<?xml version="1.0" encoding="UTF-8"?>
<feed xmlns:georss="http://www.georss.org/georss" xmlns="http://www.w3.org/2005/Atom">
<author>
<name>Bernie Burnett</name>
<email>bernie.burnett@vancouver.ca</email>
</author>
<contributor>
<name>Engineering Webmaster</name>
<email>engineering.webmaster@vancouver.ca</email>
</contributor>
<generator uri="http://www.safe.com/products/fme/index.php" version="2021.7.41.21607">FME(R) 2021.1.0.0</generator>
<id>urn:uuid:6cff5573-19f3-4852-a6c8-1940137b94d8</id>
<link href="http://vancouver.ca/streets-transportation/roadwork.aspx"/>
<logo>http://vancouver.ca/engsvcs/streets/roadwork/images/roadahead.gif</logo>
<rights>Copyright 2016, City of Vancouver</rights>
<subtitle>Media releases about roadwork affecting major routes in Vancouver.</subtitle>
<title>City of Vancouver Road Ahead Information</title>
<updated>2026-06-10T05:00:04-07:00</updated>
<entry>
<category term="Upcoming Project"/>
<content>Balaclava St - W King Edward Av to W 27th Av               Jul 2026 - Sept 2026 
Carvarnon St - W King Edward Av to W 27th Av              Aug 2026 - Sept 2026
W 27th Av - Carnarvon St to Quesnel Dr                         Sept 2026 - Oct 2026 
Location: 
Schedule: Jul 31, 2026 - Oct 6, 2026; All days; 7:00 AM - 3:00 PM</content>
<id>urn:uuid:8202e410-a914-4dba-8229-48842d59b1c6</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/4190b8ca-bcb0-40dd-a42d-c1589556110f"/>
<published>2026-04-02T07:00:00Z</published>
<title> Dunbar Southland East</title>
<updated>2026-05-28T19:09:32.0903191Z</updated>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Fir St - W 3rd Av to W 6th Av
Location: Fir St - W 3rd Av to W 6th Av
Schedule: Jan 1, 2027 - Dec 31, 2027</content>
<id>urn:uuid:7518f43e-7b3e-43ab-9771-92314b49e2f5</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a0aca0a0-6aac-49b3-8180-cf3db9151e3d"/>
<published>2025-11-27T08:00:00Z</published>
<title> Fir St - W 3rd Av to W 6th Av</title>
<updated>2026-05-27T01:01:03.7204173Z</updated>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Granville Bridge South Approach &amp; Ramps Rehabilitation Project


Location: Fir St  Off-Ramp
Schedule: Aug 26, 2025 - Dec 15, 2025</content>
<id>urn:uuid:27caf0c7-863f-4833-b735-45ecf052f9eb</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca55b5ab-70e3-4c32-b39c-47b09e49c257"/>
<published>2025-03-07T08:00:00Z</published>
<title> GBSAR Ph 1 Fir St Off-Ramp</title>
<updated>2025-11-06T15:46:51.5852301Z</updated>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Concrete renewal and repaving works on Nanaimo St, Broadway to West 12th (South Grandview Highway)
Location: 
Schedule: Mar 17, 2025 - Apr 30, 2025</content>
<id>urn:uuid:d3c592a8-e42d-442e-8b53-77ea0ffe9147</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/216ca79a-8d80-4f9b-ac3a-ae2aaefddfc8"/>
<published>2025-03-14T07:00:00Z</published>
<title> Nanaimo St, Broadway to W 12th - Street Renewal</title>
<updated>2025-03-18T19:09:51.3078939Z</updated>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Block party to celebrate National Indigenous Peoples day 200 Princess between Powell st and the alley north of E Cordova
Location: 200 princess between Powell st and the laneway south 
Schedule: Jun 19, 2026</content>
<id>urn:uuid:c155a76b-28da-4ce8-8295-963650750d86</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/036620e5-2b1c-4d77-8cb7-091ecf19ba8d"/>
<published>2026-05-19T07:00:00Z</published>
<title> National Indigenous Peoples Day Celebration</title>
<updated>2026-05-19T17:32:41.6427926Z</updated>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Intermittent closure of Water St to install concrete barriers at 0 Water St
Location: 
Schedule: Nov 27, 2025</content>
<id>urn:uuid:3ad48921-c8e7-4ab9-8551-6231389c9acf</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e0463c83-e8d2-4c1c-b61e-5d15d7e276b9"/>
<published>2025-11-10T08:00:00Z</published>
<title>0 Water - Loading Zone Installation </title>
<updated>2025-11-10T23:32:57.1216284Z</updated>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Sewer Abandonment for Henry Hudson Elementary School
Location: 
Schedule: Jul 13, 2026 - Jul 31, 2026</content>
<id>urn:uuid:61147ca0-3402-4847-9762-8b810865a9a2</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/600bb76d-8b7e-43d5-90c3-a31fad3def38"/>
<published>2026-05-04T07:00:00Z</published>
<title>1530 Maple - Sewer Abandonment</title>
<updated>2026-05-04T17:05:19.103004Z</updated>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Concrete barrier delivery and installation, sign plan implementation as per Transportation Project 2023-72-D-GP.
Location: 1600 block W 5th Ave between Fir St and Pine St.
Schedule: Nov 5, 2025</content>
<id>urn:uuid:478e3832-8fc5-48c7-80c4-e6911eb271c5</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d173eac6-86f7-4eb2-8112-a866fb721257"/>
<published>2025-11-03T08:00:00Z</published>
<title>1600 W 5th Ave (Burrard Slopes) barrier install and traffic changes</title>
<updated>2025-11-03T18:44:59.2365554Z</updated>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Median Construction - WB Closed, EB 1 Lane
Location: 200 E Cordova
Schedule: Sep 27, 2025 - Sep 28, 2025</content>
<id>urn:uuid:b59ed64e-7703-4011-88cf-69f8188680a8</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e9a7b613-8450-4bbd-b87e-5d3c6a5b4903"/>
<published>2025-09-23T07:00:00Z</published>
<title>200 E Cordova - Streets Construction</title>
<updated>2025-09-23T22:49:00.1615484Z</updated>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Shallow mill &amp; overlay of asphalt road surface in areas targeted due to poor condition.  Individual street segments to be closed  2-3 days at most.  Crews to alert residents of hard closure dates.
Location: General area is bound by Kingsway to north, Fraser to west, Victoria to east and 43rd Ave to south.
Schedule: Jun 25, 2025 - Jul 25, 2025</content>
<id>urn:uuid:d3998cb7-ba84-492d-bb21-9fee0f510108</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d1ef364f-8f52-4f5f-97f4-ba632df94862"/>
<published>2025-06-17T07:00:00Z</published>
<title>2025 Thin Lift Overlay</title>
<updated>2025-07-21T16:25:52.6974647Z</updated>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>On Sunday, October 4, 2026, the following locations will be closed for the CIBC Run for the Cure event: 

Event will cause various road closures and traffic delays on the following locations:

Sunday, October 4, 2026 from 05:00 am to 2:00 pm 

•	Pacific Blvd from Nelson to Quebec
•	Pat Quinn Way, from Pacific to Expo 
•	Cambie Bridge Off-Ramp to Pacific Blvd

Sunday, October 4, 2026 from 09:00 am to 11:00 am 

•	Expo Blvd, from Abbott to Quebec
•	Keefer, from Carrall to Columbia/Quebec
•	W 6th Ave, from Quebec to Cambie
•	Abbott St., from Pender to Pacific Blvd 
•	Carrall St., from Keefer to Pacific Blvd
•	Quebec, from Keefer to E 7th Ave
•	2nd Ave, from Main to Cambie
•	Westbound Terminal Ave, from Main to Quebec
•	Cambie Bridge on-ramp, from W 2nd
•	Cambie St &amp; Cambie Bridge (northbound), from W Broadway to Expo Blvd 

Location: Various locations
Schedule: Oct 4, 2026 5:00 AM - 2:00 PM</content>
<id>urn:uuid:3375113c-225a-4c4e-8392-b4e82a4acc13</id>
<link href="https://support.cancer.ca/site/TR/RunfortheCure/RFTC_NW_odd_?fr_id=28558&amp;pg=entry"/>
<published>2026-03-20T07:00:00Z</published>
<title>2026 CIBC Run For Cure</title>
<updated>2026-03-11T20:38:51.8982211Z</updated>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Curb lanes only – Fraser St to Cambie St. 

Location: 41st Av - Fraser ST to Cambie St
Schedule: Jun 16, 2025 - Aug 5, 2025</content>
<id>urn:uuid:422ee6fe-7521-4e70-9a45-ea3a8ab6fd76</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ea38cd74-b088-4cd8-8598-6b58c815e507"/>
<published>2025-07-10T07:00:00Z</published>
<title>41st Av - Fraser ST to Cambie St</title>
<updated>2025-07-29T21:58:23.1763401Z</updated>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>City's external contractor will be working at 500 Pacific between Seymour Mews and Richards St to construct a protected bike lane and the associated roadway upgrades. Construction is scheduled to take place during normal working hours weekdays May 1 to May 16, including excavation, gravel base compaction, concrete works, utility adjustments, asphalt paving, boulevards, landscaping, and road marking restoration.
Location: 500 Pacific St between Seymour Mews and Richards St.
Schedule: May 1, 2025 - May 16, 2025</content>
<id>urn:uuid:e29ec63b-c64f-4a94-8e7a-911602db1b91</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1cb02fce-6529-4af8-8709-81cfaaf9e59d"/>
<published>2025-04-24T07:00:00Z</published>
<title>500 Pacific St - Protected Bike Lane</title>
<updated>2025-04-25T22:12:41.231165Z</updated>
</entry>
<entry>
<category term="Under Construction"/>
<content>As part of the AB41 Project, a cyclist detour is being implemented. This entry shows the bike detour route.
Location: 
Schedule: Feb 5, 2026 - Sep 30, 2026</content>
<id>urn:uuid:b59883d3-643f-4195-a808-56cd43e2ee5b</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1c37b205-339a-4e58-b386-063b90f6e129"/>
<published>2026-02-05T08:00:00Z</published>
<title>AB41 Cyclist Detour</title>
<updated>2026-03-26T19:33:49.2010216Z</updated>
</entry>
<entry>
<category term="Under Construction"/>
<content>The construction at the Arbutus Greenways and W 41st Ave is anticipated to begin on Monday, Feb 2nd, and approximate completion is end of September 2026. During construction, traffic at intersection of W 41st Ave and W/E Blvd will be retained, with intermittent closure. Travel lanes at  West and East Boulevard and W 41st Avenue will be reduced at times.

Project Overview:
The Arbutus Greenway &amp; 41st Ave Project is a safety improvement project at one of the key intersections on the Arbutus Greenway. The project will add to the previous intersection improvements, focusing largely on optimizing the Arbutus Greenway crossing at 41st Avenue. It will better delineate active transportation modes, allow for wider pedestrian areas, and provides a new seating area on the north side of 41st. It will also include integrated Green Rainwater Infrastructure, which will enhance greenspace and reduce the strain to our storm water system. The project will be funded partially through federal grants and will be built by an external contractor.

There will be a pause of construction during FIFA, and resume post FIFA until completion.

For any questions or comments please reach out to arbutus.w41st@vancouver.ca

Location: Arbutus Greenway at W 41st; W &amp; E Boulevards at W 41st; 
Schedule: Feb 2, 2026 - Sep 30, 2026; All days; 7:00 AM - 5:00 PM</content>
<id>urn:uuid:58f68856-9ad5-4fc5-9a03-9aef9d719821</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/fb77a4aa-83da-421c-9383-8c34b17aace3"/>
<published>2026-02-02T08:00:00Z</published>
<title>Arbutus Greenway &amp; 41st Avenue Intersection Improvements</title>
<updated>2026-04-18T01:01:08.2149651Z</updated>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Sidewalk construction 
Contractor Jack CEWE  Arsh Deol	Project Manager Cell: 604-992-8318
Location: Ash St from W59th to W63rd
Schedule: Oct 27, 2025 - Mar 31, 2026</content>
<id>urn:uuid:4aaf88c9-1f3f-437f-a580-71089620e877</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/54711a32-2724-4456-95ad-62458a8ed477"/>
<published>2025-10-24T07:00:00Z</published>
<title>Ash St WITT Sidewalk - Jack CEWE</title>
<updated>2025-10-24T23:06:57.0120714Z</updated>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Traffic Impacts
- Lane (Alleyway) Closure
- Sidewalk Closure
- Parking Lane Closure
- Travel Lane Closure
- Total Road Closure 

Crews on site facilitating installation of New BC Hydro Duct Bank. 

WO# W02461712-01
Location: - [WORK COMPLETE] Both sides of 1100 Block Bidwell St from Davie St to Pendrell St. 
- [WORK COMPLETE] Both sides of 1600 Block Pendrell St from Bidwell St to Cardero St.
- [WORK COMPLETE] Both sides of 1400-1500 Block Pendrell St from Cardero St to Broughton St. 
- Both sides of 1100-1300 Block Pendrell St from Broughton St to 30m East of Bute St. 
- Both sides of 1100 Block Jervis St from Pendrell St to See-Em-La Lane. 
Schedule: Recurring schedule as follows:
- Oct 21, 2024 - Dec 20, 2024; Weekdays; 7:00 AM - 8:00 PM
Except:
- Does not occur Nov 11, 2024 (Remembrance Day)
</content>
<id>urn:uuid:24708f9e-5109-48ea-8653-0e4860780591</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/4899465a-c3f0-4916-b794-4cab60fc4fe0"/>
<published>2024-10-09T07:00:00Z</published>
<title>BC Hydro - Pendrell Duct Bank - 1100 Bidwell | 1100-1700 Pendrell St | 1100 Jervis St </title>
<updated>2025-12-06T02:00:59.0356546Z</updated>
</entry>
<entry>
<category term="Road Closure"/>
<content>Crews will be onsite to conduct Underground Utility Construction on behalf of BC Hydro

Traffic Impacts: Total road closure at both sides of 0 blk of E17th Ave from Ontario St to 10m East of Quebec St

WO# W02583304-03/461-U07-02838
Location: B/S of 0 blk of E17th Ave
Schedule: Jun 2, 2026 - Jun 16, 2026; Weekdays; 7:00 AM - 8:00 PM</content>
<id>urn:uuid:25e6e9e1-8708-47fa-a892-dbb4a4a00c28</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/78bde76d-915d-4c3f-bcf1-d61aabd8d71a"/>
<published>2026-05-25T07:00:00Z</published>
<title>BC Hydro - Underground Utility Construction - 0 blk of E17th ave - Jun 2-16, 2026</title>
<updated>2026-05-26T15:52:41.4728403Z</updated>
</entry>
<entry>
<category term="Road Closure"/>
<content>Crews will be onsite to conduct Underground Utility Construction on behalf of BC Hydro

Traffic Impacts: Total road closure at
- Both sides of 1200-1300 blk of Bute St from 30m South of Burnaby St to Panteges Lane

WO#W02525350 / 455-U07-02435 / LM-VAN-205 / DY-1042 

Extension to Friday, June 19, 2026

Location: B/S of 1200-1300 blk of Bute St

Schedule: May 25, 2026 - Jun 19, 2026; Weekdays; 7:00 AM - 8:00 PM</content>
<id>urn:uuid:ff5a04bc-9eda-491b-9a46-783e8c9bcb0d</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/f20f1628-128d-495c-8fee-1384d7bcf19f"/>
<published>2026-05-20T07:00:00Z</published>
<title>BC Hydro - Underground Utility Construction - 1200-1300 Bute St - May 25 to Jun 5, 2026</title>
<updated>2026-05-29T15:24:39.9147806Z</updated>
</entry>
<entry>
<category term="Under Construction"/>
<content>Parking lane, and travel lane closure on both sides of 1300 Block of Thurlow St to facilitate underground utility construction by BC Hydro.

WO#DY1685
Location: Both sides of 1300 Block of Thurlow St from Burnaby St to Pacific St.
Schedule: Apr 27, 2026 - Jun 19, 2026; M - Sa; 7:00 AM - 6:00 PM</content>
<id>urn:uuid:15fb60e9-4bd3-452f-9ca0-e64173c1cb6d</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/023bd65b-6b4c-4be4-a56e-6f2e18bdf559"/>
<published>2026-04-17T07:00:00Z</published>
<title>BC Hydro - Underground Utility Construction - 1300 Block of Thurlow St</title>
<updated>2026-06-03T22:16:47.0855741Z</updated>
</entry>
<entry>
<category term="Road Closure"/>
<content>Crews will be onsite to conduct Underground Utility Construction on behalf of BC Hydro

Traffic Impacts: Full closure at both sides of 1500 blk of W35th Ave from Granville St to 55m West of Granville St

WO# W02584392-01/458-U07-01173

Extension to Jun 18
Location: B/S 1500 blk of W35th Ave
Schedule: May 21, 2026 - Jun 18, 2026; Weekdays; 7:00 AM - 8:00 PM</content>
<id>urn:uuid:9ee9be53-b5e1-4ea4-bf89-f52d15282aaa</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/c5a0c737-faae-4d0c-931e-ddf4d09940b5"/>
<published>2026-05-12T07:00:00Z</published>
<title>BC Hydro - Underground Utility Construction - 1500 blk W 35th Ave - May 21- June 4, 2026</title>
<updated>2026-06-03T15:54:40.1465223Z</updated>
</entry>
<entry>
<category term="Road Closure"/>
<content>Crews will be onsite to conduct underground utility construction on behalf of BC Hydro

Traffic Impacts: Total road closure at North side of 1500 blk of W34th Ave from Granville St to 70m West of Granville St

WO# W02588559-02/458-U07-01256
Location: N/S of 1500 blk of W34th Ave
Schedule: Jun 4, 2026 - Jun 18, 2026; Weekdays; 7:00 AM - 8:00 PM</content>
<id>urn:uuid:ea4d6e51-f1a2-4a61-84e3-b3b416249f5a</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/954db709-c718-42ae-a05d-6db9b45ba6be"/>
<published>2026-05-28T07:00:00Z</published>
<title>BC Hydro - Underground Utility Construction - 1500 blk W34th Ave - Jun 4-18, 2026</title>
<updated>2026-05-28T16:31:30.0468951Z</updated>
</entry>
<entry>
<category term="Under Construction"/>
<content>Crews will be onsite to conduct Underground Utility Construction on behalf of BC Hydro

Traffic Impacts: 
- Laneway closure at both sides of Lane East of 3900 blk of Victoria Dr from E23rd Ave to Lane North of E23rd Ave
- Laneway closure at both sides of Lane North of 2000 blk of E23rd Ave from Lane East of Victoria Dr to 20m East of Lane East of Victoria Dr
- Parking closure at North side of 2000 blk of E23rd Ave from Lane East of Victoria Dr to 50m East of Lane East of Victoria Dr

WO# W02588318-04/461-U07-02819
Location: B/S of LE of 3900 blk Victoria Dr
B/S of LN of 2000 blk E23rd Ave
N/S of 2000 blk of E23rd Ave
Schedule: Jun 3, 2026 - Jul 17, 2026; Weekdays; 7:00 AM - 8:00 PM</content>
<id>urn:uuid:3ee00509-55df-41d3-bf8b-1c78acec8fde</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/846d4aa2-4611-4434-bdc2-4048ab937155"/>
<published>2026-05-26T07:00:00Z</published>
<title>BC Hydro - Underground Utility Construction - 3900 blk Victoria Dr - Jun 3-17, 2026</title>
<updated>2026-05-26T21:51:41.7208132Z</updated>
</entry>
<entry>
<category term="Under Construction"/>
<content>Crews will be onsite to conduct Underground Utility Construction on behalf of BC Hydro

Traffic Impacts: Parking Lane closure at
- Both sides of Lane South of 900 blk of W57th Ave from 30m West to 75 West of Laurel St
- West side of 7300 blk of Laurel St from W57th Ave from Lane South of W57th Ave

WO# W02587226-01/461-U07-01170
Location: B/S of LS of 900 blk of W57th Ave
W/S of 7300 blk of Laurel St
Schedule: May 29, 2026 - Jun 12, 2026; Weekdays; 7:00 AM - 8:00 PM</content>
<id>urn:uuid:c831f2d8-78f8-477b-aa4a-ccfdc79d1359</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/c7cd90ba-9844-4b08-a5ba-24e94f8bd018"/>
<published>2026-05-20T07:00:00Z</published>
<title>BC Hydro - Underground Utility Construction - 900 blk W57th Ave - May 29-June 12</title>
<updated>2026-05-20T16:31:11.7358005Z</updated>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Crews will be onsite to conduct Underground Utility Construction on behalf of BC Hydro

Traffic Impacts: Laneway closure &amp; Parking Lane closure at
- Both sides of Lane North of 3900 blk of W35th Ave from Crown St to 40m East of Crown St
- Both sides of 5000 blk of Crowns St from W35th Ave to Lane North of W35th Ave

WO# : W02590186-04 / 453-U07-01231

Location: B/S of LN of 3900 blk of W35th Ave
B/S of 5000 blk of Crown St
Schedule: Jun 17, 2026 - Jun 30, 2026; Weekdays; 7:00 AM - 8:00 PM</content>
<id>urn:uuid:b36c6140-2092-4447-a415-a3a71c6bb0d5</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/27c0639e-0fb3-48fc-a365-5253c2880ad5"/>
<published>2026-06-08T07:00:00Z</published>
<title>BC Hydro - Underground Utility Construction - LN 3900 W 35 Ave - Jun 17-30, 2026</title>
<updated>2026-06-08T17:04:54.9894912Z</updated>
</entry>
<entry>
<category term="Under Construction"/>
<content>Crews will be onsite to conduct Underground Utility Construction on behalf of BC Hydro

Traffic Impacts:
- Laneway closure at both side of Lane South of 4500 blk of W4th from 100m to 140m west of Sasamat St
- Parking lane closure at both sides of Lane South of W4th Ave to W5th Ave

WO# W02581171-02/453-U07-01236
Location: B/S of LS of 4500 blk of W4th 
B/S of 2000 blk of Sasamat St
Schedule: Jun 1, 2026 - Jul 15, 2026; Weekdays; 7:00 AM - 8:00 PM</content>
<id>urn:uuid:178bb004-1177-4599-93dc-962fdd647707</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/45aecfb2-3616-494e-8ea7-6ded8eaac984"/>
<published>2026-05-25T07:00:00Z</published>
<title>BC Hydro - Underground Utility Construction at LS of 4500 blk of W4th Ave</title>
<updated>2026-05-25T18:16:20.711751Z</updated>
</entry>
<entry>
<category term="Road Closure"/>
<content>Crews will be onsite to conduct Utility Maintenance on behalf of BC Hydro 

Traffic Impacts: Total Road closure at both sides of 1000 blk of Comox St from Burrard St to 50m West of Burrard St

WO# 2L025-V07-00100
Location: B/S of 1000 Comox St
Schedule: Jun 1, 2026 - Jun 15, 2026; Weekdays; 7:00 AM - 8:00 PM</content>
<id>urn:uuid:e12304f0-8323-4035-b204-c6939455085d</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/3c1baee3-ee78-4d4f-af1a-670a028a23bd"/>
<published>2026-05-22T07:00:00Z</published>
<title>BC Hydro - Utility Maintenance - 1000 Comox st - Jun 1-15, 2026</title>
<updated>2026-05-22T21:38:56.1242127Z</updated>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Parking lane closure on Both Sides of 700-800 Block of W 8th Avenue and Both Sides of 2300 Block of Willow Street to facilitate overhead maintenance.

WO# M219238-3/4
Location: Both Sides of 700-800 Block of W 8th Avenue From West PL of 801 to East PL of 795. Both Sides of 2300 Block of Willow Street From W 8th Avenue to Lane North of W 8th Avenue.
Schedule: Jun 22, 2026 8:00 AM - 5:00 PM</content>
<id>urn:uuid:52f734ba-2a48-4f60-8936-032ae098215f</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a5160029-d472-46b2-a950-855bb7bda6ac"/>
<published>2026-06-08T07:00:00Z</published>
<title>BC Hydro Overhead Maintenance on 700-800 Block of W 8th Avenue</title>
<updated>2026-06-08T16:21:58.1347814Z</updated>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Alleyway lane closure on Both Sides of Lane West of 500 Block of Hamilton Street and Both Sides of Lane North of 300 Block of Dunsmuir Street to facilitate parking/staging vehicles.

WO# 80044208 
Location: Both Sides of Lane West of 500 Block of Hamilton Street From Lane South of W Pender Street to Lane North of Dunsmuir Street. Both Sides of Lane North of 300 Block of Dunsmuir Street From Lane East of Homer Street to Hamilton Street.
Schedule: Jun 12, 2026 - Jul 10, 2026; Weekdays; 8:00 AM - 8:00 PM</content>
<id>urn:uuid:e2abb00d-9dfe-403b-9fc2-951f7fca7868</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/7599bb01-eaa3-41ce-902f-ac2c77581411"/>
<published>2026-06-01T07:00:00Z</published>
<title>BC Hydro Parking/Staging Vehicles on Lane West of 500 Block of Hamilton Street</title>
<updated>2026-06-01T18:42:00.8131858Z</updated>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Parking lane closure on Both Sides of 200-300 Block of E Kent Ave South to facilitate a pole installation/removal.

WO# 2572872-01
Location: Both Sides of 200-300 Block of E Kent Ave South From Main Street to E PL of 268.
Schedule: Jun 23, 2026 8:00 AM - 5:00 PM</content>
<id>urn:uuid:0ea0b05a-ab2c-4b55-bbc8-9164825495c1</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/702afd49-9132-4ce8-b81f-f74b008ba860"/>
<published>2026-06-09T07:00:00Z</published>
<title>BC Hydro Pole Installation/Removal on 200-300 Block of E Kent Ave South</title>
<updated>2026-06-09T20:22:36.6946739Z</updated>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Parking lane closure on Both Sides of 2200 Block of Willow Street and Both Sides of 700 Block of W 7th Avenue to facilitate a pole installation/removal.

WO# 2588501-01
Location: Both Sides of 2200 Block of Willow Street From Lane North of W 7th Avenue to W 7th Avenue. Both Sides of 700 Block of W 7th Avenue From Willow Street to E PL of 777.
Schedule: Jun 23, 2026 8:00 AM - 5:00 PM</content>
<id>urn:uuid:6791733d-30c3-48dc-b3a5-5c0d6e9950d8</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ebd152ec-2526-45e8-8239-ee533bbfe4f9"/>
<published>2026-06-09T07:00:00Z</published>
<title>BC Hydro Pole Installation/Removal on 2200 Block of Willow Street</title>
<updated>2026-06-09T20:16:57.570086Z</updated>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Parking lane closure on Both Sides of 2500 Block of Highbury Street to facilitate a pole installation/removal.

WO# 2586691-01
Location: Both Sides of 2500 Block of Highbury Street From W Broadway to W 10th Avenue.
Schedule: Jun 24, 2026 8:00 AM - 5:00 PM</content>
<id>urn:uuid:8d12c737-e19d-4648-867e-95f32bac9215</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/5a5bf2d4-697f-41ad-8e8c-d23c056b1ce9"/>
<published>2026-06-09T07:00:00Z</published>
<title>BC Hydro Pole Installation/Removal on 2500 Block of Highbury Street</title>
<updated>2026-06-09T16:28:44.399255Z</updated>
</entry>
<entry>
<category term="Under Construction"/>
<content>Parking and Travel lane closure on Both Sides of 2700 Block of E 21st Avenue to facilitate underground utility construction.

WO# W02574358-02/461-U07-02687
Location: Both Sides of 2700 Block of E 21st Avenue From Slocan Street to Kaslo Street. 
Schedule: May 15, 2026 - Jun 26, 2026; Weekdays; 7:00 AM - 8:00 PM</content>
<id>urn:uuid:3de06ac3-318e-4744-877d-2212bac9397d</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/186ef934-1304-4df6-b3c6-93097106c0c6"/>
<published>2026-05-05T07:00:00Z</published>
<title>BC Hydro Underground Utility Construction on 2700 Block of E 21st Avenue </title>
<updated>2026-06-08T18:00:53.8737752Z</updated>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Travel and Parking lane closure on Both Sides of 300-400 Block of W 45th Avenue and Both Sides of Lane East of 6100 Block of Cambie Street to facilitate underground utility construction.

WO# W02581733-02/459-U07-01165
Location: Both Sides of 300-400 Block of W 45th Avenue From Cambie Street to Lane East of Cambie Street. Both Sides of Lane East of 6100 Block of Cambie Street From W 45th Avenue to Lane South of W 45th Avenue.
Schedule: Jun 15, 2026 - Jun 29, 2026; Weekdays; 7:00 AM - 8:00 PM</content>
<id>urn:uuid:5224f7e2-6f3e-4a39-aa6c-14e2c79d0c25</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d3706f85-3351-46ed-bbd4-c152e3f13d91"/>
<published>2026-06-01T07:00:00Z</published>
<title>BC Hydro Underground Utility Construction on 300-400 Block of W 45th Avenue</title>
<updated>2026-06-01T20:45:41.043166Z</updated>
</entry>
<entry>
<category term="Under Construction"/>
<content>Reduced lanes on Both Sides of 3400 Block of W 6th Avenue to facilitate underground utility construction.

WO# W02582980-01/453-U07-01219
Location: Both Sides of 3400 Block of W 6th Avenue From Collingwood Street to Lane East of Collingwood Street. 
Schedule: Recurring schedule as follows:
- Jun 5, 2026 - Jun 19, 2026; Weekdays; 9:30 AM - 2:30 PM
- Jun 6, 2026 - Jun 20, 2026; Sa; 7:00 AM - 8:00 PM
</content>
<id>urn:uuid:d5b7c97c-8b5f-4061-8030-d1ec1f200422</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/fcb723aa-bb33-4ef3-b38b-06be149f5bfd"/>
<published>2026-05-28T07:00:00Z</published>
<title>BC Hydro Underground Utility Construction on 3400 Block of W 6th Avenue</title>
<updated>2026-05-28T18:08:30.4830776Z</updated>
</entry>
<entry>
<category term="Under Construction"/>
<content>Parking and Travel lane closure on Both Sides of 400 Block of W 39th Avenue, Both Sides of Lane East of 5400 Block of Cambie Street and Both Sides of Lane North of 400 Block of W 39th Avenue to facilitate underground utility construction.

WO# W02585726-03/461-U07-02808
Location: Both Sides of 400 Block of W 39th Avenue From Cambie Street to 35m East of Lane East of Cambie Street. Both Sides of Lane East of 5400 Block of Cambie Street From W 39th Avenue to Lane North of W 39th Avenue. Both Sides of Lane North of 400 Block of W 39th Avenue From Lane East of Cambie Street to Alberta Street.
Schedule: May 25, 2026 - Jun 22, 2026; Weekdays; 7:00 AM - 8:00 PM</content>
<id>urn:uuid:2a70da52-5eb5-442e-8411-794ec09ee6f9</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/dd9389eb-309d-4eeb-8821-3411ff4cc2f7"/>
<published>2026-05-14T07:00:00Z</published>
<title>BC Hydro Underground Utility Construction on 400 Block of W 39th Avenue</title>
<updated>2026-06-02T16:56:29.3719165Z</updated>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Parking lane closure on the South Side of 4700-4800 Block of Drummond Drive to facilitate underground utility construction.

WO# W02556161-02/452-U07-01098
Location: South Side of 4700-4800 Block of Drummond Drive From 80m East of Fannin Avenue to 135m East of Fannin Avenue.
Schedule: Jun 15, 2026 - Jun 29, 2026; Weekdays; 7:00 AM - 8:00 PM</content>
<id>urn:uuid:e78e190e-2d0e-4015-b159-8eea4a269441</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/b8931c12-5a19-4391-afa1-0b138f036059"/>
<published>2026-06-04T07:00:00Z</published>
<title>BC Hydro Underground Utility Construction on 4700-4800 Block of Drummond Drive</title>
<updated>2026-06-04T15:20:34.4651846Z</updated>
</entry>
<entry>
<category term="Under Construction"/>
<content>Travel lane closure on Both Sides of 6000 Block of Dunbar Street to facilitate underground utility construction.

WO# W02585723-02/453-U07-01251
Location: Both Sides of 6000 Block of Dunbar Street From Lane North of SW Marine Drive to W 44th Avenue. 
Schedule: Recurring schedule as follows:
- May 21, 2026 - Jun 26, 2026; Weekdays; 7:00 AM - 8:00 PM
- May 23, 2026 - Jun 13, 2026; Sa; 7:00 AM - 8:00 PM
</content>
<id>urn:uuid:c03f2126-9139-4c61-b0fe-cd37cfee3759</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/7902b2e0-44f8-4df2-a6df-7eae11b85d6e"/>
<published>2026-05-13T07:00:00Z</published>
<title>BC Hydro Underground Utility Construction on 6000 Block of Dunbar Street</title>
<updated>2026-06-05T16:17:47.6126511Z</updated>
</entry>
<entry>
<category term="Under Construction"/>
<content>Travel lane closure on Both Sides of 900 Block of Terminal Avenue to facilitate underground utility construction.

