss:line>
</entry>
<entry>
<category term="Road Closure"/>
<content>*Upgrading critical sewer infrastructure along Kamloops Street between East Broadway and East 5th Avenue*

The existing combined sewer system will be replaced with a larger-capacity, separated system. One pipe for rainwater runoff and a second for sewage. The new sewer mains have a life expectancy of approximately 100 years to support the needs of the growing neighborhood.

The NEKSU project includes the replacement and separation of 1.8 km of combined sewer mains in the Hastings-Sunrise neighborhood.
Location: Nanaimo East Kamloops Sewer Upgrades is scheduled to begin with pre-work investigations December 2025, with major sewer work construction to begin in January 2026. 

Contact: eastkamloopsupgrades@vancouver.ca or 311
Schedule: Dec 1, 2025 - Dec 31, 2026; Weekdays; 7:00 AM - 5:00 PM</content>
<id>urn:uuid:449f00b4-006b-4651-b4e2-8f232a6ba3b9</id>
<link href="https://vancouver.ca/streets-transportation/nanaimo-east-kamloops-sewer-upgrades.aspx"/>
<published>2025-11-10T08:00:00Z</published>
<title>Nanaimo East Kamloops Sewer Upgrades (NEKSU)</title>
<updated>2026-01-05T20:41:57.7172216Z</updated>
<georss:line>49.26523065929996 -123.05469653902755 49.264778667819854 -123.05469773006136</georss:line>
</entry>
<entry>
<category term="Road Closure"/>
<content>*Upgrading critical sewer infrastructure along Kamloops Street between East Broadway and East 5th Avenue*

The existing combined sewer system will be replaced with a larger-capacity, separated system. One pipe for rainwater runoff and a second for sewage. The new sewer mains have a life expectancy of approximately 100 years to support the needs of the growing neighborhood.

The NEKSU project includes the replacement and separation of 1.8 km of combined sewer mains in the Hastings-Sunrise neighborhood.
Location: Nanaimo East Kamloops Sewer Upgrades is scheduled to begin with pre-work investigations December 2025, with major sewer work construction to begin in January 2026. 

Contact: eastkamloopsupgrades@vancouver.ca or 311
Schedule: Dec 1, 2025 - Dec 31, 2026; Weekdays; 7:00 AM - 5:00 PM</content>
<id>urn:uuid:10f73028-df8c-46b3-96a0-461793b8015a</id>
<link href="https://vancouver.ca/streets-transportation/nanaimo-east-kamloops-sewer-upgrades.aspx"/>
<published>2025-11-10T08:00:00Z</published>
<title>Nanaimo East Kamloops Sewer Upgrades (NEKSU)</title>
<updated>2026-01-05T20:41:57.7172216Z</updated>
<georss:line>49.26477866787289 -123.05584466322799 49.264778667819854 -123.05469773006136</georss:line>
</entry>
<entry>
<category term="Road Closure"/>
<content>*Upgrading critical sewer infrastructure along Kamloops Street between East Broadway and East 5th Avenue*

The existing combined sewer system will be replaced with a larger-capacity, separated system. One pipe for rainwater runoff and a second for sewage. The new sewer mains have a life expectancy of approximately 100 years to support the needs of the growing neighborhood.

The NEKSU project includes the replacement and separation of 1.8 km of combined sewer mains in the Hastings-Sunrise neighborhood.
Location: Nanaimo East Kamloops Sewer Upgrades is scheduled to begin with pre-work investigations December 2025, with major sewer work construction to begin in January 2026. 

Contact: eastkamloopsupgrades@vancouver.ca or 311
Schedule: Dec 1, 2025 - Dec 31, 2026; Weekdays; 7:00 AM - 5:00 PM</content>
<id>urn:uuid:226b9785-4d30-4a1c-b505-805ba9d4ff54</id>
<link href="https://vancouver.ca/streets-transportation/nanaimo-east-kamloops-sewer-upgrades.aspx"/>
<published>2025-11-10T08:00:00Z</published>
<title>Nanaimo East Kamloops Sewer Upgrades (NEKSU)</title>
<updated>2026-01-05T20:41:57.7172216Z</updated>
<georss:line>49.265231216817426 -123.05584399186698 49.26523065929996 -123.05469653902755</georss:line>
</entry>
<entry>
<category term="Road Closure"/>
<content>*Upgrading critical sewer infrastructure along Kamloops Street between East Broadway and East 5th Avenue*

The existing combined sewer system will be replaced with a larger-capacity, separated system. One pipe for rainwater runoff and a second for sewage. The new sewer mains have a life expectancy of approximately 100 years to support the needs of the growing neighborhood.

The NEKSU project includes the replacement and separation of 1.8 km of combined sewer mains in the Hastings-Sunrise neighborhood.
Location: Nanaimo East Kamloops Sewer Upgrades is scheduled to begin with pre-work investigations December 2025, with major sewer work construction to begin in January 2026. 

Contact: eastkamloopsupgrades@vancouver.ca or 311
Schedule: Dec 1, 2025 - Dec 31, 2026; Weekdays; 7:00 AM - 5:00 PM</content>
<id>urn:uuid:4d4b67bf-c63b-41b5-9486-3494fde7ec4e</id>
<link href="https://vancouver.ca/streets-transportation/nanaimo-east-kamloops-sewer-upgrades.aspx"/>
<published>2025-11-10T08:00:00Z</published>
<title>Nanaimo East Kamloops Sewer Upgrades (NEKSU)</title>
<updated>2026-01-05T20:41:57.7172216Z</updated>
<georss:line>49.265231216817426 -123.05584399186698 49.26477866787289 -123.05584466322799</georss:line>
</entry>
<entry>
<category term="Road Closure"/>
<content>*Upgrading critical sewer infrastructure along Kamloops Street between East Broadway and East 5th Avenue*

The existing combined sewer system will be replaced with a larger-capacity, separated system. One pipe for rainwater runoff and a second for sewage. The new sewer mains have a life expectancy of approximately 100 years to support the needs of the growing neighborhood.

The NEKSU project includes the replacement and separation of 1.8 km of combined sewer mains in the Hastings-Sunrise neighborhood.
Location: Nanaimo East Kamloops Sewer Upgrades is scheduled to begin with pre-work investigations December 2025, with major sewer work construction to begin in January 2026. 

Contact: eastkamloopsupgrades@vancouver.ca or 311
Schedule: Dec 1, 2025 - Dec 31, 2026; Weekdays; 7:00 AM - 5:00 PM</content>
<id>urn:uuid:f7b9384d-f598-48f6-95d4-a89744a53a0f</id>
<link href="https://vancouver.ca/streets-transportation/nanaimo-east-kamloops-sewer-upgrades.aspx"/>
<published>2025-11-10T08:00:00Z</published>
<title>Nanaimo East Kamloops Sewer Upgrades (NEKSU)</title>
<updated>2026-01-05T20:41:57.7172216Z</updated>
<georss:line>49.265728328416486 -123.05469526101206 49.26523065929996 -123.05469653902755</georss:line>
</entry>
<entry>
<category term="Road Closure"/>
<content>*Upgrading critical sewer infrastructure along Kamloops Street between East Broadway and East 5th Avenue*

The existing combined sewer system will be replaced with a larger-capacity, separated system. One pipe for rainwater runoff and a second for sewage. The new sewer mains have a life expectancy of approximately 100 years to support the needs of the growing neighborhood.

The NEKSU project includes the replacement and separation of 1.8 km of combined sewer mains in the Hastings-Sunrise neighborhood.
Location: Nanaimo East Kamloops Sewer Upgrades is scheduled to begin with pre-work investigations December 2025, with major sewer work construction to begin in January 2026. 

Contact: eastkamloopsupgrades@vancouver.ca or 311
Schedule: Dec 1, 2025 - Dec 31, 2026; Weekdays; 7:00 AM - 5:00 PM</content>
<id>urn:uuid:219373e0-9283-43d5-902a-97737a2e746f</id>
<link href="https://vancouver.ca/streets-transportation/nanaimo-east-kamloops-sewer-upgrades.aspx"/>
<published>2025-11-10T08:00:00Z</published>
<title>Nanaimo East Kamloops Sewer Upgrades (NEKSU)</title>
<updated>2026-01-05T20:41:57.7172216Z</updated>
<georss:line>49.26523065929996 -123.05469653902755 49.26523058551331 -123.05215199657462</georss:line>
</entry>
<entry>
<category term="Road Closure"/>
<content>*Upgrading critical sewer infrastructure along Kamloops Street between East Broadway and East 5th Avenue*

The existing combined sewer system will be replaced with a larger-capacity, separated system. One pipe for rainwater runoff and a second for sewage. The new sewer mains have a life expectancy of approximately 100 years to support the needs of the growing neighborhood.

The NEKSU project includes the replacement and separation of 1.8 km of combined sewer mains in the Hastings-Sunrise neighborhood.
Location: Nanaimo East Kamloops Sewer Upgrades is scheduled to begin with pre-work investigations December 2025, with major sewer work construction to begin in January 2026. 

Contact: eastkamloopsupgrades@vancouver.ca or 311
Schedule: Dec 1, 2025 - Dec 31, 2026; Weekdays; 7:00 AM - 5:00 PM</content>
<id>urn:uuid:680b2ecf-dded-4438-9278-b4f2da1e4761</id>
<link href="https://vancouver.ca/streets-transportation/nanaimo-east-kamloops-sewer-upgrades.aspx"/>
<published>2025-11-10T08:00:00Z</published>
<title>Nanaimo East Kamloops Sewer Upgrades (NEKSU)</title>
<updated>2026-01-05T20:41:57.7172216Z</updated>
<georss:line>49.26573259723932 -123.05467830220574 49.26572909667905 -123.05327818909997</georss:line>
</entry>
<entry>
<category term="Road Closure"/>
<content>*Upgrading critical sewer infrastructure along Kamloops Street between East Broadway and East 5th Avenue*

The existing combined sewer system will be replaced with a larger-capacity, separated system. One pipe for rainwater runoff and a second for sewage. The new sewer mains have a life expectancy of approximately 100 years to support the needs of the growing neighborhood.

The NEKSU project includes the replacement and separation of 1.8 km of combined sewer mains in the Hastings-Sunrise neighborhood.
Location: Nanaimo East Kamloops Sewer Upgrades is scheduled to begin with pre-work investigations December 2025, with major sewer work construction to begin in January 2026. 

Contact: eastkamloopsupgrades@vancouver.ca or 311
Schedule: Dec 1, 2025 - Dec 31, 2026; Weekdays; 7:00 AM - 5:00 PM</content>
<id>urn:uuid:6f27617e-e334-4db4-9d99-637eeda29006</id>
<link href="https://vancouver.ca/streets-transportation/nanaimo-east-kamloops-sewer-upgrades.aspx"/>
<published>2025-11-10T08:00:00Z</published>
<title>Nanaimo East Kamloops Sewer Upgrades (NEKSU)</title>
<updated>2026-01-05T20:41:57.7172216Z</updated>
<georss:line>49.26572879581772 -123.05584308266539 49.265231216817426 -123.05584399186698</georss:line>
</entry>
<entry>
<category term="Road Closure"/>
<content>*Upgrading critical sewer infrastructure along Kamloops Street between East Broadway and East 5th Avenue*

The existing combined sewer system will be replaced with a larger-capacity, separated system. One pipe for rainwater runoff and a second for sewage. The new sewer mains have a life expectancy of approximately 100 years to support the needs of the growing neighborhood.

The NEKSU project includes the replacement and separation of 1.8 km of combined sewer mains in the Hastings-Sunrise neighborhood.
Location: Nanaimo East Kamloops Sewer Upgrades is scheduled to begin with pre-work investigations December 2025, with major sewer work construction to begin in January 2026. 

Contact: eastkamloopsupgrades@vancouver.ca or 311
Schedule: Dec 1, 2025 - Dec 31, 2026; Weekdays; 7:00 AM - 5:00 PM</content>
<id>urn:uuid:26ecac4a-ff54-4a6c-864b-caa973e4642b</id>
<link href="https://vancouver.ca/streets-transportation/nanaimo-east-kamloops-sewer-upgrades.aspx"/>
<published>2025-11-10T08:00:00Z</published>
<title>Nanaimo East Kamloops Sewer Upgrades (NEKSU)</title>
<updated>2026-01-05T20:41:57.7172216Z</updated>
<georss:line>49.26387554859798 -123.05469946702819 49.263423611255774 -123.05470008080094</georss:line>
</entry>
<entry>
<category term="Road Closure"/>
<content>*Upgrading critical sewer infrastructure along Kamloops Street between East Broadway and East 5th Avenue*

The existing combined sewer system will be replaced with a larger-capacity, separated system. One pipe for rainwater runoff and a second for sewage. The new sewer mains have a life expectancy of approximately 100 years to support the needs of the growing neighborhood.

The NEKSU project includes the replacement and separation of 1.8 km of combined sewer mains in the Hastings-Sunrise neighborhood.
Location: Nanaimo East Kamloops Sewer Upgrades is scheduled to begin with pre-work investigations December 2025, with major sewer work construction to begin in January 2026. 

Contact: eastkamloopsupgrades@vancouver.ca or 311
Schedule: Dec 1, 2025 - Dec 31, 2026; Weekdays; 7:00 AM - 5:00 PM</content>
<id>urn:uuid:aed45917-7911-4f83-9f93-5e131c5d8025</id>
<link href="https://vancouver.ca/streets-transportation/nanaimo-east-kamloops-sewer-upgrades.aspx"/>
<published>2025-11-10T08:00:00Z</published>
<title>Nanaimo East Kamloops Sewer Upgrades (NEKSU)</title>
<updated>2026-01-05T20:41:57.7172216Z</updated>
<georss:line>49.26342362906135 -123.05584744989747 49.263423611255774 -123.05470008080094</georss:line>
</entry>
<entry>
<category term="Road Closure"/>
<content>*Upgrading critical sewer infrastructure along Kamloops Street between East Broadway and East 5th Avenue*

The existing combined sewer system will be replaced with a larger-capacity, separated system. One pipe for rainwater runoff and a second for sewage. The new sewer mains have a life expectancy of approximately 100 years to support the needs of the growing neighborhood.

The NEKSU project includes the replacement and separation of 1.8 km of combined sewer mains in the Hastings-Sunrise neighborhood.
Location: Nanaimo East Kamloops Sewer Upgrades is scheduled to begin with pre-work investigations December 2025, with major sewer work construction to begin in January 2026. 

Contact: eastkamloopsupgrades@vancouver.ca or 311
Schedule: Dec 1, 2025 - Dec 31, 2026; Weekdays; 7:00 AM - 5:00 PM</content>
<id>urn:uuid:e8b05db7-f994-473a-b699-76524010fc3c</id>
<link href="https://vancouver.ca/streets-transportation/nanaimo-east-kamloops-sewer-upgrades.aspx"/>
<published>2025-11-10T08:00:00Z</published>
<title>Nanaimo East Kamloops Sewer Upgrades (NEKSU)</title>
<updated>2026-01-05T20:41:57.7172216Z</updated>
<georss:line>49.263876042347476 -123.05584851024813 49.26342362906135 -123.05584744989747</georss:line>
</entry>
<entry>
<category term="Road Closure"/>
<content>*Upgrading critical sewer infrastructure along Kamloops Street between East Broadway and East 5th Avenue*

The existing combined sewer system will be replaced with a larger-capacity, separated system. One pipe for rainwater runoff and a second for sewage. The new sewer mains have a life expectancy of approximately 100 years to support the needs of the growing neighborhood.

The NEKSU project includes the replacement and separation of 1.8 km of combined sewer mains in the Hastings-Sunrise neighborhood.
Location: Nanaimo East Kamloops Sewer Upgrades is scheduled to begin with pre-work investigations December 2025, with major sewer work construction to begin in January 2026. 

Contact: eastkamloopsupgrades@vancouver.ca or 311
Schedule: Dec 1, 2025 - Dec 31, 2026; Weekdays; 7:00 AM - 5:00 PM</content>
<id>urn:uuid:596d863d-2a8e-4ff5-aa5a-0e92fca81faf</id>
<link href="https://vancouver.ca/streets-transportation/nanaimo-east-kamloops-sewer-upgrades.aspx"/>
<published>2025-11-10T08:00:00Z</published>
<title>Nanaimo East Kamloops Sewer Upgrades (NEKSU)</title>
<updated>2026-01-05T20:41:57.7172216Z</updated>
<georss:line>49.26387554859798 -123.05469946702819 49.26387442272801 -123.05217422197147</georss:line>
</entry>
<entry>
<category term="Road Closure"/>
<content>*Upgrading critical sewer infrastructure along Kamloops Street between East Broadway and East 5th Avenue*

The existing combined sewer system will be replaced with a larger-capacity, separated system. One pipe for rainwater runoff and a second for sewage. The new sewer mains have a life expectancy of approximately 100 years to support the needs of the growing neighborhood.

The NEKSU project includes the replacement and separation of 1.8 km of combined sewer mains in the Hastings-Sunrise neighborhood.
Location: Nanaimo East Kamloops Sewer Upgrades is scheduled to begin with pre-work investigations December 2025, with major sewer work construction to begin in January 2026. 

Contact: eastkamloopsupgrades@vancouver.ca or 311
Schedule: Dec 1, 2025 - Dec 31, 2026; Weekdays; 7:00 AM - 5:00 PM</content>
<id>urn:uuid:f6a378cd-d107-43b2-95a5-32bf1c0af98a</id>
<link href="https://vancouver.ca/streets-transportation/nanaimo-east-kamloops-sewer-upgrades.aspx"/>
<published>2025-11-10T08:00:00Z</published>
<title>Nanaimo East Kamloops Sewer Upgrades (NEKSU)</title>
<updated>2026-01-05T20:41:57.7172216Z</updated>
<georss:line>49.263876042347476 -123.05584851024813 49.26387554859798 -123.05469946702819</georss:line>
</entry>
<entry>
<category term="Road Closure"/>
<content>*Upgrading critical sewer infrastructure along Kamloops Street between East Broadway and East 5th Avenue*

The existing combined sewer system will be replaced with a larger-capacity, separated system. One pipe for rainwater runoff and a second for sewage. The new sewer mains have a life expectancy of approximately 100 years to support the needs of the growing neighborhood.

The NEKSU project includes the replacement and separation of 1.8 km of combined sewer mains in the Hastings-Sunrise neighborhood.
Location: Nanaimo East Kamloops Sewer Upgrades is scheduled to begin with pre-work investigations December 2025, with major sewer work construction to begin in January 2026. 

Contact: eastkamloopsupgrades@vancouver.ca or 311
Schedule: Dec 1, 2025 - Dec 31, 2026; Weekdays; 7:00 AM - 5:00 PM</content>
<id>urn:uuid:526c383a-039a-426b-910d-c4a2154b5dec</id>
<link href="https://vancouver.ca/streets-transportation/nanaimo-east-kamloops-sewer-upgrades.aspx"/>
<published>2025-11-10T08:00:00Z</published>
<title>Nanaimo East Kamloops Sewer Upgrades (NEKSU)</title>
<updated>2026-01-05T20:41:57.7172216Z</updated>
<georss:line>49.264327656859024 -123.05584577615005 49.263876042347476 -123.05584851024813</georss:line>
</entry>
<entry>
<category term="Road Closure"/>
<content>*Upgrading critical sewer infrastructure along Kamloops Street between East Broadway and East 5th Avenue*

The existing combined sewer system will be replaced with a larger-capacity, separated system. One pipe for rainwater runoff and a second for sewage. The new sewer mains have a life expectancy of approximately 100 years to support the needs of the growing neighborhood.

The NEKSU project includes the replacement and separation of 1.8 km of combined sewer mains in the Hastings-Sunrise neighborhood.
Location: Nanaimo East Kamloops Sewer Upgrades is scheduled to begin with pre-work investigations December 2025, with major sewer work construction to begin in January 2026. 

Contact: eastkamloopsupgrades@vancouver.ca or 311
Schedule: Dec 1, 2025 - Dec 31, 2026; Weekdays; 7:00 AM - 5:00 PM</content>
<id>urn:uuid:799a6430-4729-47f4-8f9e-3850d8c71195</id>
<link href="https://vancouver.ca/streets-transportation/nanaimo-east-kamloops-sewer-upgrades.aspx"/>
<published>2025-11-10T08:00:00Z</published>
<title>Nanaimo East Kamloops Sewer Upgrades (NEKSU)</title>
<updated>2026-01-05T20:41:57.7172216Z</updated>
<georss:line>49.26477866787289 -123.05584466322799 49.264327656859024 -123.05584577615005</georss:line>
</entry>
<entry>
<category term="Road Closure"/>
<content>*Upgrading critical sewer infrastructure along Kamloops Street between East Broadway and East 5th Avenue*

The existing combined sewer system will be replaced with a larger-capacity, separated system. One pipe for rainwater runoff and a second for sewage. The new sewer mains have a life expectancy of approximately 100 years to support the needs of the growing neighborhood.

The NEKSU project includes the replacement and separation of 1.8 km of combined sewer mains in the Hastings-Sunrise neighborhood.
Location: Nanaimo East Kamloops Sewer Upgrades is scheduled to begin with pre-work investigations December 2025, with major sewer work construction to begin in January 2026. 

Contact: eastkamloopsupgrades@vancouver.ca or 311
Schedule: Dec 1, 2025 - Dec 31, 2026; Weekdays; 7:00 AM - 5:00 PM</content>
<id>urn:uuid:e3f42586-5812-401f-ad11-9fc66948e178</id>
<link href="https://vancouver.ca/streets-transportation/nanaimo-east-kamloops-sewer-upgrades.aspx"/>
<published>2025-11-10T08:00:00Z</published>
<title>Nanaimo East Kamloops Sewer Upgrades (NEKSU)</title>
<updated>2026-01-05T20:41:57.7172216Z</updated>
<georss:line>49.264778667819854 -123.05469773006136 49.26477800650349 -123.05215954665029</georss:line>
</entry>
<entry>
<category term="Road Closure"/>
<content>*Upgrading critical sewer infrastructure along Kamloops Street between East Broadway and East 5th Avenue*

The existing combined sewer system will be replaced with a larger-capacity, separated system. One pipe for rainwater runoff and a second for sewage. The new sewer mains have a life expectancy of approximately 100 years to support the needs of the growing neighborhood.

The NEKSU project includes the replacement and separation of 1.8 km of combined sewer mains in the Hastings-Sunrise neighborhood.
Location: Nanaimo East Kamloops Sewer Upgrades is scheduled to begin with pre-work investigations December 2025, with major sewer work construction to begin in January 2026. 

Contact: eastkamloopsupgrades@vancouver.ca or 311
Schedule: Dec 1, 2025 - Dec 31, 2026; Weekdays; 7:00 AM - 5:00 PM</content>
<id>urn:uuid:517f8449-23a9-4e7c-96e2-ca96dbeef592</id>
<link href="https://vancouver.ca/streets-transportation/nanaimo-east-kamloops-sewer-upgrades.aspx"/>
<published>2025-11-10T08:00:00Z</published>
<title>Nanaimo East Kamloops Sewer Upgrades (NEKSU)</title>
<updated>2026-01-05T20:41:57.7172216Z</updated>
<georss:line>49.262971053384916 -123.05470032278009 49.26251563496538 -123.0547006440623</georss:line>
</entry>
<entry>
<category term="Road Closure"/>
<content>*Upgrading critical sewer infrastructure along Kamloops Street between East Broadway and East 5th Avenue*

The existing combined sewer system will be replaced with a larger-capacity, separated system. One pipe for rainwater runoff and a second for sewage. The new sewer mains have a life expectancy of approximately 100 years to support the needs of the growing neighborhood.

The NEKSU project includes the replacement and separation of 1.8 km of combined sewer mains in the Hastings-Sunrise neighborhood.
Location: Nanaimo East Kamloops Sewer Upgrades is scheduled to begin with pre-work investigations December 2025, with major sewer work construction to begin in January 2026. 

Contact: eastkamloopsupgrades@vancouver.ca or 311
Schedule: Dec 1, 2025 - Dec 31, 2026; Weekdays; 7:00 AM - 5:00 PM</content>
<id>urn:uuid:dd05e2cf-2c0b-4ca3-ac6a-df0192ecb4bc</id>
<link href="https://vancouver.ca/streets-transportation/nanaimo-east-kamloops-sewer-upgrades.aspx"/>
<published>2025-11-10T08:00:00Z</published>
<title>Nanaimo East Kamloops Sewer Upgrades (NEKSU)</title>
<updated>2026-01-05T20:41:57.7172216Z</updated>
<georss:line>49.26251563496538 -123.0547006440623 49.262016741533415 -123.05470337749718</georss:line>
</entry>
<entry>
<category term="Road Closure"/>
<content>*Upgrading critical sewer infrastructure along Kamloops Street between East Broadway and East 5th Avenue*

The existing combined sewer system will be replaced with a larger-capacity, separated system. One pipe for rainwater runoff and a second for sewage. The new sewer mains have a life expectancy of approximately 100 years to support the needs of the growing neighborhood.

The NEKSU project includes the replacement and separation of 1.8 km of combined sewer mains in the Hastings-Sunrise neighborhood.
Location: Nanaimo East Kamloops Sewer Upgrades is scheduled to begin with pre-work investigations December 2025, with major sewer work construction to begin in January 2026. 

Contact: eastkamloopsupgrades@vancouver.ca or 311
Schedule: Dec 1, 2025 - Dec 31, 2026; Weekdays; 7:00 AM - 5:00 PM</content>
<id>urn:uuid:60455cd0-1aab-4318-b1c2-d311a878de1a</id>
<link href="https://vancouver.ca/streets-transportation/nanaimo-east-kamloops-sewer-upgrades.aspx"/>
<published>2025-11-10T08:00:00Z</published>
<title>Nanaimo East Kamloops Sewer Upgrades (NEKSU)</title>
<updated>2026-01-05T20:41:57.7172216Z</updated>
<georss:line>49.263423611255774 -123.05470008080094 49.262971053384916 -123.05470032278009</georss:line>
</entry>
<entry>
<category term="Road Closure"/>
<content>*Upgrading critical sewer infrastructure along Kamloops Street between East Broadway and East 5th Avenue*

The existing combined sewer system will be replaced with a larger-capacity, separated system. One pipe for rainwater runoff and a second for sewage. The new sewer mains have a life expectancy of approximately 100 years to support the needs of the growing neighborhood.

The NEKSU project includes the replacement and separation of 1.8 km of combined sewer mains in the Hastings-Sunrise neighborhood.
Location: Nanaimo East Kamloops Sewer Upgrades is scheduled to begin with pre-work investigations December 2025, with major sewer work construction to begin in January 2026. 

Contact: eastkamloopsupgrades@vancouver.ca or 311
Schedule: Dec 1, 2025 - Dec 31, 2026; Weekdays; 7:00 AM - 5:00 PM</content>
<id>urn:uuid:7ca74e9c-00f8-47f0-8c54-7b3033e59b6e</id>
<link href="https://vancouver.ca/streets-transportation/nanaimo-east-kamloops-sewer-upgrades.aspx"/>
<published>2025-11-10T08:00:00Z</published>
<title>Nanaimo East Kamloops Sewer Upgrades (NEKSU)</title>
<updated>2026-01-05T20:41:57.7172216Z</updated>
<georss:line>49.26297148467873 -123.05584828660625 49.262971053384916 -123.05470032278009</georss:line>
</entry>
<entry>
<category term="Road Closure"/>
<content>*Upgrading critical sewer infrastructure along Kamloops Street between East Broadway and East 5th Avenue*

The existing combined sewer system will be replaced with a larger-capacity, separated system. One pipe for rainwater runoff and a second for sewage. The new sewer mains have a life expectancy of approximately 100 years to support the needs of the growing neighborhood.

The NEKSU project includes the replacement and separation of 1.8 km of combined sewer mains in the Hastings-Sunrise neighborhood.
Location: Nanaimo East Kamloops Sewer Upgrades is scheduled to begin with pre-work investigations December 2025, with major sewer work construction to begin in January 2026. 

Contact: eastkamloopsupgrades@vancouver.ca or 311
Schedule: Dec 1, 2025 - Dec 31, 2026; Weekdays; 7:00 AM - 5:00 PM</content>
<id>urn:uuid:da52326d-5251-4223-b878-d9430bcf2593</id>
<link href="https://vancouver.ca/streets-transportation/nanaimo-east-kamloops-sewer-upgrades.aspx"/>
<published>2025-11-10T08:00:00Z</published>
<title>Nanaimo East Kamloops Sewer Upgrades (NEKSU)</title>
<updated>2026-01-05T20:41:57.7172216Z</updated>
<georss:line>49.26342362906135 -123.05584744989747 49.26297148467873 -123.05584828660625</georss:line>
</entry>
<entry>
<category term="Road Closure"/>
<content>*Upgrading critical sewer infrastructure along Kamloops Street between East Broadway and East 5th Avenue*

The existing combined sewer system will be replaced with a larger-capacity, separated system. One pipe for rainwater runoff and a second for sewage. The new sewer mains have a life expectancy of approximately 100 years to support the needs of the growing neighborhood.

The NEKSU project includes the replacement and separation of 1.8 km of combined sewer mains in the Hastings-Sunrise neighborhood.
Location: Nanaimo East Kamloops Sewer Upgrades is scheduled to begin with pre-work investigations December 2025, with major sewer work construction to begin in January 2026. 

Contact: eastkamloopsupgrades@vancouver.ca or 311
Schedule: Dec 1, 2025 - Dec 31, 2026; Weekdays; 7:00 AM - 5:00 PM</content>
<id>urn:uuid:5b03e3fd-4401-4dbc-bea4-662d8c53f199</id>
<link href="https://vancouver.ca/streets-transportation/nanaimo-east-kamloops-sewer-upgrades.aspx"/>
<published>2025-11-10T08:00:00Z</published>
<title>Nanaimo East Kamloops Sewer Upgrades (NEKSU)</title>
<updated>2026-01-05T20:41:57.7172216Z</updated>
<georss:line>49.262971053384916 -123.05470032278009 49.26296992122997 -123.05218904699089</georss:line>
</entry>
<entry>
<category term="Road Closure"/>
<content>*Upgrading critical sewer infrastructure along Kamloops Street between East Broadway and East 5th Avenue*

The existing combined sewer system will be replaced with a larger-capacity, separated system. One pipe for rainwater runoff and a second for sewage. The new sewer mains have a life expectancy of approximately 100 years to support the needs of the growing neighborhood.

The NEKSU project includes the replacement and separation of 1.8 km of combined sewer mains in the Hastings-Sunrise neighborhood.
Location: Nanaimo East Kamloops Sewer Upgrades is scheduled to begin with pre-work investigations December 2025, with major sewer work construction to begin in January 2026. 

Contact: eastkamloopsupgrades@vancouver.ca or 311
Schedule: Dec 1, 2025 - Dec 31, 2026; Weekdays; 7:00 AM - 5:00 PM</content>
<id>urn:uuid:5d3605cb-abaa-418c-96d5-23431b0e1277</id>
<link href="https://vancouver.ca/streets-transportation/nanaimo-east-kamloops-sewer-upgrades.aspx"/>
<published>2025-11-10T08:00:00Z</published>
<title>Nanaimo East Kamloops Sewer Upgrades (NEKSU)</title>
<updated>2026-01-05T20:41:57.7172216Z</updated>
<georss:line>49.26297985579009 -123.05584529985741 49.26297429868691 -123.05616888820468</georss:line>
</entry>
<entry>
<category term="Road Closure"/>
<content>Project Duration from Inception to Close Out

Design &amp; Procurement - 4 months - April 2026 - July 2026
Construction Tender - 2 months - August 2026 - September 2026
Pre-Work &amp; Construction - 15	months - October 2026 - December 2027
Project Total - 21 months 
Location: Sewer work will take place on various roads and alleyways within the area from Penticton St to Kaslo St, and from E Broadway to E 5th Ave.
Schedule: Jun 9, 2026 - Dec 31, 2027</content>
<id>urn:uuid:e9715fd9-d45b-4e39-ad4d-813d5fa182ca</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/56a1a22e-ce5e-429a-8d15-e616cbb37892"/>
<published>2026-06-09T07:00:00Z</published>
<title>Nanaimo East Penticton Sewer Upgrades Project (NEPSU)</title>
<updated>2026-06-09T20:51:05.7816339Z</updated>
<georss:line>49.26202319771855 -123.0522096991283 49.26434731640512 -123.05218082289912</georss:line>
</entry>
<entry>
<category term="Road Closure"/>
<content>Project Duration from Inception to Close Out

Design &amp; Procurement - 4 months - April 2026 - July 2026
Construction Tender - 2 months - August 2026 - September 2026
Pre-Work &amp; Construction - 15	months - October 2026 - December 2027
Project Total - 21 months 
Location: Sewer work will take place on various roads and alleyways within the area from Penticton St to Kaslo St, and from E Broadway to E 5th Ave.
Schedule: Jun 9, 2026 - Dec 31, 2027</content>
<id>urn:uuid:5d365d0d-4011-43d2-b4e4-c782f581c2ba</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/56a1a22e-ce5e-429a-8d15-e616cbb37892"/>
<published>2026-06-09T07:00:00Z</published>
<title>Nanaimo East Penticton Sewer Upgrades Project (NEPSU)</title>
<updated>2026-06-09T20:51:05.7816339Z</updated>
<georss:line>49.262971702619325 -123.05264284256627 49.262971702619325 -123.04775313442235</georss:line>
</entry>
<entry>
<category term="Road Closure"/>
<content>Project Duration from Inception to Close Out

Design &amp; Procurement - 4 months - April 2026 - July 2026
Construction Tender - 2 months - August 2026 - September 2026
Pre-Work &amp; Construction - 15	months - October 2026 - December 2027
Project Total - 21 months 
Location: Sewer work will take place on various roads and alleyways within the area from Penticton St to Kaslo St, and from E Broadway to E 5th Ave.
Schedule: Jun 9, 2026 - Dec 31, 2027</content>
<id>urn:uuid:95be7612-203b-4b64-a743-9ce4b30dce82</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/56a1a22e-ce5e-429a-8d15-e616cbb37892"/>
<published>2026-06-09T07:00:00Z</published>
<title>Nanaimo East Penticton Sewer Upgrades Project (NEPSU)</title>
<updated>2026-06-09T20:51:05.7816339Z</updated>
<georss:line>49.26343208254889 -123.05218645511 49.26343208254889 -123.05031912562193</georss:line>
</entry>
<entry>
<category term="Road Closure"/>
<content>Project Duration from Inception to Close Out

Design &amp; Procurement - 4 months - April 2026 - July 2026
Construction Tender - 2 months - August 2026 - September 2026
Pre-Work &amp; Construction - 15	months - October 2026 - December 2027
Project Total - 21 months 
Location: Sewer work will take place on various roads and alleyways within the area from Penticton St to Kaslo St, and from E Broadway to E 5th Ave.
Schedule: Jun 9, 2026 - Dec 31, 2027</content>
<id>urn:uuid:93a162c6-b567-4900-a33e-c46f9caa414d</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/56a1a22e-ce5e-429a-8d15-e616cbb37892"/>
<published>2026-06-09T07:00:00Z</published>
<title>Nanaimo East Penticton Sewer Upgrades Project (NEPSU)</title>
<updated>2026-06-09T20:51:05.7816339Z</updated>
<georss:line>49.26388433914795 -123.05218645511 49.26387177652063 -123.04726787073677</georss:line>
</entry>
<entry>
<category term="Road Closure"/>
<content>Project Duration from Inception to Close Out

Design &amp; Procurement - 4 months - April 2026 - July 2026
Construction Tender - 2 months - August 2026 - September 2026
Pre-Work &amp; Construction - 15	months - October 2026 - December 2027
Project Total - 21 months 
Location: Sewer work will take place on various roads and alleyways within the area from Penticton St to Kaslo St, and from E Broadway to E 5th Ave.
Schedule: Jun 9, 2026 - Dec 31, 2027</content>
<id>urn:uuid:d691284c-4b22-42ac-963d-bbfd5eb4c0d9</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/56a1a22e-ce5e-429a-8d15-e616cbb37892"/>
<published>2026-06-09T07:00:00Z</published>
<title>Nanaimo East Penticton Sewer Upgrades Project (NEPSU)</title>
<updated>2026-06-09T20:51:05.7816339Z</updated>
<georss:line>49.263871776520574 -123.04956834366281 49.26573101057551 -123.04953946743362</georss:line>
</entry>
<entry>
<category term="Road Closure"/>
<content>Project Duration from Inception to Close Out

Design &amp; Procurement - 4 months - April 2026 - July 2026
Construction Tender - 2 months - August 2026 - September 2026
Pre-Work &amp; Construction - 15	months - October 2026 - December 2027
Project Total - 21 months 
Location: Sewer work will take place on various roads and alleyways within the area from Penticton St to Kaslo St, and from E Broadway to E 5th Ave.
Schedule: Jun 9, 2026 - Dec 31, 2027</content>
<id>urn:uuid:1e0b9cdb-0e87-4107-85fe-dc0468279cec</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/56a1a22e-ce5e-429a-8d15-e616cbb37892"/>
<published>2026-06-09T07:00:00Z</published>
<title>Nanaimo East Penticton Sewer Upgrades Project (NEPSU)</title>
<updated>2026-06-09T20:51:05.7816339Z</updated>
<georss:line>49.26573101057551 -123.04954909284336 49.26573101057551 -123.04651708877766</georss:line>
</entry>
<entry>
<category term="Road Closure"/>
<content>Project Duration from Inception to Close Out

Design &amp; Procurement - 4 months - April 2026 - July 2026
Construction Tender - 2 months - August 2026 - September 2026
Pre-Work &amp; Construction - 15	months - October 2026 - December 2027
Project Total - 21 months 
Location: Sewer work will take place on various roads and alleyways within the area from Penticton St to Kaslo St, and from E Broadway to E 5th Ave.
Schedule: Jun 9, 2026 - Dec 31, 2027</content>
<id>urn:uuid:31dc3e83-e9cd-4473-9670-caf6433c9742</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/56a1a22e-ce5e-429a-8d15-e616cbb37892"/>
<published>2026-06-09T07:00:00Z</published>
<title>Nanaimo East Penticton Sewer Upgrades Project (NEPSU)</title>
<updated>2026-06-09T20:51:05.7816339Z</updated>
<georss:line>49.2652348029346 -123.05090627561562 49.26522852179323 -123.04821116089056</georss:line>
</entry>
<entry>
<category term="Road Closure"/>
<content>Project Duration from Inception to Close Out

Design &amp; Procurement - 4 months - April 2026 - July 2026
Construction Tender - 2 months - August 2026 - September 2026
Pre-Work &amp; Construction - 15	months - October 2026 - December 2027
Project Total - 21 months 
Location: Sewer work will take place on various roads and alleyways within the area from Penticton St to Kaslo St, and from E Broadway to E 5th Ave.
Schedule: Jun 9, 2026 - Dec 31, 2027</content>
<id>urn:uuid:c52198d0-077e-4110-bb32-a55b718c62ab</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/56a1a22e-ce5e-429a-8d15-e616cbb37892"/>
<published>2026-06-09T07:00:00Z</published>
<title>Nanaimo East Penticton Sewer Upgrades Project (NEPSU)</title>
<updated>2026-06-09T20:51:05.7816339Z</updated>
<georss:line>49.26478255871288 -123.05087739938642 49.26477627751396 -123.0466999715626</georss:line>
</entry>
<entry>
<category term="Road Closure"/>
<content>Project Duration from Inception to Close Out

Design &amp; Procurement - 4 months - April 2026 - July 2026
Construction Tender - 2 months - August 2026 - September 2026
Pre-Work &amp; Construction - 15	months - October 2026 - December 2027
Project Total - 21 months 
Location: Sewer work will take place on various roads and alleyways within the area from Penticton St to Kaslo St, and from E Broadway to E 5th Ave.
Schedule: Jun 9, 2026 - Dec 31, 2027</content>
<id>urn:uuid:902d1035-03fa-45b0-b1de-57a17db905cc</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/56a1a22e-ce5e-429a-8d15-e616cbb37892"/>
<published>2026-06-09T07:00:00Z</published>
<title>Nanaimo East Penticton Sewer Upgrades Project (NEPSU)</title>
<updated>2026-06-09T20:51:05.7816339Z</updated>
<georss:line>49.264330310346224 -123.04954909284336 49.264342872856844 -123.05204207396403</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Full closure of 100 E Hastings, from Columbia to Main st

New times: 7:00am to 3:00pm
Location: 
Schedule: Jun 21, 2026 7:00 AM - 3:00 PM</content>
<id>urn:uuid:955cbf2a-cb03-44a1-a38c-20a57e39a48c</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a104d131-d54d-475e-bb01-c60cbc62caa6"/>
<published>2026-03-09T07:00:00Z</published>
<title>National Indigenous Peoples Day</title>
<updated>2026-05-06T21:08:47.1745805Z</updated>
<georss:line>49.28138131664738 -123.10214603036194 49.28134772461212 -123.09974004551353</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>New St. Paul’s Hospital Area Improvements.


National/Station Intersection (ongoing)
-Sep 2023 to Oct 13, 2023

National between Station and National Yards (to be confirmed)
-Tentative start date Jun 2024

Prior, Dunlevy (to be confirmed)
-Anticipated 2025

Location: Prior St, Station, National Ave, Dunlevy Ave
Schedule: Jan 3, 2022 - Jan 1, 2027</content>
<id>urn:uuid:c612990b-b3f8-4a16-918b-ebbb24cb2fbf</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1c7c5863-268e-40e2-a280-2a1bac04b59d"/>
<published>2022-11-08T08:00:00Z</published>
<title>New St. Paul’s Hospital Area Improvements </title>
<updated>2025-07-06T01:00:53.500531Z</updated>
<georss:polygon>49.27657162567556 -123.09370167553425 49.276680508278304 -123.09892304197999 49.27568500423942 -123.09870846525881 49.2754516798002 -123.09818632769746 49.274596148410325 -123.09824593219675 49.27409837808176 -123.0953849083744 49.27409837808176 -123.09495575493203 49.27576277852242 -123.09416897449411 49.27584055268278 -123.09342987660786 49.27657162567556 -123.09370167553425</georss:polygon>
</entry>
<entry>
<category term="Under Construction"/>
<content>New St. Paul’s Hospital Area Improvements.


National/Station Intersection (ongoing)
-Sep 2023 to Oct 13, 2023

National between Station and National Yards (to be confirmed)
-Tentative start date Jun 2024

Prior, Dunlevy (to be confirmed)
-Anticipated 2025

Location: Prior St, Station, National Ave, Dunlevy Ave
Schedule: Jan 3, 2022 - Jan 1, 2027</content>
<id>urn:uuid:0c3bfd64-fc7b-47fa-8cbd-23380d128435</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1c7c5863-268e-40e2-a280-2a1bac04b59d"/>
<published>2022-11-08T08:00:00Z</published>
<title>New St. Paul’s Hospital Area Improvements </title>
<updated>2025-07-06T01:00:53.500531Z</updated>
<georss:line>49.274943175396544 -123.0990940701304 49.27490428741058 -123.09849802382816</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>New St. Paul’s Hospital Area Improvements.


National/Station Intersection (ongoing)
-Sep 2023 to Oct 13, 2023

National between Station and National Yards (to be confirmed)
-Tentative start date Jun 2024

Prior, Dunlevy (to be confirmed)
-Anticipated 2025

Location: Prior St, Station, National Ave, Dunlevy Ave
Schedule: Jan 3, 2022 - Jan 1, 2027</content>
<id>urn:uuid:a095c8c8-f1c9-4e64-b0da-ab6cf4a093d3</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1c7c5863-268e-40e2-a280-2a1bac04b59d"/>
<published>2022-11-08T08:00:00Z</published>
<title>New St. Paul’s Hospital Area Improvements </title>
<updated>2025-07-06T01:00:53.500531Z</updated>
<georss:line>49.27547982476287 -123.09908214883765 49.275324274754695 -123.09849802382816 49.274562072880315 -123.0984861025354</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>New St. Paul’s Hospital Area Improvements.


National/Station Intersection (ongoing)
-Sep 2023 to Oct 13, 2023

National between Station and National Yards (to be confirmed)
-Tentative start date Jun 2024

Prior, Dunlevy (to be confirmed)
-Anticipated 2025

Location: Prior St, Station, National Ave, Dunlevy Ave
Schedule: Jan 3, 2022 - Jan 1, 2027</content>
<id>urn:uuid:8bfc0bf4-2764-4a37-8c72-8fdcf14b5e58</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1c7c5863-268e-40e2-a280-2a1bac04b59d"/>
<published>2022-11-08T08:00:00Z</published>
<title>New St. Paul’s Hospital Area Improvements </title>
<updated>2025-07-06T01:00:53.500531Z</updated>
<georss:line>49.27675813894081 -123.09903321718957 49.27491240929686 -123.09911508814972</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>PMB - temporary zone until Dec 31, 2025

Nov 15 2024 - Extension made until end of 2025

Nov 20 2025 - Extension made until end of 2026.
Location: For use by WISH vans only
Schedule: Jun 3, 2024 - Dec 31, 2026</content>
<id>urn:uuid:018d2d60-f9ca-45a8-b897-929f088d237e</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/bd378ac4-c29d-417f-98c9-bc83fd0b4742"/>
<published>2024-05-30T07:00:00Z</published>
<title>No Stopping Except Authorized Vehicles</title>
<updated>2025-11-21T00:13:15.6261724Z</updated>
<georss:line>49.28398198245233 -123.09675416238764 49.2839738174637 -123.09642680732775</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Oak Street Upgrades Phase 2 – W. 70th Ave (Daytime Work) until Aug 2024.
Consisting of sewer upgrades / separation on W. 70th Ave to Fremlin. 
Location:  W. 70th Ave from Oak St to Fremlin St
Schedule: Feb 1, 2024 - Aug 20, 2024</content>
<id>urn:uuid:4628eccc-9057-4aa0-8ac5-5ffb05f824e1</id>
<link href="https://vancouver.ca/streets-transportation/oak-street-sewer-separation-upgrades.aspx "/>
<published>2024-01-29T08:00:00Z</published>
<title>Oak Street Upgrades - Phase 2 (W. 70th Ave)</title>
<updated>2024-11-14T02:00:31.3919367Z</updated>
<georss:line>49.20846076413801 -123.12955777005 49.20847130656301 -123.13024569212</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Oak Street Upgrades Phase 2 – W. 70th Ave (Daytime Work) until Aug 2024.
Consisting of sewer upgrades / separation on W. 70th Ave to Fremlin. 
Location:  W. 70th Ave from Oak St to Fremlin St
Schedule: Feb 1, 2024 - Aug 20, 2024</content>
<id>urn:uuid:0853864c-4d5e-4c25-87bb-641feac5f928</id>
<link href="https://vancouver.ca/streets-transportation/oak-street-sewer-separation-upgrades.aspx "/>
<published>2024-01-29T08:00:00Z</published>
<title>Oak Street Upgrades - Phase 2 (W. 70th Ave)</title>
<updated>2024-11-14T02:00:31.3919367Z</updated>
<georss:line>49.2088227273897 -123.12749394791514 49.20841371351361 -123.12749394791514</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Oak Street Upgrades Phase 2 – W. 70th Ave (Daytime Work) until Aug 2024.
Consisting of sewer upgrades / separation on W. 70th Ave to Fremlin. 
Location:  W. 70th Ave from Oak St to Fremlin St
Schedule: Feb 1, 2024 - Aug 20, 2024</content>
<id>urn:uuid:76de27eb-7967-4131-9b24-73a4bad6f2ba</id>
<link href="https://vancouver.ca/streets-transportation/oak-street-sewer-separation-upgrades.aspx "/>
<published>2024-01-29T08:00:00Z</published>
<title>Oak Street Upgrades - Phase 2 (W. 70th Ave)</title>
<updated>2024-11-14T02:00:31.3919367Z</updated>
<georss:line>49.20883497832045 -123.1288603665748 49.207975076235044 -123.12890171394372</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Oak Street Upgrades Phase 2 – W. 70th Ave (Daytime Work) until Aug 2024.
Consisting of sewer upgrades / separation on W. 70th Ave to Fremlin. 
Location:  W. 70th Ave from Oak St to Fremlin St
Schedule: Feb 1, 2024 - Aug 20, 2024</content>
<id>urn:uuid:3913966f-a3c9-42d8-ab7b-14532dd5dfd4</id>
<link href="https://vancouver.ca/streets-transportation/oak-street-sewer-separation-upgrades.aspx "/>
<published>2024-01-29T08:00:00Z</published>
<title>Oak Street Upgrades - Phase 2 (W. 70th Ave)</title>
<updated>2024-11-14T02:00:31.3919367Z</updated>
<georss:line>49.20843956663899 -123.12817508929999 49.208450184054016 -123.12886767894001</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Oak Street Upgrades Phase 2 – W. 70th Ave (Daytime Work) until Aug 2024.
Consisting of sewer upgrades / separation on W. 70th Ave to Fremlin. 
Location:  W. 70th Ave from Oak St to Fremlin St
Schedule: Feb 1, 2024 - Aug 20, 2024</content>
<id>urn:uuid:198be386-5881-4bac-ae57-6d750bbc0925</id>
<link href="https://vancouver.ca/streets-transportation/oak-street-sewer-separation-upgrades.aspx "/>
<published>2024-01-29T08:00:00Z</published>
<title>Oak Street Upgrades - Phase 2 (W. 70th Ave)</title>
<updated>2024-11-14T02:00:31.3919367Z</updated>
<georss:line>49.208428944480005 -123.12748303539 49.20843956663899 -123.12817508929999</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Oak Street Upgrades Phase 2 – W. 70th Ave (Daytime Work) until Aug 2024.
Consisting of sewer upgrades / separation on W. 70th Ave to Fremlin. 
Location:  W. 70th Ave from Oak St to Fremlin St
Schedule: Feb 1, 2024 - Aug 20, 2024</content>
<id>urn:uuid:e79fe9e2-7334-47f5-bf7c-fff4ab604376</id>
<link href="https://vancouver.ca/streets-transportation/oak-street-sewer-separation-upgrades.aspx "/>
<published>2024-01-29T08:00:00Z</published>
<title>Oak Street Upgrades - Phase 2 (W. 70th Ave)</title>
<updated>2024-11-14T02:00:31.3919367Z</updated>
<georss:line>49.208450184054016 -123.12886767894001 49.20846076413801 -123.12955777005</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>This work will occur over the May 31st weekend (significant daytime &amp; nighttime impacts - 1 lane NB) and will continue through the next week to June 13th (daytime &amp; nighttime impacts - 2 lanes NB &amp; SB).
Location: Oak St, W. 70th to W. 64th 
Schedule: May 31, 2024 - Jun 13, 2024</content>
<id>urn:uuid:05e12172-884b-4521-9b5c-6e1a6cd74a4c</id>
<link href="https://vancouver.ca/streets-transportation/oak-street-sewer-separation-upgrades.aspx "/>
<published>2024-05-16T07:00:00Z</published>
<title>Oak Street Upgrades - Phase 3 (Oak St) Pre-Works</title>
<updated>2024-11-14T02:00:31.3919367Z</updated>
<georss:line>49.20847691114062 -123.13026112058714 49.20691989181066 -123.13031404653394</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>This work will occur over the May 31st weekend (significant daytime &amp; nighttime impacts - 1 lane NB) and will continue through the next week to June 13th (daytime &amp; nighttime impacts - 2 lanes NB &amp; SB).
Location: Oak St, W. 70th to W. 64th 
Schedule: May 31, 2024 - Jun 13, 2024</content>
<id>urn:uuid:2ef4bbfb-5170-42ae-b475-3902508a5b6e</id>
<link href="https://vancouver.ca/streets-transportation/oak-street-sewer-separation-upgrades.aspx "/>
<published>2024-05-16T07:00:00Z</published>
<title>Oak Street Upgrades - Phase 3 (Oak St) Pre-Works</title>
<updated>2024-11-14T02:00:31.3919367Z</updated>
<georss:line>49.210734858913355 -123.1301861695059 49.20847691114062 -123.13026112058714</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>This work will occur over the May 31st weekend (significant daytime &amp; nighttime impacts - 1 lane NB) and will continue through the next week to June 13th (daytime &amp; nighttime impacts - 2 lanes NB &amp; SB).
Location: Oak St, W. 70th to W. 64th 
Schedule: May 31, 2024 - Jun 13, 2024</content>
<id>urn:uuid:fd2ee841-195f-4d68-9636-dea17ebffa50</id>
<link href="https://vancouver.ca/streets-transportation/oak-street-sewer-separation-upgrades.aspx "/>
<published>2024-05-16T07:00:00Z</published>
<title>Oak Street Upgrades - Phase 3 (Oak St) Pre-Works</title>
<updated>2024-11-14T02:00:31.3919367Z</updated>
<georss:line>49.212993732283365 -123.13011120050011 49.210734858913355 -123.1301861695059</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>This work will occur over the May 31st weekend (significant daytime &amp; nighttime impacts - 1 lane NB) and will continue through the next week to June 13th (daytime &amp; nighttime impacts - 2 lanes NB &amp; SB).
Location: Oak St, W. 70th to W. 64th 
Schedule: May 31, 2024 - Jun 13, 2024</content>
<id>urn:uuid:c945d1da-419e-4f06-865d-9f93c8affff1</id>
<link href="https://vancouver.ca/streets-transportation/oak-street-sewer-separation-upgrades.aspx "/>
<published>2024-05-16T07:00:00Z</published>
<title>Oak Street Upgrades - Phase 3 (Oak St) Pre-Works</title>
<updated>2024-11-14T02:00:31.3919367Z</updated>
<georss:line>49.21446429156242 -123.13006238797216 49.21341829867987 -123.1300971148763</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>This work will occur over the May 31st weekend (significant daytime &amp; nighttime impacts - 1 lane NB) and will continue through the next week to June 13th (daytime &amp; nighttime impacts - 2 lanes NB &amp; SB).
Location: Oak St, W. 70th to W. 64th 
Schedule: May 31, 2024 - Jun 13, 2024</content>
<id>urn:uuid:deff60f5-0122-4031-949b-8c7fff2d3cea</id>
<link href="https://vancouver.ca/streets-transportation/oak-street-sewer-separation-upgrades.aspx "/>
<published>2024-05-16T07:00:00Z</published>
<title>Oak Street Upgrades - Phase 3 (Oak St) Pre-Works</title>
<updated>2024-11-14T02:00:31.3919367Z</updated>
<georss:line>49.21341829867987 -123.1300971148763 49.212993732283365 -123.13011120050011</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Upcoming intersection work – August 22 – 27

Phase 3 will begin with approximately 6 days of work at the intersection of Oak Street and W. 70th Avenue. Work will begin on the evening of Thursday, August 22nd and expect to be completed by Tuesday evening, August 27th.  Workers will be on site 24/7 during this period to reduce the duration of works through this busy intersection.

