City of Vancouver - Road Ahead - Event Details
Event:
Interim Cordova 2-Way: Richards to Gore
Location:
Cordova St. - Richards to Gore Powell St., Carrall to Gore Gore Ave., Powell to Cordova Main St., Powell to Cordova Water St., Richards to Columbia
Expected Schedule:
Apr 14, 2025 - May 31, 2025
Status:
Construction Planning
Description:
Cordova Street: Cordova Street will be converted to a 2-way street for the 2025 summer Water Street Pedestrian Pilot. Modifications will be carried out on Cordova including traffic signal installations, minor civil works, paint line eradication, surveying, line painting, concrete barrier and sign installations. Starting May 12, two northern lanes of Cordova Street will be closed to traffic as the reconfiguration of the street is finalized. Eastbound vehicle travel will be retained during this work. Once construction is completed in late May, Cordova Street will re-open as a two-way street for the summer. During this time, the City will be monitoring the performance of the street. Water Street: There will be intermittent impacts to Water Street in late May and early June 2025 for the installation of the 2025 Water Street Pedestrian Pilot. The work will include the installation of concrete barriers, line painting, planters, furniture installation and removing bollards. Water Street works will be removed in September 2025.
Posted:
Apr 16, 2025
Updated:
Jun 13, 2025 10:18 AM

City Contact:
Cheri Hessami
82021
Mike Dobud
604.871.6966
Rain Chen
604.358.2996