WO# W02588157-01/460-U07-01404
Location: Both Sides of 900 Block of Terminal Avenue From Glen Drive to Cottrell Street. 
Schedule: May 5, 2026 - Jun 11, 2026; Weekdays; 7:00 AM - 8:00 PM</content>
<id>urn:uuid:7775f782-35f5-4e5c-a606-932770fef48d</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e5028f07-e1c8-475e-b521-8a01b3ce9b91"/>
<published>2026-04-27T07:00:00Z</published>
<title>BC Hydro Underground Utility Construction on 900 Block of Terminal Avenue</title>
<updated>2026-05-26T21:40:27.5133146Z</updated>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Alleyway and Parking lane closure on Both Sides of Lane East of 3500 Block of Main Street and the South Side of 200 Block of E 19th Avenue to facilitate underground utility construction.

WO# W02578524-02/461-U07-02520
Location: Both Sides of Lane East of 3500 Block of Main Street From E 19th Avenue to Lane South of E 19th Avenue. South Side of 200 Block of E 19th Avenue From Main Street to Lane East of Main Street.
Schedule: Jun 11, 2026 - Jun 25, 2026; Weekdays; 7:00 AM - 8:00 PM</content>
<id>urn:uuid:c8fc6456-e01e-41f6-b570-ddf37c41c502</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a3e691f4-92c6-4b81-a029-5554c2d730a6"/>
<published>2026-06-08T07:00:00Z</published>
<title>BC Hydro Underground Utility Construction on Lane East of 3500 Block of Main Street</title>
<updated>2026-06-02T19:51:15.515112Z</updated>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Parking and Alleyway lane closure on Both Sides of Lane East of 4100 Block of Blenheim Street and the North Side of 3200 Block of W 26th Avenue to facilitate underground utility construction.

WO# W02584874-03/453-U07-01243
Location: Both Sides of Lane East of 4100 Block of Blenheim Street From W 26th Avenue to Lane North of W 26th Avenue. North Side of 3200 Block of W 26th Avenue From Blenheim Street to Lane East of Blenheim Street.
Schedule: Jun 18, 2026 - Jul 2, 2026; Weekdays; 7:00 AM - 8:00 PM</content>
<id>urn:uuid:4265a783-f922-4de0-a9cd-360e694000ce</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/74a12ee9-f015-4f34-b536-8e11a256cb22"/>
<published>2026-06-08T07:00:00Z</published>
<title>BC Hydro Underground Utility Construction on Lane East of 4100 Block of Blenheim Street</title>
<updated>2026-06-08T21:55:24.6715955Z</updated>
</entry>
<entry>
<category term="Under Construction"/>
<content>Parking and Alleyway lane closure on Both Sides of Lane East of 4400 Block of Maple Crescent and Both Sides of 1800 Block of W 29th Avenue to facilitate underground utility construction.

WO# W02564388-02/457-U07-03371
Location: Both Sides of Lane East of 4400 Block of Maple Crescent From 45m North of W 29th Avenue to 70m North of W 29th Avenue. Both Sides of 1800 Block of W 29th Avenue From Maple Crescent to Lane East of Maple Crescent.
Schedule: May 28, 2026 - Jun 11, 2026; Weekdays; 7:00 AM - 8:00 PM</content>
<id>urn:uuid:acb8d865-c2d8-4e47-be4e-0abd5a9306dd</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/c0f11089-e6c1-4cb5-8a54-fe9ff1b7fb88"/>
<published>2026-05-21T07:00:00Z</published>
<title>BC Hydro Underground Utility Construction on Lane East of 4400 Block of Maple Crescent</title>
<updated>2026-05-19T21:19:15.5299625Z</updated>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Alleyway and Parking lane closure on Both Sides of Lane East of 4500 Block of Magnolia Street and the East Side of 4500 Block of Magnolia Street to facilitate underground utility construction.

WO# W02589345-01 / 457-U07-03413 
Location: Both Sides of Lane East of 4500 Block of Magnolia Street From North PL of 4478 to South PL of 4538. East Side of 4500 Block of Magnolia Street From South PL of 4538 to 40m South of South PL of 4538.
Schedule: Jun 16, 2026 - Jun 29, 2026; Weekdays; 7:00 AM - 8:00 PM</content>
<id>urn:uuid:e6b4af99-68d0-4280-9a58-4f047bf2e630</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e6925713-87b3-4a99-b1ae-8a46f2d299c2"/>
<published>2026-06-03T07:00:00Z</published>
<title>BC Hydro Underground Utility Construction on Lane East of 4500 Block of Magnolia Street</title>
<updated>2026-06-03T18:59:44.4327711Z</updated>
</entry>
<entry>
<category term="Under Construction"/>
<content>Parking and Alleyway lane closure on Both Sides of Lane East of 7200 Block of Fraser Street and the North Side of 700 Block of E 57th Avenue to facilitate underground utility construction.

WO# W02500381-02/461-U07-02841
Location: Both Sides of Lane East of 7200 Block of Fraser Street From E 56th Avenue to 10m South of E 57th Avenue. North Side of 700 Block of E 57th Avenue From Lane East of Fraser Street to 50m East of Lane East of Fraser Street. 
Schedule: Jun 10, 2026 - Jun 24, 2026; Weekdays; 7:00 AM - 8:00 PM</content>
<id>urn:uuid:915f1a35-b36d-469b-bbd4-b14f406cd673</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/eee3f6ff-7a53-4c13-b888-e205c30b8712"/>
<published>2026-05-29T07:00:00Z</published>
<title>BC Hydro Underground Utility Construction on Lane East of 7200 Block of Fraser Street</title>
<updated>2026-05-29T17:06:52.4170829Z</updated>
</entry>
<entry>
<category term="Under Construction"/>
<content>Alleyway and Parking lane closure on Both Sides of Lane North of 3400 Block of E 47th Avenue, Both Sides of 6000-6200 Block of Battison Street and Both Sides of Lane West of 6000-6200 Block of Battison Street to facilitate underground utility construction.

WO# W02583871-02/461-U07-02823
Location: Both Sides of Lane North of 3400 Block of E 47th Avenue From 40m West of Battison Street to 70m West of Battison Street. Both Sides of 6000-6200 Block of Battison Street From E 47th Avenue to Lane North of E 47th Avenue. Both Sides of Lane West of 6000-6200 Block of Battison Street From Lane North of E 47th Avenue to 55m North of Lane North of E 47th Avenue.
Schedule: May 13, 2026 - Jun 10, 2026; Weekdays; 7:00 AM - 8:00 PM</content>
<id>urn:uuid:984d384f-8e7e-46c9-b730-41063547c70d</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/dddd1702-6910-4036-ace1-113f4323ec04"/>
<published>2026-05-04T07:00:00Z</published>
<title>BC Hydro Underground Utility Construction on Lane North of 3400 Block of E 47th Avenue </title>
<updated>2026-05-21T16:33:56.2118804Z</updated>
</entry>
<entry>
<category term="Under Construction"/>
<content>Alleyway and Parking lane closure on Both Sides of Lane North of 3600 Block of W 6th Avenue and the East Side of 2100 Block of Alma Street to facilitate underground utility construction.

WO# W02591365-01/453-U07-01247
Location: Both Sides of Lane North of 3600 Block of W 6th Avenue From Alma Street to 70m East of Alma Street. East Side of 2100 Block of Alma Street From W 6th Avenue to Lane North of W 6th Avenue.
Schedule: Jun 5, 2026 - Jun 19, 2026; Weekdays; 7:00 AM - 8:00 PM</content>
<id>urn:uuid:d4a2e9f4-3c50-4195-8deb-b51d05c79088</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/083542cf-20f1-4dac-9372-3a656110084d"/>
<published>2026-05-28T07:00:00Z</published>
<title>BC Hydro Underground Utility Construction on Lane North of 3600 Block of W 6th Avenue</title>
<updated>2026-05-28T16:43:17.346452Z</updated>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Parking and Alleyway lane closure on Both Sides of Lane North of 2100 Block of W 10th Avenue and the East Side of 2500 Block of Yew Street to facilitate underground utility construction.

WO# W02557116-02/457-U07-03434
Location: Both Sides of Lane North of 2100 Block of W 10th Avenue and the East Side of 2500 Block of Yew Street to facilitate underground utility construction.
Schedule: Jun 16, 2026 - Jun 30, 2026; Weekdays; 7:00 AM - 8:00 PM</content>
<id>urn:uuid:95e4cb7e-36c8-4656-873e-a1b0c42cb22e</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/800dc182-7a69-4160-b31c-6ecc362c9553"/>
<published>2026-06-09T07:00:00Z</published>
<title>BC Hydro Underground Utility Construction on Lane North of W 10th Avenue</title>
<updated>2026-06-05T19:18:35.6629985Z</updated>
</entry>
<entry>
<category term="Under Construction"/>
<content>Parking and Alleyway lane closure on Both Sides of Lane South of 3500 Block of E Hastings Street and Both Sides of 400 Block of Skeena Street to facilitate underground utility construction.

WO# W02589018-02/462-U07-01194
Location: Both Sides of Lane South of 3500 Block of E Hastings Street From 70m East of Skeena Street to 130m East of Skeena Street. Both Sides of 400 Block of Skeena Street From E Pender Street to Lane South of E Hastings.
Schedule: May 13, 2026 - Jun 10, 2026; Weekdays; 7:00 AM - 8:00 PM</content>
<id>urn:uuid:7d94a3b5-3d57-4573-84ad-3542dc753c00</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ae9eb703-54e9-40bc-b741-f726829ad035"/>
<published>2026-05-04T07:00:00Z</published>
<title>BC Hydro Underground Utility Construction on Lane South of 3500 Block of E Hastings Street</title>
<updated>2026-05-21T16:38:08.5503755Z</updated>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Parking lane closure on Both Sides of 1000-900 Block of W 7th Avenue to facilitate utility maintenance.

WO# 2496438-02
Location: Both Sides of 1000-900 Block of W 7th Avenue From East PL of 1071 to West PL of 973.
Schedule: Jun 17, 2026 8:00 AM - 5:00 PM</content>
<id>urn:uuid:9105a1ad-8b4f-4674-80f5-7ff65cb9a362</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/693b4075-46d0-4c48-a322-f677af7db935"/>
<published>2026-06-03T07:00:00Z</published>
<title>BC Hydro Utility Maintenance on 1000-900 Block of W 7th Avenue</title>
<updated>2026-06-03T19:53:55.7282653Z</updated>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Parking lane closure on Both Sides of 1500 Block of W 36th Avenue to facilitate utility maintenance.

WO# 2587444-01
Location: Both Sides of 1500 Block of W 36th Avenue From Connaught Drive to Granville Street. 
Schedule: Jun 15, 2026 7:00 AM - 3:00 PM</content>
<id>urn:uuid:258fb13b-d234-49bc-8723-5002b4432ab1</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/922de198-bf5d-42a4-b36d-ca03da6e178e"/>
<published>2026-05-29T07:00:00Z</published>
<title>BC Hydro Utility Maintenance on 1500 Block of W 36th Avenue</title>
<updated>2026-05-29T19:11:00.6438437Z</updated>
</entry>
<entry>
<category term="Under Construction"/>
<content>Parking and Travel lane closure on the North Side of 1600 Block of W King Edward Ave, the North Side of 1800 Block of W King Edward Avenue and Both Sides of 3900-4000 Block of Marguerite Street to facilitate utility maintenance.

WO# 61078
Location: North Side of 1600 Block of W King Edward Avenue From Alexandra Street to W PL of 1657. North Side of 1800 Block of W King Edward Avenue From Angus Drive to Pine Crescent. Both Sides of 3900-4000 Block of Marguerite Street From W King Edward Avenue to Lane North of W King Edward Avenue. 
Schedule: Jun 8, 2026 - Jun 16, 2026; Weekdays; 8:00 AM - 5:00 PM</content>
<id>urn:uuid:7cd44945-0f91-4ede-add3-abe8407dad73</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e5a49fd3-7bf9-4a6d-8896-fcfd36688e1f"/>
<published>2026-05-27T07:00:00Z</published>
<title>BC Hydro Utility Maintenance on 1600 Block of W King Edward Ave</title>
<updated>2026-05-27T17:26:32.4669017Z</updated>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Parking lane closure on Both Sides of 3000 Block of Pine Street to facilitate utility maintenance.

WO# 2590425-02
Location: Both Sides of 3000 Block of Pine Street From Lane North of W 15th Avenue to W 15th Avenue.
Schedule: Jun 11, 2026 8:00 AM - 5:00 PM</content>
<id>urn:uuid:f3a9f87e-f268-4d40-8707-f8447280034a</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e7d15835-a3bc-461c-9cce-f9b5e3c503a8"/>
<published>2026-05-28T07:00:00Z</published>
<title>BC Hydro Utility Maintenance on 3000 Block of Pine Street</title>
<updated>2026-05-28T18:55:59.2128818Z</updated>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Parking lane closure on Both Sides of 3100 Block of Point Grey Road to facilitate utility maintenance.

WO# 2594274-01
Location: Both Sides of 3100 Block of Point Grey Road From Musqueamview Street to Balaclava Street. 
Schedule: Jun 17, 2026 8:00 AM - 5:00 PM</content>
<id>urn:uuid:ade638b0-4f9f-4aad-a925-9c92318f33bc</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/85636b8c-08be-4973-92cb-569ca913fb34"/>
<published>2026-06-08T07:00:00Z</published>
<title>BC Hydro Utility Maintenance on 3100 Block of Point Grey Road</title>
<updated>2026-06-04T16:05:42.2298684Z</updated>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Parking lane closure on Both Sides of 3400 Block of Point Grey Road to facilitate utility maintenance.

WO# 2559850-01
Location: Both Sides of 3400 Block of Point Grey Road From Collingwood Street to Waterloo Street. 
Schedule: Jun 12, 2026 8:00 AM - 5:00 PM</content>
<id>urn:uuid:5149b18b-5bb9-4c8d-9f1d-8a8a55e6a4cc</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/4abb6e93-df77-497a-8d2b-5b0114e5a889"/>
<published>2026-06-03T07:00:00Z</published>
<title>BC Hydro Utility Maintenance on 3400 Block of Point Grey Road</title>
<updated>2026-06-03T21:38:39.8206189Z</updated>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Parking lane closure on Both Sides of 700-1000 Block of E 54th Avenue to facilitate utility maintenance.

WO# 2592406-01
Location: Both Sides of 700-1000 Block of E 54th Avenue From E PL of 747 to W PL of 895.
Schedule: Jun 15, 2026 8:00 AM - 5:00 PM</content>
<id>urn:uuid:046f4a76-7433-49a9-9442-94ce0dae28be</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/9f390620-25c3-4c65-a3cf-4091daae8d89"/>
<published>2026-06-03T07:00:00Z</published>
<title>BC Hydro Utility Maintenance on 700-1000 Block of E 54th Avenue</title>
<updated>2026-06-03T18:43:50.6091799Z</updated>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Travel lane closure and Single lane alternating traffic in effect on the East Side of 8100-8700 Block of Yukon Street and Both Sides of 400 Block of W Kent Ave South to facilitate utility maintenance.

WO# 6227-30005
Location: East Side of 8100-8700 Block of Yukon Street From 60m North of Interurban Way to 180m South of Interurban Way. Both Sides of 400 Block of W Kent Ave South From 40m West of Yukon Street to 50m East of Yukon Street. 
Schedule: Jun 18, 2026 8:00 AM - 5:00 PM</content>
<id>urn:uuid:185b0d21-c7e6-4bdf-a206-631408bddfb4</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/72c5bd52-a766-4a74-99a8-4d0eb63864bd"/>
<published>2026-06-09T07:00:00Z</published>
<title>BC Hydro Utility Maintenance on 8100-8700 Block of Yukon Street</title>
<updated>2026-06-09T20:56:34.5898041Z</updated>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Parking lane closure on Both Sides of 8300 Block of Ash Street to facilitate utility maintenance.

WO# 2586017-01 
Location: Both Sides of 8300 Block of Ash Street From W 68th Avenue to W 69th Avenue.
Schedule: Jun 18, 2026 8:00 AM - 5:00 PM</content>
<id>urn:uuid:8015afa2-7ca0-4936-9248-26bc99b3c150</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/41e4cc72-578b-4e0d-ac3b-4daa7023b034"/>
<published>2026-06-04T07:00:00Z</published>
<title>BC Hydro Utility Maintenance on 8300 Block of Ash Street</title>
<updated>2026-06-04T16:13:10.7115315Z</updated>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Alleyway lane closure on Both Sides of Lane North of 100 Block of W 6th Avenue to facilitate utility maintenance.

WO# 2591439-01-02
Location: Both Sides of Lane North of 100 Block of W 6th Avenue From Columbia Street to Manitoba Street. 
Schedule: Jun 17, 2026 8:00 AM - 5:00 PM</content>
<id>urn:uuid:d6c37c9d-3193-4c7e-8ad0-fc1a62b5f9a0</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/80c12df9-b52c-49e2-bb82-81c11a0861e4"/>
<published>2026-06-03T07:00:00Z</published>
<title>BC Hydro Utility Maintenance on Lane North of 100 Block of W 6th Avenue</title>
<updated>2026-06-03T18:14:42.0620988Z</updated>
</entry>
<entry>
<category term="Under Construction"/>
<content>Alleyway lane closure on Both Sides of Lane South of 300 Block of W 6th Avenue to facilitate utility maintenance.

WO# 
Location: Both Sides of Lane South of 300 Block of W 6th Avenue From Yukon Street to Alberta Street.
Schedule: Jun 4, 2026 - Jun 12, 2026; Weekdays; 9:00 AM - 5:00 PM</content>
<id>urn:uuid:01a5e82a-455c-4cac-b7da-258116503a30</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/89bdcf0e-19c1-4ebe-9d21-bbabfb88318c"/>
<published>2026-06-01T07:00:00Z</published>
<title>BC Hydro Utility Maintenance on Lane South of 300 Block of W 6th Avenue</title>
<updated>2026-06-01T17:09:20.5783357Z</updated>
</entry>
<entry>
<category term="Under Construction"/>
<content>Alleyway and Parking lane closure on Both Sides of Lane West of 6300 Block of Fraser Street to facilitate utility maintenance.

WO# 2581476-01
Location: Both Sides of Lane West of 6300 Block of Fraser Street From E 47th Avenue to Lane South of E 47th Avenue.
Schedule: Jun 10, 2026 8:00 AM - 5:00 PM</content>
<id>urn:uuid:298d070d-cd75-4911-a881-6ef7e0ee3e28</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/af6e566b-17d4-404f-a087-2bd87b0279c4"/>
<published>2026-05-28T07:00:00Z</published>
<title>BC Hydro Utility Maintenance on Lane West of 6300 Block of Fraser Street</title>
<updated>2026-05-28T17:58:11.3901517Z</updated>
</entry>
<entry>
<category term="Under Construction"/>
<content>April 2026: ongoing project currently working at W12th on Vine St

Sewer Renewal work on local streets. 
Schedule: Starting construction in Dec 2025 to Q3 2027
Traffic Impact: TBD

Location: Vine St, W 10th Av to W 16th Av

Schedule: Dec 1, 2025 - Sep 1, 2027</content>
<id>urn:uuid:5b1bd36a-071a-4568-b7c5-24e7bf896ed1</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1454f05e-3a84-4233-b212-d21427234c92"/>
<published>2025-11-04T08:00:00Z</published>
<title>Balaclava Vine Sewer Renewal Project</title>
<updated>2026-04-23T16:04:08.0380043Z</updated>
</entry>
<entry>
<category term="Road Closure"/>
<content>Sewer Renewal work on local streets. 

Tentative Schedule: Starting construction in November 2025. Work will start along W 12th to complete spine and laterals (From east of Alma St to Musqueamview St). Approximately in Q2 2027, the crew will progress to W 13th spine and laterals (Dunbar St to Balaclava St). 

Traffic Impact: Will need the entire road width, however, we will accommodate parking access when it is safe to do so.
Location: Various local streets, W 12th and W 13th (between east of Alma St and Balaclava St)
Schedule: Nov 1, 2025 - Jul 31, 2027</content>
<id>urn:uuid:017780fb-af7a-4ea3-8061-889e108d43f6</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/68b6a6a6-4040-4bd4-9538-e684cb0279ec"/>
<published>2025-09-18T07:00:00Z</published>
<title>Balaclava-Alma Sewer Package</title>
<updated>2026-03-03T23:28:20.602559Z</updated>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Permanent upgrades to the temporary bike lanes on Beatty Street from Smithe Street to W Georgia Street. Includes upgraded traffic infrastructure at the intersection of Beatty &amp; Robson, as well as raising the intersection at Beatty &amp; Robson.

https://vancouver.ca/streets-transportation/beatty-street-upgrades.aspx 

PM - Josh Randall
Location: Beatty St Bike Lane, Smithe to Georgia, Robson &amp; Beatty intersection
Schedule: Jul 7, 2025 - May 8, 2026</content>
<id>urn:uuid:3b304188-aa9d-4307-94f0-2b25f11714bf</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/3c67438e-557e-4347-bfda-6bd240c6396f"/>
<published>2025-07-03T07:00:00Z</published>
<title>Beatty Street Transportation Upgrades (BTU)</title>
<updated>2026-04-10T16:11:10.3407695Z</updated>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>*Route is TBD - it will be similar to 2024 route - I may need to remove the bridge portion - will update soon

Approx. closure times: 18:00-22:30

Start/end point: David Lam Park - lining up along 1400 Homer st and 1300 Pacific blvd 
Exit via 200 Beach Crescent and onto the Seawall heading westbound to Hornby, travelling northbound along Hornby on bike lanes to Drake, continuing in the bike lane east to Granville and over the Granville st bridge to W 5th Ave turning north along Fir to W 1st Ave and back along the seawall back to David Lam Park 

Location: David Lam Park, along Seawall westbound to Hornby, north along Hornby bike lane to Drake turning east to Granville and south over the Granville st bridge's new bike lane to W 5th ave, turning north along Fir to W 1st and back onto the seawall back to David Lam Park
Schedule: Sep 18, 2026 6:00 PM - 10:30 PM</content>
<id>urn:uuid:175a81f5-7bdb-4b65-a6e6-c04f87b512c8</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/2e010cb4-5cf3-4e7f-a219-ee0a762377cc"/>
<published>2026-05-21T07:00:00Z</published>
<title>Bike the Night</title>
<updated>2026-05-21T16:02:20.9637879Z</updated>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Installation of rain garden within Greenway on E 37th Abe between Ross and the lane. Project includes light excavation and backfilling. Use of hydrovac and replanting is planned. The work is expected to resolve ponding issues on the roadway. *EXACT DATES TBD 
Location: E 37th Ave within bike greenway. 
Schedule: Sep 15, 2025 - Oct 31, 2025</content>
<id>urn:uuid:d8ec129e-aab1-447a-b072-624bdc4cf6e7</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/dd0efd0a-8254-45de-8577-f9018f22e24d"/>
<published>2025-08-13T07:00:00Z</published>
<title>Bioretention Rehabilitation </title>
<updated>2025-08-13T17:16:58.0611528Z</updated>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:dadcfc12-002b-4c4b-a87d-f3d8fe197d54</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdf086b1-bd80-4183-9ce8-20e86a8d12d5"/>
<published>2024-05-15T07:00:00Z</published>
<title>Broadway Subway - Project-required Lands</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Re-opening May 20 @ 7am. 
Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

Full closure to vehicle traffic: Broadway between Main Street and Quebec Street
Detour via Main St --&gt; E 8th Av --&gt; Quebec St
Location: Broadway - Main Street to Quebec Street
Schedule: Jan 26, 2026 7:00 AM - May 20, 2026 7:00 AM</content>
<id>urn:uuid:822b3a49-4f77-46c4-aae3-b2f0f1821744</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/595dacda-d252-4c24-b8cd-e3bfef1415f5"/>
<published>2025-10-24T07:00:00Z</published>
<title>Broadway Subway – FULL Road Closure</title>
<updated>2026-05-19T20:38:32.7612949Z</updated>
</entry>
<entry>
<category term="Road Closure"/>
<content>
Please note map shows areas of concern that will require coordination above and beyond typical processes. During Broadway Subway early works, if you have work to undertake in the affected area please contact Greg Nowak, Katrina McCawley, or Brendan Wu to help facilitate and coordinate the work. If you have any uncertainty surrounding the boundaries, what coordination is required, or if there are any other questions related to coordination, please feel free to reach out to any of us.

Construction is expected to take 3-4 years, with major construction activities at Great Northern Way and Thornton, as well as along Broadway at each of the station locations:

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Broadway is expected to have full time bus lanes leading up to the construction sites and only 3-4 travel lanes through station locations.  The contractor’s construction scheme may also include utilities relocation that could impact areas within a block around the station (e.g. at 8th and Main St, Cambie between Broadway and 10th).  

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

As we are planning for work for 2020 and onward, please be mindful of any planned construction near Broadway Subway Project footprint with particular focus on all E/W and N/S arterial. 

Development falling along one of the identified areas below will be subject to changes in street-use availability during construction.
More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: 2500 Yukon St
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:df189f15-6f87-4829-8925-19bebdf803dc</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/9d5234cb-7222-4864-8b3c-da68a4070dd5"/>
<published>2026-04-22T07:00:00Z</published>
<title>Broadway Subway – FULL Road Closure</title>
<updated>2026-04-22T18:27:56.5139321Z</updated>
</entry>
<entry>
<category term="Road Closure"/>
<content>Please note map shows areas of concern that will require coordination above and beyond typical processes. During Broadway Subway early works, if you have work to undertake in the affected area please contact Greg Nowak, Katrina McCawley, or Brendan Wu to help facilitate and coordinate the work. If you have any uncertainty surrounding the boundaries, what coordination is required, or if there are any other questions related to coordination, please feel free to reach out to any of us.

Construction is expected to take 3-4 years, with major construction activities at Great Northern Way and Thornton, as well as along Broadway at each of the station locations:

-	Between Main St and Quebec
-	Between Yukon and Cambie
-	Between Laurel and Oak
-	Between Hemlock and Granville
-	Between Cypress and Yew

Broadway is expected to have full time bus lanes leading up to the construction sites and only 3-4 travel lanes through station locations.  The contractor’s construction scheme may also include utilities relocation that could impact areas within a block around the station (e.g. at 8th and Main St, Cambie between Broadway and 10th).  

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

As we are planning for work for 2020 and onward, please be mindful of any planned construction near Broadway Subway Project footprint with particular focus on all E/W and N/S arterial. 

Development falling along one of the identified areas below will be subject to changes in street-use availability during construction.
More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: 2500 Quebec St from Broadway to Lane South
Schedule: Jan 4, 2021 - Dec 1, 2027</content>
<id>urn:uuid:733ce15d-2e24-4574-9627-f10d28964edb</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/8c9e9b93-e601-45b1-952d-5cfc44133302"/>
<published>2026-04-23T07:00:00Z</published>
<title>Broadway Subway – FULL Road Closure </title>
<updated>2026-04-23T21:32:48.1796633Z</updated>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

Full Closures:
•	Quebec St from E Broadway to the lane north
•	Quebec St from E Broadway to the lane south
•	Yukon St from W Broadway to the lane south
•	Laneway south of Broadway from Ash to Cambie (at Cambie)
•	Laurel St from W Broadway to the lane north (1 lane open to emergency services) 
•	Laurel St from W Broadway to the lane south (1 lane open to emergency services) 
•	Cypress St from W Broadway to the lane north (Duration ~3 months for TBM Extraction)

Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
-	12th Ave 
-	Great Northern Way/2nd/6th/4th
-	Possibly 16th Ave as well, and in the False Creek area

More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at rapidtransitoffice@vancouver.ca
Location: Various Locations
Schedule: Jan 4, 2021 - Mar 31, 2026</content>
<id>urn:uuid:236fb081-0039-46e3-bb42-330d9fb45ca8</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1cbc4ee7-698c-4ceb-bcc7-9c9d5c2814d5"/>
<published>2024-05-16T07:00:00Z</published>
<title>Broadway Subway – FULL Road Closures</title>
<updated>2026-02-05T02:01:19.593541Z</updated>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

Full Closure
Location: Arbutus from W 8th Av to Broadway
Schedule: Jun 1, 2026 - Jun 6, 2026</content>
<id>urn:uuid:e924b007-9f7c-4bf9-8d97-9d69dfcdb445</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/b4535aa5-3c24-4e33-8199-566ed18de6c3"/>
<published>2026-06-02T07:00:00Z</published>
<title>Broadway Subway – FULL Road Closures </title>
<updated>2026-06-02T15:00:26.5374142Z</updated>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project Information 
www.broadwaysubway.ca
broadwaysubway@gov.bc.ca

Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114

Reduced Lanes: Broadway between Main Street and Quebec Street
Location: Broadway - Main Street to Quebec Street
Schedule: May 20, 2026 - Sep 30, 2026</content>
<id>urn:uuid:193904d6-f80f-4424-9ad3-b238afeb2dfd</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/89df52ca-14e1-4f07-96e9-409a7907ed07"/>
<published>2025-11-04T08:00:00Z</published>
<title>Broadway Subway – Reduced Lanes</title>
<updated>2026-05-20T17:00:36.8707249Z</updated>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Closure of 2500 Carolina from Broadway to alley south. Approx 10:00 to 18:00.
Location: 
Schedule: Aug 29, 2026</content>
<id>urn:uuid:5ede3cd5-5d49-4535-92a8-4eefb6343a8c</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ac31e55d-f605-4837-983c-a50fa5f38523"/>
<published>2026-01-02T08:00:00Z</published>
<title>Broadway and Carolina Block Party</title>
<updated>2026-01-02T19:44:39.8517998Z</updated>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Intersection of 800 Bute St and Rosemary Brown lane will be closed due to planned construction activities as part of the capital improvements project for Bute / Robson.  Drivers will be unable to travel east / west at this intersection due to existing pavement removal to facilitate new design related to capital project works being carried out.
Location: 
Schedule: May 5, 2025 - May 8, 2025</content>
<id>urn:uuid:174e33b4-518d-4361-b295-797796f7cdf4</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/6d243e08-0ace-46df-8b83-aaecd0fb1fa8"/>
<published>2025-05-05T07:00:00Z</published>
<title>Bute Robson Plaza construction</title>
<updated>2025-05-05T15:18:11.2692286Z</updated>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Construction for Bute-Robson Plaza (Eihu to Haro) continues until Q4 2025. 
Scope of Project: creating a permanent public space/plaza, continuation of the cycling facility, sidewalk widening along Robson St.
Traffic Impacts: Robson St. has re-opened to two-way traffic. 
Permanent closure of Bute b/w Haro and Robson St, Rosemary Brown lane and Haro St only thru traffic.


Location: Bute St from Haro St to Eihu Ln, Along Robson St ~50m on either side of Bute
Schedule: Jul 1, 2024 - Nov 30, 2025</content>
<id>urn:uuid:a1bf83f7-94b1-42c6-8c25-e637f396d872</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/8f67eb8f-aa60-4ad2-a7bb-9e266c3d228f"/>
<published>2024-07-03T07:00:00Z</published>
<title>Bute-Robson Plaza</title>
<updated>2026-02-15T02:01:11.9150208Z</updated>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Community party for the Mount Pleasant neighbourhood
Location: 100 E 8th Ave
Schedule: Aug 22, 2026</content>
<id>urn:uuid:3d2acb3f-40b1-4514-b395-d6d3203652b6</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/990e45e1-937a-4722-93f9-2d6f05a73ee9"/>
<published>2026-02-11T08:00:00Z</published>
<title>CANCELLED - 8th Ave Block Party </title>
<updated>2026-05-20T18:30:46.3968557Z</updated>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Permission to close and occupy the curb lane and sidewalk with a pedestrian provision on the 600-700 block of Quebec St to faciliate turf renewal at Andy Livingstone Park 
Location: Andy Livingstone Park
Schedule: Nov 3, 2025 - May 31, 2026</content>
<id>urn:uuid:cd77c589-d121-4897-9a9d-662175c320f5</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/77a109ff-3f59-4687-b1c7-6c02530bcd2c"/>
<published>2025-10-14T07:00:00Z</published>
<title>COV Parks - Andy Livingstone - Turf Field Renewal</title>
<updated>2026-04-18T01:01:08.2149651Z</updated>
</entry>
<entry>
<category term="Under Construction"/>
<content>Grind and Pave streets
Location:  2400 Lillooet St
Schedule: Jun 10, 2026 7:00 AM - 3:00 PM</content>
<id>urn:uuid:449ec017-4b40-430c-9d7b-352c6ca16209</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/68bb64fa-8c6c-4051-bb5b-3a8db6a32aad"/>
<published>2026-06-08T07:00:00Z</published>
<title>COV Streets - grind &amp; pave</title>
<updated>2026-06-08T21:19:45.7012955Z</updated>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>To support the Cambie Bridge seismic upgrade and meet the additional power requirements for Cooper Park, the electrical design includes the replacement and upgrade of two kiosks.