The following traffic impacts are expected:
•	Traffic lanes will be reduced on Oak Street with at least one lane remaining open in each direction. 
•	Through traffic along W. 70th Avenue may be restricted at the intersection.  Please follow detours.
VPD Traffic Team will be on-site to manage traffic at the intersection during construction.  Residents and travellers in the area should expect delays and plan alternate routes.

Location: Oak Street and W 70th Av intersection
Schedule: Aug 22, 2024 - Aug 27, 2024</content>
<id>urn:uuid:7e8e9781-f1b9-4856-b5c2-1478ccfaa3a1</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/01c4b568-4d91-4423-b7ce-cf35d36da09a"/>
<published>2024-08-20T07:00:00Z</published>
<title>Oak Street Upgrades - Phase 3 (Oak Street and W 70th Av Intersection)</title>
<updated>2024-08-23T20:04:34.0306504Z</updated>
<georss:line>49.20847130563453 -123.13024569211605 49.2084819311911 -123.13094395289085</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Upcoming intersection work – August 22 – 27

Phase 3 will begin with approximately 6 days of work at the intersection of Oak Street and W. 70th Avenue. Work will begin on the evening of Thursday, August 22nd and expect to be completed by Tuesday evening, August 27th.  Workers will be on site 24/7 during this period to reduce the duration of works through this busy intersection.

The following traffic impacts are expected:
•	Traffic lanes will be reduced on Oak Street with at least one lane remaining open in each direction. 
•	Through traffic along W. 70th Avenue may be restricted at the intersection.  Please follow detours.
VPD Traffic Team will be on-site to manage traffic at the intersection during construction.  Residents and travellers in the area should expect delays and plan alternate routes.

Location: Oak Street and W 70th Av intersection
Schedule: Aug 22, 2024 - Aug 27, 2024</content>
<id>urn:uuid:b591758b-b0e9-4955-b6c6-8719dcfc4751</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/01c4b568-4d91-4423-b7ce-cf35d36da09a"/>
<published>2024-08-20T07:00:00Z</published>
<title>Oak Street Upgrades - Phase 3 (Oak Street and W 70th Av Intersection)</title>
<updated>2024-08-23T20:04:34.0306504Z</updated>
<georss:line>49.208460763209246 -123.12955777004638 49.20847130563453 -123.13024569211605</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Upcoming intersection work – August 22 – 27

Phase 3 will begin with approximately 6 days of work at the intersection of Oak Street and W. 70th Avenue. Work will begin on the evening of Thursday, August 22nd and expect to be completed by Tuesday evening, August 27th.  Workers will be on site 24/7 during this period to reduce the duration of works through this busy intersection.

The following traffic impacts are expected:
•	Traffic lanes will be reduced on Oak Street with at least one lane remaining open in each direction. 
•	Through traffic along W. 70th Avenue may be restricted at the intersection.  Please follow detours.
VPD Traffic Team will be on-site to manage traffic at the intersection during construction.  Residents and travellers in the area should expect delays and plan alternate routes.

Location: Oak Street and W 70th Av intersection
Schedule: Aug 22, 2024 - Aug 27, 2024</content>
<id>urn:uuid:59d56aea-1901-4f56-9628-fefe64471d4d</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/01c4b568-4d91-4423-b7ce-cf35d36da09a"/>
<published>2024-08-20T07:00:00Z</published>
<title>Oak Street Upgrades - Phase 3 (Oak Street and W 70th Av Intersection)</title>
<updated>2024-08-23T20:04:34.0306504Z</updated>
<georss:line>49.21072925329753 -123.13017074043809 49.20847130563453 -123.13024569211605</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Upcoming intersection work – August 22 – 27

Phase 3 will begin with approximately 6 days of work at the intersection of Oak Street and W. 70th Avenue. Work will begin on the evening of Thursday, August 22nd and expect to be completed by Tuesday evening, August 27th.  Workers will be on site 24/7 during this period to reduce the duration of works through this busy intersection.

The following traffic impacts are expected:
•	Traffic lanes will be reduced on Oak Street with at least one lane remaining open in each direction. 
•	Through traffic along W. 70th Avenue may be restricted at the intersection.  Please follow detours.
VPD Traffic Team will be on-site to manage traffic at the intersection during construction.  Residents and travellers in the area should expect delays and plan alternate routes.

Location: Oak Street and W 70th Av intersection
Schedule: Aug 22, 2024 - Aug 27, 2024</content>
<id>urn:uuid:3b92af0f-8c16-4ec1-91e3-ce3692b65325</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/01c4b568-4d91-4423-b7ce-cf35d36da09a"/>
<published>2024-08-20T07:00:00Z</published>
<title>Oak Street Upgrades - Phase 3 (Oak Street and W 70th Av Intersection)</title>
<updated>2024-08-23T20:04:34.0306504Z</updated>
<georss:line>49.20847130563453 -123.13024569211605 49.206914286380425 -123.13029861847401</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Oakridge Centre redevelopment

QuadReal Property Group and Westbank Development, the owners of Oakridge Centre,  are moving forward with the redevelopment of the Oakridge Centre, based on the rezoning that was approved in 2014.

The Oakridge Centre is currently home to shops, services, offices, and community and residential space. Many of the shops and services will remain open throughout the redevelopment. The current site design reflects a number of refinements responding to conditions of the 2014 rezoning and policy changes that have emerged since Council approved the rezoning of the site.

https://vancouver.ca/home-property-development/oakridge-redevelopment.aspx
Location: W 41st Ave and Cambie St
Schedule: Jun 1, 2021 - May 30, 2025</content>
<id>urn:uuid:7d8601c4-77ba-4d21-a9a0-cac8be6f6965</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/86da498f-8a4c-4741-a995-8605cd482af3"/>
<published>2023-10-30T07:00:00Z</published>
<title>Oakridge Town Centre - Development Site at W 41st Ave and Cambie St</title>
<updated>2025-07-04T01:00:26.1442131Z</updated>
<georss:polygon>49.233580135672895 -123.1216228741687 49.23275501524799 -123.12159903289285 49.231914312289945 -123.12114603686496 49.23121371556235 -123.12021620484302 49.23040412441472 -123.11909563737572 49.23041969406913 -123.1184280659363 49.22996351441765 -123.1184495236084 49.22990123776134 -123.1166136995307 49.233450919508414 -123.11647064925636 49.233580135672895 -123.1216228741687</georss:polygon>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Paving works only. East side (NB direction) of Boundary ONLY.  Schedule TBC for delivery in 2027
Location: 
Schedule: Mar 1, 2027 - Nov 1, 2027</content>
<id>urn:uuid:2605a2e0-40e8-4da5-a4a3-0f2e436deb78</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/190f28fe-8144-4645-bd36-bbab1a61be08"/>
<published>2025-10-22T07:00:00Z</published>
<title>PLACEHOLDER City of Burnaby - Boundary Rd Paving Project, E. 49th (Imperial) to Marine Way</title>
<updated>2025-10-22T22:02:18.595624Z</updated>
<georss:line>49.22194756821344 -123.02360658295498 49.22015026673765 -123.0236137604537</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Paving works only. East side (NB direction) of Boundary ONLY.  Schedule TBC for delivery in 2027
Location: 
Schedule: Mar 1, 2027 - Nov 1, 2027</content>
<id>urn:uuid:0b3eacad-18f9-4af7-8d2a-3fa68da5bbca</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/190f28fe-8144-4645-bd36-bbab1a61be08"/>
<published>2025-10-22T07:00:00Z</published>
<title>PLACEHOLDER City of Burnaby - Boundary Rd Paving Project, E. 49th (Imperial) to Marine Way</title>
<updated>2025-10-22T22:02:18.595624Z</updated>
<georss:line>49.22015026673765 -123.0236137604537 49.21756357805239 -123.0236075846855 49.217473220514194 -123.02360754165119</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Paving works only. East side (NB direction) of Boundary ONLY.  Schedule TBC for delivery in 2027
Location: 
Schedule: Mar 1, 2027 - Nov 1, 2027</content>
<id>urn:uuid:65e82874-d84e-41e6-816c-2f1f64ae5e5b</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/190f28fe-8144-4645-bd36-bbab1a61be08"/>
<published>2025-10-22T07:00:00Z</published>
<title>PLACEHOLDER City of Burnaby - Boundary Rd Paving Project, E. 49th (Imperial) to Marine Way</title>
<updated>2025-10-22T22:02:18.595624Z</updated>
<georss:line>49.217473220514194 -123.02360754165119 49.217382764026524 -123.02360749856999 49.21489647053042 -123.02360076715429 49.21480596003329 -123.0236007103326</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Paving works only. East side (NB direction) of Boundary ONLY.  Schedule TBC for delivery in 2027
Location: 
Schedule: Mar 1, 2027 - Nov 1, 2027</content>
<id>urn:uuid:65879752-31d4-4d8b-9ee9-a7920dfbd61a</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/190f28fe-8144-4645-bd36-bbab1a61be08"/>
<published>2025-10-22T07:00:00Z</published>
<title>PLACEHOLDER City of Burnaby - Boundary Rd Paving Project, E. 49th (Imperial) to Marine Way</title>
<updated>2025-10-22T22:02:18.595624Z</updated>
<georss:line>49.21480596003329 -123.0236007103326 49.214715683409224 -123.02360066735359 49.211099581452316 -123.02359146309072 49.20817384791164 -123.02340491842772</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Paving works only. East side (NB direction) of Boundary ONLY.  Schedule TBC for delivery in 2027
Location: 
Schedule: Mar 1, 2027 - Nov 1, 2027</content>
<id>urn:uuid:d7abf8fe-fcf9-4e08-aec8-104950bc647f</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/190f28fe-8144-4645-bd36-bbab1a61be08"/>
<published>2025-10-22T07:00:00Z</published>
<title>PLACEHOLDER City of Burnaby - Boundary Rd Paving Project, E. 49th (Imperial) to Marine Way</title>
<updated>2025-10-22T22:02:18.595624Z</updated>
<georss:line>49.20817384791164 -123.02340491842772 49.20691851718428 -123.023324917955</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Paving works only. East side (NB direction) of Boundary ONLY.  Schedule TBC for delivery in 2027
Location: 
Schedule: Mar 1, 2027 - Nov 1, 2027</content>
<id>urn:uuid:350d3553-4575-4fb6-ba81-b3299fe38b4c</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/190f28fe-8144-4645-bd36-bbab1a61be08"/>
<published>2025-10-22T07:00:00Z</published>
<title>PLACEHOLDER City of Burnaby - Boundary Rd Paving Project, E. 49th (Imperial) to Marine Way</title>
<updated>2025-10-22T22:02:18.595624Z</updated>
<georss:line>49.20691851718428 -123.023324917955 49.20681394825621 -123.02331823772315 49.2061081374178 -123.02333877340581</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Paving works only. East side (NB direction) of Boundary ONLY.  Schedule TBC for delivery in 2027
Location: 
Schedule: Mar 1, 2027 - Nov 1, 2027</content>
<id>urn:uuid:bc30f23b-d696-4fbf-b745-77308d231596</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/190f28fe-8144-4645-bd36-bbab1a61be08"/>
<published>2025-10-22T07:00:00Z</published>
<title>PLACEHOLDER City of Burnaby - Boundary Rd Paving Project, E. 49th (Imperial) to Marine Way</title>
<updated>2025-10-22T22:02:18.595624Z</updated>
<georss:line>49.2061081374178 -123.02333877340581 49.205432173055186 -123.02335843021517</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Establish a safer and more comfortable separated cycling path between Balsam St and Ogden Ave for all users, including children, families, and people with reduced mobility. Improving entryways into the park. 



Location: Kits Seaside Greenway
Schedule: Sep 9, 2024 - Dec 20, 2024</content>
<id>urn:uuid:c7b22fbf-a103-4010-9937-8f31ae44f24b</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/efb5988f-5482-4118-8137-1035b0643ed9"/>
<published>2024-08-19T07:00:00Z</published>
<title>Parks Bd - Kits Seaside Greenway </title>
<updated>2026-02-28T02:00:30.0032697Z</updated>
<georss:line>49.27623014703724 -123.15124945102988 49.27466283488101 -123.15264653383909</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Establish a safer and more comfortable separated cycling path between Balsam St and Ogden Ave for all users, including children, families, and people with reduced mobility. Improving entryways into the park. 



Location: Kits Seaside Greenway
Schedule: Sep 9, 2024 - Dec 20, 2024</content>
<id>urn:uuid:e50e141b-c3d6-4fa6-9fc4-4138d499c902</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/efb5988f-5482-4118-8137-1035b0643ed9"/>
<published>2024-08-19T07:00:00Z</published>
<title>Parks Bd - Kits Seaside Greenway </title>
<updated>2026-02-28T02:00:30.0032697Z</updated>
<georss:line>49.274653261006904 -123.15265240396482 49.27416331017369 -123.15268175320709 49.274093656457495 -123.1539996278844 49.27336567595526 -123.15485146745169 49.27326818748719 -123.15497754219078 49.27275598780972 -123.15506337308004 49.27273300965442 -123.15517783619937 49.27280064400023 -123.15905885069888 49.27305531745213 -123.15956659751195 49.27305531745213 -123.15963116646884 49.273145314507275 -123.15962529651642</georss:line>
</entry>
<entry>
<category term="Road Closure"/>
<content>Pedestrian Only Zone
Location:  Granville St - Davie to W Georgia St
Schedule: Jun 8, 2026 - Jul 27, 2026</content>
<id>urn:uuid:590e3e34-edf8-491d-b327-07a28744e0b0</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1c0bff1b-73f3-489d-ae54-20a393f010ba"/>
<published>2026-05-14T07:00:00Z</published>
<title>Pedestrian Zone</title>
<updated>2026-06-08T17:43:28.1607071Z</updated>
<georss:line>49.27716261590686 -123.1262090971422 49.2824633821007 -123.11816827614511</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Project: Creative Energy Decarbonization
Location: Expo Blvd, Carrall St to Griffiths Way
Schedule: Aug 3, 2026 - Dec 31, 2026</content>
<id>urn:uuid:04a7cb4a-3829-4fd9-a036-84a1bed1b19d</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/20c12b0f-dd5e-4ff6-ba84-bd24543bc7e0"/>
<published>2025-11-12T08:00:00Z</published>
<title>Placeholder - Creative Energy Decarbonization</title>
<updated>2025-12-02T19:23:04.1919638Z</updated>
<georss:line>49.27805537425138 -123.1061474701193 49.27805595585545 -123.10615082603475 49.27812283196377 -123.10641821591705 49.27820762807221 -123.10667346384601 49.2783094113712 -123.1069137495354 49.27836872061505 -123.10702602607387 49.27853797459352 -123.1073453637908 49.27855759456176 -123.10738250056993 49.278609257421834 -123.10750446826249 49.27864756849311 -123.10761979398323</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Project: Creative Energy Decarbonization
Location: Expo Blvd, Carrall St to Griffiths Way
Schedule: Aug 3, 2026 - Dec 31, 2026</content>
<id>urn:uuid:516e8675-7900-4e54-80a9-1fb81d133136</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/20c12b0f-dd5e-4ff6-ba84-bd24543bc7e0"/>
<published>2025-11-12T08:00:00Z</published>
<title>Placeholder - Creative Energy Decarbonization</title>
<updated>2025-12-02T19:23:04.1919638Z</updated>
<georss:line>49.27867060538969 -123.10868629785928 49.27866545899204 -123.10870664853229 49.278659492051474 -123.10872910096438 49.27865328240537 -123.10875137412295 49.27864681203758 -123.10877349546577 49.27864008996926 -123.10879543751477 49.278633116213456 -123.10881718652091 49.27862589975243 -123.10883875625251 49.278618431604144 -123.10886013294073 49.27861072977197 -123.10888130287624 49.27860278526083 -123.10890226603902 49.27859459808383 -123.10892300868005 49.278586177236264 -123.10894353081902 49.278577522731155 -123.10896381870697 49.2785686435509 -123.10898388611226 49.27855953072631 -123.10900370551745 49.27855019323971 -123.109023290691 49.27854063111727 -123.10904261413526 49.27853085335414 -123.10906167586995 49.27802638254761 -123.11006089998584 49.27801621651403 -123.11008133531973 49.278006293097434 -123.1101020324092 49.2779966033024 -123.11012299123425 49.27798714714194 -123.1101441980465 49.27797794259314 -123.11016566663473 49.27796898068689 -123.11018736948192 49.27796027041825 -123.11020930660833 49.27795181180022 -123.11023146426558 49.277943604819484 -123.11025385620245 49.27793565848427 -123.11027646869069 49.27792797280756 -123.11029928798192 49.277920547802296 -123.11032230032785 49.277913383455285 -123.11034551947735 49.27790648878786 -123.11036891795364 49.27789986379983 -123.110392495757 49.277893499495946 -123.11041625286767 49.27788741389281 -123.11044016182902 49.277881606963916 -123.11046425013852 49.27787839139643 -123.11047814277904</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Project: Creative Energy Decarbonization
Location: Expo Blvd, Carrall St to Griffiths Way
Schedule: Aug 3, 2026 - Dec 31, 2026</content>
<id>urn:uuid:c72ee14b-e730-4f8b-bd16-8b4dbe09157e</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/20c12b0f-dd5e-4ff6-ba84-bd24543bc7e0"/>
<published>2025-11-12T08:00:00Z</published>
<title>Placeholder - Creative Energy Decarbonization</title>
<updated>2025-12-02T19:23:04.1919638Z</updated>
<georss:line>49.27864756849311 -123.10761979398323 49.2786489494074 -123.10762445783162 49.27865534232731 -123.10764662106432 49.27866148321186 -123.10766896248859 49.27866736309133 -123.10769145458698 49.2786729909609 -123.10771409737879 49.27867835781237 -123.10773690459293 49.27868346368422 -123.10775983498272 49.27868829956827 -123.10778290227702 49.2786928834677 -123.10780609276595 49.27869718839693 -123.1078294063903 49.278701232359026 -123.1078528294402 49.27870501535392 -123.10787636191527 49.27870851940406 -123.10789999002715 49.2787117625125 -123.10792370006592 49.278714726689 -123.10794749199194 49.27871742092859 -123.1079713658245 49.278719827253695 -123.10799530777508 49.278721981657895 -123.10801930417315 49.278723848160354 -123.10804335493967 49.2787254447515 -123.10806746011357 49.27872677144413 -123.10809160594563 49.27872781925586 -123.10811577866708 49.27872858818674 -123.10813997827744 49.27872907824957 -123.10816419102754 49.27872929845245 -123.10818840318781 49.27872923978725 -123.10821262848702 49.27872890226692 -123.10823685317594 49.27872829489945 -123.10826106352505 49.27872739970746 -123.10828524574579 49.27872623466834 -123.10830941362593 49.27872479980795 -123.10833353966746 49.278723086131095 -123.10835762385028 49.278721093650745 -123.10838165242524 49.278718831362085 -123.10840562541165 49.27871629026993 -123.10842954278935 49.278713479382475 -123.1084533908289 49.27871039871263 -123.10847715578116 49.278707039278146 -123.10850082387722 49.27870341905654 -123.10852440890497 49.27869952906565 -123.10854789709552 49.27869536931837 -123.10857127469973 49.27869093981482 -123.1085945417172 49.27868624957611 -123.10861767066979 49.27868129857637 -123.10864068905478 49.278676077846484 -123.10866356935449 49.27867060538969 -123.10868629785928</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Remove the existing 6 high mast poles and replace with new poles and luminaires
Location: Georgia/Dunsmuir Via Duct
Schedule: Jul 20, 2026 - Aug 21, 2026</content>
<id>urn:uuid:024f0bc1-ddc7-4312-a9ee-ba7e3ec8954a</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/7a199adc-5919-465f-85b9-a454c728ae41"/>
<published>2026-06-02T07:00:00Z</published>
<title>Placeholder - Georgia/Dunsmuir Viaduct Lighting Masts Replacement</title>
<updated>2026-06-02T20:32:12.215128Z</updated>
<georss:line>49.277160118524506 -123.10338059696154 49.27710154088183 -123.09964450596574 49.277099197654934 -123.09953489923844 49.27709666788604 -123.09942243248577 49.277094028919464 -123.09931129911718 49.277091272767166 -123.09920033050592 49.27708839942963 -123.0990895266527 49.277084447613646 -123.09897749704979 49.27707832457122 -123.0988692989187 49.2770696583562 -123.09875809859376 49.277058384726104 -123.09864538078828 49.27704482452481 -123.09853463824246 49.277028217899556 -123.09842031512451 49.2770107115856 -123.09831663151463 49.27698946900722 -123.0982060938866 49.27696860675397 -123.09810304994973 49.276945419638565 -123.09799413095787 49.27692218325154 -123.09789016136628 49.27689753565775 -123.09778485549609 49.27687059854608 -123.097674403343 49.276846575309094 -123.0975751481738 49.27682113736034 -123.0974680537863 49.2768091808982 -123.0974169278345 49.27680400045338 -123.09739465915362 49.27679882219394 -123.09736979205556 49.276794540411544 -123.09734852877774 49.27679029462905 -123.09732723807788 49.27678694470103 -123.09731029360151 49.276782932114486 -123.09728980076721 49.27677897340277 -123.09726941802846 49.276775023798336 -123.09724889782808 49.27677157589528 -123.09723078456592 49.27676692814205 -123.09720612476808 49.27676219109094 -123.09718068114766 49.276758824260895 -123.09716241682322 49.276755081526346 -123.09714189704599 49.27675081069617 -123.09711825537698 49.27674714889875 -123.0970977495136 49.27674281583259 -123.09707322784072 49.27673911864696 -123.09705200700452 49.276735878144535 -123.09703324800749 49.276733264334354 -123.09701802354702 49.27673051640258 -123.09700183644638 49.27672667664265 -123.09697899304581 49.27672342960196 -123.09695729191665 49.27672059616202 -123.09693579782486 49.2767180063949 -123.09691334183442 49.27671595493865 -123.09689255044076 49.27671413819445 -123.09687075588523 49.276712698897626 -123.09684937451824 49.2767120754269 -123.09683125308766</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Remove the existing 6 high mast poles and replace with new poles and luminaires
Location: Georgia/Dunsmuir Via Duct
Schedule: Jul 20, 2026 - Aug 21, 2026</content>
<id>urn:uuid:5e149faf-04b5-460c-9d33-7bb0cf6d727e</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/7a199adc-5919-465f-85b9-a454c728ae41"/>
<published>2026-06-02T07:00:00Z</published>
<title>Placeholder - Georgia/Dunsmuir Viaduct Lighting Masts Replacement</title>
<updated>2026-06-02T20:32:12.215128Z</updated>
<georss:line>49.2767120754269 -123.09683125308766 49.27673278104962 -123.0968435295798 49.2767703156309 -123.09687849619817 49.276789875105635 -123.09690597608162 49.27680465922259 -123.0969321542895 49.27681236782615 -123.09695391919091 49.276855274122994 -123.09713686945888 49.276894565045126 -123.09728661075496 49.27693535860439 -123.09742493039148 49.27698513930551 -123.09758323056992 49.27704624603666 -123.09778250979831 49.27708030568064 -123.097894791283 49.27710555401882 -123.09798104354414 49.27712202818688 -123.09803997422198 49.277143933867706 -123.09812191675516 49.27716396190689 -123.09820102346515 49.27718692387617 -123.09829945256296 49.27720655138688 -123.09839454800618 49.27722344577606 -123.09848789203542 49.27723806431197 -123.09858123159262 49.27725185397361 -123.09868655816726 49.27725936439285 -123.09876091082951 49.27726718473622 -123.09885145976865 49.27727318412198 -123.09893601078355 49.27727800403005 -123.09902178306709 49.277281414793265 -123.09910386796722 49.27728443998251 -123.09919494357318 49.27728733825796 -123.09928707756413 49.27728947765257 -123.09937248706237 49.2772907966841 -123.09945991593669 49.27729218376567 -123.0995622482441 49.27729416023345 -123.09967988374113 49.27730076104726 -123.10002529875456 49.27730291769899 -123.10032871714712 49.27730530624649 -123.10049913375067 49.27730908740901 -123.10073307094508 49.27731188621357 -123.10088623414784 49.27731574009158 -123.10107729019752 49.27731975519845 -123.10125850273023 49.277323018375625 -123.10139422018737 49.277326174787504 -123.10150793994998 49.2773332569827 -123.10171935042574 49.277340722668725 -123.10190347110424 49.27735028624295 -123.10210534540452 49.277362748902306 -123.10231400376209 49.277378942526866 -123.10261573320338 49.277388482650565 -123.10278190302265 49.27739968120585 -123.10296427203659 49.2774121768995 -123.10315434297432 49.27742576985068 -123.10334423757081 49.27743483162831 -123.10347085235742</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Please confirm with Catherine Chow for any specific questions. For Transformer Delivery - FULL Closure of W. 6th from Yukon to Columbia for 3 days in late August. (Including Alberta north and south of W. 6th). 
Location: 
Schedule: Jul 15, 2026 - Sep 30, 2026</content>
<id>urn:uuid:fb5569d0-14c3-4007-99ac-0373faf759b3</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a484ab1c-a79f-42cb-91b7-dd9231d1f35b"/>
<published>2026-03-04T08:00:00Z</published>
<title>Placeholder - Mt Pleasant Substation Transformer Install</title>
<updated>2026-03-04T17:19:30.4171065Z</updated>
<georss:line>49.265690149544184 -123.11085140859302 49.265725534550285 -123.11278689598974</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Please confirm with Catherine Chow for any specific questions. For Transformer Delivery - FULL Closure of W. 6th from Yukon to Columbia for 3 days in late August. (Including Alberta north and south of W. 6th). 
Location: 
Schedule: Jul 15, 2026 - Sep 30, 2026</content>
<id>urn:uuid:d0f89286-47b5-45f1-ba75-caf530ac0c96</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a484ab1c-a79f-42cb-91b7-dd9231d1f35b"/>
<published>2026-03-04T08:00:00Z</published>
<title>Placeholder - Mt Pleasant Substation Transformer Install</title>
<updated>2026-03-04T17:19:30.4171065Z</updated>
<georss:line>49.265690149544184 -123.11085140859302 49.26523591587778 -123.11087316663239</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Please confirm with Catherine Chow for any specific questions. For Transformer Delivery - FULL Closure of W. 6th from Yukon to Columbia for 3 days in late August. (Including Alberta north and south of W. 6th). 
Location: 
Schedule: Jul 15, 2026 - Sep 30, 2026</content>
<id>urn:uuid:4caabf89-d276-4491-a170-48e2c4f580d4</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a484ab1c-a79f-42cb-91b7-dd9231d1f35b"/>
<published>2026-03-04T08:00:00Z</published>
<title>Placeholder - Mt Pleasant Substation Transformer Install</title>
<updated>2026-03-04T17:19:30.4171065Z</updated>
<georss:line>49.265663971802525 -123.10943779425952 49.265690149544184 -123.11085140859302</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Construction of new pedestrian crossing and bike permeable median at the intersection of Prince Edward St and E 16th Ave. Construction will also include upgrades of the southwest corner concrete ramp, utility adjustments, traffic signage and road marking updates. This work is going to be performed by external contractor. Traffic control measures will be in place during construction. Expect temporary intersection full-closure (7am-5pm, up to one week duration).
Location: Prince Edward St and E 16th Ave
Schedule: Nov 12, 2025 - Nov 18, 2025</content>
<id>urn:uuid:bde681c8-85f3-4e5e-92bf-b1fe83420365</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/02b9bf54-43f4-4c56-8d30-827e1be2483f"/>
<published>2025-10-01T07:00:00Z</published>
<title>Prince Edward St and E 16th Ave - New Pedestrian Crossing and Bike Permeable Median</title>
<updated>2025-10-02T16:04:01.302921Z</updated>
<georss:line>49.25654543604426 -123.09695684857564 49.256534320388084 -123.09607549610341</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Construction of new pedestrian crossing and bike permeable median at the intersection of Prince Edward St and E 16th Ave. Construction will also include upgrades of the southwest corner concrete ramp, utility adjustments, traffic signage and road marking updates. This work is going to be performed by external contractor. Traffic control measures will be in place during construction. Expect temporary intersection full-closure (7am-5pm, up to one week duration).
Location: Prince Edward St and E 16th Ave
Schedule: Nov 12, 2025 - Nov 18, 2025</content>
<id>urn:uuid:009bfa28-7ade-467f-b10f-cc1ac5d258a7</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/02b9bf54-43f4-4c56-8d30-827e1be2483f"/>
<published>2025-10-01T07:00:00Z</published>
<title>Prince Edward St and E 16th Ave - New Pedestrian Crossing and Bike Permeable Median</title>
<updated>2025-10-02T16:04:01.302921Z</updated>
<georss:line>49.25660101428758 -123.09650978572739 49.25648152098705 -123.09651404346882</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>19+ Block Party closing unit W 3rd from Manitoba to Ontario and 1900 Ontario closed from W 3rd to lane south


*Bike Lane closure of Ontario from 5th to 3rd ave - reroute plan detour at Ontario and 5th to Quebec to 3rd
Location: W 3rd from Manitoba to Ontario and 1900 Ontario closed from W 3rd to lane south
Schedule: Jul 31, 2026 - Aug 2, 2026</content>
<id>urn:uuid:38f0e5f3-70fc-4675-87a6-1360034a183d</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e05750fa-4f29-4fa7-a03b-37eae0119d65"/>
<published>2026-03-16T07:00:00Z</published>
<title>Public Disco Pride Block Party</title>
<updated>2026-05-20T18:47:08.26727Z</updated>
<georss:line>49.26834420791923 -123.1065184767484 49.268304652379555 -123.10471503480946</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>19+ Block Party closing unit W 3rd from Manitoba to Ontario and 1900 Ontario closed from W 3rd to lane south


*Bike Lane closure of Ontario from 5th to 3rd ave - reroute plan detour at Ontario and 5th to Quebec to 3rd
Location: W 3rd from Manitoba to Ontario and 1900 Ontario closed from W 3rd to lane south
Schedule: Jul 31, 2026 - Aug 2, 2026</content>
<id>urn:uuid:12f9d8c5-a064-423c-9068-e39f182321a6</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e05750fa-4f29-4fa7-a03b-37eae0119d65"/>
<published>2026-03-16T07:00:00Z</published>
<title>Public Disco Pride Block Party</title>
<updated>2026-05-20T18:47:08.26727Z</updated>
<georss:line>49.268294763489706 -123.10468472486092 49.26784976139393 -123.1046998798352</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>19+ Block Party closing unit W 3rd from Manitoba to Ontario and 1900 Ontario closed from W 3rd to lane south


*Bike Lane closure of Ontario from 5th to 3rd ave - reroute plan detour at Ontario and 5th to Quebec to 3rd
Location: W 3rd from Manitoba to Ontario and 1900 Ontario closed from W 3rd to lane south
Schedule: Jul 31, 2026 - Aug 2, 2026</content>
<id>urn:uuid:108bb570-6056-4608-8200-186599ad2d50</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e05750fa-4f29-4fa7-a03b-37eae0119d65"/>
<published>2026-03-16T07:00:00Z</published>
<title>Public Disco Pride Block Party</title>
<updated>2026-05-20T18:47:08.26727Z</updated>
<georss:line>49.26743034508078 -123.10657373252205 49.26740939096774 -123.1058190973144</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>19+ Block Party closing unit W 3rd from Manitoba to Ontario and 1900 Ontario closed from W 3rd to lane south


*Bike Lane closure of Ontario from 5th to 3rd ave - reroute plan detour at Ontario and 5th to Quebec to 3rd
Location: W 3rd from Manitoba to Ontario and 1900 Ontario closed from W 3rd to lane south
Schedule: Jul 31, 2026 - Aug 2, 2026</content>
<id>urn:uuid:2b1a0b4e-1cba-43b5-881e-7dfbadda0059</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e05750fa-4f29-4fa7-a03b-37eae0119d65"/>
<published>2026-03-16T07:00:00Z</published>
<title>Public Disco Pride Block Party</title>
<updated>2026-05-20T18:47:08.26727Z</updated>
<georss:line>49.26788609483802 -123.10656570448793 49.26785466395546 -123.10476742484413</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>City's external contractor will be working on the east side of Quebec Street between 3rd Avenue and the lane north to construct a protected, raised bike lane, and the associated roadway upgrades. Construction is scheduled to take place during normal working hours weekdays from April 22 to May 9, including localized excavation, gravel base compaction, concrete works, utility adjustments, targeted paving and road marking restoration.
Location: 1800 Quebec Street between 3rd Avenue and the lane north. 
Schedule: Apr 22, 2025 - May 9, 2025</content>
<id>urn:uuid:38bf6de2-eff2-4165-9a09-8c3f7a537c80</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/7e4e7490-2ab4-4942-841e-6162f06ca281"/>
<published>2025-04-24T07:00:00Z</published>
<title>Quebec and 3rd - Protected Bike Lane </title>
<updated>2025-04-24T17:33:13.406277Z</updated>
<georss:line>49.26869934519118 -123.10270568749046 49.268268800301314 -123.10271909853553</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>City's external contractor will be working on the east side of Quebec Street &amp; 5th Avenue intersection to construct a raised crossing and bike lane tie-in and the associated sidewalk upgrades. Construction is scheduled to take place during normal working hours weekdays from April 22 to May 9, including localized excavation, gravel base compaction, concrete works, utility adjustments, targeted paving and road marking restoration.
Location: Quebec Street &amp; 5th Avenue intersection.
Schedule: Apr 24, 2025 - May 9, 2025</content>
<id>urn:uuid:6c5633a3-926f-4fff-97de-6696a5146bed</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/09de180a-b1ec-4aa5-b01d-4c22f0667b0c"/>
<published>2025-04-24T07:00:00Z</published>
<title>Quebec and 5th - Raised Crossing</title>
<updated>2025-04-24T19:21:31.1796029Z</updated>
<georss:point>49.26644649935693 -123.10278931584256</georss:point>
</entry>
<entry>
<category term="Under Construction"/>
<content>Starting in March 2026, the City of Vancouver will be completing critical sewer renewals at the 
south end of Strathcona Park between Raymur Avenue and Chess Street. 

In late 2023, the sewer pipe running underneath the south side of Strathcona Park experienced 
a leak. Crews responded immediately, and as temporary solution an overground bypass was 
installed to maintain service to residents and businesses. The overground bypass was 
maintained while crews determined the best way to preserve the Cottonwood Community 
Garden and maintain park conditions. 

The city will use trenchless construction method to install the new pipe underground. This work 
will require crews to excavate access pits at both ends of the park (see map on the attached 
page) and use specialized equipment to install the new pipes with minimum surface 
disturbance. 
Location: South end of Strathcona Park between Raymur Avenue and Chess Street
Schedule: Mar 9, 2026 - Jul 17, 2026</content>
<id>urn:uuid:fccea4a3-9660-4518-b9aa-f190ec751bdd</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/3ba646e4-e239-4f43-a9de-399cc7dbc22c"/>
<published>2026-03-13T07:00:00Z</published>
<title>Raymur Forcemain Trenchless Rehabilitation (RFTR) Project </title>
<updated>2026-06-01T18:07:10.3540018Z</updated>
<georss:line>49.274324306455554 -123.08596715535353 49.2734043630129 -123.0830545068576</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Nootka St - E 20th Av to E 22nd Av | Nov 2025 - Dec 2025 - COMPLETE 
E 22nd Av - Kaslo St to Nootka St | Jan 2026 - Mar 2026 -  COMPLETE
E 22nd Av - Nootka St to Rupert St | Mar 2026 - Jun 2026 - UNDER CONSTRUCTION
E 20th Av - Nootka St to Lillooet St | June 2026 - Jul 2026 
Location: 
Schedule: Recurring schedule as follows:
- Nov 28, 2025 - Dec 19, 2025; Weekdays; 7:00 AM - 3:00 PM
- Jan 5, 2026 - Jul 15, 2026; Weekdays; 7:00 AM - 3:00 PM
</content>
<id>urn:uuid:3ac6a4e9-aa89-4126-9cb9-e9e617e28dd8</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/52dfca66-b7a5-4a1e-ba56-b8854961972b"/>
<published>2025-01-07T08:00:00Z</published>
<title>Renfrew Collingwood Centre </title>
<updated>2026-05-28T18:59:00.8389263Z</updated>
<georss:line>49.250652384131655 -123.04705761911339 49.25061081639254 -123.03379761454086</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Nootka St - E 20th Av to E 22nd Av | Nov 2025 - Dec 2025 - COMPLETE 
E 22nd Av - Kaslo St to Nootka St | Jan 2026 - Mar 2026 -  COMPLETE
E 22nd Av - Nootka St to Rupert St | Mar 2026 - Jun 2026 - UNDER CONSTRUCTION
E 20th Av - Nootka St to Lillooet St | June 2026 - Jul 2026 
Location: 
Schedule: Recurring schedule as follows:
- Nov 28, 2025 - Dec 19, 2025; Weekdays; 7:00 AM - 3:00 PM
- Jan 5, 2026 - Jul 15, 2026; Weekdays; 7:00 AM - 3:00 PM
</content>
<id>urn:uuid:702ca12d-0911-426e-a79b-f97f4c3415ee</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/52dfca66-b7a5-4a1e-ba56-b8854961972b"/>
<published>2025-01-07T08:00:00Z</published>
<title>Renfrew Collingwood Centre </title>
<updated>2026-05-28T18:59:00.8389263Z</updated>
<georss:line>49.25233814772017 -123.04161811387013 49.25232817630513 -123.03909749088112</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Nootka St - E 20th Av to E 22nd Av | Nov 2025 - Dec 2025 - COMPLETE 
E 22nd Av - Kaslo St to Nootka St | Jan 2026 - Mar 2026 -  COMPLETE
E 22nd Av - Nootka St to Rupert St | Mar 2026 - Jun 2026 - UNDER CONSTRUCTION
E 20th Av - Nootka St to Lillooet St | June 2026 - Jul 2026 
Location: 
Schedule: Recurring schedule as follows:
- Nov 28, 2025 - Dec 19, 2025; Weekdays; 7:00 AM - 3:00 PM
- Jan 5, 2026 - Jul 15, 2026; Weekdays; 7:00 AM - 3:00 PM
</content>
<id>urn:uuid:cf4ac6c1-d5b4-420c-a625-b0b5ae41d1e7</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/52dfca66-b7a5-4a1e-ba56-b8854961972b"/>
<published>2025-01-07T08:00:00Z</published>
<title>Renfrew Collingwood Centre </title>
<updated>2026-05-28T18:59:00.8389263Z</updated>
<georss:line>49.252339956021785 -123.04160313519614 49.25064330157471 -123.04161932300156</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>E 17th Av - Garden Dr to Nanaimo St                                 Oct 2026 - Nov 2026
E 16th Av - Copley St to Penticton St                                 Oct 2026 - Nov 2026 
E 17th Av - Copley St to Penticton St                                 Oct 2026 - Nov 2026 
Penticton St - Grandview Hwy to E 17th Av                        Nov 2026 - Jan 2027 
E 15th Av - Nanaimo St to Copley St                                  Jan 2027 - Feb 2027 
E 15th Av - Copley St to L/W of Penticton St                      Jan 2027 - Feb 2027 

Location: 
Schedule: Oct 23, 2026 - Jan 13, 2027; All days; 7:00 AM - 3:00 PM</content>
<id>urn:uuid:51735b98-ec0c-4c3c-b3a2-b4cdcf1ed7fe</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/36080eb1-8c22-474b-bdc8-0ecdb2027eab"/>
<published>2026-04-02T07:00:00Z</published>
<title>Renfrew Collingwood North West</title>
<updated>2026-05-28T19:06:01.9571201Z</updated>
<georss:line>49.25512839028687 -123.05830565608487 49.25512839028687 -123.05660976044895</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>E 17th Av - Garden Dr to Nanaimo St                                 Oct 2026 - Nov 2026
E 16th Av - Copley St to Penticton St                                 Oct 2026 - Nov 2026 
E 17th Av - Copley St to Penticton St                                 Oct 2026 - Nov 2026 
Penticton St - Grandview Hwy to E 17th Av                        Nov 2026 - Jan 2027 
E 15th Av - Nanaimo St to Copley St                                  Jan 2027 - Feb 2027 
E 15th Av - Copley St to L/W of Penticton St                      Jan 2027 - Feb 2027 

Location: 
Schedule: Oct 23, 2026 - Jan 13, 2027; All days; 7:00 AM - 3:00 PM</content>
<id>urn:uuid:f8b1aa7a-71a4-4888-9d8a-f8be25fd95dc</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/36080eb1-8c22-474b-bdc8-0ecdb2027eab"/>
<published>2026-04-02T07:00:00Z</published>
<title>Renfrew Collingwood North West</title>
<updated>2026-05-28T19:06:01.9571201Z</updated>
<georss:line>49.25644721515192 -123.05659531405098 49.255989785473105 -123.0549527672087</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>E 17th Av - Garden Dr to Nanaimo St                                 Oct 2026 - Nov 2026
E 16th Av - Copley St to Penticton St                                 Oct 2026 - Nov 2026 
E 17th Av - Copley St to Penticton St                                 Oct 2026 - Nov 2026 
Penticton St - Grandview Hwy to E 17th Av                        Nov 2026 - Jan 2027 
E 15th Av - Nanaimo St to Copley St                                  Jan 2027 - Feb 2027 
E 15th Av - Copley St to L/W of Penticton St                      Jan 2027 - Feb 2027 

Location: 
Schedule: Oct 23, 2026 - Jan 13, 2027; All days; 7:00 AM - 3:00 PM</content>
<id>urn:uuid:e108cc4a-d524-487a-a990-776b9a97c2ee</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/36080eb1-8c22-474b-bdc8-0ecdb2027eab"/>
<published>2026-04-02T07:00:00Z</published>
<title>Renfrew Collingwood North West</title>
<updated>2026-05-28T19:06:01.9571201Z</updated>
<georss:line>49.25661106988366 -123.055036464946 49.25660424253266 -123.05366593215801</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>E 17th Av - Garden Dr to Nanaimo St                                 Oct 2026 - Nov 2026
E 16th Av - Copley St to Penticton St                                 Oct 2026 - Nov 2026 
E 17th Av - Copley St to Penticton St                                 Oct 2026 - Nov 2026 
Penticton St - Grandview Hwy to E 17th Av                        Nov 2026 - Jan 2027 
E 15th Av - Nanaimo St to Copley St                                  Jan 2027 - Feb 2027 
E 15th Av - Copley St to L/W of Penticton St                      Jan 2027 - Feb 2027 

Location: 
Schedule: Oct 23, 2026 - Jan 13, 2027; All days; 7:00 AM - 3:00 PM</content>
<id>urn:uuid:97f3282b-7a0e-419b-8073-8a55165ecab2</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/36080eb1-8c22-474b-bdc8-0ecdb2027eab"/>
<published>2026-04-02T07:00:00Z</published>
<title>Renfrew Collingwood North West</title>
<updated>2026-05-28T19:06:01.9571201Z</updated>
<georss:line>49.25572351824806 -123.05504692686382 49.25572351824806 -123.05298589672294</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>E 17th Av - Garden Dr to Nanaimo St                                 Oct 2026 - Nov 2026
E 16th Av - Copley St to Penticton St                                 Oct 2026 - Nov 2026 
E 17th Av - Copley St to Penticton St                                 Oct 2026 - Nov 2026 
Penticton St - Grandview Hwy to E 17th Av                        Nov 2026 - Jan 2027 
E 15th Av - Nanaimo St to Copley St                                  Jan 2027 - Feb 2027 
E 15th Av - Copley St to L/W of Penticton St                      Jan 2027 - Feb 2027 

Location: 
Schedule: Oct 23, 2026 - Jan 13, 2027; All days; 7:00 AM - 3:00 PM</content>
<id>urn:uuid:0a1651ec-85b9-4ba2-bfda-41c6da59e3de</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/36080eb1-8c22-474b-bdc8-0ecdb2027eab"/>
<published>2026-04-02T07:00:00Z</published>
<title>Renfrew Collingwood North West</title>
<updated>2026-05-28T19:06:01.9571201Z</updated>
<georss:line>49.25487691523546 -123.0552143199438 49.25489739800247 -123.05301728367375</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>E 17th Av - Garden Dr to Nanaimo St                                 Oct 2026 - Nov 2026
E 16th Av - Copley St to Penticton St                                 Oct 2026 - Nov 2026 
E 17th Av - Copley St to Penticton St                                 Oct 2026 - Nov 2026 
Penticton St - Grandview Hwy to E 17th Av                        Nov 2026 - Jan 2027 
E 15th Av - Nanaimo St to Copley St                                  Jan 2027 - Feb 2027 
E 15th Av - Copley St to L/W of Penticton St                      Jan 2027 - Feb 2027 

Location: 
Schedule: Oct 23, 2026 - Jan 13, 2027; All days; 7:00 AM - 3:00 PM</content>
<id>urn:uuid:25e5396c-4412-42b1-98df-664c9e218a79</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/36080eb1-8c22-474b-bdc8-0ecdb2027eab"/>
<published>2026-04-02T07:00:00Z</published>
<title>Renfrew Collingwood North West</title>
<updated>2026-05-28T19:06:01.9571201Z</updated>
<georss:line>49.257448823208534 -123.05297841146132 49.25490768443774 -123.05293966576066</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Alleyway lane closure on Both Sides of Lane West of 5300 Block of Oak Street to facilitate underground utility construction.

WO#  PER-4493284  / 11945U
Location: Both Sides of Lane West of 5300 Block of Oak Street From Lane North of W 38th Avenue to Lane South of W 38th Avenue.
Schedule: Jun 15, 2026 7:00 AM - Jun 19, 2026 5:00 PM</content>
<id>urn:uuid:729df2b5-9f0b-455c-9555-864df4aa6cc4</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d2271502-fc9f-48f4-a901-b4d78534db54"/>
<published>2026-06-04T07:00:00Z</published>
<title>Rogers Underground Utility Construction on Lane West of 5300 Block of Oak Street</title>
<updated>2026-06-02T22:27:55.8178115Z</updated>
<georss:line>49.23722573096455 -123.12874489636428 49.236312249133846 -123.12877921262829</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Parking lane closure and Single lane alternating traffic in effect on the East Side of 6000 Block of Dunbar Street and the East Side of 6100 Block of Dunbar Street to facilitate utility maintenance.

WO# PRJ4380631
Location: East Side of 6000 Block of Dunbar Street From 50m North of SW Marine Drive to 85m North of SW Marine Drive. East Side of 6100 Block of Dunbar Street From 45m South of SW Marine Drive to 65m South of SW Marine Drive.
Schedule: Jun 20, 2026 8:00 AM - 4:00 PM</content>
<id>urn:uuid:8c52a50f-e527-4ffb-ad4d-afd782800304</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/01b969bf-01ce-4a51-9e6a-811a50eaa215"/>
<published>2026-05-29T07:00:00Z</published>
<title>Rogers Utility Maintenance on 6000-6100 Block of Dunbar Street</title>
<updated>2026-05-29T18:59:38.2508459Z</updated>
<georss:line>49.231185263865626 -123.18540971472457 49.23210164303998 -123.18537968795265</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Parking lane closure and Single lane alternating traffic in effect on the East Side of 6000 Block of Dunbar Street and the East Side of 6100 Block of Dunbar Street to facilitate utility maintenance.

WO# PRJ4380631
Location: East Side of 6000 Block of Dunbar Street From 50m North of SW Marine Drive to 85m North of SW Marine Drive. East Side of 6100 Block of Dunbar Street From 45m South of SW Marine Drive to 65m South of SW Marine Drive.
Schedule: Jun 20, 2026 8:00 AM - 4:00 PM</content>
<id>urn:uuid:9c044b91-0d0d-45ed-a497-4d750bdc9b05</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/01b969bf-01ce-4a51-9e6a-811a50eaa215"/>
<published>2026-05-29T07:00:00Z</published>
<title>Rogers Utility Maintenance on 6000-6100 Block of Dunbar Street</title>
<updated>2026-05-29T18:59:38.2508459Z</updated>
<georss:line>49.230228232192815 -123.18541400421671 49.22940125495015 -123.18543611781396</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Alleyway lane closure on the East Side of Lane West of 3200-3500 Block of Arbutus Street to facilitate utility maintenance.

