BC Hydro Utility Surveying on 200 Block of Terminal Avenue
Location:
North Side of 200 Block of Terminal Avenue From Main Street to 90m East of Station Street. South Side 200 Block Terminal Avenue From 22m East of Main Street to Station Street.
Expected Schedule:
Jun 23, 2025 10:00 PM - Jun 24, 2025 5:00 AM
Status:
Approved
Description:
Travel lane closure on the Both Sides of 200 Block of Terminal Avenue to facilitate utility surveying.