All excavation and road crossings will be completed by a contractor engaged by the City of Vancouver (COV). In addition, BC Hydro will engage its own contractor to carry out excavation and road crossings required to supply power to the kiosks.

This work is being coordinated with the Cambie Bridge PDB team; however, it is being delivered independently by the Electrical Design team.

Location: Under the bridge at 0 Block Nelson Street, heading toward Marina Side Crescent. Road crossings are located at Marina Side Crescent, 1000 Block Pacific Boulevard South, and 0 Block Nelson Street.

Schedule: Aug 3, 2026 - Oct 30, 2026</content>
<id>urn:uuid:9014cf10-dc1e-4135-8880-0b8118966b6b</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/f72258a1-0e4d-4c7d-86b5-f70649199f50"/>
<published>2026-02-19T08:00:00Z</published>
<title>Cambie Bridge Seismic Upgrade - Electrical Scope of work</title>
<updated>2026-02-19T21:54:18.7485994Z</updated>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Median work at Cambie and 31st
Location: 
Schedule: Jul 15, 2024 - Oct 29, 2024</content>
<id>urn:uuid:34aed077-9769-4ea6-a8a3-4d1c4f252995</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/fd155ff8-f2f9-474e-aee1-f9c47a70d829"/>
<published>2024-09-13T07:00:00Z</published>
<title>Cambie and 31st Green Infrastructure </title>
<updated>2024-09-13T17:15:36.4957939Z</updated>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Construction requires additional street use on Cambie, resulting in 1 lane Southbound from July 23 to Aug 3. 
W. 18th remains a FULL closure. 
Completion anticipated in Q1 2026

Location: W. 18th, Cambie to Tupper
Schedule: Jun 16, 2025 - Apr 17, 2026</content>
<id>urn:uuid:6002999d-a873-4693-a86c-2d8a3d9f4d9c</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/21c10050-74ba-4d33-93b4-2318ccbc14c8"/>
<published>2025-07-22T07:00:00Z</published>
<title>Cambie-18th Permanent Plaza Upgrade</title>
<updated>2026-03-13T21:04:00.9279448Z</updated>
</entry>
<entry>
<category term="Upcoming Project"/>
<content> Commercial Drive: North Grandview Highway to 1st Ave and intersecting streets
Location: 
Schedule: Sep 5, 2026</content>
<id>urn:uuid:aeb2ad76-44c0-457a-9af6-bef30d97805a</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/21458dd8-6e8f-4bf0-850b-beb975f99310"/>
<published>2026-05-20T07:00:00Z</published>
<title>Car Free Day Commercial Drive</title>
<updated>2026-05-20T16:47:51.5369636Z</updated>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Main Street: 10th Avenue to King Edward Avenue
Location: 
Schedule: Sep 13, 2026</content>
<id>urn:uuid:10e61db9-36ee-41d1-a8b7-672b127a47c2</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/8c36263c-80ef-4c9b-9c66-68ff6f366c92"/>
<published>2026-05-20T07:00:00Z</published>
<title>Car Free Day Main St</title>
<updated>2026-05-20T16:51:02.2561994Z</updated>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Celebrating our 17th year anniversary, a series of activities  will be presented to engage and connect our local  multicultural communities for their enjoyment to promote  and celebrate our Latin American Arts, Food and Culture. Carnaval del Sol, recreates the atmosphere of a vibrant city plaza in Latin America. The arts  showcased during this event include live musical bands, Native Canadian and Latin American  visual art, traditional folk dances, arts and crafts, dancing and  culinary shows
Location: Jonathon Roger's Park, 100- 300 W 8th ave, 2300 Columbia, 100 W 7th and 2300 Manitoba - *full closure along 100 - 300 W 8th, 2300 Columbia and Manitoba, 2300 - 2400 Alberta from lane north and south of W 8th*.

parking restriction: unit 00-300 W 8th Ave, Yukon to Ontario, 2200-2400 Manitoba &amp; Columbia, 2300-2400 Alberta
Schedule: Jul 8, 2026 - Jul 13, 2026</content>
<id>urn:uuid:46e78053-1d47-40a5-9eb5-f9d820e5f035</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/23f8146e-c7d4-4da9-986a-b3359f1247fd"/>
<published>2026-03-10T07:00:00Z</published>
<title>Carnaval Del Sol</title>
<updated>2026-06-03T18:50:23.0170967Z</updated>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>This proactive work is part of the City’s ongoing efforts to ensure public safety at this former landfill site to support long-term safety and mitigate any potential buildup of methane gas. The City is installing four wind-activated vertical vents at specific areas of China Creek South Park. These vents will safely release methane that may accumulate underground. 
Location: 
Schedule: Sep 17, 2025 - Sep 27, 2025</content>
<id>urn:uuid:05184689-f838-45ce-a847-a1e09a1c857a</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/dcdb2fb8-cfe9-4853-bacf-21c7759b63f4"/>
<published>2025-09-24T07:00:00Z</published>
<title>China Creek South Park - Gas Vent Installation</title>
<updated>2026-04-18T01:01:08.2149651Z</updated>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Feb 24, 2025 - Mar 21, 2025</content>
<id>urn:uuid:b961726a-d86d-4941-a372-cb32d201aa0e</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca65b04a-c767-4be5-9673-3442c68f856d"/>
<published>2025-02-25T08:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-19T21:12:45.8650112Z</updated>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Contact: Streets.Restoration@vancouver.ca
Location: 
Schedule: Mar 15, 2025 - Apr 15, 2025; Weekdays</content>
<id>urn:uuid:67234c89-3586-4819-8a87-d646ba0bb73b</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e8a0f9e9-392b-4e64-a3b1-934a40bfb185"/>
<published>2025-03-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)</title>
<updated>2025-03-28T15:10:22.2529408Z</updated>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: May 15, 2025 - Jun 15, 2025</content>
<id>urn:uuid:9f1084e3-ff9b-4329-abdc-086f6c647020</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1d0bace0-a9c9-42c8-a53d-22d3eb9916a0"/>
<published>2025-05-15T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-05-26T15:46:20.1254685Z</updated>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs

Location: 
Schedule: Apr 15, 2025 - May 15, 2025</content>
<id>urn:uuid:8eeaf83b-4fd9-4efa-ae5e-ce199037bd3c</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a9e9a055-e34c-4216-861b-239a0a018f24"/>
<published>2025-05-01T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-04-30T18:13:48.6383035Z</updated>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Jun 15, 2025 - Jul 15, 2025</content>
<id>urn:uuid:beb55c06-fa96-47e0-aa60-a549e9052196</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddb69428-73cf-4c32-866e-907bc1fd1fbd"/>
<published>2025-06-24T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP) </title>
<updated>2025-07-10T16:17:45.7479031Z</updated>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 5, 2025 - Aug 23, 2025</content>
<id>urn:uuid:2ec421d8-66ae-4a3c-b951-83886e423f63</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/70b9f514-8251-49cd-9483-17f0d9376d99"/>
<published>2025-08-05T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-08-05T16:51:37.8381377Z</updated>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Sep 15, 2025 - Sep 29, 2025</content>
<id>urn:uuid:3d4ed731-b140-4520-91f9-90342f8b8b65</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/dda1ffda-3109-444a-a777-ab7ec086e094"/>
<published>2025-09-18T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-09-18T16:36:09.3921386Z</updated>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>One (1) year pilot project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Aug 21, 2025 - Sep 21, 2025; Weekdays</content>
<id>urn:uuid:3abd3d22-9c3e-4c43-8770-bb6328add3ac</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d39f2623-3141-4451-98ca-a51ddb6cf27f"/>
<published>2025-08-21T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-12-05T17:12:50.6177833Z</updated>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Oct 15, 2025 - Nov 15, 2025</content>
<id>urn:uuid:89c8a9c3-1531-4031-ac97-71addb601b4b</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/dca65fde-26de-4ff1-a588-802ab790b1bb"/>
<published>2025-10-20T07:00:00Z</published>
<title>City-wide Cut Repair Pilot Project (CCRP)  </title>
<updated>2025-10-20T21:07:39.0613911Z</updated>
</entry>
<entry>
<category term="Under Construction"/>
<content>Project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs. 
Location: 
Schedule: Jun 1, 2026 - Jun 30, 2026</content>
<id>urn:uuid:2cd75276-16eb-46e6-b225-45a5172b0ac9</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/414de0c7-c443-4a14-918e-7879deb2d0bb"/>
<published>2026-06-04T07:00:00Z</published>
<title>City-wide Cut Repair Program (CCRP)  </title>
<updated>2026-05-28T22:31:13.4912368Z</updated>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Project repairing aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Apr 23, 2026 - May 8, 2026</content>
<id>urn:uuid:37a4a446-ab67-4108-8056-c2473232485d</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/618f5b3a-1d35-4547-9a52-18598c012913"/>
<published>2026-04-23T07:00:00Z</published>
<title>City-wide Cut Repair Program (CCRP)  </title>
<updated>2026-05-08T19:48:00.2903855Z</updated>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street repair program targeting aging temporary patches (cuts) in street infrastructure such as Curbs, Sidewalks and Road surfaces. Project is being completed by the City's contractor All Roads. Public impacts should be minor as most work locations should be completed within 3 or 4 days. We appreciate your patience and understanding during these ongoing repairs
Location: 
Schedule: Feb 23, 2026 - Mar 20, 2026</content>
<id>urn:uuid:d4b022e2-3280-43a3-bcf1-1a90d39fbda6</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e77049bd-78b1-4dbd-94b8-2b05d470247a"/>
<published>2026-02-19T08:00:00Z</published>
<title>City-wide Cut Repair Project  </title>
<updated>2026-02-26T22:30:08.9802006Z</updated>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street Renewal - Dates TBC
Location: Clark Dr  - E 1st Av to E 12th Av

Schedule: Jul 1, 2026 - Sep 30, 2026</content>
<id>urn:uuid:18add264-b081-4414-9efd-c925df9c1c94</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/af633ba5-f3fa-4127-b933-ad1819deab3a"/>
<published>2026-02-02T08:00:00Z</published>
<title>Clark Dr Street Renewal</title>
<updated>2026-03-30T21:51:59.5617724Z</updated>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Seal replacement across on roadway and both sidewalks on W Cordova Street near Howe Street Intersection.

Rolling closures over multiple lanes required on Apr 30. Traffic at intersection of Howe and W Cordova may also be impacted.

Work extended to May 5.
Location: 
Schedule: Multiple occurrences as follows:
- Apr 30, 2026 (7 AM - 8 PM)
- May 5, 2026 (7 AM - 8 PM)
</content>
<id>urn:uuid:1a8af675-433a-4406-835d-8ead8705744b</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/072d600b-ef02-4bd2-b634-1fb447d56f33"/>
<published>2026-04-01T07:00:00Z</published>
<title>Cordova Viaduct Seal Replacement</title>
<updated>2026-04-30T23:21:20.7572292Z</updated>
</entry>
<entry>
<category term="Under Construction"/>
<content>Work will begin just north of Memorial Park on Highbury St, heading north toward W 29th Avenue 
Location: 
Schedule: Apr 1, 2026 - Sep 30, 2026</content>
<id>urn:uuid:5a1721d7-e6a3-4083-b10a-821810966a69</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/15675431-2744-452d-8953-b27b0d4c1fb3"/>
<published>2026-03-10T07:00:00Z</published>
<title>Dunbar West Sewer Package </title>
<updated>2026-03-10T17:56:21.2286284Z</updated>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>City's external contractor will be working at Dunlevy and Pender to construct a raised intersection and the associated infrastructure upgrades. Construction is scheduled to take place during normal working hours weekdays May 9 to mid-June, including excavation, gravel base compaction, concrete works, utility adjustments, asphalt paving, bio-retention bulge, street lighting upgrades, grass boulevards, and road marking restoration.
Location: Dunlevy and Pender intersection.
Schedule: May 9, 2025 - Jun 13, 2025</content>
<id>urn:uuid:be6e2a33-fa1d-48e5-abf5-edc91307c093</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/b5807bac-ad4e-45b0-8a95-44912c68f746"/>
<published>2025-04-24T07:00:00Z</published>
<title>Dunlevy and Pender - Raised Intersection and Green Infrustructure</title>
<updated>2025-04-24T19:21:08.7229018Z</updated>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>E 19th Av - Knight St to 3525 Dumfries St        Jul 2026 - Aug 2026
E 20th Av - Clark Dr to Knight St                       Aug 2026 - Sep 2026




Location: 


Schedule: Jul 16, 2026 7:00 AM - Aug 27, 2026 3:00 PM</content>
<id>urn:uuid:581fc1c1-9878-434b-84d7-a0fe0dea6dfb</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/42f7b9af-7654-458e-a7d4-4b83ceb4037d"/>
<published>2026-02-24T08:00:00Z</published>
<title>E 19th Av &amp; E 20th Av</title>
<updated>2026-05-28T18:59:48.3347678Z</updated>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>E 20th Av - Clark Dr to Knight St                   Oct 2025 to Nov 2025 



Location: E 20th Av - Clark Dr to Knight St


Schedule: Oct 29, 2025 - Nov 19, 2025; Weekdays; 7:00 AM - 3:00 PM</content>
<id>urn:uuid:28df628a-e91c-4687-a625-3389f83cb9d7</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/7a13bc14-9d74-4541-81cf-7f5fe2bbc51b"/>
<published>2025-01-07T08:00:00Z</published>
<title>E 20th Av - Clark Dr to Knight St</title>
<updated>2026-04-21T21:08:14.2337229Z</updated>
</entry>
<entry>
<category term="Upcoming Project"/>
<content> E 3rd Av - Renfrew St to Rupert St -  OCT 2026 - DEC 2026 
E 2nd Av - Renfrew St to Nootka St -  DEC 2026 - JAN 2027

E 2nd Av - Nootka St to Lillooet St - 
Location: 
Schedule: Oct 7, 2026 - Jan 15, 2027; Weekdays; 7:00 AM - 3:00 PM</content>
<id>urn:uuid:5304b9ab-cace-40ce-a42b-979a7cc785f6</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/398d48e5-4d1e-46ad-b232-4c280ad5292c"/>
<published>2026-04-02T07:00:00Z</published>
<title>E 2nd Ave and E 3rd Ave</title>
<updated>2026-05-28T19:12:08.8889779Z</updated>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>E King Edward Av - St Catherines St to Knight St           Jul 2026 - Dec 2026
E King Edward Av - Knight St to Kingsway                       Nov 2026 - Feb 2027

Location:                        
Schedule: Aug 28, 2026 - Feb 5, 2027; Weekdays; 7:00 AM - 3:00 PM</content>
<id>urn:uuid:798e7f3c-949d-4a50-ba32-2ac726f46cd1</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/0a4e0683-e652-49af-b3ef-d40722ba1732"/>
<published>2025-01-01T08:00:00Z</published>
<title>E King Edward Av, St Catherines St to Kingsway</title>
<updated>2026-05-28T19:00:19.1177794Z</updated>
</entry>
<entry>
<category term="Under Construction"/>
<content>Streets concrete and paving renewal works. 
Location: 
Schedule: Apr 1, 2026 - Nov 15, 2026</content>
<id>urn:uuid:d98f52c6-b272-42d1-8ef5-c02aeea53385</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/5418cb71-8d34-4fdf-afdd-8171f0c25fb4"/>
<published>2026-03-17T07:00:00Z</published>
<title>E. 49th Ave Streets Renewal, Knight to Killarney</title>
<updated>2026-03-18T15:50:38.0640752Z</updated>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Closure of 1500 W. 66th from Granville St to the alleyway. 
Location: 1500 block West 66th Av
Schedule: Jun 27, 2026</content>
<id>urn:uuid:08394aa8-8e36-4735-9412-f4e7d9541cca</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/c860ce6a-4623-4b4e-a812-08a48112557d"/>
<published>2026-03-02T08:00:00Z</published>
<title>EVENT - Tour De Marpole</title>
<updated>2026-03-02T22:18:17.0367832Z</updated>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Triathlon around Templeton Park
Location: 
Schedule: Jun 14, 2026</content>
<id>urn:uuid:80989dda-c94f-411f-948c-c271ce895d8e</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/65b82174-d5ca-4665-93dc-f0bd776a919f"/>
<published>2026-05-31T07:00:00Z</published>
<title>EVENT - Tri It Triathlon</title>
<updated>2026-03-10T21:10:51.9860069Z</updated>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Part of Growth Triggered Upgrades Program
Spring 2026 Construction 

The high-level objective of the project is to replace the existing Combined Sewer System (CSS) with separated sanitary and storm lines to eliminate sewer overflow and prevent flooding by increasing sewer capacity along E 35th Avenue.

The Project includes,
1) separation of approximately 75 m of combined sewer from east 35th Avenue from Main Street to Quebec Street
2) pavement restoration and markings associated with the sewer separation and associated road restorations.
3) mill and overlay at 50mm depth of the existing pavement that will not be included in the trench cut restoration.
Location: E 35th Av from Main St. to 5100 Quebec St (Laneway) and 5100 / 5000-4900 Block of Main - Parking Lanes Closed, both sides
Schedule: Nov 13, 2025 - Mar 9, 2026</content>
<id>urn:uuid:9da0d86d-85ae-4d18-bea4-19cc5922efd5</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/94dc0ade-f977-484d-bab7-f9f8a4ebed4c"/>
<published>2026-01-19T08:00:00Z</published>
<title>East 35th Ave Utility Upgrades (GTUUP)</title>
<updated>2026-03-02T19:28:41.4813194Z</updated>
</entry>
<entry>
<category term="Under Construction"/>
<content>Dual use pathway on north side E Broadway connecting Nootka and Lillooet.  New bike crossings at Nootka.
Grinding and paving works on Lillooet St to be completed June 10th, 2026 - westbound curb lane on E Broadway at Lillooet from 7:00 AM to 3:00 PM to stage trucking and equipment
Location: 3000 block E Broadway
Schedule: May 4, 2026 - Jun 10, 2026</content>
<id>urn:uuid:7cdb5ff0-734f-4b76-9e9d-0d7f359bd774</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/31243c7a-55e1-4d05-a43f-c2d1bd1e80ad"/>
<published>2026-04-01T07:00:00Z</published>
<title>Eastside Crosscut Phase I</title>
<updated>2026-06-08T21:21:20.0404253Z</updated>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Full Closure
Location: BC Place and Surrounding Area
Schedule: Multiple occurrences as follows:
- Jun 13, 2026 11:00 AM - Jun 14, 2026 6:00 AM
- Jun 18, 2026 5:00 AM - Jun 19, 2026 12:01 AM
- Jun 21, 2026 8:00 AM - Jun 22, 2026 3:00 AM
- Jun 24, 2026 2:00 AM - 9:00 PM
- Jun 26, 2026 10:00 AM - Jun 27, 2026 5:00 AM
- Jul 2, 2026 10:00 AM - Jul 3, 2026 6:00 AM
- Jul 7, 2026 3:00 AM - 11:00 PM
</content>
<id>urn:uuid:07339053-4557-4dad-951d-2ea23c6e18cc</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/9999274c-73fd-435a-a1aa-5288ae6085aa"/>
<published>2026-05-25T07:00:00Z</published>
<title>FIFA - Match Day Road Closure</title>
<updated>2026-05-26T15:43:47.2597827Z</updated>
</entry>
<entry>
<category term="Road Closure"/>
<content>Full closure 
Location: Pacific - Nelson to Carrall
Schedule: May 23, 2026 - Jul 31, 2026</content>
<id>urn:uuid:9bebf31c-5db8-4c55-bd8a-b5c8d51b48bb</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a140604c-784d-4a03-a7d5-b28af5e3e8e3"/>
<published>2026-04-28T07:00:00Z</published>
<title>FIFA - full closure</title>
<updated>2026-05-25T21:19:53.1525111Z</updated>
</entry>
<entry>
<category term="Under Construction"/>
<content>Signage required 

Please sign the south side of 1100blk Pacific Blvd from Cambie St to 40m west of Cambie St. Pay Station: 32-11-20

Effective dates:
Monday March 30, 2026 to July 31, 2026
7AM to 7PM

Permission to occupy and close the following locations for hoarding/scaffolding and cable bridge for FIFA:

Please refer to TO-2026-01718 &amp; TO-2026-01537
Location: 
Schedule: Mar 30, 2026 - Jul 31, 2026</content>
<id>urn:uuid:9f06b37f-970f-433b-9413-1835cbcd7bdf</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/18634ab8-7fc4-4cc4-92eb-0494819dad30"/>
<published>2026-03-19T07:00:00Z</published>
<title>FIFA CABLE BRIDGE</title>
<updated>2026-04-29T17:41:53.4187262Z</updated>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Permission to close and occupy the curb lanes for Accredited FIFA Vehicles Only.
Location: Multiple locations
Schedule: Jun 11, 2026 - Jul 8, 2026</content>
<id>urn:uuid:002e2ae0-d2da-47d7-8a94-6f4de3023443</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/eba3e7ca-b443-4eb1-9d3b-5da85a0dbf7e"/>
<published>2026-05-26T07:00:00Z</published>
<title>FIFA Curb Space Usage</title>
<updated>2026-05-26T19:31:50.5295575Z</updated>
</entry>
<entry>
<category term="Under Construction"/>
<content>Permission to close and occupy the curb lanes for FIFA related activities.

2800blk Oxford St
3100blk E Pender St
Location: 
Schedule: Multiple occurrences as follows:
- Jun 9, 2026 7:00 AM - 7:00 PM (Both sides of 2800blk Oxford St from Renfrew St to 50m west of Renfrew St)
- Jul 20, 2026 7:00 AM - 7:00 PM (Both sides of 2800blk Oxford St from Renfrew St to 50m west of Renfrew St &amp; North side of 3100blk E Pender St from Lillooet St to 60m east of Lillooet St)
- Jun 10, 2026 7:00 AM - 7:00 PM (North side of 3100blk E Pender St from Lillooet St to 60m east of Lillooet St)
</content>
<id>urn:uuid:20d8e93d-4d74-49f8-ac04-3d025d2620ab</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/5b0d540f-ae1e-49f7-a316-63a3fd499f6e"/>
<published>2026-06-02T07:00:00Z</published>
<title>FIFA Fan Festival Curb Space Use</title>
<updated>2026-06-02T17:55:07.5403592Z</updated>
</entry>
<entry>
<category term="Under Construction"/>
<content>Permission to close and occupy the curb lanes for FIFA related activities.

Effective dates &amp; times: Saturday May 30th to Wednesday July 22nd – Full-time

East side of 300blk Renfrew St from Franklin St to E Hastings St

Location: 
Schedule: May 30, 2026 - Jul 22, 2026</content>
<id>urn:uuid:27fe71e3-9fb8-44b2-b282-48a0c14972da</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/4cabb692-0f70-4971-aa74-4f6dc22340bc"/>
<published>2026-05-01T07:00:00Z</published>
<title>FIFA Fan Festival Curb Space Use</title>
<updated>2026-05-01T19:26:57.163206Z</updated>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Permission to close and occupy the curb lanes for KIA Shuttle service to FIFA Fan Festival.

Effective dates &amp; times:
Friday July 3rd to Saturday July 4th
Friday July 10th to Saturday July 11th
Friday July 17th to Sunday July 19th
9AM to 6PM

Location:
South side of 2800blk E 12th Ave from Kaslo St to driveway east of Kaslo St
Location: 
Schedule: Multiple occurrences as follows:
- Jul 3, 2026 9:00 AM - Jul 4, 2026 6:00 PM (Friday &amp; Saturday only)
- Jul 10, 2026 9:00 AM - Jul 11, 2026 6:00 PM (Friday &amp; Saturday only)
- Jul 17, 2026 9:00 AM - Jul 19, 2026 6:00 PM (Friday, Saturday, &amp; Sunday only)
</content>
<id>urn:uuid:5135ecb9-ca32-4c5f-9d7a-cad794ddb1a0</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/340bf0fd-a858-48df-8fe3-d24e9ed818f7"/>
<published>2026-05-01T07:00:00Z</published>
<title>FIFA Fan Festival Curb Space Use</title>
<updated>2026-05-01T19:32:30.6632254Z</updated>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Permission to close and occupy the curb lanes for FIFA related activities.

Effective dates &amp; times: Thursday June 11th to Monday July 20th – Full-time

Locations:
West side of 3200blk Bridgeway St from pole 22/83 to Miller Dr
South side of 2700blk E 29th Ave from 40m east of Slocan St to Modo Pole
South side of 2900-3000blk E Hastings St from Renfrew St to Lillooet St
East side of 00blk N Renfrew St from Dundas St to Oxford St
East side of 100blk N Renfrew St from Oxford St to 20m north of Oxford St
East side of 00blk Renfrew St from Dundas St to Triumph
East side of 500-600blk Renfrew St from Carlisle St to L/S of Turner St
East side of 1300-1400blk Renfrew St from Charles St to L/S Kitchener St
West side of 2700blk Renfrew St from E 12th Ave to Bradfield Court
East 2700blk Renfrew St from approx. 8m north of pole 10/26 to pole 08/26
West side of 3800blk Slocan St from E 22nd Ave to approx. 22m south of E 22nd Ave
Location: 
Schedule: Jun 11, 2026 - Jul 20, 2026</content>
<id>urn:uuid:bfa7df48-6fd4-4c58-97ec-2b62faf9cd7f</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cdeaab47-86b0-4820-b279-933be86712d5"/>
<published>2026-05-01T07:00:00Z</published>
<title>FIFA Fan Festival Curb Space Use</title>
<updated>2026-05-01T19:24:47.1896798Z</updated>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Permission to close and occupy the curb lanes during all of the Match Days for FIFA related activities.

Saturday June 13th
Thursday June 18th
Sunday June 21st
Wednesday June 24th
Friday June 26th
Thursday July 2nd
Tuesday July 7th
Location: Multiple Locations
Schedule: Jun 13, 2026 - Jul 7, 2026</content>
<id>urn:uuid:ec3379b0-6df3-40fe-9ed6-2479cc832a66</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/0c847d31-2d4c-4c02-8879-60afdde36bf2"/>
<published>2026-05-26T07:00:00Z</published>
<title>FIFA Match Days</title>
<updated>2026-05-26T19:25:29.2588315Z</updated>
</entry>
<entry>
<category term="Under Construction"/>
<content>Permission to close and occupy the curb lane of the following locations during the FIFA World Cup.

East side of 200blk Cambie St from Water St to Trounce Alley

West side of 200blk Cambie St from L/S Water St to W Cordova St 

Effective Dates:
Saturday May 16th to Wednesday July 15th – Full-time
Location: East side of 200blk Cambie St from Water St to Trounce Alley
West side of 200blk Cambie St from L/S Water St to W Cordova St 
Schedule: May 16, 2026 - Jul 15, 2026</content>
<id>urn:uuid:e19eb4e3-1625-4b0f-966a-1ce8410bba9c</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/6dee59c5-f711-424b-b4b4-0142b631cb6c"/>
<published>2026-04-13T07:00:00Z</published>
<title>FIFA Parking</title>
<updated>2026-06-01T21:29:51.4807924Z</updated>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Permission to close and occupy the curb lane of the following locations during the FIFA World Cup.

North and south sides of 2900blk E 45th Ave from Rupert St to approximately 50m west of Rupert St

Effective Dates:
Thursday June 11th to Saturday July 11th – Full-time
Location: North and south side of 2900blk E 45th Ave from Rupert St to approximately 50m west of Rupert St
Schedule: Jun 11, 2026 - Jul 11, 2026</content>
<id>urn:uuid:be85a7cd-1411-4245-9705-e4369b6d74cc</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/418bcbe0-bb0b-403f-803f-b06a91065c21"/>
<published>2026-04-13T07:00:00Z</published>
<title>FIFA Parking</title>
<updated>2026-04-14T17:08:56.7339918Z</updated>
</entry>
<entry>
<category term="Under Construction"/>
<content>Permission to close and occupy the curb lane of the following locations during the FIFA World Cup.

North side of 900blk Pacific Blvd from Nelson St to 50m east of Nelson St
South side of 700blk Pacific Blvd from pole 10/07 to pole 08/07
South side of 700blk Pacific Blvd from pole 04/07 to Carrall St
East side of 700blk Pat Quinn Way from Pacific Blvd to Pole 08/07
West side of 700blk Pat Quinn Way from Pole 09/07 to Expo Blvd
South side of 1100blk Pacific Blvd from Davie St to Cambie St
North side of 00blk Pacific Blvd from Pat Quinn Way to Carrall St
West side of 00blk Nelson St from Expo Blvd to Pacific Blvd

Effective Dates:
Saturday May 23rd to Wednesday July 15th – Full-time
Location: Please see description.
Schedule: May 23, 2026 - Jul 14, 2026</content>
<id>urn:uuid:8aa9ad67-c143-4de1-b752-392e7f5ef962</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/0752710f-1539-40e8-86f3-7f7551589c3e"/>
<published>2026-04-13T07:00:00Z</published>
<title>FIFA Parking</title>
<updated>2026-04-13T19:46:26.5766006Z</updated>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Permission to close and occupy the curb lane of the following locations during the FIFA World Cup.