WO# V250114A01
Location: East Side of Lane West of 3200-3500 Block of Arbutus Street From Lane South of W 16th Avenue to Lane South of W 19th Avenue.
Schedule: Jun 1, 2026 - Jun 12, 2026; Weekdays; 8:00 AM - 4:00 PM</content>
<id>urn:uuid:8a234975-989e-42c7-ae0c-ccb214869a6e</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a466d55a-5040-4227-9c18-ec940ca5fdb8"/>
<published>2026-05-26T07:00:00Z</published>
<title>Rogers Utility Maintenance on Lane West of 3200-3500 Block of Arbutus Street</title>
<updated>2026-05-26T19:11:07.302571Z</updated>
<georss:line>49.256750266149794 -123.15362562950577 49.25485050091859 -123.153689972869</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Road Closure/Activation: 
GRANVILLE ST 500 - 800 Block
Location: 
Schedule: Sep 4, 2026 6:00 AM - Sep 8, 2026 12:30 AM</content>
<id>urn:uuid:6f525b47-130a-4c5d-8131-0b3c1424566b</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1dcb75d1-68ab-459e-bcce-f729e85b434b"/>
<published>2026-03-17T07:00:00Z</published>
<title>SE-2024-00447: 2026 TAIWANfest</title>
<updated>2026-03-17T22:37:20.8790164Z</updated>
<georss:line>49.280383755169964 -123.12132094090907 49.284776590139984 -123.11473904326077</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Activation:
Alexander St, 400-500 block

Jackson Ave, 00, 100, 200 blocks

Dunlevy Ave, 200 block

Powell Street, 400 block, north and south side event parking only

Cordova St, 400 block, north side, event parking only

Location: 
Schedule: Jul 30, 2026 6:00 AM - Aug 2, 2026 11:30 PM</content>
<id>urn:uuid:89883018-b4cb-4209-a1ba-a0df94215a43</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/213f7fc8-41d1-470a-9f3f-617e07b229bf"/>
<published>2026-04-02T07:00:00Z</published>
<title>SE-2025-00562: 50th Annual Powell Street Festival</title>
<updated>2026-06-05T21:46:00.9990996Z</updated>
<georss:line>49.28399965053754 -123.09523195047173 49.28394295051143 -123.09136103120551</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Activation:
Alexander St, 400-500 block

Jackson Ave, 00, 100, 200 blocks

Dunlevy Ave, 200 block

Powell Street, 400 block, north and south side event parking only

Cordova St, 400 block, north side, event parking only

Location: 
Schedule: Jul 30, 2026 6:00 AM - Aug 2, 2026 11:30 PM</content>
<id>urn:uuid:c20be462-647a-416c-8855-faf1dcb17ad4</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/213f7fc8-41d1-470a-9f3f-617e07b229bf"/>
<published>2026-04-02T07:00:00Z</published>
<title>SE-2025-00562: 50th Annual Powell Street Festival</title>
<updated>2026-06-05T21:46:00.9990996Z</updated>
<georss:line>49.28218330811407 -123.09343038123056 49.284805824778886 -123.0932750902266</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Activation:
Alexander St, 400-500 block

Jackson Ave, 00, 100, 200 blocks

Dunlevy Ave, 200 block

Powell Street, 400 block, north and south side event parking only

Cordova St, 400 block, north side, event parking only

Location: 
Schedule: Jul 30, 2026 6:00 AM - Aug 2, 2026 11:30 PM</content>
<id>urn:uuid:f530e7a2-2e8a-47ef-8836-0ccf6a5d79c6</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/213f7fc8-41d1-470a-9f3f-617e07b229bf"/>
<published>2026-04-02T07:00:00Z</published>
<title>SE-2025-00562: 50th Annual Powell Street Festival</title>
<updated>2026-06-05T21:46:00.9990996Z</updated>
<georss:line>49.28217185536556 -123.09346257094853 49.281310150390965 -123.09347908275622</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Activation:
Alexander St, 400-500 block

Jackson Ave, 00, 100, 200 blocks

Dunlevy Ave, 200 block

Powell Street, 400 block, north and south side event parking only

Cordova St, 400 block, north side, event parking only

Location: 
Schedule: Jul 30, 2026 6:00 AM - Aug 2, 2026 11:30 PM</content>
<id>urn:uuid:0a5838c4-4b3a-4dc3-8466-c992d7957364</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/213f7fc8-41d1-470a-9f3f-617e07b229bf"/>
<published>2026-04-02T07:00:00Z</published>
<title>SE-2025-00562: 50th Annual Powell Street Festival</title>
<updated>2026-06-05T21:46:00.9990996Z</updated>
<georss:polygon>49.28297969010407 -123.09519631075675 49.282333423371966 -123.09521282256446 49.28230110981298 -123.09362768902547 49.28297969010407 -123.09357815360238 49.28297969010407 -123.09519631075675</georss:polygon>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Activation:
Alexander St, 400-500 block

Jackson Ave, 00, 100, 200 blocks

Dunlevy Ave, 200 block

Powell Street, 400 block, north and south side event parking only

Cordova St, 400 block, north side, event parking only

Location: 
Schedule: Jul 30, 2026 6:00 AM - Aug 2, 2026 11:30 PM</content>
<id>urn:uuid:8fff9465-9cae-40bf-9eab-1f44716864a7</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/213f7fc8-41d1-470a-9f3f-617e07b229bf"/>
<published>2026-04-02T07:00:00Z</published>
<title>SE-2025-00562: 50th Annual Powell Street Festival</title>
<updated>2026-06-05T21:46:00.9990996Z</updated>
<georss:line>49.282224717860174 -123.09532013558689 49.282213945484386 -123.0946967472486</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Activation:
Alexander St, 400-500 block

Jackson Ave, 00, 100, 200 blocks

Dunlevy Ave, 200 block

Powell Street, 400 block, north and south side event parking only

Cordova St, 400 block, north side, event parking only

Location: 
Schedule: Jul 30, 2026 6:00 AM - Aug 2, 2026 11:30 PM</content>
<id>urn:uuid:5f7571fd-7bc1-494d-869c-2bbf590ec70a</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/213f7fc8-41d1-470a-9f3f-617e07b229bf"/>
<published>2026-04-02T07:00:00Z</published>
<title>SE-2025-00562: 50th Annual Powell Street Festival</title>
<updated>2026-06-05T21:46:00.9990996Z</updated>
<georss:line>49.28310804466918 -123.09528710839015 49.282232797140495 -123.09532839238608</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Activation:
Alexander St, 400-500 block

Jackson Ave, 00, 100, 200 blocks

Dunlevy Ave, 200 block

Powell Street, 400 block, north and south side event parking only

Cordova St, 400 block, north side, event parking only

Location: 
Schedule: Jul 30, 2026 6:00 AM - Aug 2, 2026 11:30 PM</content>
<id>urn:uuid:0f4c3585-7f1e-4e7c-b31a-af73f40fe4cd</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/213f7fc8-41d1-470a-9f3f-617e07b229bf"/>
<published>2026-04-02T07:00:00Z</published>
<title>SE-2025-00562: 50th Annual Powell Street Festival</title>
<updated>2026-06-05T21:46:00.9990996Z</updated>
<georss:line>49.28310500331014 -123.09528230478959 49.28306565086271 -123.09339361491293</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>
Activity: full closure of W Broadway from MacDonald to Blenheim and surrounding side streets
•	Activity contained to 2800 - 3200 W Broadway, MacDonald to Blenheim, and 2400 W 8th - 2500 W10th, along Trutch/Musqueamview, Balaclava, Carnarvon, Bayswater and Mackenzie - full road closure with VPD on hand to assist.
•	Additional parking restrictions on 2700 and 3300 W Broadway, Stephens and Waterloo, 2800-3200 W 10th, MacDonald to Blenheim (N/S) and W 8th MacDonald to Blenheim (S/S), 2300 &amp; 2600 W 7th to W 11th along Trutch/Musqueamview, Balaclava, Carnarvon, Bayswater and Mackenzie (W/S), 2800 Kitsilano Diversion (W/S)

Location: 
Schedule: Jun 28, 2026 5:00 AM - 11:30 PM</content>
<id>urn:uuid:21aebd31-5709-4c4c-b1ff-cc74f728f875</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e0f1148b-9f08-4bb7-9170-dc9e7aa7b509"/>
<published>2026-01-06T08:00:00Z</published>
<title>SE-2025-00607: Greek Day on Broadway</title>
<updated>2026-04-07T21:13:22.9073051Z</updated>
<georss:line>49.26413461102351 -123.17206179432556 49.263300042882776 -123.1720961267319</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>
Activity: full closure of W Broadway from MacDonald to Blenheim and surrounding side streets
•	Activity contained to 2800 - 3200 W Broadway, MacDonald to Blenheim, and 2400 W 8th - 2500 W10th, along Trutch/Musqueamview, Balaclava, Carnarvon, Bayswater and Mackenzie - full road closure with VPD on hand to assist.
•	Additional parking restrictions on 2700 and 3300 W Broadway, Stephens and Waterloo, 2800-3200 W 10th, MacDonald to Blenheim (N/S) and W 8th MacDonald to Blenheim (S/S), 2300 &amp; 2600 W 7th to W 11th along Trutch/Musqueamview, Balaclava, Carnarvon, Bayswater and Mackenzie (W/S), 2800 Kitsilano Diversion (W/S)

Location: 
Schedule: Jun 28, 2026 5:00 AM - 11:30 PM</content>
<id>urn:uuid:4c73d842-5f10-428b-9711-1eba53efa426</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e0f1148b-9f08-4bb7-9170-dc9e7aa7b509"/>
<published>2026-01-06T08:00:00Z</published>
<title>SE-2025-00607: Greek Day on Broadway</title>
<updated>2026-04-07T21:13:22.9073051Z</updated>
<georss:line>49.264864652755364 -123.16850195759622 49.26501127152696 -123.17770861914224</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>
Activity: full closure of W Broadway from MacDonald to Blenheim and surrounding side streets
•	Activity contained to 2800 - 3200 W Broadway, MacDonald to Blenheim, and 2400 W 8th - 2500 W10th, along Trutch/Musqueamview, Balaclava, Carnarvon, Bayswater and Mackenzie - full road closure with VPD on hand to assist.
•	Additional parking restrictions on 2700 and 3300 W Broadway, Stephens and Waterloo, 2800-3200 W 10th, MacDonald to Blenheim (N/S) and W 8th MacDonald to Blenheim (S/S), 2300 &amp; 2600 W 7th to W 11th along Trutch/Musqueamview, Balaclava, Carnarvon, Bayswater and Mackenzie (W/S), 2800 Kitsilano Diversion (W/S)

Location: 
Schedule: Jun 28, 2026 5:00 AM - 11:30 PM</content>
<id>urn:uuid:9cbdbd26-aa98-4815-ae78-82ac57565147</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e0f1148b-9f08-4bb7-9170-dc9e7aa7b509"/>
<published>2026-01-06T08:00:00Z</published>
<title>SE-2025-00607: Greek Day on Broadway</title>
<updated>2026-04-07T21:13:22.9073051Z</updated>
<georss:line>49.26412900981734 -123.17120348744079 49.264952361499496 -123.17120348744079</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>
Activity: full closure of W Broadway from MacDonald to Blenheim and surrounding side streets
•	Activity contained to 2800 - 3200 W Broadway, MacDonald to Blenheim, and 2400 W 8th - 2500 W10th, along Trutch/Musqueamview, Balaclava, Carnarvon, Bayswater and Mackenzie - full road closure with VPD on hand to assist.
•	Additional parking restrictions on 2700 and 3300 W Broadway, Stephens and Waterloo, 2800-3200 W 10th, MacDonald to Blenheim (N/S) and W 8th MacDonald to Blenheim (S/S), 2300 &amp; 2600 W 7th to W 11th along Trutch/Musqueamview, Balaclava, Carnarvon, Bayswater and Mackenzie (W/S), 2800 Kitsilano Diversion (W/S)

Location: 
Schedule: Jun 28, 2026 5:00 AM - 11:30 PM</content>
<id>urn:uuid:c5fd3296-9e38-4e87-bfe2-50104bd5a7f4</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e0f1148b-9f08-4bb7-9170-dc9e7aa7b509"/>
<published>2026-01-06T08:00:00Z</published>
<title>SE-2025-00607: Greek Day on Broadway</title>
<updated>2026-04-07T21:13:22.9073051Z</updated>
<georss:line>49.264053132587435 -123.16655468094262 49.26426597360168 -123.17982410655979</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>
Activity: full closure of W Broadway from MacDonald to Blenheim and surrounding side streets
•	Activity contained to 2800 - 3200 W Broadway, MacDonald to Blenheim, and 2400 W 8th - 2500 W10th, along Trutch/Musqueamview, Balaclava, Carnarvon, Bayswater and Mackenzie - full road closure with VPD on hand to assist.
•	Additional parking restrictions on 2700 and 3300 W Broadway, Stephens and Waterloo, 2800-3200 W 10th, MacDonald to Blenheim (N/S) and W 8th MacDonald to Blenheim (S/S), 2300 &amp; 2600 W 7th to W 11th along Trutch/Musqueamview, Balaclava, Carnarvon, Bayswater and Mackenzie (W/S), 2800 Kitsilano Diversion (W/S)

Location: 
Schedule: Jun 28, 2026 5:00 AM - 11:30 PM</content>
<id>urn:uuid:92773b70-3105-48dc-a598-ced5a094e4e9</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e0f1148b-9f08-4bb7-9170-dc9e7aa7b509"/>
<published>2026-01-06T08:00:00Z</published>
<title>SE-2025-00607: Greek Day on Broadway</title>
<updated>2026-04-07T21:13:22.9073051Z</updated>
<georss:line>49.265030775203485 -123.17588125996276 49.263361656082395 -123.17596709065123</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>
Activity: full closure of W Broadway from MacDonald to Blenheim and surrounding side streets
•	Activity contained to 2800 - 3200 W Broadway, MacDonald to Blenheim, and 2400 W 8th - 2500 W10th, along Trutch/Musqueamview, Balaclava, Carnarvon, Bayswater and Mackenzie - full road closure with VPD on hand to assist.
•	Additional parking restrictions on 2700 and 3300 W Broadway, Stephens and Waterloo, 2800-3200 W 10th, MacDonald to Blenheim (N/S) and W 8th MacDonald to Blenheim (S/S), 2300 &amp; 2600 W 7th to W 11th along Trutch/Musqueamview, Balaclava, Carnarvon, Bayswater and Mackenzie (W/S), 2800 Kitsilano Diversion (W/S)

Location: 
Schedule: Jun 28, 2026 5:00 AM - 11:30 PM</content>
<id>urn:uuid:9d590e90-0127-48b5-bd97-bd3a6c0c91fd</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e0f1148b-9f08-4bb7-9170-dc9e7aa7b509"/>
<published>2026-01-06T08:00:00Z</published>
<title>SE-2025-00607: Greek Day on Broadway</title>
<updated>2026-04-07T21:13:22.9073051Z</updated>
<georss:line>49.26499716942192 -123.1739672353478 49.26333365024749 -123.17402731722262</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>
Activity: full closure of W Broadway from MacDonald to Blenheim and surrounding side streets
•	Activity contained to 2800 - 3200 W Broadway, MacDonald to Blenheim, and 2400 W 8th - 2500 W10th, along Trutch/Musqueamview, Balaclava, Carnarvon, Bayswater and Mackenzie - full road closure with VPD on hand to assist.
•	Additional parking restrictions on 2700 and 3300 W Broadway, Stephens and Waterloo, 2800-3200 W 10th, MacDonald to Blenheim (N/S) and W 8th MacDonald to Blenheim (S/S), 2300 &amp; 2600 W 7th to W 11th along Trutch/Musqueamview, Balaclava, Carnarvon, Bayswater and Mackenzie (W/S), 2800 Kitsilano Diversion (W/S)

Location: 
Schedule: Jun 28, 2026 5:00 AM - 11:30 PM</content>
<id>urn:uuid:cb1de556-f9a8-44b0-857c-9619ae1d9b1f</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e0f1148b-9f08-4bb7-9170-dc9e7aa7b509"/>
<published>2026-01-06T08:00:00Z</published>
<title>SE-2025-00607: Greek Day on Broadway</title>
<updated>2026-04-07T21:13:22.9073051Z</updated>
<georss:line>49.26585813906962 -123.17596866364713 49.26514410266492 -123.17595532592448</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>
Activity: full closure of W Broadway from MacDonald to Blenheim and surrounding side streets
•	Activity contained to 2800 - 3200 W Broadway, MacDonald to Blenheim, and 2400 W 8th - 2500 W10th, along Trutch/Musqueamview, Balaclava, Carnarvon, Bayswater and Mackenzie - full road closure with VPD on hand to assist.
•	Additional parking restrictions on 2700 and 3300 W Broadway, Stephens and Waterloo, 2800-3200 W 10th, MacDonald to Blenheim (N/S) and W 8th MacDonald to Blenheim (S/S), 2300 &amp; 2600 W 7th to W 11th along Trutch/Musqueamview, Balaclava, Carnarvon, Bayswater and Mackenzie (W/S), 2800 Kitsilano Diversion (W/S)

Location: 
Schedule: Jun 28, 2026 5:00 AM - 11:30 PM</content>
<id>urn:uuid:25e35675-8f19-4262-a51a-75b98be7ddce</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e0f1148b-9f08-4bb7-9170-dc9e7aa7b509"/>
<published>2026-01-06T08:00:00Z</published>
<title>SE-2025-00607: Greek Day on Broadway</title>
<updated>2026-04-07T21:13:22.9073051Z</updated>
<georss:line>49.26582330846742 -123.1739815370287 49.265135395050095 -123.17403488140734</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>
Activity: full closure of W Broadway from MacDonald to Blenheim and surrounding side streets
•	Activity contained to 2800 - 3200 W Broadway, MacDonald to Blenheim, and 2400 W 8th - 2500 W10th, along Trutch/Musqueamview, Balaclava, Carnarvon, Bayswater and Mackenzie - full road closure with VPD on hand to assist.
•	Additional parking restrictions on 2700 and 3300 W Broadway, Stephens and Waterloo, 2800-3200 W 10th, MacDonald to Blenheim (N/S) and W 8th MacDonald to Blenheim (S/S), 2300 &amp; 2600 W 7th to W 11th along Trutch/Musqueamview, Balaclava, Carnarvon, Bayswater and Mackenzie (W/S), 2800 Kitsilano Diversion (W/S)

Location: 
Schedule: Jun 28, 2026 5:00 AM - 11:30 PM</content>
<id>urn:uuid:be4ec851-45d2-428b-af47-f6ba968590f1</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e0f1148b-9f08-4bb7-9170-dc9e7aa7b509"/>
<published>2026-01-06T08:00:00Z</published>
<title>SE-2025-00607: Greek Day on Broadway</title>
<updated>2026-04-07T21:13:22.9073051Z</updated>
<georss:line>49.265762354695 -123.17124757087583 49.26510056372513 -123.17130091655685</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>
Activity: full closure of W Broadway from MacDonald to Blenheim and surrounding side streets
•	Activity contained to 2800 - 3200 W Broadway, MacDonald to Blenheim, and 2400 W 8th - 2500 W10th, along Trutch/Musqueamview, Balaclava, Carnarvon, Bayswater and Mackenzie - full road closure with VPD on hand to assist.
•	Additional parking restrictions on 2700 and 3300 W Broadway, Stephens and Waterloo, 2800-3200 W 10th, MacDonald to Blenheim (N/S) and W 8th MacDonald to Blenheim (S/S), 2300 &amp; 2600 W 7th to W 11th along Trutch/Musqueamview, Balaclava, Carnarvon, Bayswater and Mackenzie (W/S), 2800 Kitsilano Diversion (W/S)

Location: 
Schedule: Jun 28, 2026 5:00 AM - 11:30 PM</content>
<id>urn:uuid:0cdda364-df75-4b0c-8770-a75ab5f33c30</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e0f1148b-9f08-4bb7-9170-dc9e7aa7b509"/>
<published>2026-01-06T08:00:00Z</published>
<title>SE-2025-00607: Greek Day on Broadway</title>
<updated>2026-04-07T21:13:22.9073051Z</updated>
<georss:line>49.26328409168099 -123.17602205870827 49.26242590474132 -123.17604083427965</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>
Activity: full closure of W Broadway from MacDonald to Blenheim and surrounding side streets
•	Activity contained to 2800 - 3200 W Broadway, MacDonald to Blenheim, and 2400 W 8th - 2500 W10th, along Trutch/Musqueamview, Balaclava, Carnarvon, Bayswater and Mackenzie - full road closure with VPD on hand to assist.
•	Additional parking restrictions on 2700 and 3300 W Broadway, Stephens and Waterloo, 2800-3200 W 10th, MacDonald to Blenheim (N/S) and W 8th MacDonald to Blenheim (S/S), 2300 &amp; 2600 W 7th to W 11th along Trutch/Musqueamview, Balaclava, Carnarvon, Bayswater and Mackenzie (W/S), 2800 Kitsilano Diversion (W/S)

Location: 
Schedule: Jun 28, 2026 5:00 AM - 11:30 PM</content>
<id>urn:uuid:06f8431f-9b22-4b67-9e4c-88c4460cd953</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e0f1148b-9f08-4bb7-9170-dc9e7aa7b509"/>
<published>2026-01-06T08:00:00Z</published>
<title>SE-2025-00607: Greek Day on Broadway</title>
<updated>2026-04-07T21:13:22.9073051Z</updated>
<georss:line>49.263255485593675 -123.17408191633287 49.26240138499776 -123.17410695042803</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>
Activity: full closure of W Broadway from MacDonald to Blenheim and surrounding side streets
•	Activity contained to 2800 - 3200 W Broadway, MacDonald to Blenheim, and 2400 W 8th - 2500 W10th, along Trutch/Musqueamview, Balaclava, Carnarvon, Bayswater and Mackenzie - full road closure with VPD on hand to assist.
•	Additional parking restrictions on 2700 and 3300 W Broadway, Stephens and Waterloo, 2800-3200 W 10th, MacDonald to Blenheim (N/S) and W 8th MacDonald to Blenheim (S/S), 2300 &amp; 2600 W 7th to W 11th along Trutch/Musqueamview, Balaclava, Carnarvon, Bayswater and Mackenzie (W/S), 2800 Kitsilano Diversion (W/S)

Location: 
Schedule: Jun 28, 2026 5:00 AM - 11:30 PM</content>
<id>urn:uuid:778034f2-cc19-47bb-b6f8-5b84eddc123b</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e0f1148b-9f08-4bb7-9170-dc9e7aa7b509"/>
<published>2026-01-06T08:00:00Z</published>
<title>SE-2025-00607: Greek Day on Broadway</title>
<updated>2026-04-07T21:13:22.9073051Z</updated>
<georss:line>49.263231116810545 -123.1721380190319 49.26237277829898 -123.17216054983447</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>
Activity: full closure of W Broadway from MacDonald to Blenheim and surrounding side streets
•	Activity contained to 2800 - 3200 W Broadway, MacDonald to Blenheim, and 2400 W 8th - 2500 W10th, along Trutch/Musqueamview, Balaclava, Carnarvon, Bayswater and Mackenzie - full road closure with VPD on hand to assist.
•	Additional parking restrictions on 2700 and 3300 W Broadway, Stephens and Waterloo, 2800-3200 W 10th, MacDonald to Blenheim (N/S) and W 8th MacDonald to Blenheim (S/S), 2300 &amp; 2600 W 7th to W 11th along Trutch/Musqueamview, Balaclava, Carnarvon, Bayswater and Mackenzie (W/S), 2800 Kitsilano Diversion (W/S)

Location: 
Schedule: Jun 28, 2026 5:00 AM - 11:30 PM</content>
<id>urn:uuid:93d9dd74-1077-4f01-9786-74bb1341f009</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e0f1148b-9f08-4bb7-9170-dc9e7aa7b509"/>
<published>2026-01-06T08:00:00Z</published>
<title>SE-2025-00607: Greek Day on Broadway</title>
<updated>2026-04-07T21:13:22.9073051Z</updated>
<georss:line>49.26321009202198 -123.1702114036253 49.26234000680512 -123.17023043948294</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>
Activity: full closure of W Broadway from MacDonald to Blenheim and surrounding side streets
•	Activity contained to 2800 - 3200 W Broadway, MacDonald to Blenheim, and 2400 W 8th - 2500 W10th, along Trutch/Musqueamview, Balaclava, Carnarvon, Bayswater and Mackenzie - full road closure with VPD on hand to assist.
•	Additional parking restrictions on 2700 and 3300 W Broadway, Stephens and Waterloo, 2800-3200 W 10th, MacDonald to Blenheim (N/S) and W 8th MacDonald to Blenheim (S/S), 2300 &amp; 2600 W 7th to W 11th along Trutch/Musqueamview, Balaclava, Carnarvon, Bayswater and Mackenzie (W/S), 2800 Kitsilano Diversion (W/S)

Location: 
Schedule: Jun 28, 2026 5:00 AM - 11:30 PM</content>
<id>urn:uuid:cf37755b-7b88-47e9-8a54-5f27410457ed</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e0f1148b-9f08-4bb7-9170-dc9e7aa7b509"/>
<published>2026-01-06T08:00:00Z</published>
<title>SE-2025-00607: Greek Day on Broadway</title>
<updated>2026-04-07T21:13:22.9073051Z</updated>
<georss:line>49.263278723352784 -123.16830846831878 49.263419015380634 -123.17778360057412</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>
Activity: full closure of W Broadway from MacDonald to Blenheim and surrounding side streets
•	Activity contained to 2800 - 3200 W Broadway, MacDonald to Blenheim, and 2400 W 8th - 2500 W10th, along Trutch/Musqueamview, Balaclava, Carnarvon, Bayswater and Mackenzie - full road closure with VPD on hand to assist.
•	Additional parking restrictions on 2700 and 3300 W Broadway, Stephens and Waterloo, 2800-3200 W 10th, MacDonald to Blenheim (N/S) and W 8th MacDonald to Blenheim (S/S), 2300 &amp; 2600 W 7th to W 11th along Trutch/Musqueamview, Balaclava, Carnarvon, Bayswater and Mackenzie (W/S), 2800 Kitsilano Diversion (W/S)

Location: 
Schedule: Jun 28, 2026 5:00 AM - 11:30 PM</content>
<id>urn:uuid:7c241d74-7d3f-46ff-b434-ab465b15d7a7</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e0f1148b-9f08-4bb7-9170-dc9e7aa7b509"/>
<published>2026-01-06T08:00:00Z</published>
<title>SE-2025-00607: Greek Day on Broadway</title>
<updated>2026-04-07T21:13:22.9073051Z</updated>
<georss:line>49.26319028981334 -123.16958918928394 49.26313952433253 -123.16942258974221 49.26301261031338 -123.16917269042962 49.262363531284706 -123.16831192667291</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>
Activity: full closure of W Broadway from MacDonald to Blenheim and surrounding side streets
•	Activity contained to 2800 - 3200 W Broadway, MacDonald to Blenheim, and 2400 W 8th - 2500 W10th, along Trutch/Musqueamview, Balaclava, Carnarvon, Bayswater and Mackenzie - full road closure with VPD on hand to assist.
•	Additional parking restrictions on 2700 and 3300 W Broadway, Stephens and Waterloo, 2800-3200 W 10th, MacDonald to Blenheim (N/S) and W 8th MacDonald to Blenheim (S/S), 2300 &amp; 2600 W 7th to W 11th along Trutch/Musqueamview, Balaclava, Carnarvon, Bayswater and Mackenzie (W/S), 2800 Kitsilano Diversion (W/S)

Location: 
Schedule: Jun 28, 2026 5:00 AM - 11:30 PM</content>
<id>urn:uuid:8ee5699c-4f4f-48b5-a920-012950268634</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e0f1148b-9f08-4bb7-9170-dc9e7aa7b509"/>
<published>2026-01-06T08:00:00Z</published>
<title>SE-2025-00607: Greek Day on Broadway</title>
<updated>2026-04-07T21:13:22.9073051Z</updated>
<georss:line>49.26408420121339 -123.17009627142848 49.26328323983276 -123.17013918677273</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Activation:
2800-3200 Block W Broadway
2800-3200 Block W 8th AV
2800-3200 Block W 10th AV

2300-2600 Block Mackenzie ST
2300-2600 Block Bayswater ST
2300-2600 Block Carnarvon ST
2300-2600 Block Balaclava ST
2300-2600 Block Musqueamview ST



Location: 
Schedule: Jun 28, 2026 5:00 AM - 11:30 PM</content>
<id>urn:uuid:a0930c4d-0a38-4025-993d-d2cd88618058</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/dfc2237e-4e3e-4f20-ab5c-1210c29de896"/>
<published>2026-04-17T07:00:00Z</published>
<title>SE-2025-00607: Greek Day on Broadway - 2026</title>
<updated>2026-04-17T21:18:06.8627855Z</updated>
<georss:line>49.26584309356815 -123.17111730861909 49.2641302200762 -123.17115427827778</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Activation:
2800-3200 Block W Broadway
2800-3200 Block W 8th AV
2800-3200 Block W 10th AV

2300-2600 Block Mackenzie ST
2300-2600 Block Bayswater ST
2300-2600 Block Carnarvon ST
2300-2600 Block Balaclava ST
2300-2600 Block Musqueamview ST



Location: 
Schedule: Jun 28, 2026 5:00 AM - 11:30 PM</content>
<id>urn:uuid:b20bb66b-3f26-452d-b120-8e022dd8dd17</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/dfc2237e-4e3e-4f20-ab5c-1210c29de896"/>
<published>2026-04-17T07:00:00Z</published>
<title>SE-2025-00607: Greek Day on Broadway - 2026</title>
<updated>2026-04-17T21:18:06.8627855Z</updated>
<georss:line>49.26409016798934 -123.17014431730624 49.262318712591366 -123.17016217599016</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Activation:
2800-3200 Block W Broadway
2800-3200 Block W 8th AV
2800-3200 Block W 10th AV

2300-2600 Block Mackenzie ST
2300-2600 Block Bayswater ST
2300-2600 Block Carnarvon ST
2300-2600 Block Balaclava ST
2300-2600 Block Musqueamview ST



Location: 
Schedule: Jun 28, 2026 5:00 AM - 11:30 PM</content>
<id>urn:uuid:a016cb90-1f91-411a-8f72-f7a4ad9c5718</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/dfc2237e-4e3e-4f20-ab5c-1210c29de896"/>
<published>2026-04-17T07:00:00Z</published>
<title>SE-2025-00607: Greek Day on Broadway - 2026</title>
<updated>2026-04-17T21:18:06.8627855Z</updated>
<georss:line>49.2627401813576 -123.16873659838464 49.26299370926685 -123.16907031233268 49.263000550750974 -123.16907910467052 49.26301000441674 -123.16909160319598 49.26301931377631 -123.16910436237798 49.26302846985453 -123.16911736844136 49.26303748164648 -123.16913062141693 49.263046340177 -123.16914410752945 49.26305504544604 -123.16915782677901 49.26306358845832 -123.16917177913483 49.26307196923395 -123.16918595085251 49.263080187772744 -123.16920034193195 49.263088244054586 -123.16921496611762 49.2630961291446 -123.16922978214542 49.263103851997585 -123.16924481753492 49.26311139464329 -123.1692600584801 49.2631187570816 -123.16927550498089 49.26312594834786 -123.16929112957914 49.26313295942677 -123.16930694598842 49.26313979031818 -123.16932295420867 49.26314643204705 -123.16933914046456 49.26315289360841 -123.1693555047867 49.26315916602721 -123.16937203339982 49.26316524930334 -123.16938872630377 49.26317113446177 -123.16940556972327 49.26317683047742 -123.16942257743325 49.26318233737038 -123.16943973568928 49.263187637150224 -123.16945704442952 49.26319274782742 -123.16947448997101 49.26319765143168 -123.16949205850753 49.263202356937995 -123.16950976381412 49.26320686438666 -123.16952757840171 49.263211155746916 -123.16954552969743 49.26321524906956 -123.16956357652934 49.26321913531896 -123.16958174635532 49.263222814555746 -123.16959999794184 49.26322456400953 -123.16960926774455</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Activation:
2800-3200 Block W Broadway
2800-3200 Block W 8th AV
2800-3200 Block W 10th AV

2300-2600 Block Mackenzie ST
2300-2600 Block Bayswater ST
2300-2600 Block Carnarvon ST
2300-2600 Block Balaclava ST
2300-2600 Block Musqueamview ST



Location: 
Schedule: Jun 28, 2026 5:00 AM - 11:30 PM</content>
<id>urn:uuid:821bdac9-0e72-40c0-bbbc-2a2aaa281258</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/dfc2237e-4e3e-4f20-ab5c-1210c29de896"/>
<published>2026-04-17T07:00:00Z</published>
<title>SE-2025-00607: Greek Day on Broadway - 2026</title>
<updated>2026-04-17T21:18:06.8627855Z</updated>
<georss:line>49.262278380775456 -123.16812876462032 49.2627401813576 -123.16873659838464</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Activation:
2800-3200 Block W Broadway
2800-3200 Block W 8th AV
2800-3200 Block W 10th AV

2300-2600 Block Mackenzie ST
2300-2600 Block Bayswater ST
2300-2600 Block Carnarvon ST
2300-2600 Block Balaclava ST
2300-2600 Block Musqueamview ST



Location: 
Schedule: Jun 28, 2026 5:00 AM - 11:30 PM</content>
<id>urn:uuid:6640ef2e-d9bf-4d96-b511-9e23baa3696a</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/dfc2237e-4e3e-4f20-ab5c-1210c29de896"/>
<published>2026-04-17T07:00:00Z</published>
<title>SE-2025-00607: Greek Day on Broadway - 2026</title>
<updated>2026-04-17T21:18:06.8627855Z</updated>
<georss:line>49.26320253403745 -123.16820007050042 49.26234876929138 -123.16821398826244</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Activation:
2800-3200 Block W Broadway
2800-3200 Block W 8th AV
2800-3200 Block W 10th AV

2300-2600 Block Mackenzie ST
2300-2600 Block Bayswater ST
2300-2600 Block Carnarvon ST
2300-2600 Block Balaclava ST
2300-2600 Block Musqueamview ST



Location: 
Schedule: Jun 28, 2026 5:00 AM - 11:30 PM</content>
<id>urn:uuid:aed37413-239f-4887-873e-b8880eea1c5a</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/dfc2237e-4e3e-4f20-ab5c-1210c29de896"/>
<published>2026-04-17T07:00:00Z</published>
<title>SE-2025-00607: Greek Day on Broadway - 2026</title>
<updated>2026-04-17T21:18:06.8627855Z</updated>
<georss:line>49.26410739631453 -123.16803072316903 49.264232342564554 -123.17793231613385</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Activation:
2800-3200 Block W Broadway
2800-3200 Block W 8th AV
2800-3200 Block W 10th AV

2300-2600 Block Mackenzie ST
2300-2600 Block Bayswater ST
2300-2600 Block Carnarvon ST
2300-2600 Block Balaclava ST
2300-2600 Block Musqueamview ST



Location: 
Schedule: Jun 28, 2026 5:00 AM - 11:30 PM</content>
<id>urn:uuid:85924f1d-fee8-447c-8b4e-555e7cdb02c2</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/dfc2237e-4e3e-4f20-ab5c-1210c29de896"/>
<published>2026-04-17T07:00:00Z</published>
<title>SE-2025-00607: Greek Day on Broadway - 2026</title>
<updated>2026-04-17T21:18:06.8627855Z</updated>
<georss:line>49.26332201264157 -123.16815973592321 49.26349089290099 -123.17779033201411</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Activation:
2800-3200 Block W Broadway
2800-3200 Block W 8th AV
2800-3200 Block W 10th AV

2300-2600 Block Mackenzie ST
2300-2600 Block Bayswater ST
2300-2600 Block Carnarvon ST
2300-2600 Block Balaclava ST
2300-2600 Block Musqueamview ST



Location: 
Schedule: Jun 28, 2026 5:00 AM - 11:30 PM</content>
<id>urn:uuid:629cc5e3-4a93-4ba7-bbcb-4a6d4ffd91d2</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/dfc2237e-4e3e-4f20-ab5c-1210c29de896"/>
<published>2026-04-17T07:00:00Z</published>
<title>SE-2025-00607: Greek Day on Broadway - 2026</title>
<updated>2026-04-17T21:18:06.8627855Z</updated>
<georss:line>49.26505903913787 -123.17773487752609 49.264914289265334 -123.16843700836347</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Activation:
2800-3200 Block W Broadway
2800-3200 Block W 8th AV
2800-3200 Block W 10th AV

2300-2600 Block Mackenzie ST
2300-2600 Block Bayswater ST
2300-2600 Block Carnarvon ST
2300-2600 Block Balaclava ST
2300-2600 Block Musqueamview ST



Location: 
Schedule: Jun 28, 2026 5:00 AM - 11:30 PM</content>
<id>urn:uuid:76507b8f-1b17-4e3c-86fc-c9c48a056169</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/dfc2237e-4e3e-4f20-ab5c-1210c29de896"/>
<published>2026-04-17T07:00:00Z</published>
<title>SE-2025-00607: Greek Day on Broadway - 2026</title>
<updated>2026-04-17T21:18:06.8627855Z</updated>
<georss:line>49.26595165396887 -123.17584942493247 49.262417287124094 -123.17597881873792</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Activation:
2800-3200 Block W Broadway
2800-3200 Block W 8th AV
2800-3200 Block W 10th AV

2300-2600 Block Mackenzie ST
2300-2600 Block Bayswater ST
2300-2600 Block Carnarvon ST
2300-2600 Block Balaclava ST
2300-2600 Block Musqueamview ST



Location: 
Schedule: Jun 28, 2026 5:00 AM - 11:30 PM</content>
<id>urn:uuid:dd63876d-d7e0-4d38-b7d0-ba0940f36a93</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/dfc2237e-4e3e-4f20-ab5c-1210c29de896"/>
<published>2026-04-17T07:00:00Z</published>
<title>SE-2025-00607: Greek Day on Broadway - 2026</title>
<updated>2026-04-17T21:18:06.8627855Z</updated>
<georss:line>49.26590340493138 -123.17392700268016 49.262405224005136 -123.1740194268269</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Activation:
2800-3200 Block W Broadway
2800-3200 Block W 8th AV
2800-3200 Block W 10th AV

2300-2600 Block Mackenzie ST
2300-2600 Block Bayswater ST
2300-2600 Block Carnarvon ST
2300-2600 Block Balaclava ST
2300-2600 Block Musqueamview ST



Location: 
Schedule: Jun 28, 2026 5:00 AM - 11:30 PM</content>
<id>urn:uuid:de7498da-a017-46c9-94aa-34574f2b3dad</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/dfc2237e-4e3e-4f20-ab5c-1210c29de896"/>
<published>2026-04-17T07:00:00Z</published>
<title>SE-2025-00607: Greek Day on Broadway - 2026</title>
<updated>2026-04-17T21:18:06.8627855Z</updated>
<georss:line>49.2641174620496 -123.17208114042751 49.262358458669354 -123.17211584567282</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Watermelon Foundation planning on hosting a block party on Commercial street where they are located for the families and children currently attending their programs. We also hope to welcome any
neighbors or business in the community.
Location: 
Schedule: Jul 11, 2026 8:00 AM - 7:00 PM</content>
<id>urn:uuid:4536b0ce-e4b3-41a7-8690-ebc4f1d7c167</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/5745d554-a35c-4a17-9158-0abc3d056b00"/>
<published>2026-01-09T08:00:00Z</published>
<title>SE-2025-00686: Watermelon Foundation Block Party</title>
<updated>2026-01-10T00:21:01.8634471Z</updated>
<georss:line>49.25427549366424 -123.0679805704855 49.252482541930874 -123.06805168798259</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Activation:
300 Block E 11th Av
Location: Activation:
300 Block E 11th Av
Schedule: Sep 19, 2026 10:00 AM - 6:00 PM</content>
<id>urn:uuid:d757463b-1ebc-4253-a519-f753a8b9edaa</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/72ebefac-1635-4f9f-b931-7a8809100621"/>
<published>2026-03-25T07:00:00Z</published>
<title>SE-2025-00714: 11th &amp; Kingsway Block Party</title>
<updated>2026-03-25T21:16:54.7662345Z</updated>
<georss:line>49.26108467519376 -123.0977811014925 49.26106884637662 -123.09682062279073</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Outdoor Family Music Festival with three day stages, an evening mainstage, artisans, food vendors and alcohol service.


a robust parking mitigation plan in this area to assist the residents during the festival.
Location: Jericho Park 
Schedule: Jul 7, 2026 8:30 AM - Jul 24, 2026 5:30 PM</content>
<id>urn:uuid:e384cb9e-575b-4261-b181-dafb92cecb8e</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/55b51367-73c2-4275-a04b-490a925ff132"/>
<published>2026-03-05T08:00:00Z</published>
<title>SE-2026-00063: Vancouver Folk Music Festival</title>
<updated>2026-05-14T14:24:40.7176195Z</updated>
<georss:line>49.270922029925146 -123.19182410140093 49.27152543214572 -123.18958267577311 49.27223109656629 -123.18752934180635 49.26872312887363 -123.18759203902673 49.26883563316679 -123.1934855777404</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Outdoor Family Music Festival with three day stages, an evening mainstage, artisans, food vendors and alcohol service.


a robust parking mitigation plan in this area to assist the residents during the festival.
Location: Jericho Park 
Schedule: Jul 7, 2026 8:30 AM - Jul 24, 2026 5:30 PM</content>
<id>urn:uuid:75f8b708-1991-46a8-b508-00763eda3ddd</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/55b51367-73c2-4275-a04b-490a925ff132"/>
<published>2026-03-05T08:00:00Z</published>
<title>SE-2026-00063: Vancouver Folk Music Festival</title>
<updated>2026-05-14T14:24:40.7176195Z</updated>
<georss:line>49.27127998128549 -123.20865830506715 49.271208391221194 -123.20281178926874</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Outdoor Family Music Festival with three day stages, an evening mainstage, artisans, food vendors and alcohol service.


a robust parking mitigation plan in this area to assist the residents during the festival.
Location: Jericho Park 
Schedule: Jul 7, 2026 8:30 AM - Jul 24, 2026 5:30 PM</content>
<id>urn:uuid:d524ce67-bf40-4bd4-a5d1-aecb14ebe52e</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/55b51367-73c2-4275-a04b-490a925ff132"/>
<published>2026-03-05T08:00:00Z</published>
<title>SE-2026-00063: Vancouver Folk Music Festival</title>
<updated>2026-05-14T14:24:40.7176195Z</updated>
<georss:line>49.27010384563428 -123.20718492038873 49.27006293606354 -123.20293718370945</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Outdoor Family Music Festival with three day stages, an evening mainstage, artisans, food vendors and alcohol service.


a robust parking mitigation plan in this area to assist the residents during the festival.
Location: Jericho Park 
Schedule: Jul 7, 2026 8:30 AM - Jul 24, 2026 5:30 PM</content>
<id>urn:uuid:37fb9758-d1fe-4133-8bd8-cf1996dd22ac</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/55b51367-73c2-4275-a04b-490a925ff132"/>
<published>2026-03-05T08:00:00Z</published>
<title>SE-2026-00063: Vancouver Folk Music Festival</title>
<updated>2026-05-14T14:24:40.7176195Z</updated>
<georss:line>49.269981116820276 -123.20519428364234 49.26945951595468 -123.20519428364234 49.269203827241626 -123.20488079754055 49.26880495020322 -123.20334471564178 49.26880495020322 -123.20292150940438</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Outdoor Family Music Festival with three day stages, an evening mainstage, artisans, food vendors and alcohol service.


a robust parking mitigation plan in this area to assist the residents during the festival.
Location: Jericho Park 
Schedule: Jul 7, 2026 8:30 AM - Jul 24, 2026 5:30 PM</content>
<id>urn:uuid:42f71900-d2fc-42da-af93-a1781cbc8ac1</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/55b51367-73c2-4275-a04b-490a925ff132"/>
<published>2026-03-05T08:00:00Z</published>
<title>SE-2026-00063: Vancouver Folk Music Festival</title>
<updated>2026-05-14T14:24:40.7176195Z</updated>
<georss:line>49.27113680105302 -123.20279611496365 49.26884586081712 -123.20287448648908</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>1/2 220 Block of Princess, North of alley to Powell ST
Location: 
Schedule: Sep 22, 2026 11:30 AM - 5:30 PM</content>
<id>urn:uuid:8ca73f58-ce7e-4093-89f9-b6cecb5b4c80</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/c5f64057-e3a4-425d-916b-6873bb52602e"/>
<published>2026-03-31T07:00:00Z</published>
<title>SE-2026-00118: Men's Wellness Fair</title>
<updated>2026-03-31T17:29:44.7808967Z</updated>
<georss:line>49.28305169191097 -123.09142349515812 49.282601378650554 -123.09143560603108</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Taiko drum and traditional dance performed to remember ancestors and departed ones.
Dancing on the street between Cordova Street and Jackson Avenue in front of Vancouver Buddhist Temple 220 Jackson Avenue
Location: 
Schedule: Jul 12, 2026 9:00 AM - 7:00 PM</content>
<id>urn:uuid:92718d22-bc95-4c58-b6ad-9eece316f9d6</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/f4a860ba-3728-4633-b939-d78366ad83a8"/>
<published>2026-03-12T07:00:00Z</published>
<title>SE-2026-00131: Obon Festival</title>
<updated>2026-03-12T17:30:54.2858716Z</updated>
<georss:line>49.283067660343534 -123.09336857681689 49.282197455729204 -123.09339822122129</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Closure/Activation:
100 Block E 6TH AVENUE

City Centre Artist Lodge (2111 Main St. Vancouver, BC V5T 3C6).

