Highway 1 impacts between June 9 -13
- NB off-ramp at E 1st Ave closed (Exit 27)
- No left turn onto Highway 1 NB on-ramp from EB E 1st Ave
Expected Schedule:
Jun 9, 2025 - Oct 17, 2025
Status:
Design
Description:
Streets rehabilitation on E 1st Ave:
- Median restoration
- Road Repair and Paving
- New pedestrian crossing at on/off ramps to E 1st Ave
- Re/Re of sidewalk and curb/gutter
- New Catch Basin with a storm main extension