North side of 500blk Evans Ave from Thornton St to 100m east of Thornton St – Multiple effective dates

Effective Dates:
Friday June 12, 2026 – 12:00am to 11:59pm
Wednesday June 17, 2026 – 12:00am to 11:59pm
Saturday June 20, 2026 – 12:00am to 11:59pm
Wednesday June 24, 2026 – 12:00am to 11:59pm
Friday June 26, 2026 – 12:00am to 11:59pm
Wednesday July 1, 2026 – 12:00am to 11:59pm
Monday July 6, 2026 – 12:00am to 11:59pm
Location: North side of 500blk Evans Ave from Thornton St to 100m east of Thornton St
Schedule: Multiple occurrences as follows:
- Jun 12, 2026
- Jun 17, 2026
- Jun 20, 2026
- Jun 24, 2026
- Jun 26, 2026
- Jul 1, 2026
- Jul 6, 2026
</content>
<id>urn:uuid:0e89369d-cb69-4bbb-b1c9-f5794abeee21</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/9a6308ca-42e8-486a-9032-aac30568d6e0"/>
<published>2026-04-13T07:00:00Z</published>
<title>FIFA Parking</title>
<updated>2026-04-13T20:03:24.3218106Z</updated>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Permission to close and occupy the curb lane for FIFA related activities.
Location: Multiple locations
Schedule: Jun 12, 2026 - Jul 19, 2026</content>
<id>urn:uuid:7152e725-cf5a-4e42-aed8-196f2b784429</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/50048e6c-f176-49bc-a301-3925acb36360"/>
<published>2026-05-26T07:00:00Z</published>
<title>FIFA Temporary Special Zones</title>
<updated>2026-05-26T19:37:23.3416036Z</updated>
</entry>
<entry>
<category term="Under Construction"/>
<content>Curb Space Closure @ Killarney Park
Location: 6100-6300 Raleigh St  - E / 
2800 E 46th Av - S / 
6000 Killarney St - E / 
2900 E 45th Av - S / 
6000-6100 Rupert St - SW / 
6200-6400 Kerr St - W / 
3000 E 49th Av - N / 
2800 E 48th Av - N / 
6300 Killarney St - W
Schedule: Jun 1, 2026 - Aug 1, 2026</content>
<id>urn:uuid:7ddfd38b-f761-4bb9-b6ee-1219eaeffaea</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/739afc7a-9cc4-41cd-9de1-45c1e517325d"/>
<published>2025-10-14T07:00:00Z</published>
<title>FWC26 - Curb Space Requirement</title>
<updated>2026-01-16T21:50:06.3269658Z</updated>
</entry>
<entry>
<category term="Under Construction"/>
<content>Curb Space Closure @ Pinnacle Hotel Harbourfront


Location: 1100 W Hastings St - N / 
1100 W Cordova St - S
Schedule: Jun 1, 2026 - Aug 1, 2026</content>
<id>urn:uuid:04c2ba0e-03b4-4ea3-b4fa-07616db438cb</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a69e0688-0335-4cef-baa0-4b90d5cb1003"/>
<published>2026-01-16T08:00:00Z</published>
<title>FWC26 - Curb Space Requirement</title>
<updated>2026-01-16T21:49:36.7847005Z</updated>
</entry>
<entry>
<category term="Under Construction"/>
<content>Curb Space Closure @ Thornton Park
Location: 1100-1300 Main Street - E / 
200 National Av - S / 
1100-1200 Station St - W / 
200 Terminal Av - N
Schedule: Jun 1, 2026 - Aug 1, 2026</content>
<id>urn:uuid:0878ee06-6d0a-4b91-96e2-da1178087caa</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/fc7039cb-3b49-4d2c-9861-19bcae14e176"/>
<published>2026-01-16T08:00:00Z</published>
<title>FWC26 - Curb Space Requirement</title>
<updated>2026-01-16T21:54:59.4637586Z</updated>
</entry>
<entry>
<category term="Under Construction"/>
<content>Curb Space Closure

Location: 2800 E Hastings St - N (From Renfrew to Mid Block Kaslo - North Side)


Schedule: Jun 1, 2026 - Aug 1, 2026</content>
<id>urn:uuid:60bf92d8-746b-429e-adf8-c929e6458651</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/45522b9b-ed14-4d86-bb9f-79bccba1f950"/>
<published>2026-01-30T08:00:00Z</published>
<title>FWC26 - Parking Restrictions for TransLink</title>
<updated>2026-01-30T21:54:26.4132669Z</updated>
</entry>
<entry>
<category term="Under Construction"/>
<content>Curb Space Closure
Location: 600 Burrard St - E (From Georgia to Dunsmuir - East Side)
Schedule: Jun 1, 2026 - Aug 1, 2026</content>
<id>urn:uuid:32bdc7d0-1729-493e-b230-2de16b3c3806</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/aa833c84-6f59-4300-adaf-833936fb541f"/>
<published>2026-01-30T08:00:00Z</published>
<title>FWC26 - Parking Restrictions for TransLink</title>
<updated>2026-01-30T17:28:22.6193271Z</updated>
</entry>
<entry>
<category term="Under Construction"/>
<content>Curb Space Closure

Location: 2600-2700 Renfrew St - W (From Bradfield Court to 10th Av - West Side)

Schedule: Jun 1, 2026 - Aug 1, 2026</content>
<id>urn:uuid:c3bacedb-e469-4852-9d92-dee9f4cf9e70</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/47f6ebdd-5c37-4e8d-8628-a8eefa3557b6"/>
<published>2026-01-30T08:00:00Z</published>
<title>FWC26 - Parking Restrictions for TransLink</title>
<updated>2026-01-30T22:08:05.6973172Z</updated>
</entry>
<entry>
<category term="Under Construction"/>
<content>Curb Space Closure

Location: 1400 Station St - W (From Terminal to Central - West Side)

Schedule: Jun 1, 2026 - Aug 1, 2026</content>
<id>urn:uuid:d746d51f-9c86-4bb8-9747-407443c2c17a</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/b3c9a31e-f623-4b95-b73f-a530dee08856"/>
<published>2026-01-30T08:00:00Z</published>
<title>FWC26 - Parking Restrictions for TransLink</title>
<updated>2026-01-30T21:47:47.8083507Z</updated>
</entry>
<entry>
<category term="Under Construction"/>
<content>Curb Space Closure

Location: 300 Davie St - S (From Homer st to Hamilton St - South Side)

Schedule: Jun 1, 2026 - Aug 1, 2026</content>
<id>urn:uuid:9f6d45ed-e0a9-44dc-8538-39a932899da0</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/3d18cc55-af7c-4125-9f7e-e96c2aa175a2"/>
<published>2026-01-30T08:00:00Z</published>
<title>FWC26 - Parking Restrictions for TransLink</title>
<updated>2026-01-30T21:31:25.3523277Z</updated>
</entry>
<entry>
<category term="Under Construction"/>
<content>Curb Space Closure
Location: 700 - 1000 Great Northern Way - N (From Foley St to Glen Dr - North Side)
Schedule: Jun 1, 2026 - Aug 1, 2026</content>
<id>urn:uuid:6ec26860-61a4-4a44-a1e8-0937824b523a</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1a2f6972-b266-4dd9-b02d-3cb7151db781"/>
<published>2026-01-30T08:00:00Z</published>
<title>FWC26 - Parking Restrictions for TransLink</title>
<updated>2026-01-30T21:25:09.9741864Z</updated>
</entry>
<entry>
<category term="Under Construction"/>
<content>Curb Space Closure

Location: 2700 E 29th Av - S (From Slocan St to Atlin St - South Side)

Schedule: Jun 1, 2026 - Aug 1, 2026</content>
<id>urn:uuid:5fa62115-8b10-4a5c-b0f3-542b7242d999</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e73608a2-21ce-4ee2-8c1a-3ab490c3a2a3"/>
<published>2026-01-30T08:00:00Z</published>
<title>FWC26 - Parking Restrictions for TransLink</title>
<updated>2026-01-30T22:10:20.4111466Z</updated>
</entry>
<entry>
<category term="Under Construction"/>
<content>Curb Space Closure
Location: 200 E 10th Av - N (From Watson to Kingsway - North Side)
Schedule: Jun 1, 2026 - Aug 1, 2026</content>
<id>urn:uuid:663000d5-99eb-4f13-a1d6-a2f1295d9ec1</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/7d8c3b0f-7df9-4508-8447-317d65d80e74"/>
<published>2026-01-30T08:00:00Z</published>
<title>FWC26 - Parking Restrictions for TransLink</title>
<updated>2026-01-30T17:17:19.4100336Z</updated>
</entry>
<entry>
<category term="Under Construction"/>
<content>Curb Space Closure
Location: 200 National Av - N (From Main St to Station St - North Side)
Schedule: Jun 1, 2026 - Aug 1, 2026</content>
<id>urn:uuid:226fd784-6245-4057-b39e-dde00054e0fd</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d3f3877c-a67a-46f7-b247-14d6701ffd04"/>
<published>2026-01-30T08:00:00Z</published>
<title>FWC26 - Parking Restrictions for TransLink</title>
<updated>2026-01-30T17:15:30.6160605Z</updated>
</entry>
<entry>
<category term="Under Construction"/>
<content>Curb Space Closure

Location: 0 Renfrew St - E (From Oxford to Triumph St - East Side)

Schedule: Jun 1, 2026 - Aug 1, 2026</content>
<id>urn:uuid:d6fc0ce3-62c1-4fe1-ba2e-3e83d92207a7</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/8c634e6a-857d-4b21-8e68-791f950acab6"/>
<published>2026-01-30T08:00:00Z</published>
<title>FWC26 - Parking Restrictions for TransLink</title>
<updated>2026-01-30T21:51:33.9139574Z</updated>
</entry>
<entry>
<category term="Under Construction"/>
<content>Curb Space Closure

Location: 900	Renfrew St - E (From Parker to Adanac - East Side - from 8:00pm to 2:00am)

Schedule: Jun 1, 2026 - Aug 1, 2026; All days; 8:00 PM - 2:00 AM</content>
<id>urn:uuid:0e2b73d3-5300-4082-88fc-1aac65f595c5</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/0f6e4e2f-bb98-4cb1-aa6e-98fd0a65e5e8"/>
<published>2026-01-30T08:00:00Z</published>
<title>FWC26 - Parking Restrictions for TransLink</title>
<updated>2026-01-30T22:04:51.9155335Z</updated>
</entry>
<entry>
<category term="Under Construction"/>
<content>Curb Space Closure

Location: 1400-1600 Station St - E (From Industrial Av to Terminal Av - East Side)

Schedule: Jun 1, 2026 - Aug 1, 2026</content>
<id>urn:uuid:fa9d5cca-24bc-43d3-82d5-69138c27f007</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/2b7efd36-2d06-4d2d-a691-4779f62454fe"/>
<published>2026-01-30T08:00:00Z</published>
<title>FWC26 - Parking Restrictions for TransLink</title>
<updated>2026-01-30T21:33:43.6333147Z</updated>
</entry>
<entry>
<category term="Under Construction"/>
<content>Curb Space Closure
Location: 1400 Station St - both sides of the street

Schedule: Jun 1, 2026 - Aug 1, 2026</content>
<id>urn:uuid:1a89a195-a4dc-41cb-8ab7-f512c3e50b9a</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a0cae651-65c3-4ffd-9590-31a45ae834ab"/>
<published>2026-01-16T08:00:00Z</published>
<title>FWC26 - Translink Parking and Bus Zone</title>
<updated>2026-01-16T21:57:37.7595175Z</updated>
</entry>
<entry>
<category term="Under Construction"/>
<content>Curb Space Closure

Location: 3200-4000 Granville St - E

Schedule: Jun 1, 2026 - Aug 1, 2026</content>
<id>urn:uuid:58f0e402-fd2f-4ff5-ba5b-6a312a7a6135</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1dc028a2-842a-4048-86b2-2caa350f16e4"/>
<published>2026-01-16T08:00:00Z</published>
<title>FWC26 - Translink Parking and Bus Zone</title>
<updated>2026-01-16T22:02:02.0736271Z</updated>
</entry>
<entry>
<category term="Under Construction"/>
<content>Curb Space Closure

Location: 900-1000 Station St - W

Schedule: Jun 1, 2026 - Aug 1, 2026</content>
<id>urn:uuid:be679ab7-6d0b-4d9e-aad6-1f2c3788a6f4</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/c55edde9-6c98-44d0-9181-006c7a782a53"/>
<published>2026-01-16T08:00:00Z</published>
<title>FWC26 - Translink Parking and Bus Zone</title>
<updated>2026-01-16T22:05:41.9864197Z</updated>
</entry>
<entry>
<category term="Under Construction"/>
<content>Curb Space Closure
Location: 1400-1600 Western St - both sides of the street

Schedule: Jun 1, 2026 - Aug 1, 2026</content>
<id>urn:uuid:e64bc283-1238-45e2-b671-b3cca7a7236c</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/fd8bf4a8-edd4-4963-8889-8f0843637afa"/>
<published>2026-01-16T08:00:00Z</published>
<title>FWC26 - Translink Parking and Bus Zone</title>
<updated>2026-01-16T21:47:49.121932Z</updated>
</entry>
<entry>
<category term="Under Construction"/>
<content>Curb Space Closure

Location: 400-1100	Great Northern Way - N

Schedule: Jun 1, 2026 - Aug 1, 2026</content>
<id>urn:uuid:af62905c-bd80-47fc-b6c9-adbda28c41a7</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/9150bfe1-2237-415a-801f-28351d9df1e7"/>
<published>2026-01-16T08:00:00Z</published>
<title>FWC26 - Translink Parking and Bus Zone</title>
<updated>2026-01-16T22:20:04.3873146Z</updated>
</entry>
<entry>
<category term="Under Construction"/>
<content>Curb Space Closure

Location: 200 Northern St - both sides of the street

Schedule: Jun 1, 2026 - Aug 1, 2026</content>
<id>urn:uuid:547fae41-75bc-4d15-a4ff-4428b4d228ce</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e05e8ccc-25b8-47af-ad87-0075b9a0f517"/>
<published>2026-01-16T08:00:00Z</published>
<title>FWC26 - Translink Parking and Bus Zone</title>
<updated>2026-01-16T22:00:08.9128078Z</updated>
</entry>
<entry>
<category term="Under Construction"/>
<content>Curb Space Closure

Location: 2900-3300 Hastings St - both sides of the street

Schedule: Jun 1, 2026 - Aug 1, 2026</content>
<id>urn:uuid:976ee277-1333-4817-a4e4-f1e4a6e73648</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ed25b2fd-6dd5-4a50-86e6-79d03671ee61"/>
<published>2026-01-16T08:00:00Z</published>
<title>FWC26 - Translink Parking and Bus Zone</title>
<updated>2026-01-16T22:26:04.6361323Z</updated>
</entry>
<entry>
<category term="Under Construction"/>
<content>Curb Space Closure

Location: 600	Homer St - both sides of the street


Schedule: Jun 1, 2026 - Aug 1, 2026</content>
<id>urn:uuid:c4a57d39-020e-4e5c-b6ed-02062c85be21</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a5f1fabe-01e4-484d-8bd3-8862d3ea073d"/>
<published>2026-01-16T08:00:00Z</published>
<title>FWC26 - Translink Parking and Bus Zone</title>
<updated>2026-01-16T22:21:59.3364523Z</updated>
</entry>
<entry>
<category term="Under Construction"/>
<content>Curb Space Closure

Location: 900-1000	Station St - both sides of the street


Schedule: Jun 1, 2026 - Aug 1, 2026</content>
<id>urn:uuid:6fd35ff9-f25c-4c36-8231-d4d8c4998da1</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/2e47a0bb-f59c-462c-8fb6-c8797a13f618"/>
<published>2026-01-16T08:00:00Z</published>
<title>FWC26 - Translink Parking and Bus Zone</title>
<updated>2026-01-16T22:23:40.5436589Z</updated>
</entry>
<entry>
<category term="Under Construction"/>
<content>Curb Space Closure

Location: 700-800 Renfrew St - E

Schedule: Jun 1, 2026 - Aug 1, 2026</content>
<id>urn:uuid:fca6311f-8a34-4891-b1f7-6c9dc1a874a8</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/3608e42c-b61d-470e-89df-db1c44b8b1e2"/>
<published>2026-01-16T08:00:00Z</published>
<title>FWC26 - Translink Parking and Bus Zone</title>
<updated>2026-01-16T22:28:04.9429014Z</updated>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Expansion of the NEU by adding new heat pumps and accompanying electrical and mechanical works.  The majority of the project construction is within the FCEC building, however there are some works occurring outside of the building within the property lines.  The City's contractor will be utilizing the site to the east of the new extension of Wyllie Street as a laydown area for the duration of the project.  The project site shown on the map is for the laydown area.
Location: 1890 Spyglass Place and the laydown area to the east of Wyllie Street.
Schedule: Apr 1, 2022 - Nov 30, 2024</content>
<id>urn:uuid:e121829a-d138-42ca-9fc2-777948d1090e</id>
<link href="vancouver.ca/neu-expansion"/>
<published>2023-06-02T07:00:00Z</published>
<title>False Creek Energy Centre - Low Carbon Expansion - Contractor Laydown Area</title>
<updated>2024-02-20T23:02:00.8503759Z</updated>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>2nd annual event on both side of the VAG and parking along W/S 700 Howe st
Location: W/S 700 Howe st
Schedule: Sep 12, 2026 - Sep 13, 2026</content>
<id>urn:uuid:5f329aad-ba9e-497f-ad2b-0837ea243e62</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/0d5727de-9a46-4cd7-99fc-6b8549156d4b"/>
<published>2026-05-07T07:00:00Z</published>
<title>Fiesta Mexicana 2026</title>
<updated>2026-05-07T18:27:18.0700169Z</updated>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Crews will be onsite to conduct Gas Service Connection on behalf of Fortis Bc

Traffic Impacts: Total road closure at both sides of 2700 blk of Grant St from West PL of 2735 to East PL of 2747 Grant St

WO#: 31536480
Location: B/S of 2700 blk of Grant St
Schedule: Jun 22, 2026 - Jun 26, 2026; Weekdays; 7:00 AM - 5:00 PM</content>
<id>urn:uuid:00d97442-c6b1-45f5-952d-5ab2604fc9f2</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/2892686e-74d6-42b2-a0a9-dd953da75919"/>
<published>2026-06-09T07:00:00Z</published>
<title>Fortis BC - Gas Service Connection - 2700 blk of Grant St - Jun 22-26, 2026</title>
<updated>2026-06-09T16:10:19.5394005Z</updated>
</entry>
<entry>
<category term="Under Construction"/>
<content>Crews will be onsite to conduct Gas Service Connection on behalf of Fortis BC

Traffic Impacts: Parking lane closure at west side of 3900 blk of Rupert St from North PL of 3949 to South PL of 3987 Rupert St

WO# 31511736
Location: W/S of 3900 blk of Rupert St
Schedule: Jun 10, 2026 - Jun 16, 2026; M, Tu, W, Th, F, Su; 7:00 AM - 5:00 PM</content>
<id>urn:uuid:5935ac35-5fcf-4bef-b2ac-136f22b4bcd4</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/431fbd3e-a619-4e73-ae99-1613c4138091"/>
<published>2026-06-01T07:00:00Z</published>
<title>Fortis BC - Gas Service Connection - 3900 blk Rupert St - Jun 10-16, 2026</title>
<updated>2026-06-01T20:43:35.0922302Z</updated>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Crews will be onsite to conduct Gas Service Connections on behalf of Fortis BC

Traffic Impacts: Total road closure at both sides of 3900 blk of W35th Ave from 5000 blk Crown St to West PL of 3981 of W35th Ave

WO# 31535187
Location: B/S of 3900 blk of W35th Ave
Schedule: Jun 15, 2026 - Jun 19, 2026; Weekdays; 7:00 AM - 5:00 PM</content>
<id>urn:uuid:4d7edd21-2023-457a-a88b-3201f25f8b35</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/7aa605b6-44b6-49e0-acc1-0a63e603a886"/>
<published>2026-06-03T07:00:00Z</published>
<title>Fortis BC - Gas Service Connection - 3900 blk W35th Ave - Jun 15 to 19, 2026</title>
<updated>2026-06-03T18:24:24.6567063Z</updated>
</entry>
<entry>
<category term="Under Construction"/>
<content>Crews will be onsite to conduct Gas Service Connections on behalf of Fortis BC

Traffic Impacts: Lane way closure at both sides of Lane East of 1100 blk of Burrard St from South PL of 1160 to North PL of 1134 Burrard St

WO# 31536015

Extension to June 12, 2026

Location: B/S of LE of 1100 blk of Burrard St
Schedule: Jun 1, 2026 - Jun 12, 2026; Weekdays; 7:00 AM - 5:00 PM</content>
<id>urn:uuid:035ca415-8f03-43ec-81b9-21f972c6ad3b</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e65b55cd-db77-40de-a81a-be5f192ab937"/>
<published>2026-05-25T07:00:00Z</published>
<title>Fortis BC - Gas Service Connection - LE of 1100 blk Burrard - June 1 to 5, 2026</title>
<updated>2026-06-03T18:29:46.0809619Z</updated>
</entry>
<entry>
<category term="Under Construction"/>
<content>Parking lane closure on Both Sides of 100 Block of E 22nd Avenue to facilitate a gas service connection.

WO# 31535909
Location: Both Sides of 100 Block of E 22nd Avenue From W PL of 125 to E PL of 155.
Schedule: Jun 10, 2026 - Jun 16, 2026; Weekdays; 7:00 AM - 5:00 PM</content>
<id>urn:uuid:55d1394c-c108-4732-863c-9aa37138de1b</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d71d8ebe-af24-4904-baf6-786f41a8d88a"/>
<published>2026-05-27T07:00:00Z</published>
<title>FortisBC Gas Service Connection on 100 Block of E 22nd Avenue</title>
<updated>2026-05-27T22:14:54.7244454Z</updated>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Travel and Parking lane closure on Both Sides of 1600-1700 Block of Drummond Drive to facilitate a gas service connection.

WO# 31541293
Location: Both Sides of 1600-1700 Block of Drummond Drive From North PL of 1626 to South PL of 1626.
Schedule: Jun 11, 2026 - Jun 17, 2026; Weekdays; 7:00 AM - 5:00 PM</content>
<id>urn:uuid:648552fe-a569-4b51-88fb-5b5a7f824e7d</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/5509b9f3-71ce-4852-bb79-73bb0c9d1904"/>
<published>2026-06-02T07:00:00Z</published>
<title>FortisBC Gas Service Connection on 1600-1700 Block of Drummond Drive</title>
<updated>2026-06-02T21:08:25.9849021Z</updated>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Parking lane closure on Both Sides of 200 Block of E 39th Avenue to facilitate a gas service connection.

WO# 31542010
Location: Both Sides of 200 Block of E 39th Avenue From W PL of 219 to E PL of 241.
Schedule: Jun 26, 2026 - Jun 30, 2026; Weekdays; 7:00 AM - 5:00 PM</content>
<id>urn:uuid:1c21b7b6-2335-4020-9098-cc952b9c665b</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a92442f5-ec5c-493b-b170-e43e3f9ba678"/>
<published>2026-06-09T07:00:00Z</published>
<title>FortisBC Gas Service Connection on 200 Block of E 39th Avenue</title>
<updated>2026-06-09T20:41:31.3733685Z</updated>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Parking lane closure on the North Side of 2000 Block of E 13th Avenue to facilitate a gas service connection.

WO# 31536217
Location: North Side of 2000 Block of E 13th Avenue From Semlin Drive to W PL of 2015.
Schedule: Jun 15, 2026 7:00 AM - Jun 19, 2026 5:00 PM</content>
<id>urn:uuid:834491ec-1ffc-4c1f-9e7d-b46d5580da93</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/9bbf5ebd-1461-4a3f-b202-e7e33fbb58d0"/>
<published>2026-06-03T07:00:00Z</published>
<title>FortisBC Gas Service Connection on 2000 Block of E 13th Avenue</title>
<updated>2026-06-03T18:19:50.8202518Z</updated>
</entry>
<entry>
<category term="Under Construction"/>
<content>Parking lane closure on the South Side of 2800 Block of E 43rd Avenue to facilitate a gas service connection.

WO# 31535513
Location: South Side of 2800 Block of E 43rd Avenue From W PL of 2842 to E PL of 2856.
Schedule: Jun 8, 2026 7:00 AM - Jun 19, 2026 5:00 PM</content>
<id>urn:uuid:3cbbe646-54af-4bf9-bab9-e9441e51d859</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/6e0f4ca2-7f2b-48e3-8deb-587e7c3d527d"/>
<published>2026-05-28T07:00:00Z</published>
<title>FortisBC Gas Service Connection on 2800 Block of E 43rd Avenue</title>
<updated>2026-06-09T16:14:44.6195546Z</updated>
</entry>
<entry>
<category term="Under Construction"/>
<content>Parking lane closure on the North Side of 2800 Block of Trinity Street to facilitate a gas service connection.

WO# 31468329
Location: North Side of 2800 Block of Trinity Street From W PL of 2809 to E PL of 2821.
Schedule: Jun 8, 2026 7:00 AM - Jun 12, 2026 5:00 PM</content>
<id>urn:uuid:6806bdd2-c6b9-4fca-afe7-d6b710e70e18</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/616f7822-92d7-43e1-ac66-fe47f7ad189f"/>
<published>2026-05-28T07:00:00Z</published>
<title>FortisBC Gas Service Connection on 2800 Block of Trinity Street</title>
<updated>2026-05-28T15:45:06.1053692Z</updated>
</entry>
<entry>
<category term="Under Construction"/>
<content>Parking lane closure on the North Side of 2800 Block of Venables Street to facilitate a gas service connection.

WO# 31536196
Location: North Side of 2800 Block of Venables Street From W PL of 2875 to E PL of 2887.
Schedule: Jun 8, 2026 7:00 AM - Jun 12, 2026 5:00 PM</content>
<id>urn:uuid:9d7580ae-cac7-430b-8fa4-f5005dbf4a41</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/94efcdd3-5ec9-4cd4-9e60-e40579db5e1b"/>
<published>2026-05-28T07:00:00Z</published>
<title>FortisBC Gas Service Connection on 2800 Block of Venables Street</title>
<updated>2026-05-28T15:58:11.3223824Z</updated>
</entry>
<entry>
<category term="Under Construction"/>
<content>Parking lane closure on Both Sides of 3400 Block of Garden Drive to facilitate a gas service connection.

WO# 31535503
Location: Both Sides of 3400 Block of Garden Drive From N PL of 3420 to S PL of 3436.
Schedule: Jun 10, 2026 - Jun 16, 2026; Weekdays; 7:00 AM - 5:00 PM</content>
<id>urn:uuid:18312de3-105c-4e8a-8198-b3c112564179</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/2873110a-41b3-4a72-bfcc-c8a6aaa1831c"/>
<published>2026-05-28T07:00:00Z</published>
<title>FortisBC Gas Service Connection on 3400 Block of Garden Drive</title>
<updated>2026-05-28T15:25:13.4731655Z</updated>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Parking lane closure on Both Sides of 900 Block of E 27th Avenue to facilitate a gas service connection.

WO# 31536230
Location: Both Sides of 900 Block of E 27th Avenue From W PL of 941 to E PL of 957.
Schedule: Jun 11, 2026 7:00 AM - Jun 17, 2026 5:00 PM</content>
<id>urn:uuid:9b92c3bb-3fd8-4391-b75d-8f48c04983cd</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d03cf49c-b829-4032-87e0-3eca8da662e4"/>
<published>2026-05-28T07:00:00Z</published>
<title>FortisBC Gas Service Connection on 900 Block of E 27th Avenue</title>
<updated>2026-05-28T15:30:53.503108Z</updated>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Alleyway lane closure on Both Sides of Lane East of 4900 Block of Victoria Drive to facilitate a gas service connection.

WO# 31535494
Location: Both Sides of Lane East of 4900 Block of Victoria Drive From North PL of 4936 to South PL of 4962.
Schedule: Jun 15, 2026 7:00 AM - Jun 19, 2026 5:00 PM</content>
<id>urn:uuid:2d6c4a2c-9508-4d5d-9671-10c71bfebbca</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e74ee0a8-2425-4ab9-8de4-7e4475070d4a"/>
<published>2026-06-01T07:00:00Z</published>
<title>FortisBC Gas Service Connection on Lane East of 4900 Block of Victoria Drive</title>
<updated>2026-06-01T21:08:15.9314972Z</updated>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Alleyway lane closure on Both Sides of Lane North of 1500-1600 Block of E 58th Avenue to facilitate a gas service connection.

WO# 31540669
Location: Both Sides of Lane North of 1500-1600 Block of E 58th Avenue From W PL of 1605 to E PL of 1621.
Schedule: Jun 15, 2026 7:00 AM - Jun 19, 2026 5:00 PM</content>
<id>urn:uuid:690daed7-c144-42bb-9e49-35e845345bdf</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/757c42b5-7dbb-4009-ac7a-9a3113044ee9"/>
<published>2026-06-01T07:00:00Z</published>
<title>FortisBC Gas Service Connection on Lane North of 1500-1600 Block of E 58th Avenue</title>
<updated>2026-06-09T17:56:27.1011796Z</updated>
</entry>
<entry>
<category term="Under Construction"/>
<content>Alleyway lane closure on Both Sides of Lane North of 3000 Block of E 54th Avenue to facilitate a gas service connection.

WO# 31540405
Location: Both Sides of Lane North of 3000 Block of E 54th Avenue From W PL of 3057 to E PL of 3075.
Schedule: Jun 4, 2026 - Jun 10, 2026; Weekdays; 7:00 AM - 5:00 PM</content>
<id>urn:uuid:320d53a2-6ffd-488d-ba44-7a2f5e5243a9</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/6c0c4f10-5a86-45af-b57b-0579e681d04e"/>
<published>2026-05-26T07:00:00Z</published>
<title>FortisBC Gas Service Connection on Lane North of 3000 Block of E 54th Avenue</title>
<updated>2026-05-26T22:54:44.5050807Z</updated>
</entry>
<entry>
<category term="Under Construction"/>
<content>Alleyway lane closure on Both Sides of Lane South of 1500-1600 Block of E 58th Avenue to facilitate a gas service connection.

WO# 31536786
Location: Both Sides of Lane South of 1500-1600 Block of E 58th Avenue From W PL of 1662 to E PL of 1676.
Schedule: Jun 8, 2026 7:00 AM - Jun 12, 2026 5:00 PM</content>
<id>urn:uuid:5c1ea43f-2f35-4341-86e0-fe3b6ab3b8ad</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/061febb8-b283-4ccc-bbed-376fd6b27e7e"/>
<published>2026-05-27T07:00:00Z</published>
<title>FortisBC Gas Service Connection on Lane South of 1500-1600 Block of E 58th Avenue</title>
<updated>2026-05-27T19:20:18.0900377Z</updated>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Alleyway lane closure on Both Sides of Lane South of 2300 Block of W 20th Avenue to facilitate a gas service connection.

WO# 31536292
Location: Both Sides of Lane South of 2300 Block of W 20th Avenue From W PL of 2356 to E PL of 2336.
Schedule: Jun 15, 2026 7:00 AM - Jun 19, 2026 5:00 PM</content>
<id>urn:uuid:dabd0c3e-d9a0-41b6-852f-162533dc7122</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/0f7c1b24-6223-487d-90ce-1b26f909a22a"/>
<published>2026-06-01T07:00:00Z</published>
<title>FortisBC Gas Service Connection on Lane South of 2300 Block of W 20th Avenue</title>
<updated>2026-06-01T21:33:51.2021082Z</updated>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Alleyway lane closure on Both Sides of Lane South of 2700 Block of W 20th Avenue to facilitate a gas service connection.

WO# 31536510
Location: Both Sides of Lane South of 2700 Block of W 20th Avenue From W PL of 2766 to E PL of 2754.
Schedule: Jun 18, 2026 - Jun 24, 2026; Weekdays; 7:00 AM - 5:00 PM</content>
<id>urn:uuid:2de059df-ba65-422d-b08b-8dd4d6ea7628</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/eda4a273-3034-4f6c-aab6-7175975f16c2"/>
<published>2026-06-04T07:00:00Z</published>
<title>FortisBC Gas Service Connection on Lane South of 2700 Block of W 20th Avenue</title>
<updated>2026-06-09T16:21:17.6476256Z</updated>
</entry>
<entry>
<category term="Under Construction"/>
<content>Alleyway lane closure on Both Sides of Lane South of 800 Block of E 13th Avenue to facilitate a gas service connection.