Street Closure Sep 12, 2026: East 6th Ave, between Main St and the East side of the parking lot entrance at 123 E 6th.
Location: 
Schedule: Sep 11, 2026 9:00 AM - Sep 12, 2026 11:00 PM</content>
<id>urn:uuid:dddaa14b-f8f4-4bf9-af94-d9abf4723486</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/6e03ceb6-6f58-473e-a2f0-31e96a4bbbcb"/>
<published>2026-03-19T07:00:00Z</published>
<title>SE-2026-00153: Picklefest YVR</title>
<updated>2026-03-19T17:03:24.6128001Z</updated>
<georss:line>49.265556574061065 -123.10279644866037 49.26551130620908 -123.10088491312058</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Activation:
400 Block Abbott ST
Location: 
Schedule: Aug 14, 2026 9:00 AM - 4:00 PM</content>
<id>urn:uuid:d5482183-dee3-4498-854f-0db0a5902fa1</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/c5ae57ad-e8f9-438c-83d7-6bf614240d85"/>
<published>2026-05-22T07:00:00Z</published>
<title>SE-2026-00165: Lunch Meet Friday - Abbott</title>
<updated>2026-05-22T21:47:39.1060983Z</updated>
<georss:line>49.2820079333095 -123.107206135622 49.28110430717729 -123.10755647858281</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>300 block of Carrall Street
Hastings to south
laneway to north
Location: 
Schedule: Aug 28, 2026 9:00 AM - 4:00 PM</content>
<id>urn:uuid:51448bd4-6664-4184-a72c-bba95b4e3dca</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a7c23483-046b-4308-94c9-f728a24fc83a"/>
<published>2026-05-08T07:00:00Z</published>
<title>SE-2026-00184: Lunch Meet Friday - Carrall</title>
<updated>2026-05-08T23:22:59.9245449Z</updated>
<georss:line>49.28200126751588 -123.10433404199554 49.28148776406317 -123.10434569751705</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Activation:
300 Block Carrall
Location: 
Schedule: Aug 28, 2026 9:00 AM - 4:00 PM</content>
<id>urn:uuid:e4693e8d-aa3a-48fa-811c-2e6809324a52</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/f050b1a7-fb0b-45c5-b859-f56e3c3a4c0d"/>
<published>2026-05-22T07:00:00Z</published>
<title>SE-2026-00184: Lunch Meet Friday - Carrall</title>
<updated>2026-05-22T21:53:24.1931499Z</updated>
<georss:line>49.281999500347894 -123.10432712496784 49.281476196092115 -123.10433736576209</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Carrall Alley from Water ST to the North alley, between The Local and Monarca. 
Location: 
Schedule: Jul 3, 2026 6:00 AM - 11:30 PM</content>
<id>urn:uuid:78a94a41-900e-426a-aa54-7d4788794aff</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/fb24fc1b-1897-4387-8a53-8139f9d10730"/>
<published>2026-05-06T07:00:00Z</published>
<title>SE-2026-00289: Public Outdoor Soccer Viewing Event</title>
<updated>2026-05-06T23:30:44.989184Z</updated>
<georss:line>49.283981295300975 -123.10425431577914 49.283505392919295 -123.10426504461522</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Activation:
400 Abbott ST
Location: 
Schedule: Sep 11, 2026 9:00 AM - 4:00 PM</content>
<id>urn:uuid:83dcea2c-5914-4b7e-a013-07b576471870</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/75ca64cc-b6d2-46df-8bef-369fc2d1b051"/>
<published>2026-05-26T07:00:00Z</published>
<title>SE-2026-00380: Lunch Meet Friday - Abbott</title>
<updated>2026-05-26T22:17:02.8868792Z</updated>
<georss:line>49.28197549597374 -123.10719111912194 49.28137009473062 -123.10743251793329</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Activation:
300 Block Hawks AV
Location: 
Schedule: Jul 30, 2026 9:00 AM - 5:00 PM</content>
<id>urn:uuid:7d9e151f-72e5-472c-97c6-94f4978f9782</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/428e02dc-d6ce-45a9-8092-88416afa4b5f"/>
<published>2026-06-03T07:00:00Z</published>
<title>SE-2026-00396: V6A Annual Block Party</title>
<updated>2026-06-03T23:38:23.3144925Z</updated>
<georss:line>49.28202843474122 -123.0871064198738 49.28114590549458 -123.08716031879085</georss:line>
</entry>
<entry>
<category term="Road Closure"/>
<content>Lord Selkirk Elementary Year-Round-School-Street. Full closure of 1700 E 22nd Av from September 3, 2025 to June 25, 2026, all school days
Times: 8:40-9:10AM, 2:45-3:30PM

Location: E 22nd Ave from Welwyn to Commercial St
Schedule: Sep 3, 2025 - Jun 25, 2026</content>
<id>urn:uuid:52eacd17-785c-4869-8875-69cebf4e3f7d</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/9bcb9dfb-2439-43f4-b227-8ea369d577c7"/>
<published>2025-07-22T07:00:00Z</published>
<title>School Street Closure at 1700 E 22nd Av</title>
<updated>2025-07-22T20:21:05.0591671Z</updated>
<georss:line>49.25034743334149 -123.06943131525497 49.25032458541489 -123.06813714219895</georss:line>
</entry>
<entry>
<category term="Road Closure"/>
<content>Gordon Elementary Year-Round-School-Street. Full closure of 2200 Bayswater St from September 16, 2025 to June 23, 2026, every Tuesday. May 19, 2026 to June 12, 2026 All school days.
Times: 8:40-9:10AM, 2:45-3:30PM
Extended hours: Every Friday, 2:45 - 4:00pm(May 19 - June 12, 2026)
Location: Bayswater St between W 6th and W 7th Av
Schedule: Sep 16, 2025 - Jun 23, 2026</content>
<id>urn:uuid:fca8911f-092e-48f2-adc8-9961d7b9cf03</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/98cda8a2-a5e8-41b7-af15-c4cfb742076e"/>
<published>2025-07-22T07:00:00Z</published>
<title>School Street Closure at 2200 Bayswater St</title>
<updated>2026-02-05T20:02:41.6623056Z</updated>
<georss:line>49.266648939185586 -123.17114447861454 49.26587474197456 -123.17117232799235</georss:line>
</entry>
<entry>
<category term="Road Closure"/>
<content>Full closure of 1600 block of Adanac St from June Monday 8, 2026 to June Monday 15, 2026 at 3:30 pm
Location: Adanac St from Woodland Dr to Commercial Dr
Schedule: Jun 8, 2026 - Jun 15, 2026; Weekdays; 7:00 AM - 3:30 PM</content>
<id>urn:uuid:cd068547-570a-44d1-8bb8-ef39267c6cbe</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/7f39bdd9-99f2-4e36-9fa3-6f665b674598"/>
<published>2026-06-08T07:00:00Z</published>
<title>Sewer Service of 1600 block of Adanac St</title>
<updated>2026-06-08T23:55:49.9070067Z</updated>
<georss:line>49.27759258604141 -123.072758544593 49.27757404285828 -123.07047204541759</georss:line>
</entry>
<entry>
<category term="Road Closure"/>
<content>Full closure of 400 block of W 21st Av from June Friday 5, 2026 to June Thursday 11, 2026 at 3:30 pm
Location: W 21st Av from Ln E of Cambie St to Yukon St
Schedule: Jun 5, 2026 - Jun 11, 2026; Weekdays; 7:00 AM - 3:30 PM</content>
<id>urn:uuid:281572c2-14c0-4ef3-a1a5-da50a1cf112c</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d71b12a9-a8e4-4ff1-9471-27161e63dc2b"/>
<published>2026-06-05T07:00:00Z</published>
<title>Sewer Service of 400 block of W 21st Av</title>
<updated>2026-06-05T22:29:42.3382225Z</updated>
<georss:line>49.25201517673213 -123.11270091226764 49.2520505469582 -123.11457467575897</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>**Work paused to resume Q3 2024**

Sewer Package for 2021

Sewer and Streets, Residential Streets Only (low impact)


Location: Various Locations
Schedule: Feb 1, 2021 - Jan 1, 2025</content>
<id>urn:uuid:6e74bbbe-09f6-4ff2-b58e-7eb635d7c4f5</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/811c1c9a-b923-44ed-a472-efcbda0649dd"/>
<published>2021-02-23T08:00:00Z</published>
<title>Shaughnessy Sewer Package </title>
<updated>2025-06-18T01:00:56.7161266Z</updated>
<georss:line>49.248203942203105 -123.13058603728044 49.248227676676066 -123.13205356974795</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>**Work paused to resume Q3 2024**

Sewer Package for 2021

Sewer and Streets, Residential Streets Only (low impact)


Location: Various Locations
Schedule: Feb 1, 2021 - Jan 1, 2025</content>
<id>urn:uuid:1f0d7919-038b-4a8f-bdad-2d9227b94ae2</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/811c1c9a-b923-44ed-a472-efcbda0649dd"/>
<published>2021-02-23T08:00:00Z</published>
<title>Shaughnessy Sewer Package </title>
<updated>2025-06-18T01:00:56.7161266Z</updated>
<georss:line>49.248203942203105 -123.13058603728044 49.248227676676066 -123.13205356974795</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>**Work paused to resume Q3 2024**

Sewer Package for 2021

Sewer and Streets, Residential Streets Only (low impact)


Location: Various Locations
Schedule: Feb 1, 2021 - Jan 1, 2025</content>
<id>urn:uuid:a75f82d3-570e-4959-b4df-bf9c0d6ef87f</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/811c1c9a-b923-44ed-a472-efcbda0649dd"/>
<published>2021-02-23T08:00:00Z</published>
<title>Shaughnessy Sewer Package </title>
<updated>2025-06-18T01:00:56.7161266Z</updated>
<georss:line>49.250058740170005 -123.13197022924 49.24930228142401 -123.13199819506</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>**Work paused to resume Q3 2024**

Sewer Package for 2021

Sewer and Streets, Residential Streets Only (low impact)


Location: Various Locations
Schedule: Feb 1, 2021 - Jan 1, 2025</content>
<id>urn:uuid:4a826339-6733-4c6c-ad0b-0444ca6fb2cd</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/811c1c9a-b923-44ed-a472-efcbda0649dd"/>
<published>2021-02-23T08:00:00Z</published>
<title>Shaughnessy Sewer Package </title>
<updated>2025-06-18T01:00:56.7161266Z</updated>
<georss:line>49.25072481094497 -123.13194560812002 49.250058740170005 -123.13197022924</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>**Work paused to resume Q3 2024**

Sewer Package for 2021

Sewer and Streets, Residential Streets Only (low impact)


Location: Various Locations
Schedule: Feb 1, 2021 - Jan 1, 2025</content>
<id>urn:uuid:23215c8e-f0d4-4fce-9811-a1256c473f8b</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/811c1c9a-b923-44ed-a472-efcbda0649dd"/>
<published>2021-02-23T08:00:00Z</published>
<title>Shaughnessy Sewer Package </title>
<updated>2025-06-18T01:00:56.7161266Z</updated>
<georss:line>49.248203942203105 -123.13058603728044 49.248227676676066 -123.13205356974795</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>**Work paused to resume Q3 2024**

Sewer Package for 2021

Sewer and Streets, Residential Streets Only (low impact)


Location: Various Locations
Schedule: Feb 1, 2021 - Jan 1, 2025</content>
<id>urn:uuid:53995c98-ff5e-43a8-9aa3-df9be7e1c7a8</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/811c1c9a-b923-44ed-a472-efcbda0649dd"/>
<published>2021-02-23T08:00:00Z</published>
<title>Shaughnessy Sewer Package </title>
<updated>2025-06-18T01:00:56.7161266Z</updated>
<georss:line>49.24725607600499 -123.12921880957 49.24726698711899 -123.12990070360999</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>**Work paused to resume Q3 2024**

Sewer Package for 2021

Sewer and Streets, Residential Streets Only (low impact)


Location: Various Locations
Schedule: Feb 1, 2021 - Jan 1, 2025</content>
<id>urn:uuid:7d0e3795-1a22-416f-ba52-c1344fe3eadc</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/811c1c9a-b923-44ed-a472-efcbda0649dd"/>
<published>2021-02-23T08:00:00Z</published>
<title>Shaughnessy Sewer Package </title>
<updated>2025-06-18T01:00:56.7161266Z</updated>
<georss:line>49.247715625062966 -123.12920216031 49.24725607600499 -123.12921880957</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>**Work paused to resume Q3 2024**

Sewer Package for 2021

Sewer and Streets, Residential Streets Only (low impact)


Location: Various Locations
Schedule: Feb 1, 2021 - Jan 1, 2025</content>
<id>urn:uuid:415bc18c-ccb3-478b-90e7-05dd0dc99e37</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/811c1c9a-b923-44ed-a472-efcbda0649dd"/>
<published>2021-02-23T08:00:00Z</published>
<title>Shaughnessy Sewer Package </title>
<updated>2025-06-18T01:00:56.7161266Z</updated>
<georss:line>49.248161648945 -123.12830234289001 49.248175938689 -123.12918549901002</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>**Work paused to resume Q3 2024**

Sewer Package for 2021

Sewer and Streets, Residential Streets Only (low impact)


Location: Various Locations
Schedule: Feb 1, 2021 - Jan 1, 2025</content>
<id>urn:uuid:2e9defad-27a9-40f8-a582-c00585a438c8</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/811c1c9a-b923-44ed-a472-efcbda0649dd"/>
<published>2021-02-23T08:00:00Z</published>
<title>Shaughnessy Sewer Package </title>
<updated>2025-06-18T01:00:56.7161266Z</updated>
<georss:line>49.2486266323221 -123.1283021814034 49.24816725552324 -123.12831778176235</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>**Work paused to resume Q3 2024**

Sewer Package for 2021

Sewer and Streets, Residential Streets Only (low impact)


Location: Various Locations
Schedule: Feb 1, 2021 - Jan 1, 2025</content>
<id>urn:uuid:54cb2d09-ac67-46d5-9ded-88a64d9b528a</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/811c1c9a-b923-44ed-a472-efcbda0649dd"/>
<published>2021-02-23T08:00:00Z</published>
<title>Shaughnessy Sewer Package </title>
<updated>2025-06-18T01:00:56.7161266Z</updated>
<georss:line>49.248175938689 -123.12918549901002 49.24818695001599 -123.12986644416</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>**Work paused to resume Q3 2024**

Sewer Package for 2021

Sewer and Streets, Residential Streets Only (low impact)


Location: Various Locations
Schedule: Feb 1, 2021 - Jan 1, 2025</content>
<id>urn:uuid:1c0fd046-e42b-4db8-8fd7-016364cba4f2</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/811c1c9a-b923-44ed-a472-efcbda0649dd"/>
<published>2021-02-23T08:00:00Z</published>
<title>Shaughnessy Sewer Package </title>
<updated>2025-06-18T01:00:56.7161266Z</updated>
<georss:line>49.249248657974846 -123.12828105248445 49.2486266323221 -123.1283021814034</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>**Work paused to resume Q3 2024**

Sewer Package for 2021

Sewer and Streets, Residential Streets Only (low impact)


Location: Various Locations
Schedule: Feb 1, 2021 - Jan 1, 2025</content>
<id>urn:uuid:c546a056-5e42-4ba2-98a7-d44f18b943b2</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/811c1c9a-b923-44ed-a472-efcbda0649dd"/>
<published>2021-02-23T08:00:00Z</published>
<title>Shaughnessy Sewer Package </title>
<updated>2025-06-18T01:00:56.7161266Z</updated>
<georss:line>49.248652115012334 -123.12986478645426 49.24819255641344 -123.12988188328455</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>**Work paused to resume Q3 2024**

Sewer Package for 2021

Sewer and Streets, Residential Streets Only (low impact)


Location: Various Locations
Schedule: Feb 1, 2021 - Jan 1, 2025</content>
<id>urn:uuid:a4e8be05-52f2-4189-94fe-c05546a44063</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/811c1c9a-b923-44ed-a472-efcbda0649dd"/>
<published>2021-02-23T08:00:00Z</published>
<title>Shaughnessy Sewer Package </title>
<updated>2025-06-18T01:00:56.7161266Z</updated>
<georss:line>49.24927342360081 -123.12984164166019 49.248652115012334 -123.12986478645426</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>**Work paused to resume Q3 2024**

Sewer Package for 2021

Sewer and Streets, Residential Streets Only (low impact)


Location: Various Locations
Schedule: Feb 1, 2021 - Jan 1, 2025</content>
<id>urn:uuid:e2f28585-6518-4ba5-bc08-199cd6d0f31c</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/811c1c9a-b923-44ed-a472-efcbda0649dd"/>
<published>2021-02-23T08:00:00Z</published>
<title>Shaughnessy Sewer Package </title>
<updated>2025-06-18T01:00:56.7161266Z</updated>
<georss:line>49.244483250916005 -123.12842733393002 49.244497233714014 -123.12931865352999</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>**Work paused to resume Q3 2024**

Sewer Package for 2021

Sewer and Streets, Residential Streets Only (low impact)


Location: Various Locations
Schedule: Feb 1, 2021 - Jan 1, 2025</content>
<id>urn:uuid:fc23bda8-f88b-42ef-a8b8-55186947e45f</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/811c1c9a-b923-44ed-a472-efcbda0649dd"/>
<published>2021-02-23T08:00:00Z</published>
<title>Shaughnessy Sewer Package </title>
<updated>2025-06-18T01:00:56.7161266Z</updated>
<georss:line>49.244943005815 -123.12841172294 49.244483250916005 -123.12842733393002</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>**Work paused to resume Q3 2024**

Sewer Package for 2021

Sewer and Streets, Residential Streets Only (low impact)


Location: Various Locations
Schedule: Feb 1, 2021 - Jan 1, 2025</content>
<id>urn:uuid:ce9cb59a-f7bb-4083-aebe-220cd63f3920</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/811c1c9a-b923-44ed-a472-efcbda0649dd"/>
<published>2021-02-23T08:00:00Z</published>
<title>Shaughnessy Sewer Package </title>
<updated>2025-06-18T01:00:56.7161266Z</updated>
<georss:line>49.245400961588985 -123.12839614822 49.244943005815 -123.12841172294</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>**Work paused to resume Q3 2024**

Sewer Package for 2021

Sewer and Streets, Residential Streets Only (low impact)


Location: Various Locations
Schedule: Feb 1, 2021 - Jan 1, 2025</content>
<id>urn:uuid:78c011c7-4b10-4b21-9d6c-9696ab3886d6</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/811c1c9a-b923-44ed-a472-efcbda0649dd"/>
<published>2021-02-23T08:00:00Z</published>
<title>Shaughnessy Sewer Package </title>
<updated>2025-06-18T01:00:56.7161266Z</updated>
<georss:line>49.245389168347 -123.12768234719 49.245400961588985 -123.12839614822</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>**Work paused to resume Q3 2024**

Sewer Package for 2021

Sewer and Streets, Residential Streets Only (low impact)


Location: Various Locations
Schedule: Feb 1, 2021 - Jan 1, 2025</content>
<id>urn:uuid:901d38b5-e58c-4e46-8198-cbb3bd266c7d</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/811c1c9a-b923-44ed-a472-efcbda0649dd"/>
<published>2021-02-23T08:00:00Z</published>
<title>Shaughnessy Sewer Package </title>
<updated>2025-06-18T01:00:56.7161266Z</updated>
<georss:line>49.243543779784005 -123.12845925893 49.243549286420006 -123.12882139350002 49.243552636364996 -123.12896318928001 49.24355760541201 -123.12910486565002 49.243564184597034 -123.12924639511 49.243570317869 -123.12935220189999</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>**Work paused to resume Q3 2024**

Sewer Package for 2021

Sewer and Streets, Residential Streets Only (low impact)


Location: Various Locations
Schedule: Feb 1, 2021 - Jan 1, 2025</content>
<id>urn:uuid:e75c2822-eb95-47d9-a215-9213eb7775c7</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/811c1c9a-b923-44ed-a472-efcbda0649dd"/>
<published>2021-02-23T08:00:00Z</published>
<title>Shaughnessy Sewer Package </title>
<updated>2025-06-18T01:00:56.7161266Z</updated>
<georss:line>49.244037099679986 -123.12933531289 49.243570317869 -123.12935220189999</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>**Work paused to resume Q3 2024**

Sewer Package for 2021

Sewer and Streets, Residential Streets Only (low impact)


Location: Various Locations
Schedule: Feb 1, 2021 - Jan 1, 2025</content>
<id>urn:uuid:a0537351-8104-47c6-a459-415b783bc811</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/811c1c9a-b923-44ed-a472-efcbda0649dd"/>
<published>2021-02-23T08:00:00Z</published>
<title>Shaughnessy Sewer Package </title>
<updated>2025-06-18T01:00:56.7161266Z</updated>
<georss:line>49.242390501562994 -123.12849843162999 49.24194164006698 -123.12851369837999</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>**Work paused to resume Q3 2024**

Sewer Package for 2021

Sewer and Streets, Residential Streets Only (low impact)


Location: Various Locations
Schedule: Feb 1, 2021 - Jan 1, 2025</content>
<id>urn:uuid:15462dbc-43ac-4cf1-a307-e00ea1c8c02a</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/811c1c9a-b923-44ed-a472-efcbda0649dd"/>
<published>2021-02-23T08:00:00Z</published>
<title>Shaughnessy Sewer Package </title>
<updated>2025-06-18T01:00:56.7161266Z</updated>
<georss:line>49.242417189409 -123.12939392336 49.241975199330994 -123.1294099281</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>**Work paused to resume Q3 2024**

Sewer Package for 2021

Sewer and Streets, Residential Streets Only (low impact)


Location: Various Locations
Schedule: Feb 1, 2021 - Jan 1, 2025</content>
<id>urn:uuid:91317405-7935-450a-803c-742e1909a582</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/811c1c9a-b923-44ed-a472-efcbda0649dd"/>
<published>2021-02-23T08:00:00Z</published>
<title>Shaughnessy Sewer Package </title>
<updated>2025-06-18T01:00:56.7161266Z</updated>
<georss:line>49.242390501562994 -123.12849843162999 49.242396673255 -123.12885292076 49.242399630243995 -123.12899214308 49.242404170328996 -123.12913127336 49.24241030256999 -123.12927025671002 49.242417189409 -123.12939392336</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>**Work paused to resume Q3 2024**

Sewer Package for 2021

Sewer and Streets, Residential Streets Only (low impact)


Location: Various Locations
Schedule: Feb 1, 2021 - Jan 1, 2025</content>
<id>urn:uuid:79493ee2-dfcb-4736-b1cb-23858dc78ef1</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/811c1c9a-b923-44ed-a472-efcbda0649dd"/>
<published>2021-02-23T08:00:00Z</published>
<title>Shaughnessy Sewer Package </title>
<updated>2025-06-18T01:00:56.7161266Z</updated>
<georss:line>49.244483250916005 -123.12842733393002 49.24402275834001 -123.12844297019998</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>**Work paused to resume Q3 2024**

Sewer Package for 2021

Sewer and Streets, Residential Streets Only (low impact)


Location: Various Locations
Schedule: Feb 1, 2021 - Jan 1, 2025</content>
<id>urn:uuid:f7184045-3b95-4e62-95e0-583f5714907d</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/811c1c9a-b923-44ed-a472-efcbda0649dd"/>
<published>2021-02-23T08:00:00Z</published>
<title>Shaughnessy Sewer Package </title>
<updated>2025-06-18T01:00:56.7161266Z</updated>
<georss:line>49.244497233714014 -123.12931865352999 49.244037099679986 -123.12933531289</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>**Work paused to resume Q3 2024**

Sewer Package for 2021

Sewer and Streets, Residential Streets Only (low impact)


Location: Various Locations
Schedule: Feb 1, 2021 - Jan 1, 2025</content>
<id>urn:uuid:1633f0fd-3ea9-4c4f-a922-2640433bf856</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/811c1c9a-b923-44ed-a472-efcbda0649dd"/>
<published>2021-02-23T08:00:00Z</published>
<title>Shaughnessy Sewer Package </title>
<updated>2025-06-18T01:00:56.7161266Z</updated>
<georss:line>49.244472060063 -123.12771397357999 49.244483250916005 -123.12842733393002</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>**Work paused to resume Q3 2024**

Sewer Package for 2021

Sewer and Streets, Residential Streets Only (low impact)


Location: Various Locations
Schedule: Feb 1, 2021 - Jan 1, 2025</content>
<id>urn:uuid:5e3716d0-4574-4d7c-ab4a-bbc5c5669398</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/811c1c9a-b923-44ed-a472-efcbda0649dd"/>
<published>2021-02-23T08:00:00Z</published>
<title>Shaughnessy Sewer Package </title>
<updated>2025-06-18T01:00:56.7161266Z</updated>
<georss:line>49.24727823907699 -123.13060377234 49.24681708866299 -123.13062039047999</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>**Work paused to resume Q3 2024**

Sewer Package for 2021

Sewer and Streets, Residential Streets Only (low impact)


Location: Various Locations
Schedule: Feb 1, 2021 - Jan 1, 2025</content>
<id>urn:uuid:f7a96403-089a-4eb6-99e8-9a64648a23ae</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/811c1c9a-b923-44ed-a472-efcbda0649dd"/>
<published>2021-02-23T08:00:00Z</published>
<title>Shaughnessy Sewer Package </title>
<updated>2025-06-18T01:00:56.7161266Z</updated>
<georss:line>49.24726698711899 -123.12990070360999 49.24727823907699 -123.13060377234</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>**Work paused to resume Q3 2024**

Sewer Package for 2021

Sewer and Streets, Residential Streets Only (low impact)


Location: Various Locations
Schedule: Feb 1, 2021 - Jan 1, 2025</content>
<id>urn:uuid:d5c216a5-48ec-4dc5-958a-b4063d2cc496</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/811c1c9a-b923-44ed-a472-efcbda0649dd"/>
<published>2021-02-23T08:00:00Z</published>
<title>Shaughnessy Sewer Package </title>
<updated>2025-06-18T01:00:56.7161266Z</updated>
<georss:line>49.247738058116 -123.13058719159999 49.24727823907699 -123.13060377234</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>**Work paused to resume Q3 2024**

Sewer Package for 2021

Sewer and Streets, Residential Streets Only (low impact)


Location: Various Locations
Schedule: Feb 1, 2021 - Jan 1, 2025</content>
<id>urn:uuid:6769b349-709f-45d6-9661-2d9a2af66953</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/811c1c9a-b923-44ed-a472-efcbda0649dd"/>
<published>2021-02-23T08:00:00Z</published>
<title>Shaughnessy Sewer Package </title>
<updated>2025-06-18T01:00:56.7161266Z</updated>
<georss:line>49.247738058116 -123.13058719159999 49.24776183705001 -123.13205513626002</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>**Work paused to resume Q3 2024**

Sewer Package for 2021

Sewer and Streets, Residential Streets Only (low impact)


Location: Various Locations
Schedule: Feb 1, 2021 - Jan 1, 2025</content>
<id>urn:uuid:5d8ba963-9b5b-48b6-b021-224c7d43cc0e</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/811c1c9a-b923-44ed-a472-efcbda0649dd"/>
<published>2021-02-23T08:00:00Z</published>
<title>Shaughnessy Sewer Package </title>
<updated>2025-06-18T01:00:56.7161266Z</updated>
<georss:line>49.248198335886 -123.13057059803998 49.247738058116 -123.13058719159999</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>**Work paused to resume Q3 2024**

Sewer Package for 2021

Sewer and Streets, Residential Streets Only (low impact)


Location: Various Locations
Schedule: Feb 1, 2021 - Jan 1, 2025</content>
<id>urn:uuid:21662781-9115-4553-a777-ba76d44bbd26</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/811c1c9a-b923-44ed-a472-efcbda0649dd"/>
<published>2021-02-23T08:00:00Z</published>
<title>Shaughnessy Sewer Package </title>
<updated>2025-06-18T01:00:56.7161266Z</updated>
<georss:line>49.24818695001599 -123.12986644416 49.248198335886 -123.13057059803998</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>**Work paused to resume Q3 2024**

Sewer Package for 2021

Sewer and Streets, Residential Streets Only (low impact)


Location: Various Locations
Schedule: Feb 1, 2021 - Jan 1, 2025</content>
<id>urn:uuid:abb1257d-2847-42b3-8e38-aa7c46cc4cde</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/811c1c9a-b923-44ed-a472-efcbda0649dd"/>
<published>2021-02-23T08:00:00Z</published>
<title>Shaughnessy Sewer Package </title>
<updated>2025-06-18T01:00:56.7161266Z</updated>
<georss:line>49.24346794879898 -123.13421268085001 49.243863142462004 -123.13567855065</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>**Work paused to resume Q3 2024**

Sewer Package for 2021

Sewer and Streets, Residential Streets Only (low impact)


Location: Various Locations
Schedule: Feb 1, 2021 - Jan 1, 2025</content>
<id>urn:uuid:7e3510f8-397c-4adf-b8ce-9f27674d6570</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/811c1c9a-b923-44ed-a472-efcbda0649dd"/>
<published>2021-02-23T08:00:00Z</published>
<title>Shaughnessy Sewer Package </title>
<updated>2025-06-18T01:00:56.7161266Z</updated>
<georss:line>49.24417037557299 -123.13071580764999 49.244622791474995 -123.13069951167</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>**Work paused to resume Q3 2024**

Sewer Package for 2021

Sewer and Streets, Residential Streets Only (low impact)


Location: Various Locations
Schedule: Feb 1, 2021 - Jan 1, 2025</content>
<id>urn:uuid:93bf3266-f9ef-48af-a16c-fd2f31d77c89</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/811c1c9a-b923-44ed-a472-efcbda0649dd"/>
<published>2021-02-23T08:00:00Z</published>
<title>Shaughnessy Sewer Package </title>
<updated>2025-06-18T01:00:56.7161266Z</updated>
<georss:line>49.244622791474995 -123.13069951167 49.24417037557299 -123.13071580764999</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>**Work paused to resume Q3 2024**

Sewer Package for 2021

Sewer and Streets, Residential Streets Only (low impact)


Location: Various Locations
Schedule: Feb 1, 2021 - Jan 1, 2025</content>
<id>urn:uuid:4b5b41b1-f5d5-48c2-a5b3-c67c9fab5af6</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/811c1c9a-b923-44ed-a472-efcbda0649dd"/>
<published>2021-02-23T08:00:00Z</published>
<title>Shaughnessy Sewer Package </title>
<updated>2025-06-18T01:00:56.7161266Z</updated>
<georss:line>49.24417037557299 -123.13071580764999 49.24472248254801 -123.13233004856</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>**Work paused to resume Q3 2024**

Sewer Package for 2021

Sewer and Streets, Residential Streets Only (low impact)


Location: Various Locations
Schedule: Feb 1, 2021 - Jan 1, 2025</content>
<id>urn:uuid:1d862fea-82a8-4d3d-ab0e-fa9051e15917</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/811c1c9a-b923-44ed-a472-efcbda0649dd"/>
<published>2021-02-23T08:00:00Z</published>
<title>Shaughnessy Sewer Package </title>
<updated>2025-06-18T01:00:56.7161266Z</updated>
<georss:line>49.245009539466 -123.13068555641 49.244622791474995 -123.13069951167</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>**Work paused to resume Q3 2024**

Sewer Package for 2021

Sewer and Streets, Residential Streets Only (low impact)


Location: Various Locations
Schedule: Feb 1, 2021 - Jan 1, 2025</content>
<id>urn:uuid:f0ad96ae-5476-4671-9f96-dc64e037d34c</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/811c1c9a-b923-44ed-a472-efcbda0649dd"/>
<published>2021-02-23T08:00:00Z</published>
<title>Shaughnessy Sewer Package </title>
<updated>2025-06-18T01:00:56.7161266Z</updated>
<georss:line>49.244622791474995 -123.13069951167 49.24463454313201 -123.13074378341001 49.24464690636802 -123.13078812549001 49.24465978268799 -123.13083213920001 49.24467315414802 -123.13087578328 49.24468702071701 -123.13091908521001 49.24470139143702 -123.13096200379 49.24471623933999 -123.13100452522002 49.24473157341998 -123.13104664952 49.244747384698 -123.13108836293 49.24476367319099 -123.1311296517 49.24478042993496 -123.13117048835001 49.24479765492998 -123.13121087286001 49.24481533018701 -123.13125080518999 49.24483346474699 -123.13129024415 49.244844430581 -123.13131342414 49.24507418549001 -123.13179653641 49.24507878959304 -123.13180569915998 49.245093749803004 -123.13183624063001 49.245108367732996 -123.13186717965999 49.245122625406 -123.13189850245001 49.245136522839005 -123.13193019527 49.245150060046996 -123.13196224437002 49.24516321902399 -123.13199466345 49.245176017790016 -123.13202742506999 49.245188429359985 -123.13206052916 49.24520047175599 -123.13209394829998 49.245212126986985 -123.13212768242 49.24521921769801 -123.13214912125</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>**Work paused to resume Q3 2024**

Sewer Package for 2021

Sewer and Streets, Residential Streets Only (low impact)


Location: Various Locations
Schedule: Feb 1, 2021 - Jan 1, 2025</content>
<id>urn:uuid:796aedc5-bed5-4b7e-ae97-c4fa79c837a9</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/811c1c9a-b923-44ed-a472-efcbda0649dd"/>
<published>2021-02-23T08:00:00Z</published>
<title>Shaughnessy Sewer Package </title>
<updated>2025-06-18T01:00:56.7161266Z</updated>
<georss:line>49.245438494784 -123.13067009104999 49.245009539466 -123.13068555641</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>**Work paused to resume Q3 2024**

Sewer Package for 2021

Sewer and Streets, Residential Streets Only (low impact)


Location: Various Locations
Schedule: Feb 1, 2021 - Jan 1, 2025</content>
<id>urn:uuid:626112af-2d24-4eb3-ad4e-bfe1964e86f8</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/811c1c9a-b923-44ed-a472-efcbda0649dd"/>
<published>2021-02-23T08:00:00Z</published>
<title>Shaughnessy Sewer Package </title>
<updated>2025-06-18T01:00:56.7161266Z</updated>
<georss:line>49.245438494784 -123.13067009104999 49.24545156631501 -123.13146170418 49.245451666273 -123.13147662563 49.245451596934004 -123.13149803172 49.24545129373101 -123.13151942344999 49.24545073865798 -123.1315408145 49.24544994074196 -123.13156217744 49.24544889996798 -123.13158352598 49.24544760737004 -123.13160483264 49.245446080939985 -123.13162609746001 49.245444311667 -123.13164733415 49.245442290586 -123.13166851521 49.24544003570503 -123.13168962695 49.245437537996 -123.13171069681998 49.245434806502004 -123.13173168363 49.245431823232025 -123.13175258733 49.24542861515701 -123.13177342174 49.24542515532201 -123.13179415929 49.24542147069698 -123.13181481381001 49.245417543323015 -123.13183535775 49.24541338219501 -123.13185579116 49.24540899630901 -123.13187611405 49.245404367690014 -123.13189631263 49.24539950533301 -123.13191638692999 49.245394427229 -123.13193633699 49.245389115419016 -123.13195613530002 49.245383587877996 -123.13197579562 49.245377826630005 -123.13199530419 49.245371840671 -123.13201466100999 49.245365648024006 -123.13203383867001 49.245359221670014 -123.13205286456001 49.24535258862801 -123.13207171129 49.24534573990201 -123.13209037880999 49.245338675493 -123.13210886715 49.245331404426 -123.13212714883 49.245323926671006 -123.13214525134002</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>**Work paused to resume Q3 2024**

Sewer Package for 2021

Sewer and Streets, Residential Streets Only (low impact)


Location: Various Locations
Schedule: Feb 1, 2021 - Jan 1, 2025</content>
<id>urn:uuid:74758378-e1e5-45c0-bcd3-4b29f0684e8c</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/811c1c9a-b923-44ed-a472-efcbda0649dd"/>
<published>2021-02-23T08:00:00Z</published>
<title>Shaughnessy Sewer Package </title>
<updated>2025-06-18T01:00:56.7161266Z</updated>
<georss:line>49.242580977947995 -123.13077312102 49.242581764410005 -123.13077764316 49.24260668237201 -123.13091164846 49.242633130160044 -123.13104495726999 49.24266108981499 -123.13117754207 49.242690561373024 -123.1313093754 49.24272153591903 -123.13144038854 49.24275400447499 -123.13157056774999 49.24278795812799 -123.13169984431 49.242789695854015 -123.13170629245 49.242883349785956 -123.13204907905</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>**Work paused to resume Q3 2024**

Sewer Package for 2021

Sewer and Streets, Residential Streets Only (low impact)


Location: Various Locations
Schedule: Feb 1, 2021 - Jan 1, 2025</content>
<id>urn:uuid:bb846ae6-db44-4082-9d88-00663f41a88b</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/811c1c9a-b923-44ed-a472-efcbda0649dd"/>
<published>2021-02-23T08:00:00Z</published>
<title>Shaughnessy Sewer Package </title>
<updated>2025-06-18T01:00:56.7161266Z</updated>
<georss:line>49.24317346434299 -123.13312279606 49.24316245488501 -123.13312217569 49.24313502203901 -123.13311988997 49.243107626012005 -123.13311687619999 49.24308025780999 -123.13311313434 49.243052944418 -123.13310866447 49.24302568585199 -123.13310345285 49.242998491075014 -123.13309752699 49.24297136010301 -123.13309087314 49.242944319906 -123.13308350511998 49.24291736150303 -123.13307540917 49.24289050285401 -123.13306661282 49.24286375298601 -123.13305708859998 49.242837102886995 -123.13304685024 49.24281058852199 -123.13303591158 49.242784191916 -123.13302425883 49.24275794003796 -123.13301190579 49.242731832874 -123.13299886622002 49.24270587045402 -123.13298511263 49.24268008871101 -123.13297068633 49.242654460675 -123.13295557353 49.24262901333199 -123.13293977427999 49.242603746665 -123.13292330234 49.242578669669996 -123.13290615771999 49.24255380033699 -123.13288834048001 49.242529129638 -123.13286987806 49.242504675595 -123.13285074304 49.242480447156 -123.13283097667 49.242456444351006 -123.13281055146 49.24243268512501 -123.13278950868 49.242409169507 -123.13276782085 49.242385897465965 -123.13274551545 49.24236288699197 -123.13272259253 49.242340147096 -123.13269903837998 49.24231767771403 -123.13267490794 49.24229548787298 -123.13265017377998 49.242273577556006 -123.13262484962 49.242264702476035 -123.13261420583 49.242249987635006 -123.13259733652998 49.24223509244598 -123.13258085144001 49.242219998886014 -123.13256477798 49.242204733959 -123.1325491025 49.242189288652014 -123.13253383871 49.242173671960984 -123.13251898662 49.242157883885994 -123.13250454625 49.24214194238601 -123.13249054511002 49.24212583849899 -123.13247695571 49.242109572191964 -123.13246380552 49.24209317045097 -123.13245109462 49.242088865382016 -123.13244790946999</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>**Work paused to resume Q3 2024**

Sewer Package for 2021

Sewer and Streets, Residential Streets Only (low impact)


Location: Various Locations
Schedule: Feb 1, 2021 - Jan 1, 2025</content>
<id>urn:uuid:9638d6fb-4651-48df-83fc-ff3a81b766a4</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/811c1c9a-b923-44ed-a472-efcbda0649dd"/>
<published>2021-02-23T08:00:00Z</published>
<title>Shaughnessy Sewer Package </title>
<updated>2025-06-18T01:00:56.7161266Z</updated>
<georss:line>49.24363064277799 -123.13003076766998 49.242477218431986 -123.13007142846</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>**Work paused to resume Q3 2024**

Sewer Package for 2021

Sewer and Streets, Residential Streets Only (low impact)


Location: Various Locations
Schedule: Feb 1, 2021 - Jan 1, 2025</content>
<id>urn:uuid:ddb30ca4-5639-4d94-91f0-03d77f969107</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/811c1c9a-b923-44ed-a472-efcbda0649dd"/>
<published>2021-02-23T08:00:00Z</published>
<title>Shaughnessy Sewer Package </title>
<updated>2025-06-18T01:00:56.7161266Z</updated>
<georss:line>49.24346794879898 -123.13421268085001 49.24288271853999 -123.13395691197</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>**Work paused to resume Q3 2024**

Sewer Package for 2021

Sewer and Streets, Residential Streets Only (low impact)


Location: Various Locations
Schedule: Feb 1, 2021 - Jan 1, 2025</content>
<id>urn:uuid:3cb28ce3-23f2-4add-83a0-ee880cdf6ae9</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/811c1c9a-b923-44ed-a472-efcbda0649dd"/>
<published>2021-02-23T08:00:00Z</published>
<title>Shaughnessy Sewer Package </title>
<updated>2025-06-18T01:00:56.7161266Z</updated>
<georss:line>49.242883349785956 -123.13204907905 49.242653114353004 -123.13205893413 49.242056011212014 -123.13156933165</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>**Work paused to resume Q3 2024**

Sewer Package for 2021

Sewer and Streets, Residential Streets Only (low impact)


Location: Various Locations
Schedule: Feb 1, 2021 - Jan 1, 2025</content>
<id>urn:uuid:c1ade52d-b6cc-4c2c-bbc1-3bf3f6ac68c6</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/811c1c9a-b923-44ed-a472-efcbda0649dd"/>
<published>2021-02-23T08:00:00Z</published>
<title>Shaughnessy Sewer Package </title>
<updated>2025-06-18T01:00:56.7161266Z</updated>
<georss:line>49.242477218431986 -123.13007142846 49.242480335940996 -123.13009880426 49.24249751563201 -123.13023560504 49.24251625187699 -123.13037192917001 49.242536535711 -123.13050774913998 49.24255837620899 -123.1306429963 49.242580977947995 -123.13077312102</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>**Work paused to resume Q3 2024**

Sewer Package for 2021

Sewer and Streets, Residential Streets Only (low impact)


Location: Various Locations
Schedule: Feb 1, 2021 - Jan 1, 2025</content>
<id>urn:uuid:95f359df-1f72-41ee-b37e-c4e8b71deda5</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/811c1c9a-b923-44ed-a472-efcbda0649dd"/>
<published>2021-02-23T08:00:00Z</published>
<title>Shaughnessy Sewer Package </title>
<updated>2025-06-18T01:00:56.7161266Z</updated>
<georss:line>49.242883349785956 -123.13204907905 49.24317346434299 -123.13312279606</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>**Work paused to resume Q3 2024**

Sewer Package for 2021

Sewer and Streets, Residential Streets Only (low impact)


Location: Various Locations
Schedule: Feb 1, 2021 - Jan 1, 2025</content>
<id>urn:uuid:b6009cc5-5884-49b2-b561-f39994732f6d</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/811c1c9a-b923-44ed-a472-efcbda0649dd"/>
<published>2021-02-23T08:00:00Z</published>
<title>Shaughnessy Sewer Package </title>
<updated>2025-06-18T01:00:56.7161266Z</updated>
<georss:line>49.24317346434299 -123.13312279606 49.24346794879898 -123.13421268085001</georss:line>
</entry>
<entry>
<category term="Road Closure"/>
<content>This project is an externally constructed sewer project in the Shaughnessy neighbourhood aimed to provide new separated sewers in the area.

Full road closures will occur at different sections within the project boundaries over the course of the construction period.

June 2026 - Sewer work reaching completion, restoration work remaining
Location: Between Oak Street (west) and Hudson Street (east), from the south side of the West King Edward Avenue (WKE) to the north side of West 29th Avenue.
Schedule: Jun 30, 2025 - Aug 30, 2026; Weekdays; 7:00 AM - 4:00 PM</content>
<id>urn:uuid:167271f1-8c09-4ef8-ae06-5bedaf5319fa</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/7ed4d284-aef8-48c2-8e07-cb12f97a7f20"/>
<published>2025-05-13T07:00:00Z</published>
<title>Shaughnessy Sewer Renewal Project</title>
<updated>2026-06-01T18:09:35.7971635Z</updated>
<georss:line>49.24586828976922 -123.12838026777656 49.2458810979318 -123.12926857275839</georss:line>
</entry>
<entry>
<category term="Road Closure"/>
<content>This project is an externally constructed sewer project in the Shaughnessy neighbourhood aimed to provide new separated sewers in the area.

Full road closures will occur at different sections within the project boundaries over the course of the construction period.

June 2026 - Sewer work reaching completion, restoration work remaining
Location: Between Oak Street (west) and Hudson Street (east), from the south side of the West King Edward Avenue (WKE) to the north side of West 29th Avenue.
Schedule: Jun 30, 2025 - Aug 30, 2026; Weekdays; 7:00 AM - 4:00 PM</content>
<id>urn:uuid:9d8a1055-168a-4359-a8dd-95bba72bf1fc</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/7ed4d284-aef8-48c2-8e07-cb12f97a7f20"/>
<published>2025-05-13T07:00:00Z</published>
<title>Shaughnessy Sewer Renewal Project</title>
<updated>2026-06-01T18:09:35.7971635Z</updated>
<georss:line>49.246335375667826 -123.12925213047927 49.2458810979318 -123.12926857275839</georss:line>
</entry>
<entry>
<category term="Road Closure"/>
<content>This project is an externally constructed sewer project in the Shaughnessy neighbourhood aimed to provide new separated sewers in the area.

Full road closures will occur at different sections within the project boundaries over the course of the construction period.

June 2026 - Sewer work reaching completion, restoration work remaining
Location: Between Oak Street (west) and Hudson Street (east), from the south side of the West King Edward Avenue (WKE) to the north side of West 29th Avenue.
Schedule: Jun 30, 2025 - Aug 30, 2026; Weekdays; 7:00 AM - 4:00 PM</content>
<id>urn:uuid:a3e27a70-36a1-4f1c-904a-56da62e4f407</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/7ed4d284-aef8-48c2-8e07-cb12f97a7f20"/>
<published>2025-05-13T07:00:00Z</published>
<title>Shaughnessy Sewer Renewal Project</title>
<updated>2026-06-01T18:09:35.7971635Z</updated>
<georss:line>49.246794573959335 -123.12923550838973 49.246335375667826 -123.12925213047927</georss:line>
</entry>
<entry>
<category term="Road Closure"/>
<content>This project is an externally constructed sewer project in the Shaughnessy neighbourhood aimed to provide new separated sewers in the area.

Full road closures will occur at different sections within the project boundaries over the course of the construction period.

June 2026 - Sewer work reaching completion, restoration work remaining
Location: Between Oak Street (west) and Hudson Street (east), from the south side of the West King Edward Avenue (WKE) to the north side of West 29th Avenue.
Schedule: Jun 30, 2025 - Aug 30, 2026; Weekdays; 7:00 AM - 4:00 PM</content>
<id>urn:uuid:391e793f-9b6a-45f2-b2bd-484be1c47a97</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/7ed4d284-aef8-48c2-8e07-cb12f97a7f20"/>
<published>2025-05-13T07:00:00Z</published>
<title>Shaughnessy Sewer Renewal Project</title>
<updated>2026-06-01T18:09:35.7971635Z</updated>
<georss:line>49.246320884076624 -123.12836489843437 49.24586828976922 -123.12838026777656</georss:line>
</entry>
<entry>
<category term="Road Closure"/>
<content>This project is an externally constructed sewer project in the Shaughnessy neighbourhood aimed to provide new separated sewers in the area.

Full road closures will occur at different sections within the project boundaries over the course of the construction period.

June 2026 - Sewer work reaching completion, restoration work remaining
Location: Between Oak Street (west) and Hudson Street (east), from the south side of the West King Edward Avenue (WKE) to the north side of West 29th Avenue.
Schedule: Jun 30, 2025 - Aug 30, 2026; Weekdays; 7:00 AM - 4:00 PM</content>
<id>urn:uuid:9dc3598a-a013-4f2f-a48e-3ab550b4b4d0</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/7ed4d284-aef8-48c2-8e07-cb12f97a7f20"/>
<published>2025-05-13T07:00:00Z</published>
<title>Shaughnessy Sewer Renewal Project</title>
<updated>2026-06-01T18:09:35.7971635Z</updated>
<georss:line>49.24678015308055 -123.12834928506139 49.246320884076624 -123.12836489843437</georss:line>
</entry>
<entry>
<category term="Road Closure"/>
<content>This project is an externally constructed sewer project in the Shaughnessy neighbourhood aimed to provide new separated sewers in the area.

Full road closures will occur at different sections within the project boundaries over the course of the construction period.

June 2026 - Sewer work reaching completion, restoration work remaining
Location: Between Oak Street (west) and Hudson Street (east), from the south side of the West King Edward Avenue (WKE) to the north side of West 29th Avenue.
Schedule: Jun 30, 2025 - Aug 30, 2026; Weekdays; 7:00 AM - 4:00 PM</content>
<id>urn:uuid:45f161c5-6b6f-4a9f-9173-4a1a005be1fd</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/7ed4d284-aef8-48c2-8e07-cb12f97a7f20"/>
<published>2025-05-13T07:00:00Z</published>
<title>Shaughnessy Sewer Renewal Project</title>
<updated>2026-06-01T18:09:35.7971635Z</updated>
<georss:line>49.24678015308055 -123.12834928506139 49.246794573959335 -123.12923550838973</georss:line>
</entry>
<entry>
<category term="Road Closure"/>
<content>This project is an externally constructed sewer project in the Shaughnessy neighbourhood aimed to provide new separated sewers in the area.

Full road closures will occur at different sections within the project boundaries over the course of the construction period.

June 2026 - Sewer work reaching completion, restoration work remaining
Location: Between Oak Street (west) and Hudson Street (east), from the south side of the West King Edward Avenue (WKE) to the north side of West 29th Avenue.
Schedule: Jun 30, 2025 - Aug 30, 2026; Weekdays; 7:00 AM - 4:00 PM</content>
<id>urn:uuid:58fc1b81-2527-4d3a-b94d-ebf39b1e9019</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/7ed4d284-aef8-48c2-8e07-cb12f97a7f20"/>
<published>2025-05-13T07:00:00Z</published>
<title>Shaughnessy Sewer Renewal Project</title>
<updated>2026-06-01T18:09:35.7971635Z</updated>
<georss:line>49.247241895819286 -123.12833359537797 49.24678015308055 -123.12834928506139</georss:line>
</entry>
<entry>
<category term="Road Closure"/>
<content>This project is an externally constructed sewer project in the Shaughnessy neighbourhood aimed to provide new separated sewers in the area.

Full road closures will occur at different sections within the project boundaries over the course of the construction period.

June 2026 - Sewer work reaching completion, restoration work remaining
Location: Between Oak Street (west) and Hudson Street (east), from the south side of the West King Edward Avenue (WKE) to the north side of West 29th Avenue.
Schedule: Jun 30, 2025 - Aug 30, 2026; Weekdays; 7:00 AM - 4:00 PM</content>
<id>urn:uuid:ed209346-147d-4b9f-9a67-4942fab0b999</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/7ed4d284-aef8-48c2-8e07-cb12f97a7f20"/>
<published>2025-05-13T07:00:00Z</published>
<title>Shaughnessy Sewer Renewal Project</title>
<updated>2026-06-01T18:09:35.7971635Z</updated>
<georss:line>49.24727823814905 -123.13060377233911 49.24681708773451 -123.13062039048387</georss:line>
</entry>
<entry>
<category term="Road Closure"/>
<content>This project is an externally constructed sewer project in the Shaughnessy neighbourhood aimed to provide new separated sewers in the area.

Full road closures will occur at different sections within the project boundaries over the course of the construction period.

June 2026 - Sewer work reaching completion, restoration work remaining
Location: Between Oak Street (west) and Hudson Street (east), from the south side of the West King Edward Avenue (WKE) to the north side of West 29th Avenue.
Schedule: Jun 30, 2025 - Aug 30, 2026; Weekdays; 7:00 AM - 4:00 PM</content>
<id>urn:uuid:5c6ab362-c3e4-4dbe-a1ea-5007b7b6410d</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/7ed4d284-aef8-48c2-8e07-cb12f97a7f20"/>
<published>2025-05-13T07:00:00Z</published>
<title>Shaughnessy Sewer Renewal Project</title>
<updated>2026-06-01T18:09:35.7971635Z</updated>
<georss:line>49.247256075077075 -123.12921880956934 49.246794573959335 -123.12923550838973</georss:line>
</entry>
<entry>
<category term="Road Closure"/>
<content>This project is an externally constructed sewer project in the Shaughnessy neighbourhood aimed to provide new separated sewers in the area.

Full road closures will occur at different sections within the project boundaries over the course of the construction period.

June 2026 - Sewer work reaching completion, restoration work remaining
Location: Between Oak Street (west) and Hudson Street (east), from the south side of the West King Edward Avenue (WKE) to the north side of West 29th Avenue.
Schedule: Jun 30, 2025 - Aug 30, 2026; Weekdays; 7:00 AM - 4:00 PM</content>
<id>urn:uuid:f46cc8e9-07ef-4d28-ac9a-48de3e8324ca</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/7ed4d284-aef8-48c2-8e07-cb12f97a7f20"/>
<published>2025-05-13T07:00:00Z</published>
<title>Shaughnessy Sewer Renewal Project</title>
<updated>2026-06-01T18:09:35.7971635Z</updated>
<georss:line>49.247256075077075 -123.12921880956934 49.24726698619082 -123.12990070361347</georss:line>
</entry>
<entry>
<category term="Road Closure"/>
<content>This project is an externally constructed sewer project in the Shaughnessy neighbourhood aimed to provide new separated sewers in the area.

Full road closures will occur at different sections within the project boundaries over the course of the construction period.

June 2026 - Sewer work reaching completion, restoration work remaining
Location: Between Oak Street (west) and Hudson Street (east), from the south side of the West King Edward Avenue (WKE) to the north side of West 29th Avenue.
Schedule: Jun 30, 2025 - Aug 30, 2026; Weekdays; 7:00 AM - 4:00 PM</content>
<id>urn:uuid:604539d7-0cab-468d-aeed-535e51a56628</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/7ed4d284-aef8-48c2-8e07-cb12f97a7f20"/>
<published>2025-05-13T07:00:00Z</published>
<title>Shaughnessy Sewer Renewal Project</title>
<updated>2026-06-01T18:09:35.7971635Z</updated>
<georss:line>49.247715624134514 -123.12920216031333 49.247256075077075 -123.12921880956934</georss:line>
</entry>
<entry>
<category term="Road Closure"/>
<content>This project is an externally constructed sewer project in the Shaughnessy neighbourhood aimed to provide new separated sewers in the area.

Full road closures will occur at different sections within the project boundaries over the course of the construction period.

June 2026 - Sewer work reaching completion, restoration work remaining
Location: Between Oak Street (west) and Hudson Street (east), from the south side of the West King Edward Avenue (WKE) to the north side of West 29th Avenue.
Schedule: Jun 30, 2025 - Aug 30, 2026; Weekdays; 7:00 AM - 4:00 PM</content>
<id>urn:uuid:fe3bd80f-45bf-4718-97f8-ba8c245d134e</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/7ed4d284-aef8-48c2-8e07-cb12f97a7f20"/>
<published>2025-05-13T07:00:00Z</published>
<title>Shaughnessy Sewer Renewal Project</title>
<updated>2026-06-01T18:09:35.7971635Z</updated>
<georss:line>49.24726698619082 -123.12990070361347 49.24727823814905 -123.13060377233911</georss:line>
</entry>
<entry>
<category term="Road Closure"/>
<content>This project is an externally constructed sewer project in the Shaughnessy neighbourhood aimed to provide new separated sewers in the area.

Full road closures will occur at different sections within the project boundaries over the course of the construction period.

June 2026 - Sewer work reaching completion, restoration work remaining
Location: Between Oak Street (west) and Hudson Street (east), from the south side of the West King Edward Avenue (WKE) to the north side of West 29th Avenue.
Schedule: Jun 30, 2025 - Aug 30, 2026; Weekdays; 7:00 AM - 4:00 PM</content>
<id>urn:uuid:bbbe0691-8f7b-4f88-9ed2-554f74ff2525</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/7ed4d284-aef8-48c2-8e07-cb12f97a7f20"/>
<published>2025-05-13T07:00:00Z</published>
<title>Shaughnessy Sewer Renewal Project</title>
<updated>2026-06-01T18:09:35.7971635Z</updated>
<georss:line>49.24773805718749 -123.1305871916027 49.24727823814905 -123.13060377233911</georss:line>
</entry>
<entry>
<category term="Road Closure"/>
<content>This project is an externally constructed sewer project in the Shaughnessy neighbourhood aimed to provide new separated sewers in the area.

Full road closures will occur at different sections within the project boundaries over the course of the construction period.

June 2026 - Sewer work reaching completion, restoration work remaining
Location: Between Oak Street (west) and Hudson Street (east), from the south side of the West King Edward Avenue (WKE) to the north side of West 29th Avenue.
Schedule: Jun 30, 2025 - Aug 30, 2026; Weekdays; 7:00 AM - 4:00 PM</content>
<id>urn:uuid:c270c2ce-c2eb-4750-ae61-5b775d8716f9</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/7ed4d284-aef8-48c2-8e07-cb12f97a7f20"/>
<published>2025-05-13T07:00:00Z</published>
<title>Shaughnessy Sewer Renewal Project</title>
<updated>2026-06-01T18:09:35.7971635Z</updated>
<georss:line>49.24776183612133 -123.13205513626171 49.24730173751601 -123.13207215605136</georss:line>
</entry>
<entry>
<category term="Road Closure"/>
<content>This project is an externally constructed sewer project in the Shaughnessy neighbourhood aimed to provide new separated sewers in the area.

Full road closures will occur at different sections within the project boundaries over the course of the construction period.

June 2026 - Sewer work reaching completion, restoration work remaining
Location: Between Oak Street (west) and Hudson Street (east), from the south side of the West King Edward Avenue (WKE) to the north side of West 29th Avenue.
Schedule: Jun 30, 2025 - Aug 30, 2026; Weekdays; 7:00 AM - 4:00 PM</content>
<id>urn:uuid:1f40c23d-190c-4cd9-bc84-82203ab41ce9</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/7ed4d284-aef8-48c2-8e07-cb12f97a7f20"/>
<published>2025-05-13T07:00:00Z</published>
<title>Shaughnessy Sewer Renewal Project</title>
<updated>2026-06-01T18:09:35.7971635Z</updated>
<georss:line>49.24773805718749 -123.1305871916027 49.24776183612133 -123.13205513626171</georss:line>
</entry>
<entry>
<category term="Road Closure"/>
<content>This project is an externally constructed sewer project in the Shaughnessy neighbourhood aimed to provide new separated sewers in the area.

Full road closures will occur at different sections within the project boundaries over the course of the construction period.

