East 35th Ave Utility Upgrades (GTUUP)
Location:
E 35th Av from Main St. to 5100 Quebec St (Laneway) and 5100 / 5000-4900 Block of Main - Parking Lanes Closed, both sides
Expected Schedule:
Nov 13, 2025 - Mar 9, 2026
Status:
Design
Description:
Part of Growth Triggered Upgrades Program Spring 2026 Construction The high-level objective of the project is to replace the existing Combined Sewer System (CSS) with separated sanitary and storm lines to eliminate sewer overflow and prevent flooding by increasing sewer capacity along E 35th Avenue. The Project includes, 1) separation of approximately 75 m of combined sewer from east 35th Avenue from Main Street to Quebec Street 2) pavement restoration and markings associated with the sewer separation and associated road restorations. 3) mill and overlay at 50mm depth of the existing pavement that will not be included in the trench cut restoration.
Posted:
Jan 19, 2026
Updated:
Mar 2, 2026 11:28 AM

City Contact:
Eoin O'Connell
000.000.0000
Ian Rodriguez
604.873.7297