WO# 31535775
Location: Both Sides of Lane South of 800 Block of E 13th Avenue From W PL of 874 to E PL of 892.
Schedule: Jun 4, 2026 - Jun 10, 2026; Weekdays; 7:00 AM - 5:00 PM</content>
<id>urn:uuid:26a18049-1c58-4302-8e53-92bcba4e4376</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/6523d5e8-abfc-40fa-8694-95ea12d1f98f"/>
<published>2026-05-26T07:00:00Z</published>
<title>FortisBC Gas Service Connection on Lane South of 800 Block of E 13th Avenue </title>
<updated>2026-05-26T23:00:41.4845574Z</updated>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>This project will replace the aging storm sewer and outfall along Fraser Street south of E Kent Avenue with a new storm sewer and outfall structure.  The new storm sewer is designed for increased flow anticipated from climate change and to accommodate future growth in the community by connecting a larger catchment area in the future. The outfall design includes a tide gate to prevent Fraser River water levels from entering the sewer system, and a platform structure for safe operations and maintenance. The design also includes raising the shoreline elevation to reduce the probability of Fraser River overtopping and is an incremental step towards sea level rise adaptation. 
Location: South end of Fraser Street, south of East Kent Avenue South
Schedule: Sep 1, 2025 - Dec 19, 2025</content>
<id>urn:uuid:95fff2e7-e0db-4547-840e-2ab87c5f7bef</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/330cb1f0-4f55-4e34-a5d5-dd96dd0a464c"/>
<published>2025-03-20T07:00:00Z</published>
<title>Fraser Street Outfall Replacement</title>
<updated>2026-04-18T01:01:08.2149651Z</updated>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Closure of the Fir St Off-ramp
Location: 
Schedule: Jan 7, 2026 - Feb 6, 2026</content>
<id>urn:uuid:681e1be9-cba3-456c-92e4-6a24c3d348f6</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/0af180dd-14e6-472c-a954-7f0b3d20b8e1"/>
<published>2026-01-30T08:00:00Z</published>
<title>GBSAR - Fir St Off-Ramp Closure</title>
<updated>2026-01-30T20:11:40.7901041Z</updated>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Granville Bridge South Approach &amp; Ramps Rehabilitation Project - Phase 1 (GBSAR Ph 1) 
Hemlock Off-Ramp: Full closure of the off-ramp Closure hours will be 8PM – 6AM
Location: Hemlock On-Ramp
Schedule: Mar 23, 2026 - Apr 2, 2026; All days; 8:00 PM - 6:00 AM</content>
<id>urn:uuid:9f6e370f-1bb7-465a-8ea8-5c0b8b0e9088</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a44edc6f-a110-45dd-b5a6-f652404374c1"/>
<published>2025-03-07T08:00:00Z</published>
<title>GBSAR Ph 1 Hemlock On-Ramp</title>
<updated>2026-03-30T16:20:16.5390804Z</updated>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Granville Bridge South Approach &amp; Ramps Rehabilitation Project - Phase 1 
Nightwork: March 8, 2026 to April 10, 2026 (10 PM – 6 AM)


Location: South Approach - Main Ramp 
Schedule: Dec 15, 2025 - Apr 10, 2026</content>
<id>urn:uuid:25a8bc75-8773-4ac5-a72d-4d90e9c93a8a</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/3f2676bf-0247-4f20-b08e-6715a5c5c6c8"/>
<published>2025-03-07T08:00:00Z</published>
<title>GBSAR Ph 1 South Approach - Main Ramp</title>
<updated>2026-03-02T19:26:25.5609843Z</updated>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Granville Bridge South Approach &amp; Ramps Rehabilitation Project - Phase 1

Location: West 4th Ramp
Schedule: May 14, 2025 - Aug 26, 2025</content>
<id>urn:uuid:d41534de-c05f-40cb-8aca-9c9da9b56944</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/36db0ed5-eb80-45ee-8ee9-b1cc29706434"/>
<published>2025-03-07T08:00:00Z</published>
<title>GBSAR Ph 1 W 4th Off-Ramp</title>
<updated>2025-08-27T20:02:50.1886695Z</updated>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Granville Bridge South Approach &amp; Ramps Rehabilitation Project - Phase 2
Location: West 4th Ramp
Schedule: Feb 6, 2026 - Feb 28, 2026</content>
<id>urn:uuid:4ee859b8-9b27-4ba2-9dad-ec7560c54804</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1b14d18c-e6e9-4567-9aa4-2a37cb3a3dcb"/>
<published>2025-08-27T07:00:00Z</published>
<title>GBSAR Ph 2 W 4th Off-Ramp </title>
<updated>2026-02-03T16:29:14.998178Z</updated>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Delivery of Pedestrian Zone on Water Street from Columbia Street to Richards Street. Water Street will be closed to traffic on Sundays this summer from approximately 12pm to 8pm.
Location: Water St - Richards St to Columbia St
Schedule: Jul 5, 2026 - Sep 6, 2026; Su; 12:00 PM - 8:00 PM</content>
<id>urn:uuid:9cc24bc0-6253-4b6a-9e9a-56ae7bdb308e</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/4910f6ef-4879-43ab-9609-ce242ce799bb"/>
<published>2025-05-07T07:00:00Z</published>
<title>Gastown - Water Street Pedestrian Zone Pilot</title>
<updated>2026-03-03T19:07:22.2186193Z</updated>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Curb work, asphalt ramps, brick paver repairs on east side Granville. Roadway restoration on W 67th Ave (temp full closure of 67th required).
Location: W 67th Ave, immediately east of Granville plus east side Granville St between W 67th and W 68th.
Schedule: Nov 7, 2025 - Nov 14, 2025</content>
<id>urn:uuid:0e2cd741-c9dd-4fdd-a57b-674b256e06e1</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1144f13d-6f2d-4a85-959a-e2b73dd3c988"/>
<published>2025-11-03T08:00:00Z</published>
<title>Granville &amp; 67th/68th interim bike connection</title>
<updated>2025-11-07T21:23:11.8531208Z</updated>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Closed EB curb lane for access to laydown area and staging of construction vehicles to support the bridge rehabilitation project. 
Location: Eastbound curb lane, 1500 Block of W. 4th Avenue
Schedule: May 1, 2026 - May 31, 2026</content>
<id>urn:uuid:eee95aa8-c11b-4d7a-88fd-1c2d4781e5ac</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/89b74fcd-c274-4379-b2da-ef010e850e26"/>
<published>2026-05-05T07:00:00Z</published>
<title>Granville Bridge South Approach Rehabilitation Project Phase 1</title>
<updated>2026-05-05T19:46:38.4764115Z</updated>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Granville Bridge South Approach &amp; Ramps Rehabilitation Project - Bearing Replacement (below bridge deck) 
Ongoing impacts below bridge deck on Anderson St leading into and out of Granville Island

Nov 10 to Mid-Dec 2025:  Anderson Street Impacts by Granville Island entrance
Location: Below Bridge Deck on Anderson Street  (1. Anderson St and W. 2nd Av / 2. Anderson St and W. 3rd Av)

Schedule: Mar 17, 2025 - Dec 31, 2025</content>
<id>urn:uuid:a11a73a3-80b4-425f-b6ab-50afff617f12</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/22661d2d-d9be-4918-ac54-2e53533c4538"/>
<published>2025-03-07T08:00:00Z</published>
<title>Granville Bridge South Approaches Rehab - Bearing Replacement (below bridge deck) </title>
<updated>2025-11-06T15:43:58.1795704Z</updated>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>The contractor on GBSRR2 will be performing works over the Granville Bridge deck for one week.
Location: Granville Bridge - North side pf the bridge deck
Schedule: May 11, 2026 6:00 AM - May 22, 2026 6:00 PM</content>
<id>urn:uuid:45ee4b2d-b657-4e19-a978-24f015b78a9d</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/c23af4eb-110a-4201-b108-6701a2e309e0"/>
<published>2026-05-12T07:00:00Z</published>
<title>Granville Bridge Structural Repair and Recoating Phase 2 </title>
<updated>2026-05-12T18:45:57.0557672Z</updated>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>W. 4th Ave Eastbound Off-ramp CLOSURE in place permanently. 
1. Granville Connector - Entire bridge, Howe Ramp, Fir/4th ramp, West 5th Av, Drake St - work expect through to end of July 2025
2. North Loops Reconfiguration – new “H road Network” - Portions of Continental, Neon, Rolston and Pacific Streets - “H Road Network” opened June 2025
3. South Approaches rehab - Mar-25 to Q2 2026

Location: Granville Bridge 
Schedule: Feb 21, 2023 7:00 AM - Jul 25, 2025 6:00 PM</content>
<id>urn:uuid:18a6684d-ed25-419f-82e3-2bc46ffa0311</id>
<link href="https://vancouver.ca/streets-transportation/granville-bridge-connector.aspx"/>
<published>2023-01-31T08:00:00Z</published>
<title>Granville Connector</title>
<updated>2025-07-23T22:49:23.0993711Z</updated>
</entry>
<entry>
<category term="Under Construction"/>
<content>The Granville Street Sewer Upgrades Project is scheduled to begin in mid-September 2025 on Granville Street in the Marpole area. The project will replace the existing sewer system with a separated system designed to increase capacity, better manage stormwater, and support Vancouver’s long-term infrastructure goals.

- Construction begins mid-September 2025 with exploratory work, followed by sidewalk improvements and sewer trenching, with completion expected by end of Spring 2026. 
- Nighttime sewer construction will occur on Granville Street between fall 2025 and early 2026, with some weekend 24/7 work at key intersections; daytime work follows in early 2026 on W59 Avenue and W62 Avenue.
- Granville Street will remain open with lane closures, and traffic management will prioritize safety with signage, message boards, and public advisories.
- Residents, businesses, and key stakeholders will receive updates through letters, a dedicated Community Liaison Officer, media advisories, and the project webpage.
- No further impacts to Granville are expected as of May 2026.

Location: The Granville Street Sewer Upgrades Project is scheduled to begin in mid-September 2025 in the Marpole area. The project will replace the existing combined sewer with a separated system designed to increase capacity, improve stormwater management, and support Vancouver’s long-term infrastructure goals.

Construction will start in mid-September 2025 with exploratory work, followed by sidewalk improvements and sewer trenching. Completion is expected by late spring 2026.

Nighttime sewer construction on Granville Street will take place between fall 2025 and early 2026, with some 24/7 weekend work at key intersections. Daytime work will follow in early 2026 on West 59th Avenue and West 62nd Avenue.

Contact: granvillesewerupgrades@vancouver.ca or 311
Schedule: Sep 17, 2025 - Jul 31, 2026</content>
<id>urn:uuid:42c642d5-1f11-4ed6-a25b-3c7b4a295b5e</id>
<link href="https://vancouver.ca/streets-transportation/granville-street-sewer-upgrades.aspx"/>
<published>2025-09-12T07:00:00Z</published>
<title>Granville Street Sewer Upgrades (Fraser Angus Group 4A) </title>
<updated>2026-05-26T15:58:32.2200612Z</updated>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>The Street Tree Canopy Expansion Team will be installing 4 trees on Franklin Street West between Victoria Drive and Semlin Drive. The trees will be installed within the gravel boulevard on the south side. Large tree pits will be excavated and backfilled within the parking lane to provide adequate soil volume then backfilled. The gravel parking lane will be reinstated, and the tree pits will be protected with wood surrounds. The contractor will return in the fall to install the trees when rain is expected to return. 
Location: 1900 Block Franklin Street West 
Schedule: Multiple occurrences as follows:
- Aug 25, 2025 - Sep 5, 2025 (Exact dates subject to change)
- Oct 1, 2025 (Tree installation will occur in the fall. Dates TBD.)
</content>
<id>urn:uuid:c2f74924-8e73-4ab6-adc6-bd8d4c15f2e9</id>
<link href="https://review.vancouver.ca/streets-transportation/street-tree-canopy-expansion.aspx"/>
<published>2025-07-15T07:00:00Z</published>
<title>Gravel Boulevard Tree Canopy Enhancement </title>
<updated>2025-07-15T21:51:36.4400575Z</updated>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>The Street Tree Canopy Expansion Team will be installing 11 trees on E Georgia between Clark Drive and Maclean Drive. The trees will be installed within the gravel boulevard on the north side. Large tree pits will be excavated and backfilled within the parking lane to provide adequate soil volume then backfilled. The gravel parking lane will be reinstated, and a tree pit will be protected with wood surrounds. The contractor will return in the fall to install the trees rain is expected to return. 
Location: 1300 East Georgia Street, north gravel boulevard between Clark Drive and McLean Drive. The west bound lane will be closed during excavation.
Schedule: Multiple occurrences as follows:
- Jul 21, 2025 - Aug 11, 2025
- Oct 1, 2025 (Tree installation will occur in the fall. Dates TBD.)
</content>
<id>urn:uuid:812595aa-1793-46f7-b15c-0c837f55bde4</id>
<link href="https://review.vancouver.ca/streets-transportation/street-tree-canopy-expansion.aspx"/>
<published>2025-07-15T07:00:00Z</published>
<title>Gravel Boulevard Tree Canopy Enhancement </title>
<updated>2025-07-15T20:30:14.3269302Z</updated>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>The Street Tree Canopy Expansion Team will be installing 5 trees on East Graveley between Clark Drive and Maclean Drive. The trees will be installed within the gravel boulevard on the north side. Large tree pits will be excavated and backfilled within the parking lane to provide adequate soil volume then backfilled. The gravel parking lane will be reinstated, and a tree pit will be protected with wood surrounds. The contractor will return in the fall to install the trees rain is expected to return. 
Location: 1300 Block Graveley Street between Clark Drive and McLean Drive 
Schedule: Multiple occurrences as follows:
- Jul 9, 2025 - Jul 18, 2025
- Oct 1, 2025 (Tree installation will occur in the fall. Dates TBD.)
</content>
<id>urn:uuid:443489a0-81fd-458a-be5e-68ec58f1a127</id>
<link href="https://review.vancouver.ca/streets-transportation/street-tree-canopy-expansion.aspx"/>
<published>2025-07-15T07:00:00Z</published>
<title>Gravel Boulevard Tree Canopy Enhancement </title>
<updated>2025-07-15T21:21:10.2816946Z</updated>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>The Street Tree Canopy Expansion Team will be installing 5 trees on 500 Woodland Drive between Francis Streets and East Pender. The trees will be installed within the gravel boulevard on the west side. Large tree pits will be excavated and backfilled within the gravel boulevard to provide adequate soil volume, then backfilled and protected with wood surrounds. The contractor will return in the fall to install the trees rain is expected to return. 
Location: 500 Woodland Drive between Francis Street and East Pender
Schedule: Multiple occurrences as follows:
- Aug 11, 2025 - Aug 22, 2025 (Exact dates subject to change)
- Oct 1, 2025 (Tree installation will occur in the fall. Dates TBD.)
</content>
<id>urn:uuid:0c13b481-ed2f-47c4-a8ca-3ea63668c39b</id>
<link href="https://review.vancouver.ca/streets-transportation/street-tree-canopy-expansion.aspx"/>
<published>2025-07-15T07:00:00Z</published>
<title>Gravel Boulevard Tree Canopy Enhancement </title>
<updated>2025-07-15T21:44:37.9640172Z</updated>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>The Street Tree Canopy Expansion Team will be installing 8 trees on Lakewood Drive between Vaness Ave and E19th Ave. The trees will be installed within the gravel boulevard on the west side. Large tree pits will be excavated and backfilled within the parking lane to provide adequate soil volume then backfilled. The gravel parking lane will be reinstated, and a tree pit will be protected with wood surrounds. The contractor will return in the fall to install the trees rain is expected to return. 
Location: 3500 Lakewood Drive 
Schedule: Multiple occurrences as follows:
- Sep 2, 2025 - Sep 12, 2025 (Exact dates subject to change)
- Oct 1, 2025 (Tree installation will occur in the fall. Dates TBD.)
</content>
<id>urn:uuid:f13109c0-9ab2-4c8d-8df8-6759142f1585</id>
<link href="https://review.vancouver.ca/streets-transportation/street-tree-canopy-expansion.aspx"/>
<published>2025-07-15T07:00:00Z</published>
<title>Gravel Boulevard Tree Canopy Enhancement </title>
<updated>2025-08-25T23:27:04.7614619Z</updated>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>The Street Tree Canopy Expansion Team will be installing 3 trees on Stainbury Avenue, east of Commercial Street. The trees will be installed within the gravel boulevard on the south side. Large tree pits will be excavated and backfilled within the parking lane to provide adequate soil volume then backfilled. The gravel parking lane will be reinstated, and a tree pit will be protected with wood surrounds. The contractor will return in the fall to install the trees rain is expected to return. 
Location: 1800 Stainsbury Ave 
Schedule: Multiple occurrences as follows:
- Sep 8, 2025 - Sep 12, 2025 (Exact dates subject to change)
- Oct 1, 2025 (Tree installation will occur in the fall. Dates TBD.)
</content>
<id>urn:uuid:2f6df666-34dd-4b93-8703-27c79770dd79</id>
<link href="https://review.vancouver.ca/streets-transportation/street-tree-canopy-expansion.aspx"/>
<published>2025-07-15T07:00:00Z</published>
<title>Gravel Boulevard Tree Canopy Enhancement </title>
<updated>2025-07-15T22:05:53.3187788Z</updated>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>The Street Tree Canopy Expansion Team will be installing 4 trees at 2200 Manitoba Street. The trees will be installed within the gravel boulevard on the west side. Large tree pits will be excavated and backfilled within the parking lane to provide adequate soil volume then backfilled. The gravel parking lane will be reinstated, and a tree pits will be protected with wood surrounds. The contractor will return in the fall to install the trees when rain is expected to return. 
Location: 2200 Block Manitoba Street, on the west side between W6th and W7th Ave. South bound lane will be closed during excavation. 
Schedule: Multiple occurrences as follows:
- Jun 30, 2025 - Jul 11, 2025
- Oct 1, 2025 (Tree installation will occur in the fall. Dates TBD.)
</content>
<id>urn:uuid:7a74a841-8ef4-4e74-8c69-ea1464bc6842</id>
<link href="https://review.vancouver.ca/streets-transportation/street-tree-canopy-expansion.aspx"/>
<published>2025-07-15T07:00:00Z</published>
<title>Gravel Boulevard Tree Canopy Enhancement </title>
<updated>2025-07-15T21:13:15.6867972Z</updated>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Rehabilitating existing GRI assets as well as the installation of 3 new assets. The work will take place on Nanaimo Street at the following intersections: E41st, E40th, E39, E38 &amp; E37th Aves. The majority of the work will take place within the parking lanes. Minor parking impacts will be anticipated. *Exact Dates TBD. 
Location: Nanaimo Street, E41st to E37th Avenues. 
Schedule: Jul 20, 2026 - Aug 31, 2026</content>
<id>urn:uuid:bcdd3ed2-9a95-4a5c-8e74-50eb1415742b</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/b522f6b4-468b-4acc-938a-db17f4518a47"/>
<published>2026-04-14T07:00:00Z</published>
<title>Green Infrastructure Bioretention Rehabilitation </title>
<updated>2026-04-14T17:55:42.5490695Z</updated>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>HOLD for Sewer manhole sampling
Various locations

Tuesdays only: May 23, June 2,9,16,23
Location: 
Schedule: May 26, 2026 - Jun 23, 2026; Tu; 6:00 AM - 5:00 PM</content>
<id>urn:uuid:10a82f4e-61d8-4d68-9abb-6207f36d7a1b</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/6206624a-76a7-4137-8782-f7c5e277e6f9"/>
<published>2026-05-15T07:00:00Z</published>
<title>HOLD for Sewer manhole sampling</title>
<updated>2026-05-15T20:57:16.7369462Z</updated>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Joint repairs to overpass

[Traffic Impact Updates]:
May 19, 2025 to June 6, 2025: Eastbound curb lane closed.
Location: Lane closures impacting East Hastings from Glen Dr to Campbell Ave
Schedule: May 19, 2025 - Jun 6, 2025</content>
<id>urn:uuid:68cdceb4-1cdc-40dc-a7a3-89ab2fcc8ac0</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/8508ef24-ba76-4ed2-a803-37ddca32ed81"/>
<published>2024-07-30T07:00:00Z</published>
<title>Hastings St Overpass Joint Replacement</title>
<updated>2025-06-02T21:40:40.7337042Z</updated>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Hastings Sunrise West Sewer Package 

- Project has been reinstated back into this Capital Plan starting 2026.  

Area is south of Venables and north of 5th east of Nanaimo and mostly west of Renfrew. Contact Bob Devlin. 

Sewer Scope on E. 1st to be integrated with Sewers scope from the Cassiar South Pkg 2. Includes Water scope interest and potential Streets interest.

 Constrained start time by the Broadway Subway project. 

The E. 1st Ave designs for HSW won’t be ready for IFC until 2025 or 2026, which will push construction into the 2027-2030 capital plan as a result.
Location: Various Locations
Schedule: Jan 3, 2028 - Jun 29, 2029; Weekdays; 7:00 AM - 4:00 PM</content>
<id>urn:uuid:1c10418a-f1aa-4fb9-9001-ad69e222b169</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/7af3f268-0498-4564-a5eb-757727e19fe2"/>
<published>2023-09-19T07:00:00Z</published>
<title>Hastings Sunrise West Sewer Renewal - Phase 3</title>
<updated>2026-01-10T02:00:36.0939044Z</updated>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>This is a three phase project that will renew 4.5 kilometers of combined sewers with separated sewers. Phase 2 construction is underway and will continue south of East 1st for the rest of 2023. 

TDE &amp; GI are partners in this project with potential opportunity to combine the NE Sector Greenway build on Lillooet or Windermere, TBC.  



Phase 1
January to Summer 2023
Restart construction
Complete green rainwater infrastructure work

Phase 2 
March to Spring 2024

Phase 3
Early 2024 to December 2025
Location: E. 1st Ave and Windermere St
Schedule: Jan 2, 2023 - Dec 31, 2025</content>
<id>urn:uuid:c73e7645-09df-46c5-ad66-414f5867a386</id>
<link href="https://vancouver.ca/streets-transportation/hastings-sunrise-sewer-renewal.aspx"/>
<published>2023-02-28T08:00:00Z</published>
<title>Hastings-Sunrise Sewer Renewal</title>
<updated>2025-01-29T22:36:35.0988166Z</updated>
</entry>
<entry>
<category term="Road Closure"/>
<content>The Hawks Ave Closure Pilot will involve the install of concrete barriers on Hawks Ave at the south side of the intersection with Prior St, with the intent for traffic calming on Hawks Ave as requested by the Strathcona Residents’ Association. Barriers and associated signage will be going in March 19th. 
Parking access will be retained via Malkin Ave. 

For any concerns or comments, please reach out to: PriorEnhancementPilot@vancouver.ca  

Location: 
Schedule: Mar 19, 2025 - Jan 1, 2028</content>
<id>urn:uuid:1905a19e-a7b7-422f-ab3d-27307cbe2aa1</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/3d8e433d-215c-4c98-acdf-1f504e12625f"/>
<published>2025-03-04T08:00:00Z</published>
<title>Hawks Ave Closure Pilot</title>
<updated>2025-03-04T20:22:52.3894486Z</updated>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Street concrete &amp; paving renewal on Helmcken Street from Hornby Street to Granville Street. 
Anticipated start in late Feb 2025.
Location: 
Schedule: Feb 18, 2025 - Apr 30, 2025</content>
<id>urn:uuid:7ad70bb9-37a3-4cb5-ae97-bd00b67247d6</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/0eb290df-dd98-4298-b144-a4e5b5d0cf80"/>
<published>2025-02-14T08:00:00Z</published>
<title>Helmcken Street Renewal, Hornby to Granville</title>
<updated>2025-04-08T17:49:20.7033007Z</updated>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Update as of end of July 2024. The remainder of the work includes completing paver installation in the 400 block of Homer Street and final pave of 400 Homer Street and the Hastings/Homer intersection.


Location: Homer St from W Pender St to W Cordova St 
Schedule: Feb 17, 2023 - Sep 30, 2024</content>
<id>urn:uuid:46fc39ab-abc6-49a7-9e22-e31ee57a9e49</id>
<link href="https://vancouver.ca/streets-transportation/homer-street-upgrades.aspx"/>
<published>2023-02-21T21:00:00Z</published>
<title>Homer Street Upgrades Project (HStU)</title>
<updated>2024-08-27T21:26:01.6428986Z</updated>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Cordova Street: Cordova Street will be converted to a 2-way street for the 2025 summer Water Street Pedestrian Pilot. Modifications will be carried out on Cordova including traffic signal installations, minor civil works, paint line eradication, surveying, line painting, concrete barrier and sign installations. Starting May 12, two northern lanes of Cordova Street will be closed to traffic as the reconfiguration of the street is finalized. Eastbound vehicle travel will be retained during this work.  Once construction is completed in late May, Cordova Street will re-open as a two-way street for the summer. During this time, the City will be monitoring the performance of the street.

Water Street: There will be intermittent impacts to Water Street in late May and early June 2025 for the installation of the 2025 Water Street Pedestrian Pilot. The work will include the installation of concrete barriers, line painting, planters, furniture installation and removing bollards. Water Street works will be removed in September 2025. 


Location: Cordova St. - Richards to Gore
Powell St., Carrall to Gore
Gore Ave., Powell to Cordova
Main St., Powell to Cordova
Water St., Richards to Columbia

Schedule: Apr 14, 2025 - May 31, 2025</content>
<id>urn:uuid:1d3d49ed-ba1f-48a7-9992-39c57f39c70b</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e9889b56-2d1f-4a5c-a526-e96eef45b4d3"/>
<published>2025-04-16T07:00:00Z</published>
<title>Interim Cordova 2-Way: Richards to Gore</title>
<updated>2025-12-14T02:00:53.584143Z</updated>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Closure of Commercial Dr from Venables to Grandview and side streets to alley either side for special event. Venables, E 1st and Grandview open to through traffic. Additional event activations in and around Grandview Park.

Event areas:
900-2200 Commercial Drive, Venables to Grandview Cut
1600-1700 Parker St
1600-1700 Napier St
1600-1700 William St
1200 Cotton Dr
1600-1700 Charles St
1600-1700 Kitchener St
1600-1700 Grant St
1600-1700 Graveley St
1600-1700 E 2nd Av
1600-1700 E 3rd Av
1600-1700 E 4th Av
1700 McSpadden Av
1600-1700 E 5th Av
1600-1700 E 6th Av
1700 E 7th Av
Grandview Park
Location: 
Schedule: Jun 14, 2026</content>
<id>urn:uuid:fc74ed2f-603f-4c23-89fc-ade19c9790fe</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/9de0d6af-f1d8-41f0-a90c-a9786c6978e4"/>
<published>2026-04-15T07:00:00Z</published>
<title>Italian Day on the Drive</title>
<updated>2026-04-15T17:17:40.2434087Z</updated>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Joyce Street Renewal 
Location: Joyce St - Vanness Av to south of Kingsway
Schedule: Multiple occurrences as follows:
- Mar 28, 2026 - Mar 29, 2026
- Apr 4, 2026 - Apr 5, 2026 (Back up date)
- May 23, 2026 - May 24, 2026
- Jul 15, 2026 - Aug 31, 2026 (Completion post FIFA)
</content>
<id>urn:uuid:1f75175a-72ef-4b9c-b3a6-ef3d6ae44fa8</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/21578386-d08a-4120-b8c3-0dcacf8f53e4"/>
<published>2025-11-17T08:00:00Z</published>
<title>Joyce St Street Renewal - Vanness Av to south of Kingsway</title>
<updated>2026-06-01T18:13:06.8386706Z</updated>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Road and sidewalk construction along Kaslo St from 2nd to 8th Ave, 
Location: Kaslo St from 2nd to 8th Ave
Schedule: Nov 3, 2025 - Apr 30, 2026</content>
<id>urn:uuid:bca01990-bc12-4c6b-8f67-e3650275bb61</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/dc65be5a-e5fe-4887-b255-588e9c1565fe"/>
<published>2025-10-24T07:00:00Z</published>
<title>Kaslo St Road works and Sidewalk</title>
<updated>2025-10-24T23:26:51.3601516Z</updated>
</entry>
<entry>
<category term="Road Closure"/>
<content>Chester St - E 35th Av to E 37th Av                     Apr 2026 - Jun 2026 
E 37th Av - Fraser St to Prince Albert St             May 2026 - Jun 2026
Prince Albert St - E 38th Av to E 39th Av             May 2026 - Jul 2026
E 39th Av - Prince Albert St to Windsor St           Jun 2026 - Jul 2026 
Location: 
Schedule: May 15, 2026 - Jul 30, 2026; Weekdays; 7:00 AM - 3:00 PM</content>
<id>urn:uuid:7ada393f-ee27-4f3b-8874-f1e5c9307f5a</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/56d3faad-3a24-4167-bad5-f41c54260776"/>
<published>2025-11-27T08:00:00Z</published>
<title>Kensington Cedar South-West</title>
<updated>2026-05-28T19:08:11.2637931Z</updated>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Water scope COMPLETE. 
Street Renewal - Concrete and repaving substantially complete. 
 



Location: 
Schedule: Apr 14, 2025 - Oct 8, 2025</content>
<id>urn:uuid:1d54af74-758a-4890-bf54-5dddfad89ffd</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/4255b4c4-45aa-4465-961c-cd719348210b"/>
<published>2025-03-14T07:00:00Z</published>
<title>Knight St Renewal - E. 57th to Knight St Bridge</title>
<updated>2025-09-29T22:40:16.0412004Z</updated>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Sewer Renewal Project

Full closure: Garden Dr – between E 8th Ave and E 4th Ave; and E 4th Ave – between Garden Dr and Templeton Dr
Location:  between E 8th Ave and E 4th Ave; and E 4th Ave – between Garden Dr and Templeton Dr
Schedule: Apr 1, 2024 - Sep 30, 2024</content>
<id>urn:uuid:d516b725-d8f7-44f2-9581-5f9a13429f7a</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/3d616545-c79e-4ad9-ad9d-74e295b2d947"/>
<published>2022-10-26T07:00:00Z</published>
<title>Lakewood Dr &amp; Garden Dr Sewer Renewal Project</title>
<updated>2026-01-10T02:00:36.0939044Z</updated>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>This project is a sewer upgrade to provide a separated sewer main in the lane east of Garden Dr and north of E 10th Ave.
Traffic Impact: Will need the entire lane width, however, we will accommodate parking access when it is safe to do so.
Location: Garden Dr &amp; E 10th Ave.
Schedule: Sep 18, 2025 - Oct 31, 2025</content>
<id>urn:uuid:a5efa8c5-0167-452c-8bb7-e47d115a7150</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/fc6893a4-f043-4218-a447-fe846c46b43d"/>
<published>2025-09-18T07:00:00Z</published>
<title>Lane East of Garden Drive Sewer Upgrade</title>
<updated>2025-09-18T17:48:44.7969556Z</updated>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>This project is a sewer main extension where a separated sewer and drainage pipe will be installed from 1847 Larch St to the existing separated sewer main along L/S W 3rd Ave.

Initially the sewer operations crew will shutdown Larch St from L/S W 3rd Ave to just before W 3rd Ave. Once work is complete, the sewer operations crews will shut down the intersection of Larch St and W 3rd Ave including the small sections.
Location: 1847 Larch St
Schedule: May 12, 2025 - Jun 6, 2025</content>
<id>urn:uuid:aa65c707-7d96-47ca-9440-fc197f8757cf</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/be066dd0-b0ae-414d-b2a8-18ae5bede434"/>
<published>2025-04-30T07:00:00Z</published>
<title>Larch St and W 3rd Ave to L/S W 3rd Ave Sewer Main Extension</title>
<updated>2025-05-29T19:43:58.4150328Z</updated>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Precast barrier placement, roadway paint and new traffic signage.  Converting local roads to one-way vehicle traffic in vicinity of W 70th and Oak.
Location: 900-1000 blk W 71st
8500 blk Fremlin
8300-8600 blk Shaughnessy
8500-8600 blk Osler
8500-8600 blk Selkirk

Schedule: Sep 16, 2025 - Sep 18, 2025</content>
<id>urn:uuid:325fe4bd-da88-4bb7-a766-066bb1789622</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/67de3e23-96cd-4174-9d26-1b5e924a11b5"/>
<published>2025-09-08T07:00:00Z</published>
<title>Marpole One-Ways (Neighbourhood Traffic Calming)</title>
<updated>2025-09-08T21:21:02.3109712Z</updated>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Beginning in mid-July 2025, the City of Vancouver will begin upgrading aging sewer infrastructure along Highbury Street, between West 31st Avenue and the laneway south of West 33rd Avenue, including a section that runs beneath Memorial West Park.

What to Expect During Construction:
•	Access to park facilities and parking lots will be maintained at all times.
•	Access to the playground may be temporarily restricted due to safety concerns, if required
•	The intersection of West 33rd Avenue and Highbury Street will be closed to traffic.
•	The intersection of West 31st Avenue and Highbury Street will also be closed to traffic.
•	Highbury Street will be closed between:
           - West 30th Avenue and West 31st Avenue (north end of the park), and
           - West 33rd Avenue and West 34th Avenue (south end of the park)

Temporary parking restrictions will be in place along West 31st Avenue, West 33rd Avenue, Wallace Street, and Highbury Street to accommodate construction activities. Please watch for posted "No Parking" signs as work progresses.
***NOTE FOR 3-1-1 Agents***  - During the Holiday closure between Dec 24th and Jan 1st, 2026, please contact  Shane McElligott, W&amp;B Contractor at 647-643-1832 for any urgent matters***
Location: Alignment is along Highbury Street through Memorial West Park, between W 31st Ave and lane south of W 33rd Ave.
Schedule: Jul 7, 2025 - Jan 31, 2026; M - Sa; 7:00 AM - 7:00 PM</content>
<id>urn:uuid:7d3b805e-9a06-4d4a-8b99-fcb17c44ec3f</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/9d7ad385-d4e0-46fb-8e14-7a40f958b1ef"/>
<published>2025-07-07T07:00:00Z</published>
<title>Memorial West Trenchless Sewer Upgrade</title>
<updated>2026-04-29T01:01:10.1972464Z</updated>
</entry>
<entry>
<category term="Under Construction"/>
<content>Metro Vancouver emergency repair works to existing forcemain. 
Section 1: West 1st Avenue between Columbia St and Quebec St
Pause during FIFA
Location: W 1st Av - Columbia St to Quebec St
Schedule: Jun 24, 2025 - Oct 31, 2026</content>
<id>urn:uuid:118d576d-7120-45ca-91b1-fdcebcdb9eef</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/6665737b-1b89-4b1c-9f9b-d650e3de4f76"/>
<published>2025-04-24T07:00:00Z</published>
<title>Metro Vancouver Columbia Forcemain - Section 1</title>
<updated>2026-05-19T21:24:56.9034594Z</updated>
</entry>
<entry>
<category term="Under Construction"/>
<content>Metro Vancouver emergency repair works to existing forcemain. 
Section 2: From Yukon St and W 8th Av to Alberta St and W 2nd Av
Location: Yukon St - W 8th Av to W 7th Av / W 7th Av - Yukon St to Alberta St / Alberta St- W 7th Av to W 3rd Av
Schedule: Aug 1, 2025 - Oct 31, 2026</content>
<id>urn:uuid:6caceae0-fc7e-4c20-b75c-0b37652922d9</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/07511e9a-1668-409a-b259-ebc351d83f8d"/>
<published>2025-04-24T07:00:00Z</published>
<title>Metro Vancouver Columbia Forcemain - Section 2</title>
<updated>2026-05-19T21:27:23.8751059Z</updated>
</entry>
<entry>
<category term="Under Construction"/>
<content>Metro Vancouver emergency repair works to existing forcemain.
Section 3: From Alberta St and W 2nd Av to 50 metres south of Columbia St and W 1st Av
Pause during FIFA
Location: West 2nd Av - Alberta St to Columbia St 
Schedule: Aug 1, 2025 - Oct 31, 2026</content>
<id>urn:uuid:43b598a4-c1d4-427b-b1df-3092e7228ef6</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/3ed48c4a-312c-4451-b53f-6ecd74c2b24e"/>
<published>2025-04-24T07:00:00Z</published>
<title>Metro Vancouver Columbia Forcemain - Section 3</title>
<updated>2026-05-19T21:26:47.4974264Z</updated>
</entry>
<entry>
<category term="Under Construction"/>
<content>Section 4: From 50m south of Columbia Street and West 1st Avenue to Columbia St and W 2nd Av
Pause during FIFA
Location: Columbia St - W 1st Av to W 2nd Av
Schedule: Multiple occurrences as follows:
- Oct 1, 2025 - May 19, 2026
- May 20, 2026 - Jun 3, 2026
- Jun 4, 2026 - Oct 31, 2026
</content>
<id>urn:uuid:cb05acf8-509a-4d46-b991-16aba5c3cd29</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/4721b864-f15e-481d-a7d9-a79b43ba42ad"/>
<published>2025-04-24T07:00:00Z</published>
<title>Metro Vancouver Columbia Forcemain - Section 4</title>
<updated>2026-05-19T21:25:59.9767818Z</updated>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Section 5​: ​From W 1st Av and Quebec St to Quebec St and Terminal Av
Pause during FIFA
Paving work post FIFA
Location: Quebec St - W 1st Av to Terminal Av
Schedule: Dec 1, 2025 - May 29, 2026</content>
<id>urn:uuid:59ff6b5c-f379-4ee1-9655-9590ed959298</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cfefb79a-4d67-495e-8529-61aeaf8ff00c"/>
<published>2025-04-24T07:00:00Z</published>
<title>Metro Vancouver Columbia Forcemain - Section 5</title>
<updated>2026-05-20T18:44:12.8094906Z</updated>
</entry>
<entry>
<category term="Under Construction"/>
<content>Parking lane closure on the South Side of 300 Block of W 4th Avenue and Both Sides of 2000 Block of Alberta Street to facilitate utility maintenance.