June 2026 - Sewer work reaching completion, restoration work remaining
Location: Between Oak Street (west) and Hudson Street (east), from the south side of the West King Edward Avenue (WKE) to the north side of West 29th Avenue.
Schedule: Jun 30, 2025 - Aug 30, 2026; Weekdays; 7:00 AM - 4:00 PM</content>
<id>urn:uuid:8c7f5fb3-c8bd-4a00-a965-c0adeefa8605</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/7ed4d284-aef8-48c2-8e07-cb12f97a7f20"/>
<published>2025-05-13T07:00:00Z</published>
<title>Shaughnessy Sewer Renewal Project</title>
<updated>2026-06-01T18:09:35.7971635Z</updated>
<georss:line>49.248198334958005 -123.13057059803619 49.24773805718749 -123.1305871916027</georss:line>
</entry>
<entry>
<category term="Road Closure"/>
<content>This project is an externally constructed sewer project in the Shaughnessy neighbourhood aimed to provide new separated sewers in the area.

Full road closures will occur at different sections within the project boundaries over the course of the construction period.

June 2026 - Sewer work reaching completion, restoration work remaining
Location: Between Oak Street (west) and Hudson Street (east), from the south side of the West King Edward Avenue (WKE) to the north side of West 29th Avenue.
Schedule: Jun 30, 2025 - Aug 30, 2026; Weekdays; 7:00 AM - 4:00 PM</content>
<id>urn:uuid:416db35d-9825-4752-9726-f340ad9bf427</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/7ed4d284-aef8-48c2-8e07-cb12f97a7f20"/>
<published>2025-05-13T07:00:00Z</published>
<title>Shaughnessy Sewer Renewal Project</title>
<updated>2026-06-01T18:09:35.7971635Z</updated>
<georss:line>49.24776183612133 -123.13205513626171 49.247799973673125 -123.13441267765032</georss:line>
</entry>
<entry>
<category term="Road Closure"/>
<content>This project is an externally constructed sewer project in the Shaughnessy neighbourhood aimed to provide new separated sewers in the area.

Full road closures will occur at different sections within the project boundaries over the course of the construction period.

June 2026 - Sewer work reaching completion, restoration work remaining
Location: Between Oak Street (west) and Hudson Street (east), from the south side of the West King Edward Avenue (WKE) to the north side of West 29th Avenue.
Schedule: Jun 30, 2025 - Aug 30, 2026; Weekdays; 7:00 AM - 4:00 PM</content>
<id>urn:uuid:2abbd9b0-0d5b-4e81-b514-4f062e61a7a1</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/7ed4d284-aef8-48c2-8e07-cb12f97a7f20"/>
<published>2025-05-13T07:00:00Z</published>
<title>Shaughnessy Sewer Renewal Project</title>
<updated>2026-06-01T18:09:35.7971635Z</updated>
<georss:line>49.24681708773451 -123.13062039048387 49.24684096423118 -123.13208917373356</georss:line>
</entry>
<entry>
<category term="Road Closure"/>
<content>This project is an externally constructed sewer project in the Shaughnessy neighbourhood aimed to provide new separated sewers in the area.

Full road closures will occur at different sections within the project boundaries over the course of the construction period.

June 2026 - Sewer work reaching completion, restoration work remaining
Location: Between Oak Street (west) and Hudson Street (east), from the south side of the West King Edward Avenue (WKE) to the north side of West 29th Avenue.
Schedule: Jun 30, 2025 - Aug 30, 2026; Weekdays; 7:00 AM - 4:00 PM</content>
<id>urn:uuid:02dc696f-85c1-459a-83c8-64bcf7231d15</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/7ed4d284-aef8-48c2-8e07-cb12f97a7f20"/>
<published>2025-05-13T07:00:00Z</published>
<title>Shaughnessy Sewer Renewal Project</title>
<updated>2026-06-01T18:09:35.7971635Z</updated>
<georss:line>49.24684096423118 -123.13208917373356 49.24687921976519 -123.13444521518551</georss:line>
</entry>
<entry>
<category term="Road Closure"/>
<content>This project is an externally constructed sewer project in the Shaughnessy neighbourhood aimed to provide new separated sewers in the area.

Full road closures will occur at different sections within the project boundaries over the course of the construction period.

June 2026 - Sewer work reaching completion, restoration work remaining
Location: Between Oak Street (west) and Hudson Street (east), from the south side of the West King Edward Avenue (WKE) to the north side of West 29th Avenue.
Schedule: Jun 30, 2025 - Aug 30, 2026; Weekdays; 7:00 AM - 4:00 PM</content>
<id>urn:uuid:342b89ce-6416-4d25-b9a9-7d7c7f5d7807</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/7ed4d284-aef8-48c2-8e07-cb12f97a7f20"/>
<published>2025-05-13T07:00:00Z</published>
<title>Shaughnessy Sewer Renewal Project</title>
<updated>2026-06-01T18:09:35.7971635Z</updated>
<georss:line>49.2459010567122 -123.13065340883833 49.245438493855374 -123.13067009105492</georss:line>
</entry>
<entry>
<category term="Road Closure"/>
<content>This project is an externally constructed sewer project in the Shaughnessy neighbourhood aimed to provide new separated sewers in the area.

Full road closures will occur at different sections within the project boundaries over the course of the construction period.

June 2026 - Sewer work reaching completion, restoration work remaining
Location: Between Oak Street (west) and Hudson Street (east), from the south side of the West King Edward Avenue (WKE) to the north side of West 29th Avenue.
Schedule: Jun 30, 2025 - Aug 30, 2026; Weekdays; 7:00 AM - 4:00 PM</content>
<id>urn:uuid:be48f2d3-bd7d-4cce-ba1e-0106287979cc</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/7ed4d284-aef8-48c2-8e07-cb12f97a7f20"/>
<published>2025-05-13T07:00:00Z</published>
<title>Shaughnessy Sewer Renewal Project</title>
<updated>2026-06-01T18:09:35.7971635Z</updated>
<georss:line>49.24635797927061 -123.13063694501557 49.2459010567122 -123.13065340883833</georss:line>
</entry>
<entry>
<category term="Road Closure"/>
<content>This project is an externally constructed sewer project in the Shaughnessy neighbourhood aimed to provide new separated sewers in the area.

Full road closures will occur at different sections within the project boundaries over the course of the construction period.

June 2026 - Sewer work reaching completion, restoration work remaining
Location: Between Oak Street (west) and Hudson Street (east), from the south side of the West King Edward Avenue (WKE) to the north side of West 29th Avenue.
Schedule: Jun 30, 2025 - Aug 30, 2026; Weekdays; 7:00 AM - 4:00 PM</content>
<id>urn:uuid:0afc0eab-686a-4122-ab5a-56c87dafb3ed</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/7ed4d284-aef8-48c2-8e07-cb12f97a7f20"/>
<published>2025-05-13T07:00:00Z</published>
<title>Shaughnessy Sewer Renewal Project</title>
<updated>2026-06-01T18:09:35.7971635Z</updated>
<georss:line>49.24681708773451 -123.13062039048387 49.24635797927061 -123.13063694501557</georss:line>
</entry>
<entry>
<category term="Road Closure"/>
<content>This project is an externally constructed sewer project in the Shaughnessy neighbourhood aimed to provide new separated sewers in the area.

Full road closures will occur at different sections within the project boundaries over the course of the construction period.

June 2026 - Sewer work reaching completion, restoration work remaining
Location: Between Oak Street (west) and Hudson Street (east), from the south side of the West King Edward Avenue (WKE) to the north side of West 29th Avenue.
Schedule: Jun 30, 2025 - Aug 30, 2026; Weekdays; 7:00 AM - 4:00 PM</content>
<id>urn:uuid:5aa2ecfd-293e-4e35-bc29-dee87200e925</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/7ed4d284-aef8-48c2-8e07-cb12f97a7f20"/>
<published>2025-05-13T07:00:00Z</published>
<title>Shaughnessy Sewer Renewal Project</title>
<updated>2026-06-01T18:09:35.7971635Z</updated>
<georss:line>49.246335375667826 -123.12925213047927 49.246346519390954 -123.12993497425019</georss:line>
</entry>
<entry>
<category term="Road Closure"/>
<content>This project is an externally constructed sewer project in the Shaughnessy neighbourhood aimed to provide new separated sewers in the area.

Full road closures will occur at different sections within the project boundaries over the course of the construction period.

June 2026 - Sewer work reaching completion, restoration work remaining
Location: Between Oak Street (west) and Hudson Street (east), from the south side of the West King Edward Avenue (WKE) to the north side of West 29th Avenue.
Schedule: Jun 30, 2025 - Aug 30, 2026; Weekdays; 7:00 AM - 4:00 PM</content>
<id>urn:uuid:71fe96d2-ae5e-4071-a2f1-e62c47125840</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/7ed4d284-aef8-48c2-8e07-cb12f97a7f20"/>
<published>2025-05-13T07:00:00Z</published>
<title>Shaughnessy Sewer Renewal Project</title>
<updated>2026-06-01T18:09:35.7971635Z</updated>
<georss:line>49.2458810979318 -123.12926857275839 49.245415638636075 -123.12928541147775</georss:line>
</entry>
<entry>
<category term="Road Closure"/>
<content>This project is an externally constructed sewer project in the Shaughnessy neighbourhood aimed to provide new separated sewers in the area.

Full road closures will occur at different sections within the project boundaries over the course of the construction period.

June 2026 - Sewer work reaching completion, restoration work remaining
Location: Between Oak Street (west) and Hudson Street (east), from the south side of the West King Edward Avenue (WKE) to the north side of West 29th Avenue.
Schedule: Jun 30, 2025 - Aug 30, 2026; Weekdays; 7:00 AM - 4:00 PM</content>
<id>urn:uuid:af824c09-9459-4654-9138-8f0e231eb138</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/7ed4d284-aef8-48c2-8e07-cb12f97a7f20"/>
<published>2025-05-13T07:00:00Z</published>
<title>Shaughnessy Sewer Renewal Project</title>
<updated>2026-06-01T18:09:35.7971635Z</updated>
<georss:line>49.2459010567122 -123.13065340883833 49.24592223313826 -123.13212313324763</georss:line>
</entry>
<entry>
<category term="Road Closure"/>
<content>This project is an externally constructed sewer project in the Shaughnessy neighbourhood aimed to provide new separated sewers in the area.

Full road closures will occur at different sections within the project boundaries over the course of the construction period.

June 2026 - Sewer work reaching completion, restoration work remaining
Location: Between Oak Street (west) and Hudson Street (east), from the south side of the West King Edward Avenue (WKE) to the north side of West 29th Avenue.
Schedule: Jun 30, 2025 - Aug 30, 2026; Weekdays; 7:00 AM - 4:00 PM</content>
<id>urn:uuid:8378a648-7191-47da-86d3-a33b5485d241</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/7ed4d284-aef8-48c2-8e07-cb12f97a7f20"/>
<published>2025-05-13T07:00:00Z</published>
<title>Shaughnessy Sewer Renewal Project</title>
<updated>2026-06-01T18:09:35.7971635Z</updated>
<georss:line>49.245829803185615 -123.13212655512521 49.2459231999413 -123.13320041189225 49.24612568270348 -123.134334638798 49.2461567816658 -123.13447172250747</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Charity bike ride around Jonathon Roger's Park

Closed circuit bicycle race around Jonathan Rogers Park, with closed city streets and beer garden. This will be a replica of Awesome Grand Prix, which ran from 2017-2019. Similar events include Gastown Grand Prix.
Location: 100-200 W 7th &amp; 8th Av, 2300 Alberta and Manitoba - loop around Jonathon Roger's Park. Columbia st will be closed as well as it's in the closure area
Schedule: Jul 4, 2026</content>
<id>urn:uuid:3090ac60-63ae-423c-b274-3ba08a277453</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/65d4fa50-a8bb-4448-a64d-e92c72b245dc"/>
<published>2026-05-20T07:00:00Z</published>
<title>Shim's Ride</title>
<updated>2026-05-20T19:53:17.0638516Z</updated>
<georss:line>49.263766694747034 -123.10680112805957 49.263316464077775 -123.10682490480849</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Charity bike ride around Jonathon Roger's Park

Closed circuit bicycle race around Jonathan Rogers Park, with closed city streets and beer garden. This will be a replica of Awesome Grand Prix, which ran from 2017-2019. Similar events include Gastown Grand Prix.
Location: 100-200 W 7th &amp; 8th Av, 2300 Alberta and Manitoba - loop around Jonathon Roger's Park. Columbia st will be closed as well as it's in the closure area
Schedule: Jul 4, 2026</content>
<id>urn:uuid:f44db0d5-4209-4a33-80af-d25ebc008aa0</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/65d4fa50-a8bb-4448-a64d-e92c72b245dc"/>
<published>2026-05-20T07:00:00Z</published>
<title>Shim's Ride</title>
<updated>2026-05-20T19:53:17.0638516Z</updated>
<georss:line>49.26552100264868 -123.1067297978128 49.264806867515176 -123.10675357456174</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Charity bike ride around Jonathon Roger's Park

Closed circuit bicycle race around Jonathan Rogers Park, with closed city streets and beer garden. This will be a replica of Awesome Grand Prix, which ran from 2017-2019. Similar events include Gastown Grand Prix.
Location: 100-200 W 7th &amp; 8th Av, 2300 Alberta and Manitoba - loop around Jonathon Roger's Park. Columbia st will be closed as well as it's in the closure area
Schedule: Jul 4, 2026</content>
<id>urn:uuid:49167ec4-7866-4592-9477-dc9fa33c9084</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/65d4fa50-a8bb-4448-a64d-e92c72b245dc"/>
<published>2026-05-20T07:00:00Z</published>
<title>Shim's Ride</title>
<updated>2026-05-20T19:53:17.0638516Z</updated>
<georss:line>49.26375116961992 -123.1049465416434 49.263813270099035 -123.10668224431495</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Charity bike ride around Jonathon Roger's Park

Closed circuit bicycle race around Jonathan Rogers Park, with closed city streets and beer garden. This will be a replica of Awesome Grand Prix, which ran from 2017-2019. Similar events include Gastown Grand Prix.
Location: 100-200 W 7th &amp; 8th Av, 2300 Alberta and Manitoba - loop around Jonathon Roger's Park. Columbia st will be closed as well as it's in the closure area
Schedule: Jul 4, 2026</content>
<id>urn:uuid:866d6b30-ef73-4958-bef0-529f34355f76</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/65d4fa50-a8bb-4448-a64d-e92c72b245dc"/>
<published>2026-05-20T07:00:00Z</published>
<title>Shim's Ride</title>
<updated>2026-05-20T19:53:17.0638516Z</updated>
<georss:line>49.26472148067657 -123.10665846756602 49.26469043139727 -123.10491087652002</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Charity bike ride around Jonathon Roger's Park

Closed circuit bicycle race around Jonathan Rogers Park, with closed city streets and beer garden. This will be a replica of Awesome Grand Prix, which ran from 2017-2019. Similar events include Gastown Grand Prix.
Location: 100-200 W 7th &amp; 8th Av, 2300 Alberta and Manitoba - loop around Jonathon Roger's Park. Columbia st will be closed as well as it's in the closure area
Schedule: Jul 4, 2026</content>
<id>urn:uuid:7aea4438-3d81-42ba-bec2-7a2804419cd1</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/65d4fa50-a8bb-4448-a64d-e92c72b245dc"/>
<published>2026-05-20T07:00:00Z</published>
<title>Shim's Ride</title>
<updated>2026-05-20T19:53:17.0638516Z</updated>
<georss:line>49.26385208304828 -123.11097394691551 49.263898658319704 -123.11281664495723</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Charity bike ride around Jonathon Roger's Park

Closed circuit bicycle race around Jonathan Rogers Park, with closed city streets and beer garden. This will be a replica of Awesome Grand Prix, which ran from 2017-2019. Similar events include Gastown Grand Prix.
Location: 100-200 W 7th &amp; 8th Av, 2300 Alberta and Manitoba - loop around Jonathon Roger's Park. Columbia st will be closed as well as it's in the closure area
Schedule: Jul 4, 2026</content>
<id>urn:uuid:5b9ad7ad-c23f-4dfb-8c50-949e895eb21f</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/65d4fa50-a8bb-4448-a64d-e92c72b245dc"/>
<published>2026-05-20T07:00:00Z</published>
<title>Shim's Ride</title>
<updated>2026-05-20T19:53:17.0638516Z</updated>
<georss:line>49.26382103303243 -123.1109382823726 49.26340185315817 -123.11096205738008</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Charity bike ride around Jonathon Roger's Park

Closed circuit bicycle race around Jonathan Rogers Park, with closed city streets and beer garden. This will be a replica of Awesome Grand Prix, which ran from 2017-2019. Similar events include Gastown Grand Prix.
Location: 100-200 W 7th &amp; 8th Av, 2300 Alberta and Manitoba - loop around Jonathon Roger's Park. Columbia st will be closed as well as it's in the closure area
Schedule: Jul 4, 2026</content>
<id>urn:uuid:cf22764f-036e-4f90-9198-bf81f92dc84a</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/65d4fa50-a8bb-4448-a64d-e92c72b245dc"/>
<published>2026-05-20T07:00:00Z</published>
<title>Shim's Ride</title>
<updated>2026-05-20T19:53:17.0638516Z</updated>
<georss:line>49.26561414999705 -123.11087884050028 49.26484567949339 -123.11091450562365</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Charity bike ride around Jonathon Roger's Park

Closed circuit bicycle race around Jonathan Rogers Park, with closed city streets and beer garden. This will be a replica of Awesome Grand Prix, which ran from 2017-2019. Similar events include Gastown Grand Prix.
Location: 100-200 W 7th &amp; 8th Av, 2300 Alberta and Manitoba - loop around Jonathon Roger's Park. Columbia st will be closed as well as it's in the closure area
Schedule: Jul 4, 2026</content>
<id>urn:uuid:2acf366e-b244-4a73-9bd9-e369a0ec0c30</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/65d4fa50-a8bb-4448-a64d-e92c72b245dc"/>
<published>2026-05-20T07:00:00Z</published>
<title>Shim's Ride</title>
<updated>2026-05-20T19:53:17.0638516Z</updated>
<georss:line>49.26476786342059 -123.11087483724266 49.264704379146195 -123.10677735116558 49.26387907348973 -123.10680513073679 49.26378837969432 -123.10702736730659 49.26388814241727 -123.11077760874338 49.2639969747317 -123.11090261681387 49.26474972522297 -123.11086094745703</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Charity bike ride around Jonathon Roger's Park

Closed circuit bicycle race around Jonathan Rogers Park, with closed city streets and beer garden. This will be a replica of Awesome Grand Prix, which ran from 2017-2019. Similar events include Gastown Grand Prix.
Location: 100-200 W 7th &amp; 8th Av, 2300 Alberta and Manitoba - loop around Jonathon Roger's Park. Columbia st will be closed as well as it's in the closure area
Schedule: Jul 4, 2026</content>
<id>urn:uuid:88297299-357c-4e9c-aa79-6360e16311b1</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/65d4fa50-a8bb-4448-a64d-e92c72b245dc"/>
<published>2026-05-20T07:00:00Z</published>
<title>Shim's Ride</title>
<updated>2026-05-20T19:53:17.0638516Z</updated>
<georss:line>49.265575338907524 -123.10947601115271 49.26487672905401 -123.10948790068815</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Charity bike ride around Jonathon Roger's Park

Closed circuit bicycle race around Jonathan Rogers Park, with closed city streets and beer garden. This will be a replica of Awesome Grand Prix, which ran from 2017-2019. Similar events include Gastown Grand Prix.
Location: 100-200 W 7th &amp; 8th Av, 2300 Alberta and Manitoba - loop around Jonathon Roger's Park. Columbia st will be closed as well as it's in the closure area
Schedule: Jul 4, 2026</content>
<id>urn:uuid:fb34a135-2893-4e73-9a45-41728e12b664</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/65d4fa50-a8bb-4448-a64d-e92c72b245dc"/>
<published>2026-05-20T07:00:00Z</published>
<title>Shim's Ride</title>
<updated>2026-05-20T19:53:17.0638516Z</updated>
<georss:line>49.263789982428506 -123.10945223556475 49.26335527760736 -123.10945223556475</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Charity bike ride around Jonathon Roger's Park

Closed circuit bicycle race around Jonathan Rogers Park, with closed city streets and beer garden. This will be a replica of Awesome Grand Prix, which ran from 2017-2019. Similar events include Gastown Grand Prix.
Location: 100-200 W 7th &amp; 8th Av, 2300 Alberta and Manitoba - loop around Jonathon Roger's Park. Columbia st will be closed as well as it's in the closure area
Schedule: Jul 4, 2026</content>
<id>urn:uuid:39303fb1-9f59-469c-b81c-ac1508cc1e30</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/65d4fa50-a8bb-4448-a64d-e92c72b245dc"/>
<published>2026-05-20T07:00:00Z</published>
<title>Shim's Ride</title>
<updated>2026-05-20T19:53:17.0638516Z</updated>
<georss:line>49.264798838283326 -123.11266803766425 49.26475226386157 -123.11107499896919</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>last week of school carnival for Churchill students

Full closure of 7100-7200 Heather from W 57th to W 54th - 8am to 5pm
Location: 7000-7200 Heather St
Schedule: Jun 23, 2026</content>
<id>urn:uuid:142bfe40-bb9f-4ad4-96fb-89340cd65f3e</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/8180493c-d54f-49e9-9165-aaba3dbdb05f"/>
<published>2026-03-02T08:00:00Z</published>
<title>Sir Winston Churchill School Carnival</title>
<updated>2026-03-02T22:22:48.920739Z</updated>
<georss:line>49.221396008191135 -123.12364648780684 49.2191745437637 -123.12374212969843</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>New traffic signal installation.
Location: 
Schedule: Jan 15, 2025 - Mar 31, 2025</content>
<id>urn:uuid:fa0d6e85-063a-40a2-95d1-f197287a0dc7</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/c58703ab-dba9-404a-ac57-02843e86b5c8"/>
<published>2025-02-14T08:00:00Z</published>
<title>Slocan and E. 22nd Signal Installation</title>
<updated>2025-02-14T18:22:00.3246027Z</updated>
<georss:line>49.25066051872946 -123.0496157600847 49.25065602818799 -123.04900910314416</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>New traffic signal installation.
Location: 
Schedule: Jan 15, 2025 - Mar 31, 2025</content>
<id>urn:uuid:90bfa23f-0ef2-4028-99bc-1d36cb5df166</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/c58703ab-dba9-404a-ac57-02843e86b5c8"/>
<published>2025-02-14T08:00:00Z</published>
<title>Slocan and E. 22nd Signal Installation</title>
<updated>2025-02-14T18:22:00.3246027Z</updated>
<georss:line>49.25066089523381 -123.05022249540902 49.25066051872946 -123.0496157600847</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>New traffic signal installation.
Location: 
Schedule: Jan 15, 2025 - Mar 31, 2025</content>
<id>urn:uuid:ccc93920-424a-4462-b3c3-7c4338dc174e</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/c58703ab-dba9-404a-ac57-02843e86b5c8"/>
<published>2025-02-14T08:00:00Z</published>
<title>Slocan and E. 22nd Signal Installation</title>
<updated>2025-02-14T18:22:00.3246027Z</updated>
<georss:line>49.25066051872946 -123.0496157600847 49.25016917361785 -123.0496133027478</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>New traffic signal installation.
Location: 
Schedule: Jan 15, 2025 - Mar 31, 2025</content>
<id>urn:uuid:0d11cbc4-b095-40ba-9342-df6bdbc71017</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/c58703ab-dba9-404a-ac57-02843e86b5c8"/>
<published>2025-02-14T08:00:00Z</published>
<title>Slocan and E. 22nd Signal Installation</title>
<updated>2025-02-14T18:22:00.3246027Z</updated>
<georss:line>49.2506614474143 -123.04964604135999 49.25100740036709 -123.04963311554438</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Replacement of the Spanish Banks culvert at Spanish Banks Beach Park
• Jul 7, 2026: Site mobilization and site prep work with Single Lane Alternating Traffic
• Jul 15-Sep 30, 2026:  NW Marine Drive will be closed within the MoTI project limits.
• Sept 30 -Oct 31, 2026:  Single Lane Alternating Traffic will be in effect along NW Marine Drive within the project limits.

Location: NW Marine Drive - Spanish Banks Beach Park
Schedule: Jul 7, 2026 - Oct 31, 2026</content>
<id>urn:uuid:090f66a7-49f8-44bb-83b1-ad571ed099e7</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/0e6b4ab9-4c2a-49d5-96cd-9598e7834be2"/>
<published>2025-05-23T07:00:00Z</published>
<title>Spanish Banks - Culvert Replacement - Spanish Banks Beach Park</title>
<updated>2026-04-21T22:41:56.5574933Z</updated>
<georss:line>49.277034869502955 -123.22196260165715 49.277180454694786 -123.22252952426338 49.27718971200812 -123.22256623291406 49.27720730158646 -123.22263887618182 49.27722407166263 -123.22271198325761 49.277239995303376 -123.22278552652014 49.27725508155618 -123.22285947850993 49.27726931245638 -123.22293382539424 49.27728270604669 -123.223008539754 49.27729523536752 -123.22308360771572 49.27730690949292 -123.22315898807132 49.27731771942726 -123.2232346807765 49.27732765625453 -123.22331064454194 49.27733672902244 -123.22338685190775 49.277344937730504 -123.22346330287 49.27735226446788 -123.22353995609859 49.277358718282414 -123.22361678413343 49.27736429017875 -123.2236937869299 49.277376467454474 -123.2238807110645</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>St George Rainway, Broadway to E. 5th. Green Infrastructure Led project. 

NO PERMITS TO BE ISSUED ON 2400 BLOCK WITHOUT PRIOR COORDINATION WITH THE ST GEORGE RAINWAY PROJECT

Update as of Feb 2026: Blocks 1 to 3 (2100 to 2300 St George) complete and open. Block 1(2400 St George) under construction, with lane closures on 2400 Block E 8th. Curb lane closure on 500 Block E Broadway until approximately August 30. Project is anticipated to be completed in Q2 2026. 

Location: St George St from E Broadway to E.5th Ave
Schedule: Mar 29, 2023 - Aug 30, 2026</content>
<id>urn:uuid:d4afcc67-cc82-45e3-b012-6755958b6ae5</id>
<link href="https://vancouver.ca/streets-transportation/st-george-rainway.aspx"/>
<published>2023-02-13T08:00:00Z</published>
<title>St George Rainway Project</title>
<updated>2026-05-28T17:18:55.0503897Z</updated>
<georss:line>49.26300839402131 -123.09299630747745 49.26251142029801 -123.09300440363242</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>St George Rainway, Broadway to E. 5th. Green Infrastructure Led project. 

NO PERMITS TO BE ISSUED ON 2400 BLOCK WITHOUT PRIOR COORDINATION WITH THE ST GEORGE RAINWAY PROJECT

Update as of Feb 2026: Blocks 1 to 3 (2100 to 2300 St George) complete and open. Block 1(2400 St George) under construction, with lane closures on 2400 Block E 8th. Curb lane closure on 500 Block E Broadway until approximately August 30. Project is anticipated to be completed in Q2 2026. 

Location: St George St from E Broadway to E.5th Ave
Schedule: Mar 29, 2023 - Aug 30, 2026</content>
<id>urn:uuid:f1113e45-d794-445c-8438-d66914a9e3b7</id>
<link href="https://vancouver.ca/streets-transportation/st-george-rainway.aspx"/>
<published>2023-02-13T08:00:00Z</published>
<title>St George Rainway Project</title>
<updated>2026-05-28T17:18:55.0503897Z</updated>
<georss:line>49.26346089445195 -123.09298939210346 49.26300839402131 -123.09299630747745</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>St George Rainway, Broadway to E. 5th. Green Infrastructure Led project. 

NO PERMITS TO BE ISSUED ON 2400 BLOCK WITHOUT PRIOR COORDINATION WITH THE ST GEORGE RAINWAY PROJECT

Update as of Feb 2026: Blocks 1 to 3 (2100 to 2300 St George) complete and open. Block 1(2400 St George) under construction, with lane closures on 2400 Block E 8th. Curb lane closure on 500 Block E Broadway until approximately August 30. Project is anticipated to be completed in Q2 2026. 

Location: St George St from E Broadway to E.5th Ave
Schedule: Mar 29, 2023 - Aug 30, 2026</content>
<id>urn:uuid:7f490a2e-24ae-4f81-b728-347378979b9c</id>
<link href="https://vancouver.ca/streets-transportation/st-george-rainway.aspx"/>
<published>2023-02-13T08:00:00Z</published>
<title>St George Rainway Project</title>
<updated>2026-05-28T17:18:55.0503897Z</updated>
<georss:line>49.262505808060126 -123.09298896649051 49.262489799942614 -123.09105344883959</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>St George Rainway, Broadway to E. 5th. Green Infrastructure Led project. 

NO PERMITS TO BE ISSUED ON 2400 BLOCK WITHOUT PRIOR COORDINATION WITH THE ST GEORGE RAINWAY PROJECT

Update as of Feb 2026: Blocks 1 to 3 (2100 to 2300 St George) complete and open. Block 1(2400 St George) under construction, with lane closures on 2400 Block E 8th. Curb lane closure on 500 Block E Broadway until approximately August 30. Project is anticipated to be completed in Q2 2026. 

Location: St George St from E Broadway to E.5th Ave
Schedule: Mar 29, 2023 - Aug 30, 2026</content>
<id>urn:uuid:08df7e71-af67-4823-a4d2-ff7dcb3eda8c</id>
<link href="https://vancouver.ca/streets-transportation/st-george-rainway.aspx"/>
<published>2023-02-13T08:00:00Z</published>
<title>St George Rainway Project</title>
<updated>2026-05-28T17:18:55.0503897Z</updated>
<georss:line>49.263002781760235 -123.09298087020237 49.2629873393939 -123.09104637873595</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>St George Rainway, Broadway to E. 5th. Green Infrastructure Led project. 

NO PERMITS TO BE ISSUED ON 2400 BLOCK WITHOUT PRIOR COORDINATION WITH THE ST GEORGE RAINWAY PROJECT

Update as of Feb 2026: Blocks 1 to 3 (2100 to 2300 St George) complete and open. Block 1(2400 St George) under construction, with lane closures on 2400 Block E 8th. Curb lane closure on 500 Block E Broadway until approximately August 30. Project is anticipated to be completed in Q2 2026. 

