Project Information
www.broadwaysubway.ca
[email protected]
Contact the Project
24/7 Construction Line
Phone: 1-844-815-6114
Full Closures:
• Quebec St from E Broadway to the lane north
• Quebec St from E Broadway to the lane south
• Yukon St from W Broadway to the lane south
• Laneway south of Broadway from Ash to Cambie (at Cambie)
• Laurel St from W Broadway to the lane north (1 lane open to emergency services)
• Laurel St from W Broadway to the lane south (1 lane open to emergency services)
• Cypress St from W Broadway to the lane north (Duration ~3 months for TBM Extraction)
Although the majority of the work will be along Broadway, the detouring traffic will need to be accommodated on alternate routes:
- 12th Ave
- Great Northern Way/2nd/6th/4th
- Possibly 16th Ave as well, and in the False Creek area
More information can be found on our website at vancouver.ca/broadwaysubway or by contacting us at [email protected]