Pay Station: B4-03-20 (6 parking spots); Pay Station: 78-20-09 (6 parking spots); Pay Station: 78-20-14 (6 parking spots)

WO# Charge code: LP10291
Location: South Side of 300 Block of W 4th Avenue From Alberta Street to 60m West of Alberta Street. Both Sides of 2000 Block of Alberta Street From W 4th Avenue to Lane South of W 4th Avenue. 
Schedule: Apr 16, 2026 - Aug 28, 2026; Weekdays; 7:00 AM - 5:00 PM</content>
<id>urn:uuid:3c9f4fb7-5944-4d17-9bf4-a3df3b2f5da6</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/eb5568c3-afbe-439a-880f-11a7930da601"/>
<published>2026-04-08T07:00:00Z</published>
<title>Metro Vancouver Utility Maintenance on 300 Block of W 4th Avenue</title>
<updated>2026-06-04T14:55:08.9223195Z</updated>
</entry>
<entry>
<category term="Under Construction"/>
<content>East and West bound mowing
Location: 2500 to 4600 Blk of W 16th Ave
Schedule: Jun 9, 2026 - Jun 10, 2026; All days; 9:30 AM - 2:30 PM</content>
<id>urn:uuid:da3c2a4f-1ac8-4cc8-b694-d71c39e17bbc</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/db4bb236-191e-42df-8cd6-cd928a96c3ab"/>
<published>2026-06-02T07:00:00Z</published>
<title>Mowing 16th Ave. Medians</title>
<updated>2026-06-02T22:01:15.4211801Z</updated>
</entry>
<entry>
<category term="Road Closure"/>
<content>*Upgrading critical sewer infrastructure along Kamloops Street between East Broadway and East 5th Avenue*

The existing combined sewer system will be replaced with a larger-capacity, separated system. One pipe for rainwater runoff and a second for sewage. The new sewer mains have a life expectancy of approximately 100 years to support the needs of the growing neighborhood.

The NEKSU project includes the replacement and separation of 1.8 km of combined sewer mains in the Hastings-Sunrise neighborhood.
Location: Nanaimo East Kamloops Sewer Upgrades is scheduled to begin with pre-work investigations December 2025, with major sewer work construction to begin in January 2026. 

Contact: eastkamloopsupgrades@vancouver.ca or 311
Schedule: Dec 1, 2025 - Dec 31, 2026; Weekdays; 7:00 AM - 5:00 PM</content>
<id>urn:uuid:b9d1468d-64b1-40ef-aef8-bccc31261c17</id>
<link href="https://vancouver.ca/streets-transportation/nanaimo-east-kamloops-sewer-upgrades.aspx"/>
<published>2025-11-10T08:00:00Z</published>
<title>Nanaimo East Kamloops Sewer Upgrades (NEKSU)</title>
<updated>2026-01-05T20:41:57.7172216Z</updated>
</entry>
<entry>
<category term="Road Closure"/>
<content>Project Duration from Inception to Close Out

Design &amp; Procurement - 4 months - April 2026 - July 2026
Construction Tender - 2 months - August 2026 - September 2026
Pre-Work &amp; Construction - 15	months - October 2026 - December 2027
Project Total - 21 months 
Location: Sewer work will take place on various roads and alleyways within the area from Penticton St to Kaslo St, and from E Broadway to E 5th Ave.
Schedule: Jun 9, 2026 - Dec 31, 2027</content>
<id>urn:uuid:d1e67712-813c-4f36-8c6d-aeea64a35c66</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/56a1a22e-ce5e-429a-8d15-e616cbb37892"/>
<published>2026-06-09T07:00:00Z</published>
<title>Nanaimo East Penticton Sewer Upgrades Project (NEPSU)</title>
<updated>2026-06-09T20:51:05.7816339Z</updated>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Full closure of 100 E Hastings, from Columbia to Main st

New times: 7:00am to 3:00pm
Location: 
Schedule: Jun 21, 2026 7:00 AM - 3:00 PM</content>
<id>urn:uuid:09bae46a-f353-47bd-93ae-6dff01733571</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a104d131-d54d-475e-bb01-c60cbc62caa6"/>
<published>2026-03-09T07:00:00Z</published>
<title>National Indigenous Peoples Day</title>
<updated>2026-05-06T21:08:47.1745805Z</updated>
</entry>
<entry>
<category term="Under Construction"/>
<content>New St. Paul’s Hospital Area Improvements.


National/Station Intersection (ongoing)
-Sep 2023 to Oct 13, 2023

National between Station and National Yards (to be confirmed)
-Tentative start date Jun 2024

Prior, Dunlevy (to be confirmed)
-Anticipated 2025

Location: Prior St, Station, National Ave, Dunlevy Ave
Schedule: Jan 3, 2022 - Jan 1, 2027</content>
<id>urn:uuid:4a9dc5a8-b071-4af3-a121-0fa17b8d92c9</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1c7c5863-268e-40e2-a280-2a1bac04b59d"/>
<published>2022-11-08T08:00:00Z</published>
<title>New St. Paul’s Hospital Area Improvements </title>
<updated>2025-07-06T01:00:53.500531Z</updated>
</entry>
<entry>
<category term="Under Construction"/>
<content>PMB - temporary zone until Dec 31, 2025

Nov 15 2024 - Extension made until end of 2025

Nov 20 2025 - Extension made until end of 2026.
Location: For use by WISH vans only
Schedule: Jun 3, 2024 - Dec 31, 2026</content>
<id>urn:uuid:8ebc0350-437f-45e9-98ed-d8214ca81a0b</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/bd378ac4-c29d-417f-98c9-bc83fd0b4742"/>
<published>2024-05-30T07:00:00Z</published>
<title>No Stopping Except Authorized Vehicles</title>
<updated>2025-11-21T00:13:15.6261724Z</updated>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Oak Street Upgrades Phase 2 – W. 70th Ave (Daytime Work) until Aug 2024.
Consisting of sewer upgrades / separation on W. 70th Ave to Fremlin. 
Location:  W. 70th Ave from Oak St to Fremlin St
Schedule: Feb 1, 2024 - Aug 20, 2024</content>
<id>urn:uuid:1ef8eb66-8afb-4844-bc68-0315590346ae</id>
<link href="https://vancouver.ca/streets-transportation/oak-street-sewer-separation-upgrades.aspx "/>
<published>2024-01-29T08:00:00Z</published>
<title>Oak Street Upgrades - Phase 2 (W. 70th Ave)</title>
<updated>2024-11-14T02:00:31.3919367Z</updated>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>This work will occur over the May 31st weekend (significant daytime &amp; nighttime impacts - 1 lane NB) and will continue through the next week to June 13th (daytime &amp; nighttime impacts - 2 lanes NB &amp; SB).
Location: Oak St, W. 70th to W. 64th 
Schedule: May 31, 2024 - Jun 13, 2024</content>
<id>urn:uuid:77193b8c-f2b4-421f-879d-36248566fc22</id>
<link href="https://vancouver.ca/streets-transportation/oak-street-sewer-separation-upgrades.aspx "/>
<published>2024-05-16T07:00:00Z</published>
<title>Oak Street Upgrades - Phase 3 (Oak St) Pre-Works</title>
<updated>2024-11-14T02:00:31.3919367Z</updated>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Upcoming intersection work – August 22 – 27

Phase 3 will begin with approximately 6 days of work at the intersection of Oak Street and W. 70th Avenue. Work will begin on the evening of Thursday, August 22nd and expect to be completed by Tuesday evening, August 27th.  Workers will be on site 24/7 during this period to reduce the duration of works through this busy intersection.

The following traffic impacts are expected:
•	Traffic lanes will be reduced on Oak Street with at least one lane remaining open in each direction. 
•	Through traffic along W. 70th Avenue may be restricted at the intersection.  Please follow detours.
VPD Traffic Team will be on-site to manage traffic at the intersection during construction.  Residents and travellers in the area should expect delays and plan alternate routes.

Location: Oak Street and W 70th Av intersection
Schedule: Aug 22, 2024 - Aug 27, 2024</content>
<id>urn:uuid:82d73d84-306f-45ce-b664-f0228dbd9aee</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/01c4b568-4d91-4423-b7ce-cf35d36da09a"/>
<published>2024-08-20T07:00:00Z</published>
<title>Oak Street Upgrades - Phase 3 (Oak Street and W 70th Av Intersection)</title>
<updated>2024-08-23T20:04:34.0306504Z</updated>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Oakridge Centre redevelopment

QuadReal Property Group and Westbank Development, the owners of Oakridge Centre,  are moving forward with the redevelopment of the Oakridge Centre, based on the rezoning that was approved in 2014.

The Oakridge Centre is currently home to shops, services, offices, and community and residential space. Many of the shops and services will remain open throughout the redevelopment. The current site design reflects a number of refinements responding to conditions of the 2014 rezoning and policy changes that have emerged since Council approved the rezoning of the site.

https://vancouver.ca/home-property-development/oakridge-redevelopment.aspx
Location: W 41st Ave and Cambie St
Schedule: Jun 1, 2021 - May 30, 2025</content>
<id>urn:uuid:e0486794-29ca-42cb-9c97-2f640bccd693</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/86da498f-8a4c-4741-a995-8605cd482af3"/>
<published>2023-10-30T07:00:00Z</published>
<title>Oakridge Town Centre - Development Site at W 41st Ave and Cambie St</title>
<updated>2025-07-04T01:00:26.1442131Z</updated>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Paving works only. East side (NB direction) of Boundary ONLY.  Schedule TBC for delivery in 2027
Location: 
Schedule: Mar 1, 2027 - Nov 1, 2027</content>
<id>urn:uuid:106a8e10-4e8b-4440-8115-ea0822ed5924</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/190f28fe-8144-4645-bd36-bbab1a61be08"/>
<published>2025-10-22T07:00:00Z</published>
<title>PLACEHOLDER City of Burnaby - Boundary Rd Paving Project, E. 49th (Imperial) to Marine Way</title>
<updated>2025-10-22T22:02:18.595624Z</updated>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Establish a safer and more comfortable separated cycling path between Balsam St and Ogden Ave for all users, including children, families, and people with reduced mobility. Improving entryways into the park. 



Location: Kits Seaside Greenway
Schedule: Sep 9, 2024 - Dec 20, 2024</content>
<id>urn:uuid:9e134d0e-f047-4a57-8e94-60e0b1eb1ccf</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/efb5988f-5482-4118-8137-1035b0643ed9"/>
<published>2024-08-19T07:00:00Z</published>
<title>Parks Bd - Kits Seaside Greenway </title>
<updated>2026-02-28T02:00:30.0032697Z</updated>
</entry>
<entry>
<category term="Road Closure"/>
<content>Pedestrian Only Zone
Location:  Granville St - Davie to W Georgia St
Schedule: Jun 8, 2026 - Jul 27, 2026</content>
<id>urn:uuid:f1777870-63c7-41d1-969f-bfdf55e835ee</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1c0bff1b-73f3-489d-ae54-20a393f010ba"/>
<published>2026-05-14T07:00:00Z</published>
<title>Pedestrian Zone</title>
<updated>2026-06-08T17:43:28.1607071Z</updated>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Project: Creative Energy Decarbonization
Location: Expo Blvd, Carrall St to Griffiths Way
Schedule: Aug 3, 2026 - Dec 31, 2026</content>
<id>urn:uuid:819ecb50-5fdd-4b8f-9ad7-b5a83352415a</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/20c12b0f-dd5e-4ff6-ba84-bd24543bc7e0"/>
<published>2025-11-12T08:00:00Z</published>
<title>Placeholder - Creative Energy Decarbonization</title>
<updated>2025-12-02T19:23:04.1919638Z</updated>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Remove the existing 6 high mast poles and replace with new poles and luminaires
Location: Georgia/Dunsmuir Via Duct
Schedule: Jul 20, 2026 - Aug 21, 2026</content>
<id>urn:uuid:9294c146-3d36-48b7-a6cc-3626f78d9ea3</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/7a199adc-5919-465f-85b9-a454c728ae41"/>
<published>2026-06-02T07:00:00Z</published>
<title>Placeholder - Georgia/Dunsmuir Viaduct Lighting Masts Replacement</title>
<updated>2026-06-02T20:32:12.215128Z</updated>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Please confirm with Catherine Chow for any specific questions. For Transformer Delivery - FULL Closure of W. 6th from Yukon to Columbia for 3 days in late August. (Including Alberta north and south of W. 6th). 
Location: 
Schedule: Jul 15, 2026 - Sep 30, 2026</content>
<id>urn:uuid:4d1f218b-1c1f-4185-98ca-55e7925de86f</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a484ab1c-a79f-42cb-91b7-dd9231d1f35b"/>
<published>2026-03-04T08:00:00Z</published>
<title>Placeholder - Mt Pleasant Substation Transformer Install</title>
<updated>2026-03-04T17:19:30.4171065Z</updated>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Construction of new pedestrian crossing and bike permeable median at the intersection of Prince Edward St and E 16th Ave. Construction will also include upgrades of the southwest corner concrete ramp, utility adjustments, traffic signage and road marking updates. This work is going to be performed by external contractor. Traffic control measures will be in place during construction. Expect temporary intersection full-closure (7am-5pm, up to one week duration).
Location: Prince Edward St and E 16th Ave
Schedule: Nov 12, 2025 - Nov 18, 2025</content>
<id>urn:uuid:65a7889f-5312-4ed8-b9da-615c7a6342b0</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/02b9bf54-43f4-4c56-8d30-827e1be2483f"/>
<published>2025-10-01T07:00:00Z</published>
<title>Prince Edward St and E 16th Ave - New Pedestrian Crossing and Bike Permeable Median</title>
<updated>2025-10-02T16:04:01.302921Z</updated>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>19+ Block Party closing unit W 3rd from Manitoba to Ontario and 1900 Ontario closed from W 3rd to lane south


*Bike Lane closure of Ontario from 5th to 3rd ave - reroute plan detour at Ontario and 5th to Quebec to 3rd
Location: W 3rd from Manitoba to Ontario and 1900 Ontario closed from W 3rd to lane south
Schedule: Jul 31, 2026 - Aug 2, 2026</content>
<id>urn:uuid:1884354d-6a8a-4c34-abed-054b0574c630</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e05750fa-4f29-4fa7-a03b-37eae0119d65"/>
<published>2026-03-16T07:00:00Z</published>
<title>Public Disco Pride Block Party</title>
<updated>2026-05-20T18:47:08.26727Z</updated>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>City's external contractor will be working on the east side of Quebec Street between 3rd Avenue and the lane north to construct a protected, raised bike lane, and the associated roadway upgrades. Construction is scheduled to take place during normal working hours weekdays from April 22 to May 9, including localized excavation, gravel base compaction, concrete works, utility adjustments, targeted paving and road marking restoration.
Location: 1800 Quebec Street between 3rd Avenue and the lane north. 
Schedule: Apr 22, 2025 - May 9, 2025</content>
<id>urn:uuid:560a8355-6537-4756-9f51-256449633235</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/7e4e7490-2ab4-4942-841e-6162f06ca281"/>
<published>2025-04-24T07:00:00Z</published>
<title>Quebec and 3rd - Protected Bike Lane </title>
<updated>2025-04-24T17:33:13.406277Z</updated>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>City's external contractor will be working on the east side of Quebec Street &amp; 5th Avenue intersection to construct a raised crossing and bike lane tie-in and the associated sidewalk upgrades. Construction is scheduled to take place during normal working hours weekdays from April 22 to May 9, including localized excavation, gravel base compaction, concrete works, utility adjustments, targeted paving and road marking restoration.
Location: Quebec Street &amp; 5th Avenue intersection.
Schedule: Apr 24, 2025 - May 9, 2025</content>
<id>urn:uuid:690ff062-eb7f-44ce-b804-4eec4482f984</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/09de180a-b1ec-4aa5-b01d-4c22f0667b0c"/>
<published>2025-04-24T07:00:00Z</published>
<title>Quebec and 5th - Raised Crossing</title>
<updated>2025-04-24T19:21:31.1796029Z</updated>
</entry>
<entry>
<category term="Under Construction"/>
<content>Starting in March 2026, the City of Vancouver will be completing critical sewer renewals at the 
south end of Strathcona Park between Raymur Avenue and Chess Street. 

In late 2023, the sewer pipe running underneath the south side of Strathcona Park experienced 
a leak. Crews responded immediately, and as temporary solution an overground bypass was 
installed to maintain service to residents and businesses. The overground bypass was 
maintained while crews determined the best way to preserve the Cottonwood Community 
Garden and maintain park conditions. 

The city will use trenchless construction method to install the new pipe underground. This work 
will require crews to excavate access pits at both ends of the park (see map on the attached 
page) and use specialized equipment to install the new pipes with minimum surface 
disturbance. 
Location: South end of Strathcona Park between Raymur Avenue and Chess Street
Schedule: Mar 9, 2026 - Jul 17, 2026</content>
<id>urn:uuid:baf198c2-fb71-43f4-8ea4-46af0fdafb5c</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/3ba646e4-e239-4f43-a9de-399cc7dbc22c"/>
<published>2026-03-13T07:00:00Z</published>
<title>Raymur Forcemain Trenchless Rehabilitation (RFTR) Project </title>
<updated>2026-06-01T18:07:10.3540018Z</updated>
</entry>
<entry>
<category term="Under Construction"/>
<content>Nootka St - E 20th Av to E 22nd Av | Nov 2025 - Dec 2025 - COMPLETE 
E 22nd Av - Kaslo St to Nootka St | Jan 2026 - Mar 2026 -  COMPLETE
E 22nd Av - Nootka St to Rupert St | Mar 2026 - Jun 2026 - UNDER CONSTRUCTION
E 20th Av - Nootka St to Lillooet St | June 2026 - Jul 2026 
Location: 
Schedule: Recurring schedule as follows:
- Nov 28, 2025 - Dec 19, 2025; Weekdays; 7:00 AM - 3:00 PM
- Jan 5, 2026 - Jul 15, 2026; Weekdays; 7:00 AM - 3:00 PM
</content>
<id>urn:uuid:5b2eeba4-1321-43b0-8ad5-b43c46d1b540</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/52dfca66-b7a5-4a1e-ba56-b8854961972b"/>
<published>2025-01-07T08:00:00Z</published>
<title>Renfrew Collingwood Centre </title>
<updated>2026-05-28T18:59:00.8389263Z</updated>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>E 17th Av - Garden Dr to Nanaimo St                                 Oct 2026 - Nov 2026
E 16th Av - Copley St to Penticton St                                 Oct 2026 - Nov 2026 
E 17th Av - Copley St to Penticton St                                 Oct 2026 - Nov 2026 
Penticton St - Grandview Hwy to E 17th Av                        Nov 2026 - Jan 2027 
E 15th Av - Nanaimo St to Copley St                                  Jan 2027 - Feb 2027 
E 15th Av - Copley St to L/W of Penticton St                      Jan 2027 - Feb 2027 

Location: 
Schedule: Oct 23, 2026 - Jan 13, 2027; All days; 7:00 AM - 3:00 PM</content>
<id>urn:uuid:4c5fe2da-1877-44c4-9b0a-7054f4b4d0a3</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/36080eb1-8c22-474b-bdc8-0ecdb2027eab"/>
<published>2026-04-02T07:00:00Z</published>
<title>Renfrew Collingwood North West</title>
<updated>2026-05-28T19:06:01.9571201Z</updated>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Alleyway lane closure on Both Sides of Lane West of 5300 Block of Oak Street to facilitate underground utility construction.

WO#  PER-4493284  / 11945U
Location: Both Sides of Lane West of 5300 Block of Oak Street From Lane North of W 38th Avenue to Lane South of W 38th Avenue.
Schedule: Jun 15, 2026 7:00 AM - Jun 19, 2026 5:00 PM</content>
<id>urn:uuid:71307cbb-1809-4e15-a820-247f13ab4752</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d2271502-fc9f-48f4-a901-b4d78534db54"/>
<published>2026-06-04T07:00:00Z</published>
<title>Rogers Underground Utility Construction on Lane West of 5300 Block of Oak Street</title>
<updated>2026-06-02T22:27:55.8178115Z</updated>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Parking lane closure and Single lane alternating traffic in effect on the East Side of 6000 Block of Dunbar Street and the East Side of 6100 Block of Dunbar Street to facilitate utility maintenance.

WO# PRJ4380631
Location: East Side of 6000 Block of Dunbar Street From 50m North of SW Marine Drive to 85m North of SW Marine Drive. East Side of 6100 Block of Dunbar Street From 45m South of SW Marine Drive to 65m South of SW Marine Drive.
Schedule: Jun 20, 2026 8:00 AM - 4:00 PM</content>
<id>urn:uuid:3c069749-e2d5-4f28-b60a-6670cd014811</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/01b969bf-01ce-4a51-9e6a-811a50eaa215"/>
<published>2026-05-29T07:00:00Z</published>
<title>Rogers Utility Maintenance on 6000-6100 Block of Dunbar Street</title>
<updated>2026-05-29T18:59:38.2508459Z</updated>
</entry>
<entry>
<category term="Under Construction"/>
<content>Alleyway lane closure on the East Side of Lane West of 3200-3500 Block of Arbutus Street to facilitate utility maintenance.

WO# V250114A01
Location: East Side of Lane West of 3200-3500 Block of Arbutus Street From Lane South of W 16th Avenue to Lane South of W 19th Avenue.
Schedule: Jun 1, 2026 - Jun 12, 2026; Weekdays; 8:00 AM - 4:00 PM</content>
<id>urn:uuid:9c2ec98f-9a72-4a36-ae0a-ff66f2c80703</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a466d55a-5040-4227-9c18-ec940ca5fdb8"/>
<published>2026-05-26T07:00:00Z</published>
<title>Rogers Utility Maintenance on Lane West of 3200-3500 Block of Arbutus Street</title>
<updated>2026-05-26T19:11:07.302571Z</updated>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Road Closure/Activation: 
GRANVILLE ST 500 - 800 Block
Location: 
Schedule: Sep 4, 2026 6:00 AM - Sep 8, 2026 12:30 AM</content>
<id>urn:uuid:2d596072-02a2-4f5f-86a2-ddd65d091b0b</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1dcb75d1-68ab-459e-bcce-f729e85b434b"/>
<published>2026-03-17T07:00:00Z</published>
<title>SE-2024-00447: 2026 TAIWANfest</title>
<updated>2026-03-17T22:37:20.8790164Z</updated>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Activation:
Alexander St, 400-500 block

Jackson Ave, 00, 100, 200 blocks

Dunlevy Ave, 200 block

Powell Street, 400 block, north and south side event parking only

Cordova St, 400 block, north side, event parking only

Location: 
Schedule: Jul 30, 2026 6:00 AM - Aug 2, 2026 11:30 PM</content>
<id>urn:uuid:f34ed4b2-9880-47e2-b826-3bc02935ca82</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/213f7fc8-41d1-470a-9f3f-617e07b229bf"/>
<published>2026-04-02T07:00:00Z</published>
<title>SE-2025-00562: 50th Annual Powell Street Festival</title>
<updated>2026-06-05T21:46:00.9990996Z</updated>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>
Activity: full closure of W Broadway from MacDonald to Blenheim and surrounding side streets
•	Activity contained to 2800 - 3200 W Broadway, MacDonald to Blenheim, and 2400 W 8th - 2500 W10th, along Trutch/Musqueamview, Balaclava, Carnarvon, Bayswater and Mackenzie - full road closure with VPD on hand to assist.
•	Additional parking restrictions on 2700 and 3300 W Broadway, Stephens and Waterloo, 2800-3200 W 10th, MacDonald to Blenheim (N/S) and W 8th MacDonald to Blenheim (S/S), 2300 &amp; 2600 W 7th to W 11th along Trutch/Musqueamview, Balaclava, Carnarvon, Bayswater and Mackenzie (W/S), 2800 Kitsilano Diversion (W/S)

Location: 
Schedule: Jun 28, 2026 5:00 AM - 11:30 PM</content>
<id>urn:uuid:550f6b70-53ec-41ff-9038-179dadc09f00</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e0f1148b-9f08-4bb7-9170-dc9e7aa7b509"/>
<published>2026-01-06T08:00:00Z</published>
<title>SE-2025-00607: Greek Day on Broadway</title>
<updated>2026-04-07T21:13:22.9073051Z</updated>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Activation:
2800-3200 Block W Broadway
2800-3200 Block W 8th AV
2800-3200 Block W 10th AV

2300-2600 Block Mackenzie ST
2300-2600 Block Bayswater ST
2300-2600 Block Carnarvon ST
2300-2600 Block Balaclava ST
2300-2600 Block Musqueamview ST



Location: 
Schedule: Jun 28, 2026 5:00 AM - 11:30 PM</content>
<id>urn:uuid:6170e683-244b-46b1-8b03-dd0ff7eff6c4</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/dfc2237e-4e3e-4f20-ab5c-1210c29de896"/>
<published>2026-04-17T07:00:00Z</published>
<title>SE-2025-00607: Greek Day on Broadway - 2026</title>
<updated>2026-04-17T21:18:06.8627855Z</updated>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Watermelon Foundation planning on hosting a block party on Commercial street where they are located for the families and children currently attending their programs. We also hope to welcome any
neighbors or business in the community.
Location: 
Schedule: Jul 11, 2026 8:00 AM - 7:00 PM</content>
<id>urn:uuid:840e1270-02e0-4140-8100-91f3f7b21ad7</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/5745d554-a35c-4a17-9158-0abc3d056b00"/>
<published>2026-01-09T08:00:00Z</published>
<title>SE-2025-00686: Watermelon Foundation Block Party</title>
<updated>2026-01-10T00:21:01.8634471Z</updated>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Activation:
300 Block E 11th Av
Location: Activation:
300 Block E 11th Av
Schedule: Sep 19, 2026 10:00 AM - 6:00 PM</content>
<id>urn:uuid:a27e92d8-df6c-4284-bac0-ea77e5c8793e</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/72ebefac-1635-4f9f-b931-7a8809100621"/>
<published>2026-03-25T07:00:00Z</published>
<title>SE-2025-00714: 11th &amp; Kingsway Block Party</title>
<updated>2026-03-25T21:16:54.7662345Z</updated>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Outdoor Family Music Festival with three day stages, an evening mainstage, artisans, food vendors and alcohol service.


a robust parking mitigation plan in this area to assist the residents during the festival.
Location: Jericho Park 
Schedule: Jul 7, 2026 8:30 AM - Jul 24, 2026 5:30 PM</content>
<id>urn:uuid:407d8eb5-e313-4f7a-bb2c-91196ea84e9d</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/55b51367-73c2-4275-a04b-490a925ff132"/>
<published>2026-03-05T08:00:00Z</published>
<title>SE-2026-00063: Vancouver Folk Music Festival</title>
<updated>2026-05-14T14:24:40.7176195Z</updated>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>1/2 220 Block of Princess, North of alley to Powell ST
Location: 
Schedule: Sep 22, 2026 11:30 AM - 5:30 PM</content>
<id>urn:uuid:eef72931-43eb-4c12-89d9-06d92dced003</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/c5f64057-e3a4-425d-916b-6873bb52602e"/>
<published>2026-03-31T07:00:00Z</published>
<title>SE-2026-00118: Men's Wellness Fair</title>
<updated>2026-03-31T17:29:44.7808967Z</updated>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Taiko drum and traditional dance performed to remember ancestors and departed ones.
Dancing on the street between Cordova Street and Jackson Avenue in front of Vancouver Buddhist Temple 220 Jackson Avenue
Location: 
Schedule: Jul 12, 2026 9:00 AM - 7:00 PM</content>
<id>urn:uuid:a8ae85e9-a1c8-408c-8d6f-27ec684bd90d</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/f4a860ba-3728-4633-b939-d78366ad83a8"/>
<published>2026-03-12T07:00:00Z</published>
<title>SE-2026-00131: Obon Festival</title>
<updated>2026-03-12T17:30:54.2858716Z</updated>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Closure/Activation:
100 Block E 6TH AVENUE

City Centre Artist Lodge (2111 Main St. Vancouver, BC V5T 3C6).