Location: St George St from E Broadway to E.5th Ave
Schedule: Mar 29, 2023 - Aug 30, 2026</content>
<id>urn:uuid:64a1bdcc-ad13-4045-bd03-b2075e39d1b5</id>
<link href="https://vancouver.ca/streets-transportation/st-george-rainway.aspx"/>
<published>2023-02-13T08:00:00Z</published>
<title>St George Rainway Project</title>
<updated>2026-05-28T17:18:55.0503897Z</updated>
<georss:line>49.2625212636693 -123.09492249142306 49.262505808060126 -123.09298896649051</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Traffic management will involve adequate advanced warning for motorists and cyclists along with delineators lining the curb base for additional warning. 
Location: Toderick St &amp; E 45th Av
Schedule: Jun 23, 2026 8:00 AM - 2:30 PM</content>
<id>urn:uuid:c0626192-7ed7-418f-8bef-e98db1ba4dcc</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/768aaf85-ce73-4dff-9036-24b5530568ad"/>
<published>2026-06-09T07:00:00Z</published>
<title>Street Horticulture (Local Garden Crew)</title>
<updated>2026-06-09T17:56:36.215591Z</updated>
<georss:line>49.22965697121805 -123.02918033199802 49.22925178193762 -123.02917207207574</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Traffic management will involve adequate advanced warning for motorists and cyclists along with delineators lining the curb base for additional warning. 
Location: Toderick St &amp; E 45th Av
Schedule: Jun 23, 2026 8:00 AM - 2:30 PM</content>
<id>urn:uuid:5739eafa-6842-45e9-a048-a364aa7d4063</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/768aaf85-ce73-4dff-9036-24b5530568ad"/>
<published>2026-06-09T07:00:00Z</published>
<title>Street Horticulture (Local Garden Crew)</title>
<updated>2026-06-09T17:56:36.215591Z</updated>
<georss:line>49.22925021664568 -123.02892212006985 49.22881494232598 -123.02893322480747</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Traffic management will involve adequate advanced warning for motorists and cyclists along with delineators lining the curb base for additional warning. 
Location: Toderick St &amp; E 45th Av
Schedule: Jun 23, 2026 8:00 AM - 2:30 PM</content>
<id>urn:uuid:9ef8fac4-e3a0-44df-8d74-70e2311baac0</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/768aaf85-ce73-4dff-9036-24b5530568ad"/>
<published>2026-06-09T07:00:00Z</published>
<title>Street Horticulture (Local Garden Crew)</title>
<updated>2026-06-09T17:56:36.215591Z</updated>
<georss:line>49.22925515697298 -123.02946375842855 49.229251653825514 -123.02856790061757</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Traffic management will involve adequate advanced warning for motorists and cyclists along with delineators lining the curb base for additional warning.
Location: Lakewood Dr and E 12th Ave
Schedule: Jun 18, 2026 8:00 AM - 2:30 PM</content>
<id>urn:uuid:5dbeb852-9347-4388-8072-a8fb9253bebb</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a3ba3944-07e5-4c89-9bc0-04e079721bb5"/>
<published>2026-06-08T07:00:00Z</published>
<title>Street Horticulture (Local Garden Crew)</title>
<updated>2026-06-08T18:02:43.1786387Z</updated>
<georss:line>49.260651052746226 -123.06205642194712 49.25951246383704 -123.06207728628912</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Traffic management will involve adequate advanced warning for motorists and cyclists along with delineators lining the curb base for additional warning.
Location: Lakewood Dr and E 12th Ave
Schedule: Jun 18, 2026 8:00 AM - 2:30 PM</content>
<id>urn:uuid:3178b375-3e7d-45e3-a0a5-d62696a9a677</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a3ba3944-07e5-4c89-9bc0-04e079721bb5"/>
<published>2026-06-08T07:00:00Z</published>
<title>Street Horticulture (Local Garden Crew)</title>
<updated>2026-06-08T18:02:43.1786387Z</updated>
<georss:line>49.25951246383704 -123.06207728628912 49.25905073478535 -123.06208632752941</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Traffic management will involve adequate advanced warning for motorists and cyclists along with delineators lining the curb base for additional warning.
Location: Lakewood Dr and E 12th Ave
Schedule: Jun 18, 2026 8:00 AM - 2:30 PM</content>
<id>urn:uuid:89966401-59ea-4f98-b6f5-311bb7590cfe</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a3ba3944-07e5-4c89-9bc0-04e079721bb5"/>
<published>2026-06-08T07:00:00Z</published>
<title>Street Horticulture (Local Garden Crew)</title>
<updated>2026-06-08T18:02:43.1786387Z</updated>
<georss:line>49.25952743810734 -123.06401109609985 49.25951246383704 -123.06207728628912</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Traffic management will involve adequate advanced warning for motorists and cyclists along with delineators lining the curb base for additional warning.
Location: Lakewood Dr and E 12th Ave
Schedule: Jun 18, 2026 8:00 AM - 2:30 PM</content>
<id>urn:uuid:42920430-08ad-4543-9e1f-455cad0ebe40</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a3ba3944-07e5-4c89-9bc0-04e079721bb5"/>
<published>2026-06-08T07:00:00Z</published>
<title>Street Horticulture (Local Garden Crew)</title>
<updated>2026-06-08T18:02:43.1786387Z</updated>
<georss:line>49.25951246383704 -123.06207728628912 49.25951081360722 -123.06196763872019 49.25950222436708 -123.06171333236364 49.25947629032791 -123.0614617944827 49.2594332799072 -123.0612157743616 49.25937367745925 -123.06097796655226 49.259298138311095 -123.06075098331893 49.25927451017441 -123.06069529348113 49.2590566423591 -123.0601521500142</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Traffic management will involve adequate advanced warning for motorists and cyclists along with delineators lining the curb base for additional warning.
Location: Lakewood Dr and E 12th Ave
Schedule: Jun 18, 2026 8:00 AM - 2:30 PM</content>
<id>urn:uuid:842843e9-1907-4c7b-abae-4ad39d265f90</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a3ba3944-07e5-4c89-9bc0-04e079721bb5"/>
<published>2026-06-08T07:00:00Z</published>
<title>Street Horticulture (Local Garden Crew)</title>
<updated>2026-06-08T18:02:43.1786387Z</updated>
<georss:line>49.25905073478535 -123.06208632752941 49.25859826191089 -123.06209510535284</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Traffic management will involve adequate advanced warning for motorists and cyclists along with delineators lining the curb base for additional warning.
Location: Lakewood Dr &amp; Parker St
Schedule: Jun 19, 2026 8:00 AM - 2:30 PM</content>
<id>urn:uuid:06e9b912-cd46-4cad-a7c9-4021829212f2</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/5bfa4a17-da95-4cb8-b16b-eca314954bad"/>
<published>2026-06-08T07:00:00Z</published>
<title>Street Horticulture (Local Garden Crew)</title>
<updated>2026-06-08T18:04:29.3577019Z</updated>
<georss:line>49.27570760745647 -123.06317296126693 49.275696935033636 -123.06176636445585</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Traffic management will involve adequate advanced warning for motorists and cyclists along with delineators lining the curb base for additional warning.
Location: Lakewood Dr &amp; Parker St
Schedule: Jun 19, 2026 8:00 AM - 2:30 PM</content>
<id>urn:uuid:c78e732a-6d74-4a2f-b306-81c70eb99460</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/5bfa4a17-da95-4cb8-b16b-eca314954bad"/>
<published>2026-06-08T07:00:00Z</published>
<title>Street Horticulture (Local Garden Crew)</title>
<updated>2026-06-08T18:04:29.3577019Z</updated>
<georss:line>49.275696935033636 -123.06176636445585 49.27568163587975 -123.05983144171077</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Traffic management will involve adequate advanced warning for motorists and cyclists along with delineators lining the curb base for additional warning.
Location: Lakewood Dr &amp; Parker St
Schedule: Jun 19, 2026 8:00 AM - 2:30 PM</content>
<id>urn:uuid:b8da5abc-7d69-4404-a544-0374657e6571</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/5bfa4a17-da95-4cb8-b16b-eca314954bad"/>
<published>2026-06-08T07:00:00Z</published>
<title>Street Horticulture (Local Garden Crew)</title>
<updated>2026-06-08T18:04:29.3577019Z</updated>
<georss:line>49.27614891226759 -123.06175671398972 49.275696935033636 -123.06176636445585</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Traffic management will involve adequate advanced warning for motorists and cyclists along with delineators lining the curb base for additional warning.
Location: Lakewood Dr &amp; Parker St
Schedule: Jun 19, 2026 8:00 AM - 2:30 PM</content>
<id>urn:uuid:eb46a7bb-a4b2-445b-9283-d8fafc3cc4c0</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/5bfa4a17-da95-4cb8-b16b-eca314954bad"/>
<published>2026-06-08T07:00:00Z</published>
<title>Street Horticulture (Local Garden Crew)</title>
<updated>2026-06-08T18:04:29.3577019Z</updated>
<georss:line>49.275696935033636 -123.06176636445585 49.27524443679263 -123.06177461181788</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Traffic management will involve adequate advanced warning for motorists and cyclists along with delineators lining the curb base for additional warning. 
Location: Laurel St &amp; W 59th Ave
Schedule: Jun 15, 2026 8:00 AM - 2:30 PM</content>
<id>urn:uuid:8fd729e9-d948-4473-9f4c-2b0704620dec</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/5e473353-3f81-414b-bce4-02a601d33df7"/>
<published>2026-06-08T07:00:00Z</published>
<title>Street Horticulture (Local Garden Crew)</title>
<updated>2026-06-08T17:51:21.7051293Z</updated>
<georss:line>49.217049107418575 -123.12612393106558 49.21706403879992 -123.1271911291356</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Traffic management will involve adequate advanced warning for motorists and cyclists along with delineators lining the curb base for additional warning. 
Location: Laurel St &amp; W 59th Ave
Schedule: Jun 15, 2026 8:00 AM - 2:30 PM</content>
<id>urn:uuid:b8864326-f36e-4bde-b735-fdaa5f587235</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/5e473353-3f81-414b-bce4-02a601d33df7"/>
<published>2026-06-08T07:00:00Z</published>
<title>Street Horticulture (Local Garden Crew)</title>
<updated>2026-06-08T17:51:21.7051293Z</updated>
<georss:line>49.21704183066953 -123.1261192656138 49.21702774805729 -123.12501972770603</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Traffic management will involve adequate advanced warning for motorists and cyclists along with delineators lining the curb base for additional warning. 
Location: Laurel St &amp; W 59th Ave
Schedule: Jun 15, 2026 8:00 AM - 2:30 PM</content>
<id>urn:uuid:b2153308-a518-49b5-b642-aa5c19129fd4</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/5e473353-3f81-414b-bce4-02a601d33df7"/>
<published>2026-06-08T07:00:00Z</published>
<title>Street Horticulture (Local Garden Crew)</title>
<updated>2026-06-08T17:51:21.7051293Z</updated>
<georss:line>49.21762625553967 -123.12615699485573 49.21705591327779 -123.12617316453085</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Traffic management will involve adequate advanced warning for motorists and cyclists along with delineators lining the curb base for additional warning. 
Location: Lakewood Dr &amp; Ferndale St
Schedule: Jun 18, 2026 8:00 AM - 2:30 PM</content>
<id>urn:uuid:78f6fa28-6d09-4dc0-953a-46ba9e795d54</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/8de36e11-92db-4e4d-a599-d7236e6e1a07"/>
<published>2026-06-08T07:00:00Z</published>
<title>Street Horticulture (Local Garden Crew)</title>
<updated>2026-06-08T18:00:10.6830866Z</updated>
<georss:line>49.27967404178972 -123.06366532240112 49.279664450681935 -123.06172983812225</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Traffic management will involve adequate advanced warning for motorists and cyclists along with delineators lining the curb base for additional warning. 
Location: Lakewood Dr &amp; Ferndale St
Schedule: Jun 18, 2026 8:00 AM - 2:30 PM</content>
<id>urn:uuid:b1f58af8-3602-4c32-a52a-0dc94ccd026e</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/8de36e11-92db-4e4d-a599-d7236e6e1a07"/>
<published>2026-06-08T07:00:00Z</published>
<title>Street Horticulture (Local Garden Crew)</title>
<updated>2026-06-08T18:00:10.6830866Z</updated>
<georss:line>49.279664450681935 -123.06172983812225 49.27965374711451 -123.05979554942935</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Traffic management will involve adequate advanced warning for motorists and cyclists along with delineators lining the curb base for additional warning. 
Location: Lakewood Dr &amp; Ferndale St
Schedule: Jun 18, 2026 8:00 AM - 2:30 PM</content>
<id>urn:uuid:bcd1a42d-f8bf-44a5-8fd7-02f93a76c0bc</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/8de36e11-92db-4e4d-a599-d7236e6e1a07"/>
<published>2026-06-08T07:00:00Z</published>
<title>Street Horticulture (Local Garden Crew)</title>
<updated>2026-06-08T18:00:10.6830866Z</updated>
<georss:line>49.28025177753656 -123.06172115294548 49.279664450681935 -123.06172983812225</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Traffic management will involve adequate advanced warning for motorists and cyclists along with delineators lining the curb base for additional warning. 
Location: Lakewood Dr &amp; Ferndale St
Schedule: Jun 18, 2026 8:00 AM - 2:30 PM</content>
<id>urn:uuid:b7c5ba5d-95f6-4048-b38f-14dd7b54773b</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/8de36e11-92db-4e4d-a599-d7236e6e1a07"/>
<published>2026-06-08T07:00:00Z</published>
<title>Street Horticulture (Local Garden Crew)</title>
<updated>2026-06-08T18:00:10.6830866Z</updated>
<georss:line>49.279664450681935 -123.06172983812225 49.279392910351305 -123.0617351638052</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Traffic management will involve adequate advanced warning for motorists and cyclists along with delineators lining the curb base for additional warning. 
Location: Lakewood Dr &amp; Ferndale St
Schedule: Jun 18, 2026 8:00 AM - 2:30 PM</content>
<id>urn:uuid:4de0d84b-42d1-4c04-81dc-fe9f357f521a</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/8de36e11-92db-4e4d-a599-d7236e6e1a07"/>
<published>2026-06-08T07:00:00Z</published>
<title>Street Horticulture (Local Garden Crew)</title>
<updated>2026-06-08T18:00:10.6830866Z</updated>
<georss:line>49.279392910351305 -123.0617351638052 49.279122080641116 -123.0617404628203</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Traffic management will involve adequate advanced warning as well as delineation at curb base for maintenance work being conducted in traffic circle.
Location: Vivian St at E 47th Ave
Schedule: Multiple occurrences as follows:
- May 19, 2026 8:00 AM - 2:30 PM
- Jun 11, 2026 8:00 AM - 2:30 PM
</content>
<id>urn:uuid:47160e2b-89a6-495f-9329-3238951e5126</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a3112935-3c0c-4346-aa11-0eb1c312acab"/>
<published>2026-06-03T07:00:00Z</published>
<title>Street Horticulture (Local Garden Crew)</title>
<updated>2026-06-03T20:33:22.2408722Z</updated>
<georss:line>49.22800064259661 -123.05015156172674 49.22754853923075 -123.05017592258406</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Traffic management will involve adequate advanced warning as well as delineation at curb base for maintenance work being conducted in traffic circle.
Location: Vivian St at E 47th Ave
Schedule: Multiple occurrences as follows:
- May 19, 2026 8:00 AM - 2:30 PM
- Jun 11, 2026 8:00 AM - 2:30 PM
</content>
<id>urn:uuid:4dd282ea-195e-4c22-90d1-3926eacc24f8</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a3112935-3c0c-4346-aa11-0eb1c312acab"/>
<published>2026-06-03T07:00:00Z</published>
<title>Street Horticulture (Local Garden Crew)</title>
<updated>2026-06-03T20:33:22.2408722Z</updated>
<georss:line>49.22754853923075 -123.05017592258406 49.227140594915454 -123.05019716880233</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Traffic management will involve adequate advanced warning as well as delineation at curb base for maintenance work being conducted in traffic circle.
Location: Vivian St at E 47th Ave
Schedule: Multiple occurrences as follows:
- May 19, 2026 8:00 AM - 2:30 PM
- Jun 11, 2026 8:00 AM - 2:30 PM
</content>
<id>urn:uuid:3cb1d755-8d96-4fde-84e4-f4f60735370b</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a3112935-3c0c-4346-aa11-0eb1c312acab"/>
<published>2026-06-03T07:00:00Z</published>
<title>Street Horticulture (Local Garden Crew)</title>
<updated>2026-06-03T20:33:22.2408722Z</updated>
<georss:line>49.22755716677278 -123.05064732138923 49.227544905334156 -123.04958516661934</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Traffic management will involve adequate advanced warning for motorists and cyclists along with delineators lining the curb base for additional warning. 
Location: Nanaimo St &amp; Wall St
Schedule: Multiple occurrences as follows:
- May 12, 2026 8:00 AM - 2:00 PM
- Jun 12, 2026 8:00 AM - 2:30 PM
</content>
<id>urn:uuid:62a569b2-2446-499d-8db8-51e4afe14ee7</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/93157020-1baf-4f0f-ac4b-7b5a78f2a980"/>
<published>2026-06-03T07:00:00Z</published>
<title>Street Horticulture (Local Garden Crew)</title>
<updated>2026-06-03T20:27:40.3963148Z</updated>
<georss:line>49.290689587165616 -123.05649229047977 49.29072581629626 -123.05631492905142</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Traffic management will involve adequate advanced warning for motorists and cyclists along with delineators lining the curb base for additional warning. 
Location: Nanaimo St &amp; Wall St
Schedule: Multiple occurrences as follows:
- May 12, 2026 8:00 AM - 2:00 PM
- Jun 12, 2026 8:00 AM - 2:30 PM
</content>
<id>urn:uuid:1d6cefa5-e81c-4425-b8db-8ac533a72c75</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/93157020-1baf-4f0f-ac4b-7b5a78f2a980"/>
<published>2026-06-03T07:00:00Z</published>
<title>Street Horticulture (Local Garden Crew)</title>
<updated>2026-06-03T20:27:40.3963148Z</updated>
<georss:line>49.290259852588804 -123.05649166192862 49.290689587165616 -123.05649229047977</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Traffic management will involve adequate advanced warning for motorists and cyclists along with delineators lining the curb base for additional warning. 
Location: Nanaimo St &amp; Wall St
Schedule: Multiple occurrences as follows:
- May 12, 2026 8:00 AM - 2:00 PM
- Jun 12, 2026 8:00 AM - 2:30 PM
</content>
<id>urn:uuid:707b871a-e13b-4c3c-bd08-60a3a5dacda8</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/93157020-1baf-4f0f-ac4b-7b5a78f2a980"/>
<published>2026-06-03T07:00:00Z</published>
<title>Street Horticulture (Local Garden Crew)</title>
<updated>2026-06-03T20:27:40.3963148Z</updated>
<georss:line>49.29052066158624 -123.05706217646242 49.29082650181073 -123.05593029920443</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Traffic management will involve adequate advanced warning for motorists and cyclists along with delineators lining the curb base for additional warning. 
Location: Nanaimo St &amp; Wall St
Schedule: Multiple occurrences as follows:
- May 12, 2026 8:00 AM - 2:00 PM
- Jun 12, 2026 8:00 AM - 2:30 PM
</content>
<id>urn:uuid:b6b55233-4c2b-4303-a59a-dbd37c2f538c</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/93157020-1baf-4f0f-ac4b-7b5a78f2a980"/>
<published>2026-06-03T07:00:00Z</published>
<title>Street Horticulture (Local Garden Crew)</title>
<updated>2026-06-03T20:27:40.3963148Z</updated>
<georss:line>49.29096008660076 -123.05653935696704 49.29067533963806 -123.05653396707534</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Traffic management will involve adequate advanced warning as well as delineation at curb base for maintenance work being conducted in traffic circle. 
Location: Maple Cr &amp; Nanton St
Schedule: Jun 22, 2026 8:00 AM - 2:30 PM</content>
<id>urn:uuid:dafbd577-8fb3-4133-b3c8-b1a8ea583a9e</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/455e418e-9979-44e7-bf21-4b339cd56786"/>
<published>2026-06-09T07:00:00Z</published>
<title>Street Horticulture (Local Garden Crew)</title>
<updated>2026-06-09T17:49:15.988846Z</updated>
<georss:line>49.24790479176565 -123.15013533974242 49.247236281039136 -123.14963407981388</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Traffic management will involve adequate advanced warning as well as delineation at curb base for maintenance work being conducted in traffic circle. 
Location: Maple Cr &amp; Nanton St
Schedule: Jun 22, 2026 8:00 AM - 2:30 PM</content>
<id>urn:uuid:e5441ddf-320a-41a8-a260-e35060ab1030</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/455e418e-9979-44e7-bf21-4b339cd56786"/>
<published>2026-06-09T07:00:00Z</published>
<title>Street Horticulture (Local Garden Crew)</title>
<updated>2026-06-09T17:49:15.988846Z</updated>
<georss:line>49.24758461144185 -123.15042100400277 49.24757757448833 -123.14933224587841</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Traffic management will involve an EB Curb Lane closure with a 1 lane shift.  
Location: Gladstone St &amp; SE Marine Dr
Schedule: Jun 23, 2026 9:30 AM - 2:30 PM</content>
<id>urn:uuid:e071596b-7983-41fa-8c45-b05fcf02aeef</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/2e9482da-86fa-4d3b-86c0-4587c6280575"/>
<published>2026-06-09T07:00:00Z</published>
<title>Street Horticulture (Local Garden Crew)</title>
<updated>2026-06-09T18:10:35.7478898Z</updated>
<georss:line>49.20909995419257 -123.06437143298551 49.20839297616536 -123.06225846708517</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Traffic management will involve an EB Curb Lane closure with a 1 lane shift.  
Location: Gladstone St &amp; SE Marine Dr
Schedule: Jun 23, 2026 9:30 AM - 2:30 PM</content>
<id>urn:uuid:f36d5a54-7eb4-4689-90e4-d45de9a9974f</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/2e9482da-86fa-4d3b-86c0-4587c6280575"/>
<published>2026-06-09T07:00:00Z</published>
<title>Street Horticulture (Local Garden Crew)</title>
<updated>2026-06-09T18:10:35.7478898Z</updated>
<georss:line>49.20839297616536 -123.06225846708517 49.2078216529213 -123.06226830744917</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Traffic management will involve adequate advanced warning for motorists and cyclists along with delineators lining the curb base for additional warning. 
Location: Princess St &amp; Atlantic St
Schedule: Jun 24, 2026 8:00 AM - 2:30 PM</content>
<id>urn:uuid:1472807a-7863-434a-a1d6-dcd42213ceaf</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/5fb9f872-7cdf-468f-b16e-dd310c97914c"/>
<published>2026-06-09T07:00:00Z</published>
<title>Street Horticulture (Local Garden Crew)</title>
<updated>2026-06-09T17:58:45.4178221Z</updated>
<georss:line>49.27575742392375 -123.09206789782866 49.27574517445106 -123.09133833697662</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Traffic management will involve adequate advanced warning for motorists and cyclists along with delineators lining the curb base for additional warning. 
Location: Princess St &amp; Atlantic St
Schedule: Jun 24, 2026 8:00 AM - 2:30 PM</content>
<id>urn:uuid:90a757f0-8d10-4bea-b5eb-3833dbf051b5</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/5fb9f872-7cdf-468f-b16e-dd310c97914c"/>
<published>2026-06-09T07:00:00Z</published>
<title>Street Horticulture (Local Garden Crew)</title>
<updated>2026-06-09T17:58:45.4178221Z</updated>
<georss:line>49.27597791391162 -123.09172189286575 49.27575567399924 -123.09172993949278</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Traffic management will involve adequate advanced warning for motorists and cyclists along with delineators lining the curb base for additional warning. 
Location: Prince Edward St &amp; E 13th Av
Schedule: Jun 22, 2026 9:30 AM - 2:30 PM</content>
<id>urn:uuid:0e38a89a-cdc3-441c-b2e5-8cea5fa37e7b</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e1b7b4d4-382b-4e72-a184-9694c8177824"/>
<published>2026-06-09T07:00:00Z</published>
<title>Street Horticulture (Local Garden Crew)</title>
<updated>2026-06-09T18:08:51.2535613Z</updated>
<georss:line>49.25925026638245 -123.09631037717169 49.25963315022918 -123.09627482559256</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Traffic management will involve adequate advanced warning for motorists and cyclists along with delineators lining the curb base for additional warning. 
Location: Prince Edward St &amp; E 13th Av
Schedule: Jun 22, 2026 9:30 AM - 2:30 PM</content>
<id>urn:uuid:910ae3b6-f996-416f-8c49-cd128c3d91f1</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e1b7b4d4-382b-4e72-a184-9694c8177824"/>
<published>2026-06-09T07:00:00Z</published>
<title>Street Horticulture (Local Garden Crew)</title>
<updated>2026-06-09T18:08:51.2535613Z</updated>
<georss:line>49.25925026638245 -123.09631037717169 49.259241716390505 -123.09566620695928</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Traffic management will involve adequate advanced warning for motorists and cyclists along with delineators lining the curb base for additional warning. 
Location: Prince Edward St &amp; E 13th Av
Schedule: Jun 22, 2026 9:30 AM - 2:30 PM</content>
<id>urn:uuid:ecd4d45a-99f0-4af1-a0fb-b1a451dc8537</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e1b7b4d4-382b-4e72-a184-9694c8177824"/>
<published>2026-06-09T07:00:00Z</published>
<title>Street Horticulture (Local Garden Crew)</title>
<updated>2026-06-09T18:08:51.2535613Z</updated>
<georss:line>49.25925831753 -123.09688009855994 49.25925026638245 -123.09631037717169</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Traffic management will involve adequate advanced warning for motorists and cyclists along with delineators lining the curb base for additional warning. 
Location: Prince Edward St &amp; E 13th Av
Schedule: Jun 22, 2026 9:30 AM - 2:30 PM</content>
<id>urn:uuid:6fe5a25b-f249-492e-a35a-7cbd7ed23df2</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e1b7b4d4-382b-4e72-a184-9694c8177824"/>
<published>2026-06-09T07:00:00Z</published>
<title>Street Horticulture (Local Garden Crew)</title>
<updated>2026-06-09T18:08:51.2535613Z</updated>
<georss:line>49.25925026638245 -123.09631037717169 49.258799319441636 -123.09635225506061</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Traffic management will involve adequate advanced warning for motorists and cyclists along with delineators lining the curb base for additional warning. 
Location: Dumfries St &amp; E 37th Ave
Schedule: Jun 17, 2026 8:00 AM - 2:30 PM</content>
<id>urn:uuid:a4919e29-0684-471e-9ea5-9a891649ef2e</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/62569c45-6fea-4a78-82fa-2c57c366c5ed"/>
<published>2026-06-08T07:00:00Z</published>
<title>Street Horticulture (Local Garden Crew)</title>
<updated>2026-06-08T17:58:19.7747175Z</updated>
<georss:line>49.23682101751112 -123.0741339544697 49.236806445278944 -123.07276145081562</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Traffic management will involve adequate advanced warning for motorists and cyclists along with delineators lining the curb base for additional warning. 
Location: Dumfries St &amp; E 37th Ave
Schedule: Jun 17, 2026 8:00 AM - 2:30 PM</content>
<id>urn:uuid:a552085c-5868-43c2-8801-ce3d3d83d4a5</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/62569c45-6fea-4a78-82fa-2c57c366c5ed"/>
<published>2026-06-08T07:00:00Z</published>
<title>Street Horticulture (Local Garden Crew)</title>
<updated>2026-06-08T17:58:19.7747175Z</updated>
<georss:line>49.23683903857656 -123.07551720667813 49.23682101751112 -123.0741339544697</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Traffic management will involve adequate advanced warning for motorists and cyclists along with delineators lining the curb base for additional warning. 
Location: Dumfries St &amp; E 37th Ave
Schedule: Jun 17, 2026 8:00 AM - 2:30 PM</content>
<id>urn:uuid:611bb41e-e2c7-4732-83c4-37580b4ca59e</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/62569c45-6fea-4a78-82fa-2c57c366c5ed"/>
<published>2026-06-08T07:00:00Z</published>
<title>Street Horticulture (Local Garden Crew)</title>
<updated>2026-06-08T17:58:19.7747175Z</updated>
<georss:line>49.23682101751112 -123.0741339544697 49.23640946597283 -123.07414952080866</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Traffic management will involve adequate advanced warning for motorists and cyclists along with delineators lining the curb base for additional warning. 
Location: Dumfries St &amp; E 37th Ave
Schedule: Jun 17, 2026 8:00 AM - 2:30 PM</content>
<id>urn:uuid:59b512ea-5ca2-4157-8df9-d30252b6bcde</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/62569c45-6fea-4a78-82fa-2c57c366c5ed"/>
<published>2026-06-08T07:00:00Z</published>
<title>Street Horticulture (Local Garden Crew)</title>
<updated>2026-06-08T17:58:19.7747175Z</updated>
<georss:line>49.23766078640236 -123.07410637647673 49.23682101751112 -123.0741339544697</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Traffic management with involve a temporary closure of E 37th to vehicular traffic from Knight St to Lanark St.  The road will be open to cyclists as well as local traffic where needed.
Location: 1400 Blk of E 37th Ave
Schedule: Jun 16, 2026 8:00 AM - 2:30 PM</content>
<id>urn:uuid:85a7568c-fa9f-4a3d-b86b-18d5d05223f5</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a6f78155-52bc-44b6-b27a-ec01bac282c2"/>
<published>2026-06-08T07:00:00Z</published>
<title>Street Horticulture (Local Garden Crew)</title>
<updated>2026-06-08T17:55:11.3044771Z</updated>
<georss:line>49.23685251623641 -123.07689030105894 49.23683903857656 -123.07551720667813</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Traffic management will involve adequate advanced warning for motorists and cyclists along with delineators lining the curb base for additional warning. 
Location: Chester St &amp; E 63rd Av
Schedule: Jun 24, 2026 8:00 AM - 2:30 PM</content>
<id>urn:uuid:e89e8467-ca5d-4336-a1b1-018a48f625a0</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/89a413bf-19dd-4da1-b434-31739fb1e36b"/>
<published>2026-06-09T07:00:00Z</published>
<title>Street Horticulture (Local Garden Crew)</title>
<updated>2026-06-09T18:00:22.6202861Z</updated>
<georss:line>49.21299552281545 -123.0902814877252 49.21298234208834 -123.08953368260417</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Traffic management will involve adequate advanced warning for motorists and cyclists along with delineators lining the curb base for additional warning. 
Location: Chester St &amp; E 63rd Av
Schedule: Jun 24, 2026 8:00 AM - 2:30 PM</content>
<id>urn:uuid:3541c373-eda1-4a6e-93f7-a6385fd3999a</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/89a413bf-19dd-4da1-b434-31739fb1e36b"/>
<published>2026-06-09T07:00:00Z</published>
<title>Street Horticulture (Local Garden Crew)</title>
<updated>2026-06-09T18:00:22.6202861Z</updated>
<georss:line>49.21298234208834 -123.08953368260417 49.21296995678395 -123.08884478348082</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Traffic management will involve adequate advanced warning for motorists and cyclists along with delineators lining the curb base for additional warning. 
Location: Chester St &amp; E 63rd Av
Schedule: Jun 24, 2026 8:00 AM - 2:30 PM</content>
<id>urn:uuid:4289cebf-87c8-465c-84aa-66134650bd1d</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/89a413bf-19dd-4da1-b434-31739fb1e36b"/>
<published>2026-06-09T07:00:00Z</published>
<title>Street Horticulture (Local Garden Crew)</title>
<updated>2026-06-09T18:00:22.6202861Z</updated>
<georss:line>49.21298570917685 -123.08954642460628 49.21268083406565 -123.08954642460628</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Traffic management will involve adequate advanced warning for motorists and cyclists along with delineators lining the curb base for additional warning.
Location: Tyne St &amp; Kingsway
Schedule: Multiple occurrences as follows:
- Jun 2, 2026 8:00 AM - 2:30 PM
- Jun 15, 2026 8:00 AM - 2:30 PM
</content>
<id>urn:uuid:c2c17e20-4626-43f2-bc87-f75b6348f92f</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/b944208b-25e2-4e5b-8372-62dffe9a5a6c"/>
<published>2026-06-08T07:00:00Z</published>
<title>Street Horticulture (Local Garden Crew) </title>
<updated>2026-06-08T17:48:50.8306509Z</updated>
<georss:line>49.232404232517666 -123.03250631337848 49.232287901663966 -123.0322325349557 49.23217736110513 -123.03190089222021 49.232090121620615 -123.03155342835143 49.23204262845701 -123.03128230717809</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Traffic management will involve adequate advanced warning for motorists and cyclists along with delineators lining the curb base for additional warning.
Location: Tyne St &amp; Kingsway
Schedule: Multiple occurrences as follows:
- Jun 2, 2026 8:00 AM - 2:30 PM
- Jun 15, 2026 8:00 AM - 2:30 PM
</content>
<id>urn:uuid:a9c28de8-3fc6-4e68-8989-efc0f4a2911a</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/b944208b-25e2-4e5b-8372-62dffe9a5a6c"/>
<published>2026-06-08T07:00:00Z</published>
<title>Street Horticulture (Local Garden Crew) </title>
<updated>2026-06-08T17:48:50.8306509Z</updated>
<georss:line>49.23204262845701 -123.03128230717809 49.23118976938406 -123.03210580991485 49.231175257039865 -123.03211659670714 49.23116062785951 -123.03212701255573 49.23114587285929 -123.03213701624819 49.23113101901737 -123.0321466352736 49.23111605734249 -123.03215585589075 49.231100978839436 -123.03216467809413 49.23108581049408 -123.03217310190156 49.23107054331507 -123.03218111357198 49.23105519529298 -123.03218871311732 49.23103975743268 -123.03219590053212 49.23102423872567 -123.03220268955819 49.231008639179635 -123.03220905272467 49.23099297678141 -123.03221500377924 49.23097796222871 -123.03222028220867 49.23097725153477 -123.03222052898664 49.230961454440745 -123.03222564207704 49.23095342101274 -123.03222802683882</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Traffic management will involve adequate advanced warning for motorists and cyclists along with delineators lining the curb base for additional warning.
Location: Tyne St &amp; Kingsway
Schedule: Multiple occurrences as follows:
- Jun 2, 2026 8:00 AM - 2:30 PM
- Jun 15, 2026 8:00 AM - 2:30 PM
</content>
<id>urn:uuid:fe69be78-7470-4fce-a6f2-6808c45a3cdf</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/b944208b-25e2-4e5b-8372-62dffe9a5a6c"/>
<published>2026-06-08T07:00:00Z</published>
<title>Street Horticulture (Local Garden Crew) </title>
<updated>2026-06-08T17:48:50.8306509Z</updated>
<georss:line>49.23204262845701 -123.03128230717809 49.23202714453342 -123.03119394837985 49.23202154609359 -123.03113983932693 49.231989121318236 -123.0308263807049 49.23198205222843 -123.03061900628771</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Traffic management will involve adequate advanced warning for motorists and cyclists along with delineators lining the curb base for additional warning.
Location: Tyne St &amp; Kingsway
Schedule: Multiple occurrences as follows:
- Jun 2, 2026 8:00 AM - 2:30 PM
- Jun 15, 2026 8:00 AM - 2:30 PM
</content>
<id>urn:uuid:393931f2-6cbc-4c5d-a719-65ba7fc46ab0</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/b944208b-25e2-4e5b-8372-62dffe9a5a6c"/>
<published>2026-06-08T07:00:00Z</published>
<title>Street Horticulture (Local Garden Crew) </title>
<updated>2026-06-08T17:48:50.8306509Z</updated>
<georss:line>49.232310259265944 -123.03086600265517 49.23202154609359 -123.03113983932693</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Traffic management will involve adequate advanced warning for motorists and cyclists along with delineators lining the curb base for additional warning. 
Location: Scotia St &amp; E 1st Ave
Schedule: Multiple occurrences as follows:
- Jun 12, 2026 8:00 AM - 2:30 PM
- Jun 10, 2026 8:00 AM - 2:30 PM
</content>
<id>urn:uuid:75d65f42-d05e-4666-9e4f-24cc3f64ceba</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d38fd383-52da-4dfa-926a-07958539b7e7"/>
<published>2026-06-03T07:00:00Z</published>
<title>Street Horticulture (Local Garden Crew) </title>
<updated>2026-06-03T20:34:30.241539Z</updated>
<georss:line>49.26838280981724 -123.09737360051031 49.268091171279394 -123.09776325798781</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Traffic management will involve adequate advanced warning for motorists and cyclists along with delineators lining the curb base for additional warning. 
Location: Scotia St &amp; E 1st Ave
Schedule: Multiple occurrences as follows:
- Jun 12, 2026 8:00 AM - 2:30 PM
- Jun 10, 2026 8:00 AM - 2:30 PM
</content>
<id>urn:uuid:81811bbc-294b-4a67-b9eb-42eda105fcf2</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d38fd383-52da-4dfa-926a-07958539b7e7"/>
<published>2026-06-03T07:00:00Z</published>
<title>Street Horticulture (Local Garden Crew) </title>
<updated>2026-06-03T20:34:30.241539Z</updated>
<georss:line>49.26866769712552 -123.09786782497714 49.268092253161825 -123.0968599576759</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Traffic management will involve adequate advanced warning for motorists and cyclists along with delineators lining the curb base for additional warning.
Location: 3600 Cameron Av
Schedule: Jun 26, 2026 8:00 AM - 2:30 PM</content>
<id>urn:uuid:6e946989-03e6-44d7-a752-461e9f151b11</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/92e0e189-d296-4645-85e9-a93abf012432"/>
<published>2026-06-09T07:00:00Z</published>
<title>Street Horticulture (Local Garden Crew) </title>
<updated>2026-06-09T18:05:36.2221735Z</updated>
<georss:line>49.27279989332192 -123.1835877852362 49.27285864989932 -123.18370100525955 49.27288864561626 -123.18554394354545</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Traffic management will involve adequate advanced warning for motorists and cyclists along with delineators lining the curb base for additional warning. 
Location: Elliott St &amp; Ashburn St
Schedule: Jun 25, 2026 8:00 AM - 2:30 PM</content>
<id>urn:uuid:1489f911-7236-452a-92d2-6cc4be86f34e</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/37a287f8-f46c-4310-9e42-1e38dbb9637d"/>
<published>2026-06-09T07:00:00Z</published>
<title>Street Horticulture (Local Garden Crew) </title>
<updated>2026-06-09T18:03:51.6866113Z</updated>
<georss:line>49.218956487715275 -123.05487740760944 49.21891704714423 -123.05486960523638 49.21887769702073 -123.05486075932777 49.21883846433036 -123.05485086991592 49.218799340084104 -123.05483992326114 49.218760351254474 -123.05482794686003 49.218721506842854 -123.05481492699272 49.218682815837695 -123.05480087740362 49.218644296222635 -123.05478581184711 49.21860594800387 -123.05476971659319 49.2185677891714 -123.05475259166398 49.21852983770884 -123.05473445081363 49.2184920936092 -123.05471530777635 49.21846738081763 -123.05470216634293</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Traffic management will involve adequate advanced warning for motorists and cyclists along with delineators lining the curb base for additional warning. 
Location: Elliott St &amp; Ashburn St
Schedule: Jun 25, 2026 8:00 AM - 2:30 PM</content>
<id>urn:uuid:62a94baa-7dd1-4e09-b1ce-dbb7d4d46a8c</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/37a287f8-f46c-4310-9e42-1e38dbb9637d"/>
<published>2026-06-09T07:00:00Z</published>
<title>Street Horticulture (Local Garden Crew) </title>
<updated>2026-06-09T18:03:51.6866113Z</updated>
<georss:line>49.21914205922454 -123.05492233265048 49.21894934630791 -123.0548740528882</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Traffic management with involve a temporary closure of E 45th to vehicular traffic.  The road will be open to cyclists as well as local traffic where needed.  
Location: Boundary Rd &amp; E 45th Ave
Schedule: Multiple occurrences as follows:
- Jun 17, 2025 8:00 AM - 2:30 PM
- Jun 11, 2026 8:00 AM - 2:30 PM
</content>
<id>urn:uuid:5141641f-b349-4e6b-af75-db3aa0cdd4bd</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e4b371ed-236f-4688-97fc-fb80270d0b06"/>
<published>2026-06-03T07:00:00Z</published>
<title>Street Horticulture (Local Garden Crew) Work </title>
<updated>2026-06-03T20:31:51.5784589Z</updated>
<georss:line>49.22923082730884 -123.02412293445163 49.22922843776587 -123.02358471047124</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Traffic management with involve a temporary closure of E 45th to vehicular traffic.  The road will be open to cyclists as well as local traffic where needed.  
Location: Boundary Rd &amp; E 45th Ave
Schedule: Multiple occurrences as follows:
- Jun 17, 2025 8:00 AM - 2:30 PM
- Jun 11, 2026 8:00 AM - 2:30 PM
</content>
<id>urn:uuid:241a863d-9a11-469b-b482-aec447a13a7b</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e4b371ed-236f-4688-97fc-fb80270d0b06"/>
<published>2026-06-03T07:00:00Z</published>
<title>Street Horticulture (Local Garden Crew) Work </title>
<updated>2026-06-03T20:31:51.5784589Z</updated>
<georss:line>49.22923300777171 -123.02427745516952 49.22923082730884 -123.02412293445163</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Median mow and clean up - reduced lanes
Location: Marine Dr and Knight St
Schedule: Jun 10, 2026 9:30 AM - 3:00 PM</content>
<id>urn:uuid:6e100c9e-ca4a-4b94-af85-8cbe87a7a3c4</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cec51e69-762e-448d-8206-c590f405ebc0"/>
<published>2026-06-08T07:00:00Z</published>
<title>Street Horticulture Work</title>
<updated>2026-06-08T17:41:19.7605284Z</updated>
<georss:line>49.21109735616119 -123.07914368209927 49.21109204644716 -123.07851465857102</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Median mow and clean up - reduced lanes
Location: Marine Dr and Knight St
Schedule: Jun 10, 2026 9:30 AM - 3:00 PM</content>
<id>urn:uuid:79a1c452-63ed-4cb1-8481-32a4ee742af5</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cec51e69-762e-448d-8206-c590f405ebc0"/>
<published>2026-06-08T07:00:00Z</published>
<title>Street Horticulture Work</title>
<updated>2026-06-08T17:41:19.7605284Z</updated>
<georss:line>49.21110178136607 -123.07966777923217 49.21109735616119 -123.07914368209927</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Median mow and clean up - reduced lanes
Location: Marine Dr and Knight St
Schedule: Jun 10, 2026 9:30 AM - 3:00 PM</content>
<id>urn:uuid:1fe5bc24-b23b-4db1-a836-d400c016af26</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cec51e69-762e-448d-8206-c590f405ebc0"/>
<published>2026-06-08T07:00:00Z</published>
<title>Street Horticulture Work</title>
<updated>2026-06-08T17:41:19.7605284Z</updated>
<georss:line>49.21110373533503 -123.07989931236047 49.21110178136607 -123.07966777923217</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Median mow and clean up - reduced lanes
Location: Marine Dr and Knight St
Schedule: Jun 10, 2026 9:30 AM - 3:00 PM</content>
<id>urn:uuid:25e9c740-12d3-4565-aee4-8255f8a3592d</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cec51e69-762e-448d-8206-c590f405ebc0"/>
<published>2026-06-08T07:00:00Z</published>
<title>Street Horticulture Work</title>
<updated>2026-06-08T17:41:19.7605284Z</updated>
<georss:line>49.2111101054295 -123.0807123756486 49.21110373533503 -123.07989931236047</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Median mow and clean up - reduced lanes
Location: Marine Dr and Knight St
Schedule: Jun 10, 2026 9:30 AM - 3:00 PM</content>
<id>urn:uuid:50a0539d-63fa-4ecd-a4b2-8eccdb204029</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cec51e69-762e-448d-8206-c590f405ebc0"/>
<published>2026-06-08T07:00:00Z</published>
<title>Street Horticulture Work</title>
<updated>2026-06-08T17:41:19.7605284Z</updated>
<georss:line>49.211121707990856 -123.08209282892875 49.2111101054295 -123.0807123756486</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Median mow and clean up - reduced lanes
Location: Marine Dr and Knight St
Schedule: Jun 10, 2026 9:30 AM - 3:00 PM</content>
<id>urn:uuid:4722f7d8-ba6a-4a6b-9190-e4695f7b4dcb</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cec51e69-762e-448d-8206-c590f405ebc0"/>
<published>2026-06-08T07:00:00Z</published>
<title>Street Horticulture Work</title>
<updated>2026-06-08T17:41:19.7605284Z</updated>
<georss:line>49.21106708491652 -123.07571145106039 49.21105627966122 -123.07446905763108</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Median mow and clean up - reduced lanes
Location: Marine Dr and Knight St
Schedule: Jun 10, 2026 9:30 AM - 3:00 PM</content>
<id>urn:uuid:54a94ee7-d561-477a-bf3a-364f8157a9bf</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cec51e69-762e-448d-8206-c590f405ebc0"/>
<published>2026-06-08T07:00:00Z</published>
<title>Street Horticulture Work</title>
<updated>2026-06-08T17:41:19.7605284Z</updated>
<georss:line>49.2110724780716 -123.07633259304528 49.21106708491652 -123.07571145106039</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Median mow and clean up - reduced lanes
Location: Marine Dr and Knight St
Schedule: Jun 10, 2026 9:30 AM - 3:00 PM</content>
<id>urn:uuid:7d570453-55b1-40d1-813d-199e4c5b983a</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cec51e69-762e-448d-8206-c590f405ebc0"/>
<published>2026-06-08T07:00:00Z</published>
<title>Street Horticulture Work</title>
<updated>2026-06-08T17:41:19.7605284Z</updated>
<georss:line>49.21107984445979 -123.07713264081296 49.21107931367243 -123.07711926691621 49.2110724780716 -123.07633259304528</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Median mow and clean up - reduced lanes
Location: Marine Dr and Knight St
Schedule: Jun 10, 2026 9:30 AM - 3:00 PM</content>
<id>urn:uuid:946cf2f7-6e22-419d-91ab-294f2e1630fa</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cec51e69-762e-448d-8206-c590f405ebc0"/>
<published>2026-06-08T07:00:00Z</published>
<title>Street Horticulture Work</title>
<updated>2026-06-08T17:41:19.7605284Z</updated>
<georss:line>49.21108634185833 -123.07783915832471 49.21107984445979 -123.07713264081296</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Median mow and clean up - reduced lanes
Location: Marine Dr and Knight St
Schedule: Jun 10, 2026 9:30 AM - 3:00 PM</content>
<id>urn:uuid:da7c2301-0bd5-439c-96ca-ce589f5aebf1</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cec51e69-762e-448d-8206-c590f405ebc0"/>
<published>2026-06-08T07:00:00Z</published>
<title>Street Horticulture Work</title>
<updated>2026-06-08T17:41:19.7605284Z</updated>
<georss:line>49.21109204644716 -123.07851465857102 49.21108634185833 -123.07783915832471</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Median mow and clean up - reduced lanes
Location: Marine Dr and Knight St
Schedule: Jun 10, 2026 9:30 AM - 3:00 PM</content>
<id>urn:uuid:ea1003af-03a0-4d33-acf4-71dc0cc6c34f</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cec51e69-762e-448d-8206-c590f405ebc0"/>
<published>2026-06-08T07:00:00Z</published>
<title>Street Horticulture Work</title>
<updated>2026-06-08T17:41:19.7605284Z</updated>
<georss:line>49.21105627966122 -123.07446905763108 49.21105295437357 -123.07408675326643</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Traffic Management will involve an EB and WB center lane closure with a 2 lane shift. The left turn bay will be maintained. 
Location: 1900 E. Broadway
Schedule: Jun 16, 2026 10:00 AM - 2:30 PM</content>
<id>urn:uuid:466addc9-bbf5-4e55-bbd4-a2a039bf9002</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ad3ba33a-889f-49e4-87c9-2662558b57c1"/>
<published>2026-06-08T07:00:00Z</published>
<title>Street Horticulture Work</title>
<updated>2026-06-08T17:17:22.3312542Z</updated>
<georss:line>49.26229015717084 -123.06589456722607 49.26227584414818 -123.06396063599296</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Traffic Management will involve an EB and WB center lane closure with a 2 lane shift. The Bus Stop will be maintained. 
Location: 700 Block of SE Marine Drive: 
Schedule: Jun 12, 2026 9:30 AM - 2:30 PM</content>
<id>urn:uuid:346cc5f6-7123-4e97-884b-39ebd4c4239b</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/70fb7a63-e9ed-427a-96a1-84d30d57819f"/>
<published>2026-05-25T07:00:00Z</published>
<title>Street Horticulture Work</title>
<updated>2026-05-25T22:26:38.7352323Z</updated>
<georss:line>49.21101286611753 -123.09110215997936 49.211034837214214 -123.08957809718581</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Traffic Management will involve an EB and WB center lane closure with a 2 lane shift. The Bus Stop will be maintained. 
Location: 700 Block of SE Marine Drive: 
Schedule: Jun 12, 2026 9:30 AM - 2:30 PM</content>
<id>urn:uuid:23a259dc-eee4-46f4-b9a2-2e96c2c66d98</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/70fb7a63-e9ed-427a-96a1-84d30d57819f"/>
<published>2026-05-25T07:00:00Z</published>
<title>Street Horticulture Work</title>
<updated>2026-05-25T22:26:38.7352323Z</updated>
<georss:line>49.211034837214214 -123.08957809718581 49.2110557160388 -123.0882331121052</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Traffic Management will involve an EB and WB center lane closure with a 2 lane shift. The Bus Stop will be maintained. 
Location: 2400 Block of SE Marine Drive
Schedule: Jun 11, 2026 9:30 AM - 2:30 PM</content>
<id>urn:uuid:878285c7-9fd6-4571-a8ed-b1d72234661e</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1a4b1c71-44d7-4fe7-9be1-0072a2964088"/>
<published>2026-05-25T07:00:00Z</published>
<title>Street Horticulture Work</title>
<updated>2026-05-25T22:22:28.758801Z</updated>
<georss:line>49.207086386952966 -123.05686036232612 49.207153862003906 -123.05578764468332</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Traffic Management will involve an EB and WB center lane closure with a 2 lane shift.
Location: 2500 &amp; 2400 Block of E. Broadway
Schedule: Jun 23, 2026 10:00 AM - 2:30 PM</content>
<id>urn:uuid:33b16e4b-93b3-411c-8049-49ef03ec362a</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/6afb3899-c59a-4268-9a5c-289e0d982088"/>
<published>2026-06-03T07:00:00Z</published>
<title>Street Horticulture Work </title>
<updated>2026-06-03T21:12:48.8518258Z</updated>
<georss:line>49.26201580473625 -123.05300793598103 49.26201533392816 -123.05220464329963</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Traffic Management will involve an EB and WB center lane closure with a 2 lane shift.
Location: 2500 &amp; 2400 Block of E. Broadway
Schedule: Jun 23, 2026 10:00 AM - 2:30 PM</content>
<id>urn:uuid:b3b9e32d-681c-4f62-b710-8f624ead8c53</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/6afb3899-c59a-4268-9a5c-289e0d982088"/>
<published>2026-06-03T07:00:00Z</published>
<title>Street Horticulture Work </title>
<updated>2026-06-03T21:12:48.8518258Z</updated>
<georss:line>49.262016741533415 -123.05470337749718 49.26201580473625 -123.05300793598103</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Traffic Management will involve an EB and WB center lane closure with a 2 lane shift.
Location: 2500 &amp; 2400 Block of E. Broadway
Schedule: Jun 23, 2026 10:00 AM - 2:30 PM</content>
<id>urn:uuid:f6e8116a-ab53-4c06-9c87-494c32a427d6</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/6afb3899-c59a-4268-9a5c-289e0d982088"/>
<published>2026-06-03T07:00:00Z</published>
<title>Street Horticulture Work </title>
<updated>2026-06-03T21:12:48.8518258Z</updated>
<georss:line>49.262031448941144 -123.05584978220568 49.262021159933 -123.05558551126747 49.262016741533415 -123.05470337749718</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Traffic Management will involve an EB and WB center lane closure with a 2 lane shift.
Location: 2500 &amp; 2400 Block of E. Broadway
Schedule: Jun 23, 2026 10:00 AM - 2:30 PM</content>
<id>urn:uuid:08e2f8ff-a6dc-422e-9f7e-220deff656e2</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/6afb3899-c59a-4268-9a5c-289e0d982088"/>
<published>2026-06-03T07:00:00Z</published>
<title>Street Horticulture Work </title>
<updated>2026-06-03T21:12:48.8518258Z</updated>
<georss:line>49.26214932532875 -123.05660107778434 49.26208264908891 -123.05624038131353 49.2620327816536 -123.05588404795563 49.262031448941144 -123.05584978220568</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Traffic management will involve a NB and SB center lane closure with a 1 lane shift NB and a 2 lane shift SB. The left turn bay will be maintained. 
Location: 4800 Nanaimo St
Schedule: Jul 3, 2026 9:30 AM - 2:30 PM</content>
<id>urn:uuid:c3f9f53b-e724-431c-8aea-77aa8831369c</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/c5708d12-0a24-4742-842f-e2abe048fe94"/>
<published>2026-06-09T07:00:00Z</published>
<title>Street Horticulture Work </title>
<updated>2026-06-09T18:50:47.1587894Z</updated>
<georss:line>49.24188574912884 -123.0581278620067 49.24187433773949 -123.05813864714248 49.24183654922376 -123.05817343007321 49.24179836541927 -123.05820719583241 49.24175980431741 -123.05823994444278 49.24172088391643 -123.05827166218863 49.24168159522884 -123.05830233532251 49.241641965248164 -123.05833195013952 49.24160200297035 -123.05836050665226 49.241561717391534 -123.05838800487325 49.241521126516716 -123.05841441734879 49.24148023934194 -123.0584397440917 49.24143907386525 -123.058463971387 49.24139763008739 -123.05848709923701 49.24139397704178 -123.05848903204499</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Traffic management will involve a NB and SB center lane closure with a 1 lane shift NB and a 2 lane shift SB. The left turn bay will be maintained. 
Location: 4800 Nanaimo St
Schedule: Jul 3, 2026 9:30 AM - 2:30 PM</content>
<id>urn:uuid:c5c37ce4-98ab-47a1-b181-58561ab1c3a7</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/c5708d12-0a24-4742-842f-e2abe048fe94"/>
<published>2026-06-09T07:00:00Z</published>
<title>Street Horticulture Work </title>
<updated>2026-06-09T18:50:47.1587894Z</updated>
<georss:line>49.24139397704178 -123.05848903204499 49.241355934994715 -123.05850912767598 49.241313988601746 -123.05853002922952 49.241271808892634 -123.05854981765988 49.24122941386531 -123.05856847925244 49.24118681252256 -123.05858600028216 49.241144013853216 -123.05860239450074 49.241101035862016 -123.05861763445546 49.24105789653305 -123.0586317339089 49.241014604868866 -123.05864467913612 49.24097116086986 -123.05865647014005 49.2409275915291 -123.05866709321731 49.24088390583506 -123.05867656211981 49.240840121785595 -123.05868486313362</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Traffic management will involve a NB and SB center lane closure with a 1 lane shift NB and a 2 lane shift SB. The left turn bay will be maintained. 
Location: 4800 Nanaimo St
Schedule: Jul 3, 2026 9:30 AM - 2:30 PM</content>
<id>urn:uuid:fce4f52b-86d3-475e-8e7a-b037a3ba8552</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/c5708d12-0a24-4742-842f-e2abe048fe94"/>
<published>2026-06-09T07:00:00Z</published>
<title>Street Horticulture Work </title>
<updated>2026-06-09T18:50:47.1587894Z</updated>
<georss:line>49.240840121785595 -123.05868486313362 49.24064396833924 -123.05869123880767</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Traffic management will involve a NB and SB center lane closure with a 1 lane shift NB and a 2 lane shift SB. The left turn bay will be maintained. 
Location: 4800 Nanaimo St
Schedule: Jul 3, 2026 9:30 AM - 2:30 PM</content>
<id>urn:uuid:bf15578f-062e-4fd1-992e-bb49c1810309</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/c5708d12-0a24-4742-842f-e2abe048fe94"/>
<published>2026-06-09T07:00:00Z</published>
<title>Street Horticulture Work </title>
<updated>2026-06-09T18:50:47.1587894Z</updated>
<georss:line>49.24064396833924 -123.05869123880767 49.24021072341034 -123.05870531529636</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Traffic management will involve a NB and SB center lane closure with a 1 lane shift NB and a 2 lane shift SB. The left turn bay will be maintained. 
Location: 4800 Nanaimo St
Schedule: Jul 3, 2026 9:30 AM - 2:30 PM</content>
<id>urn:uuid:96abce96-a777-443f-99b4-15a8179e7051</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/c5708d12-0a24-4742-842f-e2abe048fe94"/>
<published>2026-06-09T07:00:00Z</published>
<title>Street Horticulture Work </title>
<updated>2026-06-09T18:50:47.1587894Z</updated>
<georss:line>49.24021072341034 -123.05870531529636 49.239777361502064 -123.05871940514155</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Traffic Management will involve an EB and WB center lane closure with a 2 lane shift.  
Location: 1800 to 1900 Block of SE Marine Dr
Schedule: Jun 10, 2026 9:30 AM - 2:30 PM</content>
<id>urn:uuid:ae687cc2-c6ba-49ff-a7fc-54d8179a63db</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/3064a77d-7d71-4805-8001-1bda1c029f14"/>
<published>2026-05-25T07:00:00Z</published>
<title>Street Horticulture Work </title>
<updated>2026-05-25T22:15:37.3568633Z</updated>
<georss:line>49.210254948574175 -123.06778484859399 49.20992867727699 -123.06681770574335</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Traffic Management will involve an EB and WB center lane closure with a 2 lane shift.  
Location: 1800 to 1900 Block of SE Marine Dr
Schedule: Jun 10, 2026 9:30 AM - 2:30 PM</content>
<id>urn:uuid:da043478-50f8-41b3-b6ed-acc97cf6d0ac</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/3064a77d-7d71-4805-8001-1bda1c029f14"/>
<published>2026-05-25T07:00:00Z</published>
<title>Street Horticulture Work </title>
<updated>2026-05-25T22:15:37.3568633Z</updated>
<georss:line>49.20992867727699 -123.06681770574335 49.209689575218476 -123.0661112530178</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Traffic Management will involve an EB and WB center lane closure with a 2 lane shift.  
Location: 1800 to 1900 Block of SE Marine Dr
Schedule: Jun 10, 2026 9:30 AM - 2:30 PM</content>
<id>urn:uuid:ff4c9870-a559-4bc8-aaeb-e3858bf0c6e2</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/3064a77d-7d71-4805-8001-1bda1c029f14"/>
<published>2026-05-25T07:00:00Z</published>
<title>Street Horticulture Work </title>
<updated>2026-05-25T22:15:37.3568633Z</updated>
<georss:line>49.21074076448494 -123.06941959443566 49.21051088062774 -123.06857669115028 49.210174072115905 -123.06758648437814</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Traffic Management involve 2 separate set ups using an EB/WB center lane closure with a 2 lane shift. The left turn bay and Bus Stop will be maintained. 
Location: 2800-3000 Block of SE Marine Drive
Schedule: Jun 18, 2026 9:30 AM - 2:30 PM</content>
<id>urn:uuid:ddbf19ad-12f2-4d82-b410-e2b38da01715</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a6e9e898-14ca-4220-8be8-64f77faa7d73"/>
<published>2026-06-08T07:00:00Z</published>
<title>Street Horticulture Work </title>
<updated>2026-06-08T17:20:46.7142232Z</updated>
<georss:line>49.20759044322327 -123.0489546090255 49.20766992439536 -123.04767044781823</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Traffic Management involve 2 separate set ups using an EB/WB center lane closure with a 2 lane shift. The left turn bay and Bus Stop will be maintained. 
Location: 2800-3000 Block of SE Marine Drive
Schedule: Jun 18, 2026 9:30 AM - 2:30 PM</content>
<id>urn:uuid:5be444ae-a319-44f8-a062-452ef2f3015e</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a6e9e898-14ca-4220-8be8-64f77faa7d73"/>
<published>2026-06-08T07:00:00Z</published>
<title>Street Horticulture Work </title>
<updated>2026-06-08T17:20:46.7142232Z</updated>
<georss:line>49.207664209744905 -123.04769543277902 49.20782567622422 -123.04514121104856 49.208107141867316 -123.04225633865737</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Traffic Management will involve an EB and WB center lane closure with a 2 lane shift.   The EB left turn bay to Argyle will be maintained.  The Bus Stop will be maintained. 
Location: 1700 Block of SE Marine Drive
Schedule: Jun 19, 2026 9:30 AM - 2:30 PM</content>
<id>urn:uuid:a3397557-b718-4872-a76c-40173d8f905a</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/0c41aed4-d9d8-45c1-9101-4ec8285a7629"/>
<published>2026-06-08T07:00:00Z</published>
<title>Street Horticulture Work </title>
<updated>2026-06-08T17:23:03.7418467Z</updated>
<georss:line>49.21102808316405 -123.07211110467243 49.21101056096305 -123.07133326405811 49.210954489877935 -123.07040521973896 49.210884400932144 -123.07002971047687 49.21067062903373 -123.06914994592</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Traffic management will involve a NB and SB center lane closure with a 2 lane shift. The left turn bay will be maintained.
Location: 4600 Nanaimo Street
Schedule: Jun 30, 2026 9:30 AM - 2:30 PM</content>
<id>urn:uuid:4efd055c-ce17-4c34-bf57-ec4f630e541f</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ce64dafa-fdab-4aa6-af89-a9d2ad389745"/>
<published>2026-06-09T07:00:00Z</published>
<title>Street Horticulture Work </title>
<updated>2026-06-09T18:29:11.1085829Z</updated>
<georss:line>49.243417254204985 -123.05665517478991 49.24339487937323 -123.05666267816923 49.24337259419667 -123.05667078616051 49.24335040767713 -123.05667948503431 49.24332832880978 -123.05668877480007 49.24330634860593 -123.05669864170785 49.2432844850492 -123.05670909951655 49.24326275612984 -123.05672014824603 49.24324114387073 -123.05673176039703 49.24321967525066 -123.05674394973883 49.24319835026944 -123.05675671627077 49.24317716893361 -123.05677004625328 49.243156140238284 -123.05678393969605 49.24313528218039 -123.05679838288019 49.24311458575778 -123.05681338953377 49.24309406896748 -123.05682894593797 49.24307373181594 -123.05684503835336 49.24305357430305 -123.05686166677938 49.243033623407456 -123.05687884498558 49.24301386115195 -123.05689654547297 49.24299430552685 -123.05691476826183 49.242974965527 -123.05693351336208 49.2429558411591 -123.05695276703453 49.24293694141798 -123.05697252928911 49.24292030033732 -123.05699054929055 49.24259930936336 -123.05732778314218</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Traffic Management will involve an EB and WB center lane closure with a 2 lane shift.  The left turn bay will be maintained. 
Location: 2300 E. Broadway
Schedule: Jun 17, 2026 9:30 AM - 2:30 PM</content>
<id>urn:uuid:197e8861-6566-4aaf-b11e-e888de2a7194</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/9ce8c08f-2474-4d18-86cc-251f492beba9"/>
<published>2026-06-08T07:00:00Z</published>
<title>Street Horticulture Work </title>
<updated>2026-06-08T17:17:00.8279827Z</updated>
<georss:line>49.26223269336205 -123.05815785923444 49.26222721400845 -123.05742305844184</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Traffic Management will involve an EB and WB center lane closure with a 2 lane shift.  The left turn bay will be maintained. 
Location: 2300 E. Broadway
Schedule: Jun 17, 2026 9:30 AM - 2:30 PM</content>
<id>urn:uuid:dddd728b-69d7-4dfd-a2c6-df15aa4d019c</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/9ce8c08f-2474-4d18-86cc-251f492beba9"/>
<published>2026-06-08T07:00:00Z</published>
<title>Street Horticulture Work </title>
<updated>2026-06-08T17:17:00.8279827Z</updated>
<georss:line>49.26222721400845 -123.05742305844184 49.26222409253694 -123.0570055324409 49.26214932532875 -123.05660107778434</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Traffic Management (between Kingsway and Knight) will involve an WB center lane closure with a 1 lane shift and an EB center lane closure with a one lane shift.   The left turn bay will be maintained. Bus Stop closures of 51525 &amp; 51563.

Location: 1400 E King Edward
Schedule: Jul 2, 2026 9:30 AM - 2:30 PM</content>
<id>urn:uuid:939a0a77-4282-4742-ae12-d94461827372</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/3333b269-868a-4fcf-b2e5-65e38794ea88"/>
<published>2026-06-09T07:00:00Z</published>
<title>Street Horticulture Work </title>
<updated>2026-06-09T18:34:19.8392474Z</updated>
<georss:line>49.24846602064031 -123.07335514493096 49.248436716096336 -123.0722098247414</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Traffic Management will involve an EB and WB center lane closure with a 2-lane shift. The left turn bay will be maintained
Location: 3200 Block of E. Broadway
Schedule: Jun 24, 2026 10:00 AM - 2:30 PM</content>
<id>urn:uuid:7fbb3ba0-3475-4ce8-aa9c-3314e7d46c18</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddaece50-024e-4189-b7d9-50c711fc06bf"/>
<published>2026-06-03T07:00:00Z</published>
<title>Street Horticulture Work </title>
<updated>2026-06-03T21:14:34.3612854Z</updated>
<georss:line>49.26190052504222 -123.03651526454232 49.26189679883751 -123.0351592920575</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Traffic Management will involve an EB and WB center lane closure with a 2-lane shift. The left turn bay will be maintained
Location: 3200 Block of E. Broadway
Schedule: Jun 24, 2026 10:00 AM - 2:30 PM</content>
<id>urn:uuid:8ec95b0e-f2ad-4df1-b553-38f34a5cc3d3</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddaece50-024e-4189-b7d9-50c711fc06bf"/>
<published>2026-06-03T07:00:00Z</published>
<title>Street Horticulture Work </title>
<updated>2026-06-03T21:14:34.3612854Z</updated>
<georss:line>49.26189679883751 -123.0351592920575 49.2618958505513 -123.03481534419313</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Traffic Management will involve an EB and WB center lane closure with a 2-lane shift. The left turn bay will be maintained
Location: 3200 Block of E. Broadway
Schedule: Jun 24, 2026 10:00 AM - 2:30 PM</content>
<id>urn:uuid:465ea478-b04c-46ac-b2d3-b3c6258e68d3</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddaece50-024e-4189-b7d9-50c711fc06bf"/>
<published>2026-06-03T07:00:00Z</published>
<title>Street Horticulture Work </title>
<updated>2026-06-03T21:14:34.3612854Z</updated>
<georss:line>49.2618958505513 -123.03481534419313 49.26189134301694 -123.03375756434897</georss:line>
</entry>
<entry>
<category term="Road Closure"/>
<content>Full closure of 5000 block of Marguerite St from June Wednesday 3, 2026 to June Tuesday 30, 2026 at 3:30 pm
Location: Marguerite St from W 33rd Av to W 35th Av
Schedule: Jun 3, 2026 - Jun 30, 2026; Weekdays; 7:00 AM - 3:30 PM</content>
<id>urn:uuid:8455d882-edf7-48e0-af63-3500c9dd6583</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca0a54b8-6635-4161-8fcf-366d00f0f737"/>
<published>2026-06-03T07:00:00Z</published>
<title>Streets Service of 5000 block of Marguerite St</title>
<updated>2026-06-03T23:26:48.0761923Z</updated>
<georss:line>49.24194278366832 -123.14411712226772 49.239913962798255 -123.1441873687601</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Water St will be closed to traffic on Sundays from all day (Approx. 11-8PM)
Location: 000 - 300 Water St and 000 Powell St. 
Schedule: Jul 5, 2026 - Sep 6, 2026; Su; 11:00 AM - 9:00 PM</content>
<id>urn:uuid:a1e51917-cbfb-4bfa-b5a8-91f55ed9798d</id>
<link href="https://vancouver.ca/streets-transportation/water-street-pedestrian-zone.aspx"/>
<published>2026-05-13T07:00:00Z</published>
<title>Sunday Pedestrian only zone - Water St</title>
<updated>2026-05-13T17:55:09.4067896Z</updated>
<georss:line>49.28471888265736 -123.11081781222173 49.283552668227145 -123.10426801582214 49.28325838546144 -123.10361637791505 49.28323658666818 -123.10217943278656</georss:line>
</entry>
<entry>
<category term="Road Closure"/>
<content>Development triggered local sewer upgrade 
Location: Nigel Ave to Dinmont Ave
Schedule: Apr 20, 2026 - Jun 19, 2026</content>
<id>urn:uuid:6048ceb1-0bff-4139-bc36-8760f398f497</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/0d6eb645-ce7e-438c-b630-97def64e620f"/>
<published>2026-05-20T07:00:00Z</published>
<title>TO-2026-02210 - Construction</title>
<updated>2026-05-20T22:48:28.8831831Z</updated>
<georss:line>49.24545683870116 -123.11009519443299 49.24552950474671 -123.11017745012373 49.245535947292666 -123.11018482888673 49.2455534144907 -123.11020531229346 49.245570647350746 -123.11022627607954 49.2455876369165 -123.1102476790064 49.245604374179436 -123.11026953479374 49.24562086813455 -123.11029184346174 49.245637100817305 -123.11031457749115 49.245653072214424 -123.11033775062175 49.24566877335661 -123.11036133535424 49.24568420423054 -123.11038534542828 49.245699355853844 -123.11040976708416 49.245714228252524 -123.11043457284269 49.245728821413195 -123.11045977644329 49.2457431173452 -123.11048537784583 49.24575711608762 -123.11051133583128 49.245770817614044 -123.11053767787868 49.24578422195043 -123.11056437650869 49.245797311106145 -123.11059143168086 49.24581009408928 -123.11061882967542 49.24582256191752 -123.1106465567324 49.24583471457754 -123.11067462659113 49.245846543100185 -123.11070301175195 49.24585803850309 -123.11073169845467 49.24586920978135 -123.11076068671912 49.24588004793952 -123.11078997652476 49.24589054399527 -123.11081955411142 49.2459007069568 -123.1108494057591 49.245910527842 -123.11087951770752 49.24591999765522 -123.11090988993612 49.245929116409656 -123.1109405087047 49.24593789311342 -123.11097136029322 49.24594630976273 -123.1110024584005 49.245954375392245 -123.11103376182712 49.24596208100647 -123.11106527055232 49.24596941759697 -123.11109699829497 49.24597640319354 -123.11112890387584 49.24598301081039 -123.11116098723366 49.245989258437874 -123.11119324840818 49.245995137093786 -123.1112256736389 49.24600063779613 -123.11125824916522 49.24600576953978 -123.11129097500664 49.24601053235122 -123.11132382368307 49.2460149172484 -123.11135678143384 49.246018915209504 -123.11138987571749 49.24602254427782 -123.11142305161485 49.24602578644962 -123.11145632282442 49.24602865072001 -123.11148968936571 49.24603113712871 -123.11152311001882 49.24603323666719 -123.11155659850245 49.24603495834393 -123.11159014109641 49.246036293176786 -123.11162372403989 49.24603724117924 -123.11165733359242 49.24604544189478 -123.11231922317633</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Crews will be onsite to conduct Utility Maintenance on behalf of Telus

Traffic Impacts: Total Road closure at North side of 2000 blk Beach Ave from Chilco St to Stanley Park Dr

WO# 4007290

Location: N/S of 2000 blk Beach Ave
Schedule: Jun 15, 2026 - Jun 26, 2026; M, Tu, W, Th, F, Su; 7:00 AM - 7:00 PM</content>
<id>urn:uuid:312a4c1c-dc5d-4e72-a84a-ee89c9d63787</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/0f24a13e-34d6-47e1-940e-df34693643e9"/>
<published>2026-06-05T07:00:00Z</published>
<title>Telus - Utility Maintenance - 2061 Beach Ave - Jun 15-26, 2026</title>
<updated>2026-06-05T15:27:31.8216778Z</updated>
<georss:line>49.29035309314909 -123.14558935108181 49.28946368190984 -123.14427421750584</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Parking lane closure on the West Side of 1000 Block of Marinaside Crescent/Cambie Bridge to facilitate underground utility construction.

WO# 2956362
Location: West Side of 1000 Block of Marinaside Crescent/Cambie Bridge From Pacific Blvd to 60m South of Pacific Blvd.
Schedule: Jun 4, 2026 7:00 AM - Jun 11, 2026 5:00 PM</content>
<id>urn:uuid:5cff207d-a304-4e3d-a93c-203830eee4fe</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e52d10cf-224e-4c41-9072-38a1595754d2"/>
<published>2026-05-27T07:00:00Z</published>
<title>Telus Underground Utility Construction on 1000 Block of Marinaside Crescent/Cambie Bridge</title>
<updated>2026-05-29T16:21:19.9846557Z</updated>
<georss:line>49.27408632926222 -123.11518065129336 49.27384273090331 -123.11502622695981 49.27363553132784 -123.11494472562819 49.273478731145644 -123.11496617341592</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Parking lane closure on the West Side of 2500 Block of Willow Street to facilitate underground utility construction.