Street Closure Sep 12, 2026: East 6th Ave, between Main St and the East side of the parking lot entrance at 123 E 6th.
Location: 
Schedule: Sep 11, 2026 9:00 AM - Sep 12, 2026 11:00 PM</content>
<id>urn:uuid:9f1a6c3a-d663-4ad5-813d-072d75abf1c6</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/6e03ceb6-6f58-473e-a2f0-31e96a4bbbcb"/>
<published>2026-03-19T07:00:00Z</published>
<title>SE-2026-00153: Picklefest YVR</title>
<updated>2026-03-19T17:03:24.6128001Z</updated>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Activation:
400 Block Abbott ST
Location: 
Schedule: Aug 14, 2026 9:00 AM - 4:00 PM</content>
<id>urn:uuid:c610ffa3-954d-4a18-a54a-f05815c60fd6</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/c5ae57ad-e8f9-438c-83d7-6bf614240d85"/>
<published>2026-05-22T07:00:00Z</published>
<title>SE-2026-00165: Lunch Meet Friday - Abbott</title>
<updated>2026-05-22T21:47:39.1060983Z</updated>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>300 block of Carrall Street
Hastings to south
laneway to north
Location: 
Schedule: Aug 28, 2026 9:00 AM - 4:00 PM</content>
<id>urn:uuid:45ea043c-9f69-461b-8d77-af846db6ee1c</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a7c23483-046b-4308-94c9-f728a24fc83a"/>
<published>2026-05-08T07:00:00Z</published>
<title>SE-2026-00184: Lunch Meet Friday - Carrall</title>
<updated>2026-05-08T23:22:59.9245449Z</updated>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Activation:
300 Block Carrall
Location: 
Schedule: Aug 28, 2026 9:00 AM - 4:00 PM</content>
<id>urn:uuid:fb84c567-8c04-49cf-ba6b-f5990373d124</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/f050b1a7-fb0b-45c5-b859-f56e3c3a4c0d"/>
<published>2026-05-22T07:00:00Z</published>
<title>SE-2026-00184: Lunch Meet Friday - Carrall</title>
<updated>2026-05-22T21:53:24.1931499Z</updated>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Carrall Alley from Water ST to the North alley, between The Local and Monarca. 
Location: 
Schedule: Jul 3, 2026 6:00 AM - 11:30 PM</content>
<id>urn:uuid:4a443c50-cac8-4b6f-9d34-17b67069afa2</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/fb24fc1b-1897-4387-8a53-8139f9d10730"/>
<published>2026-05-06T07:00:00Z</published>
<title>SE-2026-00289: Public Outdoor Soccer Viewing Event</title>
<updated>2026-05-06T23:30:44.989184Z</updated>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Activation:
400 Abbott ST
Location: 
Schedule: Sep 11, 2026 9:00 AM - 4:00 PM</content>
<id>urn:uuid:9c8ff731-7f79-44ab-ad12-69625772e80b</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/75ca64cc-b6d2-46df-8bef-369fc2d1b051"/>
<published>2026-05-26T07:00:00Z</published>
<title>SE-2026-00380: Lunch Meet Friday - Abbott</title>
<updated>2026-05-26T22:17:02.8868792Z</updated>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Activation:
300 Block Hawks AV
Location: 
Schedule: Jul 30, 2026 9:00 AM - 5:00 PM</content>
<id>urn:uuid:6d6e9f9b-c09c-4bec-bc57-baabbf263493</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/428e02dc-d6ce-45a9-8092-88416afa4b5f"/>
<published>2026-06-03T07:00:00Z</published>
<title>SE-2026-00396: V6A Annual Block Party</title>
<updated>2026-06-03T23:38:23.3144925Z</updated>
</entry>
<entry>
<category term="Road Closure"/>
<content>Lord Selkirk Elementary Year-Round-School-Street. Full closure of 1700 E 22nd Av from September 3, 2025 to June 25, 2026, all school days
Times: 8:40-9:10AM, 2:45-3:30PM

Location: E 22nd Ave from Welwyn to Commercial St
Schedule: Sep 3, 2025 - Jun 25, 2026</content>
<id>urn:uuid:3d5a0723-20ae-42b1-a240-8107892cffee</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/9bcb9dfb-2439-43f4-b227-8ea369d577c7"/>
<published>2025-07-22T07:00:00Z</published>
<title>School Street Closure at 1700 E 22nd Av</title>
<updated>2025-07-22T20:21:05.0591671Z</updated>
</entry>
<entry>
<category term="Road Closure"/>
<content>Gordon Elementary Year-Round-School-Street. Full closure of 2200 Bayswater St from September 16, 2025 to June 23, 2026, every Tuesday. May 19, 2026 to June 12, 2026 All school days.
Times: 8:40-9:10AM, 2:45-3:30PM
Extended hours: Every Friday, 2:45 - 4:00pm(May 19 - June 12, 2026)
Location: Bayswater St between W 6th and W 7th Av
Schedule: Sep 16, 2025 - Jun 23, 2026</content>
<id>urn:uuid:47a75448-b19e-4061-8067-fdcbfe4e122d</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/98cda8a2-a5e8-41b7-af15-c4cfb742076e"/>
<published>2025-07-22T07:00:00Z</published>
<title>School Street Closure at 2200 Bayswater St</title>
<updated>2026-02-05T20:02:41.6623056Z</updated>
</entry>
<entry>
<category term="Road Closure"/>
<content>Full closure of 1600 block of Adanac St from June Monday 8, 2026 to June Monday 15, 2026 at 3:30 pm
Location: Adanac St from Woodland Dr to Commercial Dr
Schedule: Jun 8, 2026 - Jun 15, 2026; Weekdays; 7:00 AM - 3:30 PM</content>
<id>urn:uuid:f3d04609-8db6-4a67-86e9-57a41a0ed2f7</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/7f39bdd9-99f2-4e36-9fa3-6f665b674598"/>
<published>2026-06-08T07:00:00Z</published>
<title>Sewer Service of 1600 block of Adanac St</title>
<updated>2026-06-08T23:55:49.9070067Z</updated>
</entry>
<entry>
<category term="Road Closure"/>
<content>Full closure of 400 block of W 21st Av from June Friday 5, 2026 to June Thursday 11, 2026 at 3:30 pm
Location: W 21st Av from Ln E of Cambie St to Yukon St
Schedule: Jun 5, 2026 - Jun 11, 2026; Weekdays; 7:00 AM - 3:30 PM</content>
<id>urn:uuid:90d62dc1-1f09-4794-a9f3-d9e6ed30470e</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d71b12a9-a8e4-4ff1-9471-27161e63dc2b"/>
<published>2026-06-05T07:00:00Z</published>
<title>Sewer Service of 400 block of W 21st Av</title>
<updated>2026-06-05T22:29:42.3382225Z</updated>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>**Work paused to resume Q3 2024**

Sewer Package for 2021

Sewer and Streets, Residential Streets Only (low impact)


Location: Various Locations
Schedule: Feb 1, 2021 - Jan 1, 2025</content>
<id>urn:uuid:73972a0e-db4e-400c-aba4-80cd0e01f52a</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/811c1c9a-b923-44ed-a472-efcbda0649dd"/>
<published>2021-02-23T08:00:00Z</published>
<title>Shaughnessy Sewer Package </title>
<updated>2025-06-18T01:00:56.7161266Z</updated>
</entry>
<entry>
<category term="Road Closure"/>
<content>This project is an externally constructed sewer project in the Shaughnessy neighbourhood aimed to provide new separated sewers in the area.

Full road closures will occur at different sections within the project boundaries over the course of the construction period.

June 2026 - Sewer work reaching completion, restoration work remaining
Location: Between Oak Street (west) and Hudson Street (east), from the south side of the West King Edward Avenue (WKE) to the north side of West 29th Avenue.
Schedule: Jun 30, 2025 - Aug 30, 2026; Weekdays; 7:00 AM - 4:00 PM</content>
<id>urn:uuid:df6cf491-8f12-491a-b920-03ee9a0866ec</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/7ed4d284-aef8-48c2-8e07-cb12f97a7f20"/>
<published>2025-05-13T07:00:00Z</published>
<title>Shaughnessy Sewer Renewal Project</title>
<updated>2026-06-01T18:09:35.7971635Z</updated>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Charity bike ride around Jonathon Roger's Park

Closed circuit bicycle race around Jonathan Rogers Park, with closed city streets and beer garden. This will be a replica of Awesome Grand Prix, which ran from 2017-2019. Similar events include Gastown Grand Prix.
Location: 100-200 W 7th &amp; 8th Av, 2300 Alberta and Manitoba - loop around Jonathon Roger's Park. Columbia st will be closed as well as it's in the closure area
Schedule: Jul 4, 2026</content>
<id>urn:uuid:e298bfbb-8857-4f8c-86bd-2c47fc63d33a</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/65d4fa50-a8bb-4448-a64d-e92c72b245dc"/>
<published>2026-05-20T07:00:00Z</published>
<title>Shim's Ride</title>
<updated>2026-05-20T19:53:17.0638516Z</updated>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>last week of school carnival for Churchill students

Full closure of 7100-7200 Heather from W 57th to W 54th - 8am to 5pm
Location: 7000-7200 Heather St
Schedule: Jun 23, 2026</content>
<id>urn:uuid:578960f9-e0cb-411c-97c8-9b2d2a78bb7a</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/8180493c-d54f-49e9-9165-aaba3dbdb05f"/>
<published>2026-03-02T08:00:00Z</published>
<title>Sir Winston Churchill School Carnival</title>
<updated>2026-03-02T22:22:48.920739Z</updated>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>New traffic signal installation.
Location: 
Schedule: Jan 15, 2025 - Mar 31, 2025</content>
<id>urn:uuid:bc12db91-e4f2-4d92-a815-470ea84d41b3</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/c58703ab-dba9-404a-ac57-02843e86b5c8"/>
<published>2025-02-14T08:00:00Z</published>
<title>Slocan and E. 22nd Signal Installation</title>
<updated>2025-02-14T18:22:00.3246027Z</updated>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Replacement of the Spanish Banks culvert at Spanish Banks Beach Park
• Jul 7, 2026: Site mobilization and site prep work with Single Lane Alternating Traffic
• Jul 15-Sep 30, 2026:  NW Marine Drive will be closed within the MoTI project limits.
• Sept 30 -Oct 31, 2026:  Single Lane Alternating Traffic will be in effect along NW Marine Drive within the project limits.

Location: NW Marine Drive - Spanish Banks Beach Park
Schedule: Jul 7, 2026 - Oct 31, 2026</content>
<id>urn:uuid:3d10d7dd-1226-4376-acd7-980b5f262809</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/0e6b4ab9-4c2a-49d5-96cd-9598e7834be2"/>
<published>2025-05-23T07:00:00Z</published>
<title>Spanish Banks - Culvert Replacement - Spanish Banks Beach Park</title>
<updated>2026-04-21T22:41:56.5574933Z</updated>
</entry>
<entry>
<category term="Under Construction"/>
<content>St George Rainway, Broadway to E. 5th. Green Infrastructure Led project. 

NO PERMITS TO BE ISSUED ON 2400 BLOCK WITHOUT PRIOR COORDINATION WITH THE ST GEORGE RAINWAY PROJECT

Update as of Feb 2026: Blocks 1 to 3 (2100 to 2300 St George) complete and open. Block 1(2400 St George) under construction, with lane closures on 2400 Block E 8th. Curb lane closure on 500 Block E Broadway until approximately August 30. Project is anticipated to be completed in Q2 2026. 

Location: St George St from E Broadway to E.5th Ave
Schedule: Mar 29, 2023 - Aug 30, 2026</content>
<id>urn:uuid:3e257b4e-320b-4c4a-8d1e-05cdcf3732ff</id>
<link href="https://vancouver.ca/streets-transportation/st-george-rainway.aspx"/>
<published>2023-02-13T08:00:00Z</published>
<title>St George Rainway Project</title>
<updated>2026-05-28T17:18:55.0503897Z</updated>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Traffic management will involve adequate advanced warning for motorists and cyclists along with delineators lining the curb base for additional warning. 
Location: Toderick St &amp; E 45th Av
Schedule: Jun 23, 2026 8:00 AM - 2:30 PM</content>
<id>urn:uuid:de112e55-bf6b-4382-9d4f-ac5d634eacc9</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/768aaf85-ce73-4dff-9036-24b5530568ad"/>
<published>2026-06-09T07:00:00Z</published>
<title>Street Horticulture (Local Garden Crew)</title>
<updated>2026-06-09T17:56:36.215591Z</updated>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Traffic management will involve adequate advanced warning for motorists and cyclists along with delineators lining the curb base for additional warning.
Location: Lakewood Dr and E 12th Ave
Schedule: Jun 18, 2026 8:00 AM - 2:30 PM</content>
<id>urn:uuid:b25c3b30-9b77-48fa-a2b2-3eaeea57bf44</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a3ba3944-07e5-4c89-9bc0-04e079721bb5"/>
<published>2026-06-08T07:00:00Z</published>
<title>Street Horticulture (Local Garden Crew)</title>
<updated>2026-06-08T18:02:43.1786387Z</updated>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Traffic management will involve adequate advanced warning for motorists and cyclists along with delineators lining the curb base for additional warning.
Location: Lakewood Dr &amp; Parker St
Schedule: Jun 19, 2026 8:00 AM - 2:30 PM</content>
<id>urn:uuid:4dd4a267-e3af-4315-84f2-b5a7ef56511b</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/5bfa4a17-da95-4cb8-b16b-eca314954bad"/>
<published>2026-06-08T07:00:00Z</published>
<title>Street Horticulture (Local Garden Crew)</title>
<updated>2026-06-08T18:04:29.3577019Z</updated>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Traffic management will involve adequate advanced warning for motorists and cyclists along with delineators lining the curb base for additional warning. 
Location: Laurel St &amp; W 59th Ave
Schedule: Jun 15, 2026 8:00 AM - 2:30 PM</content>
<id>urn:uuid:8afc8b81-4577-40ee-a839-ca61e0f8035a</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/5e473353-3f81-414b-bce4-02a601d33df7"/>
<published>2026-06-08T07:00:00Z</published>
<title>Street Horticulture (Local Garden Crew)</title>
<updated>2026-06-08T17:51:21.7051293Z</updated>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Traffic management will involve adequate advanced warning for motorists and cyclists along with delineators lining the curb base for additional warning. 
Location: Lakewood Dr &amp; Ferndale St
Schedule: Jun 18, 2026 8:00 AM - 2:30 PM</content>
<id>urn:uuid:63bf09c9-8943-4611-b38a-5d7922b34f33</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/8de36e11-92db-4e4d-a599-d7236e6e1a07"/>
<published>2026-06-08T07:00:00Z</published>
<title>Street Horticulture (Local Garden Crew)</title>
<updated>2026-06-08T18:00:10.6830866Z</updated>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Traffic management will involve adequate advanced warning as well as delineation at curb base for maintenance work being conducted in traffic circle.
Location: Vivian St at E 47th Ave
Schedule: Multiple occurrences as follows:
- May 19, 2026 8:00 AM - 2:30 PM
- Jun 11, 2026 8:00 AM - 2:30 PM
</content>
<id>urn:uuid:1105859c-32c6-48ce-abad-652c14bded9a</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a3112935-3c0c-4346-aa11-0eb1c312acab"/>
<published>2026-06-03T07:00:00Z</published>
<title>Street Horticulture (Local Garden Crew)</title>
<updated>2026-06-03T20:33:22.2408722Z</updated>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Traffic management will involve adequate advanced warning for motorists and cyclists along with delineators lining the curb base for additional warning. 
Location: Nanaimo St &amp; Wall St
Schedule: Multiple occurrences as follows:
- May 12, 2026 8:00 AM - 2:00 PM
- Jun 12, 2026 8:00 AM - 2:30 PM
</content>
<id>urn:uuid:a9d0f47f-14a8-4468-922a-ae81db258ac0</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/93157020-1baf-4f0f-ac4b-7b5a78f2a980"/>
<published>2026-06-03T07:00:00Z</published>
<title>Street Horticulture (Local Garden Crew)</title>
<updated>2026-06-03T20:27:40.3963148Z</updated>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Traffic management will involve adequate advanced warning as well as delineation at curb base for maintenance work being conducted in traffic circle. 
Location: Maple Cr &amp; Nanton St
Schedule: Jun 22, 2026 8:00 AM - 2:30 PM</content>
<id>urn:uuid:90515a7d-154e-4e44-ac74-cdeaee0c0eae</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/455e418e-9979-44e7-bf21-4b339cd56786"/>
<published>2026-06-09T07:00:00Z</published>
<title>Street Horticulture (Local Garden Crew)</title>
<updated>2026-06-09T17:49:15.988846Z</updated>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Traffic management will involve an EB Curb Lane closure with a 1 lane shift.  
Location: Gladstone St &amp; SE Marine Dr
Schedule: Jun 23, 2026 9:30 AM - 2:30 PM</content>
<id>urn:uuid:764cdd95-ce03-4be3-9f81-4a31b9c95dbf</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/2e9482da-86fa-4d3b-86c0-4587c6280575"/>
<published>2026-06-09T07:00:00Z</published>
<title>Street Horticulture (Local Garden Crew)</title>
<updated>2026-06-09T18:10:35.7478898Z</updated>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Traffic management will involve adequate advanced warning for motorists and cyclists along with delineators lining the curb base for additional warning. 
Location: Princess St &amp; Atlantic St
Schedule: Jun 24, 2026 8:00 AM - 2:30 PM</content>
<id>urn:uuid:5f294fe5-9e91-43b2-b2a9-85ef308db1b7</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/5fb9f872-7cdf-468f-b16e-dd310c97914c"/>
<published>2026-06-09T07:00:00Z</published>
<title>Street Horticulture (Local Garden Crew)</title>
<updated>2026-06-09T17:58:45.4178221Z</updated>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Traffic management will involve adequate advanced warning for motorists and cyclists along with delineators lining the curb base for additional warning. 
Location: Prince Edward St &amp; E 13th Av
Schedule: Jun 22, 2026 9:30 AM - 2:30 PM</content>
<id>urn:uuid:c2b9f46c-155d-4f7e-a4fe-fd1a77385f7b</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e1b7b4d4-382b-4e72-a184-9694c8177824"/>
<published>2026-06-09T07:00:00Z</published>
<title>Street Horticulture (Local Garden Crew)</title>
<updated>2026-06-09T18:08:51.2535613Z</updated>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Traffic management will involve adequate advanced warning for motorists and cyclists along with delineators lining the curb base for additional warning. 
Location: Dumfries St &amp; E 37th Ave
Schedule: Jun 17, 2026 8:00 AM - 2:30 PM</content>
<id>urn:uuid:dfc3d7d4-bb34-4133-8fb1-8be1ed4751c1</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/62569c45-6fea-4a78-82fa-2c57c366c5ed"/>
<published>2026-06-08T07:00:00Z</published>
<title>Street Horticulture (Local Garden Crew)</title>
<updated>2026-06-08T17:58:19.7747175Z</updated>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Traffic management with involve a temporary closure of E 37th to vehicular traffic from Knight St to Lanark St.  The road will be open to cyclists as well as local traffic where needed.
Location: 1400 Blk of E 37th Ave
Schedule: Jun 16, 2026 8:00 AM - 2:30 PM</content>
<id>urn:uuid:9a9f2795-913b-4a93-8ddf-9a52ddfe4329</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a6f78155-52bc-44b6-b27a-ec01bac282c2"/>
<published>2026-06-08T07:00:00Z</published>
<title>Street Horticulture (Local Garden Crew)</title>
<updated>2026-06-08T17:55:11.3044771Z</updated>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Traffic management will involve adequate advanced warning for motorists and cyclists along with delineators lining the curb base for additional warning. 
Location: Chester St &amp; E 63rd Av
Schedule: Jun 24, 2026 8:00 AM - 2:30 PM</content>
<id>urn:uuid:ebf65fa8-83d2-4f17-a85b-d7e3c93e6ab0</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/89a413bf-19dd-4da1-b434-31739fb1e36b"/>
<published>2026-06-09T07:00:00Z</published>
<title>Street Horticulture (Local Garden Crew)</title>
<updated>2026-06-09T18:00:22.6202861Z</updated>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Traffic management will involve adequate advanced warning for motorists and cyclists along with delineators lining the curb base for additional warning.
Location: Tyne St &amp; Kingsway
Schedule: Multiple occurrences as follows:
- Jun 2, 2026 8:00 AM - 2:30 PM
- Jun 15, 2026 8:00 AM - 2:30 PM
</content>
<id>urn:uuid:af4bcf0a-1878-400a-b16b-80c9f19be2f2</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/b944208b-25e2-4e5b-8372-62dffe9a5a6c"/>
<published>2026-06-08T07:00:00Z</published>
<title>Street Horticulture (Local Garden Crew) </title>
<updated>2026-06-08T17:48:50.8306509Z</updated>
</entry>
<entry>
<category term="Under Construction"/>
<content>Traffic management will involve adequate advanced warning for motorists and cyclists along with delineators lining the curb base for additional warning. 
Location: Scotia St &amp; E 1st Ave
Schedule: Multiple occurrences as follows:
- Jun 12, 2026 8:00 AM - 2:30 PM
- Jun 10, 2026 8:00 AM - 2:30 PM
</content>
<id>urn:uuid:99fef33f-6ddb-4491-9cb4-d3d37034899a</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d38fd383-52da-4dfa-926a-07958539b7e7"/>
<published>2026-06-03T07:00:00Z</published>
<title>Street Horticulture (Local Garden Crew) </title>
<updated>2026-06-03T20:34:30.241539Z</updated>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Traffic management will involve adequate advanced warning for motorists and cyclists along with delineators lining the curb base for additional warning.
Location: 3600 Cameron Av
Schedule: Jun 26, 2026 8:00 AM - 2:30 PM</content>
<id>urn:uuid:c7ff047b-6e39-4173-b5e8-3052f39645b6</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/92e0e189-d296-4645-85e9-a93abf012432"/>
<published>2026-06-09T07:00:00Z</published>
<title>Street Horticulture (Local Garden Crew) </title>
<updated>2026-06-09T18:05:36.2221735Z</updated>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Traffic management will involve adequate advanced warning for motorists and cyclists along with delineators lining the curb base for additional warning. 
Location: Elliott St &amp; Ashburn St
Schedule: Jun 25, 2026 8:00 AM - 2:30 PM</content>
<id>urn:uuid:271a33df-0ad7-4d9b-ab54-628f34fa3300</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/37a287f8-f46c-4310-9e42-1e38dbb9637d"/>
<published>2026-06-09T07:00:00Z</published>
<title>Street Horticulture (Local Garden Crew) </title>
<updated>2026-06-09T18:03:51.6866113Z</updated>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Traffic management with involve a temporary closure of E 45th to vehicular traffic.  The road will be open to cyclists as well as local traffic where needed.  
Location: Boundary Rd &amp; E 45th Ave
Schedule: Multiple occurrences as follows:
- Jun 17, 2025 8:00 AM - 2:30 PM
- Jun 11, 2026 8:00 AM - 2:30 PM
</content>
<id>urn:uuid:6760cf0c-1bd0-4583-a28a-8e94115a0c8d</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e4b371ed-236f-4688-97fc-fb80270d0b06"/>
<published>2026-06-03T07:00:00Z</published>
<title>Street Horticulture (Local Garden Crew) Work </title>
<updated>2026-06-03T20:31:51.5784589Z</updated>
</entry>
<entry>
<category term="Under Construction"/>
<content>Median mow and clean up - reduced lanes
Location: Marine Dr and Knight St
Schedule: Jun 10, 2026 9:30 AM - 3:00 PM</content>
<id>urn:uuid:8e1d2c10-2d9e-4e49-a993-5027970d3c13</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cec51e69-762e-448d-8206-c590f405ebc0"/>
<published>2026-06-08T07:00:00Z</published>
<title>Street Horticulture Work</title>
<updated>2026-06-08T17:41:19.7605284Z</updated>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Traffic Management will involve an EB and WB center lane closure with a 2 lane shift. The left turn bay will be maintained. 
Location: 1900 E. Broadway
Schedule: Jun 16, 2026 10:00 AM - 2:30 PM</content>
<id>urn:uuid:ecea36c8-c6bb-4ac7-b94b-f0b6104bbf53</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ad3ba33a-889f-49e4-87c9-2662558b57c1"/>
<published>2026-06-08T07:00:00Z</published>
<title>Street Horticulture Work</title>
<updated>2026-06-08T17:17:22.3312542Z</updated>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Traffic Management will involve an EB and WB center lane closure with a 2 lane shift. The Bus Stop will be maintained. 
Location: 700 Block of SE Marine Drive: 
Schedule: Jun 12, 2026 9:30 AM - 2:30 PM</content>
<id>urn:uuid:fc0dc838-a2cc-428c-b470-31ba7afb54d5</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/70fb7a63-e9ed-427a-96a1-84d30d57819f"/>
<published>2026-05-25T07:00:00Z</published>
<title>Street Horticulture Work</title>
<updated>2026-05-25T22:26:38.7352323Z</updated>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Traffic Management will involve an EB and WB center lane closure with a 2 lane shift. The Bus Stop will be maintained. 
Location: 2400 Block of SE Marine Drive
Schedule: Jun 11, 2026 9:30 AM - 2:30 PM</content>
<id>urn:uuid:726600f5-c0c5-4ad4-bc84-2a88acfb4880</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1a4b1c71-44d7-4fe7-9be1-0072a2964088"/>
<published>2026-05-25T07:00:00Z</published>
<title>Street Horticulture Work</title>
<updated>2026-05-25T22:22:28.758801Z</updated>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Traffic Management will involve an EB and WB center lane closure with a 2 lane shift.
Location: 2500 &amp; 2400 Block of E. Broadway
Schedule: Jun 23, 2026 10:00 AM - 2:30 PM</content>
<id>urn:uuid:033c80ff-4e22-4dc9-9e25-101d12657876</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/6afb3899-c59a-4268-9a5c-289e0d982088"/>
<published>2026-06-03T07:00:00Z</published>
<title>Street Horticulture Work </title>
<updated>2026-06-03T21:12:48.8518258Z</updated>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Traffic management will involve a NB and SB center lane closure with a 1 lane shift NB and a 2 lane shift SB. The left turn bay will be maintained. 
Location: 4800 Nanaimo St
Schedule: Jul 3, 2026 9:30 AM - 2:30 PM</content>
<id>urn:uuid:976b6cf6-3a08-4c32-99dd-e1bd3b67b7a3</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/c5708d12-0a24-4742-842f-e2abe048fe94"/>
<published>2026-06-09T07:00:00Z</published>
<title>Street Horticulture Work </title>
<updated>2026-06-09T18:50:47.1587894Z</updated>
</entry>
<entry>
<category term="Under Construction"/>
<content>Traffic Management will involve an EB and WB center lane closure with a 2 lane shift.  
Location: 1800 to 1900 Block of SE Marine Dr
Schedule: Jun 10, 2026 9:30 AM - 2:30 PM</content>
<id>urn:uuid:f9745bc9-cbe5-4043-8d0e-f866f9cab118</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/3064a77d-7d71-4805-8001-1bda1c029f14"/>
<published>2026-05-25T07:00:00Z</published>
<title>Street Horticulture Work </title>
<updated>2026-05-25T22:15:37.3568633Z</updated>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Traffic Management involve 2 separate set ups using an EB/WB center lane closure with a 2 lane shift. The left turn bay and Bus Stop will be maintained. 
Location: 2800-3000 Block of SE Marine Drive
Schedule: Jun 18, 2026 9:30 AM - 2:30 PM</content>
<id>urn:uuid:20e1c11b-272b-4443-af55-45ca64a82d01</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a6e9e898-14ca-4220-8be8-64f77faa7d73"/>
<published>2026-06-08T07:00:00Z</published>
<title>Street Horticulture Work </title>
<updated>2026-06-08T17:20:46.7142232Z</updated>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Traffic Management will involve an EB and WB center lane closure with a 2 lane shift.   The EB left turn bay to Argyle will be maintained.  The Bus Stop will be maintained. 
Location: 1700 Block of SE Marine Drive
Schedule: Jun 19, 2026 9:30 AM - 2:30 PM</content>
<id>urn:uuid:aaa3e164-e615-44f1-bc26-0064c60239ab</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/0c41aed4-d9d8-45c1-9101-4ec8285a7629"/>
<published>2026-06-08T07:00:00Z</published>
<title>Street Horticulture Work </title>
<updated>2026-06-08T17:23:03.7418467Z</updated>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Traffic management will involve a NB and SB center lane closure with a 2 lane shift. The left turn bay will be maintained.
Location: 4600 Nanaimo Street
Schedule: Jun 30, 2026 9:30 AM - 2:30 PM</content>
<id>urn:uuid:0ea6e207-a207-4d96-802f-622fb8db27b5</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ce64dafa-fdab-4aa6-af89-a9d2ad389745"/>
<published>2026-06-09T07:00:00Z</published>
<title>Street Horticulture Work </title>
<updated>2026-06-09T18:29:11.1085829Z</updated>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Traffic Management will involve an EB and WB center lane closure with a 2 lane shift.  The left turn bay will be maintained. 
Location: 2300 E. Broadway
Schedule: Jun 17, 2026 9:30 AM - 2:30 PM</content>
<id>urn:uuid:4f3c05fa-cbb9-4840-b92f-07d19f6b838b</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/9ce8c08f-2474-4d18-86cc-251f492beba9"/>
<published>2026-06-08T07:00:00Z</published>
<title>Street Horticulture Work </title>
<updated>2026-06-08T17:17:00.8279827Z</updated>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Traffic Management (between Kingsway and Knight) will involve an WB center lane closure with a 1 lane shift and an EB center lane closure with a one lane shift.   The left turn bay will be maintained. Bus Stop closures of 51525 &amp; 51563.

Location: 1400 E King Edward
Schedule: Jul 2, 2026 9:30 AM - 2:30 PM</content>
<id>urn:uuid:120525fc-bfe0-435e-b1d6-4a2fa16b8e9b</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/3333b269-868a-4fcf-b2e5-65e38794ea88"/>
<published>2026-06-09T07:00:00Z</published>
<title>Street Horticulture Work </title>
<updated>2026-06-09T18:34:19.8392474Z</updated>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Traffic Management will involve an EB and WB center lane closure with a 2-lane shift. The left turn bay will be maintained
Location: 3200 Block of E. Broadway
Schedule: Jun 24, 2026 10:00 AM - 2:30 PM</content>
<id>urn:uuid:0777e1b5-3c6f-407e-8e50-5875753b4b55</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ddaece50-024e-4189-b7d9-50c711fc06bf"/>
<published>2026-06-03T07:00:00Z</published>
<title>Street Horticulture Work </title>
<updated>2026-06-03T21:14:34.3612854Z</updated>
</entry>
<entry>
<category term="Road Closure"/>
<content>Full closure of 5000 block of Marguerite St from June Wednesday 3, 2026 to June Tuesday 30, 2026 at 3:30 pm
Location: Marguerite St from W 33rd Av to W 35th Av
Schedule: Jun 3, 2026 - Jun 30, 2026; Weekdays; 7:00 AM - 3:30 PM</content>
<id>urn:uuid:76aaf074-193f-468e-8e64-303f4e973ac1</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ca0a54b8-6635-4161-8fcf-366d00f0f737"/>
<published>2026-06-03T07:00:00Z</published>
<title>Streets Service of 5000 block of Marguerite St</title>
<updated>2026-06-03T23:26:48.0761923Z</updated>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Water St will be closed to traffic on Sundays from all day (Approx. 11-8PM)
Location: 000 - 300 Water St and 000 Powell St. 
Schedule: Jul 5, 2026 - Sep 6, 2026; Su; 11:00 AM - 9:00 PM</content>
<id>urn:uuid:d0798e47-bf1f-4fa5-bba9-b5e0a57dd72f</id>
<link href="https://vancouver.ca/streets-transportation/water-street-pedestrian-zone.aspx"/>
<published>2026-05-13T07:00:00Z</published>
<title>Sunday Pedestrian only zone - Water St</title>
<updated>2026-05-13T17:55:09.4067896Z</updated>
</entry>
<entry>
<category term="Road Closure"/>
<content>Development triggered local sewer upgrade 
Location: Nigel Ave to Dinmont Ave
Schedule: Apr 20, 2026 - Jun 19, 2026</content>
<id>urn:uuid:3c0ce105-5b6f-431e-af46-c6719a24053a</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/0d6eb645-ce7e-438c-b630-97def64e620f"/>
<published>2026-05-20T07:00:00Z</published>
<title>TO-2026-02210 - Construction</title>
<updated>2026-05-20T22:48:28.8831831Z</updated>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Crews will be onsite to conduct Utility Maintenance on behalf of Telus

Traffic Impacts: Total Road closure at North side of 2000 blk Beach Ave from Chilco St to Stanley Park Dr

WO# 4007290

Location: N/S of 2000 blk Beach Ave
Schedule: Jun 15, 2026 - Jun 26, 2026; M, Tu, W, Th, F, Su; 7:00 AM - 7:00 PM</content>
<id>urn:uuid:0afdd260-b8ef-4137-927e-da4f8e247d71</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/0f24a13e-34d6-47e1-940e-df34693643e9"/>
<published>2026-06-05T07:00:00Z</published>
<title>Telus - Utility Maintenance - 2061 Beach Ave - Jun 15-26, 2026</title>
<updated>2026-06-05T15:27:31.8216778Z</updated>
</entry>
<entry>
<category term="Under Construction"/>
<content>Parking lane closure on the West Side of 1000 Block of Marinaside Crescent/Cambie Bridge to facilitate underground utility construction.

WO# 2956362
Location: West Side of 1000 Block of Marinaside Crescent/Cambie Bridge From Pacific Blvd to 60m South of Pacific Blvd.
Schedule: Jun 4, 2026 7:00 AM - Jun 11, 2026 5:00 PM</content>
<id>urn:uuid:6b300fd0-afce-4c35-be09-66f879c232e2</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/e52d10cf-224e-4c41-9072-38a1595754d2"/>
<published>2026-05-27T07:00:00Z</published>
<title>Telus Underground Utility Construction on 1000 Block of Marinaside Crescent/Cambie Bridge</title>
<updated>2026-05-29T16:21:19.9846557Z</updated>
</entry>
<entry>
<category term="Under Construction"/>
<content>Parking lane closure on the West Side of 2500 Block of Willow Street to facilitate underground utility construction.

Parking meters to be hood: 82-25-11/13/15/17

WO# NW 4002677
Location: West Side of 2500 Block of Willow Street From W Broadway to W 10th Avenue.
Schedule: Jun 8, 2026 7:00 AM - Jun 12, 2026 5:00 PM</content>
<id>urn:uuid:a793ba29-670f-45a4-aff1-7cd1e03651ee</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/6ca3c3b1-6ed8-4553-8ba6-6bdad23b46a7"/>
<published>2026-05-27T07:00:00Z</published>
<title>Telus Underground Utility Construction on 2500 Block of Willow Street</title>
<updated>2026-05-27T17:50:35.3084423Z</updated>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Alleyway lane closure on Both Sides of 1000 Block of Maxine Lane to facilitate utility maintenance.

WO# 2927802
Location: Both Sides of 1000 Block of Maxine Lane From Thurlow Street to 50m South of Thurlow Street. 
Schedule: Jun 15, 2026 - Jul 17, 2026; Weekdays; 8:00 AM - 4:00 PM</content>
<id>urn:uuid:da9f9464-68e6-43fc-8acc-9f6ae6ca683c</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/c48eeb47-c695-4ba8-8969-5af2c5c36451"/>
<published>2026-05-29T07:00:00Z</published>
<title>Telus Utility Maintenance on 1000 Block of Maxine Lane</title>
<updated>2026-05-29T19:42:47.1199431Z</updated>
</entry>
<entry>
<category term="Under Construction"/>
<content>Travel lane closure and Single lane alternating traffic in effect on 1000-1100 Block of Glen Drive to facilitate utility maintenance.

WO# 2949798
Location: East Side of 1000-1100 Block of Glen Drive From William Street to Parker Street. 
Schedule: Jun 1, 2026 - Jun 30, 2026; Weekdays; 8:00 AM - 4:00 PM</content>
<id>urn:uuid:5ff22cfb-68da-48a0-853b-f3da073ebf87</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/8b25301f-2220-41d9-8ed9-ca7fd66dc01d"/>
<published>2026-05-25T07:00:00Z</published>
<title>Telus Utility Maintenance on 1000-1100 Block of Glen Drive</title>
<updated>2026-06-02T18:20:58.7069762Z</updated>
</entry>
<entry>
<category term="Under Construction"/>
<content>Parking lane closure on the South Side of 1300 Block of W 8th Avenue to facilitate utility maintenance.

B8-13-02/04/06/08/10/14/16/18

WO# 4008842
Location: South Side of 1300 Block of W 8th Avenue From Hemlock Street to Birch Street. 
Schedule: Jun 9, 2026 - Jun 22, 2026; Weekdays; 8:00 AM - 4:00 PM</content>
<id>urn:uuid:cac27055-30fe-4c42-a42a-6379a57aeffe</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/ba6786df-50c2-4814-bc53-a35ac7f0a912"/>
<published>2026-05-27T07:00:00Z</published>
<title>Telus Utility Maintenance on 1300 Block of W 8th Avenue</title>
<updated>2026-05-27T18:44:34.4329405Z</updated>
</entry>
<entry>
<category term="Under Construction"/>
<content>Parking lane closure on the South Side of 200 Block of E 32nd Avenue to facilitate utility maintenance.

WO# 2596968
Location: South Side of 200 Block of E 32nd Avenue From Main Street to Sophia Street. 
Schedule: Jun 8, 2026 9:30 AM - Jun 12, 2026 2:30 PM</content>
<id>urn:uuid:b8460b7c-4390-4abd-b44d-fac06b3f8393</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d93d6406-2029-44ff-9a37-b78a0063bc99"/>
<published>2026-05-27T07:00:00Z</published>
<title>Telus Utility Maintenance on 200 Block of E 32nd Avenue</title>
<updated>2026-05-27T17:00:12.4067548Z</updated>
</entry>
<entry>
<category term="Under Construction"/>
<content>Parking lane closure on the South Side of 2200 Block of W 13th Avenue to facilitate utility maintenance.

WO# 4009663
Location: South Side of 2200 Block of W 13th Avenue From Yew Street to 25m West of Yew Street. 
Schedule: May 13, 2026 - Jun 11, 2026; Weekdays; 8:00 AM - 5:00 PM</content>
<id>urn:uuid:3b7bbbe5-f97c-4739-8b2e-675d937e685c</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1516f977-c1fa-4256-b08e-6e9884348156"/>
<published>2026-05-04T07:00:00Z</published>
<title>Telus Utility Maintenance on 2200 Block of W 13th Avenue</title>
<updated>2026-05-25T17:46:18.0733548Z</updated>
</entry>
<entry>
<category term="Under Construction"/>
<content>Parking lane closure on the East Side of 3800 Block of Tupper Street to facilitate utility maintenance.

WO# 2955561
Location: East Side of 3800 Block of Tupper Street From W 22nd Avenue to W 23rd Avenue. 
Schedule: Jun 8, 2026 8:00 AM - Jun 12, 2026 4:00 PM</content>
<id>urn:uuid:08e2b2e7-9378-4dcd-9105-661ed86ee7c1</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/384ea16e-04f0-4452-939b-3b0e7734f9e4"/>
<published>2026-05-29T07:00:00Z</published>
<title>Telus Utility Maintenance on 3800 Block of Tupper Street</title>
<updated>2026-05-29T18:42:53.3272662Z</updated>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Alleyway and Parking lane closure on the East Side of 3900-4000 Block of Perry Street to facilitate utility maintenance.

WO# 2955561
Location: East Side of 3900-4000 Block of Perry Street From Kingsway to E 22nd Avenue.
Schedule: Jun 15, 2026 8:00 AM - Jun 19, 2026 4:00 PM</content>
<id>urn:uuid:d9cd9ac5-8937-4513-a592-eb619525b77d</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/7326e232-a7a3-4c69-9a87-495c00c00728"/>
<published>2026-06-05T07:00:00Z</published>
<title>Telus Utility Maintenance on 3900-4000 Block of Perry Street</title>
<updated>2026-06-05T21:49:45.1196962Z</updated>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Parking and Travel lane closure on Both Sides of 4500-4600 Block of W 4th Avenue and the East Side of 1900 Block of Tolmie Street to facilitate utility maintenance.

WO# 2950114
Location: Both Sides of 4500-4600 Block of W 4th Avenue From Blanca Street to Sasamat Street. East Side of 1900 Block of Tolmie Street From W 4th Avenue to W 3rd Avenue.
Schedule: Jun 22, 2026 - Jul 3, 2026; Weekdays; 7:00 AM - 5:00 PM</content>
<id>urn:uuid:e28102ed-e922-4ac0-8cd4-9be8c5149603</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/08ac3a4b-a9b4-4b96-9ede-5db6f087b287"/>
<published>2026-06-08T07:00:00Z</published>
<title>Telus Utility Maintenance on 4500-4600 Block of W 4th Avenue</title>
<updated>2026-06-08T15:36:31.036855Z</updated>
</entry>
<entry>
<category term="Under Construction"/>
<content>Parking lane closure on the West Side of 5500-5600 Block of Aberdeen Street to facilitate utility maintenance.

WO# NW 2958630
Location: West Side of 5500-5600 Block of Aberdeen Street From 25m North of Kingsway to North PL of 5655.
Schedule: Jun 8, 2026 8:00 AM - Jun 12, 2026 4:00 PM</content>
<id>urn:uuid:6be38aa9-b6fa-48c0-91e6-df4d35521742</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/f91c36dc-5fc7-4277-94a3-84154b9e66a9"/>
<published>2026-05-28T07:00:00Z</published>
<title>Telus Utility Maintenance on 5500-5600 Block of Aberdeen Street</title>
<updated>2026-05-28T18:21:14.2731615Z</updated>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Travel and Parking lane closure on the North Side of 800 Block of W 10th Ave, the West Side of 2500 Block of Willow Street and Both Sides of Lane North of 800 Block of W 10th Avenue to facilitate utility maintenance.

Parking meters to be hood: D0-08-23/25/27; 82-25-11/13/15/17

WO# 2595449
Location: North Side of 800 Block of W 10th Avenue From Laurel Street to Willow Street. West Side of 2500 Block of Willow Street From W 10th Avenue to Lane North of W 10th Avenue. Both Sides of Lane North of 800 Block of W 10th Avenue From Willow Street to 85m West of Willow Street. 
Schedule: Jun 13, 2026 8:00 AM - Jun 14, 2026 4:00 PM</content>
<id>urn:uuid:e4d695f9-e30c-456c-a6f1-df3038e1acd2</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/7d1bc885-499e-4fb8-8726-52ad4c6b7c35"/>
<published>2026-06-09T07:00:00Z</published>
<title>Telus Utility Maintenance on 800 Block of W 10th Avenue</title>
<updated>2026-06-09T23:13:13.8701076Z</updated>
</entry>
<entry>
<category term="Under Construction"/>
<content>Alleyway lane closure on Both Sides of Lane North of 1500-1600 Block of E Broadway to facilitate utility maintenance.

WO# 4012224
Location: Both Sides of Lane North of 1500-1600 Block of E Broadway From Commercial Drive to 110m West of Commercial Drive.
Schedule: Jun 8, 2026 8:00 AM - Jun 10, 2026 4:00 PM</content>
<id>urn:uuid:65375186-1891-4029-8893-1d9c602baf07</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/4cf027bc-b3de-461c-ad30-a7043da5ac81"/>
<published>2026-05-27T07:00:00Z</published>
<title>Telus Utility Maintenance on Lane North of 1500-1600 Block of E Broadway</title>
<updated>2026-05-27T17:16:10.5582785Z</updated>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Alleyway lane closure on Both Sides of Lane North of 1500-1600 Block of E Broadway to facilitate utility maintenance.

WO# 4012224
Location: Both Sides of Lane North of 1500-1600 Block of E Broadway From Commercial Drive to 110m West of Commercial Drive.
Schedule: Jun 22, 2026 8:00 AM - Jun 24, 2026 4:00 PM</content>
<id>urn:uuid:8d70e231-78df-4bfe-97dc-02f7e5f55e0c</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/abdc71bc-0b32-434b-9831-17fdd460ae62"/>
<published>2026-06-09T07:00:00Z</published>
<title>Telus Utility Maintenance on Lane North of 1500-1600 Block of E Broadway </title>
<updated>2026-06-09T20:32:18.0476277Z</updated>
</entry>
<entry>
<category term="Under Construction"/>
<content>Parking lane closure on the North Side of Lane South of 1400 Block of W 12th Avenue to facilitate utility maintenance.

WO# NW 2595449, DPO-1081454
Location: North Side of Lane South of 1400 Block of W 12th Avenue From 50m West of Hemlock Street to 70m West of Hemlock Street. 
Schedule: Jun 8, 2026 8:00 AM - Jun 12, 2026 5:00 PM</content>
<id>urn:uuid:bd28eda1-8dc4-4474-ba66-1a4e8594d44a</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/b19ed16d-6d50-46e7-a62c-735e601c3932"/>
<published>2026-05-28T07:00:00Z</published>
<title>Telus Utility Maintenance on Lane South of 1400 Block of W 12th Avenue</title>
<updated>2026-05-28T18:50:50.2250258Z</updated>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Alleyway lane closure on Both Sides of Lane West of 4300 Block of Maple Street to facilitate utility maintenance.

WO# 2596968
Location: Both Sides of Lane West of Maple Street From Nanton Avenue to 60m South of Nanton Avenue.
Schedule: Jun 22, 2026 8:00 AM - 4:00 PM</content>
<id>urn:uuid:7dff0fa4-ac86-4c2d-9e68-37a639171211</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/44e80a8f-656b-437f-8072-5585546791e7"/>
<published>2026-06-09T07:00:00Z</published>
<title>Telus Utility Maintenance on Lane West of 4300 Block of Maple Street</title>
<updated>2026-06-09T20:48:43.8102951Z</updated>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Installation of new trees and green infrastructure within the north sidewalk of Terminal Ave from the 600 block to 800 block. 
Location: 
Schedule: Aug 19, 2024 - Jul 31, 2025</content>
<id>urn:uuid:8db2271f-493d-45d7-8ef4-61e90c235410</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/974de6d5-743e-419d-8b83-7bcbed0d3ecb"/>
<published>2024-08-20T07:00:00Z</published>
<title>Terminal Ave GI &amp; CEAP 2024</title>
<updated>2026-05-05T01:01:06.1650801Z</updated>
</entry>
<entry>
<category term="Under Construction"/>
<content>Road repairs on Terminal Avenue between Quebec Street and Main Street. 

Contact: terminalsewerrepairs@vancouver.ca 
Location: Main and Terminal
Schedule: Mar 1, 2025 - Aug 1, 2026</content>
<id>urn:uuid:4c89133b-391e-45db-9fba-ad2f5679881c</id>
<link href="https://vancouver.ca/streets-transportation/terminal-avenue-sewer-repairs.aspx"/>
<published>2024-06-25T07:00:00Z</published>
<title>Terminal Ave Sewer Interim Repairs</title>
<updated>2026-05-21T01:01:12.4848711Z</updated>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Full closure along Station Street between National Avenue and Terminal Avenue from March 23 to May 1, 2026. This will be implemented to complete necessary underground and surface works as part of the Thornton Pump Station project. 
Location: Station Street between National Avenue and Terminal Avenue
Schedule: Mar 23, 2026 - May 2, 2026</content>
<id>urn:uuid:03aa5042-a76c-4047-86fa-e2e791166eb7</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/d9d7f3b6-9b9c-40e1-a7f0-0f5994ef9b41"/>
<published>2026-03-19T07:00:00Z</published>
<title>Thornton Pump Station Upgrades - Station Street Closure</title>
<updated>2026-03-19T22:40:30.5534198Z</updated>
</entry>
<entry>
<category term="Road Closure"/>
<content>The Trans Canada Trail bridge is closed at this location due to slope hazards located above the bridge which pose a risk to users. CN and the City are in conversations to have the hazards removed. There is currently no expected date on when the bridge and trail will be able to be reopened. 
Location: 
Schedule: Jan 15, 2025 - Jan 15, 2027</content>
<id>urn:uuid:08e904a5-5a74-415b-bcfe-3441d4ea2c9e</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/569cde2e-876f-4ecb-b13b-86beeeeadbd9"/>
<published>2025-01-16T08:00:00Z</published>
<title>Trans-Canada Trail Bridge Closure </title>
<updated>2025-01-16T18:38:13.5422873Z</updated>
</entry>
<entry>
<category term="Under Construction"/>
<content>Parking: Temporary parking restrictions will be required to safely complete construction. Please watch for "No Parking" signs as work progresses.

Traffic and Access: From December 2025 to March 2026, crews will work intermittently to complete underground utility work.  This work will occasionally impact vehicle and cycling traffic. Pedestrian traffic will be maintained at all times. Please note this portion of the work is coordinated with Metro Vancouver’s ongoing sewer forcemain work – for information on that project, please visit https://metrovancouver.org/services/liquid-waste/columbia-street-sewer-repair

From March to June 2026, crews will undertake the surface works and signal work. This work will require daytime closures to vehicle and cyclist traffic. Pedestrian traffic will be maintained at all times.  

Vehicle and cyclist traffic will reopen after work hours whenever possible, with some exceptions depending on work activities.

The work includes construction of a protected bike lane including traffic signal upgrades. These upgrades will improve safety, accessibility, and provide more comfortable walking and cycling connections for active road users.

There will be a pause of construction during FIFA, and resume post FIFA until completion expected in October. We appreciate your patience and understanding as we complete these important improvements. If you have any questions or comments about this project, please contact streets.04@vancouver.ca or call 3-1-1

Location: Ontario St between E 1st Av and E 2nd Av

Schedule: Dec 8, 2025 - Oct 30, 2026</content>
<id>urn:uuid:6b6e1fc3-6f8b-4e8b-9f42-5bfd55d54746</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a682c1d0-30f8-4155-903e-d965d0b4d50f"/>
<published>2025-12-09T08:00:00Z</published>
<title>Transportation Improvements – Ontario St (E 1st Av to E 2nd Av)</title>
<updated>2026-02-18T18:30:53.7539317Z</updated>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Trounce Alley from Abbott to Carrall - Full closure and SLAT
Carrall from Cordova to Trounce - Bikes only
Location: 
Schedule: Nov 24, 2025 - May 15, 2026</content>
<id>urn:uuid:f704423a-93d1-4567-8cad-10df83568514</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/b9bd5b76-53b6-45b1-bc3d-4d00dcdee5c6"/>
<published>2026-01-29T08:00:00Z</published>
<title>Trounce Alley Rehabilitation</title>
<updated>2026-04-07T01:51:59.0302867Z</updated>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Contractor performing repair work to deficient concrete from Trounce Alley Rehabilitation project.
Location: Eastern half of 0 BLK of Trounce Alley (Closure from Carrall St entrance to mid-point of 0 BLK of Trounce Alley).
Schedule: May 30, 2026 - Jun 2, 2026</content>
<id>urn:uuid:5cdc7888-96b8-4713-b0ba-fac5747a6bc6</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/c5d0c15c-f28f-4b0c-82d9-fc7bdf501aa9"/>
<published>2026-05-29T07:00:00Z</published>
<title>Trounce Alley Rehabilitation - Deficiency Repairs</title>
<updated>2026-06-01T14:41:58.0079623Z</updated>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Thanksgiving Turkey Trot Run.

Monday, October 12th from 8:00am to 10:00am 

Road closures and Traffic delays:
• Burrard St., and Burrard St Bridge, from W 1st Ave to Pacific St 
• Northbound travel lanes closed from W 1st Avenue north over Burrard St Bridge.
• 900 Pacific St - One eastbound travel lane closed from Burrard to Hornby 
• 1400 – 1500 Hornby St closed from Pacific St to the seawall 
• 1500 – 1700 W 1st Avenue from Creekside Drive to Burrard St

The Turkey Trot could cause traffic delays around the Granville Island area and the Burrard St. Bridge on Monday, October 13th. 

Full road closures and traffic disruptions can be expected between 8:00am and 10:00am.

Location: Granville Island, W 1st ave, Burrard st and Bridge travelling northbound to Hornby, south to seawall and back to Granville island via sea wall
Schedule: Oct 12, 2026</content>
<id>urn:uuid:569d746a-4285-418f-ba3f-a05165cddb7d</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/12b5b8e1-9ce6-48f1-b96f-948c21efb617"/>
<published>2026-05-19T07:00:00Z</published>
<title>Turkey Trot </title>
<updated>2026-05-20T18:35:08.8851921Z</updated>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>E 57th Av - Fraser St to Prince Albert: Full closure /
Knight St and E 57th Av: Soft closure
Location: E 57th Av - Fraser St to Prince Albert
Schedule: Jun 6, 2026 - Jun 20, 2026; Sa; 7:00 AM - 5:00 PM</content>
<id>urn:uuid:6a65e2d8-3547-4f2c-baf4-939034d96703</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/24905603-30ab-4c79-a20b-e184db76ed53"/>
<published>2026-06-04T07:00:00Z</published>
<title>Utilities - BCH - FTC</title>
<updated>2026-06-04T18:19:24.3711285Z</updated>
</entry>
<entry>
<category term="Road Closure"/>
<content>Full Closure
Location: Alberta St – W 7th Av to W 6th Av 
Schedule: Jun 1, 2026 - Jun 12, 2026</content>
<id>urn:uuid:6482f86a-f75d-4b7d-8a64-08b78d9690b1</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/a519617f-9c63-4fbb-82aa-b7b9fd7756a5"/>
<published>2026-05-20T07:00:00Z</published>
<title>Utilities - MV</title>
<updated>2026-05-20T17:44:50.3280707Z</updated>
</entry>
<entry>
<category term="Road Closure"/>
<content>Road closed LTO 
Location: Yukon St – W 8th Ave to W 6th Ave (intersection closure of 7th Av) 
Schedule: Jun 1, 2026 - Jun 12, 2026</content>
<id>urn:uuid:82074a2c-45d4-490b-a4ec-edad362a5fdb</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/133d17ae-2cb1-4cde-9d32-dce5206cd738"/>
<published>2026-05-20T07:00:00Z</published>
<title>Utilities - MV</title>
<updated>2026-05-20T17:50:56.7990418Z</updated>
</entry>
<entry>
<category term="Under Construction"/>
<content>Single Lane alternating traffic
Location: 7th Av – Yukon St to Columbia St 
Schedule: Jun 1, 2026 - Jun 12, 2026</content>
<id>urn:uuid:e470afba-0161-4554-9ab3-b1895c738a23</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/59481ed3-c780-4be2-8e19-0e740168d205"/>
<published>2026-05-20T07:00:00Z</published>
<title>Utilities - MV</title>
<updated>2026-05-20T17:42:47.1241819Z</updated>
</entry>
<entry>
<category term="Road Closure"/>
<content>Road closed LTO 
Location: W 7th Ave – Cambie to Alberta St 
Schedule: Jun 1, 2026 - Jun 12, 2026</content>
<id>urn:uuid:e5d73ce0-ea22-4269-86c4-bbb1492d7c01</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/354a192f-1736-4f5f-a24e-9fbb54490dc8"/>
<published>2026-05-20T07:00:00Z</published>
<title>Utilities - MV</title>
<updated>2026-05-20T17:47:40.0748912Z</updated>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Sidewalk and curb ramp construction by Street Ops along Vernon Dr from 
Location: 
Schedule: Oct 27, 2025 - Jan 30, 2026</content>
<id>urn:uuid:dc390472-ac70-4ba7-9af3-f694775b79ad</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/582a9356-f5c0-40a5-82c5-a425d01709ee"/>
<published>2025-10-24T07:00:00Z</published>
<title>Vernon Dr - WITT Sidewalk</title>
<updated>2025-10-24T23:16:08.9949769Z</updated>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>City Crews will undertake street and signal upgrades at Victoria Dr and E 10th Ave intersection. The scope of the work will include tree removal, a new curb ramp, a new curb bulge, a concrete median, asphalt paving and traffic signal upgrades. This work aims to improve accessibility for pedestrians and cyclists crossing Victoria Dr at E 10th Ave safely and comfortably.
Location: Victoria Dr at E 10th Ave Intersection
Schedule: Jul 4, 2024 7:00 AM - Oct 4, 2024 6:00 PM</content>
<id>urn:uuid:7df9a7ef-b85d-4dbc-b248-18e4a6ddfd5c</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/4c708a7b-d9e3-481b-a3f7-075a23cb951d"/>
<published>2024-06-26T07:00:00Z</published>
<title>Victoria Drive and E 10th Ave Intersection Upgrades</title>
<updated>2024-06-26T17:47:51.8228866Z</updated>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Alder St - W 13th Av to W 15th Av       Jul 2026 - Aug 2026 
Birch St - W 12th Av to W 14th Av       Aug 2026 - Sep 2026
W 14th Av - Granville St to Alder St     Sep 2026 - Oct 2026   

Location:   
   
Schedule: Aug 5, 2026 - Oct 22, 2026; Weekdays; 7:00 AM - 3:00 PM</content>
<id>urn:uuid:d1987521-4e6a-48c7-aa38-76af39550646</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/36e847e9-5152-4900-9585-e1feb81c1e82"/>
<published>2026-01-21T08:00:00Z</published>
<title>W 14th Av,  Birch St, and Alder St</title>
<updated>2026-05-28T19:05:25.6153598Z</updated>
</entry>
<entry>
<category term="Road Closure"/>
<content>W 23rd Av - Cambie St to Yukon St                     Mar 2026 - Apr 2026   COMPLETED
Columbia St - W 23rd Av to W King Edward Av           Apr 2026 - May 2026  COMPLETED
W 23rd Av - Yukon St to Manitoba St                            May 2026   COMPLETED
Manitoba St - W 21st Av to W 26th Av                          June 2026 - Jul 2026  UNDER CONSTRUCTION
W 23rd Av - Columbia St to Manitoba St                       Jul 2026 - Aug 2026
Location:                        
Schedule: Mar 23, 2026 - Aug 4, 2026; Weekdays; 7:00 AM - 3:00 PM</content>
<id>urn:uuid:39f52160-95dd-4564-853a-ca1d3498565f</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/3f5f7853-e084-495b-bc4d-848587fa40f8"/>
<published>2025-02-13T08:00:00Z</published>
<title>W 23rd Av, Columbia St and Manitoba St</title>
<updated>2026-05-28T19:04:27.2894129Z</updated>
</entry>
<entry>
<category term="Under Construction"/>
<content>Sewer Upgrades, water upgrades, and street rehabilitation. 
End date extended to end of 2026 to account for pushing paving work to after World Cup window. Paving schedule TBC.


Location: Phase 1:
- W 50th Ave. from Quebec to Ontario
- Ontario St. from 50th Ave. to 49th Ave. 
- W 49th Ave. from Sophia St. to Cambie St.
(Phase 2 will continue North on Alberta St. in 2027 - see separate entry)


Schedule: Apr 1, 2025 - Dec 15, 2026</content>
<id>urn:uuid:bc7464e4-3bf9-44f9-ae91-71073640b31f</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/9f5e15ce-f10f-4965-9231-efed6174d208"/>
<published>2025-04-10T07:00:00Z</published>
<title>W 49th Ave. and Alberta St. Upgrades - Phase 1</title>
<updated>2026-06-01T17:56:57.7240846Z</updated>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Construction underway with expected completion end of June 2025. 
Location: W. Georgia Street Renewal - Cambie to Richards
Schedule: Mar 3, 2025 - Jun 30, 2025</content>
<id>urn:uuid:fef920f5-b8b3-412d-828f-421d81083fe2</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/1eddad61-3eea-470f-bf04-7908d057cee2"/>
<published>2025-06-05T07:00:00Z</published>
<title>W. Georgia Street Renewal - Cambie to Richards</title>
<updated>2025-06-05T19:29:42.9536433Z</updated>
</entry>
<entry>
<category term="Road Closure"/>
<content>Sewer Upgrades (Part of Alberta Trunk)

Alberta St. - W 49th to W 44th - Rolling full closure
Location: Alberta St. from W 49th Ave. to W 44th Ave. 
Schedule: Mar 1, 2026 - Dec 31, 2026</content>
<id>urn:uuid:42ae94ef-adf5-4e83-bf38-e786068a851b</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/34467bd9-f227-406a-960c-60ac6832b577"/>
<published>2025-04-09T07:00:00Z</published>
<title>W.49th Ave and Alberta St Upgrades - Phase 2</title>
<updated>2026-02-09T18:31:53.2188048Z</updated>
</entry>
<entry>
<category term="Road Closure"/>
<content>Full closure of 4000 block of Manitoba St from May Thursday 28, 2026 until further notice
Location: Manitoba St from W 23rd Av to W King Edward Av
Schedule: May 28, 2026 - May 28, 2027; Weekdays; 7:00 AM - 3:30 PM</content>
<id>urn:uuid:9d0fd410-2490-41f0-bd0e-ff0b8cabeb42</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/14a078dc-e00d-4cd5-b930-770b52c1513d"/>
<published>2026-06-01T07:00:00Z</published>
<title>Water Service of 4000 block of Manitoba St</title>
<updated>2026-06-01T21:11:50.9873033Z</updated>
</entry>
<entry>
<category term="Road Closure"/>
<content>Full closure of Ln S of W 23rd Av from May Thursday 28, 2026 until further notice
Location: Ln S of W 23rd Av from Columbia St to Manitoba St
Schedule: May 28, 2026 - Jun 28, 2027; Weekdays; 7:00 AM - 3:30 PM</content>
<id>urn:uuid:7a5fe50d-4304-48b7-9066-4b95fac29494</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/5e53d20a-c7df-4ecb-b828-7a4edfa97cfa"/>
<published>2026-06-01T07:00:00Z</published>
<title>Water Service of Ln S of W 23rd Av</title>
<updated>2026-06-01T20:57:26.8400675Z</updated>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Intermittent closures of Water St - Columbia to Richards/Cordova and intermittent lane closures on Cordova at Water on September 15th, 17th, 19th, 22nd
Location: Powell - Columbia to Carrall, Water - Carral to Cordova, Cordova/Richards/Water Intersection
Schedule: Sep 15, 2025 - Sep 22, 2025</content>
<id>urn:uuid:64f6d631-1351-499c-bc1c-ae4fe7beb8e3</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/171d4044-27f8-4921-a5bd-19bccfa917a3"/>
<published>2025-09-03T07:00:00Z</published>
<title>Water St - Winter Implementation</title>
<updated>2025-09-11T04:53:01.6889335Z</updated>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>The 2025 pilot period will run for 12 Sundays, ensuring enough days to meet the criteria of a pilot. The layout will be a full linear closure of Water St from Richards to Columbia, considering the benefits of a car-free experience, opportunities for new pilot learnings. 

Access to lane north of Water St will be maintained at Cambie and Abbott.
Location: Gastown
Water St from Columbia to Richards/Cordova
Schedule: Jun 15, 2025 - Sep 15, 2025</content>
<id>urn:uuid:0d1d8051-5b6a-4131-bac8-5c2bedaf9116</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/b58c24bd-f6ba-42fb-b023-bad123c7beee"/>
<published>2025-03-05T08:00:00Z</published>
<title>Weekend Pedestrian Zone - Gastown</title>
<updated>2025-12-14T02:00:53.584143Z</updated>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Full width arterial road surface rehabilitation. 
Location: 
Schedule: Apr 1, 2026 - Apr 12, 2026</content>
<id>urn:uuid:269c6506-b3f9-44f5-ab5a-e0f9bd80ed22</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/62b87d6a-ba15-4384-88a7-b61626bac5b6"/>
<published>2025-06-24T07:00:00Z</published>
<title>West Blvd, W. 41th to W. 51st - Street Rehabilitation </title>
<updated>2026-02-04T19:50:01.4372639Z</updated>
</entry>
<entry>
<category term="Upcoming Project"/>
<content>Phase 1 along West Pender St from ~50m east of Burrard St to Bute St: open cut construction between May-Nov 2024.  Heavy traffic impacts at the intersection of Burrard and West Pender Street for the first 4 weeks of the project.

Traffic Impact:
-Full closure on W Pender St from Thurlow St to Hornby St.
-No through-traffic except buses.
-Pedestrians access open.
Location: W Pender St and Burrard St Intersection.
W Pender St - Thurlow St to Hornby St

Schedule: May 6, 2024 - Jun 1, 2024</content>
<id>urn:uuid:e8c07506-84f0-4596-a572-04a384b451c5</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/cbfbad17-c7ad-4005-9c47-f5b07ab29d1b"/>
<published>2024-05-15T07:00:00Z</published>
<title>West Pender Street Upgrades - Phase 1 - Full Closure along Pender St</title>
<updated>2025-03-04T02:00:10.9329861Z</updated>
</entry>
<entry>
<category term="Under Construction"/>
<content>Crews will be site  to conduct Underground Utility Construction on behalf of the BC Hydro

Traffic Impacts: Travel Lane Closure at
- North side of 200 blk of W6th Ave from Alberta St to Columbia St,  B6-02-NPZ &amp; B6-02-07, (MON-SAT) 7:00am to 8:00pm, 
- West side of 2200 blk of Alberta St from W6th Ave to 20m South of W 6th Ave, B6-02-06 &amp; B6-02-SLZ   (MON-SAT) 7:00am to 8:00pm
- South side of 200 blk of W 6th Ave from Alberta St to 20m East of Alberta St  (24 HOURS CLOSURE)
- East side of 2200 blk of Alberta St from W 6th Ave to 20m South of W6th Ave (24 HOURS CLOSURE)

-WO# W02587691-01/460-U07-01351

EXTENSION to Jun 26, 2026
Location: B/S of 200 blk W6th Ave
B/S of 2200  blk Alberta St
Schedule: Recurring schedule as follows:
- May 1, 2026 - Jun 26, 2026; M - Sa; 7:00 AM - 8:00 PM
- May 1, 2026 - Jun 26, 2026; All days; 12:00 AM - 11:59 PM
</content>
<id>urn:uuid:e99e635a-8afa-44a4-a7a5-963b6dfd6d5f</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/13c78365-4869-4ed4-b51a-6ba8e7dedbc2"/>
<published>2026-04-24T07:00:00Z</published>
<title>[24 Hours] Underground Utility Construction - BC Hydro- 200 Blk of W 6th Ave - May 1-May 29, 2026 , EXTENSION to Jun 26</title>
<updated>2026-05-26T21:14:32.0075625Z</updated>
</entry>
<entry>
<category term="Road Closure"/>
<content>Crews will be onsite to conduct Utility Maintenance on behalf of Metro Vancouver

Traffic Impacts:  Total Road closure at
- East side of 2200-2300 blk of Yukon St from Lane North of West 7th Ave to West 8th Ave
Pay station: 79-23-08 (6 parking spots); Motorcycle Meter: 79-23-98;  Pay Station: 79-22-08 (6 parking spots)
- North side of 300 blk of West 7th Ave from Yukon St to Alberta St - Pay Station: B7-03-17 (6 spots); Pay Station: B7-03-05  (5 spots)
-  Both sides of 2200 blk of Albert St from Lane North of W7th Ave to W7th Ave  - Pay station: 78-33-18(4 spots)

WO# LP10291

Location: E/S of 2200-2300 Yukon St
N/S of 300 W 7th Ave
B/S of 2200 blk of Alberta St
Schedule: Jun 1, 2026 - Jun 13, 2026; M - Sa; 7:00 AM - 8:00 PM</content>
<id>urn:uuid:6a0e9c6d-c639-44f2-b692-f0ab31b3847d</id>
<link href="http://vanmapp1.vancouver.ca/roadahead/events/details/44329b58-498c-483e-bef1-3451683c5d0b"/>
<published>2026-05-28T07:00:00Z</published>
<title>[including SAT] Metro Vancouver - Utility Maintenance - 2200-2300 Yukon St &amp; W7th Ave - June 1 to 13, 2026</title>
<updated>2026-05-28T22:40:56.5374852Z</updated>
</entry>
</feed>