Parking meters to be hood: 82-25-11/13/15/17

WO# NW 4002677
Location: West Side of 2500 Block of Willow Street From W Broadway to W 10th Avenue.
Schedule: Jun 8, 2026 7:00 AM - Jun 12, 2026 5:00 PM</content>
<id>urn:uuid:d737ff75-4caf-4ee6-bc98-9d70d28c1d3e</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/6ca3c3b1-6ed8-4553-8ba6-6bdad23b46a7"/>
<published>2026-05-27T07:00:00Z</published>
<title>Telus Underground Utility Construction on 2500 Block of Willow Street</title>
<updated>2026-05-27T17:50:35.3084423Z</updated>
<georss:line>49.2633348148519 -123.12185372543996 49.262377005625325 -123.12189662101542</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Alleyway lane closure on Both Sides of 1000 Block of Maxine Lane to facilitate utility maintenance.

WO# 2927802
Location: Both Sides of 1000 Block of Maxine Lane From Thurlow Street to 50m South of Thurlow Street. 
Schedule: Jun 15, 2026 - Jul 17, 2026; Weekdays; 8:00 AM - 4:00 PM</content>
<id>urn:uuid:6a5a04aa-9982-4832-8c35-51255831a370</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/c48eeb47-c695-4ba8-8969-5af2c5c36451"/>
<published>2026-05-29T07:00:00Z</published>
<title>Telus Utility Maintenance on 1000 Block of Maxine Lane</title>
<updated>2026-05-29T19:42:47.1199431Z</updated>
<georss:line>49.279325612922975 -123.13278528907094 49.27893925595791 -123.13221048829399</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Travel lane closure and Single lane alternating traffic in effect on 1000-1100 Block of Glen Drive to facilitate utility maintenance.

WO# 2949798
Location: East Side of 1000-1100 Block of Glen Drive From William Street to Parker Street. 
Schedule: Jun 1, 2026 - Jun 30, 2026; Weekdays; 8:00 AM - 4:00 PM</content>
<id>urn:uuid:3e1473ad-e230-4d0d-9a5f-d2015236b8c0</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/8b25301f-2220-41d9-8ed9-ca7fd66dc01d"/>
<published>2026-05-25T07:00:00Z</published>
<title>Telus Utility Maintenance on 1000-1100 Block of Glen Drive</title>
<updated>2026-06-02T18:20:58.7069762Z</updated>
<georss:line>49.27590372963391 -123.08136830290535 49.274097779898 -123.08139512499547</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Parking lane closure on the South Side of 1300 Block of W 8th Avenue to facilitate utility maintenance.

B8-13-02/04/06/08/10/14/16/18

WO# 4008842
Location: South Side of 1300 Block of W 8th Avenue From Hemlock Street to Birch Street. 
Schedule: Jun 9, 2026 - Jun 22, 2026; Weekdays; 8:00 AM - 4:00 PM</content>
<id>urn:uuid:fbfe1399-851e-4cd7-8dc0-b199944ccede</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ba6786df-50c2-4814-bc53-a35ac7f0a912"/>
<published>2026-05-27T07:00:00Z</published>
<title>Telus Utility Maintenance on 1300 Block of W 8th Avenue</title>
<updated>2026-05-27T18:44:34.4329405Z</updated>
<georss:line>49.26446293235361 -123.13610166359994 49.26441812394606 -123.1337209591605</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Parking lane closure on the South Side of 200 Block of E 32nd Avenue to facilitate utility maintenance.

WO# 2596968
Location: South Side of 200 Block of E 32nd Avenue From Main Street to Sophia Street. 
Schedule: Jun 8, 2026 9:30 AM - Jun 12, 2026 2:30 PM</content>
<id>urn:uuid:7fb25a90-ede2-41be-9537-3f71495bfb5a</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d93d6406-2029-44ff-9a37-b78a0063bc99"/>
<published>2026-05-27T07:00:00Z</published>
<title>Telus Utility Maintenance on 200 Block of E 32nd Avenue</title>
<updated>2026-05-27T17:00:12.4067548Z</updated>
<georss:line>49.24227399277973 -123.10141933463935 49.24223476781097 -123.09875980912284</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Parking lane closure on the South Side of 2200 Block of W 13th Avenue to facilitate utility maintenance.

WO# 4009663
Location: South Side of 2200 Block of W 13th Avenue From Yew Street to 25m West of Yew Street. 
Schedule: May 13, 2026 - Jun 11, 2026; Weekdays; 8:00 AM - 5:00 PM</content>
<id>urn:uuid:cc80126e-6b32-4d00-a9a2-8f78bdfa102c</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1516f977-c1fa-4256-b08e-6e9884348156"/>
<published>2026-05-04T07:00:00Z</published>
<title>Telus Utility Maintenance on 2200 Block of W 13th Avenue</title>
<updated>2026-05-25T17:46:18.0733548Z</updated>
<georss:line>49.26008786783876 -123.15545025857814 49.260098370719504 -123.15622273477445</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Parking lane closure on the East Side of 3800 Block of Tupper Street to facilitate utility maintenance.

WO# 2955561
Location: East Side of 3800 Block of Tupper Street From W 22nd Avenue to W 23rd Avenue. 
Schedule: Jun 8, 2026 8:00 AM - Jun 12, 2026 4:00 PM</content>
<id>urn:uuid:d1be45a6-7a58-4e3c-805f-82d6edde546b</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/384ea16e-04f0-4452-939b-3b0e7734f9e4"/>
<published>2026-05-29T07:00:00Z</published>
<title>Telus Utility Maintenance on 3800 Block of Tupper Street</title>
<updated>2026-05-29T18:42:53.3272662Z</updated>
<georss:line>49.25151505580928 -123.11617445306908 49.2506046395998 -123.11620876933311</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Alleyway and Parking lane closure on the East Side of 3900-4000 Block of Perry Street to facilitate utility maintenance.

WO# 2955561
Location: East Side of 3900-4000 Block of Perry Street From Kingsway to E 22nd Avenue.
Schedule: Jun 15, 2026 8:00 AM - Jun 19, 2026 4:00 PM</content>
<id>urn:uuid:74ccb45b-3e5b-4bb8-a690-b70fbd98a8a0</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/7326e232-a7a3-4c69-9a87-495c00c00728"/>
<published>2026-06-05T07:00:00Z</published>
<title>Telus Utility Maintenance on 3900-4000 Block of Perry Street</title>
<updated>2026-06-05T21:49:45.1196962Z</updated>
<georss:line>49.25036669994259 -123.07109763730877 49.249377823997236 -123.07110621629296 49.24905566467717 -123.07127350910281 49.24798832175924 -123.07128208841428</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Parking and Travel lane closure on Both Sides of 4500-4600 Block of W 4th Avenue and the East Side of 1900 Block of Tolmie Street to facilitate utility maintenance.

WO# 2950114
Location: Both Sides of 4500-4600 Block of W 4th Avenue From Blanca Street to Sasamat Street. East Side of 1900 Block of Tolmie Street From W 4th Avenue to W 3rd Avenue.
Schedule: Jun 22, 2026 - Jul 3, 2026; Weekdays; 7:00 AM - 5:00 PM</content>
<id>urn:uuid:a51260c8-619b-417b-853d-4c7aec9826b4</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/08ac3a4b-a9b4-4b96-9ede-5db6f087b287"/>
<published>2026-06-08T07:00:00Z</published>
<title>Telus Utility Maintenance on 4500-4600 Block of W 4th Avenue</title>
<updated>2026-06-08T15:36:31.036855Z</updated>
<georss:line>49.269115006511726 -123.21505794556138 49.269016997448915 -123.2089371445894</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Parking and Travel lane closure on Both Sides of 4500-4600 Block of W 4th Avenue and the East Side of 1900 Block of Tolmie Street to facilitate utility maintenance.

WO# 2950114
Location: Both Sides of 4500-4600 Block of W 4th Avenue From Blanca Street to Sasamat Street. East Side of 1900 Block of Tolmie Street From W 4th Avenue to W 3rd Avenue.
Schedule: Jun 22, 2026 - Jul 3, 2026; Weekdays; 7:00 AM - 5:00 PM</content>
<id>urn:uuid:fe429d75-79d6-4850-8829-9fa5d617aeea</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/08ac3a4b-a9b4-4b96-9ede-5db6f087b287"/>
<published>2026-06-08T07:00:00Z</published>
<title>Telus Utility Maintenance on 4500-4600 Block of W 4th Avenue</title>
<updated>2026-06-08T15:36:31.036855Z</updated>
<georss:line>49.27024559697986 -123.21189830334187 49.26906600200468 -123.21192512543203</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Parking lane closure on the West Side of 5500-5600 Block of Aberdeen Street to facilitate utility maintenance.

WO# NW 2958630
Location: West Side of 5500-5600 Block of Aberdeen Street From 25m North of Kingsway to North PL of 5655.
Schedule: Jun 8, 2026 8:00 AM - Jun 12, 2026 4:00 PM</content>
<id>urn:uuid:821992aa-17af-4857-af8e-cfcb4b60ebcc</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/f91c36dc-5fc7-4277-94a3-84154b9e66a9"/>
<published>2026-05-28T07:00:00Z</published>
<title>Telus Utility Maintenance on 5500-5600 Block of Aberdeen Street</title>
<updated>2026-05-28T18:21:14.2731615Z</updated>
<georss:line>49.23234290835802 -123.02816932531249 49.23301896891448 -123.0281854185666</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Travel and Parking lane closure on the North Side of 800 Block of W 10th Ave, the West Side of 2500 Block of Willow Street and Both Sides of Lane North of 800 Block of W 10th Avenue to facilitate utility maintenance.

Parking meters to be hood: D0-08-23/25/27; 82-25-11/13/15/17

WO# 2595449
Location: North Side of 800 Block of W 10th Avenue From Laurel Street to Willow Street. West Side of 2500 Block of Willow Street From W 10th Avenue to Lane North of W 10th Avenue. Both Sides of Lane North of 800 Block of W 10th Avenue From Willow Street to 85m West of Willow Street. 
Schedule: Jun 13, 2026 8:00 AM - Jun 14, 2026 4:00 PM</content>
<id>urn:uuid:24897776-ebcc-4c2e-bb9f-90691d5969c3</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/7d1bc885-499e-4fb8-8726-52ad4c6b7c35"/>
<published>2026-06-09T07:00:00Z</published>
<title>Telus Utility Maintenance on 800 Block of W 10th Avenue</title>
<updated>2026-06-09T23:13:13.8701076Z</updated>
<georss:line>49.26242424807211 -123.12423484364037 49.262387839813385 -123.12188845546495</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Travel and Parking lane closure on the North Side of 800 Block of W 10th Ave, the West Side of 2500 Block of Willow Street and Both Sides of Lane North of 800 Block of W 10th Avenue to facilitate utility maintenance.

Parking meters to be hood: D0-08-23/25/27; 82-25-11/13/15/17

WO# 2595449
Location: North Side of 800 Block of W 10th Avenue From Laurel Street to Willow Street. West Side of 2500 Block of Willow Street From W 10th Avenue to Lane North of W 10th Avenue. Both Sides of Lane North of 800 Block of W 10th Avenue From Willow Street to 85m West of Willow Street. 
Schedule: Jun 13, 2026 8:00 AM - Jun 14, 2026 4:00 PM</content>
<id>urn:uuid:c5a41419-9e91-4b71-9d2f-801d10c74c8c</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/7d1bc885-499e-4fb8-8726-52ad4c6b7c35"/>
<published>2026-06-09T07:00:00Z</published>
<title>Telus Utility Maintenance on 800 Block of W 10th Avenue</title>
<updated>2026-06-09T23:13:13.8701076Z</updated>
<georss:line>49.26237103591862 -123.12190561376059 49.26283033860631 -123.12189274495705</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Travel and Parking lane closure on the North Side of 800 Block of W 10th Ave, the West Side of 2500 Block of Willow Street and Both Sides of Lane North of 800 Block of W 10th Avenue to facilitate utility maintenance.

Parking meters to be hood: D0-08-23/25/27; 82-25-11/13/15/17

WO# 2595449
Location: North Side of 800 Block of W 10th Avenue From Laurel Street to Willow Street. West Side of 2500 Block of Willow Street From W 10th Avenue to Lane North of W 10th Avenue. Both Sides of Lane North of 800 Block of W 10th Avenue From Willow Street to 85m West of Willow Street. 
Schedule: Jun 13, 2026 8:00 AM - Jun 14, 2026 4:00 PM</content>
<id>urn:uuid:5d852c5a-a8da-40e1-91be-f7f2091a78fa</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/7d1bc885-499e-4fb8-8726-52ad4c6b7c35"/>
<published>2026-06-09T07:00:00Z</published>
<title>Telus Utility Maintenance on 800 Block of W 10th Avenue</title>
<updated>2026-06-09T23:13:13.8701076Z</updated>
<georss:line>49.262821936788384 -123.12189274495705 49.26285554405138 -123.12342840652668</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Alleyway lane closure on Both Sides of Lane North of 1500-1600 Block of E Broadway to facilitate utility maintenance.

WO# 4012224
Location: Both Sides of Lane North of 1500-1600 Block of E Broadway From Commercial Drive to 110m West of Commercial Drive.
Schedule: Jun 8, 2026 8:00 AM - Jun 10, 2026 4:00 PM</content>
<id>urn:uuid:00f79aec-e0bb-48a3-a692-75a30921939f</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/4cf027bc-b3de-461c-ad30-a7043da5ac81"/>
<published>2026-05-27T07:00:00Z</published>
<title>Telus Utility Maintenance on Lane North of 1500-1600 Block of E Broadway</title>
<updated>2026-05-27T17:16:10.5582785Z</updated>
<georss:line>49.26282481792569 -123.0697545504815 49.26284162166593 -123.07186930215657</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Alleyway lane closure on Both Sides of Lane North of 1500-1600 Block of E Broadway to facilitate utility maintenance.

WO# 4012224
Location: Both Sides of Lane North of 1500-1600 Block of E Broadway From Commercial Drive to 110m West of Commercial Drive.
Schedule: Jun 22, 2026 8:00 AM - Jun 24, 2026 4:00 PM</content>
<id>urn:uuid:41cde755-1425-4620-be73-7f59b9144ad2</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/abdc71bc-0b32-434b-9831-17fdd460ae62"/>
<published>2026-06-09T07:00:00Z</published>
<title>Telus Utility Maintenance on Lane North of 1500-1600 Block of E Broadway </title>
<updated>2026-06-09T20:32:18.0476277Z</updated>
<georss:line>49.26282712396784 -123.06977301107636 49.26284682126294 -123.07221673993993</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Parking lane closure on the North Side of Lane South of 1400 Block of W 12th Avenue to facilitate utility maintenance.

WO# NW 2595449, DPO-1081454
Location: North Side of Lane South of 1400 Block of W 12th Avenue From 50m West of Hemlock Street to 70m West of Hemlock Street. 
Schedule: Jun 8, 2026 8:00 AM - Jun 12, 2026 5:00 PM</content>
<id>urn:uuid:1c6e4c52-a1ef-4bee-9ca8-2f497c5550a9</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/b19ed16d-6d50-46e7-a62c-735e601c3932"/>
<published>2026-05-28T07:00:00Z</published>
<title>Telus Utility Maintenance on Lane South of 1400 Block of W 12th Avenue</title>
<updated>2026-05-28T18:50:50.2250258Z</updated>
<georss:line>49.2602795677015 -123.1368075712633 49.260297072433474 -123.13782681068898</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Alleyway lane closure on Both Sides of Lane West of 4300 Block of Maple Street to facilitate utility maintenance.

WO# 2596968
Location: Both Sides of Lane West of Maple Street From Nanton Avenue to 60m South of Nanton Avenue.
Schedule: Jun 22, 2026 8:00 AM - 4:00 PM</content>
<id>urn:uuid:68d0648c-f010-439e-852b-6cde063ee624</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/44e80a8f-656b-437f-8072-5585546791e7"/>
<published>2026-06-09T07:00:00Z</published>
<title>Telus Utility Maintenance on Lane West of 4300 Block of Maple Street</title>
<updated>2026-06-09T20:48:43.8102951Z</updated>
<georss:line>49.24761798315623 -123.15249520577888 49.24685037285332 -123.15251665356662</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Installation of new trees and green infrastructure within the north sidewalk of Terminal Ave from the 600 block to 800 block. 
Location: 
Schedule: Aug 19, 2024 - Jul 31, 2025</content>
<id>urn:uuid:04f7d51f-9465-4ca1-9a2b-c058cefc677a</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/974de6d5-743e-419d-8b83-7bcbed0d3ecb"/>
<published>2024-08-20T07:00:00Z</published>
<title>Terminal Ave GI &amp; CEAP 2024</title>
<updated>2026-05-05T01:01:06.1650801Z</updated>
<georss:line>49.27167276119039 -123.09331368874882 49.27041706121045 -123.08597334255482</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Road repairs on Terminal Avenue between Quebec Street and Main Street. 

Contact: terminalsewerrepairs@vancouver.ca 
Location: Main and Terminal
Schedule: Mar 1, 2025 - Aug 1, 2026</content>
<id>urn:uuid:fba0e995-1d77-41a0-8dc8-c122eb922ece</id>
<link href="https://vancouver.ca/streets-transportation/terminal-avenue-sewer-repairs.aspx"/>
<published>2024-06-25T07:00:00Z</published>
<title>Terminal Ave Sewer Interim Repairs</title>
<updated>2026-05-21T01:01:12.4848711Z</updated>
<georss:line>49.27276113417457 -123.10015434360575 49.272007682255264 -123.1002150985845</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Full closure along Station Street between National Avenue and Terminal Avenue from March 23 to May 1, 2026. This will be implemented to complete necessary underground and surface works as part of the Thornton Pump Station project. 
Location: Station Street between National Avenue and Terminal Avenue
Schedule: Mar 23, 2026 - May 2, 2026</content>
<id>urn:uuid:69079583-72a9-464a-be44-b0b166939aeb</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d9d7f3b6-9b9c-40e1-a7f0-0f5994ef9b41"/>
<published>2026-03-19T07:00:00Z</published>
<title>Thornton Pump Station Upgrades - Station Street Closure</title>
<updated>2026-03-19T22:40:30.5534198Z</updated>
<georss:line>49.27255961925928 -123.09862599149831 49.27488474087136 -123.09847526100708</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Full closure along Station Street between National Avenue and Terminal Avenue from March 23 to May 1, 2026. This will be implemented to complete necessary underground and surface works as part of the Thornton Pump Station project. 
Location: Station Street between National Avenue and Terminal Avenue
Schedule: Mar 23, 2026 - May 2, 2026</content>
<id>urn:uuid:13fa7037-64ee-41e5-b50d-47bae6fe80a4</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d9d7f3b6-9b9c-40e1-a7f0-0f5994ef9b41"/>
<published>2026-03-19T07:00:00Z</published>
<title>Thornton Pump Station Upgrades - Station Street Closure</title>
<updated>2026-03-19T22:40:30.5534198Z</updated>
<georss:line>49.27300687467738 -123.10168734920623 49.27404583080448 -123.10165328727494</georss:line>
</entry>
<entry>
<category term="Road Closure"/>
<content>The Trans Canada Trail bridge is closed at this location due to slope hazards located above the bridge which pose a risk to users. CN and the City are in conversations to have the hazards removed. There is currently no expected date on when the bridge and trail will be able to be reopened. 
Location: 
Schedule: Jan 15, 2025 - Jan 15, 2027</content>
<id>urn:uuid:863ca4e4-6bbf-4e45-9f74-f379a32f4514</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/569cde2e-876f-4ecb-b13b-86beeeeadbd9"/>
<published>2025-01-16T08:00:00Z</published>
<title>Trans-Canada Trail Bridge Closure </title>
<updated>2025-01-16T18:38:13.5422873Z</updated>
<georss:polygon>49.29248448897795 -123.0249236046173 49.292528032815255 -123.0249287401899 49.29268211065113 -123.02412764229045 49.29263856694996 -123.02412764229045 49.29248448897795 -123.0249236046173</georss:polygon>
</entry>
<entry>
<category term="Under Construction"/>
<content>Parking: Temporary parking restrictions will be required to safely complete construction. Please watch for "No Parking" signs as work progresses.

Traffic and Access: From December 2025 to March 2026, crews will work intermittently to complete underground utility work.  This work will occasionally impact vehicle and cycling traffic. Pedestrian traffic will be maintained at all times. Please note this portion of the work is coordinated with Metro Vancouver’s ongoing sewer forcemain work – for information on that project, please visit https://metrovancouver.org/services/liquid-waste/columbia-street-sewer-repair

From March to June 2026, crews will undertake the surface works and signal work. This work will require daytime closures to vehicle and cyclist traffic. Pedestrian traffic will be maintained at all times.  

Vehicle and cyclist traffic will reopen after work hours whenever possible, with some exceptions depending on work activities.

The work includes construction of a protected bike lane including traffic signal upgrades. These upgrades will improve safety, accessibility, and provide more comfortable walking and cycling connections for active road users.

There will be a pause of construction during FIFA, and resume post FIFA until completion expected in October. We appreciate your patience and understanding as we complete these important improvements. If you have any questions or comments about this project, please contact streets.04@vancouver.ca or call 3-1-1

Location: Ontario St between E 1st Av and E 2nd Av

Schedule: Dec 8, 2025 - Oct 30, 2026</content>
<id>urn:uuid:0ab5a1af-8458-4262-b0c6-4736641d5c1c</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a682c1d0-30f8-4155-903e-d965d0b4d50f"/>
<published>2025-12-09T08:00:00Z</published>
<title>Transportation Improvements – Ontario St (E 1st Av to E 2nd Av)</title>
<updated>2026-02-18T18:30:53.7539317Z</updated>
<georss:line>49.27019009666756 -123.10460784294702 49.27000045202382 -123.10461058488852</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Parking: Temporary parking restrictions will be required to safely complete construction. Please watch for "No Parking" signs as work progresses.

Traffic and Access: From December 2025 to March 2026, crews will work intermittently to complete underground utility work.  This work will occasionally impact vehicle and cycling traffic. Pedestrian traffic will be maintained at all times. Please note this portion of the work is coordinated with Metro Vancouver’s ongoing sewer forcemain work – for information on that project, please visit https://metrovancouver.org/services/liquid-waste/columbia-street-sewer-repair

From March to June 2026, crews will undertake the surface works and signal work. This work will require daytime closures to vehicle and cyclist traffic. Pedestrian traffic will be maintained at all times.  

Vehicle and cyclist traffic will reopen after work hours whenever possible, with some exceptions depending on work activities.

The work includes construction of a protected bike lane including traffic signal upgrades. These upgrades will improve safety, accessibility, and provide more comfortable walking and cycling connections for active road users.

There will be a pause of construction during FIFA, and resume post FIFA until completion expected in October. We appreciate your patience and understanding as we complete these important improvements. If you have any questions or comments about this project, please contact streets.04@vancouver.ca or call 3-1-1

Location: Ontario St between E 1st Av and E 2nd Av

Schedule: Dec 8, 2025 - Oct 30, 2026</content>
<id>urn:uuid:fb966765-4a76-4a3b-9631-6b90d7429d3f</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a682c1d0-30f8-4155-903e-d965d0b4d50f"/>
<published>2025-12-09T08:00:00Z</published>
<title>Transportation Improvements – Ontario St (E 1st Av to E 2nd Av)</title>
<updated>2026-02-18T18:30:53.7539317Z</updated>
<georss:line>49.26973675986696 -123.10461624796606 49.26923948656608 -123.1046370392008</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Parking: Temporary parking restrictions will be required to safely complete construction. Please watch for "No Parking" signs as work progresses.

Traffic and Access: From December 2025 to March 2026, crews will work intermittently to complete underground utility work.  This work will occasionally impact vehicle and cycling traffic. Pedestrian traffic will be maintained at all times. Please note this portion of the work is coordinated with Metro Vancouver’s ongoing sewer forcemain work – for information on that project, please visit https://metrovancouver.org/services/liquid-waste/columbia-street-sewer-repair

From March to June 2026, crews will undertake the surface works and signal work. This work will require daytime closures to vehicle and cyclist traffic. Pedestrian traffic will be maintained at all times.  

Vehicle and cyclist traffic will reopen after work hours whenever possible, with some exceptions depending on work activities.

The work includes construction of a protected bike lane including traffic signal upgrades. These upgrades will improve safety, accessibility, and provide more comfortable walking and cycling connections for active road users.

There will be a pause of construction during FIFA, and resume post FIFA until completion expected in October. We appreciate your patience and understanding as we complete these important improvements. If you have any questions or comments about this project, please contact streets.04@vancouver.ca or call 3-1-1

Location: Ontario St between E 1st Av and E 2nd Av

Schedule: Dec 8, 2025 - Oct 30, 2026</content>
<id>urn:uuid:f4907123-35bb-43a4-92f1-cb0278ba057f</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a682c1d0-30f8-4155-903e-d965d0b4d50f"/>
<published>2025-12-09T08:00:00Z</published>
<title>Transportation Improvements – Ontario St (E 1st Av to E 2nd Av)</title>
<updated>2026-02-18T18:30:53.7539317Z</updated>
<georss:line>49.27018918089729 -123.1045978633537 49.26973675986696 -123.10461624796606</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Trounce Alley from Abbott to Carrall - Full closure and SLAT
Carrall from Cordova to Trounce - Bikes only
Location: 
Schedule: Nov 24, 2025 - May 15, 2026</content>
<id>urn:uuid:74806e75-8840-4ca9-afab-1784155677cb</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/b9bd5b76-53b6-45b1-bc3d-4d00dcdee5c6"/>
<published>2026-01-29T08:00:00Z</published>
<title>Trounce Alley Rehabilitation</title>
<updated>2026-04-07T01:51:59.0302867Z</updated>
<georss:line>49.28319006138409 -123.1054684904778 49.28337786835644 -123.1064725807751 49.283397490024186 -123.10660571045261</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Trounce Alley from Abbott to Carrall - Full closure and SLAT
Carrall from Cordova to Trounce - Bikes only
Location: 
Schedule: Nov 24, 2025 - May 15, 2026</content>
<id>urn:uuid:6d5a1e4f-4cfa-4ed6-92e6-c85519a694fa</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/b9bd5b76-53b6-45b1-bc3d-4d00dcdee5c6"/>
<published>2026-01-29T08:00:00Z</published>
<title>Trounce Alley Rehabilitation</title>
<updated>2026-04-07T01:51:59.0302867Z</updated>
<georss:line>49.28306739465381 -123.10479564614035 49.28319006138409 -123.1054684904778</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Trounce Alley from Abbott to Carrall - Full closure and SLAT
Carrall from Cordova to Trounce - Bikes only
Location: 
Schedule: Nov 24, 2025 - May 15, 2026</content>
<id>urn:uuid:55e2d644-32d4-4a23-b5e9-cab05b072594</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/b9bd5b76-53b6-45b1-bc3d-4d00dcdee5c6"/>
<published>2026-01-29T08:00:00Z</published>
<title>Trounce Alley Rehabilitation</title>
<updated>2026-04-07T01:51:59.0302867Z</updated>
<georss:line>49.28297694742943 -123.10429934054474 49.28300446204602 -123.10444056995414 49.2830527151024 -123.1047156311314</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Trounce Alley from Abbott to Carrall - Full closure and SLAT
Carrall from Cordova to Trounce - Bikes only
Location: 
Schedule: Nov 24, 2025 - May 15, 2026</content>
<id>urn:uuid:98bbdc6a-2355-40b3-b4f1-350d431dd0aa</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/b9bd5b76-53b6-45b1-bc3d-4d00dcdee5c6"/>
<published>2026-01-29T08:00:00Z</published>
<title>Trounce Alley Rehabilitation</title>
<updated>2026-04-07T01:51:59.0302867Z</updated>
<georss:line>49.283397490024186 -123.10660571045261 49.28383407489636 -123.10900221904582</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Trounce Alley from Abbott to Carrall - Full closure and SLAT
Carrall from Cordova to Trounce - Bikes only
Location: 
Schedule: Nov 24, 2025 - May 15, 2026</content>
<id>urn:uuid:5dbc8fb6-0dc6-47e3-a9d9-e660f0dc17b2</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/b9bd5b76-53b6-45b1-bc3d-4d00dcdee5c6"/>
<published>2026-01-29T08:00:00Z</published>
<title>Trounce Alley Rehabilitation</title>
<updated>2026-04-07T01:51:59.0302867Z</updated>
<georss:line>49.28297133558587 -123.10428389606808 49.282475700850796 -123.10430442445526</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Trounce Alley from Abbott to Carrall - Full closure and SLAT
Carrall from Cordova to Trounce - Bikes only
Location: 
Schedule: Nov 24, 2025 - May 15, 2026</content>
<id>urn:uuid:b9e21d77-0027-4992-8127-e1c8f6159674</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/b9bd5b76-53b6-45b1-bc3d-4d00dcdee5c6"/>
<published>2026-01-29T08:00:00Z</published>
<title>Trounce Alley Rehabilitation</title>
<updated>2026-04-07T01:51:59.0302867Z</updated>
<georss:line>49.283277093212035 -123.10427102450099 49.28297133558587 -123.10428389606808</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Trounce Alley from Abbott to Carrall - Full closure and SLAT
Carrall from Cordova to Trounce - Bikes only
Location: 
Schedule: Nov 24, 2025 - May 15, 2026</content>
<id>urn:uuid:d12f545a-45d9-4779-b818-82da67ce2c70</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/b9bd5b76-53b6-45b1-bc3d-4d00dcdee5c6"/>
<published>2026-01-29T08:00:00Z</published>
<title>Trounce Alley Rehabilitation</title>
<updated>2026-04-07T01:51:59.0302867Z</updated>
<georss:line>49.28382881448749 -123.10898665061075 49.28351872485797 -123.10911899996232</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Trounce Alley from Abbott to Carrall - Full closure and SLAT
Carrall from Cordova to Trounce - Bikes only
Location: 
Schedule: Nov 24, 2025 - May 15, 2026</content>
<id>urn:uuid:0ad9f4de-3522-427c-8104-bb7c7912716f</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/b9bd5b76-53b6-45b1-bc3d-4d00dcdee5c6"/>
<published>2026-01-29T08:00:00Z</published>
<title>Trounce Alley Rehabilitation</title>
<updated>2026-04-07T01:51:59.0302867Z</updated>
<georss:line>49.28431923067458 -123.10877737817344 49.283947148797125 -123.10893599414251</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Contractor performing repair work to deficient concrete from Trounce Alley Rehabilitation project.
Location: Eastern half of 0 BLK of Trounce Alley (Closure from Carrall St entrance to mid-point of 0 BLK of Trounce Alley).
Schedule: May 30, 2026 - Jun 2, 2026</content>
<id>urn:uuid:e791a9f6-cfb9-4766-b283-911bec34e2b1</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/c5d0c15c-f28f-4b0c-82d9-fc7bdf501aa9"/>
<published>2026-05-29T07:00:00Z</published>
<title>Trounce Alley Rehabilitation - Deficiency Repairs</title>
<updated>2026-06-01T14:41:58.0079623Z</updated>
<georss:line>49.28313124401049 -123.10514405288725 49.28297478431287 -123.10428975505205 49.282964236450226 -123.10426011064767</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Thanksgiving Turkey Trot Run.

Monday, October 12th from 8:00am to 10:00am 

Road closures and Traffic delays:
• Burrard St., and Burrard St Bridge, from W 1st Ave to Pacific St 
• Northbound travel lanes closed from W 1st Avenue north over Burrard St Bridge.
• 900 Pacific St - One eastbound travel lane closed from Burrard to Hornby 
• 1400 – 1500 Hornby St closed from Pacific St to the seawall 
• 1500 – 1700 W 1st Avenue from Creekside Drive to Burrard St

The Turkey Trot could cause traffic delays around the Granville Island area and the Burrard St. Bridge on Monday, October 13th. 

Full road closures and traffic disruptions can be expected between 8:00am and 10:00am.

Location: Granville Island, W 1st ave, Burrard st and Bridge travelling northbound to Hornby, south to seawall and back to Granville island via sea wall
Schedule: Oct 12, 2026</content>
<id>urn:uuid:f120261d-62fe-405e-b35a-90975ce4c9ae</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/12b5b8e1-9ce6-48f1-b96f-948c21efb617"/>
<published>2026-05-19T07:00:00Z</published>
<title>Turkey Trot </title>
<updated>2026-05-20T18:35:08.8851921Z</updated>
<georss:line>49.27131466810093 -123.14027285152298 49.27085673672394 -123.14176424254555 49.2706048726547 -123.14178178832229 49.27073080485005 -123.14539621832994 49.27227631015637 -123.14515057745541 49.272883050855654 -123.14453647526965 49.27693542942396 -123.13230706888444 49.27630584442875 -123.1313595969407 49.274668885830806 -123.13388618879073 49.271726802705814 -123.12964011082062 49.27185273203722 -123.12876282198381 49.27071935648195 -123.12700824431022 49.271120047785104 -123.12620113858034</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Thanksgiving Turkey Trot Run.

Monday, October 12th from 8:00am to 10:00am 

Road closures and Traffic delays:
• Burrard St., and Burrard St Bridge, from W 1st Ave to Pacific St 
• Northbound travel lanes closed from W 1st Avenue north over Burrard St Bridge.
• 900 Pacific St - One eastbound travel lane closed from Burrard to Hornby 
• 1400 – 1500 Hornby St closed from Pacific St to the seawall 
• 1500 – 1700 W 1st Avenue from Creekside Drive to Burrard St

The Turkey Trot could cause traffic delays around the Granville Island area and the Burrard St. Bridge on Monday, October 13th. 

Full road closures and traffic disruptions can be expected between 8:00am and 10:00am.

Location: Granville Island, W 1st ave, Burrard st and Bridge travelling northbound to Hornby, south to seawall and back to Granville island via sea wall
Schedule: Oct 12, 2026</content>
<id>urn:uuid:7fe220ff-2f82-4eba-b834-4e8fad370d42</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/12b5b8e1-9ce6-48f1-b96f-948c21efb617"/>
<published>2026-05-19T07:00:00Z</published>
<title>Turkey Trot </title>
<updated>2026-05-20T18:35:08.8851921Z</updated>
<georss:line>49.27110859950733 -123.12607831814324 49.27184128392946 -123.12492029687866 49.27184128392946 -123.12348154318627 49.27107425465803 -123.12242879658211 49.27125742691129 -123.12216560993107 49.27086818506018 -123.12148132463837 49.27122308216559 -123.1201302998297 49.271967212968605 -123.11970920118802 49.272768572049614 -123.11967410963462 49.273226485679714 -123.11891964123495 49.27337530669425 -123.11788444040752 49.273146351101275 -123.11700715157072 49.27265409297789 -123.11616495428737 49.272528165692165 -123.11553330632488 49.27302042507219 -123.11351554200023 49.27358136581938 -123.11212942563817 49.27383321469219 -123.11200660520103 49.27409650986618 -123.11137495723852 49.27415374776152 -123.11040993951802 49.27445138374665 -123.11023448175067 49.27442848873463 -123.10974320000204 49.27500086084703 -123.1096203795649 49.275023755593395 -123.10855008718399 49.27571059304245 -123.10846235830032 49.27555033182645 -123.10377763591177 49.27408506227917 -123.10346181193052 49.27343254542646 -123.10256697731697 49.27201300526684 -123.10265470620065 49.27221907008257 -123.10948001335099 49.27172680270584 -123.11030466485758 49.27156652854643 -123.11125213680135 49.27153218401594 -123.11218206296834 49.27133756455825 -123.1138489117583 49.27091397837859 -123.11497184146938 49.269746235482074 -123.117393158659 49.26892192973682 -123.11837572215622 49.267845732063506 -123.11879682079784 49.26763964897995 -123.1192705567697 49.267708343436766 -123.12081458512252 49.26844107835842 -123.12186733172669 49.26760530171566 -123.12439392357669 49.26761675080641 -123.12534139552044 49.267948773282455 -123.12574494838536</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Thanksgiving Turkey Trot Run.

Monday, October 12th from 8:00am to 10:00am 

Road closures and Traffic delays:
• Burrard St., and Burrard St Bridge, from W 1st Ave to Pacific St 
• Northbound travel lanes closed from W 1st Avenue north over Burrard St Bridge.
• 900 Pacific St - One eastbound travel lane closed from Burrard to Hornby 
• 1400 – 1500 Hornby St closed from Pacific St to the seawall 
• 1500 – 1700 W 1st Avenue from Creekside Drive to Burrard St

The Turkey Trot could cause traffic delays around the Granville Island area and the Burrard St. Bridge on Monday, October 13th. 

Full road closures and traffic disruptions can be expected between 8:00am and 10:00am.

Location: Granville Island, W 1st ave, Burrard st and Bridge travelling northbound to Hornby, south to seawall and back to Granville island via sea wall
Schedule: Oct 12, 2026</content>
<id>urn:uuid:3e05c12c-7ca2-4f95-870b-1b7b725d2992</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/12b5b8e1-9ce6-48f1-b96f-948c21efb617"/>
<published>2026-05-19T07:00:00Z</published>
<title>Turkey Trot </title>
<updated>2026-05-20T18:35:08.8851921Z</updated>
<georss:line>49.26796022229351 -123.12574494838536 49.26804036529646 -123.1296050192673 49.26792587525239 -123.12990329747184 49.26793732426873 -123.13053494543433 49.26750225977932 -123.13083322363883 49.267147335907055 -123.13149996315482 49.26720458186563 -123.13181578713608 49.26774269062929 -123.1324123435451 49.26801746730888 -123.13316681194475 49.26826934458751 -123.13355281903296 49.2685097716994 -123.13439501631628 49.269093661236155 -123.13411428388852</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>E 57th Av - Fraser St to Prince Albert: Full closure /
Knight St and E 57th Av: Soft closure
Location: E 57th Av - Fraser St to Prince Albert
Schedule: Jun 6, 2026 - Jun 20, 2026; Sa; 7:00 AM - 5:00 PM</content>
<id>urn:uuid:4dae4619-48be-4aac-acbf-cc6b100f9c41</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/24905603-30ab-4c79-a20b-e184db76ed53"/>
<published>2026-06-04T07:00:00Z</published>
<title>Utilities - BCH - FTC</title>
<updated>2026-06-04T18:19:24.3711285Z</updated>
<georss:line>49.21825548091152 -123.09095311706717 49.218265405995965 -123.09078884511115 49.21825912467307 -123.09031023075575</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>E 57th Av - Fraser St to Prince Albert: Full closure /
Knight St and E 57th Av: Soft closure
Location: E 57th Av - Fraser St to Prince Albert
Schedule: Jun 6, 2026 - Jun 20, 2026; Sa; 7:00 AM - 5:00 PM</content>
<id>urn:uuid:92841501-b62e-4d45-aab8-109f7b10e661</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/24905603-30ab-4c79-a20b-e184db76ed53"/>
<published>2026-06-04T07:00:00Z</published>
<title>Utilities - BCH - FTC</title>
<updated>2026-06-04T18:19:24.3711285Z</updated>
<georss:line>49.21825912467307 -123.09031023075575 49.2182358936378 -123.08846876370144</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>E 57th Av - Fraser St to Prince Albert: Full closure /
Knight St and E 57th Av: Soft closure
Location: E 57th Av - Fraser St to Prince Albert
Schedule: Jun 6, 2026 - Jun 20, 2026; Sa; 7:00 AM - 5:00 PM</content>
<id>urn:uuid:53801337-5e8c-4dcf-9086-c15732b78879</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/24905603-30ab-4c79-a20b-e184db76ed53"/>
<published>2026-06-04T07:00:00Z</published>
<title>Utilities - BCH - FTC</title>
<updated>2026-06-04T18:19:24.3711285Z</updated>
<georss:line>49.2182358936378 -123.08846876370144 49.21822588707201 -123.08780176729636</georss:line>
</entry>
<entry>
<category term="Road Closure"/>
<content>Full Closure
Location: Alberta St – W 7th Av to W 6th Av 
Schedule: Jun 1, 2026 - Jun 12, 2026</content>
<id>urn:uuid:60ffa538-efd3-4061-ad25-e08b67f26293</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a519617f-9c63-4fbb-82aa-b7b9fd7756a5"/>
<published>2026-05-20T07:00:00Z</published>
<title>Utilities - MV</title>
<updated>2026-05-20T17:44:50.3280707Z</updated>
<georss:line>49.265690149544184 -123.11085140859302 49.26523591587778 -123.11087316663239</georss:line>
</entry>
<entry>
<category term="Road Closure"/>
<content>Full Closure
Location: Alberta St – W 7th Av to W 6th Av 
Schedule: Jun 1, 2026 - Jun 12, 2026</content>
<id>urn:uuid:5012f39c-65c8-413b-a54b-a336ee9482e8</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a519617f-9c63-4fbb-82aa-b7b9fd7756a5"/>
<published>2026-05-20T07:00:00Z</published>
<title>Utilities - MV</title>
<updated>2026-05-20T17:44:50.3280707Z</updated>
<georss:line>49.26523591587778 -123.11087316663239 49.26478374607936 -123.11089075043989</georss:line>
</entry>
<entry>
<category term="Road Closure"/>
<content>Road closed LTO 
Location: Yukon St – W 8th Ave to W 6th Ave (intersection closure of 7th Av) 
Schedule: Jun 1, 2026 - Jun 12, 2026</content>
<id>urn:uuid:cfa0446f-adb5-4b18-a444-c000781353f1</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/133d17ae-2cb1-4cde-9d32-dce5206cd738"/>
<published>2026-05-20T07:00:00Z</published>
<title>Utilities - MV</title>
<updated>2026-05-20T17:50:56.7990418Z</updated>
<georss:line>49.26436861203334 -123.11284727692905 49.26391654728428 -123.11286744039334</georss:line>
</entry>
<entry>
<category term="Road Closure"/>
<content>Road closed LTO 
Location: Yukon St – W 8th Ave to W 6th Ave (intersection closure of 7th Av) 
Schedule: Jun 1, 2026 - Jun 12, 2026</content>
<id>urn:uuid:cc93170c-fbe8-4cd4-9364-c247d836e321</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/133d17ae-2cb1-4cde-9d32-dce5206cd738"/>
<published>2026-05-20T07:00:00Z</published>
<title>Utilities - MV</title>
<updated>2026-05-20T17:50:56.7990418Z</updated>
<georss:line>49.264820685295916 -123.11282756670643 49.26436861203334 -123.11284727692905</georss:line>
</entry>
<entry>
<category term="Road Closure"/>
<content>Road closed LTO 
Location: Yukon St – W 8th Ave to W 6th Ave (intersection closure of 7th Av) 
Schedule: Jun 1, 2026 - Jun 12, 2026</content>
<id>urn:uuid:c2cdc9f8-5d6d-4ee8-8dd8-048962568d00</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/133d17ae-2cb1-4cde-9d32-dce5206cd738"/>
<published>2026-05-20T07:00:00Z</published>
<title>Utilities - MV</title>
<updated>2026-05-20T17:50:56.7990418Z</updated>
<georss:line>49.26527311907864 -123.11280708722796 49.264820685295916 -123.11282756670643</georss:line>
</entry>
<entry>
<category term="Road Closure"/>
<content>Road closed LTO 
Location: Yukon St – W 8th Ave to W 6th Ave (intersection closure of 7th Av) 
Schedule: Jun 1, 2026 - Jun 12, 2026</content>
<id>urn:uuid:aedff0e8-0b1d-4107-b29c-fcf92272f17c</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/133d17ae-2cb1-4cde-9d32-dce5206cd738"/>
<published>2026-05-20T07:00:00Z</published>
<title>Utilities - MV</title>
<updated>2026-05-20T17:50:56.7990418Z</updated>
<georss:line>49.265725534550285 -123.11278689598974 49.26527311907864 -123.11280708722796</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Single Lane alternating traffic
Location: 7th Av – Yukon St to Columbia St 
Schedule: Jun 1, 2026 - Jun 12, 2026</content>
<id>urn:uuid:9d85352e-6ccc-4f76-b281-67c169f1ce81</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/59481ed3-c780-4be2-8e19-0e740168d205"/>
<published>2026-05-20T07:00:00Z</published>
<title>Utilities - MV</title>
<updated>2026-05-20T17:42:47.1241819Z</updated>
<georss:line>49.26478374607936 -123.11089075043989 49.264820685295916 -123.11282756670643</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Single Lane alternating traffic
Location: 7th Av – Yukon St to Columbia St 
Schedule: Jun 1, 2026 - Jun 12, 2026</content>
<id>urn:uuid:396ed9e3-2ee5-4ff2-b91c-101225558a68</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/59481ed3-c780-4be2-8e19-0e740168d205"/>
<published>2026-05-20T07:00:00Z</published>
<title>Utilities - MV</title>
<updated>2026-05-20T17:42:47.1241819Z</updated>
<georss:line>49.264755936850406 -123.1094432083651 49.26478374607936 -123.11089075043989</georss:line>
</entry>
<entry>
<category term="Road Closure"/>
<content>Road closed LTO 
Location: W 7th Ave – Cambie to Alberta St 
Schedule: Jun 1, 2026 - Jun 12, 2026</content>
<id>urn:uuid:0b985e3d-24fb-452e-aee1-9533013798ab</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/354a192f-1736-4f5f-a24e-9fbb54490dc8"/>
<published>2026-05-20T07:00:00Z</published>
<title>Utilities - MV</title>
<updated>2026-05-20T17:47:40.0748912Z</updated>
<georss:line>49.264820685295916 -123.11282756670643 49.264857469100605 -123.11476137537484</georss:line>
</entry>
<entry>
<category term="Road Closure"/>
<content>Road closed LTO 
Location: W 7th Ave – Cambie to Alberta St 
Schedule: Jun 1, 2026 - Jun 12, 2026</content>
<id>urn:uuid:9a43b213-bf2c-4e5d-9572-af385e5009c9</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/354a192f-1736-4f5f-a24e-9fbb54490dc8"/>
<published>2026-05-20T07:00:00Z</published>
<title>Utilities - MV</title>
<updated>2026-05-20T17:47:40.0748912Z</updated>
<georss:line>49.26478374607936 -123.11089075043989 49.264820685295916 -123.11282756670643</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Sidewalk and curb ramp construction by Street Ops along Vernon Dr from 
Location: 
Schedule: Oct 27, 2025 - Jan 30, 2026</content>
<id>urn:uuid:19d8d7c2-2cef-478d-81e3-1dd7b86eee1a</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/582a9356-f5c0-40a5-82c5-a425d01709ee"/>
<published>2025-10-24T07:00:00Z</published>
<title>Vernon Dr - WITT Sidewalk</title>
<updated>2025-10-24T23:16:08.9949769Z</updated>
<georss:line>49.27148980204939 -123.07870010972876 49.2749625342764 -123.07866591085227</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>City Crews will undertake street and signal upgrades at Victoria Dr and E 10th Ave intersection. The scope of the work will include tree removal, a new curb ramp, a new curb bulge, a concrete median, asphalt paving and traffic signal upgrades. This work aims to improve accessibility for pedestrians and cyclists crossing Victoria Dr at E 10th Ave safely and comfortably.
Location: Victoria Dr at E 10th Ave Intersection
Schedule: Jul 4, 2024 7:00 AM - Oct 4, 2024 6:00 PM</content>
<id>urn:uuid:6d8c1df1-f63a-437f-8c41-ca6e1811ebaa</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/4c708a7b-d9e3-481b-a3f7-075a23cb951d"/>
<published>2024-06-26T07:00:00Z</published>
<title>Victoria Drive and E 10th Ave Intersection Upgrades</title>
<updated>2024-06-26T17:47:51.8228866Z</updated>
<georss:line>49.261340477857715 -123.06591261307886 49.26088679060592 -123.06592123099502</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>City Crews will undertake street and signal upgrades at Victoria Dr and E 10th Ave intersection. The scope of the work will include tree removal, a new curb ramp, a new curb bulge, a concrete median, asphalt paving and traffic signal upgrades. This work aims to improve accessibility for pedestrians and cyclists crossing Victoria Dr at E 10th Ave safely and comfortably.
Location: Victoria Dr at E 10th Ave Intersection
Schedule: Jul 4, 2024 7:00 AM - Oct 4, 2024 6:00 PM</content>
<id>urn:uuid:f172ab25-6ec2-4533-8378-93ce28567a6b</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/4c708a7b-d9e3-481b-a3f7-075a23cb951d"/>
<published>2024-06-26T07:00:00Z</published>
<title>Victoria Drive and E 10th Ave Intersection Upgrades</title>
<updated>2024-06-26T17:47:51.8228866Z</updated>
<georss:line>49.262191613611606 -123.06589644267393 49.261340477857715 -123.06591261307886</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>City Crews will undertake street and signal upgrades at Victoria Dr and E 10th Ave intersection. The scope of the work will include tree removal, a new curb ramp, a new curb bulge, a concrete median, asphalt paving and traffic signal upgrades. This work aims to improve accessibility for pedestrians and cyclists crossing Victoria Dr at E 10th Ave safely and comfortably.
Location: Victoria Dr at E 10th Ave Intersection
Schedule: Jul 4, 2024 7:00 AM - Oct 4, 2024 6:00 PM</content>
<id>urn:uuid:fd963a46-464c-4766-a4ac-231ffe75d9da</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/4c708a7b-d9e3-481b-a3f7-075a23cb951d"/>
<published>2024-06-26T07:00:00Z</published>
<title>Victoria Drive and E 10th Ave Intersection Upgrades</title>
<updated>2024-06-26T17:47:51.8228866Z</updated>
<georss:line>49.261369581510195 -123.06978107885315 49.261340477857715 -123.06591261307886</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Alder St - W 13th Av to W 15th Av       Jul 2026 - Aug 2026 
Birch St - W 12th Av to W 14th Av       Aug 2026 - Sep 2026
W 14th Av - Granville St to Alder St     Sep 2026 - Oct 2026   

Location:   
   
Schedule: Aug 5, 2026 - Oct 22, 2026; Weekdays; 7:00 AM - 3:00 PM</content>
<id>urn:uuid:2102831e-8a40-4ff1-929b-8044d7c24097</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/36e847e9-5152-4900-9585-e1feb81c1e82"/>
<published>2026-01-21T08:00:00Z</published>
<title>W 14th Av,  Birch St, and Alder St</title>
<updated>2026-05-28T19:05:25.6153598Z</updated>
<georss:line>49.260684732724656 -123.13384671242984 49.25883992006817 -123.13390595533761</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Alder St - W 13th Av to W 15th Av       Jul 2026 - Aug 2026 
Birch St - W 12th Av to W 14th Av       Aug 2026 - Sep 2026
W 14th Av - Granville St to Alder St     Sep 2026 - Oct 2026   

Location:   
   
Schedule: Aug 5, 2026 - Oct 22, 2026; Weekdays; 7:00 AM - 3:00 PM</content>
<id>urn:uuid:537a3f5c-5b6f-4cc8-834a-96de60808f4c</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/36e847e9-5152-4900-9585-e1feb81c1e82"/>
<published>2026-01-21T08:00:00Z</published>
<title>W 14th Av,  Birch St, and Alder St</title>
<updated>2026-05-28T19:05:25.6153598Z</updated>
<georss:line>49.25973691080418 -123.13148735127574 49.25788023476301 -123.13158189331278</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Alder St - W 13th Av to W 15th Av       Jul 2026 - Aug 2026 
Birch St - W 12th Av to W 14th Av       Aug 2026 - Sep 2026
W 14th Av - Granville St to Alder St     Sep 2026 - Oct 2026   

Location:   
   
Schedule: Aug 5, 2026 - Oct 22, 2026; Weekdays; 7:00 AM - 3:00 PM</content>
<id>urn:uuid:bd4d1d4c-4c03-446a-b2da-1281e095e356</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/36e847e9-5152-4900-9585-e1feb81c1e82"/>
<published>2026-01-21T08:00:00Z</published>
<title>W 14th Av,  Birch St, and Alder St</title>
<updated>2026-05-28T19:05:25.6153598Z</updated>
<georss:line>49.25880892067437 -123.13155724686312 49.25890707894732 -123.13628414360296</georss:line>
</entry>
<entry>
<category term="Road Closure"/>
<content>W 23rd Av - Cambie St to Yukon St                     Mar 2026 - Apr 2026   COMPLETED
Columbia St - W 23rd Av to W King Edward Av           Apr 2026 - May 2026  COMPLETED
W 23rd Av - Yukon St to Manitoba St                            May 2026   COMPLETED
Manitoba St - W 21st Av to W 26th Av                          June 2026 - Jul 2026  UNDER CONSTRUCTION
W 23rd Av - Columbia St to Manitoba St                       Jul 2026 - Aug 2026
Location:                        
Schedule: Mar 23, 2026 - Aug 4, 2026; Weekdays; 7:00 AM - 3:00 PM</content>
<id>urn:uuid:ca102cdb-8efe-4da6-be1c-504ddc801324</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/3f5f7853-e084-495b-bc4d-848587fa40f8"/>
<published>2025-02-13T08:00:00Z</published>
<title>W 23rd Av, Columbia St and Manitoba St</title>
<updated>2026-05-28T19:04:27.2894129Z</updated>
<georss:line>49.25008557826274 -123.11536037145135 49.24997439991202 -123.10739788443595</georss:line>
</entry>
<entry>
<category term="Road Closure"/>
<content>W 23rd Av - Cambie St to Yukon St                     Mar 2026 - Apr 2026   COMPLETED
Columbia St - W 23rd Av to W King Edward Av           Apr 2026 - May 2026  COMPLETED
W 23rd Av - Yukon St to Manitoba St                            May 2026   COMPLETED
Manitoba St - W 21st Av to W 26th Av                          June 2026 - Jul 2026  UNDER CONSTRUCTION
W 23rd Av - Columbia St to Manitoba St                       Jul 2026 - Aug 2026
Location:                        
Schedule: Mar 23, 2026 - Aug 4, 2026; Weekdays; 7:00 AM - 3:00 PM</content>
<id>urn:uuid:e04abeb1-5566-4281-83f3-c97a0042d84d</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/3f5f7853-e084-495b-bc4d-848587fa40f8"/>
<published>2025-02-13T08:00:00Z</published>
<title>W 23rd Av, Columbia St and Manitoba St</title>
<updated>2026-05-28T19:04:27.2894129Z</updated>
<georss:line>49.250014806571414 -123.10999771587181 49.24895857714182 -123.11004394677045</georss:line>
</entry>
<entry>
<category term="Road Closure"/>
<content>W 23rd Av - Cambie St to Yukon St                     Mar 2026 - Apr 2026   COMPLETED
Columbia St - W 23rd Av to W King Edward Av           Apr 2026 - May 2026  COMPLETED
W 23rd Av - Yukon St to Manitoba St                            May 2026   COMPLETED
Manitoba St - W 21st Av to W 26th Av                          June 2026 - Jul 2026  UNDER CONSTRUCTION
W 23rd Av - Columbia St to Manitoba St                       Jul 2026 - Aug 2026
Location:                        
Schedule: Mar 23, 2026 - Aug 4, 2026; Weekdays; 7:00 AM - 3:00 PM</content>
<id>urn:uuid:baad7852-f1c3-4717-a042-3df19631fee9</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/3f5f7853-e084-495b-bc4d-848587fa40f8"/>
<published>2025-02-13T08:00:00Z</published>
<title>W 23rd Av, Columbia St and Manitoba St</title>
<updated>2026-05-28T19:04:27.2894129Z</updated>
<georss:line>49.25191150673322 -123.10732113286002 49.249977570395345 -123.10739520196937</georss:line>
</entry>
<entry>
<category term="Road Closure"/>
<content>W 23rd Av - Cambie St to Yukon St                     Mar 2026 - Apr 2026   COMPLETED
Columbia St - W 23rd Av to W King Edward Av           Apr 2026 - May 2026  COMPLETED
W 23rd Av - Yukon St to Manitoba St                            May 2026   COMPLETED
Manitoba St - W 21st Av to W 26th Av                          June 2026 - Jul 2026  UNDER CONSTRUCTION
W 23rd Av - Columbia St to Manitoba St                       Jul 2026 - Aug 2026
Location:                        
Schedule: Mar 23, 2026 - Aug 4, 2026; Weekdays; 7:00 AM - 3:00 PM</content>
<id>urn:uuid:1c7c51d8-0dde-40b7-90ec-cd0440d6c023</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/3f5f7853-e084-495b-bc4d-848587fa40f8"/>
<published>2025-02-13T08:00:00Z</published>
<title>W 23rd Av, Columbia St and Manitoba St</title>
<updated>2026-05-28T19:04:27.2894129Z</updated>
<georss:line>49.24997614815695 -123.10741998903484 49.247824802571245 -123.10752087768643</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Sewer Upgrades, water upgrades, and street rehabilitation. 
End date extended to end of 2026 to account for pushing paving work to after World Cup window. Paving schedule TBC.


Location: Phase 1:
- W 50th Ave. from Quebec to Ontario
- Ontario St. from 50th Ave. to 49th Ave. 
- W 49th Ave. from Sophia St. to Cambie St.
(Phase 2 will continue North on Alberta St. in 2027 - see separate entry)


Schedule: Apr 1, 2025 - Dec 15, 2026</content>
<id>urn:uuid:1059800a-6a1a-46a9-b740-225b5c48030d</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/9f5e15ce-f10f-4965-9231-efed6174d208"/>
<published>2025-04-10T07:00:00Z</published>
<title>W 49th Ave. and Alberta St. Upgrades - Phase 1</title>
<updated>2026-06-01T17:56:57.7240846Z</updated>
<georss:line>49.225750217295996 -123.10595862367998 49.22573365287201 -123.10610033805 49.22575124660901 -123.10658023209001</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Sewer Upgrades, water upgrades, and street rehabilitation. 
End date extended to end of 2026 to account for pushing paving work to after World Cup window. Paving schedule TBC.


Location: Phase 1:
- W 50th Ave. from Quebec to Ontario
- Ontario St. from 50th Ave. to 49th Ave. 
- W 49th Ave. from Sophia St. to Cambie St.
(Phase 2 will continue North on Alberta St. in 2027 - see separate entry)


Schedule: Apr 1, 2025 - Dec 15, 2026</content>
<id>urn:uuid:c6b4cab5-1ab7-40f4-90a6-8f54fcd84cbf</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/9f5e15ce-f10f-4965-9231-efed6174d208"/>
<published>2025-04-10T07:00:00Z</published>
<title>W 49th Ave. and Alberta St. Upgrades - Phase 1</title>
<updated>2026-06-01T17:56:57.7240846Z</updated>
<georss:line>49.22590431793901 -123.11075063725 49.225984885261994 -123.11295573067</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Sewer Upgrades, water upgrades, and street rehabilitation. 
End date extended to end of 2026 to account for pushing paving work to after World Cup window. Paving schedule TBC.


Location: Phase 1:
- W 50th Ave. from Quebec to Ontario
- Ontario St. from 50th Ave. to 49th Ave. 
- W 49th Ave. from Sophia St. to Cambie St.
(Phase 2 will continue North on Alberta St. in 2027 - see separate entry)


Schedule: Apr 1, 2025 - Dec 15, 2026</content>
<id>urn:uuid:7a5041cf-0930-43df-ad1d-0ff453150b0c</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/9f5e15ce-f10f-4965-9231-efed6174d208"/>
<published>2025-04-10T07:00:00Z</published>
<title>W 49th Ave. and Alberta St. Upgrades - Phase 1</title>
<updated>2026-06-01T17:56:57.7240846Z</updated>
<georss:line>49.22575124660901 -123.10658023209001 49.22581872237501 -123.10841439274</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Sewer Upgrades, water upgrades, and street rehabilitation. 
End date extended to end of 2026 to account for pushing paving work to after World Cup window. Paving schedule TBC.


Location: Phase 1:
- W 50th Ave. from Quebec to Ontario
- Ontario St. from 50th Ave. to 49th Ave. 
- W 49th Ave. from Sophia St. to Cambie St.
(Phase 2 will continue North on Alberta St. in 2027 - see separate entry)


Schedule: Apr 1, 2025 - Dec 15, 2026</content>
<id>urn:uuid:d10ae954-3ff1-44dc-afea-450c267ebaad</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/9f5e15ce-f10f-4965-9231-efed6174d208"/>
<published>2025-04-10T07:00:00Z</published>
<title>W 49th Ave. and Alberta St. Upgrades - Phase 1</title>
<updated>2026-06-01T17:56:57.7240846Z</updated>
<georss:line>49.22581872237501 -123.10841439274 49.22590431793901 -123.11075063725</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Sewer Upgrades, water upgrades, and street rehabilitation. 
End date extended to end of 2026 to account for pushing paving work to after World Cup window. Paving schedule TBC.


Location: Phase 1:
- W 50th Ave. from Quebec to Ontario
- Ontario St. from 50th Ave. to 49th Ave. 
- W 49th Ave. from Sophia St. to Cambie St.
(Phase 2 will continue North on Alberta St. in 2027 - see separate entry)


Schedule: Apr 1, 2025 - Dec 15, 2026</content>
<id>urn:uuid:e7a5f22e-7846-424f-b806-23377a7377a9</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/9f5e15ce-f10f-4965-9231-efed6174d208"/>
<published>2025-04-10T07:00:00Z</published>
<title>W 49th Ave. and Alberta St. Upgrades - Phase 1</title>
<updated>2026-06-01T17:56:57.7240846Z</updated>
<georss:line>49.22575582545838 -123.10597405295229 49.22574368269096 -123.10537329669687</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Sewer Upgrades, water upgrades, and street rehabilitation. 
End date extended to end of 2026 to account for pushing paving work to after World Cup window. Paving schedule TBC.


Location: Phase 1:
- W 50th Ave. from Quebec to Ontario
- Ontario St. from 50th Ave. to 49th Ave. 
- W 49th Ave. from Sophia St. to Cambie St.
(Phase 2 will continue North on Alberta St. in 2027 - see separate entry)


Schedule: Apr 1, 2025 - Dec 15, 2026</content>
<id>urn:uuid:d853c9d0-2351-43ba-8a0e-4b1f218f21fe</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/9f5e15ce-f10f-4965-9231-efed6174d208"/>
<published>2025-04-10T07:00:00Z</published>
<title>W 49th Ave. and Alberta St. Upgrades - Phase 1</title>
<updated>2026-06-01T17:56:57.7240846Z</updated>
<georss:line>49.225984885261994 -123.11295573067 49.226047519865006 -123.11467157734</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Sewer Upgrades, water upgrades, and street rehabilitation. 
End date extended to end of 2026 to account for pushing paving work to after World Cup window. Paving schedule TBC.


Location: Phase 1:
- W 50th Ave. from Quebec to Ontario
- Ontario St. from 50th Ave. to 49th Ave. 
- W 49th Ave. from Sophia St. to Cambie St.
(Phase 2 will continue North on Alberta St. in 2027 - see separate entry)


Schedule: Apr 1, 2025 - Dec 15, 2026</content>
<id>urn:uuid:28731bbf-6f20-457d-8666-7c5e23c902d5</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/9f5e15ce-f10f-4965-9231-efed6174d208"/>
<published>2025-04-10T07:00:00Z</published>
<title>W 49th Ave. and Alberta St. Upgrades - Phase 1</title>
<updated>2026-06-01T17:56:57.7240846Z</updated>
<georss:line>49.22611803510793 -123.11637371778487 49.226040960912485 -123.11464637517928</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Sewer Upgrades, water upgrades, and street rehabilitation. 
End date extended to end of 2026 to account for pushing paving work to after World Cup window. Paving schedule TBC.


Location: Phase 1:
- W 50th Ave. from Quebec to Ontario
- Ontario St. from 50th Ave. to 49th Ave. 
- W 49th Ave. from Sophia St. to Cambie St.
(Phase 2 will continue North on Alberta St. in 2027 - see separate entry)


Schedule: Apr 1, 2025 - Dec 15, 2026</content>
<id>urn:uuid:27e1e32a-f0c3-4c64-8624-1a9e37db502d</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/9f5e15ce-f10f-4965-9231-efed6174d208"/>
<published>2025-04-10T07:00:00Z</published>
<title>W 49th Ave. and Alberta St. Upgrades - Phase 1</title>
<updated>2026-06-01T17:56:57.7240846Z</updated>
<georss:line>49.224804524781035 -123.10599045554 49.224760100213956 -123.10382784319</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Sewer Upgrades, water upgrades, and street rehabilitation. 
End date extended to end of 2026 to account for pushing paving work to after World Cup window. Paving schedule TBC.


Location: Phase 1:
- W 50th Ave. from Quebec to Ontario
- Ontario St. from 50th Ave. to 49th Ave. 
- W 49th Ave. from Sophia St. to Cambie St.
(Phase 2 will continue North on Alberta St. in 2027 - see separate entry)


Schedule: Apr 1, 2025 - Dec 15, 2026</content>
<id>urn:uuid:62a7245a-f51e-4288-9891-b23097d201b9</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/9f5e15ce-f10f-4965-9231-efed6174d208"/>
<published>2025-04-10T07:00:00Z</published>
<title>W 49th Ave. and Alberta St. Upgrades - Phase 1</title>
<updated>2026-06-01T17:56:57.7240846Z</updated>
<georss:line>49.225750217295996 -123.10595862367998 49.22527774474602 -123.10597412167</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Sewer Upgrades, water upgrades, and street rehabilitation. 
End date extended to end of 2026 to account for pushing paving work to after World Cup window. Paving schedule TBC.


Location: Phase 1:
- W 50th Ave. from Quebec to Ontario
- Ontario St. from 50th Ave. to 49th Ave. 
- W 49th Ave. from Sophia St. to Cambie St.
(Phase 2 will continue North on Alberta St. in 2027 - see separate entry)


Schedule: Apr 1, 2025 - Dec 15, 2026</content>
<id>urn:uuid:ea5be4ba-7729-4f76-9d2b-16741b3a371a</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/9f5e15ce-f10f-4965-9231-efed6174d208"/>
<published>2025-04-10T07:00:00Z</published>
<title>W 49th Ave. and Alberta St. Upgrades - Phase 1</title>
<updated>2026-06-01T17:56:57.7240846Z</updated>
<georss:line>49.22568215711115 -123.10232922233503 49.22566877140011 -123.10164743415672</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Sewer Upgrades, water upgrades, and street rehabilitation. 
End date extended to end of 2026 to account for pushing paving work to after World Cup window. Paving schedule TBC.


Location: Phase 1:
- W 50th Ave. from Quebec to Ontario
- Ontario St. from 50th Ave. to 49th Ave. 
- W 49th Ave. from Sophia St. to Cambie St.
(Phase 2 will continue North on Alberta St. in 2027 - see separate entry)


Schedule: Apr 1, 2025 - Dec 15, 2026</content>
<id>urn:uuid:82b35e9d-a03f-41bf-834d-28a87a165498</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/9f5e15ce-f10f-4965-9231-efed6174d208"/>
<published>2025-04-10T07:00:00Z</published>
<title>W 49th Ave. and Alberta St. Upgrades - Phase 1</title>
<updated>2026-06-01T17:56:57.7240846Z</updated>
<georss:line>49.22527774474602 -123.10597412167 49.224804524781035 -123.10599045554</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Sewer Upgrades, water upgrades, and street rehabilitation. 
End date extended to end of 2026 to account for pushing paving work to after World Cup window. Paving schedule TBC.


Location: Phase 1:
- W 50th Ave. from Quebec to Ontario
- Ontario St. from 50th Ave. to 49th Ave. 
- W 49th Ave. from Sophia St. to Cambie St.
(Phase 2 will continue North on Alberta St. in 2027 - see separate entry)


Schedule: Apr 1, 2025 - Dec 15, 2026</content>
<id>urn:uuid:eea5e82d-2b18-46f5-8923-ad11d69d5ba0</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/9f5e15ce-f10f-4965-9231-efed6174d208"/>
<published>2025-04-10T07:00:00Z</published>
<title>W 49th Ave. and Alberta St. Upgrades - Phase 1</title>
<updated>2026-06-01T17:56:57.7240846Z</updated>
<georss:line>49.225700279330425 -123.10318232622195 49.22568215711115 -123.10232922233503</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Sewer Upgrades, water upgrades, and street rehabilitation. 
End date extended to end of 2026 to account for pushing paving work to after World Cup window. Paving schedule TBC.


Location: Phase 1:
- W 50th Ave. from Quebec to Ontario
- Ontario St. from 50th Ave. to 49th Ave. 
- W 49th Ave. from Sophia St. to Cambie St.
(Phase 2 will continue North on Alberta St. in 2027 - see separate entry)


Schedule: Apr 1, 2025 - Dec 15, 2026</content>
<id>urn:uuid:5cba2e60-ad6f-46d8-94a7-08313c4b802c</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/9f5e15ce-f10f-4965-9231-efed6174d208"/>
<published>2025-04-10T07:00:00Z</published>
<title>W 49th Ave. and Alberta St. Upgrades - Phase 1</title>
<updated>2026-06-01T17:56:57.7240846Z</updated>
<georss:line>49.22571219872489 -123.10381410629118 49.225700279330425 -123.10318232622195</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Sewer Upgrades, water upgrades, and street rehabilitation. 
End date extended to end of 2026 to account for pushing paving work to after World Cup window. Paving schedule TBC.


Location: Phase 1:
- W 50th Ave. from Quebec to Ontario
- Ontario St. from 50th Ave. to 49th Ave. 
- W 49th Ave. from Sophia St. to Cambie St.
(Phase 2 will continue North on Alberta St. in 2027 - see separate entry)


Schedule: Apr 1, 2025 - Dec 15, 2026</content>
<id>urn:uuid:8ab9ecb1-bd04-448e-8943-91dbc6c9bdb4</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/9f5e15ce-f10f-4965-9231-efed6174d208"/>
<published>2025-04-10T07:00:00Z</published>
<title>W 49th Ave. and Alberta St. Upgrades - Phase 1</title>
<updated>2026-06-01T17:56:57.7240846Z</updated>
<georss:line>49.22572605446865 -123.10447923717203 49.22571219872489 -123.10381410629118</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Sewer Upgrades, water upgrades, and street rehabilitation. 
End date extended to end of 2026 to account for pushing paving work to after World Cup window. Paving schedule TBC.


Location: Phase 1:
- W 50th Ave. from Quebec to Ontario
- Ontario St. from 50th Ave. to 49th Ave. 
- W 49th Ave. from Sophia St. to Cambie St.
(Phase 2 will continue North on Alberta St. in 2027 - see separate entry)


Schedule: Apr 1, 2025 - Dec 15, 2026</content>
<id>urn:uuid:6b48adb1-ef2d-48f0-a0d8-f18f0f30824c</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/9f5e15ce-f10f-4965-9231-efed6174d208"/>
<published>2025-04-10T07:00:00Z</published>
<title>W 49th Ave. and Alberta St. Upgrades - Phase 1</title>
<updated>2026-06-01T17:56:57.7240846Z</updated>
<georss:line>49.22574368269096 -123.10537329669687 49.22572605446865 -123.10447923717203</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Construction underway with expected completion end of June 2025. 
Location: W. Georgia Street Renewal - Cambie to Richards
Schedule: Mar 3, 2025 - Jun 30, 2025</content>
<id>urn:uuid:1c883a4c-4e98-41bb-aa7e-0c36bcc60ee4</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1eddad61-3eea-470f-bf04-7908d057cee2"/>
<published>2025-06-05T07:00:00Z</published>
<title>W. Georgia Street Renewal - Cambie to Richards</title>
<updated>2025-06-05T19:29:42.9536433Z</updated>
<georss:line>49.28091055827747 -123.11567257611512 49.28122479403444 -123.1161586140664</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Construction underway with expected completion end of June 2025. 
Location: W. Georgia Street Renewal - Cambie to Richards
Schedule: Mar 3, 2025 - Jun 30, 2025</content>
<id>urn:uuid:72227961-4369-4fc7-88a9-c5bd166c7a0d</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1eddad61-3eea-470f-bf04-7908d057cee2"/>
<published>2025-06-05T07:00:00Z</published>
<title>W. Georgia Street Renewal - Cambie to Richards</title>
<updated>2025-06-05T19:29:42.9536433Z</updated>
<georss:line>49.280596499891544 -123.11518701223562 49.28091055827747 -123.11567257611512</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Construction underway with expected completion end of June 2025. 
Location: W. Georgia Street Renewal - Cambie to Richards
Schedule: Mar 3, 2025 - Jun 30, 2025</content>
<id>urn:uuid:99bafd92-1544-4fef-9379-0d797ddfd624</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1eddad61-3eea-470f-bf04-7908d057cee2"/>
<published>2025-06-05T07:00:00Z</published>
<title>W. Georgia Street Renewal - Cambie to Richards</title>
<updated>2025-06-05T19:29:42.9536433Z</updated>
<georss:line>49.2799672342899 -123.11421616157196 49.28028176483389 -123.11470142545974</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Construction underway with expected completion end of June 2025. 
Location: W. Georgia Street Renewal - Cambie to Richards
Schedule: Mar 3, 2025 - Jun 30, 2025</content>
<id>urn:uuid:54fe2c6a-c662-4611-8d22-9c1f33f2c1bf</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1eddad61-3eea-470f-bf04-7908d057cee2"/>
<published>2025-06-05T07:00:00Z</published>
<title>W. Georgia Street Renewal - Cambie to Richards</title>
<updated>2025-06-05T19:29:42.9536433Z</updated>
<georss:line>49.28028176483389 -123.11470142545974 49.280596499891544 -123.11518701223562</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Construction underway with expected completion end of June 2025. 
Location: W. Georgia Street Renewal - Cambie to Richards
Schedule: Mar 3, 2025 - Jun 30, 2025</content>
<id>urn:uuid:1a0be4eb-ed6d-4945-90ac-239b5b8525c0</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1eddad61-3eea-470f-bf04-7908d057cee2"/>
<published>2025-06-05T07:00:00Z</published>
<title>W. Georgia Street Renewal - Cambie to Richards</title>
<updated>2025-06-05T19:29:42.9536433Z</updated>
<georss:line>49.27933838349995 -123.11324504785219 49.2799672342899 -123.11421616157196</georss:line>
</entry>
<entry>
<category term="Road Closure"/>
<content>Sewer Upgrades (Part of Alberta Trunk)

Alberta St. - W 49th to W 44th - Rolling full closure
Location: Alberta St. from W 49th Ave. to W 44th Ave. 
Schedule: Mar 1, 2026 - Dec 31, 2026</content>
<id>urn:uuid:fc5e814b-eef4-426a-8908-9d1bd6d0726e</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/34467bd9-f227-406a-960c-60ac6832b577"/>
<published>2025-04-09T07:00:00Z</published>
<title>W.49th Ave and Alberta St Upgrades - Phase 2</title>
<updated>2026-02-09T18:31:53.2188048Z</updated>
<georss:line>49.2259953800569 -123.1129737668724 49.23061984286076 -123.11302045911887</georss:line>
</entry>
<entry>
<category term="Road Closure"/>
<content>Sewer Upgrades (Part of Alberta Trunk)

Alberta St. - W 49th to W 44th - Rolling full closure
Location: Alberta St. from W 49th Ave. to W 44th Ave. 
Schedule: Mar 1, 2026 - Dec 31, 2026</content>
<id>urn:uuid:0c24853e-2276-4c01-897a-83caff658fec</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/34467bd9-f227-406a-960c-60ac6832b577"/>
<published>2025-04-09T07:00:00Z</published>
<title>W.49th Ave and Alberta St Upgrades - Phase 2</title>
<updated>2026-02-09T18:31:53.2188048Z</updated>
<georss:line>49.23063895272443 -123.11301425964687 49.230649719459365 -123.11301425964687</georss:line>
</entry>
<entry>
<category term="Road Closure"/>
<content>Full closure of 4000 block of Manitoba St from May Thursday 28, 2026 until further notice
Location: Manitoba St from W 23rd Av to W King Edward Av
Schedule: May 28, 2026 - May 28, 2027; Weekdays; 7:00 AM - 3:30 PM</content>
<id>urn:uuid:7d4e9ae9-0e10-44b2-8853-d7ba6db7c764</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/14a078dc-e00d-4cd5-b930-770b52c1513d"/>
<published>2026-06-01T07:00:00Z</published>
<title>Water Service of 4000 block of Manitoba St</title>
<updated>2026-06-01T21:11:50.9873033Z</updated>
<georss:line>49.24996046982449 -123.10740264778333 49.249436089980065 -123.10742526792777</georss:line>
</entry>
<entry>
<category term="Road Closure"/>
<content>Full closure of 4000 block of Manitoba St from May Thursday 28, 2026 until further notice
Location: Manitoba St from W 23rd Av to W King Edward Av
Schedule: May 28, 2026 - May 28, 2027; Weekdays; 7:00 AM - 3:30 PM</content>
<id>urn:uuid:2c807189-f7a6-4e0d-b025-1ec161a1567c</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/14a078dc-e00d-4cd5-b930-770b52c1513d"/>
<published>2026-06-01T07:00:00Z</published>
<title>Water Service of 4000 block of Manitoba St</title>
<updated>2026-06-01T21:11:50.9873033Z</updated>
<georss:line>49.249436089980065 -123.10742526792777 49.24888865423367 -123.10744904673571</georss:line>
</entry>
<entry>
<category term="Road Closure"/>
<content>Full closure of Ln S of W 23rd Av from May Thursday 28, 2026 until further notice
Location: Ln S of W 23rd Av from Columbia St to Manitoba St
Schedule: May 28, 2026 - Jun 28, 2027; Weekdays; 7:00 AM - 3:30 PM</content>
<id>urn:uuid:40fbc9c3-bc2f-460d-b2f8-8b034417d211</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/5e53d20a-c7df-4ecb-b828-7a4edfa97cfa"/>
<published>2026-06-01T07:00:00Z</published>
<title>Water Service of Ln S of W 23rd Av</title>
<updated>2026-06-01T20:57:26.8400675Z</updated>
<georss:line>49.249436089980065 -123.10742526792777 49.249484919393865 -123.11002166562743</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Intermittent closures of Water St - Columbia to Richards/Cordova and intermittent lane closures on Cordova at Water on September 15th, 17th, 19th, 22nd
Location: Powell - Columbia to Carrall, Water - Carral to Cordova, Cordova/Richards/Water Intersection
Schedule: Sep 15, 2025 - Sep 22, 2025</content>
<id>urn:uuid:9d1fb1d8-34cf-4f28-9755-5b320ce8cc40</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/171d4044-27f8-4921-a5bd-19bccfa917a3"/>
<published>2025-09-03T07:00:00Z</published>
<title>Water St - Winter Implementation</title>
<updated>2025-09-11T04:53:01.6889335Z</updated>
<georss:line>49.28431923067458 -123.10877737817344 49.28446530399759 -123.10957636505753</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Intermittent closures of Water St - Columbia to Richards/Cordova and intermittent lane closures on Cordova at Water on September 15th, 17th, 19th, 22nd
Location: Powell - Columbia to Carrall, Water - Carral to Cordova, Cordova/Richards/Water Intersection
Schedule: Sep 15, 2025 - Sep 22, 2025</content>
<id>urn:uuid:ca37498d-9ba6-49e5-b4a9-aa0a332b9428</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/171d4044-27f8-4921-a5bd-19bccfa917a3"/>
<published>2025-09-03T07:00:00Z</published>
<title>Water St - Winter Implementation</title>
<updated>2025-09-11T04:53:01.6889335Z</updated>
<georss:line>49.28446530399759 -123.10957636505753 49.284638225232214 -123.11054175598821 49.28467794017715 -123.11095341031987</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Intermittent closures of Water St - Columbia to Richards/Cordova and intermittent lane closures on Cordova at Water on September 15th, 17th, 19th, 22nd
Location: Powell - Columbia to Carrall, Water - Carral to Cordova, Cordova/Richards/Water Intersection
Schedule: Sep 15, 2025 - Sep 22, 2025</content>
<id>urn:uuid:ccc38152-120e-4725-98e8-8d37856f2719</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/171d4044-27f8-4921-a5bd-19bccfa917a3"/>
<published>2025-09-03T07:00:00Z</published>
<title>Water St - Winter Implementation</title>
<updated>2025-09-11T04:53:01.6889335Z</updated>
<georss:line>49.284163677415535 -123.11011616735397 49.28467794017715 -123.11095341031987</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Intermittent closures of Water St - Columbia to Richards/Cordova and intermittent lane closures on Cordova at Water on September 15th, 17th, 19th, 22nd
Location: Powell - Columbia to Carrall, Water - Carral to Cordova, Cordova/Richards/Water Intersection
Schedule: Sep 15, 2025 - Sep 22, 2025</content>
<id>urn:uuid:8b7c9852-02fe-4843-a338-e9bfd2e516e4</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/171d4044-27f8-4921-a5bd-19bccfa917a3"/>
<published>2025-09-03T07:00:00Z</published>
<title>Water St - Winter Implementation</title>
<updated>2025-09-11T04:53:01.6889335Z</updated>
<georss:line>49.28467794017715 -123.11095341031987 49.28531489007918 -123.1118938167245</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Intermittent closures of Water St - Columbia to Richards/Cordova and intermittent lane closures on Cordova at Water on September 15th, 17th, 19th, 22nd
Location: Powell - Columbia to Carrall, Water - Carral to Cordova, Cordova/Richards/Water Intersection
Schedule: Sep 15, 2025 - Sep 22, 2025</content>
<id>urn:uuid:f9907ce3-3d55-4c52-952f-3a3996a4db12</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/171d4044-27f8-4921-a5bd-19bccfa917a3"/>
<published>2025-09-03T07:00:00Z</published>
<title>Water St - Winter Implementation</title>
<updated>2025-09-11T04:53:01.6889335Z</updated>
<georss:line>49.283884968733105 -123.10638331443363 49.28431923067458 -123.10877737817344</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Intermittent closures of Water St - Columbia to Richards/Cordova and intermittent lane closures on Cordova at Water on September 15th, 17th, 19th, 22nd
Location: Powell - Columbia to Carrall, Water - Carral to Cordova, Cordova/Richards/Water Intersection
Schedule: Sep 15, 2025 - Sep 22, 2025</content>
<id>urn:uuid:50bd034b-af36-4f43-a14f-880d29528e78</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/171d4044-27f8-4921-a5bd-19bccfa917a3"/>
<published>2025-09-03T07:00:00Z</published>
<title>Water St - Winter Implementation</title>
<updated>2025-09-11T04:53:01.6889335Z</updated>
<georss:line>49.283496673786686 -123.10426176613505 49.283884968733105 -123.10638331443363</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Intermittent closures of Water St - Columbia to Richards/Cordova and intermittent lane closures on Cordova at Water on September 15th, 17th, 19th, 22nd
Location: Powell - Columbia to Carrall, Water - Carral to Cordova, Cordova/Richards/Water Intersection
Schedule: Sep 15, 2025 - Sep 22, 2025</content>
<id>urn:uuid:0db411cb-e2a0-432b-a70a-3f6786e54630</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/171d4044-27f8-4921-a5bd-19bccfa917a3"/>
<published>2025-09-03T07:00:00Z</published>
<title>Water St - Winter Implementation</title>
<updated>2025-09-11T04:53:01.6889335Z</updated>
<georss:line>49.283238505013884 -123.10217530763772 49.283264573931376 -123.10358871891665</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>The 2025 pilot period will run for 12 Sundays, ensuring enough days to meet the criteria of a pilot. The layout will be a full linear closure of Water St from Richards to Columbia, considering the benefits of a car-free experience, opportunities for new pilot learnings. 

Access to lane north of Water St will be maintained at Cambie and Abbott.
Location: Gastown
Water St from Columbia to Richards/Cordova
Schedule: Jun 15, 2025 - Sep 15, 2025</content>
<id>urn:uuid:caef60bd-4005-4088-8c42-8f4dbf85d618</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/b58c24bd-f6ba-42fb-b023-bad123c7beee"/>
<published>2025-03-05T08:00:00Z</published>
<title>Weekend Pedestrian Zone - Gastown</title>
<updated>2025-12-14T02:00:53.584143Z</updated>
<georss:line>49.283198616946095 -123.10216243968351 49.28326481525019 -123.10369480724012 49.28347002942817 -123.10424280623387 49.283880455222004 -123.10638406156127 49.284310736660416 -123.10881961264465 49.28467481802184 -123.11088983106549</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>The 2025 pilot period will run for 12 Sundays, ensuring enough days to meet the criteria of a pilot. The layout will be a full linear closure of Water St from Richards to Columbia, considering the benefits of a car-free experience, opportunities for new pilot learnings. 

Access to lane north of Water St will be maintained at Cambie and Abbott.
Location: Gastown
Water St from Columbia to Richards/Cordova
Schedule: Jun 15, 2025 - Sep 15, 2025</content>
<id>urn:uuid:8a6642f5-279e-402c-9e17-eff7a1b1528c</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/b58c24bd-f6ba-42fb-b023-bad123c7beee"/>
<published>2025-03-05T08:00:00Z</published>
<title>Weekend Pedestrian Zone - Gastown</title>
<updated>2025-12-14T02:00:53.584143Z</updated>
<georss:line>49.28467481802184 -123.11084923854744 49.2846549591078 -123.11085938667695</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Full width arterial road surface rehabilitation. 
Location: 
Schedule: Apr 1, 2026 - Apr 12, 2026</content>
<id>urn:uuid:cb0ea124-1658-4997-8318-f09c39e0a61e</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/62b87d6a-ba15-4384-88a7-b61626bac5b6"/>
<published>2025-06-24T07:00:00Z</published>
<title>West Blvd, W. 41th to W. 51st - Street Rehabilitation </title>
<updated>2026-02-04T19:50:01.4372639Z</updated>
<georss:line>49.2271583106463 -123.15515214129859 49.2249826337804 -123.15523291044629</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Full width arterial road surface rehabilitation. 
Location: 
Schedule: Apr 1, 2026 - Apr 12, 2026</content>
<id>urn:uuid:49d317e5-6348-4aa2-8273-099b64abf1e7</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/62b87d6a-ba15-4384-88a7-b61626bac5b6"/>
<published>2025-06-24T07:00:00Z</published>
<title>West Blvd, W. 41th to W. 51st - Street Rehabilitation </title>
<updated>2026-02-04T19:50:01.4372639Z</updated>
<georss:line>49.224963049052974 -123.15378176598854 49.2249826337804 -123.15523291044629</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Full width arterial road surface rehabilitation. 
Location: 
Schedule: Apr 1, 2026 - Apr 12, 2026</content>
<id>urn:uuid:61e84cd7-8f18-46b6-8f25-c0be30fe69c6</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/62b87d6a-ba15-4384-88a7-b61626bac5b6"/>
<published>2025-06-24T07:00:00Z</published>
<title>West Blvd, W. 41th to W. 51st - Street Rehabilitation </title>
<updated>2026-02-04T19:50:01.4372639Z</updated>
<georss:line>49.23272022123302 -123.15562942862758 49.23183498152957 -123.15566163289476</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Full width arterial road surface rehabilitation. 
Location: 
Schedule: Apr 1, 2026 - Apr 12, 2026</content>
<id>urn:uuid:d26aab96-8042-4a3b-acd3-461c00a5bb24</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/62b87d6a-ba15-4384-88a7-b61626bac5b6"/>
<published>2025-06-24T07:00:00Z</published>
<title>West Blvd, W. 41th to W. 51st - Street Rehabilitation </title>
<updated>2026-02-04T19:50:01.4372639Z</updated>
<georss:line>49.23086009928156 -123.15569727667678 49.22988479543483 -123.15573191510182</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Full width arterial road surface rehabilitation. 
Location: 
Schedule: Apr 1, 2026 - Apr 12, 2026</content>
<id>urn:uuid:5c53e235-ea36-40fd-81cf-51d233ab33f6</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/62b87d6a-ba15-4384-88a7-b61626bac5b6"/>
<published>2025-06-24T07:00:00Z</published>
<title>West Blvd, W. 41th to W. 51st - Street Rehabilitation </title>
<updated>2026-02-04T19:50:01.4372639Z</updated>
<georss:line>49.23183498152957 -123.15566163289476 49.23086009928156 -123.15569727667678</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Full width arterial road surface rehabilitation. 
Location: 
Schedule: Apr 1, 2026 - Apr 12, 2026</content>
<id>urn:uuid:3ad0c058-50ef-450f-ad44-aaa3616eaf9b</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/62b87d6a-ba15-4384-88a7-b61626bac5b6"/>
<published>2025-06-24T07:00:00Z</published>
<title>West Blvd, W. 41th to W. 51st - Street Rehabilitation </title>
<updated>2026-02-04T19:50:01.4372639Z</updated>
<georss:line>49.22988479543483 -123.15573191510182 49.22900015086228 -123.15576270297848</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Full width arterial road surface rehabilitation. 
Location: 
Schedule: Apr 1, 2026 - Apr 12, 2026</content>
<id>urn:uuid:7f863d41-4514-42a5-8429-453137409aed</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/62b87d6a-ba15-4384-88a7-b61626bac5b6"/>
<published>2025-06-24T07:00:00Z</published>
<title>West Blvd, W. 41th to W. 51st - Street Rehabilitation </title>
<updated>2026-02-04T19:50:01.4372639Z</updated>
<georss:line>49.22900015086228 -123.15576270297848 49.228893533940436 -123.15576646083669 49.228879509810895 -123.15576684253296 49.228870100509425 -123.15576703271212 49.22886526998113 -123.15576708620102 49.22886068232384 -123.15576714045342 49.22885053550655 -123.15576725963899 49.228837582123504 -123.15576741120627 49.22882761541436 -123.15576737987324 49.228818530422416 -123.15576721396239 49.228809445245304 -123.15576718540078 49.2287999284826 -123.15576701813265 49.228790276809974 -123.15576683670551 49.22878882863432 -123.15576679094791 49.22877731520941 -123.15576641137854 49.22876214089459 -123.15576589668586 49.22875275045385 -123.15576544138126 49.228743575879975 -123.15576500049042 49.228742298632085 -123.15576494153528 49.22872480399363 -123.15576408991035 49.228714838099165 -123.1557634542431 49.228705753847834 -123.1557627389381 49.228696669411335 -123.15576216098214 49.22868713543576 -123.15576141679401 49.22867761045541 -123.1557606726344 49.22866364259309 -123.15575935137632 49.228649458845354 -123.15575802944036 49.22863983534336 -123.15575696906907 49.228630850391255 -123.15575599311502 49.22862132579971 -123.15575496052529 49.228602384947976 -123.15575260725437 49.22858843574252 -123.15575079160256 49.22858052112949 -123.15574988768964 49.22857611456169 -123.15574906347868 49.228566833211346 -123.15574775695798 49.228560330922704 -123.15574680254575 49.22855551945861 -123.1557460594721 49.22854652608504 -123.1557446577134 49.228537047043375 -123.15574319948905 49.228528053873475 -123.15574164664827 49.228518574831725 -123.15574018842504 49.22850900626358 -123.15573841401863 49.228500013075035 -123.15573687491441 49.228490048809476 -123.15573503059117 49.22848101101505 -123.15573321665038 49.228472071964404 -123.15573155410425 49.22846209890719 -123.1557295586719 49.22845304332583 -123.15572759359362 49.22844405050736 -123.1557257797969 49.228434248544374 -123.1557236475559 49.228425166143836 -123.1557215587818 49.22841610156709 -123.15571959367821 49.22840299058291 -123.15571654453973 49.22840012197611 -123.15571588998633 49.22838923229415 -123.15571323240643 49.228378738327905 -123.15571063101069 49.22836930546501 -123.15570828017788 49.22836006163135 -123.15570583379605 49.22835009842029 -123.15570320660157 49.22834159191734 -123.15570096856122 49.22833216843813 -123.15569832932994 49.22832317654456 -123.15569582880413 49.22831394190948 -123.15569323137265 49.22830452759189 -123.1556904685596 49.22829562583547 -123.15568783097157 49.22828663412676 -123.15568519310186 49.228277192860276 -123.15568240273758 49.228267419122034 -123.15567935036813 49.228258517735526 -123.15567643808892 49.228249616163794 -123.1556736631583 49.228240409069 -123.155670653777 49.228230977204504 -123.15566756128183 49.228220313734255 -123.15566391552625 49.228212626332606 -123.15566128176253 49.22820343746844 -123.1556580938906 49.22818714589195 -123.15565227409566 49.22818510495654 -123.15565153974009 49.22817410011126 -123.15564756328396 49.228167141174396 -123.15564504169183 49.22815783576041 -123.15564156502917 49.22814847644898 -123.15563803325942 49.22813920723766 -123.15563439189573 49.228130396542184 -123.15563093052576 49.228121585846594 -123.15562746915701 49.228112388559765 -123.15562385549272 49.228112343602135 -123.15562384161677 49.22810801027154 -123.15562206995537</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Full width arterial road surface rehabilitation. 
Location: 
Schedule: Apr 1, 2026 - Apr 12, 2026</content>
<id>urn:uuid:03ca182b-5760-4110-b42b-c7648abc8ba7</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/62b87d6a-ba15-4384-88a7-b61626bac5b6"/>
<published>2025-06-24T07:00:00Z</published>
<title>West Blvd, W. 41th to W. 51st - Street Rehabilitation </title>
<updated>2026-02-04T19:50:01.4372639Z</updated>
<georss:line>49.22810801027154 -123.15562206995537 49.22805994887929 -123.15560181131403 49.228012123079196 -123.15558027612019 49.227964559837716 -123.15555747819658 49.2279172591542 -123.1555334175465 49.22787023901833 -123.15550809422962 49.22782351738266 -123.15548153577487 49.227818034601626 -123.15547831838644 49.22726280468933 -123.1551483893289 49.2271583106463 -123.15515214129859</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Full width arterial road surface rehabilitation. 
Location: 
Schedule: Apr 1, 2026 - Apr 12, 2026</content>
<id>urn:uuid:ddcf980e-cfd1-43a6-a314-602a66a13158</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/62b87d6a-ba15-4384-88a7-b61626bac5b6"/>
<published>2025-06-24T07:00:00Z</published>
<title>West Blvd, W. 41th to W. 51st - Street Rehabilitation </title>
<updated>2026-02-04T19:50:01.4372639Z</updated>
<georss:line>49.23360491265757 -123.15559679569964 49.23272022123302 -123.15562942862758</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Full width arterial road surface rehabilitation. 
Location: 
Schedule: Apr 1, 2026 - Apr 12, 2026</content>
<id>urn:uuid:3526a659-8a03-4b5a-8adc-6684629eab88</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/62b87d6a-ba15-4384-88a7-b61626bac5b6"/>
<published>2025-06-24T07:00:00Z</published>
<title>West Blvd, W. 41th to W. 51st - Street Rehabilitation </title>
<updated>2026-02-04T19:50:01.4372639Z</updated>
<georss:line>49.234576069394876 -123.15556187816902 49.23360491265757 -123.15559679569964</georss:line>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Phase 1 along West Pender St from ~50m east of Burrard St to Bute St: open cut construction between May-Nov 2024.  Heavy traffic impacts at the intersection of Burrard and West Pender Street for the first 4 weeks of the project.

Traffic Impact:
-Full closure on W Pender St from Thurlow St to Hornby St.
-No through-traffic except buses.
-Pedestrians access open.
Location: W Pender St and Burrard St Intersection.
W Pender St - Thurlow St to Hornby St

Schedule: May 6, 2024 - Jun 1, 2024</content>
<id>urn:uuid:89010b13-a712-4bf0-965b-a5d68f537d46</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cbfbad17-c7ad-4005-9c47-f5b07ab29d1b"/>
<published>2024-05-15T07:00:00Z</published>
<title>West Pender Street Upgrades - Phase 1 - Full Closure along Pender St</title>
<updated>2025-03-04T02:00:10.9329861Z</updated>
<georss:line>49.28592368662052 -123.11681374345491 49.28692343782228 -123.11834645061147 49.28752883286219 -123.12042412031262</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Crews will be site  to conduct Underground Utility Construction on behalf of the BC Hydro

Traffic Impacts: Travel Lane Closure at
- North side of 200 blk of W6th Ave from Alberta St to Columbia St,  B6-02-NPZ &amp; B6-02-07, (MON-SAT) 7:00am to 8:00pm, 
- West side of 2200 blk of Alberta St from W6th Ave to 20m South of W 6th Ave, B6-02-06 &amp; B6-02-SLZ   (MON-SAT) 7:00am to 8:00pm
- South side of 200 blk of W 6th Ave from Alberta St to 20m East of Alberta St  (24 HOURS CLOSURE)
- East side of 2200 blk of Alberta St from W 6th Ave to 20m South of W6th Ave (24 HOURS CLOSURE)

-WO# W02587691-01/460-U07-01351

EXTENSION to Jun 26, 2026
Location: B/S of 200 blk W6th Ave
B/S of 2200  blk Alberta St
Schedule: Recurring schedule as follows:
- May 1, 2026 - Jun 26, 2026; M - Sa; 7:00 AM - 8:00 PM
- May 1, 2026 - Jun 26, 2026; All days; 12:00 AM - 11:59 PM
</content>
<id>urn:uuid:17f5a8ae-273f-4216-a1aa-26ccc7528e6f</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/13c78365-4869-4ed4-b51a-6ba8e7dedbc2"/>
<published>2026-04-24T07:00:00Z</published>
<title>[24 Hours] Underground Utility Construction - BC Hydro- 200 Blk of W 6th Ave - May 1-May 29, 2026 , EXTENSION to Jun 26</title>
<updated>2026-05-26T21:14:32.0075625Z</updated>
<georss:line>49.26569440610709 -123.11085149904491 49.2656697858005 -123.10946090698506</georss:line>
</entry>
<entry>
<category term="Under Construction"/>
<content>Crews will be site  to conduct Underground Utility Construction on behalf of the BC Hydro

Traffic Impacts: Travel Lane Closure at
- North side of 200 blk of W6th Ave from Alberta St to Columbia St,  B6-02-NPZ &amp; B6-02-07, (MON-SAT) 7:00am to 8:00pm, 
- West side of 2200 blk of Alberta St from W6th Ave to 20m South of W 6th Ave, B6-02-06 &amp; B6-02-SLZ   (MON-SAT) 7:00am to 8:00pm
- South side of 200 blk of W 6th Ave from Alberta St to 20m East of Alberta St  (24 HOURS CLOSURE)
- East side of 2200 blk of Alberta St from W 6th Ave to 20m South of W6th Ave (24 HOURS CLOSURE)

-WO# W02587691-01/460-U07-01351

EXTENSION to Jun 26, 2026
Location: B/S of 200 blk W6th Ave
B/S of 2200  blk Alberta St
Schedule: Recurring schedule as follows:
- May 1, 2026 - Jun 26, 2026; M - Sa; 7:00 AM - 8:00 PM
- May 1, 2026 - Jun 26, 2026; All days; 12:00 AM - 11:59 PM
</content>
<id>urn:uuid:f7db1af1-07b5-44b7-95ef-76d8d51616c4</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/13c78365-4869-4ed4-b51a-6ba8e7dedbc2"/>
<published>2026-04-24T07:00:00Z</published>
<title>[24 Hours] Underground Utility Construction - BC Hydro- 200 Blk of W 6th Ave - May 1-May 29, 2026 , EXTENSION to Jun 26</title>
<updated>2026-05-26T21:14:32.0075625Z</updated>
<georss:line>49.26567682017509 -123.1108622788283 49.26550096051005 -123.11086766871999</georss:line>
</entry>
<entry>
<category term="Road Closure"/>
<content>Crews will be onsite to conduct Utility Maintenance on behalf of Metro Vancouver

Traffic Impacts:  Total Road closure at
- East side of 2200-2300 blk of Yukon St from Lane North of West 7th Ave to West 8th Ave
Pay station: 79-23-08 (6 parking spots); Motorcycle Meter: 79-23-98;  Pay Station: 79-22-08 (6 parking spots)
- North side of 300 blk of West 7th Ave from Yukon St to Alberta St - Pay Station: B7-03-17 (6 spots); Pay Station: B7-03-05  (5 spots)
-  Both sides of 2200 blk of Albert St from Lane North of W7th Ave to W7th Ave  - Pay station: 78-33-18(4 spots)

WO# LP10291

Location: E/S of 2200-2300 Yukon St
N/S of 300 W 7th Ave
B/S of 2200 blk of Alberta St
Schedule: Jun 1, 2026 - Jun 13, 2026; M - Sa; 7:00 AM - 8:00 PM</content>
<id>urn:uuid:a7c9e34c-022d-4cf5-b9ae-412c98c0e5ce</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/44329b58-498c-483e-bef1-3451683c5d0b"/>
<published>2026-05-28T07:00:00Z</published>
<title>[including SAT] Metro Vancouver - Utility Maintenance - 2200-2300 Yukon St &amp; W7th Ave - June 1 to 13, 2026</title>
<updated>2026-05-28T22:40:56.5374852Z</updated>
<georss:line>49.26529145154947 -123.11280592453308 49.26396533351277 -123.11285968533404</georss:line>
</entry>
<entry>
<category term="Road Closure"/>
<content>Crews will be onsite to conduct Utility Maintenance on behalf of Metro Vancouver

Traffic Impacts:  Total Road closure at
- East side of 2200-2300 blk of Yukon St from Lane North of West 7th Ave to West 8th Ave
Pay station: 79-23-08 (6 parking spots); Motorcycle Meter: 79-23-98;  Pay Station: 79-22-08 (6 parking spots)
- North side of 300 blk of West 7th Ave from Yukon St to Alberta St - Pay Station: B7-03-17 (6 spots); Pay Station: B7-03-05  (5 spots)
-  Both sides of 2200 blk of Albert St from Lane North of W7th Ave to W7th Ave  - Pay station: 78-33-18(4 spots)

WO# LP10291

Location: E/S of 2200-2300 Yukon St
N/S of 300 W 7th Ave
B/S of 2200 blk of Alberta St
Schedule: Jun 1, 2026 - Jun 13, 2026; M - Sa; 7:00 AM - 8:00 PM</content>
<id>urn:uuid:0c492330-94cb-4ef2-b612-32fd79318547</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/44329b58-498c-483e-bef1-3451683c5d0b"/>
<published>2026-05-28T07:00:00Z</published>
<title>[including SAT] Metro Vancouver - Utility Maintenance - 2200-2300 Yukon St &amp; W7th Ave - June 1 to 13, 2026</title>
<updated>2026-05-28T22:40:56.5374852Z</updated>
<georss:line>49.26482135029141 -123.11277366805244 49.264793284403 -123.11098880946072</georss:line>
</entry>
<entry>
<category term="Road Closure"/>
<content>Crews will be onsite to conduct Utility Maintenance on behalf of Metro Vancouver

Traffic Impacts:  Total Road closure at
- East side of 2200-2300 blk of Yukon St from Lane North of West 7th Ave to West 8th Ave
Pay station: 79-23-08 (6 parking spots); Motorcycle Meter: 79-23-98;  Pay Station: 79-22-08 (6 parking spots)
- North side of 300 blk of West 7th Ave from Yukon St to Alberta St - Pay Station: B7-03-17 (6 spots); Pay Station: B7-03-05  (5 spots)
-  Both sides of 2200 blk of Albert St from Lane North of W7th Ave to W7th Ave  - Pay station: 78-33-18(4 spots)

WO# LP10291

Location: E/S of 2200-2300 Yukon St
N/S of 300 W 7th Ave
B/S of 2200 blk of Alberta St
Schedule: Jun 1, 2026 - Jun 13, 2026; M - Sa; 7:00 AM - 8:00 PM</content>
<id>urn:uuid:ce1b65af-031c-4ba7-a5af-5574af595cbf</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/44329b58-498c-483e-bef1-3451683c5d0b"/>
<published>2026-05-28T07:00:00Z</published>
<title>[including SAT] Metro Vancouver - Utility Maintenance - 2200-2300 Yukon St &amp; W7th Ave - June 1 to 13, 2026</title>
<updated>2026-05-28T22:40:56.5374852Z</updated>
<georss:line>49.26522128746697 -123.11087053569862 49.26480731734918 -123.11091354433938</georss:line>
</entry>
</feed>
